Annexure 1 Office Memorandum - Gujarat Pollution Control Board
Transcription
Annexure 1 Office Memorandum - Gujarat Pollution Control Board
Annexure 1 Office Memorandum Annexure 2 NABET Declaration Center for Environment, Health & Safety ANNAMALAI UNIVERSITY ANNAMALAI NAGAR – 608002. 27/01/2014 Declaration Letter Sub: CEHS- Annamalai University -NABET/QCI accreditation- reg., Ref: List of Accredited Consultant Organizations / Rev. 16/ January 05, 2014 Published in http://www.nabet.qci.org.in. The Center for Environment, Health and Safety of Annamalai University is Provisionally Accredited Consultants by NABET/QCI for the Sectors of River Valley, Drainage and Irrigation Projects, Cement plants, Distilleries Industrial Estates/ parks/ complexes/ Areas, export processing Zones (EPZs), Special economic zones (SEZs), Biotech Parks, Leather Complexes, Common hazardous waste treatment, storage and disposal facilities (TSDFs) Ports, harbours, jetties, marine terminals, break waters and dredging Common effluent treatment plants (CETPs). The details are shown in the Figure, Published in The List of Accredited Consultant Organizations / Rev. 16/ January 05, 2014 in http://www.nabet.qci.org.in. Annexure 3 CRZ Map Annexure 4 Map provided by Wild Life Warden Annexure 5 OSEMP ON SITE EMERGENCY MANAGEMENT PLAN CRUDE OIL TERMINAL - VADINAR Prepared By: Asst. Vice President –Terminal Document No: BORL/COT/MGT/OSEMP Reviewed By: Vice President (F&S) Revision: 02 Approved By: Managing Director, BORL Date: 20.10.2012 PREFACE Despite of numerous risk mitigation, prevention, and assessment and control measures, and a welldefined and systematic approach is necessary to deal with any eventualities that may still occur. This contingency plan fulfills this objective. It will deal with incidents, which may still occur and could affect people, property and environment, both on the site and in the vicinity. This plan elaborates various aspects and assigns specific key roles to be played with corresponding responsibilities and authority. This plan is validated by simulation of incidents, which can be dealt with by works management. The large events will need the help of local authorities, neighboring industries and outside agencies. This plan elaborates the control measures to be put in by all concerned in the event of an emergency. It shall be tested and updated periodically. We gratefully acknowledge the help and assistance of all departments and individuals who have contributed in preparing & finalizing this plan. Page 1 Index Sr. No. 1 2 3 4 5 6 7 8 Annex -1 Annex – 2 Annex - 3 Annex - 4 Annex - 5 Annex - 6 Annex - 7 Annex - 8 Annex - 9 Annex - 10 Annex - 11 Description General Information Risk & Environment Impact Assessment Communication System Emergency Organization & Roles Emergency Response Chart Offsite Emergency Management Plan Training Rehearsal and Records Mutual Aid Scheme Drawing of COT with Nearby Area Drawing of Overall Plot Plan Mutual Aid Agreement List Details of Tanks at COT -Vadinar List of Hospitals and Doctors Emergency Contact numbers of Govt. Authorities Safe Assembly Points Fire Control Arrangement at COT List of Main Coordinators MSDS of Crude Oil Fire Order Chart Page No 05 12 16 19 32 44 45 47 49 50 51 52 53 54 55 56 57 58 60 Page 2 Amendment Sheet REV. NO DATE REVISIONS REVISION IN SECTION 1. Abbreviation NATURE OF CHANGE 1. New terms included 2. Emergency Scenarios 2. Bomb Threat Scenario included 3. General Information-Categorization of emergencies 4. Communication System- General 3. Siren Communication updated 9. Annexure -6 Emergency Contact Numbers of Govt. Authorities. 10. Annexure -7 Safe Assembly Points 4. Various plant Communications systems available introduced 5. Siren Tones configurations for different types of scenarios updated. 6. Fire Order Chart Changed & Updated. Emergency Organization - Responsibilities, etc changed according to the update fire order chart. 7. Fire Control Arrangements Pump details updated. 8. Mutual Aid Member Contact Details updated. 9. Emergency Contact Numbers of Govt. Authorities Updated. 10. Safe Assembly Points updated 11. Annexure -8 Fire Control Arrangements At COT 12. Annexure-9 List of Main Coordinators 13. Annexure- 11 COT Fire Order Chart 11. Fire Control Arrangements- Facilities available updated 12. Main Coordinators and the contact details updated 13. Fire Order chart updated 5. Communication System - Siren Tones 6. Emergency Organization- Fire Order Chart 02 02 Nov 2012 7. Emergency Organization- Fire Control Arrangements 8. Annexure-3 Mutual Aid Members 03 Page 3 Abbreviations AP BORL CCE COT DBV DG DISH ERT ESD F&G GPCB GMB IC MAS MCA MCP MSDS MSIHC PA System PPE SPM SMC VLCC VHF SCBA Assembly Point Bharat Oman Refineries Limited Chief Controller of Explosive Crude Oil Terminal Double Ball Valve Diesel Generator Directorate of Industrial Safety & Health Emergency Response Team Emergency Shut-down Fire & Gas Gujarat Pollution Control Board Gujarat Maritime Board Incident Controller Mutual Aid Scheme Maximum Credible Accident Manual Call Point Material Safety Data Sheet Manufacture, Storage (including isolated storage) and Import of Hazardous Chemicals Public Address System Personal Protective Equipment Single point mooring Site Main Controller Very large Crude oil carrier Very High Frequency Page 4 CHAPTER 1 GENERAL INFORMATION 1.1 Introduction In spite of sound design and engineering methods, if adequate care is not exercised during operation, maintenance and inspection, a COT can pose major threat to its employees, property and public due to major fire, explosion, toxic release, oil spill etc. When a disaster situation of this kind develops, a concise and well-written emergency plan for the entire COT should be made available and the same shall be put into action without loss of any time. Most of the emergency situations can be controlled by careful evaluation of the anticipated possible events and evolving a plan to meet such situations, organize suitable drills or rehearsals for effective implementation at the time of emergency. The On-Site Emergency Management Plan (OSEMP) is a document which contains the emergency organization structure, responsibilities of key members, communication means and emergency response strategies to control a range of major incidents. This plan has been drafted after a thorough analysis and assessment of various risks associated with the process and storage of various chemicals inside COT complex. Each key member has his own plan describing detailed activities to function effectively in the emergency management. Though a part of Off-site Emergency Plan, due consideration has been given to emergencies having impact outside our COT premises. As per risk assessment report there is no radiation flux which can have severe impact or affect the pubic or area outside COT. While action in the above emergencies would vary from case to case, many of the steps to be taken are common. The provisions of Section 41-B (4) of the Factories Act, 1948 & The MSIHC Rules, 1989 and the guidelines from the Directorate of Industrial Safety & Health have been incorporated while making this plan so as to fulfill statutory responsibility for Disaster Management & emergency planning. 1.2 Scope This plan is applicable to all the BORL-COT Vadinar Facilities which includes Single point Mooring, Tank farm area & associated facilities. This plan does not include the strategies relating to off-site emergency management plan, which is the under the jurisdiction of the District Emergency authority (District Collector). However, the role of COT management with respect to on-site emergency management is highlighted in this plan. The plan and strategies to contain / control contingencies like strike, sabotage, labor unrest etc. are not part of this document. The document however covers the consequences like fire explosion, gas release etc. arising out of these contingencies. The plan is in two sections. The first section explains basic requirement, role & responsibilities, definitions, objectives, hazard identification, risk analysis and environmental impact assessment, organizational set up, communication system, action on site; link with offsite emergency plan and the aspect of training, rehearsal and records. The second section is given as 'Annexure Section' containing general information. These annexure are designed to provide specific information in referred from the first section. It will also be useful to surrounding factories as a 'Mutual Aid' and to the Government in Preparing Local / District Contingency Page 5 Plan. Training rehearsal, records are also suggested for keeping the plan up-to-date. This plan does not cover offshore oil spill emergency, for the said emergency refer Oil Spill Plan. 1.3 Objective The primary objective of this contingency plan is to equip ourselves with required resources and information for prompt implementation of the set of actions to be undertaken in the event of an accident posing hazards to the people, property, community and environment. The objectives of the plan are to ensure the following: 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) 19) To define and assess emergencies, including risk and environmental impact assessment. To contain and control emergency incidents. To safeguard employees and people in vicinity. To provide maximum possible safety for the emergency response personnel. To minimize damage to the environment. To minimize damage to company installations and public property. To inform employees, the general public and the authority about the hazards / risk assessed To be ready for 'mutual aid' if need arises to help neighboring industries and SPM/ Jetties. To inform authorities and mutual aid members to come for assistance. To effect rescue and treatment of casualties. To identify and list any fatalities. To inform and help relatives. To secure the safe rehabilitation of affected areas / people and to restore normalcy. To provide authentic information to the news media. To dovetail properly to a similar plan of the local government for an offsite emergency arising out of an on-site emergency. Mitigate the effects of any emergency event that will impact on life safety, company assets, the environment & public in vicinity. Ensure business continuity following an emergency event. Minimize the effects of the emergency event on the company image. Ensure that the company emergency response capabilities can be augmented by Mutual Aid in the event that the company emergency response cannot control & mitigate the effects of an emergency event. 1.4 Meteorological Data of COT Vadinar 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 2 2.1 2.2 SITE LOCATION STATE NEAREST IMPORTANT TOWN AND DISTANCE NEAREST RAILWAY STATION AND DISTANCE NEAREST PORT AND DISTANCE NEAREST AIR PORT AND DISTANCE NEAREST HIGHWAY MILE STONE AND DISTANCE APPROACH ROAD GEOGRAPHICAL DATA HEIGHT ABOVE MEAN SEA LEVEL DEPTH AT SPM Gujarat State Khambaliya-15KM Khambhalia Kandla Port Trust—10KM Jamnagar – 40KM Jamnagar –Khambhalia State Highway – 9 KM 09 KM from COT To State High way 5.3 meter 30 to 40 meter Page 6 2.3 2.4 3 SITE CHARACTERISTICS (TERRAIN TYPE) LOCATION OF SPM 3.6 METEOROLOGICAL DATA CLIMATE OF AREA Annual Rainfall Highest & Lowest Visibility RELATIVE HUMIDITY % MAXIMUM MINIMUM BAROMATRIC PRESSURE AVERAGE WIND Velocity Average 4.1 WIND VELOCITY MAXIMUM Wind velocity during monsoon Ocean current Design waves WATER SUPPLY SOURCE OF WATER 3.1 3.2 3.3 3.4 3.5 4 Coastal Area 22 Deg 33 Min 528’ (N) ; 69 Deg 45 Min 750’ (E) Dry and Hot 49 cms Highest 228% of 49cm, Lowest 16% of 49 cm Good through out of the year 70 55 947.4 Mb 30KM/ hr 90Km/ hr 50 KM/hr .98M/second ( 1) year to 1.8 M/s ( 100 year) 1.5M ( 1year) to 4.7 M ( 100 years) Well nearby area. 1.5. Map of the area Map of the area with nearby village is given in annexure-1 1.6 Definitions a) Incident:It is an unplanned event, which has or could have resulted in physical harm (Injury or Disease) to person(s) damage to property, loss to the company or any combination of these effects. Incident resulting in physical injury is called accident. b) Major Emergency: Occurring at a work place is one that may affect several departments within and / or may cause serious injuries, loss of life, extensive damage to properly or serious disruption outside the works. It will require the use of outside resources to handle it effectively. c) Disaster: This is a catastrophic situation in which the day-to-day patterns of life are, in many instances, suddenly disrupted and people are plunged into helplessness and suffering and as a result need protection, clothing, shelter, medical and social care and other necessities of life. d) On-Site Emergency Management Plan: It deals with measures to prevent and control emergencies within the COT and not affecting outside public or environment. Page 7 e) Off-Site Emergency plan:It deals with measures to prevent and control emergencies affecting public and the environment outside the premises. 1.7 Emergency Scenarios Various scenarios that are anticipated to cause major emergencies inside COT are explosion, fire, oil spill, natural calamities like cyclone, flood, earth quake etc. All these scenarios are discussed in brief in the following text. 1.7.1 Explosion Explosion is a major hazard and the consequence of explosion depends on the rate at which energy is released. Explosion can bring in certain effects like blast wave, thermal effects, missile effects, ground shock and injury to personnel. The explosion types considered in this plan for the purpose of Maximum Credible Accident (MCA) Analysis. 1.7.2 Fire Fire is also a serious hazard and is normally regarded as having a disaster potential less than explosion or toxic release that can be controlled at the incipient stage. Certain examples are tank fire, pool fire, jet flame fire, flash fire, pump fire, flange fire, duct fire, cable tray fire, etc. A fire involving a storage tank is serious and would require several days of fire fighting. 1.7.3 Toxic Release There is no toxic chemical stored at COT Vadinar. The only hazardous chemical which is stored at COT is Crude oil which is having flammable nature. The MSDS of Crude is attached in the annexure-10 1.7.4 Oil Spill Spill may occur on land or on water. Spills on land are relatively simple to handle. They normally require collection and transfer of oil and clean up of oily mud. Special attention is given to prevent the pollution of watercourses and Sea. To tackle any oil spill control on sea, GMB & Indian coast guard are the nodal agencies as convener & facilitator for Oil Spill disaster. Further COT is having state of art Effluent treatment plant for handling crude oil spill within the COT. 1.7.5 Earthquake An earthquake can pose a major threat to the plant, property, life and environment. Some of the effects of an earthquake are ground shaking, ground lateral displacement, ground uplift, ground settlement, soil liquefaction and fires. The possibility of earthquake occurrence cannot be ruled out. However, the seismic effects were considered while designing this COT and proper assessments of such seismic effects were done. 1.7.6 Flood The chance of flooding in this region due to seasonal monsoons is rare by virtue of its location away from dams and rivers. However, with the advance information from the local meteorological dept. on flood warning, specific actions to be carried out on those occasions are considered in this plan. Some of the effects likely during flood are water entering the plants / processing plants, danger to life of persons / property and outbreak of epidemics / other contagious diseases. Page 8 1.7.7 Air Raid The possibility of air raid cannot be ruled out. Some of the actions to be carried out during those occasions are considered in this plan. 1.7.8 Bomb Threat Majority of bomb threat calls have turned out to be hoaxes. However hoax call should not be the bench mark for deciding jejunity of call received. There is no fixed way of assessing the genuinely of calls. The best result can be produced by the call handler by utilizing his skill and analysis power. 1.8 Categorization of emergencies The emergency situations have been classified in three categories depending upon the resources required to cope up the emergency. Categorization Category Level of Command Communication Level 1 Minor Emergency: Partial Site emergency services required Incident controller Straight Siren (01 Minute) Level 2 Serious Emergency: Full Site emergency services required Site Main controller Wailing Siren (2 Minutes) Level 3 Major Emergency: Full Site emergency Services Plus Mutual Aid required Site Main controller Wailing Siren (Total 08 Minutes) All clear All Clear Site Main controller Continuous siren for two minutes Note: Retention of same level of emergency or Escalation of emergency to higher level shall be done in joint consultation with next level of command. Level -1: Minor Emergency The emergency situation arising in one or more tank farm area, which has the potential to cause injury, or moderate damage to Plant & can be controllable by partial site emergency services is Level 1 emergency. Level -2: Serious Emergency The emergency situation arising in one or more plants / areas which has the potential to cause injury, death or major damage to plant or environment & can be controllable only by utilizing Full Site emergency services and resources is Level 2 emergency. This level of emergency situation will not affect surrounding community beyond COT premises. Level -3: Major Emergency Page 9 On-site emergency The On-site emergency situation arising in tank farm or fuel pump area can be controlled with available resources and if needs arise, mobilization of resources from the nearby industries like RIL and Essar Oil can be done. We are members of Mutual aid scheme. Off-site Emergency Incidents involving large-scale injury, death or damage-beyond resources of mutual aid and site emergency services & threatening civilian population always warrants mobilizing the necessary resources available with government to mitigate the emergency, is the Off-site Emergency. Such situations shall be controlled as per Off-site Emergency Plan prepared by district authorities. 1.9 Major Steps Involved in Operation of the Plan The essential steps in the plan are as outlined below. Further details pertaining to the step in question, together with the responsibilities of identified personnel (and their initial actions) are given in role and responsibility as indicated. a. The person noticing the incident notifies the emergency to Fire Control Room and operation control room as per reporting procedure. b. The plant operations crew initially the Shift Supervisor of the affected area takes immediate emergency actions as appropriate to protect personnel and contain the incident. c. Fire Control Room Operator receives the Emergency Call. There is round the clock fire crew at COT. d. Fire Control Room Operator activates the initial call-out for all incidents. He will intimate to COT in charge about the incident. e. Till the arrival of COT in charge, COT Shift in charge will act as Incident controller(IC) and Shift Fire Supervisor will help in controlling the situation with the guidance of COT shift in charge. f. Shift Fire supervisor will play the role of fire and rescue controller. g. The Fire Controller is responsible for directing the efforts of the Fire Team (including auxiliary Fire Squad) and for coordinating any response from the Mutual Aid Members, if called-in. h. Other Key Players when called in will familiarize themselves with the extent of the incident and the review the action plan with the IC. They will then assume the role at their respective assigned places i. Emergency Response Center (ERC) is established by the Site Main Controller for all 3 incidents j. Casualties, if any, are first taken for treatment to Jamnagar Hospitals. A list of hospital is given in annexure part. k. External Ambulance Service, if called, reports to fire station of COT Vadinar. l. The incident close-out is declared by the Incident Controller in consultation with Fire Controller. m. Incident investigation and reporting is carried out in accordance with Incident Investigation and Reporting Procedure. n. Response to the emergencies at the SPM will require involvement of the SPM, GMB and Coast guard personnel. o. In the event of more than one incidents taking place or for emergencies of longer duration, the strategy will be decided by Incident Controller and additional resources will be arranged as required. This will include calling in of additional/back-up role players. p. All the occupants in the COT upon hearing the Level-3 Siren (wailing siren for 10 minutes) shall proceed to their respective Assembly points. Upon reaching the Assembly Points, the COT Shift in charge shall arrange Head Count of the personnel and provide it to the Evacuation Coordinator. q. In case further evacuation is required from to the Main Assembly Point, all the personnel will proceed to main assembly point near main gate of COT or the alternate assembly point in case the main assembly point is not safe, declared by IC. P a g e 10 1.10 ERC (Emergency Response Centre): COT Control room will be used as emergency control centre for handling any emergency. In case control room is not accessible or it is difficult to operate from COT Control room, Fire control room or any other building can be used as ERC. P a g e 11 CHAPTER 2 RISK & ENVIRONMENTAL IMPACT ASSESSMANT Identification, analysis and assessment of hazards and risks provide vital information to the risk management, that what should be the type & capacity of any on-site and off-site emergency plan & what type of safety measures and maintenance is required. Data like equipments failure rates, acceptable criteria, frequency and statistics of past major accidents or incidents etc. are some of the important data for complete risk & environmental impact assessment. Therefore, beginning with the hazard identification this chapter proceeds towards the risk and environmental impact assessment, this is the ultimate requirement for good emergency planning. 2.1 Factory Layout Plan of the factory premises with location of various departments, indicating Boundary walls, Entry & Exit Gates, Hazardous Storage and Process Areas, Effluent Treatment Plant, Fire Pump House, Fire Control Room, Fire Station, Canteens, Assembly Points, COT control room, Approach Roads and other important location are shown in COT Overall plot plan and the layout plan for residential areas surrounding COT are Shown in Annexure-1. 2.2 Storage hazards & Controls Hazardous Chemical Handled At COT- Vadinar The Material Safety Data Sheets (MSDS) of Crude oil is given in annexure-10 and total storage capacity of all tanks is given in annexure-4. 2.3 Risk Assessment Risk assessment of COT Vadinar is done by National Research Institute of Environment Engineering. Probability or frequency of an incident gives us risk involved in a process & how they could occur and estimation of the extent, magnitude and likelihood of any harmful effects or consequences gives risk analysis and when judgment of acceptability of these risks is considered against Social, Political or Legal Criteria i.e. acceptable criteria, gives the final stage of risk assessment. Such risk assessments have some limitation like; 1. Inaccuracies of some of the mathematical. 2. Incompleteness in analysis. 3. Inadequacy of acceptable criteria. 4. Difficulty of checking the final results. 5. Complexity of the techniques. 6. Difficulty to get experts on this subject to give valid results. Following are the various studies, which are being practiced or carried out at our site for Risk Analysis. Rapid Risk Analysis conducted by NEERI & other system adequacy studies are being carried out to find failure modes, their frequencies and affect analysis. The effect & results are used in working out safety measures and emergency plans. The hazardous events analysis, which are considered for risk and environment impact assessment, are many but we have classified them as fire & explosion P a g e 12 Fire is further sub-classified as set fire (through leaking pipe), pool fire (In bund), Flash fire (escaping gas gets fire from a source of ignition), Explosion is further sub classified as Deflagration (Low flame velocity & Low peak pressure), Detonation (High flame velocity & high peak pressure). Our emergency plan is capable of dealing with the any incident as mentioned above, but planning has also been done on those events, which are most probable. 2.4 Maximum Credible Accident (MCA) Analysis A list of probable credible scenario with their impact is given here. a) Pool Fires / Dyke Fires b) Jet Fires a) Pool Fires/ dyke fire Pool fires are common fires resulting from fires over pools of liquid. A pool fire may occur in a number of situations. At its most confined state, it can take place in a storage tank. At the next level of confinement, fire may take place in a bund. The flame geometry is approximated to cylinder, in the absence of wind, but in the presence of wind it can be tilted and bend essentially resulting spill over in the down wind direction. The characteristics of a pool fire depend on the quantity and nature of chemical. Pool fire of Crude oil being a thick and sticky material can be controlled with in tank roof with the help of foam pourer and foam monitors. The computed damage distance for visualized worst case scenario of tank on fire does not go beyond compound wall around COT. b) Jet Fires There is a wide variety of situations in which a jet flames, or ejected flame, can occur in the process industries, either by design or by accident. The principle situations in which flames occur by design are in burners and flares. Ejection of flammable fluid from a vessel, pipe or pipe flange can give rise to a jet flame if the material ignites. Methodology of MCA Analysis MCA Analysis does not include quantification of occurrence of an accident. Moreover, since it is not possible to indicate exactly a level of probability that is still believed to be credible, the selection of MCA is somewhat arbitrary. In practice, the selection of accident scenarios representative for an MCA analysis is done on the basis of engineering judgment and expertise in the field of risk analysis studies, especially accident analysis. As an initial step, a selection has been made of various plants, storage units and activities that are believed to represent the higher level of risk for the surroundings in terms of the damage distances. A systematic analysis of the hazards associated with various products and raw materials was done. For selection of Maximum Credible Accident in the BORL, COT Vadinar, the inventory of these products and their storage conditions were taken into account. Based on the failures identified and comparing their frequency of occurrence as per the past accident information, MCA analysis was carried out. The damage distance for crude oil tank on fire works out to be 52 meters for 1%lethality. Therefore, the distance between two storage tanks at COT should exceed fifty two meter from (centre to centre) P a g e 13 2.5 Impact of Heat radiation & over pressure The purpose of selecting maximum credible scenarios is to have a realistic idea of consequences. 1. Damage due to incident radiation intensities. Radiation intensity ( Kw/M2) 62 37.5 Types of damages Spontaneous ignition of wood Sufficient damage to process equipments Maximum allowable radiation intensity on the thermally protected and pressurized storage tank. 1st Degree burn likely. No discomfort on long exposure. Equivalent to solar radiation. 