PDF: Pavilion Needs Mapping
Transcription
PDF: Pavilion Needs Mapping
Plumpton Pavilion Stages A+B: Needs Mapping & Brief Creation VAP & Parish Council Collaboration James Anwyl & Kelvin Speirs 07. 06. 2011 Objectives Explain the VAP Pavilion Project a) Introduce Eurobuild b) Existing Usage Analysis c) Design strategy d) Benefits for the Village e) Sustainable Future for Plumpton MassivHaus Ltd. © 2011! Eurobuild PassivHaus Architecture! 2! Building User Groups Existing MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 3 Building User Groups Proposed MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 4 Plumpton Pavilion Occupant Usage MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 5 Plumpton Pavilion Accounts Analysis £17K = >£5.5K/ yr MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 6 Plumpton Pavilion Siteplan MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 7 Existing Areas Survey MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 8 Plumpton Pavilion Existing Adjacencies MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 9 Plumpton Pavilion Existing Spaces MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 10 Plumpton Pavilion Schedule of Accomodation MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 11 Plumpton Pavilion Proposed Plan MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 12 Plumpton Pavilion Statement of Need S1. I confirm that my club management committee have been extensively consulted during the development of the new pavilion design. S2. I confirm that the ground floor plans are effective in answering the needs of my club/ group and am happy for the plans to form the basis of a planning application design. MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 13 Plumpton Pavilion Summary of Opinion MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 14 Plumpton Pavilion Summary of Opinion Does the Council accept there is a need to provide a new pavilion/ sports club/ nursery facility in accordance with the plans setout and agreed by the users? MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 15 Plumpton Pavilion Proposed Ground Floor MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 16 Plumpton Pavilion Proposed First Floor MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 17 Plumpton Pavilion Summary of Opinion S3. I confirm that my club management committee approves of the concept to construct first floor offices with the objective of making the new pavilion economically sustainable and generating revenue for the Village to reinvest in amenities. MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 18 Plumpton Pavilion Summary of Opinion MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 19 Plumpton Pavilion Summary of Opinion Does the Council accept there is a need to commission a study e.g. with the VAP Business Team to understand the market/ demand for rentable offices as part of a 1st flr? MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 20 Plumpton Pavilion Proposed Offices [PPS4; EC6] MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 21 Plumpton Pavilion Car Parking [10 overall/ 0-4 commuter] BASE option MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 22 Plumpton Pavilion Car Parking [21 overall/ 11 commuter] Option 1 MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 23 Plumpton Pavilion Car Parking [35 overall/ 25 commuter] Option 2 MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 24 Plumpton Pavilion Car Parking [48 overall/ 38 commuter] Option 3 MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 25 Plumpton Pavilion Summary of Opinion S4. I confirm that my club management committee approves of the plan labelled with the following version number [preferred option] with respect to car parking at the playing field. MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 26 Plumpton Pavilion Summary of Opinion MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 27 Plumpton Pavilion Summary of Opinion Does the Council accept there is a need to commission a separate study to develop a car parking solution for the station end of the Village? MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 28 Plumpton Pavilion Project Programme MassivHaus Ltd. © 2011 Eurobuild PassivHaus Architecture 29 VAP Objectives We would like PC & VAP: 1. To form collaborative committee to take project forward 2. To acknowledge the need for a new building 3. To action a study to gauge revenue potential in 1st floor 4. To develop a car parking design solution 5. To develop a business plan for building & car park 6. To commission the Planning Application work MassivHaus Ltd. © 2011! Eurobuild PassivHaus Architecture! 30! Thanks for listening… EUROBUILD PassivHaus Architecture, Consultancy & Supply Chain 2nd Floor, 77 South Road Haywards Heath RH16 4LB mailto: j.anwyl@eurobuild.at MassivHaus Ltd. © 2011! Eurobuild PassivHaus Architecture! 31!