Process/Monthly Report No. 42
Transcription
Process/Monthly Report No. 42
December2014 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Monthly Report Dec 2014 TABLE OF CONTENTS 1. 2. PROJECT OVERVIEW ………………………………………………………………………………………..............4 1.1. INTRODUCTION ................................................................................................................................... 4 1.2. THE PROJECT ROAD .......................................................................................................................... 4 1.3. THE PROJECT ROAD CONSTRAINTS................................................................................................ 4 1.4. PROPOSED PATNITOP TUNNEL ALIGNMENT .................................................................................. 5 1.5. PROJECT MAP..................................................................................................................................... 6 PROJECT ASSIGNMENT .............................................................................................................................. 7 2.1. 3. 4. BACKGROUND .................................................................................................................................... 7 MOBILIZATION OF AGENCIES ..................................................................................................................... 7 3.1. INDEPENDENT ENGINEER ................................................................................................................. 7 3.2. ROLE AND FUNCTIONS OF IE ........................................................................................................... 7 3.3. ORGANISATION CHART AND STAFF LIST ....................................................................................... 8 3.4. DRAWL OF AGREEMENT WITH C0NCESSIONAIRE ....................................................................... 10 3.5. PIU ...................................................................................................................................................... 10 PRE-CONSTRUCTION ACTIVITIES ............................................................................................................ 10 4.1. SHIFTING OF UTILITIES .................................................................................................................... 10 4.2. UTILIES SHIFTING & OTHER HINDRANCES .................................................................................... 11 4.2.1 STATUS OF UTILITY SHIFTING ........................................................................................................ 11 4.2.2 HINDRANCES .................................................................................................................................... 11 5. CONSTRUCTION SCHEDULE ..................................................................................................................... 12 5.1. CONSTRUCTION SHEDULE AS PER MILESTONE TARGETS……………………………………… 12 5.2. INAUGURATION ................................................................................................................................. 12 6. CONTRACTOR´S RESOURCES .................................................................................................................. 13 7. MEETINGS/SITE VISIT/REVIEW OF DOCUMENTS .................................................................................... 13 7.1. MEETINGS ......................................................................................................................................... 13 7.2. SITE VISITS ........................................................................................................................................ 13 7.3. REVIEW OF DOCUMENTS/DRAWINGS ........................................................................................... 13 7.4. INSPECTION VISIT ............................................................................................................................ 14 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 1 Monthly Report Dec 2014 8. INVOICES PAYMENT & REIMBURSEMENT ............................................................................................... 14 9. EXECUTING AGENCIES AND CONTRACT DATA ..................................................................................... 15 9.1. AGENCIES.......................................................................................................................................... 15 9.2. CONTRACT DATA .............................................................................................................................. 16 9.2.1 PROJECT COST ................................................................................................................................ 16 9.2.2 CIVIL WORKS CONTRACT DETAILS ................................................................................................ 16 9.2.3 SCOPE OF WORK ............................................................................................................................. 16 10. WEATHER REPORT .................................................................................................................................... 17 10.1. WEATHER REPORT FOR THE MONTH OF DECEMBER ................................................................. 17 11. 12 PROGRESS OF THE PROJECT .................................................................................................................. 18 11.1 ESTIMATION OF PHYSICAL PROGRESS IN GLOBAILITY ......................................................... 18 11.2 FINANCIAL PROGRESS DIAGRAM .............................................................................................. 19 11.3 MONITORING OF WORKS ........................................................................................................... 20 11.3.1 GEOLOGICAL MONITERING ....................................................................................................... 20 11.3.2 GEO TECHNICAL MONITORING .................................................................................................. 23 11.3.3 TUNNEL WORKS MONITORING .................................................................................................. 34 11.3.4 DUMP AREA AND APPROACH ROAD ......................................................................................... 44 QUALITY CONTROL AND TESTING OF MATERIALS .............................................................................. 46 12.1 UP TO DATE STATUS OF TEST................................................................................................... 46 12.2 TEST RESULT OF CONCRETE CORE & CUBES ........................................................................ 47 13 SAFETY REPORT ........................................................................................................................................ 55 14 MINUTES OF MONTHLY MEETING ........................................................................................................... 56 15 BRIEF COMMENTS FROM ALL KEY PROFESSIONALS REGARDING CRUCIAL ISSUES AND PROGRESS OF WORK. ……….………………………………………………………………………………………57 16 NCR STATUS ……………………………………………………………………………………………… ...........…60 17 ESCROW ACCOUNT…………………………………………………………………………………………………..60 18 PHOTOGRAPHIC REPORT ....................................................................................................................... ..61 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 2 Monthly Report Dec 2014 19 ANNEXURE 1 .............................................................................................................................................. 67 20 ANNEXURE 2 ............................................................................................................................................. 68 21 ANNEXURE 3 ............................................................................................................................................. 69 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 3 Monthly Report Dec 2014 1. PROJECT OVERVIEW 1.1. INTRODUCTION The Ministry of Road Transport and Highway (MORT&H) has taken a strategic decision to develop the North-South corridor connecting Srinagar (J&K) to Kanya Kumari (Tamilnadu). The National Highways Authority of India (NHAI) has been appointed by MORT&H, to implement this development. NHAI have appointed the Louis Berger Group, Inc., USA, in Joint Ventures with LRP Consultants, India and in association with L&T Ramboll, India, and D2 Consultant for Tunnel as consultants to carry out the detailed design, for the Patnitop Tunnel of the NH-1A, between Udhampur and Banihal (Km 66 to Km. 188) in the state of Jammu and Kashmir. 1.2. THE PROJECT ROAD The NH-1A National Highway will be upgraded from its present two-lane layout, to a four-lane divided carriageway configuration. The design of the road between Udhampur and Banihal, Km 67 to Km. 188 is being carried out in five separate packages. The project will require the construction of numerous structures, including one approx. 9 Km. long Tunnel (Patnitop Tunnel) and six short Tunnels (Tunnels with length below 1 km). 