32 4 1.6 0.7 2. Damage effects of blast over pressure Blast over pressure ( PSI) 5 3 2.5 2 1 Damage level Major structure damage( assume fatal people inside the building or within other structures) Oil storage tank failure Eardrum rupture Repairable damage, pressure vessels remain intact, light structures collapse Window pane breakage possible, causing injuries 3. Damage to tank farm due to thermal radiation and dyke fire/tank fire. 4. Damage due to pool fire due to oil spill in dyke. 5. Flash fire and pool fire. 2.6 Potential for off-site emergencies: Off-site emergencies initiated by on-site activities have been identified for emergency response needs, which are given below. However, separate DMP made for pipeline incidents. a. Pipelines transporting crude from SPM to COT resulting in leakage/ Fire / Explosion. b. Hydrocarbon resulting vapor cloud in populated area nearby. From the tables and figures, it can be observed that 32Kw/M2 radiation distance may not be realized. In many cases, at ground level, radiation level of 4Kw/M2 is restricted within. To reduce, occurrences of hazardous events & mitigation of consequences, following measures to be considered. P a g e 14 All the alarms related to fire and gas detection system shall be given most importance. In case of false alarms, the root cause be identified and rectified at the earliest to avoid negligence of the fire and gas alarms in future. In case of leak or fire in the terminal facility, water spray system should be started for dispersion of hydrocarbons and cooling of the adjacent equipment/ pipelines. Ensure periodic inspection and preventive maintenance of all the equipment and plant piping are carried out as per schedule. Ensure periodic calibration of fire & gas detectors, alarms, trips & interlocks. Ensure restricted movement of vehicles inside the terminal premises and control potential ignition sources like static charges etc. 2.7 Weather Condition Windsocks are provided at the strategic location of the plant, to know the, wind direction during the time of emergency. The locations are COT Fire station, COT Control room and Crude oil tanks. P a g e 15 CHAPTER 3 COMMUNICATION SYSTEM After the assessment of risk & their possible environmental impact and after making an organization for the preparedness to control the emergency, the next most essential step is to make us ready for communication at the time of emergency. Communication system is very crucial for effective control of any emergency. Any emergency, if detected and communicated to the concerned timely, can be controlled and terminated within shortest possible time without further escalation. Following means of communication are available in the COT: Fire and Gas detection system (Manual call points, smoke / heat detectors) Plant PA system Intercom telephones IP Phone VHF Sets P&T Land lines 3.1 Communication Means a) Manual Call Points (MCPs)/ Break Glass Unit (BGU) As soon as any one breaks the glass of MCP, its gives parallel alarms in the Control Panels which are located in COT Fire Station & COT Control Room. Location from where the Manual Call Point or Smoke / Heat Detector get activated will be known from the panels. The person on noticing the fire or any other emergency, by this mean, shall communicate the emergency message to fire control room and / or plant control room. In the event of any fire, smoke detector will give signal at fire station and COT control room. b) Emergency Alarms & Sirens To inform public at large during any emergency, two siren of range 3KM are installed at COT fire station and Control room. 3.2 Communication of Emergency 3.2.1 Inside the factory to the workers The communication to all personnel inside the factory shall be done by sirens & Public address system. In the specific cases, the trapped employees must be communicated by plant / Dept Head. For the same PA system & messengers may be used. 3.2.2 Outside the factory to the workers Generally, the key personnel & essential workers will be available in all shifts. But due to some reason, if someone is outside the factory premises or not on duty and if his help is required, an updated list and address of the essential workers and key personnel shall be available in the Fire Control Room and COT Control Room. They shall be communicated by Fire Control Room Operator 3.2.3 To the outside Emergency Services and the Authorities Once the emergency is declared, it is essential that the outside emergency services should be informed in the shortest possible time. Responsibilities have been fixed as per the Emergency Organization Chart to contact outside agencies for help and to communicate to the all the Government and other Authorities such as Fire Brigade, Police, District Emergency Authorities, DISH & Hospital etc. P a g e 16 3.2.4 To neighboring factories and the General Public A major emergency will affect areas outside the works and it is essential that neighboring factories and general public, should be informed to enable them to take prompt action to protect their own employees and to take whatever measures may be possible to prevent further escalation of the emergency due to effects on their own installations, at the same time, they may be required to provide assistance as part of a prearranged mutual aid plan. 3.3 When any person sees the incident Shall break the Manual Call Point/ Brake Glass Unit Shall call the following emergency numbers 1) Fire : 823400 2) COT Control room : 823444/823440 Shall communicate loudly – “fire….fire…” or “help….help…” Shall mitigate the incident- if trained Should get away from the area & go to the assembly point 3.4 Raising the Alarm As soon as anyone breaks the glass of MCP or the Smoke / Heat / Gas Detector gets activated (in case of C/R & substation) its gives parallel alarms in the control panels of COT Fire Station & COT Control Room. The fire detection system is addressable. I.e. Location of MCP/Break Glass unit can be known on panel display. For any alarm call of MCP or Detectors, fire crew has to respond without delay. Fire station & COT control room shift officer shall confirm about the indication of alarm by mutual telephonic talk. After judgment of situation by Shift in charge, he will instruct Fire Coordinator to raise local hooter or site emergency siren based on level of emergency. Fire Coordinator shall instruct concerned operations/ maintenance staff for help. Siren Tones Following are the various configurations set for different types of emergency scenarios: Major Fire / Flammable gas release / Toxic gas release (Level 2 Emergencies) (A) Siren will be on wailing mode for 02 Minutes Major (Level 3 Disaster Emergencies)/ Evacuation (B) Siren will be on wailing mode for 08 minutes with a gap of one minute in each cycle. Air Raid Warning (C) Wailing type siren for 2 minutes (Same type siren as major Fire, but the same is sounded six times at the interval of two minutes) All Clear / Test siren (D) Continuous blow for two minutes Siren Testing – Weekly Every Monday @ 1200 hrs for two minutes P a g e 17 3.5 Declaring Major Emergency Major emergency has to be declared after sufficient and through check because the declaration of major emergency puts many agencies on action and it may disturb the running system, which may be costly at, time or its consequence may be serious. Therefore major emergency must not be decided with immature judgment or without proper thought. Site Main Controller or incident controller is the authorized persons to declare Major Emergency. 3.6 Alternate Communication System There could be a situation when all the communication facilities and systems may come to halt. In the event of such a failure, VHF system shall be made available based on the seriousness of the situation. 4.7 Internal Communication Discipline The sense of urgency that every one experiences during emergency may lead to a chaotic situation if communication systems do not function properly. For proper functioning of communication systems following discipline should be followed. 1. Communication shall be proper and clear 2. No personal names to the extent possible. Use Emergency Organization titles. 3. Use clear texts in brief. Don’t engage phones much for long conversations. 3.8 Notes on the Operation of the Call-Out Lists 1. Fire Control Room Operator must hold and maintain up-to-date details of the names, telephone numbers and radio call signal of all the persons whose job titles are given in the key personnel or coordinators. The list of important person of COT is given in annexure -9. For taking assistance of district authorities, a list of important personnel is given in annexure-6. Specific lists should be prepared to cover all operating and no-operating areas. 2. The order of calling-out of personnel may be varied at the discretion of the Incident Controller depending on the circumstances. 3. Fire C/R will also have an updated list of telephone numbers of government authorities and nearby industries fire control room or fire in charges. P a g e 18 CHAPTER 4 EMERGENCY ORGANISATION This chapter is applicable for the emergency scenarios of fire, explosion & toxic gas release. For Oil spill emergency, the emergency organization & roles of emergency responders shall be as per BORL’s Oil Spill Contingency Plan (OSCP). 4.1 Emergency organization Emergency Organization includes following elements: Incident Site Fire control room/ COT Control room Overall Strategy External Coordination Resource Coordinators Resource Mobilization P a g e 19 4.1.1 Incident Site Location: Affected Site Role Function: Overall coordination at the scene of the incident. To take decisions involving the operation of the other plants or to stop or continue any process. To take technical decisions to control the incident To coordinate with other agencies. Basic Attendance: Incident Controller Shift Fire Supervisor Shift In Charge Security In Charge 4.1.2 Fire Control Room Established: Continuous – Manned by Fire Staff, on 24 hours/ day basis. Location: Fire Station Building Role/Function: Receives notification of an emergency situation Initiates call out for department Personnel Initiates the necessary measures to deal with emergency During the emergency continues to act as a focal point for emergency communications Records timing of critical information Rescue and coordination with Mutual aid members 4.1.3 Resource Coordinators Called In: For all Level- 2 & 3 Incidents; For other incidents if decided by IC. Location: Respective Work Locations / Incident Site (Will remain present till incident closure) Role Function: To ensure that the equipment and maintenance manpower resource needs and other requirements of the active groups at the (various) Incident Scene(s) are fully met and effectively Coordinated. These include catering needs. Coordinates the provision of all maintenance forces (both COT and contractors), and equipment. To arrange for emergency supplies if required. To mobilize market resources for meeting the emergency supplies. P a g e 20 Resource Coordinators: Marine Officer Commercial Officer Security Officer/ Evacuation Officer Maintenance & Inspection Officer Identification of key personnel & their Role & Responsibilities Designation Identification Incident Controller Helmet Inscribed Incident Controller Shift Fire Officer Uniform (Nomex suit) 4.2 Incident Controller (IC) Shift In charge of the COT will take over the responsibilities of Incident Controller, He will discharge this role till COT Terminal In charge arrives at the incident site. His primary duties are to takeover charge at the scene of the incident. In the initial stage he may be required to take decisions involving the operation of COT or its associated facilities to stop or continue. He has to take decisions to control the incident in consultation with IC. Responsibilities: As soon as he receives the information or comes to know about the incident, he shall proceed to incident site & take charge of the incident site. He shall put on the helmet inscribed word incident controller which should be always kept in his vehicle. Assess the magnitude of the situation & arrange to make alert panel and field operators to start controlling their respective sections. He shall ensure that Site Main Controller (SMC) is informed. Determine the level of Emergency & if he feels the emergency can escalate to level 2 or above, he will consult SMC & instruct Fire Coordinator to actuate emergency siren to warn the all field personnel & contract employees. Ensure that non-responding personnel are moved to the assembly points and evacuated to safer location / outside, if required. Initiate action for isolation of the source of incident. He may be required to take decisions whether to stop or continue any Process, isolations, depressurization, nitrogen purging, fire fighting, rescue operations. He shall direct all emergency operations within the affected area with the following priorities. Personnel safety, including of surrounding community. Minimum damage to Plant, Property and Environment. Minimize loss of Production and Material. Provide advice & information to fire fighting & rescue personnel. Preserve all evidences so as to facilitate any enquiry into the cause & circumstances. Seek additional support and resources as may be required. Direct for search of casualties. Send runners, if telephones are out of order. P a g e 21 4.3 He will work under the direction of the SMC, but till his arrival he will carry out the responsibilities of SMC in addition to his own. After the emergency, assess damage & environmental / toxicity level before ALL CLEAR signal by SMC. Site Main Controller (SMC)/ IC Jt. Sr. Vice President Terminal is the Site Main Controller (SMC). However, AVP Terminal will assume responsibilities of SMC in his absence. He has overall responsibility for directing operations & calling outside help from Emergency Response Center. He is required to take decisions after consultation with the other coordinators. Responsibilities: As soon as he receives the information, he shall proceed to COT Control room. He shall assess the situation and ensure that whatever resources needed is made available and utilized in a coordinated manner. He has overall responsibility for directing emergency action, operation and calling outside help. He shall direct all emergency operations with the following priorities. Personnel safety, including of surrounding community. Minimum damage to Plant, Property and Environment. Appropriate actions to minimize loss of Production and Material. He shall direct for evacuation of plant and areas likely to be affected by the emergency. He shall continuously review and assess possible developments to determine most probable course of events and actions. He shall ensure that all non-responding personnel, visitors, contractors are evacuated to safe assembly points and head count is completed. He shall assess the gravity of situation with the help of IC / other role players and after quickly assessing the situation, if requires, shall escalate the emergency as below: Level-2 Emergency – Full resources within to be utilized. Level-3 Emergency - Action to be taken to call Mutual Aid members. Off-Site Emergency - Action to be taken to activate / operate Off-Site Emergency Plan of Jamnagar district. He shall, if necessary, arrange for evacuation of neighboring population. He shall ensure that liaison is made with outside agencies such as Police Services, Fire Services, Expert on Health and Safety, Meteorological Office, District Emergency Authorities, Collector and Director of Industrial Safety & Health. Provide advice on possible effects to areas outside the factory. Release authorized information to press. Advise Incident Controller to close out the incident when the situation is under control. He shall give clearance to re-start the plants after it is declared safe to start by competent authorities. P a g e 22 4.4 Shift Fire Supervisor Fire Supervisor will perform the role of Shift Fire Officer. Take responsibility of fire fighting/ fire prevention activities at incident scene. On receipt of the initial call from Fire Control Room, the initial and subsequent activities include: Proceeds to Incident Scene. Assesses situation and assist Incident Controller in categorizing the incident. Assumes role of Shift Fire Officer until relieved of this role by higher authority from Fire Team. Discusses situation with Incident Controller to develop the response plan with a focus on controlling the situation. Renders assistance as necessary, e.g. Brings into full operation fixed and mobile firefighting equipment, water spray curtains etc; Searches for missing personnel; Provides water protection/manpower resource for isolation of release sources; Cooling of adjacent equipment. Works in close cooperation with the Officer-in-Charge of Mutual Aid Members to bring the incident under control. For Level 2&3 Incidents, determines whether the call-out of Off-Duty Firemen is required and informs Fire Control Room Operator accordingly. For incidents of likely extended duration, decides on a strategy for optimum utilization of available manpower and expendable resources. 4.5 Security In Charge Reports to Incident Site Controls access to incident Scene(s) and maintains site security in conjunction with outside police & other agencies. Initiate action to provide security arrangements as necessary and as directed by the Incident Controller. This includes controlling the access to incident area, guiding traffic and personnel movement etc. Alerts on-site security personnel, giving instructions as necessary. Ensures that all Mutual Aid Members are escorted from main gate to the COT Fire Station. On the instructions of the Incident Controller, arrange for security personnel to open stores and warehouse to obtain urgently required materials and to see that such stores and warehouses are secure again afterwards. 4.6 Fire Water Pump House operator Role during Emergency: Monitors and maintains firewater header pressure during fire emergencies. Ensures that the Fire Water Pumps Field Operator proceed immediately to the firewater pump house. Directs the actions of the above-listed personnel to ensure that the continuity of fire water supply is maintained. Restricts the use of firewater to all non-essential users. Provides the Shift Fire Officer with early warning of any potential loss in firewater header pressure. P a g e 23 4.7 Fire C/R Operator Fire Operator shall be available in the fire C/room round the clock. He will intimate all the higher up on declaration of emergency. He will sound the fire siren as per the instruction of Fire Services Coordinator and level of emergency code defined in onsite emergency plan. His duties are as under: To be prepared for emergency with all important internal & external phone numbers. To know the details of incident accurately this is available with Fire Control Operator. 4.8 Role & responsibilities of other key personnel are as follows: Fire & Safety Coordinator He shall report at site & evaluate the magnitude of emergency. He shall ensure proper coordination of fire fighting activities. He shall assist IC about the risk and accordingly action for evacuation if required. He will assist IC to take decision of escalation of emergency to higher level. Ensure search and rescue operations are carried out and assist first aid operation including emergency transposition. Coordinate with the Commercial Coordinator to mobilize additional firefighting equipment / spare breathing air cylinders etc. as may be required at the site of incident. Coordinate with Security Team for access control and barricading the affected area. Coordinates with Incident Controller and Shift Fire Officer for Rescue Operations if required. Actual Rescue Operations to be conducted by Fire Personnel. Mobilize all trained First-Aiders at site Liaises with Incident Controller (located at Pollution Incident source) for further information, possible assistance etc. Assess required resources to contain/clean up the pollution. Checks for specific management instructions, samples pollutant etc. Advise for containment, recovery, cleanup activities and precautions to be taken. Observes and records, as appropriate, progress, actions and critical facts of the pollution incident to subsequent investigation. Maintenance Coordinator Report to incident site and ensure availability of Resource Coordinator. Keep constant contact with IC and instruct engineer of the concerned unit for further assistance/ action as per situation demand. Will direct the Resource Coordinator for resource mobilization, information etc. To ensure that the equipment and maintenance manpower resource needs and other requirements of the active groups at the (various) Incident Scene(s) are fully met and effectively Coordinated. These include catering needs. Coordinates the provision of all maintenance crew (COT and Contractors) Inform COT control room on all maintenance activities. To mobilize market resources for meeting the emergency supplies. Mobilize the resources required for controlling the emergency. P a g e 24 Arrange special tools and tackles, de-watering pumps required during emergency operations. Provide expertise and engineering assistance to the Emergency Response Teams. Record all actions of necessary blinding / isolation / bypassing / closures etc. Keep constant contact with IC and instruct engineer of the concerned unit for further assistance/ action as per situation demand. Provide relevant labels / tagging / warning or other instructions for streamlining the emergency actions. Mobilize the resources required for controlling the emergency. Arrange for emergency DG sets, light masts and get them installed at strategic locations where ever required. Arrange heavy automotive equipment like crane and lifting machines etc. depending on the situation. Security & Evacuation Coordinator Instruct and deploy security personnel to ensure that law and order is maintained, unnecessary gathering of the personnel at the incident site is prevented and traffic movement in and out of the COT and terminal is controlled. Ensure security personnel had taken charge of the assemble point of the affected area and do head count. Mobilize additional / off duty security force for help, if necessary. Liaise with local authorities in consultation with SMC for external help (as necessary) for evacuation of the neighboring areas. If necessary, arrange for announcement through the mobile PA system for alerting the population in the surrounding areas Guide all personnel to Main Assembly point in an orderly manner. Ensure all personnel are evacuated safely. In case Main Assembly Point is not safe, guide all to alternate Assembly Point. On “All Clear Siren”, inform personnel accordingly. Admin, HR & Communication Coordinator a. Liaise with the statutory authorities (DISH, Labour Dept.) as per the instruction of the SMC. b. Provide necessary support as regards the administration, welfare, transportation for control of emergency situation as requested by the SMC / IC. c. Mobilize all the available company vehicles along with the drivers for emergency use. d. Coordinate with neighboring Industry / transport agency for additional vehicles / ambulances as may be required. e. Arrange refueling of various vehicles used in emergency. f. Arrange for transport of victims to hospitals/ dispensaries on advice of medical services coordinator. g. Arrange necessary food, soft drinks and other refreshments for the personnel engaged in the emergency operation and ensure sufficient stock is made available. h. Arrange for blood donors from COT employees on the advice of SMC. i. Liaise with various media and release written statement to the press with concurrence of the SMC. P a g e 25 j. Arrange for photography, video etc. for documentation. k. Keeps records of the press releases, information, photographs etc l. Coordinate to inform relatives of the affected persons. Operation Coordinator a. b. c. d. He shall proceed to Incident Site & then report to ERC. He shall direct all the process operations of affected & non-affected areas. He shall apprise SMC about control on process operations. He shall give feedback when all processes normalize & thus assist SMC in declaring ALL CLEAR. Security Team Security Response Plan is to prevent entry of unauthorized persons, while at the same time allowing proper reception, briefing and direction of emergency services and personnel. a. After receiving the information at the security control room, the shift security officer shall inform the security chief or next senior. b. The security chief shall advise the Adm. Coordinator to arrange vehicles to pick up other members of the security task force. c. The security chief shall order one of the senior security officers to assume charge at the security control room and start communicating with the required personnel in an effective manner. d. The security chief shall take charge of site access at the incident site. He shall further judge the gravity of the situation and communicate with the SMC. e. The security chief shall establish command posts at the COT main gate, incident site, tank farms, assembly points and other locations as appropriate. f. Roads and streets around the incident site shall be cordoned off and alternate routes shall be established with the concurrence of the concerned plant in charge. g. Additional security forces shall be mobilized to take care of the traffic control both inside and near the terminal gates. h. The security personnel shall accompany all the incoming external emergency services and direct them to the ERC / fire station. Other Personnel Employees, workers, visitors, contractors who are not participating in emergency response are Non-Responding Personnel. Visitors should move to the safer place as suggested by custodian employee. If not suggested, they shall move to Assembly Points / out of gate after seeing the wind direction Others shall move, after safe shutdown / closedown of their activities, to nearest safe assembly points after seeing the wind direction. P a g e 26 4.9 Assembly Points In affected & vulnerable plants, all non-responding personnel (who are not assigned any emergency duty) shall evacuate the area & report to a specified Assembly Points. Each assembly Point shall be clearly marked by a Conspicuous notices & provided with an identification numbers e.g. Assembly Point No. 1, 2 and so on. Assembly Points are located at a safe place, well away from area of risk and least affected by the down wind direction to ensure that employees do not have to approach the affected area to reach the Assembly Point. Assembly point’s location is given in annexure-7. At each assembly point, duties of assembly point In-charge shall be displayed in brief. Before reaching to assembly point, if it is required to pass through an affected area due to presence of obnoxious substances, suitable PPE's shall be given to the assembled persons. Upon instruction of SMC to Security Coordinator, major evacuation shall take place from plant assembly points to Master Assembly Point. Final head count shall be carried out by Evacuation (Security) Coordinator at Master Assembly Point. 4.10 Fire Control Arrangements Details of COT Fire Pumps and Fire Water Storage Tanks & Fire Alarm System are given below. 1. Fire water reservoirs: 02 Nos. of total Capacity = 14000 M3 + O1 no make up 7000 M3 2. Jockey pumps: 02 Nos. Capacity 60 M3/Hr each pressure 9.3 kg/Cm2 3. Electric operated Pumps: 02 Nos. Capacity 616 M3 per hour 4. Diesel operated Pumps: 03 Nos. Capacity 636 M3 per hour The sequence of operation and their tag no are given in the below. Pump Jockey P-101 A Jockey P-102 B Diesel Driven P-103 A Diesel Driven P-104 B Diesel Driven P-105 C Electric Operated P-106 A Electric Operated P-107 B Start pressure in Kg/Cm2 9.3 8.0 7.5 7.0 6.5 6.0 5.5 4.11 Medical Arrangements First Aid boxes are installed at Fire station and COT Control room. For any further medical assistance a list of hospitals and specialist doctors is given in annexure-5 4.12 Fire & Leak Control Arrangements Fire and leak control equipment available with COT is given in annexure-8. P a g e 27 4.13 Emergency call out & location Emergency Level Key personnel Level-1 - Incident Controller - Shift Fire Officer - Shift In Charge - Security In Charge - COT In charge Level-2 Chief Manager ( Operation) Maintenance & Inspection In charge Security officer Fire & Safety Officer Marine officer Level-3 Site Main Controller Head-Maintenance & Inspection Commercial and Finance coordinator Report at - Incident Site - Incident Site - Incident Site - Incident Site - Incident Site - Incident Site - Incident Site - Incident Site - Incident Site - Incident Site - ERC - Incident Site - Incident Site -Incident Site - Incident Site - Incident Site - ERC Called by Fire Control Room Operator Fire Control Room Operator Fire Control Room Operator BOMB THREAT EMERGENCY RESPONSE: ACTION PLAN Immediately after receipt of call/information, it should be passed to the following Heads of Department. 1. Plant Head- COT 2. Sr. Vice President- COT 3. Security In Charge- COT/ Refinery 4. MD/ COO- Refinery 5. Manager Terminal/Marine 6. HR, Admin- COT 7. Officers- COT 8. Police Station- Vadinar 9. Emergency Response Team- Jamnagar Two situations and possible Areas. a) b) When there is no time limit given by the caller When caller has given specific time limit, in such situation the concerned area in charge will make necessary fire fighting and First aid arrangements with the help of fire wing. First Situation: When there is no time limit specified by the caller. Soon after getting clearance from Chief Operating Officer the following action be initiated. ACTION PLAN WHEN TIME LIMIT IS SPECIFIED 1 2 Emergency shut down of the plants affected areas. Evacuation of the employees to safer location. P a g e 28 3 Bomb search implementing all other precautionary majors 4 Services of fire fighting and first aid be pressed into. 5 Services of bomb disposal squad be pressed into. 6 Search should be conducted along with employees working in the area and safety officer. Search procedure a) b) c) d) e) f) g) h) i) Search must be conducted along with employees of the work location since they are familiar with the area and will be able to notice a foreign object faster. Two men teams may be formed to search various parts of room/area. Stand quietly for some movement to listen for any clock work device before starting the search. As far as possible do not cause any disturbance in the environment till search is over. Do not go into the dark room and turn on lights. Use flash lights. If any foreign or suspicious object located do not move or touch it. The removal disarming of a bomb must be left to professional. Report the location and description of object immediately to control centre. If possible place a bag or maters around the object, do not cover it. Identify the danger area and block it off with clear zone of at least 300 feet including area below and above. Check that all doors and windows are open. Evacuate the area. * In the event of bomb explosion, the existing fire emergency disaster control preparedness plan will come into operation. CO-ORDINATOR’S RESPONSIBILITIES. FUNCTION OF COO OR HEAD (HR) 1 To declare the state of emergency disaster to the designation subordinate officers verbally through telephone. In turn they will inform their subordinate. 2 Will establish emergency control room and mobilize all required coordinators to assemble at Control Room to put the bomb threat action plan in action. 