Intersection Improvements at US
Transcription
Intersection Improvements at US
Public Information Meeting Project No. 102-325 FAP No. (CN) 0001 (294) Intersection Improvements at US Route 1 & State Route 53 / East Avenue City of Norwalk February 6, 2014 CONNECTICUT DEPARTMENT OF TRANSPORTATION REPRESENTATIVES William Britnell, P.E. Transportation Principal Engineer Susan Libatique, P.E. Project Manager Larry Murphy, P.E., CDM Smith Sharat Kalluri, P.E., P.T.O.E., CDM Smith Steven L. Degen, Office of Rights of Way Outline of Presentation • Project Location • Purpose and Need • Existing Conditions • Traffic Data • Proposed Design Elements • Construction Cost, Schedule & Funding • Rights of Way - CTDOT • Questions and Answers Project Location Map Purpose and Need Project Background • U.S. Route 1 Norwalk Study, April 1999 Provide Safety Improvements • • • Reduce the number of collisions Add safety measures for pedestrians Location identified in the Suggested List of Surveillance Study Sites (SLOSSS) Provide Traffic Operation Improvements • • Increase turn radii at corners Reduce delay and congestion Features of the Existing Intersection Existing Intersection Deficiencies Collision Diagram (January 1, 2009 to December 31, 2011) Existing Intersection Deficiencies Existing Intersection Deficiencies Existing Intersection Deficiencies Existing Intersection Deficiencies 2014 Legend xx(xx) – AM (PM) 60 (90) 710 (560) 400 (340) North Ave. (100) 60 (630) 380 (50) 50 East Ave. U.S. Route 1 290 (520) 230 (540) 50 (60) 260 (450) 200 (480) 40 (50) East Ave. U.S. Route 1 (180) 120 (260) 580 (80) 100 (160) 110 (220) 510 (70) 90 50 (80) 620 (490) 350 (300) North Ave. (90) 50 (550) 330 (40) 40 State Rte. 53 State Rte. 53 Traffic Volumes 2035 Existing Intersection Deficiencies Condition A.M. Peak P.M. Peak 2014 No Build D D 2035 No Build F F Existing Intersection Deficiencies No Crosswalk No Crosswalk No Sidewalk Sidewalk in poor condition No Crosswalk Only Existing Crosswalk • • Ramps are non-compliant with ADA Standards Non-exclusive pedestrian signal phasing Proposed Intersection Layout Warning Signal Ahead Sign Proposed Intersection Layout Proposed Level of Service Condition A.M. Peak P.M. Peak 2014 No Build D D 2014 Build C C 2035 No Build F F 2035 Build D D Vehicle Queues Proposed Typical Sections Proposed Roadway Work Proposed Utility & Drainage Work Existing Northeast Corner Northeast Corner Curb Radius Improvements Sample Form Liner Wall Right-of-Way Requirements Maintenance and Protection of Traffic Considerations Traffic will be maintained on existing roadway at all times Existing driveway access to businesses and residents will be maintained at all times during construction No Detours will be required Single Lane Closures may be required for roadway widening, drainage modifications, signal installation, and pavement milling and overlay. Current Schedule Design Completion: Advertisement Date: Begin Construction: Complete Construction: Construction Cost $1,240,000 Funding 80% Federal 20% State Summer 2015 Fall 2015 Spring 2016 Fall 2016 Permits None Required No Endangered Species No Impacts on Historic Properties (Per SHPO) Rights of Way Steven L. Degen CTDOT Office of Rights of Way Questions?