EDC Concesion Vial Cordoba - Sucre - En
Transcription
EDC Concesion Vial Cordoba - Sucre - En
CRUZ DEL VISO SECOND ROADWAY REHABILITATION AND MAINTENANCE SINCELEJO EASTERN BYPASS TOLU VIEJO LORICA SINCELEJO SINCELEJO COROZAL SAMPUES CORDOBA CERETE CIENAGA DE ORO LA YE MONTERIA SAHAGUN SUCRE BOLIVAR CONSTRUCTORA EMMA CASE STUDY: CORDOBA – SUCRE ROAD CONCESSION Constructora Emma partners with Autopistas de la Sabana S.A., a road concession operating transport infrastructure between the Cordoba and Sucre districts, as well as linking these districts to the interior of the country. This road corridor links cities and commercial, productive and touristic centers in the region. Its importance stems from the amount of tourist traffic generated by inland districts, specifically throughout the Montería-Cerete-Lorica-Covenas section, the main route to Colombia’s Caribbean Sea. Additionally, the La Ye-Sincelejo-Corozal trunkline receives high traffic from heavy vehicles which use it to reach the main ports in the Atlantic Coast. REHABILITATION START END AIRPORT T INTERSECTION MONTERIA CERETE CIENAGA SINCELEJO SINCELEJO PASS-THROUGH COROZAL PUERTA DE HIERRO (PR 25+000) SUCRE-BOLIVAR DISTRICT BORDER CARRETO (PR 108+695) EL MAIZAL ROAD (RECONSTRUCTION) CANO BAGRE BRIDGE (PR 13+149) SINCELEJO CERETE AIRPORT T INTERSECTION CIENAGA LA YE COROZAL PUERTA DE HIERRO SUCRE-BOLIVAR DISTRICT BORDER CARRETO (PR 108+695) CRUZ DEL VISO (PR 25+093) LORICA METALLIC BRIDGE (PR 25+000) TOLU VIEJO TOTAL LENGTH OF REHABILITATED ROADS (KM) KM CORDOBA SUCRE 7.00 14.00 17.00 16.78 11.80 12.00 13.20 29.00 55.42 25.23 4.50 41.00 18.05 7.00 14.00 17.00 16.78 264.98 54.78 210.2 CORDOBA SUCRE 11.80 12.00 13.20 29.00 55.42 25.23 4.50 41.00 18.05 CONSTRUCTION OF THE SECOND ROADWAY START END AIRPORT T INTERSECTION (PR 0+000) CAI PR 6+942 (CERETE) LA GALLERA (SAMPUES) COROZAL EXIT (PR 0+000) MONTERIA PARALLEL CONECTING ROAD 41 ST TRAFFIC CIRCLE TO PLANETA RICA MONTERIA RING ROAD (PR+850) SINCELEJO LA YE SINCELEJO CERETE CIENAGA DE ORO (PR20+000) BREMEN PR 6+500 ENTRANCE TO COROZAL INTERSECTION KM 13.40 20.00 11.20 8.80 2.00 1.60 9.20 14.50 20.20 19.25 13.40 20.00 TOTAL LENGTH OF CONSTRUCTION NEW ROAD (KM) 120.15 46.20 TOTAL LENGTH OF MAINTENANCE AND OPERATION (KM) 385.13 CONSTRUCTORA EMMA MONTERIA CERETE INSERSECTION (MOCARI) SAMPUES (RETURNS FOR 1.5 KM) SAHAGUN (RETURNS FOR 1.2 KM) TOLU VIEJO (RETURNS FOR 1.2 KM) OFFICE Carretera La Cordialidad, Transversal 54 No. 96-700 Sector Doña Manuela, Cartagena, Colombia. Tel: (57+5) 652 0236 - 651 6650 - 652 5770 11.20 8.80 2.00 1.60 9.20 14.50 20.20 19.25 73.95
Similar documents
Archivo 1 - Advanced Control of Energy Systems Group. ACES
Master Students Anton Gora Junior Bruno Leonardo Schneider Luis Márcio Medina do Carmo Renato Ferreira Simão
More information