Industrial plants and buildings

Transcription

Industrial plants and buildings
REFERENCES
IN D U STR IA L SEC TO R
2014
REFERENCES IN THE
INDUSTRIAL SECTOR
Assignia Infraestructuras has years of experience in the
industrial sector through projects and activities carried out
across various industrial business segments.
These include hydroelectric plants, solar farms, wind
farms, bio-fuel plants, installations in buildings, electrical
and mechanical installations in offices and industrial
facilities, hospital installations and power lines.
The technical competence and multidisciplinary expertise
that our project portfolio demonstrates, is reinforced by
the fact that many of our projects are located abroad in
countries such as Mexico, Italy, and Turkey, to name a few.
This valuable experience allows us to take on a wide range
of projects irrespective of location or complexity, with
complete assurance of top quality service and execution.
2
CONTENTS
1. ASSIGNIA INFRAESTRUCTURAS
 Business Areas & quality certifications
 Worldwide presence
 Companies in the group that specialize in the industrial sector
2. MAIN REFERENCES IN THE INDUSTRIAL SECTOR
 Power generation plants
 Oil & Gas
 Water treatment plants
 Industrial plants and buildings
 Equipment and installations
3. LIST OF REFERENCES IN THE INDUSTRIAL SECTOR
3
INTRODUCTION
BUSINESS AREAS/QUALITY CERTIFICATIONS
Assignia Infraestructuras is part of the Essentium group that has its head offices in Spain, it specialises in
infrastructure, services and renewable energies.
Over 50 years of experience in three business areas.:
INFRASTRUCTURE
INDUSTRY
ENERGY
CIVIL ENGINEERING
REFINERIES / PLATFORMS
CONVENTIONAL ENERGY
•Railways
•Roads
•Tunnels & bridges
•Airports
•Ports
•Environment & water
•Maintenance
• Chemicals/Petrochemicals
• Oil & Gas
• Combined Cycle
• Co-generation
FACTORIES
RENEWABLE ENERGY
BUILDING
•Hospitals
•Sports centres
•Historic buildings
•Residential building
• Iron & steel and metals
• Paper, pulp and wood
• Minerals, fertilisers
• Cement
• Pharmaceuticals & cosmetics
• Food & drinks
• Automobiles, glass & rubber
• Hydro Power
• Wind Power
• Photovoltaic
• Solar Power
• Biodiesel
INTEGRATED INSTALLATIONS
ENGINEERING
CONCESSIONS
CONSULTING & SERVICES
Our group posseses all the most important international certifications including those pertaining to Quality,
Environment management and Occupational safety and security .
4
INTRODUCTION
WORLDWIDE PRESENCE
Assignia has ample experience in large infrastructure projects with active contracts in over 25 countries.
We would like to highlight: high speed railway lines and energy plants in Turkey, highways and hydraulic
projects in Central America, railways and hospitals in Mexico, roads and suburban trains in Colombia and
Venezuela, wind farms and renovation and restoration of historical buildings in Poland, education centre
and healthcare projects in several countries in Africa and Asia, and more. Assignia Infraestructuras is a
multi-national company with a global vision.
SPAIN
ITALY
MEXICO
CHILE
ROMANIA
TURKEY
QATAR
SAUDI ARABIA
NICARAGUA
U.A.E
DOMINICAN REP.
OMAN
VENEZUELA
CHINA
COLOMBIA
INDIA
ECUADOR
ALGERIA
PERU
MOROCCO
BRAZIL
ANGOLA
URUGUAY
ECUATORIAL GUINEA
ARGENTINA
MOZAMBIQUE
5
INTRODUCTION
COMPANIES IN THE GROUP THAT SPECIALIZE
IN THE INDUSTRIAL SECTOR
Assignia Industrial is a company specialised in electrical,
mechanical and other special installations. Its scope ranges from
engineering, to installations and maintenance.
Acanto works on all types of building construction projects, and has
considerable experience in the hospital sector and in various
infrastructure projects.
