March 31, 2015 File No. - Mackenzie Valley Land and Water Board
Transcription
March 31, 2015 File No. - Mackenzie Valley Land and Water Board
Geoff Pearse Cold Lake & Conventional SSH&E Manager 780-639-5269 Tel geoff.a.pearse@exxonmobil.com March 31, 2015 File No.: Sahtu Land and Water Board c/o Bonnie Bergsma P.O. Box 1 Fort Good Hope, NT X0E 0H0 RE: 2014 Annual Report – Licence S11L1-004 (Freshwater Pipeline Installation) Imperial Oil Resources N.W.T. Limited (Imperial ) Dear Ms, Bergsma, Imperial Oil Resources N.W.T. Limited (Imperial) is submitting this 2014 Annual Report as per Part B, Section 1 of Licence S11L1-004. Details of Work Completed, including restoration: Sahtu Land and Water Board (SLWB) Licence S11L1-004 was obtained by Imperial on January 12, 2012. This Licence was required for an excavation along the Mackenzie River for the installation of a freshwater pipe between Bear Island and Frenchy’s Island. The work began January 30, 2012 and was completed February 23, 2012. No further work was completed on this site during 2014. For work completed in previous year’s under the SLWB Licence S11L1-004 please refer to the 2012 and 2013 Annual Report’s. Data Generated From Surveillance Network Program (SNP): No de-watering was required on this site 2014; as such, no sampling occurred. Unauthorized Discharges: No unauthorized discharges occurred on the site during 2014. Other Details on Waste Disposal as Requested by the Board by November 1 of the Year Being Reported: No additional details regarding waste disposal were requested by SLWB by November 1st, 2014. Results of Annual Site Assessment: The excavation area was assessed post break up between September 15th and 17th, 2014. The assessment determined that no additional work was required. The results of the assessment are attached in Figure 9 – Frenchy’s Pipeline Post Construction Photos and Hydrotechnical Assessment. Imperial Oil Resources N.W.T. Limited 1001 Canol Drive Bag #5000 Norman Wells, NT X0E 0V0 2 In compliance with condition Part G, Section 3 of Licence S11L1-004, Imperial will continue to inspect and monitor the project area annually post break until the Licence expires in January 2017. Results of monitoring will be provided to the SLWB on an annual basis, as required by the Licence. If you have any questions or concerns regarding this report please contact me at (867) 587-3215. Sincerely, Lindsay Hollands, B.ASc Environmental and Regulatory Advisor cc: T. Morton, Inspector, AANDC Circulate: J. Watson A. Phelps J. Brown R. Beck A. Campbell Operations Superintendent, Norman Wells Environment and Regulatory Supervisor, Cold Lake Field Foreman, Norman Wells Plant Foreman, Norman Wells Maintenance Foreman, Norman Wells Imperial Oil Resources N.W.T. Limited 1001 Canol Drive Bag #5000 Norman Wells, NT X0E 0V0 USER NAME: keith.wu ISSUING OFFICE: FRENCHY'S PIPELINE POST CONSTRUCTION PHOTOS AND HYDROTECHNICAL ASSESSMENT Date: XX-SEP-14 Drawn by: KW - Edited by: App'd by: WMV WorleyParsons Project No. 407074-00020 DRG No REV FIGURE 9 A This drawing is prepared for the use of the contractual customer of WorleyParsons Canada Services Ltd. and WorleyParsons Canada Services Ltd. assumes no liability to any other party for any representations contained in this drawing. FILE LOCATION:U:\CAL\GBS\407074-00020\1000 - ARTIFICIAL ISLANDS REPORT 2014\11.0_FIGURES_&_MAPS\11.4_CAD_FILES\06-FIG\407074-00020-1000-FIG 7-16.DWG PLOT DATE & TIME: 17/12/2014 1:54:57 PM SAVE DATE & TIME: 17/12/2014 1:54:04 PM IMPERIAL OIL RESOURCES 2014 ASSESSMENT