Att 1 – Draft Trans Element
Transcription
Att 1 – Draft Trans Element
This preliminary draft element was prepared by City staff on the basis of input from the CAC and members of the public received between October and December 2015. The element will be further refined following review by the full CAC in January and February 2016, and that refined product will be presented as a draft to Palo Alto City Council in March 2016. TRANSPORTATION ATTACHMENT 1 2 VISION: Palo Alto will build and maintain a sustainable network of safe, accessible and efficient transportation and parking solutions for all users and modes, while protecting and enhancing the quality of life in Palo Alto neighborhoods. Programs will include alternative and innovate transportation processes, and the adverse impacts of automobile traffic on the environment in general and residential streets in particular will be reduced. Streets will be safe, attractive and designed to enhance the quality and aesthetics of Palo Alto neighborhoods. Palo Alto recognizes the regional nature of our transportation system, and will be a leader in seeking regional transportation solutions, prioritizing Caltrain service improvements and railroad grade separations. INTRODUCTION Meeting the transportation needs of residents, visitors, and businesses will demand innovative and forward-looking solutions. The Transportation Element provides a policy framework for these solutions, recognizing that future growth in transportation needs cannot be met by the automobile alone. Strong dependence on the automobile has resulted in air and water pollution, excess noise, increased energy use, and visual degradation in Palo Alto and throughout the San Francisco Bay Area. There have also been impacts on Palo Alto neighborhoods, as motorists have used local streets as alternatives to overcrowded arterials. This Plan is designed to address these issues comprehensively and acknowledges that the future will be different than the present and the past. Recognizing changing demographics and travel preferences, new technologies, and new opportunities, the Plan includes solutions for implementation today in order to lay the groundwork for PRELIMINARY DRAFT – JANUARY 21, 2016 T-1 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N the future. Together with investments in infrastructure, these solutions will lead to an integrated transportation system that serves local, regional, and intercity travel. This Element meets the State requirement for a Circulation Element, addressing the various aspects of circulation, including complete streets, expressways and freeways, mass transit, walking, bicycling, parking, special transportation needs, and aviation. CONNECTIONS TO OTHER ELEMENTS Transportation choices and options are shaped by many factors including land use, economics, and community values. As such, the Transportation Element is strongly influenced by the Land Use Element and Housing Element because the distribution and density of residential, commercial, and office uses has a direct correlation to the type, frequency, and use of transportation options a community employs. In addition, the Transportation Element supports the objectives of the Business and Economics Element, the Community Services and Facilities Element, and the Natural Environment Element, and the Safety and Noise Element by paving the way for a transportation system that supports economic development and access to services in a manner that limits impacts to the natural environment. PALO ALTO DAILY MODE SHARE (2014) 5% 3% 8% Drive Alone Carpool 23% Transit 61% Bike Walk SUSTAINABLE TRANSPORTATION Recent data compiled from surveys and other sources show that, in 2014, more than 60 percent of all trips made each day in Palo Alto involved single-occupant vehicles. Although this is a lower ratio of single-occupant vehicles than in many other Bay Area communities, Palo Alto’s most recent greenhouse gas (GHG) emissions inventory indicates that road travel to, from, and within the city is by far the single largest source of local emissions. As a major regional employment center, Palo Alto attracts commuters from throughout the Bay Area on a daily basis, but US Census data also show that Palo Alto residents make most of their trips by car. [additional data to come on trip origins and destinations, i.e. who is driving where] Building a more sustainable transportation system will require addressing both regional and local travel patterns, as well as trips made for work, school, errands or entertainment. The key to a sustainable transportation system lies in providing more options and more convenience so that people will more readily choose not to drive. Palo Altoans recognize that, at times, the private automobile helps facilitate life’s daily activities, but we also understand that single-occupant vehicles are a major source of traffic congestion and GHG emissions in the region. To successfully address congestion, T-2 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T keep neighborhood streets safe, reduce air quality and noise impacts, lessen the effects of climate change, and improve overall quality of life, we must focus on providing convenient, affordable alternatives to the automobile. Facilitating a shift to alternative modes of transportation will require creative collaboration among transit agencies, employers, and local jurisdictions as well as residents and commuters themselves. Technology also has a role to play, whether providing up-to-the minute information to inform choices or in delivering new and better modes of travel. A robust public transit system with both a regional reach and a local focus will be essential to rebalancing mode share, and improvements to the bicycling and pedestrian environment will help encourage more people to bike and walk on a regular basis. I NNOVATION AND C OLLABORATION Palo Alto is currently pursuing a number of innovative tools to increase transportation options for residents and workers. COMMUTER WALLET The Bay Area is at the forefront of an evolving shift toward the use of transportation services in place of private vehicle ownership, led by a number of prominent ride sharing and e-hailing car services.. Originally pioneered in Europe, the concept of “Mobility as a Service (MaaS),” also known as “Commuter Wallet” in Palo Alto, allowes on-demand trip planning enabled by smartphones and mobile devices. This concept also includes "pop up" bus services, as well as car-sharing and bike-sharing services. With the advent of self-driving cars, the cost of transportation services is widely expected to drop, making vehicle ownership a less attractive option. Palo Alto is partnering with with Joint Venture Silicon Valley, the Santa Clara Valley Transportation Authority (VTA), and the City of San Jose to develop a MaaS/ Commuter Wallet smartphone app that provides access to a combination of transportation mode and employer commute benefits to help incentivize non-singleoccupant vehicle travel. The app will house information about all transportation modes under one platform so users can easily make transportation decisions based on current traffic/transit conditions. Innovative initiatives like MaaS/Commuter Wallet can help facilitate a shift away from single-occupant vehicles and rebalance mode share in the future. PRELIMINARY DRAFT – JANUARY 21, 2016 T-3 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N TRANSPORTATION D EMAND M ANAGEMENT The term Transportation Demand Management (TDM) refers to strategies that improve the efficiency of the transportation system by increasing the demand for an convenience of alternatives to the single-occupant vehicle. TDM programs can include a wide range of investments in infrastructure and incentives for the use of alternatives to the automobile, as well as parking management initiatives and marketing. Employers and local governments often collaborate in developing and implementing TDM programs, and activities can be coordinated through a Transportation Management Association (TMA) made up of local businesses in a commercial district or industrial park. Stanford University operates a TDM program designed to reduce university-related traffic impacts. The program is one of the most comprehensive in the country, with an array of initiatives from free public shuttle service to expanded bicycle parking and extensive marketing outreach and promotions. Since its inception in 2002, Stanford has reduced its drive-alone rate by 32 percent. In January 2015, the City of Palo Alto began the process to establish a TMA for the downtown area, with plans to pilot a variety of TDM initiatives in collaboration with local businesses. This effort has already yielded the first reliable data on commuter travel patterns and formal establishment of an independent nonprofit TMA. Stanford University has initiated similar efforts to survey travel patterns and work with employers to reduce commute trips to the Stanford Research Park. ALTERNATIVE F UEL VEHICLES Alternative fuel vehicles—those that run on electricity, biodiesel, compressed natural gas and other alternatives to petroleum fuels—help reduce GHG emissions by utilizing cleaner fuels or zero emission alternatives. As the City encourages increased use of alternative fuel vehicles to help reduce GHGs, additional support facilities like charging stations or biofuel pumps may be necessary. However, while alternative fuel vehicles do reduce GHGs, they are still a contributor to congestion. P UBLIC T RANSIT Palo Alto’s role in the regional economy and mix of land uses have endowed residents, workers, and visitors with an array of transit options to travel within the city and to the surrounding region. Residents can conveniently access many local destinations via buses and shuttles, while employees and visitors can travel to Palo Alto via regional bus routes and rail service. Map T-1 shows the range of public transit services in Palo Alto. T-4 PRELIMINARY DRAFT – JANUARY 21, 2016 MARSH RD T SS TGE R RU TARA RD PULGAS AVE DEMETER ST VERONICA CT PULGAS AVE VANCE LN AZALIA DR WISTERIA DR LARKSPUR DR MYRTLE CT VER BEN AD GAR R DEN IA W AY TATE ST PATR IC JACK IA LN SON DR RHO DES DR IRIS WAY R ED SHORELINE BLVD ARNOLD AVE RD GORSEY RD DAILEY E MA UD EA VE AVE ELD RD CLYDE AVE 120 U Middlefield MIDDLE FI Whisman ADA AV E T AVE BEVERL CHETW Y ST OOD DR E ERO N AV CALD ST BUSH ANZ A ST LOR ET VELA O ST RDE ST AN AV D U ELLIS ST WALKE R DR WH SHERLA ISMAN CT ND AV E FLY NN AVE PACIFI C DR EATON LN MINARE ST VIEW 51 U 52 U EVEL YN A VE MURLAG NR 104 AVE TYRELL A AVE PIAZZA DR ANNIE LAU RIE ST DORCHE STER DR KITTOE DR GLADYS AVE BRENTON CT MA CO LOGUE RY LN Mountain View 120 U Bayshore/NASA NATIONA L STEVENS RD 85 V U RD RD LE AVE AN RD AND R RD MONTE VIS LA PAZ ARMAND AVE ERSO N CT INT D TYRELLA CT EDQUIBA GIRARD WHISM L PARK LN WINDMIL N ST EASY ST ORMO NDE DR VA SAWMILL QUERO DR LN SAWMILL CT SHORELINE BLVD STIERLIN RD INI S T 32 U S PO ETER RD EVANDA CT T D BLV TT CYPR ES FFE MO CHER ST U 35 BLOSS CASTRO ST OM LN KLIN OAK ST 35 U HOP SNO W ST INGTO E ST SHO WAY ST E UN PERIM BAILEY JOAQUIN RD T NC MO RGA CT ON AVE GEM ARIS PO L E BLV D 34 U MER CY ST WASH 34 U RELIN 52 U JACK SON School ST NEP 34 U ST E Elementary School U å Miramonte PETTI S AV å Mariano Castro WAY SAN RAM FARLEY ST BONN Y ST ELA ESCU CALI FOR SAN RAFAEL AVE ALTA AVE HUFF AVE ROCK CT CAMP AVE PL MAN LN ELLO AV E E STA AV RA VI SIER AVE MARICH VILLA NIA AY RICH AVE MARY EL W EL MONTE AVE CREEDEN WAY NEW PENNY THO MP SO NA VE BEL LA C ORT E W AY FAY AVE STOR FF MONTEB RENG GAM CK AV E AR A MONTEC VE ITO AVE 34 HACK ETT AV LOTUS LN E WRIGH WILDROSE WAY T AVE VASS FRAN INDEPENDEN CE AVE SHEILA CT ER A VE ST EGE COLL E A AV ORT EG AY PAN CHIT WAY DIST EL D R CAS ITA WAY ALIC IA W AY DR NCIA OS NIN VALE INDUSTRIAL AVE AVE DEL L AVE TH RU AVE BLO DIA DR RS SHO WE AVE DAN JOR CATALINA WAY SALADO DR COMMERCIAL ST FABIAN WAY RD TONIO T SAN AN KEA TS C WA Y IO ANT ON SAN CT HEM RD NIO LOS CHERRY AVE I CT R ED KSID DIA BLO SHA CT STA DR T SC IPP SCR LO CK AVE ANTO SAN VERA CRUZ AVE TOMI LEA ST BELDEN CT KINGSWOOD WAY LINDEN AVE LOS ALTOS AVE GUADALUPE DR DEV R R ND MA L PAR DR NR OE MO DIO ME DEL RAY AVE RILMA LN TA W AY ESTR ELLI LAU R ELE SD R LN U ANA KAR EN W MO DR AY RTO NC SOLA T NA C CLA T RK A BLA CKF JUDSO VE IELD N WAY DR ES AM NP CA DU N LN LUNDY ELY PL N AL LIN CA RO PL V BA ICTOR RCL IA P AY CT L LL CT IRVEN AMA R MAY ANTA CT BEL L AV E D ERO R TRA D ARA S OD WO TOR PATRICK WAY SOL T CT EN ALL CT EYA TOR R AVE EEN MA UR VER EL TUR AA VE CT BS DRIS CO LO ENC S ROB INA L GRA ES AVE EZ NDE FLO A DR DR RAL ES D R CER ELL RD MIRANDA RD CT DEB AW MET RO GC LIN STE L AVE TER SUT WA Y OA VE AN AVE DIN FIE L MA NA VE RIO MA LE TO W CT RY GA OA VE ESIN MP CA RA VE TNE AVE WIL TON CUR VEN JAC O FER NA RGA NDO A VE RITA AVE MA PAUL SAN AVE JUD E AV E PAR ILIM ADIS SHA AC EW UNA AY TIM T LN LA PAR LOTT A A LN VE OAK HILL AVE OLD TR ACE RD TAL IS LN CIR IAL LON CO GD R EGO NA VE REN W ALL AY DR RSH WA R OR R DD AN STL COA AVE AVE ELO RM CA EL E T AV LAM AVE KEN AM AR DR NIS DEN NIA OR LIF CA DR AND GARL DO RA DO EL E E AV OLIV EA VE TAG POR WA Y R SD ALU CHIM THENDARA LN ILL OA VE OR ELS IN AVE R PL ICH GRE XPY NE EGO GRA NT AVE RID AN AVE SEN HAN OVE R ST PAGE MILL RD PALM ST VINES CT AVE STER ALE HEATHER LN PRIMRO SE WAY ERSTWILD CT ND PTO AM RTH ENW NO KS OA LEY WA VER NEV AD AA VE OR CAM E AV BRID E IFO G RNIA E AVE AVE CAL SHE AVE PEP PER BER RD LEG COL HAN MILL RD LITA LN CLARKE AVE NEWELL RD DR NA VE SO NY AVE AVE OXF O GO N Z ILLIN AGA ST OIS ST HUN TER ST GEO RGET OWN ANNAPOLIS ST BAYLOR ST FORDHAM ST COOLEY AVE CAPITOL AVE MANHATTAN AVE DD R OO ND THW SO U ISLA EA VE IDG LER AVE CO ELL LOW TEN AVE LE SEA DA AVE NA CO RIN AVE PAR K RD NFO STA Y EXP GON ORE RAIMUNDO WAY WAY RELL COTT CENTER DR GS WH LEY A IT ME MAN VE LVIL CT LE AVE LO G KEL NUEV A PL CASA GLEN WA Y DUMBARTON AVE LINCOLN ST FRENCH CT EMMA LN AVE LN CO LIN HA WAY ELLO ARGU BUCKEYE LN EL PL SAN RA FA NS RD P PL CHMA LATH RO FREN DAL L MAPLE ST MARLOWE ST PALM ST BOYCE AVE RA VE ME AVE MENALTO AVE POPLAR AVE RALMAR AVE ADDISON AV OAKWOO E D DR ELLIOTT DR L AVE MENALTO AVE CENTRA FOREST CT CONCORD DR RUSSELL CT GALVEZ ST LASUEN MALL ST ROBIN CT KELLY CT WILLO WESTM W RD INST SA ER AV RATOGA E AVE JERV IS AV E DR ENDRY DR LEXINGTON DR MAR MO NA YA VE RSIT UN IVE MIL TON B RET RYAN T A T CT VE LYT TON AVE EVE HO KIN GA VE OD AV E REDW O AVE EN HV RUT WILLOW PL T ES PO BRADLEY WAY ERMER WIND N AVE HEND ERSO RD ETER PERIM W RD WILLO MCK E ICA AV ARITA MON MARG SANTA SANTA DR IELD PALM DR ST LASUEN LANE A WAY WAL K DOL ORE S IA A VE MAR SAN TA OLD PAGE ALPINE RD LL WAY FARM HI CASTANYA WAY GABARD A WAY DEDALERA DR NA W AY CORO WAY PINERIDGE HENRY CT HOLL YBURN E SEVIER AVE AVE MAD ERA AVE CARL TON AVE E AVE E D AV E OAK LAN ALM AN O R AV DR AVE ELEY BERK AY ARL ING TO SEM INA RY LIN F TR GC PIN OP RD SH QU A RRY RD FO PI VIA CRES ST DUENA ROBLE DR GOLF LN DURAZNO WAY CONIL WAY LINARIA WAY A RD LAUREL AVE DEL NO RTE AV TEHA E MA AV E SONO MA AV E OAKS AVE WOO D RING NW AVE ER D R R RY D LOW E HAR JORDAN WAY VIA OR TEGA RD LOS ARBOLE S AVE ONT FREM B ST D ST EA PAR VE TRID CAM GE BRID AVE VAR GE AVE DA VE LEG COL STA N AVE DLE MID PL MOSA AVE OA K MENLO D WAY MOSS WO O DR CATA LPA LIV LN CE E LN REN ALIC FLO AVE TH WER PL HY CAT HER POP E Y AV PERR DR CAMPB ELL AV E THER ESA CT PEG GY LN TIMO THY LN DR ORA DEO D RD R UM IPE RD ENS WO OD EO AK LN NS RYA LN LO AVE OAK MEN AVE WA Y NE CRA AVE LIE MIL L IA P PY AVE PAT RIC AVE RUZ TA C SAN T MC AVE PAL LLY HO DO OA RIS D KDE R LL D R DR OAK ITE WH AVE OD WO GLE N RAV WAY LASS DOUG IN A VE CBA MA ISO N LO L JUN LAB UR N Y LN AVE SUR RE FEL TO ARD N DR LEN NOX EN RD A ENC VE INA L AV E S AV E WAT KIN SPR UCE AVE THO FOR RN WA Y EST STO LN NE PIN E LN BUC K AVE DRA JAN AVE DO PRA VAL PAR A N M