Company Brochure
Transcription
Company Brochure
BOTEK BOSPHORUS TECHNICAL CONSULTING CORP. BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION COMPANY INFORMATION Botek Bosphorus Technical Consulting Corporation is an independent Consulting Engineering firm which provides multi-disciplinary Civil Engineering Services. Since its establishment in 1975, Botek has gained extensive experience by monitoring major projects for quality & cost control, scheduling, design and supervision in the fields of motorways, railways, bridges, tunnels, environmental engineering, residential buildings, industrial facilities plus awarded projects in government, municipalities and major private enterprises internationally. Today Botek, along with over 450 professionals including its affiliated firms and consultants, provides multi-disciplinary services in the following fields of Civil Engineering; • Motorways, Highways, Bridges & Tunnels • Rapid Transit Systems, High Speed Railways, Metro, LRT • Commercial & Industrial Buildings • Housing & Residential Development • Hospitals and Health Facilities • Water & Wastewater Systems • Lighting & Emergency Communications For the past 41 years, Botek has been involved in major projects, total present value of which is beyond 40 Billion U.S. Dollars. Botek has evolved to become one of Turkey’s leading consulting engineering firms. The firm provides expert services in the following disciplines of Civil Engineering; ISO 9001:2008 • Design and Planning • Value Engineering • Construction Supervision and Quality Control • Construction and Project Management • Master Planning • Feasibility Studies • Architectural and Structural Engineering • Electrical and Mechanical Engineering • Geotechnical Engineering • Environmental Assessments and Hydrological Studies • Preparation of Technical Specifications • Administrative Support and Approvals • Cost Estimates & Financial Evaluations • Tender Documentations and Bill of Quantities ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION AREAS OF OUR EXPERTISE TRANSPORTATION Motorway, Highway, Railway & Bridge Design Bridge Inspection and Rehabilitation Subways and Tunnels Transportation Planning and Transit Studies Airport Facilities Traffic Studies and Traffic Control Plans Public and Private Agency Coordination Railings and Barriers Design Ventilation Systems Drainage Works Communication Systems Lighting and Electrical Works ENVIRONMENTAL ENGINEERING Environmental Impact Statements and Assessments Ground-water Modeling and Monitoring Water and Wastewater Treatment Systems Solid and Hazardous Waste Management Design Industrial Hygiene and Safety Compliance Gas and Electric Transmission Line Installations Geographic Information Systems (GIS) Mapping BUILDINGS AND FACILITIES ISO 9001:2008 Residential Buildings Commercial Buildings LRT and Metro Stations Industrial Buildings and Facilities Factories and Plants Hospitals and Health Care Centers Clean Rooms and HVAC Systems Landscape Architecture and Streetscape Design Master Planning Architectural Studies Restoration and Renovation Designs Tender Documentation and Contract Administration ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION REGIONS OF ACTIVITIES AND SERVICES PROVIDED BY BOTEK BOTEK has developed strong relations either singly or in partnership with other firms within the following regions. Middle East & Islamic Countries The CEO-Chairman of Botek, Yıldırım GELGİN, is the Founding Partner and Past President of the FCIC (Federation of Consultants from Islamic Countries). Today Mr. Levent Gelgin holds the presidency of FCIC. Therefore, thought the FCIC mechanism, cooperation and exchange of technology and expertise in the Islamic countries had major contributions to Botek's activities in this region. Former Soviet Region & Central Asia The synergy triggered during the post-cold war period has provided tremendous opportunities due to sustainable development efforts. Therefore common background of Central Asian and Turkish people resulted strong business relations between Turkey and other Central Asian Countries. Botek has developed very good relations and involved in various major projects in this region. Balkans & Eastern Europe As of late 2002, Turkey has officially been a candidate for European Union. All candidates have the right to participate in the projects funded by the European Community, Europe AID, EIB and EBRD. Botek’s proximity to region gives us not only a geographical advantage but also a tremendous opportunity for economic solutions using efficient logistics. Botek Corp. has successfully completed joint ventures and associations for various major projects in Turkey and abroad with the following international groups; ACE, Pakistan Valmont, USA Binnie Black & Veatch Consulting, UK AECOM, UK Brown and Beach, UK SAUDCONSULT, Saudi Arabia Carl Bro, Denmark ITALCONSULT S.p.A., Italy PARSONS, USA ITALFERR, Italy Earth Tech Ltd, USA IDOM, Spain EPTISA, Spain CONSULGAL, Portuguese Freeman Fox & Partners, UK PROINTEC, Spain KBR (Kellogg, Brown and Root), USA INCOSA, Spain, Louis Berger SAS, France GRONTMIJ, The Netherlands Ove Arup International, UK GETINSA, Spain Parsons Brinckerhoff, USA INCOSA, Spain Royal Haskoning, Netherlands Perkins Eastman, USA Span Consultants Pvt. Ltd., India GEODATA S.p.A., Italy ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION GENERAL INFORMATION Name of the Firm: BOTEK Bosphorus Technical Consulting Corp. Headquarters: Botek İş Merkezi, Fulya Mah. Prof. Dr. Bülent Tarcan Sok. No: 10, Kat. 4 Gayrettepe 34394 Şişli, Istanbul / Turkey Telephone: +90 (212) 347 27 20 Fax: +90 (212) 347 27 21 E-mail: botek@botek.info Web: www.botek.info Commercial & Legal Status of the Firm: JOINT STOCK COMPANY Date of Establishment: August 15, 1975 Registered Professional Associations: - Union of Turkish Engineers & Architects (TMMOB No. 328) - Association of Turkish Consulting, Engineers & Architects (TMMMB) - International Federation of Consulting Engineers (FIDIC) (No. 188026) - Federation of Consultants from Islamic Countries (FCIC) - Chamber of commerce Istanbul (ITO No: 081423) Bank References: - Halkbank - Mecidiyeköy, Istanbul - Akbank – Esentepe, Istanbul - TEB – Taksim, Istanbul - Garanti Bankası - Maslak, Istanbul - Şekerbank – E5 Maltepe, Istanbul - Vakıfbank - Esentepe, Istanbul - İş Bankası – Maslak, Istanbul Branch Office : ANKARA, Koza Sokak 608. 06700 Gaziosmanpaşa / TURKEY Telephone Facsimile : 0 (312) 446 75 57 : 0 (312) 437 37 09 Foreign Branch Offices - Today: SULTANATE OF OMAN P.O. Box 3779, Postal: 112 Ruwi /Sultanate of Oman ABU DHABI P.O. Box 8626 Abu Dhabi / U.A.E KRG-IRAQ Italian City, No: 130 Erbil, KRG-IRAQ UNITED ARAB EMIRATES, DUBAI P.O. Box 121601 Dubai / U.A.E GEORGIA, TBILISI Abashidze 47 / 1, Vake, Tbilisi INDONESIA Wisma Iskandarsyah Block A-9, Jakarta Selatan 12160 KINGDOM OF SAUDAI ARABIA Al Dhabab Street Al Sulaymaniyah District 2341 KENYA RND Palace Maisonette No:3 Along Peponi Road, Westlands P.O. Box 14984-00800, Nairobi TURKMENISTAN Bitarap Türkmenistan 553/2 Ashgabat ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Sayolu BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ORGANIZATION Board of Directors: YILDIRIM GELGİN : Chairman –Founding Partner LEVENT GELGİN : Partner – Vice Chairman - Civil Engineer and EMBA ENGIN AYSAKAR : Partner – M.S. Civil Engineer MEHMET TUMAY : Partner - M.S. Civil Engineer CEM GELGİN : Partner - M.S. Project Manager, M.S. I.T. Systems EMRE GELGİN : Partner - M.S. Civil Engineer Executive Directors (Engineering Services): YILDIRIM GELGİN : Company Executive Officer (CEO) -M.S Civil Engineer ADEM BERKMEN : Technical Director – M.S. Civil Engineer HASAN ARMAĞAN : Director, Infrastructure Projects – M.S. Civil Engineer KEMAL CENGİZKAN : Director, Structures – PhD. Civil Engineer NEŞET AKDAĞ : Director, Geotechnical, M.S Geotechnical Engineer LEVENT GELGİN : Managing Director, Board Member - Civil Engineer, EMBA TURAN GÜLER : Regional Director/Iraq – M.S. Civil Engineer SIRRI ÜLKÜ : Director, Construction Supervision - Civil Engineer SEZAİ ÇOŞKUN : Director, Site Supervision - Civil Engineer NİSA GÜRLER YÜCE : Chief Highways Engineer GÜL ÖZER : Chief Environmental Engineering AHMET AKDENİZ : Chief Bridges Engineering Administration: SARIM KARABULUT : Financial Consultant ABDURRAHMAN ABACI : Legal Consultant AYDIN CÖMERT : Accounting Director ŞEYMA BADEM : Accounting Deputy Director İBRAHİM AKTAN : Aktan YMM, Accounting Consultant Consultants (Engineering Services): HÜSEYİN ÖZTÜRK : Project Development and Investments Advisor Prof. Dr. OKAY EROSKAY : Kültür University, Scientific Sciences Faculty, Prof. Eng. Geology Prof. Dr. KAYIHAN ARIC : Vienna University, Prof. Geophysics Prof. Dr. NADIR YAYLA : Istanbul Technical University, Prof. Transportation & Highways Prof. Dr. SÖNMEZ YILDIRIM: Yıldız Technical University, Prof. Soil Mechanics and Geotechnics Prof. Dr. ŞÜKRÜ ERSOY : Yıldız Technical University, Prof. Engineering Geology Dr. AYŞE KUDAT : The World Bank Organization - Social Assessment L.L.C Dr. ZİVER ÜNER : Uner Corp. Electrical Engineer Corp. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ORGANIZATIONAL SETUP AND STRENGTH TOTAL STAFF STRENGTH PROFESSIONAL STAFF IN TRANSPORTATION DIVISION 475 306 Supervision Staff; 1. Supervisors 119 2. Resident Engineers 47 3. Geologists 6 4. Const/Adv/Ass 14 5. Soil Scientists 8 6. Financial Management Specialists 4 7. Civil Engineer 8 1. Highway Engineers 53 2. Structural Engıneers 21 3. Geotechnical Engineers 6 4. Economists 4 5. Electrical Engineers 6 6. Const/Adv/Ass 10 Design Staff; PROFESSIONAL STAFF IN BUILDING&FACILITIES DIVISION 1. Structure Engineers 36 2. Claim Managements 18 3. Draftsmen 14 4. Elect. & Mech. Supervisors 6 5. Construction Inspectors/ Lab. Tech 4 6. Const/Adv/Ass 6 PROFESSIONAL STAFF IN ENVIRONMENTAL DIVISION 53 1. Environmentalist Engineers 24 2. Supervisors/Sub-Engineers 19 3. Hydrologists 10 NON-TECHNICAL STAFF ISO 9001:2008 84 32 1. Finance & Accounts 10 2. Administration 22 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION QUALITY MANAGEMENT SYSTEM CERTIFICATE ENVIRONMENTAL MANAGEMENT SYSTEM CERTIFICATE OCCUPATIONAL HEALTH AND SAFETY SYSTEM CERTIFICATE ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION BOTEK TRANSPORTATION DEPARTMENT MOTORWAY & HIGHWAY EXPERIENCE: Botek is a 41 year old Turkish organization specializing in the supervision of major engineering design infrastructure and projects. Botek has been involved with the building of a third of the Turkey, and motorways and has expressways in successfully completed engineering works in motorways and expressways in other regional countries exceeding 3000 km in length. Botek has completed various infrastructure projects in value of over US$ 38.000.000.000 (fifteen billion dollars). Additionally, Botek has participated in various projects associated with major international banks such as the World Bank, European Investment Bank, Europe Aid, US Aid, and Islamic Development Bank. BOTEK is the leading Consulting Engineering Firm in Turkey for the design and supervision of Motorways, Highways and Roads. The experience of Botek is mostly based on Trans-European North-South Motorway (TEM) Projects which includes the following; Construction Supervision and Engineering Services for Pozanti – Tarsus – Mersin TEM Motorway (2x3), (149 km) Alanya-Gazipaşa Ayr- (Taskent-Başyayla) Ayr Road Studies and Project Consulting Services Construction Supervision and Engineering Services for Ankara – Pozanti TEM Motorway, Çiftehan – Pozanti Section (2x3), (18,5 km) Northern Marmara Highway including the 3rd Bridge and Kurtkoy-Akyazı (including connection roads) Preliminary and Final Design for Edirne – Kınalı TEM Motorway (2x3), (155 km) Preliminary and Final Design for Kınalı – Mahmutbey Motorway (2x3), (90 km) Preliminary & Final Design and Eng. Services for Istanbul – Balıkesir – Bursa – Izmir Motorway, Orhangazi - Bursa Section, (2x3), (34 km) Preliminary and Final Design, Construction Supervision for Istanbul, Bosphorus 2nd highway crossing, including 2nd Suspension Bridge, (2x4), (77.1 km), (Bridge Length 1510 m, Span Distance 1090 m) Preliminary and Final Design Engineering Services for Gaziantep – Şanlıurfa Motorway (15 km) Following major works have also been implemented by BOTEK; Consultancy Services for Design of Turkmenbashi- Ashgabat Motorway (240 Km) Design and Supervision Consultant Central Java Province (DSC-2), Regional Road Development Project in Indonesia (77 Km) ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION Design Review and Works Supervision for Batel-Gali-Zakho Road (13 Km) Construction Supervision and Consultancy Services for Tokat-Niksar Road (48 Km) Preliminary & Final Design Services for Pınarbaşı-Gürün Road (Maraşlı Nursing Home Gürün Exit) (48 Km) Upgrading of Junctions to Grade Separated Interchanges on Existing Batinah Expressway Consultancy Services for Dualization of Bidbid Sur Road, Section 1, Package 1A Preliminary & Final Design Works of Overpasses and Interchanges on Main Roads in Erbil Governorate Preliminary & Final Design for Yusufeli Dam Access Road (70 Km) Supervision Consultancy Services of Several Projects in the region of General Directorate of Highways, 3rd Division (1355 Km) Construction Supervision and Consultancy of Various Roads Between Ankara-Bolu and Düzce (1688 Km) Consultancy Services for Feasibility Study, Preliminary Engineering Design, Environmental Impact Assessment, Detailed Engineering Design and Preparation of Bid Document for the Rehabilitation and Capacity Enhancement of Road A104 from James Gichuru Road Junction to Rironi A104/B3 Junction (50 Km) Consultancy Services for Design & Supervision of the Batinah Expressway-Sultanate of Oman, 135 Km (2x4) Construction Supervision and Consultancy Services for Dualization of Izz Adam Road (50 Km) Detailed Design of Malkara-Hayrabolu-Alpullu-D100 Highway (72 Km) Detailed Design of Çay – Bolvadin - Emirdağ State Road (49 Km) Preliminary & Final Design Works of Gediz – Simav Separation – Uşak – Güre State Road (34 Km) Preliminary & Final Design Works of İzmir Aliağa Separation – Foça – New Foça Road (48 Km) Preliminary & Final Design Works of Adana South Expressway (29 Km) Construction Supervision Engineering Services and Consultancy Services (Karamağra) Cable Stayed Bridge (520 m) Preliminary & Final Design Works of Gönen Manyas Road (28 Km) Consultancy Services for Privatization of Motorways and Bridges (60 Km) Detailed Design of Candybil - Andalyp Access Road (6 Km) Design of Makhmoor Interchange, Overpass and Underpass Design of (Mama-Jalka Interchange / Hareer – Rawandoz – Jundian) Highway With Required Tunnels & Bridges, Iraq (20 Km) ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 of Ağın BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION Preliminary and Detailed Design of Haybat Sultan Tunnel, Iraq Preliminary and Final Design of Erbil-Koya Highway (65 Km) KRG/IRAQ Preliminary and Final Design of Railway Underpass Crossing Erbil-Altun Kopri (Perdi) Road Detailed Design of Galeri Street Hekimsuyu Street Intersection, Road and Intersection Design and Project Consultancy Services for Üçdam – Kığı – Yedisu Road (10 Km) Bridge, Interchange, Underpass and Road Application Projects on the European Side 6 th Phase 1st Stage (Detailed Design of TEM Overpass Bridge Widening and Connection Road and Intersection) Bridge, Interchange, Underpass and Road Application Projects on the European Side 6 th Phase 1st Stage (Detailed Design of Sarıyer Maden Underpass Bridge and Grade Separated Interchange Bridge and Road The Preparation of Detailed Design and Bidding Documents for the Upgrading of a 24 km. Section of the E-60 Highway between Igoeti and Sveneti (Funded by World Bank) Supervision Services for the Construction of Dereköy Intersection-Aziziye-Bulgarian Border State Road (Funded by EIB) (11 Km) Construction Supervision and Engineering Services for Reconstruction of Roads in Düzce, Çilimli, Gölyaka, Cumayeri, Kaynaşlı, Gümüşova, Yığılca, Beyköy, Konuralp, Boğaziçi and Akçakoca, 100 km city roads (Funded by EIB) Design, Construction Supervision and Engineering Services for Reconstruction of Urban Roads in Duzce and Golyaka Cities, Turkey, 50 km City roads (Funded by EIB) Preliminary and Final Design Engineering Services of the Diyarbakır – Silvan Separation Bingöl; (65 km.) Expressway Feasibility Study, Final Design and Engineering Services for Sirnak – Pervari Separation Catak – Begendik Separation, State Highway (24km) Preliminary and Final Design Engineering Services for Ankara – Cankiri Separation – 7th Division – İskilip Highway (84 Km) Final Design and Engineering Services for Ceyhan – Yumurtalik State Highway (2x2), (27km) Preliminary and Final Design Engineering Services for Eskişehir - City Crossing (Elevated Interchanges) Preliminary Design and Eng. Services for İskenderun – Antakya - Cilvegözü Motorway (80 km) Feasibility, Design and Engineering Services for Çanakkale (Dardanelles) Suspended Bridge and Highway Crossing, (2x3), (20 km), (Bridge Length 2196 m, Span Distance 1440 m) Final Design and Supervision Services for Ümraniye Expressway (14 km) Feasibility, Design and Engineering Services for Istanbul, Bosphorus 1st Highway Crossing ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION RAILWAYS PROJECTS BOTEK has undertaken the following railway projects alone or in association with international Companies; Preliminary and Final Project Services for Vezneciler-EdirnekapıEyüp-Gop-Sultangazi Metro Line, 17 Km Infrastructure Supply Works Construction Supervision and Consultancy Services for Ankara-Sivas Railway Project Yerköy-Yozgat-Sivas Design and Engineering Services for Halkalı – Bulgaria Railway- Dual Line 230 Km Railway Final Design And Engineering Services for Cumaovası Torbalı Railway, 27.3 Km Design and Engineering Services for Tekirdağ – Muratli – Büyük Kariştiran Railway, Dual Line 50 km Railway Final Design of