GMMOS High-End Steel Fabrication
Transcription
GMMOS High-End Steel Fabrication
PREQUALIFICATION Gulf Marine Maintenance & Offshore Service Company – Dubai – L.L.C. Page 1 Edited: July 17, 2012 PREQUALIFICATION DOCUMENT Gentlemen, I would like to take this opportunity of presenting GULF MARINE MAINTENANCE & OFFSHORE SERVICE COMPANY (GMMOS) through our Pre-Qualification Document. This document outlines GMMOS' capabilities as a General Offshore Contracting Company in the fields of fabrication, offshore hook-up and maintenance. The base of our operations is located in Dubai and work is carried out on Projects throughout the U.A.E. GMMOS' Fabrication Yard is one of the most active in the region, catering to oil companies in the Red Sea, Persian Gulf and India. Moreover, GMMOS' fabrication department is holding the Certificate of Authorization from ASME to design and manufacture pressure vessels. GMMOS Engineering & Estimation department provides engineering services that begin at the initial discussion stage through to the final design. During the bidding stage, the Engineers perform the estimating, design calculations, prepare the design drawings and material take-offs while also using the latest Auto Cad design packages to produce the optimum design which can ultimately save you, the customer, valuable time and money. GMMOS Engineers and Draftsmen have a diversified experience in Marine, Structural and Mechanical projects which form the backbone of the Fabrication & Ship Repair Division and together become actively involved to give the best service possible to the client. The GMMOS group has a workforce of over 500 skilled personnel plus a full complement of equipment and machinery that makes it possible for GMMOS to meet the stringent needs and demands of our clients. We trust you will find the above information of interest and look forward to working with your company in the future. Please contact us if you require additional information, or if you have any specific queries regarding this presentation. Yours sincerely, Gulf Marine Maintenance & Offshore Service Company-Dubai-L.L.C. Mag. Dr. Michael R. Rannacher Executive Vice President Page 2 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT INDEX Section 1 Introduction Section 2 GMMOS Profile Section 3 Organization Key Managers Section 4 Engineering Design & QA/QC Capability Section 5 Resources Section 6 Equipment Lists Section 7 Partial Client Lists Section 8 GMMOS Fabrication, Maintenance & Refurbishment Experiences - Structural Fabrication Piping Fabrication SPM Refurbishment Experience Fabrication of Pressure Vessels & Skid Packages Section 9 Certificates of Authorization Section 10 GMMOS Photo Gallery Page 3 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT CONTENTS Section 1 Introduction – GMMOS Dubai LLC Page 4 Introduction – GMMOS Kazakhstan Section 2 GMMOS Dubai LLC Profile 5 Section 3 Organization & Management 10 GMMOS Organization Chart 11 Section 4 Mechanical Design & AutoCAD Drafting Capability 12 Quality Assurance & Quality Control Capability 13 Section 5 Resources 14 Section 6 Partial Equipment List 16 Section 7 Partial Client Lists Section 8 GMMOS Fabrication Experiences x Structural Fabrication x Piping Fabrication x SBM Refurbishment & SPM Projects x Flare Stacks & Heaters x Fabrication of Pressure Vessels Section 9 Certificates of Authorization Section 10 Page 4 Revised: July 17, 2012 18 19 - 21 22 23 - 25 26 - 28 29 PREQUALIFICATION DOCUMENT GMMOS Photos Gallery Page 5 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT Section 1: 1. Introduction Background Information 1.1 Gulf Marine Maintenance & Offshore Service Company Dubai LLC (GMMOS) has been established since 1981 in Dubai, United Arab Emirates under our main Commercial License No. 200154 with license activities to Oil & Natural Gas Well Equipment Repairing & Maintenance; Ship & Boats Maintenance Services; Steel & Basic Steel Products Trading; Paint & Varnish Trading; Ship & Boats Spare Parts & Components Trading; Marine Equipment & Engine Repairing & Maintenance, Ship Charter. GMMOS Industrial License activities include Tank Manufacturing; Oil & Gas Fields Equipment Manufacturing & Structural Steel Manufacturing. 1.2 The subsidiaries companies of GMMOS are: Name Place of Formation Gulf Marine Maintenance & Offshore Service Company – Dubai -L.L.C. Dubai GMMOS Kazakhstan L. L. C. Aktau Gulf Marine Maintenance & Offshore Service Company – WLL 1.3 Abu Dhabi Affiliated Sister Company – GMMOS Kazakhstan Principal Activities of GMMOS – Kazakhstan L. L. C. Provides the following services to the Oil and Gas Industry: x Engineering, Procurement & Fabrication and Refurbishment of Pressure Vessels, Process Skids and Process Piping Page 6 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT Section 2: 1.0 GMMOS Dubai L. L. C. Manufacturing & Fabrication: Gulf Marine Maintenance & Offshore Service Company Dubai (GMMOS) has been manufacturing pressure vessels up to 115mm Thickness since 2003. The recent acquisition of a Hugh Smith 3000 Ton Roll Bending Machine allows for the fabrication of vessels up to 150mm Thickness. Our new premises at Parcel Lot No. 599-733, Jebel Ali Industrial Area 1, Dubai, are fully functional with amenities for both the administration and manufacturing services. The new location is operating under the same management and procedures as at the previous location. The yard and equipment have been significantly augmented with new cranes and production equipment. GMMOS fabrication department holds the Certificate of Authorization from ASME to design and manufacture pressure vessels (U & U2 Stamp), fabrication and assembly of pressure piping (PP Stamp), fabrication and assembly of power boilers (S - Stamp) and National Board “R” Stamp for repair and/or alterations. We have “NB” Mark Authorization to register Boilers, Pressure Vessels, or other Pressure retaining items with the National Board. GMMOS holds a Certificate of API 2B Monogram for fabrication of Structural Steel Pipe. Our Quality System is ISO 9001-2008 compliant. Page 7 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT A) Specialized Services: 1) Yard Facilities The GMMOS yard is extremely well designed, equipped, built after detailed planning to meet wide range of high end fabrication requirement specially for Oil & Gas applications. Fabrication and manufacture pressure vessels, pipe spooling and general fabrication for offshore and onshore oil & gas equipments, skid packages, jackets, risers, conductors and various jacket