2014-05 IAP Recuperación Secundaria EA – Anexos Parte 8
Transcription
2014-05 IAP Recuperación Secundaria EA – Anexos Parte 8
TENS_REP TT_REP TENS TT 800 CFTC_REP CCL_REP CBLF_REP CFTC CCL CBLF 825 850 Min 200 TENS_REP Curve (TENS_ REP) 0 VDL VariableDensity (VDL) (LBF) (US) 1200 0 1000 Amplitude Max 0 CCL_REP Curve (CCL_REP) CBLF_REP Curve (CBLF_REP) (MV) 100 −19 (−−−−) CBLF2_REP Curve (CBLF_REP) (MV) 10 400 TT_REP Curve (TT_REP) (US) CFTC_REP Curve (CFTC_REP) (CPS) 0 Time Mark Every 60 S Parameters Description SDT−C: Sonic Digital − C AGC Automatic Gain Control AMSG Auxilliary Minimum Sliding Gate ASGL Auxilliary Minimum Sliding Gate Width BILI Bond Index Level for Zone Isolation CBLG CBL Gate Width CDDEL Digitizing Delay (Acq Monitor Checked) CDSIN Digitizer Sample Interval (Acq Monitor Checked) CDTS C−Delta−T Shale CDWCO Digitizer Word Count (Acq Monitor Checked) CRMOD Receiver Mode (Acq Monitor Checked) CSTR Compressive Strength of Cement CVDLM VDL Firing Mode (Acq Monitor Checked) CWMOD Waveform Firing Mode (Acq Monitor Checked) DDE0 Digitizing Delay 0 DDEL Digitizing Delay DDMG Downhole Differential Multi−Gain DETE Detection DSI0 Digitizer Sample Interval 0 DSIN Digitizer Sample Interval DTCM Delta−T Computation Mode DTF Delta−T Fluid DTM Delta−T Matrix DWC0 Digitizer Word Count 0 DWCO Digitizer Word Count FCF CBL Fluid Compensation Factor GAI Manual Gain GOBO Good Bond ITTS Integrated Transit Time Source MCI Minimum Cemented Interval for Isolation MGAI Maximum Gain MODE Firing Mode MSA Minimum Sonic Amplitude NMSG Near Minimum Sliding Gate RATE Firing Rate RMOD Receiver Mode SFAF Sonic Formation Attenuation Factor Value ON 140 100 0.8 40 200 DS10 100 500 B 13789.5 UTFR NONE 200 200 10 E1 10 DS10 FULL 189 56 500 500 0.47 40 2 DT 1.4478 3500 CBL 1.05764 248 R15 B 0 200 1500 PIP SUMMARY DLIS Name 1 US US US US US/F KPAA US US US US/F US/F MV M MV US DB/M SGAD SGDT SGW SLEV SPFS SPSO SWW T0CA TSIG VDLG VDLM WAGC WGAI WGDT WGIN WMOD Sliding Gate ON Sliding Gate Delta−T 50 US/F Sliding Gate Width 80 US Signal Level for AGC 5000 MV Sonic Porosity Formula RAYMER_HUNT Sonic Porosity Source DT Sonic Window Width 13 MS T0 Correction ON OFF Test Signal VDL Manual Gain 5 VDL Firing Mode UTFR Waveform AGC ON Waveform Manual Gain WGAI 20 Waveform Gain Delta−T 240 US/F Waveform Gain Interval 4800 US Waveform Firing Mode NONE CNT−H: Compensated Neutron − H BHFL Borehole Fluid Type WATER CASED BHS Borehole Status 100 DEGC BHT Bottom Hole Temperature (used in calculations) BSCO Borehole Salinity Correction Option NO CCCO Casing & Cement Thickness Correction Option YES DPPM Density Porosity Processing Mode STAN FSAL Formation Salinity −50000 PPM NO FSCO Formation Salinity Correction Option GCSE Generalized Caliper Selection BS GDEV Average Angular Deviation of Borehole from Normal 0 DEG GGRD Geothermal Gradient 0.018227 DC/M GRSE Generalized Mud Resistivity Selection CHART_GEN_9 GTSE Generalized Temperature Selection LINEAR_ESTIMATE HSCO Hole Size Correction Option YES MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE MCCO Mud Cake Correction Option NO MCOR Mud Correction NATU MWCO Mud Weight Correction Option NO PTCO Pressure/Temperature Correction Option NO SDAT Standoff Data Source SOCN SHT Surface Hole Temperature 15 DEGC SOCN Standoff Distance 0.5 IN SOCO Standoff Correction Option NO CAL−Y: Casing Anomaly Locator − Y CCLD CCL reset delay 12 IN CCLT CCL Detection Level 0.3 V System and Miscellaneous SpeedCorrectedDepth ALTDPCHAN Name of alternate depth channel BS Bit Size 8.500 IN BSAL Borehole Salinity −50000.00 PPM CSIZ Current Casing Size 5.500 IN Casing Weight 15.50 LB/F CWEI DFD Drilling Fluid Density 1.00 G/C3 DORL Depth Offset for Repeat Analysis 0.0 M MST Mud Sample Temperature −50000.00 DEGC PBVSADP Use alternate depth channel for playback NO −50000.0000 OHMM RMFS Resistivity of Mud Filtrate Sample 1.0000 OHMM RW Resistivity of Connate Water TD Total Depth −50000 M TDD Total Depth − Driller 2107.00 M TDL Total Depth − Logger 2090.50 M TWS Temperature of Connate Water Sample 37.78 DEGC Format: CBL_Fluid_Compensated_REP Vertical Scale: 1:200 Graphics File Created: 03−Apr−2005 00:02 OP System Version: 11C0−305 MCM SDT−C TCC−B 11C0−305 OP11−KP1 CNT−H CAL−Y OP11−KP1 11C0−305 Input DLIS Files DEFAULT SONIC_CNL_004LUP FN:3 PRODUCER 02−Apr−2005 21:51 Output DLIS Files DEFAULT COMPANY: SONIC_CNL_006LUP YPF S.A. C` FN:5 PRODUCER 03−Apr−2005 00:02 2094.3 M 732.4 M YPF. Nq. LLY.a.−24 FIELD: LOMA LAS YEGUAS PROVINCIA: NEUQUEN MAXIS EXPRESS PAIS: ARGENTINA MAXIS 500 WELL: TRAMO SIN CORRECCION DE PROFUNDIDAD Company: Well: Output DLIS Files DEFAULT SONIC_CNL_003LUP FN:2 PRODUCER 02−Apr−2005 21:42 2091.1 M 2018.2 M OP System Version: 11C0−305 MCM SDT−C TCC−B 11C0−305 OP11−KP1 CNT−H CAL−Y OP11−KP1 11C0−305 PIP SUMMARY Time Mark Every 60 S Fluid Compensated CBL Amplitude (CBLF) 400 0 (MV) 10 0 Min 200 Amplitude Transit Time (TT) (US) Far Thermal Counts (CFTC) (CPS) 200 1500 Max Tension Fluid Compensated CBL Amplitude Casing Collar Locator (CCL) (TENS) (CBLF) −19 (−−−−) (LBF) VDL VariableDensity (VDL) 0 (MV) 100 (US) 1200 0 1000 2025 TENS TT 1 CFTC Tramo Sin Correccion de Profundidad 2050 CCL CBLF CBLF 2075 Min 200 Tension Fluid Compensated CBL Amplitude Casing Collar Locator (CCL) (TENS) (CBLF) −19 (−−−−) (LBF) VDL VariableDensity (VDL) 0 (MV) 100 (US) 1200 0 1000 Amplitude Max 0 Far Thermal Counts (CFTC) (CPS) Fluid Compensated CBL Amplitude (CBLF) 400 0 (MV) 10 Transit Time (TT) (US) 1 1500 200 PIP SUMMARY Time Mark Every 60 S Parameters DLIS Name Description SDT−C: Sonic Digital − C AGC Automatic Gain Control AMSG Auxilliary Minimum Sliding Gate ASGL Auxilliary Minimum Sliding Gate Width Bond Index Level for Zone Isolation BILI CBLG CBL Gate Width CDDEL Digitizing Delay (Acq Monitor Checked) CDSIN Digitizer Sample Interval (Acq Monitor Checked) CDTS C−Delta−T Shale CDWCO Digitizer Word Count (Acq Monitor Checked) CRMOD Receiver Mode (Acq Monitor Checked) CSTR Compressive Strength of Cement CVDLM VDL Firing Mode (Acq Monitor Checked) CWMOD Waveform Firing Mode (Acq Monitor Checked) DDE0 Digitizing Delay 0 DDEL Digitizing Delay DDMG Downhole Differential Multi−Gain DETE Detection DSI0 Digitizer Sample Interval 0 DSIN Digitizer Sample Interval DTCM Delta−T Computation Mode DTF Delta−T Fluid DTM Delta−T Matrix DWC0 Digitizer Word Count 0 DWCO Digitizer Word Count FCF CBL Fluid Compensation Factor GAI Manual Gain GOBO Good Bond ITTS Integrated Transit Time Source MCI Minimum Cemented Interval for Isolation Maximum Gain MGAI MODE Firing Mode MSA Minimum Sonic Amplitude NMSG Near Minimum Sliding Gate RATE Firing Rate RMOD Receiver Mode SFAF Sonic Formation Attenuation Factor SGAD Sliding Gate SGDT Sliding Gate Delta−T SGW Sliding Gate Width SLEV Signal Level for AGC SPFS Sonic Porosity Formula SPSO Sonic Porosity Source SWW Sonic Window Width T0CA T0 Correction TSIG Test Signal VDLG VDL Manual Gain VDLM VDL Firing Mode WAGC Waveform AGC WGAI Waveform Manual Gain WGAI WGDT Waveform Gain Delta−T WGIN Waveform Gain Interval WMOD Waveform Firing Mode CNT−H: Compensated Neutron − H BHFL Borehole Fluid Type BHS Borehole Status BHT Bottom Hole Temperature (used in calculations) BSCO Borehole Salinity Correction Option CCCO Casing & Cement Thickness Correction Option DPPM Density Porosity Processing Mode FSAL Formation Salinity FSCO Formation Salinity Correction Option GCSE Generalized Caliper Selection GDEV Average Angular Deviation of Borehole from Normal GGRD Geothermal Gradient GRSE Generalized Mud Resistivity Selection GTSE Generalized Temperature Selection HSCO Hole Size Correction Option MATR Rock Matrix for Neutron Porosity Corrections MCCO Mud Cake Correction Option MCOR Mud Correction MWCO Mud Weight Correction Option PTCO Pressure/Temperature Correction Option SDAT Standoff Data Source SHT Surface Hole Temperature Value ON 140 100 0.8 40 200 DS10 100 500 B 13789.5 UTFR NONE 200 200 10 E1 10 DS10 FULL 189 56 500 500 0.47 40 2 DT 1.4478 3500 CBL 1.05764 248 R15 B 0 ON 50 80 5000 RAYMER_HUNT DT 13 ON OFF 5 UTFR ON 20 240 4800 NONE WATER CASED 100 NO YES STAN −50000 NO BS 0 0.018227 CHART_GEN_9 LINEAR_ESTIMATE YES SANDSTONE NO NATU NO NO SOCN 15 US US US US US/F KPAA US US US US/F US/F MV M MV US DB/M US/F US MV MS US/F US DEGC PPM DEG DC/M DEGC SOCN SOCO Standoff Distance Standoff Correction Option CAL−Y: Casing Anomaly Locator − Y CCLD CCL reset delay CCLT CCL Detection Level System and Miscellaneous ALTDPCHAN Name of alternate depth channel BS Bit Size BSAL Borehole Salinity CSIZ Current Casing Size CWEI Casing Weight DFD Drilling Fluid Density MST Mud Sample Temperature PBVSADP Use alternate depth channel for playback RMFS Resistivity of Mud Filtrate Sample RW Resistivity of Connate Water TD Total Depth TDD Total Depth − Driller TDL Total Depth − Logger TWS Temperature of Connate Water Sample Format: CBL_Fluid_Compensated Vertical Scale: 1:200 0.5 NO IN 12 0.3 IN V SpeedCorrectedDepth 8.500 IN −50000.00 PPM 5.500 IN 15.50 LB/F 1.00 G/C3 −50000.00 DEGC NO −50000.0000 OHMM 1.0000 OHMM −50000 M −50000.00 M −50000.00 M 37.78 DEGC Graphics File Created: 02−Apr−2005 21:42 OP System Version: 11C0−305 MCM SDT−C TCC−B 11C0−305 OP11−KP1 CNT−H CAL−Y OP11−KP1 11C0−305 Output DLIS Files DEFAULT COMPANY: SONIC_CNL_003LUP FN:2 PRODUCER 02−Apr−2005 21:42 YPF S.A. C` YPF. Nq. LLY.a.−24 FIELD: LOMA LAS YEGUAS PROVINCIA: NEUQUEN MAXIS EXPRESS PAIS: ARGENTINA MAXIS 500 WELL: Analisis de Repetibilidad en Tramo sin Correccion Company: Well: Input DLIS Files DEFAULT SONIC_CNL_003LUP FN:2 PRODUCER 02−Apr−2005 21:42 2091.1 M 2018.2 M Output DLIS Files DEFAULT SONIC_CNL_004LUP FN:3 PRODUCER 02−Apr−2005 21:51 OP System Version: 11C0−305 MCM SDT−C TCC−B 11C0−305 OP11−KP1 CNT−H CAL−Y OP11−KP1 11C0−305 PIP SUMMARY Time Mark Every 60 S 0 0 TENS_REP CFTC_REP Curve (CFTC_REP) (CPS) CBLF2_REP Curve (CBLF_REP) (MV) 10 400 TT_REP Curve (TT_REP) (US) 1500 200 Min 200 TENS_REP Curve (TENS_ REP) 0 VDL VariableDensity (VDL) (LBF) (US) 1200 0 1000 Amplitude Max 2025 2050 CCL_REP Curve (CCL_REP) CBLF_REP Curve (CBLF_REP) (MV) 100 −19 (−−−−) 1 2075 Min 200 TENS_REP Curve (TENS_ REP) 0 VDL VariableDensity (VDL) (LBF) (US) 1200 0 1000 Amplitude Max 0 CCL_REP Curve (CCL_REP) CBLF_REP Curve (CBLF_REP) (MV) 100 −19 (−−−−) CBLF2_REP Curve (CBLF_REP) (MV) 10 400 TT_REP Curve (TT_REP) (US) CFTC_REP Curve (CFTC_REP) (CPS) 0 PIP SUMMARY Parameters Description SDT−C: Sonic Digital − C AGC Automatic Gain Control AMSG Auxilliary Minimum Sliding Gate ASGL Auxilliary Minimum Sliding Gate Width BILI Bond Index Level for Zone Isolation CBLG CBL Gate Width CDDEL Digitizing Delay (Acq Monitor Checked) CDSIN Digitizer Sample Interval (Acq Monitor Checked) CDTS C−Delta−T Shale CDWCO Digitizer Word Count (Acq Monitor Checked) CRMOD Receiver Mode (Acq Monitor Checked) CSTR Compressive Strength of Cement CVDLM VDL Firing Mode (Acq Monitor Checked) CWMOD Waveform Firing Mode (Acq Monitor Checked) DDE0 Digitizing Delay 0 DDEL Digitizing Delay DDMG Downhole Differential Multi−Gain DETE Detection DSI0 Digitizer Sample Interval 0 DSIN Digitizer Sample Interval DTCM Delta−T Computation Mode DTF Delta−T Fluid DTM Delta−T Matrix DWC0 Digitizer Word Count 0 DWCO Digitizer Word Count FCF CBL Fluid Compensation Factor GAI Manual Gain GOBO Good Bond Value ON 140 100 0.8 40 200 DS10 100 500 B 13789.5 UTFR NONE 200 200 10 E1 10 DS10 FULL 189 56 500 500 0.47 40 2 200 1500 Time Mark Every 60 S DLIS Name 1 US US US US US/F KPAA US US US US/F US/F MV ITTS MCI MGAI MODE MSA NMSG RATE RMOD SFAF SGAD SGDT SGW SLEV SPFS SPSO SWW T0CA TSIG VDLG VDLM WAGC WGAI WGDT WGIN WMOD Integrated Transit Time Source DT Minimum Cemented Interval for Isolation 1.4478 M Maximum Gain 3500 Firing Mode CBL Minimum Sonic Amplitude 1.05764 MV Near Minimum Sliding Gate 248 US R15 Firing Rate Receiver Mode B Sonic Formation Attenuation Factor 0 DB/M Sliding Gate ON 50 US/F Sliding Gate Delta−T Sliding Gate Width 80 US Signal Level for AGC 5000 MV RAYMER_HUNT Sonic Porosity Formula Sonic Porosity Source DT Sonic Window Width 13 MS T0 Correction ON OFF Test Signal VDL Manual Gain 5 VDL Firing Mode UTFR Waveform AGC ON Waveform Manual Gain WGAI 20 Waveform Gain Delta−T 240 US/F Waveform Gain Interval 4800 US Waveform Firing Mode NONE CNT−H: Compensated Neutron − H BHFL Borehole Fluid Type WATER BHS Borehole Status CASED BHT Bottom Hole Temperature (used in calculations) 100 DEGC BSCO Borehole Salinity Correction Option NO CCCO Casing & Cement Thickness Correction Option YES STAN DPPM Density Porosity Processing Mode FSAL Formation Salinity −50000 PPM NO FSCO Formation Salinity Correction Option GCSE Generalized Caliper Selection BS 0 DEG GDEV Average Angular Deviation of Borehole from Normal GGRD Geothermal Gradient 0.018227 DC/M GRSE Generalized Mud Resistivity Selection CHART_GEN_9 GTSE Generalized Temperature Selection LINEAR_ESTIMATE HSCO Hole Size Correction Option YES SANDSTONE MATR Rock Matrix for Neutron Porosity Corrections MCCO Mud Cake Correction Option NO MCOR Mud Correction NATU MWCO Mud Weight Correction Option NO PTCO Pressure/Temperature Correction Option NO SDAT Standoff Data Source SOCN SHT Surface Hole Temperature 15 DEGC SOCN Standoff Distance 0.5 IN SOCO Standoff Correction Option NO CAL−Y: Casing Anomaly Locator − Y CCLD CCL reset delay 12 IN CCLT CCL Detection Level 0.3 V System and Miscellaneous SpeedCorrectedDepth ALTDPCHAN Name of alternate depth channel BS Bit Size 8.500 IN BSAL Borehole Salinity −50000.00 PPM CSIZ Current Casing Size 5.500 IN CWEI Casing Weight 15.50 LB/F DFD Drilling Fluid Density 1.00 G/C3 DORL Depth Offset for Repeat Analysis 0.0 M MST Mud Sample Temperature −50000.00 DEGC PBVSADP Use alternate depth channel for playback NO −50000.0000 OHMM RMFS Resistivity of Mud Filtrate Sample RW Resistivity of Connate Water 1.0000 OHMM TD Total Depth −50000 M −50000.00 M TDD Total Depth − Driller TDL Total Depth − Logger −50000.00 M TWS Temperature of Connate Water Sample 37.78 DEGC Format: CBL_Fluid_Compensated_REP Vertical Scale: 1:200 Graphics File Created: 02−Apr−2005 21:51 OP System Version: 11C0−305 MCM SDT−C TCC−B 11C0−305 OP11−KP1 CNT−H CAL−Y OP11−KP1 11C0−305 Input DLIS Files DEFAULT SONIC_CNL_003LUP FN:2 PRODUCER Output DLIS Files 02−Apr−2005 21:42 2091.1 M 2018.2 M DEFAULT COMPANY: SONIC_CNL_004LUP FN:3 PRODUCER 02−Apr−2005 21:51 YPF S.A. C` YPF. Nq. LLY.a.−24 FIELD: LOMA LAS YEGUAS PROVINCIA: NEUQUEN MAXIS EXPRESS PAIS: ARGENTINA MAXIS 500 WELL: CALIBRACION Calibration and Check Summary Measurement Nominal Master Before After Change Limit Units Compensated Neutron − H Wellsite Calibration − Zero Measurement Master: 31−Mar−2005 11:43 Before: 2−Apr−2005 15:03 0 CNTC Background 1.000 CFTC Background 0 0 0.5334 1.598 N/A N/A N/A N/A N/A N/A CPS CPS Compensated Neutron − H Wellsite Calibration − Jig Measurement Master: 31−Mar−2005 11:58 Before: 2−Apr−2005 15:01 2821 CNTC Jig 2821 CFTC Jig 1169 1169 CNTC/CFTC (Jig) 2.412 2.412 2804 1181 2.374 N/A N/A N/A N/A N/A N/A N/A N/A N/A CPS CPS The CNT Master Calibration Was Done With The Following Parameters : NCT−B Water Temperature Thermal Housing Size 15.0 DEGC. 3.375 IN. Compensated Neutron − H / Equipment Identification Primary Equipment: Compensated Neutron Cartridge Neutron Logging Source Neutron Source Radioactive Compensated Neutron Box Neutron Detector without Alpha Source Compensated Neutron Box CNC − HA NLS − KL NSR − F CNB − AB CND − NA CNB − AB 212 Auxiliary Equipment: Compensated Neutron Housing Neutron Calibration Tank CNH − A NCT − B 2021 Compensated Neutron − H Wellsite Calibration Zero Measurement Phase CNTC Background CPS Master Before −0.010000 (Minimum) Value Phase 0 Master 0.5334 1.000 (Nominal) Master: 31−Mar−2005 11:43 5.000 (Maximum) CFTC Background CPS Value 0 Before −0.010000 (Minimum) 1.598 0 (Nominal) 5.000 (Maximum) Before: 2−Apr−2005 15:03 Compensated Neutron − H Wellsite Calibration Jig Measurement 2112 3625 3625 Phase CNTC Jig CPS Value Master Before 2679 (Minimum) 2821 Phase 2821 Master 2804 Before 2962 (Nominal) 1111 (Maximum) Master: 31−Mar−2005 11:58 CFTC Jig CPS (Minimum) (Nominal) Before: 2−Apr−2005 15:01 Compania: YPF S.A. Pozo: Campo: Provincia: Pais: 1169 YPF.Ch.EA−670 EL ALBA CHUBUT ARGENTINA CONTROL DE CEMENTO CBL VDL CNL CCL 1/200 Value Phase 1169 Master 1181 Before 1228 (Maximum) 2.372 (Minimum) CNTC/CFTC (Jig) Value 2.412 2.374 2.412 (Nominal) 2.452 (Maximum) LABORATORIO BASE CHUBUT EPSILON SRL LABORATORIO INDUSTRIAL Ruta 3, Km.1838, BºGral. Mosconi - (9005) C. Rivadavia -Chubut, Arg. * Tel/Fax: (0297)-4550825 / 4559365 Muestra de: Petróleo Lugar de Muestreo: Pozo: EA-670 Fecha de Extracción: 30/05/05 Fecha de Recepción: 30/05/05 Solicitado Por: REPSOL - YPF SA. Sr. Rogerio Marquez Objetivo del Análisis: Control de calidad. PROTOCOLO Nº: 2310-05CR Fecha Informe: 02/06/05 Pag. 1/1 ITEM Nº = CANTIDAD = Distrito Nº = Nº Orden = INFORME DE ENSAYO PETROLEO HIDRATADO DETERMINACION % AT(%AL+D4007) % Agua Libre NORMA UNIDAD VALORES ENCONTRADOS S/N Procedimiento REPSOL YPF V % /V 28.0 V 0.0 % /V V % /V 28.0 Impureza Total V % /V 0.0 Arena y Barro ASTM D-4007 % V/V 12.0 Agua Separada Mod. % V/V 16.0 Emulsión % V/V 28.0 Agua Exacta g/cm3 0.9579 Densidad a 15ºC de petróleo ASTM D-5002 ºC -4 Punto de escurrimiento ASTM D-97 VISCOSIDAD (MU) Y ESFUERZO DE CORTE (TAU) x REOMETRO TEMP. 100 RPM MU (cp) 3825 2681 1879 30ºC 40ºC 50ºC PETROLEO DESHIDRATADO DETERMINACION % de parafina % de Asfalteno Analista: AG TAU (Pas) 509 385 243 NORMA UOP-86 SPE 23810 300 RPM MU (cp) TAU (Pas) 3811 1411 2671 954 1872 644 UNIDAD p % /p % p/p MU (cp) 3778 2648 1856 600 RPM TAU (Pas) 2685 1806 1215 VALORES ENCONTRADOS 7.9 4.5 ....................................................... Ing. Miguel LIZZANO Rep. Tec. Por EPSILON S.R.L. ____________________________________________________________________________________________________ Los resultados consignados fueron obtenidos dentro de un sistema de calidad ISO 9001:2000 y son representativos de la muestra analizada LABORATORIO CAÑADON SECO Epsilon S.R.L. Cañadon Seco (C.P. 9013)Tel/Fax 0297-4850216 Procedente de: Pozo EA-670 Zona: Solicitado por: Ruth Kirn Extraido por: Terceros M. Behr Protocolo Nº: 01443-05CS Pozo: Fecha de Extracción: 06/04/2005 Bateria: Fecha de Recepción: 11/04/2005 Fecha de Análisis: 11/04/2005 Capa: Análisis de Cromatografía Gaseosa Extendida COMPONENTES % MOLAR N2 7,07 O2 2,05 CO2 3,00 CH4 84,70 C2H6 2,19 C3H8 0,27 iC4H10 0,21 nC4H10 0,11 iC5H12 0,06 nC5H12 0,07 C6H14 0,10 nC7H16 0,09 nC8H18 0,06 nC9H20 0,02 Total 100 Observaciones Analista: Propiedades Físicas PM (Kg/Kmol) 18,873 Vm ( m3/Kmol) 23,650 Densidad ( abs) 0,798 Densidad ( rel) 0,652 PCs (Kcal/m3) 8309,192 PCi (Kcal/m3) 7491,347 Compresib Z 0,997 ºT Critica (ºK) 190,441 Presion Critica (Atm) 44,766 Zona 961,5/63,5 mts Eq PI-222-Protocolo Nº 1439-05CR Gomez Marcelo Javier Por Lab. Epsilon S.R.L. Los resultados consignados fueron obtenidos dentro de un sistema de calidad y son representativos de la muestra analizada LABORATORIO CAÑADON SECO Epsilon S.R.L. Cañadon Seco (C.P. 9013)Tel/Fax 0297-4850216 Procedente de: Pozo EA-670 Zona: Solicitado por: Ruth Kirn Extraido por: Terceros M. Behr Protocolo Nº: 01443-05CS Pozo: Fecha de Extracción: 06/04/2005 Bateria: Fecha de Recepción: 11/04/2005 Fecha de Análisis: 11/04/2005 Capa: Análisis de Cromatografía Gaseosa Extendida COMPONENTES % MOLAR N2 7,07 O2 2,05 CO2 3,00 CH4 84,70 C2H6 2,19 C3H8 0,27 iC4H10 0,21 nC4H10 0,11 iC5H12 0,06 nC5H12 0,07 C6H14 0,10 nC7H16 0,09 nC8H18 0,06 nC9H20 0,02 Total 100 Observaciones Analista: Propiedades Físicas PM (Kg/Kmol) 18,873 Vm ( m3/Kmol) 23,650 Densidad ( abs) 0,798 Densidad ( rel) 0,652 PCs (Kcal/m3) 8309,192 PCi (Kcal/m3) 7491,347 Compresib Z 0,997 ºT Critica (ºK) 190,441 Presion Critica (Atm) 44,766 Zona 961,5/63,5 mts Eq PI-222-Protocolo Nº 1439-05CR Gomez Marcelo Javier Por Lab. Epsilon S.R.L. Los resultados consignados fueron obtenidos dentro de un sistema de calidad y son representativos de la muestra analizada A: Aguilera DE:Vahnovan DISTRITO. M. BEHR / R. ALI POZO: EA-670 ZONA: ALBA 2 FECHA: 30/03/2005 CUENTA: EQUIPO: PROGRAMA: DISEÑO: 1 1 1 207 CAÑOS BAR COLLAR 2.7/8 TBG FILTRO BHD TUBING LISO 2.7/8" 1970 1960,35 B/B BBA 25-175-RHBC 24 4´ DE BOLLAND 14 B/B 1.1/2" Grado D Nuevas 92 'B/B 3/4" Grado D Nuevas 80 'B/B 7/8" Grado D Nuevas ± 72 B/B 1" Grado D Nuevas TROZOS 1" Grado D Nuevas VASTAGO CROMADO 1 1/2" x 22´ Transportar: Dispositivo Leutert, Espaciadores, Valvula de 2" y niple de 2" sch 80 Tee prensa, Rattigan de 2.7/8", Cupla de vastago, valvula de 1" con niple, cruceta AIB SIAM M-640-305-144 en locación VH-82 CARRERA 144 REGIMEN 6 GPM INSTALACIÓN ELÉCTRICA MOTOR 100 HP Bba 25-175 valvulas VM=VF=Ctitanio piston 4' c/ 10 anillos luz 0.07 Con dispositivo para Gas Mecánico; Sello arena EA-670 Diseño! Página 1 EQUIPO: A DESIGNAR POZO:EA-670 REPARACION DE PRIMARIA PEP: ESQUEMA DE POZO OBJETIVO: ESTADO: 9-5/8" Abrir Capas nuevas/Evaluar estado actual de producción En Producción CASING: 5 1/2" 14 # Programa Operativo 391,39 A. Montar Equipo de RTP de acuerdo a procedimientos. CAUDAL FLUIDO NIVEL I-T Ultimo Control: 961,5/63,5 Gas seco p/ 50mm PD: 7Kg/cm2 ; ######## Neta: 4,40 Bruta: 8,00 %Agua: 50,00 # p/25mm PD: 9 Kg/cm2 ; p/13mm 12Kg/cm2 PE: 19 Kgcm2 Est. en 15` Ctó 1048/50 1° Montar Equipo RTP según procedimientos 1600 Pet. 855 12 Calibrar hasta 2040 mbbp(tapon) 2° Si existe buena aislación, punzar las siguientes capas 4TPP; 0-90°; 32 grs Petrofísica SW Pronostico 0°-90° 50 Pet 32gr. 0°-90° 68 Agua c/R 1719,0/22,0 32gr. 0°-90° 66 Agua c/R o S/E 1559,0/61,5 32gr. 0°-90° 58 Pet+Agua Aporta gas c/Pet. Muy viscoso no se puede 1535,0/37,0 32gr. 0°-90° 68 Agua c/R pistonear, por semi surgencia, y ahogarse 1158,0/60,0 22gr. 0°-90° 50 Pet 1152,0/54,0 32gr. 0°-90° 45 Pet 1147,0/49,0 32gr. 0°-90° 58 Pet 1118/20 300 Pet. 998 6 1147,0/49,0 1152,0/54,0 E 1158,0/60,0 1182/85 400 Ag S/R Capas Carga Fase 1973,0/75,0 32gr. 1961,0/62,5 Profundidad Neutrón 3° Ensayar hasta estabilizar nivel, caudal y análisis, según esquema A) hasta E) 1040 4° Si resultase SE probar admidión y reensayar. 1212,5/15,0 S/E 5° En caso de extraer hidrocarburo tomar muestras para análisis y enviar a Epsilon. 6° En caso de ser gas medir presiones, tomar muestra y medir caudal. 7° De acuerdo a los resultados consultar pasos a seguir. 