1.3. THE PROJECT ROAD CONSTRAINTS The existing road alignment of the NH-1A between Km 67 and Km 188 is typified by sub-standard, and often steep curves and gradients, in the horizontal and vertical planes. The proposed improvement will entail widening towards the valley side along most of the road, which will also involve the construction of many new structures, including viaducts, bridges, retaining walls and Tunnels. The project road area is within a region that is prone to frequent earthquakes of sizeable magnitude. Much of the rock in the area is well jointed and highly fragmented. Combining seismic activity, with the extreme prevailing weather conditions, also means the area experiences constant landslides. The Kashmir region, with its exceptional scenic landscapes, abundant wildlife, culture diversity and profuse number of historic and religion building, is a ‘Mecca’ for tourists from every corner of the globe. The NH-1A being the main route between the principal cities of Jammu and Srinagar carries most of the tourist for the entire area. Tourism peaks during the summer months of July and August, but spring and autumn, can also be busy. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 4 Monthly Report Dec 2014 1.4. PROPOSED PATNITOP TUNNEL ALIGNMENT In previous design stages different alternatives have been investigated for Tunnel, crossing of the Patnitop range in approx. station Km 90 to Km 130 of the existing NH-1A. Five Tunnel alternatives varying from 1.2 Km length have been assessed and presented in earlier design stages. As the optimum alternative, the longest one, a base Tunnel at elevation of approx. 1220 m a.s.l. was approved for further investigation and elaboration of the Tunnel civil tender design documents. Concerned section Km. 67 to Km. 188 is being carried out in five separate packages 1 – 5. Patnitop Tunnel is designed as a base Tunnel. Passing under the Patnitop mountain range with overburden more than 1 Km and belongs to NHDP Phase- II. This contract package start at existing road starts from Km 89 and ends at Km 130 of existing road. Tunnel mined portals are located at approx. start of Km 90 (southern portal) close to village of Chenani and Km 130 (northern portal) close to township of Batote of existing road at elevations 1230 m and 1210 m respectively. Tunnel profile grade is of a roof character with 0.5 % longitudinal profile grade. Tunnel horizontal alignment starts and ends with curves of 300 m radius, and the rest of mid-section is straight. Main Tunnel direction is South to North. Travel distance will be reduced for more than 30 Km and climbing and descending of approx. 1000 m shall be avoided. Tunnel shall be 2-lane, bidirectional tunnel with parallel escape Tunnel and cross connections into escape Tunnel for emergency exit. The Existing road (2-lane, bidirectional) will be utilized to accommodate the local traffic in the area as well as over-sized and other vehicles non-suitable for tunnel operation. The existing carriageway will be upgraded with minor improvement to both the horizontal and vertical alignment. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 5 Monthly Report Dec 2014 1.5. PROJECT MAP ------------ CHENANI TO BATOTE EXISTING ROAD ======= TUNNEL ALIGNMENT Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 6 Monthly Report Dec 2014 2. PROJECT ASSIGNMENT 2.1. BACKGROUND NHAI have appointed the Louis Berger Group, Inc., USA, in Joint Venture with LRP Consultants, India and in association with L&T Ramboll, India, as consultant to carry out the Feasibility Study and DPR for 4-Laning of the section Udhampur to Banihal, Km. 66 to Km 188 of NH-1A in the State of Jammu and Kashmir. The Complete project length is divided into 5 packages. 3. MOBILIZATION OF AGENCIES 3.1 INDEPENDENT ENGINEER It was decided that Independent Engineer may be invited to participate for project management so as to have proper management and quality assurance. Accordingly Bids were invited from pre-qualified and shortly listed consultants and the work was allotted to M/s Euroestudios.S.L. in Association with M/s Segmental Consulting and Infrastructure Advisory (P) Ltd. In an agreement for Independent Engineer, services were entered into between National Highways Authority of India, Plot No. G-5 and G-6 , Sector No.10, Dwarka, New Delhi- 110045 and M/s M/S Euroestudios.S.L., Castelló, 128, E-28006 MADRID, ESPAÑA in Association with M/s Segmental Consulting and Infrastructure Advisory (P) Ltd., Unit No. 419A-421, Spaze I Tech Park, Tower B-4.Sector 49, Sohna Road Gurgaon-122002– India, by Letter No. NHAI/12015/GM (N-1)/CS-88-92/JK/2010/512 dated 05th April 2011 for commencement of service and accordingly mobilization of Key/ Sub Key Personnel was done. M/S Euroestudios, S.L. in Association with M/s Segmental Consulting and Infrastructure Advisory (P) Ltd., as Independent Engineer in accordance with the terms of the agreement in MOU, have deployed personnel to look after the project. Office Building for Team has been hired at EktaVihar, Near M.H. Hospital, Udhampur (J&K) and office is fully operational. 3.2 ROLE AND FUNCTIONS of IE The role of IE has been described in schedule “Q” of Concession Agreement between NHAI and CNTL (SPV created by IL&FS) the main points are described below. x Review of Drawings & Documents. x Review, Inspection and Monitoring of construction work. x Conducting testing on completion of construction & issuing completion/ provisional certificate. x Review, Inspection & Monitoring of Divestment requirements. x Determining as required under the Agreement, the costs of any works or services and / or their reasonableness. x Determining, as required under the Agreement, the period or any extension thereof, for performing any duty or obligation. x Assisting the parties in resolution of disputes. x Undertaking all other duties and functions in accordance with Agreement. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 7 Monthly Report Dec 2014 3.3 ORGANIZATION CHART AND STAFF LIST Key Staff S.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Position Name Team Leader cum Sr. Tunnel Expert Tunnel Design Engineer Sr. Geologist Sr. Geotechnical Engineer Sr. E & M Expert Tunnel Safety Expert Tunnel Ventilation Expert Tunnel Excavation Expert Tunnel Lining Expert Tunnel Lighting Expert Senior Quality Cum Material Expert Bridge / Structural Engineer Financial Expert Legal Expert Tunnel Engineer-1 Tunnel Engineer-2 Mr. Valentín Salcedo Mr. JoseLuisCacho Mr. K.S. Jamwal Mr. Cesar Andia Mr. José Manuel Pineda Mr. Sanjay Kr. Sharma Mr. Rafat Ahmad Khan Mr. Sanat Kumar. Jain Mr. Ravi Kant Singh Mr. Vikas Kohli Mr. Ajay Mishra Mr. Manish Kr. Sharma Mr. Sindu Bagati Mr. Neeraj Singh Datta Date of Joining 25.05.2011 28.10.2013 01.06.2011 11.08.2011 28.04.2012 02.06.2011 30.06.2011 01.06.2011 01.06.2011 30.06.2011 03.06.2011 03.06.2011 30.06.2011 28.06.2011 25.05.2011 01.06.2011 Remarks Completed Completed Sub-Professional Staff S.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Position Name Tunnel Fire Fighting Expert Environmental Expert Hydrologist/Drainage Expert Hydrologist/Drainage Expert Geologist Geo-technical Engineer Material Engineer Material Engineer Quantity Surveyor Highway Engineer Bridge Engineer Traffic & Transportation Expert Survey Engineer Survey Engineer Assist. Tunnel Excavation Expert Assist. Tunnel Excavation Expert Assist. Tunnel Lining Expert Assist. Tunnel Lining Expert Horticulturalist Lab. Technician Lab. Technician HTMS/Toll Expert CAD Expert Mr. V.P Malhotra Mr. K.L. Razdan Mr. Susheel Sarotra Mr. Paramjit Singh Mr. Vishal Koul Mr. Vikas Gupta Mr. Mohit Gandotra Mr. Sanjay Gupta Mr. P.K. Mittal Mr. Ratish Sharma Mr. Gurpreet Singh Mr. Neeraj Gupta Mr. Sindhu Misra Mr. K.S. Chamak Mr. Subash Chander Mr. Kuldeep sharma Mr. Amit Bhandari Mr. Rajesh Mishra Mr. Manish Deshpande Date of Joining 07.06.2014 01.09.2011 01.09.2011 15.09.2011 12.09.2011 13.07.2011 08.07.2011 03.10.2011 02.01.2012 01.10.2013 03.01.2014 15.07.2013 02.04.2012 01.08.2011 01.11.2014 13.06.2011 17.06.2011 20.06.2011 14.07.2014 01.01.2013 24.06.2011 25.04.2012 02.01.2012 Remarks Completed Completed Completed Completed Completed Support Staff S.No 1 2 3 4 5 6 7 8 9 Position Name Office Manager Accountant Cashier Steno Computer Operator Photocopier Office Boy Security Guard Security Guard Mr. Amnish Jamwal Mr. Pankaj Gupta Mr. J.S. Jaswal Mrs .Superna Gandotra Mr. Ajay Singh Mr. Sanat Kr. Mishra Mr. Sahil Gupta Mr. Ramesh singh Mr. Subash Chander Date of Joining Remarks 01.06.2011 01.10.2013 12.04.2012 01.07.2014 01.06.2011 25.05.2011 01.02.2012 01.07.2014 01.07.2011 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 8 ORGANISATION CHART Monthly Report Dec 2014 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 9 Monthly Report Dec 2014 3.4 DRAWL OF AGREEMENT WITH CONCESSIONAIRE Agreement was drawn by NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI) with Chenani Nashri Tunnel way Limited. (CNTL) on 28th June 2010. For this project IL&FS Transportation Networks Ltd has formed a Special Purpose Vehicle (SPV) by the name of Chenani Nashri Tunnel way Limited (CNTL) (hereinafter referred as the “Concessionaire”). 3.5 PIU PROJECT DIRECTOR. National Highway Authority of India – PIU 315/1, 2nd Floor, Channi Himmat Jammu (J&K) 180015 4. PRE-CONSTRUCTION ACTIVITIES 4.1. SHIFTING OF UTILITIES Km.89.00 to 90.20 (0.00-1.20) y Km 00.00 to Km 00.300 y Land Handed over, however compensation Hilly Section Revenue Land /Private Land for trees pending payment by ADC. y Km 00.300 to 1.20 y Compensation for Land, Structures & Trees pending payments by ADC. Km. 90.20 to 130 Hilly Section Forest Land y Km 1.20-10.70 y Land Handed Over. Forest Diversion Cost Deposited. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 10 Monthly Report Dec 2014 4.2. UTILIES SHIFTING & OTHER HINDRANCES 4.2.1. STATUS OF UTILITY SHIFTING North Portal S.No. ListofUtilities Chainage Unit Total Status 1 OFCPillar 129.100129.500& 129.500 130.00 Nos. 11 Completed 2 ElectricalPole 129.100129.500&129.500130.00 Nos. 41 Completed 3 Transformer 129.100129.500 Nos. 2 Completed 4 HandPump 129.500130.00 Nos. 2 Completed 5 Shops 129.500130.00 Nos. 6 Completed South Portal S.No. ListofUtilities Chainage Unit Total 1 OFCPillar 89.00090.000 Nos. 8 Completed 2 ElectricalPole 89.05090.00 Nos. 15 Completed 3 Transformer 89.950 Nos. 1 Completed 4 33KVA ELECTRICALPOLE HTTower atKm89.500 Nos. 18 Shiftinginprogress 89.680 Nos. 1 Completed 89+850 5 440VAlinenear Status 7 ElectricalPoleLine 89.60090.000 Nos. 5 Shiftingyettostart (Estimateapprovedby NHAI) Completed 8 WaterLine 89.90090.000 Nos. 2 Completed Nos. 6 Completed Nos. 17 Completed Nos. 3 Completed 6 TollPlaza 9 10 11 89.65089.700,89.900 90.000 89.00089.300,89.350 Shops 89.400,89.95090.000 ReligiousStructure 89.100,89.400,89.800 House 12 TelephonePole 13 HandPump 14 PMGSY/Public Path Housebeyond 15 89.05089.200,89.750 89.900,89.95090.000 89.100 Nos. 7 Completed Nos. 1 Completed Nos. 1 Completed Nos. 1 Completed 89.100 Nos. 1 Completed Km89.0 15 TelephoneTower Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 11 Monthly Report Dec 2014 4.2.2. HINDRANCES NIL 5. CONSTRUCTION SCHEDULE 5.1 CONSTRUCTION SHEDULE AS PER MILESTONE TARGETS. Milestone Financial Percentage Date of Achievement of Milestone as envisaged in Concession Agreement Remarks AppointedDate (AsperAgreement) ProjectMilestone1 0% 230511 10% 231111 AppointedDateofthe Project Achieved ProjectMilestone2 20% 230512 Achieved ProjectMilestone3 30% 231112 Achieved ProjectMilestone4 40% 230513 Achieved ProjectMilestone5 50% 231113 Achieved ProjectMilestone6 60% 230514 Achieved ProjectMilestone7 70% 231114 FinancialProgressachieved 73.83%* ProjectMilestone8 80% 230515 ProjectMilestone9 90% 231115 ProjectMilestone10 100% 230516 * Project Milestone still pending as some replies to the queries raise by IE yet to be compliance by Concessionaire. 5.2 INAUGURATION x Escape Tunnel (South Portal) :- First blast taken on 8th August 2011 x Main Tunnel (South Portal) :- First blast taken on 18th August 2011 x Escape Tunnel (North Portal) :- First blast taken on 8 October 2011 x Main Tunnel (North Portal) :- First blast taken on 22nd October 2011 th Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 12 Monthly Report Dec 2014 6. CONTRACTOR´S RESOURCES Since EPC Contractor “Leighton” has closed all the construction activities and had left the job, no further data regarding Contractor resources has been received from the Concessionaire, despite of IE’s several reminders for the submission of the details of the resources. 7. MEETINGS /SITE VISITS / REVIEW OF DOCUMENTS 7.1 7.2 MEETINGS x Meeting with PD, NHAI, at IE Office, Udhampur dated.05.12.14 x Meeting with PD, NHAI, at PD Office, Jammu, and dated.08.12.14. x Meeting with RO and PD, NHAI, at PIU Jammu, dated.22.12.14. SITE VISITS x Team Leader visited North Portal dated 03.12.14. x Acting Team Leader along with RO, NHAI,Jammu visited South Portal and North Portal dated 23.12.14. 7.3 REVIEW of DOCUMENTS /DRAWINGS: Contractor has submitted documents regarding Built Engg Geo Map, Maintenance of Existing Highway, Commencement of project facilities, status of MEP works, etc. Some of these documents have been reviewed and sent back to the Concessionaire after reviewing. The following documents have been reviewed and sent back to the Concessionaire. Letterno Date Subject S-CO-TE.GE-2775 01.12.2014 Escape Tunnel As Built Engg Geo Map S-CO-TE.BG-2778 01.12.2014 SAR Hill Side Chainage 390 to 420 S-PD-TE.RO-2779 03.12.2014 Slow Progress of Work S-HQ-AD.QL-2780 03.12.2014 Intensive examination report by CTE's Organization of CVC S-PD-TE.RO-2781 06.12.2014 Extension of man months S-PD-TE.OT-2786 09.12.2014 REG:- MEETING REGARDING ONLINE MONITORING OF ALL 3 STAGES (UNDER DEVELOPMENT/UNDER CONSTRUCTION AND O&M) OF EPC AND PPP PROJECTS THROUGH PMIS SOFTWARE S-CO-TE.RO-2787 10.12.2014 Maintanence of Existing Highway in Winter Season S-CO-TE.RO-2788 11.12.2014 Commencement of Project Facilities for Project Milestone VII S-CO-TE.RW-2789 11.12.2014 S-CO-TE.EM-2790 11.12.2014 Design and Drawings: South Approach Road Toll Plaza Protection MEP Works PSS Technology Building Drawings S-PD-TE.RO-2791 11.12.2014 Status of maintenance of Existing Highway from chainage KM 89.00 to KM 130.00 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 13 Monthly Report Dec 2014 S-PD-TE.RW-2792 11.12.2014 National executive committee (NEC) minutes of meeting held on 22.09.2014 to review the ongoing response activities in Jammu & Kashmir and other states S-PD-AD.OT-2793 12.12.2014 S-PD-TE.RO-2795 17.12.2014 Extension of Man Month for the position of Sr. Geotechnical Engineer Slow Progress of Work S-CO-TE.QL-2796 18.12.2014 S-PD-TE.RO-2797 19.12.2014 S-CO-TE.QL-2798 24.12.2014 S-PD-TE.FN-2800 24.12.2014 Mix design for Wet Shotcrete (M-25) with Polyfiber: International Crusher Aggregates Submission of Tax Residency Certificate S-CO-TE.RO-2802 26.12.2014 Default Notice to the Concessionaire S-CO-TE.EM-2804 27.12.2014 Status of MEP Pending Works S-CO-TE.FN-2805 30.12.2014 Commencement of Project Facilities for Project Milestone VII Mix design for Wet Shotcrete (M-25) with Polyfibre: International Crusher Aggregates Replacement of Tunnel Ventilation Expert Laboratory set up: M/s Leighton has established its Laboratory for South Portal End at Plant Site at Km 87 near the batching plant, and for North Portal, established near camp at KM 134. 7.4 Inspection Visit IE have carried regular inspection of site during this month. The inspection visit report is included in ANNEXURE-1. 8. INVOICES PAYMENT & REIMBURSEMENT Invoice for the month of December 2014 has been submitted to Project Director NHAI (PIU Jammu) on 1st Jan2015. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 14 Monthly Report Dec 2014 9. EXECUTING AGENCIES AND CONTRACT DATA 9.1 AGENCIES 9.1.1 Developer: M/s IL & FS Transportation Networks Ltd is the Developer. 9.1.2 Concessionaire: They have created SPV in the name of M/s CNTL for this Project. CNTL is the Concessionaire for this project; they have mobilized staff and established its office Hotel Singh Axis, MH Morh, Near Vishal Mega Mart, Udhampur-182101 Distt. M/s CNTL is represented by Mr. J.S. Rathore Project Director. 9.1.3 EPC Contractor: M/s ITNL has awarded the construction to Leighton Contractors (India) Pvt. Ltd., The Contractor has recruited following agencies for the project design purposes. x Geodata (Design Consultants) x Geometra International (Pvt.) Ltd., Singapore (Survey Consultants) x Geotrax International Services., Hyderabad (Survey Consultants) x SMEC (Design Consultants) Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 15 Monthly Report Dec 2014 9.2 CONTRACT DATA 9.2.1 PROJECT COST Project Cost (As per Concession Agreement) – Rs. 2519 Crore 9.2.2 CIVIL WORKS CONTRACT DETAILS 9.2.3 a) Concessionaire Chenani Nashri Tunnel way Ltd. b) Contractor Section c) Contractor Length Chenani to Nashri Section of NH 1A From Km. 89.00 to 130.00 10.800 Km d) Agreement /MOU Date 28th June 2010 e) Agreement Amount Rs. 2519 Crs. f) Commencement Date 23rd May 2011 g) Intended date of Completion 23rd May 2016 h) Performance Security Released i) Mobilization Advance and Date of payment (s) Nil j) Equipment Advance and Date of Payment (s) Nil k) Net Material Advance Nil l) Retention Money upto date Nil m) Liquidated damages, if any - n) Defect Liability Period Nil SCOPE OF WORK Main Tunnel: 9.00 km (As per CA) Escape Tunnel: 9.00 Km Cross Passage: 29 nos. Rigid Pavement: 18.000 km (including Main Tunnel, Escape Tunnel and Bridges) Flexible Pavement: 1.800 km (four lane) Rotary Junction: 02 Nos. Minor Bridge: 02 nos. Culvert: 07 Nos. Box Culvert Toll Plaza: 02 Nos. Drainage pipe in Main Tunnel: 9.0 km (3 nos.) Drainage pipe in Escape Tunnel: 9.0 km (2 nos.) Drainage pipe in Cross passages: 29 Nos. (On both the ends) Slope Protection works at Valley Side: 1520 m Slope Protection works at Hill Side: 1750 m Lay bays: 15 nos. Firefighting Niches: 58 nos. Vehicular emergency exit: 08 nos. Ventilation Building: 02 nos. Tunnel Control Centre (Building):02 nos. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 16 Monthly Report Dec 2014 10. WEATHER REPORT 10.1 WEATHER REPORT FOR THE MONTH OF DECEMBER North Portal South Portal Sr. No. Date Max. Temp. (°C) Min. Temp. (°C) Snow (cm) Rainfall (mm) Max. Temp. (°C) Min. Temp. (°C) Snow (cm Rainfall (mm) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 26-Nov-14 27-Nov-14 28-Nov-14 29-Nov-14 30-Nov-14 01-Dec-14 02-Dec-14 03-Dec-14 04-Dec-14 05-Dec-14 06-Dec-14 07-Dec-14 08-Dec-14 09-Dec-14 10-Dec-14 11-Dec-14 12-Dec-14 13-Dec-14 14-Dec-14 15-Dec-14 16-Dec-14 17-Dec-14 18-Dec-14 19-Dec-14 20-Dec-14 21-Dec-14 22-Dec-14 23-Dec-14 24-Dec-14 25-Dec-14 18.4 19 22.4 22.2 21.7 22.6 21.3 20.8 21.5 21.2 21.0 20.5 21.0 20.8 21.0 21.2 21.0 20.8 20.9 21.0 19.0 18.8 17.0 17.5 17.3 17.5 17.0 16.9 17.3 17.6 5.8 6.0 5.9 5.9 6.3 5.0 5.1 6.2 6.0 5.2 4.9 4.8 4.5 4.6 5.2 5.1 4.8 4.9 5.1 5.2 4.8 5.1 5.3 5.2 5.3 5.1 5.4 5.0 5.3 5.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18.6 17.9 18.5 18.4 18.0 17.9 18.1 17.5 18.3 17.8 17.5 17.2 17.2 17.7 16.3 16.2 16.0 15.9 16.0 16.1 15.8 16.4 16.3 16.5 16.3 16.5 16.4 15.9 15.8 16.0 6.6 6.8 6.5 6.9 6.0 6.7 6.9 6.3 6.6 6.6 6.2 6.5 5.4 5.9 6.3 6.3 6.3 6.2 5.9 5.7 5.6 6.0 6.1 5.7 6.2 6.2 6.1 6.0 5.9 6.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Light Moderate Heavy Violent Precipitation rate less than 2.5 mm/ hr x Precipitation rate between 2.5 -7.6 mm/ hr x x Precipitation rate between 7.6-50 mm/ hr Precipitation rate more than 50 mm/ hr Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 17 Monthly Report Dec 2014 11. PROGRESS OF THE PROJECT 11.1 ESTIMATION OF PHYSICAL PROGRESS IN GLOBALITY Physical Progress has not to be taken as reference for financial progress, because it does not include cost incurred (i) Construction of Labour camps, Batching plants and Labs (ii) Procurement of machinery and advanced materials for construction. Physical Progress Percentage upto December 2014 S. No. Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Portal Construction MEP work Portals Dump Area South Dump Area North Main Tunnel - Heading Main Tunnel - Benching Escape Tunnel - Heading Cross Passage - Heading Staging for Lining Water Proofing - Main tunnel Lining - Main Tunnel Water Proofing - Escape tunnel Lining - Escape Tunnel Lining - Cross Passage Ground Beam Works Pavement -Main Tunnel Pavement -Escape Tunnel MEP works - Main Tunnel MEP works - Escape Tunnel Approach Road Works - EW Approach Road Works -Granular Approach Road Works - BT Misc work Bridges Toll Plaza Project Facilities Maintenance of Road Design Commercial Operations Unit LS LS LS LS RM RM RM RM No. RM RM RM RM RM RM RM RM RM RM RM RM RM RM LS LS LS LS LS LS Weightage Total Scope 4.00% 1.00 1.50% 1.00 1.50% 1.00 1.50% 1.00 23.40% 8966.00 19.15% 8966.00 12.09% 8966.00 4.36% 945.38 1.40% 10.00 2.85% 8966.00 5.35% 8966.00 1.21% 8966.00 2.25% 8966.00 0.84% 934.00 1.68% 18894.00 1.55% 8966.00 0.90% 8966.00 4.20% 8966.00 2.33% 8966.00 1.07% 1820.00 0.09% 1820.00 0.15% 1820.00 0.46% 1.00 0.55% 1.00 0.22% 1.00 0.26% 1.00 0.26% 1.00 2.28% 1.00 2.60% 1.00 100.00% Progress 0.90 0.90 0.66 0.52 7833.50 6525.40 8966.00 905.50 8.00 3742.00 3354.50 4093.00 3957.10 41.90 8863.70 0.00 0.00 0.00 0.00 400.00 0.00 0.00 0.15 0.90 0.02 0.00 0.50 0.70 0.00 % Overall Progress Progress 90.00% 90.00% 66.00% 52.00% 87.37% 72.78% 100.00% 95.78% 80.00% 41.74% 37.41% 45.65% 44.13% 4.49% 46.91% 0.00% 0.00% 0.00% 0.00% 21.98% 0.00% 0.00% 15.00% 90.00% 2.00% 0.00% 50.00% 70.00% 0.00% Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. 3.60% 1.35% 0.99% 0.78% 20.44% 13.94% 12.09% 4.18% 1.12% 1.19% 2.00% 0.55% 0.99% 0.04% 0.79% 0.00% 0.00% 0.00% 0.00% 0.24% 0.00% 0.00% 0.07% 0.50% 0.00% 0.00% 0.13% 1.60% 0.00% 66.58% Page 18 0.00 15.54 15.99 M ar-15 (46) 76.5 78.2 1.7 15.54 25.3 79.9 1.7 Apr-15 (47) 15.99 0.45 5.1 1.7 29.4 17.0 Aug-11 (3) 15.3 30.3 81.6 1.7 M ay-15 (48) 19.44 3.45 6.8 1.7 Sep-11 (4) 18.7 32.6 83.3 1.7 35.9 37.1 23.8 85.0 1.7 Jul- 15 (50) 20.51 0.60 10.2 1.7 Nov-11 (6) 22.1 Jun-15 (49) 19.91 0.47 8.5 1.7 Oct-11 (5) 20.4 38.9 86.7 1.7 Aug- 15 (51) 21.41 0.90 11.9 1.7 Dec-11 (7) 25.5 40.5 88.4 1.7 Sep- 15 (52) 24.37 2.96 13.6 1.7 41.9 28.9 Jan-12 (8) 27.2 43.2 90.1 1.7 Oct- 15 (53) 25.3 0.92 15.3 1.7 Feb-12 (9) 30.6 46.9 91.8 1.7 Nov- 15 (54) 29.4 4.11 17.0 1.7 48.2 35.7 49.8 93.5 1.7 Dec- 15 (55) 30.3 0.93 18.7 1.7 Apr-12 (11) 34.0 M ar-12 (10) 32.3 Four Lanning of NH-1A from 89.00-130( Chenani- Nashri Section) 54 35.9 3.33 22.1 1.7 Jun-12 (13) 39.1 54 95.2 1.7 96.4 1.2 Jan-16 (56) Feb-16 (57) 32.6 2.28 20.4 1.7 M ay-12 (12) 37.4 54 42.5 55 97.6 1.2 M ar-16 (58) 37.1 1.17 23.8 1.7 Jul- 12 (14) 40.8 56 45.9 56 98.8 1.2 Apr-16 (59) 38.9 1.75 25.5 1.7 100.0 1.2 M ay-16 (60) 40.5 1.63 27.2 1.7 57 47.6 Aug-12 (15) Sep-12 (16) 44.2 58 41.9 1.37 28.9 1.7 Oct-12 (17) 49.3 52.7 54.4 64.2 43.2 1.38 30.6 1.7 46.9 3.66 32.3 1.7 48.2 1.29 34.0 1.7 Nov-12 (18) Dec-12 (19) Jan-13 (20) 51.0 65.2 56.1 67.2 49.8 1.62 35.7 1.7 Feb-13 (21) 57.8 68.3 54 3.73 37.4 1.7 M ar-13 (22) 59.5 69.3 61.2 70.5 54 0.50 39.1 1.7 Apr-13 (23) 62.9 71.4 54 0.44 40.8 1.7 M ay-13 (24) 64.6 72.4 55 0.76 42.5 1.7 69.7 73.8 56 0.83 44.2 1.7 Jul- 13 (26) 68.0 73.2 Jun-13 (25) 66.3 56 0.41 45.9 1.7 Aug- 13 (27) 71.4 73.8 73.1 57 0.76 47.6 1.7 Sep- 13 (28) 74.8 58 0.73 49.3 1.7 79.9 59.24 1.28 51.0 1.7 Nov- 13 (30) 78.2 Oct- 13 (29) 76.5 63.13 3.89 52.7 1.7 Dec13 (31) 81.6 85.0 64.2 1.07 54.4 1.7 Jan- 14 (32) 83.3 65.2 0.99 56.1 1.7 Feb14 (33) 86.7 67.2 2.03 57.8 1.7 M ar-14 (34) 88.4 91.8 68.3 1.05 59.5 1.7 Apr-14 (35) 90.1 69.3 1.07 61.2 1.7 M ay-14 (36) 93.5 70.5 1.12 62.9 1.7 Jun-14 (37) 95.2 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 19 Note: Since there is no work in the month of December 2014 so IE assumes there is no financial progress during the month as data has not been provided by the Concessionaire. Cumulative Achieved Progress (%) Achieved Monthly Progress (%) Cumulative Scheduled Progress (%) 1.7 Feb-15 (45 Scheduled Monthly Progress (As Per Milestone %) Month 15.54 0.00 3.4 1.7 Jul -11 (2) 0.00 June 11 (1) Cumulative Achieved Progress (%) 8.5 13.6 Achieved Monthly Progress (%) 6.8 19.91 1.7 Month 5.1 19.44 Cumulative Scheduled Progress (%) 3.4 11.9 21.41 1.7 1 1.7 20.51 10.2 24.37 Scheduled Monthly Progress (As Per Milestone %) 0.0 20.0 40.0 60.0 Mile Stone Percentage 80.0 100.0 120.0 FINANCIAL PROGRESS DIAGRAM 63.13 11.2 Financial Financial 59.24 Monthly Report Dec 2014 73.8 71.4 0.98 64.6 1.7 98.8 72.4 1.00 66.3 1.7 Aug- 14 (39) 97.6 Jul- 14 (38) 96.4 73.2 0.74 68.0 1.7 Sep-14 (40) 100.0 73.8 0.65 69.7 1.7 Oct-14 (41) 73.8 0.00 71.4 1.7 Nov-14 (42) 73.8 0.00 73.1 1.7 Dec-14 (43) 74.8 1.7 Jan-15 (44) Monthly Report Dec 2014 11.3 MONITORING OF WORKS 11.3.1 Geological Observations: South Portal – Main Tunnel No excavation North Portal – Main Tunnel No excavation Vertical longitudinal profile along central line & horizontal plan at spring level of Main Tunnel, South Portal For Main Tunnel three drawing has been received, covering the tunnel length of 58.50m only From RD: - 3800.00m to RD: - 3820.00m, RD: - 3880.0m to RD: - 3900.00m and RD: - 3900.00m to RD: - 3918.50m. These results match with the submitted logs of the tunnel and rock mass class is B1 Vertical longitudinal profile along central line & horizontal plan at spring level of Main Tunnel, North Portal For Main Tunnel three drawing has been received, covering the tunnel length of 77.00m only From RD: - 3800.00m to RD: - 3833.00m,RD:- 4072.50m to RD:- 4100.00m and RD:- 4200.00m to RD:4216.50m. These results match with the submitted logs of the tunnel and rock mass class is B1 Vertical longitudinal profile along central line & horizontal plan of the Cross Passage NO.15 excavated from South Portal For Main Tunnel one drawing has been received, covering the tunnel length of 06.80m only From RD: - 00.00m to RD: - 06.80m. These results match with the submitted logs of the tunnel and rock mass class is B1. Vertical longitudinal profile along central line & horizontal plan of the Cross Passage NO.17 excavated from North Portal Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 20 Monthly Report Dec 2014 For Main Tunnel one drawing has been received, covering the tunnel length of 18.50m only From RD: - 00.00m to RD: - 18.50m. These results match with the submitted logs of the tunnel and rock mass class is B1. 3-D Engineering Geological mapping of the Main Tunnel (Top Heading) South Portal. During the month of December 2014, only 58.50m long 3-D Geological Map for excavated from South Portal from RD 3800.00m to RD 3820.00m,RD:- 3880.00m to RD:- 3900.00m and RD:3900.00m to RD:- 3918.50m have been received. These drawings are understandable and match with the geological face logs of the tunnel. The submitted profile has shown B1 rock mass class. 3-D Engineering Geological mapping of the Main Tunnel (Top Heading) North Portal. During the month of December 2014, only 77.00m long 3-D Geological Map for excavated from North Portal from RD 3800.00m to RD 3833.00m,RD:- 4072.50m to RD:- 4100.00m and RD:- 4200m to RD:- 4216.50m have been received. These drawings are understandable and match with the geological face logs of the tunnel. The submitted profile has shown B1 rock mass class. 3-D Engineering Geological mapping of the Cross Passage No.15 excavated from South Portal and Cross Passage No. 17 excavated from North Portal. During the month of December 2014, only 25.30m long 3-D Geological Map for excavated from South Portal from RD 00.00m to RD 6.80m and excavated from North Portal from RD:- 00.00 TO 18.50m have been received. These drawings are understandable and match with the geological face logs of the tunnel. The submitted profile has shown B1 rock mass class. Escape Tunnel As Built Engineering Geological Map of Main Tunnel. During the month of December 2014, only 54 Nos. of drawings have been received from Ch. 1 + 482 to Ch. 3+132 and Ch.8+811 to Ch. 10+461 these drawings are verified and correct. Vertical longitudinal profile along central line & horizontal plan of the Cross Passage NO.18 excavated from North Portal. For Main Tunnel one drawing has been received, covering the tunnel length of 32.60m only From RD: - 00.00m to RD: - 32.60m. These results match with the submitted logs of the tunnel and rock mass class is B1. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 21 Monthly Report Dec 2014 Some of the Drawings are attached in ANNEXURE 2 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 22 Monthly Report Dec 2014 11.3.2 Geotechnical Monitoring (Instrumentation) Convergence Last Maximum Value (mm) Main Tunnel South Portal Limit 20% (96mm) of B1 x x x x x M-S-TM-2387 M-S-TM-2677 M-S-TM-3094 M-S-TM-3261 M-S-TM-3338 Limit 100% of B1 (160mm) x x x x x x x x x x x x M-S-TM-2042 M-S-TM-2141 M-S-TM-2192 M-S-TM-2227 M-S-TM-2252 M-S-TM-2277 M-S-TM-2311 M-S-TM-2376 Limit more than 100% of B1 (mm) x M-S-TM-1785 x M-S-TM-1860 x M-S-TM-1912 x M-S-TM-1930 x M-S-TM-1983 x M-S-TM-2084 x M-S-TM-2297 x M-S-TM-3286 M-S-TM-2398 M-S-TM-2448 M-S-TM-3236 M-S-TM-3305 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 23 Monthly Report Dec 2014 Radial Deformation > 2mm Section Last Updated Support Type M-S-TM-1860 05/12/2014 B1 CS-M-S-TM-1877 05/12/2014 B1 CS-M-S-TM-1895 05/12/2014 B1 M-S-TM-1912 05/12/2014 B1 M-S-TM-1930 05/12/2014 B1 CS-M-S-TM-1947 05/12/2014 B1 CS-M-S-TM-1965 05/12/2014 B1 M-S-TM-1983 05/12/2014 B1 CS-M-S-TM-1998 05/12/2014 B1 CS-M-S-TM-2012 06/12/2014 B1 CS-M-S-TM-2027 06/12/2014 B1 M-S-TM-2042 06/12/2014 B1 CS-M-S-TM-2056 06/12/2014 B1 CS-M-S-TM-2070 06/12/2014 B1 M-S-TM-2084 06/12/2014 B1 CS-M-S-TM-2096 06/12/2014 B1 CS-M-S-TM-2107 06/12/2014 B1 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 24 Monthly Report Dec 2014 CS-M-S-TM-2125 06/21/2014 B1 M-S-TM-2141 06/12/2014 B1 CS-M-S-TM-2157 06/12/2014 B1 M-S-TM-2175 06/12/2014 B1 M-S-TM-2192 06/12/2014 B1 CS-M-S-TM-2209 07/12/2014 B1 M-S-TM-2227 07/12/2014 B1 CS-M-S-TM-2239 07/12/2014 B1 M-S-TM-2252 07/12/2014 B1 M-S-TM-2277 07/12/2014 B1 M-S-TM-2297 07/12/2014 B1 M-S-TM-2297 07/12/2014 B1 M-S-TM-2311 07/12/2014 B1 M-S-TM-2332 07/12/2014 B1 M-S-TM-2357 07/12/2014 B1 M-S-TM-2376 07/12/2014 B1 M-S-TM-2387 07/12/2014 B1 M-S-TM-2398 07/12/2014 B1 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 25 Monthly Report Dec 2014 M-S-TM-2405 07/12/2014 B1 M-S-TM-2418 07/12/2014 B1 M-S-TM-2448 08/12/2014 B1 M-S-TM-2477 08/12/2014 B1 M-S-TM-2499 08/12/2014 B1 M-S-TM-2524 08/12/2014 B1 M-S-TM-2575 08/12/2014 B1 M-S-TM-2600 08/12/2014 B1 M-S-TM-2640 08/12/2014 B1 M-S-TM-2677 08/12/2014 B1 CS-M-S-TM-2688 08/12/2014 B1 M-S-TM-2706 08/12/2014 B1 M-S-TM-2784 09/12/2014 B1 M-S-TM-2847 09/12/2014 B1 M-S-TM-2872 09/12/2014 B1 M-S-TM-2897 09/12/2014 B1 M-S-TM-2925 09/12/2014 B1 M-S-TM-2955 09/12/2014 B1 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 26 Monthly Report Dec 2014 M-S-TM-2976 09/12/2014 B1 M-S-TM-2996 09/12/2014 B1 M-S-TM-3016 09/12/2014 B1 M-S-TM-3069 10/12/2014 B1 M-S-TM-3094 10/12/2014 B1 M-S-TM-3286 10/12/2014 B1 M-S-TM-3296 10/12/2014 B1 M-S-TM-3305 11/12/2014 B1 M-S-TM-3363 11/12/2014 B1 M-S-TM-3587 12/12/2014 B1 M-S-TM-3596 12/12/2014 B1 M-S-TM-3729 03/12/2014 B1 M-S-TM-3748 03/12/2014 B1 M-S-TM-3768 03/12/2014 B1 M-S-TM-3790 03/12/2014 B1 M-S-TM-3810 03/12/2014 B1 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 27 Monthly Report Dec 2014 Convergence Last Maximum Value (mm) Main Tunnel North Portal Limit 20% (96mm) of B1 x ------------------- MN- TM 2770 Limit 20% (72mm) of B1* x Limit 100% of B1 (160mm) MN-TM 1960 Limit 100% of B1* (120mm) x x x x x x Limit more than 100% of B1 (mm) x MN- TM 2700 x NM- TM 2712 Limit more than 100% of B1* (mm) MN- TM 1810 MN- TM 1860 MN- TM 2010 MN- TM 2160 MN- TM 2310 x MN- TM 2680 MN- TM 2660 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 28 Monthly Report Dec 2014 Radial Deformation > 2mm Section last Updated Support Type M-N-TM-2360 10/12/2014 B1* M-N-TM-2660 10/12/2014 B1* M-N-TM-2700 10/12/2014 B1 M-N-TM-2840 17/11/2014 B1 M-N-TM-2865 17/11/2014 B1 M-N-TM-2890 15/11/2014 B1 M-N-TM-3025 28/11/2014 B1 M-N-TM-3052 28/11/2014 B1 M-N-TM-3078 28/11/2014 B1 M-N-TM-3078 28/11/2014 B1 M-N-TM-3575 08/12/2014 B1 M-N-TM-3602 08/12/2014 B1 M-N-TM-3655 08/12/2014 B1 M-N-TM-3683 08/12/2014 B1 M-N-TM-3710 08/12/2014 B1 M-N-TM-3735 08/12/2014 B1 M-N-TM-3790 08/12/2014 B1 M-N-TM-3816 08/12/2014 B1 M-N-TM-4092 02/12/2014 B1 M-N-TM-4118 02/12/2014 B1 M-N-TM-4145 02/12/2014 B1 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 29 Monthly Report Dec 2014 Convergence Last Maximum Value (mm) Escape Tunnel South Portal Limit 20% (48mm) at B1 x x x x ES-TM 3562 ES-TM 3805 ES-TM 4224 ES-TM 4301 Limit 20% (36mm) at B1* x x ES-TM 2540 ES-TM 2856 Limit 20% (72mm) at B2 ------------- Limit 100% of B1 (80mm) x x x x ES-TM 2225 ES-TM 2316 ES-TM 4376 ES-TM 2700 ES-TM 3054 ES-TM 3167 ES-TM 3220 Limit 100% of B2 (120 mm) --------------------- Limit 20% (24mm) at A2 -------- x ES-TM 2066 x ES-TM 2264 ES-TM 2370 Limit 100% of B1* (60mm) x x x x Limit more than 100% of B1 (mm) Limit 100% of A2 (40 mm) ------------- Limit more than 100% of B1* (mm) x x x x x x x x x ES-TM 1907 ES-TM 1960 ES-TM 2012 ES-TM 2119 ES-TM 2175 ES-TM 2752 ES-TM 2803 ES-TM 3007 ES-TM 3107 Limit more than 100% of B2 (mm) x ES-TM 1852 Limit more than 100% of AB2 (mm) ------------ Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 30 Monthly Report Dec 2014 Radial Deformation > 2mm Section last Updated support Type E-S-TM-1955 06/12/2014 B1* E-S-TM-1960 09/11/2014 B1* E-S-TM-2066 06/12/2014 B1* E-S-TM-2119 06/12/2014 B1* E-S-TM-2175 06/12/2014 B1* E-S-TM-2225 06/12/2014 B1 CS-E-S-TM-2245 07/12/2014 B1* E-S-TM-2264 07/12/2014 B1 CS-E-S-TM-2345 07/12/2014 B1 E-S-TM-2370 07/12/2014 B1 CS-E-S-TM-2378 07/12/2014 B1 E-S-TM-2435 07/12/2014 B1* CS-E-S-TM-2460 08/12/2014 B1* E-S-TM-2856 08/12/2014 B1* E-S-TM-3054 09/12/2014 B1* E-S-TM-3537 10/12/2014 B1 E-S-TM-3920 11/12/2014 B1 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 31 Monthly Report Dec 2014 E-S-TM-4010 13/12/2014 B1 E-S-TM-4034 13/12/2014 B1 E-S-TM-4061 13/12/2014 B1 E-S-TM-4275 04/12/2014 B1 Convergence Last Maximum Value (mm) Escape Tunnel North Portal Limit 20% (48mm) at B1 ---------------- Limit 20% (36mm) at B1* Limit 100% of B1 (80mm) -----------Limit 20% (24mm) of A2* ------------------ ---------- x EN-TM 3651 x EN-TM 3680 Limit 100% of B1* (60mm) x EN-TM 2225 x EN-TM 2750 Limit 20% (72mm) at B2 Limit more than 100% of B1 (mm) Limit 100% of B2 (120mm) ----Limit 100% of A2 (40mm) -------- Limit more than 100% of B1* (mm) x x x x x x x x EN-TM 2125 EN-TM 2175 EN-TM 2390 EN-TM 2500 EN-TM 2600 EN-TM 2700 EN-TM 2720 EN-TM 3000 Limit more than 100% of B2 (mm) ----Limit more than 100% of A2 (mm) -------- Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 32 Monthly Report Dec 2014 Radial Deformation > 2mm Section last Updated Support Type E-N-TM2650 30/11/2014 B1* E-N-TM2750 19/11/2014 B1* CS-E-N-TM2971 12/12/2014 B1* E-N-TM3000 13/12/2014 B1* E-N-TM3050 13/12/2014 B1* E-N-TM3057 13/12/2014 B1* E-N-TM3100 13/12/2014 B1 E-N-TM3130 13/12/2014 B1 E-N-TM3275 03/12/2014 B1 E-N-TM3330 03/12/2014 B1 E-N-TM3355 21/11/2014 B1 E-N-TM3480 21/11/2014 B1 E-N-TM3559 21/11/2014 B1 E-N-TM3590 21/11/2014 B1 E-N-TM4310 11/11/2014 B1 E-N-TM4339 11/11/2014 B1 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 33 Monthly Report Dec 2014 It has to be noted that last monitoring report received from the Concessionaire/Contractor/Designer side is the Report week 50, from 08/12/2014 to 15/12/2014. From 19th December no further data regarding geotechnical instrumentation and targets monitoring has been received from the Concessionaire, to who IE have advised to submit. 11.3.3 Tunnel works monitoring SOUTH PORTAL Tunnel Excavation in mtrs. Tunnel Meter S.No. Location Monthly Progress Cumulative Initial Final Targets* Achieved Targets* Achieved % age Progress* 1 MT (Heading) 3857.0 3857.0 100 0.00 4495.0 3857.0 85.8 2 MT (Benching) 3118.9 3132.4 415 0.00 3973.0 3132.4 78.8 3 ET 4573.0 4573.0 Break Through 4573.0 4573.0 100.0 4 Cross Passage 459.1 459.1 14 Nos completed 459.10 459.10 100.0 Note: * As per construction program Rev. 17 Other Works: No. of Bolts S.No. Location No. of Pullout Test IBO SWX IBO SWX Shotcrete in Cumul. Ground Beam m Final Lining Ventilation Slab Mts Con Cum Mts CUM 0 1572.8 1 Main Tunnel 0 0 0 0 NIL 0.00 0.00 1699.0 2 Escape Tunnel 0 0 0 0 NIL 0.00 0.00 1794.1 NIL 3 Cross Passage 0 0 0 0 NIL 0.00 0.0 28.4 NIL Rock Classification: • Main Tunnel - B1 • Escape Tunnel - B1 – Breakthrough on 2nd June 2014. In following graphics are displayed daily progress (meter achieved in left axis) and cumulated progress up to complete month (meters achieved in right axis), for Main Tunnel, top heading (HD) and bench (BEN), and Cross Passages. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 34 0.0 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. 31/12/2014 30/12/2014 29/12/2014 28/12/2014 27/12/2014 26/12/2014 25/12/2014 24/12/2014 23/12/2014 22/12/2014 21/12/2014 20/12/2014 19/12/2014 18/12/2014 17/12/2014 16/12/2014 15/12/2014 14/12/2014 13/12/2014 12/12/2014 11/12/2014 10/12/2014 09/12/2014 31/12/2014 30/12/2014 29/12/2014 28/12/2014 27/12/2014 26/12/2014 25/12/2014 24/12/2014 23/12/2014 22/12/2014 21/12/2014 20/12/2014 19/12/2014 18/12/2014 17/12/2014 16/12/2014 15/12/2014 14/12/2014 13/12/2014 12/12/2014 11/12/2014 10/12/2014 09/12/2014 08/12/2014 07/12/2014 06/12/2014 05/12/2014 04/12/2014 03/12/2014 02/12/2014 01/12/2014 DAILY (m) DAYS 15.0 MTD 120.0 10.0 100.0 80.0 5.0 60.0 0.0 1.0 Series1 0.6 Series4 0.5 200.0 0.4 150.0 0.3 0.2 100.0 0.1 50.0 0.0 DATE Page 35 MONTHLY (m) 20.0 MONTHLY (m) Series3 08/12/2014 0.8 07/12/2014 Series2 06/12/2014 0.9 05/12/2014 04/12/2014 0.7 03/12/2014 02/12/2014 01/12/2014 DAILY (m) Monthly Report Dec 2014 MAIN TUNNEL - SOUTH PORTAL - HD 200.0 180.0 160.0 140.0 40.0 20.0 0.0 DATE MAIN TUNNEL - SOUTH PORTAL - BEN 350.0 300.0 250.0 Monthly Report Dec 2014 NORTH PORTAL Tunnel Excavation in Mtrs. Tunnel Meter Monthly Progress Cumulative Location S.No. Initial Final 3976.5 3976.5 1 MT (Heading) 2 MT (Benching) 3392.0 3392.0 3 ET 4393.0 4393.0 4 Cross Passage 442.98 446.48 Targets* Target 0 Completed 25 0 Break Through Target Completed Achieved % age Progress 4473.0 3976.5 88.9 4473.0 3392.0 75.8 4393.0 4393.0 100.0 486.4 446.48 91.8 Achieved Targets* 0 Note: * As per construction program Rev. 17 Other Works: No. of Bolts S.No. No. of Pullout Test Location IBO SWX IBO SWX Final Lining Shotcrete in Cum. Ground Beam.m Ventilation Slab Mts Con Cum Mts CUM 0.00 1510.8 1 Main Tunnel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1655.5 2 Escape Tunnel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2163.0 NIL 3 Cross Passage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.50 NIL Rock Classification: x Main Tunnel - x Escape Tunnel - Breakthrough. B1 / B2 (With Lattice girder) Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 36 DAILY (m ) 35.0 6.0 30.0 5.0 25.0 4.0 20.0 3.0 15.0 2.0 10.0 1.0 5.0 0.0 0.0 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. 