A6-3-1 - Apele Romane
Transcription
A6-3-1 - Apele Romane
Contributii pentru Dezvoltarea Strategiei de Management al Riscului la Inundatii EuropeAid 123064/D/SER/RO Implementing Authority: Ministry of Environment Contracting Authority: Central Finance and Contract Unit, Ministry of Economy and Finance Final Beneficiary: National Administration ‘Apele Romane’ Recipients: Flood Study, Master Plan and Investment Plan for the Lower Siret River ANNEXES Ministry of Environment (ME) Central Finance and Contract Unit (CFCU), Ministry of Economy and Finance Final Version Date submitted: Draft Version: March 06, 2009 Final Version: July 28, 2009 CONTRIBUTIONS TO THE DEVELOPMENT OF THE FLOOD RISK MANAGEMENT STRATEGY Consortium SCE / CEMAGREF / HYDRATEC / PHARE 2005 / 017 – 690.01.01 GINGER S.A. / MEMORIS / ODISEA Consulting EuropAid / 123064 / D / SER / RO Project performance period: February 2008 – May 2009 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O DOCUMENT LEAD SHEET Client Project Number: PHARE 2005 / 017 – 690.01.01 Publication Reference: EuropeAid / 123064 / D / SER / RO SCE Project Number: 07536 Document Number: A6-3-1-1 – Annexes - Final version Ministry of Environment Contributions to the development of the Flood Risk Management Strategy Report: “Flood study, Master Plan and Investment Plan for the Lower Siret River - Annexes” Final version Issue Date A 22/12/2008 B 06/03/2009 C Client Approver Reasons for issue Collaborator Reviewer O. Sonnet H. Bousquet “ “ “ Complements 25/05/2009 “ “ “ Complements D 28/07/2009 “ “ “ E 30/09/2009 F 06/11/2009 “ “ “ 07536/A6-3-1-1 Final Author L. Vives A. Thomas SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 2 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO DATE GENERALE Titlul şi scopul proiectului de investiŃii: Studiu privind inundaŃiile, schemă directoare şi plan de investiŃii pentru Siretul inferior Număr proiect: PHARE 2005/017-690.01.01 EUROPAID/123064/D/SER/RO Amplasarea studiilor şi a lucrărilor JudeŃul Vrancea: localităŃile Bilieşti, Suraia, Vadu Roşca, Călienii Vechi, Călienii Noi, Năneşti JudeŃul GalaŃi: localităŃile Cosmeşti Vale, Condrea Salcia, Fundeni, Nămoloasa, Tudor Vladimirescu, Piscu Autoritate responsabilă cu soluŃionarea cererii (şi anume, autoritatea de management sau organismul intermediar) Nume: OI BACĂU – REGIUNEA 1 – NORD-EST Adresă: B-dul IoniŃă Sandu Sturza, nr. 78 – BACĂU 600269 Telefon: 0234-206116 Telex/Fax: 0234-515501 instrumente.structurale@arpmbc.ro E-mail: Organism responsabil cu punerea în aplicare a proiectului (beneficiar) Nume: AdministraŃia NaŃională „Apele Române” Adresă: Strada Edgar QUINET, nr. 6, Sector 1, CP 010018, Bucureşti, România Contact: TEXT Telefon: +40.21.311.03.96 Telex/Fax: +40.21.312.21.74 E-mail: dispecer@rowater.ro Consultantul care a realizat studiul: ConsorŃiul SCE, Cemagref, Ginger, Hydratec, Memoris, Odisea Consulting Liderul consorŃiului: SCE Adresa liderului: 5 avenue Augustin-Louis Cauchy, BP 10703, 44307 Nantes Cedex 3, FRANłA Tel.: +33 2 40 68 51 55 Fax: +33 2 40 68 79 43 http://www.sce.fr Semnături: Ing. Cyrille VALLET Administrator proiect Ing. Louis VIVES Responsabil sarcină Ing. Suzanne PEYRAUD Expert în hidraulică 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 3 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO DATE GENERALE 3 APPENDICES APPENDIX 1 : DAMAGES 2005 FLOOD EVENT 5 ALONG THE LOWER SIRET FOR THE JULY 6 APPENDIX 2: TABLES GAUGING STATIONS ON SIRET BASIN 8 APPENDIX 3: SUB-BASIN MAPS 12 APPENDIX 4: CHARACTERISTICS OF EACH SUB-BASIN 18 APPENDIX 5: SUB-BASIN LAND COVER 23 APPENDIX 6: TABLES OF DAILY RAINFALL ON THE SIRET BASIN 27 APPENDIX 7: PICTURES THE SIRET 32 OF THE HYDRAULIC STRUCTURES ALONG APPENDIX 8: DIKE CROSS-SECTIONS 35 APPENDIX 10: UNIT COSTS OF WORKS 60 APPENDIX 11: AGGREGATED COST ESTIMATES 62 APPENDIX 12: GABION WALL CROSS-SECTIONS 68 APPENDIX 13 – LONG TERM INVESTMENT PLAN 74 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 4 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDICES 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 5 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDIX 1 : DAMAGES ALONG THE LOWER SIRET FOR THE JULY 2005 FLOOD EVENT 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 6 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 7 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDIX 2: TABLES GAUGING STATIONS ON SIRET BASIN River AGAPIA (DALIA) ASAU BANCU BARLAD BARLAD BARLAD BARLAD BARLAD BARLAD-BR.RATES BASCA CHIOJDULUI BASCA MARE BASCA MARE BASCA MARE BASCA MICA BERHECI BERHECI BICAZ BICAZ BISTRICIOARA BISTRICIOARA BISTRICIOARA BISTRITA BISTRITA BISTRITA BISTRITA BISTRITA BISTRITA BOLATAU BRODINA BUZAU BUZAU BUZAU BUZAU BUZAU BUZAU CALNAU CALNAU CARLIBABA Gauging Station FILIOARA ASAU COSNA BACESTI BARLAD NEGRESTI TECUCI VASLUI TECUCI CHIOJDU BASCA ROZILIEI COMANDAU VARLAAM VARLAAM BOSIA FELDIOARA BICAZ CHEI TASCA BILBOR BISTRICIOARA TULGHES CARLIBABA DORNA ARINI DORNA GIUMALAU FRUMOSU FRUNZENI STRAJA (VIISOARA) POIANA LARGULUI BRODINA BANITA MAGURA NEHOIU RACOVITA SITA BUZAULUI VAMA BUZAULUI COSTOMIRU POTIRNICHESTI CARLIBABA 07536/A6-3-1-1 Final X coordinate (stereo70) Y coordinate (stereo70) 600028.068 607654.609 513805.510 671894.843 707504.322 687540.176 689440.692 707499.295 689661.240 595038.952 605300.777 599012.565 612531.215 612869.746 675368.708 681267.830 566430.000 575379.267 538470.711 568927.706 557644.437 509659.685 530951.658 526567.719 565546.110 623952.563 589608.676 574130.480 532263.077 665387.827 622603.291 602165.319 692995.812 587173.102 576757.731 644921.743 645653.233 509660.908 630592.917 550973.033 652321.208 594359.839 527889.881 594986.355 485635.409 573663.525 485057.427 428653.402 440437.758 473367.726 447117.983 447259.372 546029.822 514201.109 591983.250 598447.340 617436.378 617649.911 607577.134 674826.569 649513.523 651286.813 627397.866 583853.875 600408.781 622200.082 709595.681 401690.541 420606.398 436705.094 424329.056 458979.693 453653.596 441547.567 414573.652 675409.988 Available recording period 1964-2005 1951-2005 1976-2005 Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown 1953-2005 1980-2005 1977-2005 1953-2005 1963-2005 1968-2005 1954-2005 1955-2005 1960-2005 1977-2005 1977-2005 1977-2005 1966-2005 Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown 1963-2005 SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA Missing period Year of record Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown 1953-1960 1959-1973 1963-1967 Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown - 42 55 30 Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown 47 26 29 40 43 38 52 51 43 29 29 29 40 Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown 43 page 8 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO River Gauging Station X coordinate (stereo70) Y coordinate (stereo70) CASIN CIOBANUS COTATCU CRACAU CRACAU CRASNA CRASNA CUEJDIU DAMUC DOBROVAT DOFTEANA DORNA DORNA DORNISOARA DURDUC (STAVNIC) DURDUC (STAVNIC) GERU HAITA HUMOR IAPA IZV.GIUMALAU LEPSA LOHAN MILCOV MILCOV MOLDOVA MOLDOVA MOLDOVA MOLDOVA MOLDOVA MOLDOVITA MOLDOVITA NANESTI NARUJA NEAGRA NEAGRA NEAGRA NEAGRA NEAMT (OZANA) NEAMT (OZANA) NECHIT OITUZ HALOS CIOBANUS (CARALITA) MARTINESTI MAGAZIA SLOBOZIA MANJESTI VINETESTI CUEJDIU DAMUC DE SUS CODAESTI DOFTEANA DORNA CINDRENI POIANA STAMPEI POIANA STAMPEI CAZANESTI FRENCIUGI CUDALBI GURA HAITII GURA HUMORULUI LUMINIS POJORITA LEPSA CURTENI GOLESTI REGHIU FUNDU MOLDOVEI GURA HUMORULUI PRISACA DORNEI ROMAN TUPILATI DRAGOSA LUNGULET SOHODOR HERASTRAU BROSTENI DRAGOIASA GURA NEGRII SURA DUMBRAVA (TG. NEAMT) LEGHIN BORLESTI FERASTRAU 633441.889 603003.621 680149.358 596412.759 616838.476 717797.938 721557.895 599665.660 569307.093 712217.787 618505.076 520954.955 510465.742 