1535,0/37,0 D 1559,0/61,5 Prever estimulación con Gas-Oil a capas: 1627/29,5 250 Pet. Visc. 1520 6 1147,0/49,0 1152,0/54,0 1158,0/60,0 1719,0/22,0 C 8° Bajar Instalación de Producción 1725,5/27,5 380 Petróleo 1582 20 1784,5/86,5 1000 Pet. Viscoso 1610 7 350 Agua S/R 1785 1913,5/14,5 B NOTA: CAPAS CON PORCENTAJES DE AGUA MAYORES A 50%: CONSULTAR ANTES DE DAR POR FINALIZADO ENSAYO 1947/50 1961,0/62,5 1600 Pet. Viscoso 1750 A 1973,0/75,0 2040,00 69 EN CAPAS QUE APORTEN UN CAUDAL IMPORTANTE Tapón "N" con D. Bayler (Mayor de 500l/h) DE AGUA Y/O HIDROCARBUROS, TOMAR UNA MUESTRA Y ENVIARLA A EPSILON PARA EFECTUARLE UN UN ANALISIS COMPLETO Y RESISTIVIDAD. 2048/52 2400 Collar: 2095,66 Zapato: 2103,48 P. Final: 2110,20 Agua S/R 1850 Prep: Genini/Cameselle Geología Mbehr DATOS A LLENAR POZO BATERIA EQUIPO FECHA RUBRO COSTO OBJETIVO NOMBRE DEL PROYECTO N°DE GRAFO PEP ZONA FLUIDO DE TRABAJO FINALIZO PERFORACION ULTIMA INTERVENCION COORDENADAS X Y Z COMPAÑIAS DE SERVICIO TORRE CEMENTACION ESTIMULACION MOTOR DE FONDO COILED TUBING CABLE PARA PUNZAR CAÑÓN Ø TIROS POR PIE CASING EN BOCA DE POZO Ø Y mts. DIAMETRO Y LIBRAJE 5 1/2" 12,42 6 5/8" 18,54 7" 20,60 9 5/8" 39,40 Total de m³+5 15,5 0,0 0,0 15,4 CARGAR DATOS EA-670 Myburg KEY-08 20/11/2009 Aumentar Producción 124.669,00 Reparaciones de Primaria 2009 RS1EC.10Y4.58.R0006 Myburg AGUA DULCE CON MARCAT 0,1% (MARBAR) 29 de marzo de 2005 28 de agosto de 2009 4.949.430,15 2.582.170,82 650,00 KEY ENERGY SERVICES SAI SLB CHRISTENSEN GEOLOG Cañón Ø 4" 4 TxP 32 Grs 5 1/2" 5 1/2" 14-15,5-17# 2.095,16 390,99 NO TOCAR "PARA USO DEL BACTERICIDA" COLLAR DIFERENCIAL ZAPATO PROFUNDIDAD FINAL INSTALACION FINAL DEL POZO Adjunta en "Instalación" MATERIAL DE BOMBEO DEL POZO Adjunta en "Instalación" HERRAMIENTA A BAJAR COLOCAR TIPO DE HTA.Y Ø CALIBRAR HASTA HERMETICIDAD DEL CSG DESDE 4" ó 5" 4 Ejemplos 7" a 23 5-1/2" 15,5 2.095,16 2.103,18 2110,2 Fresa 120 mm 2040 107,83 Caratula 20/11/2009 ZONA M. BEHR UNIDAD DE NEGOCIOS ARGENTINA SUR UNIDAD ECONOMICA CHUBUT - CAÑADON SECO AREA MANANTIALES BEHR EA-670 PROGRAMA OPERATIVO del POZO : SUBREGION : ZONA : CH Myburg BAT: Myburg RUBRO: Aumentar Producción PROYECTO: Reparaciones de Primaria 2009 COSTO OBJETIVO: U$S 124.669 COSTO ESTIMADO: U$S 94.893 DIAS ESTIMADOS: 8,3 AGUA DULCE CON MARCAT 0,1% (MARBAR) FLUIDO DE REPARACION: EQUIPO : KEY-08 CANTIDAD: PEP RS1EC.10Y4.58.R0006 COMPAÑIAS ASIGNADAS: GEOLOG KEY ENERGY SERVICES SAI SLB CHRISTENSEN - CABLE: TORRE: CEMENTACION: ESTIMULACION: MOTOR DE FONDO: COILED TUBING: 29 de marzo de 2005 FINALIZO PERFORACION : 28 de agosto de 2009 ULTIMA INTERVENCION: OBSERVACIONES: COORDENADAS: X: Y: COTA: Altura mesa Rotary: Elevación mesa Rotary: 4.949.430,15 2.582.170,82 Z: 650,00 3,5 m - m 30,9 m³ PROG. M. BEHR RESERVA N°: PEP UNIDAD ECONOMICA CHUBUT-CDON. SECO DISTRITO ZONA CENTRAL EA-670 ZONA : FLUIDO DE REPARACION: Myburg Adjunta en "Instalación" INSTALACION BBEO: Adjunta en "Instalación" KEY-08 4.949.430,15 Y: 2.582.170,82 Z: 650,00 BAT: CH SUBREGION : CANTIDAD: Myburg 30,9 m³ GEOLOG COMPAÑIA WIRE LINE: 5 1/2" 14-15,5-17# 5 1/2" N° CAPA X: AGUA DULCE CON MARCAT 0,1% (MARBAR) INSTALACION FINAL: EQUIPO: RS1EC.10Y4.58.R0006 Reparaciones de Primaria 2009 PROGRAMA OPERATIVO : POZO : 20/11/2009 PROGRAMA OPERATIVO Nota: Referente MARBAR - Raúl Campoy 154-046003 - MARCAT (1 Lts x m3) 9 5/8" a 390,99 m Tope de cemento: 800 m . Fondo WL: 2090,5 m. Buen cemento en la zona registrada. 1º) Montar Equipo y realizar check list. Antes de montar controlar presiones estaticas de directa e inversa. TOC: 800 m CSG Siderca & tubhier 5 1/2" 14-15,5 lbs/ft 961,5/63,5 2º) Retirar instalación existente especificada en solapa "Instalación" Sacar varillas desarmando y revisando el estado Sacar TBG. Si los mismos estan en buen estado, consultar reemplazo. Si no se reemplazan sacar a la torre. Caso contrario sacar desarmando. < 1148,0/50,0 3º) Bajar cañería y calibrar con fresa Ø 120 mm hasta 2040 m. Circular una capacidad de CSG. < 1118,0/20,0 4º) Punzar con cañón 4" 0-90° 32gr previa correlación con neutrón las siguientes capas: < 1158,0/60,0 < 1182,0/85,0 < 1212,0/14,5 < 1627,0/29,5 < 1725,5/27,5 < 1784,5/86,5 Punzar Punzar Punzar Punzar Punzar Repunzar Punzar Punzar Capa Carga TPP Fase Esp (m) 1973,0/75,0 1961,0/62,5 1719,0/22,0 1559,0/61,5 1535,0/37,0 1158,0/60,0 1152,0/54,0 1147,0/49,0 32 gr 32 gr 32 gr 32 gr 32 gr 22 gr 32 gr 32 gr 0-90º 0-90º 0-90º 0-90º 0-90º 0-90º 0-90º 0-90º 2 1,5 3 2,5 2 2 2 2 4 4 4 4 4 2 4 4 5º) Bajar TPN y PKR, y ensayar por pistoneo las capas de la siguiente manera A), B), C), D) y E) como se indica en la solapa "Esquema" En capas que resulten SE, probar admisión y luego reensayar. En caso de ser gas medir presiones y tomar muestra. En caso de extraer hidrocarburo tomar muestra para análisis y enviar a Epsilon. 6º) Bajar instalación final, a definir por Ing de producción Guardia de Ing Manantiales Behr: 155934862. 7º) Desmontar equipo completo. Nota: Preever cementación. < 1913,0/14,5 < 1947,0/50,0 Referencias Ingeniero del pozo Gialleonardo, Lucas Geologo del pozo Baigorria, Gabriel Ing de producción Donascimiento, Fernando AD JUN TAR AL BALAN CE D EL POZO EL BALAN CE D E MATERIALES CON SUS RESP. FIRMAS. TPN N en 2040 m < 2048,0/52,0 COMPLETAR D IARIAMEN TE LA PLAN ILLA D E BALAN CE D E AGUA EN TREGAD A POR EL COMPAN Y MAN . REGISTRARLA EN EL ULTIMO PARTE D EL D AILY D RILLIN G LA AD MISIÓN TOTAL Collar: 2095,16 Zto: 2103,18 Fdo: 2110,20 NO REALIZAR RESERVAS DE SOLICITUD NI DEVOLUCIÓN DE MATERIALES Solicitar las necesidades de materiales al geólogo operativo de turno con copia a Claudio Gordillo 155940281 154776148 155934862 PROG. RECOMENDACIONES: AL FINALIZAR EL POZO DEBERÁN PRESENTAR EL ESQUEMA DE LA INSTALACIÓN FINAL (SKETCHIT) SIENDO REQUISITO PARA CERTIFICAR, LA NO PRESENTACIÓN DEL MISMO SE TENDRÁ EN CUENTA PARA LA EVALUACIÓN CORRESPONDIENTE.CUANDO OCURRA CUALQUIER TIPO DE ACCIDENTE SE DEBE COMUNICAE EN FORMA INMEDIATA (Telefónicamente) AL JEFE DE DISTRITO, DONDE OCURRA EL MISMO. DURANTE LA ETAPA DE TRANSPORTE DEL EQUIPO PROCEDER: EN CASO DE EXISTIR LINEAS ELECTRICAS EN EL RECORRIDO CUALQUIERA SEA LA ALTURA DE LAS MISMAS DAR AVISO AL SECTOR ENERGIA DE REPSOL-YPF POR INTERMEDIO DE COORDINACION DE PRODUCCION TELEF: 346000 QUEDA TERMINANTEMENTE PROHIBIDO EL USO DE LLAVES STILSON PARA REALIZAR AJUSTES DE ENROSQUES Y DESENROSQUES DE TUBULARES EN BOCA DE POZO LOS MISMOS SE HARAN CON LLAVES DE POTENCIA.SE LES RECUERDA QUE TODA PAG (SIMPLE O DOBLE) USADA O NUEVA DEBERA CONTAR CON NIPLES DE ALTA PRESION - ESPESOR ENTRE 8 y 9 mm CON ROSCA Ø 2" LP DE'11,5 FILETES POR PULG. DE NO CONTAR CON ESTOS ELEMENTOS NO ARMAR LAS MISMAS.- NOTA : TOMAR PRECAUCIONES PARA EVITAR DERRAMES DE FLUIDOS. AVISAR URGENTE A LA INSPECCION. ADEMAS SE INDICA QUE SE DEBE COMUNICAR A LA MAYOR BREVEDAD POSIBLE TODAS LAS NOVEDADES QUE REVISTAN EL CARACTER DE ACCIDENTES DE PERSONAL.ORDEN : DE TODOS LOS ENSAYOS CON INSTALACION FINAL SE DEBERA TOMAR UNA MUESTRA, DE LA ULTIMA HORA DE ENSAYO, DE TRES LITROS Y ENVIARLA DEBIDAMENTE IDENTIFICADA AL LABORATORIO EPSILON Km3, A EFECTOS DE REALIZAR EL ENSAYO DE VISCOSIDAD A TRES TEMPERATURAS, PUNTO DE ESCURRIMIENTO Y TENOR PARAFINICO.TRANSCRIPCION DE: MEMORANDUM A: COMPAÑIAS DE SERVICIOS DE: JEFE DE AREA DE OPERACIONES DE PRODUCCION REG. CDRO. RVDA. SE RECUERDA A ESA COMPAÑIA QUE EN VIRTUD DE LO DISPUESTO POR LAS RESOLUCIONES S.E Nª 105/92 Y 252/93 QUEDA EXPRESAMENTE PROHIBIDO DESCARGAR CRUDO O DERIVADOS DE DE HIDROCARBUROS A LAS PILETAS NATURALES DE LOS POZOS. CUANDO UNA EMERGENCIA OPERATIVA GENERE LA CONTAMINACION DE UNA PILETA, ESA COMPAÑIA DEBERA SUBSANAR EL PROBLEMA A LA BREVEDAD.LA NO OBSERVANCIA DE ESTAS NORMAS,GENERARA LA INTERVENCION DE YPF S.A. PARA REPARAR LA CONTAMINACION CON CARGO ESA CIA. Y LA APLICACION DE LAS MULTAS CORRESPONDIENTES.- RESPONSABLE Ingeniería de Perforación y Workover de pozos Unidad de Negocios Argentina Sur TERMINACION / REPARACIÓN DE POZOS Gerencia: Manantiales Behr Tipo de intervención ESQUEMA 9-5/8" 14 # 5 1/2" 14# 0 Repa. Prim. POZO PROGNOSIS DE Repa. Prim. PROGRAMA DE Repa. Prim. no DTM y Montar equipo 18,0 hs DTM y Montar equipo $ 9.475 Reparar Casing no Acondicionar el Pozo 30,4 hs Acondicionar el Pozo $ 8.808 Recuperar pesca no Perfilar a pozo entubado Perfilar pozo Rotar tapón no Cemento normal Cemento normal $ $ 5.000 Reentubado no Cemento correctivo 0,0 hs Cemento correctivo $ - Csg suplementario no Punzar formación 9,1 hs Punzar formación $ 11.540 Profundidad pozo 2110 m Estimular 0,0 hs Estimular $ - CBL - VDL metros a registrar 0m Fracturar 0,0 hs Fracturar $ - Intervalos punzados 8 Controlar Arena 0,0 hs Controlar Arena $ - Metros Punzados 17 m Ensayar 63,4 hs Ensayar $ 19.378 Etapas de punzado 1 Bajar instalación final 20,5 hs Bajar instalación final $ 5.947 Cantidad de Ensayos 5 NPT 13,0 hs NPT $ 2.830 Horas de ensayo por intervalo 8 Hs Transp. Cargas $ 9.467 Cantidad de Cementaciones Normales 1 Cargas sociales $ 3.664 Cantidad de Cementaciones Correctivas 0 TIEMPO DE TERMINACIÓN Inspección Cantidad de Estim. Matriciales 0 COSTO DE TERMINACIÓN $ $ 1.653 788 Horas de cierre acuohumectante 0 Hs TIEMPO DRILLING ABC Horas Ensayo Estimulación Matricial 0 Hs COSTO DRILLING ABC Cantidad de Fracturas 0 Control de arena no Gravel pack no Hs. De Fragüe arena recinada 0 Hs Horas ensayo de fractura 0 Hs Ensayo TST 0 Muestra PVT 0 18,0 hs 0,8 días $ 9.475 Acondicionar el Pozo 30,4 hs 1,3 días $ 8.808 0,0 hs 0,0 días $ - 44,0 hs 1,8 días $ 12.742 7 Cemento correctivo 0,0 hs 0,0 días $ - Punzar formación 9,1 hs 0,4 días $ 2.374 Estimular 0,0 hs 0,0 días $ - Fracturar 0,0 hs 0,0 días $ - Controlar Arena 0,0 hs 0,0 días $ - 63,4 hs 2,6 días $ 18.378 Ensayar fractura / estimulación 0,0 hs 0,0 días $ - Ensayo TST 0,0 hs 0,0 días $ - Cemento normal 6 0 5 Ensayos individuales 1 4 0,0 hs 0,0 días $ - Bajar instalación final 20,5 hs 0,9 días $ 5.947 Espera condiciones necesarias 13,0 hs 0,5 días $ 2.830 Remunerativos SUMEX+PEET 198,4 hs 8,3 días $ 3.664 $ 64.218 1,0 días $ 1.200 Tomar Muestra PVT 0 3 0 COSTO DE EQUIPO DE TORRE Camión chupa [usd/día] 2 1 1 0 2095 m 8,3 días $ - Insp. Terminación [usd/mes] 6000 8,3 días $ 1.653 0 8,3 días $ - Transporte cargas sólidas [usd/mes] 15000 8,3 días $ 4.134 Transporte cargas Líquidas [usd/mes] 15000 8,3 días $ 4.134 5,0 $ - Cementar 5.000 $ 5.000 Punzar formación 9.166 1 $ 9.166 25.000 1 $ - 0 1 $ - Zapato: 2105 m Fracturar P. Final: 2110 m Controlar Arena 0,00 2 1.200 0 Perfilar pozo Collar: 8,3 días Supervisor advisor [usd/mes] Pick UP 4x4 [usd/mes] 1.000 1 $ 1.000 10.000 0 $ - 600 1 $ 600 Alquiler de Motor de Fondo 3.000 1 $ 3.000 Adicional alquiler de trailer 3939 8,3 días $ 543 30 Fluido de Terminación Estimular Fresa 8,3 días $ 245 Venver COSTO DE SERVICIOS $ 30.675 SAI-129 COSTO DE LA Repa. Prim. $ 94.893 Scio pileta ecológica TARIFARIO DE EQUIPO Hora Operativa normal 290 Hs. Stand by con personal 261 Hs. Stand by sin personal Hs. Stand by con personal Clima/mantenim Desmontaje Trasnporte y Montaje 3a. Esceso de transporte (Km) Tprte de pileta ecológica Servicio de alquiler de trailer Servicio de pileta ecológica Pago Mensual PEET Pago Mensual SUMEX Equipo de referencia Tipo de Cambio U$s/$ 0,26315 0,0 hs 44,0 hs RESUMEN DEL PRESUPUESTO DTM y Montar equipo Perfilar a pozo 0 COSTO DE LAS ETAPAS Cementar patagoniano DESGLOSE DE COSTOS DE Repa. Prim. 8 EA-670 87 218 9475 42 174 3939 24 4585 8712 Venver 8,3 días $ 94.893 12,8 días $ 124.669 Trailer y piletas Clase Código SubCod Descripción Ter Ter Ter Ter Ter Ter Ter Ter Ter Ter Ter I EQ I EQ I EQ I EQ I EQ I EQ I LG I LG I SV I SV I MH 100 120 130 141 150 165 110 130 190 200 200 TTE. Y MONTAJE DE EQUIPO HS. OPERATIVA NORMAL HS. STAND BY C/PERSONAL PARADO P/FACTOR CLIMATICO TTE. CARGAS LIQUIDAS TTE. CARGAS SÓLIDAS (GLOBAL) SUPERVISIÓN ALOJAMIENTO INSPECCION CEMENTO SERVICIO CEMENTO MATERIALES ADITIVOS VARIOS Ter Ter Ter Ter Ter I SV I SV I SV I SV I SV 230 305 310 350 400 PUNZADO SERVICIO PILETA ECOLOGICA MOTOR DE FONDO ALQUILER ALQUILER FRESAS SERVICIOS VARIOS Monto en U$S Monto en $ 2287 27314 11084 132211 573 6843 2374,1 688 8139 2829,7 0 20269 5333,7 0 15708 4133,7 0 6283 1653,5 131 542,8 3500 1565 0 3500,0 1500 0 1500,0 1000 0 1000,0 9166,33476 0 9166,3 59 708 0 3000 0 600 3664 0 Totales 37252 219040 Total en U$s 94.893 1 9474,7 45874,9 245,1 3000,0 600,0 3664,4 1 1 Instalación de Bombeo N° Pieza 1 1 1 1 224 10 1 Componente VASTAGO TROZO VARILLA BOMBEO TROZO VARILLA BOMBEO TROZO VARILLA BOMBEO VARILLA BOMBEO VARILLA BOMBEO BOMBA PCP Tipo PCP ACERO ACERO ACERO ACERO ACERO BBA. PCP - ROTOR Diametro Nominal (in) 1,25 1 1 1 1 1 1,259 Fabricante WEATHERFORD METALMECANICA METALMECANICA METALMECANICA METALMECANICA METALMECANICA OTROS Longitud Tope Condición 6,7 -3,35 NUEVO 0,6 3,35 INSP.GRAD2 1,2 3,95 INSP.GRAD2 2,43 5,15 INSP.GRAD2 1.706,88 7,58 DEL POZO 76,2 1.714,46 INSP.GRAD2 6,4 1.790,66 NUEVO 0 1.797,06 Diametro Torque Libraje Grado Rosca Calibre (in) (lb/ft) 0 0 API 0 0 0 28,41 GRADO "D2" API 0 0 0 28,41 GRADO "D2" API 0 0 0 28,41 GRADO "D2" API 0 0 0 28,41 GRADO "D" API 0 0 0 28,41 GRADO "D" API 0 0 Instalación final N° Pieza 20 167 1 1 1 1 1 1 Componente TUBING TUBING ZAPATO A COPAS TUBING BOMBA PCP ANCLA TUBING FILTRO CUPLA Diametro Tipo Nominal (in) ACERO 2,875 ACERO 2,875 COPA RAC 2,875 ACERO 2,875 BBA. PCP - ESTATOR 2,375 TORQUE 5,5 DESARENADOR 2,875 PASADOR 2,875 Fabricante SIDERCA SIDERCA YPF S.A. SIDERCA OTROS OTROS YPF S.A. YPF S.A. Longitud 191,27 1.590 0,24 9,58 6,45 0,34 9,6 0,15 0 Diametro Libraje Grado (in) -0,6 INSP.GRAD2 0 6,5 J-55 190,67 DEL POZO 0 6,5 J-55 1.780,79 NUEVO 0 0 1.781,03 DEL POZO 0 6,5 J-55 1.790,61 NUEVO 0 0 1.797,06 NUEVO 0 0 1.797,40 REPARADO 0 0 1.807,00 DEL POZO 0 0 J-55 1.807,15 Tope Condición Rosca Calibre EUE EUE EUE EUE 0 0 0 0 0 0 0 0 Torque (lb/ft) 0 0 0 0 0 0 0 0 Esquema POZO: EQUIPO: EA-670 OBJETO: KEY-08 Est.Actual : Aumentar Producción PEP: OI: PROYECTO: Inicio: 20/11/2009 Termino: 29/11/2009 Capa N° Casing NEUTRÓN CABLE Cta GEOLOG FLUIDO: SAI Reparaciones de Primaria 2009 COSTO DRILLING ABC U$S: FRAC Acido M.Fdo. PRESUPUESTO U$S: SLB SLB CHRISTENSENACTUAL U$S: AGUA DULCE CON MARCAT 0,1% (MARBAR) 124.669,00 94.892,74 48.093,00 Transporto equipo desde el pozo EN-634, sobre 25 Km. Monto equipo completo. Saco Instalacion de Producción (Varillas en single. Tbg a la torre) Bajo Fresa 120 mm hasta 1938 m. Lavo relleno hasta 2040 m Tpn N. Saco hta. Cia Geolog punzo con cañon 4" - 4 TPP - 32 Gr. 1973,0/75,0 - 1961,0/62,0 - 1719,0/22,0 - 1559,0/61,0 1535,0/37,0 - 1158,0/60,0 - 1152,0/54,0 - 1147,0/49,0 Bajo Tpn y Pkr, ensaya por pistoneo según se indica con las letras: ( A ) - ( B ) - ( C ) - ( D ) - ( E ) - ( F ) Saca PKR para cambiar y baja nuevamente Cía SAI cementa capa 1719,0/22,0 con 20 bls. Baja fresa + MDF rota cemento desde 1685 m hasta 1722 m Baja packer realiza hermeticidad de capa cementada 1719,0/22,0. OK Baja instalación estator + tubing Baja rotor + varillas. Desmonta equipo INDUCCIÓN 5 1/2" 14-15,5-17# 9 5/8" a 390,99 m CAPAS VIEJAS RS1EC.10Y4.58.R0006 CAPAS NUEVAS Prox: Stand By (EA-48) Tope 800 m. Hs de Formación 961,5/63,5 Q Lts/h 1148,0/50,0 > 1118,0/20,0 > 1158,0/60,0 > 1182,0/85,0 > 1212,0/14,5 > < 1147,0/49,0 < 1152,0/54,0 << Repunzar < E 1627,0/29,5 IT % 1535,0/37,0 1559,0/61,5 SE - Rompe formacion con 1500 psi. Admite 147 LPM con 1100 psi. 195 l/h - ASF - N: 1458 m - Sal: 3,3 - PH: 8 - Temp: 32 °C 4 0 1719,0/22,0 X 1725,5/27,5 1784,5/86,5 1947,0/50,0 C 2400 l/h - ASF - N: 1213 m - Sal: 2,2 - PH: 7 - Temp: 30 °C B 600 l/h - ASF c/Lrpleo - N: 1573 m - Sal: 2,2 - PH: 7 - Temp: 30°C 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 57,60 0,00 0,00 0,00 0,00 0,00 0,00 0,00 17,28 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 6 2400 100% 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 14,40 0,00 0,00 0,00 4,32 0,00 0,00 0,00 0,00 5 600 100% 0,00 0,00 0,00 0,00 0,00 0,00 0,00 3,74 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 1,12 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 75,744 0,00 22,723 0,00 0,000 > > < 1961,0/62,5 < 1973,0/75,0 A SE - No rompe formacion. Admite 245 LPM con 1100 psi. 156 l/h - ASF - N: 1905 m - Sal: 2,8 - PH: 9 - Temp: 22 °C 3 156 100% > Nota: Collar: 2.095,16 Zap.: 2.103,18 Instalación del pozo: C. Dent. + filtro + 2 tbg + ancla + estator + 1 tbg + BHD + 187 tbg PF: 2110,20 Rotor + 234 Var. 7/8" + 3 trozos 1" + Vastago 1,25" REFERENCIAS Neta Estimada m3/día > X 2048,0/52,0 Bruta Estimada m3/día > XO 1913,0/14,5 Q m3/día 6 > < 30,0% 17 m de relleno D < 897 l/h - PF - N: 986 m - IT: 30 % - D: 0,986 - Sal: 2,2 - PH: 7 - Temp: 30 °C Factor Datos Tapón Fijo CSG Roto Total 1º) Montar Equipo y realizar check list. Antes de montar controlar presiones estaticas de directa e inversa. 2º) Retirar instalación existente especificada en solapa "Instalación" Sacar varillas desarmando y revisando el estado Sacar TBG. Si los mismos estan en buen estado, consultar reemplazo. Si no se reemplazan sacar a la torre. Caso contrario sacar desarmando. 3º) Bajar cañería y calibrar con fresa Ø 120 mm hasta 2040 m. Circular una capacidad de CSG. 4º) Punzar con cañón 4" 0-90° 32gr previa correlación con neutrón las siguientes capas: Capa Punzar 1973,0/75,0 Punzar 1961,0/62,5 Punzar 1719,0/22,0 Punzar 1559,0/61,5 Punzar 1535,0/37,0 Repunzar 1158,0/60,0 Punzar 1152,0/54,0 Punzar 1147,0/49,0 Carga TPP 32 gr 32 gr 32 gr 32 gr 32 gr 22 gr 32 gr 32 gr Fase 4 4 4 4 4 2 4 4 0-90º 0-90º 0-90º 0-90º 0-90º 0-90º 0-90º 0-90º Esp (m) 2 1,5 3 2,5 2 2 2 2 5º) Bajar TPN y PKR, y ensayar por pistoneo las capas de la siguiente manera A), B), C), D) y E) como se indica en la solapa "Esquema" En capas que resulten SE, probar admisión y luego reensayar. En caso de ser gas medir presiones y tomar muestra. En caso de extraer hidrocarburo tomar muestra para análisis y enviar a Epsilon. 6º) Bajar instalación final, a definir por Ing de producción Guardia de Ing Manantiales Behr: 155934862. 7º) Desmontar equipo completo. D.I.N. DIVISION REGIONAL SUR UNIDAD ECONOMICA CHUBUT - C.S. EQUIPO: PI-222 DISTRIT0 N°: 6 PROYECTO : DRILL 150 BAT: POZO: EA-670 QB QN CIA DE CABLE: Schlumberger CIA DE FRACTURA: Schlumberger ESQUEMA DE TERMINACIÓN OBJETIVO: ESTADO: 9-5/8" Poner en Producción Productivo INICIO: TERMINO: CASING: 5 1/2" 14 # 03-abr-05 11-abr-05 ACTUAL: DTM al pozo Gra-627 391,39 CAUDAL FLUIDO NIVEL ANALISIS I-T DEN SAL Hs Ensayo Temp A/SEP Posible fractura p/control de arena 961,50 963,50 12 Gas seco p/ 50mm PD: 7Kg/cm2 ; p/25mm PD: 9 Kg/cm2 ; p/13mm 12Kg/cm2 PE: 19 Kgcm2 Est. en 15` Ctó c/25 Bls. PI: 500 ; PF: 950 ; PC: 15600 PSI Hermeticidad positiva 4 1048,00 11 1600 Pet. 855 12 0,937 34 12 5.8 /PH 9 5 11,52 10,14 10 300 Pet. 998 6 0,921 20 5 4.6 /PH-9 5,5 2,16 2,03 2,88 0 1050,00 1118,00 1120,00 RF c/1800 psi 1158,00 9 1160,00 1182,00 Aporta gas c/Pet. Muy viscoso no sepuede pistonear, por semi surgencia, y ahogarse Circula con agua caliente ensaya con el mismo resultado anterior 8 400 Ag S/R 1040 25 3.5/ PH-8 1185,00 1212,00 7 RF c/1800 psi 1214,50 1627,00 S/E 6 250 2,5 Pet. Visc. 1520 6 0,969 30 5 4.6 PH-11 6 1,80 1,69 1629,50 1725,50 5 RF c/1900 psi 1727,50 1784,50 Petróleo 1582 20 0,950 30 18 4,09/PH:9 6 2,74 2,19 1000 Pet. Viscoso 1610 7 0,950 30 8 4,6/PH:9 6 7,20 6,70 2,9/9 6,5 2,52 0 4,09/9 7 11,52 3,57 3,5/8 6 17,28 0 59,62 26,32 4 1786,50 1913,00 380 3 RF c/2800 psi 1914,50 350 Agua S/R 1785 Pet. Viscoso 1750 35 RF c/2200 psi 1947,00 2 1600 69 0.948 15 68 1950,00 2040,00 2048,00 Tapón "N" con D. Bayler 1 RF c/2800 psi 2052,00 2400 Collar: 2095,66 Zapato: 2103,48 P. Final: 2110,20 Agua S/R 1850 35 COMPANIA: YPF S.A. PAIS: 666.45 m ARGENTINA COMBINADA ESCALA: 1/200 B.V. 661.9 m Elev.: Elev.: sobre nivel ref. AIT−LDL−CNL−CALI MDT NIVEL DEL TERRENO 0.0 m N. T. 661.9 m M. R. 666.15 m NIVEL DEL TERRENO @ @ @ @ @ Latitud Y: 2.584.937,96 Ref. Permanente: @ Longitud X: 4.949.913,10 Reg. Medido Desde: 28−Jun−2006 1 1800 m 1801.3 m 1798.9 m 349.7 m 9.625 in @ 350.44 m 349.7 m 8.750 in PHPA 1.17 g/cm3 55 s 6.5 cm3 8.5 PILETA 4.690 ohm.m @ 7 degC 3.880 ohm.m @ 7 degC 6.700 ohm.m @ 7 degC PRENSA PRENSA 1.472 @ 70 1.227 @ 70 70 degC 28−Jun−2006 12:15 28−Jun−2006 23:00 8116 ARCS A. AMID / D. ICHAZU ANIBAL SILVEIRA Equipo PI−245 Perforacion Medida Desde: NIVEL DEL TERRENO UWI: AR0100006830 LOCACION YPF.Ch.EA−695 Compania: YPF S.A. POZO: YPF.Ch.EA−695 EL ALBA Pozo: CAMPO: CAS CHUBUT Locacion: PROVINCIA: EL ALBA echa orrida No. rof. Perforador rof. Registro rimera Lectura tima Lectura ondo Tuberia Perforador ondo Tuberia Registro ametro Trepano po De Lodo Densidad Viscosidad PH Perdidas uente Muestra De Lodo M @ Temp. MF @ Temp. MC @ Temp. RMC uente: RMF M @ T. Fdo. RMF @ T. Fdo. emp. Maxima Medida rculacion Final Hora Hora egistro Fondo nidad No. Locacion egistrado por: estigo Campo: MUD Logging Date Run Number Depth Driller Logger Depth Bottom Log Interval Top Log Interval Casing Driller Size @ Depth Casing Logger Bit Size Type Fluid In Hole Density Viscosity Fluid Loss PH Source Of Sample RM @ Measured Temperature RMF @ Measured Temperature RMC @ Measured Temperature Source RMF RMC RM @ MRT RMF @ MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By Run 1 @ @ @ @ @ @ Run 2 @ Run 3 @ @ @ @ Run 4 @ DEPTH SUMMARY LISTING Date Created: 30−JUN−2006 10:19:37 Depth System Equipment Depth Measuring Device Type: Serial Number: Calibration Date: Calibrator Serial Number: Calibration Cable Type: Wheel Correction 1: Wheel Correction 2: IDW−B 4858 12−Nov−2004 31 7−46P −4 −4 Tension Device Type: Serial Number: Calibration Date: Calibrator Serial Number: Calibration Gain: Calibration Offset: CMTD−B/A 1689 14−Feb−2006 1028 1.28 41.00 Logging Cable Type: Serial Number: Length: 7−46P 77353 3000.15 M Conveyance Method: Wireline Rig Type: LAND Depth Control Parameters Log Sequence: First Log In the Well Rig Up Length At Surface: Rig Up Length At Bottom: Rig Up Length Correction: Stretch Correction: Tool Zero Check At Surface: 71.00 M 71.00 M 0.00 M 2.10 M 0.00 M Depth Control Remarks 1. Primera carrera en el pozo y perfil de referencia de profundidad. 2. Procedimiento Estandar de Control de Profundidad de Schlumberger aplicado a esta carrera. 3. 4. 5. 