Efficient 3-D reliability analysis of the 530m high
Transcription
Efficient 3-D reliability analysis of the 530m high
Engineering Geology 195 (2015) 269–281 Contents lists available at ScienceDirect Engineering Geology journal homepage: www.elsevier.com/locate/enggeo Efficient 3-D reliability analysis of the 530 m high abutment slope at Jinping I Hydropower Station during construction Dian-Qing Li ⁎,a, Shui-Hua Jiang a,b, Zi-Jun Cao a, Chuang-Bing Zhou b, Xue-You Li c, Li-Min Zhang c a State Key Laboratory of Water Resources and Hydropower Engineering Science, Key Laboratory of Rock Mechanics in Hydraulic Structural Engineering, Ministry of Education, Wuhan University, 8 Donghu South Road, Wuhan 430072, PR China b School of Civil Engineering and Architecture, Nanchang University, Nanchang 330031, PR China c Department of Civil and Environmental Engineering, The Hong Kong University of Science and Technology, Clear Water Bay, Kowloon, Hong Kong a r t i c l e i n f o Article history: Received 4 January 2015 Received in revised form 10 June 2015 Accepted 14 June 2015 Available online 17 June 2015 Keywords: Jinping I Hydropower Station Rock slope Reliability analysis Slope stabilization Shear strength reduction Response surface a b s t r a c t Reliability-based slope stability analysis and design show promise, but few attempts have been made to study the 3-D reliability of high rock slopes. This paper aims to investigate the 3-D reliability of practical rock slopes and to explore the effects of reinforcement measures on slope reliability. A non-intrusive stochastic finite difference method is adopted to perform 3-D reliability analysis of high rock slopes, in which response surface functions are adopted to establish the explicit functions between the factors of safety for multiple slope failure modes and the significant random variables. The left abutment slope at Jinping I Hydropower Station in China is taken as a case study. A parametric sensitivity analysis is carried out to identify the significant uncertain parameters. The effects of two reinforcement measures, namely pre-stressed cables and shear-resistant concrete plugs, on the reliability of the rock slope during construction are highlighted. The results indicate that the 3-D reliability of complex rock slopes can be efficiently evaluated using a non-intrusive stochastic finite difference method. It provides an effective tool for solving 3-D reliability problems of complex rock slopes in practice. The combined support system with pre-stressed cables and three shear-resistant concrete plugs adopted in the Jinping I left abutment slope can effectively restrain the slope deformation and ensure the slope stability during construction. The disturbances induced by the excavation blasting during construction have a significant influence on the engineered slope reliability. © 2015 Elsevier B.V. All rights reserved. 1. Introduction It is widely recognized that enormous uncertainties are present in rock slope stability analysis owing to inadequate site characterization, inherent spatial variability, and measurement errors in geological and geotechnical parameters (Phoon and Kulhawy, 1999; Duncan, 2000; Baecher and Christian, 2003; Zhu and Zhang, 2013; Li et al., 2014, 2015a; Jiang et al., 2014a, 2015). High rock slopes are traditionally designed based on a global factor of safety which cannot account for these uncertainties, and the reliability levels of such important slopes are not known. Recently the design specifications for hydraulic structure design are in the transition from traditional design to reliability-based design (Duncan, 2000; Li et al., 2015b; Wang et al., 2015; Tang et al., 2015). The reliability-based approach, allowing the systematic and quantitative treatment of these uncertainties, has received an increasing attention in rock slope engineering. The reliability levels of such high rock slopes can be calibrated accordingly. ⁎ Corresponding author at: State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, 8 Donghu South Road, Wuhan 430072, PR China. E-mail address: dianqing@whu.edu.cn (D.-Q. Li). http://dx.doi.org/10.1016/j.enggeo.2015.06.007 0013-7952/© 2015 Elsevier B.V. All rights reserved. In the literature, many investigators studied the reliability of rock slopes. For example, Low (2007) developed a practical EXCEL-based First Order Reliability Method (FORM) procedure to analyze the reliability of Sau Mau Ping slope. Park et al. (2012) adopted the point estimate method to investigate the reliability of a rock slope in Gunwi-gun, Korea. Rathod and Rao (2012) performed reliability analyses for rock slope stability in the Subansiri Lower hydroelectric project. Lee et al. (2011) and Tang et al. (2012) proposed a knowledge-based clustered partitioning approach for the reliability analysis of rock slopes. Shen and Abbas (2013) developed a random set distinct element method for the reliability analysis of rock slopes. Vatanpour et al. (2014) quantified the influence of uncertainties of effective geotechnical parameters on rock slope reliability in north-east Iran. Wang et al. (2015) applied a reliability-based Robust Geotechnical Design (RGD) methodology to the design of rock bolts for slope stabilization. Zheng et al. (2015) developed a probabilistic block theory analysis procedure for the stability analysis of a rock slope at a hydropower station in China. The aforementioned studies on the reliability analyses of rock slopes mainly focus on 2-D plane failure problems (Li et al., 2011; Rathod and Rao, 2012; Tang et al., 2012; Wang et al., 2015) or wedge failure problems (Low, 2007; Li et al., 2009; Lee et al., 2011; Park et al., 2012; Vatanpour et al., 2014). Few attempts have been made to evaluate the 270 D.-Q. Li et al. / Engineering Geology 195 (2015) 269–281 3-D reliability of practical rock slopes, especially for a rock slope with a large height (e.g., higher than 500 m). It is well known that a 2-D plane model cannot consider the anti-shear effect of both side sliding surfaces or the joint reinforced effect of a stereoscopic reinforced system in a practical rock slope. The height of slopes with wedge failure modes studied in the literature is really small (around 20 m) in relation to that of practical rock slopes. Thus, it is of great significance to perform 3-D reliability analysis of practical rock slopes which could be more accurate and reasonable in slope safety evaluation. Additionally, deterministic analyses of 3-D slope stability could be very complex and time-consuming, because the factor of safety cannot be expressed as an explicit function of the input parameters even though a limit equilibrium method is utilized to calculate the factor of safety. The resulting performance function for slope reliability analysis is an implicit function. Theoretically, the direct Monte-Carlo Simulation (MCS) can be used for such a purpose, but it could be computationally prohibitive for 3-D slope reliability analysis. Therefore, an efficient reliability method should be developed for the 3-D reliability analysis of complex rock slopes. On the other hand, the reinforcement measures such as pre-stressed cables, anchor bolts, and shear-resistant concrete plugs have been widely used to improve the rock slope stability in hydroelectricity engineering projects such as Jinping I and Dagangshan Hydropower Stations (Song et al., 2010; Zheng et al., 2012; Qi et al., 2013). However, some imperfections in installation, corrosion protection, workmanship, human errors, and inadequate support may occur in engineering practice, which may induce the failure of anchored rock slopes (Jiang et al., 2014b). For instance, the sudden landslides of the left bank slope at Manwan Hydropower Station in 1989 and the failure of the right sea-route outlet slope at Longtan Hydropower Station in 2002 were mainly caused by inadequate supports of the slope after the excavation blasting at the slope toe (Tang