509882.872 689552.735 689017.063 709150.834 518722.280 564645.540 609901.765 535351.874 622138.227 724444.795 668618.669 645363.738 529481.138 567261.465 552029.639 646424.194 625437.116 545874.962 539864.546 659173.310 627532.423 552078.233 534307.230 530438.974 519182.254 611304.442 589605.155 613221.063 622344.512 518831.122 548778.385 446348.792 623213.009 594308.669 568717.483 574156.482 610052.376 585638.140 599839.205 537625.224 650868.853 645045.451 645174.957 598671.728 602729.688 478329.203 632466.551 678019.279 591468.416 668788.674 495956.289 571231.318 465333.971 478734.347 670900.652 672093.261 673326.926 603589.900 622040.786 679575.980 691510.980 546547.989 479686.485 633692.191 628403.461 648734.834 631053.633 635618.500 636500.313 586917.875 523878.502 07536/A6-3-1-1 Final Available recording period 1951-2005 1964-2005 1975-2005 1974-2005 1954-2005 Unknown Unknown 1978-2005 1981-2005 Unknown 1977-2005 1954-2005 1967-2005 1986-2005 Unknown Unknown Unknown 1982-2005 1989-2005 1965-2005 1977-2005 1976-2005 Unknown 1957-2005 1977-2005 1953-2005 1977-2005 1953-2005 1951-2005 1959-2005 Unknown Unknown 1995-2005 1967-2005 1954-2005 1990-2005 1954-2005 1982-2005 1977-2005 1976-2005 1977-2005 1951-2005 SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA Missing period Year of record 1953-1963 Unknown Unknown Unknown 1956-1959 Unknown Unknown Unknown Unknown 1955-1967 1954-1956 1958-1982 Unknown Unknown - 46 42 31 32 52 Unknown Unknown 28 25 Unknown 29 50 39 20 Unknown Unknown Unknown 24 17 41 29 30 Unknown 49 29 43 29 52 32 47 Unknown Unknown 11 39 52 16 52 24 29 30 29 55 page 9 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO River Gauging Station X coordinate (stereo70) Y coordinate (stereo70) PERESCHIVUL M. PLUTON-DOLHESTI POZEN PUTNA PUTNA PUTNA PUTNA PUTNA PUTNA PUTNA PUTNA RACACIUNI (MOCAN) RACATAU RACOVA RAMNA RAMNA RAMNICUL SARAT RASCA REBRICEA RM.SARAT RM.SARAT ROMANI SABASA SACOVAT SACOVAT SARISORUL MARE SCHEIA SCHITU SIMILA SIMILA SIRET SIRET SIRET SIRET SIRET SIRET SIRET SIRET SLANIC SLANIC SLANIC SOLONET FICHITESTI I PLUTON HORODNIC (RADAUTI) BOTIRLAU COLACU LEPSA MIRCESTI POJORITA PUTNA TULGHES TULNICI RACACIUNI RECEA PUSCASI AV. GROAPA-TUFEI JILISTE (CIORASTI) TULBUREA (CHIOJDENI) BOGDANESTI (BOROAIA) RATES CUZA PUIESTI TATARU BUHUSI SABASA TIBANA TUNGUJEI PANACI SCHEIA CEAHLAU BACANI BARLAD (POD) ADJUDUL VECHI DRAGESTI HUTANI (SERBANESTI) LESPEZI LUNGOCI N.BALCESCU SIRET ZVORISTEA CERNATESTI CIRESOAIA LOPATARI PARHAUTI 691289.072 578722.515 565045.554 686152.983 642923.031 620197.631 676465.080 534211.101 545086.507 558139.078 629397.733 655150.728 659866.314 702764.285 655827.802 674209.662 644350.729 594847.609 695876.812 674051.244 694452.342 629040.454 562276.983 677103.552 678226.644 526719.365 592494.982 571407.755 706568.987 707110.580 669721.767 648744.586 609642.901 627753.341 696091.523 651033.414 580626.074 597856.277 637760.821 620631.396 623912.397 580827.275 525391.734 633534.911 707529.362 462070.869 489269.771 495635.610 473904.090 668742.774 707455.529 606647.592 491166.488 538408.389 549126.074 573229.735 457219.284 458389.082 453000.936 652202.302 595442.938 435730.600 447819.718 581555.106 634457.984 611799.248 607401.630 642881.754 683691.366 614900.394 537036.143 532782.565 517772.837 582522.318 689971.763 651827.034 454046.493 605070.055 718307.949 706780.939 420247.016 529231.559 443857.644 690770.398 07536/A6-3-1-1 Final Available recording period Unknown 1965-2005 1964-2005 1952-2005 1967-2005 1969-2005 1988-2005 1976-2005 1967-2005 1966-2005 1954-2005 1986-2005 1986-2005 Unknown 1961-2005 1952-2005 Unknown 1960-2005 Unknown 1988-2005 1955-2005 1999-2005 1967-2005 Unknown Unknown 1986-2005 1968-2005 1977-2005 Unknown Unknown 1986-2005 1962-2005 1969-2005 1952-2005 1951-2005 1986-2005 1963-2005 1978-2005 Unknown 1951-2005 Unknown 1956-2005 SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA Missing period Year of record Unknown 1967-1969 1991-1993 Unknown Unknown Unknown Unknown Unknown Unknown Unknown Unknown 1952-1967 Unknown - Unknown 41 41 54 39 37 18 30 39 40 51 20 20 Unknown 45 54 Unknown 46 Unknown 18 51 7 39 Unknown Unknown 20 38 29 Unknown Unknown 20 44 37 54 55 20 43 28 Unknown 41 Unknown 50 page 10 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO River SOMUZUL MARE SUCEAVA SUCEAVA SUCEAVA SUHU-PECHEA SULTA SUSITA TARCAU TARCAU TAZLAU TAZLAU TAZLAU TAZLAU SARAT TECUCEL TESNA TOMNATIC TOPOLITA TREBES TROTUS TROTUS TROTUS TROTUS TROTUS TUTOVA TUTOVA UZ UZ UZ VASLUI (VASLUET) VASLUI (VASLUET) VIZAUTI VL.NEAGRA VL.RECE ZABALA ZABRAUTI ZELETIN Gauging Station DOLHESTI BRODINA ITCANI TIBENI PECHEA SULTA CIURUC ARDELUTA MOARA IANOS(CAZACI) HELEGIU SCORTENI TAZLAU LUCACESTI TECUCI COSNA DRAGOIASA PASTRAVENI BACAU GHIMES FAGET GOIOASA ONESTI(GH.GH.-DEJ) TG.OCNA VRANCENI CIOCANI PUIESTI CREMENEA DARMANESTI VL.UZULUI CODAESTI SATU NOU VIDRA SECUIENI VL.RECE NEREJU FITIONESTI GALBENI 07536/A6-3-1-1 Final X coordinate (stereo70) Y coordinate (stereo70) 613695.985 533606.145 592705.602 576099.504 718004.750 594728.113 640776.426 591594.932 587486.472 634111.618 628048.349 611567.605 615146.375 687313.602 516594.936 531610.948 617399.676 646637.730 585222.326 599683.060 636459.330 623817.338 646248.200 697164.883 692114.500 602593.525 614473.803 595041.912 713516.895 713499.640 648488.207 643942.864 573418.781 635342.515 659736.574 684274.549 661581.924 710804.235 686645.617 703891.362 461262.072 552507.076 501693.722 581741.903 595667.765 540504.018 560157.430 581268.321 555308.875 485643.091 650960.252 629913.683 631647.012 566818.355 562457.434 550431.495 530621.175 532047.099 525020.964 531918.621 550017.326 537594.318 545156.923 537780.263 600065.077 610515.629 492966.632 596264.780 570075.302 470032.530 501247.916 514328.267 Available recording period 1953-2005 1957-2005 1952-2005 1981-2005 Unknown 1964-2005 1961-2005 1976-2005 1990-2005 1951-2005 1979-2005 1968-2005 1966-2005 Unknown 1974-2005 1967-2005 1976-2005 Unknown 1961-2005 1952-2005 1951-2005 1955-2005 1963-2005 Unknown Unknown 1977-2005 1977-2005 1968-2005 Unknown Unknown 1975-2005 1974-2005 1976-2005 1967-2005 1990-2005 Unknown SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA Missing period Year of record Unknown 1954-1970 Unknown Unknown 1952-1978 Unknown Unknown Unknown Unknown Unknown 53 49 54 25 Unknown 42 45 30 16 40 27 38 40 Unknown 32 39 30 Unknown 45 54 30 51 43 Unknown Unknown 29 29 38 Unknown Unknown 31 32 30 39 16 Unknown page 11 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDIX 3: SUB-BASIN MAPS 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 12 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O Sa co (S Ç SATU NOU ag ƒ TUNGUJEI îa ) 1 CONTRIBUTIONS TO THE DEVELOPMENT OF THE FLOOD RISK MANAGEMENT STRATEGY 2008 FRENCIUGI CAZANESTI CODAESTI CODAESTI cÇ l en i 2 NEGRESTI RATES CUZA BACESTI ) Ra c 3 d ov a Bƒ rz em e -ti ni c r la Bƒ Tu t ov St Cra s na Gauging Stations Pur c # ic a Legend ni TIBANA (D lna Ve Bo z ie et a n ic î a VASLUI 4 PUSCASI AV. S im Ch iî oc i la Gh ila h oi Berh ec i e -ti P ƒr v iala Ho r o PUIESTI BOSIA iv P ere s c h 8 5 7 CURTENI MANJESTI Idrici bo v S tav Vas lu i Ga r vÇ Te le jn a t Barlad Basin re Si Water Sub-Basins VÇ le ni BACANI CIOCANI BARLAD FICHITESTI I ian a Tr e s t JÇ ra vÇ an a i- ) e tr ze l s Ho b Co ra a ne a sa P a( et 5 BlÇ ot c el ± ne a Sir 0 6 9 u Te c sources, references : - lÇ rz Bƒ Lu p ul BÇ î FELDIOARA GALBENI TECUCI TECUCI TECUCI 10 10 KM PHARE 2005 / 017 - 690.01.01 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA EuropAid / 123064 / D / SER / RO page 13 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O Water Sub-Basins Suh u Geru Basin (P ec h CONTRIBUTIONS TO THE DEVELOPMENT OF THE FLOOD RISK MANAGEMENT STRATEGY 2008 u h ur