Knight Piésold - Stop Ajax Mine
Transcription
Knight Piésold - Stop Ajax Mine
KGHM AJAX MINING INC. AJAX PROJECT PROJECT DESCRIPTION PREPARED FOR KGHM Ajax Mining Inc. 615 - 800 West Pender Street Vancouver, BC V6C 2V6 PREPARED BY Knight Piésold Ltd. Suite 1400 – 750 West Pender Street Vancouver, BC V6C 2T8 Knight Piésold C O N S U L T I N G VA101-246/8-1 Rev 3 July 6, 2011 KGHM AJ JAX MINING G INC. AJA AX PROJECT T PROJEC CT DESCRIPT TION (REF. NO O. VA101-246 6/8-1) EXECUT TIVE SUMMA ARY The Ajax Project (“the e Project”) is a proposed open pit cop pper and gold d mine locate ed near Kamlloops, British Co olumbia. Som me components of the mine e, including th he north wastte rock manag gement facilitty, the processing facility and truck shop, and the tailin ngs storage fa acility, will be e within Kamlloops city lim mits on Crown an nd mine-owne ed lands. Th he Project is comprised c off eight 100% owned Crow wn grants inclluding the historic Ajax East and a West pits s. The Projec ct contains a pit inventoryy of 2.6 billion n pounds of ccopper and 2.4 million m ounces s of gold. Witth an expecte ed mine life o of 23 years, th he Project will provide job bs and economic c opportunities s for the Tk’e emlups Indian n Band and th he Skeetchesstn Indian Ban nd, and the p people of BC an nd Canada. In addition, the Project will contribu ute financiallyy to provincia al and federa al tax revenues through pro ovincial net proceeds p and d taxes. Th he total capital cost estiimated during the preliminarry economic assessment was $535 million. m Sincce that time,, several eng gineering trade-off studies have been co ompleted whic ch will improve the projecct economicss, and may influence / ch hange project ca apital. The prop ponent, KGHM Ajax Mining Inc. (KA AM), is a Jo oint Venture between Ab bacus Mining g and Exploratio on Corporatio on (AME); a mineral exploration and developmentt company, a and KGHM P Polska MiedĨ S.A A (KGHM), a leading global copper and silver produ ucer. KAM ccurrently conttrols approxim mately 8,124 ha of land in th he Project arrea, previously part of the e Afton-Ajax Mine operate ed by Teck ((Afton Operating g Corporation n). In the im mmediate Projject area, KA AM has owne ership of eight Crown Grranted claims an nd acquired portions of 14 additional mineral claims that were pa art of a joint vventure agree ement with New w Gold Inc. (N New Gold). New Gold has retained a 10% net p present intere est (NPI) on these mineral cllaims. KAM has h ownershiip of an additional 20 Crow wn Grants an nd 27 contiguo ous mineral cclaims in the Pro oject area and d an additional eight mine eral claims an nd three Crow wn Grants tha at are near but not contiguou us with the Pro oject. In June 2009, AME co ompleted an NI N 43-101 com mpliant positiive Preliminarry Economic Analysis (PE EA) on the Ajax property, p after a series of successful drrill programs from 2005 to o 2008. The results of the e PEA indicate th he potential fo or a robust mining operatio on capable off processing 6 60,000 tonness of ore per day. Average annual a production of the mine m is estima ated at 106 m million poundss of copper a and 99,400 ou unces of gold in concentrate, based on a conceptual c mine plan supp plying 21.9 Mtt of ore per ye ear (60,000 to onnes per day) to t the mill. Restored and expanded e min ne componen nts from previious operations are expeccted to be utilized d to the fullestt extent possiible. The ore and a waste will w be drilled for blasting utilizing elecctric drills cap pable of drilling 311 millimetre diameter blast-holes. Blasted mate erial will then be loaded intto 228 tonne haul trucks w with 35 cubic metre electric ro ope shovels and 19 cubic metre m front-en nd loaders. I of II VA101-2 246/8-1 Rev 3 July 6 6, 2011 The ore will w be deliverred from the mine utilizing g a combined d in-pit and o out-pit gyratory primary crrusher system. The crushed d ore will fee ed to a conve entional copp per concentra ator. The co oncentrator d design includes a secondary y crushing circuit, c feedin ng two high pressure g grinding rolls followed byy two 7.62 x 12..5 m ball mills s. Copper an nd gold will then be recovvered in conccentrate throu ugh a conven ntional flotation circuit. c The co oncentrate will then be filte ered and ship ped by truck tto the Port off Vancouver. Project co omponents arre expected to o include the following: x Open pit x essing plant Proce x Thickened tailings plant x Tailings storage facility x e rock manag gement facilities Waste x Waterr managemen nt facilities x Road and bridge upgrades x a and haul road New access x Borrow sources x smission line and a transform mer upgrades Trans x Explo osives storage e facility x Proce ess and potab ble water systtem x Conce entrate storag ge and shipping area, and x Conce entrate transp port to Port off Vancouver. Project im mpacts will be e primarily con ncentrated on n sites previo ously disturbe ed by historica al mining activities. o receive the No modifiications to the Port of Van ncouver will be b required to e concentrate e. The Projecct site has been intensively studied s as a result of mon nitoring activiities of the old mine sitess, and more rrecent studies an nd monitoring g activities to address a Proje ect concerns. KAM is cu urrently active e on First Nattion and publiic consultatio on as part of tthe pre-Appliccation phase of the Project. Baseline en nvironmental studies and exploration drilling, con ndemnation d drilling, prelim minary engineerin ng, and site surveys s will co ontinue throug ghout the pre e-Application p phase. II of II VA101-2 246/8-1 Rev 3 July 6 6, 2011 KGHM AJ JAX MINING G INC. AJA AX PROJECT T PROJEC CT DESCRIPT TION (REF. NO O. VA101-246 6/8-1) TABLE OF CONTEN NTS P PAGE EXECUTIIVE SUMMAR RY .................................................................................................................................. I TABLE OF CONTENTS .................................................................................................................................... i N 1.0 - INTRO ODUCTION .................................................................................................................... 1 SECTION 1.1 KGHM AJA AX MINING INC – CORPO ORATE OVER RVIEW .......................................................... 1 1.2 CORPORA ATE POLICIE ES ............................................................................................................. 3 1.3 CONTACT T INFORMAT TION .......................................................................................................... 3 1.3.1 Prroponent ........................................................................................................................ 3 1.3.2 Co onsultant ....................................................................................................................... 4 SECTION N 2.0 - PROJE ECT HISTOR RY .............................................................................................................. 5 SECTION N 3.0 - PROJE ECT LOCATIO ON AND MAP PPING ................................................................................ 6 SECTION N 4.0 - PROJE ECT PURPOS SE AND RAT TIONALE ............................................................................. 7 4.1 PROJECT T JUSTIFICAT TION ......................................................................................................... 7 4.2 ESTIMATE ED RESOURCE............................................................................................................ 7 4.3 CAPITAL COST C AND TAXATION T ................................................................................................ 7 SECTION N 5.0 - PROJE ECT OVERVIEW........................................................................................................... 9 5.1 PROJECT T COMPONEN NTS .......................................................................................................... 9 5.2 MINING METHOD M ........................................................................................................................ 9 5.3 SITE LAYO OUT AND FA ACILITIES ............................................................................................... 10 5.3.1 Aja ax Open Pit ................................................................................................................. 10 5.3.2 Prrocessing Fac cility......................................................................................................... 10 5.3.3 Ta ailings Storage Facility and d Process Wa ater............................................................... 11 5.3.4 Fresh Water Su upply ....................................................................................................... 11 5.3.5 Re eagent Handling and Stora age .................................................................................... 12 5.3.6 As ssay and Meta allurgical................................................................................................. 13 5.3.7 Airr Supply ...................................................................................................................... 13 5.3.8 Po ower Supply and a Distributio on ..................................................................................... 13 5.3.9 Staff Accommo odations................................................................................................... 14 5.3.10 Ex xplosives Mag gazine ..................................................................................................... 14 5.3.11 Water Managem ment ....................................................................................................... 15 5.3.12 So olid and Wastte Water Management........................................................................... 15 5.3.13 Co ommunication ns ............................................................................................................ 15 i of vi VA101-2 246/8-1 Rev 3 July 6 6, 2011 5.4 5.5 5.6 5.7 5.8 5.9 5.3.14 Fu uel Storage .................................................................................................................. 16 5.3.15 Bu uildings and Structures S ................................................................................................ 16 MINERAL PROCESSIN NG........................................................................................................... 16 5.4.1 Prrimary Crushe er Systems.............................................................................................. 16 5.4.2 Grrinding and Classification ............................................................................................ 17 5.4.3 Flo otation Circuit .............................................................................................................. 18 5.4.4 Co oncentrate Th hickening................................................................................................. 20 5.4.5 Ta ailings Manag gement .................................................................................................... 20 WASTE ROCK MANAG GEMENT FAC CILITIES ........................................................................... 22 ACCESS ROADS R ....................................................................................................................... 22 CONCENT TRATE TRAN NSPORT ................................................................................................. 23 ALTERNA ATIVES ASSE ESSMENT ............................................................................................... 23 CLOSURE E AND RECLA AMATION............................................................................................... 25 5.9.1 Closure of Tailings Storage Facility .............................................................................. 25 5.9.2 Waste Rock Ma anagement Facilities Closu ure............................................................... 25 5.9.3 Aja ax Pit........................................................................................................................... 25 5.9.4 Prrocessing Plant............................................................................................................ 25 5.9.5 Ac ccess Road ................................................................................................................. 26 SECTION N 6.0 - PROJE ECT SETTING G ............................................................................................................ 27 6.1 EXISTING G CONDITION NS ........................................................................................................... 27 6.2 GEOLOGY Y AND MINER RALIZATION ......................................................................................... 27 6.2.1 Ge eology ......................................................................................................................... 27 6.2 2.1.1 Re egional Geolo ogy .......................................................................................................... 27 6.2 2.1.2 Lo ocal Geology ................................................................................................................ 28 6.2.2 Miineralization ................................................................................................................ 29 6.3 TERRAIN .................................................................................................................................... 29 CLIMATE .................................................................................................................................... 30 6.4 6.4.1 Aja ax Site Meteo orology.................................................................................................... 30 6.5 HYDROLO OGY ............................................................................................................................. 31 6.6 HYDROGE EOLOGY ..................................................................................................................... 31 6.7 WATER QUALITY Q ...................................................................................................................... 32 6.7.1 Water Quality in n Receiving Water W Bodies ................................................................... 32 6.7 7.1.1 Pe eterson Creek k .............................................................................................................. 32 6.7 7.1.2 Ja acko Lake .................................................................................................................... 33 6.7 7.1.3 Ch herry Creek ................................................................................................................. 34 6.8 VEGETAT TION............................................................................................................................. 34 6.8.1 Ra are Plant Com mmunities................................................................................................ 35 6.9 FISH AND D FISH HABIT TAT ......................................................................................................... 35 6.9.1 Ra are and Endangered Fish Species S ............................................................................ 36 6.10 WILDLIFE ................................................................................................................................... 37 6.11 LAND USE E .................................................................................................................................. 37 6.12 ARCHAEO OLOGY ........................................................................................................................ 38 6.13 COMMUNITY AND ECO ONOMY ................................................................................................. 38 6.13.1 Lo ocal Community ........................................................................................................... 38 ii of vi VA101-2 246/8-1 Rev 3 July 6 6, 2011 6.13.2 Lo ocal and Regional Econom my ....................................................................................... 38 SECTION N 7.0 - POTEN NTIAL EFFEC CTS ........................................................................................................ 39 7.1 PHYSICAL L AND BIOLO OGICAL ENVIRONMENTS S .................................................................. 39 7.1.1 Airr Quality ...................................................................................................................... 39 7.1.2 No oise.............................................................................................................................. 39 7.1.3 Watershed Drainage...................................................................................................... 40 7.1.4 Fis sh and Fish Habitat H ..................................................................................................... 40 7.1.4.1 Im mpacts on Stre eam Habitat ............................................................................................ 40 7.1.4.2 Im mpacts on Lak ke Habitat ................................................................................................ 41 7.1.5 Water Quality ................................................................................................................. 41 7.1.6 Ve egetation ..................................................................................................................... 41 7.1.7 Wildlife ........................................................................................................................... 41 7.1.7.1 Ro oadkill Mortaliity ........................................................................................................... 41 7.1.7.2 Co onstruction-Related Mortality ..................................................................................... 42 7.1.7.3 Mo ortality Due To T Contaminants .................................................................................... 42 7.1.7.4 Crreation of Pro oblem Wildlife ......................................................................................... 42 7.1.7.5 Ha abitat Loss/Modification .............................................................................................. 42 7.1.7.6 Disturbance Efffects ....................................................................................................... 43 7.1.8 Ac cid Rock Drain nage and Metal Leaching (ARD/ML) ................................................... 43 7.2 ECONOMIC ENVIRONMENT .................................................................................................... 43 SOCIAL ENVIRONMEN 7.3 NT ........................................................................................................... 43 7.3.1 Ae esthetics ...................................................................................................................... 43 7.3.2 La and and Wate er Use...................................................................................................... 44 7.4 HERITAGE E ................................................................................................................................. 44 7.5 HEALTH AND A COMMU UNITY...................................................................................................... 44 SECTION N 8.0 - FIRST NATIONS EN NGAGEMENT AND PUBL LIC CONSULT TATION.................................. 45 FIRST NATION CONSU 8.1 ULTATION ............................................................................................. 45 8.2 FEDERAL L, PROVINCIA AL, AND REG GIONAL GOV VERNMENT C CONSULTATION .................. 47 8.2.1 Fe ederal Govern nment...................................................................................................... 47 8.2.2 Prrovincial Gove ernment .................................................................................................. 47 8.2.3 Re egional Goverrnment.................................................................................................... 48 8.3 PUBLIC CONSULTATIO C ON ......................................................................................................... 48 8.3.1 Lo ocal Communities, Busines sses, and Sta akeholders ................................................... 49 SECTION N 9.0 - PROPO OSED DEVELOPMENT SCHEDULE ....................................................................... 50 9.1 PERMITTIING PROCES SS ........................................................................................................... 50 9.2 CONSTRU UCTION ....................................................................................................................... 50 9.3 OPERATIO ONS ............................................................................................................................ 50 9.4 DECOMMISSIONING................................................................................................................. 50 SECTION N 10.0 - REQU UIRED PERM MITS ........................................................................................................ 51 10.1 ENVIRONMENTAL ASS SESSMENT REVIEW PRO OCESS ....................................................... 51 10.1.1 Brritish Columbia Environmen ntal Assessm ment Act Proce ess ......................................... 51 10.1.2 Ca anadian Envirronmental Assessment Acct Process .................................................... 51 iii of vi VA101-2 246/8-1 Rev 3 July 6 6, 2011 10.2 10.3 OTHER REQUIRED PE ERMITS AND D APPROVAL LS ................................................................ 52 10.2.1 Brritish Columbia Authorizatio ons, Licensess and Permitss .............................................. 52 10.2.2 Fe ederal Authorizations, Licenses and Perrmits ............................................................ 52 HARMONIIZED REVIEW W PROCESS S ........................................................................................ 53 SECTION N 11.0 - REFE ERENCES ................................................................................................................... 54 SECTION N 12.0 - CERT TIFICATION ................................................................................................................ 56 TABLES Table 4.1 Rev 1 Table 4.2 Rev 1 Table 5.1 Rev 1 Table 6.1 Rev 0 Table 6.2 Rev 0 Table 6.3 Rev 0 Table 6.4 Rev 0 Table 6.5 Rev 0 Table 6.6 Rev 0 Table 6.7 Rev 0 Table 6.8 Rev 0 Table 6.9 Rev 0 Table 6.10 0 Rev 0 Table 6.11 Rev 0 Miineral Resourrce Estimate Su ummary of Ca apital Costs Ma ajor Design Criteria C Sa ample Summa ary and Statis stics for PC02 2 Sa ample Summa ary and Statis stics for PC03 3 Sa ample Summa ary and Statis stics for PC08 8 Sa ample Summa ary and Statis stics for JC03 3 Sa ample Summa ary and Statis stics for JACL L-S Sa ample Summa ary and Statis stics for JACL L-D Sa ample Summa ary and Statis stics for JACL L-02 Sa ample Summa ary and Statis stics for JACL L-03 Sa ample Summa ary and Statis stics for CC02 2 Sa ample Summa ary and Statis stics for CC08 8 Wildlife: Potential Species off Concern FIGURES F Figure 2.1 1 Rev 2 Figure 3.1 1 Rev 1 Figure 3.2 2 Rev 2 Figure 5.1 1 Rev 2 Figure 5.2 2 Rev 2 Figure 5.3 3 Rev 2 Figure 5.4 4 Rev 1 Figure 5.5 5 Rev 0 Figure 5.5 5 Rev 2 Figure 6.1 1 Rev 0 Figure 6.2 2 Rev 1 Figure 6.3 3 Rev 1 Figure 6.4 4 Rev 2 Figure 7.1 1 Rev 1 Figure 8.1 1 Rev 0 Prroponent Mine eral Claims in n the Project A Area Prroject Location n Overview Prroject Area La and Ownershiip Miine Site Deve elopment Phases Prroject Overvie ew Aja ax Pit Develo opment Phase es Sc chematic Rep presentation of o the Extracti on Process Ka amloops Lake e Water Intake e Pumping Syystem Waste Rock Ma anagement Facilities Deve elopment Pha ases Re egional Geolo ogy in the Pro oject Area Aja ax Pit Geolog gy Pe eterson Creek k and Cherry Creek Waterssheds Water Quality and a Hydrology y Monitoring S Sites Ma ain Site Wate ercourses Firrst Nations Re eserves iv of vi VA101-2 246/8-1 Rev 3 July 6 6, 2011 PHOTOS P Photo 1 Photo 2 Photo 3 Photo 4 Photo 5 Photo 6 Photo 7 Photo 8 Photo 9 Photo 10 Photo 11 Ink ks Lake. View w from Lac Le e Jeune Highw way (Novemb ber 2006). Vie ew of Kamloo ops Lake Sou uth Shore Nea ar Existing Wa ater Intake Sttructure. Ex xisting Pumph house on Sou uth Shore of K Kamloops Lakke. Ex xisting Booste er Inline Pump ps. Historical Ajax East Pit (June e 2010). Historical Ajax west w pit (June e 2010). Re eclaimed Histtorical Waste Rock Manag ement Facilityy. Pe eterson Creek k at Sample Site S PC02. Pe eterson Creek k at Sample Site S PC08. Ja acko Lake Outlet Into Peterrson Creek. Ja acko Lake Norrtheast Arm. v of vi VA101-2 246/8-1 Rev 3 July 6 6, 2011 LIST OF ABBREVIAT A TIONS AEA AIA AME AN ANFO ARD/ML BC BCEAA BCEAO BCFS CEA Agen ncy CEAA CSR DFO EA EC HC HCA HPGR ILMB KAM KGHM KP kWh/t MIBC MOE MPMO Mt NPI NRCan PAX PEA Project ROM ROW TC TNRD TSF t t/h SSN STS Adv vanced Explo oration Agreem ment Arc chaeological Impact Assesssment Aba acus Mining and a Exploratio on Corporatio on Am mmonium Nitra ate Am mmonium Nitra ate Fuel Oil Acid Rock Drain nage / Metal L Leaching Brittish Columbia a BC Environmenttal Assessme ent Act BC Environmenttal Assessme ent Office Brittish Columbia a Forest Serv ice Canadian Enviro onmental Asssessment Age ency Canadian Enviro onmental Asssessment Act Comprehensive Study Reporrt Fisheries and Oceans Canad da Env vironmental Assessment A Env vironment Ca anada Hea alth Canada Heritage Conserrvation Act Hig gh Pressure Grinder G Roll Inte egrated Land Managemen nt Bureau KG GHM Ajax Mining Inc. KG GHM Polska MiedĨ M S.A Kniight Piésold Ltd. L Kilo owatt hour pe er tonne Methyl Iso Butyl Carbonal Min nistry of Envirronment Major Projects Management M Office Milllion tonnes Nett Present Inte erest Nattural Resourc ces Canada Pottassium Amyll Xanthate Pre eliminary Economic Analyssis Aja ax Project Run of Mine Rig ght-of-Way Tra ansport Canad da Tho ompson Nicola Regional D District Tailings Storage e Facility Ton nne Ton nnes per hour Stk k’emlupsemc of the Secwe epemc Nation Stk k’emlupsemc te Secwepem mc vi of vi VA101-2 246/8-1 Rev 3 July 6 6, 2011 JAX MINING G INC. KGHM AJ AJA AX PROJECT T PROJEC CT DESCRIPT TION (REF. NO O. VA101-246 6/8-1) SECTION 1.0 - INTRODU UCTION 1.1 KGHM K AJAX MINING M INC – CORPORA ATE OVERVIE EW The propo onent, KGHM M-Ajax Mining g Inc. (KAM), is a mineral exploration a and developm ment companyy with an advanced-stage project located in the prolific Afton Minin ng Camp nea ar Kamloops,, British Colu umbia. KAM is a joint venture company be etween KGHM M Polska Mie edĨ S.A. and A Abacus Minin ng and Explo oration Corp (AME). KGHM Polska MiedĨ S.A. is Polis sh copper mining m and sm melting comp pany, the nin nth largest ccopper producer in the world. It was creatted as a state e-owned com mpany in 1961 1, but in 1991 1 it was priva atized, and since e 1997 it has traded publically on the Warsaw Stocck Exchange under the syymbol “KGHM M”. It currently employs ove er 18,000 peo ople in its thrree mines, tw wo copper sm melters, its w wire rod plantt, and various au uxiliary busine ess units. AME is a British Columbia-registerred company, incorporated d on October 17, 1983. It has engag ged in mineral exploration in the province e, with its prim mary focus b being the dep posits associa ated with the e Ajax Project. It is registere ed company in British Co olumbia and a Tier One issuer that trrades on the e TSX Venture Exchange E und der the symbo ol “AME”. KAM hold ds a 100% in nterest in eight mineral re esource prope erties in the Afton Mine C Camp (Afton)) near Kamloops s, British Colu umbia. The Company als so holds the rights to acquire 24 km2 o of land and e earn a 100% inte erest in mining g infrastructurre and related d permits in th he Afton area a. The Ajax Project will la argely be dev veloped using g expertise frrom AME. A précis of eacch of the AME key managem ment team members is prov vided below. James Ex xcell Presidentt and CEO Mr. Excell is a Metallu urgical Engine eer with extensive senior executive, m mine managem ment, and pro ocess engineerin ng experience. His caree er includes mo ore than thre ee decades w with BHP Billitton in Canada and internation nally, serving as President and COO of o BHP Billiton n Diamonds Inc. from 199 99 to 2003, a and as its Chairm man to June 2005. 2 He has s been respo onsible for ove erseeing the managementt and develop pment some of the world's premier mining projects, including th he EKATI dia amond mine in the Northwest Territories s, where he led the constrruction, comm missioning an nd subsequen nt operation o of the $700 m million developm ment. Jim has s also manage ed copper op perations in B British Columb bia, as well ass metallurgica al and thermal coal c mines in Australia and the U.S. In I addition to o his outstand ding industryy experience, he is recognize ed for fostering g goodwill relations with go overnment an nd aboriginal groups. 1 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 Andrew Pooler P Executive e Vice Preside ent and Chieff Operating Offficer Mr. Poole er has more th han 30 years of experience e as a mining g engineer an nd operations executive wo orking in North, Central, C and South Americ ca. Prior to jo oining Abacuss, Mr. Pooler was the Sen nior Vice Pressident, o Pan Mine Ope erations, for Pan P American Silver Corp. with respons ibilities for sixx producing m mines. Prior to American Silver, Mr. Pooler held executive positions p with h several international m mining compa anies, including Amax Gold Inc. I where he e was Vice President P of O Operations. Mr. Pooler ho olds a Bache elor of Science degree d in mining engineering from the University U of Id daho. Jim Whitttaker Project Manager M Mr. Whitta aker joined th he Abacus te eam in late 2008, 2 coming from the CR RU Strategiess regional offfice in Santiago de Chile, whe ere his work was focused on business improvemen nt for their min ning sector clients. Jim was the leader of the t Performance Improvem ment practice e area, and he e lead consullting projects in the realms off operational asset produ uctivity, risk evaluation e in strategic miine planning,, and the au udit of up for Greenfield d and Brownffield capital in nvestments. Prior to this,, Jim worked for the Place er Dome grou 12 years, and during that time he h held resp ponsibility forr process op perations in copper, gold d and molybden num operation ns in Canada and Chile, an nd enhanced shareholder value through improveme ents in operationa al productivity y, project starrt-up, and resource protecttion. Gordon Frost F Chief Mine Engineer Mr. Frost has more than ten years’’ experience in the mining g industry wo orking for mining and conssulting companie es based in British B Colum mbia. For the e last five ye ears, Mr. Fro ost was with AMEC Amerricans Limited (""AMEC") whe ere he worked d on projects s and mines iin Latin Amerrica, Central Asia and Ca anada, including Abacus' Ajax x Project. Prior P to joining AMEC Mr.. Frost held various posittions with Im mperial Metals inc cluding that of o Mine Engin neer at the Huckleberry M Mine. Mr. Fro ost holds a Ba achelor of Sccience degree in n Mining Engiineering from m Queen's Un niversity and a Diploma in n Mining Technology (Hon nours) from the British B Columbia Institute of o Technology y. Dianna Stoopnikoff S Environmental Manage er Ms. Stoop pnikoff has more than 15 years’ y experie ence managin ng environme ental program ms within BC. Prior to joining AME, Dianna a led the successful issua ance of an EA A Certificate w which include ed a pilot projject to allow for concurrent c pe ermitting of th he Galore Creek Project. Dianna has also worked for several m mining companie es including Myra M Falls, Ne ew Gold, and Premier Golld, which werre in various p phases of sta art-up, construction, operation n or closure. She also has s extensive e experience ma anaging susta ainable comm munity relations, managemen nt systems fo or construction and operattions, and th he developme ent of policiess and procedure es. 2 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 1.2 CORPORATE C POLICIES KAM has adopted the following f com mprehensive Environmenta E al, Health, and d Safety Policcy: KAM is committed c to meeting or exceeding th he requireme ents of the environmental and occupa ational health and safety legis slation for eac ch authority in which it op perates. KAM M is committe ed to protectin ng the health and d safety of the public, its employees, e an nd the natura al environmen nt. Where pro oject activitiess may affect peo ople and/or the t environm ment, KAM is s committed tto eliminating g or mitigatin ng the exten nt and magnitude e of potential impacts. To achieve this, KAM is comm mitted to: x x x x x x x x x x x Implement, and continually improve upo on, an effe ective health h, safety, and environm mental mana agement syste em Identify, assess, and manage risks r to emplo oyees, contra actors, communities, and tthe environment in which h it operates Provid de and ensure understand ding of the hea alth, safety, a and environme ental risks thrrough effectivve risk asses ssment and trraining to all itts employees and contracttors Reduce, re-use an nd recycle waste w in orderr to minimize e waste and encourage th he efficient u use of resources Use appropriate a te echnologies to o prevent and reduce wastte and pollutio on Ensurre financial prreparations are a made thro oughout the liffe of the Projject to ensure e decommissiioning is imp plemented appropriately Meet, and where practical, p exce eed legal requ uirements for health, safetyy, and the envvironment Mainttain transpare ent relationships and consu ultation with a all stakeholders and indigenous peopless Suppo ort the funda amental hum man rights of all people potentially afffected by a project, inclluding emplo oyees, contractors, and communities Respe ect the traditio onal rights of indigenous peoples, p and Contrribute to the long-term so ocioeconomic c and institu tional develo opment of em mployees an nd the comm munities within n which projec cts occur. 