WAY AVE ONIGE RL CY AVE RK R BEL ND PO CLA YTO CAM CREEK DR E AVE 16TH AV NE C T 18TH MAR AVE SH R D E G AV E BUR N S AV FAIR E LE A V MAP AVE LA BEL ISA ALE SEC OYA ST LN PAR K NER CRO NAN AV E AV Y Y PA S AV E ST LIB ERT CT PRO SPE KIN HAR 17TH AVE AVE 15TH ATHLO LN OAK S IRVIN HER HOLBRO OK LN ITA GE CT ITAS AVE PLA C AY OOD W REDW N RD FAXO STE RLIN GA OAK VE LEY AVE AVE TON ASH NA VE DO GOR OLY MPIC AVE BLU EAS ERIDG TRID E AV GE A E VE LN ST CHRY SL BELLE AVE AVE 11TH 12TH AVE AVE NITO N ER L SAN BE AVE 7TH 9TH AVE R AVE RTO N ATH E LS A V INO E MA NZA A LOS CER NIT MO AA ROS NTE VE REY CAM AVE INO CED DE AR L O AVE S RO BLE S MIL CAM CRE PALM AVE 8TH AVE 6TH SA AVE CAL OO TUS YARNALL PL JONES CT 10TH AVE 6TH AV 7TH E AVE 2N D 3RD AVE AVE 4TH AVE 5TH AVE E 3RD AVE 4TH AVE AVE 5TH AVE AVE LA AVE LOY O URN WIL B LLOY DEN D DR PAR K RAL END ALM R N LN COG HLA ROSE MILLS WA Y HUR LING AME AVE WAR RIN GTO N AV E BAR R ON AVE IRE AVE HAM PSH AVE IA PAT RIC ROB LED AD AVE US HEM POL NA VE RD RES AD AC BRO DR ITY TRIN D T LN OAK SIDE AV AVE 1S T WA Y AM DR AD LN BY SEL LN ALL WH ST NDA EVICK DR RIN WA Y MA FLETCHER DR RTO R AVE GE RID CKB STO HR PINON DR FAVONI M ST IS AVE 51 U SAN PABLO DR SAN CARRIZO WAY WESCO 32 U AVE DR LATH A 22 å Theuerkauf Elementary School AT RD K RD 4TH MEA DOW OO D 522 U SAN LU VERNON AVE CLAR RD CIR EDNA JARDIN DR 35 U EAL WAG NER ST AVE ELSIE AVE PEACO MOUNTAIN VIEW 32 U 104 U AKRO CODY School ALVARADO AVE SEVILLA DR 40 U GLEN 120 U 120 U N RD 51 U E å Portola CRIS CENTRA ANTO L EX AVE PY OR TEL T 34 U EST LA A VE E RD AV AC 40 U 34 U AVE FOR BEL N AV AVE RIEL E Middle School SAN RAMON AVE DREW AV E DOAN E AVE MACO MCCO AMIN ARBUELO WAY YERBA SANTA AVE E AV Ramon School RA N DUGA ESTACADA DR EL C DIS TOL ADEL å San TER RD E Esther Clark Park PINE LN POR IS ST LAU RA LN THOMPSON SQ LIDA D R LN NELL BUSH INS AV AY OW Y ING A DOM AW ND SAN CIE HA RAQUEL LN ALPA DR JANE KING RD STEV ENS WAY CUMM MANUELA WAY TAM T å åCrittenden NS å å Monta Loma Elementary School W ER S RD Santa Rita Elementary School ALV IN B A A ENJAM ST IN D VE R e DURAND RD LA AVENIDA ST MORGAN ST 32 U DR ZOOK VAN BUREN ST Ardis G Egan Intermediate School DEUS VILLA ALAMO CT 40 U 40 U THAD ELK PAR K £ ¤ ROCK ST VE RY A PEAR AVE 40 120 U U 101 Moffett Federal Airfield WARNER RD T CT WESCOA GAB San Antonio ! Shopping ^ Center VICTO HITNEY 40 U OLD MIDDLEFIELD WAY FLORES LYNWOOD AVE MANUELA CT R 32 U 32 U 35 U 34 U DEL MONTE AVE MESA AVE AA VE AVE AVE PASA ROBLES AVE PORTOLA AVE LL WAY 104 U CT AY SEVC LER NIT ED IO MARDE San Antonio CT TON WALCOTT RD SPACE PARK WAY PLYMOUTH ST COLONY ST D NAS EL ETT FI MOFF HUNSACKER RD SHORE BIRD WAY BERRY DR ME DIO CT SILV AA VE MIL NC AN PLYMOUTH ST REINERT RD CHARLESTON RD RK N PA LOUCKS AVE AY PO SAN SERVE ORIO SE MUNDELL WAY SCR IPP BRIA S AVE RW OO DW 35 U 32 U EA VE 120 U CASA GRANDE AVE ! ^ Village Court DA K L AIR RE STIERLIN CT SAN ARDO WAY R CT MILLE CT CESANO å å WYANDOTTE ST 40 U DR DEL AVE Greendell School 104 U LEGHORN ST Powell School SAINT JULIEN WAY Middle School T DR GS AS SILVA AND U 104 U DIN ALM T U 35 ERL ARA NAVA AMPHITHEATRE PKWY 104 LAN MC AVE ITC LE MERCEDES WESTON DR WH IR H C AVE LUT DLEE E DR LEM ITC WH DU POZO 88 U C SUT H SANTA CL CRITTENDEN LN T åTerman DR ID KS REE CIA HUBBARTT PL DR ONA C 104 R ED RD TON LES HAR ADOBE PL E ETT FAY POM T GAR SSE NE TEN N EL DIX ON 88 U IG C CRA NZA COU FRA NA LOM NDO LN M BE D N A R RINCON CIR DONALD YBELL W CT AY DR MA YC U åU 88 VIA DEL LN Mitchell Park Library c Æ JLS Middle School Mitchell SOUTH Park CT Herbert Hoover School å 88 U THA IN W AY PEN AC T BAK ER A VE ABE L AV E SHADY OAKS LN ARIC DR ER DR ALG Ramos Park DR DOW MEA GR OV EA VE Shoreline Golf Links 120 U WY CT KIE WIL SA VE PK å UTU 88 U E T NE C BOW ARB å MU RD HTO OCH D R NC T LN 89 U Ross Road School COAST AVE EVE RGR E AVE EN D R R E ST Juana Briones School å DA AVE KW AY INE MONTROSE AVE 22 U S AV AN RAM ST OA LUP D KAY ORM LEY RK AS BRY AN TS RA MO T NA ST AVE MA CO c Æ RE T å HO NS Peninsula TERMINAL BLVD Conservation Center Foundation Library CASEY AVE YS BA WA VER NT ER Palo Verde Elementary School 35 U 88 å U VILL AV VER ERA DOS CAM A DR PAN AD R NTA VE EA ERD KIP International School LIN GS T 88 U NO D RRA YW NAL O CA DER MATA NATHAN WAY SEL VA D ARA IS R KEN THO NETH MA DR SD R MAC AM MU AY AV LVD R Henry M Gunn High School MIR T VER Y MARINE WA WA LS EC O PAL 104 U PRIC VE AA ST LOU ELM ENT RO 88 å De Anza School U MAPLEWOOD AVE EL C CK CORINA WAY CT LA MO STO LOM El Carmelo Elementary School RSO KB L IR PAR GEN EV GR IEVE EER CT RRIS RD D TON R PL AP C OW SAR GEN T CT CT AD Hoover Park EM E LL A VE Y WA T RO å DR AR D VAR STIRRUP WAY SC 88 U CT TRAVERSO AVE OHLO 1050A SAN ON ELL K RD PALO HILLS DR ARASTRADERO RD DER WN INS ERS DR ORE AVE AM SYC RADO O COL DR RA CLA LOS 103 U U 88 U 89 U 104 VA 101 U HILL RD CREE RP AVE MANUELA AVE YALE CT ITSE EL CERR ITO RD 280 § ¨ ¦ Ñ Y DEER AVE Veteran’s Hospital 89 U 101 U UNA RP FOOTHILL EXP COYO TE RAN DTO SIM K IR TT C OTT FFE MO MCK R OLD ADOBE RD Miles 102 U 101 U 182 U IE C RD DR AVE 1 LOS ALTOS HILLS JUL RIDGE TER RD MI å Ohlone School TH ROBLE POR 1050A HILLVIEW RD 89 U 182 U HAR OCA Y T WA R PL MIN LAG 1050A LIND A LN WH 103 U Barron Park 101 U 102 Elementary School U å CAR å Lucille M Nixon Elementary School D ROS S 88 U E 104 U 103 U 102 U 522 U RP WA Y RU RYAN CT IE VERN N TS R 101 U 89 U 104 U CT TOLMAN DR TA L WESTRIDGE DR PORTOLA VALLEY OUT 104 U R 182 U ST ON 88 U Crosstown Shuttle ST RS U ST CAJ T RC BST WE ORA COL GO WA Y DR UTH PALO ALTO 89 U CATH RO MEA AVE OP MO ER DO c Æ CET ON T ER C HR DAR T ST å California Ave PRIN ST S PET LAT CED HER TAS ER ST SO ST ST EL Jordan Middle School ST IN PAW TIP DA AV E BIA AM LD YFIE MA RA COL UM PINE HILL RD AY ADA W ESPLAN TON First Congregational Church Library SAN CARM E TA CA L DR CHA TAL BO TT T INA ER AN ST LAN IND DD IAN R DR BU RN HA MW AY D RD ST CO EM WAY MORTON c Æ Embarcadero Shuttle TECH ERO RD BARCAD FIEL NS TA N BST College Terrace Library 182 OBE RLIN ST VAR DS T HAR å STA UN CT YAL WIL E ST LIA MS LLE SLE ST Y COR ST NEL L ST R T ON IVY LN DLE CO Peers Park SE CT BYR WE WP WE AN C U RD LN ORTEGA CT CT ST VIS 87 U 86 U MS GEL LC OIN RD ALAMOS 0.5 LN ABR A N ELL 35 T ST MA R CAS IPOSA TIL LEJ AVE AA VE YL NEW D E LN O BRIN MID Ñ Cowell WD AY CT STA R CT DU T U GR East Palo Alto Shuttle HILBAR AE-F GEN WAY å Palo Alto Library e ME ELDER NC DLE LEN BLACKW ON RD C QUIL N BUR INS å TS ERS 82 V U THO T A S HOSK R SER SE BRY AN EM AVE c Æ Main Palo Alto Mun Golf Course D NA N EST AD STA SIE R FAWN LN RD ID IR S BO Health Center MI VA Castilleja High School TED S WAY O RD N CT ONA RC MS THER ZO GER TECH O RD ADER B 1050A ^ ISON JORDAN PL WALNUT DR PARKINSON AVE R 280 U Palo Alto Airport 280 U ER ING IDO RD EL ESCARPADO CT GREENWOOD AVE D Childrens Library Æ Junior Museum c and Zoo Walter Hayes Elementary School OL CRO C X DR LD DR MAD DAN A CHANNING AVE HARKER AVE R OAKES ST BAINES ST OR RD E LAN CAMPUS FIE EWO OD AVE KIN AN AV GS LN E ARCA DIA PL Harker å School GATES ST MOUTO N CI SH BAY LD NA ESCOND ITA D R DLE SAGE ST EDG ILTO N PITM MARTIN AVE GARDEN ST JANICE WAY DO MC BO LOM RRA BL VD å MID HAM FOREST AVE å AVE E ITA O AV ON DR STANFORD UNIVERSITY RO SE SAM IRE JUNIPE 9 MA X O H AYS RD E5 RP C ALTA 280 281U U OB WAY U SE LAGUNITA DR CRESCENT DR AVE ESC T LAND OCONNOR ST San Francisco Bay East Palo Alto å Charter School CYPRESS ST DINES CT 280 U 280 U 296 U 296 U U 280 U Saint Elizabeth Ann Seton School LN O LANE L RS AVE AS ST LAN PAS TERESA Addison Elementary School PAM SANTA ED D OCA U NR AM SLAC 39 522 U 22 åPalo Alto U High School AE-F LANE TA W ASH CRE SD LN RES 0 ILL DEER PARK WAY LERIDA CT CERVANTES RD RD PAN LAN E FALK CT FIFE AVE å 4WD ROAD GOYA RD NH TRAIL LN E RD D VER Source: The City of Palo Alto, 2016. SOLANA FLO CU WAY ^ LDE GO RD WAY E RD LN ESCO FARM RD A TOL POR ANJA SEARSVILL LL P AE-F LL EBLO MA ST EMBA BALSAMINA e BAR RD RD LN R ME HO LUCERO DEGAS RD NAR LA å School Airport Cultural Attraction Park/Golf Course RAM OSO ^ SLAC SERRA MA VIA PU WOOD T E8 ANSEL LN AY AW END å U Stanford Museum MUSEUM WAY PL UMTREE E LS AV OAK CT IND AS LAN LAN T German American International GU Palo Alto Medical Foundation Clinic E7 AS CA Ñ LAN ALM Dumbarton Express Woodland Elementary School Palo Alto City Boundary ROTH Hospital SEN E ^ U SE WEL 297 U 397 U Y O N U LE ST LAN 35 DO WA E5 WN GIL VERLY 6 ING MA LN N S ST T ñ T M RD HD VTA Bus 86 Routes U SamTrans Routes BER c Æ K LIN SNECKNER AY AW ñ ! ( D SR Caltrain 87 U VTA Light Rail ERIC ! ^ RD Y 297 Ñ U 397 U (cÆ 35 ! HS X AE-F VA Stanford University HIG D Y L LN Mountain View Shuttles Hospital Shopping City Hall Library ONEER RURA Menlo Park Shuttles Ñ N 281 U PA LO R SE W O HA Lytton Gardens Health Care Center Museum of American Heritage RETU MC RD LN GREEN ST DONOHOE ST OKEEFE ST åSchool BELL ST BEECH ST åU 397 88 U 83 U 89 U SO DR Redwood City Shuttles Landmarks ELECTI STOWE LN 89 U 85 U AC Transit U Line U OAK RD RD 35 U RD LN LCH WE N LE MC A RBO VINEYA S GILBER T AVE AVE NEL SA Trinity Episcopal Elementary School Stanford Margeurite S C GOVER NO NER DR BRAN WAY RSON ANDE SAND HILL RD AY NW R DR FARM El Camino Park JUG HA ND D Ñ Stanford Univ Golf Course Palo Alto Stanford 35 Shopping U 280 Center U ^ PASTEU STOCK PL El Palo Alto Park ! EEK DR SLAC RD LR RD OAK CR S U 88 N Stanford Childrens Ñ Hospital OCA RO LN SAGA D SAN RD E ST RD CLOVE R Hopkins Creekside Park D WAY EK N IA WOO ALT OL NEL NASH CRE DL AM BA AUG R WAY UST CIR Oak Knoll åElementary School VIN ON Y WA ON Palo Alto Shuttles L HIL CT OO VAR N NTE R HILL CI å T CET MA YW ST 286 U 86 87 U U OU DR Transit Services SHA R MO AY DR SAND SISKIY å N L TA SC E ST LL L AVE AND AVE RD NFO R School RIE AYE R KNO LEL ED CAD R FAIRW AP LOM CROCUS 87 U STA 86 U Phillips U åBrooks 286 OO EW OAK 80 U ST FAN ITA WA Y GRA CE LEM DR ON ST N DL EDG ST YAL E PRIN R Y WA WAY DR DEANNA DR SHARON PARK DR R LIA WA Y TON ART OLIV ST SA COT SHER ECR U COR AIN LAIR LA LOMA CAS TIN EN D LASS SIE RRA ENT DR AL DR CON ISE DSO RD R WA LLE AD MO ON T ST OR RD ARB WIN BOH ST SW K CIR TIOGA DR CT SEN LAS WHITNEY CT LOU FRE M DR HOB MA GNO LYN Y WA MAR OIR RD RESERV OW LN RD MEAD VALLEY BEL SD HER EVE U 84 U Burgess Park ER VALPARAISO AVE HALL WOODSIDE CT R AVE OD OA K ST SH LW O WA Y å DEN CRUZ TAL BELBROOK WAY HID SANTA RD DEL ON A LOS FIN V R OW E ND OBLE AY O W S CT ORA AY NGE SHE A V E RMA NA CLO VE UD AVE R 83 U T MO EY A VE RO CT TIS LE S 89 U 82 U c Æ ST RUNNYMEDE ST 296 U SCHEMBRI LN Ravenswood Elementary School BUCHANAN CT ADE KO S YD ñ ! ( c Æ DOY CUR ST 397 Willow U Oaks 296 Elementary U School å 297 U AVE AE-F AVELAR ST ARC ILA LD City Hall ND BAR N LEM WD Hillview Middle School AVE ERS IT ST 3RD ST 4TH ST BAR RON ST ST MAN U 297 U 281 EMB VA S NA VE LVIE DR EFIE REL DR AY COLE ST DURHAM AVE PL Las Lomitas Elementary School ER ER E LN ROS HIL ITZ EL 2ND HT ST OAKDALE ER RSO POL ELD NO NE E ST LAU HAIG CHESTER SACRAMENTO ST LILAC LN FAB PAT TE K LN T 82 U McKeon Memorial 296 Library ST VA Palo Alto Health WAY RAD AW ST WEEKS ST WAY O LAG PIN LS S DR CRA DR 1ST å SULA ND EAST PALO ALTO 280 U c Æ ñ City Hall ! ( JASMINE AL MIL ENT LLA 281 296 297 U U U 397 U ST INO CAM E TEO INN SEN PENIN D HO Ñ East Palo Alto Branch San Mateo County Library NA PAR AVE WA VE O AV AVE U Menlo Medical Clinic84Ñ U U U 80 82 U åU U 83 U 80 U 286 U COR MAR CUS 83 U å å WAY TA A VE VIE å DR TIAG VIS 296 295 U U 297 åU 297 U 296 286 U U Menlo Park Menlo Park 82 84 Saint Raymond Elementary 80 SAN School 83 MA å 86 U R ER BOH Peninsula School E Kavanaugh School E 280 U NOTRE DAME AVE KAVANAUGH DR DAPHNE T å DD Nativity Elementary School RA SA C Saint Joseph Elementary School Sacred Heart High School DR WO O COLBY AV ST UE AV A TA FAIR LEE FEN N D DD D MENLO PARK 3 97 Uå DR 88 U ALBERNI PURD å Costano Elementary School OBRIEN DR East Palo Alto | Menlo Park Mountain View | Palo Alto N SA LN UNIV FIEL OO åU NE R 281 U DR ABELIA WAY LIA CT CAMEL RRY c Æ Bowman Library DLE KW 114 V U 281 U NEWBRIDGE ST AVE R Laurel Elementary School 82 EDG DRO MID ITA RD ENCINO RD TOYO N RD MA BOH PAR å IVY DR ADAM S ADAMS CT CT N DR ISTA LBE TOR IA WS DR MANZAN AVE HAMILTON ST ME RY LN AVE ANT ON VIC MD IE A VE NA 88 U IO TAN Y EMIL SAN NTE 89 U SAN CIR R å RICK L MO RD Encinal Elementary School BRIT ATHERTON NL N CT MU LGA S LN STE R LIN DA V S PU LN LN ELE CLA YD R RNE FRED RP WA Y ON N HEA THE THO D DR ACORN WAY DU RIDGE VIE W DR Y LN R QU EE NS ROY BAR DS DL 296 U ENO AKS LN WISTERIA WAY FLOOD HAW GRE LUPIN BER BIE å James Flood Magnet BAY School R HAMILTON AVE Belle Haven Elementary School TERMINAL AVE Area Transportation Network DREW CT TEMPL E CT STEV ENS AVE O MISSI AR CER RD GREENWO OD PL DUNS MUIR WAY BOH AVE TULANE CHILCO ST 281 U NO MED AD AVE NT A VE ALA N ENS EDW SEL B OO DR DR MA WOO DSID CER E RD HEL RITO JUB ENA ILEE PL EL P WA CT HULL NAS RADO Y M ST AVE ONT SA WO INY U DR MILTO OD OP N ST CIR L BAR TON ST STEV L KIL N TY L CT AVE LID YMO E LA ISTA D STE SPE N LEW NR N OLIA 84 V U DR T PL ER EUC MAR BET CHE ES L 84 U 297 U Atherton Atherton Branch Library WIN MER CED ING AVE N MA GN EAL TH RD STO IA L ñ ! ( c Æ ECR U ES A VE NW A DR RAL IN A VE JAM VIR GIN 84 U BOH MO ELLI CAM AUS T 82 U 88 U COM R KEN BER GES EN R Elementary School LLO YDE WA N PARK Y L RA RP PAR K YL 87 U AYS D E NO OAK D åGarfield N U FLE WA Y DR BOHANNON DR LORELEI LN CALLIE LN ON D CER CHAU DOR E CT RD AVE 82 U V N AV E AY WA RD LAS AV DOU G E ARER ML E AV TA IA YW AR ENW UR A V ART H MAC SHE VIS UO RT HIL GRE AVE IRE KSH 72 U NA CAROLINA AVE OHIO AVE DELAW ARE AVE MS ER CO LUM AVE BIA AVE HA E BU HILLSIDE CT LN GR ES D AMA PARK DUN N DEX T ALO BLV School HE CT å LIA 14TH AVE EDISON WAY AM HER ST OD WIL BER T REN ATO C LOC MCE VOY ST CEN TER PAR ST KS T LOS CA R CEB WO å Elementary DO EN NS ORE NE S T SWE ENE Y AV E E WIL LOW ST ST CHA RTER EL K A AVE VE HAZ HE M AVE OA K BER ALT AV MO KAY NY SCO TT A V MAP LE S CA S SIA T ELM ST ST BEEC CED H ST AR S CHE T STN UT S T BUC KEY E ST SPRU MAN CE ST ZAN ITA ST LEA HY FOX ST CT RU SA THER NC A FO ESF RLOS RD AV OR E D A AVE VE AV E SEQ BO AVE NORTHGATE ST D NT FAIR OAKS AVE FLORENC E ST ITUTI SON DR DA HR ILL ST RLB DEVO NSH OR BLE OUGH IRE A NH VE EIM AVE AVE U 72 U MO IDAHO CT AVE NORTHSIDE AVE FL CRO OOD CK AVE NTIN ER AVE GT CU ON AV R CA TIS A E LVIN VE AVE 79 U AE-F CONST JEFFER CLE CIR BEL RCH NE ROB ENC å 101 £ ¤ R POPE ST R å CHU BON NUEV ITA AV E A AV E EO 270 U PAGE WAYNE CTST NCE D O DER T 278 Woodside U High School HIG DRO Ñ å ME U275 U MA MA T MAT å NDE TRENTON WAY ALA å 72 U ST åU 72 AY C 79 U SAN EPE SCOTT DR CA BAR EM AY RW KENSINGTON RD WAY TOL AY BRIS W FER SEX NSI SUS DE ST M R ARYL D E AN DS SID T OD 278 WO YS TD Henry Ford Elementary School AVE CK ST EN ATH E DSO ICU RR 278 PARK WIN TU OR ECT LIN D ITEH AV E SIL VER ST EY KEN MU U 275 U ST RD HU LE A INA VE Kaiser AVE Permanente ORCHARD LOG WHE AVE AN ELER HOR LN GAN AVE AVE ART KING HUR NEW 72 SF ORD LN Saint Pius WEM CASTL LN E BLE Elementary Y C CT T BRIG HTO School N LN CH ELS EA CA W A M Y OA ELLIA K NIM FIEL AV D E I ALE TZ AV AVE XA ND E ER Selby Lane AV E AVE AN AM NN HUDSON HAWES CT UNION AVE KE NT FIE LD AV E ST LD IND FRIENDL Y CT ODESSA CT DELMAR CT Taft Elementary School U NETWORK CIR E RD BELL CT T DEW WASHINGTON CO IA FIE 270 U HAVEN AV ROLISON CLARENCE CT NS MA 79 U å Washington Elementary School ST T GIN DLE E A DR ACACI TRU DS VIR John F Kennedy Middle School MID Fair Oaks Branch Library LOW AVE FIESTA AV HOOVER ST T LO S MEL ST RA AL å ST SLEEPY HOL E HILL AV E AS AV PLUM T TAF Y ST ON MADDUX DR AVE ST T ON T SS DIS AM W S AD AD DRO T O NS WO TO N ST CLI ST FAY LAND VE ST CLE AVIS ST D NER EBE RUB T DS T OR NT S T XF E A C O REG RIN ST SAB EESE R ST ON NS JOH G ST KIN S ST T S N LYO INLEY WAY K Z T MC NCHE T SS SA R S N CI A IVE OL NT FR RD TA SAI LO AVE VA RO IPE JUN T S S A ST WE HA EVAD N MA CD SIE R HESS RD LA RK AV PA E RO LM HA CA SEM AV M RLE AR E TO Y L PTON NC N AV T E SYC PEC AM AN OR CT EC T ST GO IN ODW å ON MBA UGH 397 U 79 U 276 U Hoover School STA c Æ WOODSID E RD ST ST ST MAIN ST ROP LATH IRIS SON 296 U 79 U AVE E AV ELT SEV RD Branch Library ST WAY T Hawes Elementary School LN CO LIN GO Roosevelt Elementary School CAR RO LER 275 U 278 U VE AA 297 U HEL WOO D NS ER JET LEXING TON AV JEF FER E SO JAC NA KS VE ON MA AV DIS E ON AV E WIL DIL SON LER ST ST MONROE ST JAM ES AVE DSO O c Æ Schaberg 79 U VER REDWOOD CITY 274 U John Gill Elementary School å McKinley Intermediate School å Redeemer School c Æ ST 270 U E HU TH KA U BROADWAY ST SPRING Sequoia Station 274 U å VE EA N ERI ñ ! ( ! 