Acentia Installations & Systems is a company that specialises in
security and monitoring systems for the industrial, building,
transport, energy and environment conservation sectors.
Hispasoleo & Hispanergy are two companies in the group
specialised in the execution of renewable energy installations,
such as solar farms, bio-fuel production plants, and hydraulic and
wind power plants.
6
MAIN REFERENCES IN THE
INDUSTRIAL SECTOR
Power generation plants
Oil & Gas
Water treatment plants
Industrial plants and buildings
Equipment and installations
7
ENERGY
HYDROELECTRIC POWER
PLANT IN TURKEY
Total Budget:: 21,730,222 €
Client: Redas
Execution period: 21 months
Tunnel excavation by rock blasting: 6,500 m
Excavation by cutting: 130,000 m3
Concrete in Tunnel lining: 20,000 m3
Concrete in dam area : 26,000 m3
Hydroelectric plant : 35 MW
Average flow of the river: 32 m3 /s
Net Head: 120.34 m
Expected annual energy production: 102 GHz
Assignia was commissioned to build the hydroelectric plant in the province of Rize Trabzon, on the river
Solakli, which will serve to supply power to the Turkish national network.
The turnkey project (EPC) includes development for all phases including: design and engineering, civil
works, supply of equipment and machinery (turbines, etc..) Electromechanical assembly and
commissioning. Also included, is the construction of transmission lines to the distribution network.
In addition, the Essentium Group has concessions to promote hydroelectric power plants in Turkey with a
capacity of over 100 MW.
8
ENERGY
SOLAR FARM IN
BASILICATA, ITALY
Total Budget:: 14,350,000.00 €
Client: Energreen Italia Holding SPA
Output: 5 MW
Surface Area: 20 Has
Modules: 27,270 Units
Annual energy production: 6,550,000 KWH / Year
10 year contract for the design, construction and maintenance of the Photovoltaic Solar Power Generation
Plant in Basilicata (Italy). It has a capacity of 5 MW, 10 units of 500 kW inverters and 5 transformer stations.
9
ENERGY
SOLAR ENERGY POWER
GENERATION PLANTS IN
PARADAS &
OSUNA
Design, construction and operation of two plants to generate electricity through photovoltaic technology in
Paradas & Osuna (Sevilla).
Paradas
Osuna
Total Budget
26,648,622.00 €
7,961,274.88 €
Client
Agrupación de Interés
Económico Paradas
Hispasoleo Osuna Agrupacíón de
Interés Económico
Output
3 MW
1 MW
Surface Area
16 Ha
5 Ha
Nº of Modules
19,860 units
6,620 units
Inverters
30 units
10 units
Transformer stations
10 units
4 units
Energy produced
5,283,000 KW
1,640,000 KW
10
ENERGY
BIODIESEL PRODUCTION PLANT
IN PUERTOLLANO & HERRERA
DE VALDECAÑAS
Design, construction and operation of facilities for the production of biodiesel EN-14214 for the transport
of vehicles, from vegetable oils by transesterification with liquid catalyst. The facilities are located in
Puertollano (Ciudad Real) and Herrera Valdecañas (Palencia).
Puertollano
Herrera de Valdecañas
Total Budget
6,482,165.10 €
14,540,765.82 €
Client
Biodesarrollo
PQV, S.L.
Hispaenergy del Cerrato
S.A.
Production Capacity
20,000 t
20,000 t
Oil storage capacity
1,500 t
1,500 t
Final product storage capacity
1,000 t
1,000 t
11
ENERGY
WIND FARMS IN POLAND
Client: Iberdrola Engineering & Construction
Poland SP. Z O.O.
Wind turbine: GE 1,5 SL
Height: 85 m
Rotor diameter : 77 m
Nominal Output: 1,500 KW
Control stop: Variable
Rate of generation : 3 m/s
Wind turbine cut-in speed: 11.8 m7s
Wind turbine cut-out speed : 20 m/s
Assignia has constructed several wind farms in different locations, including the ones in Kisielice and
Malbork, northern Poland.