31/12/2014 30/12/2014 29/12/2014 28/12/2014 27/12/2014 26/12/2014 25/12/2014 24/12/2014 23/12/2014 22/12/2014 21/12/2014 20/12/2014 19/12/2014 18/12/2014 17/12/2014 16/12/2014 15/12/2014 14/12/2014 13/12/2014 12/12/2014 11/12/2014 10/12/2014 09/12/2014 08/12/2014 07/12/2014 31/12/2014 30/12/2014 29/12/2014 28/12/2014 27/12/2014 26/12/2014 25/12/2014 24/12/2014 23/12/2014 22/12/2014 21/12/2014 20/12/2014 19/12/2014 18/12/2014 17/12/2014 16/12/2014 15/12/2014 14/12/2014 13/12/2014 12/12/2014 11/12/2014 10/12/2014 09/12/2014 08/12/2014 07/12/2014 31/12/2014 30/12/2014 29/12/2014 28/12/2014 27/12/2014 26/12/2014 25/12/2014 24/12/2014 23/12/2014 22/12/2014 21/12/2014 20/12/2014 19/12/2014 18/12/2014 17/12/2014 16/12/2014 15/12/2014 14/12/2014 13/12/2014 12/12/2014 11/12/2014 10/12/2014 09/12/2014 08/12/2014 07/12/2014 06/12/2014 05/12/2014 04/12/2014 03/12/2014 02/12/2014 DAYS 0.7 MTD 140.0 0.6 120.0 0.5 100.0 0.4 80.0 0.3 60.0 0.2 40.0 0.1 20.0 0.0 0.0 1.0 Series1 0.6 Series4 0.5 200.0 0.4 150.0 0.3 100.0 0.1 10.0 9.0 DAYS 45.0 8.0 MTD 40.0 DATE Page 37 MONTHLY (m) 0.9 MONTHLY (m) Series3 06/12/2014 0.8 06/12/2014 Series2 05/12/2014 0.9 05/12/2014 0.7 04/12/2014 03/12/2014 01/12/2014 0.8 04/12/2014 03/12/2014 02/12/2014 DAILY (m) 1.0 MONTHLY (m) 7.0 02/12/2014 01/12/2014 0.0 01/12/2014 DAILY (m) Monthly Report Dec 2014 MAIN TUNNEL - NORTH PORTAL - HD 200.0 180.0 160.0 DATE MAIN TUNNEL - NORTH PORTAL - BEN 350.0 300.0 250.0 0.2 50.0 0.0 DATE CROSS PASSAGE - NORTH PORTAL 50.0 Monthly Report Dec 2014 To finish chapter of Tunnel works monitoring, it has been included in following graphs the total daily progress of excavation (both Portals) and summary of monthly progress. 31/12/2014 30/12/2014 29/12/2014 28/12/2014 27/12/2014 26/12/2014 25/12/2014 24/12/2014 23/12/2014 ESC. TUN. 22/12/2014 21/12/2014 20/12/2014 19/12/2014 TOTAL FTD 18/12/2014 M. T. (BEN) CROSS PASSAGE 17/12/2014 M. T. (Hd) 16/12/2014 15/12/2014 14/12/2014 13/12/2014 12/12/2014 11/12/2014 10/12/2014 09/12/2014 08/12/2014 07/12/2014 06/12/2014 05/12/2014 04/12/2014 03/12/2014 02/12/2014 01/12/2014 DAILY (m ) PATNITOP TUNNEL - DAILY REPORT 1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 DATE CHENANI-NASHARI TUNNEL - MONTHLY REPORT M. T. (Hd) 0.00 M. T. (BEN) 0.00 ESC. TUN. 0.00 CROSS PASSAGE 0.00 TOTAL FTD 0.00 0 100 200 300 400 500 600 700 800 900 1000 1100 MONTHLY (m) Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 38 Activity 5 MTRoadworkinsidetunnel 4 MTFinalLining 3 Waterproofing 2 MTBenching 1 MTHeading S.NO. 0.00 8966 Mtrs Target Achieved 3354.20 8966 Target Achieved 3742.00 Mtrs 8966 * Achieved Target 6524.40 Achieved Mtrs 8966 Target 7833.60 Mtrs Mtrs * * Achieved Target 8966 88.50 11.00 237.00 180.00 150.00 30.00 30.00 120.40 270.50 292.00 311.50 314.40 277.90 294.80 11.00 237.00 180.00 150.00 150.00 150.00 166.00 270.50 292.00 311.50 555.00 495.00 525.00 108.00 186.00 218.00 88.00 55.00 70.00 125.00 238.00 447.00 332.00 226.00 181.00 445.00 150.40 228.40 260.40 130.40 97.40 112.40 167.40 280.40 489.40 374.40 525.00 300.00 637.00 0.00 3.00 7.00 56.00 105.50 184.00 188.25 224.25 213.50 253.25 129.50 216.50 208.70 308.00 335.00 275.00 312.00 207.50 237.50 242.00 110.75 101.75 116.00 39.00 109.00 70.00 41.10 47.80 233.90 146.00 185.50 177.00 134.75 0.00 5.00 9.00 40.00 101.00 126.75 128.75 158.25 216.75 236.25 249.75 147.25 151.75 172.75 222.75 216.75 236.75 274.25 211.75 248.75 230.75 211.75 191.75 86.75 236.75 199.25 224.25 186.75 248.75 184.75 174.25 249.25 224.25 287.50 1.00 47.60 93.60 212.30 204.80 179.20 155.50 249.50 255.00 258.00 261.00 337.00 397.90 331.50 385.50 267.00 310.50 359.30 285.90 314.50 84.50 48.00 52.00 0.00 11.50 125.00 99.50 126.00 193.00 251.00 227.50 279.00 293.00 270.00 2.00 46.00 93.00 211.00 202.00 185.00 153.50 231.50 174.50 183.00 215.00 220.50 247.50 238.00 311.00 306.00 337.50 375.00 284.00 300.00 125.00 125.00 120.00 87.50 125.00 150.00 150.00 150.00 230.50 242.00 232.50 200.00 200.00 265.00 unit TotalQuantity Aug11 Sep11 Oct11 Nov11 Dec11 Jan12 Feb12 Mar12 Apr12 May12 Jun12 Jul12 Aug12 Sep12 Oct12 Nov12 Dec12 Jan13 Feb13 Mar13 Apr13 May13 Jun13 Jul13 Aug13 Sep13 Oct13 Nov13 Dec13 Jan14 Feb14 Mar14 Apr14 May14 Jun14 224.50 495.00 305.00 649.00 208.00 265.00 258.00 337.50 Jul14 292.20 540.00 260.00 650.00 278.40 312.50 132.50 400.00 250.30 480.00 233.00 564.00 320.50 287.50 192.50 315.00 Aug14 Sep14 67.70 600.00 149.00 300.00 242.50 350.00 174.50 375.00 Oct14 0.00 420.00 76.00 540.00 154.00 400.00 109.50 325.00 0.00 420.00 0.00 200.00 13.50 225.00 0.00 397.00 Nov14 0.00 480.00 0.00 610.00 0.00 440.00 0.00 100.00 Dec14 Monthly Report Dec 2014 PHYSICAL PROGRESS CHARTS Main Tunnel Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 39 Activity 4 ETRoadworkinsidetunnel 3 ETFinalLining 2 Waterproofing 1 ETExcavation S.NO. 0.00 8966 Mtrs Target Achieved 3957.50 Achieved 8966 Target Mtrs 4093.00 Achieved 268 268 133 133 339 345 257 250 154 154 331 330 330 330 406 389 345 346.40 406 500.00 450.00 440.00 30.00 286.00 132.00 350.00 270.00 131.00 345.00 350.00 484.00 347.00 330.00 315.00 30.00 286.00 250.00 350.00 270.00 130.00 480.00 420.00 484.00 446.00 500.00 580.00 8966 Mtrs 35.00 86.00 168.00 229.50 305.00 294.00 263.00 309.00 305.50 303.50 225.00 274.00 300.00 275.00 322.00 322.00 320.00 330.00 281.00 286.00 286.00 250.00 260.00 235.00 250.00 235.00 250.00 223.50 320.00 308.00 315.00 360.00 310.00 130.00 Target 8966 8966.00 31.00 94.00 162.00 229.50 312.50 283.00 263.20 283.60 358.00 331.00 332.70 477.00 428.00 394.50 401.00 352.00 443.50 400.00 322.50 327.50 135.00 112.50 124.50 77.50 55.50 159.50 148.30 177.20 318.00 284.00 303.50 288.00 287.50 266.00 Mtrs Achieved * Target unit TotalQuantity Aug11 Sep11 Oct11 Nov11 Dec11 Jan12 Feb12 Mar12 Apr12 May12 Jun12 Jul12 Aug12 Sep12 Oct12 Nov12 Dec12 Jan13 Feb13 Mar13 Apr13 May13 Jun13 Jul13 Aug13 Sep13 Oct13 Nov13 Dec13 Jan14 Feb14 Mar14 Apr14 May14 298.70 420.00 245.00 545.00 2.50 Jun14 151.50 480.00 177.00 555.00 Jul14 118.50 480.00 164.00 550.00 Aug14 Oct14 75.00 600.00 86.00 480.00 15.10 540.00 51.00 570.00 Breakthroughon2ndJune2014 Sep14 0.00 540.00 0.00 590.00 Nov14 0.00 600.00 0.00 475.00 Dec14 Monthly Report Dec 2014 Escape Tunnel Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 40 Excavation Waterproofing FinalLining Roadworkinsidetunnel 2 3 4 Activity 1 S.NO. Mtrs 0.00 946 Target Achieved 41.90 Achieved 946 Target Mtrs 194.85 Achieved 946 Target Mtrs 905.55 Mtrs 946 71.20 70.15 36.40 54.40 56.40 54.40 34.30 74.40 0.00 86.40 28.40 60.40 28.40 28.40 44.40 52.40 67.30 9.1 71.3 37.6 205.5 42.75 33.00 63.50 77.65 35.62 45.50 34.50 45.50 37.15 25.50 2.50 38.50 24.00 47.50 42.70 42.70 39.00 84.79 65.29 56.00 8.00 unit TotalQuantity Oct12 Nov12 Dec12 Jan13 Feb13 Mar13 Apr13 May13 Jun13 Jul13 Aug13 Sep13 Oct13 Nov13 Dec13 Jan14 Feb14 Mar14 Apr14 Achieved Target 0.00 136.00 28.00 136.00 16.50 33.63 May14 8.10 68.00 19.65 68.00 54.25 Jun14 8.70 102.00 38.65 68.00 0.00 Jul14 Sep14 Oct14 6.00 34.00 13.65 34.00 3.65 0.00 68.00 23.65 68.00 0.00 10.00 68.00 33.65 68.00 0.00 TargetCompleted Aug14 0.00 34.00 0.00 68.00 3.50 Nov14 0.00 68.00 0.00 68.00 0.00 Dec14 Monthly Report Dec 2014 Cross Passages Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 41 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 42 ELECTRICAL AND MECHANICAL INSTALLATION (BENCHING) (HEADING) (BENCHING) (HEADING) FINAL LINING INTIALLINING EXCAVATION PROGRESS IN METERS ELECTRICAL AND MECHANICAL INSTALLATION (BENCHING) (HEADING) (BENCHING) (HEADING) FINAL LINING INTIALLINING EXCAVATION NORTH PORTAL PROGRESS IN METERS ELECTRICAL AND MECHANICAL INSTALLATION (BENCHING) (HEADING) (BENCHING) (HEADING) FINAL LINING INTIALLINING EXCAVATION PROGRESS IN METERS ELECTRICAL AND MECHANICAL INSTALLATION (BENCHING) FINAL LINING (HEADING) 400 2600 350 2600 2550 300 2550 250 2500 2450 200 2450 2400 150 2400 100 2350 2300 50 2300 2250 0 2250 0 50 2350 100 150 200 2500 250 300 350 2650 400 450 500 550 600 650 700 750 3050 800 MAIN TUNNEL LINEAR PROGRESS CHART 3100 850 3150 900 950 3200 3250 1000 3300 1050 3350 1100 3400 1150 3450 1200 3500 1250 3550 1300 1350 3600 1400 1450 1550 1650 1700 1800 4150 4400 2150 4400 4350 2100 4350 4300 2050 4300 MAIN TUNNEL LINEAR PROGRESS CHART 800 3050 1200 3450 INTIALLINING 2700 450 2700 2650 850 3100 1250 3500 (BENCHING) 2750 500 2750 900 3150 1300 3550 (HEADING) 2800 550 2800 950 3200 1350 3600 3650 3700 3800 1600 3850 3900 1750 4050 1850 4100 1900 4200 1950 4250 4450 2200 PROGRESS DIAGRAM OF CHENANI - NASHRI TUNNELWAY (NH1A). (IE/NHDP-Phase-II/BOT/V/J&K) 2850 600 2850 1000 3250 1400 3650 EXCAVATION MAIN CARRIAGEWAY 2900 650 2900 1050 3300 1450 3700 1500 3750 1650 3900 1850 4100 SOUTH PORTAL RIGHT MAIN CARRIAGEWAY 2950 700 2950 1100 3350 1500 3950 1700 3950 1900 4150 PROGRESS IN METERS LEFT MAIN CARRIAGEWAY RIGHT MAIN CARRIAGEWAY 3000 750 3000 1150 3400 1550 3800 3750 4000 1750 1950 4200 1600 3850 1800 4050 4000 2000 4250 2250 4500 4450 2000 2050 2100 2150 2200 4500 2250 STRIP CHART OF BOTH TUNNELS Monthly Report Dec 2014 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 43 ELECTRICAL AND MECHANICAL INSTALLATION PAVEMENT FINAL LINING INTIAL LINING EXCAVATION (FULL FACE) PROGRESS IN METERS ELECTRICAL AND MECHANICAL INSTALLATION PAVEMENT FINAL LINING INTIAL LINING EXCAVATION (FULL FACE) PROGRESS IN METERS NORTH PORTAL ELECTRICAL AND MECHANICAL INSTALLATION PAVEMENT FINAL LINING INTIAL LINING EXCAVATION (FULL FACE) PROGRESS IN METERS ELECTRICAL AND MECHANICAL INSTALLATION PAVEMENT 300 2550 250 2500 50 100 150 200 250 2500 2550 300 2600 350 400 450 500 550 2850 600 2900 650 700 2950 3000 750 ESCAPE TUNNEL LINEAR PROGRESS CHART 3050 800 3100 850 900 950 1000 ESCAPE TUNNEL LINEAR PROGRESS CHART 850 3100 3150 3200 1050 1100 3350 1150 1200 1300 1350 1400 1450 1500 1550 1600 PROGRESS DIAGRAM OF CHENANI - NASHRI TUNNEL WAY (NH1A). (IE/NHDP-Phase-II/BOT/V/J&K) 350 2600 900 3150 0 2250 2650 400 2650 950 3200 3250 3300 3400 3450 1250 3500 3750 1500 3750 2000 4250 FINAL LINING 0 2250 2300 2700 450 2700 1000 3250 1250 3500 3550 3800 1550 3800 2050 4300 INTIAL LINING 50 2300 2350 2750 500 1050 3300 1300 3550 3600 3850 1600 3850 4050 1800 4050 2100 4350 EXCAVATION (FULL FACE) 100 2350 2400 2450 2800 550 2800 2750 700 2950 1100 3350 1350 3600 3650 3700 3900 1650 3900 1650 1700 3950 4000 4100 1850 4100 2150 4400 PROGRESS IN METERS 150 600 750 1150 3400 1400 1700 1900 4150 2200 4450 SOUTH PORTAL 200 2450 2400 650 2900 2850 800 3050 3000 1200 3450 1450 3700 3650 1750 4000 3950 1950 4200 2250 4500 1750 1800 1850 4150 1900 1950 4200 4250 2000 2050 4300 2100 4350 2150 4400 2200 4450 4500 2250 Monthly Report Dec 2014 Monthly Report Dec 2014 STRIP CHART OF CROSS PASSAGES PROGRESS DIAGRAM OF CHENANI - NASHRI TUNNEL WAY (NH1A). (IE/NHDP-Phase-II/BOT/V/J&K) 946 900 850 800 750 700 650 600 550 500 450 400 350 300 250 150 100 50 0 PROGRESS IN METERS 200 CROSS PASSAGE LINEAR PROGRESS CHART SOUTH & NORTH PORTAL EXCAVATION (FULL FACE) INTIAL LINING FINAL LINING PAVEMENT ELECTRICAL AND MECHANICAL INSTALLATION 11.3.4 DUMP AREA AND APPROACH ROAD Dump Area: South: No Work for the construction of R.C.C wall at South dumps area during the month of December. 