Dead load (kentledge) A structure over the test pile Ground
Transcription
Dead load (kentledge) A structure over the test pile Ground
Introduction Fugro LOADTEST Overview Static load tests Previous/existing technology Developments STATIC LOAD TESTING O-cell® BiBi-directional testing State of the art Dr Melvin England Fugro LOADTEST O-cell® static loading tests Conclusions Date 27th January 2010 www.fugro.com www.fugro.fr LOADTEST Inc started in 1991 Operating around the world from 5 LOADTEST offices 45 staff – mostly engineers – Some of our staff are recognised leading experts in various forms of pile testing €10 M turnover (1/2 USA) Portable test systems allow easy access to very remote locations LOADTEST acquired Fugro as new owners in Jan 2009 and LOADTEST can now operate from any of the Fugro offices around the world and call on the resources of Fugro where necessary. www.fugro.com www.fugro.fr Oil-rig module used as Kentledge Date 27 January 2010 www.fugro.com www.fugro.fr Reaction systems for static load tests: Fugro LOADTEST Date 27 January 2010 Date 27 January 2010 Dead load (kentledge) A structure over the test pile Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell) Date 27 January 2010 www.fugro.com www.fugro.fr Test on group of 9 precast piles to 20MN www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr 1 Ready assembled reaction systems Reaction systems BiBi-directional testing ABU-DHABI 2MN 4 MN 5.5 MN 10 MN GREAT MOSQUE ABU-DHABI SHEIKH ZAYED BRIDGE ABU-DHABI Date 27 January 2010 www.fugro.com www.fugro.fr Zone of influence Date 27 January 2010 Zone of influence Kentledge Reaction beam on anchor piles Date 27 January 2010 www.fugro.com www.fugro.fr www.fugro.com www.fugro.fr Zone of influence Date 27 January 2010 www.fugro.com www.fugro.fr Zone of influence Kentledge on piles Bi-directional test Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr 2 Kentledge collapse Safety considerations Due to platform/ground failure From FPS Load testing handbook 2006 Date 27 January 2010 www.fugro.com www.fugro.fr Reaction Beam collapse Date 27 January 2010 www.fugro.com www.fugro.fr COMPLETELY AUTOMATED Due to tension bar failure From FPS Load testing handbook 2006 Date 27 January 2010 www.fugro.com www.fugro.fr BIBI-DIRECTIONAL OO-CELL LOAD TESTS Date 27 January 2010 www.fugro.com www.fugro.fr How it works Introduction To Osterberg Cell technology Advantages & Limitations Examples Current usage and costs Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr 3 Bi-directional schematic Date 27 January 2010 Bi-directional schematic www.fugro.com www.fugro.fr Comparison of O-cell and Traditional Tests Date 27 January 2010 www.fugro.com www.fugro.fr O-cell Static Load Test Advantages Very high loading capability Gets load into rock sockets (or other zone of interest) Cost, safety and space advantages No additional reaction system needed Doubles effective jack load Can measure directly skin friction and end bearing Post-test grouting techniques allow for testing of production piles Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr Single O-cell – Bearing Plate Assembly O-Cell Instrumentation Top and Bottom Plates are Welded to the O-cell O-cell / Plate System is Welded into the Rebar Cage Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr 4 O-cell Test Components Date 27 January 2010 O-cellTM fitted with bearing plates attached to cage MultiMulti-cell assembly - attaching OO-cells to bottom plate www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr Cone-shaped tremie guide MultiMulti-cell assembly - attaching top plate Date 27 January 2010 www.fugro.com www.fugro.fr www.fugro.com www.fugro.fr Other O-cell Assemblies Lifting the Cage and Attached O-cell Assembly Once the Cage With Attached O-cell is Carefully Lifted, it is Installed into the Shaft Excavation Date 27 January 2010 Date 27 January 2010 www.fugro.com www.fugro.fr O-cells can be Placed at two Levels in the Shaft to Isolate Distinct Shaft Elements Date 27 January 