6. LIMITACION DE RESPONSABILIDAD LA UTILIZACION Y CONFIANZA EN LOS DATOS AQUI GRABADOS POR PARTE DE LA NOMBRADA COMPANIA (Y POR CUALQUIERA DE SUS SUBSIDIARIAS, AFILIADAS, REPRESENTANTES, AGENTES, CONSULTORES Y EMPLEADOS) ESTA SUJETA A LOS TERMINOS Y CONDICIONES ACORDADOS ENTRE SCHLUMBERGER Y LA COMPANIA, INCLUYENDO: (a) RESTRICCIONES EN EL USO DE LOS DATOS GRABADOS; (b) LIMITACION DE RESPONSABILIDAD Y REVOCACION DE GARANTIAS EN RELACION A LA UTILIZACION Y CONFIANZA EN LOS DATOS GRABADOS POR PARTE DE LA COMPANIA, Y (c) LA SOLA Y TOTAL RESPONSABILIDAD DEL CLIENTE POR CUALQUIER INTERPRETACION HECHA O DECISION BASADA EN EL USO DE ESTOS DATOS. OTROS SERVICIOS # 1 OTROS SERVICIOS # 2 OS1: AIT−LDL−CNL−CALI OS1: OS2: MDT OS2: OS3: OS3: OS4: OS4: OS5: PI−245 OS5: OBSERVACIONES: CORRIDA # 1 OBSERVACIONES: CORRIDA # 2 1. Primera carrera en el pozo y perfil de referencia de profundidad. 2. Esquema del pozo segun datos del perforador. 3. Herramienta corrida segun diagrama. 4. AITH corrida descentralizada utilizando standoffs de 1,5". 5. Maxima desviacion del pozo segun datos del perforador = 1 deg 6. Maxima temperatura registrada 70 degC, tomada con termometro en punta de herramienta. 7. Datos adicionales del lodo: Cl = 350 ppm. Ca = 80 ppm. 8. Ultima circulacion termino el dia 28−Jun−06 a las 12:15 hs y duro 1 hora. 9. FPHI = DPHI, FNUM = 0,81 y FEXP = 2 utilizados para el calculo de RWA. 10. LDL y CNL corridos hasta 900 m a pedido del cliente. CORRIDA #1 ORDEN DE SERVICIO: VERSION DEL PROGRAMA: 14C0−302 NIVEL DEL LODO: 0m INTERVALO REGISTRADO COMIENZO FINAL CORRIDA #2 ORDEN DE SERVICIO: VERSION DEL PROGRAMA: NIVEL DEL LODO: INTERVALO REGISTRADO COMIENZO DESCRIPCION DEL EQUIPO CORRIDA # 1 SURFACE E GSR− NCT CNB− NCS− WITM (D DOWNHOLE LEH− 16.0 LEH−QT DTC− CTEM ECH−KC TelSta DTCH ToolSt DTCH HGNS H HMC HILTB− Gamma HGNSD HMC HGNH NLS− NSR−F HACC HCN Neutro HGR Neutro BOW− NPV HGNS 0 DTA− 14.815.1 14.2 14.2 14.014.2 12.2 12.0 11.3 11.3 ECH− DTA LDT− 10.1 GSR−J PGD−G NSC−E ECH−MK DRS−C PDH−L Calip LS 5.69 5.66 CORRIDA # 2 FINAL SS 5.51 AIT− 4.88 1.5 I Stand AHIS−B AHRM 1.5 I Stand Induct Tempe Power 2.41 SP SEN 0.03 DF HTEN HM Accele Mud R Tensi 0.00 TOOL Z 1.5 I Stand MAXIMUM STRING MEASUREMENTS RE ALL LENGTH YPF.Ch.EA− Schlumber PI−245 Altura Mesa: 4. Nivel Terre Casing 9 5 32.3 Lb/p Zapato @ 350. Cota: 661.90 Nivel Referen Trepano d 8 3/4" @ T Nivel Ma 1800 m TRAMO PRINCIPAL MAXIS Field Log Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_025LUP FN:24 PRODUCER 30−Jun−2006 08:23 1806.9 M 291.0 M Output DLIS Files DEFAULT AIT_LDL_TLD_MCFL_089PUP FN:42 PRODUCER 30−Jun−2006 18:52 1807.0 M 345.0 M CUST1 AIT_LDL_TLD_MCFL_089PUC FN:43 CUSTOMER 30−Jun−2006 18:52 1807.0 M 345.0 M CUST2 AIT_LDL_TLD_MCFL_089PUC FN:44 CUSTOMER 30−Jun−2006 18:52 1807.0 M 345.0 M Integrated Hole/Cement Volume Summary Hole Volume = 58.27 M3 Cement Volume = 36.02 M3 (assuming 5.50 IN casing O.D.) Computed from 1801.2 M to 349.8 M using data channel(s) CALI OP System Version: 14C0−302 MCM AIT−H DTA−A DTC−H 14C0−302 14C0−302 14C0−302 LDT−D HILTB−FTB 14C0−302 14C0−302 Changed Parameter Summary DLIS Name New Value SPDR 0 0.03921 −0.25 0 MV/M MV/M MV/M MV/M PIP SUMMARY Previous Value Depth & Time 0 0 0.03921 −0.25 MV/M MV/M MV/M MV/M 1807.0 18:52:21 1300.0 18:53:18 1044.9 18:53:47 1024.9 18:53:49 Integrated Hole Volume Minor Pip Every 0.1 M3 Integrated Hole Volume Major Pip Every 1 M3 Integrated Cement Volume Minor Pip Every 0.1 M3 Integrated Cement Volume Major Pip Every 1 M3 Time Mark Every 60 S REVOQUE From CALI to BS CAVERNA From BS to CALI SP (SP) (MV) 20 0 AIT−H 90 Inch Investigation (AHT90) (OHMM) 10 0 RWA (RWA) (OHMM) 1 0 AIT−H 60 Inch Investigation (AHT60) (OHMM) 10 0 PhotoElectric Factor (PEF) (−−−−) 5 0 AIT−H 30 Inch Investigation (AHT30) (OHMM) 10 6 Caliper (CALI) (IN) 6 Bit Size (BS) (IN) −80 Gas From DPHI to TNPH Stuck Env.Corr.Thermal Neutron Porosity Stretch AIT−H 20 Inch Investigation (AHT20) (TNPH) (STIT) 16 0 (OHMM) 10 0.4 (V/V) 0 0 (M) 20 Tension AIT−H 10 Inch Investigation (AHT10) (TENS) 0 (OHMM) 10 0.4 16 (LBF) 0 1000 Density Porosity (DPHI) (V/V) <−− Chequeo de Caliper despues ZAPATO @ 349.7 m Ultimas lecturas 350 0 375 400 425 450 475 500 525 550 575 600 625 650 675 700 725 750 775 800 825 850 875 Ultimas lecturas LDL, CNL y CALI 900 925 950 975 1000 1025 1050 1075 1100 1125 1150 1175 1200 1225 1250 1275 1300 1325 1350 1375 1400 1425 1450 1475 1500 1525 1550 1575 1600 1625 1650 1675 1700 1725 1750 1775 FR_TNPH FR_DPHI FR_CALI FR_PEF FR_AIT 1800 FONDO @ 1801.3 m Tension AIT−H 10 Inch Investigation (AHT10) (TENS) 0 (OHMM) 10 0.4 16 (LBF) 0 1000 6 Bit Size (BS) (IN) 6 Caliper (CALI) (IN) 0 PhotoElectric Factor (PEF) (−−−−) 5 0 AIT−H 30 Inch Investigation (AHT30) (OHMM) 10 0 RWA (RWA) (OHMM) 1 0 AIT−H 60 Inch Investigation (AHT60) (OHMM) 10 Density Porosity (DPHI) (V/V) 0 Stuck Env.Corr.Thermal Neutron Porosity AIT−H 20 Inch Investigation (AHT20) Stretch (TNPH) (STIT) 16 0 (OHMM) 10 0.4 (V/V) 0 0 (M) 20 Gas From DPHI to TNPH −80 SP (SP) (MV) 20 0 AIT−H 90 Inch Investigation (AHT90) (OHMM) 10 CAVERNA From BS to CALI REVOQUE From CALI to BS PIP SUMMARY Integrated Hole Volume Minor Pip Every 0.1 M3 Integrated Hole Volume Major Pip Every 1 M3 Integrated Cement Volume Minor Pip Every 0.1 M3 Integrated Cement Volume Major Pip Every 1 M3 Time Mark Every 60 S Parameters DLIS Name Description Value AIT−H: Array Induction Tool − H AHBHM Array Induction Borehole Correction Mode 2_ComputeStandoff AHBHV Array Induction Borehole Correction Code Version Number 880 108 AHBLV Array Induction Basic Logs Code Version Number AHCDE Array Induction Casing Detection Enable No AHCEN Array Induction Tool Centering Flag (in Borehole) Eccentered AHFRSV Array Induction Response Set Version for Four ft Resolution 40.70.24.21 AHMRF Array Induction Mud Resistivity Factor 1 AHORSV Array Induction Response Set Version for One ft Resolution 40.70.24.21 AHRFV Array Induction Radial Profiling Code Version Number 700 223 AHRPV Array Induction Radial Parametrization Code Version Number AHSTA Array Induction Tool Standoff 1.5 AHTRSV Array Induction Response Set Version for Two ft Resolution 40.70.24.21 ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 FEXP Form Factor Exponent 2 FNUM Form Factor Numerator 0.81 FPHI Form Factor Porosity Source DPHI GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 0.018227 GGRD Geothermal Gradient GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE YES RTCO RTCO − Rt Invasion Correction SHT Surface Hole Temperature 20 SPDR SP Drift 0 SPNV SP Next Value −4 LDT−D: Litho Density − D BFM Borehole Fluid Medium LIQUID BHS Borehole Status OPEN 70 BHT Bottom Hole Temperature (used in calculations) DHC Density Hole Correction BS DPPM Density Porosity Processing Mode HIRS FD Fluid Density 1 GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 GGRD Geothermal Gradient 0.018227 GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE MDEN Matrix Density 2.65 SHT Surface Hole Temperature 20 WMUD Mud Weight 1.17 HILTB−FTB: High resolution Integrated Logging Tool−DTS BHFL Borehole Fluid Type WATER BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 BSCO Borehole Salinity Correction Option YES CCCO Casing & Cement Thickness Correction Option NO DPPM Density Porosity Processing Mode HIRS FEXP Form Factor Exponent 2 FNUM Form Factor Numerator 0.81 FPHI Form Factor Porosity Source DPHI FSAL Formation Salinity −50000 FSCO Formation Salinity Correction Option NO IN DEGC DEG DC/M DEGC MV/M MV DEGC G/C3 DEG DC/M G/C3 DEGC G/C3 DEGC PPM GCSE GDEV GGRD GRSE GTSE HSCO ISSBAR MATR MCCO MCOR MWCO PTCO SDAT SHT SOCN SOCO Generalized Caliper Selection CALI Average Angular Deviation of Borehole from Normal 0 DEG 0.018227 DC/M Geothermal Gradient Generalized Mud Resistivity Selection AITH_RESIST Generalized Temperature Selection HSTS_HTEM Hole Size Correction Option YES Barite Mud Switch NOBARITE Rock Matrix for Neutron Porosity Corrections SANDSTONE Mud Cake Correction Option YES Mud Correction NATU Mud Weight Correction Option YES Pressure/Temperature Correction Option YES Standoff Data Source SOCN Surface Hole Temperature 20 DEGC Standoff Distance 0.125 IN Standoff Correction Option YES RWA: Apparent Water Resistivity ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 FEXP Form Factor Exponent 2 0.81 FNUM Form Factor Numerator FPHI Form Factor Porosity Source DPHI RTCO RTCO − Rt Invasion Correction YES ALLRES: Basic Resistivity Transforms ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 RTCO RTCO − Rt Invasion Correction YES HOLEV: Integrated Hole/Cement Volume BHS Borehole Status OPEN 70 DEGC BHT Bottom Hole Temperature (used in calculations) FCD Future Casing (Outer) Diameter 5.5 IN GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 DEG GGRD Geothermal Gradient 0.018227 DC/M GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM HVCS Integrated Hole Volume Caliper Selection CALI ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE SHT Surface Hole Temperature 20 DEGC STI: Stuck Tool Indicator LBFR Trigger for MAXIS First Reading Label STI STKT STI Stuck Threshold 0.762 M TDD Total Depth − Driller 1800.00 M 1801.30 M TDL Total Depth − Logger System and Miscellaneous BS Bit Size 8.750 IN BSAL Borehole Salinity 350.00 PPM CSIZ Current Casing Size 9.625 IN Casing Weight 32.30 LB/F CWEI DFD Drilling Fluid Density 1.17 G/C3 DO Depth Offset for Playback 0.2 M MST Mud Sample Temperature 7.20 DEGC PP Playback Processing RECOMPUTE RMFS Resistivity of Mud Filtrate Sample 3.8800 OHMM RW Resistivity of Connate Water 1.0000 OHMM TD Total Depth 1801.3 M TWS Temperature of Connate Water Sample 37.78 DEGC Format: COMBINADA Vertical Scale: 1:200 Graphics File Created: 30−Jun−2006 18:52 OP System Version: 14C0−302 MCM AIT−H DTA−A DTC−H 14C0−302 14C0−302 14C0−302 LDT−D HILTB−FTB 14C0−302 14C0−302 Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_025LUP FN:24 PRODUCER 30−Jun−2006 08:23 Output DLIS Files DEFAULT AIT_LDL_TLD_MCFL_089PUP FN:42 PRODUCER 30−Jun−2006 18:52 CUST1 AIT_LDL_TLD_MCFL_089PUC FN:43 CUSTOMER 30−Jun−2006 18:52 CUST2 AIT_LDL_TLD_MCFL_089PUC FN:44 CUSTOMER 30−Jun−2006 18:52 1806.9 M 291.0 M TRAMO REPETIDO MAXIS Field Log Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_024LUP FN:23 PRODUCER 30−Jun−2006 08:23 1805.0 M 1626.4 M Output DLIS Files DEFAULT AIT_LDL_TLD_MCFL_091PUP FN:48 PRODUCER 30−Jun−2006 19:01 1775.0 M 1700.9 M CUST1 AIT_LDL_TLD_MCFL_091PUC FN:49 CUSTOMER 30−Jun−2006 19:01 1775.0 M 1700.9 M CUST2 AIT_LDL_TLD_MCFL_091PUC FN:50 CUSTOMER 30−Jun−2006 19:01 1775.0 M 1700.9 M Integrated Hole/Cement Volume Summary Hole Volume = 2.76 M3 Cement Volume = 1.63 M3 (assuming 5.50 IN casing O.D.) Computed from 1775.0 M to 1700.9 M using data channel(s) CALI OP System Version: 14C0−302 MCM 14C0−302 14C0−302 14C0−302 AIT−H DTA−A DTC−H LDT−D HILTB−FTB 14C0−302 14C0−302 Changed Parameter Summary DLIS Name New Value SPDR Previous Value Depth & Time 0 MV/M PIP SUMMARY 0 MV/M 1775.0 19:01:15 Integrated Hole Volume Minor Pip Every 0.1 M3 Integrated Hole Volume Major Pip Every 1 M3 Integrated Cement Volume Minor Pip Every 0.1 M3 Integrated Cement Volume Major Pip Every 1 M3 Time Mark Every 60 S REVOQUE From CALI to BS CAVERNA From BS to CALI SP (SP) (MV) 20 0 AIT−H 90 Inch Investigation (AHT90) (OHMM) 10 0 RWA (RWA) (OHMM) 1 0 AIT−H 60 Inch Investigation (AHT60) (OHMM) 10 0 PhotoElectric Factor (PEF) (−−−−) 5 0 AIT−H 30 Inch Investigation (AHT30) (OHMM) 10 6 Caliper (CALI) (IN) 6 Bit Size (BS) (IN) −80 Gas From DPHI to TNPH Stuck Env.Corr.Thermal Neutron Porosity AIT−H 20 Inch Investigation (AHT20) Stretch (TNPH) (STIT) 16 0 (OHMM) 10 0.4 (V/V) 0 0 (M) 20 16 Tension (TENS) (LBF) 0 AIT−H 10 Inch Investigation (AHT10) (OHMM) 10 0.4 Density Porosity (DPHI) (V/V) 0 0 1000 1725 1750 1775 Tension AIT−H 10 Inch Investigation (AHT10) (TENS) 0 (OHMM) 10 0.4 16 (LBF) 0 1000 6 Bit Size (BS) (IN) 6 Caliper (CALI) (IN) 0 PhotoElectric Factor (PEF) (−−−−) 5 0 AIT−H 30 Inch Investigation (AHT30) (OHMM) 10 0 RWA (RWA) (OHMM) 1 0 AIT−H 60 Inch Investigation (AHT60) (OHMM) 10 SP (SP) (MV) 20 0 AIT−H 90 Inch Investigation (AHT90) (OHMM) 10 −80 Density Porosity (DPHI) (V/V) Stuck Env.Corr.Thermal Neutron Porosity AIT−H 20 Inch Investigation (AHT20) Stretch (TNPH) (STIT) 16 0 (OHMM) 10 0.4 (V/V) 0 0 (M) 20 Gas From DPHI to TNPH CAVERNA From BS to CALI REVOQUE From CALI to BS PIP SUMMARY Integrated Hole Volume Minor Pip Every 0.1 M3 Integrated Hole Volume Major Pip Every 1 M3 Integrated Cement Volume Minor Pip Every 0.1 M3 Integrated Cement Volume Major Pip Every 1 M3 Time Mark Every 60 S Parameters DLIS Name 0 Description Value AIT−H: Array Induction Tool − H AHBHM Array Induction Borehole Correction Mode 2_ComputeStandoff AHBHV Array Induction Borehole Correction Code Version Number 880 AHBLV Array Induction Basic Logs Code Version Number 108 AHCDE Array Induction Casing Detection Enable No AHCEN Array Induction Tool Centering Flag (in Borehole) Eccentered AHFRSV Array Induction Response Set Version for Four ft Resolution 40.70.24.21 AHMRF Array Induction Mud Resistivity Factor 1 AHORSV Array Induction Response Set Version for One ft Resolution 40.70.24.21 AHRFV Array Induction Radial Profiling Code Version Number 700 AHRPV Array Induction Radial Parametrization Code Version Number 223 AHSTA Array Induction Tool Standoff 1.5 IN AHTRSV Array Induction Response Set Version for Two ft Resolution 40.70.24.21 ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 BHS Borehole Status OPEN 70 BHT Bottom Hole Temperature (used in calculations) FEXP Form Factor Exponent 2 FNUM Form Factor Numerator 0.81 FPHI Form Factor Porosity Source DPHI GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 GGRD Geothermal Gradient 0.018227 GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE RTCO RTCO − Rt Invasion Correction YES SHT Surface Hole Temperature 20 0 SPDR SP Drift SPNV SP Next Value −3 LDT−D: Litho Density − D BFM Borehole Fluid Medium LIQUID OPEN BHS Borehole Status BHT Bottom Hole Temperature (used in calculations) 70 DHC Density Hole Correction BS DPPM Density Porosity Processing Mode HIRS 1 FD Fluid Density GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 0.018227 GGRD Geothermal Gradient GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE MDEN Matrix Density 2.65 SHT Surface Hole Temperature 20 WMUD Mud Weight 1.17 HILTB−FTB: High resolution Integrated Logging Tool−DTS BHFL Borehole Fluid Type WATER BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 YES BSCO Borehole Salinity Correction Option CCCO Casing & Cement Thickness Correction Option NO DPPM Density Porosity Processing Mode HIRS FEXP Form Factor Exponent 2 FNUM Form Factor Numerator 0.81 Form Factor Porosity Source DPHI FPHI FSAL Formation Salinity −50000 NO FSCO Formation Salinity Correction Option GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 0.018227 GGRD Geothermal Gradient GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM HSCO Hole Size Correction Option YES ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE MCCO Mud Cake Correction Option YES MCOR Mud Correction NATU MWCO Mud Weight Correction Option YES PTCO Pressure/Temperature Correction Option YES SDAT Standoff Data Source SOCN SHT Surface Hole Temperature 20 SOCN Standoff Distance 0.125 SOCO Standoff Correction Option YES RWA: Apparent Water Resistivity ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 FEXP Form Factor Exponent 2 FNUM Form Factor Numerator 0.81 Form Factor Porosity Source DPHI FPHI RTCO RTCO − Rt Invasion Correction YES ALLRES: Basic Resistivity Transforms ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 RTCO RTCO − Rt Invasion Correction YES HOLEV: Integrated Hole/Cement Volume BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 FCD Future Casing (Outer) Diameter 5.5 GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 GGRD Geothermal Gradient 0.018227 GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM HVCS Integrated Hole Volume Caliper Selection CALI ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE SHT Surface Hole Temperature 20 DEGC DEG DC/M DEGC MV/M MV DEGC G/C3 DEG DC/M G/C3 DEGC G/C3 DEGC PPM DEG DC/M DEGC IN DEGC IN DEG DC/M DEGC STI: Stuck Tool Indicator Trigger for MAXIS First Reading Label STI Stuck Threshold Total Depth − Driller Total Depth − Logger System and Miscellaneous BS Bit Size BSAL Borehole Salinity CSIZ Current Casing Size CWEI Casing Weight DFD Drilling Fluid Density DO Depth Offset for Playback DORL Depth Offset for Repeat Analysis MST Mud Sample Temperature PP Playback Processing RMFS Resistivity of Mud Filtrate Sample RW Resistivity of Connate Water TD Total Depth TWS Temperature of Connate Water Sample Format: COMBINADA Vertical Scale: 1:200 LBFR STKT TDD TDL STI 0.762 1800.00 1801.30 M M M 8.750 IN 350.00 PPM 9.625 IN 32.30 LB/F 1.17 G/C3 0.9 M 0.0 M 7.20 DEGC RECOMPUTE 3.8800 OHMM 1.0000 OHMM 1801.3 M 37.78 DEGC Graphics File Created: 30−Jun−2006 19:01 OP System Version: 14C0−302 MCM 14C0−302 14C0−302 14C0−302 AIT−H DTA−A DTC−H LDT−D HILTB−FTB 14C0−302 14C0−302 Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_024LUP FN:23 PRODUCER 30−Jun−2006 08:23 1805.0 M 1626.4 M Output DLIS Files DEFAULT AIT_LDL_TLD_MCFL_091PUP FN:48 PRODUCER 30−Jun−2006 19:01 CUST1 AIT_LDL_TLD_MCFL_091PUC FN:49 CUSTOMER 30−Jun−2006 19:01 CUST2 AIT_LDL_TLD_MCFL_091PUC FN:50 CUSTOMER 30−Jun−2006 19:01 ANALISIS DE REPETIBILIDAD MAXIS Field Log Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_024LUP FN:23 PRODUCER 30−Jun−2006 08:23 1805.0 M 1626.4 M DEFAULT AIT_LDL_TLD_MCFL_089PUP FN:42 PRODUCER 30−Jun−2006 18:52 1807.0 M 345.0 M Output DLIS Files DEFAULT AIT_LDL_TLD_MCFL_091PUP FN:48 PRODUCER 30−Jun−2006 19:01 1775.0 M 1700.9 M CUST1 AIT_LDL_TLD_MCFL_091PUC FN:49 CUSTOMER 30−Jun−2006 19:01 1775.0 M 1700.9 M CUST2 AIT_LDL_TLD_MCFL_091PUC FN:50 CUSTOMER 30−Jun−2006 19:01 1775.0 M 1700.9 M Integrated Hole/Cement Volume Summary Hole Volume = 2.76 M3 Cement Volume = 1.63 M3 (assuming 5.50 IN casing O.D.) Computed from 1775.0 M to 1700.9 M using data channel(s) CALI OP System Version: 14C0−302 MCM AIT−H DTA−A DTC−H 14C0−302 14C0−302 14C0−302 LDT−D HILTB−FTB 14C0−302 14C0−302 Changed Parameter Summary DLIS Name New Value SPDR 0 MV/M PIP SUMMARY Previous Value Depth & Time 0 MV/M 1775.0 19:01:15 Integrated Hole Volume Minor Pip Every 0.1 M3 Integrated Hole Volume Major Pip Every 1 M3 Integrated Cement Volume Minor Pip Every 0.1 M3 Integrated Cement Volume Major Pip Every 1 M3 Time Mark Every 60 S REVOQUE From CALI to BS CAVERNA From BS to CALI SP_REP Curve (SP_REP) (MV) 20 0 RWA_REP Curve (RWA_REP) (OHMM) 1 0 PEF_REP Curve (PEF_REP) (−−−−) 5 6 CALI_REP Curve (CALI_REP) (IN) 16 −80 6 BS_REP Curve (BS_REP) (IN) Gas From DPHI to TNPH 0 AHT90_REP Curve (AHT90_REP) TNPH_REP Curve (TNPH_REP) (OHMM) 10 0.4 (V/V) TENS_REP Curve DPHI_REP Curve (DPHI_REP) AHT10_REP Curve (AHT10_REP) (TENS_ 16 REP) 0 (OHMM) 10 0.4 (V/V) (LBF) 0 1000 0 0 1725 1750 1775 6 BS_REP Curve (BS_REP) (IN) TENS_REP Curve DPHI_REP Curve (DPHI_REP) AHT10_REP Curve (AHT10_REP) (TENS_ 16 REP) 0 (OHMM) 10 0.4 (V/V) (LBF) 0 0 6 CALI_REP Curve (CALI_REP) (IN) 16 0 PEF_REP Curve (PEF_REP) (−−−−) 5 0 RWA_REP Curve (RWA_REP) (OHMM) 1 SP_REP Curve (SP_REP) (MV) 20 −80 1000 0 AHT90_REP Curve (AHT90_REP) TNPH_REP Curve (TNPH_REP) (OHMM) 10 0.4 (V/V) Gas From DPHI to TNPH CAVERNA From BS to CALI REVOQUE From CALI to BS PIP SUMMARY Integrated Hole Volume Minor Pip Every 0.1 M3 Integrated Hole Volume Major Pip Every 1 M3 Integrated Cement Volume Minor Pip Every 0.1 M3 Integrated Cement Volume Major Pip Every 1 M3 Time Mark Every 60 S Parameters DLIS Name Description Value AIT−H: Array Induction Tool − H AHBHM Array Induction Borehole Correction Mode 2_ComputeStandoff AHBHV Array Induction Borehole Correction Code Version Number 880 AHBLV Array Induction Basic Logs Code Version Number 108 AHCDE Array Induction Casing Detection Enable No Eccentered AHCEN Array Induction Tool Centering Flag (in Borehole) AHFRSV Array Induction Response Set Version for Four ft Resolution 40.70.24.21 AHMRF Array Induction Mud Resistivity Factor 1 AHORSV Array Induction Response Set Version for One ft Resolution 40.70.24.21 700 AHRFV Array Induction Radial Profiling Code Version Number AHRPV Array Induction Radial Parametrization Code Version Number 223 AHSTA Array Induction Tool Standoff 1.5 AHTRSV Array Induction Response Set Version for Two ft Resolution 40.70.24.21 ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 2 FEXP Form Factor Exponent FNUM Form Factor Numerator 0.81 FPHI Form Factor Porosity Source DPHI GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 0.018227 GGRD Geothermal Gradient GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE RTCO RTCO − Rt Invasion Correction YES SHT Surface Hole Temperature 20 0 SPDR SP Drift SPNV SP Next Value −3 LDT−D: Litho Density − D BFM Borehole Fluid Medium LIQUID BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 DHC Density Hole Correction BS DPPM Density Porosity Processing Mode HIRS FD Fluid Density 1 GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 GGRD Geothermal Gradient 0.018227 GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE MDEN Matrix Density 2.65 SHT Surface Hole Temperature 20 WMUD Mud Weight 1.17 IN DEGC DEG DC/M DEGC MV/M MV DEGC G/C3 DEG DC/M G/C3 DEGC G/C3 0 HILTB−FTB: High resolution Integrated Logging Tool−DTS Borehole Fluid Type WATER Borehole Status OPEN Bottom Hole Temperature (used in calculations) 70 DEGC Borehole Salinity Correction Option YES Casing & Cement Thickness Correction Option NO HIRS Density Porosity Processing Mode Form Factor Exponent 2 Form Factor Numerator 0.81 Form Factor Porosity Source DPHI Formation Salinity −50000 PPM Formation Salinity Correction Option NO Generalized Caliper Selection CALI Average Angular Deviation of Borehole from Normal 0 DEG 0.018227 DC/M Geothermal Gradient Generalized Mud Resistivity Selection AITH_RESIST Generalized Temperature Selection HSTS_HTEM Hole Size Correction Option YES Barite Mud Switch NOBARITE Rock Matrix for Neutron Porosity Corrections SANDSTONE Mud Cake Correction Option YES Mud Correction NATU Mud Weight Correction Option YES Pressure/Temperature Correction Option YES Standoff Data Source SOCN Surface Hole Temperature 20 DEGC 0.125 IN Standoff Distance Standoff Correction Option YES RWA: Apparent Water Resistivity ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 FEXP Form Factor Exponent 2 FNUM Form Factor Numerator 0.81 FPHI Form Factor Porosity Source DPHI RTCO RTCO − Rt Invasion Correction YES ALLRES: Basic Resistivity Transforms ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 RTCO RTCO − Rt Invasion Correction YES HOLEV: Integrated