1.3 CONTACT C INF FORMATION 1.3.1 Proponent KGHM-Ajax K Mining M Inc. 6tth Floor, 800 West Penderr Street Vancouver, V BC C.V6C 2V6 Phone: Toll Free: Fax: Email: Web: W 4-682-0301 604 866 6-834-0301 604 4-682-0307 info o@amemining g.com ww ww.amemining g.com Company C Representatives: Mr. James Whittake er ager Project Mana 3 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 Ms. Diianna Stoopnikoff 1.3.2 Environmenttal Manager Consultant C AME A has enga aged Knight Piésold P Ltd. (KP) ( to condu uct environmental assessment coordin nation. Contact C inform mation for Knig ght Piésold Lttd. is provided d below. Name: N Address: A Phone: Fax: Email: Web: W Knight Piésold Ltd. L 140 00 – 750 W Pender P Street Vancouver, BC, V6C 2T8, 4-685-0543 604 866 6-685-0417 info o@knightpies sold.com ww ww.knightpieso old.com Company C Representative: Mr. Ch hris Brodie, R.P.Bio. Environmental Services Manager – E 4 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 SECTION S 2.0 - PROJECT H HISTORY Mineral exploration e an nd production n in the Ajax x Project area a can be tra aced back ovver 100 yearss with exploratio on beginning in the 1880s and continuing intermitten ntly until the 1980s. Copper, gold, and iron mineraliza ation was dis scovered at the Iron Ma ask Mine nea ar Kamloopss in 1896. Nearby prop perties including the Wheal Ta amar, Ajax, an nd Monte Carrlo claims werre explored in n the following g years. Claims in the Ajax Projject area inclu ude Afton, Ka aren, Galaxy, Lucky Strike, Rainbow, R Rogers, No. 7, Ajax, Gold Platte, Windsor, Buda, Lone Tree, T Iron Mask, Iron Ca p, Crescent, Winty, DM, Ned, Cliff an nd Big Onion. Copper and go old are the ma ain deposits of o interest in th he area. In the Pro oject area, un nderground ex xploration beg gan on the W Wheal Tamar cclaim in 1898 8 and develop pment work was s completed on the Monte Carlo claim as early as 1905 and on the Aja ax claim in 1906. Exploratio on continued in the Wheal Tamar, Ajax, and Monte C Carlo areas, b becoming spo oradic after 19 914. In 1928, the t Consolida ated Mining and a Smelting g Company o of Canada Ltd d. (CM&S) ob btained options on claims in the Project area a and com mpleted surfac ce drilling on n the Ajax and Monte Carrlo claims. S Sparse mineraliza ation was reported. In 1952, the t Ajax prop perty was op ptioned to Berens River M Mines Ltd. an nd later in 19 954, CM&S and its successor, Cominco Liimited (Comin nco), entered into option a greements an nd explored the area until 1980. More rece ently, the area a has seen production p thrrough five ope en pit depositts: Afton, Ajax East, Ajax West, Crescent, and Pothook k. In the 1980s, Afton Operating O Com mpany, then owned in m majority by Te eck Cominco (Teck), defin ned a mineral re esource. Min ning operatio ons were initia ated by Afton n in 1989 on n the Ajax Ea ast and Ajax West claims and were suspe ended in 1991 due to unfa avourable me tal prices. O Operations ressumed in 199 94 and were again suspended d in 1997. Du uring these pe eriods of prod duction, it is e estimated tha at 17 million to onnes (Mt) of ore e was mined and 13 Mt of ore was mille ed. In 2002 and a 2004, AM ME signed opttion agreements with Teckk and Discovery Enterprises Corp. to e earn a 100% inte erest in 52 mineral claims and a 20 patented claims, w which encomp pass the Cresscent and Ajaxx pits. In 2004, AME A fulfilled the terms off the agreem ment to a hold d a 100% intterest in the A Afton area claims, subject to o a Teck Cominco back-in right. r In June 2009, AME co ompleted an NI N 43-101 com mpliant positiive Preliminarry Economic Analysis (PE EA) on the Ajax property, p after a series of successful drrill programs from 2005 to o 2008. The results of the e PEA indicate th he potential fo or a robust mining operatio on capable off processing 6 60,000 tonness of ore per day. As illustra ated on Figu ure 2.1, KAM M, by virtue of o its joint ve enture agreement with A AME, currentlyy has 2 approxima ately 81 km of mineral ten nure holdings s in the Projecct area. In the immediate Project area,, KAM has owne ership of eightt Crown Gran nted claims an nd portions off 14 additiona al mineral claiims that are p part of a joint ven nture agreement with New w Gold Inc. (Ne ew Gold). KA AM has owne ership of an additional 20 C Crown Grants an nd 27 contiguous mineral claims c and an n additional e eight mineral claims and th hree Crown G Grants that are near but not co ontiguous with the Project.. 5 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 SECTION 3.0 - PROJE ECT LOCATIO ON AND MAP PPING The Proje ect is located in the South h-Central Interior of British h Columbia, ssouthwest of the junction of the Trans-Canada Highwa ay No. 1 and the Coquihalla Highway (N No. 5) (Figurre 3.1). The ccoordinates fo for the centre of the Project area e and 120°28 a are appro oximately 50°°38' N latitude 8' W longitude. The prope erty is situated southwest s of downtown d Kamloops and is located on mineral titles reference ma ap M092I068 (NTS 92I/9), in the Kamloop ps mining diviision. Some components of the mine, including the e north waste e rock managem ment facility, the processing facility and truck shop, and thickene ed tailings pla ant and emerg gency pond, and d the tailings storage facilitty, will be with hin Kamloopss city limits. T The proposed d infrastructure will be located d primarily on n private land retained by KAM, K with som me utilisation of crown land d (Figure 3.2)). The regional economy is largely res source and se ervice oriente d with a majo or emphasis o on forestry, m mining, agriculture e, and range use. Kamloops is a centtral transporta ation hub for the region w with a populattion of 86,376 an nd has conne ections to Hig ghways 5, 97 7C, the Transs-Canada, and Yellowhead d Highways, direct access to o deep sea po orts, commun nication infras structure, and d amenities tyypical of a cityy of this size.. The infrastructture that pres sently exists near the Aja ax property iss significant. Power and d water are readily available, with infrastrructure built to t service the e historic Aftton mine cam mp that was operated by Teck between the t 1970s and d 1990s. The Proje ect is located d within the Thompson River R watersh hed and the Thompson-O Okanagan Pllateau Ecoregion n. Retreat of glacial ice du uring the Pleis stocene resullted in a landsscape of genttly rolling platteaus, incised riv ver valley sys stems and large glacial la akes such as Kamloops Lake and Oka anagan Lake. The peaks in the t vicinity of the Project consist c of rock k including arreas of outcro op, and valleyys characterizzed as morainal deposits d cons sisting of drum mlinized glaciial till. Remna ant glaciolacu ustrine depossits occur justt north of the Afto on pit and coa arse colluvium m deposits oc ccur near Sug garloaf Hill. 6 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 SECTION 4.0 4 - PROJEC CT PURPOSE E AND RATIO ONALE 4.1 PROJECT JUS STIFICATION N KAM is prroposing to develop a 502 2 (Mt) ore pro oject. With an n expected m mine life of 23 3 years, the P Project will provid de jobs, economic opporttunities for lo ocal First Na ations (the Tkk’emlups Indian Band an nd the Skeetches stn Indian Ba and), and the e people of BC B and Cana ada. In addiition, the Pro oject will conttribute financially y to Provincial and Federall tax revenues s through pro ovincial net prroceeds and ttaxes. The P Project is situated on a site with over 10 00 years of mining histo ory and will b be constructe ed, operated d, and decommis ssioned in co ompliance witth modern en nvironmental best practice es. The Pro oject will conttribute positively to the susta ainability of Kamloops K and d British Colu umbia, by pro oviding econo omic stimulus and facilitating g the acquisition of job skillls that can be e applied to m mining and oth her sectors in the future. 4.2 ESTIMATED RESOURCE R The mine eral resources s of the Ajax deposit were e classified in n accordance e with CIM definition stan ndards and best practices refe erred to in NI 43-101 whic ch have a rea asonable expe ectation of ecconomic extra action. The qualiffied person fo or the minera al resource es stimate was T Thomas C. Sttubens, P.Eng g., an employyee of Wardrop Engineering E Inc. The mine eral resource estimate hass an effective date of June 18, 2009. The mineralization of the t Project sa atisfies criteriia to be classsified into Me easured, Indiccated, and Infferred mineral re esource cate egories, the results of wh hich are pressented in Ta able 4.1. Att a 0.13% ccopper equivalent cut-off, the Measured an nd Indicated resource r tota als 422 Mt at an average g grade of 0.30 0% Cu and 0.19 g/t g Au, with an additional 80.6 8 Mt of Infe erred at 0.22% % Cu and 0.16 g/t Au. These res sources are sufficient s for approximatelly 23 years o of operation a at an annual production ra ate of 60,000 tonnes per day. The economic model for f the base case c assumes s a Life of Miine (LOM) avverage gold price of 800 US$/oz and coppe er price of 2.0 00 USD/lb for revenue purp poses. The pre-ta ax net presen nt value (NPV V) at 8% disc count rate ovver the estima ated LOM is $192.7 M ove er the capital inv vestment of $535 $ M. The after-tax internal rate of re eturn is 12.4% %. Payback o of the initial ccapital is estimated to be achieved in the 6th year of prod duction. 4.3 CAPITAL C COS ST AND TAXA ATION The prelim minary econo omic assessm ment estimate ed the projecct capital wou uld be $535 m million. Since e that time, sev veral enginee ering trade-o off studies have h been ccompleted w which will improve the p project economic cs, and may in nfluence / cha ange project capital. c Included in the capita al estimate arre costs for the t initial min ning equipme ent, pre-prod duction stripping, a 60,000 to onnes per day y copper con ncentrator, sh hop, warehou use, infrastruccture, indirecct costs assocciated with the design d engine eering procure ement, and co onstruction, ccommissioning g, spare partss, contingenccy and owner's cost. c A summ mary of prelim minary econom mic assessme ent capital co osts for the Project is pressented in Table 4.2. 4 7 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 The Proje ect will contrib bute financially to the Prov vincial (BC) a and Federal G Governments through corp porate taxes, pro ovincial net prroceeds and net n revenue ta axes, and salles taxes. 8 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 SE ECTION 5.0 - PROJECT O OVERVIEW 5.1 PROJECT CO OMPONENTS Major Pro oject design criteria c are presented in Table T 5.1. O On-site Projecct componentts are expectted to include the following: x Open pit x essing plant Proce x Thickened tailings plant x Tailings storage facility x e rock manag gement facilities Waste x Waterr managemen nt facilities x Road and bridge upgrades x a road New access x Borrow sources x smission line and a transform mer upgrades Trans x Explo osives storage e facility x Conce entrate storag ge and shipping area, and x Conce entrate transp port to Port off Vancouver. 5.2 MINING M METH HOD Average annual a production of the mine m is estima ated at 106 m million poundss of copper a and 99,400 ou unces of gold in concentrate. A detailed open pit mine plan was ccompleted to supply 21.9 Mt of ore perr year (60,000 to onnes per da ay) to the mill over an exp pected mine life of 23 years. Mine siite developme ent at years 5, 10, 1 15 and end of mine are a shown on Figure 5.1. Restored an nd expanded mine compo onents from previous operations will be utilized to the fulllest extent po ossible. The Ajax ore and wa aste will be drilled d for bla asting utilizing of drilling 311 mm g electric driills capable o diameter blast-holes. Blasted mate erial from the e Ajax pit willl then be loaded into 228 8 tonne haul ttrucks with 35 m3 electric rop pe shovels an nd 19 m3 fron nt-end loaderss for deliveryy to the in-pitt gyratory cru ushers and conv veyor systems s and conve eyor systems. The crush hed ore will ffeed to a co onventional ccopper concentra ator. The con ncentrator design includes s a secondaryy crushing cirrcuit, feeding two high pre essure grinding rolls r followed by two 7.62 x 12.5 m ball mills. Copp er and gold w will be recove ered in concentrate through a conventiona al flotation circ cuit. The con ncentrate will then be filterred and shipp ped by truck to the Port of Va ancouver. The crushed wa aste will be co onveyed to th e waste rock managemen nt facilities. Metallurgiical recovery equations we ere based on n a series of llock-cycle reccovery tests p performed byy G&T Labs of Kamloops, K BC C. The expec cted recoverie es were deterrmined to be 81.5% copper and 81.1% % gold providing a 25% coppe er concentrate e at the avera age mill feed g grade. 9 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 5.3 SITE LAYOUT T AND FACILITIES The Proje ect area has an array of existing and proposed in frastructure, services, faccilities, and access roads. Th his includes approximately a y 6 km of exis sting power lin ne, 5 km of existing water supply line, 5 53 km of existing g mine acces ss road, the historical eas st and west pits (152 ha)), and various reclaimed w waste dumps (112 ha). The Project will be comprised of the followi ng componen nts, as illustra ated on Figurre 5.2: Ajax open n pit, process sing plant, tailings storage facility (TSF ), and thicken ned tailings p plant (TTP) as well as ancillary facilities, in ncluding fresh h, fire, and po otable water ssupply; reage ent handling a and storage, assay and meta allurgical, air supply, powe er supply and d distribution ; explosives magazine; w water manage ement wage collecction and trreatment faccilities; and solid d and wastte water ma anagement facilities; f sew communic cations; fuel storage; an nd buildings including ad dministration building and d truck shop p and pproximately 2,500 ha, w maintenan nce yard. The T Project will w have a fo ootprint of ap which represe ents a roughly 300% 3 increase (>750 ha) in footprint with w respect to historical mining activities. The current Project infrastructure requirements reflect the mo ost advanced d mine plan, a and will be re evised as feassibility studies prroceed. 5.3.1 Ajax Aj Open Pit Excavation of the deposit and a developm ment of the op pen pit will be e accomplished with a striipping ra atio of approx ximately 2:1 (w waste to ore tonnes) t in a ssequence tha at maximizes o ore productio on and AG) materialls that will be prrioritizes the non-reactive//Non Acid Generating (NA e deposited in the no orth and eas st waste rock k manageme ent facilities. Excavation of the depo osit will resultt in a ng six interna sm moothed pit design d for the e ultimate pit,, by completin al phases witth 35 m wide, 10% grrade ramps. The design ns will utilize double bencching of 12 m benches w with variable width be erms. A batter angle off 70° will be used to ach hieve the ovverall smoothed pit shell. The ex xception will be b the 65° ba atter angles in n the picrite ro ock unit to the e southwest h highwall. The e Ajax pit will have an n area of 169 ha after five years of operration, to a m maximum exte ent of 261 ha at the en nd of the 23 year y mine life. Pit development phasess are shown o on Figure 5.3. Removal R of the ore and wa aste will be accomplished by developin ng blast holess with electricc drills an nd subsequent blasting. The T blasted material m will b be loaded intto haul truckss with electricc rope sh hovels and fro ont-end loade ers for deliverry to the in-pitt gyratory crusshers and conveyor system ms. Measures M will be undertake en to prevent water w from Ja acko Lake and Peterson C Creek from en ntering th he open pit arrea. At present, it is assum med that meassures will be taken to keep p wall slopes dry to av void the requirement for piit dewatering.. 5.3.2 Processing Facility The Processin ng Facility wiill be situated d as shown on Figure 5.1 and is designed to process 60 0,000 t/d of ru un-of-mine (R ROM) ore. Th he plant will o operate 24 ho ours per day, 365 days perr year. Over O the 23 ye ears of opera ation, the plan nt will processs approximately 442 Mt o of copper and d gold orre. The conc centrate will be e produced via the followin ng processess: x Primary Crrushing 10 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 x Secondary y Crushing x Grinding and a Classification x Flotation Circuit C x Concentra ate Thickener,, and x Concentra ate Filter. A schematic re epresentation of the proces ss is provided d on Figure 5 .4. 5.3.3 Tailings Storag ge Facility and d Process Wa ater Fresh water will w be pumpe ed into the Frresh Water T Tank in the T Thickened Ta ailings Plant ((TTP). From the Fresh Water Tank the water will w either be d distributed th roughout the TTP via the gland water w pumps or mixed with h dry floccula ant in floccullant tanks. T The resulting flocculant dilution water w will be mixed m with ta ailings from th he mill in the feed box an nd the tailingss feed will then be discharged into o the tailings thickener. Thickener und derflow will be e pumped to tthe tailings sttorage fa acility via thickener underflow pumps and tailings diischarge pum mps. Thicken ner overflow w will be discharged fro om the tailings s thickener to o the processs water tank and then to tthe Process W Water Pond for recyc cling, or direc ctly to the Pro ocessing Plan nt. During an n accident or malfunction of the th hickener unde erflow pumps s or in the event of exce ess process ssolution or build-up of flo otation re eagent, a re--circulation pump p will dirrect the thickkener underfllow to the T Thickened Ta ailings Emergency Po ond. The Thickened Tailings Emerg ency Pond w will be situatted at the prresent lo ocation of a lo ow-lying seaso onally wetted area north off the TSF. The shallow In nks Lake, loca ated to the ea ast of the TSF F (Photo 1), w will be used a as a Process W Water Pond, as well as collecting tailings bleed d water and ssurface runofff from the outter wall of the e TSF em mbankment during d rain ev vents. No se ediments or ssolids will be placed within n the pond. W Water from the TSF Process Watter Pond will be pumped b back to the P Process Wate er Tank in the e TTP where w it will be e used in the tailings t or milling process. Some process s water generrated in the fllotation circuiit as concentrate thickene er overflow so olution will w be re-used d in the grinding circuit. Ex xcess water w will be discha arged to the p process waterr tank. Reclaimed R wa ater will be pu umped from the Process Water Pond d to the proce ess water tan nk for distribution to the points of usage. The e gland and sseal water willl be pumped d and distributed to th he slurry pumps from the frresh water tan nk. The primary so ource of millin ng water is an nticipated to b be fresh wate er supplied fro om Kamloopss Lake an nd recycled water w from th he TTP. Wa ater will be p pumped direcctly to the Pro ocess Water Tank ad djacent to the e plant facility and to the Frresh/Fire Watter Tank. 5.3.4 Fresh Water Supply S Fresh water will be required d for start milll and plant fa cilities, drilling g water, fire ssuppression, gland se eal water, reagent, flotatio on cleaning stages, s proce ess water ma akeup, and o other site acttivities (e e.g., dust conttrol). 11 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 Fresh water will w be supplied from Kam mloops Lake,, a section o of the Thomp pson River, tto the fa acilities using the existing infrastructure e as much a as possible (P Photos 2, 3, and 4) with some modifications m and a replacem ment of the ex xisting pumpss, piping, and d electrical syystems. The pump ho ouse basin size s and geometry will be e evaluated i n the detaile ed design pha ase. The exxisting arrrangement consists c of an intake filter structure, s whicch is located in the elevatio on of 323 m o on the la ake bed. Wa ater from this s intake is trransferred to the existing pump house e on the sho ore of 6” pipe, embe Kamloops K Lake (pump inve ert elevation 336 3 m) by a 36 edded in the lake bed. Wa ater is pu umped through an embe edded steel pipeline p to bo ooster pump station 1 located at elevvation 58 80 m, and fro om here to th he proposed booster pum mp station 2 located at th he New Gold fresh water w tank area. The existing pump p stations s are head drriven and mayy not be ade equate to provvide the volume of water w needed for the Ajax x Project, and d as such an n alternative water supply system shall be prrovided. A ne ew pumphous se will be built on the shorre of Kamloop ps Lake adjaccent to the exxisting la ake pump sta ation. The ne ew pumphous se will contain n two in-line pumps to tra ansfer water tto the la ake pump sta ation (Figure 5.5) 5 and new w pumps will be installed iin booster pu ump station 1 1. No modifications m to t the existing intake filterr structure on n the lake be ed are anticip pated and the e new pu umphouse wiill be situated above the no ormal high wa ater mark. Water W will continue to be pumped to the e New Gold frresh water ta ank via existin ng pipelines a and to th he Ajax prope erty through a new water su upply line. 5.3.5 Reagent R Hand dling and Storage Various V chemical reagents s will be adde ed to the pro ocess slurry stream to fa acilitate the ccopper flo otation proces ss. Preparatiion of the variious reagentss will require tthe following components: x A bulk han ndling system x Mix and ho olding tanks x Metering pumps p x A flocculan nt preparation n facility x A lime slak king and distrribution facility y x Eye-wash and safety sh howers, and x Applicable e safety equipment. Various V chemical reagents will be added d to the grindiing and flotattion circuit to modify the m mineral pa article surface es and enhan nce the flotab bility of the va aluable minera al particles in nto the copper-gold co oncentrate prroduct. Fres sh water will be used in tthe make up p for the diluttion of the va arious re eagents that will w be supplie ed in powder/solid form, orr which requirre dilution prio or to the addittion to th he slurry. The ese solutions will be added d to the additiion points of tthe various flo otation circuitts and sttreams using metering pum mps. The PA AX collector re eagent will be e made up to o a solution off 10% sttrength in a mixing m tank, and then trans sferred to the holding tank,, from where the solution w will be pu umped to the e addition point. The frother reagent, M MIBC, will nott be diluted a and will be pu umped directly from th he bulk contaiiners to the po oint of additio on using mete ering pumps. 12 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 Flocculent willl be prepared d in the stan ndard manne er as a dilute e solution with 0.30% so olution sttrength. This s will be furtther diluted in n the thicken ner feed welll. Lime, as quick-lime, w will be de elivered in bu ulk and will be e off-loaded pneumatically into a silo. T The lime will th hen be prepa ared in a lime slaking system as 20 0% concentra ation slurry. T This lime slurrry will be pum mped to the p points off addition using a closed loop l system and the valve es will be reg gulated by pH H monitors that will co ontrol the amount of lime added. a To ensure spilll containmen nt, the reagen nt preparation n and storage e facility will b be located within a co ontainment area designed to accommo odate 110% o of the content of the largest tank. In add dition, ea ach reagent will w be prepared in its own n bounded arrea in order tto limit spillag ge and facilita ate its re eturn to its respective mixing tank. The e storage tan ks will be equ uipped with le evel indicatorrs and in nstrumentation n to ensure that spills do not occu ur during no ormal operattion. Appro opriate ve entilation, fire e and safety protection, and a Material S Safety Data Sheet (MSDS) stations w will be prrovided at the e facility. Each reagent line and add dition point will be labelled d in accordan nce with Worrkplace Haza ardous Materials M Information Systtems (WHMIIS) standardss. All operrational perso onnel will re eceive WHMIS W trainin ng, along with additional tra aining for the safe handling g and use of tthe reagents. 5.3.6 Assay A and Mettallurgical The assay lab boratory will be b equipped with the neccessary analyytical instruments to provide all ro outine assays s for the mine, the concentrrator, and the e environmenttal departmen nts. The metallurg gical laborato ory will be utilized to cconduct testw work to monitor metallu urgical pe erformance and a improve process p opera ations and effiiciencies. 5.3.7 Air A Supply The following identifies the types of air supply system ms and areas of use throug ghout the prop posed mine m site: x Low-press sure air provid ded by air blow wers for flotattion cells x High-press sure air provid ded by dedica ated air comp pressors for th he filter press and concenttrate drying, and d x Instrumentt air from the plant air compressors will be dried and stored in a d dedicated air receiver. Details D with reg gards to air supply system ms and require ements will be e provided in the Applicatio on. 5.3.8 Power Supply and Distribution Preliminary dis scussions witth BC Hydro suggest tha at the power distribution ssystem in the e area sh hould be able e to provide sufficient pow wer for the m mine’s approxximate runnin ng load of 90 0 MW, re equiring only a few upgrades to increase e power supp ply reliability. 13 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 Tw wo options fo or the 138 kV V overhead power p line arre currently b being conside ered: one from the west w with interrconnection at a the substattion in Savon na (SVA) loca ated approxim mately 40 km m from th he Project, an nd one from th he east that will w tap into the e BC Hydro line 2L265 nea ar Knutsford. Any A watercourse crossings s associated with the ne ew line are intended to be constructted in ac ccordance with the criteria a for “minor works” w as ou utlined in Secction 5 of the e Minor Workks and Waters W (Navig gable Waters Protection P Ac ct) Order so a as to be exem mpt from approval under Se ection 5((3) of the NW WPA. The plant’s ma ain substation n will consist of o 138 kV to 2 25 kV step-do own power tra ansformers wiith the 25 5 kV line bein ng the plant’s main distribu ution voltage. This plant’s substation w will consist of 25 kV sw witchgear line e-ups that will be used to distribute d pow wer to the varrious plant are eas as requirred by either overhead line or land based cable tray/conduit. The High Prressure Grind ding Rolls and d both du ual pinion balll mills will als so be powered d at 25 kV. Each major pla ant area will require an ele ectrical room where the 25 kV distributtion voltage w will be sttepped down to the proce ess level distrribution voltag ges of 4.16 kkV and 600 V V. There willl be a se election of 4.16 kV switchg gear (breakerrs and starterrs) and 600 V motor contrrol centres (M MCCs) th hroughout the e facility. A critical c proces ss MCC in ea ach electricall room (where e critical load ds are id dentified) connected to a stand-alone s generator g sysstem will tran nsfer power frrom one source to an nother via an automatic tra ansfer switch.. 5.3.9 Staff Accommo odations A construction n camp is no ot anticipated d as a result of the proxiimity of the Project to exxisting ac ccommodatio on infrastructu ure in the Citty of Kamloop ps. A feasibiility study will be undertakken to en nsure that ac ccommodatio ons for all sta aff are availa able in Kamlo oops through hout the life o of the Project. Once O in opera ation, the projected person nnel requirem ments are 385 5 persons, inccluding 61 sta aff for and profess management m sional service es, 302 ope erators and maintenance e labour, an nd 22 pe ersonnel for laboratories, quality q control, process opttimization, an nd assaying. 5.3.10 Explosives Ma agazine will be a com It is proposed that the prim mary explosiv ve used durin ng operation w mbination of h heavy ANFO A and em mulsion. All required r explosives would d be obtained d through an explosives ssupply co ontractor and d stored in are eas close to the t Ajax open n pit. Bulk am mmonium nittrate (AN) and d bulk em mulsion would be deliverred to site and stored in dedicated ssilos away fro om the explo osives magazine m com mplex. An ANFO/emulsio A on truck, ope erated by the e explosives supply conttractor would w be use ed to deliver bulk explos sives to the blasting loca ations. No explosives w will be on-site. manufactured m 14 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 The secured fa acilities would d include AN silos, an emu ulsion silo, a blasting acce essories maga azine, an nd a blasting detonators magazine, m wh hich would be e designed an nd operated in compliance e with ap pplicable legislation and re egulations. 