PowerPoint template – sample title
Transcription
PowerPoint template – sample title
FMC Angola First Annual Network Meeting organized by INTSOK October 2nd 2013 FMC Angola FMC Operational locations in Angola 1 FMC Angola Introduction to FMC in Angola 1999 2 FMC Angola Introduction to FMC in Angola Actual Update on new expansion plan in next slides 3 FMC Angola Introduction to FMC in Angola FKIA Leadership Team COUNTRY MANAGER José Costa Jr. SALES & MARKETING HR MANAGER TBN Taniana Maximino NEW PROJECTS Project Manager Kjell Iversen GENERAL MANAGER FKIA Dag Andre Moen PMA- Project Managers Angola TECHNICAL MANAGER Michal Polit -Girri Magnus Salen - Clov Olav Ingebrigtsen HSE MANAGER COMMERCIAL MANAGER Pascoal da Silva Jan Inge Askeland QUALITY MANAGER Anwar Vak. ADMIN. MANAGER FINANCE CONTROLLER Alice Lelis David Da Silva SUPPLY CHAIN MANAGER Marcio da Silva WORKSHOP MANAGER Terje Fauske MANUFACTURING MANAGER OPERATIONS MANAGER Tenente Marques Tayo Akinkunmi Angolan Management positions in red 4 FMC Angola Introduction to FMC in Angola Local Manufacturing Capability • Christmas Tree Assembly – – Turnaround time 6 weeks Current Facility’s capacity of 12 per Quarter • In-Country Machining and Welding – – – Conductor Housing Wellheads Jumpers • In-Country Fabrication – – – – 5 Manifold, Caisson Foundation, Manifold Subsea Structure PBG and Flow Bases Jumpers XTree Parts (XTree Roof, ROV Panels etc.) FMC Angola Introduction to FMC in Angola Local Manufacturing Experience • First Xmas Tree built in May 2007 – – Installed Aug. 2007 Equal Quality performance with full built on the same project • 50 (off) Xmas Trees Assembled Locally to date – – 6 26 (off) Vertical Completed + 6 (off) Ongoing 24 (off) Horizontal FMC Angola Introduction to FMC in Angola Local Fabrication Experience • Total Block 17 – Rosa – – – – – – 4 Manifolds (Petromar) 4 Closed caisson foundations (Petromar) 4 Manifold subsea structures (Petromar) 18 PGB’s (Friedlander) 13 well jumpers (Friedlander on our site) Gas gathering manifold fabricated at Petromar Soyo Manifold subsea structures (Petromar) 7 FMC Angola Introduction to FMC in Angola Friedlander Luanda – PGB’s Local Fabrication Experience • BP Block 18 – – – – 6 Manifolds (Sonamet) 44 PGB’s (Algoa) Working at MV (Jembas) for fabrication on XT parts. 43 Well jumpers final assembly (Petromar in Soyo) Algoa Luanda – PGB’s Welljumpers Petromar Soyo 8 FMC Angola MM S1 during Large Bore Pressure Testing Introduction to FMC in Angola Local Machining and Welding Experience • Conductor Housing Machining • Wellhead welding and repairs 9 FMC Angola Introduction to FMC in Angola Local Aftermarket Service Capability • Site Receival Test • Hook up and Function Testing /System Integration Testing • Equipment/Tools Mobilization and Demob • Installation and Life of Field Support • Maintenance, Refurbishment & Repair of Wellhead & Completion components • Storage, Preservation and Maintenance • Spare Part Management • SCM MMR- Level 3 • XT’s assembly and test • Fabrication support test for Manifolds, Well Jumpers etc. • Development of new suppliers • Internal and External Training • Recertification and Refurbishment (Evolving) • Rental Tools Management (Evolving) 10 FMC Angola Introduction to FMC in Angola Local Aftermarket Service Experience • Five Major Field Development with LOF support – – – – – TOTAL Girrasol TOTAL Jasmine TOTAL Rosa