3 Will inform Managing Director. 4 Will mobilize help to be kept in readiness in case required from outside agencies by contacting their officers particularly those of neighboring industrial civil and local authorities. 5 Keep neighboring industries i.e.Indian Oil Corporation, ESSAR & Reliance to be appraised of the situation 6 Will activate plant shut down through the plant in charge. 7 Will approve and release information to govt. agencies/state statutory bodies. Permit electronic media. 8 Will activate search of premise and evacuation plan for refinery personnel and neighborhood of the situation through manager administration. 9 Will give all clear information when the posed threat is eliminated. FUNCTION OF THE PLANT INCHARGE 1 Will release instruction for mobilizing fire fighting, first aid facilities to be kept in readiness. 2 Will co-ordinate searching of the area with local officers and safety officer &, Police for bomb as per search procedure. 3 Will hold full responsibilities for the plant emergency. 4 Will inform Chief Operating Officer (COO) about the bomb location if and when the bomb is located and will mobilise people to cordon off the area. P a g e 29 FUNCTION OF Chief Operating Officer (COO)or Head - HR 1 Will co- ordinate with the following activities: a) Managing Director b) Public Relation officer (PRO) c) Medical advisor d) Police and Civic Administration 2 Will receive press and Government representatives 3 Will release press statement after approval of competent authority. Inform all statutory Government bodies regarding the crisis. ACTION PLAN FOR SECURITY PERSONNEL ON BOMB THREAT It is extremely necessary to have a proper action plan in case of bomb threat either genuine or hoax since it is not possible to assess whether the threat call given is genuine or hoax the golden principle to be prepared to handle the situation arising out of such contingency The objective of the scheme is to be prepared to handle the situation arising out of such contingency. a) To minimize /avoid loss or damage to life and property b) To avoid confusion, panic and build up confidence. c) To state rule for all and ensure it to be followed. ACTION BY THE ASSIGNMENT MANAGER ON RECEIVING THE INFORMATION: a) b) c) d) e) f) g) h) He shall ensure that the refinery gates are closed and no movements take place. He shall collect the reserve party and QRT for carrying search. On reaching the place, he shall cordon of the area by detailing a group of personnel depending on the area. No person should be permitted to enter the area however he shall permit the persons to move around the area/building. He shall organize a second group for carrying out search of the area. On noticing the bomb, the area should be earmarked Sandbag, and bomb blanket should be placed. No one should be permitted to deal with the suspected items. Wait for the bomb disposal team to attend to the package. After earmarking the package, to keep a check at a safety distance so that no other person handles the suspected package. No person be permitted to enter the building/ area till clearance is given by the bomb disposal team. ACTION TO BE TAKEN BY VARIOUS GATE IN-CHARGES a) b) c) d) e) The Gate in charge on receipt of information, shall immediately close down the gate and restrict the movement of the labour and employees. They should not permit any one to enter/exit. They should permit only police, bomb disposal squad, fire brigade, doctors and Government Officials who have come for help and investigation. Entry/exit for any other persons shall be confirmed over telephone either from the Manager Security or Head - HR Keep a record of persons entering and leaving the refinery. P a g e 30 DUTIES OF BARRACK INSPECTOR a) b) c) d) On receipt of information, he will fall in available personnel in unit lines and family quarter. Brief them about the emergent situation and dispatch them immediately by arranging transport to the refinery. He shall telephone and intimate the control room at plant giving details of number of personnel dispatched and item of dispatch. He shall also make entry of time of receipt of intimation for additional personnel and time of dispatch. ACTION BY THE MANAGER SECURITY a) b) c) Co-ordinate various activities of the personnel mentioned above. Co-ordinate with management. Co-ordinate with local police and other local departments submitting reports and information to higher formation. P a g e 31 CHAPTER-5 EMERGENCY RESPONSE CHART 5.1 Emergency Response Plan General Response Once emergency is declared, all the personnel inside the COT including visitors shall respond in the following manner: COT S/I shall take the charge of Incident controller till the arrival of IC at emergency site. It is advisable that all Role Players shall visit the incident site before proceeding to COT C/R. The plant personnel shall contact immediately control room and shall proceed to Assembly Point based on the announcement made through PA system. All the vehicle operators shall park their vehicle to the left and stop the engines. Engine keys shall be left inside the cabin itself. Visitors shall be necessary accompanied by the COT/ Security staff and guided to a safe location as per the announcements. If the situation escalates beyond control, employees shall evacuate the site as per the instructions made through PA system. Response of COT personnel Any person noticing a fire, explosion or the release of hazardous chemical shall immediately communicate the same by using nearest manual call point, or inform fire control room on telephone no. 823400. He shall inform COT Shift-in-charge / Control room immediately He shall isolate affected section to minimize spread of emergency IF HE IS TRAINED. He shall also try to extinguish the fire with the help of a suitable fire extinguisher available nearby and fire water monitors IF HE IS TRAINED. After receiving the information from the field, the shift in charge shall rush to the incident site with necessary protection to assess the situation and take immediate action to control the situation. Incident Controller shall interact with Shift Fire Officer for the action and assistance required. If the situations demands shutdown the plant activity and prevent the escalation of fire to other areas. All non-responding employees at the incident site shall be moved to an Assembly Points based on the prevailing wind direction and the nature of emergency. Casualties shall be transferred to the Medical help for nearby hospital or doctors Once the event is controlled using various support services, the Incident Controller (in consultation with SMC) shall declare "Incident Close Out” and "ALL CLEAR" siren shall be actuated. In case of major emergency i.e. level 2 & 3 emergency, SMC shall advise IC for incident close out. All persons from the Assembly Point shall resume their normal duty after hearing the" ALL CLEAR" siren. P a g e 32 Response of Fire Services The Fire control room operator shall initiate the turnout immediately upon receiving an emergency call. The first and second turn out for Fire and/or Rescue call received from COT complex shall be attended by fire tenders from the COT Fire Station. All the fire fighting vehicles shall go with maximum 40 km/hr speed inside the COT Premises. Fire Supervisor will perform the role of Shift Fire Officer. Upon receiving the indication of emergency on fire control panel, the COT Fire Station Control Room Operator will inform to Shift Fire Officer. Then after he will inform Security Shift in charge, COT Shift in charge or overall in charge for necessary actions. After having confirmation about real incident and upon receiving the instruction from Incident Controller for activation of siren fire control room operator shall intimate concern panel officer to activate the siren accordingly. Shift Fire Officer shall take charge immediately at the incident site and coordinate with the Incident Controller for combating the situation. Fire control room operator shall ensure the continuous fire water availability at emergency site through Fire Water Pump House Operator. If additional manpower is required for firefighting operation, Shift Fire Officer shall deploy Auxiliary Fire Squad from security dept. depending on the gravity of the situation. Shift Fire officer may seek additional support from Mutual Aid Members with the approval of IC, if the situation demands. Fire control room operator shall maintain the fire tenders availability and turn out allotments at fire control room display board. If the fire call is received from pipeline corridor, then the turn out shall be taken from COT Fire Station after consultation with COT in charge. Fire Supervisor shall constantly be in touch with IC and apprise him of the developments. Once the situation is controlled, upon receiving instruction from IC, Shift Fire Officer shall communicate to control room to actuate the “All Clear” siren. Fire control room operator shall record all the events / activities in the occurrence book with time against each event. In case of product transport emergency outside the boundary of the factory premises, it is informed to fire control room. In consultation with the Incident Controller, necessary response & control actions are taken in terms of instructions, actions and help for activation of different channels of the company and the authorities of the concerned area. When an additional turnout is called from emergency site, fire control room operator shall raise the turnout bell at main fire station and second turnout vehicle shall rush to the site. In case of an emergency in SPM, COT control room operator shall inform COT Fire Station, Security in charge and Incident controller. The detailed turn out procedures for COT Vadinar is being prepared by Fire Department. Guidelines for Evacuation / Rescue priorities Evacuation priorities are based on the circumstances under which personnel should be evacuated to shelter-in-place, the size & shape of areas that should be considered vulnerable during various types of emergencies. Guidelines obtained from the IC should only be considered a starting point for the decision process. In actual emergency, assessment of evacuation area and hazardous zone must be a continuous activity. Changes in wind velocity wind direction and temperature differences shall be constantly monitored and considered during evacuation. P a g e 33 Assembly Points All non-responding personnel (who are not assigned any emergency duty) shall evacuate the area & report to a specified Assembly Points. Each assembly Point shall be clearly marked by a Conspicuous notices & provided with an identification numbers e.g. Assembly Point No. 1, 2 and so on. Assembly Points are located at a safe place, well away from area of risk and least affected by the down wind direction. Upon instruction of IC to Security Coordinator, major evacuation shall take place from plant assembly points to Master Assembly Point. Alternate Master Assembly Point shall only be used in case of a threat to master assembly point area. Final head count shall be carried out by Security Coordinator at Master Assembly Point Before reaching an assembly point or subsequently, if it is required to pass through an affected area or the release of toxic substance, suitable PPE including respirator, helmets etc should be made available to the people. If the situation escalates beyond control whereby major evacuation of personnel from the COT is required, than people shall be shifted to strategic location where shelter, medical & food facility can be arranged for the evacuated people. Action to be taken by Operations and Maintenance Personnel Alert all the personnel working in the plant regarding the emergency. Ensure all hot works / vessel entry jobs are immediately stopped. Shut down welding generators, close acetylene / oxygen cylinder valves, and switch off electrical supply to electrically operated tools. Guide them to take appropriate escape keeping in mind the prevailing wind direction and assemble at safe assembly. Provide the list of personnel working in the plant at the time of emergency to IC to facilitate proper head counting. Ensure all the personnel are evacuated who are not required at emergency site. Inform IC / Fire Coordinator at site for evacuation of any trapped personnel. Keep cool. Do not rush. Assemble at designated Assembly Points as directed by the plant personnel. Inform Rescue coordinator regarding any person who are missing or trapped at work site. Action to be taken by IC Supervise the rescue process and issue guidance to Fire Services, Security Services, and Rescue Coordinator & Medical Services from time to time. Identify for any missing / trapped personnel, if any, instruct Fire Coordinator for search and rescue operations. Arrange for transportation, if found required for shifting the evacuated personnel from assembly points to safe locations. Instruct security for shifting personnel, if required. Ensure all the personnel are evacuated. Appraise SMC. Strategies to Combat Various Emergency Scenarios Following section describes in brief the general strategies to be taken during various emergency scenarios. These are guidelines for controlling the emergency. P a g e 34 A) Fire & Explosion Initial Operations Response Actions The O & M (Operations and maintenance) personnel, being first line respondent at site shall attempt to control the emergency at the initial stage by isolating the fuel, operating the fire protection facilities etc. to minimize the potential effects due to high inventory. Subsequent actions intended to reduce the impact of fuel released are Emergency shutdown. Depressurizing the equipment involved. Removing flammable inventory, where appropriate. Fire Water Drainage The flow of burning liquids in undesired directions has to be prevented so as not to endanger other equipment and personnel. It is therefore essential to Prevent the spread of fire through drains. Avoid flooding of sewers / oil traps / oil catchers by pumping out when necessary. Prevent spread of fire on surface waters. Mitigation Measures Removal, segregation and disposal of solid debris / damaged material Clean –up and removal of any remaining oil and disposal to appropriate place (ETP / slop tanks) Removal and disposal of contaminated soil Direct / flush out oily contaminated water to ETP Release of Flammable material Upon detection of a release/ spill, Following are the most important actions to be taken during such situation: Physical restriction of liquid pool surface areas with the help of containment booms / oil sorbent booms. Depressurization/ Isolation of equipment involved. Use of fire fighting or specialized hazardous material foams on liquid pools. Dilution / coverage of liquid pools with foam (or other compatible & safe liquids). Use of water sprays or fogs. Cease of all the hot works/ work permits Evacuation of all non-responding staff from the areas in distress in crosswind direction. Stop release of vapors. Shut down of air conditioning plants at control centre. Shut down of air compressors and diesel engines in the path of the gas cloud. Closure off roads to traffic around the distress area. Personnel responsible for rescuing victims shall don full protective equipment. Mobilize trained first-aiders. B) B Oil Spill Spill may occur on land or water. Spills on land are relatively simple to handle. The following strategies may be considered while handling an oil spill. Oil Spill on Land When a liquid or a solid has been discharged onto a land surface, attempt to contain the spilled material and prevent further spread. Dikes or barriers of earth, sand or clay materials P a g e 35 can be quickly constructed with bulldozers or similar equipment. Motorized equipment should not be used indiscriminately near flammable or explosive vapors or gases. Adequate shovels may be arranged for manual cleaning. Once the spilled material has been contained, the next step is to remove it from the environment. Following methods shall be adopted for gross cleanup of contaminated ground surfaces: Use of compatible pumps, hoses, and tanks, drums, or vacuum trucks to collect pools of accumulated liquids. Use of soil, sand, clay, straw, saw dust, fly ash, cement powder, vermiculite, or commercially available mineral or plastic sorbent materials to absorb and mop up liquid residues. Dispose off the same as per procedure. Removal of contaminated surface layers (where cleaning in place is not practical) by shovels or mechanical means. Steam-cleaning or washing of solid surfaces where hydrocarbons have spilled. Application of special mutant bacterial cultures to contaminated soils and liquids to "digest" contaminants over a period. C) Cyclone The contingency actions during a cyclone shall be based on the weather forecasts obtained from Jamnagar meteorological stations and the local meteorological department. Some of the important actions to be carried out are as follows: Preparedness for Cyclone Establish regular contact with the local meteorological department. Establish distances from storm in order to execute preparatory actions in a shorter time. Appraise the COT operations / installations and consider the consequences that the emergency might have on operations and personnel. Check the availability of tools, batteries, non-perishable foods and other materials that might be required. Review all operations carefully to ensure that systems in jeopardy are shut down. Ensure the readiness of emergency vehicles, Medical centre, medicines etc. Safeguard Jetties and move tankers into safe mooring / anchorages when predetermined levels of adverse weather conditions are forecast. Storage tanks should have products to the maximum filling capacity and secure tanks / pipelines firmly against floating. Metallic sheets, loose materials, empty drums and other light objects shall be properly secured. Flush drainage systems of jetties, tanks, tank farms and manifolds. Shut down all tank mixers and blenders. Jib cranes to be secured in safe positions and loading arms shall be locked upright position. During Cyclone Remain calm. Do not go outdoors. Do not seal the office completely as the suction created by the difference in atmospheric pressure inside and outside can rip open a window or door by breaking window glass panes. After The Cyclone Do not touch electric lines. Stay away from the disaster area. Boil drinking water before consuming. P a g e 36 D) Flood Though flood in this region is rare by virtue of its location from rivers and dams, there is every possibility that the COT can be flooded due to a heavy downpour. As a result, the low lying areas like cable cellars, sub-stations, intermediate storage tank farm, effluent treatment plant etc. are likely to be affected. Following actions may be considered during such situations: Make decision to shut down the plant and related facilities if the situation demand. Evacuate people from areas, which are likely to be affected. Arrange boats, helicopters and other necessary means to evacuate people from the affected areas. Identify swimming experts to evacuate the trapped personnel. Switch off all electrical supply until the situation comes to normal. Ensure adequate communication facilities are made available. Monitor all open drainage systems for inadvertent entry of water stream. Check that no oil enters the final water stream from the effluent treatment plants and storm water ponds. Ensure adequate de-watering pumps are made readily available. Medical team to monitor hygiene and sanitation facilities and take steps to prevent spread of any communicable diseases. Extra care shall be taken to chlorinate the drinking water. General Do's and Don'ts after flood There is a possibility of spread of water borne diseases after flood, and hence medical treatment should be taken immediately. Do not enter deep, unknown waters. Do not go near the riverbank even after the floodwater has receded. Sprinkle medicines in the stagnant dirty water. Inspect your plant / house for any cracks or other damage. Check all the walls, floor, ceiling, doors and windows, so that any chance of falling down can be known and you can be aware about the immediate danger. If the floodwater has entered the building / house or has surrounded, then it is advisable not to enter to it. Keep listening to weather forecast on radio and television. Move to your residence only when instructed by the competent authority. It is not safe to believe that the problems have ended after the flood water has receded. Inform the competent authority / officer for restoration of the necessary connections like gas, electricity, telephone, drainage, etc. Beware of the various insects or poisonous snakes that may have been dragged inside the house along with the floodwater. Destroy the food commodities that have been affected by floodwater. Check properly all the electric circuits, floor level furnace, boilers, gas cylinders, or electric equipments like motor pump etc. Check whether any inflammable or explosive item has not entered along with the floodwater. Switch off the main electric supply, if any damage is noticed to the electric equipments. If you find any breakage in the drainage system stop using latrines and do not use tap water. Do not use polluted water. Sewerage system should be checked and any damage should be repaired immediately so as to curtail spread of diseases. Empty the water clogged in the basement slowly with help of water pump so that damage to infrastructure can be minimized. P a g e 37 Check gas leakage which can be known by smell of gas or by hearing the sound of leakage; immediately open all windows and leave the house. Boil drinking water before usage and drink chlorinated water. Eat safe food. Rescue work should be undertaken immediately after flood situation as per the instruction. Do not follow any shortcut for rescue work. Do not try to leave the safe shelter to go back home until the local officials declare normalcy after flood and instruction to return home are not given. E) Earthquake Earthquakes cannot usually be forecast and therefore precautions immediately prior to such an event are not usually possible. Apart from some of the counter-measures to be taken in foreseeable cases, emergency recovery plans shall be considered by the management as per the situation and site conditions. Some of the general earthquake safety tips have been given as under: Preparedness for Earthquake Tell the facts about earthquake to your family members Construct new buildings with earthquake resistant method and strengthen the old buildings Insure your house and family members Take the training for first aid and fire fighting Do not keep cots near the glass window Do not keep heavy and fragile things in the selves Do don’t hang photo frames, mirrors, or glasses up your bed Keep your important documents, some cash and necessary articles ready in a bag Get your house insured before the earthquake Identify special skills of neighbor (medical, technical) so that it can be utilized in emergency During Earthquake Do not panic If already inside, than stay indoors! Get under a heavy desk or table and hang on to it. If fire breaks out, drop on the floor and crawl towards the exit. If you are out doors during the quake, keep away from buildings, trees and electricity lines. Walk towards open places, in a calm and composed manner. If you are driving, quickly but carefully move your car as far out of traffic as possible and stop. Do not stop on or under a bridge or overpass or under trees, light posts, power lines, or signs. Stay inside the car until tremors stops If you are in a school, get under a desk or table and hold on. After the Earthquake Do not be afraid of the aftershocks Listen to radio-TV and other media for Government Announcement Check for injuries to yourself and those around you. Take first aid where you can Extinguish fire, if any Examine walls, floors, doors, staircases and windows to make sure that the building is not in danger of collapsing Do not enter into the unsafe or risky houses or buildings Inspect for Gas leaks if you smell gas or hear blowing or hissing noises, open a window and quickly leave the building. Don’t light your kitchen stove if you suspect a gas leak. Do not keep telephone lines busy un-necessary Switch off electric lines P a g e 38 F) Air Raids Air raid warning would be obtained from the District Emergency Authority and Defense Authorities during which total blackout of the entire complex should be considered. Some of the contingency actions to be considered during those occasions are as follows: The Aviation Lights, if installed inside the COT, shall be switched off. All the lighting in the road, streets shall be put off. All the plant lighting shall be put off. Curtains shall be provided for all windows inside the building. Adequate bunkers shall be placed inside the complex to enable people take shelter during air raids. Torches shall be used by the operators and process personnel during such periods. The torches shall be covered on its glass to an extent to allow minimum light transmission. Other emergency actions shall be followed in addition as per the general procedure. G) BOMB THREAT IMMEDIATE ACTION: Person receiving the call. A) Bomb threat may be received in writing or may be received on phone. Experience shows that majority of the threats are received through telephone. Following are the instruction to the person receiving the call. ACTION TO BE TAKEN BY THE TELEPHONE RECEIVER ON RECEIPT OF BOMB THREAT CALL The threat is received either in writing or over the telephone. In number of incidents, the call is generally given over telephone. Since the threat is received over telephone, the receiver should initiate the following action:a) b) c) d) Engage the caller on a long conversation Listen carefully each and every word Request him to repeat the message Run the message verbatim and find out the location and possible time of detonation from the caller. e) Intimate caller that building is occupied and loss of life will be there in case of detonation. f) Note down the voice, modulation accents background sounds as this may give a clue. g) Note whether the space is excited or calm with any speech impediments. h) Report the matter immediately to the police, to the security control room as well as COT In Charge and COO. i) List of telephone numbers be attached. j) Fill up the bomb threat call details as per the format attached. B) ACTION BY THE SECURITY CONTROL ROOM Security control room at main gate shall function as initial control room under the charge of control room officer/in charge. The telephone numbers are: Control room Manager Security Fire Control Room -02833 256000/256400 -02833-256451/9099045813 -02833-256456/8264499479 P a g e 39 C) DUTIES OF THE CONTROL ROOM INCHARGE: a) b) c) d) e) f) g) h) i) j) k) l) m) n) o) p) q) The control room shift in charge shall immediately be to take down the details of the message call received on bomb threat. Alert the Manager Security and Plant In charge and intimate about the call. Inform Gate in - charge to close the gate for incoming movement of manpower. Do alert the personnel to carry out search Do check all personnel going out from the gate Do ensure no panic is created but checking should be thorough and methodical. Gate in -charge to advise not to allow any gathering at the gates and keep the paces clear. He shall sound the Security Barracks & pull additional security staff for carrying out clearance of the area. He should inform the Head (HR) and Fire and Safety. He shall intimate the Local Police Station Vadinar about the bomb threat and also bomb disposal squad through IG Intelligence Jamnagar. He shall not divulge the information to the press public relation officer or Designated Officer to deal with the press. He shall divert the press reporters etc. to the public relation officer for getting any information. He shall ask for the Dog Squad. He shall make entry In the General Duty (GD) Register about all events in chronological order As soon as he receives reserve party, he shall assign the duties of the personnel to strengthen the gates. He shall keep a reserve party at control room for further dispatch as per requirements. He shall leave the duties at the gate only when total clearance is given and has been directed to leave. We can approach for Explosive Detector Team in consultation with Jamnagar SP & Central Intelligence department. P a g e 40 FOR GUIDANCE OF TELEPHONE OPERATOR BOMB THREAT CHECK LIST Time ________________ Date ________________ ORIGIN: local_______________ STD ______________Com Box _____________internal___ CALLER Male------------------------Female---------------------Adult--------------------------Juvenile Language Voice Speech Manner of Accent Mental state Back ground uses speech noises English Loud Fast Obscene Local Calm Rectory Hindi Soft Slow Course Regional Rational Rural Marathi Rough Distinct Normal Foreign Irrational Roads traffic Vernacular Educated Blue red Educated South(Ind.) Co-he rent Rail traffic High pitch Stutter Bengali Incoherent Music Deep Hindi Vaterical Party Disguised Punjabi Aggrieved Atmosphere Other Humorous Quiet Drunken Background Voice Any other TEXT OF CONVERSATION------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Operator’s name___________________ Signature________________________ Should there be repeated bomb threat it will be advisable to connect a tape recorder to the switch board which can be switched on as soon as a bomb threat call is received. P a g e 41 H. CRUDE OIL PUMP HOUSE FIRE SCENARIO: EMERGENCY AT PUMP LEAK FIRE LEAK & FIRE BURST BURST & FIRE 1. Corrosion 2. Mechanical Failure 3. Third Party Activity 4. Damage to the pipeline due to the construction activity in the vicinity of the pipeline 5. Damage to the pipeline with malicious intention of third party [Attempt to pilferage, riots, etc.] 6. Damage due to Natural Calamities 7. Breaches due to flood 8. Earthquake 9. Cyclones 1. Oil Spillage 2. Fire Hazard 3. Pollution to the Irrigated Land 4. Water Pollution 1. Corrosion 2. Mechanical Failure 3. Third Party Activity 4. Ignition due to short circuit, static electricity, spark from engine exhaust 5. Burst oil in case of damage to pipeline due to natural calamity ,breaches due to flood earthquake, cyclone catches fire due to human interference . CAUSES 1.Corrosion 1. Ignition due to 2.Mechanical short circuit, Failure Static electricity 3.Third Party generation, Activity spark from 4.Operational engine exhaust Failure etc. 2. External source of ignition 3. Lightning 1. 