Marking, Preservation, Packaging and Shipping

Transcription

Marking, Preservation, Packaging and Shipping
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
Document Revision Chart
The following chart lists the revisions made to this document tracked by version.
#.
Section Modified and Revision Description
#
1.0 New Document
GE PROPRIETARY
Date
Author
06/22/2010
M. Limousin
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 1 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
1.0
PURPOSE:
2.0
SCOPE: This document applies to all Equipment shipments made by Suppliers to GE
Water facilities or directly to Site installations, where specified in the Purchase
Order. It also applies to equipment shipped from GE Water facilities to
Customer Sites, where specified in the Customer or Project requirements.
3.0
RESPONSIBILITIES:
3.1
The following departments are responsible for compliance to this document in
their respective areas:
• Engineering
• Sourcing
• Shipping
4.0
DEFINITIONS:
4.1
General:
1)
Domestic: The transfer (merchandise/commodity) within a country.
2)
Export –Overland: To carry or send (merchandise/commodity) to some
other country or outside an economic union using overland transport.
3)
Export – Overseas: To carry or send (merchandise/commodity) to some
other country or outside an economic union using overland and oversea
transport
4)
External Supplier: A supplier that is outside of GE Water & Process
Technologies.
5)
Import: To bring (merchandise/commodity) into a place or country from
another country.
6)
Internal Supplier: A supplier that is from within GE Water (a
Manufacturing department).
7)
Supplier: The individual, company, corporation, sole proprietorship, or
partnership that is being requested to provide a specific product in
accordance with this specification.
4.2
To document the general requirements for original planned shipments of GE
Water equipment and material sent to/from a GE Water facility, fabricator, export
packager or directly to site (for both inbound and outbound project shipments).
General packaging, marking, preserving, and shipping requirements for domestic
and international shipments are outlined.
Packaging:
1)
Compressive Creep: The gradual loss of thickness that may occur if a
cushioning material is placed under a constant load for a long time.
Product loosens in its cushion and becomes vulnerable to excessive
GE PROPRIETARY
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 2 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
2)
3)
4)
5)
6)
7)
8)
9)
10)
movement. Spreading the load over a larger area of cushioning usually
reduces the risk of compressive creep.
Hazardous Materials: Any material that poses a present or potential
hazard to the health or safety of humans or to the environment. GE Water
manufacturers are required to prepare Materials Safety Data Sheets
(MSDSs) for all hazardous materials. A material may be considered
hazardous because of its quantity, concentration, or physical or chemical
characteristics.
Hygroscopic: Taking up and retaining moisture.
Maximum Container ID: The maximum size that can be safely handled by
the mode of transport selected.
Oversized: Merchandise or Commodity that, due to the size or weight,
must use specialized transportation - sometimes referred to as overdimensional freight.
Packaging: The application and use of adequate protective measures to
prevent damage during transportation and storage, including application
of package wraps, cushioning, and complete identification markings.
Packing: The final placement of items or packages in exterior shipping
containers or other media, including necessary blocking, bracing,
cushioning, weatherproofing, exterior strapping, and marking.
Preserving: Method used to maintain the quality, fit, function, and form of
the item being shipped.
Protective Coatings: Provide a barrier against oxygen and water.
Materials that have extremely low permeability are best able to minimize
corrosion to metal surfaces.
Shipping Crate/Package Weight Limit: The maximum weight that can be
safely transported on or in a package of given size and structural makeup.
Follow the crate guidelines in Section 6.5 Packaging.
5.0
RECORD RETENTION: This document creates a quality record; see the Index for specific
information.
6.0
PROCEDURE:
6.1
COMMUNICATION
1)
Supplier questions should be directed to the GE Water Buyer.
2)
The GE Water Buyer then directs questions to the appropriate department.
3)
The Supplier submits any deviations from this Procedure to the GE Water
Buyer for approval prior to shipment.
6.2
PRESERVING
1)
Requirements
GE PROPRIETARY
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 3 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
a)
2)
3)
GE PROPRIETARY
Products susceptible to corrosion must be packaged in a dry noncorrosive environment for the duration of shipment and any
specified storage interval.
b)
The degree of protection depends on the item being packaged.
Cleaning
a)
Before application of preservative materials, all surfaces that
require protection from corrosion are cleaned with solvents or
detergents for removal of oil, grease, salts, dirt, fingerprints, and
contaminants.
1.
Solvents that contain chlorofluorocarbons (CFC’s),
trichloroethane, or other ozone depleting compounds are
not used.
2.
Solvents used must be Environmental Health & Safety
reviewed with effort given to eliminate dangerous products,
replacing them with products that minimize user’s exposure
risk.
3.
Cleaned parts are handled with clean gloves to avoid recontamination before, during and after preservation
b)
After cleaning, immediately dry to remove cleaning solutions or
any remaining moisture left on the commodity or part to be
preserved. Use clean cloths, heat lamps or a drying room.
c)
Finally, place the unit in a low humidity environment prior to the
packaging of the unit, allowing excess moisture to evaporate.
NOTE: The period of time depends on moisture present on the unit
and within the environment.
d)
Other processes are acceptable, pending GE approval.
Selection and Application
a)
Items not covered by GE Water specifications are preserved and
protected for the duration of the shipment and the storage cycle is
determined by the GE Water contract.
1.
Preservation agents that do not meet the ordering
specification must be submitted for approval from GE Water
and annotation on the storage preservation docket of the
required time intervals for reapplication.
2.
Any preservation agent and method of removal must
always be included with all commodity shipments and longterm storage procedures.
b)
Unless otherwise specified, in the ordering sheet or purchase order,
the equipment is painted and preserved per the applicable GE
Water Process Specification. Resolution of conflicts in documents
or clarifications should be directed to the GE Water Sourcing.
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 4 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
d)
e)
4)
5)
GE PROPRIETARY
All machined surfaces of materials susceptible to atmospheric
corrosion require preservation and protection.
1.
Typical corrosion preservative materials include VPI (Vapor
Phase Inhibitor) or VCI (Vapor Corrosion Inhibitor)
impregnated materials such as papers, foams, plastics, oils,
thin film and waxy coatings.
