Dead load (kentledge) A structure over the test pile Ground

Transcription

Dead load (kentledge) A structure over the test pile Ground
Introduction
ƒ Fugro LOADTEST Overview
ƒ Static load tests
ƒ Previous/existing technology
ƒ Developments
STATIC LOAD TESTING
O-cell® BiBi-directional testing
State of the art
Dr Melvin England
Fugro LOADTEST
ƒ O-cell® static loading tests
ƒ Conclusions
Date 27th January 2010
www.fugro.com www.fugro.fr
ƒ LOADTEST Inc started in 1991
ƒ Operating around the world from 5 LOADTEST offices
ƒ 45 staff – mostly engineers
– Some of our staff are recognised leading experts in
various forms of pile testing
ƒ €10 M turnover (1/2 USA)
ƒ Portable test systems allow easy access to very remote
locations
ƒ LOADTEST acquired Fugro as new owners in Jan 2009
and LOADTEST can now operate from any of the Fugro
offices around the world and call on the resources of
Fugro where necessary.
www.fugro.com www.fugro.fr
Oil-rig module used as Kentledge
Date 27 January 2010
www.fugro.com www.fugro.fr
Reaction systems for static load tests:
Fugro LOADTEST
Date 27 January 2010
Date 27 January 2010
ƒ Dead load (kentledge)
ƒ A structure over the test pile
ƒ Ground anchorage either by
tension piles or ground anchors.
ƒ Bi-directional (Osterberg-cell)
Date 27 January 2010
www.fugro.com www.fugro.fr
Test on group of 9 precast piles to 20MN
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
1
Ready assembled reaction systems
Reaction systems
BiBi-directional testing ABU-DHABI
2MN
4 MN
5.5 MN
10 MN
GREAT MOSQUE ABU-DHABI
SHEIKH ZAYED BRIDGE
ABU-DHABI
Date 27 January 2010
www.fugro.com www.fugro.fr
Zone of influence
Date 27 January 2010
Zone of influence
Kentledge
Reaction beam on anchor piles
Date 27 January 2010
www.fugro.com www.fugro.fr
www.fugro.com www.fugro.fr
Zone of influence
Date 27 January 2010
www.fugro.com www.fugro.fr
Zone of influence
Kentledge on piles
Bi-directional
test
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
2
Kentledge collapse
Safety considerations
Due to platform/ground failure
From FPS Load testing handbook 2006
Date 27 January 2010
www.fugro.com www.fugro.fr
Reaction Beam collapse
Date 27 January 2010
www.fugro.com www.fugro.fr
COMPLETELY AUTOMATED
Due to tension bar failure
From FPS Load testing handbook 2006
Date 27 January 2010
www.fugro.com www.fugro.fr
BIBI-DIRECTIONAL OO-CELL LOAD TESTS
Date 27 January 2010
www.fugro.com www.fugro.fr
How it works
ƒ Introduction To Osterberg Cell
technology
ƒ Advantages & Limitations
ƒ Examples
ƒ Current usage and costs
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
3
Bi-directional schematic
Date 27 January 2010
Bi-directional schematic
www.fugro.com www.fugro.fr
Comparison of O-cell and Traditional Tests
Date 27 January 2010
www.fugro.com www.fugro.fr
O-cell Static Load Test Advantages
ƒ
Very high loading capability
Gets load into rock sockets (or other zone of
interest)
ƒ
ƒ
Cost, safety and space advantages
ƒ
No additional reaction system needed
ƒ
Doubles effective jack load
ƒ
Can measure directly skin friction and end bearing
Post-test grouting techniques allow for testing of
production piles
ƒ
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
Single O-cell – Bearing Plate Assembly
O-Cell Instrumentation
Top and Bottom Plates are Welded to the O-cell
O-cell / Plate System is Welded
into the Rebar Cage
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
4
O-cell Test Components
Date 27 January 2010
O-cellTM fitted with bearing plates attached to cage
MultiMulti-cell assembly - attaching OO-cells to bottom plate
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
Cone-shaped
tremie guide
MultiMulti-cell assembly - attaching top plate
Date 27 January 2010
www.fugro.com www.fugro.fr
www.fugro.com www.fugro.fr
Other O-cell Assemblies
Lifting the Cage and Attached O-cell Assembly
Once the Cage With Attached O-cell is Carefully Lifted, it is Installed into the Shaft Excavation
Date 27 January 2010
Date 27 January 2010
www.fugro.com www.fugro.fr
O-cells can be Placed at two Levels in the
Shaft to Isolate Distinct Shaft Elements
Date 27 January 2010
