Reference No
Transcription
Reference No
REPUBLIC OF INDONESIA List of Planned Priority External Loans 2015 Ministry of National Development Planning/ National Development Planning Agency - 2015- Foreword In order to improve the effectiveness and efficiency of the external loans utilization in achieving national development goals as stated in the Medium-Term National Development Plan or Rencana Pembangunan Jangka Menengah Nasional (RPJMN) 20152019, the Government has to carefully prepare the projects that will be financed by external loans. Therefore the project that has been listed in List of Medium-Term Planned External Loans or Daftar Rencana Pinjaman Luar Negeri Jangka Menengah (DRPLN-JM) 2015-2019 was assessed its readiness using a set of Readiness Criterias (RCs). The project that already met most of the RCs and already has indicative sources of funding/ prospective lenders will be put into the List of Planned Priority External Loans or Daftar Rencana Prioritas Pinjaman Luar Negeri (DRPPLN). The DRPPLN 2015 has been issued through the Decree of the Minister of National Development Planning/Head of National Development Planning Agency Number KEP.154/M.PPN/HK/09/2015. The DRPPLN 2015 consists of 25 projects: 21 projects of ministries/agencies, 2 projects of the local government, and 2 projects of State-Owned Enterprises (SOEs). The total amount of the external loans that needed to finance the projects as listed in the DRPPLN 2015 is USD 3.9 billion. With the issuance of this DRPPLN 2015, the ministries/agencies, local government, and SOEs, as executing agencies, are expected to enhance the readiness of their proposed projects listed in the DRPPLN 2015. The DRPPLN 2015 could also be used by the executing agency as a reference in preparing its annual work plan. For development partners, this DRPPLN 2015 can be used as a reference in taking followup steps of their cooperation plan with the Government of Indonesia. Thereby, it is expected that the implementation of projects that are funded by external loans could become more efficient and effective. Ministry for National Development Planning/ Head of the National Development Planning Agency, Sofyan A. Djalil List of Contents Chapter 1 ................................................................................................................. i 1. 2. Introduction ..................................................................................................... i Recapitulation and List of Project in the DRPPLN 2015 ........................... ii Chapter 2 ............................................................................................................... ix 1. Project Digests ............................................................................................... ix Chapter 1 1. Introduction To achieve the targets of national development priorities as stated in MediumTerm National Development Plan or Rencana Pembangunan Jangka Menengah Nasional (RPJMN) of 2015-2019, the Government needs a huge number of financing supports. Since the government revenue is not sufficient to meet the need of national development funding, the Government then utilize other sources of fund, including external loans. As mandated in Government Regulation Number 10/2011 on Procedure for Procurement of External Loans and Receiving Grants and the Decree of Minister for National Development Planning/Head of National Development Planning Agency Number 4 year 2011 on Procedures of Planning, Proposing, Assessing, Monitoring and Evaluating of Projects Financed by External Loans and Grants, The Ministry of National Development Planning/National Development Planning Agency (Bappenas) composes several external loans planning document among others the List of Medium-Term Planned External Loans or Daftar Rencana Pinjaman Luar Negeri Jangka Menengah (DRPLN-JM)/ Blue Book and the List of Planned Priority External Loans or Daftar Rencana Prioritas Pinjaman Luar Negeri (DRPPLN)/ Green Book. The DRPLN-JM/ Blue Book is a document contains the planned programs and projects which are appropriate to be funded by external loans for the medium-term period, while the DRPPLN/ Green Book is a document contains the list of planned projects that have a funding indication and ready to be negotiated within yearly effective period. Through the program based approach which applied in the planning of external loans, the projects from DRPLN-JM can be adjusted such as the adjustment of the location, scope of project, and project cost, as long as the adjustment remains in the corridors of the targets achievement of external loan programs listed in DRPLN-JM 2015-2019. Therefore, the DRPPLN/ Green Book may contain initial proposed project in DRPLN-JM or part of program/ project of DRPLN-JM. The projects listed in DRPPLN should have met most of the readiness criteria based on the readiness document submitted by the executing agencies. The readiness assessment is conducted in order to reduce the barriers that may occur at the time of implementation, and in order to increase the effectiveness and the efficiency of external loans utilization. The Minister for National Development Planning/Head of Bappenas had issued the DRPPLN 2015 through Decree Number KEP.154/M.PPN/HK/09/2015. The DRPPLN 2015 is presented into two chapters. Chapter 1 consists of the recapitulation of the projects by the executing agencies and the list of projects with their indicative sources of financing. Chapter 2 consists of the list of projects in DRPPLN 2015 and the summary of the project information such as location, scope, i outputs and outcomes as well as stake holders involved in project implementation (project digest). 2. Recapitulation and List of Projects in DRPPLN 2015 The DRPPLN 2015 consists of 25 proposed projects, with the total loans amount of USD 3.9 billion, and counterpart funding of USD 1.2 billion. The recapitulation of proposed projects in DRPPLN 2015 on the basis of executing agencies is shown in Table 1, while the proportion of infrastructure and non-infrastructure loan allocation is presented in Table 2. *) Table 3 presents the recapitulation of DRPPLN 2015 by source of financing. In table 4 we can see the detail list of projects in DRPPLN 2015. Table 1. DRPPLN 2015 by Executing Agencies No Executing Agency Number of Projects Ministries/Agencies Amount (USD million) Loans Counterpart Funds 21 2,385.6 1,020.9 1 Ministry of Public Works 18 2,160.9 967.8 2 Ministry of Transportation 2 204.7 49.6 3 Indonesian National Police 1 20.0 3.5 2 859.0 85.7 Local Governments 4 Local Government of Aceh Province 1 106.8 10.7 5 Local Government of DKI Jakarta 1 752.2 75.0 2 635.7 88.7 2 635.7 88.7 25 3,880.3 1,195.4 State-Owned Enterprises (SOEs) 6 State Electricity Company Total ii Table 2. Recapitulation of DRPPLN 2015 by Sector No Number of Projects Sector 1 Infrastructure 24 2 NonInfrastructure 1 Total Amount (USD million) Loans 3,773.5 Counterpart Funds 1,184.7 10.7 106.8 17 3,880.3 1,195.4 Table 3. Recapitulation of DRPPLN 2015 by Source of Financing No Source of Financing Multilateral Agencies Loan Amount (USD million) 1,256.9 1 ADB 856.9 2 World Bank 300.0 3 IFAD 100.0 Bilateral Partners 2,623.4 1 Japan (JICA) 1,407.1 2 China (Exim Bank) 818.7 3 Korea 215.8 4 Germany (KfW) 106.8 5 Hungary 50.0 6 Spain 25.0 Total 3,880.3 iii Some figures/ diagrams of the DRPPLN/ Green Book 2015 as follows: Diagram A. Proportion of Loan Amount by Type of Executing Agency SOEs 16,4% Local Governments Diagram B. Proportion of Loan Amount by Sector Non Infrastructure 2,80% Ministries/ Agencies 61,5% 22,1% iv Infrastructure 97,20% Table 4. List of DRPPLN 2015 (in US$ 000) No Project Title Program Title Loan