Greater Plutonio Pazflor • One Major Field Development Startup – TOTAL CLOV • 156 (off) Xmas Tree Installed base – – – 116(off) Vertical Trees 39 (off) Horizontal 70 (off) in backlog • 50+ Exploration Drilling Support – Blocks 17 and 32 (TOTAL), Block 21 (Cobalt), Block 20 (Cobalt) • Completion and CWOR System Recertification (Ongoing) • Tree Refurbishment (Developing) 11 FMC Angola Introduction to FMC in Angola Local Content: Development of local capabilities Total Rosa 27 Well Development Local Content Contribution Total Girassol/Jasmin 30 Well Development BP Greater Plutonio 45 Well Development Total PAZFLOR 49 Well Development CLOV 36 Well Development 2010 2007 - 2008 2005 2004 Jumper Fabrication Shallow water tests 2000 PGB’s Foundation Caissons Jumper Fabrication Investment in Base Jumper Fabrication Manifold Syst. Fabrication Jumper Fabrication Manifold Syst. Fabrication (Inc Large Bore Pipe) SCM MMR level 2 Xmas Tree Assembly Investment in Base Jumper Fabrication Manifold Syst.fabrication (Inc Large Bore Pipe) Xmas Tree Assembly Pipe bending Manifold Syst.fabrication (Inc Large Bore Pipe) Xmas Tree Assembly SCM MMR level 2 SCM MMR level 2 SCMMR level 3 SCMMR level 3 Machining wellheads Investment in Base Machining wellheads Investment in Base FMC’s local content has increased with every major contract 12 FMC Angola Introduction to FMC in Angola GirRI Manifold System Load out March 29th, successfully installed 13 FMC Angola Introduction to FMC in Angola Local Content – Development of FMC Workforce EXPATS ANGOLANS Year Onshore Offshore Total (A) % Onshore Offshore 2000 18 32 50 69% 22 2001 18 29 47 51% 2002 10 22 32 2003 12 12 2004 9 2005 Total Total (A + B) Total (B) % 0 22 31% 72 42 3 45 49% 92 34% 55 7 62 66% 94 24 30% 47 10 57 70% 81 18 27 32% 47 10 57 68% 84 20 14 34 26% 86 9 95 74% 129 2006 20 40 60 33% 104 17 121 67% 181 2007 34 56 90 40% 108 26 134 60% 224 2008 26 44 70 30% 134 30 164 70% 234 2009 30 31 61 29% 123 29 152 71% 213 2010 43 55 98 35% 138 41 179 65% 277 2011 59 53 112 31% 192 57 249 69% 361 2012 70 55 125 30% 215 75 290 70% 415 2013 (Jan) 65 60 125 30% 215 79 294 70% 419 2014 91 62 153 28% 281 107 388 72% 541 Recruited & trained more than 115 Angolan employees From 2010 to Present Date 14 FMC Angola Introduction to FMC in Angola ANGOLANIZATION - Positions Onshore 60 50 40 30 Locals Expats 20 Trainees 10 0 *2 QC trainees will be trained in computerized radiography **12 Trainees from CINFOTEC for 3 months. 15 FMC Angola Introduction to FMC in Angola ANGOLANIZATION - Positions Offshore 35 30 25 20 15 Locals 10 Trainees Expats 5 0 16 FMC Angola Introduction to FMC in Angola ANGOLANIZATION – Work Outside Angola 2012 10 8 6 Supervisors 4 Operators Team leaders Total 2 0 17 FMC Angola Introduction to FMC in Angola FMC Angola Growth & Expansion FMC Angola New Base Location SONILS 19 FMC Angola Introduction to FMC in Angola New Base at SONILS – Yard - Status July 2013 20 FMC Angola Introduction to FMC in Angola New Base at SONILS – Offices - Status July 2013 21 FMC Angola Introduction to FMC in Angola New Facility at SONILS – Final Layout 22 FMC Angola Introduction to FMC in Angola 23 FMC Angola Introduction to FMC in Angola Location of Machining plant will be ZEE (Zona Económica Especial –Viana) 24 FMC Angola Introduction to FMC in Angola Machining Plant - preliminar layout 25 FMC Angola Introduction to FMC in Angola