Kisielice
Malbork
5,386,452.00 €
2,135,938.00 €
Access Routes 5 m wide
15,921 m
6,330 m
Wind turbine foundations
9,000 m3
4,248 m3
Electrical Connections
25,770 m
12,781 m
Jacked Piling
11.200 m
-
27 Units
12 Units
40.5 MW
18 MW
Total Budget
Total number of wind turbines
Total output (1,5 MW x Unit)
12
OIL & GAS
GAS PIPELINES IN MEXICO
Contract: VILLAHERMOSA
Total budget:: 28.335.800 €
Client: PEMEX EXPLORACION Y PRODUCCION
Contract : VERACRUZ
Total budget:: 12,937,220 €
Client: PEMEX REFINACION
Execution period: 570 calendar days
Pipe size: 30”
The contract includes several production aids for PEMEX in which are executed:
Pipelines, access roads, heads, drilling points …
Supply, installation and control of steel pipes for seamless hydrocarbons, beveled edges without welding, for
operating temperature up to 80° C. Bending work, alignment, welding, radiographic inspection and patching
joints.
Restoration with 30” replacement pipe on the Zapoapita Moreno-Arroyo stretch.
Construction of 30”carbon steel pipe with pig trap launcher system. Commissioning, cleaning with hydrogen
and capping the ends to seal. Installing a new trap launcher and dismantling of the existing.
13
POWER LINES AND SUBSTATIONS
CAYKARA SUBSTATION
Total Budget:: 3.201.658 €
Client: Redas Elektrik Dagitim Pazarlama Sanayi ve Ticaret
Anonim Sirketi
Voltage: 132/15 kV
Type: Intemperie Transformador en aceite
Supply, installation and commissioning of the 40 MW substation of the Cykara Hydro-electric power plant in
Turkey with an input voltage of 18 kV and an output voltage of 132 KV for evacuation to the Turkish power
supply grid, including connection with the network.
14
POWER LINES AND SUBSTATIONS
HIGHWAY POWER LINE
LEVANTE HIGHWAY TO
FRANCE THROUGH ARAGON:
SECTION CALAMOCHAROMANOS
Total Budget:: 1.097.697 €
Client: Ministerio de Fomento
Voltage: 132 kV
Total Length: 18,257 km
Supply, installation and commissioning of various overhead and underground power lines affected by the
construction of the Calamocha-Roman Levante motorway, with aluminum-steel conductors with sections of 281.1
mm2 in overhead lines and 95 lattice steel supports, with a maximum height of 43.9 m and minimum height of 12
m, with fractional type freestanding foundation.
15
POWER LINES AND SUBSTATIONS
AIRPORTS
Barcelona Airport
Total Budget (several contracts):: 7,000,000 €.
Client: AENA
Valencia Airport
Total Budget (several contracts):: 650,000 €.
Client: AENA
Installation of Push-Back taxiway lights on the platforms of Barcelona Airport
Civil works: Bank of pipes, concreting, agglomerate extended milling. Placing beacon manholes. Painting markings
on taxiways.
Installations: Installing dimmers, placing taxiway beacons and laying of medium voltage primary and secondary
cables . Modification and installation of new stop bar. Integration of all SMP installation. Installation of road signs.
Installation of signs LVP.
Installations in the service gallery, Valencia Airport
Electrical, fire, drainage, ventilation, CCTV, intercom and control installations.
Tray 7,500 m, 35 Km of low voltage wiring and communications 5 Km of optical fiber.
16
WATER TREATMENT PLANTS
WATER PURIFICATION
FACILITIES
Total Budget of various projects:: 20,010,265 €.
Clients: Infraestructuras del Agua de Castilla La Mancha.
Aguas de La Cuenca del Tajo, S.A.
