project - rimmsa
Transcription
project - rimmsa
HISTORY AND TRAYECTORY MEXICAN COMPANY IN OPERATIONS SINCE 1984 ENERGY AND INDUSTRIAL SECTORS ASME PRESSURE PART MANUFACTURING/ASSEMBLY FIELD SERVICES SUCH AS: ERECTION, MAJOR REPAIRS AND GENERAL POWER PLANTS RETROFITS ENGINEERING SERVICES ISO 9001 CERTIFICATION SAA WITH FIRST EXPORT APODACADA PLANT OPENING MEXICO CITY OFFICE START OPERATIONS OF ASME AND NBIC FIRST PROJECT FIRST FABRICATION First Project 1984 1988 1990 1994 1997 2005 2006 2014 FUNDAMENTS MISSION RIMMSA is a highly specialized and qualified company that provides field services and ASME components manufacture/assembly for the industrial and energy sectors. QUALITY POLICY RIMMSA is highly committed to customer service, quality and total contract compliance. RIMMSA continuously improves it’s QMS through the review and updating of business processes in order to continuously and sustainably grow and strengthen as a leader company in it’s sector. VISION To consolidate itself in a world class company and leader in it’s sector, with a highly skilled committed staff, strategic alliances, the most efficient systems, good finances and the highest commitment level with our community, employees, suppliers, clients, partners and stakeholders. LOCATIONS MONTERREY Headquarters & Manufacturing Plant MEXICO CITY Engineering and Commercial office COATZACOALCOS Sales presence HEADQUARTERS LOCATED IN THE BUILDING VAO 2 7th FLOOR VALLE ORIENTE, SAN PEDRO GARZA GARCÍA, NL DEPARTMENTS: CEO OPERATIONS PROJECT MANAGEMENT OFFICE ALL THE ADMINISTRATIVE AREAS PROCUREMENT & LOGISTICS ENGINEERING MANUFACTURING PLANT Located in Santa Rosa Industrial Park, in Apodaca, Nuevo Leon. DEPARTMENTS: PRODUCTION QUALITY ASSURANCE MATERIAL RESOURCES One of the biggest industrial areas in Mexico. Strategic location to identify supplies and exporte products to the USA. MANUFACTURING PLANT TOTALLY EQUIPPED: LAYDOWN AREA PATIO TOTAL AREA: 2,154 M2 (23,186 SQ FT) NAVE 1 SHOP FLOOR TOTAL AREA: 2,800 M2 OFICINAS NAVE 2 (30,128 SQ FT) (2 BAYS) (4) Pines Machines for bending of piping (2) Semiautomatic welding cars of 4 heads each one. 3 Gantry Cranes Heat Treatment and HT equipment SERVICES MANUFACTURING ASME PRESSURE PART MANUFACTURING/ASSEMBLY DESIGN, MANUFACTURE, INSTALLATION, AND PUT IN SERVICE OF HRSG‟s WITH CGV ENERGY, SUBSIDIARY COMPANY OF RIMMSA IN CONJUCTION WITH HAMON DELTAK FIELD SERVICES EMERGENCY REPAIRS/SERVICES INDUSTRIAL CONSTRUCTION RETROFIT PROJECTS ASSEMBLED MAJOR EQUIPMENT, PROVIDED EMERGENT FIELD TUBE REPLACEMENTS, INTEGRAL MAINTENANCE , MAJOR REPAIRS AND UPGRADES IN BOILERS, HEATERS, HEATEXCHANGERS, AND MORE. RIMMSA PROVIDES SPECIALIZED AND HIGH-QUALITY GOODS AND SERVICES TO: ENERGY POWER PLANTS SUCH AS: COMBINED CYCLES REFINERIES GAS PROCESSING PLANTS THERMOELECTRICAL CARBOELECTRIC PETROCHEMICAL PLANT REPAIRS ONBOARD SHIPPING TANKERS PULP AND PAPER MILLS, STEEL MILLS, AND MORE… SERVICES FIELD SERVICES Compliance with execution times High experienced engineers Quality of works Qualified labor work Security Aggregate value policy SERVICES FABRICATION ASME “S” Pressure Parts for steam generators, industrial, marine, and any kind of boilers. ASME “U” Drums, Tanks, etc. LOCAL CONTENT MORE THAN 110 CONTRACTS HIGH QUALITY STANDARDS INTERNATIONAL MARKET ASME “H” Heaters SERVICES 1 Lakeland, FL City of Lakeland 3 Valparaiso, IN NIPSCO 5 Houston, TX Universal Compression (Exterran) 2 Louisville, KY Louisville Gas & Electric 4 Lena, LA Cleco Power LLC 6 Orlando, FL Orlando Utility Commission (OUC) FABRICATION FOR USA MARKET 10 3 8 12 11 7 2 4 13 5 1 6 9 7 Dumfries, VA Dominion