and Gao, 2008). A major reason for the 2010 slope failure on Freeway No. 3 in Taiwan was the failure of the anchor system induced by corrosion (Lee et al., 2013; Wang et al., 2013). The effect of the reinforced system during the slope excavation on the reliability of practical 3-D slopes has not been explored in the literature. The objective of this study is to investigate the 3-D reliability of practical rock slopes and to explore the effects of two reinforcement measures, namely the pre-stressed cables and shear-resistant concrete plugs, on the deformation, stability and reliability of engineered rock slopes. First, a parametric sensitivity study is performed to identify the important uncertain parameters that have a significant effect on slope stability. Then, a non-intrusive stochastic finite difference method (NISFDM) is presented and implemented step by step. Thereafter, deformation analysis and deterministic stability analysis of the 530 m high left abutment slope at Jinping I Hydropower Station during construction using the strength reduction method are carried out to validate the numerical model. Finally, the reliability of the practical rock slope is evaluated using the NISFDM. The disturbance effects induced by the excavation blasting on the slope reliability are also highlighted. 2. A non-intrusive stochastic finite difference method It is widely accepted that the evaluation of 3-D reliability of rock slopes could be time consuming. To efficiently evaluate the reliability of complex 3-D rock slopes, a non-intrusive stochastic finite difference method (NISFDM) is adopted for this purpose. 2.1. Parametric sensitivity analysis Before applying the NISFDM, a parametric sensitivity analysis is carried out to reduce the number of basic random variables involved in slope reliability analysis because the computational cost for deterministic analyses of 3-D slope stability could be very large. For example, more than 30 h are required to perform each deterministic finite difference analysis of the reinforced slope stability studied in this paper on a desktop computer with 4 GB RAM and four Intel Core i3 CPU clocked at 3.3 GHz. Through the parametric sensitivity analysis, the important random variables significantly affecting the slope stability can be identified and the insignificant random variables are treated as deterministic quantities. In this way, the computational effort of deterministic slope stability analyses in reliability analysis can be reduced substantially. A simple parametric sensitivity analysis method proposed by Shen and Abbas (2013) is used. The sensitivity ratio of the ith random variable Xi is given by ηSR;i h i. f X U −f X L f ðX Þ i i . ¼ X X Ui −X Li ð1Þ where i = 1, 2, ⋯, n, and n is the number of random variables; f (X) is the output response of a rock slope such as stress or strain, displacement, and factor of safety; X is the vector of the mean values; X iU and X iL are the vectors of input samples at the mean value plus and minus two standard deviations for the ith random variable, respectively; f (XiU) or f (XiL) is the slope output response when the value of the ith random variable is taken as XiU or XiL while the rest of the random variables remain at their mean values. Then, the relative sensitivity α (Xi) of the ith random variable is obtained as α ðX i Þ ¼ ηSR;i : n X ηSR;i ð2Þ i¼1 The deterministic slope stability analyses will be conducted once for the mean value and 2n times again. A total of (2n + 1) deterministic finite difference analyses are required to perform the parametric sensitivity analysis for the n random variables. 2.2. Construction of explicit performance function Having identified the significant random variables, the next step is to construct explicit functions between the factors of safety and the significant random variables. In most cases, the factor of safety of a 3-D rock slope cannot be expressed as an explicit function of the basic random variables even though a limit equilibrium method is utilized to calculate the factor of safety. The response surface function (RSF) based on a quadratic polynomial chaos expansion is often used to explicitly express the factor of safety in terms of the basic random variables (Xu and Low, 2006; Zhang et al., 2011). As reported in the literature (Bucher and Bourgund, 1990; Gomes and Awruch, 2004), the accuracy of reliability results estimated from the response surface method is often improved by increasing the number of terms (including cross terms) of the quadratic polynomials, but a greater number of performance function evaluations are needed with respect to the quadratic polynomials without cross terms. Thus, to significantly improve the computational efficiency of NISFDM, a single or multiple RSFs based on a quadratic polynomial chaos expansion without cross terms are adopted to establish the explicit functions between the factors of safety and the significant random variables (e.g., Xu and Low, 2006; Zhang et al., 2011; Li et al., 2015c), FS j ðX Þ ¼ a1; j þ n X i¼1 bi; j X i þ n X ci; j X 2i ð3Þ i¼1 where FSj(X) is the factor of safety for the jth failure mode, j = 1, 2, ⋯, Ns, in which Ns is the number of the slope failure modes; X = (X1, …, Xi, …, Xn)T is the vector of input random variables in the physical space; and aj = (a1, j, b1, j, …, bn, j, c1, j, …, cn, j)T is the vector of (2n + 1) unknown coefficients. One key step of the NISFDM is the determination of the unknown coefficients of the polynomial chaos expansion in Eq. (3) (Jiang et al., 2014a, 2015). A sample design method with (2n + 1) combinations D.-Q. Li et al. / Engineering Geology 195 (2015) 269–281 where min j¼1;2;⋯;Ns 271 FS j ðÞ is the minimal factor of safety associated with multiple (i.e., Ns) failure modes. Based on Eq. (4), a direct MCS with a total of NMCS samples is performed to calculate the probability of slope failure. In this case the evaluation of the factor of safety only involves the evaluation of the algebraic expression in Eq. (3). Such a process does not require deterministic slope stability analyses again because the RSFs between the factors of safety and the basic random variables have been constructed. In this way, the computational cost for each random sample in the MCS is reduced substantially. 2.3. Implementation procedure To facilitate the understanding of the NISFDM, details of each step of the implementation procedure are summarized as below: Fig. 1. The Jinping I left abutment slope after full excavation and support. proposed by Bucher and Bourgund (1990) is adopted to determine the unknown coefficients in Eq. (3). The factor of safety for each failure mode is first evaluated at the following (2n + 1) sampling points: n o n o n o μ X 1 ; μ X 2 ; ⋯; μ X n , μ X 1 kσ X 1 ; μ X 2 ; ⋯; μ X n , μ X 1 ; μ X 2 kσ X 2 ; ⋯; μ X n , n o ⋯, and μ X 1 ; μ X 2 ; ⋯; μ X n kσ X n , where k is a sampling factor for generating the sampling points; μ X i and σ X i are the mean and standard deviation of the ith random variable Xi, respectively. In this way, a system of linear algebraic equations can be established at the selected sampling points in terms of the unknown coefficients, a ¼ ða1 ; a2 ; …; aNs ÞT . Then, a regression based approach (e.g., Li et al., 2011) is used to compute the unknown coefficients a. After that, the quadratic RSFs are obtained and taken as the surrogate model between the factors of safety and the basic random variables. In engineering practice, blasting is often used for the excavation of rock masses (e.g., Song et al., 2010; Zhou et al., 2011; Li et al., 2012). The disturbance induced by rock blasting is significant during the slope construction process especially for the high rock slopes (Zhou et al., 2011). However, the disturbance effect on the overall slope stability is often not directly incorporated in the numerical model, which will lead to an unconservative slope safety assessment. As pointed out by Song et al. (2010), the disturbance