2.
Preservative material must easily be removed with
approved solvents or other suitable cleaning methods,
before unit installation and operation.
In all cases, appropriate quantities of suitable and compatible
corrosion preservative materials are used. Preservative
manufacturer's instructions for use and application are used. If
there is any doubt about product compatibility with equipment
during shipment and storage, consult the product manufacturer or
GE Water Sourcing.
Plated and Bare Metal Surfaces
a)
Plated and bare metal surfaces must be protected from direct
contact with wood or fiberboard using a durable non-hygroscopic
material.
1.
Bare metal and plated surfaces must be properly and
adequately preserved against corrosion and discoloration.
2.
Metal surfaces that are susceptible to corrosion should be
finished, painted, or coated to provide permanent
protection.
NOTE: Gases require special approval by the GE Water
Buyer due to the potential hazards.
b)
Coatings for metal need to:
1.
Produce uniform high resistance to electrical current,
2.
Be pore-free,
3.
Have excellent adhesion,
4.
Be resistant to damage from impact and abrasion,
5.
Be resistant to moisture absorption,
6.
Be splash resistant to product spills, and
7.
Resist degradation with time and exposure to the
environment.
Protection of Critical Surfaces and Openings
a)
All machined, bright finished, or other critical surfaces are protected
by preserving, wrapping, capping, plugging, blocking, covering,
and/or other suitable methods to protect against corrosion, dust,
moisture, abrasion, or any other damage that is detrimental to the
appearance and/or function of the part or equipment. These
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 5 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
6)
7)
8)
GE PROPRIETARY
surfaces must be protected for the duration of the transport and
storage cycle of the GE Water product.
b)
Pressure sensitive adhesive tape can only be used when approved
by the GE Water Engineer.
1.
Tape may be used to secure plastic bags or plastic
coverings only as temporary covers.
2.
Tape may not leave adhesive residue on any surface after
being removed.
c)
Blind Holes (open one end only) and through holes (open both ends)
must contain an appropriate amount of VCI containing material.
These holes must then be sealed or capped in accordance with this
specification. Note that through holes must be capped or plugged
at both ends.
Pipes/Metal Rods/Similar Items
a)
It is critical that sub-components and assemblies be protected
against corrosion during the shipment and storage of these items
to include protection externally as well as internally with items such
as pipes/hollow rods.
b)
Items not covered by GE Water specifications are preserved and
protected for the duration of the shipment, and the storage cycle is
to be determined by the GE Water contract. Preservation agents
that do not meet the ordering specification must be submitted for
approval from the Buyer and annotation on the storage docket of
the required time intervals for reapplication.
External Thread Protection
a)
Protect all external threads greater than 1” diameter from physical
damage with a suitable non-hygroscopic thread protection
material such as plastic shielding, wax impregnated fiberboard, or
other suitable protective material.
b)
Materials such as untreated fiberboard or wood are not in direct
contact with metal surfaces.
Electrical Equipment
a)
A suitable quantity of a VCI impregnated material is placed inside
all electrical control cabinets, junction boxes, breaker panels, and
other similar electrical equipment, that contain electrical
instrumentation, terminal strips, switches, relays, etc., for all
shipments.
b)
The VCI product may or may not need to be removed prior to
equipment operation depending upon the type used and the
equipment being protected. If VCI product must be removed before
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 6 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
equipment operation, then there should be clear and easily visible
instructions indicating this.
9)
Gaskets
a)
10)
Synthetic gasket materials are appropriately wrapped to minimize dust
contamination and exposure to sunlight.
Barrier and Wrapping
a)
General
1.
b)
GE PROPRIETARY
It is designed to exclude or retain water, water vapor,
grease, or certain gases within or outside of the package.
The type and amount used depends on the expected
relative humidity & exposure time.
• Plastic Barrier Materials - Short term only, moisture
migrates through quickly.
• Foil Laminated Barrier Materials - Long term solution,
moisture migrates through slowly
• Tap Sealed Joints - Short term moisture protection for
barrier joints
• Heat Sealed Joints - Long-term moisture protection for
barrier joints.
• Vacuum Pack - Air pressure is removed from the interior
of the barrier material, joints are heat sealed, and
desiccants are always used.
2.
Wooden braces should always be placed on the outside of
the barrier bag and positioned so that puncture to the
barrier bag will not occur.
3.
Exposure of finished and unfinished surfaces to hygroscopic
materials or materials that contain moisture must be
avoided unless proper precautions are taken.
4.
Never seal wood or other high moisture cellulose products in
a barrier bag environment.
Shrink Wrap
1.
The Heat shrink-wrap must be blue or white and have a
minimum thickness of 7 mils. Transparent shrink-wrap,
often called cling wrap, is not allowed for covering
equipment. A VCI Poly film is recommended due to its
corrosion resistance properties.
2.
Ensure that water does not become trapped and corrode
the commodity and ensure that the manufacturers
recommendations for application are followed.
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 7 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
3.
Shrink-wrap can be used as an alternative to crating of
enclosed structural members and fluid system skids.
11)
Desiccants
a)
These are best if used in a closed/sealed moisture barrier or a
rigid/sealed container. Desiccant cannot be used in the same
enclosed space as VCI Products.
1.
Desiccant must not contact the commodity, and should be
evenly dispersed within the package.
2.
In selecting a desiccant, the following must be considered:
• Air space size
• Nature/type of the material to be used
• Moisture surrounding the package
• Desired shelf/storage life
• Atmospheric conditions when/where the package is
sealed.
b)
The minimum quantity of desiccant to be placed inside a bag is
determined from the manufacturer’s recommendation.
c)
In large enclosed areas, desiccant bags are suspended to allow
moisture collection away from material. If the supplier is unable to
self-determine if a desiccant should be used, then contact the GE
Water Engineer.
d)
Clay Desiccants: They are made from montmorillonite clay, which
has a special affinity for moisture. Clay desiccants are naturally
occurring, non-hazardous, moisture adsorbent substances. This
clay is chemically inert and non-corrosive. The layered structure
attracts and absorbs moisture onto the surface and between the
layers of the clay.
e)
Silica Gel: This is silicon dioxide (SiO2), an amorphous form of silica.
