COMPANY PROFILE

Transcription

COMPANY PROFILE
CO MPA N Y PRO FI LE
COMPANY PROFILE
INDEX
Letter from the owner – founder
3
Mission – Vision – Values
4
Services
5
Quality Control
6
Our Team
7
Categories
11
Projects
13 - 29
LETTER FROM THE
OWNER
You have to believe in failures
and doubts as you believe in
ambitions and success, these are
the greatest lessons in life.
Pascal Shedid
Founder / Managing Director
Greetings
It is a tremendous honor and a privilege for me to
introduce to you ACCESS PRO and our stream of
services and accomplishments….
ACCESS PRO in Kuwait took the industry by storm
in 2011 as single-source contractors offering a
specialized set of multiple constricting facilities.
Mounting its expertise and portfolio ever since,
ACCESS PRO successfully managed to convey
over (96) different projects with the maximum
client gratification.
ACCESS PRO’s workers PROmise to focus
on superior details and the finishing quality
PROvision. In achieving highly challenging, exotic
concepts and market-leading ideas, our firm
managed to become the specialists in PROmoting
the excellence and most PROfessional contracting
company in the broad field that ensures a
full concentration among PROviding the most
pioneering turnkey contracting solutions.
ACCESS PRO delivers only when PROduction
exceeds client expectations in terms of budget,
time frame, schedule, communication, and
customer satisfaction.
Now the stage’s been set for your open mind
to experience an entirely new world of infinite
possibilities.
3
MISSION
To deliver only when production exceeds
client expectations in terms of quality, budget
optimization, time frame and customer service,
taking into account our corporate social
responsibility when it comes to safety and
environment in every project.
VISION
To maintain company status as specialists and
market leaders who promise inventive turnkey
solutions with maximum quality and costeffectiveness.
VALUES
Operate with full accountability, integrity,
transparency and discipline, ethically applying
that to all sorts of professional relationships
within every operation - being it client-business or
business-employee.
Commitment to quality control is realized
only through regular attentive monitoring and
systematic implementations covered by AccessPro.
SERVICES
Our core expertise covers a wide range of
contracting jobs with cost-effective turnkey solutions,
complimented by a set of additional particular
services within the sector:
•Commercial interior fit-out (CIF); for your brand
to have the perfect showroom as (Restaurants,
Coffeeshops, Offices, Beauty Salons and Sports
Wear Shops)
•Complete fit-out interior contracting tasks
•Full turnkey solution to any given design
•Mechanical Work
•All Kinds of DVY wall
•Carpet
•Painter
•Fabrication of all kinds of woods mechanisms
•Electrical and lightning works
•Signage and advertising products
5
QUALITY CONTROL
OUR TEAM
Our quality control is based on regular observant
monitoring and systematic operations. Therefore
our commitment is well achieved and organized
by our estimators, production managers and
safety directors.
To establish the project successfully we arrange
for a regular pre-fabrication meeting, to have an
enhanced coordination and alignments of vision
and to follow up with the sequenced phases of
work with our clients. However this will keep our
clients persistently involved in every detail during
the execution of their PROjects.
The ACCESS PRO team is consisted of highly qualified
oriented experts. Every aspect of your project - from
concept to commissioning - will be led by a dedicated
PROfessional utilizing group that has vast experiences
of staff members to execute projects of all missions
Actual production costs are closely monitored to ensure
full value for your money and on time delivery.
Access PRO’s crew will constantly posit, test
and implement multiple facets to start the job,
Inconsideration of potential value factor costs,
aesthetics, ethics, delivery, stability, maintenance,
energy and conveniences, space utilization and
adaptation to meet with our client’s valued
requirements and agreements.