2. 3. 4. 5. CONSEQUENCES 1. Oil Spillage 2. Fire Hazard 1. Damage to equipment and / or structure 2. Injuries CONTROL MEASURES 1. Prevent ignition 2. Stop spillage 3. Clean Area 1. Extinguish fire 2. Cooling of neighboring equipment 1. Oil Spillage 2. Fire Hazard 3. Damage to equipment and/or structure 4. Injuries 1. Stop Oil spillage 2. Extinguish Fire 3. Clean the Area 4. Cooling of neighboring equipment CHECK LIST FOR MOBILISATION REQUIRED Oil the 1. Coordinator MANPOWER EQUIPMENT 1. Fire Fighting Equipment a) extinguishers b)Foam Compound 1. Coordinator 2. Fire Fighting Crew 3. Police 4. Mutual Aid Assistance Corrosion Mechanical Failure Operational Failure Third Party Activity Damage to the installation with malicious intention of third party [Attempt to pilferage, riots, etc. 6. External Source of Ignition 7. Ignition due to short circuit, Static electricity generation, sparks from engine exhaust etc. 8. Lightening 1. Coordinators 2. Fire Fighting Crew 3. Police / Home Guards / District Authority/PWD Authorities 4. Labourers 5. Mutual Aid Assistance 1. Prevent ignition 2. Stop Oil spillage 3. Contain Spread of Oil 4. Reclaim Oil 5. Clean the area 1. Coordinators 2. Fire Fighting Crew 3. Labourers 4. Police 5. Mutual Aid Assistance 1. Fire Fighting 1. Fire Fighting 1. Fire Fighting Equipment Equipment Equipment a) Extinguishers a) Extinguishers a) Fire Tender b)Foam Compound b) Foam Compound b) Extinguishers c) Water source c) Water Sources. c) Foam compound d) Fire Tender 1. Equipment for d) Water Sources. 1. Ambulance construction the bund 2. Equipment for 2. Equipment for to contain spread of construction the construction of oil- Pick Axe, Shovel, bund to contain the bund to Baskets/Gamelas, spread of oil- Pick contain spread of etc. Axe, Shovel, oil- Pick Axe, 2. Equipment fr Baskets/Gamelas Shovel, Recovery of Oil , etc. Basket/Gamelas, Mugs, Buckets, 3. Equipment fr Tagara, etc. Barrels, Pneumatic Recovery of Oil 3. Equipment for Pumps, Hoses, etc. Mugs, Buckets, 1. Oil Spillage 2. Fire 3. Damage to equipment and our structure 4. Injuries 1. Stop Oil Spillage 2. Extinguish the Fire 3. Contain Spread of Oil 4. Reclaim Oil 5. Clean the area 1. Coordinators 2. Fire Fighting Crew 3. Police / Home Guards / District Authority /PWD/ Irrigation Authorities 4. Mutual Aid Assistance 1. Fire Fighting Equipment a) Fire Tender b) Portable Extinguishers c) Water Sources. d) Foam Compound 2. Equipment for construction the bund to contain spread of oil- Pick Axe, Shovel, Baskets / Gamelas, etc. P a g e 42 Recovery of Oil - 3. Oil Dispersant and Barrels, 3. Equipment for Mugs, Buckets, sprayer Pneumatic Recovery of Barrels, 4. Emergency repair Pumps, Hoses, Oil–Hoses, Pneumatic equipment etc. Mugs, Buckets, Pumps, Hoses, 4. Oil Dispersant Barrels, etc. and sprayer Pneumatic 4. Oil Dispersant 5. Emergency Pumps, and sprayer repair equipment 4. Emergency 5. Emergency repair repair equipment equipment 5. Oil Dispersant and sprayer P a g e 43 CHAPTER 6 OFF-SITE EMERGENCY PLAN The Off-site Emergency Plan, which is the responsibility of the District Emergency authority, deals with measures to prevent and control emergencies affecting the public and the environment outside BORL, COT Vadinar premises. The District Emergency Authority based on the on-site plans of all the neighboring industries in the local region will develop this contingency plan as per MSIHC Rules 1989. This plan considers the possible effects of incidents from any industry on the neighboring population and the remedial measures. In this context, COT Vadinar will furnish to the District Emergency Authority the following technical inputs to enable it to prepare the contingency plan accordingly: 1 Inventory of hazardous chemicals 2 MSDS of such chemicals 3 Types of emergencies 4 Nature, extent and likely effects of such incidents 5 Risk and environmental impact assessment The Off-Site Plan is largely a matter of ensuring co-ordination of existing services and their readiness, as far as possible, for the specific hazards and problems, which may arise in an incident. This means that key personnel have been identified, their duties defined and proper training achieved and Management Control Centers exist. The District Emergency Authority, based on severity of any on-site emergency may declare off-site emergency. 6.1 Responsibilities of COT in Off-Site Emergency Plan The On- Site and Off-Site Plans are dovetail so that the emergency services are summoned at the appropriate time and are provided with accurate information and a correct assessment of the situation. The responsibility for this is with Incident controller. The SMC shall provide a copy of our On-Site Emergency Management Plan to the District authorities, the DISH and the Emergency Services, so that on the basis of information in various Annexure, such authorities can make their emergency preparedness plan to formulate and execute the District / Area Off-Site Emergency Plan. Further, on the advice of the authorities we can also modify our plan to make our plan more effective and perfect. COT-Vadinar shall identify and evaluate incident scenarios that would create hazardous conditions outside BORL-COT’s perimeter. The extension of critical on-site major incidents like major fire, explosion, oil spill etc., to an offsite emergency crossing the perimeter of BORL, Vadinar should be informed immediately to the local governmental agencies to take charge of the situation. BORL, COT-Vadinar shall extend a specialist advice and other emergency equipments / facilities to assist local authorities in mitigating major incidents like fire, explosion, toxic release, oil / chemical spill, major road accidents, natural calamities etc. BORL-COT Vadinar shall establish a channel of communication with the local authorities for emergency communication. The emergency coordination in all such occasions will be done by the IC of BORL COT. Thus, all the possible external coordination / liaison with a view to mitigate and minimize the incident impact / consequence outside our perimeter shall be done within the shortest possible time. P a g e 44 CHAPTER 7 TRAINING REHARSAL & RECORDS 7.1 NEED OF TRAINNING & REHEARASAL The consequences due to a major emergency may be very serious in nature. This necessitates rehearsing the OSEMP-drills involving all key members for effective emergency control operations. This will further enhance better understanding of individual's role and responsibilities in emergency response besides improving the overall coordinated efforts. The main objectives of training & rehearsals are: Familiarizing key personnel involved in the plan with their equipment, the overall plans and their roles & thus they give experience and build confidence in the team members. Familiarizing professionals like fire fighters, medical personnel with special tactics and hazards, and enabling them to test their part of the plan & to generate requirements of specific equipments. Ensuring efficiency of emergency response mechanisms. Familiarization to operational personnel on operation control and mitigation measures. Reviewing the total plan, including communications and logistics, so that updating, modifying and training activities can be improved. To check effectiveness of the communications system, including the alternative arrangements in cases of failure, the speed of mobilization of the factory emergency teams, search, rescue and treatment of casualties, emergency isolation and shut down. The procedure for conducting various drills and rehearsals are given in a separate procedure of Fire Department. Some of the salient features are discussed in the following section. The emergency plan is tested when it is devised and thereafter it is rehearsed at a frequency of once in six months. Their normal training and experience in day-to-day operations generally qualify individual personnel with their duties under the plans. Rehearsals or exercises are important for all personnel likely to be involved in an incident. After each rehearsal or practice, to take account of any the shortcomings highlighted from the exercise. In addition, its effectiveness is also reviewed every time it is used to deal with a real emergency. The plan shall be revised once in a year. 7.2 Drills These rehearsals shall be conducted at regular intervals for individual team building in order to improve the overall functioning of the integrated emergency management plan. Some of the specific team activities include, fire-fighting ground exercises, rescue and medical logistics, emergency shut downs (simulated) and communications (radio) etc. These drills shall be conducted in various plants / storage facilities at interval of one month. Exercises shall be arranged to test each part of the emergency plan on each plant, stage-by-stage, starting with First immediate action, emergency isolation and shut down where appropriate by simulation. P a g e 45 7.3 Full- Scale Emergency Exercises / Mock Drills The ability of the emergency management team to perform a set of critical tasks under simulated conditions in various process plants are validated by conducting various drills regularly. These exercises are planned to involve the outside services. Each exercise should be monitored by a number of independent observers located at various positions. A follow-up discussion between senior officers and mangers along with the observers will further assist to develop practical and effective procedures. For oil spill in sea area, BORL-COT-Vadinar will take part in rehearsal conducted by Indian Coast Guard and GMB. 7.4 RECORDS AND UPDATING THE PLAN The DMP shall be reviewed and updated once in a year to take care following: Lapses / problems identified during emergency exercises and real incidents. Major changes / modifications in operating facilities or emergency equipments. Changes in the organization structure / communication facilities, rescue and support means and their identities. P a g e 46 CHAPTER 8 MUTUAL AID SCHEME In case of Disaster no individual organization is self sufficient to fight such major eventuality. Help from nearby organization is must to protect lives & property. Keeping this view in mind Mutual Aid scheme was constituted in Jamnagar. MUTUAL-AID SCHEME ORGANISATION'S TELEPHONE NUMBERS Sr. No. Name of Mutual AidScheme Member Telephone No. Office Residence/ Mobile Nos. Sr. No. Name of Mutual AidScheme Member Telephone No. Office Residence/ Mobile Nos. 1 Chairman - Collector 2555869 9978406210 2554059 18 Sanjay Goyal -IOCL Vad Shrma 02833-256330 9909909016 9909944392 2 Addl. Collector 2550284 99784 05182 2672131 19 Asst. Commandant - CISF Vadinar 02833-256559 256558 3 RDC 2553183 2556102 20 HH Dave-AGM(SU) GSFC ltd. 2344100 9979853305 4 Jt.Chairman Commissioner,JMC 2552321 2552372 21 PK Prasad - IOCL Theba 2570712 9426911475 5 P Palanivelu- secretary MAS,EOL 02833 - 241892 9825210517 22 RP Mithani GSECL Modh Fire 2344116 9925214053 9099959252 6 RN Shah - Treasurer-MAS, GSFC 2432242 9979862520 23 Chetansinh Jadeja - Fire Officer, SDCC 2344272-75/ 2439322 (Fire) 9099038083 7 MAS OFFICE 2542764 24 V.Koti, VP(Fire) RIL Umesh Khandalkar 6611193 4023060 9998972008 9998215963 8 Office of Supdt. of Police 2554203 2555868 25 D K Thakur Jt. Secretary- MASTCL 02892 - 665247 9227676113 9 Police Control Room Jamnagar District Disaster Control Room 2550200 2344249(Sikka) 2846125(Padana) 9426950783 (DDMO) Parmar 26 Mr. Dipak Roy, Mgr.(O&M) - K Kumar AM - GSPL MJ Sunaria - Digjam Ltd. 2712972/73/74 9925013159 9879599464 9510727038 11 PB Shah ,Asst. DISH Jamnagar 2678206 27 PB Sakharkar -GAIL 4011437 9624089696 12 Dy. Chief Warden 2540371 28 P R Thatte, Jt. Sr. VP BORL R K Thakkar, AVP BORL 02833 -256450 02833 -256451 9427206501 9099045813 13 Mr. Desai -Home Guard Jamnagar 2553862 29 MU Khan - Cairn India Basavraj Girimath 2750995-96 9662539451 9662539598 14 RMO - GG Hospital 2550240 /2541081 30 Utpal R Gurav 15 Control Room GMB Jamnagar 2711805 / 2756909 31 Cdr Shashank Valsura 16 KK Bisnoi - JMC CFO 9879531101 32 Indian Air Force, Jamnagar 17 Indian Coast Guard Vadinar 2550340/101 (2662691) 02833 - 256579 1090 (Terror Helpline Toll free) 33 For any Emergency Ambulance / Fire 10 2553404 / 2541485/ 1077 (Toll Free) 9824583767 2551689 / 9824258885 Mr. GR 8238015384 Indian Navy- 3987210 7878545656 2720007, Extn.4222(fire) RK Singh 9426850187 108 P a g e 47 ANNEXURES P a g e 48 ANNEXURE-1 DRAWING OF COT WITH NEARBY AREA P a g e 49 ANNEXURE- 2 OVERALL PLOT PLAN OF COT P a g e 50 ANNEXURE -3 MUTUAL AID - MEMBERS BORL is a member of Mutual aid scheme and it has been established with nearby industries. The nearest industries are Essar Oil Refinery, Indian Oil Company and Reliance at Moti Khavdi. The list of contact number of Mutual aid members are: MUTUAL-AID SCHEME ORGANISATION'S TELEPHONE NUMBERS Sr. No. Name of Mutual AidScheme Member Telephone No. Office Residence/ Mobile Nos. Sr. No. Name of Mutual AidScheme Member Telephone No. Office Residence/ Mobile Nos. 1 Chairman - Collector 2555869 9978406210 2554059 18 Sanjay Goyal -IOCL Vad Shrma 02833-256330 9909909016 9909944392 2 Addl. Collector 2550284 99784 05182 2672131 19 Asst. Commandant - CISF Vadinar 02833-256559 256558 3 RDC 2553183 2556102 20 HH Dave-AGM(SU) GSFC ltd. 2344100 9979853305 4 Jt.Chairman Commissioner,JMC 2552321 2552372 21 PK Prasad - IOCL Theba 2570712 9426911475 5 P Palanivelu- secretary MAS,EOL 02833 - 241892 9825210517 22 RP Mithani GSECL Modh Fire 2344116 9925214053 9099959252 6 RN Shah - Treasurer-MAS, GSFC 2432242 9979862520 23 Chetansinh Jadeja - Fire Officer, SDCC 2344272-75/ 2439322 (Fire) 9099038083 7 MAS OFFICE 2542764 24 V.Koti, VP(Fire) RIL Umesh Khandalkar 6611193 4023060 9998972008 9998215963 8 Office of Supdt. of Police 2554203 2555868 25 D K Thakur Jt. Secretary- MASTCL 02892 - 665247 9227676113 9 Police Control Room Jamnagar District Disaster Control Room 2550200 2344249(Sikka) 2846125(Padana) 9426950783 (DDMO) Parmar 26 Mr. Dipak Roy, Mgr.(O&M) - K Kumar AM - GSPL MJ Sunaria - Digjam Ltd. 2712972/73/74 9925013159 9879599464 9510727038 11 PB Shah ,Asst. DISH Jamnagar 2678206 27 PB Sakharkar -GAIL 4011437 9624089696 12 Dy. Chief Warden 2540371 28 P R Thatte, Jt. Sr. VP BORL R K Thakkar, AVP BORL 02833 -256450 02833 -256451 9427206501 9099045813 13 Mr. Desai -Home Guard Jamnagar 2553862 29 MU Khan - Cairn India Basavraj Girimath 2750995-96 9662539451 9662539598 14 RMO - GG Hospital 2550240 /2541081 30 Utpal R Gurav 15 Control Room GMB Jamnagar 2711805 / 2756909 31 Cdr Shashank Valsura 16 KK Bisnoi - JMC CFO 9879531101 32 Indian Air Force, Jamnagar 17 Indian Coast Guard Vadinar 2550340/101 (2662691) 02833 - 256579 1090 (Terror Helpline Toll free) 33 For any Emergency Ambulance / Fire 10 2553404 / 2541485/ 1077 (Toll Free) 9824583767 2551689 / 9824258885 Mr. GR 8238015384 Indian Navy- 3987210 7878545656 2720007, Extn.4222(fire) RK Singh 9426850187 108 P a g e 51 ANNEXURE-4 DETAILS OF TANKS AT COT-VADINAR Sr. No. Product Tank size ( Dia X Height) Meter Tank no Tank type Qty Fire fighting System 1 Crude 68 X 20 03-TT-FR-01A Floating 60,000 M 2 3 4 5 6 7 8 Crude Crude Crude Crude Crude Crude Crude 68 X 20 68 X 20 68 X 20 68 X 20 68 X 20 68 X 20 68 X 20 Crude 18 X 10 Floating Floating Floating Floating Floating Floating Floating Fixed Cone Type 60,000 M3 60,000 M3 60,000 M3 60,000 M3 60,000 M3 60,000 M3 60,000 M3 9 03-TT-FR-01B 03-TT-FR-01C 03-TT-FR-01D 03-TT-FR-01E 03-TT-FR-01F 03-TT-FR-01G 03-TT-FR-01H Surge Relief tank Wet Slop Oil Tank 00 T 06 Foam & MVWS System. Rim Seal System, Fire Hydrants & Monitors Do Do Do Do Do Do Do 2410 M3 Water spray, Hydrants 10 Crude 5.6 x 6.6 Fixed Cone Type 150 M 3 3 Foam & MVWS System, Fire Hydrants & Monitors P a g e 52 ANNEXURE-5 LIST OF DOCTORS AND NEARBY HOSPITALS AT COT VADINAR 1. 2. 3. 4. 5. 6. 7. 8. Hospital Samarpan: Hospital G.G ( IRWIN) : Blood Bank ( IRWIN) : Sevak Eye Hospital : Shradhha Hospital : Ruparelia Neuro Hospital : Oshwal Hospital : Madhav Hospital: 0288- 2712278/2660115 0288- 2550205 0288-2661052 0288- 2553907 0288 - 2673187 0288 - 2662121 0288- 2566834 0288- 2550952 P a g e 53 ANNEXURE-6 EMERGENCY CONTACT NUMBERS OF GOVT. AUTHORITIES Sr. No. 1 2 Authority District CollectorJamnagar: SDM Khambaliya OFFICE Residence Mobile no Fax 0288-2555869 0288-2554059 9427306210 0288:2555899 02833-234577 02833-237220 9824369407 02833-234577 0288-2555899 3 RDC 0288-2553183 0288-2556102 9427305182 3 Police-C/RJamnagar 0288-2550200 0288-2550200 2344249(Sikka) 2846125(Padana) 02833-256541 9998163981 4 5 6 7 8 9 10 11 12 Police StationVadinar GPCB: Chairman Gandhi Nagar R.O. Jamnagar CCE Nagpur Chief controller of Explosives Dy. CCE: Vadodara Factory Inspector Jamnagar Chief Insp. Factory Ahmadabad CPCB-New Delhi Coast GuardVadinar 079-23222425, 23222784 079-23232161 0288-2752366 0288:2753540 07122510579,2510102,2510103 0712-2510577 0265-2420512, 2421299 0288-2678206 9824583767 079- 25502349 9978406128 011-2307233/22304948 02833-256560 02833-256560 P a g e 54 ANNEXURE-7 SAFE ASSEMBLY POINTS Location of Assembly point Sr. no of Accommodation Assembly. capacity point 1 3 Fire Station Main(1) 100 COT Control Room 2 100 Administrative Block 3 40 At the time of emergency Person In - charge Place of availability Phone number Name & In the Residence In the Residence designation Factory address Factory address 4 5 6 7 8 COT , Fire round 823400 Operator the clock Round S/I COT the 823444 clock General AVP – COT 823506 Shift P a g e 55 ANNEXURE-8 FIRE CONTROL ARRANGEMENTS AT COT Fire Water Reservoir: No of Reservoirs: 03 Total Capacity: 21000 m3 Sr. No. 1 ITEM NAME Fire Tender Break Glass unit/ Manual Call Point Smoke detectors(Ionization & Photoelectric type / Heat detectors 2 3 4 Siren 5 Dry Chemical Powder Fire Extinguisher QUANTITY 02 Nos. Fire station 67 Nos. Installed in COT operational area 140 Nos. COT Control room & Sub Station. 07 Nos. 02 Nos. a 75 Kg DCP 04 Nos. b 50 Kg DCP 01 Nos. c 25 Kg DCP 20 Nos. d 6 10 Kg DCP ( Including FT 1 & FT2) LOCATION 139 Nos. Fire Station & COT Control Room Distributed in entire COT CO2 Fire Extinguisher a 22.5 Kg CO2 01 No b 6.5 Kg CO2 05 Nos. c 4.5 Kg CO2 47 Nos. 7 SCBA set 12 Nos. COT C/R , Fire Station & FT-1 & FT -2 8 Fire fighting foam 73,000 liter Fire Station Double headed Hydrants 151 Nos. Monitors 37 Nos. Explosive meter 02 Nos. 8 9 Installed in COT- Vadinar premises Fire Station & Adm. Building. P a g e 56 ANNEXURE-9 LIST OF MAIN COORDINATORS Sr. No Name 1 P.R .Thatte 2 4 5 6 7 R. K. Thakkar Sarang Deshkar Sudhir Patkar Ketan Thakkar Amit Parmar 8 Falit Shah 9 Abdul Azeem 9 Shift Control Room 10 11 Fire Control Room Security Main Gate Designation Jt. Sr. Vice President (Site Main Controller) AVP-Projects (Incident Controller) Dy. Manager (Mechanical) AM - Marine Dy. Manager (Civil) AM (Electrical ) AM- Business Finance (Communication Officer) AM - Marine Mobile No Alternate Landline No. 9427206501 02833-256450 9099045813 9998961781 9687182107 9099045815 9712939796 02833-256451 02833-256436 02833-256169 02833-256168 02833-256 424 02833-256433 9099043034 9227644321 02833-256441 02833-256000 / 256400 02833 - 256456 02833- 256300 P a g e 57 ANNEXURE-10 MSDS OF CRUDE OIL 1. CHEMICAL IDENTITY Chemical name : Crude oil Synonyms : Regulated Identification Hazardous Ingredients 1. Toluene 2. benzene Chemical classification : flammable Shipping name: Codes/Label Haz. Waste ID No. CAS No 108-88-3 71-43-2 CAS No : 8002-05-09 UN No :1267 Haz chem No: Hazardous Ingredients 3. Hydrocarbon 4. Sulphur CAS No. 2. PHYSICAL AND CHEMICAL DATA Boiling range/point : > 23deg. C Physical State : Liquid Appearance : yellow to black viscous liquid Melting /Freezing Point : N.A Vapor Pressure @ 35deg C. Odor : Mild Vapor Density (Air-1) 1.7 Specific Gravity (Water :1) .9 Solubility in Water at 30 deg C: .01 soluble. pH : 3.FIRE AND EXPLOSION HAZARD DATA Flammability : yes LEL : 1 % Flash Point: > 35 deg C TGD Flammability : Flash Point deg C UEL : 5% Other Auto ignition Temp 235 C Explosion sensitivity to Impact Hazardous Combustion Products : Explosion Sensitivity to static Electricity : Hazardous polymerization : Not occur Hazardous Combustion Products : Combustible Liquid: yes Explosive material: Corrosive Material : Flammable Material : yes Oxidizer : Others : Pyrophoric Material : no Organic Peroxide 4. REACTIVITY DATA Chemical Stability : Stable Reactivity : Nil Incompatibility with other Material : Haz. Reaction Products: CO2. H2S, Co etc 5. Health Hazards Data Routes of Entry : Inhalation Irritating to skin and Eyes Effects of Exposure/ symptoms : redness, Irritation, dizziness on exposure Emergency Treatment : Flush with Plenty of water, get medical Attention TWA(ACGIH) : N.A mg/m3 Permissible Exposure limit : Not known STEL N.A Odor Threshold : Not known LD 50 (Oral-Rat) : P a g e 58 NFPA Hazard Signal : Health 1 6. PREVENTIVE MASURES Personal Protective Equipment Flammability 3 Stability 0 SPECIAL N.A 3 1 0 : Goggles, Rubber Hand gloves. Handling and Storage Precautions : Wear Rubber gloves, Face shield etc. 7. EMERGENCY AND FIRST AID MEASURE : FIRE Fire extinguishing Media : Water Fog, Foam, Dry Chemical or CO2 Special Procedure : Unusual Hazard : None EXPOSURE SPILLS First Aid Measures : Respiratory Protection, Use Plenty of water, Remove victims to fresh Air and provide oxygen If Breathing is difficult. Antidotes / Dosages. : ------Steps to be taken: Confined flow, collect the spilled material. Waste Disposal Method : safe disposal by burning in incinerator 8. ADDITIONAL INFORMATION / REFERENCES : 9. MANUFACTURERS / SUPPLIERS DATA NAME OF FIRM : Bharat Oman Refineries Limited Address : COT Vadinar- BORL, AT & PO: Sing ach Dist: Jamnagar , Gujarat: 361010 MAILING ADDRESS :Bharat Oman Refineries Limited, COT Vadinar- BORL, AT & PO: Singach Dist: Jamnagar , Gujarat: 361010 TELEPHONE No. CONTACT PERSON IN EMERGENCY : Fire & safety Department - 02833 - 256456 LOCAL BODIES INVOLVED : Factory Inspector: 10. DISCLAIMER : Information contained in this material data sheet is believed to be reliable but no representation; guarantee or warranties of any kind are made as to its accuracy, suitability for a particular application or results to be obtained from them. It is up to the manufacturer / seller to ensure that the information contained in the material safety data sheet is relevant to the product manufactured / handled or sold by him as the case may be. The Government makes no warranties, expressed or implied, in respect of the adequacy of this document for any particular purpose. P a g e 59 ANNEXURE-11 COT FIRE ORDER CHART P a g e 60 Annexure 6 QEHS Policy Annexure 7 DMP (JULY 2009) BHARAT OMAN REFINERIES LTD. CRUDE OIL TERMINAL, SINGACH CHAR RASTA, SINGACH VILLAGE, DIST. JAMNAGAR Pin 361010 LIST OF REVISIONS S.N. DETAILS OF REVISION SECTION PAGE UPDATED NO. NO. ON INDEX S.N PARA DESCRIPTION PAGE NO. 1 1.0.0. INTRODUCTION I-1 LOCATION OF SPM TERMINAL I-1 TANKER OPERATION I-2 STUDIES ON OIL SPILL SCENARIO OF OFF-SHORE OFF TERMINAL I-3 SENSITIVITIES AT VADINAR I-3 2 2.0.0 OBJECTIVE AND SCOPE II-1 3 3.0.0 OIL SPILL MANAGEMENT PLAN III-1 DEFINITION III-1 OIL SPILL CLASSIFICATION III-1 POSSIBLE VOLUME OF OIL SPILL III-2 RISK ANYLYSIS AND CAUSE OF SPILL III-3 IMPACT OF SECOND SPM AT VADINAR III-4 IMPACT OF SPMs OF OTHER OIL COMPANIES IN GULF OF KUTCH III-5 CAUSES OF OIL SPILL III-5 SPILL SCENARIO III-5 RESPONSE STRATEGIES III-8 DISASTER PLAN FOR VADINAR III-11 POLLUTION CONTROL NEAR SPM III-16 S.N PARA DESCRIPTION PAGE NO. TYPICAL CASE OF OIL SPILL COMBATING AT I-17 VADINAR BORL INTERFACE WITH NATIONAL OIL SPILL I-19 DISASTER CONTINGENCY PLAN 4 4.0.0. STATE OF PREPAREDNESS IV-1 REVIEW OF PREPAREDNESS IV-1 EXISTING MANPOWER IV-2 EXISTING AIRCRAFT CAPABILITY IV-3 AIRCRAFT LOGISTIC GISTIC IV-3 5 5.0.0 FUTURE SCOPE OF WORK V-1 6 6.0.0 REMIDIATION OF MAJOR SPILLS VI-1 7 ANNEXURES I LOCATION OF SPM TERMINALS IN GULF OF KUTCH II HARDWARE DETAILS OF SPM SYSTEM AT GULF OF KUTCH III DETAILS OFF POLLUTION RESPONSE CAPABILITY CAPABILITY-KANDLA KANDLA PORT TRUST AND OFFSHORE OIL TERMINAL, VADINAR DETAILS OFF POLLUTION RESPONSE CAPABILITY – RELIANCE PETROLEUM EUM LIMITED (RPL) DETAILS OFF POLLUTION RESPONSE CAPABILITY – ESSAR OIL LIMITED (VOTL) IV POLREP MESSAGE FORMAT FUNCTIONAL RESPONSIBILITIES ALLOCATED V 8 OIL SPILL EQUIPMENT AVAILABLE WITH IOCL, VADINAR VI CLASSIFICATION OF CRUDE OIL HANDLED AT VADINAR VII LIST OF OIL SPILL PILL COMBATING EQUIPMENT REQUIRED FOR VIII VADINAR AS DECIDED BY “TASK FORCE” LIST OF IMPORTANT TELEPHONE NUMBERS CHAPTER – 1 INTRODUCTION 1.0.0 INTRODUCTION 1.1.0 Bharat Oman Refineries Ltd. Ltd (BORL) owns and operates one offshore oil terminal in the Gulf of Kutch near village Vadinar/Singach in Jamnagar District. District. The terminal is intended to handle the throughput requirement of its Refinery at Bina, Madhya Pradesh.. The oil terminal facilit facility comprise of one no. Single Point Mooring (SPM) system for moorings of tankers, off-shore off / on-shore shore pipelines, the shore terminal comprising of 08 nos. of floating roof tanks of 60,000 kls each with the total storage capacity of about 0.48 million tone and originating pumping station through thro which crude is pumped to the refiner refinery at Bina through the Vadinar – Thamna, Thamna – Bewari, Bewari - Bina pipeline system. 1.1.1 The offshore oil facilities are connected to the shore tanks by means of 48” dia. Submarine pipeline of about 15 KM from SPM followed by 48” inch dia. dia of onshore pipeline of approx 1.9 KM length. T The he Pipe Line End Manifold (PLEM) of SPM has pig launcher facility to facilitate offshore based pigging operation of both offshore and onshore pipeline. A drawing showing the above is enclosed as Annexure-I. Annexure For operational flexibility, sub sub-sea isolation valves are provided at PLEM locations. The tanker berthed at SPM discharge discharges the crude oil through two strings of floating hoses connected between the tanker manifold and SPM, and two strings rings of submarine hoses connected between SPM and the PLEM located at the end of the submarine pipeline at the seabed. This off shore oil terminal in Gulf of Kutch near Sikka together with its cross-country cross pipeline system to the refiner refinery can be termed ass a vital energy artery of the Central region of the country catering to the energy requirement of the entire central region of the country. 1.2.0 LOCATION OF THE SPM TERMINAL The SPM facilities are situated within the territorial water of Gujarat Maaritime Board (GMB) near Sikka Port.. SPM is situated at Latitude 22’ 33’ 528” N and Longitude 69’ 45’ 750’ E. The draft available at SPM is 32 meters. The infra structure as well as pilotage facility for operating this terminal is lined up through external agency which will independently take care of jetty operations and movement of support vessels as per requirement including pull back tug. The entry channel of approximately 126 km (70 Nautical miles) in the Gulf of Kutch is identified identified for the navigation of vessels by KPT/GMB. A zone of 3.6 Km (2 nautical miles) around SPM is being proposed with GMB as as the “No Anchorage Zone” and it is proposed that no vessel is allowed to anchor in this area to prevent fouling of their anc anchors hors with our SPM anchor chains or sub-sea sub hoses and the pipeline. Details of hardware of the SPM Terminals in the Gulf of Kutch is enclosed at Annexure-II. 1.3.0 TANKER OPERATION Tankers can be unloaded from the SPM. The detail of tanker operating is described below. Pilots approved by GMB bring the tanker near SPM and make it all fast with the SPM using mooring hawsers. The ships are told to close it main engine and the pull back tug is connected to the aft of the ship to ensure that it maintains the safe ddistance istance from the buoy. The tug for pull back operation is necessary to avoid tankers overriding the SPM buoy and under buoy hoses etc. to prevent damage to the buoy and oil pollution. There are two strings of floating hoses of 610 mm (24”) dia. from the SPM, which are lifted by the crane of the tanker for connecting to tanker manifold. When the tanker are not there, these floating hoses are floating on sea and at the ends of the strings, butterfly valves are used to close/blind the line and additionally blinds are fitted to ensure that no spillage of oil takes place. place. Once the floating hose strings are connected to the tanker, the system is ready for discharge of cargo through SPM system. Before commencement of discharge of the tankers, ullaging of the tanker tanker is done and in the meanwhile shore tanks are also aligned and tank valves are operated for receipt of cargo into shore tanks. The inlet and outlet valves of the shore tanks are motor operated and can be closed within five minutes in case of any emergency ncy or after the discharge of the tanker is over over. The pull back tug is the Operation and maintenance vessel deployed by BORL for its da day to day maintenance works. Further during the operation of the tanker, there is a constant watch on the SPM system and the hoses for any leakage or burst and the operating parameters are kept well within the designed limits besides observing all safety aspects for the safety of the tanker, buoy and its accessories. The work of connecting and disconnecting hoses and repair of lines is given on contract to the operation and maintenance agency. agency During discharge operations technical personnel from following agencies agencies are always available: i) ii) iii) iv) BHARAT OMAN REFINERIES LTD. (BORL) VADINAR GUJARAT MARITIME BOARD (GMB) APPROVED PILOT OPERATION PERATION & MAINTENANCE TEAM TEAM, CRUDE OIL TANKER WATCH STAFF. There are isolating valves provided on the SPM for isolation of the floating strings and under buoy hose strings for use in any emergency arising out of failure of hose or burst of hose during operation to prevent oil loss, pollution and to sustain operation through the other string. The floating hose strings also have marine breakaway coupling to ensure quick disconnection of floating hoses. The sub sea hose is double carcass hose to ensure additional protection to sub sea operation of hoses. Thus by meticulously following the international marine stan standards dards of operations and maintenance the entire tanker discharge operation is kept totally spill proof. Further the entire off-shore shore facilities are subjected to stringent inspection checks as per Oil Companies International Marine Forum (OCIMF) guidelines and rigorous preventive and schedule maintenance for the upkeep of the facilities / equipment is done in order to avoid any unforeseen instances of hose burst, leaks or any other eventualities which may result in either small or large scale oil spills in tthe he ocean. 