Two important properties of silica gel are that it is non-toxic and
non-corrosive.
f)
Molecular Sieve: This is a manufactured crystalline version of Elite
and is a non-hazardous material.
12)
Humidity Indicators
a)
b)
GE PROPRIETARY
They must be used when specified by Purchase Order or Project
requirements for items requiring desiccant, i.e. instruments, electrical
equipment, electronics. Place a humidity indicator behind an inspection
window or immediately within the closing edge of the barrier material
and as far as practicable from the nearest unit of desiccant. See Figure 1.
Use a three-spot paper card type 1x4 inches in size or approved
alternative. The spots indicate relative humidity of 30 percent, 20 percent,
and 10 percent, top to bottom, by changing color from blue to pink.
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 8 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
Figure 1
6.3
STORING
1)
Requirements
a)
b)
2)
3)
Minimum specified by Purchase Order or Project requirements.
Proper amounts of desiccants, VCI to be used according to cube of
interior space. If the supplier is unable to self-determine if a desiccant
should be used, then contact the GE Water Engineer.
c)
Properly marked to identify “indoor” or “outdoor” storage - waterproof
stenciling to prevent deterioration from water or sun.
Packaging
a)
Easy access for maintenance of commodity and preservation material.
Preservation Docket
a)
b)
c)
6.4
For all items going into storage (regardless of storage duration), the
supplier (or GE Water Shipping Department for internal shipments)
provides a preservation docket (checklist) on the outside of the product or
container next to the packing list.
This docket allows for the written summary of all maintenance
requirements for internal/external storage. (See the Preservation Docket
form – Control #215-001-001 for a sample maintenance requirement
document.)
The written summary includes:
•
Inception date of storage,
•
Preservation maintenance requirement schedule/history,
•
Equipment maintenance requirement schedule/history,
•
Expected date of removal from storage.
PACKING
GE PROPRIETARY
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 9 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
1)
2)
3)
Unit and Accessories - All packaged items must:
a)
Be secure in carton or crate with bracing & blocking in place.
b)
Never exceed the recommended weight for a package or skid.
c)
Have all internal and external documentation in place.
d)
Have shock & vibration protection in place. Contact GE Water
Engineer if questions arise if shock and vibration protection is
needed.
e)
Have the proper markings on the shipping container for domestic
or international shipments.
f)
Utilize color-coded packaging items that are attached to the unit or
accessories that can be removed and discarded i.e. shipping nuts,
screws, general shipping hardware (yellow is universal color).
g)
Have unit protected against corrosion (preservation).
h)
Have proper handling/cautionary labels attached.
i)
Be securely closed (all containers).
j)
Accessories properly packaged.
k)
Protect from corrosion.
Bundling/Strapping
a)
One must create a block or solid unit of cargo for shipping,
designed to permit forklift and sling access, and limited to items up
to 3500 lbs. See Figure 2.
b)
One must use a heavy-duty steel strapping/banding, tempered for
maximum tensile strength and ductility and able to absorb impact
shocks without breaking. A heavy-duty steel banding straps with
width and thickness dimensions of 1-1/4” x .035” or greater, are
recommended.
c)
A skid specifically designed to fit the bundled item(s) is placed under
the straps to permit forklift and sling access. See Figure 3 below.
d)
A non-hygroscopic material must separate all steel banding from
the commodity. Banding and clips that are to be used directly over
the product with the non-moisture absorbing material separation
must be galvanized. Standard banding that is in compliance with
this specification may be used in applications over properly
packaged items, crates, and wooden boxes.
Piping
a)
b)
Openings must be securely covered during transport and storage and
easily reattached to allow removal for inspections.
Piping is supported in such a way to allow forklift or sling access when
unloaded at the site and prevent direct placement on the ground.
** Bundling - steel banding placement of single shape items or for items that have no trouble
with handling,transport, or storage
PAGE 10 OF 33
GE PROPRIETARY
UNCONTROLLED
WHEN
PRINTED
OR & Single shaped items
** Corrosion preservation required
for shipment
& storage
of pipes
TRANSMITTED ELECTRONICALLY
** Pipes must be sealed with a yellow cap both ends (yellow tape can be added to plain white
cap's surface)
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
Figure 2
GE PROPRIETARY
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 11 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
Figure 4
Bundling (steel banding) for structural
steel, walkways, or fabricated assemblies
Non-hygroscopic shock absorbing sheeting is required
between all surfaces of items / abraision protection is
required. PLace under banding & between items as shown.
All Bundled Items must be
secured on an
appropriate sized skid
using steel banding.
Forklift Access
Figure 3
GE PROPRIETARY
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 12 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
Figure 4
Figure 5
Butt Weld Pipe Ends
Covers to be made from galvanized or stainless
steel
Butt Weld Pipe Ends
Covers to be made from Plastic
Butt Weld Pipe Ends
Covers to be made from Plastic
Figure 6
GE PROPRIETARY
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 13 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
4)
6.5
Reels
a)
Large reels are blocked and braced on all 4 sides
b)
Small reels fewer than 2 feet in diameter are boxed.
5)
Temporary Shipping Covers/Dust Cover
a)
These are used to keep dust, moisture and other contaminants
away from items being shipped.
b)
These covers must be brightly colored (yellow preferred) so that
they can be easily identified and removed when required. See
Figures 4, 5 and 6 above. The plastic inserts shown in Figure 6
should be positively secured with a plate or other means to prevent
cracking and/or loss during transport or storage.
c)
PACKAGING
1)
Packaging Guide - Refer to Table 1 below.
PRODUCTS - TRANSPORT - PARTICULAR SPECIFICATIONS
Metallic equipment in general (for example chimneys, cyclones,
hoppers, filters, heat exchangers, tanks, silos etc.)
•
•
without applied instrumentation or insulation
volume > 5 m³ (15 cubic ft)(Export only due to oversized shipping
costs)
• without applied instrumentation or insulation
• volume ≤ 5 m³ (15 cubic ft).