effect of the left abutment slope at Jinping I Hydropower Station is mainly concentrated in the surrounding regions of the spandrel groove and the excavated slope. The disturbance effect resulting from the full excavation of the slope can be approximately taken into consideration through dividing the factor of safety of the slope under the natural condition by a factor of 1.05. To incorporate the disturbance effect induced by the excavation blasting into the slope reliability analysis, a reduction factor, K, is introduced into the performance function, which is larger than 1.0. Then, an explicit performance function can be expressed as GðX Þ ¼ min j¼1;2;⋯;N s FS j ðX Þ=K−1:0 ð4Þ (1) Identify input random variables and determine their statistics such as means, coefficients of variation (COVs), marginal distributions and cross-correlation coefficients among the input random variables. (2) Construct the slope stability model including excavated bodies, establish the finite difference grid, define the boundary conditions, failure criteria, constitutive model of rock masses and weak structural features, and design slope support schemes. (3) Perform a parametric sensitivity analysis to identify the significant random variables. The factor of safety of the slope is calculated at the (2n + 1) samples using the finite difference strength reduction method that is widely employed to evaluate slope stability. (4) Construct a single or multiple quadratic RSFs between the factors of safety and the significant random variables. Establish an explicit performance function for slope reliability analysis accounting for the disturbance effects as discussed in Section 2.2. (5) Perform MCS to generate a random sample matrix with dimensions of n × NMCS in the independent standard normal space. Then NMCS realizations of random samples in the physical space are obtained using an isoprobabilistic transformation (Li et al., 2011). The probability of slope failure is obtained by substituting NMCS realizations of the physical samples into the explicit performance function in Eq. (4). Note that the NISFDM is an effective non-intrusive reliability analysis method that does not require the user to modify existing deterministic finite difference codes, which are treated as “black boxes”. The finite difference strength reduction method is used for the deterministic analyses that are decoupled from the probabilistic analysis. In contrast, the existing deterministic finite difference (finite element) codes need to be thoroughly modified for an intrusive reliability analysis method (Stefanou, 2009). Additionally, it should be mentioned that the stochastic finite difference method is an intrusive reliability analysis method, which is completely different from the random field method although the former can incorporate the latter for modeling spatial variability of rock and soil properties. Table 1 Geomechanical parameters for rock masses. No. Rock mass γ (kN/m3) v c (MPa) φ (°) 1 Sandy slate in toppling deformation zone Strongly unloading sandy slate Weakly unloading sandy slate Thick-bedded sandy slate Strongly unloading marble Weakly unloading marble Second block marble Fresh sandy slate or marble Reinforced concrete 27 1.0 0.30 0.4 30.96 27 27 27 27 27 27 27 27 2.0 3.0 9.0 2.0 4.0 11.0 21.0 21.0 0.28 0.35 0.30 0.30 0.27 0.25 0.3 0.167 0.6 0.9 1.5 0.6 0.9 1.5 2.0 1.0 34.99 45.57 46.94 34.99 45.57 46.94 53.47 45.0 2 3 4 5 6 7 8 9 E (GPa) 272 D.-Q. Li et al. / Engineering Geology 195 (2015) 269–281 Table 2 Geomechanical parameters for structural planes. No. Structural planes γ (kN/m3) E (GPa) v c (MPa) φ (°) 1 2 Fault f42-9 Lamprophyre dike X (above elevation 1680 m) Lamprophyre dike X (below elevation 1680 m) Deep fracture SL44-1 Fault f2, f5, f8 27 27 0.375 1.00 0.35 0.20 0.02 0.02 16.71 16.71 27 3.00 0.30 0.45 27.02 27 27 1.25 0.45 0.35 0.28 0.10 0.02 24.23 16.71 3 4 5 3. Engineering background 3.1. Slope overview The Jinping I Hydropower Station is located in a deep valley of the Yalong River in south-west China (e.g., Xu et al., 2009, 2011; Qi et al., 2010, 2012; Song et al., 2010; Huang et al., 2010; Zhou et al., 2011). A 305 m high double curvature arch dam was constructed in a typical V-shaped valley. The left abutment slope at Jinping I Hydropower Station is one of the engineered rock slopes with the largest excavation scale in rock engineering, which contains the following three main features: (1) A large-scale model range with the relative height difference of the natural slope reaching 1000–1700 m, the dip angle varying from 55° to 70° near elevation 1850 m, the total excavation height being approximately 530 m (from elevations 2110 m to 1580 m), the maximum excavation width being up to 350 m, and the total excavation volume of materials reaching 5.50 million m3. (2) Very complicated geological structures in this area such as a V-shaped deep valley, high geo-stresses, strong unloading induced stress releases, complex engineering and technical conditions, inter-layer extrusion zones and deep fractures (Chengdu Hydroelectric Investigation and Design Institute, 2003; Xu et al., 2011). Furthermore, the large number of deep fractures and faults, such as faults f42-9, f5, f8 and lamprophyre dike X, could form huge latent unstable blocks that impact the slope stability. (3) The use of a complex physical–mechanical model introduces complications into deriving the numerical solution of the factor of safety. The Jinping I left abutment slope after full excavation and support is shown in Fig. 1. These special features are rare in other hydropower projects in the world, which make it very challenging for the stability analysis of the particular rock slope. Recently, 2-D/3-D stability analysis of the slope has been performed substantially with numerical methods such as the limit equilibrium method (LEM) (Zhou et al., 2006; Song et al., 2010), the finite element method (FEM) (Xu et al., 2011; Liu et al., 2013), the strength reduction method (SRM) (Xu et al., 2009; Qi et al., 2010, 2012) and block theory (Huang et al., 2010; Sun et al., 2015). However, to our best knowledge, 2-D reliability of the particular rock slope based on limit equilibrium analyses was only studied by Tang et al. (2012), and 3-D reliability of this slope taking into account the uncertainty in the shear strength of rock masses and structural planes has never been investigated. As reported in the literature (e.g., Xu et al., 2009; Huang et al., 2010; Song et al., 2010; Zhou et al., 2011; Qi et al., 2012), the overall stability of the left abutment slope is mainly controlled by a deformed and cracked rock mass, as concluded from the spatial distribution and intersections of the weak structural features in the left abutment slope. Thus, the wedge failure mode of the engineered slope below elevation 2110 m is selected as the case study for the 3-D reliability analysis in this paper. The toppling failure mode of the natural slope above elevation 2110 m is beyond the scope of the present study. 3.2. Geomechanical parameters of rock masses and structural planes It is very difficult to accurately determine the geomechanical parameters of a rock mass since it may exhibit extremely complex characteristics due to long-term geological processes. In geotechnical practice, the geomechanical parameters of a rock mass used in the numerical analysis Strongly unloading sandy slate Strongly unloading sandy slate Sandy slate in toppling deformation zone Sandy slate in toppling deformation zone Weakly unloading sandy slate Fresh sandy slate or marble Thick-bedded sandy slate Second block marble Strongly unloading marble Lamprophyre dike X (below elevation 1680 m) Weakly unloading sandy slate Weakly unloading marble Faults f2, f5, f8 Lamprophyre dike X (above elevation 1680 m) Lamprophyre dike X (above elevation 1680 m) Fault f42-9 Fault f42-9 Deep fracture SL44-1 Strongly unloading sandy slate Lamprophyre dike X (above elevation 1680 m) Z Y O X Fig. 2. Schematic diagram of 3D finite difference model of the left abutment slope. D.