Counterpart Fund Lender Ministry of Public Works Directorate General of Highways 1 Engineering Service for National Roads Development Project 2 Development of Cileunyi – Sumedang – Dawuan Toll Road Phase II 3 Toll Road Development of Balikpapan – Samarinda 4 5 Development and Improvement of National Roads Program 45,000 0 235,000 26,000 China (Exim Bank) 65,000 6,500 China (Exim Bank) Toll Road Development of Manado - Bitung 80,000 8,000 China (Exim Bank) Toll Road Development of Solo – Kertosono 200,000 31,900 China (Exim Bank) Toll Road Development Program ADB Directorate General of Human Settlement 6 Engineering Service for Sanitation Improvement Project Development of Waste Water Management Program 25,200 0 7 Community Based Water and Sanitation Program (PAMSIMAS) Drinking Water Development Program 300,000 738,850 v ADB World Bank (in US$ 000) Program Title Loan Counterpart Fund No Project Title Lender 8 Engineering Service for Water Supply Development Project 26,380 0 9 IKK Water Supply Program and Small Water Treatment Plant for Water Scarcity Area 50,000 10,000 10 Small Scale Water Treatment Plants for Emergency Relief 25,000 800 Spain 1,930 0 ADB 53,200 0 China (Exim Bank) 9,620 0 ADB 108,700 48,668 ADB 38,100 0 ADB ADB Hungary Directorate General of Water Resources 11 Engineering Service for Dam Multipurpose Development Project 12 Additional Loan for Jatigede Dam 13 Engineering Service for Coastal and River Development Project 14 Flood Management in Selected River Basins 15 Engineering Service for Irrigation and Lowland Development Project Dam Development Program Mitigation of Water Hazards Program Development and Management of Irrigation Program vi (in US$ 000) Program Title Project Title 16 Integrated Participatory Development and Management of Irrigation Project - Phase I 700,000 70,000 ADB and IFAD 17 The Urgent Rehabilitation of Strategic Irrigation for Western Region of Indonesia 195,778 27,150 Korea (EDCF) 18 Engineering Service for Bulk Water and Water Supply Development Project 2,000 0 19,200 3,220 Japan (JICA) 185,470 46,368 China (Exim Bank) 20,000 3,500 Korea Provision and Management of Bulk Water Supply Program Loan Counterpart Fund No Lender ADB Ministry of Transportation 19 20 Engineering Services Jakarta Mass Rapid Transit (MRT) East – West Line Phase I Project Railway Development Program Procurement of Track Material and Turn Out Phase II Indonesian National Police 21 National Criminal Information Center for Indonesian National Police – Phase II Information Communication and Technology (ICT) and Broadcasting Infrastructure Development Program vii (in US$ 000) No Project Title Program Title Loan Counterpart Fund Lender Local Government of Aceh Province 22 Reengineering and Improving the Hospitals and Referral Systems in Selected Aceh Districts Health Services Referral Program 106,800 10,680 Germany (KfW) 752,200 74,980 Japan (JICA) 6,570 640 Japan (JICA) 629,140 88,100 Japan (JICA) 3,880,288 1,195,356 Local Government of DKI Jakarta 23 Construction of Jakarta Mass Rapid Transit Project Railway Development Program State Electricity Company 24 25 Engineering Services of Hululais Geothermal Power Plant Project Java – Sumatera Interconnection Transmission Line Project (II) Electricity Infrastructure Development Program Total viii Chapter 2 PROJECT DIGEST Kementerian Pekerjaan Umum dan Perumahan Rakyat/ Ministry of Public Works and Housing ...................................................................................1 Direktorat Jenderal Bina Marga / Directorate General of Highways ........................ 1 2. Engineering Service for National Roads Development Project ................ 1 3. Development of Cileunyi - Sumedang - Dawuan Toll Road Phase II...... 3 4. Toll Road Development of Balikpapan - Samarinda.................................. 5 5. Toll Road Development of Manado - Bitung .............................................. 7 6. Toll Road Development of Solo - Kertosono ............................................... 9 Direktorat Jenderal Cipta Karya/ Directorate General of Human Settlements ....................................................................................................................... 11 7. Engineering Service for Sanitation Improvement Project ....................... 13 8. Community Based Water and Sanitation Program (PAMSIMAS) ......... 15 9. Engineering Service for Water Supply Development Project ................. 17 10. IKK Water Supply Program and Small Water Treatment Plant for Water Scarcity Area ...................................................................................... 19 11. Small Scale Water Treatment Plants for Emergency Relief ..................... 21 Direktorat Jenderal Sumber Daya Air/ Directorate General of Water Resources .......................................................................................................................... 23 12. Engineering Service for Dam Multipurpose Development Project ........ 25 13. Additional Loan for Jatigede Dam ............................................................. 27 14. Engineering Service for Coastal and River Development Project .......... 29 15. Flood Management in Selected River Basins ............................................ 31 16. Engineering Service for Irrigation and Lowland Development Project 34 17. Integrated Participatory Development and Management of Irrigation Project - Phase I ............................................................................................. 36 18. The Urgent Rehabilitation of Strategic Irrigation for Western Region of Indonesia........................................................................................................ 39 19. Engineering Service for Bulk Water and Water Supply Development Project ............................................................................................................. 41 Kementerian Perhubungan/ Ministry of Transportation .............................43 Direktorat Jenderal Perkeretaapian/ Directorate General of Railways .................. 45 20. Engineering Services for Jakarta Mass Rapid Transit (MRT) East-West Line Phase I Project....................................................................................... 47 21. Procurement of Track Material and Turn Out -Phase II .......................... 49 ix Kepolisian Negara Republik Indonesia/ Indonesian National Police ...... 51 22. National Criminal Information Center for Indonesian National Police – Phase II ........................................................................................................... 53 Pemerintah Daerah Provinsi Aceh/ Local Government of Aceh Province . 55 23. Reengineering and Improving the Hospitals and Referral System in Selected Aceh Districts ................................................................................. 57 Pemerintah Daerah Provinsi DKI Jakarta/ Local Government of DKI Jakarta Province .................................................................................................. 61 24. Construction of Jakarta Mass Rapid Transit Project ................................ 63 PT. Perusahaan Listrik Negara (PT.PLN)/ State Electricity Company ...... 65 25. Engineering Services of Hululais Geothermal Power Plant ................... 67 26. Java - Sumatera Interconnection Transmission Line (HVDC) Phase II . 69 x Kementerian Pekerjaan Umum dan Perumahan Rakyat/ Ministry of Public Works and Housing Direktorat Jenderal Bina Marga / Directorate General of Highways 1 GB-15-01-2 1. Project Title : Engineering Service for National Roads Development Project 2. Program Title : Development and Improvement of National Roads Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Highways, Ministry of Public Works and Housing 5. Duration : 36 Months 6. Location : Nationwide 7. Objectives To accelerate the project for road constructions of Sumatera, Java, Kalimantan, Bali and Papua. 