Hole/Cement Volume BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 DEGC FCD Future Casing (Outer) Diameter 5.5 IN GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 DEG GGRD Geothermal Gradient 0.018227 DC/M GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM HVCS Integrated Hole Volume Caliper Selection CALI ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE SHT Surface Hole Temperature 20 DEGC STI: Stuck Tool Indicator TDL Total Depth − Logger 1801.30 M System and Miscellaneous BS Bit Size 8.750 IN BSAL Borehole Salinity 350.00 PPM CSIZ Current Casing Size 9.625 IN CWEI Casing Weight 32.30 LB/F DFD Drilling Fluid Density 1.17 G/C3 DO Depth Offset for Playback 0.9 M DORL Depth Offset for Repeat Analysis 0.0 M MST Mud Sample Temperature 7.20 DEGC PP Playback Processing RECOMPUTE RMFS Resistivity of Mud Filtrate Sample 3.8800 OHMM RW Resistivity of Connate Water 1.0000 OHMM TD Total Depth 1801.3 M TWS Temperature of Connate Water Sample 37.78 DEGC Format: COMBINADA_REP Vertical Scale: 1:200 Graphics File Created: 30−Jun−2006 19:01 BHFL BHS BHT BSCO CCCO DPPM FEXP FNUM FPHI FSAL FSCO GCSE GDEV GGRD GRSE GTSE HSCO ISSBAR MATR MCCO MCOR MWCO PTCO SDAT SHT SOCN SOCO OP System Version: 14C0−302 MCM AIT−H DTA−A DTC−H 14C0−302 14C0−302 14C0−302 LDT−D HILTB−FTB 14C0−302 14C0−302 Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_024LUP FN:23 PRODUCER 30−Jun−2006 08:23 1805.0 M 1626.4 M DEFAULT AIT_LDL_TLD_MCFL_089PUP FN:42 PRODUCER 30−Jun−2006 18:52 1807.0 M 345.0 M Output DLIS Files DEFAULT AIT_LDL_TLD_MCFL_091PUP FN:48 PRODUCER 30−Jun−2006 19:01 CUST1 AIT_LDL_TLD_MCFL_091PUC FN:49 CUSTOMER 30−Jun−2006 19:01 CUST2 AIT_LDL_TLD_MCFL_091PUC FN:50 CUSTOMER 30−Jun−2006 19:01 CHEQUEO EN CAÑERIA MAXIS Field Log Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_022LUP FN:21 PRODUCER 30−Jun−2006 08:23 367.6 M Integrated Hole/Cement Volume Summary Hole Volume = 0.37 M3 Cement Volume = Computed from 0.29 M3 (assuming 5.50 IN casing O.D.) 354.9 M to 349.8 M using data channel(s) CALI OP System Version: 14C0−302 MCM AIT−H DTA−A DTC−H 14C0−302 14C0−302 14C0−302 LDT−D HILTB−FTB 14C0−302 14C0−302 PIP SUMMARY Integrated Hole Volume Minor Pip Every 0.1 M3 Integrated Hole Volume Major Pip Every 1 M3 Integrated Cement Volume Minor Pip Every 0.1 M3 Integrated Cement Volume Major Pip Every 1 M3 Time Mark Every 60 S REVOQUE From CALI to BS CAVERNA From BS to CALI 6 Caliper (CALI) (IN) 16 6 Bit Size (BS) (IN) 16 <−− Chequeo de Caliper antes 350 6 Bit Size (BS) (IN) 16 314.9 M Caliper (CALI) (IN) 6 16 CAVERNA From BS to CALI REVOQUE From CALI to BS PIP SUMMARY Integrated Hole Volume Minor Pip Every 0.1 M3 Integrated Hole Volume Major Pip Every 1 M3 Integrated Cement Volume Minor Pip Every 0.1 M3 Integrated Cement Volume Major Pip Every 1 M3 Time Mark Every 60 S Parameters DLIS Name Description Value HOLEV: Integrated Hole/Cement Volume Future Casing (Outer) Diameter Integrated Hole Volume Caliper Selection System and Miscellaneous BS Bit Size DO Depth Offset for Playback DORL Depth Offset for Repeat Analysis PP Playback Processing TD Total Depth Format: CALIPER Vertical Scale: 1:200 FCD HVCS 5.5 CALI IN 8.750 IN −1.0 M 0.0 M RECOMPUTE 1801.3 M Graphics File Created: 30−Jun−2006 19:12 OP System Version: 14C0−302 MCM 14C0−302 14C0−302 14C0−302 AIT−H DTA−A DTC−H LDT−D HILTB−FTB 14C0−302 14C0−302 Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_022LUP FN:21 PRODUCER 30−Jun−2006 08:23 367.6 M 314.9 M Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_022LUP FN:21 PRODUCER 30−Jun−2006 08:23 367.6 M 314.9 M DEFAULT AIT_LDL_TLD_MCFL_089PUP FN:42 PRODUCER 30−Jun−2006 18:52 1807.0 M 345.0 M Integrated Hole/Cement Volume Summary Hole Volume = 0.37 M3 Cement Volume = Computed from 0.29 M3 (assuming 5.50 IN casing O.D.) 354.9 M to 349.8 M using data channel(s) CALI OP System Version: 14C0−302 MCM AIT−H DTA−A DTC−H 14C0−302 14C0−302 14C0−302 LDT−D HILTB−FTB 14C0−302 14C0−302 PIP SUMMARY Integrated Hole Volume Minor Pip Every 0.1 M3 Integrated Hole Volume Major Pip Every 1 M3 Integrated Cement Volume Minor Pip Every 0.1 M3 Integrated Cement Volume Major Pip Every 1 M3 Time Mark Every 60 S REVOQUE From CALI to BS CAVERNA From BS to CALI 6 6 CALI_REP Curve (CALI_REP) (IN) 16 TENS_REP Curve (TENS_ 16 REP) (LBF) 0 1000 BS_REP Curve (BS_REP) (IN) <−−−Repetibilidad del caliper entre antes y despues 350 TENS_REP Curve (TENS_ 16 REP) (LBF) 0 1000 6 BS_REP Curve (BS_REP) (IN) 6 CALI_REP Curve (CALI_REP) (IN) 16 CAVERNA From BS to CALI REVOQUE From CALI to BS PIP SUMMARY Integrated Hole Volume Minor Pip Every 0.1 M3 Integrated Hole Volume Major Pip Every 1 M3 Integrated Cement Volume Minor Pip Every 0.1 M3 Integrated Cement Volume Major Pip Every 1 M3 Time Mark Every 60 S Parameters DLIS Name Description Value HOLEV: Integrated Hole/Cement Volume Future Casing (Outer) Diameter Integrated Hole Volume Caliper Selection System and Miscellaneous BS Bit Size DO Depth Offset for Playback DORL Depth Offset for Repeat Analysis PP Playback Processing TD Total Depth Format: CALIPER_REP Vertical Scale: 1:200 FCD HVCS 5.5 CALI 8.750 IN M −1.0 0.0 M RECOMPUTE 1801.3 M Graphics File Created: 30−Jun−2006 19:12 OP System Version: 14C0−302 MCM AIT−H DTA−A DTC−H 14C0−302 14C0−302 14C0−302 LDT−D HILTB−FTB Input DLIS Files IN 14C0−302 14C0−302 DEFAULT AIT_LDL_TLD_MCFL_022LUP FN:21 PRODUCER 30−Jun−2006 08:23 367.6 M 314.9 M DEFAULT AIT_LDL_TLD_MCFL_089PUP FN:42 PRODUCER 30−Jun−2006 18:52 1807.0 M 345.0 M CALIBRACIONES MAXIS Field Log Calibration and Check Summary Measurement Nominal Master Before After Change Limit Units Array Induction Tool − H Wellsite Calibration − Electronics Calibration Check − Thru Cal Mag. & Phase Master: 22−Jun−2006 12:20 Before: 28−Jun−2006 17:27 0 0.6264 0.6274 N/A Thru Cal Magnitude − 0 0 1.286 1.288 N/A Thru Cal Magnitude − 1 0 0.6373 0.6385 N/A Thru Cal Magnitude − 2 0 0.7196 0.7206 N/A Thru Cal Magnitude − 3 0 1.349 1.351 N/A Thru Cal Magnitude − 4 0 1.958 1.961 N/A Thru Cal Magnitude − 5 0 1.966 1.969 N/A Thru Cal Magnitude − 6 0 1.400 1.400 N/A Thru Cal Magnitude − 7 0 78.53 78.73 N/A Phase − 0 0 77.45 77.64 N/A Phase − 1 0 73.80 73.97 N/A Phase − 2 0 73.03 73.20 N/A Phase − 3 Phase − 4 0 66.88 67.03 N/A 0 65.08 65.19 N/A Phase − 5 0 65.03 65.14 N/A Phase − 6 Phase − 7 0 61.71 61.62 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A V V V V V V V V DEG DEG DEG DEG DEG DEG DEG DEG Array Induction Tool − H Wellsite Calibration − Electronics Calibration Check − Auxilliary Master: 22−Jun−2006 12:20 Before: 28−Jun−2006 17:27 992.2 991.6 Array Induction SPA Plus 990.5 0 0.1053 0.1325 Array Induction SPA Zero 0.9150 0.9191 0.9185 Array Induction Temperature Pl Array Induction Temperature Ze 0 0.0001101 0.0001361 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A MV MV V V Array Induction Tool − H Wellsite Calibration − Test Loop Gain Correction Master: 22−Jun−2006 12:20 1.022 Test Loop Gain Magnitude − 0 0 1.021 Test Loop Gain Magnitude − 1 0 1.021 Test Loop Gain Magnitude − 2 0 1.026 Test Loop Gain Magnitude − 3 0 1.005 Test Loop Gain Magnitude − 4 0 1.018 Test Loop Gain Magnitude − 5 0 1.030 Test Loop Gain Magnitude − 6 0 1.032 Test Loop Gain Magnitude − 7 0 0 2.290 Phase − 0 0 0.04832 Phase − 1 0 −0.2402 Phase − 2 0 0.06847 Phase − 3 0 0.06266 Phase − 4 0 −0.2160 Phase − 5 0 0.1292 Phase − 6 Phase − 7 0 −0.3307 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A V V V V V V V V DEG DEG DEG DEG DEG DEG DEG DEG Array Induction Tool − H Wellsite Calibration − Sonde Error Correction Master: 22−Jun−2006 12:20 0 −20.22 R Sonde Error Correction − 0 0 149.5 R Sonde Error Correction − 1 0 111.4 R Sonde Error Correction − 2 0 60.65 R Sonde Error Correction − 3 0 24.90 R Sonde Error Correction − 4 0 12.99 R Sonde Error Correction − 5 R Sonde Error Correction − 6 0 10.15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A MM/M MM/M MM/M MM/M MM/M MM/M MM/M R Sonde Error Correction − X Sonde Error Correction − X Sonde Error Correction − X Sonde Error Correction − X Sonde Error Correction − X Sonde Error Correction − X Sonde Error Correction − X Sonde Error Correction − X Sonde Error Correction − 7 0 1 2 3 4 5 6 7 0 0 0 0 0 0 0 0 0 0.3020 156.8 33.23 −73.81 80.54 22.74 20.38 8.771 −1.329 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Array Induction Tool − H Wellsite Calibration − Mud Gain Correction Master: 22−Jun−2006 12:20 Coarse − Mag, Real, Imag − 0 0 0.9338 Coarse − Mag, Real, Imag − 1 0 0.9338 Coarse − Mag, Real, Imag − 2 0 0.9338 Fine − Mag, Real, Imag − 0 0 0.9208 Fine − Mag, Real, Imag − 1 0 0.9208 Fine − Mag, Real, Imag − 2 0 0.9208 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Litho Density − D Wellsite Calibration − Background Measurement Master: 15−Jun−2006 16:22 Before: 28−Jun−2006 21:10 LL Background 20.00 LU Background 76.00 LS Background 57.00 LITH Background 5.500 SS1 Background 16.00 SS2 Background 11.00 18.07 69.61 52.88 5.086 14.78 9.983 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1.000 1.000 1.000 0.3000 0.5000 0.5000 CPS CPS CPS CPS CPS CPS 1498 1326 N/A N/A N/A N/A N/A N/A V V Litho Density − D Wellsite Calibration − Detectors Resolution From BKG Measurments Master: 15−Jun−2006 16:22 Before: 28−Jun−2006 21:10 LS Resolution Background 8.000 8.622 8.600 SS Resolution Background 8.000 9.517 9.438 N/A N/A N/A N/A N/A N/A Litho Density − D Wellsite Calibration − Caliper Calibration Before: 28−Jun−2006 21:01 Caliper Small Ring 8.000 Caliper Large Ring 12.00 N/A N/A 8.538 12.97 N/A N/A N/A N/A N/A N/A IN IN Litho Density − D Master Calibration − Aluminum Measurement Master: 15−Jun−2006 16:48 LL Aluminum 90.00 LU Aluminum 135.0 LS Aluminum 155.0 LITH Aluminum 50.00 SS1 Aluminum 175.0 SS2 Aluminum 260.0 81.09 121.5 141.8 47.96 150.7 230.0 −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− CPS CPS CPS CPS CPS CPS Litho Density − D Master Calibration − Litholog Measurement Master: 15−Jun−2006 16:58 LL Iron 80.00 LU Iron 120.0 LS Iron 135.0 30.00 LITH Iron SS1 Iron 155.0 SS2 Iron 245.0 72.83 109.2 127.4 30.94 136.7 210.5 −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− CPS CPS CPS CPS CPS CPS Litho Density − D Master Calibration − Spectrum Quality Ratios Master: 15−Jun−2006 16:58 QRLS Calculated 0.6500 QRSS Calculated 0.7200 QRLI Calculated 0.3900 QLIR Calculated 1.390 QR Calculated 1.000 0.6673 0.6554 0.3381 1.393 1.010 −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− −− High resolution Integrated Logging Tool−DTS Wellsite Calibration − Detector Calibration Before: 28−Jun−2006 17:13 Gamma Ray Background 30.00 N/A 32.48 Gamma Ray (Jig − Bkg) 153.0 N/A 153.0 165.0 N/A 165.0 Gamma Ray (Calibrated) N/A N/A N/A N/A N/A N/A N/A 13.91 15.00 GAPI GAPI GAPI High resolution Integrated Logging Tool−DTS Wellsite Calibration − Zero Measurement Master: 27−Jun−2006 12:09 Before: 28−Jun−2006 17:16 32.92 31.75 CNTC Background 32.92 CFTC Background 31.82 31.82 33.05 N/A N/A N/A N/A 4.938 4.773 CPS CPS 18.05 69.41 52.76 5.198 14.75 9.994 Litho Density − D Wellsite Calibration − Tool Quality Control Information HV Master: 15−Jun−2006 16:22 Before: 28−Jun−2006 21:10 1479 LSHV Background 1500 SSHV Background 1500 1318 High resolution Integrated Logging Tool−DTS Wellsite Calibration − Ratio Measurement MM/M MM/M MM/M MM/M MM/M MM/M MM/M MM/M MM/M Master: 27−Jun−2006 12:09 Thermal Near Corr. (Tank) Thermal Far Corr. (Tank) CNTC/CFTC (Tank) 6031 2793 2.159 5332 2296 2.322 N/A N/A N/A High resolution Integrated Logging Tool−DTS Wellsite Calibration − Accelerometer Calibration Before: 28−Jun−2006 17:28 Z−Axis Acceleration 9.810 N/A 9.799 N/A N/A N/A N/A N/A N/A N/A N/A N/A CPS CPS N/A N/A N/A M/S2 The GLS−VJ source activity is acceptable. The HGNS Neutron Master Calibration was done with the following parameters : NCT−B Water Temperature Thermal Housing Size NSR−F serial number 8.0 DEGC. 3.367 IN. 1089 Array Induction Tool − H / Equipment Identification Primary Equipment: Rm/SP Bottom Nose Array Induction Sonde AHRM − A AHIS − BA 25 Auxiliary Equipment: Array Induction Tool − H Wellsite Calibration Electronics Calibration Check − Thru Cal Mag. & Phase Idx Phase Value Master 0.6264 Thru Cal Magnitude V Nominal Value Phase DEG 78.53 0 0.6050 Before 0.6274 Master 1.286 71.00 78.73 77.45 1 1.270 Before 1.288 Master 0.6373 70.00 77.64 73.80 2 0.6230 Before 0.6385 Master 0.7196 66.00 73.97 73.03 3 0.7040 Before 0.7206 Master 1.349 65.00 73.20 66.88 4 1.337 Before 1.351 Master 1.958 59.00 67.03 65.08 5 1.955 Before 1.961 Master 1.966 57.00 65.19 65.03 6 1.955 Before 1.969 Master 1.400 57.00 65.14 61.71 7 1.415 Before 53.00 1.400 61.62 60.00 % 140.0 (Minimum) (Nominal) % Nom −60.00 (Maximum) Nom + 60.00 (Minimum) Master: 22−Jun−2006 12:20 (Nominal) Before: 28−Jun−2006 17:27 Array Induction Tool − H Wellsite Calibration Electronics Calibration Check − Auxilliary Phase Array Induction SPA Plus MV Value Phase Array Induction SPA Zero MV Value Master 992.2 Master 0.1053 Before 991.6 Before 0.1325 941.0 (Minimum) Nominal 990.5 (Nominal) 1040 −50.00 (Maximum) Phase Array Induction Temperature Plus V (Minimum) Value 0 (Nominal) 50.00 (Maximum) Phase Array Induction Temperature Zero V Value (Maximum) Master 0.9191 Master 0.0001101 Before 0.9185 Before 0.0001361 0.8700 0.9150 0.9600 −0.05000 (Minimum) (Nominal) (Maximum) (Minimum) Master: 22−Jun−2006 12:20 0 0.05000 (Nominal) (Maximum) Before: 28−Jun−2006 17:27 Array Induction Tool − H Wellsite Calibration Test Loop Gain Correction Idx 0 Value Test Loop Gain Magnitude V 1.022 0.9500 0 (Nominal) 3.000 (Maximum) −3.000 (Minimum) 0 (Nominal) 3.000 (Maximum) 1.000 (Nominal) 1.050 −3.000 (Maximum) (Minimum) 0 (Nominal) 3.000 (Maximum) 0.06847 0.9500 1.000 (Nominal) 1.050 −3.000 (Maximum) 1.005 (Minimum) 0 (Nominal) 3.000 (Maximum) 0.06266 0.9500 (Minimum) 1.000 (Nominal) 1.050 −3.000 (Maximum) 1.018 (Minimum) 0 (Nominal) 3.000 (Maximum) −0.2160 0.9500 (Minimum) 1.000 (Nominal) 1.050 −3.000 (Maximum) 1.030 (Minimum) 0 (Nominal) 3.000 (Maximum) 0.1292 0.9500 (Minimum) 7 1.050 (Maximum) 1.026 (Minimum) 6 −3.000 (Minimum) −0.2402 0.9500 5 1.000 (Nominal) 1.021 (Minimum) 4 1.050 (Maximum) 0.04832 0.9500 3 1.000 (Nominal) 1.021 (Minimum) 2 Phase DEG 2.290 (Minimum) 1 Value 1.000 (Nominal) 1.050 −3.000 (Maximum) 1.032 (Minimum) 0 (Nominal) 3.000 (Maximum) −0.3307 0.9500 (Minimum) 1.000 (Nominal) 1.050 −3.000 (Maximum) (Minimum) 0 (Nominal) 3.000 (Maximum) Master: 22−Jun−2006 12:20 Array Induction Tool − H Wellsite Calibration Sonde Error Correction Idx Value 0 −20.22 1 R Sonde Error Correction MM/M −56.00 (Minimum) (Nominal) (Nominal) 204.0 −625.0 (Maximum) 111.0 (Minimum) (Nominal) 156.0 −350.0 (Maximum) 60.65 0 (Nominal) 2250 (Maximum) 0 (Nominal) 625.0 (Maximum) (Minimum) 0 (Nominal) 350.0 (Maximum) 80.54 (Minimum) 64.00 (Nominal) 89.00 −250.0 (Maximum) 24.90 (Minimum) 0 (Nominal) 250.0 (Maximum) 22.74 15.00 (Minimum) 25.00 (Nominal) 35.00 −63.00 (Maximum) 12.99 (Minimum) 0 (Nominal) 63.00 (Maximum) 20.38 4.000 (Minimum) 14.00 (Nominal) 24.00 −50.00 (Maximum) 10.15 (Minimum) 0 (Nominal) 50.00 (Maximum) 8.771 5.000 (Minimum) 7 (Minimum) −73.81 39.00 6 159.0 111.4 (Minimum) 5 −2250 (Maximum) 33.23 66.00 4 119.0 149.5 (Minimum) 3 X Sonde Error Correction MM/M 156.8 −231.0 114.0 2 Value 10.00 (Nominal) 15.00 −30.00 (Maximum) 0.3020 (Minimum) 0 (Nominal) 30.00 (Maximum) −1.329 −5.000 (Minimum) 0 (Nominal) 5.000 (Maximum) −30.00 (Minimum) Master: 22−Jun−2006 12:20 Array Induction Tool − H Wellsite Calibration 0 (Nominal) 30.00 (Maximum) Mud Gain Correction Idx Value 0 0.9338 Coarse − Mag, Real, Imag 0.8000 1.000 (Nominal) 1.200 0.8000 (Maximum) (Minimum) 0.9338 1.000 (Nominal) 1.200 (Maximum) 0.9208 0.8000 1.000 (Minimum) 2 Fine − Mag, Real, Imag 0.9208 (Minimum) 1 Value (Nominal) 1.200 0.8000 (Maximum) (Minimum) 0.9338 1.000 (Nominal) 1.200 (Maximum) 0.9208 0.8000 1.000 (Minimum) (Nominal) 1.200 0.8000 (Maximum) (Minimum) 1.000 (Nominal) 1.200 (Maximum) Master: 22−Jun−2006 12:20 Array Induction Tool − H Master Calibration Electronics Calibration Check − Thru Cal Mag. & Phase Idx Phase Value Thru Cal Magnitude V 0 Master 0.6264 0.6050 78.53 71.00 1 Master 1.286 1.270 77.45 70.00 2 Master 0.6373 0.6230 73.80 66.00 3 Master 0.7196 0.7040 73.03 65.00 4 Master 1.349 1.337 66.88 59.00 5 Master 1.958 1.955 65.08 57.00 6 Master 1.966 1.955 65.03 57.00 7 Master 1.400 1.415 61.71 60.00 % Nominal 140.0 (Minimum) (Nominal) Value % Phase DEG 53.00 Nom −60.00 (Maximum) Nom + 60.00 (Minimum) (Nominal) Master: 22−Jun−2006 12:20 Array Induction Tool − H Master Calibration Electronics Calibration Check − Auxilliary Phase Array Induction SPA Plus MV Value Master 992.2 941.0 990.5 (Minimum) Phase Array Induction SPA Zero MV −50.00 (Maximum) Phase Array Induction Temperature Plus V (Minimum) Value Master 0.9191 0.1053 0 50.00 (Nominal) (Maximum) Phase Array Induction Temperature Zero V Master 0.8700 0.9150 0.9600 −0.05000 (Minimum) (Nominal) (Maximum) (Minimum) 0 0.05000 (Nominal) (Maximum) Array Induction Tool − H Master Calibration Test Loop Gain Correction 0 Value Test Loop Gain Magnitude V 1.022 (Minimum) 1.000 (Nominal) 1.050 0 (Nominal) 3.000 (Maximum) (Minimum) 0 (Nominal) 3.000 (Maximum) 1.000 (Nominal) 1.050 −3.000 (Maximum) (Minimum) 0 (Nominal) 3.000 (Maximum) 0.06847 (Minimum) 1.000 (Nominal) 1.050 −3.000 (Maximum) 1.005 (Minimum) 0 (Nominal) 3.000 (Maximum) 0.06266 0.9500 (Minimum) 1.000 (Nominal) 1.050 −3.000 (Maximum) 1.018 (Minimum) 0 (Nominal) 3.000 (Maximum) −0.2160 0.9500 (Minimum) 1.030 −3.000 (Maximum) 1.026 0.9500 6 (Minimum) −0.2402 (Minimum) 5 −3.000 (Maximum) 1.021 0.9500 4 (Nominal) 1.050 0.04832 (Minimum) 3 1.000 1.021 0.9500 2 Phase DEG 2.290 0.9500 1 Value 1.000 (Nominal) 1.050 −3.000 (Maximum) (Minimum) 0.1292 Value 0.0001101 Master: 22−Jun−2006 12:20 Idx Value Master 1040 (Nominal) Nominal 0 (Nominal) 3.000 (Maximum) (Maximum) 0.9500 1.000 (Minimum) 7 (Nominal) 1.050 −3.000 (Maximum) 1.032 (Minimum) 0 (Nominal) 3.000 (Maximum) −0.3307 0.9500 1.000 (Minimum) (Nominal) 1.050 −3.000 (Maximum) (Minimum) 0 (Nominal) 3.000 (Maximum) Master: 22−Jun−2006 12:20 Array Induction Tool − H Master Calibration Sonde Error Correction Idx Value 0 −20.22 1 R Sonde Error Correction MM/M −231.0 −56.00 (Minimum) (Nominal) 119.0 114.0 159.0 (Nominal) 66.00 204.0 111.0 (Nominal) 2250 (Maximum) 0 (Nominal) 625.0 (Maximum) 156.0 −350.0 (Minimum) 0 (Nominal) 350.0 (Maximum) 80.54 39.00 64.00 (Minimum) (Nominal) 89.00 −250.0 (Maximum) 24.90 (Minimum) 0 (Nominal) 250.0 (Maximum) 22.74 15.00 25.00 (Minimum) (Nominal) 35.00 −63.00 (Maximum) 12.99 (Minimum) 0 (Nominal) 63.00 (Maximum) 20.38 4.000 14.00 (Minimum) (Nominal) 24.00 −50.00 (Maximum) 10.15 (Minimum) 0 (Nominal) 50.00 (Maximum) 8.771 5.000 10.00 (Minimum) 7 −625.0 (Minimum) (Maximum) 60.65 6 0 (Nominal) −73.81 (Minimum) 5 (Minimum) (Maximum) 111.4 4 −2250 (Maximum) 33.23 (Minimum) 3 X Sonde Error Correction MM/M 156.8 149.5 2 Value (Nominal) 15.00 −30.00 (Maximum) 0.3020 (Minimum) 0 (Nominal) 30.00 (Maximum) −1.329 −5.000 0 (Minimum) (Nominal) 5.000 −30.00 (Maximum) (Minimum) 0 (Nominal) 30.00 (Maximum) Master: 22−Jun−2006 12:20 Array Induction Tool − H Master Calibration Mud Gain Correction Idx Value 0 0.9338 Coarse − Mag, Real, Imag 0.8000 1.000 (Nominal) 1.200 0.8000 (Maximum) (Minimum) 0.9338 1.000 (Nominal) 1.200 (Maximum) 0.9208 0.8000 (Minimum) 2 Fine − Mag, Real, Imag 0.9208 (Minimum) 1 Value 1.000 (Nominal) 1.200 0.8000 (Maximum) (Minimum) 0.9338 1.000 (Nominal) 1.200 (Maximum) 0.9208 0.8000 (Minimum) 1.000 (Nominal) 1.200 0.8000 (Maximum) (Minimum) 1.000 (Nominal) 1.200 (Maximum) Master: 22−Jun−2006 12:20 Litho Density − D / Equipment Identification Primary Equipment: Nuclear Services Cartridge Powered Gamma Detector Gamma Source Radioactive NSC − E PGD − G GSR − J 2772 901 3766 Auxiliary Equipment: Density Resistivity Sonde Electronics Cartridge Housing Powered Detector Housing DRS − C ECH − MKA PDH − L 6934 2777 840 Litho Density − D Wellsite Calibration Background Measurement Phase LL Background CPS Value Phase LU Background CPS Value Phase LS Background CPS Value Master Before 15.00 20.00 (Minimum) Phase 18.05 Master 18.07 Before 25.00 (Nominal) 58.00 (Maximum) LITH Background CPS Before 4.000 5.500 (Minimum) (Minimum) Value Master Phase 5.198 Master 5.086 Before 7.000 (Nominal) 76.00 (Nominal) (Maximum) Master 69.61 Before 94.00 16.00 (Minimum) (Nominal) 52.76 52.88 43.00 (Maximum) SS1 Background CPS 12.00 Master: 15−Jun−2006 16:22 69.41 (Minimum) Value Phase 14.75 Master 14.78 Before 19.50 (Nominal) 72.00 (Maximum) SS2 Background CPS Value 9.994 9.983 8.000 (Maximum) 57.00 (Minimum) 11.00 (Nominal) 13.50 (Maximum) Before: 28−Jun−2006 21:10 Litho Density − D Wellsite Calibration Detectors Resolution From BKG Measurments Phase LS Resolution Background Value Phase SS Resolution Background Value Master 8.622 Master 9.517 Before 8.600 Before 9.438 5.000 (Minimum) 8.000 (Nominal) 11.50 5.000 (Maximum) 8.000 (Minimum) Master: 15−Jun−2006 16:22 (Nominal) 11.50 (Maximum) Before: 28−Jun−2006 21:10 Litho Density − D Master Calibration Aluminum Measurement Phase LL Aluminum CPS Value Master 70.00 (Minimum) Phase 81.09 90.00 (Nominal) 125.0 35.00 (Maximum) (Minimum) (Nominal) 74.00 121.5 135.0 Phase (Nominal) 194.0 (Maximum) 150.7 175.0 (Minimum) (Nominal) LS Aluminum CPS 256.0 141.8 Phase 155.0 (Nominal) 217.0 (Maximum) SS2 Aluminum CPS Value Master 230.0 210.0 (Maximum) Value Master (Minimum) Value Master Phase 120.0 SS1 Aluminum CPS 125.0 (Maximum) Value Master (Minimum) Value 47.96 50.00 LU Aluminum CPS 100.0 LITH Aluminum CPS Master Phase (Minimum) 260.0 (Nominal) 353.0 (Maximum) Master: 15−Jun−2006 16:48 Litho Density − D Master Calibration Litholog Measurement Phase LL Iron CPS Value Master 60.00 (Minimum) Phase 72.83 80.00 (Nominal) 114.0 15.00 LITH Iron CPS Value (Minimum) (Nominal) 51.00 109.2 120.0 Phase (Nominal) 177.0 136.7 155.0 (Minimum) (Nominal) LS Iron CPS 234.0 127.4 Phase 135.0 (Nominal) 193.0 (Maximum) SS2 Iron CPS Value Master 210.5 190.0 (Maximum) Value Master (Minimum) Value Master Phase 100.0 (Maximum) SS1 Iron CPS 105.0 (Maximum) Value Master (Minimum) 30.94 30.00 LU Iron CPS 85.00 (Maximum) Master Phase (Minimum) 245.0 (Nominal) 325.0 (Maximum) Master: 15−Jun−2006 16:58 Litho Density − D Master Calibration Spectrum Quality Ratios Phase QRLS Calculated Master 0.6000 (Minimum) Phase 1.290 Phase 0.6673 Master 0.6500 0.7000 0.6200 (Nominal) (Maximum) QLIR Calculated (Minimum) Value Master (Minimum) Value 1.393 1.390 (Nominal) 1.450 Phase (Minimum) Value Phase 0.6554 Master 0.7200 0.8200 (Nominal) (Maximum) QR Calculated QRLI Calculated 0.3381 0.3900 0.4500 (Minimum) (Nominal) (Maximum) 1.010 1.000 (Nominal) 1.020 (Maximum) Master: 15−Jun−2006 16:58 High resolution Integrated Logging Tool−DTS / Equipment Identification Primary Equipment: HILT Gamma−Ray Neutron Sonde−DTS HILT Gamma−Ray Device HILT Neutron Detector with Alpha Source Z−Axis Accelerometer Neutron Logging Source HGNS − B HGR − HCNT − HACC − NLS − KL Value 0.2900 Value Master 0.9800 (Maximum) QRSS Calculated 704 Neutron Source Radioactive Compensated Neutron Box HTBC Communication Assembly DTS Mode NSR − F CNB − AB HMCA − Auxiliary Equipment: Neutron Calibration Tank Gamma Source Radioactive 1089 NCT − B GSR − U/Y High resolution Integrated Logging Tool−DTS Wellsite Calibration Detector Calibration Phase Gamma Ray Background GAPI Before Value 32.48 0 30.00 (Minimum) (Nominal) 120.0 Phase Gamma Ray (Jig − Bkg) GAPI Before 153.0 139.1 (Maximum) Value 153.0 (Minimum) (Nominal) 167.0 Phase Gamma Ray (Calibrated) GAPI Before 150.0 (Maximum) (Minimum) Value 165.0 165.0 (Nominal) 180.0 (Maximum) Before: 28−Jun−2006 17:13 High resolution Integrated Logging Tool−DTS Wellsite Calibration Zero Measurement Phase CNTC Background CPS Value Master Before 5.000 (Minimum) 32.92 (Nominal) Phase 32.92 Master 31.75 Before 40.00 CFTC Background CPS 31.82 33.05 5.000 (Maximum) 31.82 (Minimum) Master: 27−Jun−2006 12:09 Value (Nominal) 40.00 (Maximum) Before: 28−Jun−2006 17:16 High resolution Integrated Logging Tool−DTS Wellsite Calibration Ratio Measurement Phase Thermal Near Corr. (Tank) CPS Master Value 5332 5000 6031 (Minimum) (Nominal) 7200 Phase Thermal Far Corr. (Tank) CPS Master 2296 2075 (Maximum) Value 2793 (Minimum) (Nominal) 3125 Phase Value Master 2.120 (Maximum) CNTC/CFTC (Tank) (Minimum) 2.322 2.159 (Nominal) 2.540 (Maximum) Master: 27−Jun−2006 12:09 High resolution Integrated Logging Tool−DTS Wellsite Calibration Accelerometer Calibration Phase Z−Axis Acceleration M/S2 Value Before 9.799 9.610 (Minimum) 9.810 (Nominal) 10.01 (Maximum) Before: 28−Jun−2006 17:28 High resolution Integrated Logging Tool−DTS Master Calibration Zero Measurement Phase CNTC Background CPS Value Master 32.92 5.000 (Minimum) 32.92 (Nominal) 40.00 Phase CFTC Background CPS Master 31.82 5.000 (Maximum) Value 31.82 (Minimum) (Nominal) 40.00 (Maximum) Master: 27−Jun−2006 12:09 High resolution Integrated Logging Tool−DTS Master Calibration Tank Measurement Phase Thermal Near Corr. (Tank) CPS Master 5000 (Minimum) Value 5332 6031 (Nominal) Master: 27−Jun−2006 12:09 7200 (Maximum) Phase Thermal Far Corr. (Tank) CPS Master 2075 (Minimum) Value 2296 2793 (Nominal) 3125 (Maximum) Phase CNTC/CFTC (Tank) Value Master 2.120 (Minimum) 2.322 2.159 (Nominal) 2.540 (Maximum) COMPANIA: POZO: CAMPO: PROVINCIA: PAIS: YPF S.A. YPF.Ch.EA−695 EL ALBA CHUBUT ARGENTINA COMBINADA ESCALA: 1/200 PRIMERA LECTURA 1798.9 m PROFUNDIDAD PERFIL 1801.3 m PROF. PERFORADOR 1800 m BUJE DE VASTAGO 666.45 m MESA ROTATIVA 666.15 m NIVEL TERRENO 661.9 m Gordillo/MERCADO fax 4355 Para: ALTA Y BAJA DE POZOS De: FECHA: ZONA: POZO SISTEMA COL. PETROLEO SIST.EXTR. NVO./REP./REACT. TIPO POZO EA-695 BATERIA EL ALBA 2 BBEO.MEC RA-215 ASD-422 TKS.RA 201 Bateria San Diego BBEO.ELECTRO ENTRA AL TOTAL POZO NUEVO ENTRA ALTOTAL SALE RTP ENTRA ALTOTAL SALE RTP PCP SISTEMA SISTEMA PROD.PET COL. PET SI COL. GAS SI Prod.Pet Prod.Pet SI SI NO SI 27-oct-06 MANANTIALES BEHR NOMBRE FECHA BRUTA % AGUA PET N° CELDA GRUPO COLECTOR GAS ALTA 01/10/2006 GAS ( m3/d ) 2,0 35,0% 0,70 1,30 0,0 EL ALBA EL ALBA 2 03/10/2006 20/10/2006 8,4 183,0 98,0% 97,90% 8,23 179,2 0,17 3,84 0,0 UNIDAD DE SEPARACIÓN EL ALBA 2 Unidad de separ. San Diego ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, .................................. FIRMA RESERVORIOS Ergas Juan Eduardo FIRMA PRODUCCIÓN RESTINGA ALI RESTINGA ALI 1 San Diego San Diego ALTA Y BAJA DE POZOS POZO BAT. AIB - CABEZAL CARRERA - REGIMEN TIPO BOMBA PRESION PRESION SDS-604 ASD-423 San Diego San Diego MII-912D-365-168 MII-912D-365-168 168"-8.75 GPM 168"-6 GPM 2 1/2" 2" TUBING 8 10 CASING 4 12 A: Tenorio DE:Vahnovan DISTRITO. M. BEHR / R. ALI POZO: EA-695 ZONA: ALBA 2 FECHA: 16/07/2006 CUENTA: EQUIPO: PROGRAMA: DISEÑO: 1 1 1 67 1 119 CAÑOS BAR COLLAR 2.7/8 TUBING LISO 2.7/8" BHD TUBING LISO 2.7/8" ANCLA AT-4 Nueva TUBING LISO 2.7/8" 1765 1755,35 1122,2 B/B BBA 25-175-RHBC 24 4´ DE BOLLAND 12 B/B 1.1/2" Grado D Nuevas 88 'B/B 3/4" Grado D Nuevas 66 'B/B 7/8" Grado D Nuevas ± 65 B/B 1" Grado D Nuevas TROZOS 1" Grado D Nuevas VASTAGO CROMADO 1 1/2" x 22´ Transportar: Dispositivo Leutert, Espaciadores, Valvula de 2" y niple de 2" sch 80 Tee prensa, Rattigan de 2.7/8", Cupla de vastago, valvula de 1" con niple, cruceta AIB Siam M-640 CARRERA 168 REGIMEN 6 GPM INSTALACIÓN ELÉCTRICA MOTOR 75 HP Bba 25-175 valvulas VM=VF=Ctitanio piston 4' c/ 10 anillos luz 0.07 Con dispositivo para Gas Mecánico; Sello arena EA-695 Diseño BM Página 1 1-ADM. PEDIDO DE OPERACIONES 5-OBJETO: 6-FECHA DE EJECUCION PERFILAJE POZO ENTUBADO YPF. Ch. EA - 695 2-AREA 3-ZONA 4-PEDIDO Nro. 7-EJECUTANTE REQUERIDA Dia Mes Año 03 07 2006 GEOLOG S.A. 8-OPERACION PEDIDA NEUTRON de CORRELACIÓN (N) Registrar en los siguientes tramos: Desde: 1789 m. (Fondo) Hasta: Desde: 0 m. Hasta: 950 m. 0 m. 839 0 839 CEMENTACION-IMAGEN SEGMENTADA (CBL-VDL-IS) Registrar en los siguientes tramos: Desde: 1789 m. (Fondo) Hasta: Desde: 0 m. Hasta: 950 m. 839 0 m. 0 839 Registrar tope anillo de cemento y cañería libre OBSERVACIONES: NOTA: Operación a realizar con Mastil de la Compañía. FONDO MINIMO: 0 m. Obs: Cumple frague el día Diámetro Casing: 5 1/2" de 15.5 lbs/pie (---/--- mm.) 03/07/2006 a las #### Hs. ZAPATO: 1797,83 m. COLLAR: 1789,48 m. 9- SOLICITANTE 10- RESPONSABLE DE EJECUCIÓN 03/07/2006 Nelso D. Lovera 24/06/2014 FECHA FIRMA FECHA 11- CONTROL EJECUCION 24/06/2014 FIRMA FECHA FIRMA COMPANIA: YPF S.A. PAIS: ARGENTINA 666.45 m PROBADOR DE PRESIONES ESCALA: 1/200 B.V. 661.9 m Elev.: Elev.: sobre nivel ref. AIT−LDL−CNL−CALI MDT NIVEL DEL TERRENO 0.0 m N. T. 661.9 m M. R. 666.15 m NIVEL DEL TERRENO @ @ @ @ @ Latitud Y: 2.584.937,96 Ref. Permanente: @ Longitud X: 4.949.913,10 Reg. Medido Desde: 29−Jun−2006 2 1800 m 1801.3 m 1764 m 1121 m 9.625 in @ 350.44 m 349.7 m 8.750 in PHPA 1.17 g/cm3 55 s 6.5 cm3 8.5 PILETA 4.690 ohm.m @ 7 degC 3.880 ohm.m @ 7 degC 6.700 ohm.m @ 7 degC PRENSA PRENSA 1.472 @ 70 1.227 @ 70 70 degC 28−Jun−2006 12:15 29−Jun−2006 12:45 8116 ARCS O. CASTILLO ANIBAL SILVEIRA Equipo PI−245 Perforacion Medida Desde: NIVEL DEL TERRENO UWI: AR0100006830 LOCACION YPF.Ch.EA−695 Compania: YPF S.A. POZO: YPF.Ch.EA−695 EL ALBA Pozo: CAMPO: CAS CHUBUT Locacion: PROVINCIA: EL ALBA echa orrida No. rof. Perforador rof. Registro rimera Lectura ltima Lectura ondo Tuberia Perforador ondo Tuberia Registro iametro Trepano ipo De Lodo Densidad Viscosidad PH Perdidas Fuente Muestra De Lodo M @ Temp. MF @ Temp. MC @ Temp. RMC uente: RMF M @ T. Fdo. RMF @ T. Fdo. emp. Maxima Medida irculacion Final Hora Hora egistro Fondo nidad No. Locacion egistrado por: estigo Campo: MUD Logging Date Run Number Depth Driller Logger Depth Bottom Log Interval Top Log Interval Casing Driller Size @ Depth Casing Logger Bit Size Type Fluid In Hole Density Viscosity Fluid Loss PH Source Of Sample RM @ Measured Temperature RMF @ Measured Temperature RMC @ Measured Temperature Source RMF RMC RM @ MRT RMF @ MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By Run 1 @ @ @ @ @ @ Run 2 @ Run 3 @ @ @ @ Run 4 @ DEPTH SUMMARY LISTING Date Created: 30−JUN−2006 15:52:34 Depth System Equipment Depth Measuring Device Type: Serial Number: Calibration Date: Calibrator Serial Number: Calibration Cable Type: Wheel Correction 1: Wheel Correction 2: IDW−B 4858 12−Nov−2004 31 7−46P −4 −4 Tension Device Type: Serial Number: Calibration Date: Calibrator Serial Number: Calibration Gain: Calibration Offset: CMTD−B/A 1689 14−Feb−2006 1028 1.28 41.00 Logging Cable Type: Serial Number: Length: 7−46P 77353 3000.15 M Conveyance Method: Wireline Rig Type: LAND Depth Control Parameters Log Sequence: Subsequent Log In the Well Reference Log Name: Reference Log Run Number: Reference Log Date: AIT−LDL−CNL−CAL 1 28−Jun−2006 Depth Control Remarks 1. Procedimiento Estandar de Control de Profundidad de Schlumberger aplicado a esta carrera. 2. Perfil correlacionado con registro AIT−LDL−CNL−CALI del dia 28−Jun−2006 3. 4. 5. 6. LIMITACION DE RESPONSABILIDAD LA UTILIZACION Y CONFIANZA EN LOS DATOS AQUI GRABADOS POR PARTE DE LA NOMBRADA COMPANIA (Y POR CUALQUIERA DE SUS SUBSIDIARIAS, AFILIADAS, REPRESENTANTES, AGENTES, CONSULTORES Y EMPLEADOS) ESTA SUJETA A LOS TERMINOS Y CONDICIONES ACORDADOS ENTRE SCHLUMBERGER Y LA COMPANIA, INCLUYENDO: (a) RESTRICCIONES EN EL USO DE LOS DATOS GRABADOS; (b) LIMITACION DE RESPONSABILIDAD Y REVOCACION DE GARANTIAS EN RELACION A LA UTILIZACION Y CONFIANZA EN LOS DATOS GRABADOS POR PARTE DE LA COMPANIA, Y (c) LA SOLA Y TOTAL RESPONSABILIDAD DEL CLIENTE POR CUALQUIER INTERPRETACION HECHA O DECISION BASADA EN EL USO DE ESTOS DATOS. OTROS SERVICIOS # 1 OTROS SERVICIOS # 2 OS1: AIT−LDL−CNL−CALI OS1: OS2: MDT OS2: OS3: OS3: OS4: OS4: OS5: PI−245 OS5: OBSERVACIONES: CORRIDA # 1 OBSERVACIONES: CORRIDA # 2 1. Perfil correlacionado con registro AIT−LDL−CNL−CALI del 28−Jun−2006. 2. Esquema del pozo segun datos del perforador. 3. Herramienta corrida segun diagrama. 4. Herramienta corrida con 2 precamaras de 10 cc y packer estandar. 5. Maxima desviacion del pozo segun datos del perforador = 1 deg 6. Maxima temperatura registrada 70 degC, tomada con termometro en punta de herramienta. 7. Datos adicionales del lodo: Cl = 350 ppm. Ca = 80 ppm. 8. Ultima circulacion termino el dia 28−Jun−2006 a las 12:15 hs y duro 1 hora. 9. Puntos solicitados: 8, Normales:7, Sin entrada: 1, Perdida de Sello: 0 9. Puntos solicitados: 8, Normales:7, Sin entrada: 1, Perdida de Sello: 0 10. Cliente presente en todos los pretests. 11. Pretest @ 1762 m repetido para comprobacion de lectura de la herramienta. 12. En el pretest 1138,5 m se comenzo a identificar fluido para tomar muestra. Bombeados 20lts. Luego se tapo el probe sin determinar el fluido. Se saco herramienta para limpiar. CORRIDA #1 ORDEN DE SERVICIO: VERSION DEL PROGRAMA: 14C0−302 NIVEL DEL LODO: 0m INTERVALO REGISTRADO COMIENZO FINAL CORRIDA #2 ORDEN DE SERVICIO: VERSION DEL PROGRAMA: NIVEL DEL LODO: INTERVALO REGISTRADO COMIENZO DESCRIPCION DEL EQUIPO CORRIDA # 1 SURFACE E MRPP GSR− WITM (C DOWNHOLE LEH− 15.5 LEH− TCC− ECH− TCC− SGT− SGH SGC− SGD− 14.6 TelSta Gamma MRP 13.3 13.013.7 12.1 MRPC PC MRMS 10.1 10.5 BOTT_ BOTT_ BOTT_ BOTT_ BOTT_ BOTT_ MRMS_ MS1 LFA MRFA 6.13 6.56 CORRIDA # 2 FINAL FA−B 4.58 MRHY 5.01 MRHY_ HY1 2.01 MRPS 2.44 MRPS_ DF PS1−CQ PS1−R Tension TOOL Z TOOL BO MAXIMUM STRING MEASUREMENTS RE ALL LENGTH YPF.Ch.EA− Schlumber PI−245 Altura Mesa: 4. Nivel Terre Casing 9 5 32.3 Lb/p Zapato @ 350. Cota: 661.90 Nivel Referen Trepano d 8 3/4" @ T Nivel Ma 1800 m RESUMEN DE LA OPERACION MAXIS Field Log Client: YPF S.A. Tool: MRPS_1− Field: EL ALBA Probe Type: Conventional probe Well: YPF.Ch.EA−695 Gauge: BQP1 Gauge Resolution: 0.010 psi Run date: 29−Jun−2006 Test 1 3 5 7 12 2 5 File 44 45 47 48 49 33 34 Depth TVD M M 1294.27 1668.28 1738.32 1742.46 1763.98 1120.99 1138.48 1294.27 1668.28 1738.32 1742.46 1763.98 1120.99 1138.48 Drawdown Last read Formation Mobility Before After build−up Pres Pressure MD/CP PSIA PSIA PSIA PSIA 0.03 166.95 2.39 2.55 1.12 130.73 Mud Pressure 2185.85 2868.82 2882.21 2871.06 2908.29 1863.36 1871.36 2066.68 2858.71 2873.56 2858.36 2893.98 1842.51 1846.48 1281.31 1567.39 69.14 1602.04 1745.21 898.50 736.12 1281.31 1567.39 69.14 1602.04 1745.21 898.50 736.12 Test Type Volumetric Pretest Volumetric Pretest Dry Test Volumetric Pretest Volumetric Pretest Volumetric Pretest Volumetric Pretest 6 35 1188.27 1188.27 1.23 1942.75 1928.67 897.51 897.51 Volumetric Pretest PRETEST@1121 M MAXIS Field Log File 33 Depth, M: 1120.99 Volumetric Pretest − Large−Diameter probe Mud Pressure before test, PSIA: Mud Pressure after test, PSIA: Last build−up pressure, PSIA: Draw−down mobility, md/cp: 1863.36 1842.6 898.5 1.1 2000 1800 1600 T0: 156.0sec Production time: 25.2sec Pressure, PSIA 1400 1200 1000 800 600 400 200 0 0 100 200 300 400 Time, sec 500 600 700 Pretest Volume: 10.2cc − MRPS_1− BQP1 Resolution: 0.010psi Company: Well: Output DLIS Files DEFAULT MDT_OFA_033LTP FN:32 PRODUCER 29−Jun−2006 03:51 1121.0 M 1.7 M Elapsed Event Summary Time (s) 607.5 Retract Single Probe Module (MRPS) 1 124.5 Vert Pretest 10.2 cc @ 60 C3/M Single Probe Module (MRPS) 1 69.0 Probe Set @ 1121.0 M Single Probe Module (MRPS) 1 PIP SUMMARY Time Mark Every 60 S MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Quartz Gauge Temperature (BQT1) 100 150 (DEGF) MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 Retract MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) 666 657 648 639 630 621 612 603 594 585 576 567 558 549 540 531 522 513 504 495 486 477 468 459 1815.45 1815.75 1816.05 1816.34 1816.48 1816.32 1814.54 977.06 878.03 877.96 877.88 877.88 877.81 877.86 877.87 878.27 879.47 877.29 877.18 877.11 877.04 876.94 876.79 876.76 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) 1842.51 1842.63 1842.94 1843.24 1843.26 1843.36 1841.83 995.70 898.74 898.51 898.45 898.41 898.37 898.39 898.52 898.93 900.21 897.94 897.85 897.77 897.66 897.57 897.48 897.38 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 Vert Pretest 10.2 cc @ 60 C3/M Probe Set @ 1121.0 M MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 450 441 432 423 414 405 396 387 378 369 360 351 342 333 324 315 306 297 288 279 270 261 252 243 234 225 216 207 198 189 180 171 162 153 144 135 126 117 108 99 90 81 72 63 54 45 36 27 18 9 0 876.59 876.42 876.35 876.17 876.09 875.88 875.72 875.59 875.50 875.32 875.03 874.79 874.46 874.08 873.66 873.25 872.93 872.50 872.04 871.62 871.45 871.84 870.55 869.37 868.49 867.26 864.00 859.45 852.35 842.94 827.70 794.81 689.50 383.90 153.02 99.47 1876.97 1870.79 1847.75 1856.44 1833.57 1833.98 1834.36 1834.78 1835.22 1835.69 1836.19 1836.64 1837.15 1837.64 1838.17 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Resistivity Cell Temperature (B1TR) 897.27 897.16 897.03 896.87 896.73 896.60 896.46 896.33 896.19 896.01 895.79 895.52 895.19 894.84 894.44 894.06 893.69 893.23 892.76 892.33 892.18 892.67 891.20 890.10 889.18 887.81 884.38 879.80 872.35 862.64 846.58 810.92 691.45 374.40 159.50 146.09 1903.42 1898.61 1869.88 1871.45 1861.92 1862.39 1862.81 1863.14 1863.70 1864.17 1864.67 1865.18 1865.67 1866.21 1866.37 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 100 (DEGF) 150 PIP SUMMARY Time Mark Every 60 S Parameters DLIS Name Description Value MRPS_1: Single Probe Module (MRPS) 1 Quartz Gauge Pressure Correction Applied Quartz Gauge Deviation Angle Quartz Gauge Flow Line Density LFA: Live Fluid Analyzer PDCO Probe Depth Correction Offset MRPC: Power Cartridge PDCO Probe Depth Correction Offset Format: MRPS_1_SGQG_Station Vertical Scale: 1" per 60S QGCA QGDA QGFD DYCO 0 1 0 DEG G/C3 M 0 M Graphics File Created: 29−Jun−2006 03:51 OP System Version: 14C0−302 MCM MRPS_1 LFA MRMS_1 SGT−L MRHY_1 MRPO MRPC TCC−BF 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 Output DLIS Files DEFAULT MDT_OFA_033LTP FN:32 PRODUCER 29−Jun−2006 03:51 PRETEST@1138.5 M MAXIS Field Log File 34 Depth, M: 1138.48 Volumetric Pretest − Large−Diameter probe Mud Pressure before test, PSIA: Mud Pressure after test, PSIA: Last build−up pressure, PSIA: Draw−down mobility, md/cp: 2250 2000 1750 : 3.0 sec Pressure, PSIA 1500 1250 1000 750 1871.36 1846.48 736.12 130.7 Production tim 500 T0: 3207.9sec 250 0 0 500 1000 1500 2000 2500 3000 3500 Time, sec Pretest Volume: 10.3cc − MRPS_1− BQP1 Resolution: 0.010psi Company: Well: Output DLIS Files DEFAULT MDT_OFA_034LTP FN:33 PRODUCER 29−Jun−2006 04:06 1138.5 M 8.8 M Elapsed Event Summary Time (s) 3351.6 Retract Single Probe Module (MRPS) 1 3310.2 Pumping Stopped 366.0 C3 Dual Pumpout Module (MRPO) 3262.5 Pump Out Started Dual Pumpout Module (MRPO) 3197.1 Vert Pretest 10.3 cc @ 60 C3/M Single Probe Module (MRPS) 1 3140.4 Probe Set @ 1138.6 M Single Probe Module (MRPS) 1 3057.6 Retract Single Probe Module (MRPS) 1 2912.1 Pumping Stopped 20130.0 C3 Dual Pumpout Module (MRPO) 291.0 Pump Out Started Dual Pumpout Module (MRPO) 165.0 Vert Pretest 10.1 cc @ 60 C3/M Single Probe Module (MRPS) 1 106.8 Vert Pretest 10.1 cc @ 60 C3/M Single Probe Module (MRPS) 1 54.0 Probe Set @ 1138.5 M Single Probe Module (MRPS) 1 PIP SUMMARY Time Mark Every 60 S MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) 3465 1825.86 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) 1851.82 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 Retract Pumping Stopped 366.0 C3 Pump Out Started Vert Pretest 10.3 cc @ 60 C3/M Probe Set @ 1138.6 M Retract Pumping Stopped 20130.0 C3 3456 3447 3438 3429 3420 3411 3402 3393 3384 3375 3366 3357 3348 3339 3330 3321 3312 3303 3294 3285 3276 3267 3258 3249 3240 3231 3222 3213 3204 3195 3186 3177 3168 3159 3150 3141 3132 3123 3114 3105 3096 3087 3078 3069 3060 3051 3042 3033 3024 3015 3006 2997 2988 2979 2970 2961 2952 2943 2934 2925 2916 2907 2898 2889 2880 2871 2862 2853 2844 2835 2826 2817 2808 2799 1825.81 1825.79 1825.72 1825.72 1825.69 1825.64 1825.55 1825.50 1825.41 1825.32 1824.75 1822.81 135.41 134.73 134.20 131.19 127.22 163.46 439.78 548.49 608.36 1408.19 1463.35 1467.47 1478.52 718.16 718.07 717.75 696.90 2020.44 1940.92 1926.10 1822.06 1821.71 1821.32 1820.94 1820.35 1816.93 1822.28 1822.01 1821.83 1821.40 1821.68 1820.95 1818.34 43.87 43.81 43.69 43.58 43.49 43.39 43.30 43.18 43.08 42.95 42.84 42.74 42.66 42.43 42.42 42.18 42.17 42.20 42.11 42.06 42.07 42.02 42.01 42.05 41.96 41.90 41.89 42.03 34.96 1851.81 1851.76 1851.72 1851.67 1851.62 1851.58 1851.52 1851.48 1851.42 1851.42 1851.14 1848.91 151.92 149.37 148.89 145.68 141.62 178.92 457.82 561.92 635.94 1580.19 1487.15 1492.00 1507.22 737.18 736.41 735.64 1121.43 2019.27 1969.95 1967.20 1848.21 1847.72 1847.24 1846.60 1848.57 1843.00 1848.05 1847.93 1847.92 1847.27 1847.98 1847.63 993.12 58.75 57.96 57.86 57.76 57.67 57.56 57.45 57.34 57.22 57.10 56.99 56.87 56.74 56.61 56.61 56.36 56.33 56.32 56.29 56.27 56.23 56.19 56.13 56.11 56.08 56.07 56.06 56.13 47.43 2790 2781 2772 2763 2754 2745 2736 2727 2718 2709 2700 2691 2682 2673 2664 2655 2646 2637 2628 2619 2610 2601 2592 2583 2574 2565 2556 2547 2538 2529 2520 2511 2502 2493 2484 2475 2466 2457 2448 2439 2430 2421 2412 2403 2394 2385 2376 2367 2358 2349 2340 2331 2322 2313 2304 2295 2286 2277 2268 2259 2250 2241 2232 2223 2214 2205 2196 2187 2178 2169 2160 2151 2142 27.02 26.14 34.01 47.70 93.00 55.68 33.45 23.00 27.89 41.82 69.42 68.96 38.39 35.08 42.29 50.81 66.59 93.18 64.08 63.96 63.80 69.16 83.48 100.08 100.80 106.01 114.52 105.73 111.50 121.57 128.56 156.14 168.56 197.07 283.50 307.28 329.88 389.17 430.77 349.78 382.90 415.41 424.50 424.53 399.90 416.65 421.91 427.82 428.19 438.04 458.12 440.99 445.51 449.90 453.91 455.27 438.34 447.32 449.53 453.09 456.98 469.33 623.20 468.90 469.42 471.29 477.71 480.43 442.20 473.56 477.27 480.15 488.34 41.12 40.63 49.18 63.94 107.46 67.43 46.07 37.42 42.54 57.44 87.20 79.42 50.80 49.04 57.77 65.64 83.14 102.82 78.32 78.20 77.95 84.76 98.13 114.53 115.19 129.93 127.20 120.39 126.89 136.05 145.07 174.34 185.99 221.41 302.16 327.26 339.90 418.67 442.50 371.61 399.18 433.61 440.81 439.84 410.89 432.81 438.38 443.81 445.95 455.08 479.33 458.28 462.84 466.41 470.36 472.34 448.93 463.84 466.35 470.25 473.80 487.87 626.45 485.36 487.34 488.51 494.46 496.88 442.70 490.71 493.68 497.30 506.73 2133 2124 2115 2106 2097 2088 2079 2070 2061 2052 2043 2034 2025 2016 2007 1998 1989 1980 1971 1962 1953 1944 1935 1926 1917 1908 1899 1890 1881 1872 1863 1854 1845 1836 1827 1818 1809 1800 1791 1782 1773 1764 1755 1746 1737 1728 1719 1710 1701 1692 1683 1674 1665 1656 1647 1638 1629 1620 1611 1602 1593 1584 1575 1566 1557 1548 1539 1530 1521 1512 1503 1494 1485 644.58 484.77 491.94 494.13 497.65 499.97 511.88 691.18 687.55 680.38 496.43 499.08 502.49 502.06 506.68 507.47 498.83 500.23 504.36 506.98 510.24 539.98 519.23 519.17 522.34 524.20 528.35 501.43 523.47 525.63 533.06 541.33 569.90 534.83 535.29 539.45 543.79 545.99 565.53 550.89 561.41 595.72 683.03 542.29 548.17 553.00 553.90 557.02 536.45 554.97 560.73 567.55 573.02 632.51 570.17 574.55 580.47 580.19 592.14 699.79 697.33 693.14 572.63 578.57 578.24 582.61 585.78 603.88 697.97 696.01 690.28 579.36 584.86 687.70 504.96 507.82 510.97 515.19 518.78 527.60 708.44 705.18 697.21 514.68 515.30 518.64 520.50 523.52 524.05 515.88 519.26 521.56 525.36 526.73 567.95 535.90 536.73 538.72 541.81 544.61 492.29 540.35 543.16 550.17 557.47 593.50 551.78 553.84 557.14 558.52 562.50 562.01 569.40 579.75 625.42 699.65 562.40 562.73 568.55 568.44 574.03 548.69 573.76 577.42 583.48 590.37 690.16 587.96 591.94 594.32 602.04 615.75 717.40 714.72 709.76 591.53 596.08 598.21 603.64 606.16 623.92 716.20 712.96 706.79 599.55 602.12 1476 1467 1458 1449 1440 1431 1422 1413 1404 1395 1386 1377 1368 1359 1350 1341 1332 1323 1314 1305 1296 1287 1278 1269 1260 1251 1242 1233 1224 1215 1206 1197 1188 1179 1170 1161 1152 1143 1134 1125 1116 1107 1098 1089 1080 1071 1062 1053 1044 1035 1026 1017 1008 999 990 981 972 963 954 945 936 927 918 909 900 891 882 873 864 855 846 837 828 819 591.48 586.47 591.36 611.94 697.55 691.50 685.44 583.11 587.61 586.61 587.44 596.51 583.54 587.08 592.71 596.75 596.65 669.93 601.66 599.08 608.96 611.69 614.52 609.32 610.00 615.25 619.42 627.46 619.67 620.34 624.05 627.27 628.98 624.81 627.32 627.05 632.06 634.35 630.47 631.87 630.60 632.18 636.03 638.21 632.67 636.11 635.02 638.61 648.09 634.44 634.01 634.80 639.68 640.34 635.61 660.36 660.67 660.69 662.83 666.31 686.52 658.45 658.91 660.84 660.05 662.83 666.70 676.12 716.90 715.89 715.54 725.52 789.08 660.15 604.23 604.77 612.73 692.92 713.54 709.50 701.42 602.15 602.59 605.63 607.61 611.80 603.54 606.29 606.09 611.61 614.08 620.57 619.55 619.87 623.21 626.57 630.69 623.84 629.04 632.48 636.11 644.63 635.83 639.24 640.42 643.12 646.13 641.65 644.26 645.71 648.92 651.70 646.79 648.42 648.87 651.19 652.83 650.02 650.90 652.24 653.99 656.85 669.35 652.22 653.48 654.31 657.86 659.45 654.41 678.04 