• with applied instrumentation (e.g. pressure gauges, electrovalves,
etc.) or insulated
• of any volume or dimensions
Non-metallic equipment in general (e.g. glass fibre reinforced plastic
tanks, silos in PVC, plastic constructions etc.)
• conventional sea transport / air transport
• sea transport in container / road transport / railway transport
Accessories, parts, spare parts
Machinery in general (e.g. agitators, centrifuges, generators, pumps, lift
trucks, mixers, cranes and hoists, compressors, noise control cabins
etc.)
GE PROPRIETARY
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PACKAGE
SADDLES
CRATE
CASE
CRATE
SADDLES / PALLET
CASE
CASE
PAGE 14 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
PRODUCTS - TRANSPORT - PARTICULAR SPECIFICATIONS
Packages (e.g. turbines, compressors, generating sets, furnaces, bag
filters, boilers, alternators, extruders, palletizers, pneumatic haulage
units, water treatment units, lifts and goods lifts, refrigerating groups,
air conditioning systems, fire fighting systems, electric transformers,
etc.)
• any type of transport
• with possible intermediate storages
• road / railway transport
• without intermediate storages
• without instrumental equipment sensitive to dust or humidity
Instrumental laboratory and electric equipment sensitive to dust or
humidity (e.g. electric motors with protection < IP 54, electric panels,
transformer etc.)
Instrumental laboratory and electric equipment insensitive to dust or
humidity (e.g. electric motors with protection ≥ IP 54, pressure gauges
etc.)
Electrical cables wound in reels
• Ф > 80 cm (30 inches)
• Ф ≤ 80 cm (30 inches)
Cable trays (with small parts pre-packed in small-sized cases)
Fiber glass protective boxes without electrical and instrumental
components inside
Plates
Quick couplings
Bolts and tie rods
Expansion bends
Flanges
Gaskets
Fittings
Piping valves and relevant accessories
Lugs
Manifolds
Pre-fabricated steel structural works and structural shapes with sturdy
carrying structure ≤ 5 mm thick ( ¼ inch)
Stairs, ladders, guards, parapets, handrails, steps, gratings whether
shaped or not, cable trays, chequered and/or pre-coated plates
Calendered plates and bearings that can be easily piled up
Pipes and piping in general: conduit pipes, stainless steel or other metal
pipes, nonmetallic pipes in general (PVC, fiber glass), pre-fabricated
piping, standard or coated carbon steel pipes of diameter up to DN80
(3")
GE PROPRIETARY
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PACKAGE
CASE
CRATE
CASE
CASE
STAVED REEL
CRATE
CRATE
PALLET
CASE
CRATE
PAGE 15 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
PRODUCTS - TRANSPORT - PARTICULAR SPECIFICATIONS
Pre-fabricated steel structural works and structural shapes with sturdy
carrying structure > 5 mm thick (1/4 inch)
Standard or coated carbon steel pipes of diameter over DN80 (3")
Products that are not dangerous (see the safety sheet - point 14; e.g.
refractory, sand, cement, powders, resins, coal, gravel) and that are
prepacked in metallic drums , sacks , big bags
• road transport / sea transport in container
• air transport / conventional sea transport
Products that are not dangerous and that are prepacked in plastic
drums
Rock wool and fiber glass prepacked (e.g. in rolls)
Products that are not dangerous and that are prepacked in cartons
Dangerous products
(refer to “Hazardous Materials” – currently para 8.2)
Table 1
2)
BUNDLE
PALLET
CASE
CRATE
CASE
HOMOLOGATED
PACKAGE
Solid Wood
a)
General Requirements
1.
Solid wood packaging & bracing must be free of bark, live pest or
plants, and free of insect damage (i.e. Holes)
2.
Wood should not directly contact commodity unless a medium is
used between solid wood and dunnage.
3.
Acceptable Solid Wood Packaging Alternatives are External Grade
Plywood, Metal or Plastic Skids Crates, and Containers. External
Grade OSB Board can only be used with GE Water approval.
b)
SMP 15
1.
2.
ISPM-15 requires that all non-manufactured wood packaging
materials (NMWP) or solid wood packing materials (SWPM) must
be either heat treated or fumigated regardless of the country of
export. The requirement includes the proper marking of all treated
materials per the IPPC standard for export to some countries.
It is the responsibility of the GE Water supplier to ensure
compliance with ISPM-15. Visit the following web sites for
additional information regarding this directive.
•
•
c)
IPPC - http://www.ippc.int/IPP/En/default.html
APHIS/USDA- http://www.aphis.usda.gov/ppq/swp/
Wooden Crates
1.
GE PROPRIETARY
PACKAGE
For international shipments, all items are crated in accordance
with approved packaging procedure. Sample crate examples are
shown in Figure 7.
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 16 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
Wood box - Type 1
Standard Box
Wood box - Type 2
Square Reinforced Ends
Wood box - Type 3
Vertical Ends Reinforced
Wood box - Type 4
Horizontal Ends Reinforced
Wood box - Type 5
Reinforced Internal Corners
2.
3.
4.
5.
GE PROPRIETARY
Figure 7
For domestic shipments, alternative material may be used
instead of fully crating for shipment.
Open or slotted crates are acceptable with approval by a GE
Water Buyer.
All non-containerized equipment must be crated for export
and shipment. The GE Water buyers have the authority to
grant written exceptions if not covered under the ordering
specifications. It is required that all GE Water product being
placed in exterior storage follow the crate guidelines
outlined in this specification unless a written exception has
been granted or the packaging requirements are covered
under the ordering specifications.
Crate Considerations
• Minimum fork access 29 inches.
• Minimum sling openings 4 inches.
• Minimum 1-inch clearance between crate top, walls,
and the commodity. Unless commodity has been
prepackaged prior to crating and the one-inch
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 17 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
•
•
•
clearance has already been incorporated into the
interior package.
For crates greater than 8 feet high the minimum roof
thickness is ¾ inch.
The minimum width (thickness) is 1/2" for plywood.
Crate weight limit is determined by the maximum
weight that can safely be supported by the crate, by
the method of transport, and the method of loading
and offloading.