8. Scope of Project Conduct FS, Environmental Impact Assesment, LARAP, and DED for preparation of national road constructions, including flyover/ underpass on national roads in major cities and railway crossings, ring roads (bypass) and the other strategic road construction in Sumatera, Java, Kalimantan, Sulawesi, Bali and Papua Island along 1.000 km. 9. Activities Implementation Location Activities Consulting services Project Implementation Unit Directorate General of Highways, Ministry of Public Works and Housing Nationwide 10. Funding Source Implementing Agency Funding (US $ 000) Loan Grant Directorate General of Highways, Ministry of Public Works and Housing 45,000 0 0 45,000 Total 45,000 0 0 45,000 1 Local Total Source ADB GB-15-01-2 11. Disbursement Plan Disbursement Plan (US $ 000) 1 2nd st 11,250 Total 3rd 16,875 16,875 45,000 12. Funding Allocation Activities Category (US $ 000) Services Constructions Goods Trainings Other a. Preparing FS document; 11,250 b. Preparing Environmental Impact Assessment and LARAP document; 5,625 c. Preparing DED document. Total 28,125 45,000 13. Program Reference BB-ID: BB-1519-R0-03 2 GB-15-02-1 1. Project Title : Development of Cileunyi - Sumedang - Dawuan Toll Road Phase II 2. Program Title : Toll Roads Development Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Highways, Ministry of Public Works and Housing 5. Duration : 36 months 6. Location : West Java Province 7. Objectives 8. 9. a. To increase road capacity from Bandung - Sumedang - Cirebon Cities, thereby contributing to sustainable urban activities; b. To supplement the function of radial toll roads and the Kertajati airport access; c. To enhance physical distribution across Bandung, Sumedang, Cirebon area; and d. To support improved land use in the West Java area. Scope of Project a. Civil works of toll road construction for 11.60 km; b. Consulting services for detailed engineering design and construction supervision. Activities Activities Civil works Implementation Locations Project Implementation Units Cileunyi - Sumedang Dawuan, West Java Province Directorate General of Highways, Ministry of Public Works and Housing 10. Funding Source Implementing Agency Funding (US $ 000) Loan Grant Local Total Directorate General of Highways, Ministry of Public Works and Housing 235,000 26,000 261,000 Total 235,000 26,000 261,000 3 Source China (Exim Bank) GB-15-02-1 11. Disbursement Plan Disbursement Plan (US $ 000) 1 2nd st 61,250 3rd 82,250 4th 94,000 Total 23,500 261,000 12. Funding Allocation Activities Category (US $ 000) Services Constructions Goods Trainings Civil works 261,000 Total 261,000 13. Program Reference BB-ID: BB-1519-R0-01 4 Other GB-15-03-0 1. Project Title : Toll Road Development of Balikpapan - Samarinda 2. Program Title : Toll Roads Development Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Highways, Ministry of Public Works and Housing 5. Duration : 60 months 6. Location : Balikpapan and Samarinda City, East Kalimantan Province 7. Objectives 8. 9. a. Improve accessibility and capacity of road networks to facilitate traffic movement in the East Kalimantan Province. b. Increase productivity by the repression of distributional cost and by opening access to regional and international market c. Provide an efficient road transport network in Kalimantan Island to promote the island’s rapid socio-economic development. Scope of Project a. Pre-development (detailed engineering design, tender assistance); b. Construction of Balikpapan - Samarinda - Panajam toll road with the length of 11,09 km; c. Construction supervision. Activities Activities Civil Works Implementation Locations Balikpapan and Samarinda City, East Kalimantan Province 5 Project Implementation Units Directorate General of Highways, Ministry of Public Works and Housing GB-15-03-0 10. Funding Source Funding (US $ 000) Implementing Agency Loan Grant Local Total Directorate General of Highways, Ministry of Public Works and Housing 65,000 6,500 71,500 Total 65,000 6,500 71,500 Source China (Exim Bank) 11. Disbursement Plan Disbursement Plan (US $ 000) 1 2nd st 16,250 32,500 3rd 4th 5th 22,750 Total 71,500 12. Funding Allocation Activities Category (US $ 000) Services Constructions Goods Trainings Civil Works 71,500 Total 71,500 13. Program Reference BB-ID: BB-1519-R0-01 6 Other GB-15-04-0 1. Project Title : Toll Road Development of Manado - Bitung 2. Program Title : Toll Roads Development Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Highways, Ministry of Public Works and Housing 5. Duration : 36 months 6. Location : Manado and Bitung City, North Sulawesi Province 7. Objectives 8. a. Improve accessibility and capacity of road networks to facilitate traffic movement in the integrated economic development area (KAPET) of Manado - Bitung and Bitung SEZ as well as to support Bitung International Hub Port; b. Increase productivity by repression of distributional cost and by opening access to regional and international market; c. Improve economic growth by developing road to support regional development; d. Reduce travel time and travel cost along the corridor; e. Provide an alternative road to improve safety and comfort for users. Scope of Project Civil works of toll road construction for 7.3 km. 9. Activities Activities Civil Works Implementation Locations Manado and Bitung City, North Sulawesi Province 7 Project Implementation Units Directorate General of Highways, Ministry of Public Works and Housing GB-15-04-0 10. Funding Source Funding (US $ 000) Implementing Agency Directorate General of Highways, Ministry of Public Works and Housing Total Loan Grant Local Total 80,000 8,000 88,000 80,000 8,000 88,000 Source China (Exim Bank) 11. Disbursement Plan Disbursement Plan (US $ 000) 1 2nd st 28,000 3rd 32,000 Total 4th 20,000 8,000 88,000 12. Funding Allocation Activities Category (US $ 000) Services Constructions Goods Trainings Civil Works 88,000 Total 88,000 13. Program Reference BB-ID: BB-1519-R0-01 8 Other GB-15-05-1 1. Project Title : Toll Road Development of Solo - Kertosono 2. Program Title : Toll Roads Development Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Highways, Ministry of Public Works and Housing 5. Duration : 36 months 6. Location : Central Java and East Java Province 7. Objectives 8. 9. a. To improve the access and capacity of road networks in order to facilitate traffic movement in the Trans Java toll road corridor; b. To increase productivity by reducing distributional cost and by opening access to regional and international market; c. To provide an efficient road transport network on Java island to promote the island’s rapid socio-economic development. Scope of Project a. Pre-development (detailed engineering design, tender assistance); b. Construction of toll road at Solo - Kertosono at approximately 37.39 km; c. Construction supervision. Activities Implementation Locations Activities Civil works Central Java and East Java Province Project Implementation Units Directorate General of Highways, Ministry of Public Works and Housing 10. Funding Source Implementing Agency Funding (US $ 000) Loan Grant Local Total Directorate General of Highways, Ministry of Public Works and Housing 200,000 31,900 231,900 Total 200,000 31,900 231,900 9 Source China (Exim Bank) GB-15-05-1 11. Disbursement Plan Disbursement Plan (US $ 000) 1 st 71,900 2nd Total 3rd 100,000 60,000 231,900 12. Funding Allocation Activities Category (US $ 000) Services Constructions Goods Trainings Civil works 231,900 Total 231,900 13. Program Reference BB-ID: BB-1519-01 10 Other Direktorat Jenderal Cipta Karya/ Directorate General of Human Settlements 11 GB-15-06-2 1. Project Title : Engineering Service for Sanitation Improvement Project 2. Program Title : Development of Waste Water Management Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Human Settlements, Ministry of Public Works and Housing 5. Duration : 36 Months 6. Location : Cirebon City, Kendari City, Tangerang City, Bekasi City and Bekasi Regency 7. Objectives a. To accelerate the project preparation for sanitation improvement in selected region; b. To improve the quality of project implementation. 