e a, S Gauging Stations Ge Gologan (Bujo re-ti) r u- iî a # lu i) Legend 1 3 Je p ea CUDALBI Sir et 2 Ger u PECHEA sources, references : - 0 ± 4 8 KM Sir et Sir et PHARE 2005 / 017 - 690.01.01 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA EuropAid / 123064 / D / SER / RO page 14 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O Water Sub-Basins Putna Basin CONTRIBUTIONS TO THE DEVELOPMENT OF THE FLOOD RISK MANAGEMENT STRATEGY 2008 2 p Le -a Vi d r 14 9 z Co Va le a SÇ 10 a r ii lim Ti -iîa Ti ch ir VÇ s ui uî r ce i- i i) VIDRA 15 COLACU Val ea Ch i 5 Pu et ea TULNICI a( et ro g Ast Ca c iu r Pƒ lM ƒu Vi zÇ 4 LEPSA LEPSA Sir Gauging Stations i u # u lu Çr j De Legend Re a HERASTRAU REGHIU ZÇ 7 1 tn Pu la ba 13 a 11 NEREJU ZÇ 6 Va le a St ƒn e la ba lc Mi ov 16 ¸o im ul MIRCESTI 12 Rƒ m na 3 GOLESTI i BOTIRLAU 17 8 GROAPA-TUFEI JILISTE sources, references : - 0 ± 4 8 KM PHARE 2005 / 017 - 690.01.01 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA EuropAid / 123064 / D / SER / RO page 15 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O Water Sub-Basins Ramnicu Sarat Basin Sir CONTRIBUTIONS TO THE DEVELOPMENT OF THE FLOOD RISK MANAGEMENT STRATEGY 2008 et Legend # Gauging Stations nÇ u a ot î rÇ el Ma rtin Tu lb u re SÇ 1 Rƒ mnice l M TULBUREA BÇ uî lan CÇ tÇ TATARU î Co MARTINESTI 4 at cu 2 3 nic Rƒ m Çn ra u l SÇ ab Gr e PUIESTI t sources, references : - 0 ± 3 6 KM PHARE 2005 / 017 - 690.01.01 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA EuropAid / 123064 / D / SER / RO page 16 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O Water Sub-Basins Susita Basin CONTRIBUTIONS TO THE DEVELOPMENT OF THE FLOOD RISK MANAGEMENT STRATEGY 2008 Legend Gauging Stations em Cr eî Du m ic u - 1 a a un CIURUC oa r Al ira ej ea a Dr m go Re p d Ve r ) re ) h iu a M a Ch iu a (C en p ejoa ra Alba (Lim # a -iî ¸u 2 Sir et sources, references : - 0 ± 2.5 5 KM PHARE 2005 / 017 - 690.01.01 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA EuropAid / 123064 / D / SER / RO page 17 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDIX 4: CHARACTERISTICS OF EACH SUBBASIN 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 18 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O Barlad Barlad Barlad Barlad Barlad Barlad Barlad Barlad Barlad Barlad Bistrica Bistrica Bistrica Bistrica Bistrica Bistrica Bistrica Bistrica Bistrica Bistrica Bistrica Bistrica Bistrica Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau 07536/A6-3-1-1 Final Sub-basin ID AREA (km²) Longest hydraulic path (m) Longest hydraulic path (km) ZMAX ZMIN Mean slope (m/m) Mean slope (%) Tc: Time of concentration (hr) Tlag: Lag time (hr) Tc / Area 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 11 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1536.9 703.4 523.4 408.6 816.2 457.9 950.2 1075.3 228.1 561.0 755.1 311.7 772.2 391.5 443.9 1164.0 560.9 540.5 556.2 322.8 623.5 185.8 320.3 108.0 238.5 104.3 332.5 189.7 188.8 106.9 233.7 231.6 114.3 477.5 262.9 250.8 251.8 606.0 504.4 98.1 65.5 78000 73000 58000 58000 39000 26000 90000 90000 20000 45000 69800.0 34600.0 63500.0 32600.0 66600.0 46000.0 38307.0 13400.0 49300.0 26800.0 54600.0 30300.0 26900.0 17400 46085 16614 40875 34426 34993 20337 33651 50310 15941 77382 33085 41177 59592 61148 34000 13962 18066 78 73 58 58 39 26 90 90 20 45 69.8 34.6 63.5 32.6 66.6 46.0 38.3 13.4 49.3 26.8 54.6 30.3 26.9 17 46 17 41 34 35 20 34 50 16 77 33 41 60 61 34 14 18 420 425 417 466 450 357 473 500 277 305 1679 1824 1288 1290 1192 1824 1297 1200 810 600 1524 438 400 1776 1770 1439 1770 1191 900 1496 1116 38 1954 1312 177 725 850 551 114 1079 1434 93 100 85 80 60 55 48 40 40 24 805 786 512 400 259 650 512 512 259 236 786 160 213 1005 535 370 525 175 150 470 240 8 785 123 55 97 90 39 22 685 755 0.00419 0.00445 0.00572 0.00666 0.01000 0.01162 0.00472 0.00511 0.01185 0.00624 0.01252 0.03000 0.01223 0.02730 0.01401 0.02552 0.02049 0.05134 0.01117 0.01358 0.01352 0.00917 0.00695 0.04431 0.02680 0.06434 0.03046 0.02951 0.02143 0.05045 0.02603 0.00060 0.07333 0.01537 0.00369 0.01525 0.01275 0.00837 0.00271 0.02822 0.03758 0.4 0.4 0.6 0.7 1.0 1.2 0.5 0.5 1.2 0.6 1.3 3.0 1.2 2.7 1.4 2.6 2.0 5.1 1.1 1.4 1.4 0.9 0.7 4.4 2.7 6.4 3.0 3.0 2.1 5.0 2.6 0.1 7.3 1.5 0.4 1.5 1.3 0.8 0.3 2.8 3.8 91 58 44 36 45 32 65 67 22 45 36 15 37 18 26 34 25 19 33 24 32 21 33 8 14 6 15 12 14 7 14 90 6 25 40 19 20 39 67 9 6 54 35 27 22 27 19 39 40 13 27 22 9 22 11 15 20 15 12 20 14 19 13 20 5 8 4 9 7 8 4 8 54 4 15 24 11 12 24 40 6 4 0.06 0.08 0.08 0.09 0.05 0.07 0.07 0.06 0.10 0.08 0.05 0.05 0.05 0.05 0.06 0.03 0.05 0.04 0.06 0.07 0.05 0.11 0.10 0.07 0.06 0.06 0.05 0.06 0.07 0.06 0.06 0.39 0.05 0.05 0.15 0.07 0.08 0.07 0.13 0.09 0.09 SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 19 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Buzau Geru Geru Geru Putna Putna Putna Putna Putna Putna Putna Putna Putna Putna Putna Putna Putna Putna Putna Putna Putna Ramnicu Sarat Ramnicu Sarat Ramnicu Sarat Ramnicu Sarat Siret Diffuse Runoff 07536/A6-3-1-1 Final Sub-basin ID AREA (km²) Longest hydraulic path (m) Longest hydraulic path (km) ZMAX ZMIN Mean slope (m/m) Mean slope (%) Tc: Time of concentration (hr) Tlag: Lag time (hr) Tc / Area 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 1 2 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 2 3 4 1 41.7 46.3 60.6 66.2 78.7 121.9 100.6 46.4 50.9 50.0 63.7 40.5 72.7 50.4 30.8 66.1 113.8 269.8 371.9 116.6 71.6 80.7 85.8 143.1 266.7 123.8 348.4 152.4 37.2 122.8 295.1 157.7 138.0 131.6 114.0 101.8 190.7 312.7 321.0 239.2 108.8 10883 14169 12795 9233 9038 19270 16801 10839 12883 9667 12690 7000 6000 7477 7691 7563 21 000 57 000 67 000 8000 16000 10000 23000 21000 44000 15000 58000 18000 6000 26000 20000 13000 13000 10000 28000 30000 24 000 66 000 43 000 43 000 26 000 11 14 13 9 9 19 17 11 13 10 13 7 6 7 8 8 21 57 67 8 16 10 23 21 44 15 58 18 6 26 20 13 13 10 28 30 24 66 43 43 26 1166 1090 1288 1657 1558 1662 1442 1060 1114 908 1343 826 725 735 464 799 273 251 305 996 1390 88 924 1724 1778 1676 979 1514 825 1330 999 1375 1284 960 281 510 1378 979 571 167 430 715 675 670 660 570 510 470 330 300 275 365 265 255 222 140 142 80 2 8 32 590 16 210 650 520 520 30 440 270 280 55 310 310 175 33 30 331 55 30 10 88 0.04144 0.02929 0.04830 0.10798 0.10932 0.05978 0.05785 0.06735 0.06318 0.06548 0.07707 0.08014 0.07833 0.06861 0.04213 0.08687 0.00919 0.00437 0.00443 0.12050 0.05000 0.00720 0.03104 0.05114 0.02859 0.07707 0.01636 0.05967 0.09250 0.04038 0.04720 0.08192 0.07492 0.07850 0.00886 0.01600 0.04363 0.01400 0.01258 0.00365 0.01315 4.1 2.9 4.8 10.8 10.9 6.0 5.8 6.7 6.3 6.5 7.7 8.0 7.8 6.9 4.2 8.7 0.9 0.4 0.4 12.050 5.000 0.720 3.104 5.114 2.859 7.707 1.636 5.967 9.250 4.038 4.720 8.192 7.492 7.850 0.886 1.600 4.4 1.4 1.3 0.4 1.3 5 6 5 4 4 7 6 4 4 4 4 4 5 4 4 5 17 36 42 5 6 17 8 8 14 6 21 8 3 8 13 7 7 7 17 12 10 21 23 37 13 3 4 3 2 3 4 4 2 3 3 3 2 3 3 3 3 10 21 25 3 3 10 5 5 8 4 13 5 2 5 8 4 4 4 10 7 6 13 14 22 8 0.12 0.13 0.09 0.06 0.06 0.06 0.06 0.09 0.08 0.09 0.07 0.09 0.07 0.09 0.14 0.07 0.15 0.13 0.11 0.05 0.08 0.21 0.09 0.06 0.05 0.05 0.06 0.05 0.09 0.07 0.04 0.05 0.05 0.05 0.15 0.11 0.05 0.07 0.07 0.16 0.12 SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 20 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O Siret Diffuse Runoff Siret Diffuse Runoff Siret Diffuse Runoff Siret Diffuse Runoff Siret Diffuse Runoff Siret Diffuse Runoff Siret Diffuse Runoff Siret Diffuse Runoff Siret Diffuse Runoff Siret Diffuse Runoff Siret Diffuse Runoff Siret Diffuse Runoff Siret Diffuse Runoff Susita Susita Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus 07536/A6-3-1-1 Final Sub-basin ID AREA (km²) Longest hydraulic path (m) Longest hydraulic path (km) ZMAX ZMIN Mean slope (m/m) Mean slope (%) Tc: Time of