397 ^ MARSHALL ST AV SITY å Kaiser Permanente Redwood City Hall ER UNIV Sequoia High School 270 U LA VE E AV ME AN DU T DS T NS LTO T FU DS AN GR OO B RD DFO BRA HIM C LI ELW R STE W RE FLXS U å FU Redwood City JEFFERSON AVE U ST AVE ST CH ST BIR TON T N ES INS PK HO WINSLOW ST CH AR 73 U P L A N DOUGLAS CT T HIPPL W A L Monroe T O C O M P R E H E N S I V E 270 ^ U T å Elementary School ! Veterans Square NS E D T PAL OLLER SR T A T I O ÑN VETERANS BLVD ST ECR 273A U RU N KXS VE EA HAMILTON ST PA L O T CS RAV ALE END DR RNA RDO AVE M ABE P T- 1 E X I S T I N G T R A N S P O R TAT I O N S E R V I C E S P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T T-6 P L A N PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T RAIL SERVICE Caltrain is Palo Alto’s primary regional transit service, with riders traveling to San Francisco, Gilroy, and all cities in between. Since introduction of the baby bullet limited express trains in 2003, ridership has more than doubled and today, Palo Alto’s University Avenue station is the second largest generator of weekday Caltrain trips, behind only the San Francisco station and ahead of stations in larger cities such as San Jose, San Mateo, and Sunnyvale. Long-range plans for Palo Alto Station and adjacent University Avenue underpass area will enhance pedestrian circulation and the prominence and visibility of the transit station, creating a vital link between Stanford and the University Avenue/Downtown area and further increasing transit usage. The planned extension of Caltrain to the Transbay Terminal in downtown San Francisco will improve regional transit connections for Peninsula communities, including Palo Alto, and electrification of Caltrain will speed service, allow for more trains, and decrease noise and air pollution. BUS SERVICE Three transit providers, VTA, SamTrans, and AC Transit, provide bus service in Palo Alto, providing connecting residents to both local and regional destinations. The VTA operates local bus service within the city, with 14 bus routes in Palo Alto, and also offers connections to VTA light rail, Caltrain, Altamont Corridor Express (ACE) and AMTRAK Capitol Corridor. SamTrans operates bus service throughout San Mateo, San Francisco, and Santa Clara counties, helping to connect Palo Alto to other parts of the Peninsula and Silicon Valley. AC Transit’s Dumbarton Express provides express bus service between the East Bay and communities on the Peninsula, including Palo Alto. The VTA’s proposed El Camino Real Bus Rapid Transit (BRT) project aims to improve transit operations and increase transit ridership along the El Camino Real Corridor. With curbside stations and signal priority (“queue jumping”), BRT in shared travel lanes will provide faster, more reliable service with target stops and specialized transit vehicles and facilities. The El Camino Real BRT Corridor extends from Downtown San Jose (Arena Station) to Downtown Palo Alto (Palo Alto Transit Center) passing through the cities of Santa Clara, Sunnyvale, Mountain View and Los Altos. Visual simulation of BRT operating on El Camino Real PRELIMINARY DRAFT – JANUARY 21, 2016 Source: VTA T-7 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N SHUTTLE SERVICE There are three types of shuttle services operating in Palo Alto, including the City operated Palo Alto Shuttle, the Stanford University Marguerite shuttle, and private employee shuttles which transit through Palo Alto offering transportation for employees to other job centers on the Peninsula. The Marguerite, run by Stanford University Parking and Transportation Services, is a free public service that connects the Stanford campus to nearby destinations including the Palo Alto Station and Downtown. The Palo Alto Shuttle is a free, wheelchair-accessible shuttle provided by the City. This shuttle currently serves three routes that connect Caltrain stations and important destinations in the community, and the City is developing plans for enhanced service in response to community input. Marguerite and Palo Alto Shuttle routes are shown on Map T-1. FIRST/LAST MILE CONNECTIONS In November 2015, Palo Alto City Council adopted a Complete Streets resolution affirming the City’s longstanding commitment to design and construction of a comprehensive, integrated transportation network that allows safe and convenient travel along and across streets for all users, including pedestrians, bicyclists, persons with disabilities, motorists, movers of commercial goods, users and operators of public transportation, emergency vehicles, seniors, children, youth, and families. Council also adopted National The concept of first/last mile connections refers to the level of accessibility to and from transit stations. Many people live or work approximately one mile from a transit station or bus stop, but distance, perception of safety or the availability of an enjoyable connection may deter them from using transit. The Palo shuttle provides first/last mile connections to and from Caltrain stations, as does the provision of bike share facilities. For now, walking and biking remain the best first/last mile option for most of Palo Alto, although rideshare services are increasingly attractive, In the future, ridesharing and other on-demand transportation services could be integrated into the City’s overall first/last mile connection strategy through MaaS. B ICYCLING AND W ALKING Originally passed in 2008, California’s Complete Streets Act came into force in 2011 and requires local jurisdictions to plan for land use transportation policies that reflect a “complete streets” approach to mobility. Complete streets comprises a suite of policies and street design guidelines which provide for the needs of all road users, including pedestrians, bicyclists, transit operators and riders, children, the elderly, and the disabled. From 2011 onward, any local jurisdiction—county or city—that undertakes a substantive update of the circulation element of its general plan must consider complete streets and incorporate corresponding policies and programs. Association of Transportation Officials (NACTO) guidelines for bikeway and BIKING urban street design, which incorporate Palo Alto dedicated its formal bikeway system—one of the nation’s first—in 1972. Bikeways have since become commonplace in surrounding cities and considerable Complete Streets best practices. T-8 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T progress has been made in overcoming barriers to bicycle travel in and around Palo Alto. Palo Alto’s bikeway network consists of on-road bicycle lanes, bicycle boulevards and bicycle routes, off-road shared-use paths and bridges, and bicycle parking facilities. Highlights of the system are 14 underpasses and bridges, spanning barriers such as freeways, creeks, and railroad tracks. Map T-2 shows the existing and planned bikeway network in Palo Alto. The City has received national recognition as a leader in the development of innovative bikeways and programs and has been widely acknowledged for its successful Safe Routes to Schools program. Palo Alto is in a position to significantly increase its proportion of travel by bicycle. Its flat terrain, mild weather, grid street network, and environmentally- and health-conscious citizenry make cycling a practical option at a minimal cost. Future challenges include more routes for northeast-southwest travel and overcoming physical barriers like railroads and freeways. Better provisions for bicycles on mass transit would promote the use both modes by increasing convenience and accessibility of destinations. The Palo Alto Bicycle + Pedestrian Transportation Plan (BPTP, 2012), adopted in 2012, contains a policy framework, design guidance, and specific recommendations to increase walking and biking rates over the next decade and beyond—rates that will be instrumental in helping to address the impacts of regional growth while maintaining mobility. BPTP 2012 seeks to encourage planning, construction, and maintenance of complete streets’ that are safe and accessible to all modes and people of all ages and abilities, incorporating best practices from the National Association of Transportation Officials (NACTO) Bikeway Design Guide. PRELIMINARY DRAFT – JANUARY 21, 2016 T-9 Recommended Facilities and Con Recommended Facilities and Con PA L O A LT O C O M P R E H E N S I V E P L A N T R A N S P O R TAT I O N Source: The City of Palo Alto, 2012. Map 6-1. Proposed Bikeway Network Map 6-1. Proposed Bikeway Network M A P T- 2 Alta Plann Alta Plan B I K E W AY S I N PA L O A LT O P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T WALKING Mode share data indicates that walking accounts for more trips than public transit in Palo Alto each day, yet is an inexpensive and often overlooked means of transportation. As shown on Map T-3, Palo Alto's pedestrians are generally well served by current facilities and will benefit from the attention given to street trees and bikeways. There will be more benefits in the future, as the City emphasizes walkable neighborhoods and pedestrian- oriented design. The most needed improvements are to fill in the gaps in the sidewalk system, make intersection crossings “friendlier,” and overcome the barriers to northeast-southwest travel. STREETS All modes of transportation in Palo Alto depend to some degree on the street network. The City’s street network has remained essentially unchanged since the 1960s, except for projects along the Sand Hill Road corridor, yet overall traffic volumes have increased. S TREET C LASSIFICATIONS Palo Alto’s streets fall into various categories, depending on their purpose and design and the amount of traffic they carry. This street hierarchy is defined below and is illustrated on Map T-4. Even before California adopted Complete Streets principles, Palo Alto sought to accommodate all modes of travel in the design and modification of its street system. Improvements to road surfaces, curbs, crossings, signage, landscaping, and sight lines must make streets safer for vehicles, but must consider the needs and safety of pedestrians and cyclists as well. PRELIMINARY DRAFT – JANUARY 21, 2016 T-11 PA L O A LT O C O M P R E H E N S I V E Existing Facilities and Programs | 3-5and Programs Existing Facilities P L A N T R A N S P O R TAT I O N Downtown Inset Source: City of Palo Alto, 2012. Map 3-2: Existing Pedestrian Conditions M A P T- 3 Map 3-2: Existing Pedestrian Conditions Map 3-2: Existing Pedestrian Conditions EXISTING PEDESTRIAN FACILITIES Alta Planning + Des P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N P L A N E L E M E N T S A N F R A N C I S C O B A Y East Palo Alto Un ive rsit y Av en ue Menlo Park 101 £ ¤ Road dero a c r a Emb am Or eg C El on E xp res s wa y ! a Re ino l ! 82 | ÿ Mi dd lef iel dR oa d Stanford East Charleston Road aS tre e t Ant oni oR oad Alm San Mountain View Fo o thi l lE xp res sw a y § ¦ ¨ 280 Los Altos Los Altos Hills 0 0.25 0.5 Miles Source: City of Palo Alto, 2013; PlaceWorks, 2014. Local/Collector ! Arterial (incl. Residential Arterial) Expressway Railroads Sphere of Influence Freeway PRELIMINARY DRAFT MAP T-4 Caltrain Stations Parks City Boundary ROA WEAE Y SD TR T N N EE T TW WO OR RK P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T T-14 P L A N PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T PALO ALTO’S STREET HIERARCHY Freeway: Major roadway with controlled access; devoted exclusively to traffic movement, mainly of a through or regional nature. Expressway: Major roadway with limited access to adjacent properties; devoted almost exclusively to traffic movement, mainly serving throughtraffic. Arterial: Major roadway mainly serving through-traffic; takes traffic to and from expressways and freeways; provides access to adjacent properties. Residential Arterial: Major roadway mainly serving through-traffic; takes traffic to and from express- ways and freeways; provides access to adjacent properties, most of which are residential properties located on both sides of the roadway with direct frontages and driveways on that roadway. Collector: Roadway that collects and distributes local traffic to and from arterial streets, and provides access to adjacent properties. Local: Minor roadway that provides access to adjacent properties only. R OADWAY AND I NTERSECTION I MPROVEMENTS [To be updated when Preferred Alternative and associated roadway improvements are identified]. Intersections are the most constricted points on the network. Many intersections are congested during the peak morning and afternoon travel periods. Some intersection improvements have been made over the years and a few others are planned. No major expansions of the City-owned road network are planned, although the City and County have collaborated on plans to address the intersection of Page Mill Road and El Camino Real, and nearby intersections. Palo Alto desires to keep traffic flowing as freely as possible on major streets and to minimize the diversion of through-traffic onto local residential streets. For that purpose, several key intersections and roadways segments, as shown on Map T-5, have been identified for monitoring. A challenge is to balance the free flow of traffic with the safety of pedestrians and cyclists of all abilities, as well as with residents’ desire to maintain low traffic speeds on residential arterials. Most future improvements will be made within existing rights-of-way at intersections and will provide relatively small increases in roadway capacity. Intersection improvements are planned only at the major intersections noted below. Additional turning lanes and other related changes are proposed at the following major intersections in Palo Alto: [list to be determined based on final decisions about the locations of future development] PRELIMINARY DRAFT – JANUARY 21, 2016 T-15 PA L O A LT O C O M P R E H E N S I V E P L A N T R A N S P O R TAT I O N # Key Roadway Segments: 1. Sand Hill Road between I-280 and El Camino Real (SR 82) 2. El Camino Real (SR 82) between Sand Hill Road and Page Mill Road (CMP) 3. El Camino Real (SR 82) between Page Mill Road and San Antonio Road (CMP) 4. Page Mill Road between I-280 and El Camino Real (SR 82) (CMP) 5. Arastradero Road between I-280 and El Camino Real (SR 82) 6. Alma Street between University Avenue and San Antonio Road 7. Middlefield Road between University Avenue and San Antonio Road 8. University Avenue between El Camino Real (SR 82) and US 101 9. Embarcadero Road between El Camino Real (SR 82) and US 101 10. Oregon Expressway between El Camino Real (SR 82) and US 101 (CMP) 11. Charleston Road between El Camino Real (SR 82) and San Antonio Road 12. San Antonio Road between El Camino Real (SR 82) and US 101 (CMP) 13. Foothill Expressway/Junipero Serra Blvd between Sand Hill Road and Arastradero Road (CMP) # Key Intersections: 1. I-280 Northbound Off-Ramp and Sand Hill Road (Menlo Park) 2. Middlefield Road and Charleston Road 3. Middlefield Road and San Antonio Road (CMP) 4. Alma Street and Charleston Road 5. El Camino Real (SR 82) and Embarcadero Road/ Galvez Road (CMP) 6. El Camino Real (SR 82) and Page