8. Scope of Project a. Preparation of FS, DED, and Environmental Impact Assesment document; b. Preparation of LARAP in Cirebon City, Kendari City, Tangerang City, Bekasi City and Bekasi Regency; c. Supervision activities. 9. Activities Activities Consulting services 1. 2. 3. 4. 5. Implementation Location Project Implementation Unit Cirebon City Kendari City Tangerang City Bekasi City Bekasi Regency Directorate General of Human Settlements, Ministry of Public Works and Housing 10. Funding Source Implementing Agency Funding (US $ 000) Loan Grant Local Total Directorate General of Human Settlements, Ministry of Public Works and Housing 25,200 0 0 25,200 Total 25,200 0 0 25,200 13 Source ADB GB-15-06-2 11. Disbursement Plan Disbursement Plan (US $ 000) 1 2nd st 2,520 Total 3rd 2,520 20,160 25,200 12. Funding Allocation Activities Consulting services Total Category (US $ 000) Services Constructions Goods 25,200 25,200 13. Program Reference BB-ID: BB-1519-R0-05 14 Trainings Other GB-15-07-1 1. Project Title : Community Based Water and Sanitation Program (PAMSIMAS) 2. Program Title : Drinking Water Development Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Human Settlements, Ministry of Public Works and Housing 5. Duration : 60 months 6. Location : Nationwide 7. Objectives To increase the number of under-served and low income rural population accessing improved and sustained water and sanitation services and practicing improved hygiene behaviors. 8. Scope of Project a. Protected water sources development, both in community and household level; b. The development of water supply system and sanitation’s infrastructures in 5,000 villages in selected provinces and regencies; c. Procurement and training of consultant at national, provincial and regency level; d. Procurement and training of community facilitators for 5,000 villages; e. Support to community empowerment and local institutional capacity building activities; f. Support to strategic planning for the implementation of capacity building activities. 9. Activities Activities a. Community empowerment and local institutional development; b. Improving sanitation and hygiene practices; c. Water supply and public sanitation infrastructure; d. District and village incentive grants; e. Implementation support and project management. 15 Implementation Location Project Implementation Unit Nationwide Directorate General of Human Settlements, Ministry of Public Works and Housing GB-15-07-1 10. Funding Source Funding (US $ 000) Implementing Agency Loan Grant Local Total Directorate General of Human Settlements, Ministry of Public Works and Housing 300,000 738,850 1,038,850 Total 300,000 738,850 1,038,850 Source World Bank 11. Disbursement Plan Disbursement Plan (US $ 000) 1st 2nd 124,660 3rd 311,660 4th 342,820 250,610 Total 5th 9,100 1,038,850 12. Funding Allocation Activities Category (US $ 000) Services Constructions Goods Trainings a. Community empowerment and local institutional development; b. Improving sanitation and hygiene practices; 158,070 42,800 c. Water supply and public sanitation infrastructure; 437,500 d. District and village incentive grants; e. Implementation support and project management. Total Other 297,930 102,550 145,350 437,500 13. Program Reference BB-ID: BB-1519-R0-04 16 158,070 297,930 GB-15-08-2 1. Project Title : Engineering Service for Water Supply Development Project 2. Program Title : Drinking Water Development Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Human Settlements, Ministry of Public Works and Housing 5. Duration : 36 Months 6. Location : Riau Province; Bengkulu Province; Banten Province and DKI Jakarta Province; West Java Province. 7. Objectives a. To accelerate the project preparation for water supply development in selected region. b. To improve the quality of project implementation; 8. Scope of Project a. Preparation of FS, Environmental Impact Assessment, and DED document; b. Preparation of LARAP; c. Supervision during project implementation. 9. Activities Activities Consulting services Implementation Location Project Implementation Unit 1. Riau Province (Dumai City, Rokan Hilir Regency, Bengkalis Regency) 2. Bengkulu Province (Bengkulu Tengah Regency, Bengkulu City, Seluma Regency) 3. Banten Province and DKI Jakarta Province 4. West Java Province (Sumedang Regency, Majalengka Regency, Indramayu Regency, Cirebon Regency, and Cirebon City) Directorate General of Human Settlements, Ministry of Public Works and Housing 17 GB-15-08-2 10. Funding Source Funding (US $ 000) Implementing Agency Loan Directorate General of Human Settlements , Ministry of Public Works and Housing Total Grant Local Total 26,380 0 0 26,380 26,380 0 0 26,380 Source ADB 11. Disbursement Plan Disbursement Plan (US $ 000) 1 2nd st 7,275 Total 3rd 14,100 5,000 26,380 12. Funding Allocation Activities Consulting services Total Category (US $ 000) Services Constructions 26,380 26,380 13. Program Reference BB-ID: BB-1519-R0-04 18 Goods Trainings Other GB-15-09-1 1. Project Title : IKK Water Supply Program and Small Water Treatment Plant for Water Scarcity Area 2. Program Title : Drinking Water Development Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Human Settlements, Ministry of Public Works and Housing 5. Duration : 36 months 6. Location : Nationwide 7. Objectives To increase access to clean water for communities in water scarcity areas. 8. Scope of Project Construction water supply systems for communities in water scarcity areas: a. Construction of water treatment plant; 9. b. Construction of raw water transmission pipelines; c. Construction of distribution pipelines. Activities Implementation Locations Activities a. Construction of water treatment plant b. Construction of raw water transmission pipeline c. Construction of distribution pipeline Nationwide Project Implementation Units Directorate General of Human Settlements, Ministry of Public Works and Housing 10. Funding Source Implementing Agency Directorate General of Human Settlements, Ministry of Public Works and Housing Total Funding (US $ 000) Loan Local Total 50,000 10,000 60,000 50,000 10,000 60,000 19 Grant Source Hungary GB-15-09-1 11. Disbursement Plan Disbursement Plan (US $ 000) 1 st 20,000 2nd 3rd 20,000 20,000 Total 60,000 12. Funding Allocation Activities Category (US $ 000) Services Constructions Goods Trainings Other Construction of water treatment plant, raw water transmission pipelines, and distribution pipelines 60,000 Total 60,000 13. Program Reference BB-ID: BB-1519-R0-04 20 GB-15-10-0 1. Project Title : Small Scale Water Treatment Plants for Emergency Relief 2. Program Title : Drinking Water Development Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Human Settlements, Ministry of Public Works and Housing 5. Duration : 24 months 6. Location : Medan, Bekasi, Surabaya, and Makassar City 7. Objectives a. b. 8. Scope of Project a. b. c. 9. To provide small scale water treatment plants that can be effectively used in case of emergency; To overcome the difficulties to get save drinking water