Paenal Brochure February 2014
Transcription
Paenal Brochure February 2014
PAENAL FABRICATION FACILITY Porto Amboim, Angola PAENAL SBM Executive Visit – 13th October 2013 PORTO AMBOIM ESTALEIROS NAVAIS OVERVIEW PRESENTATION IR- 18/09/2013 INTRODUCTION • In 2007 the Sonangol and the SBM Offshore Group committed to develop a new fabrication yard in Porto Amboim, Kwanza Sul Region in order to expand “Angolan Content” and enhance the capacity of the Angolan fabrication industry. • PAENAL Lda (Porto Amboim Estaleiros Navais Lda) was formed initially as a Joint Venture between Sonangol and SBM. At the end of 2010 the JV was joined by DSME from South Korea. Today the composition of PAENAL Lda is: SONANGOL (40%) SBM (30%) DSME (30%) • The first phase of PAENAL Yard was completed in 2008 and the full phase of yard development was completed in Q3-2013, with the commissioning of the 2,500-ton capacity Heavy Lift Crane (HLC) in August 2013. • At full operating capacity the PAENAL yard provides approximately two (2) million man hours of work per year. IR- 18/09/2013 LOCATION The yard is located three kilometres south of the City of Porto Amboim and is a forty five minute drive from Sumbe, the capital city of Kwanza Sul Province. Porto Amboim - Main Town IR- 18/09/2013 PAENAL YARD TODAY 2500t Heavy Lift Crane SONANGOL Marine Oil Terminal Pipe Shops Warehouse Main Offices, Client Offices, Canteen 4MW Power Plant Maintenance Shop IR- 18/09/2013 Fabrication Shops Site Offices & Clinic PROJECT WORK Client Project SBM/ CABGOC Construction of 2 Shallow Water Calm Buoys for the MTOE Project. HMC/BP . Fabrication of 26 Mudmats . Integration of FTAs . Fabrication of Ballast Blocks Technip/BP Fabrication of Initiation Pile (75t) and 10”, 6” Gas Injection Spools (16t) OPS, Angola Fabrication of FPSO Boarding Ladder DSME/Total Protectors, Water Treatment Module (M122) and 17 Suction Anchor Piles Total Weight Delivery Date 500 metric tons Q2 2009 1.700 tons Q4 2010 2.900 metric tons 91 metric tons Q1 2011 75 metric tons Q2 2011 7,700 metric tons Q4 2013 SBM/ENI 9 Suction Anchors Piles, Sulfate Reduction Package Module (M08) and Hot Oil Pump Module (M18) 1,359 metric tons Q4 2013 CABGOC Fabrication, load out and sea-fastening of 2 WHP Topsides 6,400 metric tons Q4 2014 IR- 18/09/2013 MAPOWER AND TRAINING IMPLEMENTATION: OBJECTIVES: • • • • • Angolanization • Career Development • Transfer of know how Continuous Training at all levels Strong Performance Appraisal Process Employee Couching Clear measurable objectives DIRECT PERSONNEL: WELDERS, FABRICATORS, RIGGERS, SCAFFOLDERS, QA/QC, ENGINEERING TOTAL NUMBER OF PAENAL PERSONNEL (DIRECT + INDIRECT) 2009 2010 2011 2012 2013 Expats 64 46 58 99 119 990 Nationals 170 192 319 590 750 85% 85% % National 73% 81% 85% 86% 86% 964 1170 TOTAL NUMBER 234 238 377 689 869 2009 2010 2011 2012 2013 Expats 77 87 152 144 180 Nationals 282 333 675 820 % National 79% 79% 82% TOTAL NUMBER 359 420 827 TRAINING SCHOOL • • • • The PAENAL Training School was established in April 2007, first training session launched in May 2007 The Training School re-opened in November 2010 with 70 new Trainees per quarter Successfully trained 421 Porto Amboim young personnel for welding and fabrication works Training will re-start in 2 QTR 2014 (35 welders and 35 fabricators) IR- 18/09/2013 RISKS AND CHALLENGES RISKS • Reduction of Scope of Work of ongoing projects, having a negative impact on revenue and profit forecast • Slow “know how” transfer, lack of proposals for high end integration equipment such as Power Generation and Gas Compression • High Operating Costs, high labor