1.4.0 STUDIES ON OIL SPILL SCENARIO OF OFF OFF-SHORE SHORE TERMINALS 1.4.1 Taking into account of the intrinsic importance of the offshore operations of Crude oile terminal of Vadinar Bina Pipeline (VBPL) system, BORL had commissioned services of reputed Consultants in the field of Oil spill response plan through M/S Oil Spill Response Ltd. with Environment Resources Management, L London, UK . The objective and scope of above studies were to review the requirement of facilities/procedures and system to be provided for combating oil spill and resulting marine pollution due to operation of facilities of BORL,s SPM.. The study was also done to recommend the specific short term and long term corrective measures needed at vulnerable locations. Identification of m most ost suitable oil spill response technique for anticipated oil spill situations, logistic for equipment mobilization, risk analysis study with respect to accidental oil leakage, identification of probable locations for oil spill etc. were also dealt with by the consultants. The study was conducted and the report was submitted in March 2000 2000. 1.4.2 In addition to the above a few other reports are also available with BORL such as “Risk Analysis of Crude Oil Unloading and Storage facilities at Vadinar” submitted by M/s /s Engineers India Limited (EIL), National Oil Spill Disaster Contingency Plan of Indian Cost Guard (NOS--DCP), Marine environme ntal study Operation of Multiple SPM’s in Environmentally sensitive areas from UK, Risk Assessment of proposed Single Point Mooring ing facility in GMB water limits and crude oil terminal at Vadinar, Gujarat and this disaster management plan for off shore terminal. 1.5.0 SENSITIVITIES AT SIKKA The oil pollution and control thereof in the GMB is very sensitive from the environment angel in view of the following: i) Environmental: There are high numbers of environmental sensitivities in and round the offshore terminal near Vadinar/Singach /Singach such as Mangrove, Marine Park, bird habitat which includes des flamingoes, stocks, cranes, pelicans and many other sea and weeding birds. ii) Industrial: Industrial sensitivities that exist in the Vadinar region due scope of operations are Ship Building, other oil industries who operate and maintain SPM’s, Petrol Petroleum product jetties, Salt Pans / Industries and fishing fishing,, which represent major income for some members of particular community. CHAPTER – 2 OBJECTIVE AND SCOPE 2.0.0 OBJECTIVE AND SCOPE 2.1.0 The objective of this plan is provided to assist personnel in dealing with an unexpected discharge of oil and the same entering the marine environment as the result of activities which are the responsibility of Bharat Oman Refineries Limited (BORL) at the single point mooring facility near Sikka port. Its primary function purpose is to set in motion the necessary to stop orr minimize the discharge and to mitigate its effect. Effective planning ensures that the necessary actions to be taken in a structured, logical and timely manner. 2.1.1 The main objective of this plan document is to identify the nature and possible causes of potential oil spills, assessment of the attended risks involved, associated hazards and dovetail features of various in-house in information available with BORL with a view to develop a disaster plan delineating the functions of various concerns, departments/agencies nts/agencies for the operational responsibility to marine incidents which could result due to spillage of oil into sea. The main objectives of the plan include the following: a. b. c. d. e. f. g. To develop appropriate and effective systems for the detection and reporting of spillage of oil. To ensure prompt response to either prevent pollution or to restrict the spread of oil slick. To ensure that appropriate ate response & techniques are us used ed to clean up the pollutants and disposal of the recovered product is carried out in an eenvironmentally nvironmentally accepted manner. To ensure that adequate protection is provided to the marine environment environment.. To provide the framework of co co-ordination for further integrated response by various departments/agencies such as GMB, KPT, Coast Guard and other related ted government agencies and oil terminal operators and also to respond to any future national oil spill disaster contingency plan. The importance of disaster planning as a part of an overall oil spill response strategy cannot be over emphasized. The disaster er plan also incorporates the response strategies along with remediation of oil spills, the present state of preparedness and the oil combat equipments in vogue are summarized in relation to typical requirements as recommended by the consultants. While framing this plan reference is made to National Oil Spill Disaster Contingency Plan prepared by Indian Coast Guard. CHAPTER – 3 OIL SPILL MANAGEMENT PLAN 3.0.0 OIL SPILL MANAGEMENT PLAN. 3.1.0 DEFINITION Accidental and unwanted discharge of crude oil in the sea during the operation of SPM system including accidental spillage, if any, from the oil tankers may be termed as an oil spill resulting into pollution of marine environment. The oil spill may be minor, or, intermediate or major in nature depending upon the source and duration of the oil spill. 3.2.0 OIL SPILL CLASSIFICATION Oil spill can be broadly categorized into three categories depending upon the volume and area of oil spill, which has taken place. These three categories of oil spill are generally classified as Tier one, two and three and each Tier will require response strategies to suit its magnitude and manifestations as mentioned below: A. TIER ONE This would be a spill of a magnitude the local l resources of the terminal operator who could respond to successfully without assistance from other agencies. B. TIER TWO This would uld be a spill of a magnitude that would outstrip the local resources and would require assistance on a regional basis. This would either come from local / central Government or Local Industries Mutual Aid aarrangement. ment. C. TIER THREE This would be a spill of a magnitude that would surpass the capabilities of Tier one and Tier two. Additional resources would be required on a national and international level. Clearly Tier one and Tier two levels of response equipment and manpower resources are governed by a number mber of criteria. These criteria are such as location, logistics for national and international assistance, nearby sensitivities and many others. 3.3.0 The following classification has been made as per OISD norms : Tier Level Volume Tier – I Tier – II Tier – III Up to 100 MT 100 MT. – 1000 MT More than 1000 MT 3.4.0. POSSIBLE VOLUME OF OIL SPILL AT BORL SPM The different types of sources of oil spill along with the potential oil volume release categorized as “Most likely and Worse Case” have been identified by the consultant M/S OSRL UK and given as under. Sr. Source No. 1 Connection of Floating Hoses 2 Sea and Overboard Discharge Valve 3 Slop Tank Overflow 4 Spillage of Fuel Oil (internal transfer) 5 Vessel Break out 6 Hull Failure 7 Fire and Explosion Type Maximum Spillage Crude Oil -do- 1 cu. m 25 cu. m -do-do- 25 cu. m 1 cu. m -do-do-do- 100 cu. m Min. 700 cu. m. Min 700 cu. m 3.5.0 RISK ANALYSIS AND CAUSES OF SPILL Accidental spill from tankers contribute an estimated 0.4 million tons to annually globally. Analysis of tanker spills occurring throughout world shows that the majority occurs in port during routine ship operations such as loading, discharge and bunkering. The most of these spill are, however, relatively small. Over 92% ar aree less than 7 tones and probably in total, contribute less than 20000 ton annually. In comparison, accidents, such as collisions and grounding give rise to less than 10% of oil spills from tankers, but a quarter of these are larger than 700 tons. 3.5.1 SPILLS DUE UE TO COLLISION The statistical data shows that as a percentage of the total no. of incident, collision account for 5% of oil spill regardless of the quantity of oil released. The classification based on size of the spill shows more alarming statistics wi with th 29% of all large spills (>700 tons) being due to a collision. Almost 21% of the sizable spills involving the release of between 7 and 700 tons are due to collisions. Small spills of less than 50 barred (7 tons) from a collision account for less than 2% of total. 3.5.2 SPILL DUE TO GROUNDING A similar analysis of statistical data shows that although as a percentage of the total incidence spills due to grounding are rather small, accounting for only 5.2%. a different picture emerges when the quantities involve involved are scrutinized.. Large spills of more than 700 tones caused by grounding account for 33% of all release of that magnitude.. Off the sizable spill between 7 – 700 tones about 18% are a direct result of grounding. The small spills of up to 7 tones are fairly fairly insignificant and are 2.7% of the total spills in that category. It is prudent to assume that in any collision or grounding, spill quantity may be more than 700 tones. 3.5.3 The most likely maximum spill can result from a central compartment of a tanker being ruptured at the bottom of the hull releasing most of its contents. Quantities in the order of 7000 tones are therefore more probable due to the release of an assumed 90% of the contents of a center tank of a typical 175,000 DWT single skin fully lade laden tanker ruptured due to grounding. 3.5.4 A collision with another vessel causing a tank to rupture will release only the contents of the tank above the water line. The ensuring spill caused by a gash in the tank resulting from a surface collision will release near about 1750 tones. Therefore the spill quantities in both the above scenarios pertaining to rupture due to collision and a bottom gash resulting from a grounding are to be 1750 – 7000 tones when a single tank has been damaged. 3.5.5 Oil spilled into the sea undergoes a number of physical and chemical changes, some of which lead to its disappearances from the sea surface whilst others cause it to persist. The time taken depends primarily upon the physical and chemical characteristics of the oil, as well as thee quantity involved, the prevailing climate and sea conditions and whether the oil remains at sea or its washed ashore. The he fate of spilled oil at sea is normally related with a,, a distinction is frequently made between non-persistent persistent oil, which tend to ddisappear isappear rapidly from the sea surface, and persistent oil, which in contract, dissipates more slowly and usually requires a clean-up clean response. Most crude oils and refined residual oils have varying degree of persistent depending upon their physical propert properties ies and size of the spill. The main physical properties, roperties, which affect the behavior of oil spilled at sea, are specific gravity, distillation characteristics, viscosity and pour point. 3.5.6 Most spills will in fact be small, involving less than two tones and wi will ll occur mostly when the hose system failed at the terminal. This can usually be dealt with swiftly and efficiently by the terminal operator. Major spills are fortunately considered rare with estimated probabilities ilities between One in 100 years to one in 220 years. In the event of such a large spill at the Gulf of Kutch efforts can be made either to contain and collect the oil using booms and skimmers, or to disperse it using chemical dispersant which are spread either from marine raft using side booms or aircraft aircraft (similar to crop spraying). If oil is washed ed ashore on a ha hard d sand beach, for instance, it can be quickly and effectively cleared by manual labor with the aid of trucks and bulldozers. 3.5.7 In some cases, bio-degradation degradation method may be applied using bacte bacteria ria to digest the oil which can halve the time that natural forces would take to achieve the same result. However, natural forces usually degrade any oil, which cannot be cleaned up, and such forces are exceptionally strong at the Gulf of Kutch and the eff effects ects of a pollution incident are rarely long term. 3.5.9. IMPACT OF SPMs OF COMPANIES IN GULF OF KUTCH As of now in the Gulf of Katchch has five nos. of SPM terminals & foure four nos of oil jetties of M/s Reliance Petroleum, Jamnagar. J Also there is one SPM terminal & one no. of oil jetty of M/s Essar, Vadinar. Vadinar There are two SPM’s of Indian Oil Corporation for unloading of crude oil. oil The cumulative capacity of the crude oil/product being handles in the Gulf of Katchch for operators like Reliance Refinery, ESSAR Refinery IOCL SPM’s is touching nearly 100MMTPA 100MMTPA.. Handling of such a voluminous quantity of petroleum product will definitely have impact on preparedness for combating any oil spillage in this area. The details of estimated quantity of spillage in worst case, preparedness for handling emergency may be referred from similar documents of M/s RPL, Jamnagar & M/s ESSAR, Vadinar respectively. However present availability of spill combating equipment as published in National Oil Spill Disaster Contingenc Contingency plan of Indian Coast Guard – 2006 in enclosed as Annexure-III. 3.5.10 CAUSES OF OIL SPILL The cause of oil spill linked to SPM crude oil terminal operations has been identified as once or combination of the following concerns: A. B. C. D. E. F. G. H. I. J. SPM floating hoses joints. SPM floating hose end valves and blanks. SPM manifold joints SPM swivel. Under buoy hoses / joints PLEM Submarine pipeline Pipeline, landfall to BORL facility Tanker grounding and collision. Accidental or deliberated bilge operation carried out by vessels calling at Kandla,, Vadinar and Sikka. K. Oil spill at SPM of other oil companies. 3.6.0 SPILL SCENARIOS The definition of oil spill and the associated risk and causes of the spill have been discussed vide para 3.1.0 and 3.5.0. In the following paras the possible spill scenarios in case of minor and major oil spills are being dealt with in detail. a. Failure of floating hose and blanks and valves would cause pollution in area of SPM also given appropriate weather condition, portion of the oil could impac impact sensitive reefs, shore lines and salt pans. b. Failure of ship to SPM mooring lines causing one or both floating hoses to part. Pollution again in area of SPM and sensitive areas described above. c. Over run of hoses and SPM due to failure of pull back tug. This would cause damage to hoses and SPM. Damage to SPM may well prolong closing of valves on SPM or at worst, make it impossible to close valves. Oil pollution would extend in the area of the SPM and again gain oil could impact shorelines endangering sensitive sensitive areas and saltpans etc. d. Failure of submarine pipeline due to corrosion or damage by a vessel’s anchor (it is noted that no vessel is allowed to anchor in area of pipeline). Dependent on the location of the leak in the submarine pipelines oil po pollution llution could exist anywhere between the SPM and the pipeline landfall landfall. A failure due to corrosion is not thought to pose the threat of an almost ost instantaneous discharge of oil but a prolonged small leak over a period of time. e. Pollution from such a failure would threaten the sensitive areas around Forest creek. creek f. Failure of the landline from Singah salt pan area to the crude oil terminal of BORL, BORL due to corrosion again would most likely to be a slow continuous leak of oil rather than an instantaneous one. However, because of the fact that the line runs through or adjacent to Salt Pans and sensitive areas, contamination contamination of these areas is almost inevitable. 3.6.1 For the type of crude oil handled at Sikka their likely movments in the different weather conditions has been done by NIO based on 100% known speed, direction .It . must be borne in mind that only 4% wind speed impact has been used in the diagram, and that with a northerly wind the oil would be set very quickly onto the reefs and into the inlets on the southern shore line. But with a southerly wind the oil would be set out into the Gulf, It must also be remembered that on a flood tide, oil on the surface will naturally flow in towards Sikka and the reef areas. The likely movement of oil based on the spill studies done is placed on the annexure III. 3.6.2 WEATHERING EFFECTS OF SPILT CRUDE OIL When crude oil is acciden accidentally tally spilled, it undergoes a no. of physical and chemical changes, these are commonly known as weathering. A knowledge of this process and how they interact to alter the nature and composition of the oil with time is valuable in preparing and implementing disaster management plan for oil spill response. 3.63 SPREADING. Spreading is one of the most significant processes during the early stage of spill. The main driving process during the initial spreading of the oil is its weight. A large instantaneous spill ill will therefore spread more rapidly than a slow discharge. This gravity assisted spreading is quickly replaced by surface tension effects. Variation and spreading rate are due to differences in prevailing hydrographical conditions such as Currents, tida tidal streams and wind speeds. 3.6.4 EVAPORATION The rate and extent of evaporation is determined primarily by the volatility of the oil. The greater the proportion of the component with low boiling points, the greater the evaporation. The initial spreading of the oil also effects the evaporation since the larger surface area; the faster the light components will evaporate. Rough sea, high wind speeds and warm temperature will further increase the rate of evaporation. 3.6.5 DISPERSION Waves and turbulence att the sea surface act on the slick to produce oil droplets with a range of sizes. Small droplets remain in suspension when the large one rise back to the surface, behind the advancing slick, where they may either coalesce with other droplet to re-form form a slick, slick, or spread out in a very thin film. Droplets small enough to remain in suspension become mixed into the water column and the increased surface area presented by this dispersed oil can enhance other processes such as biodegradation and sedimentation. 3.6.6 EMULSIFICATION Many oil tend to absorb water to form water water-in-oil oil emulsions, which can increase the volume of pollutants by a factor between three and four. In moderate to rough sea conditions most oils rapidly form emulsions, the stability of which are a dependent on the concentration of asphalt. Emulsions may separate out into oil and water again if heated by sunlight under calm condition or when stranded on shoreline. Absorption of water usually results in black oil changing color to brown, orange or yellow. As the emulsion develops, the movement of the oil in the waves causes droplets of water taken up in the oil to become smaller and smaller making the emulsion progressively more viscous. As the amount of water absorbed increases, the density of the emulsion approaches that of sea water. 3.6.7 DISSOLUTION The rate and extent to which an oil dissolves depends upon its composition, extent of spreading, water temperature, turbulence and degree of dispersion. The heavy components of crude oil are virtual virtually ly insoluble in sea water whereas lighter Compounds, particularly aromatic hydrocarbons such as benzene and toluene, are slightly soluble. However, these components are also the most volatile and so are lost very rapidly by evaporation, faster than dissolution. dissolu 3.6.8 OXIDATION Hydrocarbon molecules react with oxygen and either breaks down into soluble products or combine to form persistent tars. Many of these oxidation reactions are promoted by sunlight and their effect on overall dissipation is minor in relation to other weathering processes. 3.6.9 SEDIMENTATION Some heavy residue oils have specific gravity greater than LO, and so will sink in sea water. However, very few crude oils are sufficiently dense, or weather to such a extent that the residues alone one will sink in sea water. Sinking is usually brought about by adhesion of particles of sedimentation or organic matter to the oil. "Temperature can also be expected to affect the behavior of, neutrally buoyant oil. Over a 10 degree centigrade temperature range the density of sea water will only change by 0.25 % whereas oil changes by 0.5 %. 3.6.10 BIODEGRADAT10N Sea water contains a range of marine bacteria, moulds and yeasts which can utilize oil as source of carbon and energy. The main factors affecting the rate of biodegradation are temperature and the availability of oxygen and nutrient, principally compounds of nitrogen and phosphorous. Each type of micro micro-organism organism tends to degrade a specific specif group of hydrocarbons and whilst a range of bacteria exists between them which are capable of degrading most of the wide variety of compounds in crude oil, some components are resistant to attack. Because the micro-organisms organisms live in sea water, biodegrad biodegradation ation can only take place at an oil/water interface. At sea, the creation of oil droplets, either through natural or chemical dispersion, increases the interfacial area available for biological activity and so enhances degradation. 3.6.11 COMBINED P'ROCESS SS The processes of spreading, evaporation, dispersion, emulsification and dissolution are most important during the early stages of spill while oxidation, sedimentation and biodegradation are long term processes which determines the ultimate fate of oil, 3.7.0 RESPONSE ONSE STRATEGIES The response strategies may be defined as the process of responding to the dangers caused by mobilization accidental oil spill involving obligation of trained manpower at the site together with the necessary hardware to combat oi oil spills. Any disaster plan has essentially to be action oriented, riented, to cover such aspect as reporting, alerting, assessment, operations, administration, finances, public relations and arrangements ents with other contiguous states. The plan must also assign the responsibility for various tasks to be undertaken by the relevant Govt. Departments and agencies, identify trained personal perso l and equipments, resources, and means of access to the same. Physical resources may be speciali specialized ed pollution combating equipment or multi ulti purpose such as vessels, aircraft and communication system. Further the response plan should also intend to delineate functions of various concerned department/agencies for the operational responsibility to marine incidence, which could result due to spillage of oil into water. It also meant to provide the framework of co coordination ordination of integrated response by various departments/agencies and Mutual aid partners such as IOC, RIL,, ESSAR, ESSAR Coast Guard and other related government aagencies and also to respondd to any future national oil spill disaster contingency plan. 3.7.1 Based on the volume of oil spill, the categori categorization ation in respect of seriousness of spill, has already been dealt with in detail in the chapter relating to the definition of oil spill (vide clause no. 3.2.0) Accordingly, the proposed oil spill response plan are based on three Tier ier approach corresponding to each 'Pier of spill as mentioned below: TIER ONE 1. Spill observed by terminal operator / spill observed by operators on the SPM, the crew of the standby tug or the launch present at the terminal or by any passing vessel. 2. Notified by radio to the terminal at Singach giving the co-ordinates ordinates / location of the spill. 3. Give time, location of spill and assess volume if possible and report directly to the Boarding Officer. 4. Wait at the location for the arrival of the first-aid first aid launch, which should be prompt within the hour. 5. Remain in radio contact and try to report the spread of the spill, giving qualitative description (gushing oil, no clear point to locate the source etc.) 6. Mooring master will decide on activating the emergency shutdown system and. inform the tanker's bridge to shutdown the pumps and the on shore control officer of the suspension/ discontinuation of operations. 7. Mooring master will decide whether to release the tanker and ask tugs to tow the tanker away and deploy an oil containm nment boom. 8. The response to combat the spill will depend on the type of crude, its size and the sea condition as follows; i. Light crude, small spill (seven tones), calm sea - use dispersant. As (i) above but rough sea - no action will be possible, observe spread of spill. ii. Heavy crude, small spill - deploy sorbent boom or (oil mop)- act quickly before mousse begins to form. iii. As (ii) above but rough sea - deploy sorbent boom and observe spread of spill. iv. After several days weathering, use trawler nets to collects asphaltic residue from the sea bottom. v. Boarding officer will decide when the spill has reached medium size of over 70 tones and his resources are getting depleted to and afterwards he has to contact following agencies: a. Contact Mutual Aid Team requesting assistance and supplies. b. Inform the Coast Guard. Tire One Incident Flow Chart Notification of Oil Spill Carry out Oil spill Assessment Does the Spill fall into Tier 1 Category? TIER TWO I Co-ordination ordination of spill combat activity is to remain with the local mooring master. 2. Inform local control officer responsible for on shore operation of the terminal and tank farm to have fire tender and crew on standby at the scene. Inform all vessels in the 3. Inform GMB about the type of crude and request dispersant if the spill is light crude. Surround the spill with a containment boom and deploy a skimmer to collect the spill. Ask for extra manpowerr to operate on a shift basis until the spill is removed or dispersed. 4. If the spill is heavy crude then it should be attended by a boom and" oil mop" sorbent pads or booms should be used to absorb the spill. 