in emergency situations. Infrastructure, including land acquisition and storage construction, access road to small scale water treatment plant storage location/LOS (Location Open Storage), electricity, communication, and fencing storage; Procurement and instalment of mobile water treatment plant for emergency relief; Emergency Module Units (EMUs) training program, consists of: i. EMUs Management and Training through knowledge and capacity building programs in management, planning, and coordination to provide training for new staff; ii. EMUs Operation and Maintenance for Technicians through capacity building for technical staff (theoretical and practical training) to Emergency Module Units operational, maintenance and sustainability. Activities Activities a. b. Infrastructure works Procurement and instalment of mobile water treatment plant Implementation Locations Project Implementation Unit Medan (North Sumatera) Bekasi (West Java) Surabaya (East Java) Makassar (South Sulawesi) Directorate General of Human Settlements, Ministry of Public Works and Housing 21 GB-15-10-0 10. Funding Source Implementing Agency Directorate General of Human Settlements, Ministry of Public Works and Housing Total Funding (US $ 000) Loan Grant Local Total 25,000 800 25,800 25,000 800 25,800 Source Spain 11. Disbursement Plan Disbursement Plan (US $ 000) 1st Total 2nd 15,480 10,320 25,800 12. Funding Allocation Activities Category (US $ 000) Services Constructions Goods a. Infrastructure works b. Procurement and instalment of mobile water treatment plant 2,580 23,220 Total 2,580 23,220 13. Program Reference BB-ID: BB-1519-R0-04 22 Trainings Other Direktorat Jenderal Sumber Daya Air/ Directorate General of Water Resources 23 GB-15-11-1 1. Project Title : Engineering Service for Dam Multipurpose Development Project 2. Program Title : Dam Development Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing 5. Duration : 18 months 6. Location : Nationwide 7. Objectives a. To accelerate the project preparation for dam development including recommendations for Design Approval from the Commission of Dams Safety and Certificate of Design Approval for dam constructions; b. To prepare technical details of dam construction; c. To do preparation plans of goods and services procurement. 8. Scope of Project a. Conducting analysis in term of operation, maintenance, facility construction and procurement plans; b. Conducting analysis in term of detailed design, land acquisition, resettlement plan and environmental impact assessment; c. Review of dam design; d. Certification of design. e. Procurement document preparation. 9. Activities Implementation Location Activities Consulting services Project Implementation Unit Directorate General of Water Resources, Ministry of Public Works and Housing Nationwide 10. Funding Source Funding (US $ 000) Implementing Agency Loan Grant Directorate General of Water Resources, Ministry of Public Works and Housing 1,930 0 0 1,930 Total 1,930 0 0 1,930 25 Local Total Source ADB GB-15-11-1 11. Disbursement Plan Disbursement Plan (US $ 000) 1 Total 2nd st 1,158 772 1,930 12. Funding Allocation Activities Consulting services Total Category (US $ 000) Services Constructions 1,930 1,930 13. Program Reference BB-ID: BB-1519-R0-10 26 Goods Trainings Other GB-15-12-0 1. Project Title : Additional Loan for Jatigede Dam 2. Program Title : Dam Development Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing 5. Duration : 20 months 6. Location : West Java 7. Objectives The Jatigede Dam project is urgently needed to guarantee the availability of Rentang Irrigation supply (90,000 ha), to overcome the water crises for domestic, urban and industrial in the lower part of Cimanuk (Pantura CIAYU) of 3,500 liters/sec, power supply of 110 MW, flood control of 14,000 ha in the northern coast of Java, and to control the critical land in the Cimanuk watershed. 8. Scope of Project Construction of Jatigede Dam project that consist of the following: 9. a. Preparatory and General Works; b. Grouting Gallery; c. Main Dam; d. Road Works; e. Power Gates; f. Primary and Secondary Electrical Work. Activities Activities Construction Works and Consulting Services Implementation Locations West Java 27 Project Implementation Units Directorate General of Water Resources, Ministry of Public Works and Housing GB-15-12-0 10. Funding Source Funding (US $ 000) Implementing Agency Loan Directorate General of Water Resources, Ministry of Public Works and Housing Total Grant Local Total 53,200 53,200 53,200 53,200 Source China (Exim Bank) 11. Disbursement Plan Disbursement Plan (US $ 000) 1 2nd st 5,320 Total 3rd 42,560 5,320 53,200 12. Funding Allocation Activities Category (US $ 000) Services Constructions a. Civil Works 21,387 b. Hydro mechanical works 13,008 c. Others Goods Trainings Other 18,805 Total 34,395 13. Program Reference BB-ID: BB-1519-R0-10 28 18,805 GB-15-13-1 1. Project Title : Engineering Service for Coastal and River Development Project 2. Program Title : Mitigation of Water Hazard Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing 5. Duration : 36 months 6. Location : Nationwide 7. Objectives a. To accelerate the project preparation of coastal and river development; b. To identify the constrains during river and coastal development and rehabilitation planning; c. To improve the planning process of river and coastal development and rehabilitation; d. To strengthen the capability of river and coastal human resources; e. To compose river and coastal development and rehabilitation document/standard from project preparation to operation maintenance. 8. Scope of Project a. Analyze river and coastal master plan and feasibility studies; b. Prepare complete detail design, land acquisition, resettlement plan, EIA, construction, operation and maintenance documents for river and coastal development and rehabilitation; c. Prepare procurement scheme that will be done during river and coastal development and rehabilitation projects ; d. Implement technical and financial analysis for every river and coastal development and rehabilitation projects; e. Strengthen the capabilities of human resources in Directorate General of Water Resources and other river and coastal stakeholders. 9. Activities Activities Consulting services Implementation Location Project Implementation Unit Directorate General of Water Resources, Ministry of Public Works and Housing Nationwide 29 GB-15-13-1 10. Funding Source Funding (US $ 000) Implementing Agency Directorate General of Water Resources, Ministry of Public Works and Housing Total Loan Grant Local 9,620 0 0 9,620 9,620 0 0 9,620 Source Total ADB 11. Disbursement Plan Disbursement Plan (US $ 000) 1 2nd st 1,924 Total 3rd 4,810 2,886 9,620 12. Funding Allocation Activities Consulting services Total Category (US $ 000) Services Constructions Goods 9,620 9,620 13. Program Reference BB-ID: BB-1519-R0-11 30 Trainings Other GB-15-14-1 1. Project Title : Flood Management in Selected River Basins 2. Program Title : Mitigation of Water Hazards Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing 5. Duration : 72 months 6. Location : Maluku and Banten Province 7. Objectives To better manage and mitigate flood risks in selected rivers and reducing its negative impacts to economic and social sector, though implementation of processoriented integrated flood risk management (IFRM). 