5.3.11 Water W Manage ement A water mana agement plan will be deve eloped to con ntrol all surface water with hin the mine area. Goals G of the plan p include preservation p of o water quan ntity and qua ality downstre eam of the Prroject, op ptimization off water use, maximization n of water re--use, minimizzing mixing o of clean and mineco ontact waterr, managing seepage, utilizing u wate er diversion, and elimina ating unconttrolled re eleases. Key K aspects off water management includ de the followiing: x Ajax pit wa ater and runo off from the waste w rock ma anagement fa acilities will be e transferred to the site proces ss water pond ds during pre--production a nd throughou ut the mine life e x The site is s in a water deficit. d This deficit can be e made up th hrough fresh water supplyy from Kamloops Lake via an upgraded u sys stem, and x All affected d site water will w be captured in the site e process watter ponds or sseepage colle ection ponds for containmentt. All unaffe ected water w will be divertted around tthe site exce ept as required to o make up the e water balance deficit. Tailings bleed water and runoff from exte ernal slopes o of the TSF will be diverted through ditch hes to th he Process Water W Pond that t will be established e in n Inks Lake. Water from m this pond w will be pu umped to the TTP or to the e processing facility as nee eded. 5.3.12 Solid and Was ste Water Man nagement Solid waste ma anagement The standard approach a of segregating s waste w streamss for recycling g or disposal will be adoptted on siite. Recyclab ble materials will w be collectted on site an nd shipped to o Kamloops fo or recycling. Other waste w materials that are an nticipated to be b generated d onsite include lubricantss, waste oils, spent re eagents, spen nt hydrocarbo ons, and comb bustibles. Th hese items willl be transportted to an app proved offf-site waste receiver r for diisposal. Waste W water management m The sewage trreatment plan nt will be a pre-packaged R Rotating Biolo ogical Contacctor (RBC) syystem. The plant will be manufactu ured off site and a containe erized for simple connectio on to the colle ection sy ystem on-site e. Once tre eated, the sewage s treattment plant effluent will be discharged in ac ccordance with applicable legislation an nd regulationss. 5.3.13 Communicatio C ns An A optical fibre e backbone will w be incorpo orated throug ghout the plan nt in order to provide a pa ath for th he data requirrements for voice, v data, an nd control sysstem communications. A fibre backbone for a site Ethernett-type system will also be developed d to provide data and voice ba andwidth. 15 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 5.3.14 Fuel Storage Diesel D fuel req quirements fo or the mining equipment a and haul truckks will be sup pplied from a abovegrround diesel fuel storage e tanks locate ed near the truck shop. Diesel stora age will conssist of ete with load ab bove-ground tanks and a containmentt pad, comple ding and disp pensing equip pment co onforming to applicable re egulations. The diesel fue el storage tank will have a capacity suff fficient fo or approximattely three day ys of Project operations. o A dedicated service truck w will transport diesel fu uel to the miniing equipmen nt as required. 5.3.15 Buildings and Structures S It is anticipated d that the follo owing buildings and structtures will be rrequired for th he Project, an nd will be e included as s part of the processing pla ant complex: building Concentrator C x Stockpile x Primary crrushing buildin ng x Concentra ate load-out bu uilding x Secondary y crushing building x Administra ation building x Maintenan nce/truck shop p x Assay and d metallurgica al laboratory x Cold warehouse, and x Temporary y construction n facilities. 5.4 MINERAL M PRO OCESSING 5.4.1 Primary Crusher Systems The primary crrushing and process p plantt will be desig gned to opera ate on the ba asis of two 12 2-hour sh hifts per day, 365 days pe er year. The e primary crussher overall a availability wiill be 70% an nd the grrinding and flotation f circu uit availability will have a running time e of 92%. Th his will allow for a po otential incre ease in crus shing rate, and a will allow w sufficient downtime fo or scheduled d and un nscheduled maintenance m of o the crushin ng and processs plant equip pment. A conventiona al gyratory crrusher facility y will be desiigned to crussh ROM ore or waste up p to a prrocessing ratte of 10,000 t/h, to reduce e the size of the material in preparatio on for the griinding prrocess and waste w stacking g (Figure 5.4 4). The propo osed equipment and faciliities in the crrusher arrea include th he following: x Dump pocket x Stationary grizzly x Hydraulic rock r breaker x Gyratory crushers c – 1,5 525 mm x 2,79 94 mm (60Ǝ x 110Ǝ) x Apron feed ders x Crushed ore o stockpile, 60,000 6 t capa acity 16 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 x x x x Reclaim ap pron feeders Conveyor belts, metal detectors, d selff-cleaning ma agnets, and belt tear detecctors Belt scale, and Dust collec ction system. The ROM ore will be transp ported in the open o pit to the e in-pit primarry crusher using 240-tonne e haul trucks. There the ore will be reduced to 80% minus 1 150 mm using g a gyratory ccrusher, and a rock brreaker will be e used to brea ak oversize ro ocks. The cru usher productt will be disch harged into a dump po ocket, and the en onto a con nveyance system, which trransports the ore to the coa arse ore stocckpile. The coarse orre stockpile will w be design ned to have a live capaccity of 60,000 0 t and ore w will be re eclaimed from m this stockpile by apron feeders f at a nominal rate of 2,717 tonnes per hourr (t/h). The apron feed ders will trans sport the crus shed ore to a 960 mm wid de conveyor b belt (equipped d with a belt scale) that t leads to the Seconda ary Crushing g and High P Pressure Grin nding Roll (HPGR) sy ystem. The crushing facilities f and crushed c ore stockpile s will b be equipped with a dust ccollection systtem to co ontrol fugitive e dust that ma ay be generated during con nveyor loading and transpo ortation of the e ore. 5.4.2 Grinding G and Classification C The grinding circuit c will con nsist of a HPG GR/ball mill ccombination ccircuit as a tw wo-stage ope eration with w the HGPR R in closed cirrcuit with vibrrating screenss, and the two o ball mills in n closed circuit with th he classifying g cyclones. The T HPGR will w be conduccted as a dryy process at a nominal ra ate of 2,717 t/h of ma aterial. The grinding g circuit will include tthe following equipment and facilities: x Conveyor feed belt x Conveyor belt weigh sc cale x Two 750 KW K secondary y cone crushe ers x Two interm mediate secon ndary crusherr screens x Two HPGR R mills – 2.4 m diameter x 1.7 m long x Two ball mills m – 7.62 m diameter x 12 2.5 m long x Ball mill feed distributorr box x Two ball mill m discharge pumpboxes x Two sets of o cyclone fee ed slurry pumps x Two cyclon ne clusters x Mass flow meter x Particle siz ze analyzer, and a x Sampler sy ystem. Ore O from the crushed c ore stockpile s will be reclaimed d under contro olled feed ratte conditions using ap pron feeders and will be discharged d onto the conve eyor belt feed ding double d deck screenss, with th he oversize material m feed ding the two secondary ccone crusherrs, and the u undersize ma aterial fe eeding the HP PGR surge bin. The crus shed material will be return ned as feed to a second set of do ouble deck screens. The e HPGR units s will be fed ffrom the surg ge bin using belt feeders. The 17 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 e bin. HPGR H produc ct will be scre eened with oversize o mate erial returned d to the HPG GR feed surge Screen unders size material will w be fed to the t Ball Mill ccyclone feed p pumpboxes. Each ball mill will be opera ated independ dently in a cllosed-circuit w with a cyclon ne cluster, witth the prroduct from each e ball mill being discha arged into its separate cycclone feed pu umpbox to be ecome th he cyclone fee ed. The slurrry in each milll discharge p pumpbox will be pumped to o a cyclone ccluster fo or classificatio on. The cut size s for the cy yclones will b be a P80 of 1 50 ȝm, and tthe circulating g load to o the individua al ball mill cirrcuits will be 300% 3 with the e cyclone und derflow return ning to the ba all mill as s feed material. The new feed to each ball mill circuit will w be 1,359 t/h and the ccombined tottal of the two o mills (2 2,717 t/h) will constitute the e feed rate to o the copper fflotation circu uit. The ball m mills will operrate at a critical speed d of 75%. Dilution water will w be added tto the grinding g circuit as re equired. The cyclone overflow from both classific cation circuitss will be disch harged into th he copper flo otation co onditioning ta ank ahead of the flotation process whe ere the pulp d density of the e cyclone ove erflow sllurry will be approximately 33% solids. Provision will be made for the addition of lime to th he ball mills ffor adjustmen nt of the pH o of the sllurry in the grinding circuit prior to the flotation pro ocess. Grinding media wiill be added tto the mills m in order to o maintain the e grinding effficiency. Stee el balls will be e periodically added to eacch mill us sing a ball charging kibble. 5.4.3 Flotation Circu uit The milled ore e will be subjjected to flota ation to recovver the targe eted mineralss into a high--grade co opper concentrate contaiining gold. The copperr flotation cirrcuit will incllude the following eq quipment (Fig gure 5.4): x Conditionin ng tank – 7.7 m diameter x 8.3 m x Flotation re eagent additio on facilities x Rougher flotation tank cells c – 6 x 300 0 m3 each x Scavengerr flotation tank cells – 6 x 300 3 m3 each x Regrind ba all mill – 5,030 0 mm diamete er x 6,400 mm m long x Two classiification cyclo one clusters (o one for each regrind stage e) x First cleaner flotation ta ank cells – 5 x 50 m3 each x First cleaner scavengerr flotation tank k cells – 4 x 5 50 m3 each x Regrind to ower mill – 13.46 m high x 4.09 4 m long x 4.52 m wide e 3 x Second cle eaner flotation n tank cells – 5 x 10 m ea ach 3 x Third clean ner flotation ta ank cells – 4 x 10 m each h x Pumpboxe es and standp pipes x Slurry and concentrate pumps x Two partic cle-size analyz zers (one for each regrind stage), and x Sampling system. s 18 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 The cyclone overflow o from m the grindin ng circuit willl be combine ed to feed the flotation circuit co onditioning ta ank by gravity y flow from th he cyclone clu usters. The slurry will be conditioned in the co opper conditio oning tank at the design fe eed rate of 2,,718 t/h. The e first cleaner scavenger ta ailings will w be directe ed to the co onditioning ta ank for repro ocessing. Flotation reage ents includin ng the co ollector, PAX X, the frother (MIBC) and lime, will be e added to th he conditionin ng tank as de efined th hrough testing g. Provision will be made e for the stag ged addition of the reage ents in the cleaner sttage of the flo otation circuit. The conditione ed slurry will overflow o from the condition ning tank into o the rougher flotation tankk cells. Rougher R and scavenger s co oncentrates will w be processsed and disch harged into th he first regrin nd ball mill m circuit cyc clone feed pumpbox from m where it w will be pumpe ed to the reg grind classificcation cy yclone. The scavenger ta ailings will be e sampled au utomatically p prior to disch harge into the e final ta ailings pumpb box. This stre eam will consttitute the final tailings leaviing the plant. To completely liberate the fine-sized f gra ains of the co opper mineralls from the ga angue constittuents an nd to enhance upgrading g of the copper concentrrate, stage re egrinding and d cleaning w will be in ncorporated in n the cleaner flotation circuit. The roug gher regrind ccircuit cyclone will separate the fin nely ground fllotation conce entrate into a cyclone overrflow product according to the design pa article siize P80 of 60 0 ȝm. The co oarser cyclon ne underflow will be the fe eed for the ro ougher regrin nd mill (b ball mill). The e ball mill willl discharge in nto the cyclo ne feed pum mpbox togethe er with the rougher an nd scavengerr flotation con ncentrates and d the first clea aner scaveng ger tailings, co onstituting the e feed fo or classificatio on by the cyclone. The cyclone overflow o from m the rougherr/scavenger rregrind circuitt will combine with the se econd clleaner tailings s as feed to the t first clean ner stage. Th he first cleane er concentratte will report to the clleaner regrind d cyclone fee ed pumpbox where w it will jo oin the regrin nd mill discharge for pump ping to th he cleaner reg grind cyclone e for sizing. The T cleaner rregrind mill will be a towerr mill. The cyyclone ov verflow produ uct will have a design parrticle size P8 0 of 20 ȝm. The concen ntrate from the first clleaner stage will feed the second clea aner flotation stage with th he second clleaner concentrate re eporting to th he third clean ner flotation stage. s The concentrate from the thirrd cleaner flo otation sttage will be the final copper concen ntrate and w ill feed direcctly to the co opper concentrate th hickener. The e tailings from m the third cle eaner stage w will be returne ed to join the ffeed to the se econd clleaner stage. Tailings from the second d cleaner flottation stage w will be recycle ed back to the first clleaner flotatio on stage. Tailings from the first cleane er scavenger flotation stag ge will report to the co onditioning ta ank. Operatio onally, there will w be the op ption of direccting the first cleaner scavvenger ta ailings to the final tailings pumpbox. p Conventional ttank flotation cells will be used for the entire co opper flotation n circuit. Provision will be b made for th he use of cop pper concentrrate thickenerr overflow watter to be re-ussed in th he grinding circuit c as dilution water prroviding this does not ha ave a deleterrious effect o on the flo otation of the copper and gold g minerals. 19 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 5.4.4 Concentrate C Thickening The cleaner flo otation conce entrate will be e thickened, filtered, and stored prior to shipment tto the sm melter. The concentrate c handling h circuit will be com prised of the following equ uipment: x Concentra ate thickener x Concentra ate thickener overflow o stand dpipe x Concentra ate slurry pum mps x Process water w tank and d pump x Concentra ate stock tank x Concentra ate filter press s, and x Concentra ate storage an nd dispatch fa acility. The concentrate will be pum mped from the e final cleanerr flotation stage to the con ncentrate thickkener. Flocculant will be added to the thicke ener feed to aid the setttling processs. The thickkened co oncentrate wiill be pumped d to the conce entrate stock ttank using thiickener underrflow slurry pu umps. The underflow density will be b 60% solids s. The concen ntrate stock tank will be an n agitated tan nk that will w serve as the feed tank for the conc centrate filter. The concen ntrate filter w will be a filter press un nit. Since filtration with a filter f press un nit will be a ba atch process, the concenttrate stock tan nk will allso act as a surge tank for the filtration operation. o Th he filter presss will dewaterr the concentrrate to prroduce a fina al concentrate e with a moistture content o of about 8%. The filtrate will be return ned to ed to the con th he concentratte thickener. The filter pre ess solids willl be discharge ncentrate stocckpile. The dewatered d concentrate e will be store ed in a desig gnated storag ge facility. Th he concentratte will pe eriodically be loaded into trucks t for disp patch off the p property. The thickener overflow solution from th he concentratte thickener w will be collectted in the process water w tank for recycling with hin the grindin ng circuit. Exxcess overflo ow solution wiill be discharg ged to th he process wa ater pond. 5.4.5 Tailings Manag gement The tailings de elivery and re eclaim system ms have been routed to su uit the arrange ement of the major co omponents off the tailings facility. f The tailings delive ry system is a as follows: x A tailings pipeline p will trransport slurry y tailings from m the mill to th he TTP x Slurry will be thickened into a paste and a deposited d in the TSF, and x A land bas sed pump stattion and pipeline will re-cirrculate the pro ocess water b back to the mill. The tailings de elivery and rec claim systems s will consist of the followin ng: x A mill tailin ngs pipeline x A thickene er overflow pip peline x A thickene ed tailings plant x A sedimen ntation pond x Thickened tailings emergency pond, and x A water ma anagement plan. p 20 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 The principal design obje ectives for th he TSF will be to ensu ure protection of the reg gional grroundwater and a surface waters w during g operations and post clo osure, and to o achieve efffective re eclamation at mine closure e. Design D objectiv ves for the TS SF are as follo ows: x Utilize the available are ea to construc ct the TSF x Minimize the area requiired for the TS SF x Utilize loca ally available fill materials for f constructio on x Allow for ease e of constrruction x Allow for ease e of operattion x Allow for re elatively simp ple water conttrol x Prevent wa ater ponding on the facility y, which is co nsidered to b be the primaryy risk factor fo or any tailings sto orage facility, and x Provide a long term, stable dry stack of tailingss that can be e covered at closure to prrevent water pond ding, provide dust control, and allow forr vegetative ccover. Final plant tailings will be th hickened and d directed into o the TSF, located in a relatively flat area of th he site. The TSF will be e a single im mpoundment w with raised e embankmentss to create a zero discharge facillity, with proc cess water reclaim and pu ump-back cap pture of any sseepage. De etailed ge eotechnical and a groundwa ater investiga ations will be e completed tto identify ap ppropriate see epage co ontrol measurres. A thickened ta ailings plant will w be constru ucted adjacen nt to the TSF.. Slurry tailin ngs will be pu umped from the mill to o the thickener. Overflow w from the thicckener will be e directed to the process water ta ank and the th hickened tailings will be pu umped to the e TSF for surfface discharg ge. Tailings w will be th hickened to produce a non-segregati n ing material that will be e capable of flowing from m the discharge pipe e down a 2% to 3% gradie ent while main ntaining its co onsistency. D Dearth bleed water is s anticipated during d depos sition; this water will be co ollected in the e TSF Runofff Pond. The slope an ngle was sele ected to minimize erosion from runoff, while preven nting ponding g on the facilitty. In an n emergency situation whe en the thicken ner has to be e emptied, a re ecirculation p pump will pum mp the th hickener content into the Thickened T Ta ailings Emerg gency Pond located on th he site of an alkali po ond north of the t TSF. The tailings sttorage facility y will be cons structed in an manner, with thickened ta ailings n upstream m discharged fro om the west side of the facility f to forrm a slope to owards the e east of the fa acility. Tailings will be placed in thin, t uniform lifts (0.5 m – 1.0 m) wh hich will be a allowed to pa artially de esiccate priorr to placemen nt of subseque ent lifts. Waste W rock fro om the Ajax open o pit will be used to cconstruct an iinitial pipeline e berm to faccilitate ta ailings discha arge and to contain c the thickened tailin ngs on the ea ast side of th he TSF. The e TSF em mbankments will be cons structed in sttages throug ghout the life of the mine e with the start-up im mpoundments s providing sttorage for the e first year o of mine produ uction. The final embankkment co onfiguration will w be raised to an elevatio on that provid des sufficientt capacity to sstore the thickkened ta ailings and associated site water. 21 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 The outer shell of waste ro ock will be co onstructed pa artly on the ta ailings beach h and partly o on the prrevious waste e rock berm. The waste ro ock berm is de esigned to se erve the follow wing purposess: x Pipeline su upport berm x Pipeline an nd spigot access x Tailings co ontainment x Allows for steepening th he tailings sta ack (minimize height of pile e and surface e area disturba ance) x Allows for easy access of constructio on equipmentt to raise the b berm and pip peline x Allows for drainage of th he tailings pile e and seepag ge control x Provides outer o slope sta ability x Provides downstream d erosion e protec ction x Provides dust d control x Allows for staged construction, and x Allows for progressive closure. c The maximum elevation of tailings is 99 95 masl along g the west side of the faccility. The TS SF will ha ave an area of 283 ha aftter five years s of operation n, and a maximum footprin nt of 376 ha at the en nd of mine life e. 5.5 WASTE W ROCK K MANAGEM MENT FACILIT TIES Currently,, it is propose ed that potenttially reactive waste rock a and non-reacttive waste rocck would be sstored in two wa aste rock ma anagement fa acilities locate ed to the norrth and east of the pit. These waste e rock managem ment facilities are identified d on Figure 5.6. The east waste rock m management ffacility will ha ave an area of 26 60 ha, and th he north wastte rock mana agement facil ity will have an area of 40 03 ha. The w waste rock hand dling arrange ement include es gyratory crushers, c be lt conveyors,, and stackin ng systems. It is assumed that semi mobile systems will be use ed to reduce the waste ssize to 80% < <101.6 cm, b before feeding th he conveyors.. The crushers used for th he 10,000 t/h ssystem will be e 152.4 cm x 279.4 cm, an nd the conveyors s are assume ed to have a width w of 152.4 4 cm. The sta acking system m includes exxtendable con nveyor equipmen nt with caterpillar crawlers, tripper and a spreader. The wastte rock crush hing system will w significan ntly reduce th he carbon foo otprint of the e mine site d due to reduced diesel d consum mption. The use of conve eyance system ms on the wa aste piles will also reduce noise and dust contamination c n. 5.6 ACCESS A ROA ADS The Ajax Project is currently acces ssed via the old o Afton mine e haul road. The old hau ul road crosse es the Lac Le Je eune Highway y approximate ely 8.3 km so outh of the inttersection of the Lac Le Je eune Highwa ay and Copperhe ead Drive off Highway H 1, west w of Kamloops. A new a access road w will be built frrom the mill area to Lac Le Je eune Highwa ay, from whence commerc cial traffic wi ll travel on to o Highway 1 to the north h (see Figure 5.1 1 A gated maintenance m he proposed water line an nd the west p power track will be constructed adjacent to th line option n between La ac Le Jeune Highway H and the Coquiha alla Highway. The water line and powe er line 22 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 will contin nue west of the Coquihalla Highway alon ngside existin ng mine roadss to the propo osed booster pump station 2. Site roads s will be built to access the mine facilitiies. The site e road to acce ess the explosives storage e area will cross Peterson Cre eek downstre eam from Jac cko Lake. Pe eterson Creekk adjacent to the proposed d Ajax pit and ea ast waste rock manageme ent facility is a narrow (app proximately 2 m wide), dre edged channe el with flows controlled at the e outlet of Jac cko Lake for irrigation dow wnstream. T The alignment for the haul road and site ro oads will be determined d du uring the deta ailed design p phase. Any a additional pere ennial waterccourse crossings will be identified during this phase. 5.7 CONCENTRAT C TE TRANSPO ORT At the min ne site, conce entrate will be e transferred from the con centrate load d-out building onto approprriately sized trac ctor-trailers. Before leav ving the site e, each transsport trailer would be w weighed to e ensure complianc ce with private and public road requirem ments. The cconcentrate w will be transpo orted to the P Port of Vancouve er before it is loaded onto ships s for its fin nal destinatio on in Asia. Concentra ate will be tra ansported by y truck from site s along the e Lac Le Jeu une Highwayy to the Coqu uihalla Highway (Highway 5)) to Hope, th hen along th he Trans-Can nada Highwa ay (Highway 1) to the Port of Vancouve er. No mod difications to Port of Van ncouver infra astructure willl be require ed to ship P Project concentra ate from the port. p Wet conc centrate production in the e peak production years w will be 556 t//d, and highw way trucks ha ave a capacity of o 40 t. There efore, it is antticipated that at peak prod duction, fourte een 40 t highw way trucks pe er day would hau ul wet concen ntrate to the Port P of Vanco ouver. Transsport activitiess will require applicable pe ermits from the Ministry M of Tra ansportation and a Infrastruc cture. 5.8 ALTERNATIVE A ES ASSESSM MENT KAM is currently c completing altern natives asses ssments of prroposed infra astructure and processes (e.g., tailings sttorage facilitie es, access roads, concenttrate transporrt, etc.). All te echnological refinements of the design ha ave been inte ernally tested for technicall, economic, social and exxecution riskss. It is anticiipated that a ma atrix rating system will be e applied to each option , providing a transparentt and reproducible alternative es assessment process an nd decision. The follow wing provides s some exam mples of alterrnatives asse essment conssiderations off the major P Project facilities: The mine ed materials from the Aja ax pit will be delivered uttilizing combiined in-pit an nd out-pit gyyratory primary crusher c and conveyor systems. s This option w was the besst alternative e when costt and environme ental conside erations were e evaluated. Use of the cconveyor from m inside the pit will reducce the haulage distance d and cost, and als so reduces th he total carbo on emissions and dust and d noise emissions. Water ma anagement was w considere ed a priority for f siting the tailings stora age facility and the waste e rock managem ment facilities in order to miinimize the ris sk of environm mental impactts. 23 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 The road alignment co onsidered cos st and the sh hortest distan nce from the mine site to the highway, once other project infrastructure was situa ated. The propo osed TSF rep presents the best b location with respect to proximity to the pit and d processing plant, cost, and risk. Consideration was given g to using g the historic A Afton Mine TSF 10 km northwest of the e Ajax project, but b this altern native was no ot selected because b of co ost and risk of pumping tthe tailings o over a greater distance. d Ad dditionally the historic fa acility would require sign nificant expansion in ord der to accommo odate the Project’s tailings storage requirements. The location of the wa aste rock man nagement fac cilities was a function of to opography an nd proximity tto the pit. Alterrnative sites considered included i the vicinity soutth of the pit, however, th his alternative e was considere ed to be less preferable because b of grreater terrain n roughness, which would require morre site preparatio on and cost. In addition, th he southern option o would ttransport wasste rock acrosss Peterson C Creek, increasing g cost and environmental risk. r Transportt of the conc centrate to Vancouver V by y rail was co onsidered as an alternativve to truckin ng the concentra ate directly to the Port of Vancouver. V This T option w would have inccluded truckin ng the concentrate from the mine site via a existing Afto on Mine haul road to the Coquihalla H Highway, and d from here tto the Trans-Canada Highwa ay (Highway 1) west to Cache C Creek. From Cach he Creek the trucks would d turn south along the Okanagan Connec ctor (Highway y 97C) to the e town of Ashcroft. The concentrate w would then be lo oaded onto ra ail cars and transported by y rail down th he Fraser Ca anyon to the P Port of Vanco ouver, where it would w then be b loaded on nto ships. This T option w would require more materrials handling g than trucking th he concentrate directly to the Port of Vancouver V fro om Kamloops via the Lac Le Jeune Hig ghway and Coqu uihalla Highw way (Highway y 5) south to o Hope and then along tthe Trans-Ca anada Highw way to Vancouve er. Several alternatives a fo or the water in ntake system on Kamloop s Lake to sup pply process and potable water to the site e were considered, includin ng: x Using g the existing water intake system s x Upgra ading the exis sting water inttake system x Consttructing a new w water intake e system x Using g a floating ba arge system x Upgra ading existing g pump station n and installin ng new pumpss, and x Consttructing a new w pump statio on. The optio on of constru ucting a new w pumphouse e adjacent to o the existing g pumphouse e on the sho ore of Kamloops s Lake above the normal high h water ma ark and installling new pum mps in each pu umphouse wa as the preferred alternative. No work within the lake will be required d, reducing th he potential im mpacts on fish and fish habita at, although some s riparian n vegetation may need to o be cleared during consttruction of the e new pumphous se. This con nfiguration als so minimizes s the visual im mpact that a barge would d have, and is not expected to impact any y navigable waters. w 24 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 5.9 CLOSURE C AN ND RECLAMA ATION It is estim mated that mine m closure will proceed over a periiod of two yyears and the e reclamation n and monitoring g phase will fo ollow for an additional a thre ee years. 5.9.1 Closure C of Taillings Storage Facility General G consid derations that are likely to o be incorpora ated in the closure plan fo or the TSF in nclude th he following: x Removal and a restoration of disturb bed areas in ncluding struccture footprin nts, access rroads, conveyanc ce structures, pipelines, etc c. x Stabilizatio on, shaping, contouring, c an nd re-vegetat ion of disturbed surfaces, and x Monitoring g activities to confirm c the de esign assump ptions adopte ed for closure. 5.9.2 Waste W Rock Management M Facilities F Clos sure The current pla an regarding the waste roc ck manageme ent facilities w will be to leave e the waste ro ock in pllace and cons struct an engineered cove er complete w with growth me edium and ve egetation. In order to o accomplish h this, suitab ble growth medium m will b be identified,, salvaged, a and stored d during co onstruction an nd operation for f use during g reclamation n and closure.. 5.9.3 Ajax Aj Pit Once O mining has h ceased, site drainage e will be alte red to allow each open p pit to be filled d with water. w Water quality in the e open pit will be modelled d prior to filling to approxim mate effluent water qu uality once th he pit has filled and overfflows into the e receiving en nvironment. As the pit fills up, water w quality sampling s will be conducte ed to verify th he accuracy of the model and define water treatment requ uirements to meet established discha rge criteria. Passive and d active trea atment sttrategies will both be con nsidered as a potential ttreatment op ption, if required. As a ssafety measure, m an earthen berm will be constrructed around d the open pitt to prevent acccidental entrry into th he flooded are ea. 5.9.4 Processing Pla ant All A of the build dings and sttructures iden ntified in the mine descrip ption above will be disma antled an nd/or demolis shed and then removed frrom the mine e site. Salvag geable materrial will be re--used, re ecycled, or tra ansformed intto other usefu ul forms. All A materials re emoved from m the site will be disposed of in accordance with ap pplicable legisslation an nd regulations. Any conta aminated matterial (e.g., pe etroleum hydrocarbons or heavy metals) will allso be store ed, handled, and dispos sed of in acccordance w with applicable legislation n and re egulations. Once O the buildings and structures have e been remo oved, the area as will be sh haped, co overed with growth g medium m, and vegeta ated with app propriate plantt species. 