Menemen - Manisa Railway Extension Project (33.5 Km) Preliminary and Final Design for Rehabilitation Project of Sirkeci - Halkali, Haydarpasa Gebze Railway Istanbul, 73 Km Feasibility Studies for Istanbul Bosphorus Tunnel Railway (Marmaray) Feasibility Studies for Istanbul Subway Feasibility Study for Istanbul Bosphorus Second Road and Railway Passing Project Istanbul Light Rail System Project Within the scope of Railway projects the following disciplines have been carried out under BOTEK responsibilities; Geotechnical and Geological Studies Determination of the route of the available lines Identification of the Project Standards Determination of Local Stations and Preparation of the Placement Plan of the Stations Tunnel and Station Ventilation Systems Fire in Combat Systems Drainage Systems Lighting Systems Communication Systems Environmental Control Energy Supply ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION TRANSPORTATION PROJECTS ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION TRANSPORTATION PROJECTS Scope of Work Constru ction Cost Actual Situation Northern Marmara Highway including the 3rd Bridge and Kurtköy-Akyazi (including connection roads) Stfa Gülsan Yapı Merkezi Preliminary design of; 120 km Highway and 50 km Access road Preparation of BOQ USD 800 Million Ongoing work Alanya-Gazipaşa Ayr(Taskent-Başyayla) Ayr Road Studies and Project Consulting Services General Directorate of Highways USD 2.25 Billion Ongoing work Ongoing work Consultancy Services for POLİMEKS Construction Design of TurkmenbashiAshgabat Motorway Preliminary and Final Project Istanbul Metropolitan Municipality Services for VeznecilerEdirnekapı-Eyüp-Gop- Km: 3 + 500-25 + 175 (G27 + 603 (i) between) Studies and Project Consulting Services Consultancy Services for Preliminary and Final Design of 240 km Motorway Preliminary and Final Design of 17 km long metro Sultangazi Metro Line USD 2 Billion USD 850 Million Ongoing work USD 900 Million Ongoing work USD 80 Million Ongoing work USD 150 Million Ongoing work USD 40 Million Ongoing work USD 35 Million Ongoing work Tunnel Client Bridge Project Name Railway Motorway Highway Content line Design and Supervision Consultant Central Java Government of Indonesia Province (DSC-2), Regional Road Development Project in Indonesia General Directorate of Roads and Bridges and Construction & Housing-KRG Design Review and Works Supervision for Batel-GaliZakho Road (13 Km) Design and Construction Supervision of 77 km long regional roads located in the islands of Java and Kalimantan Design Review and Works Supervision of 13 km road and 2 interchanges Construction Construction Supervision and General Directorate of Highways Consultancy Services for Tokat-Niksar Road Supervision and Consultancy Services for 48 Km Road Ankara-Sivas Railway Project Infrastructure Yerköy-Yozgat-Sivas Infrastructure Supply Works Construction Supervision and Supply Works Turkish State Railways Construction Supervision and Consultancy Services (Section Consultancy II Km:332+300 - 363+527) Services Preliminary & Final Design Services for Pınarbaşı-Gürün Road (Maraşlı Nursing Home Gürün Exit) ISO 9001:2008 ISO 14001:2004 Survey and General Directorate of Highways OHSAS 18001:2007 Project Consultancy Services BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION TRANSPORTATION PROJECTS Client Scope of Work Construction Cost Actual Situation Upgrading of Junctions Ministry of Communication and Transportation, Sultanate of Oman Design of 6 Interchanges USD 20 Million Ongoing work Consultancy Services for Dualization of Bidbid Sur Road, Section 1, Package 1A Astaldi-Ozkar JV Design, Engineering and Consultancy Services for various structures USD 510 Million Ongoing work Preliminary & Final Design Works of Overpasses and Interchanges on Main Roads in Erbil Governorate The General Directorate of Roads & Bridges Construction & Housing / Erbil Preliminary and Final Design of 8 Interchanges, USD 20 Million Ongoing work USD 1 Billion Ongoing work USD 500 Million Ongoing work USD 600 Million Ongoing work USD 30 Million Ongoing work Ongoing work to Grade Separated Interchanges on Existing Batinah Expressway Preliminary & Final Design of Yusufeli Dam Access Roads Various Projects in the region of General Directorate of Rehabilitation and Capacity Enhancement of Road A104 from James Gichuru Road Junction to Rironi Consultancy Services for the Design & Supervision of the Construction of Batinah Expressway ISO 9001:2008 Project Consultancy Services Supervision General Directorate of Highways, 3rd Division Highways, 3rd Division Construction Supervision and Consultancy of Various Roads between Ankara – Bolu and Düzce Survey and General Directorate of Highways Supervision Consultancy Services of Bridge Project Name Tunnel Railway Motorway Highway Content General Directorate of Highways Kenya National Highways Authority Ministry of Transportation and Communication Sultanate of Oman ISO 14001:2004 Consultancy Services, Survey Works, Quality Control Construction Supervision and Consultancy Feasibility Study, Preliminary Engineering Design, EIA,SIA, Detailed Engineering Design Batinah Expressway 135 km (2x4) Motorway Consultancy Services for the Design & Supervision OHSAS 18001:2007 USD 1.2 Billion BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION TRANSPORTATION PROJECTS Client Scope of Work Construction Cost Actual Situation Consultancy Services Ministry of Communication and Transportation Construction Supervision and Consultancy USD 130 Million Ongoing work Malkara-HayraboluAlpullu-D100 Highway Survey and Project Consultancy Services General Directorate of Highways Detailed Design of a 72 kilometer highway USD 90 Million Ongoing work Detailed Design of ÇayBolvadin-Emirdağ State Road General Directorate of Highways USD 56 Million Ongoing work Preliminary & Final Design of Gediz – Simav Separation – Uşak – Güre State Road General Directorate of Highways Preliminary and Final Design of the (34km.) Motorway USD 68 Million Completed in 2014 Preliminary & Final Design of İzmir Aliağa Separation – Foça – Yeni Foça State Road General Directorate of Highways Preliminary and Final Design of the (48km.) Motorway Completed in 2014 Ağın (Karamağra Bridge) Completion, Construction Supervision and Consulting Services General Directorate of Highways Construction Supervision and Consulting Services USD 25 Million Ongoing work Preliminary & Final Design of Gönen Manyas Road General Directorate of Highways Preliminary & Final Design Works for 28 km road USD 34 Million Ongoing work Ankara-Pozanti Motorway CiftehanPozanti Section Construction Supervision and Engineering Consulting Services General Directorate of Highways Construction Supervision of (2x3) Motorway (18.5 km) USD 430 Million Ongoing work Kurdish Regional Government Preliminary Design Preparation, Detailed Design, Preparation of Bill of Quantities USD 450 Million Completed in 2012 for Dualization of Izz Adam Road Design of (Mama-Jalka Interchange / Hareer – Rawandoz – Jundian) Highway With Required Tunnels & Bridges ISO 9001:2008 ISO 14001:2004 Detailed Design of a 49 Kilometer State Roadway OHSAS 18001:2007 USD 96 Million Bridge Project Name Tunnel Railway Motorway Highway Content BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION TRANSPORTATION PROJECTS Client Scope of Work Construction Cost Actual Situation Makhmoor Interchange, Overpass and Underpass Design Kurdish Regional Government Design of interchange, overpass and underpass over the 60 meter wide road USD 15 Million Completed in 2015 Preliminary and Final Design of Adana South Expressway General Directorate of Highways Preliminary and Final Design of the (29km.) Motorway Completed in 2014 Consultancy Services for Privatization of Motorways and Bridges Turkish Republic Privatization Administration - Nurol Consortium Preliminary Design of 60 km of Motorways, Preparation of BOQ, 25 year maintenance and operation cost of Suspension Bridges USD 3 Billion Completed in 2012 Final Detailed Design Candybil-Andalyp Access Road Project Polimeks Construction Industry Trade Corp. Final detail design of the project USD 15 Million Completed in 2012 Preliminary and Detailed Design of Haybat Sultan Tunnel Kurdish Regional Government Preliminary and Detailed Design of 3,5 km tunnel 3 km approach roads ,2 interchanges USD 48 Million Completed in 2012 Üçdam-(Kığı-Yedisu) Road Study and Project Consultancy Services General Directorate of Highways Survey and Project Consultancy Works of a 10 kilometer road USD 5,5 Million Completed in 2012 Preliminary & Final Design of Erbil – Koya Highway Ministry of Construction and Housing General Directorate of Roads and Bridges, Erbil Preliminary and Final Design of the (65km.) Highway USD 150 Million Completed in 2011 Menemen – Manisa Railway Extension Project General Directorate of Highways Final Design of the (33.5km) Railway USD 66 Million Completed in 2011 Preliminary and Final Design of Erbil – Altun Kopri (Perdi) Road Final Design of Railway Underpass Ministry of Construction and Housing General Directorate of Roads and Bridges, Erbil Preliminary and Final Design of the Railway Underpass ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 USD 58 Million USD 10 Million Completed in 2011 Bridge Project Name Tunnel Railway Motorway Highway Content BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION TRANSPORTATION PROJECTS Scope of Work Construction Cost Actual Situation General Directorate of Highways Construction Supervision and Engineering Services of Expressway (5 km) USD 10 Million (Funded by EIB) Completed in 2011 Sirnak-Pervari Separation - CatakBegendik Separation, State Highway General Directorate of Highways Feasibility study, Final Design and Engineering Services of State Highway (24 km) USD 50 million Completed in 2009 Ankara-Cankiri Seperation-7th Division- Iskilip State Highway Project; Preliminary and Final Design Engineering Services General Directorate of Highways Preliminary and Final Design of the (2x1) State Highway (84 km) USD 90 million Completed in 2009 Diyarbakır – Silvan Seperation - Bingöl; Preliminary and Final Design Engineering Services General Directorate of Highways Preliminary and Final Design of the Expressway(65 km) USD 150 Million Completed in 2011 Gaziantep – Şanlıurfa Motorway Project; Preliminary and Final Design Engineering Services General Directorate of Highways Preliminary and Final Design of the Motorway (15 km) USD 75 Million Completed in 2009 Halkalı – Bulgaria High Speed Rail Line General Directorate of Railways, Harbors and Airports Construction (DLH) Design and Engineering Services For Dual Line Railway (303 km) USD 540 Million Completed in 2009 USD 30 Million Completed in 2008 Supervision Services for the Construction of Dereköy Intersection – Aziziye – Bulgarian Border State Road Cumaovası Torbalı Railway Final Design And Engineering Services The Preparation of Detailed Design and Bidding Documents for the Upgrading of a 24 km. Section of the E-60 Highway between Igoeti and Sveneti ISO 9001:2008 Turkish State Railways, 3th District Directorate Ministry of Economic Development of Georgia (MOED) ISO 14001:2004 Final Design And Engineering Services for Railway (27.3 km) The Preparation of Detailed Design and Bidding Documents for the Upgrading of a Section (24 km) OHSAS 18001:2007 USD 12 Million (Funded by World Bank) Completed in 2008 Bridge Client Project Name Tunnel Railway Motorway Highway Content BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION TRANSPORTATION PROJECTS Client Scope of Work Construction Cost Actual Situation Tekirdağ – Muratli – Büyük Kariştiran Railway, Turkey General Directorate of Railways, Harbors and Airports Construction Design and Engineering Services For Dual Line Railway (50 km) USD 90 Million Completed in 2007 Istanbul Metropolitan Municipality Detailed Design for Street Intersection, Road and Intersection USD 10 Million Completed in 2007 Istanbul Metropolitan Municipality TEM OverPass Bridge Widening and Connection Road and Intersection Detailed Design USD 10 Million Completed in 2006 Istanbul Metropolitan Municipality Sariyer Maden UnderPass Bridge and Grade Seperated Interchange Bridge and Road Detailed Design USD 10 Million Completed in 2006 Completed in 2007 Completed in 2005 Completed in 2005 Galeri Street Hekimsuyu Street Intersection, Road and Intersection Detailed Design Bridge, Interchange, Underpass and Road Application Projects on the European Side 6th Phase 1st Stage Bridge, Interchange, Underpass and Road Application Projects on the European Side 6th Phase 1st Stage Reconstruction of Roads in Düzce, Çilimli, Gölyaka, Cumayeri, Kaynaşlı, Gümüşova, Yığılca, Beyköy, Konuralp, Boğaziçi and Akçakoca Reconstruction of Urban Roads in Duzce and Golyaka Cities, Turkey Ceyhan-Yumurtalık State Highway Study, Final Design and Engineering Services Work ISO 9001:2008 Düzce Municipality Düzce Municipality General Directorate of Highways ISO 14001:2004 Construction Supervision and Engineering Services for City Roads (100 km) Design, Construction Supervision and Engineering Services for City Roads (20 km) Preliminary and Final Design of the (2x2) State Highway (27 km) OHSAS 18001:2007 USD 24 Million (Funded by EIB) USD 10 Million (Funded by EIB) USD 60 Million Bridge Project Name Tunnel Railway Motorway Highway Content BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION TRANSPORTATION PROJECTS Eskisehir-City Crossing (Elevated Interchanges) Preliminary and Final Design Engineering Services Scope of Work Construction Cost Actual Situation Tunnel Istanbul-BursaBalıkesir -Izmir Motorway, Orhangazi-Bursa Section Preliminary And Final Design, Engineering Services Client Bridge Pozanti-Tarsus-Mersin Motorway Design and Construction Supervision and Engineering Services Railway Project Name Motorway Highway Content General Directorate of Highways Construction Supervision and Engineering Services of Motorway (149 km) USD 1,25 Billion Completed in 2004 USD 466 Million Completed in 2005 USD 20 Million Completed in 2003 USD 300 Million Completed in 1999 Feasibility Study, Preliminary and General Final Design, Directorate of Tender Highways 14th Documents to Division Include Geotechnical and Geodetical Surveys Preliminary and Final Design of 2 Interchanges General and Connecting Directorate of (2x3) Roads to Highways Include Geodetic Surveys Iskenderun-Antakya Cilvegozu Motorway Preliminary Design and Engineering Services General Directorate of Highways Preliminary Design of Engineering Services Including Geodetic Surveys and Geotechnical Works (80 km) Çanakkale (Dardanelles) Suspended Bridge and Highway Crossing, (2x3), (20 km), (Bridge Length 2196m, Span Distance 1440m) General Directorate of Highways Feasibility and Final Design Study of Bridge Crossing and Approach Roads USD 700 Million Completed in 1998 General Directorate of Highways 17th Division Preliminary and Final Design of Motorway (150km) and Connection Highways (60km) Including Mapping and Geotechnical Works USD 1,35 Billion Completed in 1996 Edirne Kinali Motorway Project (Including Connection Roads) Edirne – Kinali, Turkey 1987 ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. TRANSPORTATION PROJECTS Final Design and Supervision Services for the Umraniye Expressway, between the first and second Peripheral Highways of Istanbul,14 km Feasibility Studies, Preliminary and Final Design, Preparation of Tender Documents and Construction Supervision to Include Geotechnical and Geodetic Surveys (77.1 km) Construction Cost Actual Situation USD 90 Million Completed in 1996 USD 900 Million Completed in 1994 Umraniye Expressway Project Istanbul, Turkey General Directorate of Highways 17th Division Istanbul II. Peripheral Motorway and Suspension Bridge, Preliminary and Final Design and Construction Supervision Engineering Services General Directorate of Highways 17th Division Bosphorus Cornice Road for European Side and the Coastal Link Drawings Istanbul, Turkey Municipality of Istanbul Location study, Preliminary and Final Design of a 2x3 divided road (13 km) USD 50 Million Completed in 1987 Municipality of Istanbul Preliminary and Working Design of Goztepe and Bostancı Streets Interchanges between Motorway E5 and Bagdat Boulevar,30 km USD 90 Million Completed in 1986 Municipality of Bakırkoy Location study, Preliminary and Final Design, Preparation of Tender Doc., Transparent. Study Establishing New Road Arteries and Bus Routes USD 20 Million Completed in 1985 Ministry of Public Works, General Directorate of Railways Increasing the Existing 2 Tracks to 4 Rehabilitation of the Vertical and Horizontal Alignment of the Railway Preliminary and Final Design of Railway (73 km) USD 700 Million Completed in 1985 Arterial Road Study and Design of Anatolian side of Istanbul, Turkey Municipality of Bakirkoy 2 number Railway Over- bridges and Rail Transportation Studies Istanbul, Turkey Rehabilitation Project for Sirkeci-Halkali, Haydarpasa-Gebze Railway Istanbul, Turkey ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Tunnel Scope of Work Bridge Client Railway Project Name Motorway Highway Content BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. TRANSPORTATION PROJECTS Scope of Work Construction Cost Actual Situation Feasibility Study of the Bosphorus Railroad Crossing, Istanbul, Turkey Ministry of Public Work, General Directorate of Railways Consultancy Services for the Feasibility Study and Preliminary Design of Rail Tunnel Develop Across the Bosphorus USD 1,10 Billion Completed in 1984 Final Design of the 90km Portion of Thracian Motorway (Mahmutbey- Kinali) Istanbul General Directorate of Highways 1st Division USD 580 Million Completed in 1982 Second Bosphorus Highway And Railroad Crossing Istanbul General Directorate of Highways 17th Division USD 1,00 Billion Completed in 1980 USD 500 Million Completed in 1979 Preliminary and Final Design of Motorway to Include Mapping and Geotechnical Engineering Underwater Crossing For Motorway