8. Scope of Project The Project will address the following concerns: 9. a. Strengthening of watershed conservation activities; b. Providing public information on flood risks for flood plain management; c. Improving conveyance of the river for reduction of flood peak; d. Strengthening community’s preparedness for emergency flood management; and e. Improving capacity of the government in the flood subsector. Activities Activities Construction Works and Consulting Services Implementation Locations Project Implementation Unit Maluku and Banten Province a. Directorate General of Water Resources, Ministry of Public Works and Housing; b. Directorate of Water Resources and Irrigation, Bappenas; c. Directorate General of Agriculture Infrastructure and Facilities, Ministry of Agriculture; d. Directorate General of Regional Development, Ministry of Home Affairs 31 GB-15-14-1 10. Funding Source Implementing Agency Funding (US $ 000) Local Total 87,286 39,080 126,366 b. Directorate of Water Resources and Irrigation, Bappenas; 1,163 521 1,684 c. Directorate General of Agriculture Infrastructure and Facilities, Ministry of Agriculture 11,240 5,032 16,272 d. Directorate General of Regional Development, Ministry of Home Affairs 9,011 4,035 13,046 108,700 48,668 157,368 a. Directorate General of Water Resources, Ministry of Public Works and Housing Total Loan Grant Source ADB 11. Disbursement Plan Disbursement Plan (US $ 000) 1st 13,544 2nd 27,613 3rd 4th 31,566 36,286 32 5th 28,854 6th 19,505 Total 157,368 GB-15-14-1 12. Funding Allocation Activities Category (US $ 000) Services Constructions Goods Trainings Other a. Construction Works b. Consulting Services 85,652 12,302 c. Vehicle and Equipment 1,956 d. Workshop, Training, and Socialization 6,050 e. Land Acquisition 17,163 f. Contingencies 11,430 g. Others Total 22,814 12,302 85,652 13. Program Reference BB-ID: BB-1519-R0-11 33 1,956 6,050 51,407 GB-15-15-1 1. Project Title : Engineering Service for Irrigation and Lowland Development Project 2. Program Title : Development and Management of Irrigation Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing 5. Duration : 48 months 6. Location : Nationwide 7. Objectives a. To accelerate the project preparation of irrigation and lowland development; b. To identify the constrains during irrigation and lowland development and rehabilitation planning; c. To improve the planning process of irrigation and lowland development and rehabilitation; d. To assess the benefit of the project in order to increase agricultural production and farmer’s income; e. To strengthen the capability of irrigation and lowland human resources; f. To create irrigation and lowland development and rehabilitation document standard from project preparation to operation maintenance. 8. Scope of Project a. Analyze irrigation and lowland master plan and feasibility studies; b. Prepare complete detailed design, land acquisition, resettlement plan, EIA, construction, operation and maintenance documents for irrigation and lowland development and rehabilitation; c. Prepare procurement scheme that will be done during irrigation and lowland development and rehabilitation projects; d. Implement technical and financial analysis for every irrigation and lowland development and rehabilitation projects; e. Strengthen the capabilities of human resources in Directorate General of Water Resources and other irrigation and lowland stakeholders. 34 GB-15-15-1 9. Activities Activities Consulting services Implementation Location Project Implementation Unit Nationwide Directorate General of Water Resources, Ministry of Public Works and Housing 10. Funding Source Implementing Agency Directorate General of Water Resources, Ministry of Public Works and Housing Total Funding (US $ 000) Loan Grant Local Total 38,093 0 0 38,093 38,093 0 0 38,093 Source ADB 11. Disbursement Plan Disbursement Plan (US $ 000) 1st 2nd 6,349 3rd 12,698 Total 4th 12,698 6,349 38,093 12. Funding Allocation Activities Consulting services Total Category (US $ 000) Services Constructions Goods 38,093 38,093 13. Program Reference BB-ID: BB-1519-R0-08 35 Trainings Other GB-15-16-0 1. Project Title : Integrated Participatory Development and Management of Irrigation Project - Phase I 2. Program Title : Development and Management of Irrigation Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : a. Directorate General of Water Resource, Ministry of Public Works and Housing b. The Agency for Agricultural Extension and Human Resources Development, Ministry of Agriculture c. Ministry of Home Affair d. Ministry of National Development Planning/ National Development Planning Agency 5. Duration : 60 months 6. Location : Nationwide 7. Objectives Increase rice production, to accelerate poverty alleviation in agriculture on western and eastern region of Indonesia through the establishment of sustainable irrigated agriculture development in the participative manner emphasizing the empowerment of the beneficiary farmers and water user's organization (WUAs). 8. Scope of Project a. Supporting the integrated development of irrigation facilities through participatory sustainable integrated development (SID), construction phase, and Operation & Maintenance (O&M) activities; b. Participatory rehabilitation of rehabilitation system; c. Forming and empowerment of WUAs; d. Empowerment of O&M officers; e. Implementation of irrigation's asset management; f. Improvement of tertiary and on-farm level; g. Improvement of conservatory catchment area through public consultation and dissemination. 36 GB-15-16-0 9. Activities Implementation Location Activities a. Civil Works b. Procurement of Equipment c. Consulting Services d. Training, Workshop e. Rehabilitation of Irrigation Scheme (District Level) f. Rehabilitation of Irrigation Scheme (Province Level) Nationwide Project Implementation Unit Ministry of Public Works and Housing, Ministry of Home Affairs, Ministry of Agriculture, Local Governments, National Development Planning Agency 10. Funding Source Implementing Agency Ministry of Public Works and Housing, Ministry of Home Affairs, Ministry of Agriculture, Local Governments, National Development Planning Agency Total Funding (US $ 000) Source Loan Grant Local Total 700,000 1,500 70,000 771,500 700,000 1,500 70,000 771,500 ADB and IFAD 11. Disbursement Plan Disbursement Plan (US $ 000) 1 st 33,635 2nd 3rd 4th 5th 117,308 226,180 244,255 150,122 37 Total 771,500 GB-15-16-0 12. Funding Allocation Activities Category (US $ 000) Services Constructions a. Civil Works Trainings 2,754 60,449 d. Training and Capacity Building 28,171 e. Survey and Investigation 14,337 f. Survey, Investigation, and Design 16,059 g. Irrigation Asset Management 130,339 h. Contingencies Total Other 447,791 b. Equipment, Vehicles, and Furniture c. Consulting Services Goods 71,601 90,845 447,791 13. Program Reference BB-ID: BB-1519-R0-08 38 2,754 28,171 201,940 GB-15-17-0 1. Project Title : The Urgent Rehabilitation of Strategic Irrigation for Western Region of Indonesia 2. Program Title : Development and Management of Irrigation Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing 5. Duration : 48 months 6. Location : Lampung and Banten Province 7. Objectives To increase agricultural production, create employment opportunities and improve socio-economic condition of the rural population in the Project area through the provision of assured irrigation & drainage facilities, improved flood control, farm road system, and village water supply. 8. 