Mill Road/Oregon Expressway (CMP) 7. El Camino Real (SR 82) and Arastradero Road/ Charleston Road (CMP) 8. El Camino Real (SR 82) and San Antonio Road (CMP; Mountain View) 9. Foothill Expressway and Page Mill Road (CMP) 10. Foothill Expressway and Arastradero Road (CMP) 11. El Camino Real (SR 82) and Sand Hill Road/Alma Street (CMP) 12. Charleston Road and San Antonio Avenue (CMP) 13. University Avenue & El Camino Real, northbound ramps (CMP) 14. University Avenue/Palm Drive & El Camino Real, southbound ramps (CMP) Hexagon Transportation Consultants, 2015. M A P T- 5 K E Y I N T E R S E C T I O N S A N D R O A DWAY S E G M E N T S P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T L EVEL OF S ERVICE Level of Service (LOS) is a way of measuring traffic congestion based on average control delay per vehicle, and in some analyses, based on the ratio of the volume of traffic to the capacity of the road. LOS A is a free-flowing condition for cars and LOS F is an extreme congestion condition, with traffic volumes at or over capacity. LOS definitions for signalized intersections are shown in Table T-1. Intersections in the City of Palo Alto are subject to the City of Palo Alto LOS standards, which seek to maintain an LOS D or better, except at intersections that are monitored as part of the VTA’s Congestion Management Plan, where the agency seeks to maintain an LOS of E or better. TABLE T-1 SIGNALIZED INTERSECTION LOS DEFINITIONS BASED ON AVERAGE DELAY Vehicle miles traveled (VMT) is an indicator of the level of traffic on the roadway system by motor vehicles. VMT is estimated for the given period of time - for LOS Average Control Delay Per Vehicle (Seconds) A 10.0 or less B 10.1 to 20.0 so does VMT; however, other factors that C 20.1 to 35.0 economic growth, relatively affordable D 35.1 to 55.0 auto travel costs, tourism, low levels of E 55.1 to 80.0 of auto travel increases, the time wasted F Greater than 80.0 Source: Transportation Research Board, 2000 Highway Capacity Manual. (Washington, D.C. 2000) example daily or annually. The estimate is based on both traffic volume counts and roadway length. As population increases, contribute to a rise in VMT include public transit, and sprawl. As the amount on congested roadways, the energy used by the vehicles and total costs of auto travel increase accordingly. Senate Bill 743, passed in 2013, will shift the State away from LOS as the metric for evaluating transportation impacts under CEQA, based on the idea that prioritizing the free flow of cars over any other roadway user contradicts State goals to reduce GHGs. Instead, the State’s Office of Planning and Research is developing alternative measurements of transportation impacts, which may include vehicle miles travelled (VMT), VMT per capita, automobile trip generation rates, or automobile trips generated. Once alternative criteria are incorporated into the CEQA Guidelines, auto delay will no longer be considered a significant impact under CEQA. However, because this Comprehensive Plan includes policies establishing the City’s LOS standards, individual development projects will still be required to analyze, disclose, and address LOS impacts as a part of the project review and approval process. PRELIMINARY DRAFT – JANUARY 21, 2016 T-17 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N M ULTIMODAL L EVEL OF S ERVICE Multimodal level of service (MMLOS) applies the concept of LOS to all modes of travel, not just automobiles. Within Santa Clara County, in response to State laws that require planning for complete streets and deprioritize vehicular LOS as a metric for transportation analysis, VTA is developing guidelines for multimodal transportation planning to include in all transportation studies, and the City of Palo Alto will have an opportunity to participate in this effort. One possible outcome could be the adoption of metrics for safety, convenience, and delay for transit, bicycles, and pedestrians similar to the LOS standards the City has adopted for cars. R AIL C ORRIDOR Palo Alto is bisected by the Caltrain rail corridor, which creates a significant barrier to connectivity and circulation. RAIL CORRIDOR STUDY The Caltrain rail corridor was the subject of a significant planning effort from 2010 to 2013 to evaluate land use, transportation and urban design, particularly in response to Caltrain electrification and other possible upgrades and the potential for High Speed Rail. The study area encompasses approximately 1,000 acres, and is bounded by Palo Alto Avenue on the north, San Antonio Road on the south, one-half block east of Alma Street, and one half block west of El Camino Real. This effort was led by a 17-member citizen Task Force to working with staff and the community, and included a number of public meetings. The City Council adopted the Rail Corridor Study policy document and incorporated it into the Comprehensive Plan on January 22, 2013 to “generate a community vision for land use, transportation, and urban design opportunities along the rail corridor, particularly in response to improvements to fixed rail services along the tracks through Palo Alto.” The Study provides land use and transportation policies under a variety of scenarios, allowing Palo Alto to be proactive to changes to the rail system. The Study will guide staff and the City as decisions are made regarding land use and transportation improvements, such as private development and the Capital Improvement Program. GRADE SEPARATION To increase safety, enhance connectivity, and improve pedestrian and bicycle circulation, the City of Palo Alto is considering conceptual grade separation alternatives for a portion of the Caltrain right-of-way. Recent studies have focused on three existing at-grade crossings at Charleston, Meadow, and Churchill, however T-18 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T there is significant interest in analyzing and pursuing grade separations at Alma Street as well, in addition to possible establishment of a “quiet zone” for the near term. Options analyzed for Charleston Rd/West Meadow Drive and Churchill Avenue include: Trenching the Caltrain corridor at either a one percent or two percent grade from approximately San Antonio to approximately Oregon Expressway, which would grade separate both Meadow and Charleston by keeping the existing roadways at-grade and running rail traffic beneath it in an open trench. Submerging the roadway beneath the railroad tracks at Churchill Avenue. Submerging the roadway beneath the railroad tracks at West Meadow Drive. Submerging the roadway beneath the railroad tracks at Charleston Road. Trenching the Caltrain corridor would be the most expensive alternative, and could potentially require rerouting existing creeks and adding infrastructure pump stations. While the roadway submersion alternatives would cost less, they would require the taking of existing homes and partial property acquisitions, eliminate turning movements, and have far more visual impacts at each intersection due to their larger footprints. In the 2013 Rail Corridor Study, the City affirmed that trenching rail was the preferred alignment. NEIGHBORHOOD IMPACTS Most Palo Alto streets are bordered by residential land uses. Citizens’ concerns reflect chronic problems like speeding, commuter shortcutting, and too much traffic. The City has designated some streets as residential arterials to recognize that they carry large volumes of through-traffic but also have residential uses on both sides of the street. The objective is to address the desires of residents of these streets who would like to have slower speeds, safer conditions for bicycles and pedestrians, and aesthetic improvements. This must be done economically and without appreciably reducing traffic capacity or diverting traffic onto local neighborhood streets. The Traffic Infusion on Residential Environment (TIRE) index is a measure of the effect of traffic on the safety and comfort of human activities, such as walking, cycling, and playing on or near a street and on the freedom to maneuver vehicles in and out of residential driveways. The TIRE index scale ranges from 0 to 5 depending on daily traffic volume. An index of 0 represents the least infusion of traffic and 5 the greatest, and thereby, the poorest residential Additionally, to address community concerns, the City has developed a Traffic Intrusion on Residential Environments (TIRE) methodology that estimates resident perception of traffic impacts based on anticipated average daily traffic growth. Although not required under the California Environmental Quality Act or pursuant to VTA guidelines, the City of Palo Alto uses the TIRE index to measure the impact of traffic on residents along a street. PRELIMINARY DRAFT – JANUARY 21, 2016 environment. T-19 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N T RAFFIC C ALMING Traffic calming refers to projects that make permanent, physical changes to streets to slow traffic and/or reduce volumes, thus improving their safety and addressing residents’ concerns. Traffic calming measures can reduce speeds and return some through-traffic from local and collector streets to nearby arterials. Traffic calming also includes education and enforcement measures that promote changes in driver behavior. Where warranted by traffic conditions and residents’ desires, Palo Alto’s policy is to implement physical changes to local and collector streets that slow traffic close to the 25 miles per hour (mph) residential speed limit. Physical changes implemented are safe and take into account the needs of all road users. Some examples of traffic calming measures include: Curb and Sidewalk Design. In many of the areas of Palo Alto built since World War II, an integral curb and sidewalk design was used, resulting in sidewalks immediately next to traffic lanes. Adding planting pockets and street trees would promote pedestrian use and also provide visual cues to drivers to reduce speeds. Lane Reductions. In commercial areas, it may be feasible to reduce the number of lanes for through-traffic with- out losing too much traffic handling capacity. In these areas, curb lanes are often not very useful for through-traffic since they may be blocked or slowed by cars turning into and out of driveways and parking spaces. Street Closures. Street closures are effective at eliminating through-traffic, especially when safety issues are involved. They may be a necessary design element for a bicycle boulevard or transit mall, but closures can often be controversial because they disrupt the traditional neighborhood street grid, and may shift traffic to adjacent streets. MOTOR VEHICLE AND BICYCLE PARKING A comprehensive parking strategy is an important part of Palo Alto’s comprehensive strategy to reduce traffic congestion, protect the livability of residential neighborhoods, and support local businesses. Reducing vehicle trips through transportation demand management, as discussed above, is one crucial component of this strategy. In addition, over the life of this Comprehensive Plan, the City will continue to explore innovative parking management tools and parking supply T-20 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T initiatives. These efforts focus on the Downtown area, where major local employers, thriving stores and restaurants, and residential neighborhoods coexist and share a finite parking supply. P ARKING M ANAGEMENT Managing Palo Alto’s parking supply wisely can significantly reduce the number of parking spaces needed, reduce the costs of providing parking, encourage transit and alternative transportation, and support Palo Alto’s goals for livable neighborhoods. The City is managing parking by: Phasing in a pilot Residential Preferential Parking (RPP) district in the residential blocks around the Downtown commercial district and South of Forest Area (SOFA). Under the RPP, vehicles with permits are allowed unrestricted parking. Cars without permits are limited to parking for a maximum of two hours. Installing parking guidance systems that give drivers real-time information on how many spaces are available where. Designing clear logos and wayfinding signage for public parking to improve visibility and accessibility. Studying options for parking pricing, time limits, and space allocations. Free, unregulated parking makes it more likely that people will drive alone; charging for parking or limiting parking supply makes it more likely that people will carpool, take transit, walk or bike. Providing access and revenue technologies to implement recommendations of the parking pricing study. DOWNTOWN P ARKING SUPPLY MEASURES The City regularly monitors parking demand and supply Downtown and is considering several initiatives to increase parking supply, with the dual goals supporting local businesses and minimizing impacts on surrounding neighborhoods. B ICYCLE P ARKING Bicyclists, like motorists, need a place to store their vehicle, whether a sidewalk rack to grab a coffee or a more secure bicycle locker or cage for all-day parking near transit. Vandalism, theft, and inconvenience are all main concerns for bicyclists, who typically expect parking close to their destinations. Providing dedicated bicycle PRELIMINARY DRAFT – JANUARY 21, 2016 T-21 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N parking makes it more convenient to bike rather than drive, and keeps sidewalks clear for pedestrians. The City manages numerous programs that provide bicycle parking facilities, including bicycle lockers at the California Avenue Caltrain station and several Downtown locations for a monthly fee. The Palo Alto Bikestation, located at the Palo Alto Caltrain station, provides secure storage for up to 96 bicycles accessible 24 hours a day, seven days a week via electronic key access. The City’s Municipal Code requires new private development to provide bicycle parking facilities, typically at 10 to 25 percent of the vehicle parking requirement. The 2012 Bicycle + Pedestrian Transportation Plan includes specific recommendations for the amount, location, and type of bicycle parking. TRAFFIC SAFETY Traffic safety will continue to be among the City’s top priorities in the future. City officials, city employees and community members are committed to working together to build better and safer streets, educate the public on traffic safety, enforce traffic laws, and adopt policy changes that save lives. The City is undertaking a comprehensive traffic safety program, and partners with Palo Alto Unified School District and the Palo Alto Parent Teacher Association (PTA) on a Safe Routes to School Program that encourages families to walk, bike, and use other alternatives to driving to school more often and to reduce the risk of accidents for students. A new approach to roadway safety that has proven to be successful in substantially reducing traffic-related fatality rates without compromising mobility is the Vision Zero Initiative, developed in Sweden. At the core of this approach is the concept of shifting responsibility for safety from roadway users to the design of the roadway system. While local conditions and traffic culture in Palo Alto are different than in Sweden, the Vision Zero Initiative could potentially offer ideas and lessons for Palo Alto to draw on in pursuing the goal of roadway safety for all users. SPECIAL NEEDS Many people cannot or do not wish to drive and some are not able to use all transportation modes. Young people, seniors, people with low incomes, and people with disabilities all have special transportation needs. Palo Alto is committed to providing reasonable accessibility and mobility for these populations and for others who do not or cannot drive. T-22 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T S ENIORS As the baby boomer generation (i.e., those born between 1946 and 1964) ages, more