25 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 5.9.5 Access A Road At A this stage in the Projectt, it is not cle ear whether a access to the area will be required following cllosure, but in the event it is s no longer re equired, closu ure will include e the following: x Reclamatio on of access roads x Removal of o bridges, culverts, and other watercou rse crossing structures x Restoration of affected stream banks s and riparian n areas, and x Re-vegeta ation of affecte ed areas with appropriate p plant speciess. 26 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 SECTION S 6.0 - PROJECT SETTING 6.1 EXISTING CO ONDITIONS Mining an nd ranching have h historica ally dominated d the land usse regime in tthe area, and d have shape ed the existing conditions c of the landsca ape. The Prroject is loca ated on the footprint of tthe previous, now deactivate ed and deco ommissioned, Ajax open pit mine. T The site is ccharacterized by anthropo ogenic disturbanc ce including the t old open pits (Photos 5 and 6), acccess and ha aul roads, recclaimed waste e rock piles (Pho oto 7), and other mining g infrastructurre. Ten kilo ometres westt, on the opposite side o of the Coquihalla a Highway, is s the Afton mine m site, currrently being o operated by N New Gold Inc. The Afton ssite is characterized by two open pits, as s well as oth her mine infrrastructure in ncluding acce ess roads, se ewage lagoons, retention pon nds, smelter site near Hig ghway 1, TS SF, and recla aimed waste rock manage ement facilities. The TSF us sed by both historical h mine e sites is loca ated approxim mately 1.1 km m southwest of the Afton pit. Several strructures rema ain in place at the Afton site, includin ng the smeltter foundation n and adjacent facilities. f As described in detail in Sec ction 6.3 belo ow, much of tthe area is ve egetated by rrolling grassland d and shrubs, with conifero ous forests gro owing at high er elevations. 6.2 GEOLOGY G AN ND MINERALIZATION 6.2.1 Geology G ng on The following sections des scribe the reg gional and loccal geology in the Projectt area focusin mining m aspects. The regio onal and loca al geological information presented be elow was obttained from the PEA developed d forr the Project by b Wardrop E Engineering in n 2009. 6.2.1.1 Region nal Geology Figure e 6.1 illustrattes the regional geologyy in the Pro oject area, d dominated by the approx ximately 5 km m wide and 20 km long Upper Triasssic Iron Massk batholith, which trends northwest th hrough the re egion. The IIron Mask ba atholith intrud ded a sequen nce of Nicola Group flows and volcanic clastic rocks o of mafic and intermediate ccomposition. Near the contact with the e Iron Mask batholith, b the Nicola Group p rocks are ccommonly bassalt to andesite flows and flow breccias s. Stratigraph hically above the Nicola G Group is a serries of serpen ntinized picrite basalts, wh hich are pressent within th he batholith a and are appa arently localized along major structural corridors. c Multiplle phases are e recognized in the Iron Mask Batholiith. The Potthook diorite is the oldest phase and consists of a medium to coarse-grain ned biotite pyyroxene dioritte. A hybrid unit is recognized where e Nicola Gro oup rocks ha ave been inccorporated intto the Pothoo ok. The Hy ybrid phase consists c of u up to 80% N Nicola Group p fragments within Pothoo ok intrusive breccia. The Cherry Creek phase p domina ates the north h and east ma argins of the b batholith and forms a pluton northwestt of the bath holith. The Cherry Cree ek postdates the Pothookk and consis sts of a mon nzonite to mo onzodiorite. Ubiquitous K-feldspar generally give es the Cherry y Creek a pink kish colour. 27 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 The Sugarloaf phas se dominates s the western n margin of th he batholith a and also posttdates the Po othook phase. The age re elationship witth Cherry Cre eek is uncerta ain. The Sug garloaf phase is commonly a fine-gra ained porphyrritic hornblen nde diorite. A Albite alteration is common near zones of minera alization. Th he Kamloops Group contains the you ungest rocks in the region and consists dominantly o of tuffaceous sandstone, ssiltstone, and shale with minor m flows and agglomerattes of basalticc and andesittic compositio on. Coppe er-gold minerralization ass sociated with h the Iron M Mask batholith is classifie ed as alkalin ne porphyry copper-gold c deposits d and d is associate ed with the C Cherry Creekk and Sugarlloaf phases. Mineralization is genera ally localized d along majo or fault zoness and associiated with albite and K-feld dspar alteratio on. 6.2.1.2 Local Geology G As ma any as 11 ro ock types hav ve been reco ognized in th he Project arrea, but these e can genera ally be combined into thre ee main rock types: Iron M Mask Hybrid, Sugarloaf D Diorite, and Nicola Volcanic cs, which are illustrated on n Figures 6.1 for the Proje ect area and 6 6.2 for the Aja ax Pit. Outcro ops are generrally abundan nt in the Proje ect area. The e contact betw ween the Sug garloaf Diorite e and the Iron n Mask strikes s southeasterrly through th he West Ajax area and cha anges to a no ortheasterly strike s through h the East Aja ax area. The Sugarloaf-Iro on Mask conttact is truncated by a souttheasterly striking fault at the north end d of the East Project area. The contac ct between th he Sugarloaf Diorite and N Nicola Group generally strrikes southea asterly throug gh the Project area. Sugarlloaf Diorite is characteris stically a fine e to coarse-g grained, light to medium m gray porphy yritic diorite co ontaining euh hedral hornble ende phenocrrysts. Unalte ered Sugarloa af may contain n up to 5% fiine-grained magnetite. m Lo ocally, the Su ugarloaf Dioriite has assim milated rocks of the Nicola a Group and is referred tto as the Su ugarloaf Hybrrid. Albite and Kfeldspa ar alteration is i present in varying degrrees. Strong albite alterattion has comm monly destroyed original textures loca ally. Sulphid de mineraliza ation is asso ociated with albite alterattion and co onsists predo ominantly off chalcopyrite e and pyritte. Molybd denite, tetrahe edrite, and bo ornite have be een observed . The Iron Mask Hyb brid is consid dered to be a an assimilatio on of the Nico ola Group intto the intruding Pothook Diorite. D The Iron Mask iss coarse-graiined and dioritic to gabbrroic in compo osition. Weak propylitic alteration is co ommon with K-feldspar an nd albite alte eration occurrring locally. The T Iron Mas sk Hybrid ma ay contain up p to 10% magnetite and locally chalco opyrite and py yrite are pres sent. The N Nicola Group consists of p picrite and va arious fine-grrained and py yroxene porph hyritic mafic vvolcanic rockks. A variety of steeply dip pping, unmineralized dyke es up to 5 m wide w intrude th he main rock types. Dyke es are compossed of aplite, monzonite, la atite, and fine e-grained maffic rocks. 28 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 6.2.2 Mineralization M The Iron Mask k Batholith is host to more e than 20 kn nown mineral deposits and d occurrences and is commonly mineralization m y copper-gold d. Chalcopyrrite is the do ominant sulph hide mineral. The prresence of accessory a sulphide minera als is highly variable and d can include tetrahedrite e and Secondary copper molybdenite. m c oxides s (bornite and d chalcocite)) and native copper have been ob bserved loca ally. Mineralization is ass sociated with regional fau ult zones thatt trend easte erly or so outheasterly through t the area (Wardrop p, 2009). The mineraliza ation in the Project P area is associated with structural corridors of highly fracctured se ections of Sug garloaf and Sugarloaf S Hyb brid phases off the Iron Massk Batholith. Chalcopyrite is the do ominant copp per mineral and a occurs as a veins, ve inlets, fracturre fillings, disseminationss, and is solated blebs in the host rock. Conce entrations of chalcopyrite rarely excee ed 5%. Acce essory su ulphide minerrals include py yrite, magnettite, and molyybdenite (Warrdrop, 2009). High-grade H copper mineralization (>1.0% % Cu) is con nfined to chalccopyrite vein systems. Copper grrades decrease away from m the chalcopy yrite veins. H High-grade mineralization ccan extend se everal metres m from the t vein stru ucture. Low-grade coppe er mineraliza ation (0.10% to 0.50% C Cu) is ge enerally asso ociated with the Sugarloa af-Iron Mask contact. Mineralization e extends to d depths ex xceeding 400 0 m and has a strike length h exceeding 2 2,000 m (Ward drop, 2009). It is common for f gold conc centrations to be directly ccorrelated witth copper con ncentrations. Gold mineralization m increases slightly in are eas where sstrong albite alteration occcurs. The albite allteration is in n part controlled by fault and vein strructures. Min nor palladium m mineralizattion is as ssociated with copper nea ar the contactts of the Iron Mask Hybrid d and Sugarlo oaf units (Wardrop, 20 009). 6.3 TERRAIN The Proje ect area con nsists of rolling grassland ds surrounde ed by local rrelief that ran 800 to nges from 8 1100 mas sl and foreste ed areas at hiigher elevatio ons. Sugarlo af Hill is the prominent lan ndform in the e area and has an a elevation of o 1130 masll. Extensive glacial action n has created d topographyy of low rolling g hills with locall deep accum mulations of glacial till on n the southe east flanks off larger rock outcroppingss and drumlins. The low annual a precipitation level is s reflected in the flora of tthe area. Bunchgrass, sagebrush, and d cacti are abund dant on the lo ower grassy slopes s being joined by sta ands of ponde erosa pine att higher eleva ations. Water is abundant a in th he spring in numerous n small saline pon nds and sloug ghs. However, year-round fresh water with hin the Peters son Creek dra ainage is restricted to Jaccko Lake and Edith Lake, and these so ources are heavilly committed to irrigation use. u Drainage is somewhat disrupted res sulting in num merous shallow w ponds. So ome of these a are ephemera al and are borde ered with pre ecipitate encrustations. Several S pondss have been raised with dams. The three owing run northeas principal watercourses w st; however, most m of their ccourses are m made up of no orth or east flo sections following f the minor m lineatio on pattern. Th he most recen nt glaciation p pushed south heast parallel to the 29 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 Kamloops s Lake valley y. Hilltops were w largely denuded of soil while va alleys were in nfilled with d debris, thereby ac ccentuating th he northwest grain of the la and terraces in the northea ast section off the propertyy. 6.4 CLIMATE C The clima ate of the Project P area is semi-arid and contine ental, with lo ow total preccipitation and d high evaporatio on compared to the rest of o BC. Lying within the raiin shadow off the Coast M Mountains, the e area ool, dry winte has a sem mi-arid steppe e climate cha aracterized by y generally co ers and hot, dry summerss, with low humidity (Canadia an Climate Normals, N 200 03). Convecctive storm ccell events are frequent iin the summer months m creatting occasion nal dry lightning condition ns, which can n ignite foresst fires. The e area receives an a average off 279 mm of precipitation p annually. a Summers s are hot and dry. In July y, the average e high is 28.3 3 degree Celsius (C), witth a record high of 40.6C. Humidity is generally g low w (<20%). Precipitation iss generally g greatest in Ju une and Julyy, with averages of 35.2 mm and a 29.5 mm respectively. Winters are a generally mild and short, with period dic cold snap ps where temperatures can n drop significantly below ave erage for seve eral weeks. The T winter mean m tempera ature is -4.2C C, with an ave erage low of --7.6C in January y, and a reco ord low of -37..2C. Precipitation is lowe est in Februarry (14.4 mm), March (11.7 mm), and Octob ber (16.2 mm). Snowfall ty ypically occurrs from Novem mber to March. 6.4.1 Ajax Aj Site Mete eorology Hydrometeoro H logical values s for the Projject area werre estimated on the basis of short-term m sitesp pecific data and a long-term m regional info ormation. Me eteorological d data have be een collected in the Project area from November 2006 an nd includes records of ttemperature, relative hum midity, prrecipitation, and a wind spe eed and direc ction. Active e and inactive regional climate station ns are lo ocated throug ghout the area a, with severral stations ha aving two decades or more of climate data. Data D presente ed here are collected c by th he Ministry o of Environmen nt (MOE) and d British Colu umbia Forestry Serviice (BCFS) climate c statio ons. Long-te erm regional climate data most suitab ble for co omparison to o Project area a data are av vailable from Afton (BCFS S), Leighton Lake (BCFS)), and Kamloops K (MO OE), which are e all located within w 30 kilom metres of the Project area.. Below is a sum mmary of a preliminary stud dy on hydrom meteorological site characte eristics. x The long-te erm average annual tempe erature is est imated to be 7.9C x Relative humidity h varie es throughout the year, b but it is typiccally highest in mid-winte er and lowest in mid-summer m x Approxima ately 25% of precipitation p at a the Project Area is expected to fall ass snow x Approxima ately 75% of precipitation p at a the Project Area is expected to fall ass rain x Wind direc ction and mag gnitude vary throughout the e year x Runoff in the t Project area a results frrom rainfall a and snowmeltt, producing a unimodal a annual hydrograph with a relatiively large but brief surge o of flows durin ng the spring ffreshet period d x Unit runofff values are very low relativ ve to most oth her areas in B BC x Flows exhibit extreme seasonal s varia ability, and 30 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 x 6.5 Most proje ect area cree eks likely hav ve zero flow conditions fo or extended periods durin ng the coldest win nter months. HYDROLOGY H Y The Proje ect is located within the Peterson Cree ek and Cherryy Creek wate ersheds (Figu ure 6.3). Petterson Creek dra ains into the South S Thomp pson River ne ear its conflue ence with the e North Thom mpson River, to the east of Ka amloops Lake e. Cherry Cre eek is a relatively large pe erennial drain nage within the Thompson River watershed d, flowing no orthwest from m Greenstone e Mountain to Kamloopss Lake. It d drains an arrea of 56,000 km m2, carrying runoff from the t Columbia a and Monasshee mounta ains. At Kam mloops, the South Thompson River and the North Thompson T Riv ver converge e to form the e Thompson River, the la argest tributary of o the Frase er River. Frrom its conflu uence at the e North and South Thom mpson Riverss, the Thompson River flow ws approximately 15 km to t the west where it entters Kamloop ps Lake, a locally 2 enlarged reach of the river. r The lak ke has a catchment area o of 29,050 km and a surfacce area of 148 8 km2. Kamloops s Lake is approximately 30 0 km long, and ends at the e town of Savvona. From K Kamloops Lakke the Thompson River contin nues to flow west and the en southwest to its conflue ence with the Fraser Riverr near Lytton. Small, mo ostly alkaline lakes are rela atively common in the Petterson Creek watershed. Jacko Lake, within the Peters son Creek wa atershed and located adja acent to the p proposed pit, is the largestt water body in the Project arrea. Regional stream flow data were an nalyzed from Water Surve ey of Canada a survey statiions to the sttart of October 2008 2 (Knight Piésold 2009). Stream flo ow data for th e Project are ea has been ccollected from m April 2008 to present at five stream gaug ging locations installed by K Knight Piésolld as shown o on Figure 6.4. The stations were w installed to monitor co ontinual waterr level at 15 m minute interva als. 6.6 HYDROGEOL H OGY A groundwater investigation comm menced at the e Afton Mine e property in 2007 by Knight Piésold. The investigation included 1) a prelimina ary review of historical grou undwater datta, 2) installation of ground dwater monitoring g wells, 3) hydraulic tes sting of mon nitoring wells , and 4) qu uarterly groun ndwater sam mpling. Collected data are being used to characterize c the t existing b baseline grou undwater regiime to suppo ort the definition of potential impacts, mittigation measures, monittoring and co ontingency m measures as mine planning proceeds. p Th he baseline ch haracterizatio on of the grou ndwater regim me will includ de: x Chara acterization off the regional and Project area a geology x Exam mination of sea asonal fluctua ations and spa atial variation n of groundwa ater levels and d water qualitty x Descrription of the methodology, m , analysis and d results of hyydraulic testin ng x Estim mate of the rate and directio on of groundw water flow, an d x Expec cted interactio on of groundw water with surrface water. 31 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 6.7 WATER W QUAL LITY Discharge e from the Pro oject has the potential to affect a downsttream water q quality. Potential effects w will be determine ed in advance e of the Applic cation for the construction , operation, a and decommisssioning phasses of the Projec ct. 6.7.1 Water W Quality in Receiving Water W Bodies s All Projec ct infrastructurre and Projec ct related activities will occcur in the Petterson Creek and Cherry C Creek watershed ds. The majo or receiving water w bodies in i these wate ersheds will b be Peterson C Creek, Jacko Lake, Inks Lake e, and Cherry y Creek. It is i intended th hat the Proje ect will mainta ain sufficient water qualityy and quantity in n each of thes se water bodies. 6.7.1.1 Peters son Creek Peters son Creek is a large draina age system w within the Sou uth Thompso on River wate ershed flowing g north from Chuwhels Mo ountain to Ja acko Lake, ea ast through K Knutsford, BC, then north again through the City off Kamloops tto its conflue ence with the e South Thom mpson River (Photos 8, 9,, and 10). Peterson P Cre ek has a ma ainstem lengtth of 40 km a and a waters shed area of approximately 82 km2 (Su ummit, 2006). It has been n used for drinking water, irrigation, and a as a dra ainage chann nel since Eu uropean settllers colonize ed the Kamlo oops area. Th he majority of o Peterson C Creek in down ntown Kamloo ops is contain ned in culvertts and channelled in concrete waterrways from C Columbia Street to the South Thomp pson River (C City of Kamlo oops, 2007). The average e gradient of Peterson Cre eek is 3.2%. The major tributaries of o Peterson C Creek includ de Davidson Brook, Hum mphrey Creek, and Jacko Creek. C Flows s in Peterson n Creek are regulated for irrigation purp poses by a weir w located at a the outlet off Jacko Lake . Figure 6.3 shows the Peterson Cree ek and Cherry y Creek waterrsheds. The Peterson P Cree ek outlet is th hrough the ssoutheast arm m of Jacko L Lake via a 17 7.4 m, 460 mm concrete culvert runniing through an earthfill d dam (Ministryy of Environ nment, 1980). The portion n of the chann nel running th hrough the old Afton mine esite was lined d with imperv vious till in 19 990 to prevent seepage b between the storage dam m and the irrig gation gates located down nstream (Price e 1991). No ssurface flow e exists betwee en the lake an nd the creek except during g high flow ye ears when wa ter levels excceed the spillw way crest elevvation (891.1 m) and flow is channelled d to Peterson n Creek via th he spillway channel (Minisstry of Enviro onment, 1980). Approximately 60 m do ownstream o of the lake, th he flow is con nfined within an open top p concrete channel with a V-notch w weir at the do ownstream e end; a pressu ure transduce er and datalo ogger installe d at this loca ation monitorr water depth hs. A furtherr 60 m downstream from the weir, the e flow is chan nnelled through two corru ugated metal culverts emb bedded in co oncrete blockss. The culve ert inlets are e raised abovve the elevatiion of the cha annel bed, and at low flowss downstream m flow is via sseepage unde er and around d the concrette blocks. Th he creek is p onded upstre eam of the bllocks and the e right culvertt is choked with small woo ody debris. Th he Kinder Mo organ pipeline e crosses Petterson Creek approximately 300 m dow wnstream of th he double culvvert at a footb bridge. 32 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 In 200 07, water qua ality monitorin ng sites were e established on Peterson n Creek just below Jacko Lake (PC08,) and outside e the propertyy, approximattely 2 km easst of the Ajax West Pits (P PC03). Two o additional monitoring m sittes were add ded in April and May 20 008 to supple ement the info ormation available: site PC C02 was esta ablished (with h permission of the local la andowner) on n agricultural property, dow wnstream of the Long Lakke Road Qua arry in Knutsfford, BC, app proximately 6 km downstrream of PC0 03. Monitoring site JC03 3 was establiished as a reference r site e, approxima ately 1.5 km upstream off Jacko Lake e, and above any potentia al mining influ uence. The location of P Project water quality moniitoring sites is s presented on o Figure 6.4. The na atural hydrolo ogic regime of o Peterson C Creek is affeccted by huma an use (extra action) permittted by numerous water lic censes in the e upper and mid-reaches. Flow from JJacko Lake into Peterson n Creek is reg gulated to en nsure sufficie ent water is a available to liccense holderrs during perio ods of drough ht or water sh hortages. An nalytical results for water q quality monito oring sites on Peterson Creek, including PC02, PC03, PC08 8, and JC03 3, are provided in Tables 6.1 through 6.4. 6 6.7.1.2 Jacko Lake Jacko Lake is a mo odified lake, approximately a y 0.4 km2 in area, located d immediatelyy west of the Ajax Pits. It is generally ice-free frrom April thrrough Novem mber, and sto ocked rainbow trout popu ulations make e it a popularr local fishing g destination, particularly in the spring and fall. Historiical records in ndicate that Jacko J Lake ha as been impa acted by human activity sin nce at least 1949, when the outlet channel c (Petterson Creekk) was modiified for irrig gation. Bathym metry mappin ng from a su urvey in 195 50 shows a llake with a perimeter of 3700 metres s, surface area of 40 ha and volume of 3,575,304 4 m3 (Fish a and Game Brranch, 1968). A lake surve ey form from 1949 and 195 50 names bo oth the inlet an nd outlet cree eks as Peters son Creek, an nd notes that the t outlet flow ws only during g high water ((Anon, 1950). The Peters son Creek inle et (now know wn locally as JJacko Creek)) was described as a very small channel emptying into the lake through a larrge marshy a area, flowing only in the sspring, and fillled with dead dwood. The outlet o containe ed the only su uitable spawn ning area, alth hough the inlet was noted d to provide fair f spawning habitat in w wet years. Ba athymetry ma apping from 1978 shows an a expanded lake, l with cre eation of the ccurrent northe east and souttheast arms and a expansion of the two westerly w armss. The lake th hen had a pe erimeter of 49 925 m, surface area of 46.7 ha, and a volume v of app proximately 4 4,000,000 m3. Survey drawings of the earthfill dam and spillway from 1980 sh how assumed d original grou und at 890 m and a high water w level at 891.1 m with h the dam at 892.300 m (M Ministry of En nvironment, 1 1980). The sttorage dam was w raised on ne meter in th he fall of 199 90 to double the amount o of live storage for irrigation n (Price 1991). Monito oring sites esttablished on Jacko J Lake in nclude shallow w (JACL-S) a and deep (JAC CL-D) locatio ons at the approximate de eepest part o of the lake (23 m deep). In 2008 additional shallow w samples were w collected d in the nortthwest (JACL L-02) and no ortheast (JAC CL-03) 33 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 arms of o the lake. Analytical su ummary statisstics for all Ja acko Lake m monitoring loca ations are pro ovided in Tab bles 6.5 throug gh 6.8. The dissolved d oxy ygen and temperature p rofiles for Ja acko Lake in June 2010 0 are indicattive of meso otrophic (moderately biollogically prod ductive) cond ditions where the dissolv ved oxygen concentration c n remains hig gh in the epiilimnion (the upper wind-m mixed layer – from surfac ce to a depth of 6 m on Ju une 3, 2010), throughout tthe summer d due to photos synthesis and d diffusion fro om the atmossphere. A th hermocline w was noted bettween 6 m an nd 16 m depth h. Dissolved oxygen tend s to decline in the hypolim mnion (bottom m layer below which little or no wind-mix xing occurs) d due to the absence of oxygen inputs an nd the consum mption of oxygen by organisms. Anoxic cond ditions were observed in n the hypolim mnion in June e below 16 m deep, likely d due to decom mposition of orrganic matterr. 6.7.1.3 Cherry y Creek Cherry y Creek is a relatively large perenn nial drainage e within the Thompson River waters shed, flowing northwest fro om Greenston ne Mountain to Kamloopss Lake. Moniitoring Cherry Creekk downstream sites CC02 C and CC C08 were esttablished on C m and upstream of the Prroject area, respectively. Project activvities are nott anticipated to influence water quality y at CC08 du ue to its cons siderable dista ance upstrea am of the exissting TSF are ea on Greenstone Moun ntain; therefo ore, this site e may reprresent backg ground cond ditions throug ghout the life of the Projec ct. Monitorin ng site CC02 is located approximately 2 km west and a down gra adient of the impounded Afton Seepa age Pond and d TSF. Ana alytical results s for water qu uality monitoring sites on C Cherry Creek, including CC C02 and CC08, are provided in Tables 6.9 and 6.10 respectively. Almost 30 water lic censes are cu urrently active e on Cherry C Creek. Withiin the Projectt area these are predominantly for irrrigation and stockwaterin ng purposes,, but also in nclude domes stic and comm mercial uses further f downsstream near C CC02. Site C CC08 is locate ed in a foreste ed area on Greenstone G Mountain an nd is not hea avily influencced by agricu ultural activity y, although th here are seve eral water lice ense points o of diversion b both upstream m and downs stream of the site, primarily y for irrigation n purposes bu ut also for dom mestic and sttorage purpos ses. 6.8 VEGETATION V The Ajax Project is loc cated in the Southern Inte erior Forest R Region, in the e Kamloops Forest Districct and Kamloops s Timber Sup pply Area, sou uthwest of the e City of Kam mloops. The Project is witthin the Thom mpson Basin (THB) ecosecttion. The THB T ecosecttion is a wa arm and ve ery dry, low--elevation are ea of predomina antly gentle slopes s (Dema archi, 1996). There are n no managem ment areas (e.g. Wildlife H Habitat Areas, pa arks, or Old Growth G Mana agement Areas) present w within the Prroject area, tthough the area is considere ed of value by y the Grasslan nd Conservation Council o f BC. The Proje ect area is cha aracterized by y rolling grass slands with ti mber at highe er elevations. Elevations range between 800 8 to 1130 masl. m The are ea was previo ously glaciate d as evidence ed by numero ous drumlins. 34 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 At lower elevations, e the e vegetation is typically bu unchgrass, sa agebrush, and d prickly pearr cacti. Vege etation surveys in n 2007 and 20 008 documen nted the follow wing listed pla ant species (K Keystone, 200 08): x Red liisted: o Blue grama (B Bouteloua grac cilis), and o Hutchinsia H (Hu utchinsia proc cumbens). x Blue listed: o Freckled milk-v vetch (Astrag galus lentigino osus var lentig ginosus), and d o Sheathing pon ndweed (Stuck kenia vaginatta). Forested portions of the t Project area, a generally found at h higher elevattions, are ma ainly compossed of Douglas-ffir (Pseudots suga menzies sii), lodgepolle pine (Pin us contorta), and ponde erosa pine ((Pinus ponderosa a); although at a present mu uch of the pine e is dead or d dying due to tthe pine beetle epidemic. Four biogeoclimatic subzones of thrree biogeoclim matic zones a are present: x Bunch hgrass very dry, d hot, Thom mpson variantt (BGxh2). A small amoun nt is present in n the northeasst portio on of the Proje ect area. x Bunch hgrass very dry d warm, Nico ola variant (B BGxw1). Thiss variant is fou und near the ccentre of the Projec ct area. x Ponde erosa Pine ve ery dry hot, Th hompson variant (PPxh2). This variantt is found betw ween the IDF F and the Bu unchgrass zo ones, Interior Douglas-fir ve ery dry hot, T Thompson varriant (IDFxh2)). This varian nt is found in the southe ern end of the e Project area a and on Suga arloaf Hill. Most of th he forested portion of the Project area is structural sstages 4 and d 5 as a result of a frequent fire regime. A recent fire south s of Ned Roberts Lake e (south of Hu ughes Lake ta ailings pond) has removed d most of the olde er forest in that portion of the t Project arrea. Very little e old forest iss currently pre esent in the vvicinity of the Pro oject. 6.8.1 Rare R Plant Com mmunities The footprint of o the propos sed Project ha as been distu urbed by min ning, grazing, road building g and griculture. Many invasive species are present; p howe ever, no rare communitiess, as defined b by the ag Conservation C Data D Centre, were located during surve eys around Prroject areas. 6.9 FISH AND FIS SH HABITAT Fish prese ence in the Project area is noted in Jacko Lake, Pete erson Creek, and Cherry C Creek. Jacko o Lake is stocked d with rainbow w trout (Oncorhynchus my ykiss) and use ed locally as a sport fishing g venue. Petterson Creek has s a fish barrie er in proximity y of its interse ection with the e Kamloops ccity limits (Bridal Veil Falls), and therefore fish use in th he headwaters s of Peterson n Creek is mo ostly as a resu ult of downstrream movement of stocked ra ainbow trout from f Jacko La ake. Rainbow w trout have b been found th hroughout Cherry Creek. Downstream of the Pro oject area, Pe eterson Creek k flows into th he South Tho ompson Riverr and Cherry C Creek flows into o Kamloops Lake. L The following species are prese ent in the Norrth and South h Thompson River systems, Kamloops La ake and Thom mpson River (M MOE, 2007): 35 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 x x x x x x x x x Bull trrout (Salvelinu us confluentu us), Dolly Vard den (S. malm ma), and lake ttrout char (S. namaycush) Chino ook (Oncorhyn nchus tshawy ytscha), coho (O. kisutch), pink (O.gorb buscha), and ssockeye (O. n nerka) salmo on Rainb bow trout, stee elhead Burbo ot (Lota lota) Moun ntain whitefish h (Prosopium williamsoni), round whitefi sh (P. cylindrraceum) Weste ern brook lam mprey (Lampe etra richardson ni), lamprey sspecies Carp (Cyprinus ca arpio), redside e shiner (Ric chardsonius b balteatus), lake chub (Co ouesius plumb beus), peam mouth (Myloch heilus caurinu us), northern pike minnow w (Ptychocheilus oregonen nsis), leopard dace (Rhiniichthys falcattus), and long gnose dace (R R. cataractae)) Bridge elip sucker (C Catostomus columbianus) c ), largescale sucker (C. m macrocheilus)), longnose ssucker (C. ca atostomus), and northern mountain m suck ker (C. platyrh rhynchus), and d Slimy sculpin (Cotttus cognatus)), and torrent sculpin (C. rh hotheus). Fish and fish habitat investigation ns were initia ated in 2007 by Knight P Piésold in the Peterson C Creek watershed d to: document fish presen nce/absence, abundance, and distribution in the Pro oject area; qu uantify available habitat at fis sh sample sittes; and to confirm c and d document fis h migration o obstructions within Peterson Creek and Cherry Creek. Coho salm mon fry were e captured at the confluence of Peterso on Creek and d the South T Thompson River in July and August 2008. In Septem mber 2008 botth coho salm mon and rainb bow trout werre captured a at this site. No fish have bee en captured during electro ofishing in Pe eterson Cree ek at sites be etween Jacko Lake and Goos se Lake Road d, but rainbow w trout have been b captured d in Peterson n Creek Park upstream of Bridal Veil Falls, located app proximately 2 km upstream m from the mo outh. Rainbo ow trout have e been captured in Cherry Crreek during sa ampling by KP P and in prev vious surveys (Rescan, 200 06). Fisheries and aquatic surveys s are ongoing. o 6.9.1 Rare R and Enda angered Fish Species Rare R and enda angered fish with w the potential to be in the Project a area were dettermined usin ng the BC Species and Ecosystem m Explorer database (CD DC, 2010). T There are no records of ra are or en ndangered fiish species in the Proje ect area; how wever, down nstream of the Project in the Thompson Riv ver and Kam mloops Lake,, white sturg geon (Acipen nser transmontanus), mou untain su ucker, and bu ull trout are prresent. The Middle Fra aser River po opulation of white w sturgeon n is Red Liste ed in BC. White sturgeon n have be een documen nted in Shus swap Lake (M McMynn, 195 58), and in th he Fraser Rivver from Lyttton to Lillooet (McKenzie, 1997). Mountain M suck kers are Blue Listed in BC C. The neare est recorded m mountain succker observattion to th he Project is outside o the zo one of influen nce of the Pro oject on the N North Thomp pson River, ne ear its co onfluence with Heffley Cre eek (Carl, 194 48). 