678.40 679.82 681.56 685.29 713.80 676.80 678.32 679.26 680.15 682.73 686.05 694.98 734.39 733.35 731.27 746.14 744.46 679.41 Pump Out Started Vert Pretest 10.1 cc @ 60 C3/M 810 801 792 783 774 765 756 747 738 729 720 711 702 693 684 675 666 657 648 639 630 621 612 603 594 585 576 567 558 549 540 531 522 513 504 495 486 477 468 459 450 441 432 423 414 405 396 387 378 369 360 351 342 333 324 315 306 297 288 279 270 261 252 243 234 225 216 207 198 189 180 171 162 661.14 663.54 666.23 664.52 668.70 667.79 660.76 663.04 660.11 665.33 665.32 666.01 669.31 662.71 659.34 667.46 665.65 667.81 667.47 671.84 664.67 665.98 666.20 667.65 668.24 667.25 674.32 677.28 678.41 677.49 679.13 679.70 682.35 680.90 683.73 715.17 674.75 674.85 676.16 677.53 675.94 680.31 680.59 682.71 673.77 676.30 670.05 692.66 693.51 694.21 694.77 695.55 696.24 697.77 695.03 697.19 688.03 680.45 779.79 819.18 903.14 736.98 736.99 736.95 736.97 736.93 736.85 736.81 736.71 736.63 736.20 716.95 737.20 680.01 680.45 681.55 681.62 683.47 685.39 679.88 680.94 681.77 682.59 683.94 685.95 690.42 680.71 680.41 683.87 683.03 684.09 685.63 688.46 682.58 684.98 684.25 685.71 687.44 688.87 694.32 694.48 696.04 695.85 697.38 697.99 699.53 700.76 702.43 727.37 693.37 693.68 694.25 696.35 696.71 698.47 700.60 705.95 691.68 692.03 689.00 712.55 712.14 713.08 714.63 714.50 715.67 715.33 714.35 713.97 707.38 700.33 801.33 843.27 1068.14 756.44 756.07 756.05 756.03 755.98 755.96 755.90 755.82 755.67 755.22 742.56 756.67 Vert Pretest 10.1 cc @ 60 C3/M Probe Set @ 1138.5 M MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 153 144 135 126 117 108 99 90 81 72 63 54 45 36 27 18 9 0 736.86 736.80 736.79 736.63 706.72 1881.59 1873.66 1724.55 1842.86 1843.20 1843.57 1843.67 1844.47 1844.35 1844.62 1844.85 1845.00 1845.13 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) 756.04 755.99 755.86 755.51 724.01 1908.18 1893.27 1737.73 1870.09 1870.47 1870.76 1870.82 1871.47 1871.58 1871.84 1872.04 1872.21 1872.03 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 PIP SUMMARY Time Mark Every 60 S Parameters DLIS Name Description Value MRPS_1: Single Probe Module (MRPS) 1 Quartz Gauge Pressure Correction Applied Quartz Gauge Deviation Angle Quartz Gauge Flow Line Density LFA: Live Fluid Analyzer PDCO Probe Depth Correction Offset MRPC: Power Cartridge PDCO Probe Depth Correction Offset Format: MRPS_1_SGQG_Station Vertical Scale: 1" per 60S QGCA QGDA QGFD DYCO 0 1 0 MCM MRHY_1 MRPO MRPC TCC−BF 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 Output DLIS Files DEFAULT MDT_OFA_034LTP FN:33 PRODUCER M 0 M Graphics File Created: 29−Jun−2006 04:07 OP System Version: 14C0−302 MRPS_1 LFA MRMS_1 SGT−L DEG G/C3 29−Jun−2006 04:06 LFA@1138.5 M MAXIS Field Log File 34 Probe Depth (BQP1) 1138.5 M 3000 2500 Pressure, PSIA 2000 1500 1000 500 0 0 500 1000 Start of Test Time: 106.8 sec 1500 2000 2500 3000 3500 4000 4500 5000 Time, seconds Start of Build−up Time: 119.1 sec Reference pressure st start of build−up (BQP1) 1915.8 PSIA. Company: Well: Output DLIS Files DEFAULT MDT_OFA_034LTP FN:33 PRODUCER 29−Jun−2006 04:06 Elapsed Time (s) Event Summary 3351.6 Retract Single Probe Module (MRPS) 1 3310.2 Pumping Stopped 366.0 C3 Dual Pumpout Module (MRPO) 3262.5 Pump Out Started Dual Pumpout Module (MRPO) 3197.1 Vert Pretest 10.3 cc @ 60 C3/M Single Probe Module (MRPS) 1 3140.4 Probe Set @ 1138.6 M Single Probe Module (MRPS) 1 1138.5 M 8.8 M 3057.6 Retract Single Probe Module (MRPS) 1 2912.1 Pumping Stopped 20130.0 C3 Dual Pumpout Module (MRPO) 291.0 Pump Out Started Dual Pumpout Module (MRPO) 165.0 Vert Pretest 10.1 cc @ 60 C3/M Single Probe Module (MRPS) 1 106.8 Vert Pretest 10.1 cc @ 60 C3/M Single Probe Module (MRPS) 1 54.0 Probe Set @ 1138.5 M Single Probe Module (MRPS) 1 PIP SUMMARY Time Mark Every 60 S MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 LFA Optical Density Channel 9 (FAOD_ LFA[9]) −36 (−−−−) 4 LFA Optical Density Channel 8 (FAOD_ LFA[8]) −32 (−−−−) 8 LFA Optical Density Channel 7 (FAOD_ LFA[7]) −28 (−−−−) 12 LFA Optical Density Channel 6 (FAOD_ LFA[6]) −24 (−−−−) 16 LFA Optical Density Channel 5 (FAOD_ LFA[5]) −20 (−−−−) 20 MRPO Hydraulic Pump Output Volume (POPV) 0 (C3) 1000 LFA Optical Density Channel 4 (FAOD_ LFA[4]) −16 (−−−−) 24 MRPO Motor Speed (POMS) 5000 (RPM) LFA Optical Density Channel 3 (FAOD_ LFA[3]) −12 (−−−−) 28 0 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10000 High Gas MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10000 5 MRPO Solenoid 3 Status (POS3) (−−−−) Retract Pumping Stopped 366.0 C3 Pump Out Started Vert Pretest 10.3 cc @ 60 C3/M Probe Set @ 1138.6 M Retract 0 Mediu m Gas Elapsed Time (ETIM) (S) 3465 3420 3375 3330 3285 3240 3195 3150 3105 3060 3015 2970 Low Gas Oil Water LFA Optical Density Channel 2 (FAOD_ LFA[2]) −8 (−−−−) 32 LFA Fluid Coloration (FCOL_ LFA Optical Density Channel 1 (FAOD_ LFA[1]) LFA) −4 (−−−−) 36 (−−−−) 0.000001 0.0001 LFA Fluid LFA Optical Density Channel 0 (FAOD_ Highly Coloration (FCOL_ LFA[0]) Absorbing LFA) 0 (−−−−) 40 Fluid 0.0001 (−−−−) 0.01 2925 2880 2835 2790 2745 2700 2655 2610 2565 2520 2475 2430 2385 2340 2295 2250 2205 2160 2115 2070 2025 1980 1935 1890 1845 1800 1755 1710 1665 1620 1575 1530 1485 1440 1395 1350 1305 1260 1215 1170 1125 1080 1035 990 945 900 855 810 765 720 675 630 585 540 495 450 405 360 315 270 225 180 135 90 45 0 Pumping Stopped 20130.0 C3 Pump Out Started Vert Pretest 10.1 cc @ 60 C3/M Vert Pretest 10.1 cc @ 60 C3/M Probe Set @ 1138.5 M 5 MRPO Solenoid 3 Status (POS3) (−−−−) 0 MRPS 1 Strain Gauge Pressure (BSG1) Elapsed Time (ETIM) (S) Low Gas Mediu LFA Fluid Highly Coloration (FCOL_ LFA Optical Density Channel 0 (FAOD_ LFA[0]) Absorbing LFA) 0 (−−−−) 40 Fluid 0.0001 (−−−−) 0.01 LFA Fluid Coloration (FCOL_ LFA Optical Density Channel 1 (FAOD_ 0 (PSIG) 10000 m Gas MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10000 High Gas Water LFA) −4 (−−−−) 0.000001 0.0001 LFA[1]) (−−−−) 36 LFA Optical Density Channel 2 (FAOD_ LFA[2]) −8 (−−−−) 32 Oil MRPO Motor Speed (POMS) 5000 (RPM) LFA Optical Density Channel 3 (FAOD_ LFA[3]) −12 (−−−−) 28 MRPO Hydraulic Pump Output Volume (POPV) 0 (C3) 1000 LFA Optical Density Channel 4 (FAOD_ LFA[4]) −16 (−−−−) 24 0 LFA Optical Density Channel 5 (FAOD_ LFA[5]) −20 (−−−−) 20 LFA Optical Density Channel 6 (FAOD_ LFA[6]) −24 (−−−−) 16 LFA Optical Density Channel 7 (FAOD_ LFA[7]) −28 (−−−−) 12 LFA Optical Density Channel 8 (FAOD_ LFA[8]) −32 (−−−−) 8 LFA Optical Density Channel 9 (FAOD_ LFA[9]) −36 (−−−−) 4 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 PIP SUMMARY Time Mark Every 60 S Parameters DLIS Name Description Value MRPS_1: Single Probe Module (MRPS) 1 Quartz Gauge Pressure Correction Applied DYCO 0 DEG Quartz Gauge Deviation Angle 1 G/C3 Quartz Gauge Flow Line Density LFA: Live Fluid Analyzer C1C7SIG_LFA LFA C1/C7 Signal Values in 1g/cc ** V ** CEXP_LFA LFA Coloration Exponent 4.6 FAGM_LFA LFA GOR Allow/Disallow Mode ALLOW FAJM_LFA LFA Job Mode LFA FATCM_LFA LFA Temp. Coef. Measure Mode ** V ** FATCS_LFA LFA Temp. Coef. Source Mode ** V ** GASH_LFA LFA Gas Indicator High Level Threshold 0.4 LFA Gas Indicator Low Level Threshold 0.05 GASL_LFA GASM_LFA LFA Gas Indicator Medium Level Threshold 0.1 GORD_LFA LFA GOR Disqualification Level 0.1 PDCO Probe Depth Correction Offset 0 M SATL_LFA LFA Saturation Level of Optical Density Measurement ** V ** TCPS_STATUS_LFA LFA Temperature Compensation Coefficient Status NOT_VALID MRPC: Power Cartridge PDCO Probe Depth Correction Offset 0 M Format: LFA_Station Vertical Scale: 1" per 300S Graphics File Created: 29−Jun−2006 04:07 QGCA QGDA QGFD OP System Version: 14C0−302 MCM MRPS_1 LFA MRMS_1 14C0−302 14C0−302 14C0−302 MRHY_1 MRPO MRPC 14C0−302 14C0−302 14C0−302 SGT−L 14C0−302 TCC−BF 14C0−302 Output DLIS Files DEFAULT MDT_OFA_034LTP FN:33 PRODUCER 29−Jun−2006 04:06 PRETEST@1188.3 M MAXIS Field Log File 35 Depth, M: 1188.27 Volumetric Pretest − Large−Diameter probe Mud Pressure before test, PSIA: Mud Pressure after test, PSIA: Last build−up pressure, PSIA: Draw−down mobility, md/cp: 1942.75 1928.68 897.51 1.2 2250 2000 1750 Pressure, PSIA 1500 1250 1000 Production time: 6.0 sec 750 500 T0: 129.6sec 250 0 0 100 200 300 400 500 600 700 800 900 1000 Time, sec Pretest Volume: 10.3cc − MRPS_1− BQP1 Resolution: 0.010psi Company: Well: Output DLIS Files DEFAULT Elapsed MDT_OFA_035LTP FN:34 PRODUCER 29−Jun−2006 05:11 1188.3 M 2.5 M Event Summary Time (s) 937.2 Retract Single Probe Module (MRPS) 1 116.7 Vert Pretest 10.3 cc @ 60 C3/M Single Probe Module (MRPS) 1 61.2 Probe Set @ 1188.3 M Single Probe Module (MRPS) 1 PIP SUMMARY Time Mark Every 60 S MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 Retract Elapsed Time (ETIM) (S) 990 981 972 963 954 945 936 927 918 909 900 891 882 873 864 855 846 837 828 819 810 801 792 783 774 765 756 747 738 729 720 711 702 693 684 675 666 657 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) 1902.19 1902.16 1902.12 1902.10 1901.69 1900.77 1063.37 877.91 877.84 877.84 877.82 877.84 877.80 877.77 877.71 877.64 877.59 877.51 877.44 877.30 877.11 876.95 876.69 876.45 876.16 875.90 875.55 875.21 874.87 874.50 874.14 873.77 873.27 872.94 872.49 872.08 871.57 871.13 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) 1928.67 1928.67 1928.67 1928.51 1928.49 1928.14 1094.93 897.62 897.51 897.49 897.47 897.44 897.42 897.38 897.33 897.29 897.21 897.14 897.03 896.89 896.72 896.51 896.28 896.02 895.74 895.44 895.11 894.78 894.43 894.07 893.68 893.28 892.87 892.45 892.01 891.57 891.11 890.64 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 Vert Pretest 10.3 cc @ 60 C3/M Probe Set @ 1188.3 M 648 639 630 621 612 603 594 585 576 567 558 549 540 531 522 513 504 495 486 477 468 459 450 441 432 423 414 405 396 387 378 369 360 351 342 333 324 315 306 297 288 279 270 261 252 243 234 225 216 207 198 189 180 171 162 153 144 135 126 117 108 99 90 81 72 63 54 45 36 27 18 9 0 870.67 870.20 869.69 869.12 868.64 868.12 867.57 867.02 866.41 865.85 865.27 864.62 864.03 863.46 862.83 862.15 861.44 860.79 860.11 859.35 858.64 857.90 857.16 856.35 855.58 854.77 853.88 853.03 852.17 851.24 850.37 849.37 848.39 847.36 846.24 845.19 844.08 842.96 841.77 840.45 839.10 837.71 836.27 834.70 833.04 831.36 829.47 827.50 825.42 823.06 820.50 817.73 814.61 811.09 807.04 802.11 795.90 787.44 419.27 2030.58 2041.21 1997.95 1912.09 1915.73 1915.94 1916.15 1916.31 1915.53 1917.63 1917.98 1918.28 1918.56 1918.76 890.16 889.66 889.17 888.65 888.13 887.60 887.04 886.48 885.91 885.32 884.72 884.12 883.49 882.86 882.21 881.55 880.88 880.19 879.48 878.76 878.03 877.28 876.51 875.72 874.92 874.09 873.25 872.37 871.48 870.57 869.63 868.66 867.66 866.63 865.57 864.47 863.33 862.15 860.91 859.62 858.29 856.87 855.40 853.85 852.20 850.44 848.56 846.53 844.37 842.02 839.45 836.63 833.46 829.87 825.67 820.61 814.17 805.09 303.33 2061.77 2068.95 2024.60 1942.47 1942.38 1942.61 1942.85 1942.93 1942.10 1944.36 1944.69 1944.99 1945.27 1945.45 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 PIP SUMMARY Time Mark Every 60 S Parameters DLIS Name Description Value MRPS_1: Single Probe Module (MRPS) 1 Quartz Gauge Pressure Correction Applied Quartz Gauge Deviation Angle Quartz Gauge Flow Line Density LFA: Live Fluid Analyzer PDCO Probe Depth Correction Offset MRPC: Power Cartridge PDCO Probe Depth Correction Offset Format: MRPS_1_SGQG_Station Vertical Scale: 1" per 60S QGCA QGDA QGFD DYCO 0 1 0 DEG G/C3 M 0 M Graphics File Created: 29−Jun−2006 05:11 OP System Version: 14C0−302 MCM MRPS_1 LFA MRMS_1 SGT−L MRHY_1 MRPO MRPC TCC−BF 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 Output DLIS Files DEFAULT MDT_OFA_035LTP FN:34 PRODUCER 29−Jun−2006 05:11 PRETEST@1294.3 M MAXIS Field Log File 44 Depth, M: 1294.27 Volumetric Pretest − Large−Diameter probe Mud Pressure before test, PSIA: Mud Pressure after test, PSIA: Last build−up pressure, PSIA: Draw−down mobility, md/cp: 2185.85 2066.68 1281.31 0.03 3000 2500 Pressure, PSIA 2000 1500 Production time: 625.5sec 1000 T0: 735.6sec 500 0 0 250 500 750 1000 1250 1500 1750 2000 2250 2500 Time, sec Pretest Volume: 10.3cc − MRPS_1− BQP1 Resolution: 0.010psi Company: Well: Output DLIS Files DEFAULT MDT_044LTP FN:43 PRODUCER 29−Jun−2006 10:40 Elapsed Event Summary Time (s) 2285.1 Retract Single Probe Module (MRPS) 1 104.1 Vert Pretest 10.3 cc @ 60 C3/M Single Probe Module (MRPS) 1 49.5 Probe Set @ 1294.3 M Single Probe Module (MRPS) 1 PIP SUMMARY Time Mark Every 60 S MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRHY 1 Motor MRPS 1 Quartz MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 5000 Speed (HMS1) (RPM) 0 8000 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) 2358 2349 2340 2331 2322 2313 2304 2295 2286 2277 2268 2259 2250 2241 2232 2223 2214 2205 2196 2187 2178 2169 2160 2151 2142 2133 2124 2115 2106 2097 2088 2079 2070 2061 2052 2043 2034 2025 2016 2007 1998 1989 1980 1971 1962 1953 1944 1935 1926 1917 1908 1899 1890 1881 1872 1863 1854 1845 1836 1827 1818 1809 1800 1791 2038.20 2038.26 2038.29 2038.40 2038.40 2038.24 2038.05 2038.02 1757.77 1257.53 1257.63 1257.74 1257.57 1257.53 1257.59 1257.60 1257.32 1257.11 1257.00 1256.84 1256.64 1256.42 1256.13 1255.89 1255.71 1255.30 1255.10 1255.13 1254.95 1254.96 1254.77 1254.56 1254.26 1254.17 1253.96 1253.43 1253.04 1252.34 1252.10 1251.81 1251.57 1251.36 1251.20 1250.95 1250.82 1250.63 1250.33 1250.13 1249.85 1249.61 1249.46 1249.17 1249.00 1248.68 1248.37 1248.10 1247.72 1247.54 1247.23 1246.85 1246.50 1246.29 1245.97 1245.66 Retract Gauge Pressure (BQP1) 0 (PSIA) 10 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) 2066.68 2066.68 2066.71 2066.71 2066.71 2066.55 2066.38 2066.03 1818.94 1282.30 1281.21 1281.36 1281.17 1281.20 1281.20 1281.24 1280.88 1280.68 1280.62 1280.41 1280.25 1280.01 1279.68 1279.46 1279.24 1278.96 1278.74 1278.68 1278.62 1278.56 1278.36 1278.10 1277.86 1277.76 1277.46 1277.04 1276.50 1275.90 1275.66 1275.36 1275.14 1274.94 1274.76 1274.52 1274.36 1274.14 1273.87 1273.67 1273.42 1273.19 1272.97 1272.76 1272.54 1272.25 1271.91 1271.62 1271.32 1271.03 1270.76 1270.39 1270.06 1269.79 1269.45 1269.14 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 1782 1773 1764 1755 1746 1737 1728 1719 1710 1701 1692 1683 1674 1665 1656 1647 1638 1629 1620 1611 1602 1593 1584 1575 1566 1557 1548 1539 1530 1521 1512 1503 1494 1485 1476 1467 1458 1449 1440 1431 1422 1413 1404 1395 1386 1377 1368 1359 1350 1341 1332 1323 1314 1305 1296 1287 1278 1269 1260 1251 1242 1233 1224 1215 1206 1197 1188 1179 1170 1161 1152 1143 1134 1245.42 1245.07 1244.71 1244.37 1243.94 1243.70 1243.32 1242.90 1242.52 1242.14 1241.77 1241.29 1240.91 1240.47 1239.92 1239.51 1238.93 1238.39 1237.80 1237.24 1236.52 1235.80 1234.98 1234.18 1233.27 1232.03 1230.60 1229.12 1227.55 1225.83 1224.10 1222.18 1220.15 1218.14 1216.04 1213.78 1211.46 1209.03 1206.49 1203.80 1201.03 1198.22 1195.26 1192.20 1189.03 1185.79 1182.30 1178.87 1175.17 1171.40 1167.51 1163.39 1159.12 1154.70 1150.18 1145.46 1140.53 1135.48 1130.21 1124.83 1119.14 1113.53 1107.42 1100.92 1094.39 1087.60 1080.51 1072.99 1065.07 1056.94 1048.91 1040.74 1032.47 1268.90 1268.56 1268.16 1267.80 1267.41 1267.11 1266.74 1266.35 1265.96 1265.55 1265.16 1264.73 1264.27 1263.83 1263.34 1262.85 1262.32 1261.73 1261.12 1260.45 1259.70 1258.87 1257.97 1257.00 1255.91 1254.64 1253.21 1251.69 1250.07 1248.35 1246.54 1244.63 1242.65 1240.57 1238.41 1236.17 1233.81 1231.35 1228.78 1226.10 1223.33 1220.46 1217.49 1214.41 1211.22 1207.89 1204.45 1200.89 1197.20 1193.38 1189.42 1185.29 1180.97 1176.56 1171.98 1167.18 1162.25 1157.11 1151.84 1146.35 1140.63 1134.97 1128.80 1122.33 1115.70 1108.82 1101.64 1094.15 1086.05 1077.88 1069.73 1061.60 1053.22 1125 1116 1107 1098 1089 1080 1071 1062 1053 1044 1035 1026 1017 1008 999 990 981 972 963 954 945 936 927 918 909 900 891 882 873 864 855 846 837 828 819 810 801 792 783 774 765 756 747 738 729 720 711 702 693 684 675 666 657 648 639 630 621 612 603 594 585 576 567 558 549 540 531 522 513 504 495 486 477 1023.92 1014.94 1005.98 996.62 987.13 977.11 966.99 956.54 945.39 934.29 923.09 911.59 899.88 887.71 875.29 862.40 849.36 835.85 822.01 808.42 794.44 780.25 765.54 750.83 735.52 720.18 704.23 687.68 671.83 654.71 639.17 623.56 607.53 591.31 573.00 554.32 536.71 517.51 497.03 477.58 461.52 443.63 422.09 406.77 389.69 374.64 360.26 342.88 328.52 315.68 304.32 292.56 281.30 268.35 259.08 249.78 241.43 229.56 219.15 208.34 201.37 194.49 186.96 180.36 174.16 167.91 160.89 155.62 150.58 144.67 140.40 135.07 128.69 1044.57 1035.61 1026.51 1017.09 1007.42 997.46 987.11 976.47 965.44 954.21 942.85 931.38 919.52 907.26 894.65 881.73 868.55 854.87 841.11 827.27 813.16 798.77 784.15 769.16 753.64 738.32 722.17 705.69 689.57 672.35 656.85 641.00 625.02 608.53 590.13 571.22 553.65 534.12 513.69 494.28 477.43 459.78 438.33 422.81 405.74 390.73 375.68 358.57 344.54 331.18 320.29 308.28 297.14 283.65 274.67 265.12 256.93 245.29 234.14 223.78 216.52 209.73 202.56 194.73 189.31 183.25 176.39 170.76 165.65 159.92 155.82 149.79 143.84 Vert Pretest 10.3 cc @ 60 C3/M Probe Set @ 1294.3 M MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 468 459 450 441 432 423 414 405 396 387 378 369 360 351 342 333 324 315 306 297 288 279 270 261 252 243 234 225 216 207 198 189 180 171 162 153 144 135 126 117 108 99 90 81 72 63 54 45 36 27 18 9 0 124.11 120.20 116.98 113.60 110.49 107.20 104.77 102.20 99.55 96.35 93.55 90.69 88.83 86.51 84.29 81.97 79.71 77.37 75.39 73.16 71.15 69.07 67.03 64.83 62.89 61.16 59.45 57.67 56.35 55.25 54.22 53.36 52.30 50.87 49.45 47.85 45.94 43.59 41.04 37.36 2274.83 2381.65 2329.36 2193.40 2150.03 2150.86 2151.51 2152.15 2153.01 2153.85 2154.68 2155.52 2156.31 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Resistivity Cell Temperature 139.17 135.44 132.16 128.76 125.77 122.56 120.09 117.47 114.70 111.85 108.89 106.29 104.48 102.07 100.00 97.57 95.27 93.05 90.98 88.90 86.92 84.72 82.71 80.55 78.62 76.95 75.25 73.51 72.21 71.16 70.25 69.36 68.29 66.91 65.43 63.76 61.75 59.31 56.07 52.24 2308.25 2417.78 2362.76 2225.31 2183.00 2183.84 2184.60 2185.35 2186.19 2187.06 2187.92 2188.77 2189.30 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 PIP SUMMARY Time Mark Every 60 S Parameters DLIS Name Description Value MRPS_1: Single Probe Module (MRPS) 1 Quartz Gauge Pressure Correction Applied Quartz Gauge Deviation Angle Quartz Gauge Flow Line Density MRPC: Power Cartridge PDCO Probe Depth Correction Offset Format: MRPS_1_SGQG_Station Vertical Scale: 1" per 60S QGCA QGDA QGFD DYCO 0 1 DEG G/C3 0 M Graphics File Created: 29−Jun−2006 10:40 OP System Version: 14C0−302 MCM MRPS_1 MRPC TCC−BF MRHY_1 SGT−L 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 Output DLIS Files DEFAULT MDT_044LTP FN:43 PRODUCER 29−Jun−2006 10:40 PRETEST@1668.3 M MAXIS Field Log File 45 Depth, M: 1668.28 Volumetric Pretest − Large−Diameter probe Mud Pressure before test, PSIA: Mud Pressure after test, PSIA: Last build−up pressure, PSIA: Draw−down mobility, md/cp: 3400 3200 3000 time: 8.1 sec Pressure, PSIA 2800 2600 2400 2200 2000 1800 2868.82 2858.71 1567.39 167 Productio T0: 147.9sec 1600 1400 0 25 50 75 100 125 150 175 200 225 250 Time, sec Pretest Volume: 5.6 cc − MRPS_1− BQP1 Resolution: 0.010psi Company: Well: Output DLIS Files DEFAULT MDT_045LTP FN:44 PRODUCER 29−Jun−2006 11:32 1668.3 M 0.6 M Elapsed Event Summary Time (s) 211.2 Retract Single Probe Module (MRPS) 1 139.8 Vert Pretest 5.6 cc @ 60 C3/M Single Probe Module (MRPS) 1 97.2 Vert Pretest 5.2 cc @ 60 C3/M Single Probe Module (MRPS) 1 38.7 Probe Set @ 1668.3 M Single Probe Module (MRPS) 1 PIP SUMMARY Time Mark Every 60 S MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 Retract Vert Pretest 5.6 cc @ 60 C3/M Elapsed Time (ETIM) (S) 252 243 234 225 216 207 198 189 180 171 162 153 144 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) 2823.35 2823.70 2824.42 2824.43 2822.17 1540.84 1540.50 1540.44 1540.39 1540.38 1540.37 1540.28 1538.68 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) 2858.55 2858.55 2859.34 2859.67 2858.90 1574.79 1567.41 1567.39 1567.37 1567.33 1567.26 1567.13 1567.20 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 Vert Pretest 5.2 cc @ 60 C3/M Probe Set @ 1668.3 M MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 135 126 117 108 99 90 81 72 63 54 45 36 27 18 9 0 1540.43 1540.61 1540.65 1541.45 2974.46 3131.81 3143.23 2877.70 2831.52 2831.81 2832.04 2832.01 2832.36 2832.76 2833.11 2833.40 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) 1567.36 1567.41 1567.29 1567.45 3038.21 3171.56 3149.19 3079.86 2868.01 2868.21 2868.45 2868.68 2868.86 2869.29 2869.62 2869.71 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 PIP SUMMARY Time Mark Every 60 S Parameters DLIS Name Description Value MRPS_1: Single Probe Module (MRPS) 1 Quartz Gauge Pressure Correction Applied Quartz Gauge Deviation Angle Quartz Gauge Flow Line Density MRPC: Power Cartridge PDCO Probe Depth Correction Offset Format: MRPS_1_SGQG_Station Vertical Scale: 1" per 60S QGCA QGDA QGFD DYCO 0 1 0 M Graphics File Created: 29−Jun−2006 11:32 OP System Version: 14C0−302 MCM MRPS_1 MRPC TCC−BF MRHY_1 SGT−L 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 Output DLIS Files DEFAULT MDT_045LTP FN:44 PRODUCER DEG G/C3 29−Jun−2006 11:32 PRETEST@1738.3 M MAXIS Field Log File 47 Depth, M: 1738.32 Dry Test − Large−Diameter probe Mud Pressure before test, PSIA: Mud Pressure after test, PSIA: Last build−up pressure, PSIA: 2882.21 2873.56 69.14 3500 3000 Pressure, PSIA 2500 2000 1500 1000 500 0 0 50 100 150 200 250 300 Time, sec Pretest Volume: 5.5 cc − MRPS_1− BQP1 Resolution: 0.010psi Company: Well: Output DLIS Files DEFAULT MDT_047LTP FN:46 PRODUCER 29−Jun−2006 12:10 Elapsed Event Summary Time (s) 246.0 Retract Single Probe Module (MRPS) 1 96.9 Vert Pretest 5.5 cc @ 60 C3/M Single Probe Module (MRPS) 1 42.0 Probe Set @ 1738.3 M Single Probe Module (MRPS) 1 PIP SUMMARY Time Mark Every 60 S MRPS 1 Resistivity Cell Temperature 100 (B1TR) (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 Retract Vert Pretest 5.5 cc @ 60 C3/M Probe Set @ 1738.3 M MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) 279 270 261 252 243 234 225 216 207 198 189 180 171 162 153 144 135 126 117 108 99 90 81 72 63 54 45 36 27 18 9 0 2840.47 2840.85 2840.72 2838.68 60.84 55.30 54.83 54.31 53.85 53.41 52.89 52.28 51.62 50.92 50.13 49.20 48.12 46.98 45.58 