-Q. Li et al. / Engineering Geology 195 (2015) 269–281 273 Table 3 Basic mechanical and geometric parameters of the pre-stressed cables. Cable type Pullout load Young's modulus Strand yield strength Number of strands Nominal cross-sectional area Hole diameter Cable diameter Anchored part length (mm) (mm) (m) (kN) of strand (GPa) (MPa) (mm2) DKDF-2000 2000 DKDF-3000 3000 180 180 1860 1860 12ϕ15.24 mm 19ϕ15.24 mm of slope stability are usually derived from in-situ tests and/or laboratory tests such as the direct shear test and triaxial test supplemented with engineering judgment from similar projects (e.g., Miranda et al., 2009; Xu et al., 2011). According to the geological investigation conducted by Chengdu Hydroelectric Investigation and Design Institute (2003), the geomechanical parameters of rock masses and structural planes are summarized in Tables 1 and 2, respectively. These parameters are used for the deterministic slope stability analysis. 3.3. Finite difference model The variation of stress field within the left abutment slope during the construction period is simulated using a finite difference model in this study. To achieve a realistic evaluation of the stress field, the boundary effect on studied area should be minimized. Therefore, the analysis domain is selected as follows (Xu et al., 2009; Qi et al, 2012): 495 m in width from 205 m at the upstream of section II-II to 10 m at the downstream of section I-I, 1200 m in length in the direction perpendicular to the river from the centerline of river to the deep internal part of the slope and 1500 m in height from elevations 1300 to 2800 m. A three-dimensional finite difference model is constructed in a Cartesian coordinate system as shown in Fig. 2, in which the X-axis is along the river, the Y-axis is perpendicular to the river, and the Z-axis trends upwards. The finite difference grid consists of 75,647 grid points. The rock masses and weak structural features are modeled by 46,875 eight-node hexahedral zones, 773 six-node wedge zones and 135,754 four-node tetrahedron zones. The materials of the rock masses and structural planes have been represented by different colors. Following Zienkiewicz et al. (1975) and Qi et al. (2012), a Mohr–Coulomb failure criterion is adopted to represent the stress–strain behavior of the rock masses and weak structural features. Movements are allowed vertically on four lateral boundaries in the directions along the river and perpendicular to the river, while restraint is imposed in three directions on the base boundary. Although faults f42-9, f5, f8, f2, deep fractures SL44-1–SL44-9 and lamprophyre dike X are usually treated as interfaces between the rock blocks, they are modeled as special zones with assigned shear strength rather than as interfaces for simplicity. Additionally, the topography, stratigraphic boundaries, unloading or weathering boundaries and the excavation face are modeled properly. The excavation process of the left abutment slope lasted for more than 3 years, started in September 2005, advanced to the dam crest 2188.92 3465.79 ϕ 140 ϕ 165 ϕ 90 ϕ 110 12 12 (at elevation 1885 m) in June 2007 and the concrete cushion foundation platform (at elevation 1730 m) in August 2008. The slope excavation was completed when the dam foundation pit (at elevation 1580 m) was excavated in August 2009. The slope excavation process is simulated using FLAC3D (Itasca, 2007), which includes 25 steps. Step 0 represents the stability of the natural slope. The slope is then cut to elevations 1960 m, 1885 m, 1855 m, 1810 m and 1780 m corresponding to steps 3, 5, 7, 10 and 12, respectively. Finally, the slope is excavated to elevation 1580 m in step 25. The materials that are to be excavated at various stages of the excavations are represented using the null model available in FLAC3D (Itasca, 2007). To control the sustained deformation of the slope and ensure the stability of the crushed rock masses within the shallow slope, a large number of pre-stressed cables with design pullout loads of 2000 and 3000 kN and lengths of 40, 60 and 80 m are installed. For all the prestressed cables, the length of the anchored part is 12 m, the inclination is 8°, and the horizontal and vertical spacings are 4 m × 4 m or 6 m × 6 m, respectively. A total of 2815 and 930 bunches of prestressed cables are simulated above and below elevation 1885 m, respectively. The basic mechanical and geometric parameters of the pre-stressed cables are listed in Table 3. An arrangement of the pre-stressed cables with the design pullout load of 3000 kN is shown in Fig. 3. The cable elements in FLAC3D are utilized to simulate the stabilization effects of the pre-stressed cables. For illustration, the code for a bunch of pre-stressed cable of 2000 kN is programmed as “sel cable id=1 property emod 180e9 yt 4.071e6 xcarea 6.3585e-3 gr_coh 1.0e6 gr_fric 45.0 gr_k 15e9 gr_per 0.4396” in FISH language, in which emod, yt, xcarea, gr_coh, gr_fric, gr_k, and gr_per denote the Young's modulus of a strand (Pa), the tensile yield strength of a cable (N), the cross-sectional area of a cable (m2), the cohesion of grout (N/m), the friction angle of grout (°), the stiffness of grout (Pa) and the exposed perimeter of grout (m), respectively. To further improve the slope stability, three shear-resistant concrete plugs (tunnels excavated and then backfilled with reinforced concrete) with a size of 9 m (width) × 10 m (height) were constructed at elevations 1883 m, 1860 m and 1834 m, respectively, to cut through the crush zones of fault f42-9. The corresponding lengths are 110, 90 and 78 m, respectively. Fig. 4 shows the locations of the three shear-resistant concrete plugs and the interrelation with the boundaries of the deformed and cracked rock mass which include the downstream fault f42-9 as the main slip surface, the deep fracture SL44-1 as the upstream cut surface, Fig. 3. Sketch of the arrangement for pre-stressed cables of 3000 kN. 274 D.-Q. Li et al. / Engineering Geology 195 (2015) 269–281 the Lamprophyre dike X forming the rear boundary and the fault f5 forming the excavation face. The stabilization and shear-resistant effects of the three shear-resistant concrete plugs are modeled in FLAC3D by using the entity elements assigned with the shear strength of reinforced concrete as shown in Table 1. It should be pointed out here that there inevitably exists model bias between the FLAC3D model and the field condition, which may have a significant influence in the slope reliability analysis. The model bias should be reduced by calibrating the numerical model to reflect the field condition by the following means: Firstly, collect as much data as possible relating to the specific field condition such as insitu test data, exploration information about rock mass structures, on-site construction condition, reinforcement and seepage control measures, and incorporate these data into the establishment of the numerical model. Furthermore, determine proper boundary conditions and constitutive models of the rock masses and weak structural features in accordance with the field condition. Finally, collect some monitoring data including stresses, strains, displacements and pore water pressures in different areas of the studied slope to validate the numerical model. creep, performance degradation of the reinforced system and so on as the in-service time of the high rock slope goes on. 3.5. Deterministic stability analysis of rock slope using strength reduction method The finite difference strength reduction method (SRM) (e.g., Zienkiewicz et al., 1975; Qi et al., 2010) can not only account for the effect of the stress–strain behavior of rock masses and weak structural features, but also simulate the progressive failure path of a slope without the assumption of the shape and location of the failure surface in advance. Thus, the