5. If the wind/ tide action moves the spill towards the shore then "Inter Inter tidal boom" boom should be deployed to protect critical places such as mangroves, saltpans, water intakes, marinas and such like. 6. In the case of heavy crude spill after several days weathering, trawler nets should s be used to collect the asphaltic residue from the sea bottom. TIER THREE Major spills require a Tier Three response, which involves regional, national and international resources dealing with such spills 3.8.0 DISASTER PLAN FOR VADINAR RESOURCE AGENCIES The following Government ent Departments / agencies will act as Resource Agencies as required to support the action of BORL, Vadinar, • • • • • • • • • Commander, Coast Guard Region (Western) KPT (Off Shore Oil Terminal, Vadinar) Gujarat Maritime Board Sikka Office of Conservator of Forest, Forest Department Jamnagar Department of Fisheries Central Fisheries Institute National Institute of Oceanography, Goa. Department of Environment Environ and Forest, Government of Gujarat Gujarat Pollution Control Board, 3.8.2 ORGANISATION The location head at BORL Crude oil Terminal is the Chief Crisis Co-ordinating Co authority and has the overall responsibility to ensure that appropriate response is made to any incidence in the sea around SPM terminal or related with SPM system, In absence of Chief Crisis Co-ordinating Co authority, rity, alternate Chief Crisis Co-ordinator Co assumes his responsibilities, Chief Crisis Co-ordinating Co ordinating authority will direct the various aspects of the operations and will be assisted by Maintenance In-Charge Charge,, Boarding Officer and Shift-in-Charge Charge as required, depending upon the types of disaster. Maintenance In-Charge will act as a representative of BORL,, Vadinar to co-ordinate co all activities at the scene of pollution and will pass on regular reports to the location head and assistance required. Organograrn fo forr oil spill disaster management plan is enclosed as Figure-4 3.8.3 The basic responsibility of combating oil spill disaster and marine pollution lies with the Operating company and local port authority and the Regional HQ of the Coast Guard (West). The HQ, Coast Guard Region (West) has been delegated the responsibility of making a disaster plan to deal with oil pollution in the West Coast. Ministry of Environment ent and Forest, Govt. of India has constituted a sub group having representatives from State Pol Pollution lution Control Boards of all Coastal States, Central Pollution Control Board, Coast Guard Organi Organization ation (CGO), National Institute of Oceanography (NIO), Department of Ocean Development (DOD) etc. for further monitoring of such incidences. As oil company operator at Vadinar our responsibility is to ensure that no pollution occurs while transfer of oil from ship to shore, due to cracks in pipeline, bursts in floating hoses/ under buoy hoses and leaks that occur due to improper connection of various pipes etc. As such the role of local BORL in National Oil Spill Disaster Contingency Plan is very limited but in terms of its responsibility and commitment, BORL is fully prepared and has developed its own disaster plan to provide assistance as and when required by the Coast Guard. Bharat Oman Refinery Limited, L Oil spill Disaster Management Plan ORGANOGRAM Sr.Vice President, Bina NAME : MR. V. K. Agrawal DC, JAMNAGAR OFF. RESI. COMMANDANT COAST GUARD Vadinar P&T 07580-2710103 P&T : 2555869 2554059 (0288) (M) 9427306210 P&T : 256579 6579 256534 (02833)256560, 256560, 256583 (M) 9427734206 734206 MOBILE : 09754310103 FOREST DEPARTMENT JAMANGAR (0288) OFF. RESI. P&T 2679371 2553327 Fax : 2770161 GANDHINAGAR (079) P&T : 23230034 Fax : 23221097 Port Officer Jamnagar OFF. RESI. P&T : Code : Mobile : CHIEF CO-ORDINATOR DESG. : Vice President NAME : P. R. Thatte OFF. 256400 P&T : Code : 02833 Mobile : 9427206501 ALT. COORDINATOR DESG. NAME : OFF. GPCB, GANDHINAGAR (079) OFF. P&T : 23222756 / 23222095 2322425 Fax : 23232156/23232161 GPCB, Jamnagar (0288) P&T : 2753266 Fax : 2753540 BPCL SHIPPING, MUMBAI OFF. RESI. RESI. DESG. : P&T : Code : P&T : Asst. V.P /Manager Att. Att.MANAGER(MARINE), BORL, VADINAR OFF. RESI. R. K. Thakker Sarang Deshkar FAX : 1. BORL MARINE ROOM SIGNAL STATION Bedi PH : MOBILE : PH. _____ 2. SHIFT ENGINEER, BORL CONTROL ROOM PH. : _______ BORL SPILL RESPONSE TEAM PH. : MOB. : FAX : 3.8.4 RESPONSIBILITY DURING EMERGENCY The basic responsibility of combating oil spill disaster and marine pollution lies with the local port authority within its port jurisdiction and the defaulter company/ compan organisation. 3.8.5 CIIIEF CO-ORDINATOR ORDINATOR (LOCATION HEAD, VADINAR) . a. On getting information of oil spill, he will report to Port authority and other resource agencies. b. He will co-ordinate ordinate all activities through Maintenance Manager, & Marine team. c. Hee will ensure that appropriate response and techniques are in action to clean up pollutants. d. Hee will ensure that all the resource agencies have been duly reported about iincident. e. He will apprise Head of BORL about the incident and actions undertaken. f. Hee will make arrangements for disposal of oil as per the directive of Regional Coast Guard Commander ander (West). g. Hee will be responsible for the resumption of Operations aatt SPM terminal. i. He will contact BPCL Shipping and seek assistance required to meet the emergency. j. He will record all the information regarding oil spill incidence as per specified format at Annexure-IV. 3.8.6 ROLE 0F BORL IN CON'T'ROLLING OIL SPILL DISASTER 3.8.6.1 BORL, VADINAR a) To assist Port off shore oil terminal,, and Coast Guard Vadinar action group, in implementation of local action plan. b) To assist Port offshore terminal terminal,, Vadinar and Coast Guard Vadinar in obtaining additional available equipment and chemicals from identified resources if and when required. c) To assist in chartering/hiring of tankers to undertake transportation/ transshipment operation if so required by Port Authority. d) To arrange for storage of oil transshipped aas above, e) To make assessment of the value of the oil transshipped. 3.8.6.2 BPCL, SHIPPING MUMBAI a. To arrange for chartering tankers for Vadinar as required. 3.8.6.3 INDIAN COAST GUARD - CENTRAI, CO-ORDINATING ORDINATING AUTHORITY a. To receive the report of significant spillage of oil at sea. b. To keep the Ministry of Defense apprised of the development on.. receipt of information about oil spill. c. To decide upon the nature and extent of actions required and to advise the Regional Headquarters Local Action Groups Groups/authorities /authorities concerned regarding the action to be taken by the latter in consultation with Apex Committee on Control of Marine Pollution/Task Force on oil spills. d. To arrange for chartering of any tankers for oil transshipment operations, if required. e. If the resources available with the Regional Headquarters / Port authorities/other agencies, Local Action Group/authorities are inadequate, to mobilize all available and necessary resources and direct the same towards the concerned Regional Headquarters/Local Headquarters/Lo Action Groups/authorities. Regional Coast Guard Commanders (RCC) (a) Receiving reports of oil pollution sea. (b) Coordinating the activities of RCC when activated. (c) Keeping the Director General, Coast Guard apprised of developments. (d) Processing and coordinating claims of the affected parties and participating agencies with a view to compilation for processing by Director General Shipping. (e) Mobilizing ing Coast Guard resources to support On Scene Commander mander (OSC) action at spill area. (f) Maintaining the Regional Contingency Plan (RCP) and forward revised plans to members as may be required by RCC. (g) Receiving periodic reports from resource agencies on account of Pollution Equipment and material with a view to have an upto date inventory list in the Coast Guard weste western rn Region, Eastern Region and Andaman and Nicobar Region. (h) Providing the administrative infrastructure to the R RCC for conduct of routine and operational tasks. (i) Providing additional sampling effort during spills when requested by OSC. (j) Maintaining a list of national and international agencies that may be called upon to assist for pollution response at the discretion of RC(:. (k) Arranging for periodical exercise in pollution response. (1) Providing sensor data to RCC/OSC as required. 3.8.6.4 RESPONSIBILITY Y OF PORT AUTHORITY The port authorities will be responsible for response to accident / oil spill within Port Limits keeping the coast guard regional commander informed and request for any additional assistance through the Regional Communication/Operations Centers. The detailed responsibilities are as follows : a. To arrange for the preparation of a local contingency plan in consultation with Regional Head Quarter/Central Co Co-ordinating Authority. b. To identify a suitable sea going tug when required for operations c. To identify surface crafts on which dispersant spraying equipment can be mounted and (ii) which can be used for rigging the booms etc.. (i) d. To ensure that the purpose of part part-XIII XIII of Merchant Shipping Act, 1958, actions are taken by the various au authorities thorities under the overall legal receiver of the wrecks and dock concerned. e. To ensure that at least following minimum equipment is kept available locally at all time : Inflatable booms. Dispersant spraying equipments capable of being mounted on surface craft. Suitable dispersant chemicals of the nature and quantity estimated as requirement of Local Action Group as part of the local contingency plan. Oil skimmer equipment. Surface crafts on which above dispersant equipment can be mounted and which can be used for rigging booms etc.. • To arrange for training of personnel expected to be engaged in above operation. • To arrange for periodic exercise under the guidance of the RCC to keep equipment and personnel on continuous readiness for oil spill response oper operation. To consult the Coast Guard or Director General Shipping or any other authority, when further advice/assistance is required. To keep the Coast Guard appraised of actions being taken. • • 3.8.6.4 RESPONSIBILITY OF BOARDING . OFFICER a. Inform Chief Crisis Co-ordinator ordinator / Alternate Chief Crisis Co-ordinator, Co ordinator, Maintenance Manager (Marine) , BORL Control room, Marine Department about the oil spill incident. b. Stop the cargo or slow down the cargo as may be the case and accordingly isolate the affected ffected portion causing the oil spill. c. Instruct the O&M contractor to fight the oil spill & locate the source of oil spill and co-ordinate ordinate with various agencies for oil spill containment. d. To carry out the water flushing of the SPM system as per the rrequirement equirement in coco ordination with BORL control room. 3.8.7 REPORTING AND ALERTING PROCEDURE After knowing major oil spill, Chief Co Co-ordinator, BORL L is to report the same immediately to GMB authority who in turn will inform Commander Coast Guard Region (West). besides esides informing KPT, Chief Co-ordinator or other oil oil terminal operating companies in the area. BORL L should inform DC Jamnagar, Jamnagar Forest Department Jamnagar and Gujarat Pollution Control Board Jamnagar, Gandhinagar regarding the incident. The information ation is to be passed to the various Government agencies in the required format as per Annexure--IV IV as mentioned above. It should be ensured that the information have been intimated to all the connected agencies as per the enclosed "emergency information flow fl network" (Refer Figure — 5) 3.8.8 HANDLING SPM EMERGENCY In case of any burst or leakage in floating / under buoy hoses or in any system of SPM, is noticed by the master or Deputy Officer or Our Boarding officer or any other person, the above incident should be immediately brought to the notice of Master/ Deputy Officer of EMERGENCY INFORMATION FLOW NETWORK SPM OPERATION STAFF ROOM 1. BORL (BOARDING OFFICER) 2. BORL (MOORING MASTER) 3. M/S UNDER WATER SERVICES EMERGENCY ARISES SEARCH OPERATION DETECTED BY BOARDING OFFICER / MASTER OF VEESEL / OR ANY OTHER STAFF PORT SIGNAL STATION (BEDI) SHIFT OFFICER / FOREMAN ASST.VP/MANAGER CHIEF CO CO-ORDINATOR Sr. VP BORL BINA COMMANDANT COAST GUARD PORT OFFICER GMB FOREST DEPT. JAMNAGAR GPCB GANDHINGAR the Ship. On getting the information, the discharging operation should be immediately stopped and the BORL control room at Vadinar should be informed through V VHF channel 12 and 07 (US) about the stoppage of oil discharge. discha The Master aster of the ship/ BORL Boarding officer with the help of crew members of ship and supporting contract vessel of BORL should try to assess where the spill is coming from and try to contain the spill by means of deploying booms available with the ship/contract vessels of BORL.. Procedure to be adopted in case of leakage from following is as detailed below: 3.8.8.1 FLOATING HOSE i. ii. iii. iv. Stop discharge. Close the butterfly valve near tanker manifold and isolation valve near SPM. Contain the leak Further operation can be done only after replacement of burst/leaked hose or hoses 3.8.8.2 UNDER BUOY HOSE i Stop discharge. ii Close the PLEM M valve of the leaking line. iii Contain the leak 1"urther operation can be done only after replacement of bburst/leaked urst/leaked hose or hoses. iv 3.8.8.3 CENTRAL SWIVEL LEAK If the leak is not controllable then i. ii. iii. iv. 3.8.9 Cast-off the vessel. Contain the leak. ii. Arrest the leak. Re-berth the vessel. Restart operation. MOORING ROPE DAMAGE The officer on board of the vessel can decide in consultation with pilot/master of the vessel whether the ship can continue at berth. If necessary, arrangement should be made to replace the damaged mooring rope. 3.8.10 DAMAGE TO BUOY It is due to overriding of tanker. The officer on board of the vessel can decide in consultation with the pilot/master of the vessel whether the ship can continue at berth. 3.9.0 POLLUTION CONTROL NEAR SPM a. The master of the vessel will be informed about the oil spillage by boarding officer. The master in turn will contact the port signal station, which is provided with VH HF F channels 16, 12, 10 and 07 (US) and give a detailed report of the incidence to GMB. b. The signal station in turn will inform the Port Officer GMB. c. Boarding officer will also inform BORL shore control room/ marine department through VHF and BORL control room in turn will inform the incident to Chief CoCo ordinator, BORL,, Vadinar. d. Upon receipt of information from port signal station, Port Officer will direct all the crafts presently posted poste at Vadinar/Sikka to combat the oil spill within port limit. e. The tug / launches of GMB should carry sufficient quantity of dispersant before leaving their respective jetty. f. Since the flow of under water current around this coast is very high, usage of oil skimmer to recover oil from any leakage from SPM and other floating hoses is not much effective, hence the pollution control near SPM done presently is limited to spray of dispersant. 3.10.0 TYPICAL CASE OF OIL SPILL COMBATING AT VADINAR/SIKKA /SIKKA. In case of any accidental oil spill in and around S SP'M 'M following action plan is to be brought to effect immediately in line with the disaster plan in association with GMB. (1) Reporting: a. On getting any information about o oil il spill noticed by the Master or the Duty Officer of the vessel, or Boarding Officer of BORL on board, working SPM Maintenance Contractor, Coast Guard patrol party, GMB pilot or any other person, the above incident should be brought to the notice of the Master Master / Duty Officer of the ship. On getting any such information, the discharging operation should immediately be suspended and the BORL tank farm which is also available on VHF,, channel 12 and 07 (US) should be immediately informed about the stoppage of discharge. b. On getting such information from Boarding Officers, the shift in charge in BORL shore control room shall inform the incident to Chief Co Co-ordinator, BORL, BORL Vadinar and the necessary line isolation from ship to shore tank farm should be ensured by closing necessary valves. c. The master or the Boarding Officer of the vessel should contact the Port Signal Station which is provided with V VHF channel 16,12,10 and 07 (US) and give a detailed first hand information report of the incident. d. The Signal Station, in turn, should inform the Port Officer GMB. GMB Port Officer may in turn pass on the information to their authorities and Coast Guard etc. e. BORL officer on board should also pass on the information to location head Vadinar through BORL control room on VHF chan channel and check back with Port Officer GMB for confirmation of the message receipt through Port Signal Station. f. Chief Co-ordinator, BORL Vadinar will immediately establish contact with Sr. VP Bina and pass on the first hhand information nformation report besides informing the incident to statutory bodies like Gujarat Pollution Control Board (GPC (GPCB)) and Forest Department / National Marine Park authorities. auth (2) Alerting: a. Port Officer will direct the crafts posted at Sikka to proceed to SPM and during the passage rig-up up the dispersant spraying booms. b. BORL should ask its maintenance contract vessel to be ready for deployment of spill combating facilities on board the barge and prelimanry action to be started on . c. Small tug available with SPM maintenance contractor should also be put on alert for deployment, if so demanded by KPT for replenishment of oil dispersant and other support services. (3) (4) Operational Requirements: a. In view of the strong current experienced at Sikka only ly dispersant may be sprayed by tugs of GMB while one tug exclusively for replenishing her stock of dispersant chemicals from the storage provided at Vadinar jetty. b. The Master of harbour tugs / launches should ensure that sufficient quantity of dispersant chemical is carried out on board prior to leaving the jetty. c. In view of the strong currents experienced at Sikka and the location of the SPM, it has been recommended that the GMB should equip its crafts with dispersant spraying units. Accordingly, the Por Portt had provided only the dispersant spraying equipments for use at Sikka. Execution: The craft should move downstream of the oil spill and then star( streaming up against the current while carrying out spray of dispersant chemicals with a systematic run over the oil spill, till the total spill gets dispersed. (5) Support Services: BORL shall assist GMB and Coast Guard in a. Implementing the local action plan. b. In obtaining additional equipments and chemicals from HQs of GMB and Coast Guard, if and when requi required. c. Chartering of tankers to undertake transportation / transshipment operation if so required by GMB GMB. d. Arranging for the storage of oil transported at shore and e. Making assessment of the value of the oil transshipped. (6) Claims: In case the oil spill in and around SPM terminal is due to any problem of tanker or any negligence from tanker operation crew, following steps should be taken for claim, which will be done by Port Officer , GMB. a. Port Officer GMB should inform the Master of the Vessel holding him responsible for the spillage/pollution and also steps taken by the Port to combat the oil spill and for cleaning operations and the charges thereof as per rules. b. Record of all expenditures towards the use of port craft / tugs / disp dispersant chemicals / port vehicles and any other material should be maintained by the Port Officer , GMB for subsequent recovery from the Master/Agent of the ship, prior to her departure. (7) Final Report: The detailed report of the oil spill in chronological chronological order supported with available data/records will be prepared by GMB and sent to respective Organizations including BORL. However owever necessary reports for informing BORL official should be prepared by Chief Co-ordinator, BORL BORL, Vadinar. He will also submit necessary ecessary reports to statutory bodies like Gujarat Pollution Control Board, Forest Department/National Marine Park authorities. NOTE: The option of using dispersant to respond to oil pollution incident at Sikka will remain the primary method. These dispersant shall be applied correctly and file area suitable for their use. 3.11.0 BORL INTERFACE WITH NATIONAL OIL,, SPILL DISASTER CONTINGENCY PLAN (NOS-DCP) CP) FOR COMBATING OIL, SPILLS AT SEA. 3.11.1 The Govt. of India has developed a National Oil Spill Disaster Contingency Plan (NOS-DCP) P) to combat oil spills at sea or coastal regions through Indian Coast C Guard. 3.11.2 The aim of this plan is to co-ordinate co ordinate resources io mitigate the effects of pollution arising from om oil spills that could result from a number of locations and incidents. 'these range from off shore exploration and production accidents, grounding of tankers to minor unloading and transfer operations. 3.11.3 NODAL AGENCIES As per the National oil spill Disaster Control Plan (NOS (NOS-DCP), DCP), the Ministry of Home affairs will be the nodal ministry for crisis management in case of an oil spill disaster, and Horne orne Secretary will be the Chairman of the crisis management group (CMG). Other her member of the crisis management group that stand constituted in case of an oil spill disaster shall be the Defense Secretary, Foreign Secretary , the secretaries of Environment and Forests, Shipping , Petroleum and Natural Gas, Urban Development, Ocean Development, Science and Technology, Agriculture and Co Co-operation, Chemicals and Petrochemicals, Industrial Development, and the Secretary (Security) in the Cabinet Secretariat. Besides , the Director General Coast Guard , Chairman of the concerned ports & the DG , hydro, carbon will also be members of the group. The Director General, Indian Coast Guard, New Delhi, (DGCG) is the Central Coordinating Authority (CCA) and has the' overall responsibility to ensure that appropriate response is made to any incid incidence ence in the seas around India. fie will direct the various aspects of the operations and will be assisted by the commanders, coast guard regions (West), (East) and (Andaman and Nicobar ) (COMCGs) as required, depending on the proximity of the scene of cont contingency. The port authorities will be responsible for the response to accidents within the port limits. They will keep the coast guard regional commanders informed and request for any additional assistance through the Regional Co Communication/Operations unication/Operations Centre. Cent The details of responsibilities allocated to Ministries/ Departments and the capabilities of pollution response of various agencies is indicated in Annexure Annexure-V. ROLE OF BORL AS A RESOURCE AGENCY AS PER NOS NOS-DCP 3.11.4 As per National Oil Spill Disaster Contingency Plan, overall incharge of Oil Spill Incidents is the Indian Coast Guard. The Coast Guard's responsibilities are divided up into Regions and Districts also under the National Disaster Plan. Other organisations and agencies are named as resources resources,, to be activated and drawn upon in the event of an oil Spill. 3.11.5 Among these resource organizations organizations, BORL is one. Under this plan BORL is required to provide certain types of advice and assists in other activities, a brief summary of these are; i. Provide de reception facilities for recovered oil/water mixers and possibly debris. ii. Liaison with local Indian Coast Guard pollution response officer. iii. If' required assist in the interface between ship/cargo owner. iv. If BORL is the cargo owner, be able to provide inte interface rface as cargo owner to Coast Guard and other agencies. v. Provide assistance to recovery/clean up operations with men and equipment. vi. Provide assistance on technical matters regarding the crude or product: oil spilt. vii. Deploy oil spill combating equipment/facilities provided on board maintenance contract vessel to combat spill to the tune 100 MT, if deemed necessary by the coast guard/GMB. 3.12.0 RELATIONSHIP WITH COAST GUARD AND PORT TRUSTS: The Indian Coast Guard and Gujarat Maritime Board along with BORL would be among the main organization involved in the more practical aspects of oil spill response at BORL Crude Oil terminal in Sikka. It has been therefore, our endeavor to ensure that good working relationship, understanding of individuals, als, operating procedure are developed and understood before the high pressure environment of spill response prevents the building of such ties. All relationship with the Indian Coast Guard has been undertaken with the knowledge that in the National Disaster flan it states that ICG is the controlling body for all oil spill response activity. CHAPTER – 4 STATE OF PREPAREDNESS 4.0.0 STATE ATE OF PREPAREDNESS: 4.1.0 Presently BORL,, Vadinar have the following disaster plan to meet with emergencies of this nature. 1. OFF-SHORE SHORE Disaster Management plan. 2. National Oil Spill Disaster Contingency Plan (NOS_DCP) (NOS_D P) as prepared by Indian Coast Guard who centrally co co-ordinates ordinates among various agencies such as IOC,, KPT, Coast Guard, SSAR, State Authorities and other Statutory Bodies. These disaster plans are drawn for the Vadinar terminal and offshore pipeline operation. n. The plan identifies scope and response to possible source of pollution, decision paths and investigation procedures, So far this documents is the only comprehensive document available for follow follow-Lip Lip in case of such contingencies. 4.2.0 REVIEW OF PREPARDNESS: DNESS: 4.2.1 Existing Vessel: BORL owns no vessels at their SPM *site. However, BORL have on contract, "M.V. Onyx"" (Maintenance Vessel), "M.V. Peridot"" (Support Vessel), "Boat Al Chameria" and "Boat Al A Ajmeria"" for mooring and floating hose handling, during tanker berthing. i. M. V. ONYX MV ONYX built in 1977 77 at Taiwan, LOA: 56.69 meters, Breadth : 13.11 1 meters, GRT 1029 tones has clear AFT deck length of approx. 229.7 meters mete (wooden top), a roller stem and "A" frame. She also has her own derrick at the rear end of her accommodation. It has 42 T Bollard pull. The vessel has twin screws (fixed pitch) and a bow thruster. Speed approx pprox. eight knots. The ONYX is equipped with dispersant spraying anus, type type--3 oil dispersant. ii. M. V. Peridot M.V.Peridot built in 1992 at Malaysia, Malaysia Length 19.00 meters, breadth 6 meter, GRT 73 tonnes has clear AFT deck with A frame. She has a good clear AFT deck Portable spray equipment could be fitted to this vessel. iii. Boat Al chameria and al Ajmeria are approx. 10 meters in length used for supply logistic boat and also for taking lines.Together Together they make an effective boom deployment, oil recovery unit for minor spill (Tier One). 4.2.2 GMB, Sikka have got the following support vessels: 4.2.4 The Coast Guard operates es a mechanized fiber body Launch, provided by 10C, to guard the SPM. The boat is having a top speed of about 10 knots and do not have any deck space and considered not suitable for use during a spill situation other than personnel transport duties. 4.3.0 EXISTING MANPOWER : Existing manpower to respond to oil pollution at Vadinar can be drawn from two Sources i.e i) SPM activities and from ii) BORL terminal. At the SPM, the manpower available would co coming from GMB and BORL contract vessels. Some of the manpower available from BORL contract vessels is experienced in oil spill combat. They will be guided by BORL personnel from terminal. This his is due to the fact that, in an emergency it is felt that many of those at that location would be involved in other duties rather than pollution response. 4.4.0 EXISTING AIRCRAFT CAPABILITY: Presently BORL do not have any arrangement for the use of surveillance air craft. However, Indian Coast Guard have confirmed that in case of any emergency their light aircraft equipped for spraying oil dispersant chemicals can reach Vadinar from their base at Mumbai within 3 hrs. of notice. 4.5.0 AIRCRAFT LOGISTICS The mobilization and flying times for foreign aircraft fitted with oil spill combating ting equipments for Vadinar as suggested by the consultant is given herein below which can be utilized in the event of major oil spills. HERCULES C-130 130 PAY LOAD 15 TONS 1. 2. 3. 4. 5. Equipment mobilization and loading Southampton-Ankara Ankara Ankara-Karachi Karachi-Jamnagar Jamnagar-Vadinar (Best case) TOTAL, RESPONSE TIME 3 Hrs. 00 Min. 6 Hrs. 00 Min, 5 Hrs. 30 Min. 4 Hrs. 35 Min. 1 Hr. 30 Min. 16 Hrs. 45 Min, ILYUSHIN IL-766 PAYLOAD 30 TONS 1. 2. 3. 4. 5. Equipment mobilization and loading Southampton-Istanbul Istanbul Istanbul-Karachi Karachi-Jamnagar Jamnagar-Vadinar 3 Hrs. 00 Min. 4 Hrs. 15 Min. 6 Hrs. 00 Min. 2 Hrs. 00 Min. 1 Hr. 30 Min. (Best Case) TOTAL RESPONSE TIME 16 Hrs.45 Min. EAST ASIA RESPONSE LIMITED, SINGAPORE HERCULES C-130 130 PAY LOAD 15 TONS 1. Singapore-Jamnagar Jamnagar 16 Hrs. 45 Min. At the SPM. CHAPTER – 5 FUTURE SCOPE OF THE WORK 5.0.0 FUTURE SCOPE OF THE WORK: 5.1.0 The developments of the oil terminal in the Gulf of Kutch with the installation of facilities by the private industries such as ESSAR, RIL etc. along with their the respective impacts and plans have not been included in these documents. The existing demarcation of administrat administrative domain of different agencies such as I0C, 0C, KPT, Coast Guard etc. has also not been considered in this domain as for our terminal only GMB sikka Port under Bedi Group of minor ports is applicable. This may undergo a change in future context. Hence, ence, the plan requires regular updation as per various future requirements. vices of M/s Oil 5.2.0 As mentioned elsewhere in the report, BORL commissioned the set-vices Spill Response Limited, UK to review the adequacy of existing facilities, procedure and systems provided ded for combating oil spill and resulting Marine pollution due to off shore facilities of IOC including the 2nd SPM Project.. The consultants have come out with recommendations to upgrade the facilities for combating oil spill either on its own or in association ation with KPT. The up gradation of facilities includes procuring and keeping in readiness booms, skimmers, dispersants and other ancillary items, shallow craft etc. Also the consultants have recommended for imparting training to the field personnel in thiss area and have also recommended for formation of core group of Engineers to be specialized in this area. 5.2.1 The detailed recommendations of the consultant in this regard are furnished in the following paragraphs. 