43.08 2785.64 2771.25 2662.35 2906.95 2848.52 2848.66 2848.85 2849.00 2849.28 2849.49 2849.72 2849.83 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 2873.28 2873.28 2873.82 2872.82 79.48 69.86 69.23 68.78 68.29 67.80 67.27 66.64 66.01 65.31 64.49 63.54 62.44 61.07 59.02 54.79 2814.60 2802.80 2693.30 2935.81 2881.75 2881.93 2882.05 2882.12 2882.40 2882.61 2882.77 2882.74 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 PIP SUMMARY Time Mark Every 60 S Parameters DLIS Name Description Value MRPS_1: Single Probe Module (MRPS) 1 Quartz Gauge Pressure Correction Applied Quartz Gauge Deviation Angle Quartz Gauge Flow Line Density MRPC: Power Cartridge PDCO Probe Depth Correction Offset Format: MRPS_1_SGQG_Station Vertical Scale: 1" per 60S QGCA QGDA QGFD DYCO 0 1 DEG G/C3 0 M Graphics File Created: 29−Jun−2006 12:10 OP System Version: 14C0−302 MCM MRPS_1 MRPC TCC−BF MRHY_1 SGT−L 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 Output DLIS Files DEFAULT MDT_047LTP FN:46 PRODUCER 29−Jun−2006 12:10 PRETEST@1742.5 M MAXIS Field Log File 48 Depth, M: 1742.46 Volumetric Pretest − Large−Diameter probe Mud Pressure before test, PSIA: Mud Pressure after test, PSIA: Last build−up pressure, PSIA: Draw−down mobility, md/cp: 3500 3000 : 3.9 sec Pressure, PSIA 2500 2000 1500 1000 2871.06 2858.36 1602.04 2.4 Production tim T0: 170.7sec 500 0 0 50 100 150 200 250 300 350 400 Time, sec Pretest Volume: 5.1 cc − MRPS_1− BQP1 Resolution: 0.010psi Company: Well: Output DLIS Files DEFAULT MDT_048LTP FN:47 PRODUCER 29−Jun−2006 12:17 1742.5 M 1.0 M Elapsed Event Summary Time (s) 309.3 Retract Single Probe Module (MRPS) 1 161.7 Vert Pretest 5.1 cc @ 60 C3/M Single Probe Module (MRPS) 1 114.0 Vert Pretest 5.3 cc @ 60 C3/M Single Probe Module (MRPS) 1 56.7 Probe Set @ 1742.5 M Single Probe Module (MRPS) 1 PIP SUMMARY Time Mark Every 60 S MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 Retract MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) 369 360 351 342 333 324 315 306 297 288 279 2825.73 2826.15 2826.61 2827.10 2827.25 2827.41 2823.70 1863.79 1577.46 1577.44 1577.38 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) 2858.24 2858.38 2858.81 2859.23 2859.04 2859.90 2858.95 1937.35 1602.38 1602.04 1602.00 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 Vert Pretest 5.1 cc @ 60 C3/M Vert Pretest 5.3 cc @ 60 C3/M Probe Set @ 1742.5 M MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 270 261 252 243 234 225 216 207 198 189 180 171 162 153 144 135 126 117 108 99 90 81 72 63 54 45 36 27 18 9 0 1577.36 1577.39 1577.29 1577.16 1577.14 1577.01 1576.96 1576.88 1576.40 1575.71 1573.57 1291.70 2063.72 2031.83 1985.48 1960.43 1904.25 2971.94 3163.02 3178.00 2912.32 2837.37 2837.69 2837.99 2838.01 2838.26 2838.66 2838.98 2839.25 2839.51 2839.72 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) 1601.96 1601.89 1601.83 1601.76 1601.66 1601.56 1601.42 1601.40 1600.83 1600.08 1597.56 845.70 2081.91 2047.60 2010.48 1984.50 1923.04 3005.39 3197.67 3200.31 3118.82 2870.35 2870.54 2870.74 2870.73 2871.06 2871.46 2871.74 2872.01 2872.24 2872.29 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 PIP SUMMARY Time Mark Every 60 S Parameters DLIS Name Description Value MRPS_1: Single Probe Module (MRPS) 1 Quartz Gauge Pressure Correction Applied Quartz Gauge Deviation Angle Quartz Gauge Flow Line Density MRPC: Power Cartridge PDCO Probe Depth Correction Offset Format: MRPS_1_SGQG_Station Vertical Scale: 1" per 60S QGCA QGDA QGFD DYCO 0 1 0 M Graphics File Created: 29−Jun−2006 12:17 OP System Version: 14C0−302 MCM DEG G/C3 MRPS_1 MRPC TCC−BF 14C0−302 14C0−302 14C0−302 MRHY_1 SGT−L 14C0−302 14C0−302 Output DLIS Files DEFAULT MDT_048LTP FN:47 PRODUCER 29−Jun−2006 12:17 PRETEST@1762.0 M MAXIS Field Log File 49 Depth, M: 1763.98 Volumetric Pretest − Large−Diameter probe Mud Pressure before test, PSIA: Mud Pressure after test, PSIA: Last build−up pressure, PSIA: Draw−down mobility, md/cp: 2908.29 2893.98 1745.21 2.6 3500 3000 T0: 511.5sec Production time: 5.4 sec Pressure, PSIA 2500 2000 1500 1000 500 0 0 200 400 600 800 1200 Time, sec Pretest Volume: 5.2 cc − MRPS_1− BQP1 Resolution: 0.010psi Company: Well: Output DLIS Files DEFAULT 1000 MDT_049LTP FN:48 PRODUCER 29−Jun−2006 12:27 Elapsed Event Summary Time (s) 1034.7 Retract Single Probe Module (MRPS) 1 501.3 Vert Pretest 5.2 cc @ 60 C3/M Single Probe Module (MRPS) 1 417.6 Vert Pretest 5.3 cc @ 60 C3/M Single Probe Module (MRPS) 1 391.8 Vert Pretest 5.0 cc @ 60 C3/M Single Probe Module (MRPS) 1 336.3 Probe Set @ 1764.0 M Single Probe Module (MRPS) 1 254.1 Retract Single Probe Module (MRPS) 1 138.3 Vert Pretest 5.2 cc @ 60 C3/M Single Probe Module (MRPS) 1 111.9 Vert Pretest 5.7 cc @ 60 C3/M Single Probe Module (MRPS) 1 54.6 Probe Set @ 1764.0 M Single Probe Module (MRPS) 1 PIP SUMMARY Time Mark Every 60 S MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 Retract MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) 1089 1080 1071 1062 1053 1044 1035 1026 1017 1008 999 990 981 972 963 954 945 936 927 918 909 900 891 882 873 864 855 846 2827.57 2828.10 2828.46 2828.46 2829.58 2828.44 1892.44 1719.65 1719.65 1719.63 1719.66 1719.61 1719.58 1719.58 1719.56 1719.53 1719.49 1719.49 1719.46 1719.40 1719.42 1719.40 1719.27 1719.27 1719.28 1719.18 1719.20 1719.13 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) 2859.98 2859.98 2860.33 2860.13 2861.65 2860.46 1861.95 1745.74 1745.22 1745.19 1745.17 1745.15 1745.13 1745.10 1745.08 1745.06 1745.03 1745.00 1744.97 1744.93 1744.90 1744.87 1744.83 1744.80 1744.75 1744.71 1744.66 1744.63 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 Vert Pretest 5.2 cc @ 60 C3/M Vert Pretest 5.3 cc @ 60 C3/M Vert Pretest 5.0 cc @ 60 C3/M Probe Set @ 1764.0 M Retract 837 828 819 810 801 792 783 774 765 756 747 738 729 720 711 702 693 684 675 666 657 648 639 630 621 612 603 594 585 576 567 558 549 540 531 522 513 504 495 486 477 468 459 450 441 432 423 414 405 396 387 378 369 360 351 342 333 324 315 306 297 288 279 270 261 252 243 234 225 216 207 198 189 1719.10 1719.03 1719.04 1718.98 1718.89 1718.89 1718.84 1718.79 1718.76 1718.72 1718.70 1718.59 1718.53 1718.42 1718.40 1718.30 1718.26 1718.14 1718.08 1717.96 1717.82 1717.73 1717.55 1717.35 1717.22 1717.05 1716.86 1716.65 1716.32 1716.09 1715.79 1715.37 1714.85 1714.11 1712.96 1710.57 1686.85 1833.28 1835.11 1849.78 1915.28 1824.93 1878.02 1717.52 1717.35 1712.90 1186.29 2433.85 2406.20 2385.17 2377.97 2383.54 3054.85 2860.55 2860.95 2861.20 2861.41 2862.44 2862.48 2862.94 2863.36 2863.78 2864.08 2864.60 2863.23 2191.06 1720.13 1720.23 1720.15 1720.18 1720.18 1720.26 1720.13 1744.58 1744.51 1744.47 1744.42 1744.36 1744.32 1744.28 1744.24 1744.18 1744.15 1744.09 1744.03 1743.95 1743.87 1743.78 1743.68 1743.60 1743.50 1743.39 1743.26 1743.16 1743.03 1742.87 1742.69 1742.52 1742.33 1742.12 1741.87 1741.60 1741.29 1740.93 1740.51 1739.96 1739.19 1737.96 1735.32 1675.19 1861.22 1864.44 1879.70 1930.04 1857.62 1935.49 1742.86 1742.82 1740.41 2055.69 2461.04 2438.15 2414.86 2407.05 2410.23 3034.05 2893.09 2893.50 2893.70 2894.39 2894.75 2894.90 2895.30 2895.73 2896.14 2896.49 2897.22 2894.73 2262.43 1746.19 1745.62 1745.61 1745.60 1745.60 1745.59 1745.53 Vert Pretest 5.2 cc @ 60 C3/M Vert Pretest 5.7 cc @ 60 C3/M Probe Set @ 1764.0 M MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 5000 180 171 162 153 144 135 126 117 108 99 90 81 72 63 54 45 36 27 18 9 0 1719.96 1719.62 1718.56 1715.77 2039.91 2973.18 2982.38 2747.11 3143.28 3152.01 2918.24 2873.95 2874.03 2874.52 2874.31 2875.43 2875.66 2876.04 2876.48 2876.92 2877.33 Elapsed Time (ETIM) (S) MRPS 1 Strain Gauge Pressure (BSG1) (PSIG) 1745.32 1744.88 1743.58 1740.49 2572.70 3014.42 3016.31 2948.31 3176.50 3189.50 2902.50 2907.00 2907.09 2907.54 2907.46 2908.42 2908.61 2909.03 2909.45 2909.88 2910.13 MRPS 1 Strain Gauge Pressure (BSG1) 0 (PSIG) 10 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 1 MRPS 1 Quartz Gauge Pressure (BQP1) (PSIA) MRHY 1 Motor MRPS 1 Quartz Gauge Pressure (BQP1) Speed 0 (PSIA) 5000 (HMS1) (RPM) 0 8000 MRPS 1 Quartz Gauge Pressure (BQP1) 0 (PSIA) 10 MRPS 1 Quartz Gauge Temperature (BQT1) 100 (DEGF) 150 MRPS 1 Flowline Fluid Resistivity (BFR1) 0 (OHMM) 1 MRPS 1 Resistivity Cell Temperature (B1TR) 100 (DEGF) 150 PIP SUMMARY Time Mark Every 60 S Parameters DLIS Name Description Value MRPS_1: Single Probe Module (MRPS) 1 Quartz Gauge Pressure Correction Applied Quartz Gauge Deviation Angle Quartz Gauge Flow Line Density MRPC: Power Cartridge PDCO Probe Depth Correction Offset Format: MRPS_1_SGQG_Station Vertical Scale: 1" per 60S QGCA QGDA QGFD DYCO 0 1 0 M Graphics File Created: 29−Jun−2006 12:27 OP System Version: 14C0−302 MCM MRPS_1 MRPC TCC−BF MRHY_1 SGT−L 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 Output DLIS Files DEFAULT MDT_049LTP FN:48 PRODUCER DEG G/C3 29−Jun−2006 12:27 CORRELACIONES MAXIS Field Log Company: Well: Output DLIS Files DEFAULT MDT_OFA_031LUP FN:30 PRODUCER 29−Jun−2006 03:35 1153.2 M 1101.9 M OP System Version: 14C0−302 MCM MRPS_1 LFA MRMS_1 SGT−L 0 MRHY_1 MRPO MRPC TCC−BF 14C0−302 14C0−302 14C0−302 14C0−302 Gamma Ray (GR) (GAPI) 150 14C0−302 14C0−302 14C0−302 14C0−302 10000 1125 Tension (TENS) (LBF) 0 1150 Gamma Ray (GR) (GAPI) 0 150 10000 Tension (TENS) (LBF) 0 Parameters DLIS Name Description Value LFA: Live Fluid Analyzer Probe Depth Correction Offset MRPC: Power Cartridge PDCO Probe Depth Correction Offset Format: CORRELATION Vertical Scale: 1:200 PDCO 0 M 0 M Graphics File Created: 29−Jun−2006 03:35 OP System Version: 14C0−302 MCM MRPS_1 LFA MRMS_1 SGT−L MRHY_1 MRPO MRPC TCC−BF 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 Output DLIS Files DEFAULT MDT_OFA_031LUP FN:30 PRODUCER 29−Jun−2006 03:35 Company: Well: Output DLIS Files DEFAULT MDT_042LUP FN:41 PRODUCER 29−Jun−2006 10:32 1267.7 M 1242.4 M OP System Version: 14C0−302 MCM MRPS_1 MRPC TCC−BF 0 MRHY_1 SGT−L 14C0−302 14C0−302 14C0−302 Gamma Ray (GR) (GAPI) 150 14C0−302 14C0−302 10000 Tension (TENS) (LBF) 0 1250 Gamma Ray (GR) (GAPI) 0 150 10000 Tension (TENS) (LBF) Parameters DLIS Name Description Value MRPC: Power Cartridge PDCO Probe Depth Correction Offset Format: CORRELATION Vertical Scale: 1:200 0 M Graphics File Created: 29−Jun−2006 10:32 OP System Version: 14C0−302 MCM MRPS_1 MRPC TCC−BF MRHY_1 SGT−L 14C0−302 14C0−302 14C0−302 14C0−302 14C0−302 Output DLIS Files DEFAULT MDT_042LUP FN:41 PRODUCER 29−Jun−2006 10:32 CALIBRACION MAXIS Field Log MASTER CALIBRATION SUMMARY: Quartz Gauge ( Single Probe Module 1 ) Calibration Pressure Unit: PSIA Calibration Temperature Unit: DEGC 0 Sensor Comment: : Sensor Serial Number: 0190 Sensor Calibration Date (DDMMYY): 120202 Pressure Model: P=F(Fc,Fb) Pressure Matrix: 66 Pressure CRC: C6C8 Temperature Model: T=F(Fb,Fc) Temperature Matrix: 66 Temperature CRC: 7262 Clock Comment: : Clock Serial Number: 620 Clock Calibration Date (DDMMYY): 170102 Clock Model: Fclk=F(Fb’−Fc’) Clock Matrix: 16 Clock CRC: FA79 Fc Offset: +.514400000000E+07 Hz Fb Offset: +.558800000000E+07 Hz R Offset: +.470000000000E+06 Hz Pressure Coefficients Fb**0 Fb**1 Fb**2 Fb**3 Fc**0 +.571239452275E+04 −.181372313898E−02 −.118943880868E−05 −.986455100182E−10 Fc**1 −.107049306737E+01 −.128880131495E−04 −.911384689621E−10 +.484107088151E−15 Fc**2 +.112882605008E−05 +.498457703730E−10 +.902361683627E−15 0.0 Fc**3 +.258973918781E−11 0.0 0.0 0.0 Fc**4 0.0 0.0 0.0 0.0 Fc**5 0.0 0.0 0.0 0.0 Fb**4 Fb**5 Fc**0 −.178003595327E−14 −.223534445461E−19 Fc**1 +.251413399109E−19 0.0 Fc**2 0.0 0.0 Fc**3 0.0 0.0 Fc**4 0.0 0.0 Fc**5 0.0 0.0 Temperature Coefficients Fc**0 Fc**1 Fc**2 Fc**3 Fb**0 +.942734590474E+02 −.234883671014E−03 +.668003692343E−08 +.163439577304E−13 Fb**1 −.620357278758E−02 +.206380305088E−07 +.171407223844E−12 0.0 Fb**2 −.344220341729E−07 +.420788225560E−12 +.220232791758E−17 0.0 Fb**3 −.319874149203E−12 +.103696594514E−16 0.0 0.0 Fb**4 −.228340967657E−17 +.238779228963E−21 0.0 0.0 Fb**5 +.381757283573E−22 0.0 0.0 0.0 Fc**4 Fb**0 0.0 Fc**5 0.0 Fb**1 0.0 0.0 Fb**2 0.0 0.0 Fb**3 0.0 0.0 Fb**4 0.0 0.0 Fb**5 0.0 0.0 Clock Coefficients F’b/F’c**0 +.517533948463E+07 F’b/F’c**1 +.646960296962E−02 F’b/F’c**2 +.607338552283E−06 F’b/F’c**3 −.665323443386E−10 F’b/F’c**4 −.492821797923E−15 F’b/F’c**5 +.493863972092E−20 COMPANIA: POZO: CAMPO: PROVINCIA: PAIS: YPF S.A. YPF.Ch.EA−695 EL ALBA CHUBUT ARGENTINA PRIMERA LECTURA 1764 m PROFUNDIDAD PERFIL 1801.3 m PROF. PERFORADOR 1800 m BUJE DE VASTAGO 666.45 m MESA ROTATIVA 666.15 m NIVEL TERRENO 661.9 m PROBADOR DE PRESIONES ESCALA: 1/200 PROGRAMA de TERMINACION Pozo: EA- 695 UE CH-CS MANANTIALES BEHR FECHA: A. Montar equipo PI- XXX. Armar BOP. B. Calibrar pozo hasta válvula en 1789,48 mbbp. C. Si buena aislación punzar con cañón de 4" 4TPP las siguientes zonas: (Ver CBL-VDL) Profundidad induccion Ensayo Prof Neutron Carga CIV 1 1760,5/ 1762 2,5 Individual 32gr, 0°-180° CIV 2 1741,5/ 1743 1,5 Individual 32gr, 0°-90° CIII 3 1539,5/ 1542 1,5 Individual 32gr, 0°-90° C III 4 1510,5/ 1512 1,5 Individual 32gr, 0°-90° C III 5 1293/ 1295,5 2,5 Individual 32gr, 0°-90° C III 6 C III 7 1180/ 1181,5 1138/1139,5 1,5 1,5 Individual Individual 32gr, 0°-90° 32gr, 0°-90° C III 8 1105,5/ 1107 1,5 Individual 32gr, 0°-90° TOTAL: 14 m C.Ensayar las zonas punzadas desde fondo a superficie. En las capas 1, 2, 3,4,5 y 8 probar admisión previo ensayo. De las capas con aporte de fluido tomar muestras para su análisis; en caso de ser gas medir presiones y tomar muestra. D. De acuerdo al resultado se indicará el programa a seguir Prever Fractura Diseño de Csg : 5 1/2" Caños Marca: Collar Diferencial: 1789,48m Zapato: 1797,83 m Fondo: 1801,3m Preparado por: Biocca 05-jul-06 PROGRAMA de TERMINACION Pozo: EA UE CH-CS MANANTIALES BEHR FECHA: /2006 Punzar con cañón de 4" 4TPP las siguientes zonas: Profundidad induccion Diseño de Csg : 5 1/2" Caños Marca: Collar Diferencial: Ensayo Prof Neutron Carga Zapato: Fondo: m Preparado por: m m COMPANIA: YPF Compania: YPF S.A. S.A. PAIS: 666.45 m ARGENTINA QUICKLOOK ESCALA: 1/200 B.V. 661.9 m Elev.: Elev.: sobre nivel ref. AIT−LDL−CNL−CALI MDT NIVEL DEL TERRENO 0.0 m N. T. 661.9 m M. R. 666.15 m NIVEL DEL TERRENO @ @ @ @ @ Latitud Y: 2.584.937,96 Ref. Permanente: @ Longitud X: 4.949.913,10 Reg. Medido Desde: 28−Jun−2006 1 1800 m 1801.3 m 1798.9 m 349.7 m 9.625 in @ 350.44 m 349.7 m 8.750 in PHPA 1.17 g/cm3 55 s 6.5 cm3 8.5 PILETA 4.690 ohm.m @ 7 degC 3.880 ohm.m @ 7 degC 6.700 ohm.m @ 7 degC PRENSA PRENSA 1.472 @ 70 1.227 @ 70 70 degC 28−Jun−2006 12:15 28−Jun−2006 23:00 8116 ARCS A. AMID / D. ICHAZU ANIBAL SILVEIRA Equipo PI−245 Perforacion Medida Desde: NIVEL DEL TERRENO UWI: AR0100006830 LOCACION YPF.Ch.EA−695 YPF.Ch.EA−695 POZO: Pozo: EL ALBA CAS CAMPO: Locacion: CHUBUT EL ALBA PROVINCIA: Campo: Fecha Corrida No. Prof. Perforador Prof. Registro Primera Lectura Ultima Lectura Fondo Tuberia Perforador Fondo Tuberia Registro Diametro Trepano Tipo De Lodo Densidad Viscosidad PH Perdidas Fuente Muestra De Lodo RM @ Temp. RMF @ Temp. RMC @ Temp. RMC Fuente: RMF RM @ T. Fdo. RMF @ T. Fdo. Temp. Maxima Medida Circulacion Final Hora Hora Registro Fondo Unidad No. Locacion Registrado por: Testigo Municipio: MUD Logging Date Run Number Depth Driller Logger Depth Bottom Log Interval Top Log Interval Casing Driller Size @ Depth Casing Logger Bit Size Type Fluid In Hole Density Viscosity Fluid Loss PH Source Of Sample RM @ Measured Temperature RMF @ Measured Temperature RMC @ Measured Temperature Source RMF RMC RM @ MRT RMF @ MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By Run 1 @ @ @ @ @ @ Run 2 @ Run 3 @ @ @ @ Run 4 @ DEPTH SUMMARY LISTING Date Created: 30−JUN−2006 10:19:37 Depth System Equipment Depth Measuring Device Type: Serial Number: Calibration Date: Calibrator Serial Number: Calibration Cable Type: Wheel Correction 1: Wheel Correction 2: IDW−B 4858 12−Nov−2004 31 7−46P −4 −4 Tension Device Type: Serial Number: Calibration Date: Calibrator Serial Number: Calibration Gain: Calibration Offset: CMTD−B/A 1689 14−Feb−2006 1028 1.28 41.00 Logging Cable Type: Serial Number: Length: 7−46P 77353 3000.15 M Conveyance Method: Wireline Rig Type: LAND Depth Control Parameters Log Sequence: First Log In the Well Rig Up Length At Surface: Rig Up Length At Bottom: Rig Up Length Correction: Stretch Correction: Tool Zero Check At Surface: 71.00 M 71.00 M 0.00 M 2.10 M 0.00 M Depth Control Remarks 1. Primera carrera en el pozo y perfil de referencia de profundidad. 2. Procedimiento Estandar de Control de Profundidad de Schlumberger aplicado a esta carrera. 3. 4. 5. 6. LIMITACION DE RESPONSABILIDAD LA UTILIZACION Y CONFIANZA EN LOS DATOS AQUI GRABADOS POR PARTE DE LA NOMBRADA COMPANIA (Y POR CUALQUIERA DE SUS SUBSIDIARIAS, AFILIADAS, REPRESENTANTES, AGENTES, CONSULTORES Y EMPLEADOS) ESTA SUJETA A LOS TERMINOS Y CONDICIONES ACORDADOS ENTRE SCHLUMBERGER Y LA COMPANIA, INCLUYENDO: (a) RESTRICCIONES EN EL USO DE LOS DATOS GRABADOS; (b) LIMITACION DE RESPONSABILIDAD Y REVOCACION DE GARANTIAS EN RELACION A LA UTILIZACION Y CONFIANZA EN LOS DATOS GRABADOS POR PARTE DE LA COMPANIA, Y (c) LA SOLA Y TOTAL RESPONSABILIDAD DEL CLIENTE POR CUALQUIER INTERPRETACION HECHA O DECISION BASADA EN EL USO DE ESTOS DATOS. OTROS SERVICIOS # 1 OTROS SERVICIOS # 2 OS1: AIT−LDL−CNL−CALI OS1: OS2: MDT OS2: OS3: OS3: OS4: OS4: OS5: PI−245 OS5: OBSERVACIONES: CORRIDA # 1 OBSERVACIONES: CORRIDA # 2 1. Primera carrera en el pozo y perfil de referencia de profundidad. 2. Esquema del pozo segun datos del perforador. 3. Herramienta corrida segun diagrama. 4. AITH corrida descentralizada utilizando standoffs de 1,5". 5. Maxima desviacion del pozo segun datos del perforador = 1 deg 6. Maxima temperatura registrada 70 degC, tomada con termometro en punta de herramienta. 7. Datos adicionales del lodo: Cl = 350 ppm. Ca = 80 ppm. 8. Ultima circulacion termino el dia 28−Jun−06 a las 12:15 hs y duro 1 hora. 9. FPHI = DPHI, FNUM = 0,81 y FEXP = 2 utilizados para el calculo de RWA. 10. LDL y CNL corridos hasta 900 m a pedido del cliente. CORRIDA #1 ORDEN DE SERVICIO: VERSION DEL PROGRAMA: 14C0−302 NIVEL DEL LODO: 0m INTERVALO REGISTRADO COMIENZO FINAL CORRIDA #2 ORDEN DE SERVICIO: VERSION DEL PROGRAMA: NIVEL DEL LODO: INTERVALO REGISTRADO COMIENZO DESCRIPCION DEL EQUIPO CORRIDA # 1 SURFACE E GSR− NCT CNB− NCS− WITM (D DOWNHOLE LEH− 16.0 LEH−QT DTC− CTEM ECH−KC TelSta DTCH ToolSt DTCH HGNS H HMC HILTB− Gamma HGNSD HMC HGNH NLS− NSR−F HACC HCN Neutro HGR Neutro BOW− NPV HGNS 0 DTA− 14.815.1 14.2 14.2 14.014.2 12.2 12.0 11.3 11.3 ECH− DTA LDT− 10.1 GSR−J PGD−G NSC−E ECH−MK DRS−C PDH−L Calip 5.69 CORRIDA # 2 FINAL LS SS 5.66 5.51 AIT− 4.88 1.5 I Stand AHIS−B AHRM 1.5 I Stand Induct Tempe Power 2.41 SP SEN 0.03 DF HTEN HM Accele Mud R Tensi 0.00 TOOL Z 1.5 I Stand MAXIMUM STRING MEASUREMENTS RE ALL LENGTH YPF.Ch.EA− Schlumber PI−245 Altura Mesa: 4. Nivel Terre Casing 9 5 32.3 Lb/p Zapato @ 350. Cota: 661.90 Nivel Referen Trepano d 8 3/4" @ T Nivel Ma 1800 m TRAMO PRINCIPAL MAXIS Field Log Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_025LUP FN:24 PRODUCER 30−Jun−2006 08:23 1806.9 M 291.0 M Output DLIS Files DEFAULT AIT_LDL_TLD_MCFL_089PUP FN:42 PRODUCER 30−Jun−2006 18:52 1807.0 M 345.0 M CUST1 AIT_LDL_TLD_MCFL_089PUC FN:43 CUSTOMER 30−Jun−2006 18:52 1807.0 M 345.0 M CUST2 AIT_LDL_TLD_MCFL_089PUC FN:44 CUSTOMER 30−Jun−2006 18:52 1807.0 M 345.0 M OP System Version: 14C0−302 MCM AIT−H DTA−A DTC−H 14C0−302 14C0−302 14C0−302 LDT−D HILTB−FTB 14C0−302 14C0−302 Changed Parameter Summary DLIS Name New Value SPDR 0 0.03921 −0.25 0 MV/M MV/M MV/M MV/M PIP SUMMARY Previous Value Depth & Time 0 0 0.03921 −0.25 MV/M MV/M MV/M MV/M 1807.0 18:52:21 1300.0 18:53:18 1044.9 18:53:47 1024.9 18:53:49 Time Mark Every 60 S REVOQUE From CALI to BS AIT−H 90 Inch Investigation (AHT90) 1 (OHMM) 100 Tension (TENS) (LBF) 0 1000 AIT−H 60 Inch Investigation (AHT60) 1 (OHMM) 100 CAVERNA From BS to CALI AIT−H 30 Inch Investigation (AHT30) 1 (OHMM) 100 Caliper (CALI) −80 6 (IN) 16 SP (SP) (MV) Invasion From AHTD2 to F4 Gas From DPHI to TNPH 0 RWA (RWA) (OHMM) 2 0 AHF90/AHF10 (LC02) (−−−−) 2 AHT90/AHT10 (LC01) (−−−−) 2 Env.Corr.Thermal Neutron AIT−H 20 Inch Investigation Porosity (TNPH) (AHT20) 20 0 1 (OHMM) 100 0.4 (V/V) 0 AIT−H Outer Invasion Bit Size AIT−H 10 Inch Investigation Density Porosity (DPHI) PhotoElectric Factor (PEF) (BS) Diameter (AHTD2) (AHT10) 0 (−−−−) 5 0.4 (V/V) 0 6 (IN) 16 1 (OHMM) 100 210 (IN) 10 ZAPATO @ 349.7 m 350 375 Ultimas lecturas 400 425 450 475 500 525 550 575 600 625 650 675 700 725 750 775 800 825 850 875 Ultimas lecturas LDL, CNL y CALI 900 925 950 975 1000 1025 1050 1075 1100 1125 1150 1175 1200 1225 1250 1275 1300 1325 1350 1375 1400 1425 1450 1475 1500 1525 1550 1575 1600 1625 1650 1675 1700 1725 1750 1775 1800 FONDO @ 1801.3 m AIT−H Outer Invasion Bit Size AIT−H 10 Inch Investigation PhotoElectric Factor (PEF) Density Porosity (DPHI) (BS) Diameter (AHTD2) (AHT10) 0 (−−−−) 5 0.4 (V/V) 0 6 (IN) 16 1 (OHMM) 100 210 (IN) 10 Caliper (CALI) −80 6 (IN) 16 SP (SP) (MV) Env.Corr.Thermal Neutron AIT−H 20 Inch Investigation Porosity (TNPH) (AHT20) 20 0 1 (OHMM) 100 0.4 (V/V) 0 CAVERNA From BS to CALI AIT−H 30 Inch Investigation (AHT30) 1 (OHMM) 100 Tension (TENS) (LBF) 0 1000 AIT−H 60 Inch Investigation (AHT60) 1 (OHMM) 100 REVOQUE From CALI to BS AIT−H 90 Inch Investigation (AHT90) 1 (OHMM) 100 Gas From DPHI to TNPH AHT90/AHT10 (LC01) (−−−−) 2 0 AHF90/AHF10 (LC02) (−−−−) 2 0 RWA (RWA) (OHMM) 2 Invasion From AHTD2 to F4 PIP SUMMARY Time Mark Every 60 S Parameters DLIS Name Description Value AIT−H: Array Induction Tool − H AHBHM Array Induction Borehole Correction Mode 2_ComputeStandoff AHBHV Array Induction Borehole Correction Code Version Number 880 AHBLV Array Induction Basic Logs Code Version Number 108 AHCDE Array Induction Casing Detection Enable No AHCEN Array Induction Tool Centering Flag (in Borehole) Eccentered AHFRSV Array Induction Response Set Version for Four ft Resolution 40.70.24.21 AHMRF Array Induction Mud Resistivity Factor 1 AHORSV Array Induction Response Set Version for One ft Resolution 40.70.24.21 AHRFV Array Induction Radial Profiling Code Version Number 700 AHRPV Array Induction Radial Parametrization Code Version Number 223 1.5 AHSTA Array Induction Tool Standoff 40.70.24.21 AHTRSV Array Induction Response Set Version for Two ft Resolution ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 BHS Borehole Status OPEN 70 BHT Bottom Hole