And Railway; Feasibility Study And Preliminary Design For The Second Bosphorus Bridge And 40km. Access Roads Feasibility Study for Istanbul Subway Istanbul, Turkey General Directorate of Highways 17th Division Transportation Study and Preliminary Design for Rail, Tunnels, Bridges, Stations and ElectroMechanical Systems, 15 km Feasibility Study for Dardanelles Road Crossing Dardanelles, Turkey General Directorate of Highways Feasibility and Final Design Study of Bridge Crossing and Approach Roads USD 700 Million Completed in 1978 Consultancy Services First Bosphorus Suspended Bridge Istanbul, Turkey General Directorate of Highways 17th Division Consultancy Services for the Operation and Maintenance Bosphorus Bridge USD 650 Million Completed in 1978 Preparation of Tender Documents for the Anatolian Motorway Izmit, Turkey General Directorate of Highways 1st Division Preparation of Tender Documents, Both Turkish and English Versions USD 720 Million Completed in 1977 ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Tunnel Client Bridge Project Name Railway Motorway Highway Content BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. MOTORWAYS & HIGHWAYS & RAILWAYS PROJECTS ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. CONSULTANCY SERVICES FOR DESIGN OF TURKMENBASHI-ASHGABAT MOTORWAY CLIENT: POLİMEKS Construction Turkmenistan PROJECT DURATION: 2015-2016 Project Profile Projects consists of Consultancy Services for Preliminary and Final Design of 240 km Motorway Services Provided Corridor Survey Mapping Works Determination of horizontal and vertical alignment and preparation of the reports Hydrological and Hydraulic Surveys Bridge and Interchange Design Hydraulic culvert and underpass designs Drawings and preparation of final report Drainage Works Bill of Quantities Traffic Studies Landscape Design ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. DESIGN AND SUPERVISION CONSULTANT CENTRAL JAVA PROVINCE (DSC-2), REGIONAL ROAD DEVELOPMENT PROJECT IN INDONESIA CLIENT: Government of Indonesia PROJECT DURATION: 2015-2018 Project Profile This project is located in the islands of Java (in provinces of Central Java and East Java) and Kalimantan (West Kalimantan and East Kalimantan). Project scope consists of supervision services for widening, reconstruction, rehabilitation and construction of 77 km of national, provincial and kabupaten roads, bridges and associated drainage structures. This is an ISDB financed project. Services Provided Design review and detailed design activities are carried out to the appropriate technical standards; Supervision services for widening, reconstruction, rehabilitation and construction Supervision guidance and organization of constructions supervision teams; Establish and monitor construction quality assurance; Monitoring of construction schedules comparing actual progress to planned; Monitoring of costs and recommendation for approval of payments to contractors. Support the Field Team, in supervision of the setting-up, organization and lay out of the Contractor’s field laboratory and in monitoring the mobilization of the equipment. Monthly Payment Certificates ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY AND FINAL PROJECT SERVICES FOR VEZNECILER-EDIRNEKAPI-EYÜP-GOP-SULTANGAZI METRO LINE CLIENT: Istanbul Metropolitan Municipality İstanbul/Turkey PROJECT DURATION: 2014-2016 Project Profile This work is the carrying out of the route studies of the approximately 17 km long VeznecilerEdirnekapı-Eyüp-GOP-Sultangazi Railway System Line that has been determined within the frame of the Istanbul Metropolitan Area Integrated Urban Transportation Plan, by watching out for integration, standardization and also the optimization of the depot-maintenance area, carrying out of the comparative route researches at appropriate scales route alternatives that are to be developed, determining of appropriate route in the direction of the results of the study, carrying out of the line based transportation studies, developing of financing model that provides the supporting of the planned rail mass transportation route by real estate investments, determining of the locations of the stations, the carrying out of the preliminary project designs of the stations and appropriate depot areas, determining of the operating scenarios, preparing of the construction plans of the selected route with scale of 1/5000 and preparing of the Financial and Economical Feasibility Studies. Services Provided - Project Management - Preliminary Design - Surveysand reports -Geotechnics (seismic study included) -Topography Land Survey -Traffic -Dilapidation -EIA/Noise/Vibration -Land Usage -Utilities - Utilities Diversion Design - Traffic Diversion Design - MEP (tunnel, station depot) - Power Supply, Communication/Signalization - New Urban Zoning Plan, Expropriations - Contribution to Design Standards and FS - Construction Health and Safety - Bill of Quantities and Tender Documents ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY & FINAL DESIGN SERVICES FOR SORGUN-ÇEKEREK ROAD CLIENT: General Directorate of Highways Kayseri – Turkey PROJECT DURATION: 2015 - 2017 Project Description: The project includes preliminary and final design services for 48 Kilometer road. Services Provided Corridor Survey Mapping Works Determination of horizontal and vertical alignment and preparation of the reports Hydrological and Hydraulic Surveys Bridge and Interchange Design Hydraulic culvert and underpass designs Drawings and preparation of final report Drainage Works Bill of Quantities Traffic Studies Landscape Design ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY & FINAL DESIGN SERVICES FOR ALANYA-GAZIPAŞA AYR- TAŞKENT-BASYAYLA ROAD CLIENT: General Directorate of Highways Antalya – Turkey PROJECT DURATION: 2016 - 2017 Project Description: The project includes preliminary and final design services for (Km:3+500-5+175(G)/27+603(İ)). Services Provided Corridor Survey Mapping Works Determination of horizontal and vertical alignment and preparation of the reports Hydrological and Hydraulic Surveys Bridge and Interchange Design Hydraulic culvert and underpass designs Drawings and preparation of final report Drainage Works Bill of Quantities Traffic Studies Landscape Design ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. NORTHERN MARMARA HIGHWAY INCLUDING THE 3RD BRIDGE AND KURTKOY-AKYAZI (INCLUDING CONNECTION ROADS) CLIENT: Stfa – Gülsan – Yapi Merkezi Joint Venture Istanbul – Turkey PROJECT DURATION: 2016 - 2016 Project Description Northern Marmara Highway including the 3rd Bridge and Kurtkoy-Akyazı (including connection roads) to relieve the traffic of Istanbul and surrounding areas, Northern Marmara Motorway’s 4th , 5th and 6th segment’s will be tendered as Build-Operate-Transfer model. Project includes; Services Provided Preliminary design of; 120 km Highway (2 Toll Plazas) 50 km Access road (13 Toll Plazas) 25 Overpasses 2 Tunnels 13 Viaducts 106 Bridges Traffic diversion study Preparation of BOQ ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. DESIGN REVIEW AND WORKS SUPERVISION FOR BATEL-GALI-ZAKHO ROAD CLIENT: General Directorate of Roads and Bridges and Construction &Housing-KRG Duhok-Iraq PROJECT DURATION: 2014-2016 Project Description: Project consists of Design Review and Construction Supervision Works for 13 km section of Batel Gali – Zakho Road and Design Supervision of Batel and Smail Ava Interchanges in Duhok. Services Provided 2. Construction Supervision 1. Design Review Data Collection and Site Ensuring that the notice to commence Reconnaissance the works is issued in accordance Traffic Study with contract requirements Geometric Design Field Surveys / Topographic Surveys method, temporary/perminent works, Geotechnical Study / Surveys drawings, quality control system etc. Hydrological Surveys Structural Concept Design management, health and safety and Drainage Concept Design environmental protection Utilities Supervision Site of security ISO 14001:2004 OHSAS 18001:2007 and safety, Verification of as-built drawings Approval of drawings work traffic interchanges ISO 9001:2008 Contractor’s for 2 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. CONSTRUCTION SUPERVISION AND CONSULTANCY SERVICES FOR TOKAT – NIKSAR ROAD CLIENT: General Directorate of Highways Tokat-Turkey PROJECT DURATION: 2014-2018 Project Description Project includes Construction Supervision and Consultancy Services for Tokat – Niksar Road Km: 0+000 – 48+962. Tokat – Niksar Road is an important arterial road for E80 State Road which provides link between Sivas, Tokat cities and Amasya-Erzincan cities and E70 State Road which connects Samsun and Ordu cities. Moreover, Tokat – Niksar Road includes 8 Bridges which have a total length of 582 m and 18 interchanges. Services Provided Supervision of Road Construction Supervision of Bridge & Structure Constructions Supervision of Interchanges Constructions Line Installations and Lighting Works Traffic Signs and Signalization Drainage Works Landscape Studies and Planning Quality Control Data Processing and Documentation Preparation of Final Accounts and Certificates ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Payment BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. ANKARA-SIVAS RAILWAY PROJECT YERKÖY-YOZGAT-SIVAS INFRASTRUCTURE SUPPLY WORKS CONSTRUCTION SUPERVISION AND CONSULTANCY SERVICES CLIENT: Turkish State Railways Sivas-Turkey PROJECT DURATION: 2014-2016 Project Description Ankara - Sivas Railway route is a part of the railway network from west border to east border of Turkey and is located on the railway networks of Europe-Iran, Europe-Middle East and Caucasian countries. Moreover, this line is located on the continuation of Pan-European 4. Corridor. With this project, existing Ankara-Sivas Railway route’s length which is 602 km will be decreased to 461 km. When Ankara-Sivas Railway Project is completed, travelling time between Ankara-Sivas will be decreased from 12 hours to approximately 3 hours. Services Provided Infrastructure Supply Works Construction Supervision and Consultancy Services for the Section II KM: 332+300 – 363+527 of the Ankara – Sivas Railway Route. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY & FINAL DESIGN SERVICES FOR PINARBAŞI-GÜRÜN ROAD (MARAŞLI NURSING HOME GÜRÜN EXIT) CLIENT: General Directorate of Highways Kayseri-Turkey PROJECT DURATION: 2013-2015 Project Description The project includes preliminary and final design services for 48 Kilometer road. Services Provided Corridor Survey Mapping Works Determination of horizontal and vertical alignment and preparation of the reports Hydrological and Hydraulic Surveys Bridge and Interchange Design Hydraulic culvert and underpass designs Drawings and preparation of final report Drainage Works Bill of Quantities Traffic Studies Landscape Design ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. UPGRADING OF JUNCTIONS TO GRADE SEPARATED INTERCHANGES ON EXISTING BATINAH EXPRESSWAY CLIENT: Ministry of Communication and Transportation Muscat- Sultanate of Oman PROJECT DURATION: 2013-2015 Project Description The project includes design of 6 interchanges on existing Batinah Expressway. Services Provided Topographical survey of each junction location, including identification of existing utilities. (1/1000 scale topographical maps showing existing utilities) Concept highway design of the grade separated interchange, including service roads along both sides of the highway. (Interchange plan and profile drawings including at-grade roundabout layout, arrangement of diverting and joining lanes, arrangement of service roads) Concept structural design of the bridge for overpassing road will have 3 lanes in each direction. (Design of overpassing bridge containing 3 lanes each way. Plan, elevation, sections and typical details about structural members will be provided. The bridge will have similar appearance as already approved bridges. Special attention will be paid to aesthetic features) Bill of Quantities (BOQ) of construction items. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. CONSULTANCY SERVICES FOR DUALIZATION OF BIDBID SUR ROAD, SECTION 1, PACKAGE 1A CLIENT: Astaldi-Ozkar JV Sultanate of Oman PROJECT DURATION: 2013-2015 Project Description The dualisation project is aimed at transforming the single-lane Bidbid-Sur carriageway into an allweather motorway. The scope of work for the first phase involves the construction of the 40km stretch of the existing carriageway from Sarur in Samayil Wilayat to beyond Wadi al Aqq and some adjoining roads. This segment represents Package 1-A of Section 1 of the dualisation project, which will cover the entire 250 km length of the carriageway after completion. Moreover, five major wadi bridges at higher elevations, as well as a number of smaller bridges and culverts, will be constructed at key points along the existing carriageway stretch. BOTEK is responsible for Design, Engineering and Consultancy Services for various structures. Services Provided Design, Engineering and Consultancy Services Alternative design of the foundations of bridges Technical Assistance to the Contractor ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY & FINAL DESIGN WORKS OF OVERPASSES AND INTERCHANGES ON MAIN ROADS IN ERBIL GOVERNORATE CLIENT: The General Directorate of Roads & Bridges Construction & Housing Erbil-Iraq PROJECT DURATION: 2013-2015 Project Description The project consists of design of 9 interchanges on main roads in Erbil. Services Provided Topographic Map, Preliminary and Final Design Geological and Geotechnical Study Feature Table and preparation of the Technical Specifications Preliminary Design Detailed Design Preparation of Tender Documents ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY AND FINAL DESIGN SERVICES FOR YUSUFELI DAM ACCESS ROADS CLIENT: General Directorate of Highways Artvin-Turkey PROJECT DURATION: 2013-2016 Project Description Yusufeli Dam and Hydroelectric Power Plant is located on Coruh River, about 40 km southwest of Artvin City center and about 10 km downstream of Yusufeli Town. It is the highest dam of Turkey and 6th highest dam of Europe. Yusufeli Dam Access Roads is located alongside the Coruh River. The project consists of survey and project consultancy services for Yusufeli Dam Access Roads including technical studies, preliminary and final design. Yusufeli Dam Access Road will provide continuous accessibility between Erzurum, Ardahan, Kars provinces and Yusufeli district. Project Details 7 Bridges 1 Special Bridge 3 Viaducts ( The longest viaduct has a length of 600 m and height of 160 m) 47 Tunnels (Total Length of tunnels: 35 km; The longest tunnel’s length is 3200 m) Total Length of the roads: 70 km Services Provided Topographical Surveys Road Structures (Bridge, viaduct etc.) Horizontal-Vertical Alignment Studies Hydraulic Surveys Interchange projects Tunnel Project Services Drainage Works Cross-section and Clearence Drawings, Bruckner Traffic Studies Environmental Impact Assessment ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. SUPERVISION CONSULTANCY SERVICES OF SEVERAL PROJECTS IN THE REGION OF GENERAL DIRECTORATE HIGHWAYS, 3RD DIVISION rd CLIENT: General Directorate of Highways, 3 Division Konya-Turkey PROJECT DURATION: 2012-2016 Project Description Section I: Konya-Akşehir, Akşehir-Afyon, Akşehir-(Yalvaç-Şarkikaraagaç) Roads, Polatlı-Yunak-Akşehir State Roads Section II: Konya-Seydişehir, Seydişehir-13.Region Border, Konya-Beyşehir, Beyşehir-Derebucak-13 Division Border State Road Section III: Konya-Aksaray, Konya-Ereğli-6 Region Border, Konya-Karaman-5 Division Border Road Section IV: Afyon-Kütahya, Altıntaş-Dumlupınar, Afyon-Sandıklı, Afyon-Emirdağ, Sivrihisar-Emirdağ State Roads Services Provided Supervision of Motorway Construction Supervision of Bridge & Structure Constructions Supervision of Motorway Barriers and Railings Mountings Supervision of Construction of Facilities, Parking and Maintenance Areas, Service Stations Supervision of Motorway Landscape Works, Pavement and Earthworks, Electric and Water Line Installations and Lighting Works Traffic Census Traffic Signs and Signalization Drainage Works Landscape Studies and Planning Design Review Quality Control Data processing and Documentation Preparation of Final Accounts and Payment Certificates ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. CONSTRUCTION SUPERVISION AND CONSULTANCY OF VARIOUS ROADS BETWEEN ANKARA-BOLU AND DUZCE CLIENT: General Directorate of Highways Ankara-Turkey PROJECT DURATION: 2012-2015 Project Description Construction Supervision and Consultancy Services for seventeen different road constructions in 4 th Region, General Directorate of Highway Services Provided Supervision of Motorway Construction Supervision of Bridge & Structure Constructions Supervision of Motorway Barriers and Railings Mountings Supervision of Construction of Facilities, Parking and Maintenance Areas, Service Stations Supervision of Motorway Landscape Works, Pavement and Earthworks, Electric and Water Line Installations and Lighting Works Traffic Signs and Signalization Drainage Works Landscape Studies and Planning Design Review Quality Control Data processing and Documentation Preparation of Final Accounts and Payment Certificates ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PRELIMINARY ENGINEERING DESIGN, ENVIRONMENTAL IMPACT ASSESSMENT, DETAILED ENGINEERING DESIGN AND PREPARATION OF BID DOCUMENT FOR THE REHABILITATION AND CAPACITY ENHANCEMENT OF ROAD A104 FROM JAMES GICHURU ROAD JUNCTION TO RIRONI A104/B3 JUNCTION CLIENT: Kenya National Highway Authority (KENHA) Nairobi-Kenya PROJECT DURATION: 2012-2016 Project Description Rehabilitation of existing pavement, widening and any other infrastructural improvements necessary to enhance capacity on the section of the A104 highway from the junction with James Gichuru Road to Rironi (junction with B3). Including; recarpeting, addition of lanes, construction of service