global factor of safety of the rock slope during construction is herein evaluated by the SRM based on a bisection method in FLAC3D (Xu et al., 2009; Qi et al., 2012). The convergence criterion for the strength reduction analysis is the nodal unbalanced 3.4. Deformation analysis of rock slope during construction As mentioned earlier, the reinforced system of the left abutment slope is mainly composed of the pre-stressed cables and three shear-resistant concrete plugs at elevations 1883 m, 1860 m and 1834 m, respectively, as shown in Fig. 5. To account for the effect of the reinforced system on the deformation and stability of the rock slope during construction, four reinforcement conditions during slope excavation are considered as follows: (1) Combined support with pre-stressed cables and three shear-resistant concrete plugs; (2) The pre-stressed cables fail and only the three shear-resistant concrete plugs perform well; (3) The three shear-resistant concrete plugs fail and only the pre-stressed cables perform well; (4) No reinforcements. To evaluate the stabilization effects of pre-stressed cables and shearresistant concrete plugs on slope stability, the displacements at representative points, factors of safety, and probabilities of slope failure during construction are taken as indices. Firstly, the horizontal displacements perpendicular to the river of two representative points at the slope surface, TPL14 (at elevation 1945 m) and TPL10 (at elevation 1990 m), which are located in the region of the deformed and cracked rock mass are analyzed. Fig. 6(a) and (b) show the variations of the horizontal displacements at points TPL14 and TPL10 under various reinforcement conditions, respectively. The time–history curves of the monitoring horizontal displacements at these two points are also plotted in Fig. 6. The starting monitoring dates for these two points were both January 24th, 2008. As far as point TPL14 is concerned, the horizontal displacement is only 10.5 mm when the pre-stressed cables and three shear-resistant concrete plugs are supported after full excavation of the slope, which is approximately consistent with the monitoring value of 12.5 mm. The horizontal displacement will increase to 18.3 mm (or 27.7 mm) if all pre-stressed cables (or the three shear-resistant concrete plugs) fail due to some causes. It will drastically increase to 80.35 mm if no stabilization of the slope is provided during excavation. These results indicate that the combined stabilization measures with the pre-stressed cables and three shear-resistant concrete plugs in the left abutment slope are very effective in controlling the slope deformation. Compared with the pre-stressed cables, the three shear-resistant concrete plugs can restrain the slope deformation more effectively. Additionally, the slope deformation induced by the slope excavation can be captured in the numerical model, except that a fall back of the horizontal displacement near the end of 2008 cannot be effectively reflected. This can be attributed to the fact that the numerical model cannot accurately model the complex structural features within the slope and on-site construction conditions. The uncertainties in input parameters also cannot be fully taken into account in the numerical analysis. Additionally, a continual steady increase of monitoring displacements after full excavation of the slope can be observed in Fig. 6, which can be attributed to rock Location of the deformed and cracked rock mass (a) Location of the deformed and cracked rock mass Lamprophyre dike X Deep crack SL44-1 Fault f42-9 Shear-resistant concrete plug at elevation of 1883 m Shear-resistant concrete plug at elevation of 1860 m Shear-resistant concrete plug at elevation of 1834 m (b) Layout of the deformed and cracked rock mass Fig. 4. Location and layout of three shear-resistant concrete plugs and boundaries of the deformed and cracked rock mass. D.-Q. Li et al. / Engineering Geology 195 (2015) 269–281 275 the natural slope and the slope excavated to elevations 1960 m, 1885 m, 1855 m, 1810 m, 1780 m and 1580 m, respectively. For the case of the excavated slope without reinforcements in Fig. 7, the factor of safety almost remains the same at about 1.5 before the slope is excavated to elevation 1885 m in June 2007. The reason is that the marble outside the faults f5 force: the sum of forces acting on a node from its neighboring elements. A simulation is considered to have converged when the ratio of the nodal unbalanced forces is less than 10−5 under a specified calculation step (e.g., 5500). Fig. 7 compares the factors of safety of the rock slope under various reinforcement conditions. The seven points in each curve denote Excavation and support area (a) Excavation and support area 2815 bunches of pre-stressed cables above elevation 1885 m Shear-resistant concrete plug at elevation 1883 m Shear-resistant concrete plug at elevation 1860 m Shear-resistant concrete plug at elevation 1834 m 930 bunches of pre-stressed cables below elevation 1885 m (b) Arrangement of pre-stressed cables and three shear-resistant concrete plugs Fig. 5. Layout of the reinforced system of the left abutment slope. 276 D.-Q. Li et al. / Engineering Geology 195 (2015) 269–281 Fig. 6. Variation of horizontal displacement perpendicular to the river during construction. 1.55 2200 1.50 2100 2000 1.40 1900 1.35 Excavation process line 1800 1.30 1.25 1.20 1.15 2005/9/30 1700 Support with cables and shear-resistant plugs Only three shear-resistant plugs perform well Only pre-stressed cables perform well No reinforcements 2006/3/30 2006/9/30 2007/3/30 2007/9/30 1600 2008/3/30 2008/9/30 Excavation date Fig. 7. Variation of factor of safety of slope during construction. 2009/3/30 1500 2009/9/30 Excavation elevation /m Factor of safety 1.45 D.-Q. Li et al. / Engineering Geology 195 (2015) 269–281 Table 4 Results of 3D slope stability analysis. Methods Nature Support after No reinforcements Source slope full excavation after full excavation SRM SRM SRM LEM FEM Block theory Block theory 1.483 1.277 1.45 1.202 1.35 1.413 1.56 1.405 1.385 1.35 – 1.36 – 1.43 1.186 1.152 1.05 1.130 – – 1.104 This study Xu et al. (2009) Qi et al. (2012) Zhou et al. (2006) Liu et al. (2013) Huang et al. (2010) Sun et al. (2015) The symbols “–” denote that the results are not available. Contour of Shear Strain Increment Plane: on Magfac = 0.000e+000 Gradient Calculation 3.5458e-005 to 2.0000e-002 2.0000e-002 to 4.0000e-002 4.0000e-002 to 6.0000e-002 6.0000e-002 to 8.0000e-002 8.0000e-002 to 1.0000e-001 1.0000e-001 to 1.2000e-001 1.2000e-001 to 1.4000e-001 1.4000e-001 to 1.6000e-001 1.6000e-001 to 1.8000e-001 1.8000e-001 to 1.9033e-001 Interval = 2.0e-002 277 and f8 could support the deformed and cracked rock mass like a “rock wall”, and the excavation process plays a role in reducing the surcharge loads and improving the slope stability. When the slope is excavated to elevation 1810 m in March 2008, the factor of safety decreases to 1.264 due to gradual exposure of the boundaries of the deformed and cracked rock mass as the excavation is proceeding. When the slope is excavated to elevation 1780 m in May 2008, the fault f42-9 is fully exposed at the excavation face. Consequently, the factor of safety dramatically decreases to 1.186, which is below the minimal factor of safety of 1.25–1.3 for the slope in a very important project under the permanent condition specified by the Design Specification for the Slope in Water Conservancy Contour of Shear Strain Increment Plane: on Magfac = 0.000e+000 Gradient Calculation 2.2621e-005 to 2.5000e-002 2.5000e-002 to 5.0000e-002 5.0000e-002 to 7.5000e-002 7.5000e-002 to 1.0000e-001 1.0000e-001 to 1.2500e-001 1.2500e-001 to 1.5000e-001 1.5000e-001 to 1.7500e-001 1.7500e-001 to 2.0000e-001 2.0000e-001 to 2.2160e-001 Interval = 2.5e-002 Fig. 8. Contours of shear strain increment for the slope excavated to elevation 1780 m. 278 D.