Design and construction (EPC) of 40 sewage treatment plants in various locations, including: Valmojado,
Retamosa Sales, Iniesta, Iniesta Farm, Castillejo de Iniesta, Almodovar del Pinar, Campillo de Altobuey, and
other locations in the provinces of Cuenca, Toledo and Ciudad Real.
17
WATER TREATMENT PLANTS
DESALINATION PLANTOROPESA DEL MAR
Total Budget: 52,367,633.87 €
Client: Acuamed
Period of operation: 3 years
3
Dredged sand fill: 36,150 m
Corrugated steel : 1,535,000 Kg.
Pipes PRFV D=1.600 to 400 mm: 18,875 m
Reverse osmosis racks: 1,535,000 units
Pressure sand filters, D=3.600 mm: 15 units
Centrifugal Pumps : 92 units
Transformer 12 MVA 20 KV/0,69 KV: 2 units
Photovoltaic panel 75,6 KWp: 432 units
Motor Control Center : 4 units
Oropesa desalination plant (the 2nd largest in Spain) has been constructed to supply drinking water, with a
maximum capacity of 130,000 m3 per day, and a final annual production of 42.90 Hm3.
18
WATER TREATMENT PLANTS
WATER PURIFICATION LABS &
MIRRORED REMOTE CONTROL,
COMMUNICATIONS AND
SYSTEMS BUILDING
Water Purification Lab:
Waste Water Laboratory
Sludge Laboratory
Waste Laboratory
Low activity lab divided into sampling zone,
common
services, and common services
located in outdoor booth.
Total Budget: 9,354,372.34 €
Client: Canal de Isabel II
Mirrored Remote control, Communications
& Systems Building :
Energy Area
Communications Area
 IT Systems Area
 Operations Area
Command Posts and Reinforcements Area
 Control Centre Area
19
INDUSTRIAL PLANTS
AIRBUS A350 WAREHOUSE
IN MADRID
Total Budget:: 10.400.150,63 €
Client: Airbus Operations, S.L.
Remodeling of the A320 HTTP building to include industrial building plus HTTP assembly facilities for Airbus
A350 in Getafe. Construction of parking area south of the EADS factory.
20
INDUSTRIAL PLANTS
INDUSTRIAL WORKSHOPS IN
SAN FERNANDO DE HENARES
Total Budget: 12,510,410.02 €
Client: Toquero Expres, S.A .
Two buildings were built in the industrial area of San Fernando de Henares, one is a 5,400 m2, 5 storey
building with a basement and the other is a building with a surface area of 1,400 m2 with 2 floors.
The installations included: Transformer stations, telecommunications and radio installations, hydraulic
elevator v = 0.6 m/s, 6 stops, 450 kg nominal load, 2 units, Ventilation, heating and air conditioning,
plumbing, and fire protection facilities .
21
INDUSTRIAL PLANTS
CASA FACTORY BUILDING
Total Budget: 10,400,150.63 €
Client: Airbus Operations, S.L.
Building project II Fitting out EADS-CASA Factory
• Air Conditioning, Solar, Plumbing and drainage installation.
• LV with Electrical lighting control, intrusion communications, voice- data, videoconference, security,
public address system, integrated into the management system of the factory.
22
EQUIPMENT & INSTALLATIONS
HOSPITAL INSTALLATIONS
Hospital Ixtapaluca (México)
Installations Budget: 13,857,150 €
Client: Secretaría de Salud de México
Tajo Hospial (Madrid)
Installations Budget: 5,250,101 €
Client: Madrid City Hall, Health Care Council
Assignia Industrial has fully equipped and carried out necessary installations in many top ranking hospitals
in Spain and abroad, including:
Hospital Ixtapaluca (México)
Electrical Installations (Medium and Low voltage)
Air-conditioning .
Hydraulic system, water supply and fire prevention.
Data installations
 Fire detection equipment
Lighting
Special Installations (pneumatic tube, patient – nursing unit etc.)
Tajo Hospial (Madrid)
Air conditioning, structured cabling, voice and data systems, etc..