roads, reconfiguration of storm water drainage along the alignment. Design features for use by non-motorized traffic. Incorporate improvements into a bid document. Services Provided Feasibility Studies, environmental and social impact assessment and resettlement Traffic Studies Non-motorized Traffic Surveys Urban Highway Design Pavement Strength and Roughness / Deterioration Investigations / Surveys Tender Documentation Stormwater Drainage Design ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. CONSULTANCY SERVICES FOR DESIGN & SUPERVISION OF THE BATINAH EXPRESSWAY- SULTANATE OF OMAN, 135 KM (2X4) CLIENT: Ministry of Transportation and Communication Muscat-Sultanate of Oman PROJECT DURATION: 2009-2017 Project Description Project Details Batinah Expressway, about 275 km long and with 250 km link roads, starts from the end of Muscat Highway. The alignment runs nearly parallel to 6 interchanges,14 flyovers, 18 underpasses All types of drainage structures including bridges, culverts, retaining and flood protection/training works All the works necessary for the construction and operation of the expressway the existing Batinah Highway dual carriageway at a distance varying between 5 km and 20 km approximately on the mountain side, and ends near the Oman – UAE border at Khatmat Malaha. Services Provided The Expressway is divided into Three Sections, namely Section–I, Section–II and Section–III within each of these sections the existing network of roads which will link to the Expressway are proposed to be upgraded and dualized. Section–I have 80 Km. of Link Roads, Section–II has 130 Km. of Link Roads and Section–III has 40 Km. of Link Roads. Section I: 90 km (2x4) and 80 km link road Section II: 90 km (2x4) and 130 km link road Section III: 95 km (2x4) and 40 km link road ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Review and updating of the existing alignment Preparation of Feasibility, Preliminary and Detailed Designs Tender Document Preparation Construction Bidding Document Analysis Supervision of Motorway Construction Supervision of Viaduct, Bridge and other Structures Constructions Supervision of Motorway Barriers and Railings Mountings Supervision of Pavement and Earthworks Supervision of Electric, Water and Gas Lines Installations and/or Replacements. Supervision of Lighting Works BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. CONSTRUCTION SUPERVISION AND CONSULTANCY SERVICES FOR DUALIZATION OF IZZ ADAM ROAD (50 KM) CLIENT: Ministry of Communication and Transportation Izz Adam-Sultanate of Oman PROJECT DURATION: 2012-2015 Project Description Services Provided Construction Supervision and Consultancy Services for 50 kilometer road. Review and updating of the alignment studied by others Project Details All types of drainage structures including bridges, culverts, retaining and flood protection/training works All the work necessary for the construction and operation of the expressway. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Supervision of Road Construction Supervision of Road Barriers and Railings Mountings Supervision of Pavement and Earthworks Supervision of Electric and Water Line Installations Supervision of Lighting Works BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. DETAILED DESIGN OF MALKARA-HAYRABOLU-ALPULLU –D100 HIGHWAY (72 KM) CLIENT: General Directorate of Highways Tekirdağ -Turkey PROJECT DURATION: 2012-2014 Project Description Detailed Design of a 72 Kilometer Malkara-Hayrabolu-Alpullu-D100 Highway, enhancing of existing road standard, investigation of alternative alignments and rehabilitation of road pavement in various regions. Project Details Bridge, Culvert, Drainage Structures, Retaining Walls Services Provided Survey and Mapping Engineering Structures Project Geotechnical Services Hydrological Studies Drainage Design Traffic Studies, Signalization ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. DETAILED DESIGN OF ÇAY-BOLVADIN-EMIRDAG STATE ROAD CLIENT: General Directorate of Highways Afyonkarahisar -Turkey PROJECT DURATION: 2012-2014 Project Description Detailed Design of a 49 Kilometer State Roadway Services Provided Survey and Mapping Engineering Structures Hydrological Studies Project Geotechnical Services Drainage Design Traffic Studies, Signalization ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY & FINAL DESIGN WORKS OF GEDIZ SIMAV SEPARATION GURE-USAK SEPARATION ROAD CLIENT: General Directorate of Highways Uşak-Turkey PROJECT DURATION: 2010-2014 Project Description Preliminary and Final Design of 34 kilometer State Roadway, (2x1) Services Provided Preliminary and Final Design Detailed Bridge Design Interchange Design Drainage Design Geological Studies Hydrogeological Studies Geotechnical Studies ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY & FINAL DESIGN WORKS OF IZMIR ALIAGA SEPARATION-FOCA-NEW FOCA ROAD CLIENT: General Directorate of Highways Izmir-Turkey PROJECT DURATION: 2010-2015 Project Description Preliminary and Final Design of 48 kilometer State Roadway Services Provided Preliminary and Final Design Detailed Bridge Design Interchange, Viaduct Drainage Design Geological Studies Hydrogeological Studies Geotechnical Studies ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY & FINAL DESIGN WORKS OF ADANA SOUTH EXPRESSWAY th CLIENT: General Directorate of Highways, 5 Division Adana-Turkey PROJECT DURATION: 2010-2014 Project Description Preliminary and Final Design of 29 kilometer State Motorway. Services Provided Horizontal and Vertical Alignment Studies Preliminary and Final Design Detailed Bridge Design Drainage Design Geological Studies Hydrogeological Studies Geotechnical Studies ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. CONSTRUCTION SUPERVISION ENGINEERING SERVICES AND CONSULTANCY SERVICES OF AGIN (KARAMAGARA) CABLE STAYED BRIDGE CLIENT: General Directorate of Highways Ağın-Turkey PROJECT DURATION: 2012-2016 Project Description Ağın Karamağara Cable Stayed Bridge Construction Supervision, Engineering Services and Consultancy Services (Main span: 280 m, Length: 520 m) Services Provided Supervision of Bridge & Structure Constructions Supervision of Motorway Landscape Works Supervision of Pavement and Earthworks Supervision of Electric and Water Line Installations Supervision of Lighting Works Quality Control Data processing and Documentation Preparation of Final Accounts and Payment Certificates ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY & FINAL DESIGN WORKS OF GÖNEN MANYAS ROAD CLIENT: General Directorate of Highways Balıkesir-Turkey PROJECT DURATION: 2012-2014 Project Description Preliminary and Final Design of a 28 Kilometer Road, including a bridge Services Provided Soil Investigation and Boring Preliminary Design Final Design Bridge Design Bill of Quantities Preparation of reports and final report ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. CONSULTANCY SERVICES FOR PRIVATIZATION OF MOTORWAYS AND BRIDGES CLIENT: Republic of Turkey Prime Ministry Privatization Administration, Nurol Holding Corporation -Turkey PROJECT DURATION: 2012 Project Description Establish a basis for the maintenance and repair costs that may arise only for the Bridges about urgent maintenance and repairs following the takeover of the operating rights and projected costs for the whole operation period of 25 years. Services Provided Preliminary Design of 60 km of Motorways, Preparation of BOQ, 25 year maintenance and operation cost of Suspension Bridges. Report Preparation of the following issues: o Present Condition of Bridges o Urgent Maintenance & Repair Activities o Projected Inspection, Maintenance & Repair Activities o Traffic Diversion ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. DETAILED DESIGN OF THE CANDYBIL –ANDALYP ACCESS ROAD CLIENT: Polimeks Construction Industry Trade Corp. Candybil - Turkmenistan PROJECT DURATION: 2011-2012 Project Description Detailed Design of the Candybil-Andalyp Access Road Project Details 1 interchange bridge with 2 opening 6 culverts 2 span (30 m span each) Services Provided Final Detail Design of The Project Shop Drawings and Preparing Calculation Report ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. DESIGN OF THE MAKHMOOR INTERCHANGE, OVERPASS AND UNDERPASS CLIENT: Kurdistan Regional Government Erbil- Iraq PROJECT DURATION: 2012-2014 Project Description Design and Consultancy Services for Overpass and Underpass (Bridges) in the main intersection of Erbil – Makhmoor on the circular new 60 meters street in Erbil City. Services Provided Prepare the alignment alternatives Provision of Route Study Identification and Assessment Provision of Preliminary Design Provision of Final Design Provision of Supplementary Drawings Data Processing and Documentation ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. DESIGN OF (MAMA-JALKA INTERCHANGE / HAREER – RAWANDOZ – JUNDIAN) HIGHWAY WITH REQUIRED TUNNELS & BRIDGES CLIENT: Kurdish Regional Government Iraq PROJECT DURATION: 2011-2012 Project Description The existing Erbil-Shaglawa-Mama-Jalka-Rewanduz-Hacıomran Highway, extending North-East from the Capital city Erbil to Iranian border is one of the important routes of Kurdistan to Iran. The existing road carries considerable traffic, including heavy and long vehicles and need to be upgraded with alternate corridors to improve the horizontal and vertical geometry of the road. It has been agreed by the Ministry of Construction and Housing to upgrade the existing route and constructing a new dual carriageway up to Hareer-Mama-Jalka interchange. And the final decision was made as to continue the route by a new design from the new Mama-Jalka interchange to Haciomran via Rewanduz and Jundian. The scope of this study covers the works from the new Mama-Jalka Interchange up to Jundian. This section applies to the execution of New Austrian Tunneling Method (NATM) in any type of rock. This section does not deal with specific topics of rock classification. Excavation may be carried out by drill and blast using pre-split or smooth blasting techniques or by road header or tunnel excavator. The New Austrian Tunneling Method (NATM) is based on the principle to take utmost advantage of the rock's capacity to support itself, by careful measures and deliberate guidance of the forces during the readjustment process from the primary to the secondary state of stress, which takes place in the surrounding of the excavation. By this way, local progressive loosening will be limited by careful excavation methods and timely installation of the support elements and the rock mass will be able to support itself. The supports elements are shotcrete, wiremesh, rock bolts and steel ribs. Project Details The project consists of 3 tunnels and 4 viaducts. Preliminary design preparation for (Mamajalka Interchange / Hareer – Rawandoz – Jundian) Highway with Required Tunnels & Bridges and for all structures and installations (such as tunnels, viaducts, bridges, interchanges and installations for the maintenance and services) on the highway. Detail designs of (Mamajalka Interchange / Hareer – R0wandoz – Jundian) Highway With Required Tunnels & Bridges Bill of Quantities, Conditions of Contract of Technical Specifications required for the Construction contracts of the whole section. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. Continuing PAGE 2 of 2 MAMA JALKA INTERCHANGE/HAREER-RAWANDOZ-JUNDIAN HIGHWAY TUNNEL CHARACTERISTIC PROPERTIES Design Length of Tunnel; Tunnel #1: 3600 m, Tunnel #2: 6860 m, Tunnel #3: 1750 m Tunnel Height : 5,50 meter Tunnel Tube Internal Area : 71 m2 Tunnel Circumference : 33 meter Max. Avg. Wind Velocity: 9 m/sn. Passenger Car Traffic Density : 800 vehicle/hour Heavy Vehicle Traffic Density : 1200 vehicle/hour Road Width Inside Tunnel Tube: 8.50 meters (2 lanes) Tunnel Horizontal and Vertical Geometry Design Speed : 120 km/hr Allowable Speed In Tunnel : 80 km/hr Tunnel Excavation Method : New Austrian Tunneling Method Number of Emergency Vehicle Exit : Tunnel #1: 3, Tunnel #2: 6, Tunnel #3: 2 Number of Emergency Pedestrain Exit : Tunnel #1: 2, Tunnel #2: 4, Tunnel #3: 1 Fire Extinguishing System: All the fire suppression systems shall be designed to the highly reliable, having low operation and maintenance costs, operable with few numbers of personnel and as automatic as possible. Ventilation System: Tunnel #1: 28, Tunnel #2: 64, Tunnel #3: 16 number of jet fans are used in ventilation design. Jet Fan Properties o Flow (m3/s) : 26.3 o Velocity (m/s) : 33.5 o Thrust : 1004 o Power (kw) : 30 Tunnel Electrical System: Tunnel Electrical System Design consists of Tunnel Electrification and Lighting, Tunnel Emergency Announce System, Tunnel Emergency Call (Telephone) System, Signalization System, Tunnel controlling System. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY AND DETAILED DESIGN OF HAYBAT SULTAN TUNNEL CLIENT: Kurdish Regional Government Erbil-Iraq PROJECT DURATION: 2011-2012 PAGE 1 of 2 Project Description The Haybat Sultan Tunnel is designed to cross the Haybat Sultan Mountain and create a new corridor between the Erbil – Koya Highway, at existing Koisanjaq – Suleymaniye Road and existing Raniyah – Dukan / Suleymaniye road. This section applies to the execution of New Austrian Tunneling Method (NATM) in any type of rock. This section does not deal with specific topics of rock classification. Excavation may be carried out by drill and blast using pre-split or smooth blasting techniques or by road header or tunnel excavator. The New Austrian Tunnelling Method (NATM) is based on the principle to take utmost advantage of the rock's capacity to support itself, by careful measures and deliberate guidance of the forces during the readjustment process from the primary to the secondary state of stress, which takes place in the surrounding of the excavation. By this way, local progressive loosening will be limited by careful excavation methods and timely installation of the support elements and the rock mass will be able to support itself. The supports elements are shotcrete, wiremesh, rock bolts and steel ribs. The application of the NATM requires deformation monitoring for the purpose of stability assessment and the verification of the sufficiency of the support elements installed. The deformation monitoring is accomplished by means of advanced surveying methods and special devices. Project Description This project consists of detailed design for Haybat Sultan Tunnel Scope of the Project: Preliminary and Detailed Design of 3 km tunnel Preliminary and Detailed Design 3 km approach roads Preliminary and Detailed Design 2 interchanges ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. Continuing PAGE 2 of 2 Services Provided Survey & Mapping Preliminary and Detailed Design of Highways and Tunnel Geotechnical Works Geology Report Bill of Quantities Specifications Tunnel Support System Electromechanical Works (ventilation, firefighting system, electrical signalization, tunnel controlling system) Design Length of Haybat Sultan Tunnel: Twin Tube, 3165 meter Tunnel Height: 7.60 meter. Tunnel Internal Area : 71 m² Tunnel Circumference: 33 meter Max. Avg. Wind Velocity: 9 m/sn Passenger Car vehicle/hour Heavy Vehicle vehicle/hour Road Width Inside Tunnel Tube: 8.50 meters ( 2 lanes ) Tunnel Horizontal and Vertical Geometry Design Speed : 120 km/hr Allowable Speed In Tunnel : 80 km/hr Tunnel Excavation Method : New Austrian Tunneling Method (NATM) Number of Emergency Vehicle Exit: 3 nos. Number of Emergency Pedestrian Exit: 2 nos. ISO 9001:2008 Traffic ISO 14001:2004 Density Density OHSAS 18001:2007 All the fire suppression systems shall be designed to the highly reliable, having low operation and maintenance costs, operable with few number of personnel and as automatic as possible. Ventilation System: 28 number of jet fans are used in ventilation design. Jet Fan Properties Flow (m3/s): 26.3 Velocity (m/s): 33.5 Thrust: 1004 Power (kw): 30 HAYBAT SULTAN TUNNEL CHARACTERISTIC PROPERTIES Traffic Fire Extinguishing System: : : 800 1200 Tunnel Electrical System: Tunnel Electrical System Design consists of Tunnel Electrification and Lighting, Tunnel Emergency Announce System, Tunnel Emergency Call (Telephone) System, Signalization System, Tunnel controlling System. BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY & FINAL DESIGN OF ERBIL – KOYA HIGHWAY KRG/ IRAQ CLIENT: Ministry of Construction and Housing General Directorate of Roads and Bridges Erbil-Iraq PROJECT DURATION: 2010-2011 Project Description Taking into consideration high volume of traffic on the existing road, the Ministry of Construction and Housing has decided to initiate a new corridor study and then design and construction of new road. Botek is given the assignment, which includes the corridor study of various alignments and selection and recommendation of the best suitable alignment to the Ministry and after the approval of the selected alignment, preparation of Preliminary and Final Design and also Tender Documents of new Erbil Koya highway. The project starts after Kasnazan on Erbil – Koya Highway just after the dual carriageway ends. The project section is approximately 65 km and existing Koya – Suleymaniye road after Koya city. Total length of the alignment is 59 km and has 1 major bridge, 67 culverts and 3 intersections. Design speed adopted is 120 km/hr, minimum horizontal curvature adopted on the alignment is R= 1000 m, maximum longitudinal grade is 6% which is used once in a critical location. This slope can be decreased after the detail survey. The road will be dual carriageway 2*2 with a 7 m median and 3.75 lane widths. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Services Provided Prepare the alignment alternatives Preparation of preliminary and detailed design BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. DESIGN AND ENGINEERING SERVICES FOR HALKALI – BULGARIA HIGH SPEED RAIL PROJECT- DUAL LINE 230 KM RAILWAY CLIENT: General Directorate of Railways, Harbours and Airports Construction (DLH) Halkalı-Turkey PROJECT DURATION: 2005-2009 Project Description Botek has been completing the works for this very important and comprehensive railway project which is the connecting line of Europe and Turkey. This railway contributes great amounts to development and improvement of these mostly agricultural region and exportation of their production. For this reason, during the feasibility studies and planning stage, these vital subjects have taken into consideration for the economy, tourism and transportation sectors of Turkey. The project of 230 km long Halkali-Bulgaria Dual Line Railway includes the following studies: 1/25000 scale route investigation Preparation of 1/2000 scale maps with the route drawn of these maps. Design of railway structures such as tunnels, bridges, viaducts, retaining walls etc., station buildings and the railway itself in accordance with the provision of the technical specifications. Station design Design of electrification, signaling and telecommunication Feasibility Studies Environmental Impact Assessment report of the route Preparation of expropriation plans Execution of boreholes, laboratory testing and other soil investigation studies Preparing of bill of quantities and tender documents Maximum Design Speed: 250 km/h Services Provided Route Studies (Corridor Investigation) Mapping and Expropriation Plans Plans and Longitudinal Sections Hydraulic – Hydrological Studies Drainage System Design Soil investigations Final railway design Preparation of the Detail Designs Regarding the Structures (Tunnels, Bridges, Retaining Walls etc.) Cross-sections Boreholes and Laboratory Testing Environmental Impact Assessment Final Design Report ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. FINAL DESIGN OF MENEMEN - MANISA RAILWAY EXTENSION PROJECT (33.5 KM) CLIENT: Turkish State Railways Manisa-Turkey PROJECT DURATION: 2010-2011 Project Description In the content of the Manisa - Menemen railway project, bridges are designed (3 reinforced prefabric truss which provide 16.0m clear width, 8 reinforced concrete box frame structure which provides 9.0 m clear width and 3 portal frames which provide 9.0m clear width). It is prepared 1/1000 scale maps with the route drawn of these maps, 1/1000 scale geological maps, expropriation plans and bill of quantities. Services Provided Preparation of Detailed Design Geotechnical Survey Soil Investigation Preparation of Bill of Quantities ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY AND FINAL DESIGN OF RAILWAY UNDERPASS CROSSING ERBIL – ALTUN KOPRI (PERDI) ROAD CLIENT: Ministry of Construction and Housing General Directorate of Roads and Bridges Erbil-Iraq PROJECT DURATION: 2010-2011 Project Description Railway line crosses Erbil- Altun Kopri Road at station Km 21+985. In the content of the rehabilitation of the road project, a railway underpass is planned at this location. A reinforced concrete box frame structure which provides 12.0m clear Width and 6,5 m vertical clearance above top of rail is designed for double track Railway line. The underpass is approximately 58 degree skew and 60 m long. Services Provided Prepare the alignment alternatives Preliminary and Final Design ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. DETAILED DESIGN OF GALERI STREET HEKIMSUYU STREET INTERSECTION, ROAD AND INTERSECTION CLIENT: Istanbul Metropolitan Municipality Istanbul-Turkey PROJECT DURATION: 2007 Project Description This project consists of detailed design for Galeri Street Hekimsuyu Street Intersection, Road and Intersection. Scope of the Project Design of road structures Geotechnical Survey, Soil Investigation Field Surveys Drainage Design Earthworks Services Provided Calculations, Calculations, Cross Sections Bruckner Review of Control Drawings Provision of Route Study Bridge Design Intersection Design Identification and Assessment Bill of Quantities Provision of Preliminary Design Provision of Final Design Provision of Supplementary Drawings Data Processing and Documentation ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. BRIDGE, INTERCHANGE, UNDERPASS AND ROAD APPLICATION PROJECTS ON THE EUROPEAN SIDE, 6TH PHASE 1ST STAGE (DETAILED DESIGN OF TEM OVERPASS BRIDGE WIDENING AND CONNECTION ROAD AND INTERSECTION) CLIENT: Istanbul Metropolitan Municipality Istanbul-Turkey PROJECT DURATION: 03/2006-12/2006 Project Description This project consists of detailed design for Gaziosmanpasa Hadimkoy TEM OverPass Bridge Widening and Connection Road and Intersection. Scope of the Project Design of road structures Geotechnical Survey, Soil Investigation Field Surveys Drainage Design Earthworks Calculations, Bruckner Calculations, Cross Sections Bridge Design Intersection Design Services Provided ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Review of Control Drawings Provision of Route Study Identification and Assessment Provision of Preliminary Design Provision of Final Design Provision of Supplementary Drawings Data Processing and Documentation BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. BRIDGE, INTERCHANGE, UNDERPASS AND ROAD APPLICATION PROJECTS ON THE EUROPEAN SIDE, 6TH PHASE 1ST STAGE (DETAILED DESIGN OF SARIYER MADEN UNDERPASS BRIDGE AND GRADE SEPERATED INTERCHANGE BRIDGE AND ROAD) CLIENT: Istanbul Metropolitan Municipality Istanbul-Turkey PROJECT DURATION: 03/2006-12/2006 Project Description This project consists of detailed design for Sariyer Maden UnderPass Bridge and Grade Separated Interchange Bridge and Road. Scope of the Project Design of road structures Geotechnical Survey, Soil Investigation Field Surveys Drainage Design Earthworks Calculations, Bruckner Calculations, Cross Sections Bridge Design Interchange Design Bill of Quantities Services Provided ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Review of Control Drawings Provision of Route Study Identification and Assessment Provision of Preliminary Design Provision of Final Design Provision of Supplementary Drawings Data Processing and Documentation BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. FINAL DESIGN AND ENGINEERING SERVICES FOR CUMAOVASI TORBALI RAILWAY (27.3 KM) CLIENT: Turkish State Railways Izmir-Turkey PROJECT DURATION: 2007-2008 Project Description The work done to comply with the agreement and it’s annexes, geological and geotechnical survey studies of bridges and culverts present in various kilometers was prepared, construction design and static-reinforced concrete calculations of bridges and culverts was prepared, the profile and plans belonging to the aforesaid railway track was delivered to the Client, the geotechnical reports of the railway track prepared and delivered and the delivered documents, calculations, reports and projects are compliance with Services Provided Prepare the alignment alternatives Preparation of detailed drainage design Preparation of detailed structures design Preparation of detailed stations ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 the contract and specifications. BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. DESIGN AND ENGINEERING SERVICES TEKIRDAĞ – MURATLI – BÜYÜK KARIŞTIRAN RAILWAY (FOR DUAL LINE 50 KM RAILWAY) CLIENT: Turkish State Railways Tekirdag-Turkey PROJECT DURATION: 2007-2008 Project Description In the content of the TEKIRDAĞ – MURATLI – BÜYÜK KARIŞTIRAN RAILWAY project, 1/25000 scaled track survey and Forest Management Map, 1/2000 scaled Strip Map Preparation and tracing the track into those maps, Preparation of expropriation Plans, Making the Required Drillings and other Soil Survey Works over the track, Making Projects of Engineering Structures like; Tunnels, Bridges, Retaining Walls and Subway Station Facilities and Railway according to the Technical Provision Principles, Superstructure, Making Projects of Electrification, Signalization, and Telecommunications, Preparation of EIA report, Feasibility Study of the track and reconnaissance and bill of quantities of track and tender documentation preparation of double lined Tekirdag-Murali-Buyuk Karistiran Railway Line having general standards maximum slope %012,5 and minimum Radius curve of 3000m. (in obligatory places with the approval of the Client it can be changed.) Services Provided Prepare the alignment alternatives Preparation of detailed Design Geotechnical Survey ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. THE PREPARATION OF DETAILED DESIGN AND BIDDING DOCUMENTS FOR THE UPGRADING OF A 24 KM. SECTION OF THE E60 BETWEEN IGOETI AND SVENETI CLIENT: Ministry of Economic Development of Georgia (MEOD) Georgia PROJECT DURATION: 2007-2008 Project Description The Government of Georgia has received a grant from the International Development Association (IDA) for a Georgian infra-structure preinvestment facility (IPF). The purpose was for as detailed engineering design and preparation of bidding document based on World Bank standards for the 24km section of the E-60 Highway (this section) was between km56 and km80 (Iogeti-Sveniti). The section is located about 56 km. west from Tbilisi and is to be upgraded from a 2 lane to a 4 lane road Services Provided Project Funded By World Bank Revision/Completion of the preliminary design Preparation of detailed design Preparation of the bidding documents Preparation of draft pre-qualification document (PQD) Work plan and time schedule Monthly progress reports Technical reports (geometrical design, pavement design, bridge and structure design, bill of quantity, cost estimate), Draft bidding documents Final bidding documents ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. SUPERVISION SERVICES FOR THE CONSTRUCTION OF DEREKÖY INTERSECTION – AZIZIYE – BULGARIAN BORDER STATE ROAD CLIENT: General Directorate of Highways Kırklareli / TURKEY PROJECT DURATION: 2007-2011 Project Description The platform width of Kırklareli–Dereköy– Aziziye Turkish - Bulgarian State Road Project is 10 m and pavement is only 7 m with surface treatment, after the completion of the proposed project platform width will be 12-14 m, the pavement will be 10 meter, and surface type will be asphalted concrete. By widening the existing platform width from 10 meter to 14 meter throughout Kırklareli–Dereköy–Aziziye the works consist of .A-Earth Works: Preparation for filling, cut excavation, Filled section works. B-Hydraulic Structure: Construction of 5 box culverts, 12 arc culverts, different types of retaining walls and drainage structures. C-Pavement Works: Crushed stone sub base (20 cm), Plant-mix base (15 cm), Bituminous hot mix base layer (8 cm), Asphalted concrete binder layer (6 cm), Asphalted concrete wearing layer (5 cm) Project Funded By Europe Aid ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY AND FINAL DESIGN ENGINEERING SERVICES FOR GAZIANTEP – SANLIURFA MOTORWAY (15KM) CLIENT: General Directorate of Highways, 17th Division Ankara – TURKEY PROJECT DURATION: 2006 - 2007 Project Description The purpose of this project is to connect TEM highway to GAP (South Anatolia Project). The highway consists of a 37 km. highway, 17 km. connection roads as well as 3 overpasses 150 m. long, 16 underpasses 192 m. long, a bridge of 40 m. of length and four (bridged type) junctions. Project Details Approximately 15,000,000 m³ of earth works, 156,000 m³ of concrete, 1,256,000 tons of sub- base, 896,000 tons of mechanic stabilization base and 762,000 tons of bituminous hot mix asphalt works were realized. Services Provided Preliminary and Final Design Detailed Bridge Design Elevated Interchange, Viaduct and Suspension Bridge Design Drainage Design Service Area Design ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. CONSTRUCTION SUPERVISION AND ENGINEERING SERVICES FOR RECONSTRUCTION OF DÜZCE, ÇİLİMLİ, GÖLYAKA, UMAYERİ, KAYNAŞLI, GÜMÜŞOVA, YIĞILCA, BEYKÖY, KONURALP, BOĞAZİÇİ AND AKÇAKOCA ROADS CLIENT: Düzce Municipality Düzce-Turkey PROJECT DURATION: May 2006 - December 2007 Project Description The European Investment Bank has provided a fund for the Government of Turkey, a portion of which is to be utilized in the reconstruction of the urban roads in Düzce, Çilimli, Gölyaka, Cumayeri, Kaynaşlı, Gümüşova, Yığılca, Beyköy, Konuralp, Boğaziçi and Akçakoca which have been damaged during the 1999 earthquake. The total length of roads to be reconstructed is approximately 100 km. The reconstruction of the roads will begin with the excavation to the necessary depth. This depth will be determined such that it will accommodate the new pavement thickness, consisting of sub-base, binder course and wearing course. In case the soil at the bottom of excavation is found to be unsuitable on which to construct the pavement, then an additional excavation is to be performed and the excavated material is to be replaced with such material whose properties are suitable and allows Provided the construction of the pavement. Services Monitoring and Inspection of the Quality Control of the Works Supervision of Cut-fill Works Estimated Construction Cost: Supervision of Asphalt Pavement 14 Million USD Works Final This project is executed according to the construction FIDIC Red Book. Accounts and Payment Certificates ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. DESIGN, CONSTRUCTION SUPERVISION AND ENGINEERING SERVICES FOR RECONSTRUCTION OF URBAN ROADS IN DÜZCE AND GÖLYAKA CLIENT: Düzce Municipality Düzce-Turkey PROJECT DURATION: May 2005 - December 2006 Project Description The European Investment Bank has provided a fund for the Government of Turkey, a portion of which is to be utilized in the reconstruction of the 50 km long urban roads in Düzce and Gölyaka. In Düzce (Center) and Gölyaka; constant controlling of all manufactures pertaining to the reconstruction work of roads damaged at a great extent due to the earthquake and infrastructural works after earthquake and infrastructural works after earthquake and executing necessary engineering services. This project is executed according to the FIDIC Red Book. Project Summary Monitoring and Inspection of the construction Quality Control of the Works Supervision of Cut-fill Works Supervision of Asphalt Pavement Works Final Accounts and Payment Certificates ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. CONSTRUCTION SUPERVISION AND ENGINEERING CONSULTING SERVICES FOR ANKARA – POZANTI MOTORWAY ÇIFTEHAN - POZANTI SECTION CLIENT: General Directorate of Highways Ankara – Turkey PROJECT DURATION: 2001 - 2016 PAGE 1 of 2 Project Description Ankara – Pozantı (Çiftehan – Pozantı Section) Motorway is the part of Trans-European Motorway (TEM) connecting western Anatolia to the southern Anatolia starting from Ankara. BOTEK has provided supervision and engineering consultancy services for 18.498 km long, 3-lane Motorway comprises earthworks, structures, bridges and viaducts, tunnels, administrative and service buildings, toll plaza, road pavement, security, traffic and secondary works, for the Ankara – Pozantı Motorway . Project Summary Lighting Works comprising all motorway, toll plaza, tunnels, over-passes, underpasses and interchanges to include transformers, lanterns, armatures, polls, cables, emergency generator and Motorways (2x3) 16.046 km Connection Roads (2x2) 2.452 km TOTAL: 18.498 km all other ancillary equipments and spares Emergency communications system works include phones, cabling, power source, posts and other works and spares Demolition, reconstruction or relocation of under or above ground electrical, telecommunication lines and drinking Arrangement and planning of side roads and facilities located alongside of the together with the absence of PIU unit in this project, BOTEK in reality, while executing the main ISO 14001:2004 duties of the expected from a PIU unit, as far as quality control and, financial and administrative duties were concerned. motorway ISO 9001:2008 actual services provided by our staff Consultant, also fulfilled the task that was water installations As can be seen from the description of OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. Continuing PAGE 2 of 2 Project Summary Services Provided 54 Culverts 6 Under-Passes 2 Under-pass bridges having total length of 81 m 2 Interchange Bridges having total length of 117 m 8 Viaducts having total length of 2470 m 2 Twin Tube Tunnels; o Kırkgeçit Tunnel: 2 x 497 m o Çakıt Tunnel: 2 x 469 m 1 Toll Plaza 10 Reinforced concrete retaining walls having total length of 10.383 m Reinforced concrete piles having total length of 38400 m will be constructed for the foundations of viaducts and bridge Building Summary Within the scope of Çiftehan – Pozantı Section of Ankara – Pozantı Motorway, there exist; 1 Administrative Building at the Toll Plaza which is 1200 m2 in area 1 Tunnel Control Centre which is 1000 m2 in area ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Supervision of Motorway Construction Supervision of Viaduct, Bridge & Structure Constructions Supervision of Motorway Barriers and Railings Mountings Supervision of Construction of Facilities, Parking and Maintenance Areas, Service Stations, Toll Plazas, Administrative and Public Buildings Supervision of Motorway Landscape Works Supervision of Pavement and Earthworks Supervision of Electric and Water Line Installations Supervision of Lighting Works Traffic Census Traffic Signs and Signalization Drainage Works Landscape Studies and Planning Design Review Quality Control Data processing and Documentation Preparation of Final Accounts and Payment Certificates BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY AND FINAL DESIGN ENGINEERING SERVICES FOR DIYARBAKIR SILVAN SEPARATION BINGOL ROAD CLIENT: General Directorate of Highways Diyarbakır– Turkey PROJECT DURATION: 2007 - 2011 Project Description This road connects Genç-Bingöl to Diyarbakır. Diyarbakır is a very old and biggest city in the south east of Turkey with a very high and rich population. Genç-Silvan-Lice and Hani are districts of Diyarbakır. This project is aimed to increase the comfort of the road which has 6 