Installation Manual - Top Mounted slatted cover ( 4,7
Transcription
Installation Manual - Top Mounted slatted cover ( 4,7
INSTALLATION MANUAL TOP INSTALLATION PoolLock & PoolDeck factory Liptál 415, CZ-756 31 Czech Republic Tel.: +420 571 423 861 Fax: +420 571 423 322 Mob: +47 90 55 99 55 e-mail: pooldeck@poollock.com 1. Prepare the fixing brackets of roll-up tube to 2. Place the fixing bracket of roll-up tube to the the side of pool, where should be the system placed. correct distance from the pool edge (A=1/2 of diam. roll-up tube with fully wind-up cover - see table in the back of the manual). If OVERHANG INSTALLATION - the brackets should be placed just on the edge of the pool! Inside edge of the bracket should be in line with the edge of the pool. 3. The distance between the inside walls of the 4. Using a marker, mark the positions of the brackets must be the same as the POOL WIDTH. 5. Using ø8 mm drill, drill 50 mm deep holes for wallplugs. bracket holes on the floor. 6. Cleanup the holes and hammer in the wallplugs. 7. Fix the bracket of roll-up tube to the floor using attached screws St 5,5 x 50. 9. Put the bearing block on the shaft. 8. Check that the bracket is mounted in the correct position and fix the second bracket of roll-up tube at the opposite side of the pool. BE AWARE, to ensure the correct functioning of the slatted cover, the roll-up tube must be mounted in horizontal position perpendiculary with pool wall. Prepare the roll-up tube. 10. DO NOT USE A KNIFE! The watertight cable cannot be damaged in any way! Use pliers to cut the binder. 11. Run the cabel through the groove in the bracket. 12. Set the roll-up tube to the brackets and check that it is placed in perpendicular way to the pool. 13. Fix the roll-up tube in the brackets by using 14. Nuts should be tighten very well. screws M8 x 100. Steps 15-19 are valid for FLUSH instalation only. If your cover is OVERHANG installation proceed straight to installation point No. 24 15. Devide the space between the brackets equally to be able to place attached ROLLERS the way that the space between each roller and also between roller and bracket is equal.. 17. Using ø8 mm drill, drill 50 mm deep holes for wall-plugs. 16. Place the ROLLERS in perpendicular way with pool edge and mark the position of fixing holes. 18. Cleanup the holes and hammer in the wallplugs. 19. Fix the ROLLERS to the floor with screws St 5,5 x 50. 21. Attach the rest of slats to the first slat, which is connected to the fixing straps. 20. Attach the slat fixing straps by screws St 3,5x6,5 to pre-made holes on the roll-up tube. PoolDeck - Top installation Diameters of roll-up tubes with fully wind-up cover Valid from: 01.01.2008 Installation of the slats. Attachment of the slats. 1. Place the ends of the mats at right angles to each other so the longest hook of the first mat fits in the groove of the second mat. 2. Now press on the top side of the slats so the short hook clicks in the groove. 3. Repeat this wave-like movement over the entire width of the pool until the two mats are attached together completely. 4. Once all the mats have been attached, click them onto the slats that are already attached to the reel. VERY IMPORTANT SAFETY CONCERN Always ensure that the pool is completely covered with slats (there may be slats left over) and that they all float on the water so the deck no longer can be pushed open. Attachment of the guide plates The directional guide plates are attached to the first two slats at edge of the slats. These ensure that the slats go in the correct direction during unrolling. A) Sketch for Top Mount Installation B) Sketch for Under Mount Installation