The O-cell Need Not be Attached to a Rebar
Cage
www.fugro.com www.fugro.fr
5
Multilevel testing
Multilevel testing Stage 1
Middle cell closed
Test is performed in stages
Lower cell pressurised
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
Multilevel testing Stage 1
Multilevel testing Stage 2
Downward movement below bottom O-Cell
Middle cell pressurised
(MN)
0.0
5.0
10.0
www.fugro.com www.fugro.fr
15.0
20.0
25.0
30.0
0
-10
-20
-30
-40
Lower cell draining
-50
-60
-70
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
Multilevel testing Stage 2
www.fugro.com www.fugro.fr
Multilevel testing Stage 3
Downward movement below middle O-Cell
(MN)
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
55.0
60.0
Middle cell pressurised
0
-5
-10
-15
-20
-25
-30
Lower cell hydraulically closed
-35
-40
-45
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
6
Multilevel testing Stage 3
Multilevel testing Stage 3
30
25
20
Downward movement below middle O-Cell
15
(MN)
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
55.0
60.0
10
0
5
-5
0
-10
0.0
-15
-20
-25
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
55.0
60.0
(MN)
End of Stage 2 testing, Bottom
O-cell hydraulic lines closed allowing load transfer to end
bearing.
Upward movement above middle O-Cell
-30
-35
-40
-45
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
Test Setups
Equivalent top load-settlement curve
Load (MN)
Settlem ent (m m )
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
110.0
120.0
130.0
0
-10
-20
-30
-40
-50
-60
-70
-80
-90
-100
-110
-120
-130
-140
-150
World record – 160 MN
Date 27 January 2010
www.fugro.com www.fugro.fr
Advantage – Space Requirements
Date 27 January 2010
www.fugro.com www.fugro.fr
O-cell Test Limitations
ƒPreselected shaft
2000 ton Conventional
3000 ton Conventional
ƒMaximum load limited by weaker of end bearing
or skin friction
ƒTest results need interpretation
ƒTop of the pile is not tested structurally tested
2000 ton
O-cell Test
Date 27 January 2010
3000 ton
O-cell Test
www.fugro.com www.fugro.fr
ƒTop load movement curve must be calculated
ƒFrom the sum of measured behaviour;
ƒFrom the sum of modeled behaviour;
ƒFinite element;
Date 27 January 2010
www.fugro.com www.fugro.fr
7
Analysis of O-cell test results
Equivalent TLT Assumptions
ƒ ‘Rigid’ shaft (includes OLT elastic compression)
ƒL-Movement compatibility, friction and end bearing
ƒCorrections for direction of skin friction
ƒFactor = 1 clays, rock sockets
ƒCorrection for direction of loading can be used
ƒFactor = 0.80 Equivalent tension test
ƒCorrection for additional TLT elastic compressionƒconservative, iterations not needed
ƒGood practical agreements
Date 27 January 2010
www.fugro.com www.fugro.fr
Sum of measured results
Date 27 January 2010
Date 27 January 2010
www.fugro.com www.fugro.fr
Measured behaviour Sum of components
www.fugro.com www.fugro.fr
Date 27 January 2010
Measured plus additional elastic shortening
www.fugro.com www.fugro.fr
Comparison test curves
Kentledge Test versus O-cell equivalent top load-settlement curve
0
-10
-20
Settlement (mm)
-30
O-cell Test
Kentledge Test
-40
-50
-60
-70
-80
-90
-100
-110
-120
0
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
2
4
6
8
10
12
14
16
18
Top Load (MN)
20
22
24
26
28
30
www.fugro.com www.fugro.fr
8
Advantage – High Loads
Incheon 2nd Link, Korea
World Record History
Location
Diameter
Depth
Maximum Load
Ohio River Bridge,
Kentucky ( 1992 )
1.8m ( 6 ft. )
36m ( 117 ft. )
54 MN ( 6,200 tons )
St. Mary’s River, Georgia
(1996 )
1.5m ( 5 ft. )
23m ( 75 ft. )
65 MN ( 7,300 tons )
Penang, Malaysia
( 1996 )
6x1m barrette
91m ( 300 ft. )
97 MN ( 11,000 tons )
Apalachicola River, Florida
( 1997 )
2.75m ( 9 ft. )
39m ( 127 ft. )
133 MN ( 15,000 tons )
Tucson, Arizona
( 2001 )
2.4m ( 7.9 ft. )
41m ( 135 ft. )
151 MN ( 17,000 tons )
Pomeroy - Mason WV,
Ohio River
2.4m (8 ft.)
26m (86ft.)
163 MN (18,400 tons)
2nd
2.4m – 3.0m
(8 ft. – 10ft.)
67m (220ft.)
279 MN (31,350 tons)
Crossing
Incheon
Korea
Date 27 January 2010
www.fugro.com www.fugro.fr
Incheon 2nd Link, Korea
Date 27 January 2010
www.fugro.com www.fugro.fr
Incheon 2nd Link, Korea