components. Scrubbers KO Drums Filters Fabrication of Spools Air Drying Unit Anchor Piles Dearators Cladding – Various Pressure Vessels Surge Tanks Chemical Injection Package Pig Launchers and Receivers Metering Skid Packages Manifold Skids Burner Booms Fired Heaters Flare Stacks Skid Mounted Packages (Glycol Dehydration Package, TEG Package, MEG Package, Separators Package, Desalters, Vapor Recovery, Spud Cans Jack Up Legs Materials used for manufacturing pressure vessels are: Materials Carbon Steel Stainless Steel Clad Materials Thickness Range Min 5 mm – Max 150 mm Min 5 mm – Max 100 mm 15 + 3 mm to 90 + 3 mm Materials used for manufacturing of Structural (i.e. Pipe Racks & Skid Manifolds etc.) & Spools are: Materials Carbon Steel, Stainless Steel, Alloy Steel, Copper Nickel, Duplex/Super Duplex Inconel, Hastelloy, Monel, 904L, 254 SMO Page 8 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT 2) Engineering Design & Drafting GMMOS has in-house engineering, design and drafting division based in Mumbai and Dubai which is well established. The GMMOS division provides wide range of facilities customized to specific client requirements and equipped with latest software’s and trained manpower. GMMOS provides pressure vessel design and drafting facilities from initial concept to final design. The company is equipped with the latest CAD Software enabling it to tailor client designs on line. 3) Onshore & Offshore Manpower Services GMMOS supplies manpower and equipment services for onshore and offshore to Dubai Petroleum Company for nearly three (3) decades. This includes sandblasters, painters, welders, fabricators, pipe fitters, riggers, carpenters, electricians, clerks, and warehouse and yard personnel for short or long-term service contracts. Page 9 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT Section 2: GMMOS Dubai Jebel Ali Yard Plant Manufacturing Facilities – GMMOS Jebel Ali U AnnualProductionCapacity YardAreas U TotalYardArea Length (Meter) 9,000Tons Width (Meter) Area (M²) Area (SqFt.) 223.0 150.0 33450 360,052.80 U FabricationBay#1(OpenBothEnds) 90 23.4 2106 22,668.80 U FabricationBay#2(OpenOneEnd) 40 23.4 936 10,075.02 U FabricationBay#3(OpenOneEnd) 50 23.4 1170 12,593.78 U FabricationBay#4(2Doors3MWidex5MHigh) 42 10.0 420 4,520.00 U StoresBay#5(1Door3MWidex5MHigh) 30 10.0 300 3,229.00 U GantryCraneBay(Uncovered) 90 12.5 1125 12,109.00 U BlastingShop(6Mx6MDoorsBothEnds) 30 14 420 4,520.00 U PaintingShop(6Mx6MDoorsBothEnds) 34 14 476 5,123.00 U PaintingHardStandingArea(Uncovered) 40 14 560 6,027.79 U PWHTFurnaceArea(LengthAdjustabletoSuit) 5.5MWidex5.0MHighx34MLong U RadiographyBunker(Uncovered) 23 30 690 7,427.98 U PressureTestArea(Uncovered) 25 25 625 67,27.44 U Pipe&PlateStorageArea(Uncovered) 25 30 750 8,072.93 23,872 256,956.10 U OpenFabricationArea(Uncovered) U PressureTestingEquipment 15000PSIG U PowerSupply 3000KVA U Parking 56Spaces 1x10Meters,1x20Meters 1650M² 17,760.45 U AccessGates U Offices/Building Page 10 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT Page 11 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT Section 2: 1) Financial Mashreq Bank PSC P.O. Box 2469, Dubai, U.A.E. USD Account No. 0448477512 Account of Gulf Marine & Offshore Service Company Dubai LLC Swift Code: BOMLAEAD 2) Lloyds TSB Bank PLC, Dubai USD Account No. 60600756222301 Ultimate Beneficiary: Gulf Marine & Offshore Service Company Dubai LLC Swift Code: LOYD AEAD Page 12 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT Section 3: Organization & Management GMMOS GROUP CORPORATE OFFICE Vikram Naik Praman Naik Michael Rannacher Sameer P. Sharma : : : : President & CEO Managing Director Executive Vice President Chief Financial Officer Gulf Marine Maintenance & Offshore Service Company Dubai LLC – Operating Company Management Johann Stangl Natrajan Ponuswamy Bashir Akilesh Tiwari T.K.SreeRanganath Syed Aqeel Muthalugu Alagapan Henson D’Souza Marian Sirbu Albino Henson D’Souza Gabawan Sudhir & Jeniel Maligmat Logistics & Stores Supervisor Vinod Kumar Page 13 Revised: July 17, 2012 : : : : : : : : : : : : Operations Manager QA/QC Manager HR & Admin Manager Purchasing Dept. Head Estimation Dept. Head Project Manager Design Engineering Dept. Head Drafting - Supervisor Yard Superintendent HSE Manager Drafting - Supervisor Yard General Foreman : NACE II Painting Inspectors : : Helmi Fares IT Manager Section 3: Page 14 Edited: July 17, 2012 Organizational Chart PREQUALIFICATION DOCUMENT Section 4: Mechanical Design and AutoCAD Drafting Capability Detailed Engineering involving design calculations and shop fabrication drawings of static mechanical equipments viz pressure vessels, process columns and reactors, skid mounted packages etc. is our area of specialization. A team of qualified and experienced engineers and draughtsman can produce quality design documents that meet the requirements of international codes, specifications, standards and design practices. International design codes frequently used by us are ASME Section VIII Division 1, Division 2 ASME Section I, PD 5500, ASME B 31.3, 31.4, 31.8, etc. Accreditation to the following ASME stamps is available U, U2, R, S and PP. Indian Design codes commonly used by us are IBR, ISO-R-831, SMPV, IS-875 (Pt3), IS-1893, etc. The specifications, standards and design practices frequently used by us are those of ARAMCO, SHELL, BECHTEL, TECHNIP, FLUOR DANIEL, SNAMPROGETTI, BROWN, FOSTER WHEELER, CHIYODA, ETC. The materials used are conforming to ASME Section II Parts A, B, C, D, ASTM, DIN, JIS, AISI, IS, API, etc. The following software’s is utilized for design: a. P. V. Elite b. Finglow, c. Advanced Pressure Vessels d. Stad III, e. Caesar II f. Cadworx Pipe All the drawings we produce are in AutoCAD Release 2005. E-mail and Internet facilities available in house enable electronic transmission of documents. Page 15 Edited: July 17, 2012 PREQUALIFICATION DOCUMENT Section 4: Quality Assurance & Quality Control Capability 1.0 GMMOS QA System is documented and implemented against QA Standards ISO 9001-2000, accredited by internationally recognized body ABS Quality Evaluations Inc. 2.0 Our company is authorized to apply ASME Code Stamp(s) U, U2, S, PP & R Stamp and API Monogram Spec 2 B. 3.0 Our Quality Plans and Work Instruction is being used as controlling documents on the shop floor and routinely used for the compliance with specification and quality plan requirements. 