-Q. Li et al. / Engineering Geology 195 (2015) 269–281 Fig. 8 (continued). and Hydropower Project (DLT5353-2006) (Song et al., 2010). These results indicate that the slope stability cannot be guaranteed in this case. The status of slope safety will be adversely impacted if other factors such as excavation disturbances and unloading, rainfall, and earthquakes are also incorporated. Therefore, some reinforcement measures are urgently taken to ensure the slope safety. As discussed earlier, the combined support using pre-stressed cables and three shear-resistant concrete plugs can be used to reinforce the rock slope. In this case, the factor of safety of the excavated slope increases to 1.498, which indicates that the combined stabilization measures can effectively ensure the Jinping I left abutment slope stability. Alternatively, if only the three shear-resistant concrete plugs or only the pre-stressed cables perform well, the factor of safety of the excavated slope will decrease to 1.342 or 1.306, respectively. It can be observed that the three shear-resistant concrete plugs also have a more significant effect on the slope stability in comparison with the pre-stressed cables. Table 4 compares the results of 3-D slope stability analyses using the SRM, LEM, FEM and block theory. The results obtained from this study are consistent with those reported in the literature (e.g., Zhou et al., 2006; Xu et al., 2009; Qi et al., 2012; Huang et al., 2010; Liu et al., 2013; Sun et al., 2015). These results further demonstrate the validity of the 3-D numerical model in this study. Fig. 8 presents the contours of shear strain increments for a representative cross section II1-II1 of the left abutment slope under four different reinforcement conditions when the slope is excavated to elevation 1780 m in May 2008. The failure path of the rock slope can be approximately determined from the shear strain increments (Zienkiewicz et al., 1975; Xu et al., 2009). As expected, the sliding surface mainly coincides with the bottom of the deformed and cracked rock mass. Only a single shallow failure mode is observed in Fig. 8. The combined stabilization measures taken in the Jinping I left abutment slope can effectively control the development of the plastic zones of the slope. In addition, the plastic zones do not cut through the rock masses when the pre-stressed cables perform well. 4. Three-dimensional reliability analysis of rock slope 4.1. Statistics of input geomechanical parameters To evaluate slope reliability, the statistical parameters of the uncertain geomechanical parameters should be determined first. They are often derived from in-situ tests, laboratory tests and expert experience based on similar projects in the study area. Ideally, the parameters should be determined based on sufficient laboratory or field tests. In this study, the ranges of the COVs of shear strength parameters are adopted based on the values reported in the literature (e.g., Phoon and Kulhawy, 1999; Baecher and Christian, 2003; Tang et al., 2012). The statistics of the basic random variables are summarized in Table 5. Following Hoek (1998) and Tang et al. (2012), lognormal distributions are used to model the distributions of geomechanical properties to avoid negative values. 4.2. Reliability analysis results A parametric sensitivity study is first carried out to identify uncertain parameters which have a significant effect on the slope reliability. With this purpose in mind, the mean value plus and minus two standard deviations for each random variable are adopted when studying the sensitivity of the parameters, while keeping the rest of the random variables at their mean values. Considering the 12 random variables in Table 5, a total of 25 deterministic finite difference analyses are conducted for the parametric sensitivity analysis. For simplicity, Fig. 9 presents the relative sensitivities of the 12 input random variables at seven key excavation steps (i.e., steps 0, 3, 5, 7, 10, 12 and 25) for the case of the excavated slope without reinforcements. It can be observed that cohesion c6 and friction angle φ6 of the class III2 rock mass (i.e., weakly unloading sandy slate and marble) are the most sensitive random variables, followed by cohesion c5 and friction angle φ5 of the class IV1 rock mass before the slope is excavated to elevation 1810 m in March 2008. As explained earlier, the marble outside faults f5 and f8 can prevent the slope from sliding before fault f42-9 is fully exposed at the excavation face. Thus, the shear strength parameters of the class III2 rock mass have a significant effect on the slope stability. When the slope is excavated to elevation 1780 m, the relative sensitivities of the friction angle φ1 of fault f42-9, cohesion c3 and friction angle φ3 of the deep fracture SL44-1 become larger. For example, when the slope is excavated from the crown to elevation 1780 m, the values of α (φ1), α (c3) and α (φ3) increase from 0.053 to 0.2, 0.024 to 0.11 and 0.038 to 0.2, respectively, while the value of α (φ6) decreases from 0.46 to 0.15. These results indicate that the shear strength of the sliding surfaces of the deformed and cracked rock mass begins to affect the slope stability significantly once the fault f42-9 is fully exposed at the excavation face. D.-Q. Li et al. / Engineering Geology 195 (2015) 269–281 279 Table 5 Statistics of the basic variables of the rock slope. Materials Random variables Mean COV Distribution type Fault f42-9 c1/MPa φ1/° c2/MPa φ2/° c3/MPa φ3/° c4/MPa φ4/° 0.02 16.7 0.02 16.7 0.1 24.228 0.4 30.96 0.3 0.2 0.25 0.15 0.22 0.14 0.2 0.12 Lognormal Lognormal Lognormal Lognormal Lognormal Lognormal Lognormal Lognormal c5/MPa φ5/° 0.6 35 0.18 0.10 Lognormal Lognormal c6/MPa φ6/° 0.9 45.57 0.15 0.08 Lognormal Lognormal Lamprophyre dike X (above elevation 1680 m) Deep fracture SL44-1 Class IV2 rock mass (Sandy slate in toppling deformation zone) Class IV1 rock mass (Strongly unloading sandy slate and marble) Class III2 rock mass (Weakly unloading sandy slate and marble) Fig. 10. Variation of probability of slope failure with sampling factor, k. To identify the significant uncertain parameters for the slope reliability analysis, a threshold value for the relative sensitivity should be specified. The threshold value is usually within a range of 5%–10% (Shen and Abbas, 2013). A threshold value of 1% is selected for conservative purposes. The random variables with the relative sensitivities below the threshold value are treated as deterministic quantities in the slope reliability analysis. In this way, the numbers of random variables in the slope reliability analysis are reduced from 12 to 9, 8, 9, 9, 11, 10 and 9 for the natural slope and the slope excavated to elevations 1960 m, 1885 m, 1855 m, 1810 m, 1780 m and 1580 m, respectively. In agreement with investigations by Huang et al. (2010) and Qi et al. (2012), the slope stability below elevation 2110 m is mainly controlled by a single wedge failure mode as observed in Fig. 8. Thus, only one response surface function needs to be constructed. The probability of slope failure is then calculated using a direct MCS with NMCS = 106 samples in this study. To explore the effect of the sampling factor, k, for the construction of the response surface function on the slope reliability results, Fig. 10 presents the variation in the probability of slope failure with the sampling factor, k, for the natural slope and the slope excavated to elevation 1780 m without reinforcements, respectively. It can be observed that k has some effect on the probability of slope failure, but it is less significant than one order of magnitude. Generally, there is no rigid rule for selecting k (Xu and Low, 2006). Additionally, note that the factors of safety obtained from the parametric sensitivity analyses can be further used to construct RSFs if k = 2. Consequently, the computational cost is further reduced. Thus, k = 2 is used in this study for illustration