REQUIRED CRATE SIZES
LOAD NET
WEIGHT
(LBS.)
0-100 Lbs.
100-250 Lbs.
250-500 Lbs.
PACKAGING METHOD
Skid enclosed bottom
Fragility protection where required.
Internal bracing and blocking of unit.
Wooden box.
Corrugated carton w/ secondary
over-pack
Crates should be of sturdy
construction to allow stacking to a
maximum height of 96" (2.438
meters) without damage to the crate
or contents unless specified clearly
on the exterior of the crate.
Skid enclosed bottom
Fragility protection where required.
Internal bracing and blocking of unit.
Wooden box or Full crate.
Crates should be of sturdy
construction to allow stacking to a
maximum height of 96" (2.438
meters) without damage to the crate
or contents unless specified clearly
on the exterior of the crate.
Skid enclosed bottom
Fragility protection where required.
Internal bracing and blocking of unit.
Asphalt Lined Wooden box or Full
crate.
Crates should be of sturdy
GE PROPRIETARY
MATERIALS
Corrugated in secondary
container
3/8" Plywood Minimum
Asphalt paper / VCI Paper
Corrugated in secondary
container for accessories
1/2" Plywood Minimum
Asphalt paper / VCI Paper
Corrugated in secondary
container for accessories
1/2" Plywood Minimum
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PRESERVATION
METHOD
See preservation
Barrier bag & desiccant,
Vacuum sealed.
Surface coatings/Oils
VCI Paper
See preservation
Bar Asphalt lining &
desiccant
Surface coatings/Oils
VCI Paper
See preservation
Asphalt lining & desiccant
Surface coatings/Oils
VCI Paper
PAGE 18 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
construction to allow stacking to a
maximum height of 96" (2.438
meters) without damage to the crate
or contents unless specified clearly
on the exterior of the crate.
500-750 Lbs.
750-1000 Lbs.
Skid enclosed bottom
Fragility protection where required.
Internal bracing and blocking of unit.
Asphalt Lined Full crate.
Crates should be of sturdy
construction to allow stacking to a
maximum height of 96" (2.438
meters) without damage to the crate
or contents unless specified clearly
on the exterior of the crate.
Asphalt paper / VCI Paper
Corrugated in secondary
container for accessories
1/2" Plywood Minimum
See preservation
Asphalt lining & desiccant
Surface coatings/Oils
VCI Paper
Skid enclosed bottom
Fragility protection where required.
Internal bracing and blocking of unit.
Asphalt Lined Full crate.
Crates should be of sturdy
construction to allow stacking to a
maximum height of 96" (2.438
meters) without damage to the crate
or contents unless specified clearly
on the exterior of the crate.
Asphalt paper / VCI Paper
Corrugated in secondary
container for accessories
1/2" Plywood Minimum
See preservation
Asphalt lining & desiccant
Surface coatings/Oils
VCI Paper
Table 2
6.
GE PROPRIETARY
Crate Lumber
• New/free of defects.
• Knots must not exceed 1/4th the width of the structural
member or 1/3rd the width of a sheathing board.
• Moisture content of lumber must not exceed 20% and
not less than 10% for standard grade.
• No.4 pine or better (Spruce is acceptable/approvable).
• Plywood to be minimum of 3/8" type 3 weather resistant
or exterior grade CDX plywood thick for items less than
100 lbs.
• Plywood to be minimum of 1/2” thick type 3 weather
resistant or exterior grade CDX plywood for items
greater than 100 lbs.
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 19 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
7.
8.
Crate Hardware
• Screws & cement nails coated (preferred), acceptable
alternative twist nails.
• Type size and strength appropriate for item being crated
and size of crate.
• Hardware holding equipment shall be bolted to the skid.
Washers, nuts are required.
• Counter sinking of bolt heads into the bottom of the
runners.
Banding – Metal or plastic banding may be used as added
protection against hardware failure. See Figure 8 below.
Figure 8
9.
GE PROPRIETARY
Waterproofing
• All wooden boxes/cases/crates are built to ensure water
does not penetrate and corrode the equipment but still
allows drainage from the bottom.
1.
Items 25,000 lbs. or greater should have an
engineered approved skid design for shipment.
2.
A lifting base must be provided for structural steel,
bars, tubing, piping, and ductwork. The maximum
allowable over-hang on any skid is 6 inches.
3.
Skid wood or wood bracing cannot come in direct
contact with the commodity.
4.
Refer to the Required Skid and Header Sizes in Table.
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 20 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
NET WEIGHT OF LOAD
(LBS.)
200 – 500 Lbs.
501 – 1000 Lbs.
1001 – 2000 Lbs.
2001 – 10,000 Lbs.
10,001 – 20,000 Lbs.
20,001 – 30,000 Lbs.
30,001 – 50,000 Lbs.
50,001 – 80,000 Lbs.
80,001 – 100,000 Lbs.
SKID LENGTH MAX. IN FEET
(INCHES)
8’
(96”)
8’
(96”)
16’
(192”)
20’
(240”)
30’
(360”)
30’
(360”)
30’
(360”)
35’
(420”)
35’
(420”)
RUNNER/HEADER LUMBER
SIZES (INCHES)
2X4
2X4
3X4
4X4
4X6
6X6
6X8
8X8
8X10
Table 3
3)
Void/Void Fillers
a)
b)
c)
d)
4)
Non-hygroscopic materials used to fill voids in container.
Closed cell foams (polyethylene) are acceptable.
Paper base materials acceptable if sealed in plastic.
Antifoam (Polyurethane foams) is acceptable provided separation is
maintained between the foam and the commodity.
Corrugated Cartons
a)
Corrugated cartons may be used as an alternative to wooden
crates if the following criteria meet your shipment details.
b)
If corrugated cartons are needed for shipments that fall outside of
below criteria then approval must be received from a GE Water
Buyer.
1.
Destination is a domestic location.
2.
Weight does not exceed 150lbs or 68 kgs.
3.
It does not contain hazardous material.
4.
It does not contain liquid or fluids.
c)
Corrugated cartons with wooden base
1.
Straps MUST be used across both directions - IATA
requirement for all Air shipments.
d)
Stacking
1.
