commuter SyStem
Transcription
commuter SyStem
South Africa Commuter System Gautrain Rapid Rail Link Bombardier Transportation, as a member of the Bombela Consortium, provided the impressive 80 km rapid rail transit system that connects Johannesburg, Tshwane (Pretoria) and the OR Tambo International Airport in South Africa. In a contract awarded in 2006, Bombardier was Gautrain Rapid Rail Link station platform responsible for the design and supply of the core electrical and mechanical systems, including a fleet of vehicles, of which most underwent final assembly in 96 BOMBARDIER* ELECTROSTAR* vehicles, and is now South Africa, were designed for commuter operation providing 15 years of maintenance services. and are capable of speeds of up to 160 km/h. The commuter system features the BOMBARDIER* The project was a Public Private Partnership, consisting CITYFLO* 250 train control technology, well proven on of financing, designing, building and operations and transportation systems in Europe. The ELECTROSTAR maintenance of the Gautrain Rapid Rail Link. Transportation Systems 3,774 mm 2,800 mm Project Schedule Notice to proceed (NTP) September 2006 Vehicle fleet 24 (4-car trains) Construction start September 2006 Train control CITYFLO 250 Signalling & ATP First vehicle delivery July 2008 (Derby) System design capacity (@ Year 15) December 2008 (on site) • Hatfield to Johannesburg 4,284 pphpd • Rhodesfield to Sandton 2,757 pphpd Last vehicle delivery December 2010 In service June 2010 Major Subsystems • Airport Service OR Tambo to Sandton 660 pphpd Maximum grade 4% Average line speed 160 km/h Length underground tunnel 20 km Vehicle Electrostar Electric Multiple Unit Length at grade 44 km Signalling CITYFLO 250 Length elevated 13 km Power supply 25 kV AC Intermodal connections Bus network Power collection Overhead catenary distribution system Fixed Facilities (rigid conductor bar in tunnel) Guideway types Underground, at grade, elevated Traction power substations 1 main substation and Switches Mainline #12 and #18.5 with 5 auto paralleling transformer moveable point depot #9 with substations fixed point Communications Fibre-optic ring, SCADA, CCTV, Number of stations 10 PA/PI, ETEL, PABX, Closed Circuit Television (CCTV), Average station spacing 8 km 2 cameras per car, recording Platform length 165 m to on-board system Station “accessibility” provisions Station elevators, ramps System Description System type Intercity Rapid Rail Link System length 80 km (dual track) Number of lines Two (one commuter service from Hatfield-Pretoria to Johannesburg, and one mixed commuter-airport service from OR Tambo Airport to Sandton) Maintenance building location North of the intersection between Midrand and Malboro stations on the west side of the alignment Maintenance workshop building size 7001 m² Yard operation Manual with ATP protection Yard storage capacity Dual, electrified and shunter 21,593.5 mm Vehicle Data Type of vehicle Electrostar Quantity ordered 96 vehicles Train consist 4 vehicles Dimensions and Weight Train length (over body ends) 83,167 mm Overall width 2,800 mm Overall height (top of rail to top car) 3,774 mm Top of rail to floor 1,148 mm Doorway width (side doors) 1,300 mm Doorway height (side doors) 1,900 mm Floor to ceiling height 2,100 mm Wheel diameter (new) 840 mm Bogie wheelbase 2,600 mm Train weight (tare) 177,700 kg Technical Characteristics Primary power 25k Vac Auxiliary power supply 400 Vac Low-voltage power supply 110 Vdc Propulsion traction Water cooled VVVF asynchronous Service braking Friction disc brakes with blended pneumatic and regenerative braking Carbody Semi-monocoque aluminium Parking brakes Spring applied, air release park brake units Emergency brakes Pneumatic Side windows Mechanically fixed double glazed with hoppers for emergency ventilation Doors (per car) 2 pairs plug sliders, electrically operated Air-conditioning (per car) 2 roof mounted HVAC units Performance and Capacity Maximum acceleration rate (service) 1.0 m/s² Maximum braking rate (service) 1.0 m/s² Maximum braking rate (emergency) 1.3 m/s² Maximum operating speed 160 km/h Maximum passenger capacity (a) Commuter trains - seated 282 - total (seated and standing) 638 (b) Airport trains - seated 240 - total (seated and standing) 590 South Africa Project scope TSHWANE Hatfield Pretoria Station In addition to the manufacture and supply of 96 Electrostar vehicles, Bombardier, in conjunction with its Broad Based Black Economic Empowerment partners, has been responsible for: • CITYFLO 250 automatic train control technology • Power supply and distribution systems • Communications systems Centurion • Automatic fare collection • Trackwork and maintenance equipment • Project management • Systems engineering and integration • Testing and commissioning • Workshop equipment • 15 years of maintenance services Midrand Depot The Bombela Consortium shareholders comprise: • Bombardier Transportation • French civil contractor Bouygues Travaux Publics Marlboro • South African civil contractor Murray & Roberts Sandton Rhodesfield Rosebank OR Tambo International Airport • J&J Group - South African broad-based investment holding and management company • Strategic Partners Group (SPG), which is a group of several South African Broad Based Black Economic Empowerment companies Park Station JOHANNESBURG The civil contractors were responsible for all of the civil works, including tunnels, stations and the maintenance depot. RATP Développement is responsible for providing 15 years of operations. Bombardier Transportation Schöneberger Ufer 1 10785 Berlin, Germany Tel +49 30 98607 0 Fax +49 30 98607 2000 www.bombardier.com * Trademark(s) of Bombardier Inc. or its subsidiaries. © 2014, Bombardier Inc. or its subsidiaries. All rights reserved/11459/SYS/12-2014/en • Training and manuals
Similar documents
Bombardier standard presentation
TRAXX low diesel consumption multi-engine locomotive (Germany, 2014) Battery assisted propulsion for TRAXX locomotives (Last Mile Locomotives, Germany, 2014)
More informationAdvanced Signalling Solutions
From high density mass transit systems to long distance and high speed passenger and freight operations, and cross-border solutions to advanced rapid transit systems, Bombardier’s highly proven rai...
More information