36 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 Bull trout are Blue B Listed in BC. Bull trou ut have been documented in both Kamlloops Lake an nd the Thompson Riv ver (Galesloott, 1999). 6.10 WILDLIFE W The Proje ect is in the Kamloops Forest F District and the Th hompson-Nicola Wildlife M Managementt Unit. There are e no Wildlife Habitat Area as (as legisla ated by the Forest and R Range Practiices Act) or parks present within w the Project area. Crittical deer and d moose winte er range has been mapped by the Kam mloops Land and Resource Management Plan P (LRMP), and does no ot overlap witth Project foo otprints. Terre estrial wildlife sp pecies of conc cern potentially occurring in n the Project area are liste ed in Table 6.11. Wildlife surveys condu ucted during the 2007 an nd 2008 field d seasons in ncluded breeding bird surrveys, woodpeck ker surveys, bat detector surveys, waterfowl w surrveys, small mammal tra apping, amph hibian surveys, snake hibern nacula surve eys and owl call playbacck surveys. Notable ressults included the detections s of a numbe er of listed wildlife species s in the Proje ect area, inclu uding badger (Provinciallyy Redlisted, SA ARA Schedule e 1 Endange ered), Great Blue Heron (Provincially Blue-listed), Swainson’s Hawk (Provincia ally Red-listed d), Peregrine Falcon (Prov vincially Red--listed, SARA A Schedule 1 Threatened),, Barn Swallow (Provincially ( Blue-listed), B Great G Basin Spadefoot S (Blu ue-listed and SARA Sched dule 1 Threattened) and Western Toad (SA ARA Schedule e 1 Special Concern) (Keyystone, 2008).. Wildlife su urveys are on ngoing. 6.11 LA AND USE The propo osed Project is located witthin the bound daries of the Kamloops La and and Reso ource Manage ement Plan (LRM MP), adopted d by the Prov vince of British Columbia a in 1995 and d amended in 1996 and 2001. oops Interage Implemen ntation of the Kamloops LRMP is the responsibility r of the Kamlo ency Manage ement Committe ee. Ranching is currently the t dominant land use in the t Project arrea. Most off the surface rights are privvately owned with grazing lea ases granted on much of the t outlying ccrown land. T The area is close to all forrms of infrastructture and is served by a network Road, n of roa ads including g the gravel, all-weather G Goose Lake R running be etween the Princeton-Kam P mloops Highw way (5A) at Kn nutsford to the e east of the Project and L Lac Le Jeune Hig ghway to the south s of the Project P area. Peterson Creek, whic ch flows through the Projject area, is designated by the Kamlloops LRMP as a “Commun nity Watershe ed Resource Managementt Zone”. Com mmunity wate ershed mana agement zone es are regulated in terms of the conserva ation of water quality and d quantity, an nd timing of fflow. The prrimary objectives s for Special Resource R Management – Community C W Watershed Zo ones are to: x Mainttain the quality y and quantity y of community water supp ply x Minim mize risk to live es and prope erty from flood ding and eros ion, and x Mainttain natural sttream flow reg gimes within acceptable a lim mits. 37 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 Resource e developmen nt activities are a permitted and encoura aged as long g as the com mmunity wate ershed zone obje ectives are achieved. a Min nimum standa ards are gov erned by Pro ovincial Community Wate ershed Guidelines. 6.12 ARCHAEOLOG A GY Archaeolo ogical work has been co onducted und der an Herittage Conserv rvation Act p permit for on ngoing exploratio on work at the e Project. An Archaeologic cal Impact Asssessment is being conducted to develop an understan nding of the existence e of historical or archaeologica a al sites within n the bounda aries of the P Project developm ment activities.. 6.13 COMMUNITY C OMY AND ECONO 6.13.1 Lo ocal Commun nity Kamloops K is th he largest city y in the Thom mpson-Nicola Regional Disttrict. Accordiing to the Sta atistics Canada C 2006 census, c demo ographics of the t City of Ka amloops are a as follows: x Population n: 86,376 x Total priva ate dwellings: 34,163 x Land area: 297.30 km2 (114.79 sq mi) m x Density: 27 70.4 /km2 (70 00 /sq mi) x Aboriginal population: 5,165 5 (6.43%)), and x Growth ratte (2001–2006): 4.0%. 6.13.2 Lo ocal and Reg gional Econom my Major M industrie es that supp port the Kam mloops and T Thompson-Nicola Region nal District in nclude fo orestry, touris sm, mining, and a fishing with w the mosst notable em mployers bein ng Domtar, T TolkoHeffley H Creek k Plywood an nd Veneer, LaFarge Ce ment, Highla and Valley C Copper Mine, and Thompson Riv vers University. Other bu usinesses tha at support th he local and regional eco onomy in nclude health h care & social s assista ance, accom mmodation & food services, constru uction, manufacturing m , transportation & wareho ousing, educcational services, adminisstration & support, waste w manage ement and remediation, r and public administration. The 200 06 Census P Profile prrepared by Statistics S Canada shows the regiona l labour forcce to be com mprised of 5 51,065 in ndividuals in th he 15+ age category. Other O commu unity profile statistics of interest succh as transp portation and d communica ations, in nfrastructure and services s, housing, employment, household in ncome, dwelling values, h health prrofile, social support s servic ces and crime e and policing g will be furth her investigatted and includ ded in th he Application n. 38 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 SE ECTION 7.0 - POTENTIAL L EFFECTS Project im mpacts will be restricted priimarily to site es previously d ning activities. The disturbed by historical min site has been b intensive ely studied as s a result of monitoring m acttivities of the o old mine sitess, and more rrecent studies an nd monitoring g activities to address a Proje ect concerns. Ongoing investigations s and monitorring have com mmenced for tthe following: x Surfic cial geology, topography, te errain, and so oils x Geochemistry (ARD/ML) x Meteo orology and climate c x Dustfa all x Surface hydrology x Surface water quality x Hydro ogeology and groundwaterr quality x Fisheries and aqua atics x Terrestrial ecosysttems, vegetation, and wildlife x Socio oeconomic x Land use, land status, and land capability, an nd x Archa aeological res sources. Results off these studie es will be inclu uded in the Ap pplication. 7.1 PHYSICAL AN ND BIOLOGIC CAL ENVIRONMENTS 7.1.1 Air A Quality A number of airborne em missions may y result from m the Projecct including: particulate m matter (in ncluding fugitive dust) from f road use, u crushing g operation, screening, blasting, loa ading, co onveyance, etc., e and Gre een House Gases G (CO2, CO, SOX, N NOX) from fu uel combustio on by ve ehicles and back-up generrators. 7.1.2 Noise N Health-based H guidelines g ha ave been deve eloped by the e World Healtth Organizatio on (WHO) an nd can se erve as a fra amework for managementt of communiity noise. Co ommunity no oise includes noise em mitted from all sources, with the main m sourcess being trafffic, industry, construction n and ne eighbourhood d noise (WHO O, 1999). WHO W defines the potential health effeccts associated d with no oise to inclu ude hearing impairment, speech inte elligibility, sle eep disturbance, physiolo ogical im mpairment, mental m illness s, performanc ce effects an nd social and behavioura al effects. W WHOde efined health h effects ass sociated with h noise in la arge outdoorr areas inclu udes disruption of tranquillity, wh hich can be managed by y maintaining g a low ratio o of intruding g noise to na atural. Construction C related r noise e in proximity y to importan nt wildlife ha abitat can re esult in decre eased efffectiveness and a utilization n by wildlife. Noise N will be considered c forr the Project at a several leve els: 39 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 x x x 7.1.3 Proximity of o Kamloops and a its surrou unding comm unities Worker he ealth and safe ety, and Noise impa acts on wildliffe. Watershed W Dra ainage The Project sitte is in a wate er deficit area a. This deficitt will largely b be made up th hrough fresh water su upplied from Kamloops Lake via an upgraded u sysstem. All un naffected wate er will be divverted arround Projectt facilities (e.g g., waste roc ck manageme ent facilities, T TSF, the ope en pit, processs and in nfrastructure facilities, f road ds, protection n berms, and thickened ta ailings plant) e except as req quired to o make up the e water balan nce deficit. A short section n of Peterson n Creek near the outlet of JJacko La ake will be diverted d wherre it runs adja acent to the Ajax pit and east waste rock manage ement fa acility (see Fig gure 5.1). An ny ephemeral streams or s urface runoff that flows intto Inks Lake w will be diverted into th he Process Water W Pond in n Inks Lake n ear the east TSF embankkment. Waterr from In nks Lake, (Ph hoto 1), a non-fish bearing g water bodyy, will be use ed as required in the thickkened ta ailings plant. Ajax pit wa ater and run noff from the waste rock managemen nt facilities w will be transferred to site s process water w ponds during d pre-pro oduction and throughout th he mine life. The waste roc ck management facilities will affect in ntermittent run noff drainage es (gullies with no allluvial channe els), alkali ponds, and sea asonally wette ed low-lying ccatchment are eas, none of which prrovide fish or benthic inverrtebrate habittat or have an ny surface co onnection to fish-bearing w waters. No N waterbodie es or perenn nial or ephemeral stream ms will be im mpacted by the TSF: su urface drrainages are e indicated on o provincial basemaps; however, fiield reconnaissance foun nd no ev vidence of alluvial a chann nels. Site co omponents in n relation to surface drainage feature es are illustrated on Figure F 7.1. 7.1.4 Fish and Fish Habitat Potential impa acts to the aquatic a enviro onment inclu ude alteration ns to stream and lake ha abitat. Figure 7.1 illu ustrates the project infra astructure in relation to the existing lake and stream drrainages. Be elow is a brieff summary off the potentiall impacts of this habitat altteration on aq quatic liffe. 7.1.4.1 Impactts on Stream Habitat A 1500 0 m section of o Peterson crreek (1.5 ha o of instream ha abitat) downsstream of the outlet of Jacko Lake will be b realigned to accommod date the Projject pit and th he east waste e rock manag gement facilitty. Fish habittat will be losst, which will likely be con nsidered a Ha armful Alterattion, Disruptio on, or Destru uction of Fish h Habitat (HA ADD) by Fish heries and Occeans Canad da (DFO), and d consequenttly will require e Fisheries A Act Authorizattions under se ection 35(2). Section 32 Authorization A s, required fo or direct morta ality of fish, a are not anticip pated. Aquatiic habitat in this t section is s rated as low w value in preliminary su urveys, and n no fish have been b captured d during the Project-specif P fic surveys. C Compensation measures w will be explored and adoptted to achieve e a “No Net L oss Policy”. 40 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 Potenttial impacts to o riparian hab bitat may occcur where roa ad constructio on and/or upg grades cross any waterco ourses, such as the new w road and b bridge across Peterson C Creek require ed for access s to the explo osives storage e facility. Co ompensation measures will also at stream cro be con nsidered for any a potential impacts to aq uatic habitat a ossings. 7.1.4.2 Impactts on Lake Ha abitat The western edge of o the pit and pit berm will impact the tip of the north heast arm of JJacko Lake, (Photo 11), affecting a an arrea less than half a hectarre in size. Ho owever, fish h habitat will be lost, which will w likely be considered a H HADD by DFO and consequently will re equire Fisherries Act Auth horizations under u section n 35(2). M Mitigation and d/or compenssation measu ures will be ex xplored and adopted a to acchieve a “No Net Loss Po olicy”. Inks La ake, a non-fis sh bearing wa ater body with no surface connection w with adjacent watercourse es, will be use ed as the Proc cess Water Pond P and the T TSF runoff co ollection pond d. 7.1.5 Water W Quality Release R of efffluents to the aquatic enviironment mayy cause dete erioration of a aquatic habita at and re esult in morta ality or reduc ction in utiliza ation of habittat by fish sp pecies. Redu uced water q quality co ould also hav ve negative impacts on irrigation i watter and huma an health, wh hich is particcularly re elevant given the proximity y of the City off Kamloops. 7.1.6 Vegetation V The construction of Projec ct facilities and infrastruccture will permanently rem move, alter a and/or re eplace vegeta ation within th he Project are ea. Terrestria al habitat losss and/or degrradation may occur as s a result of clearing tops soil, woody debris d remova al, and the cconstruction o of Project faccilities. The constructiion of permanent facilities s will result i n the permanent loss of vegetated ha abitat, whereas w staging, borrow, and spoil are eas will be rreclaimed folllowing the co onstruction p period, re esulting in the e temporary loss of vegettation and ha abitat. Riparrian vegetatio on will be rem moved where w streams s have to be diverted and where stream m crossings need to be e established fo or new ro oads. The re emoval of ve egetation will impact wildliife species a as a result off habitat alterration, fragmentation, and/or o de estruction, degradation, d obstruction. Riparian ha abitat will b be rees stablished on n re-routed strream sections s. 7.1.7 Wildlife W 7.1.7.1 Roadk kill Mortality Mine cons struction and operation willl result in an n increase in local road tra affic. The sp pecies most vulne erable to road dkill mortality in the Projecct area are sm mall, slow-mo oving species,, such as snakes and amphibians, which arre difficult for drivers to se ee. Passerine e birds that ne est on the ground d at the road dsides (e.g., Vesper Spa arrow (Pooece etes gramine eus)) may alsso be vulnerable e to roadkill. 41 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 Potential roadkill r morta ality is most significant fo or Great Basin Spadefoott (provinciallyy Blue listed; SAR RA Schedule e 1 Threatene ed), Western toad (SARA A Schedule 1 Special Con ncern) and rubbe er boa (SARA A Schedule 1 Special C Concern). Otther Blue-listted snake sp pecies (racer, ratttlesnake, and d gopher sna ake) have nott been obserrved during field surveys o of the Project are ea, and are lik kely present at a low densitie es if at all with hin the proposed Project a area. 7.1.7.2 Constrruction-Relate ed Mortality Blasting and excavation of previous sly undisturbe ed terrain du uring construcction may ressult in wildlife mo ortality. Wildliife unable to escape may be crushed b by rock or ma achinery durin ng the initial exca avations. Spe ecies most vu ulnerable to th his type of mo ortality are sn nakes, amphib bians, and roden nts. Vulnerable species detected in tthe rock outccrop/grasslan nds around th he pit includes deer mice, lon ng-toed salam mander, garte r snake, and bushy-tailed woodrat, alth hough additional species are likely presen nt. Bats mayy also roost in rock creviices including g four provincially y blue listed species s know wn to occur in the Kamloops Forest Distrrict: fringed m myotis, spotted ba at (also COSE EWIC listed as a a species of Special C Concern), Tow wnsend’s big--eared bat, and western w small-footed myotiis. Some birrd species ne est on the gro ound or within n rock crevices, and a construction may result in nest desttruction. Native plan nts are at risk k of mortality as a a result off Project consstruction. Exccavation/blastting of habitat, changes in soil drainage pattterns, and cru ushing by ma achinery and ttrampling from m foot traffic may y result in elim mination of som me native and d/or rare plan nts. 7.1.7.3 Mortality Due To Co ontaminants Contamina ants may affe ect both wildliffe and plants within the Prroject area. F For instance, some plants may y be tolerant to some hea avy metals, b but that tolera ance is speciffic to the partticular metal and to the particular plant pop pulation. He avy metals ssuch as coppe er, cadmium, lead, chromium,, and mercury y are known to t be persiste ent and mobile in the envirronment, and to be potentially toxic to many y forms of life e. 7.1.7.4 Creatio on of Problem m Wildlife Animals th hat lose their fear of humans can causse property d damage and injuries to pe eople, and have to t be relocate ed or, where necessary, e eradicated. The Project arrea is not exp pected to harbourr a high dens sity of the wildlife species that are likely to become e pests (e.g., black bears, raccoons). How wever, coyote es, red foxes, and even de eer can causse problems if they become ha abituated to people p and as ssociate hum an presence with food. A Animals that are fed by people or that bec come used to o feeding on garbage ma ay become a aggressive o or raid storage are eas. 7.1.7.5 Habita at Loss/Modification Constructio on of mine fa acilities will result r in loss or modificattion of habita at for some w wildlife species. Quantification n of habitat lo oss is not po ossible at thiss time; howe ever, habitats most 42 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 likely to be affected in nclude grassla ands, rock o outcrops, dry forest, riparian, wetlandss, and aspen fore est along Pete erson Creek. 7.1.7.6 Disturb bance Effects s A variety of o wildlife may y be disturbed due to loud d construction n-related noisses such as d drilling and blastin ng. The prese ence of work crews and no oise produced d by machine ery, and road traffic may also result in distu urbance to wildlife. w Rapto ors and Grea at Blue Heron ns are sensittive to loud noises in close pro oximity to nest sites, which can result in stress and nest abandonm ment. 7.1.8 Acid A Rock Drainage and Me etal Leaching (ARD/ML) Static testing was w carried ou ut as part of the t environme ental baseline e study, and tthe results ind dicate th hat the waste e rock and orre are not ac cid generating g (Golder, 20 010). Kineticc and heavy metal le each potential testing will be carried ou ut at a future e date. The preliminary p project design n was ba ased on the assumption a of o non-acid ge enerating tailings (Golder, 2010). Howe ever, the dessign of th he tailings sto orage and waste rock man nagement faciilities has bee en included in n the design of the fa acility to recov ver seepage and a runoff from the facility prior to disch harge to the e environment. 7.2 ECONOMIC ENVIRONMEN E NT The Kam mloops region, and in parrticular the Project P site, h has a rich h history of min ning. The C City of Kamloops s is expected to have exte ensive resourrces available e to support tthe developm ment of the Prroject. The Proje ect will provide local emplo oyment and the remaining g workforce could commutte from outsid de the immediate e area or resiide in the com mmunity. The e project will employ appro oximately 385 5 personnel d during the opera ational phase and require approximately a y 2000 perso on-years of em mployment during constru uction. Indirect em mployment op pportunities will w be created d in a variety of service ind dustries including housing, road maintenan nce, transporrt, consumable es, catering, and a equipme nt servicing. The effectts on the loca al and regiona al economy arre expected tto be positive,, and will be a analysed to assess their impa act. The analy ysis will includ de considerattion of: x Creattion of new job bs: local effec cts and region nal effects inccluding worke er migration, x Accom mmodations: economic and social effec cts of housing g workforce in n Kamloops, a and x Perso on years of em mployment cre eated during both construcction and ope erations. 7.3 SOCIAL ENVIRONMENT 7.3.1 Aesthetics A Potential visual changes to existing g conditions during d the co onstruction, operation, and d decommissiioning phases of o the Projec ct will be evaluated e for aesthetic im mpacts in a advance of tthe Environm mental Assessme ent Applicatio on / CSR. Changes to the landscape will include tthe developm ment of the ta ailings storage fa acility, as well as the north and east was ste rock mana agement facillities. The exxisting two Aja ax pits will be ex xpanded to be ecome one la arge open pit. Computer-e enhanced sim mulations willl assist to illu ustrate viewscape e changes so o that an aesth hetic assessm ment can be ccompleted. 43 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 7.3.2 La and and Wate er Use The Proje ect is a propos sed brownfield developme ent in a locatio on with historrical mining a activity and exxisting mining inffrastructure. The Applicattion / CSR will w describe i n depth the anticipated P Project impaccts on existing and potential future f land us se. Privately--owned land rrequired for tthe Project ha as been purch hased by KAM, and no new acquisitions are expected d in order to accommoda ate the propo osed infrastru ucture. Project ac ctivities assoc ciated with po otential effectts that will be e evaluated w will include bu ut not be limitted to the following: x Changes in traffic volumes on the Lac Le Je eune Highwayy, Highway 1,, Highway 5, ffor access to// from the site during con nstruction and d operation, in ncluding that associated w with shipping the concentrrate to the Po ort of Vancou uver x Trans sportation of ore o concentra ate by truck on n existing and d upgraded acccess roads x Brush hing, upgrade e, and/ or repair of the existing e overh head powerlin ne, and consstruction of a new powerline where needed x Consttruction of a new n pumphou use on the sh hore of Kamlo oops Lake and a new wate er supply pipe e from the ex xisting booste er station nea ar the old Afto on site near H Highway 1 to tthe new thickkened tailingss plant and processing p pla ant x Pit en ncroachment on o the northe east arm of Ja acko Lake on navigable wa aters quality and w x Effectts to neighbou uring ranch la ands, including noise, air q uality, water q water quantity,, and x Expan nsion of the decommission d ned mine site and associatted infrastructture. 7.4 HERITAGE H Archaeolo ogical work has been conducted underr a Heritage Conservation n Act (HCA) permit for on ngoing exploratio on work at th he Project. An A Archaeolo ogical Impacct Assessmen nt (AIA) is be eing conductted to develop an a understand ding of the existence of historical h or a archaeologica al sites within the boundarries of the Projec ct development activities. As defined by the HCA A, a “heritage object” mean ns, whether d designated orr not, persona al property tha at has heritage value v to British Columbia a, a commun nity or an ab boriginal people. A “heriitage site” m means, whether designated d or o not, land, including lan nd covered b by water thatt has heritag ge value to B British Columbia, a community or an abo original peop ple. The actt defines “he eritage value”” as the histo orical, cultural, aesthetic, a scie entific or educ cational worth or usefulnesss of a site or object. During the e Project asse essment, con nsultation and d studies will b be developed d to identify an ny heritage objects or sites, and, a if identifie ed, seek means to mitigate e negative effe fects. 7.5 HEALTH H AND COMMUNITY Studies will w be conduc cted to determ mine Project effects e on soccial, health, an nd communityy issues. Da ata will be collectted from a ran nge of stakeholders including First Natio ons, commun nity administra ators, public h health and socia al services an nd infrastructure providers s, educationa al institutions, and businesss representa atives. Potential effects will be evaluated, including wo orker and com mmunity healtth, air qualityy, noise, and water quality. 44 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 SECTION 8.0 - FIRST NATIONS N ENG GAGEMENT AND PUBLIC C CONSULTA ATION KAM ackn nowledges its s responsibility y to engage in consultation n with First N Nations, regula atory agencie es and potentially y affected and d interested stakeholders s in the EA revview processs. A consulta ation record w will be kept that will describe engagementt activities (e.g. telephone e calls, emailss, mail, and m meetings) dates of discussion ns, group/ind dividuals eng gaged in discussions, me eans of eng gagement, an nd specific issues discussed d. 8.1 N CONSULTA ATION FIRST NATION KAM is committed to maximising the t participatiion of First N Nations involvvement during the EA pro ocess, without prrejudice to an ny First Natio on Rights or Title. T KAM iss committed tto continue to o work closelyy with local Firstt Nations to develop worrking agreements, such a as a memora andum of und derstanding a and/or economic c and impact benefit agre eements. Co onsultation acctivities will ccomply with o or exceed BC C and Canadian requirementts under the BC Environm mental Assesssment Act an nd the Canad dian Environm mental Assessme ent Act. Cons sultation with First Nations s will be ongo ing for the du uration of the Project. The Proje ect lies entirelly within the traditional t territory of the S Secwepemc N Nation. Within the Secwe epemc Nation, th he Tk’emlúps te Secwepem mc (Kamloops Indian Band d) and the Skkeetchestn In ndian Band are the First Natio ons in closes st proximity to o the Project (Figure 8.1). Both bandss are members of the Shu uswap Nation Trribal Council. In a cooperrative effort, the t Tk’emlúp ps and Skeetcchestn Bandss have forme ed the Stk’emlup psemc te Sec cwepemc (ST TS), as a diviision of the g greater Secwepemc Nation. The STS (also known as s the Stk’emlu upsemc of the e Secwepemc c Nation, or S SSN) have se everal agreem ments in place e with the government of British Columbia a, specifically with respect to mining acttivity in their a asserted traditional territory. As A defined in these agreem ments1, the Ajax A Project lie es within theirr asserted tra aditional territo ory. The Tk’emlúps Indian n Band and the Skeetch hestn Indian Band were initially conttacted by AM ME in February, 2006, to intrroduce the Company to th he Bands and d present info ormation on tthe Project. Since then, seve eral meetings s have taken place p pertainiing to informa ation on the P Project and the Bands’ con ncerns and needs related to the t Project. During the First Nations ccommunicatio on process, isssues, valuess, and questions s were raised by both the Tk’emlúps T Ind dian Band an nd Skeetchesttn Indian Ban nd. Concernss from both Ban nds revolved d around Project design details, e environmenta al safeguardss, and econ nomic opportunitties. KAM co ontinues to wo ork with both Bands to info orm them of P Project progre ess, and to id dentify and resolv ve issues. The follow wing is a summary of historrical consulta ation with the First Nations to date: x Janua ary 2008: Senior S propon nent manage ement held introductory meetings in Kamloopss with repres sentatives fro om the Tk’emllúps and Skee etchestn Ban nds x July 2008: Abacu us Mining and a Exploratiion Corp. e ntered into a formal ag greement to fund archa aeological studies and lega al assistance for future ne egotiations – agreement w was for a one e year term and a ended Ju uly 31, 2009 1 See Appe endix 1 of the April 2009 Min ning and Minerrals Agreementt between Herr Majesty the Q Queen in Right of the Province of o British Colu umbia as repre esented by th he Minister of Energy, Mine es and Petrole eum Resource es and Stk’emlups semc of the Secwepemc Nation as represen nted by the Tk’ emlúps (forme erly Kamloops) Indian Band a and the Skeetchesttn Indian Band, available at www.empr.gov. w .bc.ca. 45 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 x x x Augus st 2009 – project p update e meeting and site visit with representatives fro om Tk’emlúpss and Skeettchestn Bands with districtt representatiives from the e Ministry of M Mines and En nergy to visit areas of culttural importan nce in the are ea Augus st 2009 – Ab bacus employ yed Terra Arc chaeology und der recomme endation of bo oth Tk’emlúp ps and Skeettchestn Bands for future arrchaeology work w in projectt area, and Decem mber 2010 – KAM has dev veloped an advanced exp loration agree ement to worrk together with the Tk’em mlúps and Ske eetchestn Ban nds through the t project de evelopment prrocess. Througho out the meetin ngs, both Tk’e emlúps and Skeetchestn re epresentative es have demo onstrated open nness to the pro oject developm ment, and continue to eng gage in dialog gue. Both ba ands have ide entified the ne eed to study and d protect arc chaeological and cultural resources in n the area, a and to minim mize environm mental impacts, both b of which h have been accommodate a ed in the exp ploration and mining plans by the propo onent. Both bands have also o identified an a interest in securing ecconomic bene efits from the e project. KA AM is currently working with h the each band (collec ctively the SS SN) to ensu ure that all ffeasible econ nomic opportunitties are made e available. KAM reac ched an Adv vanced Explo oration Agree ement in No ovember 2010 0 with STS. This Agree ement confirms the t intentions s of both KAM M and the ST TS to build a positive relattionship throu ugh the explo oration phase to advance the e Ajax Projec ct while minim mizing the dissturbance to the natural e environment. The Agreemen nt provides op pportunity for STS to comm ment on prop osed activitie es prior to the submission o of any permits orr applications s, ensuring tha at on-going ex xploration wo ork will procee ed in a timely manner. KAM and the STS will continue to work togethe er during the ffeasibility sta age of the Pro oject in negottiating service ag greements, in ncluding thos se for STS participation p in n archaeolog gical work and cultural he eritage reviews. Following completion of th he Feasibility y Study and d determination of the econo omic viability of the Project, KAM K and ST TS will work toward a lon ng-term and definitive “W Working Intere est Agreeme ent” to maintain a positive rela ationship throughout all phases of the P Project. The First Nation engag gement plan to be followed d by KAM incl udes the follo owing: x Ensurring early partticipation by First F Nations x Provid ding opportun nity for employ yment x Provid ding timely infformation and d updates reg garding the Prroject on an o ongoing basiss x Provid ding timely information i and a updates regarding th he environmental and re egulatory app proval proce esses associa ated with the Project P on an ongoing basiis x Respo onding to Firs st Nations qu uestions and//or informatio n requests re egarding the Project in a ttimely mann ner x Seekiing to unders stand First Nations N conce erns or issue es regarding the Project a and considerr such issues s or concerns s in the Projec ct’s final desig gn and delive ery x Engag ging in discu ussions with the First Na ations to furtther identify means, whe ere appropria ate, to mitiga ate, minimize or otherwise accommodatte First Nation ns concerns o or issues relating to the Prroject x Docum menting all consultation activities with w First N Nations and providing a record of such docum mentation to all a appropriate e Crown decis sion makers a and regulatorrs x Provid ding regular opportunities o for First Natio ons memberss to meet with h KAM and their representatives to exc change inform mation regarding the Projec ct, and 46 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 x Placin ng a high prio ority on safety and respect for the land. 8.2 FEDERAL, PR ROVINCIAL, AND A REGION NAL GOVERN NMENT CON NSULTATION It is anticiipated that the BCEAO will establish a formal EA w working group p with the Pro oponent, potentially affected First F Nations s, and releva ant provincial, federal, an nd local gove ernment reprresentatives. The objective of the workiing group will be to prov vide guidance e to KAM with regards tto data acquisition objectives s, ways to av void potential project effec cts, and strate egies to mitig gate any effe ects that cann not be avoided. 