23
EQUIPMENT & INSTALLATIONS
HOSPITAL INSTALLATIONS
Costa del Sol Hospital (Marbella)
Hospital Constructed for the regional government
of Andalusia
Total Budget for Installations: 6,389,000 €
Client: Andalusian Regional Govt.
Lighting and general electrification
Installation of air-conditioning systems
Installation of control systems
Hospital Dr. Pesset Rennovation (Valencia)
Total Budget for Installations : 5,001,500 €
Client: Generalitat Valenciana. Consejería de
Sanidad
 Air-conditioning, generators etc.
Centro de Salud Natzaret (Valencia)
Total Budget for Installations: 1,500,035 €
Client: Generalitat Valenciana. Consejería de
Sanidad
plumbing,
sanitation, gas, PCI, generator, etc..
Centre for Investigation and Prevention of disease
and Promotion of Public Health Care (Valencia)
Total Budget for Installations: 9,001,231 €
Client: Generalitat Valenciana. Consejería de
Sanidad
Air conditioning, electricity (MV and LV), structured
cabling, megaphones, anti-intrusion systems,
plumbing, sanitation, gas, PCI, generator, etc..
Sanitas in Alameda de Osuna
Total Budget for Installations: 468,000 €
Client: Sanitas
Installation of heating and air conditioning
 Low voltage electrical installation
 Solar energy power generation system for ACS.
Air conditioning, electricity (MV and LV), structured
cabling, megaphones, anti-intrusion systems,
24
EQUIPMENT & INSTALLATIONS
PHARMACEUTICAL
INSTALLATIONS
KERN PHARMA
Total Budget for Installations: 2,057,000€
Client: KERN PHARMA
TAIBA PHRAMA, OMAN
Total Budget for Installations: 1,050,000€
Client: TAIBA PHARMA
KERN PHARMA
• Realization of a pharmaceutical silo with a palletised warehouse of 2000m2 (11,000 pallets) and a
dispatch area of 3000m2
• Installation of fire alarm and fire protection system (over 5000 sprinklers) 600,000€
• Installation of HVAC , from 1000Kv chiller in addition to the three existing ones
• Electrical installation 350,000€
• BMS Installation 120,000€
• Office extension 390,000€
TAIBA PHARMA , OMAN
Office and warehouse 6000m2 in Rusayl, Oman
• HVAC, electrical, mechanical, fire protection and low voltage installations
25
EQUIPMENT & INSTALLATIONS
RAILWAY INSTALLATIONS
Sub-urban railway stations, Miranda de Ebro,
Entrevías & Segovia high speed railway station
Total Budget for Installations: 3,500,503 €
Client: RENFE-ADIF
sanitation.
 Installation of 180 KVA generator. continuous,
200 KVA. in an emergency.
 Installation of Air-conditioning systems for the
railway stations Miranda de Ebro, Entrevías, and
the Segovia high speed train station, all equipped
with direct expansion systems, next-generation
VRV with R-410 refrigerant and heat recovery.
Sub-urban railway stations: Sanlucar La Mayor,
Benacazón & Villanueva del Ariscal
Total Budget for Installations: 3,702,004 €
Client: RENFE-ADIF
 Low voltage electrical installations. Total power
output of 2 x 1000 KVA, Primary and secondary
boxes,
lighting and electrical power. Special
facilities: structured wiring, sound and antiintrusion systems.
 Plumbing, sanitation and fire protection.
 Air-conditioning
 Control facilities and special systems.
 Modification of catenary
 Installing anti-fire system, gas, plumbing and
26
EQUIPMENT & INSTALLATIONS
COSLADA MULTI-SPORT CENTRE
Installations Budget: 1,845,000 €
Client: Ayuntamiento de Coslada
 The sports facilities include auxiliary spaces for toilets, equipment rooms, bathrooms, plumbing and fire
wells and spa purifying area.
 The first floor contains the gymnasium and swimming pools together with their corresponding personal
and public locker rooms, locker area, storage and space dedicated for medical purposes and ATS.