concentration (hr) Tlag: Lag time (hr) Tc / Area 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 41.2 271.1 335.6 602.2 154.2 203.1 82.0 146.2 107.8 175.2 379.0 145.6 140.5 178.4 209.5 469.7 208.6 119.7 27.1 76.4 47.2 38.8 11.4 117.6 135.3 109.0 123.1 331.6 130.1 276.6 106.3 128.0 15.8 27.4 21.5 16.4 24.7 23.8 26.7 17.0 100.6 15 000 40 000 43 000 45 000 18 000 36 000 29 000 39 000 7 000 26 000 36 000 14 000 6 000 22 000 50 000 18200.0 40000.0 28400.0 9500.0 22400.0 15000.0 13100.0 6900.0 24500.0 32900.0 22100.0 25900.0 65900.0 10100.0 17000.0 13600.0 24300.0 8800.0 5500.0 6000.0 4600.0 5040.0 7000.0 4900.0 3400.0 15100.0 15 40 43 45 18 36 29 39 7 26 36 14 6 22 50 18.2 40.0 28.4 9.5 22.4 15.0 13.1 6.9 24.5 32.9 22.1 25.9 65.9 10.1 17.0 13.6 24.3 8.8 5.5 6.0 4.6 5.0 7.0 4.9 3.4 15.1 517 120 198 60 62 80 295 699 217 495 171 295 45 1350 709 900.0 1400.0 1400.0 1300.0 1600.0 1340.0 900.0 1400.0 1300.0 1300.0 1500.0 1500.0 1400.0 1400.0 1000.0 800.0 1200.0 1400.0 1340.0 1400.0 1400.0 1400.0 1100.0 600.0 580.0 800.0 95 12 8 10 18 13 3 60 90 68 2 55 25 345 45 250.0 400.0 190.0 700.0 600.0 660.0 375.0 900.0 520.0 500.0 300.0 250.0 200.0 600.0 350.0 150.0 640.0 900.0 940.0 800.0 700.0 660.0 450.0 350.0 500.0 200.0 0.02813 0.00270 0.00442 0.00111 0.00244 0.00186 0.01007 0.01638 0.01814 0.01642 0.00469 0.01714 0.00333 0.04568 0.01328 0.036 0.025 0.043 0.063 0.045 0.045 0.040 0.072 0.032 0.024 0.054 0.048 0.018 0.079 0.038 0.048 0.023 0.057 0.073 0.100 0.152 0.147 0.093 0.051 0.024 0.040 2.8 0.3 0.4 0.1 0.2 0.2 1.0 1.6 1.8 1.6 0.5 1.7 0.3 4.6 1.3 3.6 2.5 4.3 6.3 4.5 4.5 4.0 7.2 3.2 2.4 5.4 4.8 1.8 7.9 3.8 4.8 2.3 5.7 7.3 10.0 15.2 14.7 9.3 5.1 2.4 4.0 6 47 41 111 39 48 13 14 14 15 43 15 40 10 18 20 13 8 3 6 5 5 2 9 11 7 7 19 7 14 7 11 2 3 2 2 2 2 4 5 8 3 28 24 67 23 29 8 8 8 9 26 9 24 6 11 12 8 5 2 4 3 3 1 5 6 4 4 12 4 8 4 7 1 2 1 1 1 1 2 3 5 0.14 0.17 0.12 0.18 0.25 0.24 0.16 0.09 0.13 0.09 0.11 0.10 0.28 0.05 0.09 0.04 0.06 0.06 0.12 0.08 0.10 0.12 0.16 0.08 0.08 0.06 0.06 0.06 0.05 0.05 0.07 0.09 0.16 0.12 0.11 0.10 0.09 0.10 0.14 0.27 0.08 SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 21 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus Trotus 07536/A6-3-1-1 Final Sub-basin ID AREA (km²) Longest hydraulic path (m) Longest hydraulic path (km) ZMAX ZMIN Mean slope (m/m) Mean slope (%) Tc: Time of concentration (hr) Tlag: Lag time (hr) Tc / Area 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 45.8 104.1 115.8 26.2 53.0 31.4 48.6 68.4 68.8 35.6 31.2 122.8 33.3 213.4 111.7 373.9 237.3 7300.0 13800.0 22400.0 5900.0 6500.0 7800.0 5100.0 8600.0 12500.0 9500.0 10100.0 22300.0 9600.0 28600.0 16100.0 55000.0 21300.0 7.3 13.8 22.4 5.9 6.5 7.8 5.1 8.6 12.5 9.5 10.1 22.3 9.6 28.6 16.1 55.0 21.3 860.0 600.0 700.0 900.0 800.0 1600.0 1400.0 1300.0 1500.0 1300.0 1200.0 1500.0 1400.0 1200.0 1500.0 1300.0 500.0 400.0 200.0 150.0 400.0 275.0 800.0 500.0 600.0 700.0 800.0 400.0 800.0 900.0 550.0 400.0 185.0 80.0 0.063 0.029 0.025 0.085 0.081 0.103 0.176 0.081 0.064 0.053 0.079 0.031 0.052 0.023 0.068 0.020 0.020 6.3 2.9 2.5 8.5 8.1 10.3 17.6 8.1 6.4 5.3 7.9 3.1 5.2 2.3 6.8 2.0 2.0 4 9 10 3 4 3 3 5 5 4 3 9 4 15 6 20 17 3 6 6 2 3 2 2 3 3 2 2 6 2 9 4 12 10 0.10 0.09 0.09 0.11 0.08 0.09 0.06 0.07 0.07 0.11 0.10 0.08 0.12 0.07 0.06 0.05 0.07 SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 22 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDIX 5: SUB-BASIN LAND COVER Trotus river basin Sub-basin ID Urban areas (%) Meadows (%) Forests (%) Agriculture (%) CN 1 15 16 34 35 85.68 2 2 2 94 1 95.00 3 7 5 87 1 95.00 4 6 11 72 11 80.03 5 1 1 92 5 78.15 6 9 12 78 1 78.87 7 19 14 32 34 86.09 8 1 39 60 0 65,07 9 3 9 86 2 84.00 10 1 1 99 0 77.13 11 4 8 86 2 78.17 12 4 9 83 4 88.00 13 4 4 80 12 79.74 14 1 1 98 0 77.15 15 11 20 48 20 82.77 16 12 21 27 39 86.18 17 0 13 83 4 83.87 18 1 60 36 3 79.48 19 12 32 57 0 87.59 20 13 29 54 4 80.45 21 12 39 48 1 80.10 22 15 20 54 10 81.68 23 17 7 71 5 80.63 24 23 7 36 35 86.54 25 39 17 25 18 86.48 26 13 19 5 63 90.21 27 8 19 60 14 81.07 28 14 2 45 38 85.69 29 5 6 74 15 80.52 30 13 20 64 2 79.98 31 12 31 50 7 80.92 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 23 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Sub-basin ID Urban areas (%) Meadows (%) Forests (%) Agriculture (%) CN 32 7 18 73 2 78.96 33 8 15 75 3 79.07 34 9 6 64 21 82.12 35 8 11 78 4 79.10 36 8 29 61 2 79.39 37 10 16 60 14 71.46 38 6 44 48 2 79.61 39 8 22 70 0 78.83 40 0 3 96 1 77.29 41 3 7 87 2 78.15 42 8 10 65 18 81.50 43 14 3 52 31 84.38 * The values reported in RED have been adapted for calibration purposes Siret river basin Basin Sub-basin ID Urban areas (%) Meadows (%) Forests (%) Agriculture (%) CN Siret_Tribs 1 10 15 14 61 89.31 Siret_Tribs 2 8 14 9 69 90.23 Siret_Tribs 3 3 1 5 92 93.05 Siret_Tribs 4 5 2 3 91 93.24 Siret_Tribs 5 6 5 8 82 91.87 Siret_Tribs 6 11 2 24 62 89.36 Siret_Tribs 7 8 2 6 84 92.57 Siret_Tribs 8 12 5 2 81 92.73 Siret_Tribs 9 6 4 44 47 85.91 Siret_Tribs 10 12 2 35 51 87.52 Siret_Tribs 11 12 3 33 52 87.71 Siret_Tribs 12 12 4 11 73 63.70 Siret_Tribs 13 10 3 16 71 90.67 Siret_Tribs 14 14 5 35 45 86.97 Geru 1 5 3 6 86 92.53 Geru 2 5 5 4 87 92.57 Geru 3 8 4 7 81 92.04 Ramnicul 1 6 8 79 7 79.35 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 24 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Basin Sub-basin ID Urban areas (%) Meadows (%) Forests (%) Agriculture (%) CN Ramnicul 2 16 6 39 39 86.20 Ramnicul 3 5 6 18 71 90.05 Ramnicul 4 7 7 0 86 92.83 Susita 1 4 18 69 9 79.66 Susita 2 12 8 48 32 84.41 Putna 1 18 6 27 49 88.16 Putna 2 1 1 98 0 77.23 Putna 3 9 2 8 81 92.21 Putna 4 5 20 54 22 82.02 Putna 5 1 5 94 0 77.33 Putna 6 2 3 94 0 77.51 Putna 7 0 1 98 0 77.15 Putna 8 11 6 46 38 85.22 Putna 9 1 7 92 1 77.45 Putna 10 9 30 54 7 80.52 Putna 11 5 15 72 8 79.55 Putna 12 11 5 52 31 76.18 Putna 13 11 27 55 7 80.66 Putna 14 7 42 30 21 82.96 Putna 15 8 13 56 23 82.54 Putna 16 20 7 0 73 92.59 Putna 17 13 2 3 82 92.93 Barlad 1 9 11 32 47 86.78 Barlad 2 9 10 26 55 88.01 Barlad 3 9 11 25 56 88.11 Barlad 4 12 6 28 53 88.04 Barlad 5 9 10 19 62 89.16 Barlad 6 8 12 15 64 89.54 Barlad 7 10 9 19 62 89.26 Barlad 8 11 8 22 59 88.84 Barlad 9 8 7 8 77 91.50 Barlad 10 10 6 10 74 91.25 * The values reported in RED have been adapted for calibration purposes 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 25 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Buzau river basin Sub-basin ID Urban areas (%) Meadows (%) Forests (%) Agriculture (%) CN 1 1 5 94 0 77.35 2 0 1 99 0 77.08 3 7 9 73 10 80.10 4 1 2 97 0 77.19 5 14 15 42 30 84.58 6 13 16 41 31 84.67 7 2 8 87 3 78.14 8 8 15 48 28 83.54 9 6 4 6 85 92.41 10 0 12 85 3 77.82 11 12 12 46 30 84.26 12 9 6 8 77 62.19 13 7 4 66 23 82.09 14 12 7 25 56 88.51 15 6 2 4 88 92.91 16 10 9 6 74 91.41 17 16 26 36 22 83.85 18 3 8 77 11 79.68 19 4 27 47 22 82.16 20 14 21 45 20 83.17 21 3 3 93 1 77.60 22 3 7 88 2 77.92 23 0 0 1 99 93.83 24 1 4 95 0 77.30 25 5 4 89 3 78.34 26 11 17 63 10 80.79 27 9 28 54 9 80.78 28 17 15 35 32 75.70 29 8 6 73 13 80.55 30 17 18 31 35 86.00 31 17 6 55 22 83.49 32 15 16 36 33 85.30 33 9 23 22 46 86.84 34 19 7 32 42 87.18 * The values reported in RED have been adapted for calibration purposes 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 26 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDIX 6: TABLES OF DAILY RAINFALL ON THE SIRET BASIN 1) RAINFALL STATION USED – TROTUS BASIN The 3h time-step rainfall station used for the Trotus basin is the Targu-Ocna station. Rainfall (mm) RIVER STATION X_COORD Y_COORD 11th July 2005 12th July 2005 13th July 2005 SUM FRUMOASA FRUMOASA 565062.56 550916.19 6.5 29.3 1 36.8 SIRET ADJUDUL VECHI 669721.77 517772.84 9 47 3 59 NECHIT BORLESTI 613221.06 586917.88 28.6 127 8.4 164 TROTUS LUNCA DE SUS 575097.54 563949.07 30 28 2 60 TROTUS GHIMES