costs • Lack of proper infrastructure in the area to attract young professionals from other Provinces GAS COMPRESSION MODULE - NEXT STEP IN PAENAL DEVELOPMENT - CHALLENGES • Convert Paenal in a true EPC Company, providing management for Detailed Engineering, Procurement, Construction and Commissioning. • Prepare PAENAL for future growth to achieve 2 million man-h of fabrication capacity. POWER GENERATION MODULE - NEXT STEP IN PAENAL DEVELOPMENT - IR- 18/09/2013 SOCIAL RESPONSIBILITY PAENAL has become a Major contributor to the Social Responsibility in the Kwanza Sul Region: Main Targets & Actions: • Mitigate high unemployment by training and offering job opportunities to the local people from kwanza Sul and surrounding areas. • Encourage the creation of small private companies, to support the needs of the yard. • Encourage International Contractors, Service Providers to establish a presence/base in Porto Amboim creating additional training and job opportunities. • Encourage and Participate in the development of Social Activities (Karting, Football, Beach Volley…) • Identify & encourage the development of infrastructure required to improve the quality of life of the local people; assistance to hospital/clinics, schools. • • Supporting local charities. Sponsor Education elementary schools IR- 18/09/2013 programs such as revamping of PAENAL Completed CLOV & Ready for N’GOMA… CLOV a Series of “1st” 1st FPSO to Berth at a quay in Angola 1st Module Fabrication and Integration in an Angolan Yard 1St FPSO Naming Ceremony in Angola (combined with 60 Year anniversary of TOTAL in Angola). Checklist 495m of Quay 1.200 employees 85% Angolan Content 2.500T HLC Pipe Shops & Mechanical Shops Others… 9 IR- 18/09/2013 PAENAL on the NEWS…. “Africa's largest crane built in Angola The USD50 million crane has been named Jamba and is able to lift cargoes weighing up to 2,500 tonnes” Source: Heavylift International Sept 13 “Africa’s Strongest Crane Gets to Grips With Angola Oil Projects” Source: Bloomberg Aug 13 The 2500T HEAVY LIFT CRANE has been named “JAMBA” by the Governor of the Kwanza Sul Province; Eusébio de Brito Teixeira at the occasion of the naming Ceremony on the 14th August 13. Source: Macauhub Aug 13 “JAMBA” is the meaning for “ELEPHANT” 10 IR- 18/09/2013 PAENAL on the NEWS…. IR- 18/09/2013 PAENAL on the NEWS…. CLOV NAMING CEREMONY IR- 18/09/2013 PAENAL on the NEWS…. CLOV NAMING CEREMONY IR- 18/09/2013 PAENAL a trusted partner • Proven capacity to SAFELY execute large scale projects Every Person SAFE every day • High focus on Safety Leadership, behaviour and workforce Engagement Robust Construction and Commissioning • Strong Management Team with international expertise and experience in delivering projects to the highest standards of safety and quality, on time and on budget • Paenal brings a controlled step change in terms of Angolan Content by expanding the Capabilities of an Angolan Fabrication yard in terms of fabrication Complexity, EPC competencies and Exposure to Oil Majors. • Establish a High quality Project Team for every Project • To promote and develop the topsides fabrication, integration and project management know-how in Country • Delivery of projects safely, on time and with high quality at the Satisfaction of Company and its Stakeholders. Long Term Commitment to ANGOLA OUR COMMITMENT IR- 18/09/2013
Similar documents
Porto Amboim | Angola
PAENAL, Porto Amboim Estaleiros Navais Limitada, is a joint venture between SONANGOL and SBM. The new construction yard will provide the working area required to build offshore structures and will ...
More information