8.2.1 Federal Goverrnment A preliminary meeting witth the Cana adian Environ nmental Asse essment Age ency was he eld in February 2010 0 to introduce e the Project, and corresp pondence ha as continued through ema ail and te elephone disc cussions since that time to o receive dire ection. It is a anticipated that consultatio on will allso include the following fe ederal government ministrie es: x Natural Re esources Can nada x Environme ent Canada x Fisheries and a Oceans Canada, C and x Transport Canada. 8.2.2 Provincial Gov vernment Preliminary me eetings and/o or discussions s have taken place with a variety of provincial agencies. The intent of these t meetings and discu ussions was tto introduce the project a and to obtain early in nput with rega ards to potential project issues. Agencie es contacted to date includ de: x British Columbia Enviro onmental Asse essment Officce; x Ministry off Energy, Mine es and Petroleum Resourcces; x Ministry off Forests and Range, and x Ministry off Environmentt: o Enviro onmental Prottection Divisio on o Enviro onmental Stew wardship Divis sion, and o Water Stewardship Division. Consultation C with w provinciall agencies will be ongoing g for the durattion of the prroject. Consulltation will w be establis shed with the following age encies: x Ministry off Agriculture x Ministry off Transportatio on and Infrastructure x Ministry off Community, Sport and Cu ultural Develo opment, and x Ministry off Forests, Lan e Operationss, Integrated L nds, and Natu ural Resource Land Manage ement Bureau. 47 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 8.2.3 Regional R Gove ernment Consultation C with w regional government g offices o has be een initiated to o introduce th he project and d also to o gain an un nderstanding of local land d rights and taxation issues. The following is a list of meetings m held at the regional level: x March 17, 2010 – Introd ductory meetiing with Mr. P Peter Milobar, Mayor of the e City of Kam mloops and Chair of the Thomp pson Nicola Regional R Distrrict (TNRD) B Board of Direcctors. The me eeting included discussion d of project deve elopment, efffect on city limits and taxxation, and o overall project sch hedule. ctory meeting with City of K Kamloops pla anning departtment and witth City x April 7, 2010 – Introduc of Kamloo ops Financia al and Taxattion Departm ment. The m meeting prese ented the Prroject, discussed current city planning p and limits of devvelopment, disscussion of th he Ajax Proje ect on City limits, and development of unde erstanding of llocal heavy in ndustry taxatio on. It is expected that t consultattion with the City of Kamlo oops and the TNRD will co ontinue throu ughout th he life of the Project. P Additionally, it is expected tha at future conssultation will b be established d with In nterior Health, and the Kam mloops and Merritt M Chambe ers of Commerce. 8.3 PUBLIC CONS SULTATION Interested d members off the public will w be encourraged to partiicipate throug ghout the planning processs and e Project prroceeds, KAM regulatory y review. As A the enviro onmental ass sessment pro ocess for the M will undertake e public notification and consultation c activities a thatt satisfy requ uirements of the Environm mental Assessme ent process in BC and Canada; C to be determined d following cconsultation w with provincia al and federal go overnment ag gencies. KAM commits to undertaking u fo ormal public cconsultation a activities durin ng the public com mment period d prior to and following sub bmission of the e Application. Objectives s of planned consultation c include: x Provid de and distrib bute informatio on on the Pro oject, and rele evant EA mate erial x To prrovide the public with the opportunity to t participate e and/or provvide input reg garding the P Project Applic cation and all relevant conc current permiit applicationss x Identify, documentt, and resolve all issues raised, and x Incorp porate comments and input at a strate egic level rela ated to Proje ect developme ent, environm mental mitiga ation, manage ement, and monitoring m plan ns. A compre ehensive apprroach to inform ming and con nsulting with th he general pu ublic will inclu ude: x Open public proce ess: intereste ed parties willl be encoura aged to participate throug ghout the pla anning proce ess and regu ulatory review w stages, witth effective ttwo-way com mmunication. The consulltation proce ess is viewed as an opportu unity for cons structive dialog gue with an in nformed audience x Mean ningful consultation: interes sted parties can c expect th hat consultation will be rea al and meaniingful. Speciific expectatio ons may vary among the pe eople being cconsulted and d may change e over time x Trans sparency and accountabilitty: interested d parties can e expect that th hey will be pro ovided with access to all relevant inforrmation and th hat they will be b informed a bout changess to the Project, and x Consu ultation, not consensus: input from m the public, along with information gathered through technical, environm mental and so ocial impact sttudies, will infform Project d decisions. 48 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 To date public p consultation has be een primarily limited to in nformal discussions. As tthe Project m moves forward open houses/in nformation se essions will ta ake place in th he local comm munity. 8.3.1 ocal Commun nities, Businesses, and Sta akeholders Lo Consultation C activities a for local communities, busine esses, and sstakeholders are anticipatted to in nclude the following: x Open houses, informattion sessions s, and meetin ngs to raise a awareness, a and to identify fy and address issues and con ncerns x Public issu ues scoping and a communitty profiling x Meetings with w key stake eholder group ps x Website de evelopment and a printed materials x Meetings with w media in the Project area a x On-going issues trackin ng and proactive response x Public notiification of ev vents, meeting gs, and the sstatus of the P Project using a variety of m media (advertising, mailings, etc.), e and x Providing comprehensive reporting of the proce ess and resullts of the con nsultation pro ocess, including consultation c summaries s to support the A Application. 49 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 SECTION 9.0 - PROPOS SED DEVELO OPMENT SCH HEDULE 9.1 PERMITTING PROCESS The prop posed develo opment sche edule for the e Project wa as created u under the a assumption th hat a harmonize ed Federal and Provincial Environm mental Assesssment (EA) review will be required d and completed d. The Proje ect does meet the thresholds of the Re eviewable Pro ojects Regula ation under th he BC EAA and the likely requ uirement for one o or more federal f permitts are expecte ed to trigger tthe CEAA. KAM is cu urrently initiatting First Nation and public c consultation n in the pre-A Application ph hase of the Prroject. Baseline environmenta al studies an nd exploration n drilling, con ndemnation d drilling, prelim minary engine eering and site surveys will continue throughout the e pre-Applica ation phase. A preliminary breakdow wn of permitting g related activ vities is provid ded below: x Prelim minary Economic Analysis Complete Augustt 2009 x Initiate Discussions s with BC EA AO and CEA Agency A Februaryy 2010 x Contin nuation of Ba aseline Enviro onmental Stud dies Mayy 2010 x Projec ct Description n Submission Februaryy 2011 x AIR Submission S March h 2011 x Public c Open House e and AIR Co omment Perio od Aprill 2011 x Feasibility Level Design Augustt 2011 x Comp pletion of Baseline Studies and Baseline e Reports Augustt 2011 x Subm mission of App plication/CSR Document Septemberr 2011 x Public c Open House e and Applica ation/CSR Co omment Perio od Octoberr 2011 x EA Ce ertificate Decision March h 2012 x Federral Decision June e 2012 x Concu urrent Permittting Complete ed June e 2012 9.2 CONSTRUCT C ION Upon rec ceipt of the EA Certificate, Federal Decision, Co oncurrent Pe ermits and a any other req quired permitting g, construction will be initiated in July, 2012. It is e estimated tha at a period off two years w will be required to move from the initiiation of co onstruction to o mechanica al completion n. Start-up p and commissio oning will require an additional two to th hree months tto complete. 9.3 OPERATIONS O S The anticiipated operattional phase of o the Project is 23 years, w which is conttingent on ma aterial change es that could aris se during the continued c exp ploration work k, process reffinement or th hroughput mo odifications. 9.4 DECOMMISSI D ONING Timing an nd duration off closure and reclamation activities a will b be determined d when the de etailed reclamatio on plan is sub bmitted as part of the BC Mines M Act perrmit applicatio on. 50 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 SE ECTION 10.0 - REQUIRED D PERMITS 10.1 ENVIRONMEN NTAL ASSES SSMENT REV VIEW PROCE ESS Major min ning projects in i BC are sub bject to enviro onmental asse essment as p part of the legislated certificcation and permitting process s. Depending on the scope e of a propossed project, itt may also be e subject to fe ederal or harmon nized provincial/federal rev view. The env vironmental rreview processs achieves th he following: x Opportunities for all a stakeholderrs and First Nations N to iden ntify potentiall issues and p provide input x An un nderstanding of o the environ nmental, socia al, economic,, heritage, and d health effeccts of the Projject x Opportunity to iden ntify ways to prevent p or minimize negatiive effects fro om the Projecct or Project re elated activitties, and x Provid des an opportunity for inp put from all interested pa rties during tthe Environm mental Assesssment proce ess. 10.1.1 British Columb bia Environme ental Assessm ment Act Proccess The Project is s subject to review unde er the British Columbia E Environmenta al Assessmen nt Act (B BCEAA), which is administered by th he British Co olumbia Envvironmental A Assessment Office (B BCEAO). Th he BCEAA is s the legal frramework forr the provincce's environm mental assesssment prrocess for pro oposed major projects. The BCEAA iss supported b by several reg gulations, inclluding th he Reviewable Projects Regulation, R as a well as a variety of p policy, proced dure and technical gu uidelines. The production n capacity off the propose ed project willl exceed 75,0 000 tonnes p per year of m mineral orre, and there of the efore will trigg ger an Enviro onmental Ass essment und der Section 8 (1) and (2) o Reviewable R Prrojects Regula ation to the BCEAA. 10.1.2 Canadian C Enviironmental As ssessment Ac ct Process The Project is expected to trigger an Environm mental Asse essment und der the Can nadian Environmental E l Assessmen nt Act (CEA AA), by virttue of it re equiring fede eral permitss and au uthorizations.. The Projec ct Description Guide to De etermine Federal Roles un nder the Can nadian Environmental Assessmen nt Act (CEAA A, 2006) wa as consulted to determin ne and define the in nvolvement off federal agen ncies in the re eview processs. A comprehens sive study is required r when n the project, as scoped b by the Respon nsible Authorrity (or au uthorities), contains c one e or more components c listed in the Comprehe ensive Studyy List Regulation. R The T Project contains com mponents listted in the a above regulattion, thereforre will warrant w a com mprehensive review r process. The crite eria listed forr a mineral P Project to trig gger a co omprehensive e study are: x The prop posed constru uction, decom mmissioning o or abandonme ent of: (a) a me etal mine, other than a gold d mine, with an ore produ uction capacitty of 3,000 t/d or mo ore, and (b) a me etal mill with an a ore input ca apacity of 4,0 000 t/d or morre. 51 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 As A a major re esource proje ect, the proce ess will involvve the federa al Major Projjects Manage ement Office O (MPMO O). The MPM MO works witth federal de epartments an nd agencies to offer guid dance, co oordinate agreements and timelines, and to offerr tracking and monitoring of the regu ulatory re eview process s. 10.2 OTHER O REQU UIRED PERM MITS AND APPROVALS 10.2.1 British Columb bia Authorizations, License es and Permitts Provincial auth horizations an nd permits th hat may be re equired for th he proposed project includ de the fo ollowing: x BC Ministtry of Forests s, Lands, and d Natural Re esource Operrations o Licens se to cut. o Land Act A Authorizattions. o Environme ent x Ministry of o Water License for new n sedimentt control pond ds/detention p ponds o Section 9 Water Ac ct Approvals o Water License for surface s water withdrawal/w water use, if re equired, and o Permitts under the Environmen ntal Managem ment Act for effluent (e.g g., tailings sttorage facility y), air emissions (crushers)), and refuse. o Energy and d Mines x Ministry of o Mines Act Permit Approving A the Mine Plan an nd Reclamatio on Program. x Interior He ealth Authorrity o Operation Permits (drinking ( wate er, sewage disposal, etc.). Specific permiitting requirem ments will be e further refin ned during th he review pro ocess and through discussions with provincial agencies. a 10.2.2 Federal Authorrizations, Lice enses and Pe ermits Federal authorizations and d permits that may be req quired for the e proposed p project includ de the fo ollowing: x Fisheries and Oceans s Canada o Section 35(2) Authorization under the Fisherries Act for th he harmful altteration, disru uption or destruction of fish habitat in Ja acko Lake an nd Peterson C Creek. dian Wildlife S Services) x Environment Canada2 (and Canad o Specie es At Risk Act o Migrattory Birds Con nvention Act o Canad dian Environm mental Protecttion Act (CEP PA), and o Metal Mining Effluent Regulation ns (MMER). 2 Note: no o disposal at sea is anticip pated, and the erefore KAM w eeking a perm mit under Can nadian will not be se Environmental Protectiion Act (CEPA A) subsection n 127(1). 52 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 x Health Can nada o Regula atory interest in potential noise n and air quality impaccts, potential impacts to co ountry foods, and possibly y potable wate er and sewag ge. nada x Natural Resources Can o Authorrization underr the Explosiv ves Act for exxplosives stora age. C x Transport Canada o Naviga able Waters Protection P Ac ct (NWPA) ap pprovals for w works that are e built or placced in, on, over, or through h any waters deemed d navig gable. E Board d, accountable e to the Minisster of Natura al Resources Canada, regu ulates The National Energy in nternational and a interproviincial aspects s of the oil a and gas and electric utilitty industries. The Project will not construct a pipeline or in nternational e electrical transmission long ger than 40 kkm as re egulated by the National Energy E Board d, and therefo ore will not trrigger a revie ew by the Na ational Energy Board. Specific permiitting requirem ments will be e further refin ned during th he review pro ocess and through discussions with federal age encies. 10.3 HARMONIZED H D REVIEW PR ROCESS Since the Proje ect will likely trigger both Provincial P and d Federal revview processe es, it is expeccted to be e subject to a harmonized review led by y BCEAO. 53 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 ENCES SECTION 11.0 - REFERE Anon. 19 950. Lake Survey Data. Surveyed by IB BB, CCL, TGN N, PAL. Nam me: Jacko Lakke. BC Conservation Data Centre (CDC). 2010. BC B Species and Ecosysttems Explore er. BC Minisstry of Environ. Victorria, BC Availa able: http://a10 00.gov.bc.ca//pub/eswp/ (a accessed Jun 10, 2010). Canadian Climate Norm mals. 2003. Viewed V online e at: htttp://climate.w weatheroffice.gc.ca/climate e_normals/ind dex_e.html Carl, C.G. 1948. The Freshwater F Fis shes of British h Columbia. Canadian Environmenttal Assessme ent Act (CEAA A). 2006. Pro oject Descriptiion Guide to Determine Fe ederal Roles R under th he Canadian Environmenta E al Assessmen nt Act. City of Ka amloops. 2007 7. Peterson Creek C Park. Available A at: htttp://www.city y.kamloops.bc c.ca/parkgard dens/peterson ncreek.shtml Demarchi, D. 1996. An n introduction to the ecoreg gions of Britis h Columbia. Fish and Game G Branch h. 1968. Jac cko Lake Bath hymetry. Dep partment of Re ecreation and d Conservatio on. Galesloot, M.M. 1999.. Thompson basin-wide coho c smolt esstimate feasib bility study. C Contract Rep port to DFO D Habitat Restoration R and a Salmonid d Enhanceme ent Program by Shuswap p Nation Fish heries Commission, C Kamloops, K BC C. Golder. 20 010. Technical memorand dum re: prelim minary snapsh hots of the th hickened disposal raising. From: Irw win Wislesky, Golder Asso ociates Ltd. Keystone. 2008. Afton n Mine: Wildlife Surveys and a Terrestria al Ecosystem Mapping Re eport. Prepare ed for Abacus A Mining g and Explora ation Company, by Keyston ne Wildlife Re esearch Ltd. Knight Pié ésold (KP). 2009. 2 Abacus s Mining and Exploration C Corporation A Afton Project: 2008 Prelim minary Hydrometeoro H logy Report. Prepared P for Abacus Minin ng and Explorration Corporration. McKenzie e, S. 1997. Fraser F River White Sturge eon Monitorin ng Program - Region 3 ((Thompson-N Nicola) 19 996 Investiga ations - Final Report. R McMynn. R.G. 1958. Untitled U Reporrt: Game Fish h Culture: Sun ndry - Fish Sp pecies. Ministry of n and o Environment (MOE). 1980. Jacko Lake Reservvoir General Plan, Longitu udinal Section Cross C Section ns of Dam. Inventory 0302080-23 , Drawing N No. 4613-9A A. Inventoryy and Engineering Brranch. 54 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 Ministry of o Environmen nt (MOE). 20 007. British Columbia C Spe ecies and Eco osystem Explorer. Availab ble at: htttp://www.env v.gov.bc.ca/attrisk/toolintro..html Price, C.J J. 1991. Inte egrating Minin ng with Otherr Resource U Users at the A Afton Mine. P Proceedings of the 15 5th Annual British Columbia a Mine Recla amation Symp posium in Kam mloops, BC, 1 1991. Rescan. 2006. 2 Afton Copper-Gold C Project: 2006 Aquatics a and Fisheries Baseline Re eport. Prepare ed for New N Gold Inc. Summit Environmenta E s Ltd. (Summ mit). 2006. Co ommunity Wa atershed Adaptive Manage ement l Consultants Trials: FFT Wo ork Project 21 - Final Repo ort. Wardrop Engineering E (Wardrop). ( 20 009. Ajax Cop pper/Gold Pro oject, Kamloo ops, British Co olumbia – Preliminary As ssessment Te echnical Repo ort Document No. 0854610 0100-REP-R0 0001-02. htttp://www.amemining.com//i/pdf/2009-08 8-05_AjaxPAT TechnicalRep port.pdf World Hea alth Organiza ation (WHO). 1999. Guidelines for Comm munity noise.. Available on nline at: htttp://www.who o.int/docstore e/peh/noise/Comnoise-1.pd df 55 of 56 VA101-2 246/8-1 Rev 3 July 6 6, 2011 TABLE 4.1 KGHM AJAX MINING INC. AJAX PROJECT MINERAL RESOURCE ESTIMATE Print 02/03/11 13:58 Contained Metal Cut-off CuEq (%) Mt Cu(%) Au(g/t) Mo (%) Ag(g/t) CuEq Measured 0.13 231.4 0.3 0.18 0.0018 0.35 Indicated 0.13 211 0.29 0.19 0.0012 Measured + Indicated 0.13 422.4 0.3 0.19 Inferred 0.13 80.6 0.22 0.16 Cu (M lb) Au (k oz) 0.32 1,527 1,364 0.31 0.32 1,368 1,287 0.0015 0.31 0.32 2,895 2,651 0.0011 0.38 0.24 391 404 M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 4.1 - Mineral resource Estimate.xls]Table 4.1 NOTE: 1. SOURCE: NI 43-101 PREPARED BY WARDROP ENGINEERING AUGUST 5, 2009. 1 08FEB'11 REV DATE ISSUED WITH REPORT VA101-246/8-1 DESCRIPTION AP RS RCB PREP'D CHK'D APP'D TABLE 4.2 ABACUS MINING AND EXPLORATION CORPORATION AJAX PROJECT SUMMARY OF CAPITAL COSTS Print 02/03/11 13:56 TotalManhour TotalLabourCost TotalMaterial Cost Total Construction EquipmentCost TotalEquipment Cost TotalCost 39,487 2,428,456 1,306,547 2,530,266 11,045,072 17,310,341 0 0 30,010,000 0 29,300,000 59,309,999 Crushing 94,579 5,816,631 4,801,107 496,588 8,952,748 20,067,074 CrushedOreStorageAndReclaim 55,996 3,443,748 2,338,363 265,044 5,493,863 11,541,017 Process 484,833 29,817,210 30,059,622 7,764,447 101,369,575 169,010,854 Tailings 176,823 10,874,639 21,598,023 3,810,673 963,500 37,246,835 SiteServicesandUtilities 25,813 1,587,519 1,560,732 283,884 2,712,191 6,144,326 AncillaryBuildings 92,959 5,716,963 8,321,084 496,564 2,022,361 16,556,972 PlantMobileFleet 669 41,162 82 0 3,745,282 3,786,526 0 0 8,200,000 0 0 8,200,000 460 28,290 103,832,950 12,300 0 103,873,540 Owner'sCosts 0 0 16,400,000 0 0 16,400,000 Contingencies 0 0 65,481,101 0 0 65,481,101 971,619 59,754,618 293,909,611 15,659,766 165,604,592 534,928,585 Description OverallSite Mining OffͲSiteInfrastructure&Facilities ProjectIndirects GrandTotal M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 4.2 - Capital Costs.xls]Table 4.2 NOTE: 1. SOURCE: NI 43-101 PREPARED BY WARDROP ENGINEERING AUGUST 5, 2009. 1 08FEB'11 REV DATE ISSUED WITH REPORT VA101-246/8-1 DESCRIPTION AP RS RCB PREP'D CHK'D APP'D TABLE 5.1 KGHM AJAX MINING INC. AJAX PROJECT MAJOR DESIGN CRITERIA Print 02/03/11 14:00 Criteria Unit Operating Year d 365 Crushing Availability % 70 Grinding and Flotation Availability % 92 Primary Crushing Rate t/h 3572 Milling & Flotation Process Rate t/h 2717 SAG Mill Feed Size, 80% Passing ȝm 150,000 SAG Mill Transfer Size, 80% Passing ȝm 1250 Ball Mill Grind Size, 80% Passing ȝm 150 Ball Mill Circulating Load % 300 Bond Ball Mill Work Index kWh/t 19.7 Bond Abrasion Index g 0.26 Concentrate Regrind Size, 80% Passing ȝm 15 M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 5.1 - Major Design Criteria.xls]Table 5.1 NOTE: 1. SOURCE: NI 43-101 PREPARED BY WARDROP ENGINEERING AUGUST 5, 2009. 1 08FEB'11 REV DATE ISSUED WITH REPORT VA101-246/8-1 DESCRIPTION AP RS RCB PREP'D CHK'D APP'D TABLE 6.1 KGHM AJAX MINING INC. AJAX PROJECT SAMPLE SUMMARY & STATISTICS FOR PC02 Print Feb/03/11 14:02:21 28-Apr-08 12:26 PM 7-Jul-08 11:40 AM 6-Sep-08 10:30 AM BCWQG (b) CCME (c) --------------- 1376 92.4 10.7 969 85.5 9.41 7.79 -70.3 1326 10.9 6.5 to 9 6.5 to 9 1993 8.79 1118 90.7 9.52 8.08 -102 1451 13 5 0.7 0.01 2 2 13 - 20 3 0.1 7.7 931 8.12 1990 421 1420 19.3 0.71 22 654 8.33 1450 413 999 15.3 5.64 8.3 780 8.3 1850 446 1320 4.7 2.29 6.5 to 9 6.5 to 9 0.05-0.5 0.5-5 <0.5 125 0.067 80.1 0.077 113 600 0.02-0.2 0 02-0 2 0.5-5 0.24 0 24 582 0.243 0 243 324 0.244 0 244 476 0 2 to 0 0.2 0.3 3 (g) 100 0.02 0.005-0.05 0.021 0.442 0.021 0.0931 0.041 0.167 0.681 to 28.3 (h,i) 200 0.001-0.01 0.001 0.002-0.02 0.05 0.019 0.0277 0.0326 0.563 0.0011 0.073 0.08 0.637 0.0036 0.06 to 0.6 (j) 0.005 0.005 0.005 <0.005 <0.005 <0.005 <0.005 0.0071 <0.005 <0.005 <0.005 0.01 Aluminum (Dissolved) Antimony (Dissolved) Arsenic (Dissolved) Barium (Dissolved) Beryllium (Dissolved) Boron (Dissolved) 0.01-0.025 0.001-0.0025 0.001-0.0025 0.02 0.002-0.005 0.1 <0.025 <0.0025 <0.0025 0.065 <0.005 <0.1 <0.01 <0.001 0.0025 0.056 <0.002 <0.1 <0.025 <0.0025 <0.0025 0.056 <0.005 <0.1 0.1 to e(1.209-2.426*pH+0.286*pH(2)) (k) 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 Cadmium (Dissolved) Calcium (Dissolved) Chromium (Dissolved) Cobalt (Dissolved) 0.000034-0.000085 0.1 0.002-0.005 0.0006-0.0015 <0.000085 147 <0.005 <0.0015 0.000052 102 <0.002 <0.0006 <0.000085 132 <0.005 <0.0015 Copper (Dissolved) Iron (Dissolved) 0.002-0.005 0.03 <0.005 0.031 0.0028 <0.03 <0.005 <0.03 Lead (Dissolved) Lithium (Dissolved) Magnesium (Dissolved) 0.001-0.0025 0.01-0.025 0.1 <0.0025 <0.025 137 <0.001 <0.01 96.7 <0.0025 <0.025 110 Manganese (Dissolved) Mercury (Dissolved) Molybdenum (Dissolved) 0.0006-0.0015 0.00002 0.002-0.005 0.0589 <0.00002 0.011 0.0432 <0.00002 0.0147 0.117 <0.00002 0.0121 (0.01102*Hardness)+0.54 (g) 0.0001 2 0.000026 0.073 0.002-0.005 0 002-0 005 2 0.002-0.005 <0.005 <0 005 20.4 <0.005 0.0029 0 0029 19 <0.002 0.0054 0 0054 20.4 <0.005 0 025 to 0 0.025 0.150 150 (g) 0 025 to 0 0.025 0.15 15 (g) 0.002 0.00004-0.0001 2 0.0004-0.001 0.001-0.0025 0.01 0.0004-0.001 <0.0001 109 <0.001 <0.0025 <0.01 0.0038 <0.00004 83.7 <0.0004 <0.001 <0.01 0.00234 <0.0001 101 <0.001 <0.0025 0.01 0.0035 0.0001 to 0.003 0.001 0.0001 0.002-0.005 <0.005 0.0037 <0.005 0.006 (33+0.75*(Hardness-90))/1000 to 0.033 (g) Date Sampled Time Sampled In Situ Parameters Conductivity (In Situ) (uS/cm) Dissolved Oxygen (In Situ) (%) Dissolved Oxygen (In Situ) pH (In Situ) Redox Potential (In Situ) (mV) Specific Conductivity (In Situ) (uS/cm) Temperature (In Situ) (°C) Physical Tests Color (TCU) Hardness pH Specific Conductivity (uS/cm) Total Alkalinity (as CaCO3) Total Dissolved Solids Total Suspended Solids Turbidity (NTU) Dissolved Anions Bromide Chloride MDL Fluoride Sulphate Nutrients Ammonium Nitrogen (as N) Nitrate (as N) Nitrite (as N) Orthophosphate (as P) Phosphorus (Total) (as P) Total Nitrogen Cyanide Cyanide (Free) Cyanide (Total) Cyanide (WAD) Dissolved Metals Nickel (Dissolved) Potassium (Dissolved) Selenium (Dissolved) Silver (Dissolved) Sodium (Dissolved) Thallium (Dissolved) Tin (Dissolved) Titanium (Dissolved) Uranium (Dissolved) Vanadium (Dissolved) Zinc (Dissolved) Total Metals 0.0536 to 185 (h,i) 13 0.06 0.365 0.005 <0.005 <0.005 <0.005 Aluminum (Total) Antimony (Total) Arsenic (Total) Barium (Total) Beryllium (Total) Boron (Total) 0.01-0.025 0.001-0.0025 0.001-0.0025 0.02 0.002-0.005 0.1 <0.025 <0.0025 <0.0025 0.065 <0.005 <0.1 0.174 <0.001 0.0026 0.054 <0.002 <0.1 0.043 <0.0025 <0.0025 0.057 <0.005 <0.1 Cadmium (Total) Calcium (Total) Chromium (Total) Cobalt (Total) 0.000034-0.000085 0.1 0.002-0.005 0.0006-0.0015 <0.000085 146 <0.005 <0.0015 0.000058 100 <0.002 <0.0006 Copper (Total) Iron (Total) 0.002-0.005 0.03 <0.005 0.05 Lead (Total) Lithium (Total) Magnesium (Total) 0.001-0.0025 0.01-0.025 0.1 Manganese (Total) Mercury (Total) Molybdenum (Total) 0.005 (0.86*(log(Hardness))-3.2) 10 /1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.11 (g) 0.002 to 0.004 (g) 0.3 /1000 (g) 0.001 to 0.007 (g) (0.094*(Hardness)+2)/1000 0.3 (1.273*ln(Hardness)-1.460) 0.003 to e (g) 0.0003 0.0008 0.03 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 <0.000085 132 <0.005 <0.0015 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.0045 0.249 <0.005 0.099 (0.094*(Hardness)+2)/1000 (g) 0.3 0.002 to 0.004 (g) 0.3 <0.0025 <0.025 137 <0.001 <0.01 94.1 <0.0025 <0.025 112 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.001 to 0.007 (g) 0.0006-0.0015 0.00002 0.002-0.005 0.0603 <0.00002 0.011 0.0702 <0.00002 0.0147 0.123 <0.00002 0.0119 (0.01102*Hardness)+0.54 (g) 0.0001 2 0.000026 0.073 Nickel (Total) Potassium (Total) Selenium (Total) 0.002-0.005 2 0 002 0 005 0.002-0.005 <0.005 20.5 <0 005 <0.005 0.0043 18.9 <0 002 <0.002 0.0056 20.6 <0 005 <0.005 0.025 to 0.150 (g) Silver (Total) Sodium (Total) Thallium (Total) Tin (Total) Titanium (Total) Uranium (Total) Vanadium (Total) 0.00004-0.0001 2 0.0004-0.001 0.001-0.0025 0.01 0.0004-0.001 0.002-0.005 <0.0001 109 <0.001 <0.0025 <0.01 0.0038 <0.005 <0.00004 82.6 <0.0004 <0.001 0.012 0.00237 0.0044 <0.0001 104 <0.001 <0.0025 0.012 0.0034 <0.005 0.0001 to 0.003 (g) 0 001 0.001 0.0001 0.0003 0.0008 0.11 0 002 0.002 0.006 (33+0.75*(Hardness-90))/1000 to 0.033 (g) Zinc (Total) Organics Dissolved Organic Carbon 0.005 <0.005 <0.005 <0.005 0.5 6.93 11.2 6.44 M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 6.1 Water Quality PC02.xls]Table 6.1 NOTES: (a) UNITS ARE mg/L, UNLESS OTHERWISE STATED. (g) HARDNESS DEPENDENT. (b) BCWQG - BC WATER QUALITY GUIDELINES FOR FRESHWATER AQUATIC LIFE (AUGUST 2006). (h) pH (In Situ) DEPENDENT. (c) CCME - CANADIAN WATER QUALITY GUIDELINES FOR THE PROTECTION OF AQUATIC LIFE. (DECEMBER 2006). (i) TEMPERATURE (In Situ) DEPENDENT. (d) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG (j) CHLORIDE DEPENDENT. (e) BOLD INDICATES THE VALUE EXCEEDS THE CCME GUIDELINES (k) pH DEPENDENT. (f) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG & CCME 0 23JUL'10 REV DATE ISSUED WITH REPORT VA101-246/8-1 DESCRIPTION RP JEM RCB PREP'D CHK'D APP'D 0.025 to 0.15 0.03 (g) TABLE 6.2 KGHM AJAX MINING INC. AJAX PROJECT SAMPLE SUMMARY & STATISTICS FOR PC03 Print Feb/03/11 14:04:26 Date Sampled Time Sampled In Situ Parameters Conductivity (In Situ) (uS/cm) Dissolved Oxygen (In Situ) (%) Dissolved Oxygen (In Situ) pH (In Situ) Redox Potential (In Situ) (mV) 2-May-07 9:00 AM 18-Jul-07 10:10 AM 28-Apr-08 11:30 AM 7-Jul-08 12:05 PM 4-Sep-08 10:00 AM 652 824 7.87 8.09 7.59 1295 87.5 9.61 8.32 823 112 10.2 8.11 -106 599 60.9 6.22 7.8 -71.4 ----- 929 9.4 933 18.9 1780 10.7 909 20 782 12.8 5 0.7 0.01 2 2 10 - 13 3 0.1 21.3 425 8.25 877 253 572 <3 35.2 371 8.29 855 276 544 4.6 27.1 880 8.34 1790 471 1320 3.3 1.43 44.2 391 8.37 896 339 565 4.5 0.9 37.3 364 8.28 867 326 528 3.3 3.54 0.05-2.5 0.5-25 <0.05 60.3 <0.05 61.6 <2.5 57 <0.05 55.8 <0.05 61.5 0.02-1 0.5-25 0 5 25 0.206 145 92.9 92 9 1.1 568 0.236 99.3 99 3 0.224 70.6 70 6 0.02 0.005-0.25 0.152 <0.005 0.037 <0.005 0.025 0.76 0.033 <0.005 0.035 0.0546 0.001-0.05 0.001 0.002-0.02 0.05 <0.001 0.0067 0.0337 0.852 <0.001 0.0557 0.0847 1.1 0.157 0.0117 0.045 0.836 <0.001 0.0353 0.0701 1.01 0.0293 0.121 0.128 0.746 0.005 0.005 0.005 0.0109 <0.005 0.0081 <0.005 <0.005 0.0101 <0.005 <0.005 0.0067 <0.005 Aluminum (Dissolved) Antimony (Dissolved) Arsenic (Dissolved) Barium (Dissolved) Beryllium (Dissolved) Boron (Dissolved) 0.005-0.025 0.0005-0.0025 0.0005-0.0025 0.02 0.001-0.005 0.1 <0.005 <0.0005 0.00136 0.045 <0.001 <0.1 <0.005 <0.0005 0.002 0.04 <0.001 <0.1 <0.025 <0.0025 <0.0025 0.096 <0.005 <0.1 <0.01 <0.001 0.0021 0.059 <0.002 <0.1 <0.01 <0.001 0.0022 0.062 <0.002 <0.1 Cadmium (Dissolved) Calcium (Dissolved) Chromium (Dissolved) Cobalt (Dissolved) 0.000017-0.000085 0.1 0.001-0.005 0.0003-0.0015 0.000023 69.2 <0.003 <0.0003 0.000039 59.7 <0.001 <0.0003 0.000143 126 <0.005 <0.0015 0.00004 62.6 <0.002 <0.0006 <0.000034 58.7 <0.002 <0.0006 0.001-0.005 0.03 0.0022 <0.03 <0.001 0.068 <0.005 0.037 <0.002 0.058 <0.002 0.035 Lead (Dissolved) Lithium (Dissolved) Magnesium (Dissolved) 0.0005-0.0025 0.005-0.025 0.1 <0.0005 0.0077 61.3 <0.0005 <0.005 53.9 <0.0025 <0.025 137 <0.001 <0.01 57 <0.001 <0.01 52.7 Manganese (Dissolved) Mercury (Dissolved) Molybdenum (Dissolved) 0.0003-0.0015 0.00002 0.001-0.005 0.00817 <0.00002 0.023 0.062 <0.00002 0.0095 0.115 <0.00002 0.0438 0.0676 <0.00002 0.0119 0.0991 <0.00002 0.0111 Nickel (Dissolved) Potassium (Dissolved) Selenium (Dissolved) 0.001-0.005 2 0.001-0.005 0.0014 13.1 <0.001 <0.001 12.2 <0.001 <0.005 19.8 <0.005 <0.002 16 <0.002 <0.002 15.2 <0.002 Silver (Dissolved) Sodium (Dissolved) Thallium (Dissolved) Tin (Dissolved) Titanium (Dissolved) Uranium (Dissolved) Vanadium (Dissolved) 0.00002-0.0001 2 0.0002-0.001 0.0005-0.0025 0.01 0.0002-0.001 0.002-0.03 <0.00002 52.4 <0.0002 <0.0005 <0.01 0.00179 <0.03 <0.00002 48.5 <0.0002 <0.0005 <0.01 0.00085 <0.03 <0.0001 97.4 <0.001 <0.0025 <0.01 0.0031 <0.005 <0.00004 50.3 <0.0004 <0.001 <0.01 0.00063 <0.002 <0.00004 48.8 <0.0004 <0.001 <0.01 0.00105 0.0026 0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.005-0.025 0.0005-0.0025 0.0005-0.0025 0.02 0.001-0.005 0.1 0.014 <0.0005 0.00101 0.042 <0.001 <0.1 0.012 <0.0005 0.0017 0.039 <0.001 <0.1 <0.025 <0.0025 <0.0025 0.095 <0.005 <0.1 0.012 <0.001 0.002 0.062 <0.002 <0.1 0.072 <0.001 0.002 0.062 <0.002 <0.1 0.000035 58.6 <0.001 <0.0003 0.000137 128 <0.005 <0.0015 0.000034 62.7 <0.002 <0.0006 0.000053 55.6 <0.002 <0.0006 MDL ----------- Specific Conductivity (In Situ) (uS/cm) Temperature (In Situ) (°C) Physical Tests Color (TCU) Hardness pH Specific Conductivity (uS/cm) Total Alkalinity (as CaCO3) Total Dissolved Solids Total Suspended Solids Turbidity (NTU) Dissolved Anions Bromide Chloride Fluoride S Sulphate l h t Nutrients Ammonium Nitrogen (as N) Nitrate (as N) Nitrite (as N) Orthophosphate (as P) Phosphorus (Total) (as P) Total Nitrogen Cyanide Cyanide (Free) Cyanide (Total) Cyanide (WAD) Dissolved Metals Copper (Dissolved) Iron (Dissolved) Zinc (Dissolved) Total Metals Aluminum (Total) Antimony (Total) Arsenic (Total) Barium (Total) Beryllium (Total) Boron (Total) Cadmium (Total) Calcium (Total) Chromium (Total) Cobalt (Total) 0.000017-0.000085 <0.000017 0.1 66.9 0.001-0.005 <0.001 0.0003-0.0015 <0.0003 Copper (Total) Iron (Total) 0.001-0.005 0.03 0.0025 0.049 <0.001 0.086 <0.005 0.081 <0.002 0.091 0.0022 0.125 Lead (Total) Lithium (Total) Magnesium (Total) 0.0005-0.0025 0.005-0.025 0.1 <0.0005 0.0068 58.7 <0.0005 <0.005 52.3 <0.0025 <0.025 137 <0.001 <0.01 56.3 <0.001 <0.01 50.4 Manganese (Total) Mercury (Total) Molybdenum (Total) 0.0003-0.0015 0.00002 0.001-0.005 0.0153 <0.00002 0.0215 0.0675 <0.00002 0.0094 0.123 <0.00002 0.0435 0.0715 <0.00002 0.0114 0.109 <0.00002 0.011 Nickel (Total) Potassium (Total) Selenium (Total) 0.001-0.005 2 0.001-0.005 0.0015 12.5 <0.001 <0.001 11.8 <0.001 <0.005 19.9 <0.005 <0.002 15.8 <0.002 0.0026 15 <0.002 Silver (Total) Sodium (Total) Thallium (Total) Tin (Total) Titanium (Total) Uranium (Total) Vanadium (Total) 0.00002-0.0001 2 0.0002-0.001 0.0005-0.0025 0.01 0.0002-0.001 0.002-0.03 <0.00002 51.2 <0.0002 <0.0005 <0.01 0.00166 <0.03 <0.00002 47 <0.0002 <0.0005 <0.01 0.00083 <0.03 <0.0001 96.6 <0.001 <0.0025 <0.01 0.0031 <0.005 <0.00004 49.6 <0.0004 <0.001 <0.01 0.00061 <0.002 <0.00004 46.7 <0.0004 <0.001 <0.01 0.00106 0.0027 Zinc (Total) Organics Dissolved Organic Carbon Total Organic Carbon 0.005 <0.005 0.5 0.5 14.8 <0.005 <0.005 <0.005 <0.005 17 13.5 17.6 17.8 BCWQG 0.1 to e 10 JEM RCB CHK'D APP'D 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.002 to 0.004 (g) 0.3 0.001 to 0.007 (g) (g) 0.000026 0.073 0.025 to 0.15 (g) 0.002 (g) 0.0001 to 0.003 0.001 0.0001 0.0003 0.0008 0.006 (33+0.75*(Hardness-90))/1000 to (g) 0.033 0.03 0.005 to 0.1 0.005 5 0.0053 1.2 10 (0.86*(log(Hardness))-3.2) (k) 0.005 /1000 (g) 0.11 (g) (0.094*(Hardness)+2)/1000 0.3 (1.273*ln(Hardness)0.003 to e 1.460) /1000 (g) (0.01102*Hardness)+0.54 0.0001 2 (g) 0.025 to 0.150 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.002 to 0.004 (g) 0.3 (g) 0.001 to 0.007 (g) 0.000026 0.073 (g) 0.025 to 0.15 0.002 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.006 (33+0.75*(Hardness-90))/1000 to (g) 0.033 (k) pH DEPENDENT. RP /1000 (g) (0.01102*Hardness)+0.54 0.0001 2 (g) 0.025 to 0.150 (g) HARDNESS DEPENDENT. PREP'D 0.005 to 0.1 (k) 0.005 0.11 (g) (0.094*(Hardness)+2)/1000 0.3 (1.273*ln(Hardness)0.003 to e 1.460) /1000 (g) (j) CHLORIDE DEPENDENT. DESCRIPTION (1.209-2.426*pH+0.286*pH(2)) (k) (0.86*(log(Hardness))-3.2) (e) BOLD INDICATES THE VALUE EXCEEDS THE CCME GUIDELINES ISSUED WITH REPORT VA101-246/8-1 0.0536 to 185 (h,i) 13 0.06 0.005 5 0.0053 1.2 (h) pH (In Situ) DEPENDENT. DATE 6.5 to 9 0.01 (i) TEMPERATURE (In Situ) DEPENDENT. 