and more people will forego driving or become unable to drive. Without proper access to affordable transit or families, friends, and/or neighbors who can provide rides, seniors face an increased risk of social and physical isolation. Seniors who do not drive have access to the public transit providers described under Goal T2. VTA offers seniors 65 and over a discounted Regional Transit Connection Card. In addition, Outreach, a non-profit organization that serves seniors and the disabled, offers transportation services for seniors in Santa Clara County. These services include a subsidized transit pass and subsidized taxi rides. Residents must be 65 or older to participate and there are no income restrictions. Outreach provides transportation services to destinations within Santa Clara County only. While Outreach provides an important service to the community, there is a daily cap on the number of rides offered so all user requests may not be accommodated D ISABLED The Santa Clara Valley Transportation Authority operates paratransit service administered through a contract with Outreach and Escort, Inc. (OUTREACH). Riders may reserve paratransit trips from one to three days in advance, between 8:00 a.m. and 5:00 p.m. for service the next day. The paratransit service area is within a ¾-mile corridor around the VTA bus routes and light rail stations. For travel outside of the service area, customers can arrange a transfer to the paratransit operator in the adjacent county. Paratransit hours of operation are the same hours and days of week that bus and light rail run on their regular schedules. U NIVERSAL D ESIGN The principle of universal design for mobility is to achieve roadways and sidewalks that can accommodate all users including automobiles, pedestrians, bicyclists, and the disabled. Examples of universal design to support the disabled include placing pedestrian push buttons at wheelchair level, audible pedestrian crossing systems, sidewalk curb ramps, increasing pedestrian crossing times, sidewalk widths of 6 feet or greater, roadway and sidewalk materials that reduce slipping and add stability, minimizing driveway crossings and obstructions, and avoiding steep grades and slopes. PRELIMINARY DRAFT – JANUARY 21, 2016 T-23 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N REGIONAL LEADERSHIP Increasing population and traffic congestion over the past 20 years have required an increased emphasis on regional solutions to transportation issues. A regional approach for some transportation issues is needed to avoid local solutions that simply shift the problem elsewhere or produce unintended results. For instance, a higher gas tax or parking fee in Santa Clara County or Palo Alto might shift business to other cities. Moreover, transportation facilities like Caltrain or the Bayshore Freeway need to be managed on a regional basis. C ONGESTION M ANAGEMENT P LAN Palo Alto has been an active participant in the Santa Clara Valley Transportation Authority Congestion Management Program (CMP). The CMPs in the various Bay Area counties are focal points for transportation planning and funding. Palo Alto representatives also participate and provide leadership in numerous Bay Area regional bodies affecting transportation, including the Metropolitan Transportation Commission (MTC), Association of Bay Area Governments (ABAG), and the Bay Area Air Quality Management District (BAAQMD), as well as the various public transportation providers in Palo Alto, including the California Department of Transportation (Caltrans). HOV AND E XPRESS L ANES High Occupancy Vehicle (HOV) and Express lanes are used as a traffic management strategy to reduce congestion on freeways and improve air quality in adjacent areas. HOV lanes are reserved at peak travel times or longer for the exclusive use of vehicles with a driver and one or more passengers, although motorcycles and some alternative fuel and transit vehicles are not subject to the occupancy requirement. Express lanes are open to single occupant vehicles for a fee, and are free for motorcycles and some alternative fuel vehicles. There are about 174 directional miles of freeway carpool lanes in Santa Clara County, including 84 directional miles along US 101 between the San Mateo County line and Cochrane Road. By 2018, VTA plans to convert 36 miles from Dunne Avenue in Morgan Hill to the San Mateo County line on US 101 to express lanes, with a second express lane will be added for the majority of the corridor. [Additional suggested topics: County sales tax, Dumbarton Corridor, Caltrain modernization] T-24 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T PALO ALTO AIRPORT Palo Alto Airport (PAO) is a general aviation airport owned and operated by the City of Palo Alto. PAO occupies 102 acres of land east of Highway 101 in the baylands and has one paved runway 13/31 measuring 2,443 × 70 feet. The airport is the tenth busiest single runway airport in California and functions as a reliever to three Bay Area airports. PAO facilities include an air traffic control tower operated by the Federal Aviation Administration and a terminal building with Wi-Fi, seating, restrooms and a small vehicle parking lot adjacent to the terminal. Airport operations, facility and field maintenance; and tie-down services are handled by Airport staff located in the terminal building. Flight clubs and fixed base operators operate onsite, offering fuel sales, flight lessons, pilot training, and aircraft sales, rentals, maintenance, and repair. Prior to construction of PAO at its current location between 1934 and 1936, the airport operated at a location adjacent to Stanford Stadium in the late 1920s. From 1967 to 2015, PAO was operated by Santa Clara County under a lease agreement. Operations and control have since been transferred to the City and key challenges ahead include addressing deterioration of runway conditions and the need to redevelop onsite fixed base operator facilities. TRAFFIC CONGESTION Transportation and land use are inextricably linked. Low-density land use patterns generally dictate the use of an automobile, while higher density and mixed use patterns generally translate into higher transit usage and pedestrian activity. Transit stations and bus routes present opportunities for higher density development. Palo Alto recognizes the relationship between transportation and land use and will promote a land use pattern that supports walking, bicycling, and reduced dependence on cars. In some cases, this may mean a shift away from prioritizing the free flow of cars. Local governments have a range of trip reduction strategies available to them to help alleviate peak roadway congestion. Among the strategies identifies by the VTA Congestion Management Program are: Congestion Pricing. Congestion pricing consists of surcharging users of public goods during peak hours. PRELIMINARY DRAFT – JANUARY 21, 2016 T-25 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Parking Cash-Out Program. An employer funded program where the employer pays an employee not to use a parking space. Unbundling Residential Parking. Unbundling the price of parking from residential units lets residents decide whether to own fewer cars to save money otherwise spent on parking. Parking Management and Pricing. Requiring payment for parking or increasing parking fees are ways to encourage drivers to find alternate modes of transportation. Subsidizing Ridesharing. Employers can promote carpooling by paying for fuel costs or subsidizing carpool costs. Employee Pre-Tax Commuter Benefits. Employees can offer pre-tax transit vouchers for purchase by employees. Transit Subsidies. Employers and residential developments can provide free or discounted transit passes to employees and residents. Alternative Cash Incentive Program. Employers offer gifts or prizes for commuting via an alternative mode of transportation. Express Lanes. Express lanes that permit non-carpool drivers to pay for the use of the lane. Alternative Modes of Transportation. Encouraging the shift of single occupancy vehicles to biking, walking, carpooling, vanpooling, car sharing, and transit. Employee Amenities. Encouraging employers to provide on-site amenities such as bike lockers and showers. Flexible Work Environment. Allowing employees to work flexible schedules to avoid peak rush hours or telecommute. Employer TDM strategies are an important part of the solution for congestion management. In addition to incentivizing alternatives to driving alone, employer TDM programs can also include flexible work schedules, staggered hours, and telecommuting options. New technology is also contributing to the development and rapid expansion of ridesharing and car-sharing services. MaaS and other on-demand trip planning apps facilitate the use of this type of transportation service, making it easier and convenient to choose not to drive alone. While less effective in relieving congestion than other strategies, membership-based car sharing services allow T-26 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T drivers access to a network of shared vehicles at unattended self-service locations, thereby reducing the need for auto ownership. GOALS, POLICIES, AND PROGRAMS S USTAINABLE T RANSPORTATION GOAL T-1 Create a sustainable transportation system, complemented by a mix of land uses, that emphasizes walking, bicycling, use of public transportation, and other methods to reduce GHG emissions and the use of single occupancy vehicles. Policy T-1.1 Consider economic, environmental, and social cost issues in local and regional transportation decisions. [(Previous Policy T-2) (Edited)] Program T1.1.1 Allocate funding to conduct an annual survey of mode shares downtown, and expand to other employment districts when feasible. [NEW PROGRAM] R EDUCING R ELIANCE ON S INGLE -O CCUPANT V EHICLES Policy T-1.2 Collaborate with employers, the Palo Alto Unified School District, and other sources of commute trips to develop, implement and expand comprehensive, effective programs to reduce single-passenger auto use and associated GHG emissions and to reduce traffic congestion at the local and regional levels. [(PTC Policy T1.7) (Edited) (Previous Policy T-3 & Program T-5) (Merged & Edited)]. Program T1.2.1 Create a long-term education program to change the travel habits of residents, visitors, and workers by informing them about transportation alternatives, incentives, and impacts. Work with the Palo Alto Unified School District and with private interests, such as the Chamber of Commerce, to develop and implement this program. [Previously Program T-8]. Program T1.2.2 Formalize the City’s Transportation Demand Management (TDM) program by establishing an ordinance that outlines when TDM should be applied, what performance metrics are required, PRELIMINARY DRAFT – JANUARY 21, 2016 T-27 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N and how compliance will be periodically measured and enforced. Establish a list of acceptable TDM measures that include transit use, prepaid transit passes, commuter checks, car sharing, carpooling, parking cash-out, bicycling, walking, and education and outreach to support the use of these modes. The ordinance should provide a system for incorporating alternative measures as new ideas for TDM are developed. TDM measurements should include a comparison of building occupancy and land use standards. [(PTC Program T.1.7.1) (Edited)]. Program T1.2.3 Expand Palo Alto’s Transportation Demand Measures for City employees and PAUSD staff. [(PTC Program T1.7.2) (Edited) (Previous Program T-6) (Edited)]. Program T1.2.4 Evaluate the performance of pilot programs implemented by the Downtown TMA and consider expanding to other areas of the city as appropriate. Program T1.2.5 Review existing regulations, policies, and programs to identify revisions that encourage telecommuting, satellite office concepts, and work-at-home options. [(PTC Program T1.7.3) (Previous Program T-12) (Edited)]. Policy T-1.3 Coordinate with Stanford University on the development and implementation of transportation demand strategies via development of a Transportation Management Association in the Stanford Research Park. [NEW POLICY]. Policy T-1.4 New development should not make traffic worse. Require new development projects to adopt effective TDM plans in order to meet specific targets and to offset remaining peak period motor vehicle trips through one of the following methods: T-28 By directly contracting with another property owner or organization to reduce trips generated from another site; or PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T By paying an annual fee to the City for use in reducing motor vehicle trips to the extent feasible through the provision of transit services, carpool/rideshare incentives, bicycle lanes, and other similar programs and improvements. [EIR Mitigation Measure Trans-1a] Program T1.4.1 Complete a nexus study and develop a fee for offset. [staff suggestion from 1/7/16 call] Policy T-1.5 Encourage the Palo Alto Unified School District to use parking fees, regulations, and education to discourage students from driving to school. [Previously Program T-7] Program T1.5.1 Expand the range of City services that can be received via computers or through the mail [Previously Program T-10]. Program T1.5.2 Promote private delivery services to reduce the necessity of driving [Previously Program T-11]. R EDUCING G REENHOUSE G AS E MISSIONS Policy T-1.6 Reduce GHG emissions associated with transportation by reducing vehicle miles traveled and per-mile emissions through use of vehicle technologies and other transportation technologies to meet the State’s goals for GHG reductions by 2030. [(PTC Policy T-1.1) (Edited)] Program T1.6.1 Review the Zoning Ordinance to ensure compatibility with electric vehicle infrastructure ordinance through parking technology improvements, including vehicle lifts and electronic monitoring. Update the Zoning Ordinance to reflect changes that result from this review. [(PTC Program T4.7.1) (Edited)] Policy T-1.7 Continue to support the adoption and use of technologies that reduce emissions of GHGs and pollutants from passenger and transit vehicles to meet the City's 2020 goals for GHG reductions. [(PTC Policy T1.2) (Edited)] PRELIMINARY DRAFT – JANUARY 21, 2016 T-29 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Program T1.7.1 Further encourage the installation of facilities that support alternative fuel vehicles by periodically reviewing requirements for electric and plug-in vehicle infrastructure in new construction. Consider and periodically review requirements for electric and plug-in infrastructure for remodels. [(PTC Program T1.2.1) (Edited)] Policy T-1.8 Require new development to install electric vehicle charging stations when feasible. [NEW POLICY] Policy T-1.9 Continue to measure the effectiveness of the City’s transportation network to make better decisions on transportation issues, and consider the use of parking fees and tax revenues to fund alternative transportation projects. [(PTC Policy T1.8) (Edited)] Program T1.9.1 Collect and analyze transportation data, including through surveys and other methods, to evaluate implementation of related policies on a regular basis. [NEW PROGRAM] M ASS T RANSIT Policy T-1.10 Support mass transit access to regional destinations, multimodal transit stations and employment centers, including those within Palo Alto. [(PTC Policy T1.11) (Previous Policy T-6) (Edited)] Program T1.10.1 In concert with the study of expanded shuttle service, prepare a study that identifies other possible first/last mile connection strategies and considers trips for the purposes of local errands and commuting. [NEW PROGRAM] Program T1.10.2 Evaluate the feasibility of new transit routes on major corridors, including BRT and Ferry, to establish