Generation 9 Orlando, FL Orlando Utility Commission (OUC) 11 Manchester, OH Dayton Power & Light (DPL) 8 Wheatfield, IN NIPSCO 10 Yarmouth, MA Florida Power & Light (FPL) 12 Easton, PA PPL Generation, LLC 13 Gainesville, FLGainesville Regional Utilities (GRU) SERVICES ENGINEERING SHOP DETAILING DRAWINGS CAPABILITIES AS REQUIRED FOR FABRICATION FEASIBILITY ENGINEERING AND CALCULATIONS INVERSE ENGINEERING ASME CALCULATIONS DETAIL ENGINEERING 3D DESIGN SERVICES DESIGN, MANUFACTURE, INSTALLATION, AND PUT IN SERVICE OF HRSG‟s CGV Energy is the subsidiary company of RIMMSA that develops this service http://cgvenergy.com CERTIFICATIONS RIMMSA manufactures pressure parts in compliance with A.S.M.E (American Society of Mechanical Engineers) and it is regulated by Bureau Veritas having the following certificates of authorization . The repairs on site are done according to NBIC. (National Board Inspection Code) FABRICATIONS REPAIRS Under the ASME code (American Society of Mechanical Engineers) Section I an are the stamps “S”, “U” & “H”. Done according to the NBIC. (National Board Inspection Code) they have the stamps “R” Y “NB”. STAMPS HEATERS PRESSURE VESSELS BOILERS REPAIRS ON SITE ORGANIZE, REGISTRY AND CONTROL OF FABRICATIONS CERTIFICATIONS THE QUALITY MANAGEMENT SYSTEM OF RIMMSA IS CERTIFIED WITH THE INTERNATIONAL NORMATIVE ISO 9001:2008. RIMMSA IS REGULATED BY TüV SüD AMERICA OF MEXICO. RIMMSA developed, implemented and formalized the quality management system internally on April 29th, 2013 and obtained the certification on August 20th, 2014 with the purpose of: Standardize the documentation of the operative processes Control the operative processes Comprehend and satisfy more adecuately the needs and expecations of its clients Improve its administration Satisfy the requirements of the international normative ISO 9001:2008 The system includes the management of services and products of field services and metal mechanical manufacturind, supply of materials and any other related services. This includes: Sales, Development and presentation of technical and economical proposals, metal mechanical manufacturind, administration of field services, and billing. VALUE PROPOSAL HIGHLY SPECIALIZED ENGINEERING HIGHLY QUALIFIED LABOR 26 YEARS IN THE INDUSTRY AND 6 EXPORTING TO USA MORE THAN 450 CONTRACTS 100% MEXICAN COMPANY STAMPS “S”,”U” Y “H” OF ASME STAMPS “R” Y “NB” OF NBIC ISO 9001 CERTIFICATION NATIONAL COVERAGE CAPACITY TO INSTALL INFRASTRUCTURE ON SITE STRATEGIC ASSOCIATIONS INTERNATIONAL PROCUREMENT CREDENTIALS CLIENT: SIEMENS (Comision Federal de Electricidad, Tula Conventional thermal Power Plant (5 x 300 Mw)) PROJECT CFE Tula, Unit # 3 & # 4, Pressure Part Supply, Fabrication & Installation (2) X 300 Mw Radiant Boilers Babcock & Wilcox Canada SCOPE Fabrication highlights: RIMMSA Completed and shipped 120 Water Wall Panels, 112 Economizer Elements, 156 Superheater elements, 104 Reheater Elements and 24 headers with a total weight of 886 Tons, consisting of 56 truck loads of ASME pressure part components in 8 months. Installation highlights: RIMMSA installed all the pressure parts, new Howden air preheaters, ducts, insulation, refractory, Peabody burners and supplied through T&M all the qualified labor for the redesigned condenser works. Over 17,000 (shop & field) pressure part welds at time of final Hydro, there were a total of 8 leeks. CREDENTIALS CLIENT: PEMEX REFINACION, REFINERIA FRANCISCO I. MADERO (Waste Heat Boiler BI-DRUM Babcock & Wilcox of Mexico) PROJECT Rehabilitation of Waste Heat Boiler U-100 at Catalytic Plant 2 (FCC-2) SCOPE RIMMSA developed all the project