Date 27 January 2010
www.fugro.com www.fugro.fr
Oste rbe rg Ce ll Loa d-Move me nt Curve s
Date 27 January 2010
www.fugro.com www.fugro.fr
Advantage – Rock Sockets
60
OLT
TLT
50
P
40
Displacement ( mm)
30
Overburden
20
Upwar d Top of O- c ell
10
0
-10
Downwar d Base of O- c ell
Rock
-20
Q
Ub & Eb difficult to interpret
-30
-40
0
20
40
60
80
100
120
140
160
• Uncertain Distribution
• Less Distribution Uncertainty
• Little or No Top Load Gets into base
• All Load into Socket
• May Need Model Shaft
• Can Test Full Scale
O-ce ll Gr os s Load ( M N )
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
9
Applications
O-cells in CFA piles
ƒ Bored piles (wet and dry)
ƒ CFA piles
ƒ Driven Piles
– Cast in-situ (with and without
permanent steel casing)
– Precast
– Steel tubular piles
ƒ Barrettes
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
O-cells in CFA piles
O-cells in CFA piles
Maximum size/loads tested to date
Pile Diameter [mm]
Pile Length [m]
O-cell Diameter [mm]
Mobilised Load [MN]
Date 27 January 2010
www.fugro.com www.fugro.fr
O-cells in PRECAST piles
Date 27 January 2010
600
750
900
900
38
40
35
36
405
540
660
2x540
17.5
32
32
46
www.fugro.com www.fugro.fr
Barrettes
Sizes tested
to date
Pile Section
300 mm
450 mm
600mm
750 mm
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
10
St. Petersburg, Russia
St. Petersburg, Russia
30 MN Reaction system
• 60 m deep
90 MN O-cell test
• 90 MN capacity
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
Maximum size/loads tested to date
Kiev Ukraine: 90 MN Barrette
7.0m x 1.2 m
50 m deep
loaded to 110 MN
T shaped:
2.8 x 4.0 m
Multiple tremie pipes
Date 27 January 2010
www.fugro.com www.fugro.fr
Maximum size/loads tested to date
loaded to 70MN
Date 27 January 2010
www.fugro.com www.fugro.fr
Applications: Bridges
Cooper river
Jiangsu Sutong
Panama 2nd Bridge
Confederation
UAE: Multilevel; 80 m deep; 220 MN mobilised
Date 27 January 2010
www.fugro.com www.fugro.fr
Date 27 January 2010
www.fugro.com www.fugro.fr
11
Applications: Buildings
Osterberg Cells Installed
Actual
Projected
350
300
250
200
150
100
www.fugro.com www.fugro.fr
09
08
20
20
06
05
04
07
20
20
20
20
02
01
00
03
20
20
20
98
99
19
Date 27 January 2010
20
96
97
19
19
19
94
93
95
19
19
Date 27 January 2010
19
92
0
19
Venetian Hotel,
Las Vegas, NV
50
91
Four Seasons
Hotel
Miami, FL
19
One Raffles
Quay,
Singapore
www.fugro.com www.fugro.fr
O-cell Tests World-wide
COMPARISON OF LOAD TESTING COSTS
CONVENTIONAL VS. O-CELL
O-cell
COST/ MN
Conventional
Key
0
1-10
11-20
21-30
>30
Upcoming/In
progress
1
10
100
1000
TEST LOAD - MN
Date 27 January 2010
www.fugro.com www.fugro.fr
Bi-directional testing
Disadvantages
•No external reaction
system
•Pile test not exactly
as a full load test.
•No anchor piles
•Maximum load
applied limited
•Only half the stresses
applied to the concrete
•For large tests a
significant cost saving
Date 27 January 2010
www.fugro.com www.fugro.fr
Conclusions
Advantages
•Little or no heavy
transport requirements
Date 27 January 2010
ƒ Bi-directional testing routinely reveals more about the
geotechnical behaviour than a traditional top-down
loading test. (Over 1400 tests worldwide).
ƒ O-cell testing much safer than traditional top-loading
•Jack is expendable
and needs fitting
during pile
installation
www.fugro.com www.fugro.fr
ƒ As the test loads increase the more cost effective and
attractive O-cell testing becomes.
Date 27 January 2010
www.fugro.com www.fugro.fr
12
Providing confidence in foundations through
load testing - around the world.
www.loadtest.com
Thank You
A member of the Fugro Group of companies
Florida, USA
Date 27 January 2010
UAE
LONDON
SINGAPORE
KOREA
www.fugro.com www.fugro.fr
Date 27th January 2010
www.fugro.com www.fugro.fr
13

Similar documents

CK2500-II Spec Book 12-05

CK2500-II Spec Book 12-05 All wiring corded for easy serving with individual, fused branch circuit.

More information

HYDRAULIC CRAWLER CRANE CK2500

HYDRAULIC CRAWLER CRANE CK2500 An optional boom insert is available to provide extension capabilities. It also has welded lattice construction with

More information