4.0 GMMOS is a member of the following manufacturers associations: i) ii) iii) American Society of Mechanical Engineers (ASME) The National Board of Boiler & Pressure Vessel Inspections American Petroleum Institute 5.0 We permit our clients to carry out QA Audit during order execution. 6.0 Sub suppliers and sub contractors are assessed for approval and selection by performance and product evaluation. 7.0 Procurement of materials is in accordance with client’s specification and requirements. 8.0 We have specialized in-house facilities for ring groove, pipe bore cladding, cladding, SAW and Electroslag for welding and fabrication along with other welding process like SMAW, FCAW, GMAW, GTAW. 9.0 Weld Procedures and Welder Qualifications generally performed under the surveillance of a recognized independent inspectorate. 10.0 Standard Procedures and Welders are qualified through ASME IX, AWS D1.1, EN 287 Code. Page 16 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT Section 5: Resources NumbersofManpowerResourcesforthefollowingcategoriesemployedbyGMMOS: AdministrationStaff(i.e.CEO,GM,Accounts,HumanResources,Secretaries,Drivers, Clerks,SecurityGuards,DataEntryClerks AssistantGeneralManager Estimators ProjectEngineers DesignEngineers Draftsman BillofMaterialsEngineers QA/QCEngineers QA/QCInspectors NDTTechnicians QA/QCDocumentControllers MaterialTraceability SafetyManager SafetyOfficer Yard&ShopSuperintendent GeneralForeman Foreman&LeadmanWelding Foreman&LeadmanStructuralFabrication Foreman&LeadmanPressureVesselFabrication Foreman&LeadmanPiping Foreman&LeadmanBlast&Paint PaintInspector&Supervisor QualifiedWelders Fabricators PipeFitters Painters&Blasters Blaster&PaintersDPESupply Riggers PurchasingOfficers&Buyers Port,Custom,TransportationLogisticsOfficer MaterialCoordinator,Warehousemen&Clerks Electricians Mechanics ForkliftOperators CraneOperators 40 1 4 6 2 8 2 3 4 4 4 5 1 2 1 1 8 8 8 4 2 2 146 110+ 40+ 30+ 60 30+ 3 2 6 4 5 3 3 N. B. Arrangements can be made for either skilled or unskilled labour to be engaged to meet the requirement of the clients. Page 17 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT List of Information Systems We have a client/server setup using Windows Server 2003, with over 4 Dell Servers for Data, Exchange, Proxy, Web and Anti Virus 100 Workstations 15 Network Printers 30 Local Printers Servers are less than 2 years old with Intel Dual Xeon Processors (2.66 Ghz+) List Of Engineering Application Software Used: Software Available Software Developer Name/Description Version PV-elite Coade Till 2010 Code Calc Coade Till 2010 Nozzle Pro Paulin Research Groups 2009 Finglow Finglow 2008 STADD Pro Bently Systems V8i CAD Worx AutoDesk 2009 Auto CAD AutoDesk 2007 Usage Design Of Pressure Vessels, Columns And Heat Exchangers Individual Pressure/Non-Pressure Load Bearing Components Design. Finite Element Analysis For Nozzles, External Attachments And Saddles Of Various Configurations Design Of Pressure Vessels, Columns And Heat Exchangers Structural Analysis And Design 3D Modeling Of Pressure Vessels, Heat Exchangers And Skid Mounted Packages Including Piping, Structural’s And Isometric Drawing Generations. Preparation Of 2D Drawings For Various Systems, Equipments And Components PROFESSIONAL BASIC USER SUPPORT WINDOWS XP PROFESSIONAL, OFFICE 2003, ACROBAT FILE SERVER, WEB SERVER, EXCHANGER SERVER, PROXY, MAIN SCANNER, NETWORK SHARE, NETWORK PRINTER ETC. – HARDWARE USED PENTIUM 4 (3.60 GHZ TO QUAD CORE 2.66 GHZ) RAM 2 GB MS – 2GB HDD40 -160 GB – SYSTEM USED END USER MACHINES WINDOWS SERVER 2003, EXCHANGE 2003, GFI MAIL SECURITY, SYMANTEC ANTI VIRUS WITH ANTI SPYWARE – BACKEND SERVER SUPPORT 2.8 GHZ DUAL XEON PROCESSOR SERVERS WITH 200 GB INTERNAL & 20DGB EXT STORAGE & EXTERNAL FIREWALL (NET SCREEN) – HARDWARE USED JUNIPER NETSCREENS + FIREWALL & MCAFEE ENTERPRISE ANTI VIRUS Page 18 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT Section 6: Partial Yard Equipment Lists: Yard Cranes Fabrication Bay #1 2 x 10 Tons (7M To Hook) 2 x 1.5 Tons JIB Fabrication Bay #2 1 x 10 Tons (7M To Hook) Fabrication Bay #3 1 x 10 Tons (7M To Hook) Fabrication Bay #4 1 x 7.5 Tons (5M To Hook) Stores Bay #5 1 x 3Ton High reach Fork Lift Gantry Crane Bay #6 1 x 5 Ton Gantry Crane 4M to Hook Blasting Shop 100 Ton Bogey on Rail Track Painting Shop 100 Ton Bogey on Rail Track Paint Hard Standing Area 100 Ton Bogey on Rail Track PWHT Furnace Area Open Fabrication Area Lifting Equipment Radiographic Bunker Open Fabrication Area Lifting Equipment Pressure Test Area Open Fabrication Area Lifting Equipment Pipe & Plate Storage Area Open Fabrication Area Lifting Equipment Open Fabrication Area 1 x 250 Ton FMC Crawler 1 x 80 Ton Kobelco Crawler 2 x 25 Ton Mobile 2 x 7.5 Ton Fork Lift 1 x 3.0 Ton Forklift Additional Equipment List: (Attached) Page 19 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT HUGH SMITH 3000 TONNE VERTICAL BENDER CAPACITY LIST Thickness which can be bent to all diameters to the following minima using the Main Roller. The 3000 Tonne Machine can accommodate plates up to 200 mm thick 4.0M Machine Yield Stress Kg/mm² Min. Inside Dia. 960 mm Main Roller Diameter 25 50 Small Dia. Range 1150 Plate Width 35 1170 25 35 50 Medium Diameter 1340 2300 25 35 50 Large Dia. Range 5500 and above Plate Thickness 4000 77 68 60 97 85 74 125 107 90 3500 81 72 63 102 90 79 133 114 96 3000 86 77 67 108 96 83 142 123 104 2500 93 82 72 117 103 89 153 134 113 2000 102 89 78 128 112 97 168 146 126 1500 113 100 88 145 126 110 188 165 143 Contact Centers For above Thickness Page 20 Revised: July 17, 2012 500 650 800 PREQUALIFICATION DOCUMENT Section 7: Partial Client & Structural Fabrication List Major Clients Major clients include: PLENTY FILTERS – UK DUBAI PETROLEUM COMPANY ETA PROCESS PLANT – UK LARSEN & TOUBRO – INDIA SAUDI ARAMCO – KSA GLOBAL PROCESS SYSTEMS - UAE QATAR PETROLEUM SNAMPROGETTI – ITALY SCHLUMBERGER INDIA – MIDDLE EAST & TECHNIP – KTI ALDERLEY FZE - UAE PETROLEUM DEVELOPMENT OMAN J. RAY MCDERMOTT – UAE EXPRO GROUP LAMPRELL ENERGY LTD. TOTAL – ABK - UAE PETROFAC SHARJAH CAIRN ENERGY Page 21 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT Section 8: GMMOS FABRICATION EXPERIENCE STRUCTURAL FABRICATION Year 2011 2011 2008 JobNo. 