23JUL'10 6.5 to 9 0.005 (c) CCME - CANADIAN WATER QUALITY GUIDELINES FOR THE PROTECTION OF AQUATIC LIFE. (DECEMBER 2006). (d) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG 0 6.5 to 9 (h,i) (b) BCWQG - BC WATER QUALITY GUIDELINES FOR FRESHWATER AQUATIC LIFE (AUGUST 2006). REV 6.5 to 9 0.681 to 28.3 200 (j) 0.06 to 0.6 NOTES: (f) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG & CCME CCME (c) 600 (g) 0.2 to 0.3 100 M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 6.2 Water Quality PC03.xls]Table 6.2 (a) UNITS ARE mg/L, UNLESS OTHERWISE STATED. (b) 0.03 TABLE 6.3 KGHM AJAX MINING INC. AJAX PROJECT SAMPLE SUMMARY & STATISTICS FOR PC08 Print Feb/03/11 14:14:52 Date Sampled Time Sampled In Situ Parameters Conductivity (In Situ) (uS/cm) Dissolved Oxygen (In Situ) (%) Dissolved Oxygen (In Situ) pH (In Situ) Redox Potential (In Situ) (mV) Specific Conductivity (In Situ) (uS/cm) Temperature (In Situ) (°C) Physical Tests Color (TCU) Hardness pH Specific Conductivity (uS/cm) Total Alkalinity (as CaCO3) Total Dissolved Solids Total Suspended Solids Turbidity (NTU) Dissolved Anions Bromide Chloride 2-May-07 11:00 AM MDL --------------- 17-Jul-07 5:15 PM 28-Apr-08 1:30 PM 7-Jul-08 1:20 PM 4-Sep-08 9:30 AM 621 610 80.2 8.44 8 -75.2 793 12.9 BCWQG (b) CCME (c) 11 8.6 9.4 8.44 8.02 7.05 626 94.2 10.1 8.26 969 8.01 755 23.2 847 11.1 826 12.3 595 85.1 7.84 8.34 -119 674 19.3 5 0.7 0.01 2 2 10 3 0.1 14 342 8.38 725 231 455 7.5 16.1 319 8.45 756 238 441 7.6 21.7 344 8.16 845 315 502 18.7 14.5 370 8.1 845 295 515 6.8 6.59 20.2 296 8.43 672 220 416 4 6.63 23.7 335 8.12 802 314 478 10.8 3.38 0.05 0.5 <0.05 60.7 <0.05 61 <0.05 61.2 <0.05 60.5 <0.05 52.8 <0.05 58.7 0.02 0.5 0.5 0.192 85 83 0.274 54.5 <0.5 0.237 80.2 0.194 64.9 0.264 51.3 600 0.2 to 0.3 (g) 100 Ammonium Nitrogen (as N) Nitrate (as N) 0.02 0.005 0.029 <0.005 0.081 0.005 0.024 <0.005 0.02 <0.005 0.197 0.0146 0.36 <0.005 0.681 to 28.3 (h,i) 200 Nitrite (as N) Orthophosphate (as P) Phosphorus (Dissolved) (as P) Phosphorus (Total) (as P) Total Nitrogen Cyanide Cyanide (Free) Cyanide (Total) Cyanide (WAD) Dissolved Metals 0.001 0.001 0.002 0.002 0.05 <0.001 0.0026 0.0024 0.0027 <0.001 0.0024 0.0012 <0.001 0.0014 0.01 0.06 to 0.6 (j) 0.0433 1 0.0302 1.03 <0.001 0.0056 0.0158 0.082 0.836 0.0435 0.842 0.031 1.56 0.0598 1.48 0.005 0.005 0.005 0.0057 0.006 0.0078 <0.005 0.0065 <0.005 <0.005 0.0077 <0.005 0.005-0.01 0.0005-0.001 0.0005-0.001 0.02 0.001-0.002 0.1 0.000017-0.000034 0.1 0.001-0.003 0.0003-0.0006 <0.005 <0.0005 0.00105 0.05 <0.001 <0.1 <0.000017 61.4 <0.003 <0.0003 <0.005 <0.0005 0.00127 0.043 <0.001 <0.1 <0.000017 53.1 <0.001 <0.0003 <0.005 <0.0005 0.00158 0.044 <0.001 <0.1 <0.000017 67.4 <0.001 <0.0003 <0.005 <0.0005 0.0009 0.072 <0.001 <0.1 <0.000017 72.7 0.0012 <0.0003 <0.005 <0.0005 0.00133 0.048 <0.001 <0.1 <0.000017 51.5 <0.001 <0.0003 <0.01 <0.001 0.0018 0.062 <0.002 <0.1 <0.000034 64.7 <0.002 <0.0006 0.1 to e(1.209-2.426*pH+0.286*pH(2)) (k) 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) Copper (Dissolved) Iron (Dissolved) 0.001-0.002 0.03 <0.001 <0.03 <0.001 <0.03 <0.001 0.082 0.0013 0.073 <0.001 0.032 <0.002 0.176 (0.094*(Hardness)+2)/1000 (g) 0.3 0.002 to 0.004 (g) 0.3 Lead (Dissolved) Lithium (Dissolved) Magnesium (Dissolved) 0.0005-0.001 0.005-0.01 0.1 <0.0005 0.0059 46 <0.0005 0.0076 45.3 <0.0005 0.0063 42.7 <0.0005 <0.005 45.7 <0.0005 0.0053 40.6 <0.001 <0.01 42.2 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.001 to 0.007 (g) Manganese (Dissolved) Mercury (Dissolved) Molybdenum (Dissolved) 0.0003-0.0006 0.00002 0.001-0.002 0.00482 <0.00002 0.0026 0.00425 <0.00002 0.0029 0.183 <0.00002 0.003 0.185 <0.00002 0.0021 0.0082 <0.00002 0.0024 0.0955 <0.00002 0.0032 (0.01102*Hardness)+0.54 (g) 0.0001 2 0.000026 0.073 Fluoride Sulphate Sulphite Nutrients Aluminum (Dissolved) Antimony (Dissolved) Arsenic (Dissolved) Barium (Dissolved) Beryllium (Dissolved) Boron (Dissolved) Cadmium (Dissolved) Calcium (Dissolved) Chromium (Dissolved) Cobalt (Dissolved) Nickel (Dissolved) Potassium (Dissolved) Selenium (Dissolved) 518 14-Sep-07 10:15 AM 6.5 to 9 6.5 to 9 6.5 to 9 6.5 to 9 0.0536 to 185 (h,i) 13 0.06 0.005 0.01 0.11 0.025 to 0.150 (g) 0.025 to 0.15 (g) 0.001-0.002 2 0.001-0.002 <0.001 11.1 <0.001 <0.001 10.5 <0.001 0.0025 12.1 <0.001 0.0017 10.3 <0.001 <0.001 12 <0.001 0.0022 12.4 <0.002 0.00002-0.00004 2 0.0002-0.0004 0.0005-0.001 0.01 0.0002-0.0004 0.001-0.03 0.005 <0.00002 43.5 <0.0002 <0.0005 <0.01 0.00122 <0.03 <0.005 <0.00002 40.2 <0.0002 <0.0005 <0.01 0.0013 <0.03 <0.005 <0.00002 45.9 <0.0002 <0.0005 <0.01 0.0004 <0.03 <0.005 <0.00002 39 <0.0002 <0.0005 <0.01 0.00056 <0.001 <0.005 <0.00002 35.7 <0.0002 <0.0005 <0.01 0.00107 0.0018 <0.005 <0.00004 40.1 <0.0004 <0.001 <0.01 0.00062 <0.002 <0.005 0.005-0.01 0.0005-0.001 0.0005-0.001 0.02 0.001-0.002 0.1 0.000017-0.000034 0.1 0.001-0.002 0.0003-0.0006 0.111 <0.0005 0.00108 0.049 <0.001 <0.1 <0.000017 59.8 <0.001 <0.0003 0.0169 <0.0005 0.00125 0.043 <0.001 <0.1 <0.000017 53.6 <0.001 <0.0003 0.193 <0.0005 0.00191 0.057 <0.001 <0.1 0.000018 64.4 <0.001 0.00037 0.0559 <0.0005 0.0012 0.077 <0.001 <0.1 <0.000017 73.8 0.0015 <0.0003 0.0354 <0.0005 0.00154 0.05 <0.001 <0.1 <0.000017 44.1 <0.001 <0.0003 0.262 <0.001 0.002 0.071 <0.002 <0.1 <0.000034 65.2 <0.002 <0.0006 Copper (Total) Iron (Total) 0.001-0.002 0.03 0.0015 0.153 <0.001 0.04 0.0028 1.37 0.0024 1.23 0.0015 0.078 0.0048 1.04 (0.094*(Hardness)+2)/1000 (g) 0.3 0.002 to 0.004 (g) 0.3 Lead (Total) Lithium (Total) Magnesium (Total) 0.0005-0.001 0.005-0.01 0.1 <0.0005 0.0057 44.4 <0.0005 0.0071 46.8 <0.0005 0.0059 41.3 <0.0005 <0.005 46 <0.0005 0.0065 40 <0.001 <0.01 42.2 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.001 to 0.007 (g) Manganese (Total) Mercury (Total) Molybdenum (Total) 0.0003-0.0006 0.00002 0.001-0.002 0.0121 <0.00002 0.0026 0.00632 <0.00002 0.0026 0.215 <0.00002 0.0029 0.188 <0.00002 0.0021 0.0159 <0.00002 0.0028 0.102 <0.00002 0.0031 (0.01102*Hardness)+0.54 (g) 0.0001 2 0.000026 0.073 Nickel (Total) Potassium (Total) Selenium (Total) 0.001-0.002 2 0 001 0 002 0.001-0.002 0.0011 10.9 <0 001 <0.001 <0.001 10.6 <0 001 <0.001 0.0034 11.6 <0 001 <0.001 0.0018 10.2 <0 001 <0.001 <0.001 12.8 <0 001 <0.001 0.0031 12.9 <0 002 <0.002 0.025 to 0.150 (g) 0.025 to 0.15 (g) 0 002 0.002 Silver (Total) Sodium (Total) Thallium (Total) Tin (Total) Titanium (Total) Uranium (Total) Vanadium (Total) 0.00002-0.00004 2 0.0002-0.0004 0.0005-0.001 0.01 0.0002-0.0004 0.001-0.03 <0.00002 42 <0.0002 <0.0005 <0.01 0.00125 <0.03 <0.00002 40.4 <0.0002 <0.0005 <0.01 0.00114 <0.03 <0.00002 44.3 <0.0002 <0.0005 0.013 0.00036 <0.03 <0.00002 39.1 <0.0002 <0.0005 <0.01 0.00055 0.002 <0.00002 38.9 <0.0002 <0.0005 <0.01 0.00126 0.0023 <0.00004 38.7 <0.0004 <0.001 0.017 0.00064 0.0032 0.0001 to 0.003 (g) 0 001 0.001 0.0001 0.0003 0.0008 0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 (33+0.75*(Hardness-90))/1000 to 0.033 (g) 0.5 0.5 14.8 13.2 11.7 15.9 14.7 14.9 Silver (Dissolved) Sodium (Dissolved) Thallium (Dissolved) Tin (Dissolved) Titanium (Dissolved) Uranium (Dissolved) Vanadium (Dissolved) Zinc (Dissolved) Total Metals Aluminum (Total) Antimony (Total) Arsenic (Total) Barium (Total) Beryllium (Total) Boron (Total) Cadmium (Total) Calcium (Total) Chromium (Total) Cobalt (Total) Zinc (Total) Organics Dissolved Organic Carbon Total Organic Carbon 0.0001 to 0.003 (g) 0.002 0.001 0.0001 0.0003 0.0008 0.006 (33+0.75*(Hardness-90))/1000 to 0.033 (g) 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.11 0.006 M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 6.3 Water Quality PC08.xlsx]T4.3-PC08 NOTES: (a) UNITS ARE mg/L, UNLESS OTHERWISE STATED. (g) HARDNESS DEPENDENT. (b) BCWQG - BC WATER QUALITY GUIDELINES FOR FRESHWATER AQUATIC LIFE (AUGUST 2006). (h) pH (In Situ) DEPENDENT. (c) CCME - CANADIAN WATER QUALITY GUIDELINES FOR THE PROTECTION OF AQUATIC LIFE. (DECEMBER 2006). (i) TEMPERATURE (In Situ) DEPENDENT. (d) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG (j) CHLORIDE DEPENDENT. (e) BOLD INDICATES THE VALUE EXCEEDS THE CCME GUIDELINES (k) pH DEPENDENT. (f) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG & CCME 0 23JUL'10 REV DATE ISSUED WITH REPORT VA101-246/8-1 DESCRIPTION RP JEM RCB PREP'D CHK'D APP'D 0.03 0.03 TABLE 6.4 KGHM AJAX MINING INC. AJAX PROJECT SAMPLE SUMMARY & STATISTICS FOR JC03 Print Feb/03/11 14:16:03 Date Sampled Time Sampled In Situ Parameters Conductivity (In Situ) (uS/cm) Dissolved Oxygen (In Situ) (%) Dissolved Oxygen (In Situ) pH (In Situ) Redox Potential (In Situ) (mV) Specific Conductivity (In Situ) (uS/cm) Temperature (In Situ) (°C) Physical Tests Color (TCU) Hardness pH Specific Conductivity (uS/cm) Total Alkalinity (as CaCO3) Total Dissolved Solids Total Suspended Solids Turbidity (NTU) Dissolved Anions Bromide Chloride MDL 28-Apr-08 3:05 PM 7-Jul-08 10:10 AM Samples Collected 598 82.2 9.18 Samples below MDL Max Mean Standard Deviation 2 2 2 1 1 2 2 598 82.2 9.18 7.8 -86.1 830 12.98 559 81.9 8.87 7.8 -86.1 753 11.7 55.9 0.495 0.438 110 1.82 27.4 383 8.4 842 306 516 89.8 66.7 23.7 345 8.3 754 301 457 51.2 37.4 5.23 54.4 0.141 125 7.78 84.1 54.7 41.5 71.4 51.6 28.1 0.22 47.8 - 0.194 35.9 - 0.0375 16.8 - BCWQG (b) CCME (c) --------------- 830 10.4 519 81.5 8.56 7.8 -86.1 675 13 5 0.7 0.01 2 2 10 3 0.1 20 383 8.2 842 306 516 89.8 66.7 27.4 306 8.4 665 295 397 12.5 8.04 2 2 2 2 2 2 2 2 0.05 0.5 <0.05 71.4 <0.05 31.7 2 2 0.02 0.5 0.5 0.167 47.8 0.22 24 <0.5 2 2 1 0.02 0.005 0.079 0.0717 0.075 0.056 2 2 0.079 0.0717 0.077 0.0638 0.00283 0.0111 0.681 to 28.3 (h,i) 200 0.001 0.001-0.01 0.02 0.05 0.0042 0.0645 0.435 2.24 0.0036 0.119 0.161 0.516 2 2 2 2 0.0042 0.119 0.435 2.24 0.0039 0.0917 0.298 1.38 0.000424 0.0385 0.194 1.22 0.06 to 0.6 (j) 0.005 0.005 0.005 <0.005 0.0134 <0.005 <0.005 0.0081 <0.005 2 2 2 2 0.0134 - 0.0107 - 0.00375 - Aluminum (Dissolved) Antimony (Dissolved) Arsenic (Dissolved) Barium (Dissolved) Beryllium (Dissolved) Boron (Dissolved) 0.005 0.0005 0.0005 0.02 0.001 0.1 0.0064 <0.0005 0.00108 0.089 <0.001 <0.1 <0.005 <0.0005 0.00164 0.075 <0.001 <0.1 2 2 2 2 2 2 1 2 0.0064 0.00164 0.089 - 0.0057 0.0014 0.082 - 0.00099 0.000396 0.0099 - 0.1 to e(1.209-2.426*pH+0.286*pH(2)) (k) 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 Cadmium (Dissolved) Calcium (Dissolved) Chromium (Dissolved) Cobalt (Dissolved) 0.000017 0.1 0.001 0.0003 <0.000017 95.2 0.0011 <0.0003 <0.000017 78.1 <0.001 <0.0003 2 2 2 2 2 95.2 0.0011 - 86.7 0.001 - 12.1 0.0000707 - 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) Copper (Dissolved) Iron (Dissolved) 0.001 0.03 0.002 0.04 0.0017 0.119 2 2 0.002 0.119 0.0018 0.0795 0.000212 0.0559 (0.094*(Hardness)+2)/1000 (g) 0.3 0.002 to 0.004 (g) 0.3 Lead (Dissolved) Lithium (Dissolved) Magnesium (Dissolved) 0.0005 0.005 0.1 <0.0005 <0.005 35.4 <0.0005 <0.005 26.9 2 2 2 35.4 31.2 6.01 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.001 to 0.007 (g) Manganese (Dissolved) Mercury (Dissolved) Molybdenum (Dissolved) 0.0003 0.00002 0.001 0.0748 <0.00002 0.0017 0.0581 <0.00002 0.0018 2 2 2 0.0748 0.0018 0.0664 0.0017 0.0118 0.0000707 (0.01102*Hardness)+0.54 (g) 0.0001 2 0.000026 0.073 Nickel (Dissolved) Potassium (Dissolved) Selenium (Dissolved) 0.001 2 0.001 <0.001 9.3 <0.001 0.0012 9.2 <0.001 2 2 2 0.0012 9.3 - 0.0011 9.25 - 0.000141 0.0707 - 0.025 to 0.150 (g) 0.025 to 0.15 (g) 0.002 Silver (Dissolved) Sodium (Dissolved) Thallium (Dissolved) Tin (Dissolved) Titanium (Dissolved) Uranium (Dissolved) Vanadium (Dissolved) 0.00002 0 00002 2 0.0002 0.0005 0.01 0.0002 0.001 <0.00002 <0 00002 33 <0.0002 <0.0005 <0.01 0.00135 0.003 <0.00002 <0 00002 25.9 <0.0002 <0.0005 <0.01 0.00093 0.0027 2 2 2 2 2 2 2 29.5 0.0011 0.0028 5.02 0.000297 0.000212 0 0001 to 0.003 0.0001 0 003 (g) 0.001 0.0001 2 2 2 33 0.00135 0.003 0.0003 0.0008 0.005 <0.005 <0.005 2 2 - - - (33+0.75*(Hardness-90))/1000 to 0.033 (g) Aluminum (Total) Antimony (Total) Arsenic (Total) Barium (Total) Beryllium (Total) Boron (Total) 0.005 0.0005 0.0005 0.02 0.001 0.1 1.7 <0.0005 0.00153 0.115 <0.001 <0.1 0.157 <0.0005 0.00163 0.075 <0.001 <0.1 2 2 2 2 2 2 1.7 0.00163 0.115 - 0.929 0.0016 0.095 - 1.09 0.0000707 0.0283 - Cadmium (Total) Calcium (Total) Chromium (Total) Cobalt (Total) 0.000017 0.1 0.001 0.0003 0.000027 99.4 0.0047 0.0017 <0.000017 74.2 <0.001 <0.0003 2 2 2 2 0.000027 99.4 0.0047 0.0017 86.8 0.0028 0.001 Copper (Total) Iron (Total) 0.001 0.03 0.0151 2.89 0.0032 0.382 2 2 0.0151 2.89 Lead (Total) Lithium (Total) Magnesium (Total) 0.0005 0.005 0.1 <0.0005 0.0058 35.7 <0.0005 <0.005 26.6 2 2 2 Manganese (Total) Mercury (Total) Molybdenum (Total) 0.0003 0.00002 0.001 0.179 <0.00002 0.0016 0.0723 <0.00002 0.0021 2 2 2 Fluoride Sulphate Sulphite Nutrients Ammonium Nitrogen (as N) Nitrate (as N) Nitrite (as N) Orthophosphate (as P) Phosphorus (Total) (as P) Total Nitrogen Cyanide Cyanide (Free) Cyanide (Total) Cyanide (WAD) Dissolved Metals Zinc (Dissolved) Total Metals Nickel (Total) Potassium (Total) Selenium (Total) 0.001 2 0.001 0.0055 9.5 <0.001 0.0018 8.7 <0.001 2 2 2 Silver (Total) Sodium (Total) Thallium (Total) Tin (Total) Titanium (Total) Uranium (Total) Vanadium (Total) 0.00002 2 0.0002 0.0005 0.01 0.0002 0.001 <0.00002 31.7 <0.0002 <0.0005 0.072 0.00149 0.0089 <0.00002 24.3 <0.0002 <0.0005 0.012 0.00097 0.0035 2 2 2 2 2 2 2 0.005 0.0076 <0.005 2 0.5 9.19 11.2 2 Zinc (Total) Organics Dissolved Organic Carbon 2 1 2 2 2 1 2 2 2 2 1 2 2 2 2 2 1 1 1 2 1 2 2 2 2 2 1 6.5 to 9 6.5 to 9 6.5 to 9 6.5 to 9 600 0.2 to 0.3 100 (g) 0.005 0.01 0.11 0.006 0.005 5 0.0053 1.2 0.005 0.00000707 17.8 0.00262 0.00099 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.0091 1.64 0.00841 1.77 (0.094*(Hardness)+2)/1000 (g) 0.3 0.002 to 0.004 (g) 0.3 0.0058 35.7 0.0054 31.2 0.000566 6.43 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.001 to 0.007 (g) 0.179 0.0021 0.126 0.0018 0.0754 0.000354 (0.01102*Hardness)+0.54 (g) 0.0001 2 0.000026 0.073 0.11 (g) 0.0036 9.1 - 0.00262 0.566 - 0.025 to 0.150 31.7 0.072 0.00149 0.0089 28 0.042 0.0012 0.0062 5.23 0.0424 0.000368 0.00382 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.0076 0.0063 0.00184 (33+0.75*(Hardness-90))/1000 to 0.033 (g) 11.2 10.2 1.42 0.002 0.006 (g) HARDNESS DEPENDENT. (b) BCWQG - BC WATER QUALITY GUIDELINES FOR FRESHWATER AQUATIC LIFE (AUGUST 2006). (h) pH (In Situ) DEPENDENT. (c) CCME - CANADIAN WATER QUALITY GUIDELINES FOR THE PROTECTION OF AQUATIC LIFE. (DECEMBER 2006). (d) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG (j) CHLORIDE DEPENDENT. (e) BOLD INDICATES THE VALUE EXCEEDS THE CCME GUIDELINES (k) pH DEPENDENT. 0 23JUL'10 REV DATE ISSUED WITH REPORT VA101-246/8-1 DESCRIPTION RP JEM RCB PREP'D CHK'D APP'D 0.025 to 0.15 (g) 0.0055 9.5 - NOTES: (f) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG & CCME 0.03 0.005 to 0.1 (k) M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 6.4 Water Quality JC-03.xls]Table 6.4 (a) UNITS ARE mg/L, UNLESS OTHERWISE STATED. 0.0536 to 185 (h,i) 13 0.06 (i) TEMPERATURE (In Situ) DEPENDENT. 0.03 TABLE 6.5 KGHM AJAX MINING INC. AJAX PROJECT SAMPLE SUMMARY & STATISTICS FOR JACL-S Print Feb/03/11 14:17:28 3-May-07 2:15 PM 19-Jul-07 11:45 AM 20-Sep-07 11:45 AM 29-Apr-08 9:30 AM 10-Jul-08 7:25 AM 7-Sep-08 9:00 AM 518 692 608 14.7 8.73 9.67 8.62 8.2 8.87 490 94.2 11.9 8.21 2264 106 10.5 8.39 749 8.81 745 21.3 762 14.5 778 5.61 612 92 8.43 8.29 -116 684 19.5 2753 15.7 5 0.7 0.01 2 1-2 10 - 20 3 0.1 322 8.55 725 246 450 <3 13.9 323 8.58 732 229 453 5.6 12.7 309 8.36 736 231 461 <3 12.4 335 8.1 777 252 465 5.8 2.31 19.4 273 8.44 678 218 416 4.3 8.57 16.3 291 8.35 717 230 431 <3 1.09 0.05-0.5 0.5-5 <0.5 60.3 <0.05 59.6 <0.05 61.6 <0.05 60.5 <0.05 53.4 <0.05 59.1 0.02-0.2 0.5-5 0.19 84.5 81.7 0.2 83.9 0.174 83.5 0.174 66.2 0.199 74.6 0.02 0.005-0.05 0.028 <0.05 0.035 <0.005 0.055 0.0118 <0.02 <0.005 0.037 <0.005 0.098 0.0293 0.001-0.01 0.001 0.002-0.02 0.05 <0.01 <0.001 0.0343 0.895 <0.001 <0.001 0.0279 1.1 0.0034 0.0016 0.0203 0.943 <0.001 0.0074 0.124 1.62 <0.001 <0.001 0.0307 1.38 0.0136 0.0021 0.0227 1.26 0.005 0.005 0.005 0.0062 0.0056 0.0099 <0.005 <0.005 <0.005 <0.005 0.0082 <0.005 Aluminum (Dissolved) Antimony (Dissolved) Arsenic (Dissolved) Barium (Dissolved) Beryllium (Dissolved) Boron (Dissolved) 0.005-0.05 0.0005-0.005 0.0005-0.005 0.02 0.001-0.01 0.1 <0.05 <0.005 0.0012 0.057 <0.01 <0.1 <0.005 <0.0005 0.00141 0.056 <0.001 <0.1 <0.005 <0.0005 0.00131 0.057 <0.001 <0.1 <0.005 <0.0005 0.00118 0.058 <0.001 <0.1 <0.005 <0.0005 0.00138 0.051 <0.001 <0.1 <0.005 <0.0005 0.00168 0.06 <0.001 <0.1 0.1 to e(1.209-2.426*pH+0.286*pH(2)) (k) 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 Cadmium (Dissolved) Calcium (Dissolved) Chromium (Dissolved) Cobalt (Dissolved) 0.000017-0.00017 0.1 0.001-0.01 0.0003-0.003 <0.00017 58.8 <0.01 <0.003 <0.000017 54 <0.001 <0.0003 <0.000017 50.8 <0.001 <0.0003 <0.000017 57.3 <0.001 <0.0003 <0.000017 45.1 <0.001 <0.0003 <0.000017 48.6 <0.002 <0.0003 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.001-0.01 0.03 <0.01 <0.03 <0.001 <0.03 <0.001 <0.03 <0.001 <0.03 0.0013 <0.03 0.0016 <0.03 Lead (Dissolved) Lithium (Dissolved) Magnesium (Dissolved) 0.0005-0.005 0.005-0.05 0.1 <0.005 <0.05 42.6 <0.0005 0.0068 45.7 <0.0005 0.0069 44.3 <0.0005 0.0063 46.7 <0.0005 <0.007 38.9 <0.0005 0.0066 41.2 0.11 (0.094*(Hardness)+2)/1000 (g) 0.3 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.002 to 0.004 (g) 0.3 0.001 to 0.007 (g) Manganese (Dissolved) Mercury (Dissolved) y (Dissolved) ( ) Molybdenum 0.0003-0.003 0.00002 0.001-0.01 0.00088 <0.00002 <0.01 0.001 <0.00002 0.0029 0.00129 <0.00002 0.0031 0.00111 <0.00002 0.0025 0.00446 <0.00002 0.0027 0.00216 <0.00002 0.003 0.001-0.01 2 0.001-0.01 <0.01 11.8 <0.01 <0.001 12.4 <0.001 <0.001 12.4 <0.001 <0.001 12.1 <0.001 <0.001 11.8 <0.001 0.0015 13.3 0.0011 (0.01102*Hardness)+0.54 (g) 0.0001 2 0.025 to 0.150 (g) 0.000026 0.073 0.025 to 0.15 (g) 0.00002-0.0002 2 0.0002-0.002 0.0005-0.005 0.01 0.0002-0.002 0.001-0.03 0.005-0.05 <0.0002 39 <0.002 <0.005 <0.01 0.00129 <0.03 <0.05 <0.00002 41.9 <0.0002 <0.0005 <0.01 0.0012 <0.03 <0.005 <0.00002 44.2 <0.0002 <0.0005 <0.01 0.00117 <0.03 <0.005 <0.00002 40.7 <0.0002 <0.0005 <0.01 0.00116 0.0016 <0.005 <0.00002 36.5 <0.0002 <0.0005 <0.01 0.00111 0.0019 <0.005 <0.00002 37.3 <0.0002 <0.0005 <0.01 0.00118 0.0023 <0.005 0.002 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.006 (33+0.75*(Hardness-90))/1000 to 0.033 (g) 0.03 Aluminum (Total) Antimony (Total) Arsenic (Total) Barium (Total) Beryllium (Total) Boron (Total) 0.005-0.05 0.0005-0.005 0.0005-0.005 0.02 0.001-0.01 0.1 <0.05 <0.005 0.0012 0.058 <0.01 <0.1 0.0051 <0.0005 0.00143 0.056 <0.001 <0.1 0.0079 <0.0005 0.00128 0.058 <0.001 <0.1 <0.005 <0.0005 0.00116 0.06 <0.001 <0.1 0.0105 <0.0005 0.00144 0.051 <0.001 <0.1 0.0065 <0.0005 0.00177 0.059 <0.001 <0.1 Cadmium (Total) Calcium (Total) Chromium (Total) Cobalt (Total) 0.000017-0.00017 0.1 0.001-0.01 0.0003-0.003 <0.00017 59.3 <0.01 <0.003 <0.000017 54.9 <0.001 <0.0003 <0.000017 50.3 <0.001 <0.0003 <0.000017 57.8 <0.001 <0.0003 <0.000017 44.2 <0.001 <0.0003 <0.000017 48.4 <0.002 <0.0003 0.001-0.01 0.03 <0.01 <0.03 0.0011 <0.03 0.0011 <0.03 <0.001 <0.03 0.0014 <0.03 0.001 <0.03 Lead (Total) Lithium (Total) Magnesium (Total) 0.0005-0.005 0.005-0.05 0.1 <0.005 <0.05 43 <0.0005 0.0069 45.8 <0.0005 0.0075 44 <0.0005 0.0062 46.9 <0.0005 <0.008 37.9 <0.0005 0.0069 40.9 Manganese (Total) Mercury (Total) Molybdenum (Total) 0.0003-0.003 0.00002 0.001-0.01 0.00622 <0.00002 <0.01 0.0029 <0.00002 0.0028 0.0027 <0.00002 0.0029 0.0101 <0.00002 0.0023 0.0102 <0.00002 0.0029 0.00411 <0.00002 0.0031 0.001-0.01 2 0.001-0.01 <0.01 12 <0.01 <0.001 12 3 12.3 <0.001 <0.001 12 5 12.5 <0.001 <0.001 12 3 12.3 <0.001 <0.001 11 5 11.5 <0.001 <0.001 13 2 13.2 0.001 0.00002-0.0002 2 0.0002-0.002 0.0005-0.005 0.01 0.0002-0.002 0.001-0.03 0.005-0.05 <0.0002 39.1 <0.002 <0.005 <0.01 0.00121 <0.03 <0.05 <0.00002 41 <0.0002 <0.0005 <0.01 0.00099 <0.03 <0.005 0.000033 44.5 <0.0002 <0.0005 <0.01 0.00107 <0.03 <0.005 <0.00002 41.5 <0.0002 <0.0005 <0.01 0.00079 0.0015 <0.005 <0.00002 35.4 <0.0002 <0.0005 <0.01 0.00131 0.0021 0.032 <0.00002 38.4 <0.0002 <0.0005 <0.01 0.00113 0.0023 <0.005 0.5 14.5 15.1 15.3 14.4 16.7 15 Date Sampled Time Sampled In Situ Parameters Conductivity (In Situ) (uS/cm) Dissolved Oxygen (In Situ) (%) Dissolved Oxygen (In Situ) pH (In Situ) Redox Potential (In Situ) (mV) Specific Conductivity (In Situ) (uS/cm) Temperature (In Situ) (°C) Physical Tests Color (TCU) Hardness pH Specific Conductivity (uS/cm) Total Alkalinity (as CaCO3) Total Dissolved Solids Total Suspended Solids Turbidity (NTU) Dissolved Anions Bromide Chloride MDL --------------- Fluoride Sulphate Nutrients Ammonium Nitrogen (as N) Nitrate (as N) Nitrite (as N) Orthophosphate (as P) Phosphorus (Total) (as P) Total Nitrogen Cyanide Cyanide (Free) Cyanide (Total) Cyanide (WAD) Dissolved Metals Copper (Dissolved) Iron (Dissolved) Nickel (Dissolved) Potassium (Dissolved) Selenium (Dissolved) Silver (Dissolved) Sodium (Dissolved) Thallium (Dissolved) Tin (Dissolved) Titanium (Dissolved) Uranium (Dissolved) Vanadium (Dissolved) Zinc (Dissolved) Total Metals Copper (Total) Iron (Total) Nickel (Total) Potassium (Total) Selenium (Total) Silver (Total) Sodium (Total) Thallium (Total) Tin (Total) Titanium (Total) Uranium (Total) Vanadium (Total) Zinc (Total) Organics Dissolved Organic Carbon BCWQG (b) 6.5 to 9 6.5 to 9 6.5 to 9 6.5 to 9 600 ( ) 0.2 to 0.3 (g) 100 0.681 to 28.3 (h,i) 200 0.06 to 0.6 (j) 0.01 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.11 (0.094*(Hardness)+2)/1000 (g) 0.3 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.002 to 0.004 (g) 0.3 0.001 to 0.007 (g) (0.01102*Hardness)+0.54 (g) 0.0001 2 0.025 to 0.150 (g) 0.000026 0.073 0.025 to 0.15 (g) 0.002 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.006 (33+0.75*(Hardness-90))/1000 to 0.033 (g) 0.03 NOTES: (g) HARDNESS DEPENDENT. (b) BCWQG - BC WATER QUALITY GUIDELINES FOR FRESHWATER AQUATIC LIFE (AUGUST 2006). (h) pH (In Situ) DEPENDENT. (c) CCME - CANADIAN WATER QUALITY GUIDELINES FOR THE PROTECTION OF AQUATIC LIFE. (DECEMBER 2006). (i) TEMPERATURE (In Situ) DEPENDENT. (d) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG (j) CHLORIDE DEPENDENT. (e) BOLD INDICATES THE VALUE EXCEEDS THE CCME GUIDELINES (k) pH DEPENDENT. (f) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG & CCME 0 23JUL'10 REV DATE ISSUED WITH REPORT VA101-246/8-1 DESCRIPTION RP JEM RCB PREP'D CHK'D APP'D 0.0536 to 185 (h,i) 13 0.06 0.005 M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 6.5 Water Quality JACL-S.xls]Table 6.5 (a) UNITS ARE mg/L, UNLESS OTHERWISE STATED. CCME (c) TABLE 6.6 KGHM AJAX MINING INC. AJAX PROJECT SAMPLE SUMMARY & STATISTICS FOR JACL-D Print Feb/03/11 14:18:56 Date Sampled Time Sampled In Situ Parameters Conductivity (In Situ) (uS/cm) Dissolved Oxygen (In Situ) (%) Dissolved Oxygen (In Situ) pH (In Situ) Redox Potential (In Situ) (mV) Specific Conductivity (In Situ) (uS/cm) Temperature (In Situ) (°C) Physical Tests Color (TCU) Hardness pH Specific Conductivity (uS/cm) Total Alkalinity (as CaCO3) Total Dissolved Solids Total Suspended Solids Turbidity (NTU) Dissolved Anions Bromide Chloride 3-May-07 2:45 PM MDL --------------- Fluoride Sulphate Nutrients Ammonium Nitrogen (as N) Nitrate (as N) Nitrite (as N) Orthophosphate (as P) Phosphorus (Total) (as P) Total Nitrogen Cyanide Cyanide (Free) Cyanide (Total) Cyanide (WAD) Dissolved Metals 19-Jul-07 12:00 PM 20-Sep-07 12:00 PM 29-Apr-08 9:45 AM 10-Jul-08 7:45 AM 7-Sep-08 9:30 AM 511 503 1.5 0.19 7.29 803 5.43 492 BCWQG (b) CCME 0.47 7.76 0.01 7.54 0.21 8 484 62.3 7.99 8.1 754 5.44 787 5.85 792 6.42 790 4.72 503 1.3 0.16 7.42 -64.4 801 5.47 5 0.7 0.01 2 2 10 - 20 3 0.1 321 8.24 749 248 461 <3 13.9 337 7.99 774 247 471 3.6 15.3 329 7.9 779 280 465 <3 21.3 341 8.12 790 257 447 3.2 2.43 12.6 322 8.2 793 250 492 <3 2.15 14.2 320 7.85 801 255 470 <3 9.9 0.05-0.5 0.5-5 <0.5 61.4 <0.05 60 <0.05 59.8 <0.05 60.6 <0.05 61.9 <0.05 62.5 0.02-0.2 0.5-5 0.191 86.4 83.7 0.207 82.5 0.172 83.7 0.175 85.2 0.198 73.9 0.02 0.005-0.05 0.131 0.161 0.932 <0.005 1.57 <0.005 0.076 0.0299 0.448 <0.005 1.94 <0.005 0.681 to 28.3 (h,i) 200 0.001-0.01 0.001-0.01 0.002-0.02 0.05 0.0106 0.0523 0.0788 1.02 <0.001 0.216 0.257 1.95 <0.001 0.336 0.362 2.94 0.0045 0.0281 0.0816 1.13 <0.001 0.116 0.16 1.34 <0.001 0.343 0.383 3.17 0.06 to 0.6 (j) 0.005 0.005 0.005 0.0051 0.0117 <0.005 <0.005 <0.005 <0.005 0.006 <0.005 <0.005 0.006 (c) 6.5 to 9 6.5 to 9 6.5 to 9 6.5 to 9 600 0.2 to 0.3 100 (g) 0.0536 to 185 13 0.06 (h,i) 0.005 <0.005 0.01 (1.209-2.426*pH+0.286*pH(2)) (k) 0.1 to e 0.005 to 0.1 (k) Aluminum (Dissolved) Antimony (Dissolved) Arsenic (Dissolved) Barium (Dissolved) Beryllium (Dissolved) Boron (Dissolved) 0.005-0.05 0.0005-0.005 0.0005-0.005 0.02 0.001-0.01 0.1 <0.05 <0.005 0.0014 0.059 <0.01 <0.1 <0.005 <0.0005 0.00138 0.065 <0.001 <0.1 0.009 <0.0005 0.00123 0.067 <0.001 <0.1 <0.005 <0.0005 0.00126 0.059 <0.001 <0.1 <0.01 <0.001 0.0013 0.067 <0.002 <0.1 <0.01 <0.001 0.0016 0.069 <0.002 <0.1 Cadmium (Dissolved) Calcium (Dissolved) Chromium (Dissolved) Cobalt (Dissolved) 0.000017-0.00017 0.1 0.001-0.01 0.0003-0.003 <0.00017 57.5 <0.01 <0.003 <0.000017 60.2 <0.001 <0.0003 <0.000017 61.1 <0.001 <0.0003 <0.000017 57.9 <0.001 <0.0003 <0.000034 56.4 <0.002 <0.0006 <0.000034 58.5 <0.004 <0.0006 0.001-0.01 0.03 <0.01 <0.03 <0.001 <0.03 <0.001 <0.03 <0.001 <0.03 <0.002 <0.03 <0.002 <0.03 Lead (Dissolved) Lithium (Dissolved) Magnesium (Dissolved) 0.0005-0.005 0.005-0.05 0.1 <0.005 <0.05 43 <0.0005 0.0072 45.3 <0.0005 0.0063 43 <0.0005 0.0062 46.7 <0.001 <0.01 44 <0.001 <0.01 42.3 Manganese (Dissolved) Mercuryy (Dissolved) ( ) Molybdenum (Dissolved) 0.0003-0.003 0.00002 0.001-0.01 0.0297 <0.00002 <0.01 0.0995 <0.00002 0.0021 0.107 <0.00002 0.0011 0.00936 <0.00002 0.0024 0.086 <0.00002 0.0025 0.0982 <0.00002 <0.002 Nickel (Dissolved) Potassium (Dissolved) Selenium (Dissolved) 0.001-0.01 2 0.001-0.01 <0.01 12.3 <0.01 <0.001 12.6 0.0034 <0.001 12.4 <0.001 <0.001 12.2 <0.001 <0.002 12.6 <0.002 <0.002 13 0.0107 0.025 to 0.150 (g) 0.025 to 0.15 (g) 0.002 Silver (Dissolved) Sodium (Dissolved) Thallium (Dissolved) Tin (Dissolved) Titanium (Dissolved) Uranium (Dissolved) Vanadium (Dissolved) 0.00002-0.0002 2 0.0002-0.002 0.0005-0.005 0.01 0.0002-0.002 0.001-0.03 <0.0002 39.8 <0.002 <0.005 <0.01 0.00129 <0.03 <0.00002 42 <0.0002 <0.0005 <0.01 0.00118 <0.03 <0.00002 43.4 <0.0002 <0.0005 <0.01 0.00098 <0.03 <0.00002 40.7 <0.0002 <0.0005 <0.01 0.00109 0.0016 <0.00004 41.3 <0.0004 <0.001 <0.01 0.00121 <0.002 <0.00004 39.2 <0.0004 <0.001 <0.01 0.00112 <0.002 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 Copper (Dissolved) Iron (Dissolved) Zinc (Dissolved) Total Metals Aluminum (Total) Antimony (Total) Arsenic (Total) Barium (Total) Beryllium (Total) Boron (Total) Cadmium (Total) Calcium (Total) Chromium (Total) Cobalt (Total) Copper (Total) Iron (Total) Lead (Total) Lithium (Total) Magnesium (Total) Manganese (Total) Mercury (Total) Molybdenum (Total) Nickel (Total) P Potassium t i (T (Total) t l) Selenium (Total) Silver (Total) Sodium (Total) Thallium (Total) Tin (Total) Titanium (Total) Uranium (Total) Vanadium (Total) Zinc (Total) Organics Dissolved Organic Carbon 0.005-0.05 <0.05 <0.005 <0.005 <0.005 <0.005 <0.005 0.005-0.05 0.0005-0.005 0.0005-0.005 0.02 0.001-0.01 0.1 0.000017-0.00017 0.1 0.001-0.01 0.0003-0.003 0.001-0.01 0.03 0.0005-0.005 0.005-0.05 0.1 0.0003-0.003 0.00002 0.001-0.01 0.001-0.01 2 0.001-0.01 0.00002-0.0002 2 0.0002-0.002 0.0005-0.005 0.01 0.0002-0.002 0.001-0.03 0.005-0.05 <0.05 <0.005 0.0012 0.058 <0.01 <0.1 <0.00017 58.8 <0.01 <0.003 <0.01 <0.03 <0.005 <0.05 44 0.0479 <0.00002 <0.01 <0.01 12 12.2 2 <0.01 <0.0002 39.6 <0.002 <0.005 <0.01 0.00126 <0.03 <0.05 0.0058 <0.0005 0.00137 0.066 <0.001 <0.1 <0.000017 60.9 <0.001 <0.0003 <0.001 <0.03 <0.0005 0.0067 45.9 0.0965 <0.00002 0.002 <0.001 12 12.6 6 0.0034 <0.00002 41.4 <0.0002 <0.0005 <0.01 0.00105 <0.03 <0.005 0.0092 <0.0005 0.0012 0.07 <0.001 <0.1 <0.000017 62.1 <0.001 <0.0003 <0.001 <0.03 <0.0005 0.0063 43.2 0.106 <0.00002 0.0014 <0.001 12 12.3 3 <0.001 <0.00002 43 <0.0002 <0.0005 <0.01 0.00083 <0.03 <0.005 <0.005 <0.0005 0.00127 0.062 <0.001 <0.1 <0.000017 58.6 <0.001 <0.0003 <0.001 <0.03 <0.0005 0.0064 47.2 0.0359 <0.00002 0.0024 <0.001 12 12.4 4 <0.001 <0.00002 41.4 <0.0002 <0.0005 <0.01 0.00077 0.0017 <0.005 <0.01 <0.001 0.0013 0.067 <0.002 <0.1 <0.000034 56.9 <0.002 <0.0006 <0.002 <0.03 <0.001 <0.01 44.3 0.0855 <0.00002 0.0024 <0.002 12 12.6 6 <0.002 <0.00004 41.2 <0.0004 <0.001 <0.01 0.00115 <0.002 <0.005 <0.01 <0.001 0.0016 0.069 <0.002 <0.1 <0.000034 58 <0.003 <0.0006 <0.002 <0.03 <0.001 <0.01 42.3 0.0982 <0.00002 <0.002 <0.002 13 0.0171 <0.00004 39.3 <0.0004 <0.001 <0.01 0.00095 <0.002 <0.005 0.5 14.2 14.7 14.1 14.7 14.9 13.2 0.005 5 0.0053 1.2 0.005 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.11 (0.094*(Hardness)+2)/1000 (g) 0.3 0.002 to 0.004 (g) 0.3 0.003 to e(1.273*ln(Hardness)1.460) /1000 (g) 0.001 to 0.007 (g) (0.01102*Hardness)+0.54 0.0001 2 0.005 5 0.0053 1.2 (0.86*(log(Hardness))-3.2) 10 0.002 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.006 (33+0.75*(Hardness-90))/1000 to 0.03 (h) pH (In Situ) DEPENDENT. (i) TEMPERATURE (In Situ) DEPENDENT. (d) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG (j) CHLORIDE DEPENDENT. (e) BOLD INDICATES THE VALUE EXCEEDS THE CCME GUIDELINES (k) pH DEPENDENT. DESCRIPTION RP JEM RCB PREP'D CHK'D APP'D 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.000026 0.073 0.025 to 0.15 (g) (c) CCME - CANADIAN WATER QUALITY GUIDELINES FOR THE PROTECTION OF AQUATIC LIFE. (DECEMBER 2006). ISSUED WITH REPORT VA101-246/8-1 /1000 (g) (0.01102*Hardness)+0.54 (g) 0.0001 2 (g) 0.025 to 0.150 (g) HARDNESS DEPENDENT. DATE 0.005 0.002 to 0.004 (g) 0.3 0.001 to 0.007 (g) (b) BCWQG - BC WATER QUALITY GUIDELINES FOR FRESHWATER AQUATIC LIFE (AUGUST 2006). 