interchanges that connect Hani, Lice, Silvan, Genç and some other small towns and villages to the main state highway network. Diyarbakır – Silvan Seperation – Bingöl Road Project contains preliminary and final design engineering services of 65 km state road km: between 0+000- 65+000. Services Provided Review of Conceptual Design Field Surveys Soil Investigation Digital Ground Modeling Final Highway Design Detailed Bridge Design Traffic Study Preparation of Bill of Quantities Tender Assistance to State Highway Directorate ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. FEASIBILITY STUDY, FINAL DESIGN AND ENGINEERING SERVICES FOR SIRNAK-PERVARI SEPARATION – CATAK BEGENDIK SEPARATION STATE HIGHWAY th CLIENT: General Directorate of Highways, 11 Division Şırnak – Turkey PROJECT DURATION: 2004 - 2008 Project Description This project consists of feasibility study, final design and engineering services for 24 km state highway in Şırnak province which is located in the east of Turkey and has very rough terrain characteristics. Landscape identification and assessment were completed and now it is at the phase of alternative route study. Scope of the Project: Hydraulic and Hydrologic Study Interchange Design Drainage Design Projecting of Tunnels, Viaducts, Bridges (if any) Feasibility Studies Traffic Signs and Signalization Design Landscape Design Services Provided Review of Control Drawings Provision of Route Study Provision of Feasibility Study Landscape Identification and Assessment Provision of Preliminary Design Provision of Final Design Provision of Supplementary Drawings Data Processing and Documentation ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY AND FINAL DESIGN ENGINEERING SERVICES FOR ANKARA – ÇANKIRI SEPERATION – 7TH DIVISION – İSKİLİP HIGHWAY CLIENT: General Directorate of Highways Kastamonu – TURKEY PROJECT DURATION: 2002 - 2008 Project Description This project connects the city of Çankırı to capital Services Provided Ankara. The 84 km long state highway was Review of Conceptual Design designed as two lane dual carriage highway. The Field Surveys Project is implemented to provide more efficient Soil Investigation land and Digital Ground Modeling Ankara. Ankara is the largest city in the middle of Final Highway Design Turkey and is commercial social center of the Detailed Bridge Design region. To cope with the rapidly deteriorating traffic Drainage Design conditions due to ever increasing population in Expropriation Studies urban areas of Ankara the construction of the İskilip Environmental Impact Highway Road became a definite requirement. Assessment Traffic Study Preparation of Bill of Quantities Tender Assistance to State Highway Directorate transport ISO 9001:2008 of cargo ISO 14001:2004 between Çankırı OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. FINAL DESIGN AND ENGINEEERING SERVICES FOR CEYHAN – YUMURTALIK STATE HIGHWAY CLIENT: General Directorate of Highways Adana – TURKEY PROJECT DURATION: 2001 - 2006 Services Provided Project Description The project included preparation of preliminary and final design of (2x2) state highway approximately 27 km long. The design work has been based on upgrading the highway standards at those sections of the existing Ceyhan – Yumurtalık State Highway which lies south of Turkey. In addition to highway design sections, BOTEK also made improvements to the existing sections on the horizontal and vertical geometric standards. The design work included the following: Topographical and other field surveys, structural evaluation and design, drainage and hydrological studies and design, soils and materials investigations, pavement evaluation and design, preparation of complete construction plans. Project Details Field Surveys Environmental Impact Assessment Design of Hydrological Structures Final Detailed Design of Ancillary Structures Drainage Design Cross Sections Earthworks Bruckner Calculations Soil Investigation Traffic Study Preparation for the Bill of Quantities Assistance to State Highways Directorate on 2 bridges of 4 spans Tender Procedures 1 under-bridge 45 hydraulic structures along the project alignment ISO 14001:2004 Review of Conceptual Design 11 at-grades interchanges ISO 9001:2008 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. DESIGN AND CONSTRUCTION SUPERVISION AND ENGINEERING SERVICES FOR POZANTI- TARSUS – MERSİN – MOTORWAY CLIENT: General Directorate of Highways Mersin – Turkey PROJECT DURATION: 1990 - 2004 Project Description PAGE 1 of 2 Pozantı – Tarsus – Mersin Motorway is the major and comprehensive part of the Trans-European Motorway which is located at the Mediterranean region of Turkey and it is also one of the most important roads which connect Middle East, South and South Eastern Anatolia. This motorway contributes great amounts to development and improvement of these mostly agricultural region and exportation of their production. For this reason, during the feasibility studies and planning stage, these vital subjects have Supervision Services of this Trans-European taken into consideration for the economy, tourism Motorway (TEM) project have been carried and transportation sectors of Turkey. out in three stages: In the scope of this project, Botek has also made an urban planning for Mersin city which has one of the most active and significant harbours in Turkey. Within the planning project, approximately 40 km long city roads and their motorway connections were designed and supervised including all drainage works, settlement and structure plans, landscape works, earthworks and traffic census and study. In addition, Botek has provided supervision services for 700,000 m2 of park area which is known as the most significant and extensive projects one in Turkey. It comprises administrative buildings, public buildings, parks, restaurants, shops, petrol stations, toilets and all electrical and mechanical installations related with these facilities. 1.Pozantı – Tarsus Motorway, Section I. (15.266 km) This Motorway Section starts at Tekir Hill of Pozantı and ends at Çamalan region. At this section, a part of road infrastructure and some of the structures have previously been constructed by (GDH), General Directorate of Highways. 2.Pozantı – Tarsus Motorway, Section II, (30.492 km) The motorway which is constructed between Pozantı and Tarsus continues as TAG Motorway in Adana – Gaziantep direction towards East and, as Çukurova Motorway in Mersin-Çeşmeli direction towards West. 3.Tarsus Separation, Mersin Motorway (103.00 km) Besides motorway works, Botek was also responsible for following activities: Lighting Works comprising all motorway, toll plazas, parking areas, service and maintenance areas, tunnels, over-passes, under-passes and interchanges to include transformers, lanterns, armatures, polls, cables, emergency generator and all other ancillary equipments and spares Emergency communications system works include phones, cabling, power source, posts and other works and spares Demolition, reconstruction or relocation of under or above ground electrical, telecommunication lines and drinking water installations Arrangement and planning of side roads and facilities located alongside of the motorway ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. Continuing PAGE 2 of 2 Services Provided Project Summary Pozantı – Tarsus Motorway, Section I: (2x3), 15.266 km Pozantı – Tarsus Motorway, Section II: (2x3), 30.492 km Tarsus – Mersin Motorway: (2x3), 103.000 km Totally 148.7 km Motorway 6 Viaducts (Total Length of 4422 m) Berdan Viaduct (L: 971 Meter) Deliçay Viaduct (L: 893 Meter) İçme Viaduct (L: 425 Meter) Müftü Viaduct (L: 1.088 Meter) Mezitli Viaduct (L: 854 Meter) Mersin - Gözne Road (Outgoing Connection Road on the highway)(L: 191 Meter) 10 Toll Plazas 200 m Long Cut and Cover Tunnel 3 Maintenance Areas 3 Parking Areas 2 Service Areas 41 Over-pass Bridges 23 Under-pass Bridges 16 Interchange Bridges 483 Box Culverts 41 Under-passes 12 Over-passes Building Summary Within the scope of Pozantı – Tarsus and Tarsus – Mersin Motorways, there exist; 3 Maintenance and Operating Centres (77,800 m2) each comprising of: a) Administrative Building (2 Storey) b) Dormitories and Kitchen (4 Storey) c) 22x22 (4 Storey) Lodgements 1 Administrative Buildings at each 10 different Toll Plazas 2 Police Stations at 2 different Toll Plazas 3 Parking Areas (185,000 m2) each consisting of toilets, buffets and restaurant buildings 2 Service Stations (367,990 m2) each consisting of petrol stations, restaurants and repair plus maintenance workshops The grand total of the buildings are approx. 20 000 m2 closed area at a value of nearly EUR 18 Million. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Supervision of Motorway Construction Supervision of Viaduct, Bridge & Structure Constructions Supervision of Motorway Barriers and Railings Mountings Supervision of Construction of Facilities, Parking and Maintenance Areas, Service Stations, Toll Plazas, Administrative and Public Buildings Supervision of Motorway Landscape Works Supervision of Pavement and Earthworks Supervision of Electric and Water Line Installations Supervision of Lighting Works Traffic Census Traffic Signs and Signalization Drainage Works Landscape Studies and Planning Design Review Quality Control Data processing and Documentation Preparation of Final Accounts and Payment Certificates BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY AND FINAL DESIGN ENGINEERING SERVICES FOR ESKİŞEHİR-CITY CROSSING (ELEVATED INTERCHANGES) CLIENT: General Directorate of Highways Eskişehir – TURKEY PROJECT DURATION: 2001 - 2003 Project Description The project purpose was for the preparation of preliminary and final design of 2 major interchanges and (2x3) connecting roads. The preexisting state highway was a two lane dual carriageway intersecting the city through these two interchanges. The upgrade was for these two major intersections and related roads enhanced provide of a smoother traffic flow pattern through rush-hours during serious traffic congestion. All of the technical studies, field investigations and related services for the detailed design stage of the project were perform finalized by Botek Estimated Construction Cost: 20 Million US $ Services Provided Field Survey Geotechnical Survey Preliminary Design Final Highway Design Structural Detailed Design Project Details Drainage Design 2 Interchanges Cross Sections Bridges with 4 Spans Earthworks Calculations 2 Underbridges Bruckner Calculations 1 Diamond Interchanges Preparation of Bill of 2 Box Sectional Underbridges Quantities Tender Assistance Figures Proposed Project Interchange ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY AND FINAL DESIGN ENGINEERING SERVICES FOR ISTANBUL-BURSA BALIKESİR-IZMIRMOTORWAY, ORHANGAZI-BURSA SECTION CLIENT: General Directorate of Highways Bursa - TURKEY PROJECT DURATION: 1998 - 2005 PAGE 1 of 2 Project Description The Orhangazi-Bursa Section is the northward section of the Bursa Peripheral Highway which forms a part of the İstanbul – Bursa – Balıkesir – İzmir Motorway. This dual-three lane motorway was 34 km. long and forms part of the İzmit Bay Crossing and Motorway which is planned to be expanded in the future. Izmit and Gemlik Bays have great dual importance with regions. Therefore Botek has taken all of these All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe) important factors and conditions into consideration and Besides motorway works, Botek has also design performed following activities: respect to trade and industry. In addition to this, the lands on the route of Motorway are very fertile so agriculture and farming are well developed in these the motorway for future traffic flow and forthcoming necessity. Botek has also determined the conditions in order to protect the nature, agriculture and structures in the vicinity of the motorway from harmful effects of all sorts of materials used against icing on the surface of the motorway and on the structures and established systematic solutions for the installations and structures to be used for prevention and purification, and examined the design outlines of the motorway, connection and frontage roads and roadside installations from the viewpoint of harmony with nature and ensured the conformity of the motorway with its surroundings. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Arrangement and planning of side roads and facilities located alongside of the motorway Derivation and rehabilitation of 3 streams around the interchanges. Lighting Works comprising all motorway, toll plazas, parking areas, service and maintenance areas, overpasses, under-passes and interchanges to include transformers, lanterns, armatures, polls, cables, emergency generator and all other ancillary equipments and spares Emergency communications system works include phones, cabling, power source, posts and other works and spares Demolition, reconstruction or relocation of under or above ground electrical, telecommunication lines and drinking water installations BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. Continuing PAGE 2 of 2 Services Provided Project Summary Motorway (2x3), (34km) Side Roads (26km) 2 Motorway Interchange Bridges 2 State Highway Interchange Bridges 7 Viaducts (Approx. 3312 m) 2 Toll plazas 1 Service Area 1 Car park 91 Culverts 19 Under-bridges 9 Over-bridges 5 Motorway Bridges 1 State Highway Bridge 34,605 m2 Retaining Walls ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Field Survey Geotechnical Survey Preliminary Design Final Motorway Design Detailed Structural Design Landscape Design Environmental Impact Assessment and Pollution Prevention Studies Traffic Signs and Signalization Expropriation Plans Cross Sections Earthworks Calculations Bruckner Calculations Preparation of Bill of Quantities and Tender Assistance BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY DESIGN AND ENGINEERING SERVICES FOR İSKENDERUN – ANTAKYA – CİLVEGÖZÜ MOTORWAY CLIENT: General Directorate of Highways İskenderun – TURKEY PROJECT DURATION: 1995 - 1999 Project Description This project consists of preliminary design and Project Details engineering consultancy services for 80 km (2x3) 138 Culverts motorway Iskenderun- 31 Underbridges Antakya-Cilvegözü motorway is the extension of 15 Overbridges Iskenderun motorway which is the last section of 4 Interchange Bridges the Edirne – Istanbul – Ankara – Tarsus – Adana – 4 River Bridges Gaziantep – Urfa Motorway Route named as TEM 7 Viaducts (Transit European Motorway) 4 Motorway Interchanges 1 State Highway in the south Turkey. TEM (Trans-European North-South Motorway) is a motorway network which connects the Baltic, Adriatic, Aegean and Black Seas and it has the total planned length amounting to 23797 km, out of Interchange 1 At-Grade Interchange 2 Tunnels total length of 1260 m which 7021 km are currently in operation. All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe). Study objectives included investigation of the site conditions including geological, hydrological, and social conditions. Services Provided Preliminary and Application Design Geotechnical Survey Soil Investigation Field Surveys Earthworks Calculations Bruckner Calculations Cross Sections Drainage Design Preparation of Bill of Quantities ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. FEASIBILITY, DESIGN AND ENGINEERING SERVICES FOR ÇANAKKALE (DARDANELLES) SUSPENDED BRIDGE AND HIGHWAY CROSSING, (2X3), (20 KM), (BRIDGE LENGTH 2196M, SPAN DISTANCE 1440M) CLIENT: General Directorate of Highways Çanakkale – Turkey PROJECT DURATION: 1993 - 1998 PAGE 1 of 2 Project Description Project Details Rapid traffic load increase derived from tourism, * Suspension Bridge agriculture, and transit transportation required for a Suspension steel bridge 2x3 lanes highway crossing study in Çanakkale Region. The Total length 2196 m. Dardanelles suspension steel bridge with 2x3 lanes Span distances 1440 m. will provide a traffic flow which would ease the Length of the approach span on each side: traffic problems of the region for the present and 378 m. future. * Kilitbahir Side Approach Motorway Motorway with 2x3 lanes (7 km) Services Provided 1 Elevated interchange Geotechnical Survey Feasibility Survey Preliminary and Application Design Structural Detailed Design Drainage Design Environmental Impact Assessment Cross Sections Service Area Design 1 At-grade interchange 1 Toll plaza 3 Twin Tube Tunnels; T1 Tunnel: 1210.942 m + 1239.058 m T2 Tunnel: 302.370 m + 307.630 m T3 Tunnel: 428.986 m + 421.015 m 1 Bridge * Çanakkale Side Approach Motorway Motorway with 2x3 lanes (8 km) 1 Elevated interchange 1 Toll plaza 1600 m. Suspended Bridge Approach Viaduct 1 River Bridge Intercity access road (5 km) 1 Roundabout 1 Bridge Continuing ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PAGE 2 of 2 Project Details * Suspension Bridge Suspension steel bridge 2x3 lanes Total length 2196 m. Span distances 1440 m. Length of the approach span on each side: 378 m. * Kilitbahir Side Approach Motorway Motorway with 2x3 lanes (7 km) 1 Elevated interchange 1 At-grade interchange 1 Toll plaza 3 Tunnels total 2196 m. 1 Bridge * Çanakkale Side Approach Motorway Motorway with 2x3 lanes (8 km) 1 Elevated interchange 1 Toll plaza 1600 m. Suspended Bridge Approach Viaduct 1 River Bridge Intercity access road (5 km) 1 Roundabout 1 Bridge ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY AND FINAL DESIGN OF EDIRNE – KINALI MOTORWAY (INCLUDING CONNECTION ROADS) CLIENT: General Directorate of Highways Edirne – Turkey PROJECT DURATION: 1987 - 1996 Project Description Edirne-Kinali section of Trakya Highway is a part of TEM (Transit European Motorway) connecting East Europe to Middle East. The project consists of (2x3) 155 km. motorway and (2x2) connection roads (60 km) with earthworks, structures, bridges and viaducts, tunnels, pavement, security, traffic and secondary works. Botek had been associated with Ove Arup International, London on the project. TEM (Trans-European North-South Motorway) Services Provided is a motorway network which connects the Baltic, Adriatic, Aegean and Black Seas and it Field, Geotechnical and Geodetic Surveys has the total planned length amounting to Soil Investigation 23797 km, out of which 7021 km are currently Preliminary and Final Design in operation. All design and engineering works Drainage Design are “TEM Cross Sections Standards and Recommended Practice” which is Quality Control of Works made completely according to published by UNECE (United Nations Economic Commission for Europe). ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. PRELIMINARY & FINAL DESIGN AND CONSTRUCTION SUPERVISION ENGINEERING SERVICES FOR ISTANBUL II.PERIPHERAL MOTORWAY AND SUSPENSION BRIDGE CLIENT: General Directorate of Highways İstanbul – Turkey PROJECT DURATION: 1983 - 1994 PAGE 1 of 2 Project Description The project, the Second Suspension Bridge constructed in the Bosphorus Region, improves the highway connection among the continents; Project Details Asia Europe. The project consists of 1 suspension (2x3) Motorway, 150 km long bridge with 2x4 lanes and sidewalks, and a total of 77.1 km peripheral motorway with viaducts (2x2) Connection Roads 8.588 km long and interchanges. Botek had been associated 16 Viaducts (Total length of 6553 m) with Freeman Fox & Partners, London on the 8 Toll Plazas project, which is one of the most elegant, streamlined transportation structures to mark the 5 Parking Areas Bosphorus Region. 10 Elevated Interchanges For the original structure, Botek prepared the 2 Service Areas preliminary 20 River Bridges feasibility report, all preliminary works, final design of all highways and connecting (Total length of 2014 m) roads and interchanges as well as construction supervision. The project also included approaches 2 Bridges with complex interchanges to connecting express Hasdal-Okmeydani Connection 5.0 km. highways and local streets, service buildings, Total 77.1 km garages and toll plazas with complete toll facilities and related equipment. 1 3 5 0 M i l l i o n U S ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 $ BOTEK BOĞAZİÇİ TEKNİK MÜŞAVİRLİK A.Ş. Continuing PAGE 2 of 2 This motorway is a part of the TEM Motorway. TEM (Trans-European North-South Motorway) is a motorway network which connects the Baltic, Adriatic, Aegean and Black Seas and it has the total planned length amounting to 23797 km, out of which 7021 km are currently in operation. All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe). Services Provided Preliminary and Final Design Detailed Bridge Design Elevated Interchange, Viaduct and Suspension Bridge Design Drainage Design Service Area Design Cross Sections Supervision of Landscape Works Supervision of Asphalt Pavement Works Supervision of Cut-fill Works Supervision of Motorway ElectricElectronic Works Supervision of Major and Minor Structure Works Quality Control of the Works Monitoring and Inspection of the Construction Preparation of Bill of Quantities Expropriation Studies ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION PRELIMINARY & FINAL DESIGN AND CONSTRUCTION SUPERVISION ENGINEERING SERVICES FOR ISTANBUL I. PERIPHERAL MOTORWAY & SUSPENSION BRIDGE (BOSPHORUS BRIDGE) th CLIENT: General Directorate of Highways, 17 Division İstanbul – Turkey PROJECT DURATION: 1970 - 1973 Project Description The project, the Second Suspension Bridge constructed in the Bosphorus Region, improves the highway connection among the continents; Asia Europe. suspension The bridge project with consists 2x3 lanes of 1 and sidewalks For the original structure Mr. Yıldırım Gelgin prepared the preliminary feasibility report, all preliminary works, final design of all highways and connecting roads and interchanges as well as construction supervision. The project also included approaches with complex interchanges to connecting express highways and local streets, service buildings, garages, toll plazas with complete toll facilities and related equipment. 1 3 5 0 M i l l i o n U S $ ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION BUILDING AND DEVELOPMENT PROJECTS ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION BUILDING AND DEVELOPMENT PROJECTS Project Name Client Scope of Work Construction Cost Actual Situation Final Excavation, Sub-grade Preparation and Construction of Foundation and Superstructure for Central Reference Lab. with Water Storage Tanks in Tbilisi, Georgia BECHTEL INTERNATION AL SYSTEMS, INC. Engineering Works Final Excavation, Sub-grade Preparation and Construction of Foundation, Superstructure and Water Storage Tanks USD 45 Million Completed in 2009 SFC - DORTEK Industrial Building Project, Kastamonu / Turkey 2004 American EXIM BANK Cost Appraisal, Design Check, Construction Supervision, Quality Control, Payment Approval USD 15 Million Completed in 2007 Final Design & Construction Supervision of General Directorate Of Highways Residence, Mersin / Turkey General Directorate of Highways Final Design And Construction Supervision USD 25 Million Completed in 2004 Service Buildings And Toll Plazas, Mersin / Turkey 1990 General Directorate of Highways Final Design and Construction Supervision USD 25 Million Completed in 2004 Anıtkabir Atatürk Museum, Ankara/Turkey Ministry of National Defense Preparation Restoration And Final Designs, Construction Supervision USD 4 Million Completed in 2002 Beyoğlu,Tarlabaşı-Refik Saydam Streets Restitution, Restoration Works And Construction Supervision Istanbul Metropolitan Municipality Preparation of restoration Designs, Construction Supervision and Consultancy Services USD 8 Million Completed in 2003 2,000-Unit Zekeriyaköy Housing Development Project Istanbul / Turkey, 1989 Koza Corporation Preliminary and Final Design of Infrastructure Works for 2,000-Unit Single Family Homes USD 850 Million Completed in 1996 Kavala Sabanci and Bebek Eliyesil Villas Development Projects, Istanbul / Turkey, 1987 Koray Construction Final Design of the Infrastructure works, for a Total of 90 Luxury Villas USD 100 Million Completed in 1987 Saudi Arabia Airlines Istanbul Central and Ticket Sales Offices Design, Istanbul, Turkey-1984 Saudi Arabian Airlines Interior Design and Construction of Management of New Office Center (800 m2) USD 2 Million Completed in 1985 Electricity Company Building of Riyadh Saudi Arabia-1978 Ministry of Electricity of Saudi Arabia Structural Design USD 30 Million Completed in 1979 Al Jouf Library Building Saudi Arabia-1978 Ministry of Culture of S. Arabian King Structural Design USD 40 Million Completed in 1979 Maintenance and Administration Facilities for Directorate of Highways General Directorate of Highways 17th Division Preliminary and Final Architectural and Structural Design USD 40 Million Completed in 1977 General Directorate of Highways 1st Division Tutunciftik Administration And Service Areas And, Residential Buildings Preliminary Design General Directorate of Highways 1st Division Inner Roads And Motorway Connection Roads (Having A Total Area Of 1,200.00 m2), Exchanger Final Designs USD 20 Million Completed in 1977 ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION 1. EGYPTALUM Pitch Melting Plant Structural Design (2008 EGYPT) Pitch Melting Plant Structural Engineering Services Preliminary design, detail Steel design and their shop drawings. *In association with TEZ YAPI. 2. Women’s Club Trade Center and Residence Structural Design (2008 Baku/AZERBAIJAN) 120,000 m2 cast in place reinforce concrete. Pile & mat foundation design. *In association with TEZ YAPI. 3. Dikilitaş BüyükHanlı Residence (2007 Dikilitaş / İstanbul) Design of 45,000 m2 cast in place concrete high rise building. Foundation, underground parking and the superstructure design *In association with TEZ YAPI. 4. Central Reference Laboratory (200 Tbilisi / GEORGIA) Final Design and Shop drawing preparation services for the Cast in Place laboratory building and the two Water Storage tanks in accordance with ACI and SNIP norms. 5. GEA Air Conditioner Plant Project Gebze (2007 Istanbul) 2 15000 m base area structural steel and cast in place concrete. 6. Silivri Kapı Ice Scatting Hall and Service Building (2006 Istanbul) ISO 9001:2008 48 m length roof closing preliminary design and detail design services. ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION 7. Metro Ümraniye Project (2006 Istanbul) 25000 m2 shopping center and 5000 m2 Cinema steel building structural engineering services. Detail design& shop drawings. 8. Radisson SAS Hotel Ortakoy (2005 Istanbul) Strengthening Project for A,B Blocks (14 storey) and Application Project for C,D blocks 9. Ümraniye Municipality Hekimbaşı Additional Service Building Includes Social and Managerial Facility of Additional Service Building 10. TJK İzmit Sarımeşe Hippodrome and Training Center Project (2005 Izmit) Static, Reinforcement, Steel Application Projects of Various Structures such as Managerial Buildings, Social Facilities, Depots 11. Ümraniye Municipality İstiklal District Culture Center Project (2005 Istanbul) (2005 Istanbul) 8 Storey Culture Center Project 12. İzmir Alsancak 12 Storey Housing Project (2006 Izmir) Housing Project whose Difficulty Level is High (Large Spans and Piled Raft exist) 13. Housing and Rehabilitation House Project (2006 Istanbul) 6 Storey Housing and Rehabilitation House Project 14. Strengthening and Application Project of Silivri Kapı Ice Skating and Swimming Pool 15. Ümraniye Metro M1 Square Project (2006 Istanbul) Steel Roof Project of 25000 m2 Closed Area and 5000 m2 Cinema 16. İÇDAŞ Steel Inc. Factory Strengthening Project (2006 Istanbul) 2 17,000 m Mahmutbey Factory Strengthening Project 17. Bodrum Güvercinlik Wastewater Treatment System Static Reinforced Concrete Application Projects (2006 Mugla) Static Reinforced Concrete Application Projects of Infrastructures and Superstructures in Various Different Types 18. Eşkinoz Stream Wastewater Collectors and By-Pass Work Various Shaft, Chimney and Sheet Pile Projects Made for İSKİ ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION SFC - DORTEK INDUSTRIAL BUILDING PROJECTS CLIENT: ULARTE Const. Co. Istanbul – Turkey PROJECT DURATION: 2005 - 2007 Project Description SFC - DORTEK Industrial Building Project is a “design-build” project on “turn-key” basis, performed Industrial in Kastamonu, Building is a Turkey. typical This industrial building. Steel Structured Paint Factory 2 Floors 8.082 m2 in Each 16.164 m2 Total Closed Area The Building was built on Z3 Class soil in Turkish Local Geotechnical and Seismic Code (TDY98), or SC-SD in UBC 97 (uniform Building Code 97). Primary and secondary structural system of the Building was designed and built with structural steel on a concrete foundation. The roofing and cladding will be insulated sandwich panel system Services Provided Cost Appraisal Design Check Construction Supervision Quality Control Payment EXIM Bank ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 Approval for American BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION FINAL DESIGN and CONSTRUCTION SUPERVISION GENERAL DIRECTORATE OF HIGHWAYS RESIDENCE (IN SCOPE OF POZANTI-TARSUS-MERSİN MOTORWAY PROJECT) CLIENT: General Directorate of Highways Mersin – Turkey PROJECT DURATION: 1990 - 2004 During the Pozanti - Tarsus - Mersin Motorway Design, Construction Supervision and Engineering Services, Botek also involved in design of the dwellings for General Directorate of Highways. These residential buildings was built for General Directorate of Highways Personnel who work in motorway service areas and toll plazas The dwellings consist from 4 identical apartments. They are 4 storied and each of them has 16 flats. Botek performed design and construction supervision of these dwellings. They are completed in 2003. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION FINAL DESIGN and CONSTRUCTION SUPERVISION of SERVICE BUILDINGS And TOLL PLAZAS (IN THE SCOPE OF POZANTI-TARSUS-MERSİN MOTORWAY PROJECT) CLIENT: General Directorate of Highways Mersin – Turkey PROJECT DURATION: 1990 - 2004 PAGE 1 of 2 Project Description Besides Motorway Design, Construction Supervision and Engineering Services, BOTEK also performed supervision and design for the service buildings of General Directorate of Highways and Toll plazas. This motorway project comprises two sections. Under the scope of these two sections following structures were built: Maintenance & Operating Areas Parking Areas Service Areas Toll plazas Total square measure of construction area in three separate sections is 78.000 m2. Maintenance & Operating areas contain: Dormitories Warehouses Administrative Buildings Dinning Halls Workshops Service Areas were constructed at two separate sections. These sections comprise all necessary managing and administrative buildings. Total square measure of service areas is 360.000 m2 Total square measure of parking areas and other constructed areas is 186.000 m2 ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION Continuing PAGE 2 of 2 Police Station In addition to service and parking areas, following structures were constructed in the scope of Pozanti Tarsus - Mersin Motorway project. Toll plazas Police Stations Gas Station Operating Buildings Services Provided Cost Analysis Design of Toll Plazas Design of Administrative & Service Buildings Construction Supervision Quality Control ISO 9001:2008 ISO 14001:2004 Gas Station OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ZEKERİYAKÖY HOUSING DEVELOPMENT PROJECT (2000 UNIT VILLAS) CLIENT: Garanti - Koza Corp. Istanbul – Turkey PROJECT DURATION: 1989 - 1996 PAGE 1 of 2 Project Description This project consists of preliminary and final design, and construction supervision of 2000 – Single unit family homes all requirements for 550 Acres, infrastructure approximately 2,400,000 m². The Zekeriyaköy Houses, built on 550 acres of Black Sea Cost and consisting of 2000 Single unit villas. Dwellings, The project Bazaars, also consists Shopping of Centers, Hypermarkets, Cafes, Taverns, Common and Personal Parking Areas, and Administrative Buildings. The Contractor is Garanti- Koza Co. All requirements and features like car parks, common spaces, domestic water generators, tanks e.g. fire for and today’s modern living exist in Zekeriyaköy Houses in the lovely green nature. All kinds of heat and water insulation techniques were used in the buildings, the main entrances and stairs of which are of granite. Acrylic-based imported paint was applied on the faces. Very simple but good quality materials were used inside the villas and buildings. A parking lot is available for common use; and a surrounding wall was built to ensure security. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION Continuing PAGE 2 of 2 Zekeriyaköy Houses are constructed on such a geological zone of Istanbul which has a minimum earthquake risk. All necessary soil tests have been performed and the structures rest on raft foundations. The load-bearing structural frame has been calculated according to the parameters stated in the “Regulations Regarding Structures to Be Constructed in Disaster Zones” which came into force on 01.01.1998. The seismic and structural characteristics of the zone and the building have also be taken into consideration ensuring the resistance and rigidity factors and with the quality of the concrete cast during the construction stage, the safety level which is foreseen in the above mentioned regulation is consequently exceeded. Services Provided Preliminary and Final Design, Drainage Design Checking and construction (Office factory monitoring and based, and installation. together site of visits with as necessary) Independent review of design, including load definition, structure analysis and details Preparing bill of quantities, Allowance calculations, reporting Material selection, Following up and controlling laboratory tests, Quarry investigation ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION KAVALA SABANCI & BEBEK ELİYEŞİL VILLAS DEVELOPMENT PROJECT (90 UNIT VILLAS) CLIENT: Koray Const. Istanbul – Turkey PROJECT DURATION: 1987 - 1987 Project Description Kavala Sabancı - Bebek Eliyeşil Villas Project are distinguished residential complexes in Turkey. Complexes consist of 14 private villas in Eliyeşil and 76 villas in Sabancı. Eliyeşil with its individual gardens are built on a hill among century old trees overlooking. Eliyesil villas have their façade clad with travertine panels and solid hardwood elements. Copper roofs have “Cihannuma”s (small rooms to watch neighboring landscape) which are reminiscent of the Ottoman architecture. The total construction area of the project which was designed by Arch. Erkut Sahinbas, was 6,156 m2 Services Provided Cost Analyses Preliminary & Final Infrastructure Design Drainage Design Construction Supervision Quality Control ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION Adana ADANA YESILOBA RACECOURSE Yeşiloba Racecourse is located on Adana – Mersin intercity highway and is 12 km far from the city center. It is established on 666.000 square meters area in Yeşiloba district. The races which started in 1962 near the airport, moved its today’s location in a short time. Inside the racecourse there is a dirt track of 1800 meters long and 25 meters wide, later in 1996 the new turf track of 1600 meters long is constructed and is put into service in 1998 spring. A training track of 1400 meters long and 15 meters wide is put into service in 2000 autumn. There are totally 3 tracks. With the 3 floored modern grandstand building of 3000 people capacity which is completed in January 1999 there are 2 grandstand buildings, 1 honour grandstand, 5 restaurants (one of them is inside a garden, others are in the pensions area, the rest is in the grandstand buildings), various buffets, one children park, one haflinger paddock, sitting places inside the gren areas that exceeds 10.000 square meters. The racing fans and people from public have the opportunity of spending time enjoyable, resting and entertaining. There are 5 pony stables and 4 ponies. There are oat store and farrier building inside the racecourse. There are 1260 boxes stables and a modern racehorse hospital with an operating room in the pensions area. Also inside this area there is a mosque, 3 convenience stores, a barber, harness maker and restaurants fort he service of the grooms. There are 2 pools for watering the tracks, 1 water store of 600 tons, 3 water wells. There are two 250 KVA, two 400 KVA an done 630 KVA totally six transformers, also there are generators of 208 KVA, 425 KVA and 50 KVA and there are two 20 KVA an done 10 KVA continuous power supply units which support the ordinary power. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION Assignment name: General master project services for Adana Hippodrome Country: TURKEY Location within country: Adana Approx. value of the contract (in current US$ or Euro): 70 Million USD – Development of existing hippodrome, racecourses, grandstand buildings 8 Million USD – Renewal of existing works Duration of assignment (months): 11 months Name of Client: Republic of Turkey -TJK Total No of staff-months of the assignment: 72 M/M Address: Approx. value of the services provided by your firm under the contract (in current US$ or Euro): 165,000 USD Adana Start date: 2007 Completion date: 2008 No of professional staff-months provided by associated Consultants: - Name of associated Consultants, if any: - Name of senior professional staff of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader): Yıldırım Gelgin: Project Director Gül Özer: Project Coordinator Nisa Gürler Yüce: Design Engineer Arzu Serter: Structural Engineer 100 % of works were completed by BOTEK Narrative description of Project: Feasibility and preliminary study for redevelopment and infrastructure works of Adana Hippodrome to include: Preliminary design of racing tracks and grandstand building; Preliminary and final design of tunnel crossing, electrical works, drinking water system, drainage system, irrigation system, fire water system, solar heating system, security system and rehabilitation of existing buildings, such as; such as; horse hospital, administrative building and other facilities buildings; Preparation of tender documents and bill of quantities for the infrastructure projects. Description of actual services provided by your staff within the assignment: - Preparation of inception report; - Feasibility study; - Final design report; - Preparation of bill of quantities and construction documents. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION IZMIR SIRINYER RACECOURSE İzmir Şirinyer Racecourse is inside the borders of İzmir’s Buca district. It is 15 kilometers away from Adnan Menderes Airport and it has borders to İzmir – Aydın Railway from the west side. The racecourse is established on 323.674 square meters. Inside 155.440 square meters area, there are 1281 boxes, a horse hospital, car park with a capacity of 100 cars, walking paddocks, totally it has 479.114 square meters area. Inside the racecourse area there are a dirt track of 1756 meters long, turf track of 1572 meters long, dirt training track of 1345 meters long, 2 grandstand buildings, 2 restaurants, 2 garden restaurants, 1 country coffee, saddling place, 1 feed store, 4 walking paddocks, jockeys’ room, doping control area, managership building, garage and workshops, a car park with a capacity of 1000 cars, children playing area, 3 watering pools with a capacity of 1100 tons. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION Assignment name: General master project services for Izmir Hippodrome Country: TURKEY Location within country: Izmir Approx. value of the contract (in current US$ or Euro): 60 Million USD – Development of existing hippodrome, racecourses, grandstand buildings 7 Million USD – Renewal of existing works Duration of assignment (months): 11 months Name of Client: Republic of Turkey -TJK Total No of staff-months of the assignment: 63 M/M Address: Approx. value of the services provided by your firm under the contract (in current US$ or Euro): 142,000 USD Izmir Start date: 2007 Completion date: 2008 No of professional staff-months provided by associated Consultants: - Name of associated Consultants, if any: - Name of senior professional staff of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader): Yıldırım Gelgin: Project Director Gül Özer: Project Coordinator Nisa Gürler Yüce: Design Engineer Arzu Serter: Structural Engineer 100 % of works were completed by BOTEK Narrative description of Project: Feasibility and preliminary study for redevelopment and infrastructure works of Izmir Hippodrome to include: Preliminary design of racing tracks and grandstand building; Preliminary and final design of tunnel crossing, electrical works, drinking water system, drainage system, irrigation system, fire water system, solar heating system, security system and rehabilitation of existing buildings, such as; jockey building, administrative building and other facilities buildings; Preparation of tender documents and bill of quantities for the infrastructure projects. Description of actual services provided by your staff within the assignment: - Preparation of inception report; - Feasibility study; - Final design report; - Preparation of bill of quantities and construction documents. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION IZMIT TRAINING CENTER Izmit training center, which is established on 422.000 square meters land inside the Sarımeşe district, is the first training center owned by The Jockey Club of Turkey. It is located between Istanbul, Bursa and Ankara which is the optimum choice because of the distance from racecourses. The benefits of this facility include the ability to provide all kind of services that host approximately 600 horses yearly for The Jockey Club of Turkey and private owners. Technical structuring of facility: • • • • • • • • • • 468 Box stable, Several type stables [288 Box (12 Blok 24 Box)], Stablemates [180 Box (5 Blok 36 Box)], Dirt track and ambulance road of 1400 meters in length and 20 meters in width, Walking paddocks, groundwork and practice fields, Administrative buildings, Race hospitals Blacksmith, Country café houses, Horse ramps. Inside of the training center, there is dirt track of 1400 meters long with 40 cm filling materials using 11 cm washed sand. On the center of dirt track, there are two major drainage lines with connecting waste water using the discharge pipes to out of the track. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION Assignment name: Izmit Stud Farm Country: TURKEY Location within country: IZMIT Approx. value of the contract (in current US$ or Euro): 14 Million USD – Development of existing infrastructure and the new administration building 7 Million USD – Renewal of existing works Duration of assignment (months): 9 months Name of Client: Republic of Turkey -TJK Total No of staff-months of the assignment: 28 M/M Address: Approx. value of the services provided by your firm under the contract (in current US$ or Euro): 65,000 USD Izmit Start date: 2008 Completion date: 2009 No of professional staff-months provided by associated Consultants: - Name of associated Consultants, if any: - Name of senior professional staff of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader): Yıldırım Gelgin: Project Manager Gül Özer: Project Coordinator Arzu Serter: Structural Engineer 100 % of works were completed by BOTEK Narrative description of Project: Feasibility and preliminary study for redevelopment and infrastructure works of Izmit Stud Farm to include: Preliminary and final design of electrical works, drinking water system, drainage system, irrigation system, fire water system, solar heating system, security system and rehabilitation of existing buildings, such as; administrative building, social facilities for employees and other facilities buildings; Preparation of tender documents and bill of quantities for the infrastructure projects. Description of actual services provided by your staff within the assignment: - Preparation of inception report; - Feasibility study; - Final design report; - Preparation of bill of quantities and construction documents. Firm’s Name: BOTEK Bosphorus Technical Consulting Corporation ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ISTANBUL VELIEFENDI RACECOURSE Istanbul Veliefendi Racecourse is established on 596.000 square meters land. It has one 2020 meters long, 27-36 meters wide turf, and one 1870 m long, 17.5-19 m. wide synthetic (Polytrack) tracks. At the inmost of the tracks, It has also a sand training track 1720 m in length and 14-16 m in width. Inside the racecourse area there are Club and associations locals, administrative buildings, racehorse hospital, apprentice training center, gift shop, museum and exhibition place, two Grand stands and a giant led - screen of 102m2, a picnic area with 110 tables, 1 play garden, various cafeterias and a car park. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION Assignment name: Istanbul Veliefendi Hippodrome Approx. value of the contract (in current US$ or Euro): 25 Million USD Country: TURKEY Location within country: Istanbul Duration of assignment (months): 10 months Name of Client: Republic of Turkey -TJK Total No of staff-months of the assignment: 38 M/M Address: Approx. value of the services provided by your firm under the contract (in current US$ or Euro): 105,000 USD Istanbul Start date: 2000 Completion date: 2001 No of professional staff-months provided by associated Consultants: - Name of associated Consultants, if any: - Name of senior professional staff of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader): Adem Berkmen: Project Manager Nisa Gürler Yüce: Design Engineer Arzu SERTER: Structural Engineer 100 % of works were completed by BOTEK Narrative description of Project: Feasibility and preliminary study for redevelopment and infrastructure works of Veliefendi Hippodrome to include: Preliminary design of racing tracks and grandstand building; Preliminary and final design of tunnel crossing, electrical works, drinking water system, drainage system, irrigation system, fire water system, solar heating system, security system and rehabilitation of existing buildings, such as; such as; horse hospital, administrative building and other facilities buildings; Preparation of tender documents and bill of quantities for the infrastructure projects. Description of actual services provided by your staff within the assignment: - Preparation of inception report; - Feasibility study; - Final design report; - Preparation of bill of quantities and construction documents. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION INDUSTRIAL BUILDINGS & FACILITIES EPC PROJECTS (Turn Key Engineering, Procurement and Construction Works) ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION INDUSTRIAL BUILDINGS & FACILITIES PROJECTS Project Name Client Scope of Work Construction Cost Actual Situation Engineering, Procurement and Construction (EPC) of Central Reference Laboratory Tbilisi, Georgia BECHTEL INTERNATION AL SYSTEMS, INC. Engineering Works Final Excavation, Sub-grade Preparation and Construction of Foundation, Superstructure and Water Storage Tanks USD 45 Million Completed in 2009 ÇAMSAN WOOD FACTORY (Sakarya / TURKEY) 2003 Camsan Ind. & Trade Inc. Project Management USD 42 Million Completed in 2005 Kayalar Chemical Factory Istanbul / TURKEY 2004 KAYALAR Kimya Corp. Project Management USD 12 Million Completed in 2005 ÇAMSAN WOOD FACTORY (Ordu / TURKEY) 1981 Camsan Ind. & Trade Inc. Project Management USD 50 Million Completed in 1984 ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION FINAL EXCAVATION, SUBGRADE PREPARATION AND CONSTRUCTION OF FOUNDATION AND SUPERSTRUCTURE FOR THE CENTRAL REFERENCE LABORATORY AND CONSTRUCTION OF WATER STORAGE TANKS IN TBILISI, GEORGIA CLIENT: BECHTEL INTERNATIONAL SYSTEMS, INC. Georgia PROJECT DURATION: 2006 - 2009 Page 1 of 2 Project Description The purpose of this subcontract is to complete engineering, complete the excavation performed by others, prepare the subgrade, and construct the foundations and the Superstructure for the Central Reference Laboratory (CRL) building. Also, review and complete the remaining engineering for the Potable Water Storage Tanks located west of the CRL Building. Design and Furnish all Underground Utilities in Under slab and outside the Building. Design and Furnish Underground Fuel Oil Tank. Upon construction of the foundations and Superstructure, and the water tanks, the buildings will be completed and finished for operation by others. Services Provided Mobilization equipment Provide Engineering services and Preparation of all required submittals Performing civil surveys and establishing existing topography and conditions of the site Excavating and disposal of unsuitable subsurface material Setting up a Compaction Test Pads to establish the minimum number of passes of a specific type of compaction equipment proposed for compaction of subgrade and engineered Structural Backfill Material (SBM) for Quality Control Preparing the subgrade, Compacting the subgrade, and compaction testing of the subgrade Installing Polyvinylchloride (PVC) liner on the subgrade and on top of the SBM Supplying and installing SBM Project Location The CRL site is located in the eastern part of Tbilisi approximately three (3) kilometers form the airport, and approximately eighteen (18) kilometers from the Tbilisi Freedom Square, in Alekseevka settlement, within the property owned by the Ministry of Defense (MOD). The site is fairly flat and the elevations range between 510 meters to 517 meters above the sea level. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 of all personnel, BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION Continuing PAGE 2 of 2 Services Provided Performing Plate Bearing Load Test after installation of SBM Selecting and identifying the source for obtaining engineered SBM Identifying sources of coarse and fine aggregates and testing of aggregates for concrete Developing mix designs for concrete and mortar Procuring, furnishing, and installing rebar and associated accessories Supplying, furnishing and installing structural steel embeds, and accessories Procuring and furnishing embedded piping and other components Forming, placing rebar, pouring concrete for foundation superstructure, testing and curing concrete Installation of damp proofing, waterproofing, thermal insulation Furnishing and installing roofing system Furnishing services of an independent onsite Material Testing Laboratory Preparing As-Built Drawings and maintaining project records Construction of water storage and oily water filtration facility Site Cleanup and Demobilization ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ÇAMSAN WOOD FACTORY CLIENT: ÇAMSAN Ind. & Trade Inc. Sakarya-Turkey PROJECT DURATION: 2003 - 2005 Project Description ÇAMSAN Wood Industry and Trade Inc. is a multi-partner company. ÇAMSAN is currently producing wood-based Medium Density Fiberboard and with its current total plant production capacity of 200.000 cubic meters per year, it is one of the outstanding factories both in Europe and Middle East both in quality and in capacity. ÇAMSAN - SAKARYA was planned on approximately 170.000 m2 and in a confined area of approximately 40.000 m2. Apart from the production of plain MDF board having different quality and dimensions, it is an integrated plant with its several other production units including Building Profiles, Soft Forming Products, Melamine Faced Boards and Laminated Flooring (parquet) products. ÇAMSAN implements both the multi-layered press and continuous press technologies in its factories. Services Provided Cost Analysis Design Check Construction Preparing Tender Documents Quality Control ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION KAYALAR CHEMICAL FACTORY CLIENT: KAYALAR CORP. İstanbul – Turkey PROJECT DURATION: 2004 - 2005 Project Description It was founded at the Tuzla / ISTANBUL for the purpose of manufacturing paint and varnish for Wood and Furniture. It is a full automatic facility. Automation system was settled by Emerson Company and System. Installations and Boilers were imported from Italy. The factory building has; 32.000 m2 Opened Space 16.500 m2 Closed Space 4.800 m2 Finished Good Warehouse 3.600 m2 Production Facility 3.400 m2 Office Laboratory 1.200 m2 Resin Production Facility Services Provided Design Check Preparing Tender Documents Construction ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORPORATION ÇAMSAN WOOD FACTORY CLIENT: ÇAMSAN Ind. & Trade Inc. Ordu-Turkey PROJECT DURATION:1981 - 1984 Project Description ÇAMSAN - ORDU Wood Factory is active since 1984 over a surface of 162.000 m2 out of which 42.000 m2 comprise to indoor area. Being the first MDF (Medium Density Fiberboard) producer in Turkey, ÇAMSAN has established its first MDF factory in 1984 in Ordu and started its production with a capacity of 200 m3 per day. ÇAMSAN which carried the honor of introducing this technology for the first time in Turkey still maintains its pioneer position as for the quality, capacity and product varieties that it offers. ÇAMSAN Inc. carries the responsibility of being the first and the pioneer on its branch and never deviates from its quality and line. In other words when MDF is mentioned, ÇAMSAN Inc. is the first company recalled in Turkey Services Provided Cost Analysis Design Check Construction Preparing Tender Documents Quality Control ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 BOTEK BOSPHORUS TECHNICAL CONSULTING CORP. Fulya Mah., Prof. Dr. Bülent Tarcan Sok. Botek Is Merkezi No: 10 Kat: 4 Gayrettepe 34394 Şişli – ISTANBUL Tel: +90 (212) 347 27 20 Fax: +90 (212) 347 27 21 E-mail: botek@botek.info Web: www.botek.info ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007