2010 The O-cell Need Not be Attached to a Rebar Cage www.fugro.com www.fugro.fr 5 Multilevel testing Multilevel testing Stage 1 Middle cell closed Test is performed in stages Lower cell pressurised Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 Multilevel testing Stage 1 Multilevel testing Stage 2 Downward movement below bottom O-Cell Middle cell pressurised (MN) 0.0 5.0 10.0 www.fugro.com www.fugro.fr 15.0 20.0 25.0 30.0 0 -10 -20 -30 -40 Lower cell draining -50 -60 -70 Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 Multilevel testing Stage 2 www.fugro.com www.fugro.fr Multilevel testing Stage 3 Downward movement below middle O-Cell (MN) 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 Middle cell pressurised 0 -5 -10 -15 -20 -25 -30 Lower cell hydraulically closed -35 -40 -45 Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr 6 Multilevel testing Stage 3 Multilevel testing Stage 3 30 25 20 Downward movement below middle O-Cell 15 (MN) 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 10 0 5 -5 0 -10 0.0 -15 -20 -25 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 (MN) End of Stage 2 testing, Bottom O-cell hydraulic lines closed allowing load transfer to end bearing. Upward movement above middle O-Cell -30 -35 -40 -45 Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr Test Setups Equivalent top load-settlement curve Load (MN) Settlem ent (m m ) 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140 -150 World record – 160 MN Date 27 January 2010 www.fugro.com www.fugro.fr Advantage – Space Requirements Date 27 January 2010 www.fugro.com www.fugro.fr O-cell Test Limitations Preselected shaft 2000 ton Conventional 3000 ton Conventional Maximum load limited by weaker of end bearing or skin friction Test results need interpretation Top of the pile is not tested structurally tested 2000 ton O-cell Test Date 27 January 2010 3000 ton O-cell Test www.fugro.com www.fugro.fr Top load movement curve must be calculated From the sum of measured behaviour; From the sum of modeled behaviour; Finite element; Date 27 January 2010 www.fugro.com www.fugro.fr 7 Analysis of O-cell test results Equivalent TLT Assumptions ‘Rigid’ shaft (includes OLT elastic compression) L-Movement compatibility, friction and end bearing Corrections for direction of skin friction Factor = 1 clays, rock sockets Correction for direction of loading can be used Factor = 0.80 Equivalent tension test Correction for additional TLT elastic compressionconservative, iterations not needed Good practical agreements Date 27 January 2010 www.fugro.com www.fugro.fr Sum of measured results Date 27 January 2010 Date 27 January 2010 www.fugro.com www.fugro.fr Measured behaviour Sum of components www.fugro.com www.fugro.fr Date 27 January 2010 Measured plus additional elastic shortening www.fugro.com www.fugro.fr Comparison test curves Kentledge Test versus O-cell equivalent top load-settlement curve 0 -10 -20 Settlement (mm) -30 O-cell Test Kentledge Test -40 -50 -60 -70 -80 -90 -100 -110 -120 0 Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 2 4 6 8 10 12 14 16 18 Top Load (MN) 20 22 24 26 28 30 www.fugro.com www.fugro.fr 8 Advantage – High Loads Incheon 2nd Link, Korea World Record History Location Diameter Depth Maximum Load Ohio River Bridge, Kentucky ( 1992 ) 1.8m ( 6 ft. ) 36m ( 117 ft. ) 54 MN ( 6,200 tons ) St. Mary’s River, Georgia (1996 ) 1.5m ( 5 ft. ) 23m ( 75 ft. ) 65 MN ( 7,300 tons ) Penang, Malaysia ( 1996 ) 6x1m barrette 91m ( 300 ft. ) 97 MN ( 11,000 tons ) Apalachicola River, Florida ( 1997 ) 2.75m ( 9 ft. ) 39m ( 127 ft. ) 133 MN ( 15,000 tons ) Tucson, Arizona ( 2001 ) 2.4m ( 7.9 ft. ) 41m ( 135 ft. ) 151 MN ( 17,000 tons ) Pomeroy - Mason WV, Ohio River 2.4m (8 ft.) 26m (86ft.) 163 MN (18,400 tons) 2nd 2.4m – 3.0m (8 ft. – 10ft.) 67m (220ft.) 279 MN (31,350 tons) Crossing Incheon Korea Date 27 January 2010 www.fugro.com www.fugro.fr Incheon 2nd Link, Korea Date 27 January 2010 www.fugro.com www.fugro.fr Incheon 2nd Link, Korea Date 