needed first and last mile connections at major corridors such as Bayshore, Alma, and Embarcadero. [NEW PROGRAM] T-30 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O Policy T-1.11 A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T Support plans for a quiet, fast rail system that encircles the Bay, and for intra-county and transbay transit systems that link Palo Alto to the rest of Santa Clara County and adjoining counties. [Previously Policy T-7] Program T1.11.1 Work with regional transportation providers, including BART and Caltrain, to improve connections between Palo Alto and San Francisco International Airport. [NEW PROGRAM] Policy T-1.12 Support Caltrain capacity enhancements.. Policy T-1.13 Continue to work with Caltrain, Amtrak, and public bus operators to expand bicycle storage on public transit vehicles during both peak and off-peak hours. [(NEW POLICY) (Previous Program T-27)] Policy T-1.14 Support efforts to integrate train, bus, and shuttle schedules at multimodal transit stations to enable efficient transfer among public transit modes. [(PTC Policy T1.15) (Previous Policy T-11) (Edited)] Policy T-1.15 Work to ensure public and private school commute patterns are accommodated in the local transit system, including through schedule and route coordination. ([PTC Policy T1.13) (Previous Policy T-9) (Edited)] Policy T-1.16 Continue to encourage the provision of amenities such as seating, lighting, and signage, including real-time arrival information, at bus and shuttle stops and train stations to increase rider comfort, safety, and convenience. [(PTC Policy T1.14) (Previous Policy T-10) (Edited)] Policy T-1.17 Encourage transit service providers to provide subsidized transit passes for low income riders. [NEW POLICY] Policy T-1.18 Support continued development and improvement of the Caltrain stations as important transportation nodes for the City. [(PTC Policy T1.10) (Previous Policy T-5) (Edited)] PRELIMINARY DRAFT – JANUARY 21, 2016 T-31 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Program T1.18.1 Continue improvement and operations at the Palo Alto Station including revisiting circulation and access improvements as necessary to meet current and future demands. [(PTC Program T1.10.1) (Edited) (Previous Program T-14& T-15) (Merged & Edited)] Program T1.18.2 Recognize the importance of the University Avenue Multi-modal Transit Station during special events and if dedicated funds are available, explore opportunities for station improvements, including circulation and access improvements to the station, in cooperation with Stanford University. [(PTC Program T1.10.2) (Edited)] Program T1.18.3 Improve the environment at the University Avenue Multi-modal Transit Station, including connecting tunnels, through short-term improvements and regular maintenance. [Previous Program T-15] Program T1.18.4 Work with Caltrain to identify joint development opportunities including shuttle services and parking structures to address Caltrain commuter parking intrusion into surrounding neighborhoods. [(PTC Program T1.10.3) (Edited)] Program T1.18.5 Work with Caltrain to identify appropriate locations for baby bullet stations, considering all stations that are located within Palo Alto. [NEW PROGRAM] T-32 Policy T-1.19 Support Caltrain modernization and its extension to Downtown San Francisco. [(PTC Policy T7.16) (Previous Program T-17) (Program changed to Policy) (Edited)] Policy T-1.20 Collaborate with transit agencies in planning and implementing convenient, efficient bus service in Palo Alto. [NEW POLICY] Policy T-1.21 Pursue expanded evening and night time bus service. [NEW POLICY] PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O Policy T-1.22 Provide traffic signal prioritization for buses at Palo Alto intersections, focusing first on regional transit routes. Also, advocate for bus service improvements on El Camino Real, including queue jump lanes and curbside platforms. [EIR Mitigation Measure TRANS-6] Policy T-1.23 Continue and enhance the Palo Alto Shuttle Program to increase frequency and prioritize destinations of value to the community, including health centers, parks, schools, senior centers, and shopping areas. [(PTC Policy T1.9) (Edited) (Previous Policy T-4) (Edited)] A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T Program T1.23.1 Establish a jitney bus system similar to Stanford University’s Marguerite Shuttle [Previously Program T-13]. Program T1.23.2 Conduct a study of the shuttle system that identifies routes, usage, and utility to inform system improvements. The study shall be based on collaboration with PAUSD and community members, especially seniors, to identify new routes and expanded schedules that will accommodate peak demands and coordinate with transit connections. Evaluate the feasibility of new shuttle routes that provide access within a 10- to 15minute walk from most neighborhoods, including the development of new shuttle routes in communities not currently served, such as Barron Park and Palo Verde. Address costs, funding sources for ongoing operation and maintenance. [NEW PROGRAM] Program T1.23.3 Study the feasibility of evolving technology to increase the accessibility, reliability, and/or efficiency of local transit and shuttle service. [NEW PROGRAM] Program T1.23.4 Develop and/or continue to provide an app or other method of providing real-time arrival and schedule information for all Palo Alto shuttle routes. [NEW PROGRAM] PRELIMINARY DRAFT – JANUARY 21, 2016 T-33 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Policy T-1.24 Encourage employers to develop shared shuttle services to connect employment areas with the multi-modal transit stations and City amenities. [(PTC Policy T1.12) (Previous Policy T-8)] Policy T-1.25 Encourage a responsive, private sector, fuel-efficient taxi service that contributes to reducing traffic congestion.. [(PTC Policy T.17) (Previous Policy T-13)] B ICYCLING AND W ALKING Policy T-1.26 Prioritize investments for enhanced pedestrian access and bicycle use within Palo Alto and to surrounding communities. [PTC Policy T1.19] Policy T-1.27 Incorporate the 2012 Bicycle + Pedestrian Transportation Plan into this Comp Plan by reference. Study projects to depress bikeways and pedestrian walkways under Alma Street and the Caltrain tracks and implement if feasible [Previously Program T21]. Program T1.27.1 Prioritize improvements from the 2012 Bicycle + Pedestrian Transportation Plan and the Parks, Trails & Open Space Master Plan, incorporating those improvements into the City's capital improvements plan. Program T1.27.2 Review and update the Bike Plan as needed every 5 years. Program T1.27.3 Complete a mobility and safety study for downtown Palo Alto, looking at ways to improve circulation and safety for all modes. Program T1.27.4 Conduct a study of, and, if feasible, provide support and dedicated funding for a recurring Palo Alto Sunday Streets program of events, potentially in coordination with local business groups, which would include street closures and programming. [NEW PROGRAM] T-34 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O Policy T-1.28 Increase cooperation with surrounding communities and other agencies to establish and maintain off-road bicycle and pedestrian paths and trails using that are integrated with creek, utility, railroad rights-of-way and green spaces in a manner that helps frame and define the community and avoids environmental impacts. [(PTC Policy T1.22) (Edited) (Previous Policy T-17, L-66 & L-68) (Merged & Edited)] Policy T-1.29 Support regional plans to complete development of the Bay Trail and Bay-to-Ridge Trail. [(PTC Program T1.22.1) (Previous Program T-25 & T-26) (Merged & edited)] Policy T-1.30 Support the development of the Santa Clara County Countywide Bicycle System, and other regional bicycle plans. [Previously Policy T-18] Policy T-1.31 Require new private developments to provide improvements that improve bicycle and pedestrian connectivity as called for in the Bicycle Pedestrian Transportation Plan, and require dedication of easements where a nexus can be established. [(PTC Policy T1.20) (Previous Policy T-15) (Edited)] Policy T-1.32 Encourage the private schools within the community to develop Walk and Roll Maps as part of Transportation Demand Management strategies to reduce vehicle trips. [NEW POLICY] Policy T-1.33 Regularly maintain off-road bicycle and pedestrian paths, including sweeping, weed abatement, and pavement maintenance. [Previously Program T-29] Policy T-1.34 Improve maintenance of bicycle and pedestrian infrastructure. [Previously Policy T-20] A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T Program T1.34.1 Adjust the street evaluation criteria of the City's Pavement Management Program to ensure that areas of the road used by bicyclists are maintained at the same standards as, or at standards higher than, areas used by motor vehicles. [Previously Program T-28] PRELIMINARY DRAFT – JANUARY 21, 2016 T-35 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Program T1.34.2 Develop cooperative programs with the City and businesses to keep sidewalks clean in the University Avenue/Downtown and California Avenue business districts, and other centers. [Previously Program T-30] Policy T-1.35 Maintain pedestrian- and bicycle-only use of University Avenue/Downtown alleyways where appropriate. [(PTC Policy T1.26) (Edited) (Previous Policy T-21) (Edited)] Policy T-1.36 Improve amenities such as seating, lighting, bicycle parking, street trees, and interpretive stations along bicycle and pedestrian paths and in City parks to encourage walking and cycling and enhance the feeling of safety. [Previously Policy T-22] Policy T-1.37 Encourage pedestrian-friendly design features such as sidewalks, street trees, on-street parking, public spaces, gardens, outdoor furniture, art, and interesting architectural details. [Previously Policy T-23] Policy T-1.38 Improve pedestrian crossings with bulb outs, small curb radii, and street trees near corners, bollards, and landscaping to create protected areas. [Previously Program T-32] Policy T-1.39 Increase the number of east-west pedestrian and bicycle crossings along Alma Street, particularly south of Oregon Expressway. [PTC RC Policy 3.1] S TREETS GOAL T-2 Maintain an efficient roadway network for all users. L EVEL OF S ERVICE T-36 Policy T-2.1 Maintain a hierarchy of streets that includes freeways, expressways, arterials, residential arterials, collectors, and local streets in a safe and appropriate manner. [(Previous Policy T-24) (Edited)] Policy T-2.2 Design and maintain the City street network to provide a variety of alternate routes, so that the traffic loads on any one street are minimized. [Previously Policy T-32] PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O Policy T-2.3 Avoid major increases in street capacity unless necessary to remedy severe traffic congestion or critical neighborhood traffic problems. Where capacity is increased, balance the needs of motor vehicles with those of pedestrians and bicyclists. [(PTC Policy T2.8) (Previous Policy T-27) (No Change)] Policy T-2.4 Achieve and maintain acceptable levels of service for transit vehicles, bicyclists, pedestrians and automobiles on roads in Palo Alto. [(PTC Policy T2.10) (Previously Policy T-28) (Edited)] A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T Program T2.4.1 Maintain current thresholds for acceptable levels of service for intersections in Palo Alto and establish protocols for development proposals to evaluate Level of Service for transit vehicles, bicyclists, and pedestrians. [PTC Program T2.10.1] Program T2.4.2 Monitor and publicly report on the previously identified twenty critical intersections annually and consider additional intersections to add to this list to monitor the effectiveness of the City's growth management policies. [(PTC Program T2.10.2 & T2.10.3) (Merged & Edited)] Program T2.4.3 Develop a transportation strategic plan, with an updated roadway classification system that reflects desired routes for transit, cycling and regional traffic as well as priorities for study and investments. [NEW PROGRAM] Policy T-2.5 Monitor and evaluate VMT and VMT per capita Citywide, and require traffic impact analyses for individual development proposals to include analysis of metrics adopted as part of the State CEQA Guidelines. [staff suggestion from 1/7 call] Policy T-2.6 Balance provisions for transit, bicycle, and pedestrians with vehicle level of service through implementation of a multi-modal Level of Service calculation that looks at all modes separately. [(PTC Policy T1.6) (Edited)] PRELIMINARY DRAFT – JANUARY 21, 2016 T-37 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Policy T-2.7 Maintain the current program of not adding traffic signals on Alma Street north of Lytton Avenue and south of Channing Avenue to Churchill Avenue; and on Middlefield Road north of Lytton Avenue and south of Channing Avenue to Embarcadero Road. [Previously Program T-39] Policy T-2.8 Regulate truck movements and commercial buses in a manner that balances the efficient movement of trucks and buses while preserving the residential character of Palo Alto's arterial street system. [(PTC Policy T2.11) (Edited) (Previous Policy T-29) (Edited)] Program T2.8.1 Evaluate the feasibility of changes to Palo Alto’s through truck routes and weight limits to consider such issues as relationship to neighboring jurisdictions, lower weight limits, increased number of routes, and economic and environmental impacts. [Previously Program T-40] ROADWAY IMPROVEMENTS Policy T-2.9 Coordinate transportation and infrastructure improvements. [NEW POLICY] Policy T-2.10 Work with Caltrans, Santa Clara County and VTA to improve east and west connections in Palo Alto and maintain a circulation network that binds the city together in all directions. [(PTC RC Goal 3) (Edited)] Policy T-2.11 Continue to prioritize the safety and comfort of school children in street modification projects that affect school travel routes [Previously Policy T-40]. Policy T-2.12 Provide bicycle facilities and sidewalks on roadways throughout the city as envisioned in the Bicycle and Pedestrian Transportation Plan. [(PTC Policy T2.3) (Edited)] Policy T-2.13 Ensure that additional through lanes are not installed at the expense of bicycle lanes, sidewalks, or landscaping. [(PTC Policy T2.4)] Program T2.13.1 Study the feasibility of smoothing and slowing traffic flow in commercial areas by reducing through-traffic lanes and trading the area for improved turning lanes, landscaping, and bicycle lanes. [Previously Policy T-31] T-38 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T ROADWAY DESIGN Policy T-2.14 When constructing or modifying roadways, plan for use of the roadway space by all users, including motor vehicles, transit vehicles, bicyclists, and pedestrians. [(PTC Policy T2.2) (Previous Policy T-25) (Edited)] Program T2.14.1 Update the comprehensive roadway design standards and criteria to be consistent with Complete Streets best practices and the Urban Forest Master Plan, focusing on bicycle and pedestrian safety and multimodal uses. ([PTC Program T2.2.1) (Previous Program T-33) (Edited)] Consider opportunities to incorporate best practices from the National Association of City Transportation Officials guidelines for urban streets and bikeways. Program T2.14.2 Establish procedures for considering the effects of street modifications on emergency vehicle response time. [Previously Program T-34] Policy T-2.15 Consider pedestrians and bicyclists when designing road surfaces, curbs, crossings, signage, landscaping, and sight lines. [(PTC Policy T2.5)] Policy T-2.16 Participate in the design and implementation of comprehensive solutions to traffic problems near Stanford Shopping Center and Stanford Medical Center. [Previously Policy