7
ACCESS PRO OFFICE 9
RESTAURANTS
1
PROJECTS
Cake N Bake Regea
Cake N Bake Mahboula
Hardeez Baskin Robins Dajeej
Living Colors
Weekend Marina Mall
Clucksters
KFC Dajeej
OR Bakery
Diet Center
Oval
Bo Tambah
Zuma
Kunefis
Peanut House
Salsan
Seven Heaven
Miss chocolate
Container
Dip N Dip
Hardeez Selayel Mall
TGI Avenues
Horouf
TGI Arabella
Hardeez Tikka Baskin Robins Adaileya
Olive Garden
KFC Khitan Mall
Cake N Bake Discovery Mall
Cup café
Curry House
Dragon Express
Snowbiz
Altro Level
Lebanese House
KFC Khitan
2
OFFICES
Al Anbaa News Paper
Al Shayea Trading
Food Choice
OR Bakery
Americana IT Department
OSAKA Company
Boshahri Group
HOSPITALITY
3
Abo Misheal Complex
Curves Discovery Mall
Gardenia Nail Spa
Curves Bairaq Mall
Curves Jabriiya
Rotana Manshar Hotel
4
RETAIL &
SHOWROOM
New Horizon
Scholl Avenues
Adidas Avenues
Adidas Hamra Mall
Scholl Salmiya
Comtech Redlines
Baloony Land
Future kid Al Ray
Future kid Kaifan
Pitman Training Center
Top Kitchen
Trade Zoom
Sport Corners
Maridian Exchange
Scholl Hawalli
Mohamed Al Hajery & Sons.
11
TGI FRIDAY’S
The TGI project in Arabella Mall built in 2015,
was a total of 430sqm and constructed in 60 days.
The challenge in building this project was the
combination of Light and wood.
RESTAURANTS 13
KFC
HARDEES BASKIN ROBBINS
The KFC project in Dajeej- Dalal Mall –built
in 2015, was a total of 220sqm and constructed in
45 days. The challenge was to work on the
changing of design concept within the agreed
period without any delay.
The Hardee’s – Baskin Robbins project in Dajeej –
Dalal Mall built in 2015, was a total of 220sqm and
constructed in 45 days. The challenge in building this
project and finish it within the short timetable was the
right terms of finishing and building.
RESTAURANTS 15
CONTAINER 75
The Container 75project in Abu Halaifa –
The C View Mall built in 2014, was a total
of 220sqm and constructed in 60 days. The
challenge was to deal with solid materials
and to use all accessories with lueafing and
handmade materials
RESTAURANTS 17
OLIVE GARDEN
RESTAURANTS 19
th
7 HEAVEN
CAFÉ
The 7th Heaven Café project in Kuwait City –
Mubarakiya built in 2014, was a total of 70sqm
and constructed in 45 days. The challenge was to
mix many materials with different sizes with the
right application and finishing.
DIP N DIP
The Dip N Dip project in Eqaila – The Gate Mall built
in 2014, was a total of 260sqm and constructed in
45 days. The challenge was building this project
and finishing it within the short timetable with
right terms of finishing. We were aiming for the
building to look nicer than the 3D design.
RESTAURANTS 21
OR NOYA
The OR Noya project in Sharq – Jassem Tower built
in 2013, was a total of 350sqm (280sqm Central
Kitchen and 70sqm showroom) and constructed in
60 days. The challenge was to deal with natural
materials as block wall and concrete.
RESTAURANTS 23
OFFICES 25
AL ANBAA
NEWSPAPER
HEAD OFFICES
Al Anba Newspaper Head Offices project in AlShuwaikh area.
Built between 2012 to 2013 with a total of 3 Floors
divided into 12 departments, was constructed in
One year. The challenge was to build offices with
the proper finishing and as agreed.
OFFICES 27
FOOD CHOICE
The Food Choice project in Al Ardiya area –built
in 2012, was a total of 250sqm and constructed in
60 days. The challenge was building this project
Assembling and installing different sizes of floor
tiles in the Food Choice office, and the color
contrast in the wooden paint.
OFFICES 29
GARDENIA
The Gardenia project in Abu Elhasaniya – Divonne
Mall built in 2013, was a total of 110sqm and
constructed in 60 days. The challenge was to build
the project in colloguing wise, and all material
items were made by Access pro team.
RETAIL & SHOWROOM 31
ADIDAS
The Adidas project in Al Hamra Mall –built in
2012, was a total of 434sqm and constructed in
60 days. The challenge was to fix the fabricated
wall fixture in the right places.
32
RETAIL & SHOWROOM