27 January 2010 www.fugro.com www.fugro.fr Oste rbe rg Ce ll Loa d-Move me nt Curve s Date 27 January 2010 www.fugro.com www.fugro.fr Advantage – Rock Sockets 60 OLT TLT 50 P 40 Displacement ( mm) 30 Overburden 20 Upwar d Top of O- c ell 10 0 -10 Downwar d Base of O- c ell Rock -20 Q Ub & Eb difficult to interpret -30 -40 0 20 40 60 80 100 120 140 160 • Uncertain Distribution • Less Distribution Uncertainty • Little or No Top Load Gets into base • All Load into Socket • May Need Model Shaft • Can Test Full Scale O-ce ll Gr os s Load ( M N ) Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr 9 Applications O-cells in CFA piles Bored piles (wet and dry) CFA piles Driven Piles – Cast in-situ (with and without permanent steel casing) – Precast – Steel tubular piles Barrettes Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr O-cells in CFA piles O-cells in CFA piles Maximum size/loads tested to date Pile Diameter [mm] Pile Length [m] O-cell Diameter [mm] Mobilised Load [MN] Date 27 January 2010 www.fugro.com www.fugro.fr O-cells in PRECAST piles Date 27 January 2010 600 750 900 900 38 40 35 36 405 540 660 2x540 17.5 32 32 46 www.fugro.com www.fugro.fr Barrettes Sizes tested to date Pile Section 300 mm 450 mm 600mm 750 mm Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr 10 St. Petersburg, Russia St. Petersburg, Russia 30 MN Reaction system • 60 m deep 90 MN O-cell test • 90 MN capacity Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr Maximum size/loads tested to date Kiev Ukraine: 90 MN Barrette 7.0m x 1.2 m 50 m deep loaded to 110 MN T shaped: 2.8 x 4.0 m Multiple tremie pipes Date 27 January 2010 www.fugro.com www.fugro.fr Maximum size/loads tested to date loaded to 70MN Date 27 January 2010 www.fugro.com www.fugro.fr Applications: Bridges Cooper river Jiangsu Sutong Panama 2nd Bridge Confederation UAE: Multilevel; 80 m deep; 220 MN mobilised Date 27 January 2010 www.fugro.com www.fugro.fr Date 27 January 2010 www.fugro.com www.fugro.fr 11 Applications: Buildings Osterberg Cells Installed Actual Projected 350 300 250 200 150 100 www.fugro.com www.fugro.fr 09 08 20 20 06 05 04 07 20 20 20 20 02 01 00 03 20 20 20 98 99 19 Date 27 January 2010 20 96 97 19 19 19 94 93 95 19 19 Date 27 January 2010 19 92 0 19 Venetian Hotel, Las Vegas, NV 50 91 Four Seasons Hotel Miami, FL 19 One Raffles Quay, Singapore www.fugro.com www.fugro.fr O-cell Tests World-wide COMPARISON OF LOAD TESTING COSTS CONVENTIONAL VS. O-CELL O-cell COST/ MN Conventional Key 0 1-10 11-20 21-30 >30 Upcoming/In progress 1 10 100 1000 TEST LOAD - MN Date 27 January 2010 www.fugro.com www.fugro.fr Bi-directional testing Disadvantages •No external reaction system •Pile test not exactly as a full load test. •No anchor piles •Maximum load applied limited •Only half the stresses applied to the concrete •For large tests a significant cost saving Date 27 January 2010 www.fugro.com www.fugro.fr Conclusions Advantages •Little or no heavy transport requirements Date 27 January 2010 Bi-directional testing routinely reveals more about the geotechnical behaviour than a traditional top-down loading test. (Over 1400 tests worldwide). O-cell testing much safer than traditional top-loading •Jack is expendable and needs fitting during pile installation www.fugro.com www.fugro.fr As the test loads increase the more cost effective and attractive O-cell testing becomes. Date 27 January 2010 www.fugro.com www.fugro.fr 12 Providing confidence in foundations through load testing - around the world. www.loadtest.com Thank You A member of the Fugro Group of companies Florida, USA Date 27 January 2010 UAE LONDON SINGAPORE KOREA www.fugro.com www.fugro.fr Date 27th January 2010 www.fugro.com www.fugro.fr 13
Similar documents
CK2500-II Spec Book 12-05
All wiring corded for easy serving with individual, fused branch circuit.
More informationHYDRAULIC CRAWLER CRANE CK2500
An optional boom insert is available to provide extension capabilities. It also has welded lattice construction with
More information