GE PROPRIETARY
Inner cushioning material as in i.e. polyurethane,
polyethylene foam is to be placed between the top of the
carton and the top of the commodity.
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 21 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
6.6
MARKINGS
1)
2)
3)
Requirement - Mandatory for equipment/shipments for GE Water. See Figures 912 below.
Stenciling
a)
Markings for crated equipment are to be applied in English with (black)
non-fading paint using a block-lettering stencil.
b)
Alternatives for non-crated items are a stainless steel engraved
nameplate, plywood or plastic cutouts attached to the component. Affix
by banding or bolting to a support member of the commodity.
Letter Size - Is determined by the panel size. Largest possible stencil size
for panel must be used.
M LI XXXXXXX
C G W t . 2 0 lb s
9 .0 7 1 8 5 K g
D i m 8 X 8 X 8 in
2 0 .3 X 2 0 .3 X 2 0 .3 c m
G E C U S T O M E R X Y Z C o rp
T U R B IN E N U M 1 1 1 X X B B 2 2 1 1 0 1
DES
In s e r t B o a r d
D R A W N U M XX 121212XX12
PO NUM XXXXXXXXXXXXXXX
C O T A IN E R C A S E N U M X X 1 2 1 2 1 2
STORAGE OUTDOOR
N E T W T 1 8 lb s /8 .1 6 K g
P a c k a g e S u r fa c e S iz e 8 in c h X 8 in c h
2 0 .3 2 c m X 2 0 .3 2 c m
( 6 4 S q u a r e in c h e s )
L e tte r S iz e
S ite In fo r m a tio n 3 /8 in c h o r .9 5 3 c m
L o g is tic In fo r m a tio n 1 /4 in c h o r .6 3 5 c m
Figure 9
M LI XXXXXXX
C G W t. 2 0 lb s
9 .0 7 1 8 5 K g
D im 1 2 X 1 2 X 1 2 in
3 0 .4 8 X 3 0 .4 8 X 3 0 .4 8 c m
G E C U STO M E R
X Y Z C o rp
T U R B IN E N U M 1 1 1 X X B B 2 2 1 1 0 1
D ES
In s e r t B o a r d
D R A W N U M XX121212XX12
P O N U M XXXX XXX XXXXXXX X
C O T A IN E R C A S E N U M X X 1 2 1 2 1 2
STO R A G E O U TD O O R
N E T W T 1 8 lb s /8 .1 6 K g
P a c k a g e S u r fa c e S iz e 1 2 in c h X 1 2 in c h
3 0 .4 8 c m X 3 0 .4 8 c m
( 1 4 4 S q u a r e in c h e s )
L e tte r S iz e
S it e In fo r m a tio n 5 /8 in c h o r 1 .5 9 c m
L o g is t ic In fo r m a tio n 3 /8 in c h o r .9 5 3 c m
Figure 10
GE PROPRIETARY
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 22 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
MLI XXXXXXX
CGW t. 20 lbs
9.07185 Kg
Dim 24 X 24 X 24 in
60.96 X 60.96 X 60.96cm
GE CUSTOMER XYZ Corp
TURBINE NUM 111XXBB221101
DES
Insert Board
DRAW NUM XX121212XX12
PO NUM XXXXXXXXXXXXXXX
COTAINER CASE NUM XX121212
STORAGE OUTDOOR
NET W T 18 lbs/8.16 Kg
Package Surface Size 24inch X 24 inch
60.96 cm X 60.96 cm
(576 Square inches)
Letter Size
Site Information 1 1/4 inch or 3.175 cm
Logistic Information 3/4 inch or 1.905 cm
Figure 11
MLI XXXXXXX
CGWt. 20 lbs
9.07185 Kg
Dim 48 X 48 X 48 in
121.9X121.9X121.9cm
GE CUSTOMER XYZ Corp
TURBINE NUM 111XXBB221101
DES
Insert Board
DRAW NUM XX121212XX12
PO NUM XXXXXXXXXXXXXXX
COTAINER CASE NUM XX121212
STORAGE OUTDOOR
NET WT 18 lbs/8.16 Kg
Package Surface Size 48inch X 48 inch
121.9 cm X 121.9 cm
(2304 Square inches)
Letter Size
Site Information 3 inch or 7.62 cm
Logistic Information 1 inch or 2.54 cm
Figure 12
4)
GE PROPRIETARY
Placement - Marking will be placed on two adjacent sides with following
information. See Figure 13.
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 23 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
a)
b)
c)
d)
e)
f)
g)
h)
Container Gross Weight lbs. (add Kg for international shipments)
Container Dimensions inches (add cm for international shipments)
Customer Name
Tag Number
Item Description
GE Purchase Order #
Container Case/Package Number
Storage/Maintenance Requirements (Indoors, or Outdoors)
Marking Placed on Two Adjacent Sides
Figure 13
5)
Cautionary Markings - The following is added to the exterior of all
shipping containers.
a)
b)
c)
d)
e)
f)
g)
GE PROPRIETARY
Center of Gravity (balance) - Required on all unstable packages. For
internal shipments, GE Water Engineering will work with the GE Water
Shipping Dept to determine if the shipment is unstable, requiring CoG
marking.
If the center of gravity can not be marked due to its location on the unit
and a plywood panel can not be affixed to allow the for marking it’s
location. A print sealed in plastic, affixed to the commodity in a visible
location is required for all unstable packages. The print must show a side
profile and end profile with the CoG precisely located on each view.
Handle with care, fragile, etc.
Glass - Must be marked “Glass” separate or combination “Fragile-Glass”
precautionary mark.
Liquids - Must identify as Liquid, or contains Liquid.
Sling Locations - Mark special locations or notched skid locations
Other special requirements/precautionary warning marked appropriately.
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 24 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
h)
Refer to Table 4 below for Typical Precautionary Marks.
Table 4
6)
Packing Slips
a)
The packing list is the primary method used to inventory shipped
components. The packing list must identify the contents within each
individual package if the container has multiple packages with different
items.