60+000-260+000: R.C.C wall up to 4.0 m height completed. North: Gabion wall at North Portal Dumping yard collapsed for 24.0 m approx. from Ch. 533+000 – 557+000. Revised design is still awaited by IE for their review. Only retaining solution affecting highway or new alignment of existing highway has been submitted and reviewed. 0-75 m: R.C.C wall up to 4.0 m height completed No work has been done in the month of December Approach Road: South: Alignment drawing of South approach road a gradient of 7 % is given which is more than required 5% as per IRC and needs to be revised and advised to submit it along with cross section at every 10 m. No Earthwork has been done during the month December. North: Alignment drawing reviewed by I.E. with some comments, revised drawing after incorporation by Concessionaire has not been received till date. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 44 Monthly Report Dec 2014 ROAD LINER PROGRESS CHART Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 45 Monthly Report Dec 2014 12. QUALITY CONTROL AND TESTING OF MATERIALS. 12.1 UPTO DATE STATUS OF THE TESTS. 17.0 Up to Date Status of the Tests Up to December 2014 UPTO DATE STATUS For the month December 2014 S. No Name of the Tests Total no. No. of No. of of Tests Tests Tests Required Performed Passed Cumulative upto December 2014 No. of Tests Failed Total no. of Tests Required No. of Tests Passed No. of Tests Failed Shortcrete / Concrete / Course Aggregate 1 a Gradation 0 0 0 0 578 4883 34 b FI + EI 0 0 0 0 313 702 0 c AIV 0 0 0 0 320 477 0 d Specific gravity 0 0 0 0 13 13 0 e Moisture Content 0 0 0 0 4825 5929 0 g Crushing value 0 0 0 0 165 351 0 h Log Angles 0 0 0 0 167 326 0 a Gradation 0 0 0 0 728 1825 68 b Moisture content 0 0 0 0 5585 7661 0 c Specific Gravity 0 0 0 0 10 10 0 Fine Aggregate 2 Cement Ambuja 53 Grade 3 a Fineness 0 0 0 0 126 126 0 b IST & FST 0 0 0 0 126 126 0 c Soundness 0 0 0 0 126 126 0 d Consistency 0 0 0 0 126 126 0 Cement Cube Strength 4 a 03 days 0 0 0 0 366 366 0 b 07 days 0 0 0 0 372 372 0 c 28 days 0 0 0 0 375 375 0 2200 2200 0 Pullout Testing 5 Pullout Test for Rock Bolts at North/South Portals 0 07 Days 0 0 0 0 3927 3927 0 28 Days 0 0 0 0 9880 9880 0 07 Days 0 0 0 0 78 78 0 28 Days 0 0 0 0 303 303 0 07 Days 0 0 0 0 5862 5862 0 28 Days 0 0 0 0 22940 22940 0 07 Days 0 0 0 0 1449 1449 0 28 Days 0 0 0 0 3922 3922 0 07 Days 0 0 0 0 192 192 0 28 Days 0 0 0 0 652 652 39 07 Days 0 0 0 0 42 42 0 28 Days 0 0 0 0 108 108 0 4379 39 6 a Action taken in case of Failied Tests./Remarks 0 0 0 Concrete Cube's Compressive Strength Test M15 b M25 c M30 d M35 e M40 f M45 Insitu Cores Compressive Strength Test 7 Insitu Cores Compressive Strengthat North/South Portals 0 0 0 0 4418 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 46 Monthly Report Dec 2014 12.2 TEST RESULT OF CONCRETE CORES AND CUBES. DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF DECEMBER 2014. SOUTH PORTAL DATE 1-Dec-14 2-Dec-14 3-Dec-14 4-Dec-14 5-Dec-14 6-Dec-14 7-Dec-14 8-Dec-14 9-Dec-14 10-Dec-14 11-Dec-14 12-Dec-14 13-Dec-14 14-Dec-14 15-Dec-14 16-Dec-14 17-Dec-14 18-Dec-14 19-Dec-14 20-Dec-14 21-Dec-14 22-Dec-14 23-Dec-14 24-Dec-14 25-Dec-14 26-Dec-14 27-Dec-14 28-Dec-14 29-Dec-14 30-Dec-14 Total INSITU CORES Pass 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Fail 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PANEL CASTED 1 days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Remarks 28 days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 47 Monthly Report Dec 2014 DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF DECEMBER 2014. NORTH PORTAL INSITU CORES PANEL CASTED DATE 1-Dec-14 2-Dec-14 3-Dec-14 4-Dec-14 5-Dec-14 6-Dec-14 7-Dec-14 8-Dec-14 9-Dec-14 10-Dec-14 11-Dec-14 12-Dec-14 13-Dec-14 14-Dec-14 15-Dec-14 16-Dec-14 17-Dec-14 18-Dec-14 19-Dec-14 20-Dec-14 21-Dec-14 22-Dec-14 23-Dec-14 24-Dec-14 25-Dec-14 26-Dec-14 27-Dec-14 28-Dec-14 29-Dec-14 30-Dec-14 Total Remarks Pass Fail 1 days 7 days 28 days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 48 Monthly Report Dec 2014 DETAILS OF CUBES TESTED IN THE MONTH OF DECEMBER 2014. NORTH PORTAL Grout Cube Testing DATE Remarks 3 days 7 days 28 days 1-Dec-14 0 0 0 2-Dec-14 0 0 0 3-Dec-14 0 0 0 4-Dec-14 0 0 0 5-Dec-14 0 0 0 6-Dec-14 0 0 0 7-Dec-14 0 0 0 8-Dec-14 0 0 0 9-Dec-14 0 0 0 10-Dec-14 0 0 0 11-Dec-14 0 0 0 12-Dec-14 0 0 0 13-Dec-14 0 0 0 14-Dec-14 15-Dec-14 0 0 0 0 0 0 16-Dec-14 0 0 0 17-Dec-14 0 0 0 18-Dec-14 0 0 0 19-Dec-14 0 0 0 20-Dec-14 0 0 0 21-Dec-14 0 0 0 22-Dec-14 0 0 0 23-Dec-14 0 0 0 24-Dec-14 0 0 0 25-Dec-14 0 0 0 26-Dec-14 0 0 0 27-Dec-14 0 0 0 28-Dec-14 0 0 0 29-Dec-14 0 0 0 30-Dec-14 0 0 0 Total 0 0 0 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 49 Monthly Report Dec 2014 DETAILS OF CUBES TESTED IN THE MONTH OF DECEMBER 2014. SOUTH PORTAL Grout Cube Testing DATE Remarks 3 days 7 days 28 days 1-Dec-14 0 0 0 2-Dec-14 0 0 0 3-Dec-14 0 0 0 4-Dec-14 0 0 0 5-Dec-14 0 0 0 6-Dec-14 0 0 0 7-Dec-14 8-Dec-14 0 0 0 0 0 0 9-Dec-14 0 0 0 10-Dec-14 0 0 0 11-Dec-14 0 0 0 12-Dec-14 0 0 0 13-Dec-14 0 0 0 14-Dec-14 15-Dec-14 0 0 0 0 0 0 16-Dec-14 0 0 0 17-Dec-14 0 0 0 18-Dec-14 0 0 0 19-Dec-14 0 0 0 20-Dec-14 0 0 0 21-Dec-14 0 0 0 22-Dec-14 0 0 0 23-Dec-14 0 0 0 24-Dec-14 0 0 0 25-Dec-14 0 0 0 26-Dec-14 0 0 0 27-Dec-14 0 0 0 28-Dec-14 0 0 0 29-Dec-14 0 0 0 30-Dec-14 0 0 0 Total 0 0 0 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 50 Monthly Report Dec 2014 DETAILS OF CUBES TESTED IN THE MONTH OF DECEMBER 2014. SOUTH PORTAL Concrete Cube’s Compressive Strength Remarks M 15 DATE 7 Days M25 28 28 7 Day Day Days s s 0 0 0 M35 M30 7 Day s 0 7 28 Day Days s 0 0 M45 M40 28 Days 7 Days 0 0 7 28 28 Day Days Days s 0 0 0 1-Dec-14 0 2-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 3-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 4-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 5-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 6-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 7-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 8-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 9-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 10-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 11-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 12-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 13-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 14-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 15-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 16-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 17-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 18-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 19-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 20-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 21-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 22-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 23-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 24-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 25-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 26-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 27-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 28-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 29-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 30-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 51 Monthly Report Dec 2014 DETAILS OF CUBES TESTED IN THE MONTH OF DECEMBER 2014. NORTH PORTAL Concrete Cube’s Compressive Strength Remarks M 15 DATE M25 28 7 Days Days 0 0 1-Dec-14 7 Days 0 28 Days 0 2-Dec-14 0 0 0 3-Dec-14 0 0 0 4-Dec-14 0 0 5-Dec-14 0 0 6-Dec-14 0 7-Dec-14 8-Dec-14 M35 M30 7 Days 0 28 Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9-Dec-14 0 0 0 10-Dec-14 0 0 11-Dec-14 0 0 12-Dec-14 0 13-Dec-14 14-Dec-14 M45 M40 7 28 Days Days 0 0 7 Days 0 28 Days 0 7 28 Days Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 16-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 17-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 18-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 19-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 20-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 21-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 22-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 23-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 24-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 25-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 26-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 27-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 28-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 29-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 30-Dec-14 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cube testing No Testing develop during this month due to the stoppage of work. (ANNEXURE 3.) Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 52 Monthly Report Dec 2014 12.4 DETAILS OF AGGREGATES TESTING DETAILS OF TESTING IN THE MONTH OF DECEMBER 2014. SOUTH PORTAL DATE 1-Dec-14 2-Dec-14 3-Dec-14 4-Dec-14 5-Dec-14 6-Dec-14 7-Dec-14 8-Dec-14 9-Dec-14 10-Dec-14 11-Dec-14 12-Dec-14 13-Dec-14 14-Dec-14 15-Dec-14 16-Dec-14 17-Dec-14 18-Dec-14 19-Dec-14 20-Dec-14 21-Dec-14 22-Dec-14 23-Dec-14 24-Dec-14 25-Dec-14 26-Dec-14 27-Dec-14 28-Dec-14 29-Dec-14 30-Dec-14 Total MOISTURE CONTENT % GRADATION 10 & 20 mm Crusher Dust Sand 10 mm Crusher Dust 20 mm Sand Combined F.I AIV 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 53 Monthly Report Dec 2014 DETAILS OF TESTING IN THE MONTH OF DECEMBER 2014. NORTH PORTAL MOISTURE CONTENT % GRADATION DATE 10 & 20 mm Crusher Dust Sand 10 mm Crusher Dust 20 mm Sand Combined F.I AIV 1-Dec-14 0 0 0 0 0 0 0 0 0 0 2-Dec-14 0 0 0 0 0 0 0 0 0 0 3-Dec-14 4-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5-Dec-14 0 0 0 0 0 0 0 0 0 0 6-Dec-14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7-Dec-14 8-Dec-14 9-Dec-14 10-Dec-14 11-Dec-14 12-Dec-14 13-Dec-14 14-Dec-14 15-Dec-14 16-Dec-14 17-Dec-14 18-Dec-14 19-Dec-14 20-Dec-14 21-Dec-14 22-Dec-14 23-Dec-14 24-Dec-14 25-Dec-14 26-Dec-14 27-Dec-14 28-Dec-14 29-Dec-14 30-Dec-14 Total Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 54 Monthly Report Dec 2014 13. SAFETY REPORT S.no. Particulars Up to last Month Current Month Cumulative 25524385 0 25524385 43136 0 43136 1 Total Man- hours worked 2 Average No. of Employees 3 Incidents 73 0 73 4 Environment Incidents 0 0 0 5 Training (Man hours) 991519 0 991519 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 55 Monthly Report Dec 2014 14 MINUTES OF MONTHLY MEETING No Monthly Meeting held from last Four months. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 56 Monthly Report Dec 2014 15 BRIEF COMMENTS FROM ALL KEY PROFESSIONALS REGARDING CRUCIAL ISSUES AND PROGRESS OF WORK. Geological: During the month of December 2014, this office had received 46 number as built Engineering Geological Drawings for their review. These drawings were reviewed and most of them were found correct .Wherever some correction was needed, it was pointed out and got it corrected. From these drawings, smooth Tunneling conditions were intercepted without incursion of groundwater as anticipated. No spalling or Overbreak was noticed in these drawings and timely support system is being provided to the excavated sections. The rocks and their structural discontinuities with respect to Tunnel Alignment have been found favorable and such combination seems to continue further also with the progressive excavation of Tunnels. Tunnel Lining and Tunnel Excavation: Final lining in Main Tunnel and Escape Tunnel is lagging behind and no work has been done in the month of December. The issue has been discussed in several meeting but still no progress has been achieved except bring one formwork for final lining Gantry in North Portal. Finishing of lining is not satisfactory. This issue was also discussed in several earlier meetings but still finish of surface is not up to the mark. Progress of fixing \geotextile water proofing membrane is also Nil. Health and Safety: No incident was occurred in the month December 2014. Both tunnels at both portals were not being progressed but keeping adequate safety procedure. Additionally maintenance work, housekeeping and essential services is being done on regular basis without construction works Temporary Ventilation system has upgraded on regular basis for fresh air inside tunnel. Rest of all other works at both Portals was done under safety and healthy environment. Existing Highway: Repairing of all Patches has been done and repairing of potholes in progress. Toll Plaza slope Stabilization: In South Toll Plaza location, up to date they have completed excavation cross section no 1, 2, 3 & 4. According to modified design for full stabilization, instability in lower part created a bulging and displacement of present road, and diversion of road to accommodate 1 lane per direction has been completed. Geo investigation of slide area is completed, including drilling of boreholes with core recovery. No work has been done in the month of December. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 57 Monthly Report Dec 2014 Approach Road: South: Alignment drawing of South approach road a gradient of 7 % is given which is more than required 5% & limiting of 6% as per IRC and needs to be revised and advised to submit it along with cross section at every 10 m. North: Alignment drawing reviewed by I.E. with some comments, revised drawing after incorporate on by Concessionaire has not been received till date No work has been done in the month of December. Dump Area: South: No Work for the construction of R.C.C wall at South dumps area during the month of December. 60+000-260+000: R.C.C wall up to 4.0 m height completed. North: Gabion wall at North Portal Dumping yard collapsed for 24.0 m approx. from Ch. 533+000 – 557+000. Revised design is still awaited by IE for their review. Only retaining solution affecting highway or new alignment of existing highway has been submitted and reviewed. 0-75 m: R.C.C wall up to 4.0 m height completed No work has been done in the month of December. Structure Works: x Bridge B1 – Deck slab casted, stressing and grouting done for all cables, Crash Barrier is completed and return wall in progress. x Bridge B2 – Construction of Crash Barrier completed, Expansion joint Pending. First floor slab for Ventilation Building have been completed for first to fourth Grid and column & walls in progress for other Grids of South portal. First floor slab for Ventilation Building have been completed for Seventh to Eighth Grid and column & walls in progress for other Grids of North portal. Base slab has been casted for technology building, concreting for some of columns also done at North Portal. No work has been done in the month of December. Quality: Energy absorption test has been carried out carried out in IIT Buvneshwer and the results for the same are has been received and found in confirmatory. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 58 Monthly Report Dec 2014 Geotechnical: Main Tunnel South Portal: x During the first two weeks this month countermeasures were placed in order to stabilize displacement under 2mm/month with 10 to 12 IBO Rock bolts of 9-12m length have been placed between CH.2230 to 2260. Escape Tunnel South Portal: x During this month, no countermeasures work has been carried out. Main Tunnel North Portal: x During this month, no countermeasures work has been carried out. Escape Tunnel North Portal: x During this month, no countermeasures work has been carried out. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 59 Monthly Report Dec 2014 16. Non Confirmatory Report (NCR) Status: The Status of the Non Confirmatory Report (NCR) is tabulated below: NCR No Subject Date of Issue Present Status 1 Failure of Caste- in –Situ Cores of shotcrete at North Portal. 14-09-2012 Reviewed and closed dated 15th Oct 2013 2 Shotcrete Thickness in Tunnels 08-12-2012 Partially compliance dated 5th Apr 2014 3 Water Proofing and Lining Works 08-05-2013 Reviewed and closed dated 6th Dec 2013 4 Concreting of Raft of Retaining wall at Chainage 10+635 - 10+640 North Approach road 04-02-2014 Reviewed and closed dated 13th Feb 2014 5 Failure of stone masonry wall with RCC Ground Beam and concrete boulder fills. 08-08-2014 Still not compliance 6 Concrete Portal) 25-08-2014 Partially compliance dated 4th Sept. 2014 17. Lining of Cross Passage-01(South ESCROW ACCOUNT Escrow Account statement from 1st September to 31st Oct 2014 has been submitted by the Concessionaire. Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 60 Monthly Report Dec 2014 18. PHOTOGRAPHIC REPORT Ventilation Building work - South Portal Ventilation Building works - South Portal Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 61 Monthly Report Dec 2014 Water proofing memberane Instalation in Progress – North portal Vent Slab – North portal Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 62 Monthly Report Dec 2014 Main Tinnel heading face(XP 12-XP 13) - South Portal Benching between XP9-XP10) - South portal Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 63 Monthly Report Dec 2014 Main tunnel waterprofing gantry at XP06 - South Portal Main tunnel layby Pour No.6 in preperation - South Portal Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 64 Monthly Report Dec 2014 XP02 second Pour Preperation - South Portal Surface Works - South Bridge Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 65 Monthly Report Dec 2014 Final linning in Escape Tunnel Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 66 Monthly Report Dec 2014 ANNEXURE – 1 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 67 Monthly Report Dec 2014 ANNEXURE - 2 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 68 Monthly Report Dec 2014 ANNEXURE-3 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 69 TypesofTest SampleDescription SampleLocation Page1of1 NoTestingdevelopduringthismonthduetothestoppageofwork. DateofTesting LABTESTINGABSTRACTFORTHEMONTHOFDECEMBER2014SOUTHPORTAL&NORTHPORTAL. CodeSpecification Observation