9. Scope of Project a. Rehabilitation and modernization of irrigation facilities; b. Development and Improvement of irrigation and drainage systems; c. Operation and Maintenance capacity building. Activities Implementation Locations Activities Construction Works and Consulting Services Lampung and Banten Province Project Implementation Units Directorate General of Water Resources, Ministry of Public Works and Housing 10. Funding Source Implementing Agency Funding (US $ 000) Loan Grant Local Total Directorate General of Water Resources, Ministry of Public Works and Housing 195,778 27,150 222,928 Total 195,778 27,150 222,928 39 Source Korea (EDCF) GB-15-17-0 11. Disbursement Plan Disbursement Plan (US $ 000) 1 2nd st 27,837 43,724 3rd 4th 27,837 61,765 5th 61,765 Total 222,928 12. Funding Allocation Activities Category (US $ 000) Services Constructions Goods Trainings Other a. Construction Works; b. Consulting Services; 143,180 11,834 c. Land Acquisition; 8,167 d. Others Total 59,764 11,834 143,180 13. Program Reference BB-ID: BB-1519-R0-08 40 67,913 GB-15-18-1 1. Project Title : Engineering Service for Bulk Water and Water Supply Development Project 2. Program Title : Provision and Management of Bulk Water Supply Program 3. Executing Agency : Ministry of Public Works and Housing 4. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing 5. Duration : 36 months 6. Location : Java Islands, Nusa Tenggara, Maluku Islands, Bangka Belitung Islands, and archipelago region in Southern and Northern Sulawesi 7. Objectives a. To accelerate project preparation for bulk water and water supply development. b. To identify and evaluate of water demand and water use in Java, Nusa Tenggara, and Archipelago Region; c. To identify existing condition of water supply; d. To identify the potential of surface water and underground water; 8. Scope of Project a. Conduct research, analysis, mapping area, and rehabilitation system of water supply; b. Prepare basic design of water supply system, budget analysis, estimated construction cost, and financial analysis in mentioned areas; c. Identification and preparation conservation area, and analyze the maximum supporting capacity of raw and underground water in mentioned areas; d. Strengthen the capabilities of human resources in Directorate General of Water Resources and other bulk water and water supply stakeholders 9. Activities Activities Consulting services Implementation Location Project Implementation Unit Java Islands, Nusa Tenggara, Maluku Islands, Bangka Belitung Islands, and archipelago region in Southern and Northern Sulawesi Directorate General of Water Resources, Ministry of Public Works and Housing 41 GB-15-18-1 10. Funding Source Funding (US $ 000) Implementing Agency Directorate General of Water Resources, Ministry of Public Works and Housing Total 11. Loan Grant Local 2,000 0 0 2,000 2,000 0 0 2,000 1 2 st Total 3 nd 500 850 rd 650 2,000 Funding Allocation Activities Consulting services Total 13. ADB Disbursement Plan Disbursement Plan (US $ 000) 12. Source Total Category (US $ 000) Services Constructions Goods 2,000 2,000 Program Reference BB-ID: BB-1519-R0-09 42 Trainings Other Kementerian Perhubungan/ Ministry of Transportation 43 Direktorat Jenderal Perkeretaapian/ Directorate General of Railways 45 GB-15-19-1 1. Project Title : Engineering Services for Jakarta Mass Rapid Transit (MRT) East-West Line Phase I Project 2. Program Title : Railway Development Program 3. Executing Agency : Ministry of Transportation 4. Implementing Agency : Directorate General of Railways, Ministry of Transportation 5. Duration : 30 months 6. Location : DKI Jakarta 7. Objectives 8. 9. a. To prepare the establishment of MRT System on East-West Line; b. To develop the integration of MRT System networks for East-West Line and North-South Line. Scope of Project a. Basic engineering design; b. Investment analysis; c. Tender document preparation. Activities Implementation Locations Activities a. Consulting Services b. Route and network planning c. Demand forecast review and analysis d. Transport capacity and operation planning e. Detailed route surveys f. Design and engineering analysis g. Environmental impact assessment h. Implementation planning 47 DKI Jakarta Project Implementation Units Directorate General of Railways, Ministry of Transportation GB-15-19-1 Implementation Locations Activities j. Economic and financial impact analysis and evaluation k. Prequalification and tender documents preparation DKI Jakarta Project Implementation Units Directorate General of Railways, Ministry of Transportation 10. Funding Source Implementing Agency Funding (US $ 000) Loan Directorate General of Railways, Ministry of Transportation Total Grant Local Source Total 19,200 3,220 22,400 19,200 3,220 22,420 Japan (JICA) *) equivalent with JP¥ 1.92 billion 11. Disbursement Plan Disbursement Plan (US $ 000) 1 2nd st 4,480 Total 3rd 8,960 8,960 22,400 12. Funding Allocation Activities Category (US $ 000) Services Consulting Services 22,420 Total 22,420 Constructions Goods Trainings 13. Program Reference BB-ID: BB-1519-R0-14 48 Other GB-15-20-1 1. Project Title : Procurement of Track Material and Turn Out Phase II 2. Program Title : Railway Development Program 3. Executing Agency : Ministry of Transportation 4. Implementing Agency : Directorate General of Railways, Ministry of Transportation 5. Duration : 36 months 6. Location : DKI Jakarta 7. Objectives 8. 9. a. To recondition the existing railway lines into the real capacity, which is designed to maintain train speed; b. To upgrade the service line for both passenger and freight train operations; c. To reduce accident risks. Scope of Project a. Procurement of 1,500 km track materials of the International Union of Railways (UIC) – 54 type; b. Procurement of 500 units of turn out. Activities Activities Procurement of Track Material and Turn Out Implementation Locations DKI Jakarta Project Implementation Units Directorate General of Railways, Ministry of Transportation 10. Funding Source Implementing Agency Directorate General of Railways, Ministry of Transportation Total Funding (US $ 000) Loan Grant Local Total 185,470 46,368 231,838 185,470 46,368 231,838 49 Source China (Exim Bank) GB-15-20-1 11. Disbursement Plan Disbursement Plan (US $ 000) 1 st 46,367.5 2nd Total 3rd 92,735 92,735 231,838 12. Funding Allocation Activities Category (US $ 000) Services Constructions Goods Procurement of Track Material and Turn Out 231,838 Total 231,838 13. Program Reference BB-ID: BB-1519-R0-14 50 Trainings Other Kepolisian Negara Republik Indonesia/ Indonesian National Police 51 GB-15-21-0 1. Project Title : National Criminal Information Center for Indonesian National Police – Phase II 2. Program Title : Information Communication and Technology (ICT) and Broadcasting Infrastructure Development Program 3. Executing Agency : Indonesian National Police 4. Implementing Agency : Indonesian National Police 5. Duration : 24 months 6. Location : Nationwide 7. Objectives 8. 9. a. To provide National Criminal Information System (NCIS) accessible by the Criminal Justice System and the Indonesian people; b. To assist The Indonesian National Police and related departments in crime prevention, by providing fast, reliable, and accurate criminal data; c. To support The Indonesian National Police in its cooperation with international police organizations in preventing and processing crime in its new dimension, including but not limited to organized and transnational crimes. Scope of Project a. Providing brainware and software program; b. Developing NCIS network system. Activities Activities a. Providing brainware and software b. Developing NCIS network system Implementation Location Nationwide 53 Project Implementation Unit Indonesian National Police GB-15-21-0 10. Funding Source Implementing Agency Indonesian National Police Total Funding (US $ 000) Loan Grant Local Source Total 20,000 3,500 23,500 20,000 3,500 23,500 Korea 11. Disbursement Plan Disbursement Plan (US $ 000) 1st Total 2nd 3,500 20,000 23,500 12. Funding Allocation Activities a. Providing brainware and software Category (US $ 000) Services Constructions Goods Trainings Other 2.500 16.000 3.500 1.500 2.500 16.000 3.500 1.500 b. Developing