1. Dispersants : The option of using dispersants to respond to oil pollution incidents at Vadinar should remain a primary method. "These dispersants should be applied correctly and in areas suitable for their use, the minimum international accepted depth of water required being 20 mts. 2. Booms and Skimmers: This method of pollution control (commonly known as mechanical recovery) should be a response option that BORL/GMB would consider at Vadinar. This is a valuable option with the use of aan active Boom System, that is a containment ent boom, which which has integral oil recovery pumps. The use of such a system combined with the towing vessels, operating to minimize any relative efforts of current will allow recovery and therefore the reduction of free flowing oil. This mechanical recovery method is the the much preferred option, as it removes the oil from the sea surface, without the introduction of dispersants into the environment. BORL for this option does have skimmers of two types namely rope mop and disc and can be considered as good option in case oof calm weather of the boom does the containment work. The mechanical recovery option is dependent oil suitable weather and other prevailing conditions, therefore the option of the use of dispersant should also be available as another method of pollution control. c 3. Protective and Exclusion Strategies: Experience has shown that for the off shore response to be 100% effective there will be the need to protect sensitive areas in a total systematic way through a , well balanced co-ordinated ordinated response. These locations tions should be protected by booms, both normal floating oil boom and inertial booms. Boom configurations should be deployed with suitable anchoring systems at the inlets to channels feeding environmentally sensitive areas or salt pans. The same type of boom om should also be used in spur Booming operations to slow down or prevent the migration of oil along a shore line. This will prevent additional pollution of foreshores as oil is moved by wind and or current. 4. Storage and Disposal a. Storage : a. Storage : Once oil is recovered there is normally a period when it has to be temporarily stored before transportation and. final disposal. At Vadinar there are a no. of options to allow for the storage of any recovered oil/debris. However, there are areas that would would require the acquisition of additional equipment mainly in the area of quick erect storage tanks at land use and storage pit liners, to line pits dug at the back of beach areas to provide temporary storage capacity. Also in the particular case at Vadinar where it is felt that off shore containment and recovery is possible, some storage tanks for use on the BORL contract vessel vessels may be necessary. b. i. Disposal: Liquid Oil recovered with low water content : Pumped to Binatt Refineries along with crude oil for use as fuel stock or disposal by processing in the refinery if suitable. ii. Liquid oil recovered with high water content : Addition to demulsifier to break oil/water emulsion, dispose of oil as in (a) above. Or stored in effluent holding ponds and to be proc processed essed through ETP. Recovered oil to be stored in crude oil tanks and pumped to refinery. iii. Oil Contaminated Debris : Dump in open pits initially for a temporary period. The beris is then required to be transported in the approved disposal units. The ssame is then burnt in purpose built incinerator available with Pollution control board approved agencies 5. Equipment Recommendations (Vadinar) The equipments that arce to be made available at BORL floating barge are as follows i. Booms : 600 mtr. intertidal boom. 600 meter coastal boom. ii. Skimmers : Oleophilic leophilic disk skimmers. Rope mod skimmer Vacuum acuum recovery systems. High pressure pump cleaner iii. Dispersant Equipment: Two portable vessel mounted dispersant application systems. Renew dispersant stocks as used with modern, concentrate applied dispersant. The volume of dispersant available should be in the region of 2,05,000 lts. ts. this would give the capacity to combat 40% of tthe maximum spill volume. iv. Ancillary Items: Boom anchor systems 25-30 30 Kg anchors. Four floating tanks. Onshore tanks. Air blowers and water pumps to support shoreline and intertidal boom. Two storage pit liners. Stakes and hammers (for mooring off shore shor line booms at shore end.) V. Communications: One VHF Marine Base station and antenna. Six Mobile VIIF handsets. 6. Vessel Recommendations : Small shallow draft craft (inflatable) will be required for use during protection and deflection booming operations. Bearing in mind the nature of the shoreline, which includes saltpans, mud flats and reefs. These shallow draft vessels will need to be able to tow small inshore booms and have space for anchors and mooring equipment. These craft could be appro approximately 4 - 5 meters in length. It is suggested that atleast one is purchased by GMB GMB. It must be available at all times. Again some form of landing craft will be required to enable manpower and equipment to be delivered to the point of operations. It is recommended that one of these vessels is purchased. It needs to be approx. 15 mtr. in length to facilitate the carriage of sufficient equipment and personnel. Propulsion by water jets is recommended. These vessels could also be used with dispersant spraying spraying equipment. For off shore spraying operations large workboats or tugs: will be required. They can be fitted with portable self'-contained contained spray equipment as and when required. For active booming operations, the vessels of the supply boat type will be required. They will need to have good clear AFT' AF ' deck to allow the equipment to be easily loaded. An open roller type stem will be required to allow for easy boom deployment and recovery. The vessels must have good slow speed handling capabilities. They w will ill also require some on board storage for recovered oil, unless used in conjunction with a barge or small, tanker alongside. In addition, for active booming another towing vessel would be required for the other end of the boom.. Again this must have good slow speed handling capabilities. Good communications must be set up between the vessels as well. Onyx and Peridot are a good example of the type and size of vessels needed for an effective booming unit. Initially they could be the first line booming/skimming booming/ski unit. More vessels would need to be identified or provided by GMB for use during recovery operations in the event of a large spill. These vessels, as well as those stated, could be used for dispersant spraying operations. However as decided by BORL oil spill combating equipment for Crude Oil Terminal is procured as appended in Annexure Annexure-VIII VIII and all the items are kept on board dumb barge of maintenance contractor. 7 Manpower and Training i. Local Co-ordinator : Vadinar shall have a local oil spill response coordinator. co This BORL staff member would be the person locally, to implement response operations, update local response plans and maintain training levels. This person would also be the main interface between SIKKA Port and the BORL Refinery or Corporate Center for Oil Spill Response. anpower : ii. Local Full Time (on shift) Manpower Because of the nature of the BORL operation at Vadinar the no. of direct employed staff to provide this resource is relatively low. Those concer concerned ned with fire fighting should not be looked upon as the first line to respond to oil pollution incidents. Manpower resources, from Port staff at Sikka and BORL O&M contractor for SPM should be seen as full time available staff. iii. Local Labor : Quite often a prolonged spill response clean up operation, certainly shoreline protection and clean up will require large no. of personnel. These people would be required to carry out manual duties. Such people shall be arranged from local Vadinar village and other near by places.1n addition use should be made of the security forces assigned to Vadinar for extra spill response duties. iv. Training : a. The BORL staff member would be the person locally, to implement response operations, update local response plans. plans. As regards maintaining their training level person would also trained with help of various training programmes conducted by Coast Guards. 5.3.0 PRESENT AND D FUTURE SPM SCENARIO OF SPM TERMINAL SYSTEMS IN THE GULF OF KUTCH AND PREPAREDNESS OF OIL SPILL COMBATING Presently two no. of SPM terminals of IOC, five no. of SPM terminals & three nos. of jetties of Reliance Petroleum Ltd. and one no. of SPM & one no. of jetty of Essar are under nder operation and in future Jetties of Reliance and Essar and one no. of SPM of ESSAR is going to come in this area. Due to increase in no. of SPM terminal in the Gulf of Kutch, quantity of oil being handled will increase and nos. of tanker being handled will also increase which ma may increase the probability of occurrences of no. of spills. In order to prepare for combating mbating oil spill in this area Indian Coast guard is setting up detailed Response Centre at Vadinar CHAPTER – 6 REMEDIATION OF MAJOR OIL SPILLS 6.0.0 REMEDIATION OF MAJOR 00IL, SPILLS. 6.1.0 General : It has been established by major oil companies and the authorities alike that prevention is the best of oil spill response. Accident prevention requires that vessels are maintained and operated to the highest standards and manned by well trained officers and crew. It is stressed that the above requirements apply more stringently to the masters and crew of an SPM terminal. The "human" factor remain remainss to be the cause of around 90% of accidents; training people to work safely is therefore vital. The key message in training aining should be that each individual engaged in the operation of the terminal has a responsibility for safety. Mooring officers, pilots, operators and crew of the SPM terminal should attend regular training and refreshing courses. Special emergency drills should be conducted under the auspices of an experienced SPM operation expert. Crisis exercises should be designed and used in actual drills dri to ensure "combat- readiness". 6.2.0 Another factor in preventing oil spills is the provision and regular testing of emergency shutdown devices (valves, release hooks etc.) to ensure its proper functioning in an emergency. Testing and routine replacement replacement of hoses is mandatory to avert hose breaks in an SPM installation. The requirement laid down on the transporting tankers are dealt with under subsection 6.2.1 hereunder : 6.2.1 Reducing the Risk of a Spillage: The major concern in this area relates to preventing major spills occurring as a result of a grounding or a collision. The related risks assessment indicate the existence of a statistical probability of a ship collision once in 12 years, a tanker collision once in 36 years and a tanker grounding accident once in 100 years with a chance of once in 220 years that the grounded tanker damages a submarine pipeline. To reduce the risk and the probability of a spill the following causes are presented and remedial measured recommended: A. Tanker Collision : Two main factors identified in bringing two vessels on a collision course are the high frequency of ship to ship encounter and the probability of a collision given an encounter. To reduce the frequency of ship encounter requires the presence of sophisticated ship borne navigational aids (radar, echo sounder, VHF radio, etc.) and the trained crew to operate them on board all vessels navigating the channel. Additionally strict watch keeping and alertness at the bridge is a major factor in reducing encounters. Clearly the above requirement is far far-fetched fetched and difficult to monitor and enforce. The only feasible way to prevent encounters is to enforce a traffic scheme based on two segregated lanes with adequate separation distances and constant monitoring by an agency having jurisdiction in punishing offenders (e.g. Coast Guard). The provision of a vessel traffic service (VTS) under implementation by Govt. of Gujarat and the presence of pilots on non local ships will reduce the risk of a collision. collisio Present regulations at the Gulf of Kutch require all tank tankers ers to take up a pilot from the port authority on approaching the entrance to the Gulf. Navigational aids are essential to mark the channel and the separation distances. Regular patrolling by the Coast Guards, especially during the movement of VLCC's which is regular feature of the Gulf of Kutch and to ensure that smaller vessels (fishing boats, ferries, etc.) keep well out of the way will improve safety. B. Tanker Grounding: Due to the high risk associated with a large spill caused by a tanker running aground (One in three of all large spills), special recommendations are in order. It is considered essential that vessels likely to be considered by BORL for charter Should be inspected on a regular basis and assessed according to a set of criteria Which include safety awareness of officers and crew and adequacy of safety equipment. Vessels taken on "period charter" should be inspected more extensively. As the main cause of grounding gro is loss of power of a tanker, only vessels with certified maintenance record should be allowed at the terminal. Tankers with anti anti- Pollution features such as load on top where crude washings are retained on board in separate slop tanks should be chartered. cha The preference should be given to chartering tankers with a double 111,111 as this appears to be a secure method of retaining crude oil cargo after rupture of the hull in grounding. The existence and application of a traffic navigation scheme woul would d go a long way in ensuring that tankers remain inside navigational channels, which should be clearly marked and indicated on charts. All submerged obstacles, outcrops, etc., in the vicinity of a channel should be marked with buoys and shown on the charts. ANNEXURE HARDWARE DETAILS OF SPM SYSTEM AT GULF OF KUTCH S.NO. 01 02 03 04 05 06 I II III IV V VI VII I II PARAMETERS CAPACITYOF TANKERS TO BE HANDLED MEAN SEALEVEL GEOGRAHICAL CO-ORDINATES ORDINATES SPM 3,20,000 DWT 32.5 MTR LAT:22’33’528’ N LONG:69’45’750’”E AUGUST-2009 14.686 KM YEAR OF COMMISSONING OFF-SHORE LINE HOSE CONFIGURATION (A) FLOATING HOSE TOTAL NO OF FLOATING 02STRINGS STRINGS 24” X40’ HALF FLOAT HOSE 01 NO IN EACH STRING 24” X40’ HALF REINFORCED HOSE ---DO--24” X40’STANDARD FULL FLOAT HOSE 16 NOS IN STBD STRING & 17 NOS IN PORT STRING FLOATING Y PIECE 01 NO IN EACH STRING 16” X40’ HALF FLOAT HOSE 4NO. IN STRING A 3NO. IN STRING B 4NO IN STRING C 3NO. IN STRING D 16” X30’ HOSE ONE IN STRING B & D 16” X 35” TANKER RAIL L HOSE 01 NO IN EACH STRING TOTAL LENGTH IN MTRS IN PORT STR1085feet EACH ATRING STBD STR :1105 feet 24” X 35’’ DOUBLE CARCASS HALF 04 NO IN EACH REINFORCED STRING SUBMARINE HOSE 24” X 35” DOUBLE CARCASS 04 NO IN EACH SUBMARINE HOES STRING TOTAL LENGTH IN MTRS IN OFF:SH: 140’ EACH ATRING ON. SH: 140’ Details of the Equipment Recommended for BORL, SPM in the Oil Spill Response Plan Sr. No. Equipments 1 Rapid deployment 600m m X 1.5m high. On a deck mounted deployment reel. A non continuous inflation type boom, offshore boom segmented air tube for maintaining integrity if damaged. Manufactured from reinforced neoprene with Power Pack coated fabric with integral ballast tension member. or Powered Reel Details • Powered reel for dep deployment/recovery • Towing bridles • Air inflation device • Repair kit • Compatible connectors for use with booms operated by other companies (consider Quantity 01 containerized reel for whether protection) 2 Offshore Skimmer 30 cu. m + /hr recovery of potentially potentially weathered oil of > 30000 cSt oleophilic or weir design, with + Power Pack Unit remote or onboard pump. The unit is light weight and hand deployable if the support vessel does not have an onboard crane. Design features are: • Ability to operate in all seasons if safe to do so; • High oil recovery rate • Low weight 01 3 • Minimal maintenance; • High oil viscosity recovery and pumping range; • Compact power pack unit; • Ability to deal with debris; • Durable construction. Offshore Floating 25 cu. M+12.5 capacity bladder tank. Immediate storage of recovered oil will done in the tanks.T tanks.Tthe Storage support vessel has little or no onboard storage, floating towable storage is a consideration. The system 02+02 would have to be stowed onboard the support vessel at all times so design feature features should include: 4 • Compact storage size • Rapid and easy deployment • Integral lifting points • Towing points • Ability to decant water • Durable, against weather and abrasion • Low maintenance Vessel mounted Vessels mounted self contained portable unit giving flexible arm positioning for coastal vessels. Unit dispersant spray should have: system • Diesel driven pump unit; • Capable of delivering ‘neat’ dispersant; 02 5 Dispersant • Pressure control valves and gauges; • Hoses and couplings suitable for chemical use; • Low drift no nozzles; • Barrel and vessel tank suction fittings; (Acceptable to Indian authorities) 10 205 Litre drum at ratio of 20:1; only 5 drums are required but to be extra cautious it would be prudent to purchase more 6 7 Inshore (Intertidal) 20 m lengths of shore sealing type boom manufactured from polyurethane for the protection of water Boom intakes and inlets to salt pans etc inter inter-tidal areas: Inshore ancillaries • Rapid deployment • Flexible, contour following sections; • Durable, able to withstand a degree of abrasion abrasion; • Low maintenance; • Minimum storage space. These ancillaries are required to support 600 m of inshore booms • Air blowers • Water pumps • Tow bridles • Stakes • Sledge hammers 30 8 9 10 Vacuum head / • Rope 10 mm X 200 m • Anchors • Anchor chain • Buoys A vacuum head cleaning unit for shore cleaning purpose shall also be available tool (for shoreline • Light weight and robust recovery) • Easy to use • Able to operate in shallow drift • Recovery rate of > 20m / hr • Low maintenance • Able connect to vacuum trucks Temporary storage 2000 gallons fast erect tank for storage of recovered shoreline oil or for the intermediate storage of the tanks oil recovered at sea. Comprising: Transfer Pumps • Oil resistant fabrics • Fast and easy to assemble • Ability to decant water • Spares kit • Cover / roof for keeping rain and contamination out Capable of pumping the weathered oil of approximately 30000 cSt from storage barge to transport or temporary storage tanks. 01 01 01 11 12 Rope Mop Sorbent type oleophyllic rope ability to be linked together to make one length to cover a larger area. skimmer Uses on small spills were the use of conventional booms would not be justified. Pressure Washer For cleaning equipment and manmade surfaces. For bringing oiled equipment back tto state of readiness. 13 PPE ( PVC gloves Health safety and welfare of the clean clean-up up personnel is important. Correct PPE should be worn when / goggles / masks / prolonged contact with oils and dispersants is unavoidable. A stock of PPE for 20 people minimum disposal paper should be held. overalls / water proof trousers + Jackets / Safety boots/ field first aid kits) 14 Decontamination Decontaminating, cleaning of the equipment and personnel after a spill requires a lot of additional Equipments equipment. Without proper decontamination and restoration the equipment may not operate to its (Heavy duty optimim. plastic bags / brooms / detergents / cleaning cloths ans rags. 01 01 DETAILS OF POLLUTION RESPONES CAPABILITY KANDLA PORT TRUST AND OFFSHORE OIL TERMINAL VADINAR SL.NO PARTICLARS 1. POLLUTION RESPONES DETAILS AT KANDLA EQUIPMENT • ONE SET OF PORTABLE DISPERSANT SPRAYING BOOMS HELD • ONE TUGFITTED WITH CHEMICAL DISPERSANT BOOMS/UNIT • ONE NUMBER MOULDED POLYPHONE TANK OF 4000 LTS CAPACITY INSTALLED AT TANKER BERTH • SERVICE OF 6 NOS.OF CRAFT CAN BEUTILISED IN CASE OF OIL SPILLAGE • KANDALA PORT FIRE SERVICE MANPOWER CAN BE UTILISED DURING THE ABOVE CRISI CRISIS RECEPTION FACILITIES: • 250 TONES CAPACITY TANK FOR RECEPTION OF WATER/BILGE WATER. • 10 KL TANKER-TRUCK TANKER TRUCK TO TRANSPORT BILGE/ OILY WATER. •1 NO.4000 LTRS CAPACITY TANK FOR RECEPTION OF DIRTY BALLAST. AT VADINAR a) 4 NOS.OF MOULDED POLYTHENE TANKS EACH OF 5000 L LTRS TRS CAPACITY (4X5000)HAVE BEEN PROVIDED AT VADINAR FOR STORAGE OF CHEMICIL DISPERRSANT. b) 3 CRAFS ARE BEING PROVIDIED WITH PILLOW TANKS TO CARRY DISPERSANT CHEMICALS. c)INDIAN COAST GUARD HAVE A STATION AT VADINAR VESSELS AT VADINAR (KPT) a. b. c. d. e. f. g. MT ASHWINI MT CHEETAH MT GAJRAJ MT SAGRIKA MT BANI MT SURAJ BANI MT KARISHMA FOUR OF THE ABOVE CRAFT ARE BEING PROVIDED WITH PORTABLE CHEMICAL DISPERSANT SPRAYING BOOMS / UNITS FOR CONTROL OF WATER POLLUTION DUE TO OIL SPILLAGE. VADINAR, WHICH IS A SATELLITE PORT OF KANDLA, HADNLES CRUDE OIL TANKERS AT THE SBM. THE EQUIPMENT AVAILABLE IS : a) 4 NOS. OF MOULDED POLYTHENE TANKS EACH OF 5000 LTS CAPACITY HAVE BEEN PROVIDED FOR STORAGE OF DISPERSANT CHEMICALS. b) 3 SMALL CRAFT PROVIDED WITH PORTABLE DISPERSAN DISPERSANT SPRAYING BOOM. AS REGARDS TRAINING OF PERSONNEL FORHANDLING THE BOOMS REGULAR DRILL IS CONDUCTED WHERE THE BOOMS ARE FITTED AND USED. INDIAN COAST GUARD HAVE A STATION AT VADINAR AT VADINAR THE DISCHARGE RATE OF CRUDE OIL IS AT TIMES 9500 TONS PER HOUR A SMALL HOSE BURST WILL SPILL CRUDE OIL (ABOUT 250 TONES) WITHIN A SHORT PERIOD. THIS MAY CREATE A SERIOUS HAZARD TO MARINE NATIONAL PARK, SALT PANS, FISHING INDUSTRY ETC. UNDER THESE SE CIRCUMSTANCES, IT MAY NOT BE POSSIBLE FOR KANDLA PORT TRUST TO COMBAT THIS OIL SPILLAGE. SO COAST GUARD IS AT VADINAR TO COMBAT OIL SPILL MAGNITURE. DETAILS OF POLLUTION RESPONES CAPABILITY BY INDIAN OIL CORPORATION LTD AT VADINAR SL.NO PARTICLARS DETAILS QTY. 1. POLLUTION RESPONSE EQUIPMENT RESPONES a) INTER TIDAL BOOM 600 M EQUIPMENT HELD b) LIGHT DUTY OIL CONTAINMENT BOOM (COASTAL BOOM) 600 M c) DISC SKIMMER 01 NO d) MOP SKIMMER 01 NO e) DISPERSANT SPRAY SET 02 SETS f) SHORE CLEANING SYSTEM 01 SET g) FLOATING TANK 25 CUM CAPACITY 02 NOS h) FLOATING TANK 12.5 CUM CAPACITY 04 NOS i) 01 NO OFF-LOADING LOADING PUMP CONSUMABLES DEPLOYED j) OIL IL SPILL DISPERSANT TYPE – III 1640 LTRS k) OIL ABSOBENT PILLOW ( SIZE 12’ X 8’) 80 NOS l) 130 NOS OIL ABSORBENT BOOM (3’ X 8” DIA) m) OIL ABSORBENT SHEET 767 NOS AT VADINAR STORE n) OIL SPILL DISPERSANT TYPE-III TYPE 2400 LTRS SL.NO PARTICLARS 2. WHETHER ANY VESSEL / CRAFT AVAILABLE. DETAILS FOLLOWING VESSELS ARE AVAILABLE FOR RESPONSE ACTIVITY A. MAINTENANCE BARGE FULLY EQUIPPED WITH OIL SPILL RESPONSE EQUIPMENTS & CONSUMABLES. B. VESSEL (MV OCEAN TOPAZ) FOR POLLUTION WATCH AND IS KEPT ALL THE TIME READY WITH BOOM, STORAGE TANKS AND SKIMMER APART FROM INTEGRAL DISPERSANT SPRAY SET WITH VESSEL. C. ANOTHER MAINTENANCE VESSEL, MV OCEAN PEARL, IS EQUIPPED WITH DISPERSANT SPERSANT SPRAY SET AND CAN BE DEPLOYED DURING EXIGENCY. ONE BOAR IS EQUIPPED WITH DISPERSANT SPRAY SET. 3. TRAINING a) 06 PERSONS FROM IOCL HAS BEEN TRAINED TO USE POLLUTION CONTROL GRAR. DETAILS OF POLLUTION RESPONES CAPABILITY RELIANCE PETROLEUM LIMITED (RPL) SL.NO PARTICLARS DETAILS QTY. 1. POLLUTION a) PERMANENTLY DEPLOYED BOOMS AT THE BERTH 1100 M RESPONES b) BOOM ON BUOY AND READY FOR DEVELOPMENT 500M EQUIPMENT HELD c) BRUTH TYPE OIL SKIMMERS 01 NO d) TYPE-III TYPE DISPERSANT 3000 LRT e) RT-66 AND DRT DRT-7 WHICH ARE PULL BACK TUGS ARE EQUIPPED WITH WIDE ARM DISPERSANT SPRAYING SYSTEM f) HI SPRINT BOOM WITH POWER PACK, AIR BLOWER AND DECK REEL 01 NO g) DISC SKIMMER 01 NO h) ABSORBENT BOOMS 2. 3. i) ABSORBENT PADS AND PILLOWS 5 BALES j) ABSSORBENT SORBENT PILLOWS 5 BALES OTHER EFFORTS / DUMB BARGE FOR COLLECTION OF SKIMMED OIL WITH A CAPACITY OF 500 FACILITIES AVAILABLE CUM VESSELS / AIR EFFORT i) RT-8, RT-9 & RT-10 10 TUG IS USED FOR REGULAR JETTY OPERATIONS AVAILABLE ii) ONE AIRCRAFT AND ONE CHOPPER IS AVAILABLE WITH RPL AND USED FOR INTERNAL TANSPORATION PURPOSES 4. 60M ORGANISATIONAL THE OIL SPILL MANAGEMENT OPERATION SHALL BE CO CO-ORDINATED ORDINATED BY THE STRUTURE COMPOSITION MARINE CHIEF AND HE WILL BE ASSISTED BY THE PORT CAPTAION AND OF LOCAL ACTION GROUP PILOTS. 1 NO. DETAILS OF THE POLLUTION RESPONES CAPABILITY ESSAR OIL LIMITED / VADINAR OIL TERMINAL LIMITED SL.NO 1. PARTICLARS DETAILS QTY. POLLUTION a) PERMANENTLY BOOM (0.65 METERS) FOR JETTY 350 M RESPONES b) AIR INFLATED BOOM (1.2 METERS) 300 M EQUIPMENT HELD c) DISC SKIMMER, 20 M3 / HR 02 NOS d) STORAGE TANK (20 MT) 02 NOS e) STORAGE TANK (05 MT) 01 NO f) OIL ABSORBENT PADS 5000 NOS g) OIL SPILL DISPERSANT 05 MT POLREP MESSAGE FORMAT (See amplification in succeeding table) Reference: IMO – 560 (1995) From Time Address Date Identification Serial number Serial Number Part 1 (POLWARN) 1. 2. 3. 4. 5. 40. 41. 42. 43. 44. 45. 46. 47. Part II (POLINF) 48. 49. 50. 51. 52. 60. 80. 81. 82. 83. 84. 85. Part III (POLFAC) 86. 87. 88. 89. To Group Date and time Position Incident Outflow Acknowledge Date and time Position Characteristics of Pollution Source and cause of pollution Wind direction and speed Current or tide Sea state and pollution Drift of pollution Forecast Identity of observer and ships on scene Action taken Photographs or samples Names of other agencies informed 53 53-59. Spare Acknowledge Date of Time Request for assistance Coast Pre Pre-arrangements for the deliver Assistance to where and how Other agencies requested Change of command Exchange of information Names and number of Description of equipment ETA and arrival information Place of embarkation Place of disembarkation 93-98. Spare 93. Acknowledge 90. 91. 92. Amplification of POLREP Message Format CONTENTS DTG (Date Time Group) POLREP BONN AGREEMENT/ NORDIC/BALTIC/ DENGER REMARKS Day and tinge of drafting of the telex (DTG). Always six figures can be month indication. The DTG call be used as a reference. This is the identification of the report. "POL... " Indicates that the report might deal with all aspects of pollution such as oil as well as other harmful substances. "...REP" indicates that this is a report on a pollution incident. It call contain up to three main parts: Part I is all initial notice ( a first information or a warning) of a (POLWARN) casualty or the presence of oil slicks or harmful substances this part of the report is numbered from 1 to 5 . Part 11 is a detailed supplementary report to part 1. This part of the (POLINF) report is numbered from 40 to 60. Part III is a request for assistance from other contracting pat-ties, pat as (POLFAC) well as for operational matterss in the assistance situation. This part of the report is numbered from 80 to 99. BONN Is for identifying the agreement in question (other code words: AGREEMENT "NORDIC" for the Copenhagen Agreement, 1971: "BALTIC" for the Helsinki Convention, 1974 and "DENGER" for the Danish German Joint Maritime Contingency Pl4n 1962) Parts 1, 11 and III call be transmitted all together in one report or separately. Further more, single figures front each part can be transmitted separately or combined with figures fl-0111 the two other parts. Figures without additional text shall not appear in the POLREP. When part I is used as a warning of a serious threat, the telex should be headed with the traffic priority word "URGENT" (URGENT is optional under the Bonn agreement.) I All POLREPs containing ACKNOWLEDGE figures(5, 60 or 99) should be acknowledged as soon as possible by the competent national authority. POLREPs for a. specific incident shall always be terminated by a telex from the reporting State which indicates that no more operational communication orr that particular incident call be expected. CONTENTS DK 1/1 REMARKS Each single report should be easily identifiable and the receiving agency should be in a position to check whether all reports of the incidents in question have been received. This is done by using a nation nation- identifier (Dll,, FRG, Ul", PO,Fl, etc) followed by a stroke system , where the figure before the stroke indicated the Figure to which the report refers and figure following the str stroke oke indicates the actual number of reports which have been originated oil the incident in question. POLREP BONN AGREEMENT DK 1/1 indicates the first report from Denmark of the incident in question in the Boils agreement region. POLREP BONN AGREEMENT DK 1/ 1/22 will, in accordance with the described escribed system, then indicate the second report front the same incident. If the pollution caused by the incident splits up into clearly defined patchespatches in this example two — the wording POLREP BONN AGREEMENT I now splitting splittin into POLREP BONN AGREEMENT 2 & POLREP BONN AGREEMENT 3 " should be indicated in the last report on the incident identified by figure I preceding the stroke. The first reports oil the two patches originating from the incident: first reported will DK 1/1 Each single report should be easily identifiable and the receiving agency should be in a position to check whether all reports of the incidents in question have been received. This is done by using a nation nation- identifier (Dll,, FRG, Ul", PO,Fl, etc) followed foll by a stroke system , where the figure before the stroke indicated the Figure to which the report refers and figure following the stroke indicates the actual number of reports which have been originated oil the incident in question. POLREP BONN AGREEMENT ENT DK 1/1 indicates the first report from Denmark of the incident in question in the Boils agreement region. POLREP BONN AGREEMENT DK 1/2 will, in accordance with the described system, then indicate the second report front the same incident. If the pollution caused by the incident splits up into clearly defined patches patches- in this example two — the wording POLREP BONN AGREEMENT I now splitting into POLREP BONN AGREEMENT 2 & POLREP BONN AGREEMENT 3 " should be indicated in the last report on the incident identified identified by figure I preceding the stroke. The first reports oil the two patches originating from the incident: first reported will CONTENTS DK 1/1 REMARKS Each single report should be easily identifiable and the receiving agency should be in a position to check whether all reports of the incidents in question have been received. This is done by using a nation nation- identifier (Dll,, FRG, Ul", PO,Fl, etc) followed by a stroke system , where the figure before the stroke indicated the Figure to which the report refers and figure following the stroke indicates the actual number of reports which have been originated oil the incident in question. POLREP BONN AGREEMENT DK 1/1 indicates the first report from Denmark of the incident in question in the Boils agreement a region. POLREP BONN AGREEMENT DK 1/2 will, in accordance with the described system, then indicate the second report front the same incident. If the pollution caused by the incident splits up into clearly defined patches patches- in this example two — the wording POLREP BONN AGREEMENT I now splitting into POLREP BONN AGREEMENT 2 & POLREP BONN AGREEMENT 3 " should be indicated in the last report on the incident identified by figure I preceding the stroke. The first reports oil the two patches originating ffrom rom the incident: first reported will CONTENTS DK 1/1 REMARKS Each single report should be easily identifiable and the receiving agency should be in a CONTENTS 1. Date and time 2. Position 3. Incident 4. Outflow 5. Acknowledge position to check whether all reports of the incidents in question have been received. This is done by using a nation nation- identifier (Dll,, FRG, Ul", PO,Fl, etc) followed by a stroke system , where the figure before the stroke indicated the Figure to which the report refers and figure following the str stroke oke indicates the actual number of reports which have been originated oil the incident in question. POLREP BONN AGREEMENT DK 1/1 indicates the first report from Denmark of the incident in question in the Boils agreement region. POLREP BONN AGREEMENT DK 1/ 1/22 will, in accordance with the described system, then indicate the second report front the same incident. If the pollution caused by the incident splits up into clearly defined patches patches- in this example two — the wording POLREP BONN AGREEMENT I now splitting splitting into POLREP BONN AGREEMENT 2 & POLREP BONN AGREEMENT 3 " should be indicated in the last report on the incident identified by figure I preceding the stroke. The first reports oil the two patches originating from the incident: first reported will PART I (POLWARN) REMARKS The date of the month as well as the time of the day when the incident took place or, if the cause of the pollution is not known, the time of the observation should be stated with six figures. Time should be stated as GMT. for example 0919007 (i.e. the 9"' of the relevant figures at 1900 GMT) Indicates the main position of the incident in latitude and longitude in degrees and minutes and may, in addition, give the bearing of and the distance from the location known by the receiver. The nature of the incident should be stated here, such as BLOWOUT, TANKER GROUNDING, TANKER COLLISION, OIL SLICK, ETC. The nature of the pollution, such as CRUDE OIL, CHLORINE, DINITROPHENOL, ETC as well as the total quantity in tons of the outflow and / or flow rate as well as the risk of further outflow. If there is no pollution but a pollution threat, the words NOT YET followed by the name of the substance, for example NOT YET FUEL OIL, should be stated. When this figure is used the telex should be acknowledged as soon as possible by the competent national authority. PART II (POLINF) 40. Date and time No. 40 relates to the situation described in figure 41 to 60 if it varies from fig.I. 41. Position and / Indicates the main position of the pollution in latitude and longitude in degrees and or extent of minutes and may, in addition, give the distance & bearing of some prominent Pollution oil landmark to the receiver if other than indicate in fig. 2. Estimated amount of above/ in the sea pollution ( e.g. size of polluted areas, number tonnes of oil spilled if other than indicated in fig. 4, or number of containers, drums, etc. lost). Indicates length and width of slick, in nautical naut miles, if not indicated in fig. 2. 