Standard requirements needed for each packing slip:
b)
GE PROPRIETARY
•
•
•
•
•
•
•
GE PO # or Contract # with Client
GE Tag Number
GE PO Line #
GE PO Quantity
Item/equipment per GE PO or Contract
Unit of Measure
Country of Origin
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 25 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
For internal shipments, each GE Water location will create it’s own packing
slips meeting unique needs and requirements specific to that location.
7)
Attaching
a)
8)
6.7
Use caution when affixing to prevent breach of inner vapor barrier,
case liners, or other packaging of the equipment.
b)
Minimum of one placed internally and one secured externally on
the package.
c)
Do not attach the packing list directly to painted equipment, where
the removal of the packing list may cause damage to the painted
surface.
d)
It is recommend that the packing list be attached with a tape or
glue adhesive. If placed in contact with the commodity, the tape or
glue cannot leave a residue.
e)
If the packing list is stapled to the package, then the staples must
be covered with waterproof tape.
Packing List Enclosure - Place in a waterproof pouch labeled Packing List.
SHIPPING
1)
Transport Modes
NOTE: Shipments originating from or destined for the EU must comply
fully with ADR and IMDG regulations.
a)
Air
1.
All air shipments must be authorized in writing by GE Water.
2.
The key limitation factor for air shipment is height. For
efficient shipment by air, packages and crates should be
held to a maximum of 300cm (118") long X 226cm (89") wide
X 206cm (81") tall. A more efficient and some times more
economical height limit is 160cm (63”). This allows belly
loading in all cargo and most passenger aircraft.
3.
Crate height is the key factor for efficient air transport. The
following summarizes the key height dimensions that affect
cost and cycle time for air transport.
•
74 cm (29 Inches) - Most efficient and economical air
service.
•
160 cm (63 Inches) - Still very good efficiency and
economy.
•
206 cm (81 Inches) - Point where problems and costs
increase greatly.
•
241 cm (95 Inches) - 747 cargo aircraft only possible
carrier above this height
GE PROPRIETARY
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 26 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
•
b)
300 cm (118 Inches) - Maximum height limit for air
transport.
Ocean
1.
Products shipping by ocean are typically loaded in Standard
Containers (solid top & open top), Flat Rack Containers and
shipped as Break Bulk. See Figure 14.
2.
Standard containers can be loaded below or on the deck of
the vessel. Flat rack containers are typically loaded above
deck. Non-containerized shipments can be loaded below or
above deck.
Figure 14
3.
4.
5.
c)
GE PROPRIETARY
Independent of which type of ocean vessel or container
type, all shipments MUST have securing points for proper
lashing and securing.
Due to longer transit times, protection from corrosion and
humidity is greatest when shipping by ocean.
Container equipment can be used as outer packaging as
long as the container is delivered to final destination and
can be used for storage. Products inside must be properly
blocked and braced
Land
1.
Typical equipment types are closed vans or open deck
flatbeds.
2.
Closed vans normally require a loading dock; flatbeds can
be loaded/offloaded from any open side.
3.
Less than truckload (LTL) shipments require added structural
protection due to multiple terminal handlings and
stacking/mixing with other company’s products.
4.
The carrier MUST block loaded skids with wood or load bars
to prevent shifting of the load during transport.
5.
If the product is not fully enclosed, a tarp may be required
by the supplier or carrier to protect from incremental
weather
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 27 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
6.
2)
Hazardous Materials (References to DOT and EPA apply to US shipments
only).
a)
No GE Water shipments, either Intra-US or International, may
contain any materials such as paints, stains, inks, paint thinners,
solvents, or other materials that may otherwise render the
shipment hazardous, (if the GE Water supplier is shipping
hazardous materials not covered under the ordering specifications,
then the following clause applies), “without the expressed written
approval of the GE Water Buyer.” Hazardous shipments should
move on their own set of documents (invoice, BOL).
A supplier of hazardous material must provide the following:
• D.O.T. proper shipping name
• D.O.T. hazard class
• Identification number (UN/NA)
• Packing group (if applicable)
• Exact weight of the hazardous material in each package
• Required type of International or D.O.T. (diamond hazard) label
• International or D.O.T. ground packaging requirements
• 24-hour emergency response contact number
• Or as required by the country of export and import and those
countries located on the transport route.
Package in accordance with rules and regulations of the IMO
(International Maritime Organization), IATA (International Air
Transport Association), and ASTM (American Society for Testing and
Materials) packaging for hazardous materials and DOT, or in
accordance with applicable regulations of your country.
GE Water supplier must be in compliance with all OSHA rules,
regulations and standards governing hazardous materials, their use
and disposal as well as employee and public safety requirements
mandated by OSHA, or in accordance with applicable regulations of
your country.
• 29 CFR - hazardous material requirements OSHA.
• Compliance with all OSHA MSDS requirements.
GE Water supplier must be in compliance with all EPA rules,
regulations and standards governing hazardous materials, their use
and disposal, or in accordance with applicable regulations of your
country.
• 40 CFR - hazardous material requirements EPA
b)
c)
d)
e)
GE PROPRIETARY
Independent of which type of equipment, all shipments
MUST have securing points for proper lashing and securing.
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 28 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
f)
GE PROPRIETARY
Packaging must meet all regulations and requirements for the
chosen mode of transportation. As well as country specific
requirements not listed in this document.
1.
Ocean
• Title 49 (49 CFR) – Transportation
• PART 176 - CARRIAGE BY VESSEL
• IMDG (International Maritime Dangerous Goods)
• IMDG (International Maritime Dangerous Goods) Code
• Needs to reflect the Power & Water spec latest revision
Packaging GE Water Specification
• In accordance with applicable regulations of your
country and with all regulations of the countries located
on the transport route where compliance is required
because of off-loading of the vessel, as well as those
regulations of the receiving country of the shipment.
2.
Barge
• Title 49 (49 CFR) - Transportation
• PART 176--CARRIAGE BY VESSEL
• IMDG (International Maritime Dangerous Goods)
• IMDG (International Maritime Dangerous Goods) Code
• Needs to reflect the Power & Water spec latest revision
Packaging GE Water Specification
• In accordance with applicable regulations of your
country and with all regulations of the countries located
on the transport route, as well as those regulations of
the receiving country of the shipment.