5103 5042 4690 Client CairnEnergy IndiaPty Ltd. Lamprell Energy Emirates Alumuniun (EMAL)SNC Lavalin EndUser CairnEnergy FredOlsen Emirates Alumuniun (EMAL) Project MBAPhaseII Development BhagyamField Project WindCarrier OffshoreInstallation Vessels1 SmelterComplex PowerPlant Taweelah ScopeofService ManifoldSkidsTypeI&II (SkidFrame,Piping, Insulation,Assemblyof SkidFrame&Piping, Installation,HookUpand Precommissioning, Instrumentation&Supply ofMaterials 17Nos. FabricationofSpudCans 8,500Widthx13,500 Lengthx4,000Longx200 Tons 2Nos. FabricationofTubularLegs 4,600ODx25,000mmLong x230Tons 4Nos. P91HPSteamLinesand Drains 256Meter P11HPSteamLinesand Drains 22Meter A53HPSteamLinesand Drains 13Meter P91HPSHeaderand BypassLines 440Meter A53HPSHeaderand BypassLines 8Meter A53LPSteamLineand Drains 576Meter A53CLSSupply&Return Lines 469Meter A53HRSGInstrumentAir Lines 322Meter A106HRSGFeedwaterand Condensate 74Meter A53HRSGFeedwaterand Condensate GalvanizedSteelPipeRack ModulesSteelAssembly Page 22 Revised: July 17, 2012 Quantity 357Meter 16Modules PREQUALIFICATION DOCUMENT Year JobNo. Client EndUser Project ScopeofService Quantity 2sets 2sets 2008 4685 Expro Americas LLC HerculesRig 262 PE0771R3 UShaped90FtBoomswith PipingWaterSpraySystem &GasFlare,VerticalKing Post,SeaEmeraldBurner, DiverterManifold&Diesel Tank,PropaneManifold 2008 4675 DPIRLimited 60FtBurnerBooms&2 EachMiniKingPost 2008 4627 Bluewater Energy Service MaerskOil QatarBlk5 Development AlShaheenTerminal 2008 2007 2007 2007 27OffSPMAnchorPiles& 27Nos. 12OffBackOffMooring Piles 12Nos. 4606 Expro Americas LLC RowanRig 600 PE0726 UShaped90FtBoomswith PipingWaterSpraySystem &SeaEmeraldBurner,Rig DiverterManifold&17 NozzleDelugeSystem,Gas FlareTip 4560 Leighton Contractors IndiaPvt. Ltd. M/sReliance Portsand Terminals Limited SBM/Bechtel RelianceJamnagar ExportRefinery Project EarthquakeRestraintPiles 2Nos. 1Set 1No. 4518 TotalABK TotalABK EC2309AKEast SouthSideSlot Extension FabricationofSupply materials,fabricatedeck framingmembers,bracing, stiffeners,hatchcovers, mezzaninedeckwith ladder/handrailand grating,gritblast&paint structures 4471 Leighton Contractors IndiaPvt. Ltd. M/sReliance Portsand Terminals Limited SBM/Bechtel RelianceJamnagar ExportRefinery Project AP41AnchorPilefor Bechtel 2007 4408 TotalABK TotalABK EC2308AKFWSouth SlotExtension 2007 4378 TotalABK TotalABK EC2308AKFWSouth SlotExtension 2007 4365 TotalABK TotalABK SO4900003584EC 23071/2 Page 23 Revised: July 17, 2012 Fabricationof3Conductor GuideFramesandmisc looseitemsbyusingPipe 14",12",10",8"&6"Fitted withone38"IDConical Guides FabricationofSupply materials,fabricatedeck framingmembers,bracing, stiffeners,hatchcovers, mezzaninedeckwith ladder/handrailand grating,gritblast&paint structures FabricationConductor Guides 2sets 3Sets 1Set 1Set PREQUALIFICATION DOCUMENT Year JobNo. 2006 4298 2006 4233 2006 4224 2006 4209 Client Bluewater Energy Service Toyo Engineering Corporation Bluewater Energy Service SBMImodco Inc. EndUser Project RelianceJamnagar ExportRefinery Project FoundationPiles610mm DiaxWallThickness19mm x16750mmLength,Weight inAir5mTonseach 4Nos. NIOC StackSectionSouth ParsPhase6,7&8 ExhaustStacks4500Meter 3Nos. ADOCJapan FabricationofAnchorPile 54"Lengthx16Meters 1No. RelianceJamnagar ExportRefinery Project Fabricationof12Nos. MooringPiles&8Nos.Pin PilesforExportBuoys SBM5AnchorPiles2250 Diax8230Long SBM5PlemPiles1070Dia x10150Long SBM4AnchorPiles2490 Diax10250Long SBM4PlemPiles1070Dia 10150Long SBM3PlemPiles1070Dia x15650Long M/sReliance Portsand Terminals Limited 3874 Bluewater Energy Service ADOCJapan 2005 3607 Technip Oceania Woodside Subsea7EnfieldJV 2003 2963 TotalABK TotalABK 2002 2435 SingleBuoy Mooring Shell 2027 SingleBuoy Mooring 2001 2018 SingleBuoy Mooring 2001 1951 SingleBuoy Mooring 2001 1950 SingleBuoy Mooring 2001 1933 SingleBuoy Mooring Page 24 Revised: July 17, 2012 Quantity M/sReliance Portsand Terminals Limited 2005 2001 ScopeofService Halliburton/ Shell Development Company Nigeria Halliburton/ Shell Development Company Nigeria Nigerian National Petroleum Corporation Nigerian National Petroleum Corporation Nigerian National Petroleum JobEC2100North SideSlotExtension ShellBonga,Lagos Nigeria 54"x16MeterAnchor Piles PullinWinch,Ballast& LandingP/F+AddItems& RiserColumnFender FabricationofConductor Guides&Decks SPMITubesRiserClamp Support 12Nos. 6Nos. 4Nos. 6Nos. 4Nos. 4Nos. 6Nos. 1Sets 1Sets 1No. ShellEAField Development SoftYokeMooring PlatformSBMRefSO 12750FabricationofYoke 1No. ShellEAFPSO SO–12750Jacket&Yoke 1No. AtlasCoveProjectfor NNPC SO12770Fabricationof 20"Plem AtlasCoveProjectfor NNPC SO12770Fabricationof 52"Plem AtlasCoveProjectfor NNPC SO12770Fabricationof6 MagAnchors 6Nos. PREQUALIFICATION DOCUMENT Year 2010 2011 2009 JobNo. 5046 4690& 4879 2007 4520 2010 5023 EPCFORRUWAIS4TH NGLTRAINPROJECT CARBONSTEEL PIPING PREFABRICATION& PAINTINGWORKS PETROFACGS JV EMALSMELTER COMPLEX SIMPLECYCLE LARGEBOREPIPING FORNATURALGAS, HYDROGEN,LUBE OIL,SEAWATER SERVIVE&PIPE SPOOLSFORPIPE RACKSHPSTEAM &HPFEEDWATER SERVICE SNCLAVALIN WORLY PARSONSJV/ EMAL 67344 2"~36" PETROFAC 24000 0.5"~18" MATERIALFIMBY CLIENT DPIR 5832 2"~4" AISI4130& SA106 GRB SELASFLUID PROCESSING CORP(SUBSIDIA RYLINDE GROUP) 14400 2"~3" SA106GRBPIPING D.P.C 19112 2"~18" APIX52&SA333 GR6 NENOOTER/ ERICKSEN 12150 0.5"~20" SA106GRBPIPING NENOOTER/ ERICKSEN 11390 3"~14" SA106GRBPIPING, &S&PPSTAMP CONDENSATE PIPING ALDERLY/ PETROFAC 2500 2"~40" FISCALMETERING SYSTEM PIPING ALDERLY/ CHIYODA TECHNIPJV 4000 2"~24" FISCALMETERING SYSTEM PIPING ALDERLY/ CHIYODA TECHNIPJV 3000 2"~36" PIPESPOOL FABRICATIONFOR RIGS MIS 3000 2"~6" PIPESPOOL FABRICATION DPC 9069 2"~20" DPIRKIRINSKAYA BOROUGEIII ETHYLENE CRACKINGFURNACE RUWAIS COMPLEX D.P.C 2008 4586 2004 3122 2006 3882 FEWA/NAKHEELHRSG #4 2006 4096 KKURSANIYAH/SAUDI ARAMCO 2009 4890 2007 4517 2006 4036 2009 4910 2005 2276 KUWAITOILCO QGIICL4FISCAL METERING SYSTEM QATARGASII DEVELOPMENT PROJECT RIG013&RIG014 D.P.C DUPLEXPIPE SPOOLS(SA790 DUPLEX UNS31803)FOR TRAINSGT3& SGT4 HPPRESSUREPIPE SPOOLS FLUEGASPIPING FORETHYLENE CRACKING FURNACE PIGLAUNCHERS& RECEIVERS PIPINGFORHRSG #4BOILERPLANT FEWA PIPINGFORHRSG KHURSANIAH PROJECT Page 25 Revised: July 17, 2012 Pipesizes handled Natureofwork PETROLEUMSALAM GAS TREATMENTUNIT Client'sname Total inch dia 33774 396376 Projectdescription 166 CSPIPE LTCS GLASSFLA KELINE SPOOL Remarks APPROXIMATELY 190,000WELDDIA INCHOFNDT, PWHTAND PAINTING SA335P91 5468DI (PPSTAMP)& SA106GRC7981DI FORPIPERACK MODULES(VALUE INCLUDESSUPPLY OFVALVESAND ASSEMBLYOFPIPE RACKS) SIMPLECYCLEPIPE SPOOLS SA106GRB46531 DI& SA312TP304L& 31254PIPES 7365DI SA106GRBPIPING &FIMBY CLIENT SA106GRBPIPING &FIMBY CLIENT SA106GRBPIPING & SA312TP304LFIM BYCLIENT SA106GRBPIPING FIMBY CLIENT SA106GRBPIPING FIMBY CLIENT PREQUALIFICATION DOCUMENT Section 8: GMMOS FABRICATION EXPERIENCE SPM REFURBISHMENT Over the past 8 years, GMMOS has ventured into this specialized type of work and has successfully completed dry docking and overhauling of fourteen (14) units, owned by some of the prominent petroleum companies in the Persian Gulf. GMMOS has the capability of disconnecting the buoy, utilizing diving services and towing the unit into GMMOS yard for dry-docking and refurbishing. After completion, the unit can be towed back on location and reconnected to sub-marine hoses and back in operation. Below is a typical and brief scope of work carried out on the SPM units refurbished by GMMOS. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. Disconnection and inspection of the submarine hoses, anchor chains and mooring chains. Wet tow the SPM to GMMOS Jetty. Dry dock SPM in Dubai Ship Docking Yard. H.P. wash, clean, gas free and disassembly of piping and valves. Disconnect turntable/arms and MPDU for overhauling. Weld repair, re-bushing, and line boring of connecting pad eyes of arms and MPDU. Disassemble MPDU, clean, inspect and weld repair as necessary. Reassemble with new bearing and seals. Pressure test and rotation test as per manufacturer's specification. Fabricate new product piping and pipe supports and install on pipe arm. Install 3/4" thick bogie wheel track plate and modify bogie wheel assembly to suit the new arrangement. Overhaul watertight arrangement and valves. Renew damaged skirt fender and deck fender. Lining inside of hawser pipe. Removal of existing rubber fender and install 8" diameter steel fender on hull. Grit blast and paint as per clients' specification. Reassemble turntable/arms and MPDU. Install bogie wheel, rope guard and navigational lights. Pressure test as per manufacturers' specification. Undock and carry out floatation test and rotation test as per clients' specification. Tow back to the field and install the buoy in position. Connect submarine hoses, pressure test and handover to client. Page 26 Revised: July 17, 2012 PREQUALIFICATION DOCUMENT SPM Projects include the following: Date of completion October 2005 to June 2006 Client/Owner: Petroleum Development Oman November 2002 Client/Owner: Al Khafji Joint Operation Page 27 Revised: July 17, 2012 Specifications Make: SBM 1) SO-1107 2) SO-1246 3) SO-1157 Weight: Diameter Depth: Make: SBM Weight: 156 M Tons Diameter: Depth: Scope of Work Scope of Work: This contract involves change out of 3 SBM Buoys and complete overhaul including replacement of bearing. Change Out & Overhaul: Dry-docking of Buoy, Scrapping & HP Washing, Degassing & Hot work Permit, Inspection & UT Test, and Removal of misc. items, piping, valves, & water connection. Disconnect & remove turntable, removal of CP bearing, C. Well Piping. Renew Skirt Fender, outer shell plate, outboard ladder. Repair mooring platform, manhole covers, & winch support foundation Remove & overhaul mooring platform, Chain Hawsers, & piping. Replace protection cage & weld chain hose and reweld bottom cutout. Overhaul mooring equipment. Leak Test Compartments & Hawser Box. Install wooden platform, new lights supports Reinstall swivel, main bearing & grout, turntable, piping, valves, anode lights, bridles etc. Hydrotest turntable, Trim test, Blast & Paint, Undock & Preparation of Towing. SCOPE OF WORK: Overhaul repair, disassembly of SPM Buoy. Remove turn table sealing, all manholes, valves, expansion joints, central pipe arm, main veering, mooring bridle, turntable and misc. items. Marine growth removal etc. Surface preparation and painting final assembly, testing. PREQUALIFICATION DOCUMENT Date of completion June 2002 Client/Owner: Zakum Development Company (ZADCO) Specifications Make: IMODCO Scope of Work SCOPE OF WORK: INT’L. INC. Dry docking, clean, water wash, renewal of skirt fender and plates, repair and modification of hydraulic skid unit, disconnection of arms and MPDU unit, overhauling of winch, air motor, MPDU, valves and pulleys, grit blast and paint, hydro test, rotation test, load test, undock and trim test. SCOPE OF WORK: Dry docking, clean, water wash, renewal of skirt fender and plates, repair and modification of hydraulic skid unit, disconnection of arms and MPDU unit, overhauling of winch, air motor, MPDU, valves and pulleys, grit blast and paint, hydro test, rotation test, load test, undock and trim test. Weight: Diameter: Depth: 2001 Make: SBM Weight: N/A Diameter: N/A Depth: N/A Client/Owner: National Iranian Oil Company (NIOC) August 1999 Client/Owner: Dubai Petroleum Company (DPC) Section 8: Make: SBM Weight: 252 (approx.) Diameter: 12.5 m Depth: 5.3 m SCOPE OF WORK: Towing to dry dock, disassemble turntable and piping, renew main and swivel bearing, built up and machine contact surface of seal running face of swivel, renew skirt fenders, deck fenders and damaged hull plate, grit blast and paint, reassemble, test, undock. GMMOS FABRICATION EXPERIENCE FLARE STACKS & HEATERS Year Job No. Client End User Project 2009 4980 John Zink/Petrofac ADCO EPC For Asab FFD Project Page 28 Revised: July 17, 2012 Scope of Service Quantity Flare Risers (Guy Wired Flares) Tag Height (m) Dia Inch x Thk mm PREQUALIFICATION DOCUMENT 70 36" x 12/16/18mm 48" x 12/16mm 1 14-39-FL-1935 70 48" x 12/16mm 1 14-39-FL-1939 70 48" x 12/16mm 1 14-39-FL-1936 40 36" x 12mm 1 14-39-FL-1938 40 36" x 12mm 1 14-39-FL-1937 30 20" x 12mm 1 14-39-FL-1951 23 18" x 12/16mm 1 14-39-FL-1952 25 18" x 12/16mm 1 14-39-FL-1953 25 18" x 12/16mm 1 14-39-FL-1933 55 14-39-FL-1934 1 Flare Risers (Self Supported Flares) 2008 4722 Born Canada Petrofac Ebla Gas Project, Syria 14-39-FL-1946 16 18" x 10/12mm 1 14-39-FL-1947 16 18" x 10/12mm 1 14-39-FL-1948 16 18" x 10/12mm 1 14-39-FL-1949 16 18" x 10/12mm 1 14-39-FL-1950 16 18" x 10/12mm 1 8046-06 Hot Oil Fired Heater Package Structural Fabrication of Convection Section, Radiant Section, Stacks, Transition, Ladders & Platforms, Stack Frames, Internal Baffles, Dampers Supports, Saddles, Lining Anchors & External Painting Steel Stack Size: * Dia 4400 x 6 Thk x 14000 Long & * Dia 1500 x 8 Thk x 20000 Total Weight: Approximately 65 Tons Coil Fabrication of Radiant Section, Convection Section including installations of tube sheets, header box dampers, sidewall etc. Page 29 Revised: July 17, 2012 1 Lot PREQUALIFICATION DOCUMENT Year 2008 Job No. 4771 Client Born Canada End User Petrofac/Hayan Petroleum, Syria Project Jihar Stage 3 Project Scope of Service 8049-05 Hot Oil Fired Heater Package Structural Fabrication of Convection Section, Radiant Section, Stacks, Transition, Ladders & Platforms, Stack Frames, Internal Baffles, Dampers Supports, Saddles, Lining Anchors & External Painting Steel Stack Size: * Dia 5500 x 6 Thk x 17000 Quantity 