T-26] Program T2.16.1 Support increased public transit, traffic management and parking solutions to ensure safe, convenient access to and from the Stanford Shopping Center/ Medical Center area. [(PTC Program T2.6.1) (Edited) (Previous Program T-35) (Edited)] Program T2.16.2 Extend Sand Hill Road to El Camino Real and construct related improvements consistent with neighborhood and community interests. Do not extend Sand Hill Road to Alma Street [Previously Program T-36]. PRELIMINARY DRAFT – JANUARY 21, 2016 T-39 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Program T2.16.3 Implement and monitor Development Agreement traffic mitigations at Stanford Medical Center. [(PTC Program T2.6.2) (Edited)] Program T2.16.4 Provide safe, convenient pedestrian, bicycle, and transit connections between the Stanford Shopping Center/Medical Center areas and housing along the Sand Hill Road/Quarry Road corridors to Palo Alto Station, Downtown Palo Alto, and other primary destinations. [(PTC Program T2.6.3) (Previously Program T-37) (Edited)] Program T2.16.5 Study extension of Quarry Road for transit, pedestrians and bicyclists to access the Palo Alto Station from El Camino Real. Also study the feasibility of another Caltrain underpass at Everett. [(PTC Program T2.6.4) (Edited)] R AIL C ORRIDOR Policy T-2.17 Redevelopment along the rail corridor shall take into account the land use and transportation policies discussed in the Rail Corridor Study Report. [Policy T-1 as amended by Council Resolution adopting Rail Corridor Study Report] Policy T-2.18 Participate in regional planning initiatives for the rail corridor and provide a strong guiding voice. Policy T-2.19 Pursue a below-grade alignment and not an elevated alignment for regional fixed rail in Palo Alto, including both high speed rail and Caltrain. [(PTC RC Policy 1.1) (Edited)] Policy T-2.20 When examining the potential impacts of vertical rail alignments equal attention shall be given to all Palo Alto neighborhoods. Adopted mitigation measures should be proportionate to the impacts identified in the studies. [PTC RC Policy 1.3] Policy T-2.21 Pursue grade separation of rail crossings along the corridor as a City priority. [NEW POLICY] Program T2.21.1 Undertake studies and outreach necessary to advance grade separation of Caltrain. T-40 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T Program T2.21.2 In collaboration with regional agencies and neighboring jurisdictions, identify and pursue funding for rail corridor improvements and grade separation. [NEW PROGRAM] Program T2.21.3 Consider supplementing external grade separation funding, if necessary to create below grade rail alignments. Local sources could include value capture options, assessment districts, and/or impact fees. [(PTC Program T7.16.2) (Edited)] Policy T-2.22 Keep all four existing at-grade rail crossings open to vehicular traffic. [PTC RC Policy 3.2] Policy T-2.23 Improve existing at-grade rail crossings to ensure the highest feasible level of safety along the corridor and provide additional safe, convenient crossings. [PTC RC Goal 2 edited] Program T2.23.1 Commission an Alma Street crossing study to identify opportunities to improve safety and convenience in the near term, including potential implementation of a “quiet zone.” [PTC RC Policy 2.1 and Policy 2.2 edited to reflect recommendations of Rail Corridor Study] Program T2.23.2 Coordinate implementation of crossing improvements with neighborhood planning efforts. [PTC RC Policy 2.2 edited to reflect recommendations of Rail Corridor Study] Policy T-2.24 Ensure that future grade separation projects include a community participation and review process, and undergo environmental review. Future grade separation improvement projects would have the potential to cause environmental impacts, such as impacts associated with construction-related emissions, noise, and traffic, and aesthetics and land use impacts. These impacts, and alternatives to these grade separation projects, would be evaluated in detail when the projects are more clearly defined. [EIR Mitigation Measure Trans-1c] PRELIMINARY DRAFT – JANUARY 21, 2016 T-41 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Policy T-2.25 Improve safety and minimize adverse noise, vibrations and visual impacts of operations in the Caltrain rail corridor on adjoining districts, public facilities, schools and neighborhoods with or without the addition of High Speed Rail. [PTC RC Policy 2.3 edited] Policy T-2.26 Enhance connections to parks, community centers, recreation facilities, libraries and schools within the rail corridor or between the rail corridor and nearby facilities. Opportunities to increase school capacity and facility development and use should be evaluated and coordinated between the Palo Alto Unified School District and the City. [PTC RC Policy 4.1] NEIGHBORHOOD IMPACTS GOAL T-3 Protect neighborhood streets that support residential character and provide a range of local transportation options. Policy T-3.1 Implement traffic calming measures to slow traffic on local and collector residential streets and prioritize traffic calming measures over congestion management. [(PTC Policy T3.4) (Previous Policy T-34) (Edited)] Program T3.1.1 Develop a traffic calming program with a tool box of specific improvements that can be used to discourage drivers from using local, neighborhood streets to bypass traffic congestion on arterials. [EIR Mitigation Measure TRANS-8]. Implement appropriate traffic calming measures when requested by the neighborhood. (Previous Program T-43) (Edited)]. Program T3.1.2 Periodically review residential areas for traffic impacts, and use the results of that review to prioritize traffic calming measures. Consider development impacts fees as a funding source for this program. [(PTC Program T3.4.1) (Edited) (Previous Program T-43) (Edited)] T-42 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T Program T3.1.3 Study the feasibility of changing Homer and Channing Avenues to two-way streets. [Previously Program T-44] Policy T-3.2 Maintain a “guard and go” system of stop signs approximately every other block on local residential streets to discourage through-traffic. [Previously Policy T-38] Policy T-3.3 Keep all neighborhood streets open unless there is a demonstrated safety or overwhelming through-traffic problem and there are no acceptable alternatives, or unless a closure would increase the use of alternative transportation modes. [Previously Policy T-33] Policy T-3.4 Reduce the impacts of through-traffic on residential areas by designating certain streets as residential arterials. [Previously Policy T-30] Program T3.4.1 The following roadways are designated as residential arterials. Treat these streets with landscaping, medians, and other visual improvements to distinguish them as residential streets, in order to reduce traffic speeds. Middlefield Road (between San Francisquito Creek and San Antonio Road) University Avenue (between San Francisquito Creek and Middlefield Road) Embarcadero Road (between Alma Street and West Bayshore Road) Charleston/Arastradero Roads (between Miranda Avenue and Fabian Way). [Previously Program T-41] Program T3.4.2 Use landscaping and other improvements to establish clear “gateways” at the points where the Oregon Expressway, University Avenue and Embarcadero Road transition from freeways to neighborhoods. ([PTC Program T3.2.3) (Edited) (Previous Program T-42) (Edited)] PRELIMINARY DRAFT – JANUARY 21, 2016 T-43 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Policy T-3.5 Minimize the danger of increased commercial ingress/egress adjacent to major intersections, and noticeable increases in traffic from new development in residential neighborhoods, through traffic mitigation measures. [(PTC Policy T3.1) (Edited)] Policy T-3.6 Employ Traffic Impact on Residential Environments (TIRE) analysis to measure potential street impacts from new development in residential neighborhoods. [(PTC Policy T3.1) (Edited)] Policy T-3.7 Require new residential development projects to implement best practices for street design, stormwater management and green infrastructure. [(PTC Policy T3.6) (Previous Policy T-35) (Edited)] Policy T-3.8 Make new and replacement curbs vertical where desired by neighborhood residents. [Previously Policy T-36] Policy T-3.9 Where sidewalks are directly adjacent to curbs and no planting strip exists, explore ways to add planting pockets with street trees to increase shade and reduce the apparent width of wide streets. [Previously Policy T-37] M OTOR V EHICLE AND B ICYCLE P ARKING GOAL T-4 Encourage attractive, convenient, efficient and innovative parking solutions. M OTOR V EHICLE P ARKING Policy T-4.1 Provide sufficient motor vehicle and bicycle parking in the University Avenue/Downtown and California Avenue business districts and other centers to support vibrant economic activity. Limit under-parked development while there is insufficient public parking. [(PTC Policy T4.1) (Previous Policy T-45) (Edited)] Program T4.1.1 Provide adequate parking for customers and employees within each business district to avoid impacts on adjacent residential neighborhoods. [(PTC Program T4.1.2) (Edited)] Program T4.1.2 Manage parking supplies to encourage the use of alternative modes by employees within each business district. [(PTC Program T4.1.6) (Edited)] T-44 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T Program T4.1.3 Monitor the effectiveness of the Valet Assist Parking Program and regularly evaluate opportunities to improve or expand. [NEW PROGRAM] Program T4.1.4 Policy T-4.2 Ensure that the City’s comprehensive parking strategy includes technology and transportation demand management solutions. [NEW PROGRAM] New development projects should not rely on the use of on-street parking to fulfill minimum parking requirements, and should comply with parking regulations in the Municipal Code. [PTC Policy T4.6] Program T4.2.1 Study the feasibility of reduced parking requirements for developments that are well-served by transit and demonstrated walking and biking connections, including senior housing developments. [NEW PROGRAM to be added if PTC Policy T-1.9 & T1.12 are not sufficient] Program T4.2.2 Consider changes to the zoning ordinance to count partly or fully enclosed private garages dedicated to individual housing units as floor area in mixed use and multifamily residential developments. [PTC Program T4.6.2] Program T4.2.3 Consider updating parking standards for nonresidential uses to better reflect occupancy and employee density. [(PTC Program T4.6.3) (Edited)] Policy T-4.3 To encourage the use of alternatives to the private automobile and reflect the true cost of providing parking, the City shall eliminate free or subsidized parking in new commercial and residential development (i.e. require employees and residents to pay for parking). The City should also consider eliminating minimum parking requirements in transit-served areas. [EIR Mitigation Measure Trans-1b] Policy T-4.4 Continue to implement a comprehensive program of parking supply and demand management strategies for Downtown Palo Alto. [(Previous Program T-49) (Moved to Policy)] PRELIMINARY DRAFT – JANUARY 21, 2016 T-45 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Program T4.4.1 Continue working with merchants, the Chamber of Commerce, neighbors, and a parking consultant to explore options for constructing new parking facilities or using existing parking more efficiently. [Previous Program T-50] Program T4.4.2 Work with merchants to designate dedicated employee parking areas. [Previously Program T-51] Program T4.4.3 Conduct a paid parking study for the Downtown area to collect data on parking occupancy and turnover and to recommend pricing and management policies to prioritize short-term parking spaces closest to the commercial core for customers, garage parking for employees, and neighborhood parking for residents. [NEW PROGRAM] Program T4.4.4 Develop and implement a parking wayfinding strategy for the Downtown commercial core with the capability for changeable message signs indicating where parking is available. [NEW PROGRAM] T-46 Policy T-4.5 Encourage the use of Transportation Demand Management (TDM) strategies to minimize the need for all-day employee parking facilities in the University Avenue/Downtown and California Avenue business districts and encourage the use of available spots for short-term customer parking. [(Previous Policy T-46) (Edited)] Policy T-4.6 Continue to encourage shared parking in order to reduce the overall number of new parking spaces that must be provided on site for new development, while still being completely self-parked. [PTC Policy T4.7] Policy T-4.7 Design vehicle parking areas to reduce stormwater runoff, increase compatibility with street trees, and add visual interest to streets and other public locations. Encourage covered parking in parking lots or on top of parking structures through the use of tree canopies or photovoltaic panel canopies. [PTC Policy T4.9] PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O Policy T-4.8 Encourage the use of below-grade or structured parking instead of surface parking for new developments where feasible. [PTC Policy T4.10] Policy T-4.9 Parking regulation enforcement should focus on ensuring parking availability, rather than revenue generation. [PTC Policy T4.11] A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T Program T4.9.1 Use technology to help identify parking availability and make it easy to pay any parking fees. Clearly provide information about regulations, reducing the likelihood that tickets will need to be issued. [PTC Program T4.11.1] Policy T-4.10 Protect residential areas from the parking impacts of nearby business districts. [Previous Policy T-47] Program T4.10.1 Evaluate options to ensure maximum use of the City parking structures in the University Avenue/Downtown and California Avenue areas. [Previous Program T-52] Program T4.10.2 Discourage parking facilities that would intrude into adjacent residential neighborhoods. [Previous Program T-53] Program T4.10.3 Coordinate with neighborhood associations and residents’ groups to monitor the availability of parking in residential neighborhoods and gauge the need for a residential parking permit program in areas outside Downtown Palo Alto. [NEW PROGRAM] Policy T-4.11 Encourage employee parking strategies at the Stanford Medical Center area that maximize the efficient use of existing parking and encourage the use of alternatives to single-occupant vehicles. [(PTC Policy T4.12) (Edited) (Previous Policy T-48)] BICYCLE PARKING Policy T-4.12 Increase the number of safe, attractive and well-designed public bicycle parking spaces available in the city. [PTC Policy T4.13] PRELIMINARY DRAFT – JANUARY 21, 2016 T-47 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Policy T-4.13 Improve and add attractive, secure bicycle parking at both public and private facilities, including multi-modal transit stations, City parks, City streets and other public rights of way, in private developments, and at other community destinations. [(PTC Policy T1.23) (Previous Policy T-19) (Edited)] Program T4.13.1 Determine where additional bicycle parking is needed by reviewing bicycle parking availability and use in heavily traffic areas such as University Avenue/Downtown, California Avenue, Midtown, and neighborhood commercial centers. Include merchants, employees, and the public in this process. [PTC Program T4.13.1] Policy T-4.14 Continue to require safe and convenient off street bicycle parking as part of the approval process for new development; prioritize retention of bicycle parking spaces, even if space is at a premium, whenever the Director of Planning and Community Environment permits a reduction in the total number of vehicle parking spaces. [PTC Policy