NCIS network system Total 13. Program Reference BB-ID: BB-1519-R0-15 54 Pemerintah Daerah Provinsi Aceh/ Local Government of Aceh Province 55 GB-15-22-0 1. Project Title : Reengineering and Improving the Hospitals and Referral System in Selected Aceh Districts 2. Program Title : Health Services Referral Program 3. Executing Agency : Local Government of Aceh Province 4. Implementing Agency : Local Government of Aceh Province 5. Duration : 60 months 6. Location : Aceh Province 7. Objectives 8. a. To improve the quality of services through regionalized referral system in the Aceh Province; b. To improve the quality of human resources through functional training (medical and nursing) as well as managerial training; c. To reduce disparities / inequalities in health status between the district/ city; d. To provide PONED (Basic Essential Obstetric Newborn Care) services as the flagship program to improve maternal care and neonatal emergency services; e. To reduce morbidity and mortality, especially in high-risk groups (pregnant women, newborns, and toddlers); f. To implement the center of excellence of cancer diagnosis and medication at the dr. Zainal Abidin regional public hospital. Scope of Project a. Civil works; b. Procurement of equipments; c. Training-Scholarship; d. Consultant services; e. System development; f. Monitoring and evaluation. 57 GB-15-22-0 9. Activities Implementation Location Activities a. Civil works; b. Procurement of equipment; c. TrainingScholarship; d. Consultant services; e. System development; f. Monitoring and evaluation. Project Implementation Unit Aceh Province Local Government of Aceh Province 10. Funding Source Implementing Agency Local Government of Aceh Province Total Funding (US $ 000) Loan Grant Local Total 106,800 10,680 117,480 106,800 10,680 117,480 Source Germany (KfW) *) converted an exchange rate of USD 1 = IDR 13,078 11. Disbursement Plan Disbursement Plan (US $ 000) 1 st 11,214 2nd 33,642 3rd 4th 40,050 27,127 58 5th 5,447 Total 117,480 GB-15-22-0 12. Funding Allocation Activities Category (US $ 000) Services Constructions a. Civil works and Equipment; b. Land Acquisition; c. Environmental Impact Analysis; d. Design Architects; 66,000 Goods Other 28,000 6,366 76 121 e. Implementatio n Consultant; 4,300 f. System development; 5,000 g. Project Management; 4,116 h. Others. Total Trainings 3,500 15,863 66,000 13. Program Reference BB-ID: BB-1519-R0-23 59 28,000 7,616 Pemerintah Daerah Provinsi DKI Jakarta/ Local Government of DKI Jakarta Province 61 GB-15-23-1 1. Project Title : Construction of Jakarta Mass Rapid Transit Project 2. Program Title : Railway Development Program 3. Executing Agency : Local Government of DKI Jakarta Province 4. Implementing Agency : a. b. Local Government of DKI Jakarta Province PT. Mass Rapid Transit Jakarta 5. Duration : 54 months 6. Location : DKI Jakarta 7. Objectives 8. 9. a. To increase the transportation infrastructure and facilities capacity in order to reduce traffic jams and the bottleneck of transportation infrastructure capacity; b. To increase the accessibility of the community to transportation infrastructure and facilities services; c. To improve the adaptation and mitigation of climate change by the use of mass transportation; d. To reduce the use of personal vehicle in big cities, resulting in reduced emissions. Scope of Project a. Civil and track works (elevated and depot); b. Civil and track works (underground); c. Mechanical and Electrical; d. Rolling Stocks; e. Management and Operation Consultant; f. Supervision Consultant; g. Procurement Assistance Consultant (for mechanical and electrical). Activities Activities a. Engineering design b. Consulting services c. Civil works Implementation Location DKI Jakarta 63 Project Implementation Unit Local Government of DKI Jakarta Province and PT. Mass Rapid Transit Jakarta GB-15-23-1 10. Funding Source Implementing Agency Local Government of DKI Jakarta Province and PT. Mass Rapid Transit Jakarta Total Funding (US $ 000) Loan Grant Local Total 752.200 74.980 827,180 752.200 74.980 827,180 Source Japan (JICA) *) equivalent with JP¥ 75.22 billion 11. Disbursement Plan Disbursement Plan (US $ 000) 1 2nd st 82,718 186,116 3rd 186,116 Total 4th 5th 186,116 186,116 827,180 12. Funding Allocation Activities a. Consulting services Category (US $ 000) Services Constructions Trainings Other 27,219 b. Civil works Total Goods 27,219 13. Program Reference BB-ID: BB-1519-R0-14 64 521,788 77,788 200,385 521,788 77,788 200,385 PT. Perusahaan Listrik Negara (PT.PLN)/ State Electricity Company 65 GB-15-24-0 1. Project Title : Engineering Services of Hululais Geothermal Power Plant 2. Program Title : Electricity Infrastructure Development Program 3. Executing Agency : State Electricity Company 4. Implementing Agency : State Electricity Company 5. Duration : 60 months 6. Location : Lebong District, Bengkulu Province 7. Objectives a. To improve the power supply capacity in Sumatera system as well as to improve the living standards and economic growth; b. To utilize renewable energy reserve for electricity; c. To contribute to the mitigation measures against climate change. 8. Scope of Project Consulting services for construction of Hululais Geothermal Power Plant Unit 1 and 2 (2x55 MW) include: a. Detail design and preparation of tender document; b. Pre-qualification of bidders; c. Bid evaluation and contract negotiation; d. Construction supervision. 9. Activities Activities Consulting services Implementation Location Project Implementation Unit Lebong Regency, Bengkulu Province State Electricity Company 10. Funding Source Implementing Agency Funding (US $ 000) Loan Grant Local Total State Electricity Company 6,570 640 7,210 Total 6,570 640 7,210 *) equivalent JP¥ 657 Million 67 Source Japan (JICA) GB-15-24-0 11. Disbursement Plan Disbursement Plan (US $ 000) 1st 2nd 1,490 3rd 1,420 4th 1,480 1,550 5th 1,280 Total 7,210 12. Funding Allocation Activities Category (US $ 000) Services Consulting services 7,210 Total 7,210 Constructions Goods Trainings 13. Program Reference BB-ID: BB-1519-R0-16 68 Other GB-15-25-0 1. Project Title : Java - Sumatera Interconnection Transmission Line (HVDC) Phase II 2. Program Title : Electricity Infrastructure Development Program 3. Executing Agency : State Electricity Company 4. Implementing Agency : State Electricity Company 5. Duration : 48 months 6. Location : Sumatera and Java Island 7. Objectives 8. a. Utilize non-tradable low rank coal in South Sumatera; b. Evacuate power from mine mouth power plants to load centers in Java; c. Increase the reliability of Java-Bali system and Sumatera system; d. Share reserved capacity between Java-Bali and Sumatera. Scope of Project Construction of 500 kV Transmission Line includes: a. AC/DC Converter Stations and Switching Stations (Sumatera side, Java side); 9. b. DC Submarine Cable (Sumatera-Java, Sunda Strait); c. DC Overhead Transmission Line (Sumatera side, Java side); d. AC Overhead Transmission Line (Sumatera side, Java side). Activities Activities Construction Works Implementation Location Sumatera and Java Island Project Implementation Unit State Electricity Company 10. Funding Source Implementing Agency State Electricity Company Total Funding (US $ 000) Loan Grant Local Total 629,140 88,100 717,240 629,140 88,100 717,240 *) equivalent with JP¥ 62.914 billion, 1 USD=100.0 JPY 69 Source Japan (JICA) GB-15-25-0 11. Disbursement Plan Disbursement Plan (US $ 000) 1st 1,260 2nd 3rd 4th 279,310 431,820 Total 4,850 717,240 12. Funding Allocation Activities Category (US $ 000) Services Constructions Goods Trainings Construction Works 717,240 Total 717,240 13. Program Reference BB-ID: BB-1519-R0-16 70 Other