according to Zhang et al. (2011). Fig. 11 compares the probabilities of slope failure between the case where only the three shear-resistant concrete plugs perform well and the case where no reinforcements are used. It can be observed that the three shear-resistant concrete plugs can improve the slope reliability substantially. For the case of the reduction factor K = 1.05 and the slope reinforced with the three shear-resistant concrete plugs, the probability of slope failure decreases from 5.3 × 10−5 for the natural slope to 3.1 × 10−5 and 1.2 × 10−6 for the slope excavated to elevations 1885 m in June 2007 and 1780 m in May 2008, respectively. In contrast, the probability of slope failure dramatically increases from 3.1 × 10−5 to 1.27 × 10−2 when the slope is excavated from elevations 1885 to 1780 m for the excavated slope without reinforcements. The latter is about 400 times greater than the former. Such a high probability of failure cannot meet the slope safety requirement of above average performance level (i.e., pf = 1.0 × 10−3) as suggested by the U.S. Army Corps of Engineers (1997). Additionally, the probability of slope failure significantly increases when the reduction factor K increases from 1.05 to 1.1, which indicates that the disturbance induced by rock bursts is an important factor affecting slope reliability. Therefore, effective measures should be taken to minimize disturbance effects during excavation blasting. 0.6 α (c1 ) 0.4 0.3 α (c2 ) α (ϕ2 ) α (c3 ) α (ϕ3 ) α (c4 ) α (ϕ4 ) α (c5 ) α (ϕ5 ) α (c6 ) α (ϕ6 ) Excavation process line 2200 2100 2000 1900 1800 0.2 1700 0.1 1600 0.0 2005/9/30 2006/3/30 2006/9/30 2007/3/30 2007/9/30 2008/3/30 2008/9/30 Excavation date Fig. 9. Variation of relative sensitivities of input random variables. 2009/3/30 1500 2009/9/30 Excavation elevation /m Relative sensitivity α 0.5 α (ϕ1 ) 280 D.-Q. Li et al. / Engineering Geology 195 (2015) 269–281 2200 0.1 2000 1E-3 Above average level for pf =1.0×10 -3 1900 1E-4 1800 1E-5 1E-6 Reduction factor K = 1.05 Only three shear-resistant plugs perform well No reinforcements Reduction factor K = 1.1 Only three shear-resistant plugs perform well No reinforcements 1E-7 2005/9/30 2006/3/30 2006/9/30 2007/3/30 2007/9/30 1700 Excavation elevation /m Probability of failure 2100 Excavation process line 0.01 1600 2008/3/30 2008/9/30 2009/3/30 1500 2009/9/30 Excavation date Fig. 11. Variation of probability of slope failure during construction. It can be seen from Fig. 11 that the probability of slope failure will be significantly increased if no reinforcements are used during slope excavation. To further explain such a finding from a perspective of probabilistic analysis, the probability density functions (PDFs) of the factor of safety for the case where only the three shear-resistant concrete plugs perform well and the case where no reinforcements are used are plotted in Fig. 12 for the slope excavated to elevation 1780 m. Note that the mean values of the factor of safety are 1.346 and 1.172 for the aforementioned two cases, respectively, while the COVs of the factor of safety almost remain the same. These results imply that a significant increase in the probability of failure for the slope without reinforcements is mainly attributed to the decrease in the mean value of the factor of safety rather than to the increase in the variability of the factor of safety. 5. Conclusions This paper has conducted 3-D reliability analysis of the left abutment slope at Jinping I Hydropower Station in south-west China using a nonintrusive stochastic finite difference method. The effects of the reinforced system, namely pre-stressed cables and three shear-resistant concrete plugs, on the reliability of a practical rock slope during construction are investigated systematically. Several conclusions can be drawn from this study: (1) The 3-D reliability of complex rock slopes can be efficiently evaluated using a non-intrusive stochastic finite difference method. A major advantage of the non-intrusive stochastic finite difference method is that it does not require the user to modify existing deterministic finite difference codes, such as FLAC3D. It provides an effective tool for solving 3-D reliability problems of complex rock slopes in practice. (2) The parametric sensitivity analysis approach can effectively identify the significant uncertain parameters in the slope stability analysis. The shear strength parameters of the sliding surfaces of the deformed and cracked rock mass significantly affect the slope stability once the fault f42-9 is fully exposed at the excavation face. Additionally, the deterministic analyses of slope stability used for the parametric sensitivity analysis can be used again for the slope reliability analysis. Thus, the computational efforts can be reduced substantially. (3) The combined support system with the pre-stressed cables and three shear-resistant concrete plugs adopted in the Jinping I left abutment slope can effectively restrain the slope deformation and ensure the slope stability during construction. The horizontal displacement and probability of slope failure will increase greatly if the reinforced structures, especially the three shear-resistant concrete plugs, do not take effect after the slope has been excavated to elevation 1780 m. The shear-resistant concrete plugs play a more important role in improving the slope reliability than the pre-stressed cables. Additionally, the excavation disturbance also affects the slope reliability significantly. (4) The statistics of shear strength parameters of rock masses and structural planes are not accurately determined due to the limited in-situ data available, which may impede the wide applications of reliability methods to evaluate the stability of high rock slopes. Additionally, to improve the computational accuracy of the slope reliability analysis, the numerical models need to be calibrated to sufficiently reflect the field condition. Acknowledgments Fig. 12. Probability density functions of factor of safety. This work was supported by the National Science Fund for Distinguished Young Scholars (Project No. 51225903), the National Basic Research Program of China (973 Program) (Project No. 2011CB013506), D.-Q. Li et al. / Engineering Geology 195 (2015) 269–281 the National Natural Science Foundation of China (Project No. 51329901) and the Natural Science Foundation of Hubei Province of China (Project No. 2014CFA001). References Baecher, G.B., Christian, J.T., 2003. Reliability and Statistics in Geotechnical Engineering. John Wiley and Sons, New York. Bucher, C.G., Bourgund, U., 1990. A fast and efficient response surface approach for structural reliability problems. Struct. Saf. 7 (1), 57–66. Chengdu Hydroelectric Investigation and Design Institute, State Power Corporation of China, 2003. Feasibility Study Report on Jinping I Hydropower Station (3): Engineering Geology. Chengdu Hydroelectric Investigation and Design Institute, State Power Corporation of China, Chengdu (in Chinese). Duncan, J.M., 2000. Factors of safety and reliability in geotechnical engineering. J. Geotech. Geoenviron. 126 (4), 307–316. Gomes, H.M., Awruch, A.M., 2004. Comparison of response surface and neural network with other methods for structural reliability analysis. Struct. Saf. 26 (1), 49–67. Hoek, E., 1998. Reliability of Hoek–Brown estimates of rock mass properties and their impact on design. Int. J. Rock Mech. Min. 35 (1), 63–68. Huang, R., Lin, F., Yan, M., 2010. Deformation mechanism and stability evaluation for the left abutment slope of Jinping I hydropower station. Bull. Eng. Geol. Environ. 