ZONAL MASTER PLAN
FOR
MOUNT ABU ECO SENSITIVE ZONE
Case of Eco Sensitive Hill Town : Mt
Abu
MoEF Notification 2009
• It has been increasingly observed, from past few decades that
the adverse environmental impacts caused by soil erosion,
water and air pollution as a result of tourist and other
developmental activities are not only damaging the natural,
cultural and manmade resources, but also affecting the health
and very survival of living beings. The notification emphasizes
on making a Zonal Master Plan for the entire Eco-sensitive
Zone, Sub-Zonal Plans for the area within and outside the
Mount Abu Municipal Council Area and a Tourism Master
Plan.
Planning Process for Mount Abu
Master Plans of Mount Abu
Master Plan of Mount Abu Urban Area had been prepared by the Chief Town Planner and Town and Country Planning
Department for 1981-2001 and 2001-2025
MoEF Notification 2009
Mount Abu designated
as an ESZ
Recognizing ecological importance coupled with
natural, cultural and manmade heritage.
Preparation of
ZMP & sub ZMP
Ban on constructions
activities till ZMP is in place
Directions for preparation of ZMP
Within 2 years by the State Government with the involvement of the State Departments of Environment, Forest, Urban
Development, Tourism, Municipal Department, Revenue Department, and the Rajasthan State Pollution Control Board
Hiring a consultant by Government of Rajasthan
In April 2010, SPA-D appointed as consultant
Scope of work outlined in the TOR finalized with the T&CP
Dept
The ZMP & Sub ZMP
SPA-D consultant Team prepared the Plan with
detailed work studies, analyses & vision
Regular deliberations with various
Government Departments
Public hearing/
suggestions
Submission to the Govt Of Rajasthan
Submission of the Plan for final approval
Observations of Monitoring committee, CEC
Approval to the Plan
After indepth scrutiny the Plan was approved in 2013
Planning Process for Mount Abu
Master Plan Under
Act
THE TEAM
•Project Co-ordinator
MoEF Notification
2009
Directions for
preparation of ZMP
Hiring a consultant
by Govt of
Rajasthan
The ZMP & Sub
ZMP
Submission to the
Govt Of Rajasthan
Approval to the
Plan
•Transport Planning
•Tourism development
•Heritage & Conservation
•Urban and Regional
Planning
•Pollution and
Infrastructure
•Landscape Development
•Urban Design
•GIS and Remote
Sensing
•Urban Planning
6
HOUSING
8
SLUM ENCROACHMENTS
•Presence of hotels and
tourism sector has resulted in
increase in slum population
within municipal limits
•Slums on the water bodies
pose a serious threat to natural
water channels
9
HEIGHT CONTROL
THE POSSIBILITIES FOR 2030
EXISTING SATELLITE VIEW FROM ACHALGARH 2005
11
PARAMETERS CONSIDERED FOR FUTURE
DEVELOPMENT
•
•
•
•
•
•
•
•
Density
Slopes
Forest Cover
Water sources and its
availability
Natural heritage
Cultural heritage
Land availability and Suitability
Carrying capacity ( Tourism,
Transport, Social and Physical
Infrastructure etc )
REGULATE
Development
Activity
SUPPORT
Tourism within
Carrying Capacity
ZMP
Mount Abu
ESA
PROTECT
Unique Ecology
CONSERVE Heritage
•Natural
•Built
•Cultural
12