FAGET 585222.33 562457.43 31.5 51 0 82.5 TROTUS GOIOASA 599683.06 550431.49 29.8 0 0 29.8 TROTUS TG.OCNA 623817.34 532047.1 25 89 4 118 TROTUS ONESTI 636459.33 530621.18 39.6 112 0 151.6 TROTUS VRANCENI 646248.2 525020.96 41.4 114 6.7 162.1 SULTA SULTA 594728.11 552507.08 30.2 0 0 30.2 CIOBANUS CIOBANUS 603003.62 548778.39 32.3 0 0 32.3 ASAU ASAU 607654.61 550973.03 81.1 36.8 6.9 124.8 UZ CREMENEA 602593.53 537594.32 44.8 0 0 44.8 UZ DARMANESTI 616532.04 541901.33 61.7 93.2 0 154.9 DOFTEANA DOFTEANA 618505.08 537625.22 54.5 130 0 184.5 SLANIC CIRESOAIA 620631.4 529231.56 35 74.6 0 109.6 CASIN HALOS 633441.89 518831.12 73.7 132 12.5 218.2 TAZLAU TAZLAU 611567.61 581268.32 23.8 150 11.5 185.3 TAZLAU SCORTENI 628048.35 560157.43 28.4 134 0 162.4 TAZLAU HELEGIU 634111.62 540504.02 40.2 87.5 12.3 140 TAZLAU SARAT LUCACESTI 615146.38 555308.87 33.2 117 0 150.2 LEPSA LEPSA 622138.23 495956.29 66 109 0 175 VL.RECE VL.RECE 573418.78 570075.3 0 42 10 52 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 27 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO SUSITA CIURUC 640776.43 501693.72 43 0 0 43 RACACIUNI (MOCAN) RACACIUNI 655150.73 538408.39 26 25.3 25.3 76.6 TREBES BACAU 646637.73 566818.35 2 100 19 121 UZ VL.UZULUI 595041.91 537780.26 0 88 13.8 101.8 2) RAINFALL STATION USED – BISTRITA BASIN The 3h time-step rainfall station used for the Bistrita basin is the Bacau station. RIVER STATION X_COORD Y_COORD A11 A12 A13 SUM SIRET DRAGESTI 648744,6 582522,3 1,9 42,5 1,9 46,3 MOLDOVA FUNDU MOLDOVEI 529481,1 670900,7 5,1 13,6 2,5 21,2 MOLDOVA TUPILATI 625437,1 622040,8 0,8 23,2 0,4 24,4 IZV.GIUMALAU(COLBUL) POJORITA 535351,9 668788,7 6,1 16,1 3,4 25,6 NEAMT(OZANA) LEGHIN 589605,2 636500,3 15,2 63,1 49,3 127,6 PLUTON-DOLHESTI PLUTON 578722,5 633534,9 7,2 53,9 0,6 61,7 AGAPIA (DALIA) FILIOARA 600028,1 630592,9 1,0 53,3 0,0 54,3 VL.NEAGRA SECUIENI 643942,9 596264,8 1,5 53,6 4,3 59,4 BISTRITA DORNA GIUMALAU 526567,7 651286,8 1,0 8,0 0,0 9,0 BISTRITA DORNA ARINI 530951,7 649513,5 0,6 18,6 0,0 19,2 BISTRITA FRUMOSU 565546,1 627397,9 6,5 29,3 1,0 36,8 BISTRITA STRAJA 589608,7 600408,8 65,0 92,2 3,0 160,2 BISTRITA FRUNZENI 623952,6 583853,9 16,2 52,0 3,1 71,3 CARLIBABA CARLIBABA 509660,9 675410,0 1,9 11,1 0,0 13,0 DORNA POIANA STAMPEI 510465,7 645045,5 1,5 13,0 2,0 16,5 DORNA DORNA CINDRENI 520955,0 650868,9 0,8 7,4 1,3 9,5 BANCU COSNA 513805,5 652321,2 0,5 2,9 2,4 5,8 NEAGRA GURA NEGRII 530439,0 648734,8 0,0 0,0 0,0 0,0 SARISORUL MARE PANACI 526719,4 642881,8 0,0 0,0 0,0 0,0 SABASA SABASA 562277,0 634458,0 5,2 37,0 1,2 43,4 BOLATAU POIANA LARGULUI 574130,5 622200,1 0,0 35,9 3,3 39,2 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 28 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO RIVER STATION X_COORD Y_COORD A11 A12 A13 SUM BISTRICIOARA TULGHES 557644,4 607577,1 39,2 22,3 2,5 64,0 BISTRICIOARA BISTRICIOARA 568927,7 617649,9 19,6 104,0 0,0 123,6 SCHITU CEAHLAU 571407,8 614900,4 17,2 83,5 10,2 110,9 BICAZ BICAZ CHEI 566430,0 591983,3 42,0 35,5 3,8 81,3 BICAZ TASCA 575379,3 598447,3 43,2 62,2 1,5 106,9 CUEJDIU CUEJDIU 599665,7 610052,4 17,2 83,5 10,2 110,9 IAPA LUMINIS 609901,8 591468,4 39,4 133,0 0,0 172,4 CRACAU MAGAZIA 596412,8 623213,0 8,0 55,0 0,0 63,0 CRACAU SLOBOZIA 616838,5 594308,7 14,0 62,7 14,0 90,7 NECHIT BORLESTI 613221,1 586917,9 28,6 127,0 8,4 164,0 RACATAU RECEA 659866,3 549126,1 13,2 86,5 2,1 101,8 TROTUS GHIMES FAGET 585222,3 562457,4 31,5 51,0 0,0 82,5 TAZLAU TAZLAU 611567,6 581268,3 23,8 150,0 11,5 185,3 TAZLAU SCORTENI 628048,4 560157,4 28,4 134,0 0,0 162,4 MOLDOVA CIMPULUNG 9,3 17,6 6,4 33,3 BISTRITA BROSTENI 2,4 16,9 0,0 19,3 VL.RECE VL.RECE 42,0 10,0 0,0 52,0 TREBES BACAU 2,0 100,0 19,0 121,0 BISTRITA PIATRA NEAMT 1,0 75,0 24,0 0,0 3) 573418.78 570075.3 RAINFALL STATION USED – DOWNSTREAM SIRET BASIN The 3h time-step rainfall stations used for the Downstream Siret basin are resumed in the following table: Water basin 3h time-step rainfall stations Putna TG Ocna Ramnicul Sarat Adjud Susita TG Ocna Siret (tributaries) 07536/A6-3-1-1 Final Adjud for the upstream (BV1, 2, 10, 11 et 9) Tecuci for the downstream (BV13, 14, 6, 7, 5, 3, 4, 12) SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 29 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO For the Barlad and the Geru basin no daily rainfall stations were available. The following stations have been used: Daily station Water basin (cumulated rainfall) 3h timestep rainfall stations Barlad 1, 2, 3 et 4 Secueni Bacau Barlad 5, 6, 7 et 8 Adjud Adjud Barlad 9 et 10 Tecuci Tecuci Geru Tecuci Tecuci RIVER STATION X_COORD Y_COORD A11 A12 A13 SUM SIRET ADJ. VECHI 669721,76717 517772,83720 6.2 43,4 0.4 50,0 SIRET COSMESTI 673815,47000 497709,62000 18.7 71,6 0 90,3 SIRET LUNGOCI 696091,52313 454046,49293 17.4 80,4 2.6 100,4 VL.NEAGRA SECUENI 643942,86386 596264,77962 1.5 53,6 4.3 59,4 RACATAU RECEA 659866,31404 549126,07402 13.2 86,5 2.1 101,8 RACACIUNI RACACIUNI 655150,72786 538408,38867 26 25,3 0 51,3 TROTUS VR┬NCENI 646248,20048 525020,96417 41.4 114,0 6.7 162,1 CASIN HALOS 633441,88886 518831,12207 73.7 132,0 12.5 218,2 SUSITA CIURUC 640776,42612 501693,72156 43 0,0 0 43,0 PUTNA LEPSA 620197,63108 495635,61040 66 109,0 0 175,0 PUTNA TULNICI 629397,73349 491166,48807 40.6 93,0 0 133,6 PUTNA COLACU 642923,03143 489269,77125 25 148,0 26.5 199,5 PUTNA MIRCESTI 676465,08041 473904,08991 9.4 94,1 0 103,5 PUTNA BOT┬RLAU 686152,98300 462070,86906 12.5 87,5 1.0 100,0 LEPSA LEPSA 622138,22693 495956,28917 66 109,0 0 175,0 ZABALA NEREJU 635342,51510 470032,53010 45 0,0 0 45,0 NARUJA HERASTRAU 627532,42275 479686,48525 73.4 147,0 0 220,4 MILCOV REGHIU 645363,73796 478734,34719 63.5 0,0 0 63,5 MILCOV GOLESTI 668618,66921 465333,97137 8.7 0,0 0 8,7 RAMNA GR. TUFEI 655827,80152 457219,28357 23.6 0,0 0 23,6 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 30 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO RIVER STATION X_COORD Y_COORD A11 A12 A13 SUM RAMNA JILISTE 674209,66214 458389,08167 9.2 100,0 0 109,2 RM. SARAT TULBUREA 644350,72867 453000,93584 39.2 107,0 0 146,2 RM. SARAT PUIESTI 674051,24413 435730,60000 21.1 70,1 0 91,2 RM. SARAT TATARU 694452,34163 447819,71772 29.2 62,4 3.2 94,8 COTATCU MARTINESTI 680149,35847 446348,79201 14 101,0 0 115,0 4) RAINFALL STATION USED – BUZAU BASIN For the Buzau water basin no precipitation data was available. The whole basin has been split in two rainfall areas in order to consider a spatial repartition: • Upstream area : transposition of the observed precipitations at Targu-Ocna station • Downstream area : transposition of the observed precipitations at Tecuci 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 31 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDIX 7: PICTURES OF THE HYDRAULIC STRUCTURES ALONG THE SIRET Road bridge at Cosmeti – Chainage 50 233 Railway at Suraja – chainage 71 775 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 32 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Road bridge at Nanesti – Chainage 102 310 Conduit at Cotu Mihalea - Chainage 161 591 No picture available Road bridge at Sendreni – Chainage 173 283 Railway at Galati – Chainage 177 229 No picture available 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 33 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Conduit at Galati – Chainage 181 146 Road bridge at Galati – Chainage 181 391 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 34 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDIX 8: DIKE CROSS-SECTIONS Elevation (m) Dike cross section n°1 80.5 80 79.5 79 78.5 78 77.5 77 76.5 76 75.5 0 5 10 15 20 25 30 Distance (m) Elevation (m) Dike cross section n°2 79 78.5 78 77.5 77 76.5 76 75.5 75 74.5 74 73.5 0 5 10 15 20 25 30 35 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 35 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°3 