69 (3), 365–372. Itasca, 2007. Fast Lagrangian Analysis of Continua in 3-dimension (FLAC3D V3.1). Itasca Consulting Group, Minneapolis, USA. Jiang, S.H., Li, D.Q., Zhang, L.M., Zhou, C.B., 2014a. Slope reliability analysis considering spatially variable shear strength parameters using a non-intrusive stochastic finite element method. Eng. Geol. 168, 120–128. Jiang, S.H., Li, D.Q., Zhang, L.M., Zhou, C.B., 2014b. Time-dependent system reliability of anchored rock slopes considering rock bolt corrosion effect. Eng. Geol. 175, 1–8. Jiang, S.H., Li, D.Q., Cao, Z.J., Zhou, C.B., Phoon, K.K., 2015. Efficient system reliability analysis of slope stability in spatially variable soils using Monte Carlo simulation. J. Geotech. Geoenviron. 141 (2), 04014096. Lee, Y.F., Chi, Y.Y., Juang, C.H., Lee, D.H., 2011. Reliability analysis of rock wedge stability: knowledge-based clustered partitioning approach. J. Geotech. Geoenviron. 138 (6), 700–708. Lee, W.F., Liao, H.J., Chang, M.H., Wang, C.W., Chi, S.Y., Lin, C.C., 2013. Failure analysis of a highway dip slope slide. J. Perform. Constr. Facil. 27 (1), 116–131. Li, D.Q., Zhou, C.B., Lu, W.B., Jiang, Q.H., 2009. A system reliability approach for evaluating stability of rock wedges with correlated failure modes. Comput. Geotech. 36 (8), 1298–1307. Li, D.Q., Chen, Y.F., Lu, W.B., Zhou, C.B., 2011. Stochastic response surface method for reliability analysis of rock slopes involving correlated non-normal variables. Comput. Geotech. 38 (1), 58–68. Li, A.J., Cassidy, M.J., Wang, Y., Merifield, R.S., Lyamin, A.V., 2012. Parametric Monte Carlo studies of rock slopes based on the Hoek–Brown failure criterion. Comput. Geotech. 45, 11–18. Li, D.Q., Qi, X.H., Phoon, K.K., Zhang, L.M., Zhou, C.B., 2014. Effect of spatially variable shear strength parameters with linearly increasing mean trend on reliability of infinite slopes. Struct. Saf. 49, 45–55. Li, D.Q., Xiao, T., Cao, Z.J., Zhou, C.B., Zhang, L.M., 2015a. Enhancement of random finite element method in reliability analysis and risk assessment of soil slopes using Subset Simulation. Landslides http://dx.doi.org/10.1007/s10346-015-0569-2. Li, D.Q., Zhang, L., Tang, X.S., Zhou, W., Li, J.H., Zhou, C.B., Phoon, K.K., 2015b. Bivariate distribution of shear strength parameters using copulas and its impact on geotechnical system reliability. Comput. Geotech. 68, 184–195. Li, D.Q., Jiang, S.H., Cao, Z.J., Zhou, W., Zhou, C.B., Zhang, L.M., 2015c. A multiple response-surface method for slope reliability analysis considering spatial variability of soil properties. Eng. Geol. 187, 60–72. Liu, Y., He, Z., Li, B., Yang, Q., 2013. Slope stability analysis based on a multigrid method using a nonlinear 3D finite element model. Front. Struct. Civ. Eng. 7 (1), 24–31. Low, B.K., 2007. Reliability analysis of rock slopes involving correlated nonnormals. Int. J. Rock Mech. Min. 44 (6), 922–935. Miranda, T., Correia, A.G., Sousa, L.R.e., 2009. Bayesian methodology for updating geomechanical parameters and uncertainty quantification. Int. J. Rock Mech. Min. 46 (7), 1144–1153. Park, H.J., Um, J.G., Woo, I., Kim, J.W., 2012. The evaluation of the probability of rock wedge failure using the point estimate method. Environ. Earth Sci. 65 (1), 353–361. 281 Phoon, K.K., Kulhawy, F.H., 1999. Characterization of geotechnical variability. Can. Geotech. J. 36 (4), 612–624. Qi, S., Wu, F., Zhou, Y., Song, Y., Gong, M., 2010. Influence of deep seated discontinuities on the left slope of Jinping I Hydropower Station and its stability analysis. Bull. Eng. Geol. Environ. 69 (3), 333–342. Qi, Z.F., Jiang, Q.H., Tang, Z.D., Zhou, C.B., 2012. Stability analysis of abutment slope at left bank of Jinping I Hydropower Project during construction. Rock Soil Mech. 33 (2), 531–538 (in Chinese). Qi, Z.F., Jiang, Q.H., Zhou, C.B., Xiang, B.Y., Shao, J.D., 2013. A new slope displacement back analysis method based on v-SVR and MVPSO algorithm and its application. Chin. J. Rock Mech. Eng. 32 (6), 1185–1196 (in Chinese). Rathod, G.W., Rao, K.S., 2012. Finite element and reliability analyses for slope stability of Subansiri lower hydroelectric project: a case study. Geotech. Geol. Eng. 30 (1), 233–252. Shen, H., Abbas, S.M., 2013. Rock slope reliability analysis based on distinct element method and random set theory. Int. J. Rock Mech. Min. 61, 15–22. Song, S.W., Xiang, B.Y., Yang, J.X., Feng, X.M., 2010. Stability analysis and reinforcement design of high and steep slopes with complex geology in abutment of Jinping I hydropower station. Chin. J. Rock Mech. Eng. 29 (3), 442–458 (in Chinese). Stefanou, G., 2009. The stochastic finite element method: past, present and future. Comput. Meth. Appl. Mech. 198 (9), 1031–1051. Sun, G., Zheng, H., Huang, Y., 2015. Stability analysis of statically indeterminate blocks in key block theory and application to rock slope in Jinping-I Hydropower Station. Eng. Geol. 186, 57–67. Tang, X.L., Gao, Q., 2008. Landslides on the left abutment and engineering measures for Manwan Hydropower Project. In: Chen, Z.Y., Zhang, J.M., Li, Z.K. (Eds.), 10th International Symposium on Landslides and Engineered Slopes. Landslides and Engineered Slopes: From the Past to the Future Vols 1-2, pp. 1795–1798. Tang, X.S., Li, D.Q., Chen, Y.F., Zhou, C.B., Zhang, L.M., 2012. Improved knowledge-based clustered partitioning approach and its application to slope reliability analysis. Comput. Geotech. 45, 34–43. Tang, X.S., Li, D.Q., Zhou, C.B., Phoon, K.K., 2015. Copula-based approaches for evaluating slope reliability under incomplete probability information. Struct. Saf. 52, 90–99. U.S. Army Corps of Engineers, 1997. Engineering and design: introduction to probability and reliability methods for use in geotechnical engineering. Engineer Technical Letter, 1110-2-547. Department of the Army, Washington, D.C. Vatanpour, N., Ghafoori, M., Talouki, H.H., 2014. Probabilistic and sensitivity analyses of effective geotechnical parameters on rock slope stability: a case study of an urban area in northeast Iran. Nat. Hazards 71, 1659–1678. Wang, L., Hwang, J.H., Luo, Z., Juang, C.H., Xiao, J.H., 2013. Probabilistic back analysis of slope failure — a case study in Taiwan. Comput. Geotech. 51, 12–23. Wang, L., Gong, W., Luo, Z., Khoshnevisan, S., Juang, C.H., 2015. Reliability-based robust geotechnical design of rock bolts for slope stabilization. International Foundations Congress and Equipment Expo 2015 (IFCEE 2015), GSP 256. ASCE, pp. 1926–1935. Xu, B., Low, B.K., 2006. Probabilistic stability analyses of embankments based on finite-element method. J. Geotech. Geoenviron. 132 (11), 1444–1454. Xu, Q., Zhang, D.X., Zheng, G., 2009. Failure mode and stability analysis of left bank abutment high slope at Jinping I hydropower station. Chin. J. Rock Mech. Eng. 28 (6), 1183–1192 (in Chinese). Xu, N.W., Tang, C.A., Li, L.C., Zhou, Z., Sha, C., Liang, Z.Z., Yang, J.Y., 2011. Microseismic monitoring and stability analysis of the left bank slope in Jinping first stage hydropower station in southwestern China. Int. J. Rock Mech. Min. 48 (6), 950–963. Zhang, J., Zhang, L.M., Tang, W.H., 2011. New methods for system reliability analysis of soil slopes. Can. Geotech. J. 48 (7), 1138–1148. Zheng, W., Zhuang, X., Cai, Y., 2012. On the seismic stability analysis of reinforced rock slope and optimization of pre-stressed cables. Front. Struct. Civ. Eng. 6 (2), 132–146. Zheng, J., Kulatilake, P., Deng, J., 2015. Development of a probabilistic block theory analysis procedure and its application to a rock slope at a hydropower station in China. Eng. Geol. 188, 110–125. Zhou, Z., Gong, M.F., Lei, C.D., 2006. Research on stability of slope at left abutment of Jinping first stage hydropower station. Chin. J. Rock Mech. Eng. 25 (11), 2298–2304 (in Chinese). Zhou, C.B., Chen, Y.F., Jiang, Q.H., Lu, W.B., 2011. A generalized multi-field coupling approach and its application to stability and deformation control of a high slope. J. Rock Mech. Geotech. Eng. 3 (3), 193–206. Zhu, H., Zhang, L.M., 2013. Characterizing geotechnical anisotropic spatial variations using random field theory. Can. Geotech. J. 50 (7), 723–734. Zienkiewicz, O.C., Humpheson, C., Lewis, R.W., 1975. Associated and non-associated visco-plasticity and plasticity in soil mechanics. Geotechnique 25 (4), 671–689.