1 Set * Dia 1500 x 8 Thk x 15500 Total Weight: Approximately 75 Tons Coil Fabrication of Radiant Section, Convection Section including installations of tube sheets, header box dampers, sidewall etc. 2008 2007 4662 4551 Verga Engineering Born Canada W. J. Towell Company LLC/Petroleum Development Oman NPCC C671C010/C110 REV. 00 Gas Sweetening Unit Upgrade - Lekhwair Maersk Oil Al Shaheen Development Supply and relevant fabrication of steelwork and coil fabrication for New Fired for Hot Oil Heaters Item F27700/F-27701 (Radiant Floor, Radiant Vertical Walls, Radiant Arch, Transition, Convection Materials, Convection End Tube Sheets, Convection Header Boxes, Breeching, Stack Frame and Add Structures, Stack, Ladders & Platforms, Gratings, Stack Dampers, Instrument Conn, Lining Anchors Weld, Stiffening for transport, Trial Assembly, Inlet Duct, Ducts to Burners, Stack Accessories) Steel Stack Size: * Dia 4500 x 6 Thk x 10000 = 1 No. * Dia 1500 x 16/8 Thk x 37000 = 1 No. Total Weight: Approximately 110 Tons Heater, Convection Boxes 8042-06A Radiant Section - 114,600 lbs Convection Box - 28,660 lbs Stack - 24,250 lbs Transition - 4,409 lbs. Ladders & Platforms & Structure 55,120.00 2 Lots 1 Lot Fan Ducting, Welding of Fiber Studs, Welding of SS Anchor, Welding of Mesh, Painting of Structure, Fabrication of SS Items. 2007 4351 Born Canada Page 30 Revised: July 17, 2012 Khalda Petroleum Company Salam Gas Train 3 & 4 Project 8040-05 Hot Oil Fired Heater Radiant Coil & Convection Coil 388 + 612 Joints Radiant Section - 124,620 lbs Convection Box - 29,846.53 lbs Stack - 21,506.11 lbs Transition - 70045.50 lbs Ladders & Platforms - 35,903.30 Lbs Fan Ducting, Fasteners, Shipping Saddles, Welding of Mesh, Fiber Studs 1 Lot PREQUALIFICATION DOCUMENT Year 2005 2004 Job No. 3886 3201 Client Born Canada Mactronic/ Enerflex, Reed Alberta Canada Page 31 Revised: July 17, 2012 End User CCC & Oman Refinery Company LLC ADCO Project Scope of Service Preflash Tower Fired Reboiler Stack Top Section L12600 x W1600 x H1600 Stack Middle Section L1200 x W1600 x H1600 Stack Bottom Section w/Damper L12000 x W2200 x H2000 Transition Section L3400 x W1900 x H1750 Convection Section, with coil, header boxes, etc Radiant Section, complete with Arc Roof, Internal Coil and coil supports Buhasa - Cable & Block Diagram Project Quantity 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set HP Flare System & LP/HP Flare System Package (FL-1945, 1947) Design “A” 48” Dia.*.375” Inlet 48” 2 Nos. LP Flare System & Tank Flare System Package (FL-1946) Design “A” 42” Dia. *.375” Inlet 42” 1 No. Tank Flare System Package (FL-1941) Design “C” 36”/24”/20” Dia. *.375” inlet 42” 1 No. Tank Flare System Package (FL-1942, 1943,1944) Design “C” 42”/24”/20” Dia. *.375” Inlet 42” RDS-1,2,3 Flare System Package (FL1952,1953, 1954) Design “A” 24” Dia. *.375” Inlet 12” HP Flare System Package (FL-1951) Design “A” 30” Dia.*.375” Inlet 20” 30” Guy Ring/Lug Assembly 3 Nos. 3 Nos. 1 No. 11 Nos. PREQUALIFICATION DOCUMENT Section 9: Certificates of Authorization Issued By 1 The National Board of Boiler and Pressure Vessel Inspectors 2 The American Society of Mechanical Engineers 3 The American Society of Mechanical Engineers 4 The American Society of Mechanical Engineers 5 The American Society of Mechanical Engineers 6 The National Board of Boiler and Pressure Vessel Inspectors 7 ABS Quality Evaluations Inc. 8 API Monogram Description of Certificate Certificate of Authorizations: NB ASME Stamp: U, S, PP U2: GMMOS is authorized to apply the “NB” mark and register boilers, pressure vessels, or other pressure retaining items with the National Board in accordance with its provisions. Certificate of Authorization: U2 Scope: Manufacture of Pressure Vessels in Registered Location & Field Sites Certificate of Authorization: U Scope: Manufacture of Pressure Vessels in Registered Location & Field Sites Certificate of Authorization: PP Scope: Fabrication & Assembly of Pressure Piping. Certificate of Authorization: S Scope: Manufacture of Power Boilers Certificate of Authorization: R Metallic Repairs &/or Alterations at the above location & extended for Field Repairs &/or Alteration Controlled by this location. ISO 9001:2008 Certificate of Compliance American Petroleum Institute entitled API Spec 2B Certificate #2B-0084 Copies of each Certificate are attached. Page 32 Revised: July 17, 2012 Issue Date Expiration Date March 2, 2012 February 8, 2015 January 30, 2012 February 8, 2015 January 30, 2012 February 8, 2015 January 30, 2012 February 8, 2015 January 30, 2012 February 8, 2015 March 2, 2012 February 8, 2015 23 October 2002 10 October 2014 January 4, 2008 January 14, 2014 Activity: Validity of this certificate is based on the periodic audits of the management system defined by the above scope and is contingent upon prompt, written notification to ABS Quality Evaluations, Inc. of significant changes to the management system or components thereof. ABS Quality Evaluations, Inc. 16855 Northchase Drive, Houston, TX 77060, U.S.A. Validity of this certificate may be confirmed at www.abs-qe.com/cert_validation. Copyright 2003 ABS Quality Evaluations, Inc.. All rights reserved. Additional Facility: has been assessed by ABS Quality Evaluations, Inc. and found to be in conformance with the requirements set forth by: Certificate Of Conformance ABS Quality Evaluations Effective Date: JANUARY 4, 2011 Expiration Date: JANUARY 4, 2014 QMS Exclusions: Section 7.3, Design and Development The scope of this license includes the following product: Steel Pipe 2B-0084 API Spec 2B GULF MARINE MAINTENANCE & OFFSHORE SERVICE COMPANY DUBAI LLC Parcel ID 599-733 Jebel Ali Industrial Area 1 Jebel Ali, Dubai United Arab Emirates 2B-0084 Job No. 2850 - GPS/Addax Test Separator Job No. 2838 GPS/Petroiran GLP Gas Dehydration Package Job No. Sadra – Samsung/Frames Glycol Regeneration Job No. 2944 – Schlumberger Three Phase Separator Job No. 2896 GPS/Petroiran KPP Gas Dehydration Package Job No. 2235 – GPS/GNPOC Electrostatic Treater Package Gulf Marine Maintenance & Offshore Service Company Dubai L. L. C. Job No. 2149 – Schlumberger KO Drum Job No. 2607 GPS/Daewoo Fuel Gas Package Job No. 2797 – Halliburton Calibration Tanks Job No. 2163 – GPS/China Petroleum Fire Water KO Drum Job No. 2147 – GPS Power Generation Module Job No. 1976 - ADDAX Three Separation Package Job No. 2103 – Frames Shell EA Gas Dehydration Package Job No. 3014 - GPS Low Pressure Fuel Gas System Job No. 2346 – Hardy Oil FPU Water Injection Tel: 009714-8803637 Fax: 009714-8803647 