Temperature (used in calculations) FEXP Form Factor Exponent 2 0.81 FNUM Form Factor Numerator FPHI Form Factor Porosity Source DPHI GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 GGRD Geothermal Gradient 0.018227 GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM ISSBAR Barite Mud Switch NOBARITE SANDSTONE MATR Rock Matrix for Neutron Porosity Corrections RTCO RTCO − Rt Invasion Correction YES SHT Surface Hole Temperature 20 SPDR SP Drift 0 −4 SPNV SP Next Value LDT−D: Litho Density − D BFM Borehole Fluid Medium LIQUID BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 DHC Density Hole Correction BS HIRS DPPM Density Porosity Processing Mode FD Fluid Density 1 GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 0.018227 GGRD Geothermal Gradient GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE 2.65 MDEN Matrix Density SHT Surface Hole Temperature 20 1.17 WMUD Mud Weight HILTB−FTB: High resolution Integrated Logging Tool−DTS BHFL Borehole Fluid Type WATER BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 YES BSCO Borehole Salinity Correction Option CCCO Casing & Cement Thickness Correction Option NO DPPM Density Porosity Processing Mode HIRS FEXP Form Factor Exponent 2 0.81 FNUM Form Factor Numerator FPHI Form Factor Porosity Source DPHI FSAL Formation Salinity −50000 FSCO Formation Salinity Correction Option NO GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 GGRD Geothermal Gradient 0.018227 GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM HSCO Hole Size Correction Option YES ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE MCCO Mud Cake Correction Option YES MCOR Mud Correction NATU MWCO Mud Weight Correction Option YES PTCO Pressure/Temperature Correction Option YES SDAT Standoff Data Source SOCN SHT Surface Hole Temperature 20 SOCN Standoff Distance 0.125 SOCO Standoff Correction Option YES RWA: Apparent Water Resistivity ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 FEXP Form Factor Exponent 2 FNUM Form Factor Numerator 0.81 FPHI Form Factor Porosity Source DPHI RTCO RTCO − Rt Invasion Correction YES ALLRES: Basic Resistivity Transforms ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 RTCO RTCO − Rt Invasion Correction YES IN DEGC DEG DC/M DEGC MV/M MV DEGC G/C3 DEG DC/M G/C3 DEGC G/C3 DEGC PPM DEG DC/M DEGC IN HOLEV: Integrated Hole/Cement Volume Borehole Status OPEN 70 DEGC Bottom Hole Temperature (used in calculations) Generalized Caliper Selection CALI Average Angular Deviation of Borehole from Normal 0 DEG Geothermal Gradient 0.018227 DC/M Generalized Mud Resistivity Selection AITH_RESIST Generalized Temperature Selection HSTS_HTEM Barite Mud Switch NOBARITE SANDSTONE Rock Matrix for Neutron Porosity Corrections Surface Hole Temperature 20 DEGC STI: Stuck Tool Indicator TDL Total Depth − Logger 1801.30 M System and Miscellaneous BS Bit Size 8.750 IN 350.00 PPM BSAL Borehole Salinity CSIZ Current Casing Size 9.625 IN CWEI Casing Weight 32.30 LB/F 1.17 G/C3 DFD Drilling Fluid Density DO Depth Offset for Playback 0.2 M MST Mud Sample Temperature 7.20 DEGC PP Playback Processing RECOMPUTE RMFS Resistivity of Mud Filtrate Sample 3.8800 OHMM RW Resistivity of Connate Water 1.0000 OHMM TD Total Depth 1801.3 M TWS Temperature of Connate Water Sample 37.78 DEGC Format: QUICKLOOK Vertical Scale: 1:200 Graphics File Created: 30−Jun−2006 18:52 BHS BHT GCSE GDEV GGRD GRSE GTSE ISSBAR MATR SHT OP System Version: 14C0−302 MCM AIT−H DTA−A DTC−H 14C0−302 14C0−302 14C0−302 LDT−D HILTB−FTB 14C0−302 14C0−302 Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_025LUP FN:24 PRODUCER 30−Jun−2006 08:23 1806.9 M 291.0 M 30−Jun−2006 08:23 1805.0 M 1626.4 M Output DLIS Files DEFAULT AIT_LDL_TLD_MCFL_089PUP FN:42 PRODUCER 30−Jun−2006 18:52 CUST1 AIT_LDL_TLD_MCFL_089PUC FN:43 CUSTOMER 30−Jun−2006 18:52 CUST2 AIT_LDL_TLD_MCFL_089PUC FN:44 CUSTOMER 30−Jun−2006 18:52 TRAMO REPETIDO MAXIS Field Log Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_024LUP FN:23 PRODUCER Output DLIS Files DEFAULT AIT_LDL_TLD_MCFL_091PUP FN:48 PRODUCER 30−Jun−2006 19:01 1775.0 M 1700.9 M CUST1 AIT_LDL_TLD_MCFL_091PUC FN:49 CUSTOMER 30−Jun−2006 19:01 1775.0 M 1700.9 M CUST2 AIT_LDL_TLD_MCFL_091PUC FN:50 CUSTOMER 30−Jun−2006 19:01 1775.0 M 1700.9 M OP System Version: 14C0−302 MCM AIT−H 14C0−302 LDT−D 14C0−302 AIT−H DTA−A DTC−H 14C0−302 14C0−302 14C0−302 LDT−D HILTB−FTB 14C0−302 14C0−302 Changed Parameter Summary DLIS Name New Value SPDR 0 MV/M PIP SUMMARY Previous Value Depth & Time 0 MV/M 1775.0 19:01:15 Time Mark Every 60 S REVOQUE From CALI to BS AIT−H 90 Inch Investigation (AHT90) 1 (OHMM) 100 Tension (TENS) (LBF) 0 1000 AIT−H 60 Inch Investigation (AHT60) 1 (OHMM) 100 CAVERNA From BS to CALI AIT−H 30 Inch Investigation (AHT30) 1 (OHMM) 100 Caliper (CALI) −80 6 (IN) 16 SP (SP) (MV) Invasion From AHTD2 to F4 Gas From DPHI to TNPH 0 RWA (RWA) (OHMM) 2 0 AHF90/AHF10 (LC02) (−−−−) 2 AHT90/AHT10 (LC01) (−−−−) 2 Env.Corr.Thermal Neutron AIT−H 20 Inch Investigation Porosity (TNPH) (AHT20) 20 0 1 (OHMM) 100 0.4 (V/V) 0 AIT−H Outer Invasion Bit Size AIT−H 10 Inch Investigation Density Porosity (DPHI) PhotoElectric Factor (PEF) (BS) Diameter (AHTD2) (AHT10) 0 (−−−−) 5 0.4 (V/V) 0 6 (IN) 16 1 (OHMM) 100 210 (IN) 10 1725 1750 1775 Bit Size AIT−H Outer Invasion AIT−H 10 Inch Investigation PhotoElectric Factor (PEF) Density Porosity (DPHI) (BS) Diameter (AHTD2) (AHT10) 0 (−−−−) 5 0.4 (V/V) 0 6 (IN) 16 1 (OHMM) 100 210 (IN) 10 Caliper (CALI) −80 6 (IN) 16 SP (SP) (MV) Env.Corr.Thermal Neutron AIT−H 20 Inch Investigation Porosity (TNPH) (AHT20) 20 0 1 (OHMM) 100 0.4 (V/V) 0 CAVERNA From BS to CALI AIT−H 30 Inch Investigation (AHT30) 1 (OHMM) 100 Tension (TENS) (LBF) AIT−H 60 Inch Investigation (AHT60) Gas From DPHI to TNPH AHT90/AHT10 (LC01) (−−−−) 2 0 AHF90/AHF10 (LC02) (−−−−) 2 0 RWA (RWA) (OHMM) 2 0 1000 REVOQUE From CALI to BS 1 (OHMM) 100 AIT−H 90 Inch Investigation (AHT90) 1 (OHMM) 100 Invasion From AHTD2 to F4 PIP SUMMARY Time Mark Every 60 S Parameters DLIS Name Description Value AIT−H: Array Induction Tool − H AHBHM Array Induction Borehole Correction Mode 2_ComputeStandoff AHBHV Array Induction Borehole Correction Code Version Number 880 108 AHBLV Array Induction Basic Logs Code Version Number AHCDE Array Induction Casing Detection Enable No Eccentered AHCEN Array Induction Tool Centering Flag (in Borehole) AHFRSV Array Induction Response Set Version for Four ft Resolution 40.70.24.21 AHMRF Array Induction Mud Resistivity Factor 1 AHORSV Array Induction Response Set Version for One ft Resolution 40.70.24.21 AHRFV Array Induction Radial Profiling Code Version Number 700 223 AHRPV Array Induction Radial Parametrization Code Version Number AHSTA Array Induction Tool Standoff 1.5 AHTRSV Array Induction Response Set Version for Two ft Resolution 40.70.24.21 AITH_TwoResA90 ARTS AIT Rt Selection (for ALLRES computation) BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 FEXP Form Factor Exponent 2 0.81 FNUM Form Factor Numerator FPHI Form Factor Porosity Source DPHI GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 GGRD Geothermal Gradient 0.018227 GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE RTCO RTCO − Rt Invasion Correction YES SHT Surface Hole Temperature 20 0 SPDR SP Drift −3 SPNV SP Next Value LDT−D: Litho Density − D BFM Borehole Fluid Medium LIQUID BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 DHC Density Hole Correction BS HIRS DPPM Density Porosity Processing Mode FD Fluid Density 1 GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 GGRD Geothermal Gradient 0.018227 GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE MDEN Matrix Density 2.65 SHT Surface Hole Temperature 20 WMUD Mud Weight 1.17 HILTB−FTB: High resolution Integrated Logging Tool−DTS BHFL Borehole Fluid Type WATER BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 YES BSCO Borehole Salinity Correction Option CCCO Casing & Cement Thickness Correction Option NO DPPM Density Porosity Processing Mode HIRS FEXP Form Factor Exponent 2 FNUM Form Factor Numerator 0.81 FPHI Form Factor Porosity Source DPHI FSAL Formation Salinity −50000 FSCO Formation Salinity Correction Option NO GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 0.018227 GGRD Geothermal Gradient GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM HSCO Hole Size Correction Option YES ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE MCCO Mud Cake Correction Option YES IN DEGC DEG DC/M DEGC MV/M MV DEGC G/C3 DEG DC/M G/C3 DEGC G/C3 DEGC PPM DEG DC/M MCOR MWCO PTCO SDAT SHT SOCN SOCO Mud Correction NATU Mud Weight Correction Option YES Pressure/Temperature Correction Option YES Standoff Data Source SOCN Surface Hole Temperature 20 DEGC Standoff Distance 0.125 IN Standoff Correction Option YES RWA: Apparent Water Resistivity ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 FEXP Form Factor Exponent 2 0.81 FNUM Form Factor Numerator FPHI Form Factor Porosity Source DPHI RTCO RTCO − Rt Invasion Correction YES ALLRES: Basic Resistivity Transforms ARTS AIT Rt Selection (for ALLRES computation) AITH_TwoResA90 RTCO RTCO − Rt Invasion Correction YES HOLEV: Integrated Hole/Cement Volume BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 70 DEGC GCSE Generalized Caliper Selection CALI GDEV Average Angular Deviation of Borehole from Normal 0 DEG 0.018227 DC/M GGRD Geothermal Gradient GRSE Generalized Mud Resistivity Selection AITH_RESIST GTSE Generalized Temperature Selection HSTS_HTEM ISSBAR Barite Mud Switch NOBARITE MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE SHT Surface Hole Temperature 20 DEGC STI: Stuck Tool Indicator TDL Total Depth − Logger 1801.30 M System and Miscellaneous BS Bit Size 8.750 IN BSAL Borehole Salinity 350.00 PPM CSIZ Current Casing Size 9.625 IN CWEI Casing Weight 32.30 LB/F 1.17 G/C3 DFD Drilling Fluid Density DO Depth Offset for Playback 0.9 M 0.0 M DORL Depth Offset for Repeat Analysis MST Mud Sample Temperature 7.20 DEGC PP Playback Processing RECOMPUTE RMFS Resistivity of Mud Filtrate Sample 3.8800 OHMM RW Resistivity of Connate Water 1.0000 OHMM TD Total Depth 1801.3 M TWS Temperature of Connate Water Sample 37.78 DEGC Format: QUICKLOOK Vertical Scale: 1:200 Graphics File Created: 30−Jun−2006 19:01 OP System Version: 14C0−302 MCM AIT−H DTA−A DTC−H 14C0−302 14C0−302 14C0−302 LDT−D HILTB−FTB 14C0−302 14C0−302 Input DLIS Files DEFAULT AIT_LDL_TLD_MCFL_024LUP FN:23 PRODUCER 30−Jun−2006 08:23 1805.0 M 1626.4 M Output DLIS Files DEFAULT AIT_LDL_TLD_MCFL_091PUP FN:48 PRODUCER 30−Jun−2006 19:01 CUST1 AIT_LDL_TLD_MCFL_091PUC FN:49 CUSTOMER 30−Jun−2006 19:01 CUST2 AIT_LDL_TLD_MCFL_091PUC FN:50 CUSTOMER 30−Jun−2006 19:01 COMPANIA: POZO: CAMPO: PROVINCIA: PAIS: YPF S.A. YPF.Ch.EA−695 EL ALBA CHUBUT ARGENTINA QUICKLOOK PRIMERA LECTURA 1798.9 m PROFUNDIDAD PERFIL 1801.3 m PROF. PERFORADOR 1800 m BUJE DE VASTAGO 666.45 m MESA ROTATIVA 666.15 m NIVEL TERRENO 661.9 m EA-695 Solicitud Perfilaje Pozo entubado Registrar Neutrón de correlación en los tramos: 1780/ 950 mbbp Registrar CBL-VDL desde fondo ( 1780m) continuo hasta 950m. Registrar tope de cemento y cañería libre 30 m. Fondo mínimo 1780m. Casing: 51/2” Zapato: 1797.83mbbp Collar: 1789.48 mbbp Vinculó casing 19.30hs Día 30 de Junio 2006. Client: YPF S.A. Tool: MRPS_1− Field: EL ALBA Probe Type: Conventional probe Well: YPF.Ch.EA−695 Gauge: BQP1 Gauge Resolution: 0.010 psi Run date: 29−Jun−2006 Test 1 3 5 7 12 2 5 6 File 44 45 47 48 49 33 34 35 Depth TVD M M 1294.27 1668.28 1738.32 1742.46 1763.98 1120.99 1138.48 1188.27 1294.27 1668.28 1738.32 1742.46 1763.98 1120.99 1138.48 1188.27 Drawdown Last read Formation Mobility Before After build−up Pres Pressure MD/CP PSIA PSIA PSIA PSIA 0.03 166.95 2.39 2.55 1.12 130.73 1.23 Mud Pressure 2185.85 2868.82 2882.21 2871.06 2908.29 1863.36 1871.36 1942.75 2066.68 2858.71 2873.56 2858.36 2893.98 1842.51 1846.48 1928.67 1281.31 1567.39 69.14 1602.04 1745.21 898.50 736.12 897.51 1281.31 1567.39 69.14 1602.04 1745.21 898.50 736.12 897.51 Test Type Volumetric Pretest Volumetric Pretest Dry Test Volumetric Pretest Volumetric Pretest Volumetric Pretest Volumetric Pretest Volumetric Pretest DATOS A LLENAR POZO BATERIA EQUIPO FECHA RUBRO COSTO OBJETIVO NOMBRE DEL PROYECTO N°DE GRAFO PEP: ZONA FLUIDO DE TRABAJO FINALIZO PERFORACION ULTIMA INTERVENCION COORDENADAS X Y Z COMPAÑIAS DE SERVICIO CABLE TORRE CEMENTACION ESTIMULACION MOTOR DE FONDO COILED TUBING CARGAR DATOS EA-695 PI 222 05/07/2006 TERMINACION 65.000 RS1EC.6E07.53.P0005 EL ALBA AGUA DE REC. SEC. 30 de junio de 2006 4,949,914.00 2,584,939.00 661,00 4.837.999,00 2.606.340,00 286,38 GEOLOG PRIDE INT. SCHL SCHL CHRISTENSEN RODER - PARA PUNZAR CAÑÓN Ø TIROS POR PIE CASING EN BOCA DE POZO Ø Y mts. DIAMETRO Y LIBRAJE 22,5 5 1/2" 12,50 0,0 6 5/8" 18,54 0,0 7" 20,60 13,8 9 5/8" 39,40 Total de m³+5 COLLAR DIFERENCIAL ZAPATO PROFUNDIDAD FINAL INSTALACION FINAL DEL POZO Cañón Ø 4" 4 TxP 32 Grs 5 1/2" 5 1/2" 14 # 1797,83 350,44 NO TOCAR "PARA USO DEL BACTERICIDA" 1.789,48 1.797,83 1.801,30 MATERIAL DE BOMBEO DEL POZO HERRAMIENTA A BAJAR COLOCAR TIPO DE HTA.Y Ø CALIBRAR HASTA HERMETICIDAD DEL CSG DESDE 4" ó 5" 4 Ejemplos 7" a 23 5-1/2" 15,5 Fresa Ø 120 mm - 05/07/2006 M. BEHR DIVISION REGIONAL SUR UNIDAD ECONOMICA CHUBUT - CAÑADON SECO DISTRITO ZONA CENTRAL EA-695 PROGRAMA OPERATIVO del POZO : SUBREGION : CH ZONA : EL ALBA BAT. TERMINACION RUBRO: PROYECTO: COSTO OBJETIVO: U$S 65.000 COSTO ESTIMADO: U$S 8,25 DIAS ESTIMADOS: FLUIDO DE REPARACION: EQUIPO : AGUA DE REC. SEC. PI 222 CANTIDAD: PEP: RS1EC.6E07.53.P0005 COMPAÑIAS ASIGNADAS: CABLE: TORRE: CEMENTACION: ESTIMULACION: MOTOR DE FONDO: COILED TUBING: GEOLOG PRIDE INT. SCHL SCHL CHRISTENSEN RODER - FINALIZO PERFORACION : 30 de junio de 2006 ULTIMA INTERVENCION: OBSERVACIONES: COORDENADAS: X: Y: COTA: Altura mesa Rotary: Elevación mesa Rotary: 4,949,914.00 2,584,939.00 Z: 661,00 3,5 m - m 36,3 m³ M. BEHR 05/07/2006 PEP: RS1EC.6E07.53.P0005 UNIDAD ECONOMICA CHUBUT-CDON. SECO DISTRITO ZONA CENTRAL EA-695 ZONA : FLUIDO DE REPARACION: 4,949,914.00 Y: 2,584,939.00 Z: 661,00 TERMINACION PROGRAMA OPERATIVO : POZO : X: EL ALBA SUBREGION : AGUA DE REC. SEC. CH BAT. CANTIDAD: 36,3 m³ INSTALACION FINAL: INSTALACION BBEO: EQUIPO: N° CAPA PI 222 GEOLOG COMPAÑIA WIRE LINE: 5 1/2" 14 # 5 1/2" PROGRAMA OPERATIVO 1º) Montar equipo completo y BOP de acuerdo al manual de procedimiento. 9 5/8" a 350 m ts Probar funcionamiento hidraúlico de BOP.- Probar lineas c/2500 PSI. Llenar pozo con fluido de reparación: Agua de Rec. Sec. Armar linea de venteo de gas. 2º) La Cía. de Cable punzará y repunzará con cañón de 4" 32 grs (0-90º) las siguientes capas: INDUCCION A) 1760,5/62,0 (0-180º) B) 1741,5/43,0 C) 1539,5/42,0 D) 1510,5/12,0 E) 1293,0/95,5 F) 1180,0/81,5 G) 1138,0/39,5 H) 1105,5/07,0 3º) Bajar TPN/PKR con c/b 2-7/8"J-55. Ensayar las capas indicadas con las letras: A, B, C, D, E, F, G y H. Estabilizando Caudal, Nivel e Análisis. En las capas A, B, C, D, E y H, probar admisión previo al ensayo. NOTA: De las capas con aporte de fluido tomar muestras para su análisis; en caso de ser gas medir presiones y tomar muestra. 4º) De acuerdo al resultado los ensayos se determinará programa a seguir. NOTA: Preveer Fractura Collar: 1789,48 Zto: 1797,83 Fdo: 1801,30 RECOMENDACIONES: AL FINALIZAR EL POZO DEBERAN PRESENTAR EL ESQUEMA DE LA INSTALACION FINAL (SKETCHIT) SIENDO REQUISITO PARA CERTIFICAR, LA NO PRESENTACION DEL MISMO SE TENDRA EN CUENTA PARA LA EVALUACION CORRESPONDIENTE.CUANDO OCURRA CUALQUIER TIPO DE ACCIDENTE SE DEBE COMUNICAE EN FORMA INMEDIATA (Telefónicamente) AL JEFE DE DISTRITO, DONDE OCURRA EL MISMO. DURANTE LA ETAPA DE TRANSPORTE DEL EQUIPO PROCEDER: EN CASO DE EXISTIR LINEAS ELECTRICAS EN EL RECORRIDO CUALQUIERA SEA LA ALTURA DE LAS MISMAS DAR AVISO AL SECTOR ENERGIA DE REPSOL-YPF POR INTERMEDIO DE COORDINACION DE PRODUCCION TELEF: 4361 - 4365 Y FAX 4363.-L73 QUEDA TERMINANTEMENTE PROHIBIDO EL USO DE LLAVES STILSON PARA REALIZAR AJUSTES DE ENROSQUES Y DESENROSQUES DE TUBULARES EN BOCA DE POZO LOS MISMOS SE HARAN CON LLAVES DE POTENCIA.SE LES RECUERDA QUE TODA PAG (SIMPLE O DOBLE) USADA O NUEVA DEBERA CONTAR CON NIPLES DE ALTA PRESION - ESPESOR ENTRE 8 y 9 mm CON ROSCA Ø 2" LP DE'11,5 FILETES POR PULG. DE NO CONTAR CON ESTOS ELEMENTOS NO ARMAR LAS MISMAS.- NOTA : TOMAR PRECAUCIONES PARA EVITAR DERRAMES DE FLUIDOS. AVISAR URGENTE A LA INSPECCION. ADEMAS SE INDICA QUE SE DEBE COMUNICAR A LA MAYOR BREVEDAD POSIBLE TODAS LAS NOVEDADES QUE REVISTAN EL CARACTER DE ACCIDENTES DE PERSONAL.ORDEN : DE TODOS LOS ENSAYOS CON INSTALACION FINAL SE DEBERA TOMAR UNA MUESTRA, DE LA ULTIMA HORA DE ENSAYO, DE TRES LITROS Y ENVIARLA DEBIDAMENTE IDENTIFICADA AL LABORATORIO EPSILON Km3, A EFECTOS DE REALIZAR EL ENSAYO DE VISCOSIDAD A TRES TEMPERATURAS, PUNTO DE ESCURRIMIENTO Y TENOR PARAFINICO.TRANSCRIPCION DE: MEMORANDUM A: COMPAÑIAS DE SERVICIOS DE: JEFE DE AREA DE OPERACIONES DE PRODUCCION REG. CDRO. RVDA. SE RECUERDA A ESA COMPAÑIA QUE EN VIRTUD DE LO DISPUESTO POR LAS RESOLUCIONES S.E Nª 105/92 Y 252/93 QUEDA EXPRESAMENTE PROHIBIDO DESCARGAR CRUDO O DERIVADOS DE DE HIDROCARBUROS A LAS PILETAS NATURALES DE LOS POZOS. CUANDO UNA EMERGENCIA OPERATIVA GENERE LA CONTAMINACION DE UNA PILETA, ESA COMPAÑIA DEBERA SUBSANAR EL PROBLEMA A LA BREVEDAD.LA NO OBSERVANCIA DE ESTAS NORMAS,GENERARA LA INTERVENCION DE YPF S.A. PARA REPARAR LA CONTAMINACION CON CARGO ESA CIA. Y LA APLICACION DE LAS MULTAS CORRESPONDIENTES.- RESPONSABLE LUCAS S. MORENO EA-695 PRESUPUESTO POZO PEP: RS1EC.6E07.53.P0005 CANT. ITEM Unidad Unidad Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas Horas HS. 1 3 10,00 0 6 0,00 100 1 100,00 6 1 6,00 4 1 4,00 12 1 12,00 24 1 24,00 0 1 0,00 0 1 0,00 0 1 0,00 0 1 0,00 0 1 0,00 0 1 0,00 0 1 0,00 0 1 0,00 0 1 0,00 0 1 0,00 0 1 0,00 0 1 0,00 0 1 0,00 0 1 0,00 0 1 0,00 10 2A 10,00 6 2A 6,00 6 2A 6,00 0 2A 0,00 8 2A 8,00 0 2A 0,00 0 2B 0,00 12 2C 12,00 Total Horas incl.DTM 198,00 Total de Días 8,25 $ U$S DESCRIPCION DE MANIOBRAS 2440,63 0,00 19525,52 1171,53 781,02 2343,06 4686,12 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 1757,15 1054,29 1054,29 0,00 1405,72 0,00 0,00 1522,98 528,28 0,00 4226,25 253,58 169,05 507,15 1014,30 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 380,36 228,22 228,22 0,00 304,29 0,00 0,00 329,66 DTM Equipo completo, Colocar BOP. Bajar TPN/PKR y realiza 8 ensayos . Prueba admisión en 5 capas. Movimiento por cambio de zona. Fractura una capa. Reensaya zona fracturada. Bajar instalación final. Stand By Wireline Stand By Cía. de Fractura. Stand By Frague de arena. Stand By Stand by por reuniones de seguridad, carga y descarga de mat. Stand by sin personal. Equipo parado por inclemencias de tiempo.RESUMEN UNI Tarifa Nueva RTP ITEM CANTIDAD COSTO ($1,1310) (U$S 0.2450) 1 (Opert.Normal) 146,00 25.185,00 $28.507,25 U$S 6170,33 2A (SB c/Pers.) 30,00 4.657,50 $5.271,45 U$S 1141,09 2B (SB s/Pers.) 0,00 0,00 $0,00 U$S 0,00 2C (Factor Clima) 12,00 1.345,56 $1.522,98 U$S 329,66 3 (DTM) 10,00 2.156,25 $2.440,63 U$S 528,28 3B (C.Sólidas) 0,28 2.938,80 $3.326,38 U$S 720,00 3C (Carg.y Desc.) 0,28 715,00 $809,30 U$S 175,18 4B (C.Líquidas) 0,28 2.137,31 $2.419,19 U$S 523,64 5 (Pileta Ecol.) 8,00 120,00 $135,80 U$S 29,40 5A (Tpte.pil.ecol.) 1,00 110,00 $124,51 U$S 26,95 6 (Conj.DSK-Pieza) 0,00 0,00 $0,00 U$S 0,00 7 (Aumento comb.) 0,00 0,00 $0,00 U$S 0,00 Subtotal 198,00 39.365,41 $44.557,48 U$S 9.644,53 Wire Perfil N Corr.+N F 0,00 $0,00 U$S 0,00 Punzado 0,00 $0,00 U$S 0,00 Line Fijado de Tapón 0,00 $0,00 U$S 0,00 Cementación 0,00 $0,00 U$S 0,00 Fractura Hidráulica 25.000,00 $0,00 U$S 25000,00 Htas. de fractura 0,00 $0,00 U$S 0,00 Estimulación äcida 0,00 $0,00 U$S 0,00 Bombeo - Prueba de admisión 0,00 $0,00 U$S 0,00 Fresa 600,00 $453,04 U$S 288,00 Válvula Implosora 0,00 $0,00 U$S 0,00 Hot-Oil + Camión chupa 0,00 $0,00 U$S 0,00 Camión Chupa 0,00 $0,00 U$S 0,00 Transporte Gasoil 0,00 $0,00 U$S 0,00 Coiled Tubing 0,00 $0,00 U$S 0,00 Motor de fondo 2.800,00 $840,00 U$S 1960,00 Gas-Oil($104xm3) 0,00 $0,00 U$S 0,00 Alquiler de Radio 0,00 $0,00 U$S 0,00 Limpieza de Locación 400,00 $240,00 U$S 160,00 Subtotal 28.800,00 $1.533,04 U$S 27.408,00 TOTAL OBJETIVO (U$S) Capas punzadas Profundidad Nº de Pruebas N° de Ensayos 68.165,41 $46.090,52 65.000 8 1.789,48 6 8 PRESUPUESTO TOTAL EN U$S Tipo de cambio: 0,33333 U$S 37.052,53 52415,88 EA-695 POZO: PI 222 EQUIPO: TERMINACION OBJETO: PEP: RS1EC.6E07.53.P0005 Est.Actual : PROXIMO POZO: A CONFIRMAR PROYECTO: COSTO OBJETIVO U$S: Inicio: 11/07/2006 CABLE Cta FRAC Acido M.Fdo. PRESUPUESTO $: Termino: 19/07/2006 GEOLOG SCHL SCHL SCHL Christ. PRESUPUESTO U$S: Capa N° NEUTRÓN INDUCCIÓN Ø5,1/2"(14#) Ø9,5/8": 350 mts 65000 - FLUIDO: Agua de Rec. Sec. SALINIDAD: g/l Transporta equipo del pozo EA-691 al EA-691 (10 kms). Monta equipo. Prueba lineas y cierres de BOP: OK. Ingresa a locación y monta Cía. GEOLOG. Punza según programa (1760,5/62 - 1741,5/43 1539,5/42 - 1510,5/12 - 1293/95,5 - 1180/81,5 - 1138/39,5 - 1105,5/07 mts). Baja TBG c/Fresa de 120 m para ampliar cámara por debajo del primer punzado. Profundiza hasta 1785,33 mts. Circula pozo. Saca herramienta de rotación. Baja conunto de TPN/PKR. Ensaya la zona A. Prueba admisión. Ensaya A - B - C - D - E - F - G - H. Cia. BJ cementó zona 1741,5/43,0, rota cemento y prueba hermeticidad positivo.Bajó instalación de tbg : 116 tbg Ø2.7/8" + Ancla: 1119m + 66 tbg + NAC: 1756 m + 1 tbg + C/pasador: 1766m Bajó instalación de B/B: Vtgo.+ 62 v/bØ1" + 66 v/bØ7/8" + 88 v/bØ3/4" + 12 b/PØ1.1/2" + bba 1756m Desmonta equipo Transporta equipo al pozo Gbk - 708 CIII s/e < 1105,5/07,0 H S/E CIII XO < 1138,0/39,5 G 2320 l/h. ASFc/ARP N: 925 mts (AS: 100 % - Sal:4,6 %° - PH: 8 - 25ºC) < 1180,0/81,5 F 120 l/h. ASF N: 1126 mts (AS: 100 % - Sal: 4,6 %° - PH: 8 - 20ºC) CIII s/e < 1293,0/95,5 E S/E CIII s/e < 1510,5/12,0 D S/E CIII s/e < 1539,5/42,0 C S/E 1741,5/43,0 B Rompe Fm. con 2150 psi - Admite con 2150 psi: 174 LxM. X CIII X CIV 2400 l/h. ASF N: 1300 mts (AS: 100 % - Sal: 0,8 %° - PH: 8 - 30ºC) Cemntó a presión < CIV 1760,5/62,0 A Rompe Fm. con 2700 psi - Admite con 2000 psi: 440 LxM. 580 l/h. PF N: 1549 mts (AS: 10 % - D: 0,900 - Sal: 4,2 %° - PH: 7 - 20ºC) Collar: 1.789,48 Zap.: 1.797,83 Inst. de tbg: PF: 1801,30 116 tbg Ø2.7/8" + Ancla:1119m + 66 tbg + NAC: 1756m + 1 tbg + C/P.: 1766m REFERENCIAS Tapón Fijo Inst. de B/B: CSG Roto Vtgo.+ 62 v/bØ1" + 66 v/bØ7/8" + 88 v/bØ3/4" + 12 b/PØ1.1/2" + bba 1756m