detailing drawings by inverse engineering, supply of boiler tubes, ASME Fabrication of all pressure parts, (230 Tons) hydrostatic test, pneumatic test, Radiographic test, PWHT, Painting, chemical cleaning, instrumentation, expansion joints, duct work, stack paint, and more…The installation works executed according to the National Board Inspection Code. (-R- Stamp) CREDENTIALS CLIENT: SIEMENS (PPL Electric Utilities Corporation, Martin„s Creek Station, Bangor, PA , Unit-4) PROJECT Fabrication of Horizontal Reheater Replacement For an 800 Mw unit SCOPE RIMMSA fabricated and shipped 303 RH Assemblies with Hanger Tubes, Terminal Tube (partial) & Inlet Leads and SCW Panels, Door & Sootblower Panels with a total weight of 937 Tons, consisting of more than 50 trucks loads of ASME pressure part components. CREDENTIALS CLIENT: ALSTOM POWER End user: Iberdrola PROJECT Monterrey Unit 41 Once- Through Cooler (OTC) Retrofit. Consists on changing tubes with fissures and pressurizing the component air side and water side to assure the reparations were made correctly. SCOPE RIMMSA completed more than 450 welding joints with 0% of rejection as well as Non Destructive Test: • Ultrasonic test • Penetrant test • Radiographic test The result was 100% of acceptance, as well as hydro test reaching to a pressure as per ITP specified. The retrofit was finally stamped with our – R- Stamp according to National Board Inspection Code. CREDENTIALS CLIENT: ICA Fluor (Final User: GDF Suez Tractebel Energia de Monterrey) PROJECT Complete reconstruction of the Air-Cooled Condenser (ACC) CREDENTIALS CLIENT: PEMEX REFINACION, REFINERIA ING. ANTONIO M. AMOR (RIAMA) (Boiler SF of 200 tons of capacity Foster Wheeler) PROJECT Rehabilitation of CB-9 Boiler SCOPE RIMMSA developed all the project detailing drawings, supply of boiler tubes, ASME Fabrication of pressure parts, (210 Tons) hydrostatic test, pneumatic test, Radiographic test, PWHT, Painting, chemical cleaning, instrumentation, expansion joints, duct work, stack paint, and complete BMS…The installation works executed according to the National Board Inspection Code. (-R- Stamp) CREDENTIALS CLIENT: PEMEX GAS Y PETROQUIMICA BASICA COMPLEJO PROCESADOR DE GAS CACTUS Heat Recovery Boiler CH-31 Deltak SCOPE Complete Fabrication of the Heat Recovery Boiler CH-31 including inverse engineering, ASME calculations, detail drawings, supply of all the materials and all non destructive test according to the code. Upper Dome (11.4 Tons) Lower Dome (100.1 Tons) CREDENTIALS CLIENT: CFE CT Valle de Mexico PROJECT Scope: Supply and Manufcature of Economizer and Superheater Elements FULL SCOPE • Supply and manufacture of 130 elements of the upper bank of the superheater of intermediate temperature for the steam generator of Unit 2 and 3 with an approximate weight of 95 tons. • Supply and manufacture of the economizer bank for the steam generator of Unit 1. Approximate weight of the bank of 30 tons. CREDENTIALS CLIENT: GDF Suez Energy Monterrey Power Plant PROJECT Dismounting of High and Low pressure Gas Heaters and Mounting of new Gas Heaters HP E-450 and LP E-400. SCOPE • Dismounting of the current High and Low Pressure Heaters • Mounting and connection of the new High and Low Pressure Heaters • Mounting of the Flash tanks and Condensate Pumps including foundation. • Installation of instrumentation for Gas Heaters and Flash Tank • Supply and Fabrication of piping lines and platform for connection of Flash Tank. • Installation of piping from the flash tank to the demineralization tank. +52(81) 83353052 www.rimmsa.com sales@rimmsa.com ¡THANKS FOR YOUR TIME!