T4.14] TRAFFIC SAFETY GOAL T-5 Provide a high level of safety for motorists, pedestrians, and bicyclists on Palo Alto streets. Policy T-5.1 To the extent allowed by law, continue to make safety the first priority of citywide transportation planning. Prioritize pedestrian, bicycle, and automobile safety over vehicle level-of-service at intersections. [Previously Policy T-39] Program T5.1.1 Establish a comprehensive, proactive traffic safety program focused on safe routes to school, work, shopping and community services. [NEW PROGRAM] Program T5.1.2 Develop and disseminate maps of safe routes to school, work, shopping, and community services in collaboration with stakeholders, including PAUSD, major employers, TMAs, local businesses and community organizations. [(PTC Program T5.7.4) (Edited and enhanced)] T-48 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O Policy T-5.2 Achieve zero roadway fatalities in Palo Alto within 10 years. [NEW POLICY] Policy T-5.3 Continue to work with Caltrain to increase safety at train crossings, including improving gate technology, and signal coordination. [(PTC Policy T5.4) (Edited)] Policy T-5.4 Use engineering, enforcement, and educational tools to improve traffic safety on City roadways. [(PTC Program T5.1.1) (Previous Program T-47) (Edited)] A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T Program T5.4.1 Periodically evaluate safety on roadways and at intersections and enhance conditions through the use of signal technology and physical changes. Consider the construction of traffic circles for improved intersection safety. [PTC Program T5.2.1, edited] Program T5.4.2 Continue to provide educational programs for children and adults, in partnership with communitybased educational organizations, to help promote the safe use of bicycles, mopeds or scooters, and motorcycles, including the City-sponsored bicycle education programs in the public schools and the bicycle traffic school program for juveniles. [(Previous Program T-46) (Edited)] Program T5.4.3 Identify and implement safety improvements for underpasses, including on Embarcadero Road. [NEW PROGRAM] Program T5.4.4 Provide adult crossing guards at school crossings that meet adopted criteria. [Previous Program T-45] [insert sidebar with adopted crossing guard criteria] Policy T-5.5 Use appropriate technology to monitor and improve circulation safety throughout the City. [(PTC Policy T5.2) (Edited)] Program T5.5.1 Evaluate the performance of safety improvements and identify methods to encourage alternative transportation modes. PRELIMINARY DRAFT – JANUARY 21, 2016 T-49 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Policy T-5.6 Vigorously and consistently enforce speed limits and other traffic laws, including for vehicle and bicycle traffic. [(Previous Policy T-41) (Edited)]. SPECIAL NEEDS GOAL T-6 Provide mobility options that allow seniors and people with special needs to reach their destinations. Policy T-6.1 Identify and address the needs of community members, including seniors and people with disabilities, and meet or exceed the requirements of the Americans with Disabilities Act (ADA) during the planning and implementation of transportation and parking improvement projects. Utilize the principles of Universal Design, and local and State design standards to guide these efforts. [(PTC Policy T6.1) (Previous Policy T-42) (Edited)] Policy T-6.2 Coordinate with social service agencies to fill gaps in existing transportation routes and services accessible to people with special needs no matter their means and design new bus routes that enable those lacking the resources to travel in timely and economical ways to access those service. [(PTC Program 6.3.1) (Edited)] Policy T-6.3 Continue to partner with the VTA to support demand-responsive paratransit service for eligible participants in Palo Alto and maintain existing paratransit services, particularly where bus service is discontinued. Encourage the VTA to emphasize service quality and timeliness when contracting for paratransit services. [(PTC Policy T6.2) (Edited) (Previous Policy T-43) (Edited)] Policy T-6.4 Expand transportation opportunities for seniors and those with mobility constraints by supporting a variety of methods, such as by funding discounts for taxi fares, coordinating transit systems to be shared by multiple senior housing developments, supporting a volunteer program to expand the supply of drivers, creating a database of volunteer drivers and other transit options. [NEW PROGRAM] Program T6.4.1 Monitor Santa Clara County’s paratransit program to assess its adequacy [Previously Program T-48]. T-50 PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O Policy T-6.5 Collaborate with the Valley Transportation Authority, SamTrans, Stanford Marguerite Shuttle, Palo Alto Shuttle Bus, Dumbarton Express Bus Service and Caltrain in the provision of transit service that is accessible to people with special needs. [PTC Policy T6.3] Policy T-6.6 Support transit agencies in implementing or continuing reduced fare or no fare voucher systems for selected populations, including seniors and people with disabilities. [Previously Policy T-44] A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T REGIONAL LEADERSHIP GOAL T-7 Influence the shape and implementation of regional transportation policies and technologies to reduce traffic congestion and GHG emissions. Policy T-7.1 Take a leadership role in regional transportation planning and advocating for specific transit improvements and investments, such as Caltrain service enhancements and grade separations, Dumbarton Express service, enhanced bus service on El Camino Real with queue jumping and curbside platforms, and additional VTA bus service. [EIR Mitigation Measure Trans-1d] Policy T-7.2 Recognize the need for collaboration with a range of stakeholders, including regional agencies, neighboring jurisdictions and major employers, on issues of regional importance such as traffic congestion, reduced reliance on single-occupant vehicles, and sustainable transportation. Take the lead in forging regional partnerships and solutions. [(Previous Policy T-49) (Edited)] Policy T-7.3 Coordinate with local, regional agencies, and Caltrans to support regional efforts to maintain and improve transportation infrastructure in Palo Alto. [(PTC Policy T7.8) (Edited)] Policy T-7.4 Support the efforts of the Metropolitan Transportation Commission (MTC) to coordinate transportation planning and services for the MidPeninsula and the Bay Area that emphasize alternatives to the automobile. Encourage MTC to base its Regional Transportation Plan (RTP) on compact land use development assumptions. [Previous Policy T-51] PRELIMINARY DRAFT – JANUARY 21, 2016 T-51 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Policy T-7.5 Collaborate with communities to the north and west to ensure that Palo Alto and its immediate neighbors receive their fair share of regional transportation funds, proportional to the need and demand for transportation improvements within these communities to address region-wide transportation issues. [staff suggestion from 1/7/16 call] Policy T-7.6 Collaborate with public interest groups as well as federal, State, and local governments to study and advocate for transportation regulatory changes, such as an increase in the gasoline tax and market pricing efforts. [Previously Policy T-50] Program T7.6.1 Work regionally, and in particular with adjacent communities, to establish a system of parking fees that discourages single occupant vehicle use and encourages other transportation modes. [(Previous Program T-54) (Restored)] Policy T-7.7 Support efforts by Caltrans and the Valley Transportation Authority to reduce congestion and improve traffic flow on area freeways consistent with Statewide GHG emissions reduction initiatives. [(Previous Policy T-54) (Edited)] Program T7.7.1 Support provision of a new southbound entrance ramp to Highway 101 from San Antonio Road, in conjunction with the closure of the southbound Charleston Road on-ramp at the Rengstorff Avenue interchange in Mountain View. [Previously Program T-55] T-52 Policy T-7.8 Support the application of emerging freeway information, monitoring, and control systems that provide non-intrusive driver assistance and reduce congestion. [(PTC Policy T7.13) (Previous Policy T-55) (Edited)] Policy T-7.9 Where appropriate, support the conversion of existing traffic lanes to exclusive bus and high-occupancy vehicle (HOV and express) lanes on freeways and expressways, including the Dumbarton Bridge, and the continuation of an HOV and express lane from Redwood City to San Francisco. [(PTC Policy 7.14) (Edited) (Previous Policy T-52) (Edited)] PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O Policy T-7.10 Participate in seeking a regional solution to improve roadway connections, including HOV and express lanes, between Highway 101 and the Dumbarton Bridge without construction of a southern rail connection across the environmentally sensitive baylands. [(PTC Policy T7.5) (Edited) (Previous Policy T-53) (Edited)] Policy T-7.11 Support state and federal legislation to reduce motor vehicle emissions, noise, and fuel consumption. [Previously Policy T-56] A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T Program T7.11.1 Implement as appropriate the “local action list” of the Bay Area Air Quality Management District (BAAQMD) and work with the Santa Clara Valley Transportation Authority's Congestion Management Program (CMP) and other juris- dictions to implement those actions that require a multijurisdictional effort [Previously Program T-56]. AIRPORT GOAL T-8 Maintain an economically viable local airport with minimal environmental impacts. Policy T-8.1 Operate Palo Alto Airport (PAO) as a vital and efficient facility without significantly increasing its intensity or intruding into open space areas. PAO should remain limited to a single runway. Palo Alto will allow for improvement and only minor expansion of existing PAO facilities and safety improvements in compliance with federal and state requirements. [Previously POLICY T-57] Program T8.1.1 Relocate the terminal building away from the Runway 31 clear zone, allowing for construction of a new terminal. [Previously PROGRAM T-58:] Program T8.1.2 Prepare an Airport Master Plan in accordance with Federal Aviation Administration requirements to address long-term facility needs and the future of PAO. City staff will work to identify ways to align the Airport Master Plan and the Baylands Master Plan. [NEW PROGRAM] PRELIMINARY DRAFT – JANUARY 21, 2016 T-53 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Program T8.1.3 Identify and pursue funding to address maintenance, safety and security improvements needed at PAO. [NEW PROGRAM] Policy T-8.2 Minimize the environmental impacts associated with PAO operations, including adverse effects on the character of surrounding open space and the quality of life in residential areas as required by federal and state requirements. [NEW POLICY] Program T8.2.1 Maintain landscaping consistent with the open space character of the baylands to screen the airport along Embarcadero Road and continue to provide a bicycle/pedestrian path adjacent to Embarcadero Road, consistent with the Baylands Master Plan and open space character of the baylands subject to airport federal and state regulations. [Previously PROGRAM T-57] Program T8.2.2 Maintain the native grasses planted on the abandoned second runway pad and leave as open space. This is subject to federal wildlife hazard requirements and guidelines for airports. [NEW PROGRAM] Program T8.2.3 Revise lease agreements with flight schools, clubs, and rental service operators to require that those parties inform pilots of voluntary noise abatement procedures. [NEW PROGRAM] Program T8.2.4 Establish a system for processing, tracking and reporting noise complaints regarding local airport operations. [NEW PROGRAM] Policy T-8.3 T-54 Encourage the use of alternatives to leaded fuel in aircraft operating in and out of Palo Alto Airport. [NEW POLICY] PRELIMINARY DRAFT – JANUARY 21, 2016 P A L O A L T O C O M P R E H E N S I V E P L A N T R A N S P O R T A T I O N E L E M E N T TRAFFIC CONGESTION GOAL T-9 Decrease congestion and improve transportation efficiency with a priority on our worst intersections and our peak commute times, including school traffic. Policy T-9.1 Promote mixed use development to provide housing and commercial services near employment centers, thereby reducing the necessity of driving. [(Previous Program T-2) (Converted to Policy)] Program T9.1.1 Monitor the traffic surrounding new developments and compare with the projections anticipated during the review and approval process of the development. Impose penalties if traffic exceeds projections. Include this information as part of TDM reporting. [(PTC Program T2.10.4) (Edited)] Policy T-9.2 Favor new development that is within 10-minute walk of a transit stop or station and provides walking and bicycling connections and facilities as a congestion management strategy. [NEW POLICY] Policy T-9.3 The City supports the establishment and operation of Transportation Management Associations to address transportation and parking issues as appropriate in the City’s employment districts. [NEW POLICY] Program T9.3.1 Work in partnership with the Downtown TMA and Stanford University to realize measurable reductions in SOV commuting in Downtown and in the Stanford Research Park. [NEW PROGRAM] Policy T-9.4 Encourage employers to inform employees and the public about alternate modes of transportation and parking options. [NEW POLICY] Policy T-9.5 Encourage the location of childcare facilities near major employment hubs to reduce traffic congestion associated with child pick-up and drop-off. [NEW POLICY] Program T9.5.1 Study ways to use parking management strategies to help alleviate traffic congestion, including paid parking in the Downtown area. [NEW PROGRAM] PRELIMINARY DRAFT – JANUARY 21, 2016 T-55 P A L O A L T O C O M P R E H E N S I V E T R A N S P O R T A T I O N E L E M E N T P L A N Program T9.5.2 Evaluate the City’s Transportation Impact Fee every five years to implement new transportation priority projects. [PTC Program T2.10.8] Policy T-9.6 Work with PAUSD to ensure that decisions regarding school assignments are analyzed to reduce peak period motor vehicle trips to and from school sites. [EIR Mitigation Measure Trans-1e] Policy T-9.7 Work with the PAUSD to resolve traffic congestion issues associated with student drop-off and pick-up. [NEW POLICY] Program T9.7.1 Continue to participate in regional efforts to develop technological solutions that make alternatives to the automobile more convenient and thereby contribute to reducing congestion [NEW PROGRAM] Policy T-9.8 Encourage the use of car and bike sharing to reduce single occupant vehicle trips, and support the provision of car share stations throughout Palo Alto, especially within 10-minute walk of transit stations and stops. [(PTC Policy T1.18) (NEW POLICY] Program T9.8.1 Implement a pilot program to test the effectiveness of subsidizing a taxi or rideshare program for Palo Altans to get to/from downtown. Policy T-9.9 Work with VTA to implement traffic management strategies, such as signal coordination, centralized traffic control, red-light, and speed enforcement cameras, and real-time travel information, to reduce traffic congestion in and around Palo Alto. [NEW POLICY] Program T9.9.1 Implement computerized traffic management systems to improve traffic flow when feasible. [(PTC Program 2.10.5) (Previously Program T-38)] Program T9.9.2 Implement a program to monitor, coordinate, and optimize traffic signal timing a minimum of every five years along arterial and residential arterial streets. [PTC Program T2.10.7] T-56 PRELIMINARY DRAFT – JANUARY 21, 2016