integrated technology corporation

Transcription

integrated technology corporation
Providing Leading Edge Technology to Meet Your Future Requirements Today
PROBE CARD METROLOGY
HIGH TEMPERATURE TESTING
OF PROBE CARDS
Rod Schwartz
Dan Kosecki
VP & Technical Director
VP Software Development
Integrated Technology Corporation
Integrated Technology Corporation
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Purpose
• To show the effects of temperature
on probe card parameters
• To prove the usefulness of high
temperature probe card metrology
• To highlight some differences in
probe card technology &
construction
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Equipment & Samples
• Probilt PB3500 Probe Card Analyzer with Hot
Chuck Option
• Epoxy Ring Cards
– 3 Identical Cards
– J971 Type
– Designed for High Temperature
• Form Factor Card
– Logic Array
• Membrane Card
– Logic Array
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Hot Chuck Block Diagram
HPCDA
Supply
Air Filter
&
Heater
Heated Air Control
Heated Air Flow
Computer
Interface
Hot Chuck
System
Controller
Probe Card
Hot Chuck
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Hot Chuck System Controller
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Heated Measurement Chuck
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Heated Air “Top-Hat”
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Bottom of “Top-Hat”
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
“Top-Hat” & Adapter
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Hot Chuck Specifications
Control
Point
Minimum Maximum Control
Stability
Temp.
Temp.
Heated
Chuck
Room
125 C
+/- 1.0 C
Heated
Air
Stream
Room
125 C
+/- 1.0 C
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Metrology Environment
Heated Air Flow
Pogo Pins
Retainer
Pogo Pins
Heated Chuck
Planarity
Adjustors
Heater Strips
&
Thermal Barrier
Camera & Optics
X,Y,Z Stage
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
Subchuck
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Probe Card Construction
PCB Aperture
PCB
R ing
Ring Aperture
E p o xy
Probe Tip Depth
Probe
PC
Bo tto
Surfa
Probe Details
R ing
H ighest
Probe
P lanarity
Probe W ire
Diam eter
E p o xy
Lowest
Probe
Tip
Length
E p o xy
Clearance
Tip Diam eter
Tip Shape
F lat
E-tip (Radiused)
Figure 3: PCB and Epoxy Ring Assembly
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Probe Ring
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Large Ceramic Probe Ring
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Large Array on Probe Card
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Cross Section View
CHUCK
TEMP.
25 C
25 C
120 C
80 C
10 mils
60 C
1000 mils
1004 mils
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Pitch Change with Temp
CHUCK
TEMP
25 C
120 C
70 u
80 u
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Alignment Shifts (3 Cards)
•
•
•
•
•
•
•
Averages of 6 groups of 5 probes
3 groups each side, evenly spaced
Boxes represent +/- 5 microns movement
Lines represent direction and magnitude
of movement (25 °C to 125 °C)
The “+” is 25 °C location
#11-Red, #12-Blue, #14-Green
Repeatability of multiple runs affected by
stabilization time
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Epoxy Ring Probe Card
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Epoxy Card Array
X,Y Pad Coordinates
6000
4000
Y (m icrons)
2000
0
-6000
-4000
-2000
0
2000
4000
6000
-2000
-4000
-6000
X (m icrons)
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Alignment Shift (Epoxy Card)
*Box = +/- 10u
*The + in center of box is 25
°C location
*Each line is 5 probe average
*Card 11 – Red
*Card 12 – Blue
*Card 13 – Green
*Length of line represents
the shift in position from
25 °C to 125 °C.
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Other Shifts (Epoxy Card)
Parameter
Card 11
Card 12
Card 14
Z Shift
-221 u
-147 u
-148 u
Planar
Window
Leakage
Increase
55u (25)
50u (125)
6-10 uA
58u (25)
54u (125)
6-9 uA
30u (25)
33u (125)
6-10 uA
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Memory Card
Probes at 25, 36, 70 & 90 °C
Probes Movement with Temperature
Yoffset (microns)
15
10
Series1
5
Series2
0
-10
-5
0
10
20
30
Series3
-10
Xoffset (microns)
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Form Factor Micro Spring
MLC Connections
Space Transformer
Micro-Spring
Truncated Pyramid
Probe Tip
Contact Paddle
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Form Factor Probe Card
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Form Factor Array
X,Y Pad Coordinates
6000
4000
Y (microns)
2000
0
-8000
-6000
-4000
-2000
0
2000
4000
6000
8000
-2000
-4000
-6000
X (microns)
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Alignment Shifts (FFI)
*Box = +/- 10u
*The + in center of box is 25
°C location
*Each line is a single probe
*Length of line represents
the shift in position from 25
°C to 125 °C.
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Other Shifts (FFI)
Parameter
FFI Card Value
Z Shift
-160 microns
Planar Window
36 microns (25°C)
48 microns (125 °C)
0.4 to 0.6 uA
Leakage Increase
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Form Factor Results
•
•
•
•
Fairly predictable results
Larger shift than epoxy ring
Not as consistent as expected
Data on only one card should not be
taken as representative of type
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Membrane Probe Head
Window (opt)
Probe
Frame
Springs
PCB
Membrane
Plunger
Bumps
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Membrane Array
X,Y Pad Coordinates
15000
10000
Y (microns)
5000
0
-15000
-10000
-5000
0
5000
10000
15000
-5000
-10000
-15000
X (microns)
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Alignment Shifts (Membrane)
*Box = +/- 10u
*The + in center of box is 25
°C location
*Each line is a single probe
*Length of line represents the
shift in position from 25 °C to
100 °C.
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Other Shifts (Membrane)
Parameter
FFI Card Value
Z Shift
-145 microns
Planar Window
72 microns (25°C)
71 microns (100 °C)
Not Run
Leakage Increase
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Membrane Results
• Mylar expands and probes move a
lot
• Very well behaved – predictable
results
• More temperature sensitive than
other technologies
• Requires card to be designed for
temperature of use
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Cobra Probe Card
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Cobra Head Cross Section
Metalization
Space
Transformer
Upper
Die
Mylar
Lower
Die
"Cobra"
Probe Needle
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Cobra Considerations
• Lower die is close to wafer
– Heats up considerably
– Test time vs. Index Time changes
heating
• Mylar insulator may move
• Probe stresses
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Conclusions
• Probe movement for most technologies
with temperature is NOT predictable, but
it IS repeatable
• Epoxy card construction techniques can
make a significant difference in
temperature performance
• FFI cards are more predictable than
epoxy, but there are still variations
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Conclusions (2)
• Membrane card is the most
predictable
• Membrane card has largest shifts
with temperature
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Future Studies
•
•
•
•
•
Other Probe Card Technologies
Scrub Mark vs. Analyzer Data
Probe Material Variations
Card Construction Techniques
Path of Probe Movement vs. Temperature
Change
• Stabilization Times vs. Repeatability
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION
Providing Leading Edge Technology to Meet Your Future Requirements Today
Acknowledgements
• Bill Williams – Motorola
– Thanks for supplying cards for this
study.
• Russ Allred - ITC
– Data Collection
• Hoa Do Thai - ITC
– Data Collection
4/9/2002
Copyright April 2002 - ITC
www.inttechcorp.com
INTEGRATED TECHNOLOGY CORPORATION

Similar documents

1950-1960 Chemung County Obituaries

1950-1960 Chemung County Obituaries Abraham Abraham Abrahamson Abrams Ace Acker Ackerman Ackerman

More information