23JUL'10 (k) 0.11 (0.094*(Hardness)+2)/1000 (g) 0.3 (1.273*ln(Hardness)0.003 to e NOTES: 0 0.03 0.005 to 0.1 (a) UNITS ARE mg/L, UNLESS OTHERWISE STATED. REV 0.000026 0.073 0.006 (33+0.75*(Hardness-90))/1000 to 0.033 (g) M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 6.6 Water Quality JACL-D.xls]Table 6.6 (f) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG & CCME (g) TABLE 6.7 KGHM AJAX MINING INC. AJAX PROJECT SAMPLE SUMMARY & STATISTICS FOR JACL-02 Print Feb/03/11 14:20:20 29-Apr-08 10:30 AM 10-Jul-08 10:15 AM 7-Sep-08 10:00 AM --------------- 233 96.5 12.1 8.03 583 101 10.2 8.33 370 5.66 609 88.3 8.12 8.3 -116 682 19.4 718 15.2 5 0.7 0.01 2 1-2 10 3 0.1 12.3 336 8.29 781 251 460 5.7 2.28 19.6 273 8.49 678 219 407 5.8 8.42 15.6 284 8.35 717 231 448 <3 1.33 0.05 0.5 <0.05 60.3 <0.05 53.4 <0.05 59.1 0.02 0.5 0.175 83.1 0.174 66 0.206 74.2 0.02 0.005 <0.02 <0.005 0.022 <0.005 0.092 0.0254 0.001 0.001 0.002 0.05 <0.001 0.0074 0.0666 1 <0.001 <0.001 0.0325 1.36 0.0131 <0.001 0.0227 1.22 0.005 0.005 0.005 <0.005 0.0081 <0.005 <0.005 0.0101 <0.005 <0.005 <0.005 0.01 Aluminum (Dissolved) Antimony (Dissolved) Arsenic (Dissolved) Barium (Dissolved) Beryllium (Dissolved) Boron (Dissolved) 0.005 0.0005 0.0005 0.02 0.001 0.1 <0.005 <0.0005 0.0012 0.06 <0.001 <0.1 <0.005 <0.0005 0.00142 0.053 <0.001 <0.1 <0.005 <0.0005 0.00182 0.058 <0.001 <0.1 0.1 to e(1.209-2.426*pH+0.286*pH(2)) (k) 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 Cadmium (Dissolved) Calcium (Dissolved) Chromium (Dissolved) Cobalt (Dissolved) 0.000017 0.1 0.001-0.003 0.0003 <0.000017 57.6 <0.001 <0.0003 <0.000017 45.4 <0.001 <0.0003 <0.000017 48 <0.003 <0.0003 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.001 0.03 <0.001 <0.03 0.0012 <0.03 <0.001 <0.03 Lead (Dissolved) Lithium (Dissolved) Magnesium (Dissolved) 0.0005 0.005-0.006 0.1 <0.0005 0.0063 46.7 <0.0005 <0.006 38.9 <0.0005 0.0068 39.9 0.11 (0.094*(Hardness)+2)/1000 (g) 0.3 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.002 to 0.004 (g) 0.3 0.001 to 0.007 (g) Manganese (Dissolved) Mercury (Dissolved) y ((Dissolved)) Molybdenum 0.0003 0.00002 0.001 0.00114 <0.00002 0.0025 0.00412 <0.00002 0.0025 0.00238 <0.00002 0.0028 Nickel (Dissolved) Potassium (Dissolved) Selenium (Dissolved) 0.001 2 0.001 <0.001 12.3 <0.001 <0.001 11.8 <0.001 <0.001 12.9 0.002 (0.01102*Hardness)+0.54 (g) 0.0001 2 0.025 to 0.150 (g) 0.000026 0.073 0.025 to 0.15 (g) Silver (Dissolved) Sodium (Dissolved) Thallium (Dissolved) Tin (Dissolved) Titanium (Dissolved) Uranium (Dissolved) Vanadium (Dissolved) 0.00002 2 0.0002 0.0005 0.01 0.0002 0.001 <0.00002 40.6 <0.0002 <0.0005 <0.01 0.00112 0.0017 <0.00002 36.1 <0.0002 <0.0005 <0.01 0.00113 0.0018 <0.00002 38.2 <0.0002 <0.0005 <0.01 0.00121 0.0025 0.002 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.005 <0.005 <0.005 <0.005 0.006 (33+0.75*(Hardness-90))/1000 to 0.033 (g) 0.03 Aluminum (Total) Antimony (Total) Arsenic (Total) Barium (Total) Beryllium (Total) Boron (Total) 0.005-0.02 0.0005 0.0005 0.02 0.001 0.1 <0.02 <0.0005 0.00109 0.059 <0.001 <0.1 0.0057 <0.0005 0.0014 0.05 <0.001 <0.1 0.0064 <0.0005 0.00173 0.058 <0.001 <0.1 Cadmium (Total) Calcium (Total) Chromium (Total) Cobalt (Total) 0.000017 0.1 0.001-0.003 0.0003 <0.000017 56.1 <0.001 <0.0003 <0.000017 43.5 <0.001 <0.0003 <0.000017 48.2 <0.003 <0.0003 0.001 0.03 <0.001 0.03 0.0012 <0.03 <0.001 <0.03 Lead (Total) Lithium (Total) Magnesium (Total) 0.0005 0.005-0.007 0.1 <0.0005 0.0071 45.3 <0.0005 <0.007 37.3 <0.0005 0.0066 40.1 Manganese (Total) Mercury (Total) Molybdenum (Total) 0.0003 0.00002 0.001 0.0116 <0.00002 0.0026 0.00931 <0.00002 0.0028 0.00389 <0.00002 0.0026 Nickel (Total) Potassium (Total) Selenium (Total) 0.001 2 0.001 <0.001 11 9 11.9 <0.001 <0.001 11 3 11.3 <0.001 <0.001 13 1 13.1 0.0022 Silver (Total) Sodium (Total) Thallium (Total) Tin (Total) Titanium (Total) Uranium (Total) Vanadium (Total) 0.00002 2 0.0002 0.0005 0.01 0.0002 0.001 <0.00002 40.3 <0.0002 <0.0005 <0.01 0.00132 0.0019 <0.00002 34.9 <0.0002 <0.0005 <0.01 0.00128 0.0021 <0.00002 38.3 <0.0002 <0.0005 <0.01 0.00111 0.0024 0.005 <0.005 <0.005 <0.005 0.5 14.7 16.1 13.9 Date Sampled Time Sampled In Situ Parameters Conductivity (In Situ) (uS/cm) Dissolved Oxygen (In Situ) (%) Dissolved Oxygen (In Situ) pH (In Situ) Redox Potential (In Situ) (mV) Specific Conductivity (In Situ) (uS/cm) Temperature (In Situ) (°C) Physical Tests Color (TCU) Hardness pH Specific Conductivity (uS/cm) Total Alkalinity (as CaCO3) Total Dissolved Solids Total Suspended Solids Turbidity (NTU) Dissolved Anions Bromide Chloride MDL Fluoride Sulphate Nutrients Ammonium Nitrogen (as N) Nitrate (as N) Nitrite (as N) Orthophosphate (as P) Phosphorus (Total) (as P) Total Nitrogen Cyanide Cyanide (Free) Cyanide (Total) Cyanide (WAD) Dissolved Metals Copper (Dissolved) Iron (Dissolved) Zinc (Dissolved) Total Metals Copper (Total) Iron (Total) Zinc (Total) Organics Dissolved Organic Carbon BCWQG (b) 6.5 to 9 6.5 to 9 6.5 to 9 6.5 to 9 600 ( ) 0.2 to 0.3 (g) 100 0.681 to 28.3 (h,i) 200 0.06 to 0.6 (j) 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.11 (0.094*(Hardness)+2)/1000 (g) 0.3 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.002 to 0.004 (g) 0.3 0.001 to 0.007 (g) (0.01102*Hardness)+0.54 (g) 0.0001 2 0.025 to 0.150 (g) 0.000026 0.073 0.025 to 0.15 (g) 0.002 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.006 (33+0.75*(Hardness-90))/1000 to 0.033 (g) 0.03 NOTES: (a) UNITS ARE mg/L, UNLESS OTHERWISE STATED. (g) HARDNESS DEPENDENT. (b) BCWQG - BC WATER QUALITY GUIDELINES FOR FRESHWATER AQUATIC LIFE (AUGUST 2006). (h) pH (In Situ) DEPENDENT. (c) CCME - CANADIAN WATER QUALITY GUIDELINES FOR THE PROTECTION OF AQUATIC LIFE. (DECEMBER 2006). (i) TEMPERATURE (In Situ) DEPENDENT. (d) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG (j) CHLORIDE DEPENDENT. (e) BOLD INDICATES THE VALUE EXCEEDS THE CCME GUIDELINES (k) pH DEPENDENT. 0 23JUL'10 REV DATE ISSUED WITH REPORT VA101-246/8-1 DESCRIPTION RP JEM RCB PREP'D CHK'D APP'D 0.0536 to 185 (h,i) 13 0.06 0.005 M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 6.7 Water Quality JACL-02.xls]Table 6.7 (f) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG & CCME CCME (c) TABLE 6.8 KGHM AJAX MINING INC. AJAX PROJECT SAMPLE SUMMARY & STATISTICS FOR JACL-03 Print Feb/03/11 14:22:54 29-Apr-08 11:15 AM 11-Jul-08 8:05 AM 7-Sep-08 10:30 AM --------------- 492 97.7 12.2 8.12 580 71.2 6.83 7.9 780 5.72 588 77.5 7.56 8.2 -110 691 17.2 5 0.7 0.01 2 2 10 3 0.1 12.5 333 8.28 785 251 460 5.2 2.94 20.5 281 8.49 670 223 415 <3 7.07 18.2 290 8.28 725 235 436 <3 2.51 0.05 0.5 <0.05 60.4 <0.05 53.6 <0.05 59.4 0.02 0.5 0.172 83.2 0.178 66.2 0.211 74.6 0.02 0.005 <0.02 <0.005 <0.005 0.128 0.0284 0.001 0.001 0.002 0.05 0.008 0.0067 0.0642 1.11 0.0015 <0.001 0.0334 0.0148 0.0102 0.0339 1.3 0.005 0.005 0.005 <0.005 0.0065 <0.005 <0.005 0.008 <0.005 <0.005 <0.005 0.01 0.005 0.0005 0.0005 0.02 0.001 0.1 0.000017 0.1 0.001-0.003 0.0003 <0.005 <0.0005 0.00124 0.058 <0.001 <0.1 <0.000017 57.1 <0.001 <0.0003 <0.005 <0.0005 0.00133 0.054 <0.001 <0.1 <0.000017 47 <0.001 <0.0003 <0.005 <0.0005 0.0018 0.061 <0.001 <0.1 <0.000017 48.9 <0.003 <0.0003 0.1 to e(1.209-2.426*pH+0.286*pH(2)) (k) 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) Copper (Dissolved) Iron (Dissolved) 0.001 0.03 <0.001 <0.03 0.0011 <0.03 <0.001 <0.03 Lead (Dissolved) Lithium (Dissolved) Magnesium (Dissolved) 0.0005 0.005 0.1 <0.0005 0.0063 46.3 <0.0005 0.0056 39.8 <0.0005 0.007 40.8 0.11 (0.094*(Hardness)+2)/1000 (g) 0.3 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.002 to 0.004 (g) 0.3 0.001 to 0.007 (g) Manganese (Dissolved) Mercury (Dissolved) Molybdenum (Dissolved) 0.0003 0.00002 0.001 0.00207 <0.00002 0.0026 0.00612 <0.00002 0.0026 0.00756 <0.00002 0.0027 0.001 2 0.001 <0.001 12 <0.001 <0.001 12 <0.001 <0.001 13.2 0.0018 (0.01102*Hardness)+0.54 (g) 0.0001 2 ( ) 0.025 to 0.150 (g) 0.000026 0.073 ( ) 0.025 to 0.15 (g) 0.00002 2 0.0002 0.0005 0.01 0.0002 0.001 0.005 <0.00002 40.4 <0.0002 <0.0005 <0.01 0.00114 0.0016 <0.005 <0.00002 37.8 <0.0002 <0.0005 <0.01 0.00116 0.0019 <0.005 <0.00002 38.7 <0.0002 <0.0005 <0.01 0.00119 0.0025 <0.005 0.002 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.006 (33+0.75*(Hardness-90))/1000 to 0.033 (g) 0.03 0.005 0.0005 0.0005 0.02 0.001 0.1 0.000017 0.1 0.001-0.003 0.0003 0.0134 <0.0005 0.00108 0.059 <0.001 <0.1 <0.000017 56.5 <0.001 <0.0003 0.0098 <0.0005 0.00146 0.059 <0.001 <0.1 <0.000017 47.3 0.0011 <0.0003 0.0097 <0.0005 0.00174 0.062 <0.001 <0.1 <0.000017 48.8 <0.003 <0.0003 Copper (Total) Iron (Total) 0.001 0.03 <0.001 <0.03 0.0012 <0.03 <0.001 <0.03 Lead (Total) Lithium (Total) Magnesium (Total) 0.0005 0.005 0.1 <0.0005 0.007 45.9 <0.0005 0.0057 39.7 <0.0005 0.0065 40.6 Manganese (Total) Mercury (Total) Molybdenum (Total) 0.0003 0.00002 0.001 0.0146 <0.00002 0.0026 0.00992 <0.00002 0.0021 0.00883 <0.00002 0.0026 0.001 2 0.001 <0.001 12.1 <0.001 <0.001 11.9 <0.001 <0.001 13.2 0.0017 0.00002 2 0.0002 0.0005 0.01 0.0002 0.001 0.005 <0.00002 40.5 <0.0002 <0.0005 <0.01 0.00127 0.002 <0.005 <0.00002 37.9 <0.0002 <0.0005 <0.01 0.00088 0.0019 <0.005 <0.00002 38.2 <0.0002 <0.0005 <0.01 0.00108 0.0025 <0.005 0.5 14.5 15.8 14.6 Date Sampled Time Sampled In Situ Parameters Conductivity (In Situ) (uS/cm) Dissolved Oxygen (In Situ) (%) Dissolved Oxygen (In Situ) pH (In Situ) Redox Potential (In Situ) (mV) Specific Conductivity (In Situ) (uS/cm) Temperature (In Situ) (°C) Physical Tests Color (TCU) Hardness pH Specific Conductivity (uS/cm) Total Alkalinity (as CaCO3) Total Dissolved Solids Total Suspended Solids Turbidity (NTU) Dissolved Anions Bromide Chloride MDL Fluoride Sulphate Nutrients Ammonium Nitrogen (as N) Nitrate (as N) Nitrite (as N) Orthophosphate (as P) Phosphorus (Total) (as P) Total Nitrogen Cyanide Cyanide (Free) Cyanide (Total) Cyanide (WAD) Dissolved Metals Aluminum (Dissolved) Antimony (Dissolved) Arsenic (Dissolved) Barium (Dissolved) Beryllium (Dissolved) Boron (Dissolved) Cadmium (Dissolved) Calcium (Dissolved) Chromium (Dissolved) Cobalt (Dissolved) Nickel (Dissolved) Potassium (Dissolved) Selenium (Dissolved) Silver (Dissolved) Sodium (Dissolved) Thallium (Dissolved) Tin (Dissolved) Titanium (Dissolved) Uranium (Dissolved) Vanadium (Dissolved) Zinc (Dissolved) Total Metals Aluminum (Total) Antimony (Total) Arsenic (Total) Barium (Total) Beryllium (Total) Boron (Total) Cadmium (Total) Calcium (Total) Chromium (Total) Cobalt (Total) Nickel (Total) Potassium (Total) Selenium (Total) Silver (Total) Sodium (Total) Thallium (Total) Tin (Total) Titanium (Total) Uranium (Total) Vanadium (Total) Zinc (Total) Organics Dissolved Organic Carbon BCWQG (b) 6.5 to 9 6.5 to 9 6.5 to 9 6.5 to 9 718 15 600 0.2 0 2 to 0.3 0 3 (g) 100 0.681 to 28.3 (h,i) 200 0.06 to 0.6 (j) 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.11 (0.094*(Hardness)+2)/1000 (g) 0.3 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.002 to 0.004 (g) 0.3 0.001 to 0.007 (g) (0.01102*Hardness)+0.54 (g) 0.0001 2 0.025 to 0.150 (g) 0.000026 0.073 0.025 to 0.15 (g) 0.002 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.006 (33+0.75*(Hardness-90))/1000 to 0.033 (g) 0.03 NOTES: (a) UNITS ARE mg/L, UNLESS OTHERWISE STATED. (g) HARDNESS DEPENDENT. (c) CCME - CANADIAN WATER QUALITY GUIDELINES FOR THE PROTECTION OF AQUATIC LIFE. (DECEMBER 2006). (h) pH (In Situ) DEPENDENT. (d) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG (i) TEMPERATURE (In Situ) DEPENDENT. (e) BOLD INDICATES THE VALUE EXCEEDS THE CCME GUIDELINES (j) CHLORIDE DEPENDENT. (f) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG & CCME 0 23JUL'10 REV DATE ISSUED WITH REPORT VA101-246/8-1 DESCRIPTION (k) pH DEPENDENT. RP JEM RCB PREP'D CHK'D APP'D 0.0536 to 185 (h,i) 13 0.06 0.005 M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 6.8 Water Quality JACL-03.xls]Table 6.8 (b) BCWQG - BC WATER QUALITY GUIDELINES FOR FRESHWATER AQUATIC LIFE (AUGUST 2006). CCME (c) TABLE 6.9 KGHM AJAX MINING INC. AJAX PROJECT SAMPLE SUMMARY & STATISTICS FOR CC02 Date Sampled Time Sampled In Situ Parameters Conductivity (In Situ) (uS/cm) Dissolved Oxygen (In Situ) (%) Dissolved Oxygen (In Situ) pH (In Situ) Redox Potential (In Situ) (mV) Specific Conductivity (In Situ) (uS/cm) Temperature (In Situ) (°C) Physical Tests Color (TCU) Hardness pH Specific Conductivity (uS/cm) Total Alkalinity (as CaCO3) Total Dissolved Solids Total Suspended Solids Turbidity (NTU) Dissolved Anions Bromide Chloride --------------- Calcium (Dissolved) Chromium (Dissolved) Cobalt (Dissolved) Copper (Dissolved) Iron (Dissolved) Lead (Dissolved) Lithium (Dissolved) Magnesium (Dissolved) Manganese (Dissolved) M Mercury (Di (Dissolved) l d) Molybdenum (Dissolved) Nickel (Dissolved) Potassium (Dissolved) Selenium (Dissolved) Silver (Dissolved) Sodium (Dissolved) Thallium (Dissolved) Tin (Dissolved) Titanium (Dissolved) Uranium (Dissolved) Vanadium (Dissolved) Total Metals Aluminum (Total) Antimony (Total) Arsenic (Total) Barium (Total) Beryllium (Total) Boron (Total) Cadmium (Total) Calcium (Total) Chromium (Total) Cobalt (Total) Copper (Total) Iron (Total) Lead (Total) Lithium (Total) Magnesium (Total) Manganese (Total) Mercury (Total) Molybdenum (Total) Nickel (Total) P Potassium t i (T (Total) t l) Selenium (Total) Silver (Total) Sodium (Total) Thallium (Total) Tin (Total) Titanium (Total) Uranium (Total) Vanadium (Total) Zinc (Total) Organics Dissolved Organic Carbon Total Organic Carbon 28-Apr-08 8:30 AM 7-Jul-08 9:20 AM 4-Sep-08 2:20 PM BCWQG (b) CCME (c) 408 461 96.8 10.4 8.25 -75.6 614 12 6.5 to 9 6.5 to 9 6.5 to 9 6.5 to 9 15 8.03 11.8 7.9 11.7 8.29 352 5.78 582 12.1 534 12.6 828 7.97 5 0.7 0.01 2 1-2 10 3 0.1 16.4 187 8.33 336 150 222 9 9.4 270 8.37 541 232 338 6.6 8.4 246 8.44 538 240 340 6.2 7.1 404 7.91 807 334 528 <3 0.91 9.5 281 8.38 602 260 390 <3 1.25 7.3 295 8.46 624 262 386 <3 1.01 0.05 0.5 <0.05 1.41 <0.05 2.48 <0.05 2.45 <0.05 7.02 <0.05 3.71 <0.05 3.23 0.02 0.5 0.5 0.093 30.3 66.5 0.116 61.4 <0.5 0.094 134 0.116 85.3 0.113 86.2 0.02 0.005 0.023 0.033 0.031 0.0389 0.024 0.0322 0.031 0.224 <0.02 0.14 0.024 0.0677 0.001 0.001 0.002 0.002 0.05 <0.001 0.0088 0.0022 0.0192 0.0029 0.0104 0.0026 0.0172 0.0015 0.0279 0.025 0.247 0.0315 0.335 <0.001 0.015 0.0169 0.0258 0.177 0.0257 0.299 0.0222 0.277 0.0335 0.221 0.005 0.005 0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.0055 <0.005 <0.005 0.01 0.005-0.01 0.0005-0.001 0.0005-0.001 0.02 0.001-0.002 0.1 0.006 <0.0005 0.00057 0.051 <0.001 <0.1 <0.005 <0.0005 0.00095 0.06 <0.001 <0.1 <0.005 <0.0005 0.00075 0.07 <0.001 <0.1 <0.01 <0.001 <0.001 0.114 <0.002 <0.1 <0.005 <0.0005 0.00076 0.085 <0.001 <0.1 <0.005 <0.0005 0.00075 0.08 <0.001 <0.1 0.1 to e(1.209-2.426*pH+0.286*pH(2)) (k) 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 0.000017-0.000034 <0.000017 <0.000017 <0.000017 <0.000034 <0.000017 0.000031 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.1 0.001-0.002 0.0003-0.0006 0.001-0.002 0.03 0.0005-0.001 0.005-0.01 0.1 0.0003-0.0006 0.00002 0 00002 0.001-0.002 0.001-0.002 2 0.001-0.002 0.00002-0.00004 2 0.0002-0.0004 0.0005-0.001 0.01 0.0002-0.0004 0.001-0.03 50.1 <0.001 <0.0003 0.0026 <0.03 <0.0005 <0.005 15 0.00466 <0.00002 <0 00002 0.0122 <0.001 2 <0.001 <0.00002 8.9 <0.0002 <0.0005 <0.01 0.00046 <0.03 66.6 <0.001 <0.0003 0.0019 <0.03 <0.0005 <0.005 25.1 0.0279 <0 <0.00002 00002 0.0106 <0.001 2.3 <0.001 <0.00002 20.3 <0.0002 <0.0005 <0.01 0.00063 <0.03 60.2 <0.001 <0.0003 0.0017 <0.03 <0.0005 <0.005 23.3 0.0208 <0 <0.00002 00002 0.0103 <0.001 3.3 <0.001 <0.00002 22.5 <0.0002 <0.0005 <0.01 0.00056 <0.03 100 <0.002 <0.0006 <0.002 0.031 <0.001 <0.01 37.1 0.0542 <0 <0.00002 00002 0.0085 <0.002 4.6 <0.002 <0.00004 36.5 <0.0004 <0.001 <0.01 0.00089 <0.002 70.8 <0.001 <0.0003 0.002 <0.03 <0.0005 <0.005 25.3 0.0283 <0 <0.00002 00002 0.01 <0.001 3.5 <0.001 <0.00002 27.2 <0.0002 <0.0005 <0.01 0.00062 0.0019 72.9 <0.001 <0.0003 0.0015 <0.03 <0.0005 <0.005 27.5 0.0207 <0 <0.00002 00002 0.0099 <0.001 3.8 <0.001 <0.00002 28.3 <0.0002 <0.0005 <0.01 0.00063 0.002 0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.005-0.01 0.0005-0.001 0.0005-0.001 0.02 0.001-0.002 0.1 0.000017-0.000034 0.1 0.001-0.002 0.0003-0.0006 0.001-0.002 0.03 0.0005-0.001 0.005-0.01 0.1 0.0003-0.0006 0.00002 0.001-0.002 0.001-0.002 2 0.001-0.002 0.00002-0.00004 2 0.0002-0.0004 0.0005-0.001 0.01 0.0002-0.0004 0.001-0.03 0.005 0.107 <0.0005 0.00059 0.052 <0.001 <0.1 <0.000017 47.7 <0.001 <0.0003 0.0035 0.131 <0.0005 <0.005 14.9 0.0125 <0.00002 0.0121 <0.001 <2 <0.001 <0.00002 8.8 <0.0002 <0.0005 <0.01 0.00046 <0.03 <0.005 0.0894 <0.0005 0.00074 0.063 <0.001 <0.1 <0.000017 67.8 <0.001 <0.0003 0.0032 0.169 <0.0005 <0.005 25.6 0.0459 <0.00002 0.0111 <0.001 2 2.4 4 <0.001 <0.00002 20.8 <0.0002 <0.0005 <0.01 0.00068 <0.03 <0.005 0.0249 <0.0005 0.00073 0.073 <0.001 <0.1 <0.000017 59.3 <0.001 <0.0003 0.0022 0.069 <0.0005 <0.005 22.7 0.0333 <0.00002 0.0103 <0.001 3 3.2 2 <0.001 <0.00002 21.9 <0.0002 <0.0005 <0.01 0.00054 <0.03 <0.005 <0.01 <0.001 <0.001 0.116 <0.002 <0.1 <0.000034 100 <0.002 <0.0006 <0.002 0.068 <0.001 <0.01 37.1 0.0683 <0.00002 0.0084 <0.002 4 4.6 6 <0.002 <0.00004 37 <0.0004 <0.001 <0.01 0.00087 <0.002 <0.005 0.0186 <0.0005 0.00078 0.089 <0.001 <0.1 0.000031 72.7 <0.001 <0.0003 0.0023 0.06 <0.0005 <0.005 26.4 0.0352 <0.00002 0.0099 <0.001 3 3.6 6 <0.001 <0.00002 28.4 <0.0002 <0.0005 <0.01 0.00061 0.002 <0.005 0.0117 <0.0005 0.00073 0.079 <0.001 <0.1 0.000027 71.6 <0.001 <0.0003 0.0016 0.041 <0.0005 <0.005 27.5 0.0255 <0.00002 0.0096 <0.001 3 3.8 8 <0.001 <0.00002 28 <0.0002 <0.0005 <0.01 0.00063 0.002 <0.005 0.5 0.5 6.11 5.35 5.12 6.03 5.39 8.76 Zinc (Dissolved) 223 14-Sep-07 4:45 PM 460 99 10.7 8.02 -103 615 11.9 Ammonium Nitrogen (as N) Nitrate (as N) Cadmium (Dissolved) 18-Jul-07 6:55 AM 548 95 11.4 7.87 Fluoride Sulphate Sulphite Nutrients Nitrite (as N) Orthophosphate (as P) Phosphorus (Dissolved) (as P) Phosphorus (Total) (as P) Total Nitrogen Cyanide Cyanide (Free) Cyanide (Total) Cyanide (WAD) Dissolved Metals Aluminum (Dissolved) Antimony (Dissolved) Arsenic (Dissolved) Barium (Dissolved) Beryllium (Dissolved) Boron (Dissolved) 1-May-07 7:00 AM MDL 600 0.2 to 0.3 (g) 100 0.681 to 28.3 (h,i) 200 0.06 to 0.6 (j) 0.005 0.11 (0.094*(Hardness)+2)/1000 (g) 0.3 0.003 to e(1.273*ln(Hardness)- 0.002 to 0.004 (g) 0.3 0.001 to 0.007 (g) (0.01102*Hardness)+0.54 (g) 0 0.0001 0001 2 0.025 to 0.150 (g) 0 0.000026 000026 0.073 0.025 to 0.15 (g) 0.002 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.006 (33+0.75*(Hardness-90))/1000 to 0.033 (g) 0.005 5 0.0053 1.2 0.005 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.11 (0.094*(Hardness)+2)/1000 (g) 0.3 0.003 to e(1.273*ln(Hardness)- 0.002 to 0.004 (g) 0.3 0.001 to 0.007 (g) (0.01102*Hardness)+0.54 (g) 0.0001 2 0.025 to 0.150 (g) 0.000026 0.073 0.025 to 0.15 (g) 0.002 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.006 (33+0.75*(Hardness-90))/1000 0.03 NOTES: (g) HARDNESS DEPENDENT. (b) BCWQG - BC WATER QUALITY GUIDELINES FOR FRESHWATER AQUATIC LIFE (AUGUST 2006). (h) pH (In Situ) DEPENDENT. (c) CCME - CANADIAN WATER QUALITY GUIDELINES FOR THE PROTECTION OF AQUATIC LIFE. (DECEMBER 2006). (i) TEMPERATURE (In Situ) DEPENDENT. (d) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG (j) CHLORIDE DEPENDENT. (e) BOLD INDICATES THE VALUE EXCEEDS THE CCME GUIDELINES (k) pH DEPENDENT. (f) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG & CCME 0 23JUL'10 REV DATE ISSUED WITH REPORT VA101-246/8-1 DESCRIPTION RP JEM RCB PREP'D CHK'D APP'D 0.03 0.005 to 0.1 (k) M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 6.9 Water Quality CC02.xlsx]Table 6.9 (a) UNITS ARE mg/L, UNLESS OTHERWISE STATED. 0.0536 to 185 (h,i) 13 0.06 TABLE 6.10 KGHM AJAX MINING INC. AJAX PROJECT SAMPLE SUMMARY & STATISTICS FOR CC08 Print Feb/03/11 14:25:02 1-May-07 8:45 AM 18-Jul-07 7:30 AM 14-Sep-07 4:00 PM 28-Apr-08 9:00 AM 7-Jul-08 9:55 AM 4-Sep-08 1:45 PM BCWQG (b) CCME (c) 158 233 166 11.8 8.34 10.2 7.82 12.9 8.6 107 94.1 13 8.2 6.5 to 9 300 13.3 228 10.3 333 2.02 212 89.4 9.85 8.21 -92.9 290 11 6.5 to 9 252 5.46 220 96.6 10.6 8.16 -106 299 11.3 5 0.7 0.01 2 1-2 10 3 0.1 20.7 133 8.31 230 108 161 3 18.4 158 8.29 280 135 186 3.1 15.1 118 8.32 232 130 149 4.7 7.7 182 8.11 333 158 195 10.4 3.08 15.1 153 8.36 290 143 197 <3 0.22 9.7 153 8.34 292 149 179 <3 0.51 6.5 to 9 6.5 to 9 0.05 0.5 <0.05 0.54 <0.05 <0.5 <0.05 0.55 <0.05 0.95 <0.05 0.66 <0.05 0.62 0.02 0.5 0.5 0.067 14.6 13.4 0.069 3.4 <0.5 0.094 25.3 0.083 11.3 0.076 8.4 600 0.2 to 0.3 (g) 100 Ammonium Nitrogen (as N) Nitrate (as N) 0.02 0.005 <0.02 0.0082 0.03 0.0634 0.031 0.0379 <0.02 0.167 <0.02 0.0085 0.036 <0.005 0.681 to 28.3 (h,i) 200 Nitrite (as N) Orthophosphate (as P) Phosphorus (Dissolved) (as P) Phosphorus (Total) (as P) Total Nitrogen Cyanide Cyanide (Free) Cyanide (Total) Cyanide (WAD) Dissolved Metals 0.001 0.001 0.002 0.002 0.05 <0.001 0.0039 <0.001 0.0109 <0.001 0.0076 <0.001 0.0108 <0.001 0.0117 0.06 to 0.6 (j) 0.0105 0.232 0.0198 0.307 <0.001 0.0094 0.0122 0.0194 0.18 0.0213 0.243 0.0226 0.215 0.0155 0.14 0.005 0.005 0.005 0.0065 0.006 <0.005 <0.005 <0.005 <0.005 0.0061 <0.005 <0.005 0.0061 <0.005 <0.005 0.01 Aluminum (Dissolved) Antimony (Dissolved) Arsenic (Dissolved) Barium (Dissolved) Beryllium (Dissolved) Boron (Dissolved) 0.005 0.0005 0.0005 0.02 0.001 0.1 <0.005 <0.0005 <0.0005 0.04 <0.001 <0.1 <0.005 <0.0005 <0.0005 0.043 <0.001 <0.1 <0.005 <0.0005 <0.0005 0.04 <0.001 <0.1 <0.005 <0.0005 <0.0005 0.055 <0.001 <0.1 <0.005 <0.0005 <0.0005 0.055 <0.001 <0.1 <0.005 <0.0005 <0.0005 0.052 <0.001 <0.1 0.1 to e(1.209-2.426*pH+0.286*pH(2)) (k) 0.005 to 0.1 (k) 0.005 5 0.0053 1.2 0.005 Cadmium (Dissolved) Calcium (Dissolved) Chromium (Dissolved) Cobalt (Dissolved) 0.000017 0.1 0.001 0.0003 <0.000017 41.1 <0.001 <0.0003 <0.000017 47.4 <0.001 <0.0003 <0.000017 35.2 <0.001 <0.0003 <0.000017 54.1 <0.001 <0.0003 <0.000017 45.7 <0.001 <0.0003 0.000027 45.9 <0.001 <0.0003 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) Copper (Dissolved) Iron (Dissolved) 0.001 0.03 0.0025 <0.03 0.0026 <0.03 0.0024 <0.03 0.0016 <0.03 0.0029 <0.03 0.0025 <0.03 (0.094*(Hardness)+2)/1000 (g) 0.3 0.002 to 0.004 (g) 0.3 Lead (Dissolved) Lithium (Dissolved) Magnesium (Dissolved) 0.0005 0.005 0.1 <0.0005 <0.005 7.48 <0.0005 <0.005 9.68 <0.0005 <0.005 7.31 <0.0005 <0.005 11.3 <0.0005 <0.005 9.54 <0.0005 <0.005 9.28 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.001 to 0.007 (g) Manganese (Dissolved) Mercury (Dissolved) Molybdenum (Dissolved) 0.0003 0.00002 0 001 0.001 <0.0003 <0.00002 0 0122 0.0122 0.00144 <0.00002 0 0111 0.0111 0.0007 <0.00002 0 0057 0.0057 0.00033 <0.00002 0 0103 0.0103 0.00159 <0.00002 0 0106 0.0106 0.00074 <0.00002 0 0087 0.0087 (0.01102*Hardness)+0.54 (g) 0.0001 2 0.000026 0 073 0.073 Nickel (Dissolved) Potassium (Dissolved) Selenium (Dissolved) 0.001 2 0.001 <0.001 <2 <0.001 <0.001 <2 <0.001 <0.001 <2 <0.001 <0.001 <2 <0.001 <0.001 <2 <0.001 <0.001 <2 <0.001 0.025 to 0.150 (g) 0.025 to 0.15 (g) 0.002 Silver (Dissolved) Sodium (Dissolved) Thallium (Dissolved) Tin (Dissolved) Titanium (Dissolved) Uranium (Dissolved) Vanadium (Dissolved) 0.00002 2 0.0002 0.0005 0.01 0.0002 0.001-0.03 <0.00002 3.1 <0.0002 <0.0005 <0.01 <0.0002 <0.03 <0.00002 3.2 <0.0002 <0.0005 <0.01 <0.0002 <0.03 <0.00002 3.4 <0.0002 <0.0005 <0.01 <0.0002 <0.03 <0.00002 4.5 <0.0002 <0.0005 <0.01 0.00051 <0.001 <0.00002 4.2 <0.0002 <0.0005 <0.01 <0.0002 0.0013 <0.00002 4 <0.0002 <0.0005 <0.01 <0.0002 0.0013 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 (33+0.75*(Hardness-90))/1000 to 0.033 (g) Aluminum (Total) Antimony (Total) Arsenic (Total) Barium (Total) Beryllium (Total) Boron (Total) 0.005 0.0005 0.0005 0.02 0.001 0.1 0.0391 <0.0005 <0.0005 0.039 <0.001 <0.1 0.0549 <0.0005 <0.0005 0.04 <0.001 <0.1 0.0339 <0.0005 <0.0005 0.041 <0.001 <0.1 0.0737 <0.0005 <0.0005 0.051 <0.001 <0.1 0.0106 <0.0005 <0.0005 0.056 <0.001 <0.1 <0.005 <0.0005 <0.0005 0.052 <0.001 <0.1 Cadmium (Total) Calcium (Total) Chromium (Total) Cobalt (Total) 0.000017 0.1 0.001 0.0003 <0.000017 39.4 <0.001 <0.0003 <0.000017 45 <0.001 <0.0003 0.00002 34.5 <0.001 <0.0003 0.000034 51.7 <0.001 <0.0003 <0.000017 45.8 <0.001 <0.0003 Copper (Total) Iron (Total) 0.001 0.03 0.0028 0.068 0.003 0.092 0.0027 0.06 0.0027 0.121 Lead (Total) Lithium (Total) Magnesium (Total) 0.0005 0.005 0.1 <0.0005 <0.005 7.32 <0.0005 <0.005 9.17 <0.0005 <0.005 7.21 Manganese (Total) Mercury (Total) Molybdenum (Total) 0.0003 0.00002 0.001 0.00225 <0.00002 0.0125 0.00458 <0.00002 0.0109 Nickel (Total) Potassium (Total) ( ) Selenium (Total) 0.001 2 0.001 <0.001 <2 <0.001 Silver (Total) Sodium (Total) Thallium (Total) Tin (Total) Titanium (Total) Uranium (Total) Vanadium (Total) 0.00002 2 0.0002 0.0005 0.01 0.0002 0.001-0.03 Date Sampled Time Sampled In Situ Parameters Conductivity (In Situ) (uS/cm) Dissolved Oxygen (In Situ) (%) Dissolved Oxygen (In Situ) pH (In Situ) Redox Potential (In Situ) (mV) Specific Conductivity (In Situ) (uS/cm) Temperature (In Situ) (°C) Physical Tests Color (TCU) Hardness pH Specific Conductivity (uS/cm) Total Alkalinity (as CaCO3) Total Dissolved Solids Total Suspended Solids Turbidity (NTU) Dissolved Anions Bromide Chloride Fluoride Sulphate Sulphite Nutrients Zinc (Dissolved) Total Metals Zinc (Total) Organics Dissolved Organic Carbon Total Organic Carbon MDL --------------- 0.005 0.11 0.006 0.005 5 0.0053 1.2 0.005 0.000027 45.6 <0.001 <0.0003 10(0.86*(log(Hardness))-3.2)/1000 (g) 10(0.86*(log(Hardness))-3.2)/1000 (g) 0.003 <0.03 0.0025 <0.03 (0.094*(Hardness)+2)/1000 (g) 0.3 0.002 to 0.004 (g) 0.3 <0.0005 <0.005 10.9 <0.0005 <0.005 9.56 <0.0005 <0.005 9.44 0.003 to e(1.273*ln(Hardness)-1.460)/1000 (g) 0.001 to 0.007 (g) 0.00375 <0.00002 0.0057 0.00515 0.000494 0.0099 0.00194 <0.00002 0.0105 0.00103 <0.00002 0.0087 (0.01102*Hardness)+0.54 (g) 0.0001 2 0.000026 0.073 <0.001 <2 <0.001 <0.001 <2 <0.001 <0.001 <2 <0.001 <0.001 <2 <0.001 <0.001 <2 <0.001 0.025 to 0.150 (g) 0.025 to 0.15 (g) 0.002 <0.00002 3.1 <0.0002 <0.0005 <0.01 <0.0002 <0.03 <0.00002 3 <0.0002 <0.0005 <0.01 <0.0002 <0.03 <0.00002 3.3 <0.0002 <0.0005 <0.01 <0.0002 <0.03 <0.00002 4.2 <0.0002 <0.0005 <0.01 0.00053 0.0014 <0.00002 4.1 <0.0002 <0.0005 <0.01 <0.0002 0.0013 <0.00002 4.1 <0.0002 <0.0005 <0.01 <0.0002 0.0013 0.0001 to 0.003 (g) 0.001 0.0001 0.0003 0.0008 0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 (33+0.75*(Hardness-90))/1000 to 0.033 (g) 0.5 0.5 8.52 8.21 5.8 7.89 6.81 9.52 0.11 0.006 NOTES: (a) UNITS ARE mg/L, UNLESS OTHERWISE STATED. (g) HARDNESS DEPENDENT. (b) BCWQG - BC WATER QUALITY GUIDELINES FOR FRESHWATER AQUATIC LIFE (AUGUST 2006). (h) pH (In Situ) DEPENDENT. (c) CCME - CANADIAN WATER QUALITY GUIDELINES FOR THE PROTECTION OF AQUATIC LIFE. (DECEMBER 2006). (i) TEMPERATURE (In Situ) DEPENDENT. (d) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG (j) CHLORIDE DEPENDENT. (e) BOLD INDICATES THE VALUE EXCEEDS THE CCME GUIDELINES (k) pH DEPENDENT. (f) BOLD INDICATES THE VALUE EXCEEDS THE BCWQG & CCME 0 23JUL'10 DATE ISSUED WITH REPORT VA101-246/8-1 DESCRIPTION 0.03 0.005 to 0.1 (k) M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 6.10 Water Quality CC08.xlsx]Table 6.10 REV 0.0536 to 185 (h,i) 13 0.06 RP JEM RCB PREP'D CHK'D APP'D 0.03 TABLE 6.11 KGHM AJAX MINING INC. AJAX PROJECT WILDLIFE: POTENTIAL SPECIES OF CONCERN Print Feb/03/11 14:26:51 Species American Avocet (Recurvirostra americana ) American Bittern (Botaurus lentiginosus ) American Badger (Taxidea taxus) Barn Swallow (Hirundo rustica) Bighorn Sheep (Ovis canadensis) Bobolink (Dolichonyx oryzivorus) Brewer's Sparrow, breweri subspecies (Spizella breweri breweri) Burrowing Owl (Athene cunicularia) Canyon Wren (Catherpes mexicanus) Fisher (Martes pennant) Flammulated Owl (Otus flammeolus) Fringed Myotis (Myotis thysanodes) Great Basin Gopher Snake (Pituophis catenifer deserticola) Great Basin Pocket Mouse (Perognathus parvus) Great Basin Spadefoot (Spea intermontana) Great Blue Heron, herodias subspecies (Ardea herodias herodias) Grizzly Bear (Ursus arctos) Lark Sparrow (Chondestes grammacus) Lewis's Woodpecker (Melanerpes lewis) Long-billed Curlew (Numenius americanus) Monarch (Danaus plexippus) p g g ((Hemphillia p camelus)) Pale Jumping-slug Peregrine Falcon, anatum subspecies (Falco peregrinus anatum) Prairie Falcon (Falco mexicanus) Rubber Boa Charina bottae) Sharp-tailed Grouse, columbianus subspecies Tympanuchus phasianellus columbianus) Short-eared Owl (Asio flammeus) Silky Vallonia (Vallonia cyclophorella) Spotted Bat (Euderma maculatum) Swainson's Hawk (Buteo swainsoni) Townsend's Big-eared Bat (Corynorhinus townsendii) Umbilicate Sprite (Promenetus umbilicatellus) Western Grebe (Aechmophorus occidentalis) Western Painted Turtle (Chrysemys picta pop. 2) Western Rattlesnake (Crotalus oreganus) Western Screech-Owl, macfarlanei subspecies (Megascops kennicottii macfarlanei) Western Small-footed Myotis (Myotis ciliolabrum) Williamson's Sapsucker, thyroideus subspecies (Sphyrapicus thyroideus thyroideus) Wolverine, luscus subspecies (Gulo gulo luscus) Western Toad (Bufo boreas) BC Status1 Red Blue Red Blue Blue Blue Red Red Blue Blue Blue Blue Blue Red Blue Blue Blue Red Red Blue Blue Blue Red Red Yellow Blue Blue Blue Blue Red Blue Blue Red Blue Blue Red Blue Red Blue Yellow M:\1\01\00246\08\A\Report\1- Project Description\Rev 1\Tables\[Table 6.11 Wildlife Potential Species of Concern.xlsx]Table 6.11 NOTE: 1. REFERENCE: CDC, 2010 0 REV 23JUL'10 DATE ISSUED WITH REPORT 101-246/8-1 DESCRIPTION KEF PREP'D TS CHK'D RCB APP'D SARA No Status No Status Schedule 1 Endangered No Status No Status No Status No Status Schedule 1 Endangered No Status No Status Schedule 1 Special Concern Schedule 3 Special Concern Schedule 1 Threatened No Status Schedule 1 Threatened No Status No Status No Status Schedule 1 Special Concern Schedule 1 Special Concern Schedule 1 Special Concern No Status Schedule 1 Threatened No Status Schedule 1 Special Concern No Status Schedule 3 Special Concern No Status Schedule 1 Special Concern No Status No Status No Status No Status Schedule 1 Special Concern Schedule 1 Threatened Schedule 1 Endangered No Status Schedule 1 Endangered No Status Schedule 1 Special Concern