Parcel ID 599-733, Jebel Ali Industrial Area I P. O. Box 4613 Dubai, United Arab Emirates Job No. 2899 - Petreco Sarl HP Vent KO Drum Job No. 2888 – GPS Canadian Nexen Water Pump Strainers Job No. 2531-5 GPS/SBM HP Fuel Gas Scrubber Job No. 2363 – Kuwait Oil Company Test Separator Job No. 2570 – ETA Process Plant Vacuum Dearator Job No. 2791 - Plenty Filters Seawater Strainers Job No. 2697 – GPS/ADDAX Pig Launcher & Receiver Job No. 2563 – Plenty Filters Sour Gas Filter Separator Gulf Marine Maintenance & Offshore Service Company Dubai L. L. C. Job No. 2889 – Canadian Nexen 400 Bbl Pop Tank Job No. 2083 – Lamprell KO Drum Job No. 2790 – Plenty Filters Liquid/Gas Filters Job No. 2500 Alderley/Aramco Horizontal Liquid Gas Separator Job No. 2304 – Bluewater Buoyancy Tank Job No. 2403 – SBM/GPS Fuel Gas Scrubber Job No. 2837 – Plenty Filters Botas – Filter Vessels Job No. 2798 – GPS/Canadian Nexen Inlet Separator Tel: 009714-8803637 Fax: 009714-8803647, Parcel ID 599-733, Jebel Ali Industrial Area I P. O. Box 4613 Dubai, United Arab Emirates Job No. 4245 Lamprell Degasser Installed on Module Job No. 4315 Lamprell/SBM/Chevron 30 mm SS Clad Scrubber Job No. 4344 Lamprell/Aker Fuel Gas Scrubber Job No. 4245 Lamprell 2nd Stage Separator Job No. 4315 Lamprell/SBM/Chevron 30 mm SS Clad Scrubber Job No. 4315 Lamprell/SBM/Chevron MBD-1070 Test Separator Gulf Marine Maintenance & Offshore Service Company Dubai L. L. C. Job No. 4315 Lamprell/SBM/Chevron Amine Flash Drum Job No. 4315 Lamprell/SBM/Chevron 20mm x 27.5 M Vertical SS Steel Column Job No. 4344 Lamprell/Aker 70 mm 1st Stage Clad Vessel Job No. 4315 Lamprell/SBM/ Chevron MBD-1050 2nd Stage Test Separator Job No. 4315 Lamprell/SBM/Chevron 24 Meter x 85 mm SS Strip Clad Vertical Contactor Job No. 4315 Lamprell 30mm 2nd Stage Tel: 00971-4-8803637 Fax: 00971-4-8803647, Parcel ID 599-733 Jebel Ali Industrial Area 1, P. O. Box 4613 Dubai, U. A. E Job # 4487 Margham Dubai Suction Scrubbers 65mm + 4mm Job # 4173 Plenty Filters/Technip Filters/Technip Stainless Steel (50 mmThk) mmThk) Job # 4157 Foster Wheeler/ENOC LPG Wash Water Drum (25mm) 75 mm Compressor K. O. Drum Job # 3973 Plenty/Snamprogetti Plenty/Snamprogetti Job # 4118 Fasam/Iranian Fasam/Iranian Central Oilfields 2nd Stage Suction Scrubber Job # 4173 Plenty Filters/Technip/Yemgas Filters/Technip/Yemgas 90 mm Common Gas Filter Job # 4195 Snamprogetti (Product Chamber) Job # 4257 Snamprogetti High Pressure Flare KO Drum Job # 3957 Technip KTI Thermal Oxidizer under production Job # 3920 ETA/Weir Westgarth/ Westgarth/ Saipem Golfinho – Dearator Vessel High Pressure Flare KO Drum under production Job # 3895 Snamprogetti Tel: 00971-4-8803637 Fax: 00971-4-8803647, Parcel ID 599-733 Jebel Ali Industrial Area 1, P. O. Box 4613 Dubai, U. A. E Job # 4157 Foster/ENOC HC Flare KO Drum Gulf Marine Maintenance & Offshore Service Company Dubai L. L. C. GMMOS EMAL PIPE RACK MODULES FOR TAWEELAH SMELTER PLANT (Fabricated & Assembled at GMMOS RAK Yard) Description Client Project OD Length Weight Year Built Owner : Jack up Leg Section Vessel 1 & 3 - Part 1 to 4 : Lamprell Energy : The Construction of Self Elevating Wind Turbines Installation Vessels : : : : : 4,600 mm 25,000mm 230 Tons 2011 – 2012 Fred Olsen Windcarrier Job No.: 5042 Description : Spud Cans Vessel 1 – 2 Nos. Client : Lamprell Energy Project : The Construction of Self Elevating Wind Turbines Installation Vessels Size Width Height Length Weight Year Built Owner : : : : : : 8,200 mm 13,500 mm 4,000 mm 200 Tons Each 2011 - 2012 Fred Olsen Windcarrier Job No.: 5042 Description Client Project End User : : : : Skid Manifold – 17 Sets Cairn Energy India Bhagyam Field Development ONGC India Year : 2011 - 2012 Fabrication of Skid Frames, Piping, Insulation, Assembly of Skid Frame & Piping, Installation, Hook Up and Precommissioning, Instrumentation & Supply of Materials Job No.: 5103 Description Client Project Year End User : : : : : Carbon Steel Piping Prefabrication Works & Painting Petrofac GS Joint Venture GASCO Ruwais 4th NGL Train Project 2011 - 2012 GASCO Abu Dhabi Prefabrication of approximately 190,000 Weld Dia Inch of CS Piping, relevant NDE, PWHT and Painting Job No.: 5046 Description Client Project Year Built : Fabrication, Assembly & Delivery of Pipe Rack Modules 17 Nos. : SNC Lavalin/Emirates Aluminium : EMAL Smelter Complex Power Plant Taweelah : 2008-2009 Scope of Works: Purchased Materials, Received and Stored EMAL Supplied P91 Piping & Pipe Rack Steel, Pipe Fabrication, Assembly Pipe Rack Modules, Structural Steel, Freight and Off Load for Pipe Rack Modules, and Fabrication of Simple Cycle Bore Pipe Approximate Weights: Structural, Piping & Valves Module 1 : 56.01 Tons Module 6 : 167.42 Tons Module 11: 53.97 Tons Module 2 : 74 .11 Tons Module 7 : 152.27 Tons Module 12: 53.97 Tons Module 3 : 107.44 Tons Module 8 : 56.41 Tons Module 13: 53.97 Tons Module 4 : 57.61 Tons Module 9 : 79.11 Tons Module 14: 53.97 Tons Module 5 : 111.16 Tons Module 10: 79.24 Tons Materials: Pipe S335 P91, SA 53A/106GRB , SS304 Job No.: 4690 & 4879 EMAL PIPE RACK MODULES FOR TAWEELAH SMELTER PLANT (Fabricated, Assembled GMMOS RAK Yard & Loaded to Rak Port Jetty) Scope of Works: Purchased Materials, Received and Stored EMAL Supplied P91 Piping & Pipe Rack Steel, Pipe Fabrication, Assembly Pipe Rack Modules Structural Steel, Freight and Off Load for Pipe Rack Modules, and Fabrication of Simple Cycle Bore Pipe Approximate Weights: Structural, Piping & Valves Module 1 : 56.01 Tons Module 6 Module 2 : 74 .11 Tons Module 7 Module 3 : 107.44 Tons Module 8 Module 4 : 57.61 Tons Module 9 Module 5 : 111.16 Tons Module 10: : : : : : 167.42 Tons 152.27 Tons 56.41 Tons 79.11 Tons 79.24 Tons Module 11: Module 12: Module 13: Module 14: 53.97 Tons 53.97 Tons 53.97 Tons 53.97 Tons Materials: Pipe S335 P91, SA 53A/106GRB , SS304 Job No.: 4690 & 4879 Description : Changeout and Overhaul of SPM Buoys Client : Petroleum Development Oman Area : Mina Al Fahal SO1107/SO1157/SO1246 SBM BODY Outside Diameter Inside Diameter Skirt Diameter Body Height Buoy Weight Compartment : : : : : : 12.00m 3.73m 16.00m 5.30m 230T (approx.) 