79 78 Elevation (m) 77 76 75 74 73 72 71 0 10 20 30 40 Distance (m) Elevation (m) Dike cross section n°4 79 78 77 76 75 74 73 72 71 70 69 68 0 10 20 30 40 50 Distance (m) Dike cross section n°5 80 Elevation (m) 78 76 74 72 70 68 66 0 10 20 30 40 50 60 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 36 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°6 69.5 69 Elevation (m) 68.5 68 67.5 67 66.5 66 65.5 0 10 20 30 40 50 40 50 40 50 Distance (m) Elevation (m) Dike cross section n°7 68 67.5 67 66.5 66 65.5 65 64.5 64 63.5 63 62.5 0 10 20 30 Distance (m) Dike cross section n°8 66 Elevation (m) 65 64 63 62 61 60 0 10 20 30 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 37 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°9 55 Elevation (m) 54.5 54 53.5 53 52.5 52 0 10 20 30 40 50 20 25 Distance (m) Dike cross section n°10 57 Elevation (m) 56.5 56 55.5 55 54.5 54 0 5 10 15 Distance (m) Dike cross section n°11 52.5 52 Elevation (m) 51.5 51 50.5 50 49.5 49 48.5 48 0 5 10 15 20 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 38 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Elevation (m) Dike cross section n°12 54.6 54.4 54.2 54 53.8 53.6 53.4 53.2 53 52.8 52.6 0 5 10 15 20 25 Distance (m) Dike cross section n°13 54 53.5 Elevation (m) 53 52.5 52 51.5 51 50.5 50 0 5 10 15 20 25 30 20 25 30 Distance (m) Dike cross section n°14 52.5 52 Elevation (m) 51.5 51 50.5 50 49.5 49 48.5 0 5 10 15 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 39 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Elevation (m) Dike cross section n°15 51.5 51 50.5 50 49.5 49 48.5 48 47.5 47 46.5 0 5 10 15 20 25 30 35 Distance (m) Dike cross section n°16 52 51 Elevation (m) 50 49 48 47 46 45 44 43 0 10 20 30 40 50 20 25 Distance (m) Dike cross section n°17 38 37.5 Elevation (m) 37 36.5 36 35.5 35 34.5 34 0 5 10 15 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 40 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°18 34 33.5 Elevation (m) 33 32.5 32 31.5 31 30.5 30 0 5 10 15 20 25 30 35 Distance (m) Dike cross section n°19 34 Elevation (m) 33.5 33 32.5 32 31.5 31 0 5 10 15 20 25 Distance (m) Dike cross section n°20 33 Elevation (m) 32.5 32 31.5 31 30.5 30 29.5 0 5 10 15 20 25 30 35 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 41 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°21 31 30.5 Elevation (m) 30 29.5 29 28.5 28 27.5 27 0 10 20 30 40 15 20 Distance (m) Dike cross section n°22 31 30.5 Elevation (m) 30 29.5 29 28.5 28 27.5 27 26.5 0 5 10 Distance (m) Dike cross section n°23 27 Elevation (m) 26.5 26 25.5 25 24.5 24 0 5 10 15 20 25 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 42 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°24 26 Elevation (m) 25.5 25 24.5 24 23.5 23 0 10 20 30 40 50 Distance (m) Dike cross section n°25 24.5 Elevation (m) 24 23.5 23 22.5 22 21.5 0 10 20 30 40 30 40 Distance (m) Dike cross section n°26 24 Elevation (m) 23.5 23 22.5 22 21.5 21 0 10 20 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 43 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°27 24 Elevation (m) 23.5 23 22.5 22 21.5 21 20.5 0 5 10 15 20 Distance (m) Dike cross section n°28 23.5 23 Elevation (m) 22.5 22 21.5 21 20.5 20 19.5 19 0 5 10 15 20 25 30 Distance (m) Dike cross section n°29 24 23.5 Elevation (m) 23 22.5 22 21.5 21 20.5 20 19.5 0 10 20 30 40 50 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 44 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°30 24 Elevation (m) 23.5 23 22.5 22 21.5 21 20.5 0 5 10 15 20 25 30 Distance (m) Dike cross section n°31 23.5 23 Elevation (m) 22.5 22 21.5 21 20.5 20 19.5 19 0 5 10 15 20 25 30 35 Distance (m) Dike cross section n°32 23 Elevation (m) 22 21 20 19 18 17 0 10 20 30 40 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 45 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°33 24 Elevation (m) 23 22 21 20 19 18 17 0 10 20 30 40 50 60 40 50 60 Distance (m) Elevation (m) Dike cross section n°34 21 20.5 20 19.5 19 18.5 18 17.5 17 16.5 16 0 10 20 30 Distance (m) Dike cross section n°35 21.5 Elevation (m) 21 20.5 20 19.5 19 18.5 18 0 5 10 15 20 25 30 35 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 46 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°36 21 Elevation (m) 20.5 20 19.5 19 18.5 18 0 10 20 30 40 50 Distance (m) Elevation (m) Dike cross section n°37 22 21.5 21 20.5 20 19.5 19 18.5 18 17.5 17 0 10 20 30 40 Distance (m) Dike cross section n°38 22 Elevation (m) 21 20 19 18 17 16 0 5 10 15 20 25 30 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 47 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°39 22 Elevation (m) 21 20 19 18 17 16 15 0 10 20 30 40 Distance (m) Dike cross section n°40 22 Elevation (m) 21 20 19 18 17 16 15 0 10 20 30 40 50 Distance (m) Elevation (m) Dike cross section n°41 21 20.5 20 19.5 19 18.5 18 17.5 17 16.5 16 0 10 20 30 40 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 48 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°42 21 Elevation (m) 20 19 18 17 16 15 0 10 20 30 40 Distance (m) Dike cross section n°43 21 Elevation (m) 20 19 18 17 16 15 0 5 10 15 20 25 30 Distance (m) Dike cross section n°44 21 Elevation (m) 20 19 18 17 16 15 0 5 10 15 20 25 30 35 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 49 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°45 20 Elevation (m) 19 18 17 16 15 14 13 0 10 20 30 40 50 60 Distance (m) Dike cross section n°46 20 Elevation (m) 19 18 17 16 15 14 13 0 5 10 15 20 25 30 35 Distance (m) Dike cross section n°47 19 Elevation (m) 18 17 16 15 14 13 0 10 20 30 40 50 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 50 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°48 20 Elevation (m) 19 18 17 16 15 14 13 0 10 20 30 40 50 Distance (m) Elevation (m) Dike cross section n°49 18 17.5 17 16.5 16 15.5 15 14.5 14 13.5 13 0 5 10 15 20 25 30 35 Distance (m) Dike cross section n°50 19 Elevation (m) 18 17 16 15 14 13 12 0 10 20 30 40 50 60 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 51 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°51 19 Elevation (m) 18 17 16 15 14 13 12 0 10 20 30 40 50 Distance (m) Dike cross section n°52 18 Elevation (m) 17 16 15 14 13 12 0 10 20 30 40 Distance (m) Dike cross section n°53 18 Elevation (m) 17 16 15 14 13 12 0 10 20 30 40 50 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 52 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°54 18 Elevation (m) 17 16 15 14 13 12 0 5 10 15 20 25 30 Distance (m) Elevation (m) Dike cross section n°55 17 16.5 16 15.5 15 14.5 14 13.5 13 12.5 12 0 5 10 15 20 25 30 35 Distance (m) Elevation (m) Dike cross section n°56 17 16.5 16 15.5 15 14.5 14 13.5 13 12.5 12 0 5 10 15 20 25 30 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 53 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°57 17 Elevation (m) 16 15 14 13 12 11 0 10 20 30 40 Distance (m) Dike cross section n°58 17 Elevation (m) 16 15 14 13 12 11 10 0 10 20 30 40 50 60 70 Distance (m) Dike cross section n°59 16 Elevation (m) 15 14 13 12 11 10 0 10 20 30 40 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 54 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°60 16 Elevation (m) 15 14 13 12 11 10 0 5 10 15 20 25 30 35 Distance (m) Dike cross section n°61 16 15 Elevation (m) 14 13 12 11 10 9 8 0 10 20 30 40 50 40 50 Distance (m) Dike cross section n°62 16 Elevation (m) 15 14 13 12 11 10 9 0 10 20 30 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 55 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°63 15 Elevation (m) 14 13 12 11 10 9 0 10 20 30 40 50 Distance (m) Dike cross section n°64 16 15 Elevation (m) 14 13 12 11 10 9 8 7 0 10 20 30 40 50 60 Distance (m) Dike cross section n°65 14.5 14 Elevation (m) 13.5 13 12.5 12 11.5 11 10.5 10 0 5 10 15 20 25 30 35 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 