Case Study - Space Engineering Services

Transcription

Case Study - Space Engineering Services
Case Study
Tesco Dęblin, Poland
Services: Turnkey Refrigeration
Project Overview
Our Solution
Space Engineering Services has been operational in Europe for several
Based on our proven
experience in the UK and
Europe for delivering quality
and innovative refrigeration
services, Tesco Polska selected
Space Engineering Services to
deliver the complete
refrigeration package to the
Dęblin store.
years, and included in this expansion outside the UK has been their
operations in Poland.
Established in Warsaw, Space Engineering Services has delivered their first
turnkey refrigeration package to Tesco Polska which employs 28,000 people
across its portfolio of 431 stores.
Space Engineering Services has supported the opening of a new Tesco store in
the small town of Dęblin, home of the Polish Air Force Academy, 99km south
east of the capital Warsaw.
The Polish market is Tesco Polska’s largest in Central Europe. With only two
major supermarket chains located in Dęblin along with other smaller
This included the design, plant
manufacture, cabinet supply,
installation, and commissioning
of the refrigeration systems.
independent stores, the opening of the new store presents an opportunity for
Tesco Polska to become the leading supermarket retailer and provide greater
consumer choice to the local community when purchasing food items.
Our UK and European
manufacturing specialists and
design team delivered the
design elements for the project
and refrigeration plant,
including the specification of
the condenser and evaporators
for the cold rooms.
Client: Tesco Dęblin, Poland
Services: Turnkey Refrigeration
Services Delivered
Space Engineering Services delivered the following services to the Tesco Dęblin store:
• Refrigeration design service
• Plant design, specification
and manufacture
• Supply and installation of
multi-deck display cabinets
• Installation of plug in deli counters
• Commissioning of chiller and
freezer cold rooms
• Installation and commissioning of
refrigeration plant
Challenges Faced
initially suitable for this type of installation. Our European
design team fabricated alterations to deal with the
complexity of the roof and worked with the steel
contractor to implement these modifications. The intricacy
of the roof was also a significant consideration in the design
and manufacture of the refrigeration plant.
At Space Engineering Services we are experienced at
overcoming challenges, ensuring projects are delivered
on-time, on budget and to our customers’ expectations.
The Dęblin store presented its own unique challenges, from
design adjustments to extreme weather conditions.
The refrigeration plant and condenser were positioned on
the roof of the Dęblin store, however, the roof was not
The Polish winter weather and strong winds also made
the positioning of the roof top refrigeration system more
problematic. Manoeuvring large and heavy equipment at
high altitudes in these wintry conditions can often cause
project delays of up to five days. The installation team
had to hire a 60ft crane from a supplier 25km away to
successfully position the plant in the centre of the roof.
Despite these challenges, the project was completed two
days ahead of schedule and the store opened to customers
on 13th December 2012.
Refrigeration Experience
The successful completion of this project demonstrates Space Engineering Services’ expertise in delivering turnkey
refrigeration packages to clients across Europe.
For further information on how Space Engineering Services
can help your business, please contact:
0845 602 0670
Email enquiries@space-engineering.co.uk
Visit www.space-engineering.co.uk
Understand. Innovate. Deliver.
Visit space-engineering.co.uk
Call us 0845 602 0670