6 unequal spaced NOMINAL PLATE THICKNESS Outside Shell Plating : 9mm & 12mm Inside Shell Plating : 9mm & 16mm Bottom Plating : 12mm & 14mm Deck Plating : 9mm & 16mm Watertight bulkheads : 9mm & 12mm Description : 2 Nos. KPP Gas Dehydration System Package Client : Global Process Systems/PEDCO/NIOC Project : Salman Oil & Gas Field Job No. 2896 Description Client Project Year Built : : : : 2 Nos. KPP Gas Dehydration System Package Global Process Systems/PEDCO/NIOC Salman Oil & Gas Field 2004 Scope of Work includes fabrication of skid frames, piping, platforms, ladders, assemblies and instrumentations Job No. 2896 Description Client Year Built Length Diameter Thickness Weight Includes : 200 Psig Test Separator : ADOC Japan Abu Dhabi : 2010 : : : : : 8230mm T/T 1981 mm (Incoloy 825 Roll Bonded) 16mm 12200 Kg Fabrication of Skid, Piping, Ladders, Platforms including Assembly and Instrumentations & Valves Job No.: 4873 Description Client Location : 3 Phase 2000 Psig WP Test Separator Skid Pkg. : Expro Group Ltd. : Algeria Length : 4572mm T/T Diameter : 1067mm ID Thickness : 70mm Weight : 13799 Kg Includes : Fabrication of Skid, Piping, Ladders, Platforms including Assembly and Electrical & Instrumentations & Valves, Belzona Lining Job No.: 5101 Description Client E. P. N. Installation End User : : : : : Jacket Leg Structure Fabrication – Under Construction Single Buoy Moorings Inc. Halliburton Hook-Up FPSO to SYMP using SBM’s Dynamic Installer Shell Petroleum Development Co. Nigeria – Shell EA FPSO – SO 12750 Year Built : 2000 Bottom section of a shallow water jacket unders construction at Al Jadaf Yard. The 2 meter high bottom frame support 48” diameter leg at each corner which when completed support the soft yoke mooring arm assembly connected to FPSO Ballast Tank Loaded Out & Sea fastened GMMOS Yard Sharjah Mooring System: Jacket Yoke Installed Offshore GMMOS Scope: • Bottom Jacket Frame, Jacket Legs, Pile Guides & Sleeves • Ballast Tank including the conical sections, uni joint-connections together with the section of arm to the knuckle, eight bulkhead plates, end cones, ring stiffeners, tank outer shell, 24”pipe and manholes. • Two arms of the yoke • Sections of walkways, stairs and ladders • Structure laid out and assembled to the design dimensions, walkways fitted, painting completed, loaded out and sea fastened. Description Client Project Year Built : : : : Gas Dehydration Package Frames Separation Technologies/Halliburton Shell EA, Nigeria 2001 Main Equipment Pressure Vessels: 1) Glycol Trim Cooler 2) Off Gas Condenser 3) Glycol Exchanger 4) Lean Glycol Fine Filter 5) Glycol Carbon Filter 6) Glycol Reboiler Heater Qty. 1 2 1 2 1 3 Skids Structures: Fabrication & Assemblies of Skid Frames, Gratings, Handrails, Ladders, Piping, Electrical and Instrument, Valves and Free Issue Materials Job No. 2103 Description Client Project Year Built : : : : Equipment List:: Glycol Flash Drums Glycol Surge Drums Still Column Reflux Condenser Glycol Reboiler Glycol Storage Tank Glycol Regeneration Skid (3-Z-111 Train 1 & 2) Frames Separation Technologies/Halliburton South Pars Phase 1 2001 Qty. 2 2 2 2 2 2 Weight Kg. ID MM 4500 1500 4300 1200 2650 700 2650 700 8000 1700 3200 4790x1490 T/T MM 4750 4700 4150 4150 4240 1800 Matl SA516GR70N SA516GR70N S240 316L S240 316L SA516GR70N SA516GR70N Skids Structures: Fabrication & Assemblies of Skid Frames, Gratings, Handrails, Ladders, Piping, Electrical and Instrument, Valves and Free Issue Materials Job No. 2101 Description Client Project Year Built : : : : Glycol Regeneration Skid (Train 1 & 2) Frames Separation Technologies/Halliburton South Pars Phase 1 2001 Control Panels Electrical & Instrumentation Components Job No. 2101 Description Client Project Year Built : 90 Ft U Shaped Burner Booms 2 Sets : Halliburton : : 2005 Dimensions Weight Service Year Built : 1094” x 48” X 84” (L x W x H) : 5400 Kgs. : H2S : Description Client End User Project Year Built : : : : : Mag Anchors 6 Nos. Single Buoy Moorings Inc. Nigerian National Petroleum Corp. Construction of Pipeline to Atlas Cove Depot 2000 15.5 Tons Mag Anchors Description Client Project Year Built : : : : Fabrication of Conductor Guides & Deck Total - ABK Job EC 2100 North Side Slot Extension 2003 Fabrication of Conductor Guides & Deck under construction Description Client Project Year Built : Pull in Winch, Ballast & Landing P/F + Add Items & Riser Column Fender : Technip Oceania : Subsea 7 Enfield JV : 2005 Job No.: 3607 Description Client Project Year Built : : : : SPM I Tubes Riser Clamp Support Single Buoy Moorings Shell Bonga, Lagos Nigeria 2002 Description Client Project Year Built : Hot Oil Fire Heaters Radiant Section, Convection Boxes & Coils (Installed at Site) : Born Canada : Hayan Petroleum Company Stage 3 Jihar : 2009 - 2010 Job No.: 4771 Description Client Project Year Built : 27 Nos. Anchor Piles & 12 Nos. Back Off Mooring Piles Loaded to Rak Port Jetty : Bluewater Energy : Maersk Oil Qatar – Topside Modules : 2009 Job No.: 4627 2ND STAGE SEPARATOR INSTALLED ON MODULE AKER KVAERNER 1ST STAGE SEPARATOR 1st STAGE CLAD SEPARATOR 70MM - LAMPRELL/AKER KVAERNER FLOATING PRODUCTION SEPARATION MODULE 85MM THK SS STRIP CLAD VERTICAL CONTACTOR - LAMPRELL/SBM/CHEVRON BRAZIL UPSTREAM (FRADE FPSO) 20MM X 27.5M VERTICAL SS STEEL COLUMN LAMPRELL/SBM/CHEVRON BRAZIL UPSTREAM (FRADE FPSO) 2 NOS. LPG STORAGE TANKS - MELROSE RESOURCES - WEST DIKIRNIS PLANT - EGYPT 24 METER HP FLARE KO DRUM - FOSTER WHEELER - ENOC NAPHTA HYDROTREATER PACKAGE 130 MM THK HP SEPARATOR DRUM 90 MM THK HP SEPARATOR DRUM 90MM STRIP CLAD VESSELS LP CRUDE METHANOL CATCH POT - PEERLESS/ EGYPTIAN METHANEX 72+3MM THK WELD OVERLAY FEED GAS FILTER COALESCERS TECHNIP GEOPRODUCTION TURKMENISTAN 50MM + 3 MM THK AMINE CONTACTORS 4 NOS. TECHNIP GEOPRODUCTION TURKMENISTAN 50MM + 3 MM THK WELD OVERLAY AMINE CONTACTOR 4 NOS. TECHNIP GEOPRODUCTION TURKMENISTAN 2 OFF VACCUM DEARATORS LOAD OUT - ETA/BP AZERI AZERBAJAN 2 OFF VACCUM DEARATORS LOAD OUT - ETA/BP AZERI AZERBAJAN 90MM THK COMMON FEED GAS FILTER - PLENTY/TECHNIP - YEMGAS DEARATORS - ETA PROCESS PLANT/BP ANGOLA - BLK 18 GREATER PLUTONIO PROJECT PRODUCT CHAMBER FOR QATAR PETROLEUM - SNAMPROGETTI 50MM THK SS LOADING ARM PLENTY/TECHNIP - YEMGAS HP FLARE KO DRUM SNAMPROGETTI/SAUDI ARAMCO HP FUEL GAS SCRUBBER - SBM FPSO MYSTRAS 114MM THK MOLECULAR SIEVE KO DRUM - PETROFAC FOR CRESCENT PETROLEUM HALLIBURTON CALIBRATION TANKS CT 7311 AMINE REGENERATOR CLAD VESSEL INSTALLATION AT SITE ASSEMBLY ENCANA DEEP PANUKE PROJECT 80MM THK CLAD DEEP AMINE CONTACTOR INSTALLATION AT SITE ASSEMBLY ENCANA DEEP PANUKE PROJECT Gulf Marine Maintenance & Offshore Service Company Dubai – L. L. C. PO Box 4613, Dubai, United Arab Emirates Tel: 00971-4-3241433 Fax: 009714-3241027 Email: info@gmmos.com/limcd@gmmos.com ´0$4(*QTK\QPVCN)CU(KNVGTU GMMOS Kazakhstan LLP Promzone, AKMO88 Premises Aktau 130001, Mangistau Oblast Republic of Kazakhstan Tel.: 007 3292 579500/519947 Email: ibrahim@gmmos.kz