42. Characteristics Give type of pollution, e.g. type of oil with its viscosity and pour point, packaged of pollution or bull< chemicals sewage. For chemicals, give proper name or United Nations Number, if known. For all, give also appearance, e.g. liquid, floating solid, liquid oil, semi-liquid sludge, tarry lumps, weathered oil, discoloration of sea, visible vapour. Any markings oil drums, containers etc should be given. 43. Source and e.g. from om vessel or other undertaking, if from vessel, say whether as a result of a cause of pollution deliberate discharge or casualty. If the latter, give brief description. Where possible, give name, type , size, call sign, nationality and port of registration of polluting vessel. l. If vessel is proceeding oil its way, give course, speed and destination. 44. Wind direction Indicates wind direction in deg. And speed in m/s . 'File direction always and speed indicates from where the wind is blowing CONTENTS 45. Current direction & speed and/ or Tide 46. Sea state and visibility 47. Drift of Pollution REMARKS Indicates current direction in degrees and speed in knots and tenths of knot. The direction always indicates the direction in which the current is flowing. flowi 48. Forecast of likely effect of pollution and zones affected 49. Identity of observer/ reporter, Identity of ships on scene 50. Action taken 51. Photographs or samples 52. Names of other States and Organisations informed 53-59. e.g. arrival on beach, with estimated timing. Results of mathematical model. 60. Acknowledge 80. Date & time 81. Request for assistance 82. Cost 83. Sea state indicated as wave height in meters. Visibility in nautical miles. Indicates drift codes and speed of pollution in degrees and in knots and tenths of knots. In case of air pollution( Gas cloud) drift speed in indicated in m/s) Indicated who has reported the incident. If a ship, its name, home port, flag & calll sign must be given. Ships oil scene can also be indicated under this item by name, home port, flag and call sign, especially if the polluter can not be identified and the spill is considered onsidered to be the recent origin. o Any action taken for the disposal of the pollution. Indicates if photographs or samples from the pollution have been taken, Telex no. of the sampling authority should be given. Spare for any other relevant information( e.g. Results of sample or photographic analysis, results of inspections of surveyors, statements of ships personnel nel etc. When this figure is used the telex should be acknowledged as soon as possible by the competent national authority. No. 80 is related to the situation described below, if it varies from figures and/or 40 Part- III (POLFAC) Type and amount of assistance required in the form of • Specified equipments • Specified equipments with trained personnel • Complete strike teams • Personnel with special expertise with indication of country requested Requirements for cost information to requesting country of delivered assistance Pre- Information concerning Custom clearance, access to territorial waters, arrangements for the delivery of assistance 84. To where assistance should be rendered and how 85, Names of other states and Organization 86. Change of command 87. Exchange of Information 88-89 99. Acknowledge etc, in the requesting Information concerning the delivery of assistance e.g. rendezvous at sea, with information oil frequencies to be used, call sign and name of Supreme On Scene Commander of the requesting country, or land based authorities with no., telex no. and contact person Only to be filled filled-in in if not covered by figure 81, e.g. if further assistance is later needed-by by other states. When a substantial part of an oil pollution or serious threat of oil pollution moves or has moved in to the zone of another Contracting Party, the country which has exercised the supreme command of the operation may request the other county to take over the supreme eme command When a mutual agreement has been reached between two parties on a change of supreme upreme command, the country transferring the supreme command should give a report on all relevant information pertaining to the operation to the Country taking over the command. Spare for any other relevant requirements or instructions When this figure is used the telex should be acknowledged as soon as the competent national authority FUNCTIONAL RESPONSIBILITIES ALLOCATED TO MINISTRIES/ DEPARTMENT AS PER DECISION TAKEN AT A MEETING OF THE COMMITTEE OF SECRETARIES ON 04 Nov. 93. MINISTRY/ DEPARTMENT AGENCY MINISTRY OF ENVIRONMENT AND FOREST MINISTRY OF SHIPPING RESPONSIBILITIES AS PER ALLOCATION OF BUSINESS RULES FUNCTIONAL RESPONSIBILITIES ALLOCATED. Environment and ecology , including Environment and ecology , including environment in coastal waters , in environment in coastal waters , in mangroves mangroves , coral reefs and especially coral reef but excluding marine environment of the high seas 1. Enactment of legislation for preven prevention and control of marine pollution from land and sea based sources. 2. Prevention and control of marine pollution at source, on Land or the sea. 3. Monitoring of pollution upto the shore. 4. Cleaning of beaches affected by oil pollution through Coastal states and Union Territories. 1. Maritime Shipping and navigation 1.Prevention and control of pollution arising 2. Administration of Indian Ports Act, 1908 from ships all over the sea including the major ports areas. and ports declared as major ports 2. Enactment and administration of the legislation related to prevention control and combating of pollution arising from ships. 3.Functions through DG ( Shipping). To comply with provision made in section 356 G(1) and (2) of Merchant Shipping Act'1958 ( Amendment) for the purpose of (a)Inspection of construction of ships and tankers in order to comply with provision of MARPOL 73/78 or of the other convention on maritime pollution formulated by IMO and/or other related bodies , Merchant Shipping Act and issue of necessary certificates , and (b)Penalising the offenders apprehended by the Indian Coast Guard and port authority for violations of the above provisions of the Act including includin processing of pollution damage claims etc. 4. Functions through major port authorities within port limits (a)Inspection of oil record books (b)Apprehending of violators of anti anti- pollution provisions mentioned under section 356 G(1) and (2) of the Me Merchant Shipping Act. (c)Checking Checking of vessels for carrying necessary insurance certificate against oil pollution damage. MINISTRY OF 1. EXPLORATION FOR AND EXPLOITATION PETROLEUM AND OF PETROLEUM RESOURCES INCLUDING NATURAL GAS NATURAL GAS 2. PLAN WING, DEVELOPMENT AND REGULATION OF OIL FIELD SERVICES 3. OIL REFINERIES, FINERIES, INCLUDING LU LUBE (d)Empowered to handle necessary anti pollution provisions mentioned under Indian Ports Act' 1908 ( Amendment ). (e)Monitoring and combating of oil pollution in the port areas. 1. COMBATING OF OIL POLLUTION AROUND OFFSHORE EXPLORATION AND PRODUCTION PLATFORM UPTO 500 MTR. 2. COMBATING OF OIL POLLUTION AROUND COASTAL REFINERIES THROUGH THE CONCERNED REFINERIES DEPARTMENT OF OCEAN DEVELOPMENT MINISTRY OF DEFENCE PLANTS 1. Policies including co co-ordination regulatory measures and development relating to prevention, conservation and protection of oceans Indian Coast Guard Organisation Scientific monitoring of marine pollution arising from land based , ship shipbased and other resources in various maritime zones including coastal waters , but excluding monitoring of oil pollution within the limits of major ports , oil platforms installations and structures. 2. Surveillance of maritime zones zone against oil spills. 3. Combating oil spills in various maritime zones except in the waters of major ports 4. Central Co-ordinating ordinating agency for combating of oil pollution in the coastal and Co-ordinating ordinating agency combating maritime environment of various maritime zones of the country. 5. Implementation of national contingency plan for oil spill disaster. 6. ( Following) controlling activities in various maritime zones except within the limits major ports:(a) Inspection of oil record books (b) Apprehending ending violators of anti anti- pollution provisions mentioned under sections 356 G(1) and (2) of the Merchant Act. (c) Checking of vessels for carrying necessary insurance certificates against oil pollution damage. OIL SPILL EQUIPMENT AVAILABLE WITH BORL VADINAR: Item Description Qty 1 Inter-tidal tidal Boom 600m 2 Coastal Boom 600m 3 Disc Skimmer 1 no, 4 Mop Skimmer 1. no. 5 Dispersant Spray Sets 2 sets 6 On-Shore Shore cleaning System 1 no. 7 Floating Tank 25 m3 2 nos. 8 Floating Tank 12.5m3 2 nos. 9 Off-loading loading Pump 1 no. S.No. OIL SPILL CONSUMABLES AVAILABLE WITH BORL VADINAR: S.No 01 02 03 04 Item Description Oil Spill Dispersant Oil absorbent pillow (1.5'xl'x5") Oil absorbent boom (length-10'x dia-7") Oil absorbent sheet (1.5'xI.5') Qty. 2000 Ltr 80 Nos 130 Nos 767 Nos Classifications of Oil Handled at Vadinar Parameter Types of Crude Oil with typical values Low Sulphur High Sulphur Bombay High Gravity API 32.5 - 36.3 24.7 - 33.8 39.35 Sulphur % weight 0.12 - 1.38 1.35 - 4.52 0.17 Viscosity in cst 11.5 at 20 deg. C 10 - 37 at 70 deg. F 24 at 75 deg. F A. Type of Crude oil Arabian Heavy Arabian High Sulphur Oil Origin Specification Gravity API 27.9 Sulphur Wt.% 2.85 Rastanura Pour Point .F 20 Saudi Arabia RVP PSI 7.5 Kin. Vis. Cst 70.17 37.0 @ 100.E 19.0 Gravity API , 33.4 Sulphur Wt.% 1.79 Pour Point .F 30 RVP PSI 3.6 Kin. Vis. Cst 701 10.2 @ 1001 6.25 Rastanura Gravity API Arabian Medium Sulphur Wt.% 30.8 Rastanura Pour Point.F + 5 2.40 Saudi Arabia RVP PSI 3.2 16.2 Kin, Vis.cst 70.F 9.41 @ 100.F Basrah Heavy Basrah Light Iraq Gravity API 24.7 Sulphur Wt.% 3.5 Pour Point.0 30 Kin.Vis @ 10.0 cst 86.3 C4 & lighter wt % 0.08 Gravity API 33.7 Klier-alArnaya alArnaya SIUIPIILII- wt.% 1.95 Piled structure Pour Point .0 15 In Gulf Yandu Kin Vis cst @ I 0.c 15.0 C4 & Lighter wt.% 1.3 Pension Gulf Type of Crude oil Basrah Medium Dubai Suez Mix (Egypt) Hout Kuwait Origin Lordport Specification Gravity API 31.1 Mina-al al-Bala Sulphur Wt.% 2.58 Sea terminal Pour Point dec, C 30 Persian Gulf Kin Vis Cst @ 10.0 41 C4 & Lighter wt.% 1.6 Gravity API 31.05 Sulphur Wt.% 2.0 Kin.Vis.Cst @ 20.0 12.82 Carbon wt. % 4.62 Asphaltene wt 1%, 1.70 RVP @ 40.0 7.05 Pour Point .0 9 Gravity API 31.9 Sulphur Wt.% 4.52 FVP psi 8.3 Pour Point .F 35 Rans Carbon wt% 4.4 Kin.Vis.cst @100.F 8.74 Cl-05/vol yield 5.48 Gravity API 32.8 Sulphur Wt.% 1.90 FV1 psi 4.6 Sea Berth Off Pour Point. F -13.0 Ras AI Khaiji Kin.Vis cst 0 86.F 9.88 Carbon content wt% 5.01 Asphaltene wt% 1.65 Wax content wt% 3.2 Gravity API 31.4 VIS SUV Sec at 100.F 58.1 Pour Point .F +5 Slulphur wt.% 2.52 Fateh, UAE Ras Shukhair Mina Al Ahmadi Type of Crude oil Origin Lordport Iranian Heavy Kharg Island Iranian Light Kharg Island Specification Gravity Sulphur Wt.% Pour Point °F V is.cst 70 °F Yield Volume % Gravity Sulphur Wt.% Pour Point . Vis.cst 70°F 31.0 1.65 -5 16.84 2.38 33.8 1.35 -20 10,58 Gravity Sulphur Wt.% Pour Point .F RVII psi ViS.SUS.wt 60°F Yield Volume % Gravity Sulphur Wt.% Pour Point RVP Vis at 20°C Gravity Slulphur wt.% POUT- Point RVP Vis at 59°C 36.3 0.79 - 15 4.2 64.8 3.63 32.5 1.38 -23°C 49.2 11.5 35.8 0.12 -45°C 6.0 6.76 B. Low Sulphur Oil Oman Blend Mina Al Fahal Soviet Blend Novorossysk Black Sea Negerian Qua lboe C. BOMBAY HIGH CRUDE OIL a. Physico-Chemical Chemical Prosperties: Density, Kg/Litre at 15°C Specific gravity at 60/60°F API gravity at 60°F RVP Kg/cm2 at 38°C Pour Point °C (Neat Crude) 0.8278 0.8282 39.35 0.34 +30 Kinematic viscosity cst at 37.8 °C (100°F) 40.0°C 50°C Water Content, % Vol. Salt Content, % wt Lb/1000 bbl Sulpur total, % wt. Nitrogen, total % wt. Carbon residue (Conradson), % wt. Asphaltene, % wt. Ash content % wt Wax content, (EH), % wt. Congealing point of wax, °C Water & sediment by Centrifuge %wt Total acidity, mg/KOH/g /gm Inorganic acidity, nig KOH/gm Characterization. ation. factor K(uop) 3.75 3.28 2.24 0.15 0.0032 11 0.17 0.015 1.2 0.28 0.01 14.7 58.0 0.2 0.15 Nil 11.70 b. Thermal properties: Specific heat Fluid conductivity Vapour pressure at 30°C Thermal expansion coefficient c. 0.475 Keal / kg °C 0.470 Keal / kg °C at 20 °C 0.12 Keal / hr M °C 3.5 psi 0.000860 Per °C Characteristic of Panna/Mukta crude oil a) Density @ 15'C/g/inl (weighted average) b) API gravity @ 60°F Psi c) Reid vapour pressure @100 'F Psi (determined for middle sample of tank) d) Water and sediment % Vol water content e) salt content as NACL loss/ 1000 bbl f) Pour point °F Method IP-60 Calculated Results 0.8304 38.8 IP-69 4.0 % val IP-77 IP-15 IP-75 75 Not checked 70 LIST OF IMPORTANT TELEPHONE NUMBERS LIST OF IMPORTANT TELEPHONE NUMBERS OF GOVT. OFFICIALS RELATED TO SPILL COMBATING S.N. DESCRIPTION 1 DISTRICT COLLECTOR, JAMNAGAR 2. COLLECTOR OFFICE JAMNAGAR (0288) SUPERINTENDENT OF POLICE, JAMNAGAR (0288) 3. 4. 5 6. 7. 8., 9. 10. 11. 12. 13. 14. MUNICIPAL FIRE IRE STATION, JAMNAGAR (0288) .RGIONAL OICER, GUJARAT POLLUTIOB CONTROR BOARD, JAMNAGAR (0288) CONSERVATOR OF OREST, JAMNAGAR (0288) POLICE OUTPOST,VADONAR (0288) KPT CONTROL TOWER, OWER, VADINAR (0288) DEPUTY SUPERINTENDENT OF POLICE,KHAMBALIA (0288) DEPUTY COLLECTOR, KHAMBALIA (0288) COMMANDER COAST GUARD, PORBANDAR (0288) GUJARAT POLLUTION CONTROL BOARD, GADHINAGAR (079) CHIEF CONSERVATOR OF FOREST, GANDHINAGAR (079) DIRECTOR ENVIRONMENT, GOVT. OF GUJARAT.GANDHINAGAR TELEPHONE NO. OFFICE RESIDENCE 2555869 2554059 MOB: 9427306210 2557601-5 --------------- FAX NO. 2555899 2555899 2556382 2550101 2555868 MOB: 9427305071 ---------------- 2752366 2540741 2753540 2552077 2553327 2679371 256541 ----------------- ----------------- 256555 ----------------- ----------------- 234262 234726 234262 234577 234714 234577 2554203 ------------- 224234 2244056 ---- 23232156 23254123 ---- 23229917 23251062 ---- 23252156 2241794/ 2240958 23222756/ 23222095 LIST OF IMPORTANT TELEPHONE NUMBERS OF GOVT. OFFICIALS RELATED TO SPILL COMBATING S.N. DESCRIPTON 15. 16. 17. 18. 19 CG, STATION, VADINAR. COM.KPT,VADINAR. HEAD (ENVIRONMENT),RIL, (Mr. Kannan) RPL, PORT OPERATION CENTER MUNDRAPORT (PORT OPERATION CENTER) TELEPONE NO. FAX NO. OFFICE RESIDENCE 256560/256579 256534 256560 256749 256522 256540 95288-3012152 9528333012199 95288-288270 02838-288201to 288207,02838220033 Important Telephone Numbers of VOTL Marin Operation (ESSAR) S.N. NAME 1. Capt KV Balasbramanian 2. Capt Deepak Sachdeva 3. Capt DK Mishira 4. 5. Capt Deep Saxena V Gopalakrishnan 6. Control room 7. Control room fax DESIG Head marine Facilities Head-Marine Operations Head_Port Facility Security Port Captain Admin Officer Shift -incharge MOBILE NO. TEL (OFF) 02833-241777 241777 9979891407 02833-241777 241777 9925153618 02833-241780 241780 9909021183 02833-241776 241776 9909021113 02833-241779 241779 9979891335 02833-241775 241775 9979868460 02833-241779 241779 Annexure 8 Maps 69°38'0"E 69°40'0"E 69°42'0"E 69°44'0"E 69°46'0"E 69°48'0"E 69°50'0"E Land Use Map of Study Area 22°30'0"N Legend Class 22°28'0"N 22°28'0"N 22°30'0"N Within 10 km Rdiaus of the BORL COT 10 Km Radius Agriculture Land Gulf of Kutchh 22°26'0"N 22°26'0"N Barren Land Industrial Area Mangrove BORL COT Salt Pan 22°24'0"N 22°24'0"N ! Settlement 22°22'0"N Water Body Ü 22°20'0"N 22°20'0"N 22°22'0"N Tidal Flats BORL COT 69°38'0"E 22°18'0"N 22°18'0"N 0 69°40'0"E 69°42'0"E 69°44'0"E 69°46'0"E 69°48'0"E 69°50'0"E 1:50,000 4 8 Kilometers DHI (India) Water & Environment Pvt. Ltd. 69°38'0"E 69°40'0"E 69°42'0"E 69°44'0"E 69°46'0"E 69°48'0"E 69°50'0"E Land Use Map of Study Area 22°30'0"N Legend Class 22°28'0"N 22°28'0"N 22°30'0"N Within 10 km Rdiaus of the BORL COT 10 Km Radius Agriculture Land Gulf of Kutchh 22°26'0"N 22°26'0"N Barren Land Industrial Area Mangrove BORL COT Salt Pan 22°24'0"N 22°24'0"N ! Settlement 22°22'0"N Water Body Ü 22°20'0"N 22°20'0"N 22°22'0"N Tidal Flats BORL COT 69°38'0"E 22°18'0"N 22°18'0"N 0 69°40'0"E 69°42'0"E 69°44'0"E 69°46'0"E 69°48'0"E 69°50'0"E 1:50,000 4 8 Kilometers DHI (India) Water & Environment Pvt. Ltd. 69°44'0"E 69°46'0"E 69°48'0"E 22°28'0"N 22°28'0"N 69°42'0"E Location of Villages Within 5Km radius of BORL COT 22°26'0"N 22°26'0"N Legend Villages d 5Km radius Satellite Image (IRS LISS 3) RGB Red: Band_3 Green: Band_2 22°24'0"N 22°24'0"N Vadinar Blue: Band_1 d Singach d Ü BORL COT 1:50,000 Bharana d 22°22'0"N 22°22'0"N Zankhar d Timbdi 69°44'0"E 1 2 4 Kilometers DHI (India) Water & Environment Pvt. Ltd. d 69°42'0"E 0 69°46'0"E 69°48'0"E Annexure 9 Complaint Handling Mechanism 1.0 PURPOSE To establish an efficient and effective customer compliant handling system in respect of complaints made by customers relating to product and/or product related service; arising out of a deviation from the BORL Quality, environmental, health & Safety performance or as a result of observations by statutory / regulatory bodies and/or any other interested party. 2.0 SCOPE All complaints received in the BORL from customers and/or statutory/ regulatory bodies and/or any other interested parties. 3.0 RESPONSIBILITY Complaints on Product and/or product service and Environmental, Health & Safety performance, received from customers and/or end-users / interested parties are categorized and accordingly handled as under: Sr. No. a. Note: 4.0 Category of Complaint Complaints related specifications to the suitability of product HOD – TS/BDT. b. Complaints related to the specifications of the delivered Area–in–charge – product BDT c. Complaints related to product delivery and post delivery HOD – BDT activities d. Complaints related to environmental issues HOD - TS e. Complaints related to health & safety issues HOD (F&S) The overall responsibility for all the actions, however, belongs to the Departmental or Section Head of the area which deals with the complaint in co-ordination with MRIMS. Specific other responsibilities are defined in ‘DETAILS’ under 6.3 & 6.4 PERFORMANCE CRITERIA Customer Compliant Registers IMS Complaint Register - Environmental IMS Complaint Register - OHS Customer complaint Redressal Form 5.0 Handled by CROSS REFERENCE BDT and TS. Section Head - E & E Section Head / VP (F&S) BDT and TS. / Section Head-E&E / VP (F&S) ISO 9001:2008 Clause 8.2.1 Customer Satisfaction 6.0 DETAILS 6.1 DEFINITIONS Customers: The different departments/sections in the Marketing setup of BORL. End-user: Any individual, industry, institution, Commercial or social establishment, government organization or Private Company to whom the products of the BORL are sold or transferred Other interested party: This includes employees, contractors & vendors, customers, residents in the neighborhood of the BORL, stakeholders and any other individual/organization Operative or affected by the BORL environmental performance. 6.2 Complaints are received through correspondence or on telephone or in person. They may be addressed to the person responsible (see 3.0 above) or to any other individual in the BORL who then effectively communicates the complaint to the person responsible and to the MR-IMS. A complaint about the environmental, health & safety performance of the BORL, made by the Statutory Authorities, is received and referred to the MR-IMS by the Section Head -E&E and F&S. 6.3 Complaints related to the product or product related services are reviewed by the responsible person (see 3.0 above) and, if required, clarity about the nature of the complaint is first obtained from the complainant. He/she also consults the Customer, if the complaint is received from an end-user to ensure that there is no duplication of effort and to safeguard any other interests of BORL 6.3.1 6.3.2 6.3.3 6.3.4 6.3.5 The complaint is then recorded by the responsible person in the Customer Complaint Register maintained by him. An identification number is allocated to the complaint and this is conveyed to the complainant either in writing or verbally. This constitutes the acknowledgement of the complaint. A verbal acknowledgement is recorded. The responsible person then analyses the complaint and takes appropriate action to avoid the recurrence of such situations. He/she may consult his/her superiors in this activity and also seek necessary assistance from the Quality Assurance laboratory. Where required, the responsible person shall inform the customer of the steps taken to avoid recurrence of such situations, through designated communication channels. Once the action taken to resolve a complaint is found to be effective, a suitable entry is made in the Customer Complaint Register and the complaint is closed by the Responsible Person. 6.3.6 6.3.7 6.3.8 The Responsible Person provides the following data to his Section Head/ Departmental Head for inclusion in the ‘Monthly Highlights’: Number of customer complaints received in that month Number of complaints closed with brief details about their nature & actions taken. Number of ‘open’ complaints and their status. Responsible Persons compile data about complaints every six months and analyse the information to establish : any specific trends in the complaints potential non-conformities opportunities for improvement Results of the analysis carried out as in 6.3.7 above, supported with any suggestions for preventive action(s) are distributed to the members of the Steering Committee for discussion at Management Review Meetings. 6.3.9 i. ii. iii. Complaints which do not involve detailed investigations and/or analysis and/or cross functional involvement are usually closed within seven days. Complaints which involve detailed investigation and/or analysis and/or cross functional involvement are usually closed within thirty days To have a standardized recording regarding customer complaints, a uniform format is used which is titled as “Customer complaint Redressal Form” and shown below: Sr. No. External Customer Date of Receipt Mode of Receipt Internal Customer Name of the Person (Internal Customer) Description of Complaint Complaint investigated by Finding of the Investigation Corrective (Immediate) Action taken Steps to avoid recurrence Current Status Date of Closure Attachments (Description) 6.4 Telephonic / Verbal / E-mail I&C / Supplies / Etc. TS / BDT etc. Closed / Open Complaints about the environmental, health & safety performance are clarified, if necessary and then recorded in the ‘IMS Complaint Register – Environment / IMS Complaint Register - OHS and suitably acknowledged by HOD (F&S) /TS Sr. No. a. Action to be taken Review the complaint and refer to the Operative department(s) responsible for attending to such complaints Responsibility VP (F&S)/Section Head(E&E) Operative HODs / MRIMS b. Examine the complaint to determine the cause of the complaint, collect further data if required and decide corrective and preventive action(s). c. If corrective and preventive action(s) require any review of targets, additional resources, refer to the Senior MR for review by a committee consisting of HOD (Tech.), Sec. Head (Q.A. Lab) and HODs of interfacing departments. Operative HODs /MRIMS d. Review the targets and Environmental / OHS Management Programmes where necessary for corrective action. IMS - MRC e. Take suitable corrective and preventive action and where necessary modify / initiate ‘Environmental/OHS Management Programmes’. Operative HODs /MRIMS f. Send suitable reply to interested parties / statutory authorities, where necessary and where possible substantiate the reply with data and proposed programmes, if any. VP (F&S)/Section Head(E&E) g. Update ‘QEMS/OHS Complaint Register’ and close the complaint after necessary corrective and preventive action has been taken. h. Submit status of complaints, including corrective & preventive actions taken and relevant communication with respect to complaint for review during Management Review Meetings. VP (F&S)/Section Head(E&E) / MR-IMS MR-IMS i. Verify the status of pending complaints related to the IMS performance of the BORL once in three months and follow up with Operative personnel for necessary action and timely completion. 7.0 FORMS IMSP / F03: IMS Complaint Register 8.0 RECORDS MR-IMS a. Customer Complaints Register with BDT & TS. b. Reports of investigations/analysis along with records of the results of corrective and/or preventive actions implemented c. IMS Complaint Register - Environmental with E&E d. IMS Complaint Register - OHS with F&S e. Customer complaint re-dressal Form maintained by BDT and TS. All the above records are to be retained for a period of three years after the respective complaint has been closed. 9.0 CHECKING, CORRECTIVE AND PREVENTIVE ACTIONS HODs / Section Heads - BDT and TS Departments Section Head - E&E / Section Head / VP (F&S) shall ensure effective implementation of the above procedure, and in case of any deviations, shall take appropriate corrective and preventive actions, The record of deviation and reasons shall be maintained. Annexure 10 Plates BEELARPUR COLONY The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use. I. O. C. izLrqr vkjs[k ,oa blesa fufgr fMt+kbu bathfu;LkZ bafM;k fyfeVsM dh LkaifRr gSA ;s ek= m/kkj fn, x, gSa vkSj m/kkjdrkZ us ;g Li"V Lke>kSrk fd;k gS fd u rks mUgsa iqu% eqfnzr fd;kk tk,xk] u udy dh tk,xh] u m/kkj fn, tk,axs] u iznf'kZr fd, tk,axs vkSj u gh Lkhfer vkSj futh iz;ksx ds vykok budk dksbZ vU; iz;ksx gksxk vkSj ;g iz;ksx m/kkj nsus okys }kjk m/kkjdrkZ dks fyf[kr :i esa nh xbZ Lkgefr Lks gksxk A TANK FARM REF. DWG. NO. DATE SCALE REFERENCE DRAWING TITLE NOTES :- PARKING REVISIONS JOB NO. DRN UNIT DEPT. SECT. BY CHKD APPD Hkkjr vkseku fjQkbujh fyfeVsM chuk fjQkbujh ifj;kstuk dPpk rsy VfeZuy oknhukj lEiw.kZ Hkw[k.M ;kstuk DWG. NO. 1-1641-0500 REV.0 REV. A0-1189 x 841