3.
Truck (Land Shipments)
• Title 49 (49 CFR) - Transportation
• PART 177 - CARRIAGE BY PUBLIC HIGHWAY
• Needs to reflect the Power & Water spec latest revision
Packaging GE Water Specification
• In accordance with applicable regulations of your
country and with all regulations of the countries located
on the transport route, as well as those regulations of
the receiving country of the shipment.
4.
Rail
• Title 49 (49 CFR) - Transportation
• PART 174 - CARRIAGE BY RAIL
• AAR (Association of American Railroads) Rule or Standard
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 29 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
•
•
5.
Air
•
•
•
•
•
•
•
•
•
g)
h)
Needs to reflect the Power & Water spec latest revision
Packaging GE Water Specification
In accordance with applicable regulations of your
country and with all regulations of the countries located
on the transport route, as well as those regulations of
the receiving country of the shipment.
Title 49 (49 CFR) - Transportation
PART 175 - CARRIAGE BY AIRCRAFT
ICAO (International Civil Aviation Organization)
Safe Transport of Dangerous Goods by Air (ICAO TI)
IATA (International Air Transport Association)
Dangerous Goods Regulations
Shippers Declaration
Needs to reflect the Power & Water spec latest revision
Packaging GE Water Specification
In accordance with applicable regulations of your
country and with all regulations of the countries located
on the transport route, as well as those regulations of
the receiving country of the shipment.
Packaging must follow all hazardous regulatory requirements for
countries being exported to and the requirements of the sending
country.
Hazardous materials being ground shipped must comply with all
regulations of the countries located on the transport route.
1.
i)
j)
GE PROPRIETARY
Hazardous materials must be properly labeled, marked,
documented, and place carded in strict accordance with
sections 172.000 through 172.600 of 49 CFR and all other
applicable sections of 49 CFR as well as the requirements of
all ISTA and IMO rules and regulations, if applicable, or In
accordance with applicable regulations of your country and
with all regulations of the countries located on the transport
route, as well as those regulations of the receiving country
of the shipment.
2.
Proper labeling, marking and documentation for hazardous
materials is the responsibility of GE supplier.
Testing of packaging, in certain cases, may be required when
dealing with hazardous materials. Certification of the packaging
may be necessary.
The supplier must declare any hazardous materials at the time of
reporting shipping information to the logistics group. No
Exceptions!
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 30 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
k)
l)
6.8
A copy of the shipper’s IMO declaration or IATA declaration along
with the MSDS sheets (in English) must be presented to the logistics
group a minimum of 48 hours prior to the arrival of the freight in
the USA. There are No Exceptions! (Due to new regulation requiring
that the manifest be provided to customs 24 hours prior to arrival
of products or goods.)
Emergency Response Information Requirement
1.
The GE Water Supplier must provide an MSDS (Material
Safety Data Sheet) for all hazardous materials to be shipped.
2.
The GE Water Supplier must follow strict emergency
response guidelines presented in sections 172.600 through
172.606 of 49 CFR and all other applicable sections of 49
CFR as well as the IATA and IMO rules and regulations if
applicable, or country specific requirements.
3.
The GE Water Supplier or manufacturer is legally responsible
for the improper marking, packaging, or documentation of
all Hazardous Material Shipments for GE Water.
HANDLING
1)
Load Stability
a)
Pallets/Crates/Cartons that have unstable loads have wood and/or
steel bases designed to prevent tipping of packaged item. Base of
packaging must be oversized to compensate for off center of
gravity. Product should be able to be tilted one end 22° from
vertical and released without tipping over.
b)
For tall narrow length and width items, the item should be
positioned horizontally on the pallet if possible. (Laid down)
c)
For tall narrow length and width items that are unable to lay flat
the supplier should attempt to consolidate multiple units on to
larger skid.
d)
If consolidation is not possible and the item cannot be positioned
horizontally, then the skid must be oversized by ½ the height in the
length and width at a minimum.
2)
Stacking
a)
Packaging should be designed to allow for supporting a 90-inch
stack height.
b)
If item cannot be stacked it should be clearly marked "DO NOT
STACK", "DO NOT TOP LOAD".
3)
Manual and Powered Mechanical Lifting
a)
Hand trucks/fork trucks/overhead lifting equipment. See Figure 15
below.
GE PROPRIETARY
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 31 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
Base (end view)
(8.9 cm)
(74 cm)
Minimum required opening
for hand truck entry
Minimum
clearance
height
DO
N
THIS OT FOR
K
E ND
If the skid should not be handled from a side, that
side should be closed off, and clearly marked
** DO NOT FORK THIS END **
SLING
LOCATION
SLING
LOCATION
OPEN FOR HANDLING
ALL DIRECTIONDS
Figure 15
4)
GE PROPRIETARY
Shock/Tilt Sensors (examples shown in Figures 16 & 17).
a)
The purpose of these sensors is a visual indicator to the recipient
that a more careful inspection of the product is needed.
b)
Activated sensors do not mean that the product is damaged. Apply
if product meets one or more of the following criteria:
1.
Large, sensitive products in crates where concealed
damage is a problem.
2.
Very fragile products that require special handling.
3.
Shock sensitive products with a history of damage.
4.
Tall, top heavy products prone to tilting
5.
Special packages designed specifically to ship upright.
For internal shipments, GE Water Engineering will determine if GE Water
Shipping will need to install sensors prior to crating, loading, or coordinate
with Shipping on when best to conduct this task.
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 32 OF 33
g
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
Rev: 1.0
Figure 16
Title:
Reference:
Revision:
Application Date:
Expiration Date:
Author:
External References:
Figure 17
GE Water Quality Management System
GE Water Marking, Preserving, Packaging, and Shipping
SPS-PSSWTR-0010
1.0
6/22/2010 17:51:19
6/21/2012 00:00:00
Marie Limousin
<externalreferences>
GE PROPRIETARY
UNCONTROLLED WHEN PRINTED OR
TRANSMITTED ELECTRONICALLY
PAGE 33 OF 33