56 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°66 15 Elevation (m) 14 13 12 11 10 9 0 10 20 30 40 30 40 Distance (m) Dike cross section n°67 14 Elevation (m) 13 12 11 10 9 8 0 10 20 Distance (m) Dike cross section n°68 14 Elevation (m) 13 12 11 10 9 8 0 10 20 30 40 50 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 57 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Elevation (m) Dike cross section n°69 13 12.5 12 11.5 11 10.5 10 9.5 9 8.5 8 0 10 20 30 40 50 Distance (m) Elevation (m) Dike cross section n°70 13 12.5 12 11.5 11 10.5 10 9.5 9 8.5 8 0 10 20 30 40 50 60 20 25 30 Distance (m) Dike cross section n°71 10 Elevation (m) 9.5 9 8.5 8 7.5 7 0 5 10 15 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 58 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Dike cross section n°72 12 Elevation (m) 11 10 9 8 7 6 5 0 10 20 30 40 50 60 Distance (m) Dike cross section n°73 12 Elevation (m) 11 10 9 8 7 6 0 10 20 30 40 50 40 50 Distance (m) Dike cross section n°74 11 10.5 Elevation (m) 10 9.5 9 8.5 8 7.5 7 0 10 20 30 Distance (m) 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 59 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDIX 10: UNIT COSTS OF WORKS UNIT COST ESTIMATES Unit costs of civil works The following unit costs estimates are based on June 2008 economic conditions. The euro/RON exchange rate considered is 3,66 RON/€. Designation of the work Unit Unit Cost (RON) Unit Cost (€) EXCAVATION Tree cutting Tree uprooting unit unit m2 110 10 1,6 30 2,7 0,44 ha m3 5300 10 1448 2,7 Rehandling of materials and dumping on embankment m3 2,4 0,66 Rehandling of materials and transportation to waste area (distance < 10 km) m3 14 3,8 Trench Excavation m3 2,4 0,66 Trench Backfill m3 3,3 0,9 Ditch excavation m3 22 6,0 Preparation of foundations m2 1,4 0 Removal of loose and unsuitable foundation material m3 1,7 0 Earthfill placing on embankment m3 7,9 2 Wire mesh screen m2 15 4,1 Geogrid screen m2 50 14 Top soil cover on the slopes m2 3,5 1 Seeding of the top soil cover m2 0,9 0 Construction of road crest (crushed aggregates) m3 9,6 3 Supply of crushed aggregates Engineering fabric (filter under the aggregates) t m2 78 15 21 4 Supply of cobbles for gabions m3 89 24 Gabion boxes m3 260 71 Gabion mattress 0,3m thick m3 91 25 Bank slopes excavation prior to gabions placing m2 1,3 0,4 Engineering fabric (filter under the gabions) m3 15 4,1 Brush clearing Stripping (top soil removal) Open cut excavation EMBANKMENT BANK PROTECTION 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 60 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Designation of the work Unit Unit Cost (RON) Unit Cost (€) CONCRETE WORKS Blinding concrete m3 Structural Concrete m3 Steel Reinforcing bars Formwork (straight) kg m2 380 4,0 35 Formwork (curved) m2 59 16 ml ml ml ml ml ml 160 220 300 440 690 3900 44 60 82 120 189 1066 m2 m2 45 130 12.3 35.5 330 90 104 1,1 9,6 PIPES Concrete pipe, diameter 400 mm Concrete pipe, diameter 600 mm Concrete pipe, diameter 800 mm Concrete pipe, diameter 1 000 mm Concrete pipe, diameter 1 200 mm Manhole, diameter 1000 mm OTHERS Road demolition Road reconstruction Some unit costs (for instance tree cutting) are given here for memory as the corresponding quantities can not be assessed at this stage of the technical studies. These works will be included in the miscellaneous. Unit costs of equipment The following unit costs estimates are based on June 2008 economic conditions. The euro/RON exchange rate considered is 3,66 RON/€. Designation of the work Unit Unit Cost (RON) Unit Cost (€) Balustrade Gate 1,6 m ht x 2 m Trash rack ml u m2 915 100 000 1 300 250 27 322 355 Bulkhead (out of metal) m2 4 000 1 093 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 61 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDIX 11: AGGREGATED COST ESTIMATES AGGREGATED COST ESTIMATE FOR POLDERS On the basis of the detailed unit costs presented in annex 1, global costs have been computed. These aggregated costs, which are of much easier use for the present study than detailed costs, are: Embankment cost Weir cost Outlet cost Polder embankment aggregated cost The calculation of the embankment aggregated cost is based on the following assumptions, considering that the height of the embankment may vary: Crest width : 5 m Slopes : 3 / 1 Top soil depth : 0,3 m Wire mesh barrier against diging animals Gravel track for inspection and maintenance on top of crest Provision for some bad soil foundation removal and replacement Provision for miscellaneous 15% : way crossings, drainage outlets, etc. General costs 10%: installations, execution studies, etc. The following table gives the aggregated cost per meter cube of earthfill, with regards to the height of the embankment. Aggregated cost of embankment Embankment height above ground level (m) H=3m 14,2 €/m H = 3,5 m 3 13,4 €/m 3 H=4m 12,8 €/m H = 4,5 m 3 12,4 €/m 3 H=5m 12,0 €/m 3 Weir aggregated cost The calculation of the weir aggregated cost is based on the following assumptions, considering that the height of the embankment may vary: Crest width of embankment: 5 m Slopes of embankment: 3 / 1 Spillway made of concrete slabs and concrete guiding walls Concrete spillway basin and gabions mattresses for energy dissipation at the toe of the spillway Upstream embankment protection made of gabions mattresses 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 62 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Provision for miscellaneous: 15% General costs 10%: installations, execution studies, etc. The following table gives the aggregated cost per linear meter of spilling weir length, with regards to the height of the embankment. Aggregated cost of weir Embankment height above ground level (m) H=3m H = 3,5 m 5 900 €/ml 6 200 €/ml H=4m H = 4,5 m H=5m 6 500 €/ml 6 800 €/ml 7 100 €/ml Outlet aggregated cost The calculation of the outlet aggregated cost is based on the following assumptions, considering that the height of the embankment may vary, as well as the number of gated sluices according to the needs: Crest width of embankment : 5 m Slopes of embankment : 3 / 1 Outlet made of concrete culvert, with at least two sluices Typical gate : 1,6m ht x 2 m i.e 3,2 m2, with at least two gates Provision for miscellaneous 15% General costs 10%: installations, execution studies, etc. The following table gives the aggregated cost per square meter of outlet gate, with regards to the height of the embankment (the height of the embankment impacts longer sluices and guiding walls). Aggregated cost of outlet Embankment height above ground level (m) H=3m 22 800 €/m H = 3,5 m 2 24 700 €/m H=4m 2 26 100 €/m H = 4,5 m 2 28 600 €/m H=5m 2 30 300 €/m 2 AGGREGATED COST ESTIMATE FOR PROTECTION EMBANKMENT Protection embankments are more exposed to flow velocity than the polder embankments (except for the polder embankments settled along the stream banks). The calculation of the protection embankment aggregated cost is based on the following assumptions, considering that the height of the embankment may vary: Crest width : 4 m Slopes : 2,5 / 1 Top soil depth : 0,3 m Wire mesh barrier against digging animals Gravel track for inspection and maintenance on top of crest 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 63 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Provision for some bad soil foundation removal and replacement Provision for miscellaneous 15%: way crossings, drainage outlets, etc. General costs 10%: installations, execution studies, etc. The following table gives the aggregated cost per meter cube of earthfill, with regards to the height of the embankment. Aggregated cost of protection embankment Embankment height above ground level (m) H=2m 16,7 €/m H = 2,5 m 3 15,3 €/m 07536/A6-3-1-1 Final 3 H=3m 14,2 €/m H = 3,5 m 3 13,5 €/m 3 H=4m 12,9 €/m 3 SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 64 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO AGGREGATED COST ESTIMATE FOR CULVERTS On the basis of the detailed unit costs presented in annex 1, global costs have been computed. These aggregated costs, which are of much easier use for the present study than detailed costs, are: Culvert cost Road embankment cost Culvert aggregated cost The calculation of the culvert aggregated cost is based on the following assumptions, considering that the height of the embankment may vary: Platform crest width : 10 m Slopes : 3 / 1 Top soil depth : 0,3 m Basic size of concrete culvert : 2 m x 2 m u/s and d/s protection of floodplain with 0,3 m thick gabion mattresses Destruction and rebuilding of road structure Provision for miscellaneous: 15% General costs 10%: installations, execution studies, etc. The following table gives the aggregated cost per meter cube of earthfill, with regards to the height of the embankment. Aggregated cost of relief culvert Embankment height above ground level (m) number of culverts: 2mx2m H=3m H = 3,5 m H=4m H = 4,5 m H=5m 2 11 900 €/m 2 14 100 €/m 2 15 900 €/m 2 18 800 €/m 2 21 000 €/m 2 3 10 300 €/m 2 12 000 €/m 2 13 400 €/m 2 15 600 €/m 2 17 300 €/m 2 4 9 500 €/m 2 10 900 €/m 2 12 200 €/m 2 14 000 €/m 2 15 400 €/m 2 5 9 000 €/m 2 10 400 €/m 2 11 500 €/m 2 13 100 €/m 2 14 400 €/m 2 Road embankment aggregated cost The calculation of the embankment aggregated cost is based on the following assumptions, considering that the height of the embankment may vary: Embankment crest width : 10 m Slopes : 3 / 1 Top soil depth : 0,3 m Polyethylene mesh against erosion Destruction and rebuilding of road structure 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 65 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Provision for some bad soil foundation removal and replacement Provision for miscellaneous including way crossings The following table gives the aggregated cost per square meter cube of hydraulic cross-section, with regards to the number of culverts. Aggregated cost of road embankment Embankment height above ground level (m) H=3m 19,6 €/m H = 3,5 m 3 18,3 €/m 3 H=4m 17,2 €/m H = 4,5 m 3 16,4 €/m 3 H=5m 15,7 €/m 3 AGGREGATED COST ESTIMATE FOR MAJOR STREAMBED CROSS SECTION ENLARGEMENT On the basis of the detailed unit costs presented in Appendix 7, a global cost called enlargement cost have been computed. It includes stripping, excavation, re-handling and transportation to waste. It amounts to 9 €/m3. 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 66 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO AGGREGATED COST ESTIMATE FOR BANK PROTECTION The calculation of the bank protection aggregated cost is based on the following assumptions, considering that the height of the bank may vary: Protections made of a gabion wall Gabion mattress on toe to prevent erosion for height > 3 m Concrete cover on top Provision for miscellaneous 15% (temporary embankment protection of work area and water control during the works, etc.) General costs 10%: installations, execution studies, etc. The following table gives the aggregated cost per linear meter cube of bank protection, with regards to the height of the bank. Aggregated cost of bank protection Bank protection height (m) H=1m 160 €/ml H = 1.5 m 230 €/ml H=2 360 €/ml H=3m 710 €/ml H=4m 1070 €/ml In case of protection placed directly in the minor streambed below water level, an extra cost of 20% will be applied. 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 67 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDIX 12: GABION WALL CROSS-SECTIONS NB: on the figures, “Trotus” is indicated as to mention the river. The presented cross-section are typic cross-sections elaborated for the Trotus but identically applicable for the Siret. 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 68 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 69 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 70 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 71 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 72 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 73 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO APPENDIX 13 – LONG TERM INVESTMENT PLAN LIST OF INVESTMENTS ON THE RIVER BASIN SIRET The list of investments presented below has been aproved and provided to the Consultant by ANAR. The Consultant does not take any responsibility regarding the relevance of these projects and their implementation. LUCRARI IN DERULARE Nr. Nominalizarea pe obiective de investitii, dotari si alte cheltuieli de investitii Crt. 1 2 VALOAREA TOTALA (mii RON) INV/C+M Valoarea totala actualizata (mii RON) INV/C+M INV/C+M MII LEI Capacitati Termen P.I.F Canal magistral Siret Baragan, 769 708 968 44.3 km canal jud. Vrancea 709 623 573 2015 Amenajare rau Putna pe zona comunei Vanatori 4 293 4 670 dig=2.55km jud Vrancea 3 877 4 218 aparare de mal=0.524 km calibrare albie=0.524km 3 Amenajare rau Trotus si afluenti, 42 466 49 027 jud. Harghita 37 581 43 387 2015 13.275 km recalibrare albie 12.385 km aparare de mal 2015 (PHARE 2005-17) 4 Amenajare rau Tazlau si afluenti 60 111 69 399 11.075 km aparari de mal jud bacau 52 644 60 778 9.375 km dig 13.09 km recalibrare albie (PHARE 2005-17) 5 Amenajare rau Trotus si afluenti, pe tronson 614 420 651 654 Ghimes-Urechesti, 547 180 580 339 jud Bacau 2010 110.975 km recalibrare albie 101.175 km aparari de mal 309 buc praguri 2010 6 Amenajare parau Ramna in zona Taratu Dumbraveni 6 824 7 238 jud Vrancea (Siretul Inferior) 6 048 6 415 2.4 km consolidari mal 17 praguri de fund 2009 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 74 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO Valoare investitie Nr. DENUMIREA OBIECTIVULUI DE INVESTITIE Crt. INV/C+M LEI/EURO CAPACITATI ANUL 2008 Abandonare baraj si acumulare Belci, judetul Bacau 10000 -Refacerea barajului initial de acumulare in lac, V = 2,2 mil. mc. -Refacerea lacului de acumulare Belci ca o acumulare laterala in fostul lac,V = 2,2 mil.mc. 1 Faza: SPF -Abandonarea barajului si acumularii Belci si reconstructia ecologica a zonei ANUL 2009 2 Amenajare rau Rm. Sarat la Topliceni, judetul 3 781,58 -Regularizare albie, L = 1.080 m; 3 422,68 -Aparare de mal, L = 1.150 m. 15 279,24 -lucrari de indiguire, L = 12.000 m; 13 505,45 -amenajare albie, L= 8.600 m. Buzau 903,92 Faza:SF 818,15 S.C.Moldape S.R.L. Bacau 3 Amenajare rau Putna pe zona comunei Tifesti, jud. Vrancea Faza:SF 4 Amenajare rau Ramnicu Sarat la Buda, jud. 3 652,30 3 228,27 2 810,83 -consolidari maluri L = 1.090 m; 2 460,73 -calibrare albie minora L = 1.550 m. Buzau Faza : SF 671,885 Amenajare albie rau Trotus in zona municip. Adjud, jud. Vrancea 14 586,04 -aparare mal, L = 1.500m Faza: SF 13 356,24 -dig geocontainer, L = 2. 000 m 3 968,02 -regularizare albie, L = 4.000m. 8 976,90 -aparare mal, L = 2.000m 6 280,49 -recalibrare albie, L = 2.000m. 588,198 5 3 633,46 6 Amenajare parau Zabrauti la Fitonesti, jud. Vrancea Faza: SF 1 898,01 1 708,56 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 75 / 76 MINISTRY OF ENVIRONMENT C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T STR ATE GY – EUROPE AI D/123064/D/SER/RO 7 Regularizare parau Slimnic la Tamboiesti, jud. 2 598,18 -aparare mal, L = 500m 2 296,72 -recalibrare albie, L = 1.000m. Vrancea Faza: SF 706,82 624,8 07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 76 / 76
Similar documents
lucrari hidrotehnice in administrarea a.b.a siret_2012
Functiunea principala: atenuare viituri Clasa de importanţă: a III-a, conform STAS 4273/81 Categoria de importanţă: normalã C - indice de risc asociat RB = 0,19. Administrator: S.G.A. SUCEAVA
More information