 The second floor houses the sports pavilion with changing rooms for teams and referees, toilets, lockers,
storage areas and pool stands with a capacity for 290 people.
 On the third floor is a sports stand with seating capacity for 1,200 people, toilets, track control,
warehouses, offices and file-storage area.
 The roof has various installations such as chillers and Solar panels etc.
27
EQUIPMENT & INSTALLATIONS
HOTEL INSTALLATIONS
Government-run Tourism Hotel Installations
¨Paradores¨
Design, supply and installation of all facilities of
the Parador de Ibiza, La Palma, Lerma and Lorca.
Contracts are particularly demanding, given the
protected environment in which work is carried
out.
Other Hotel Installations
Design, supply and installation of all facilities for
the Travelodge hotels in Hospitalet de Llobregat
and Las Rozas.
28
EQUIPMENT & INSTALLATIONS
COMPREHENSIVE
MAINTENANCE
Total Maintenance Budget: 4,500,000 €/3 years
Client: Telefónica Gestión de Servicios Compartidos, S.A.
District “C” Telefónica
3 years of maintenance services, for Telefónica Gestión de Servicios Compartidos, S.A., for the installations in
buildings West 1, West 2, West 3, East 1, East 2, East 3, E. Services & Health centre for Telefonica District ¨C¨
in Madrid.
Facilities and installations include the following:
Air-conditioning, electrical installations and earthing, energy management, UPS's, generators, transformers,
control facilities, anti-legionnaires, plumbing, carpentry, painting, metalwork, cleaning and water disinfection
tanks and garage doors.
29
EQUIPMENT & INSTALLATIONS
FITTING OUT
Fitting out technical rooms at the Buñuel Studios
Total Budget: 800,000 €
Client: RTVE Corporation (Regular client)
Parla Fire Station, Madrid
Total Budget: 600,000 €
Client: Comunidad de Madrid, Parla Cityhall.
Fitting out technical rooms at the Buñuel Studios
Installation of air-conditioning, low voltage, plumbing, fire protection, communications and
soundproofing of Technical & Control rooms at the Buñuel Studies.
Parla Fire Station, Madrid
• Air Conditioning, Solar, Plumbing and drainage installations.
• Compressed Air Installation consists of a production and distribution plant.
• Gas installation for heat production equipment and kitchens.
30
EQUIPMENT & INSTALLATIONS
MUSEUMS
Total Budget: 1,100,000 €
Client: BIM/SA
Partial interior renovation of the Ethnological Museum in Barcelona.
31
LIST OF REFERENCES IN THE
INDUSTRIAL SECTOR
32
REFERENCES
ENERGY PLANTS
CLIENT
PROJECT
1. Hispasoleo Osuna Agrupación
Design & Construction of Solar Farms in Osuna | Sevilla
de Interés Económico.
2. Agrupación de
Design & Construction of Solar Farms in Paradas | Sevilla
Interés Económico Paradas.
3. Hispaenergy del Cerrato, S.A.
Biodiesel Production Factory & Seed Drying facility in Herrera
de Valdecañas | Palencia
4. Biodesarrollo PQV
Design, construction and operation of biodiesel plant in
Puertollano | Castilla – La Mancha
5. Iberdrola Engineering
Wind Farm in Kisielice | Poland
& Construction Poland SP. Z O.O.
6. Iberdrola Engineering
Wind farm in Malbork | Poland
& Construction Poland SP. Z O.O.
7. Redas Electrik Uretim
EPC Hidroelectric Power Generation Plant in Trabzon | Turkey
Dagtim Pazarlama Ve Ticaret As
8. Energreen Italia Holding SPA
Construction of a 5 MW Photovoltaic Power Plant in Basilicata | Italy
9. EFACEC Sistemas España, S.L.
Civil Works in Solar Farms| Baleares
POWERLINES AND SUBSTATIONS
CLIENT
PROJECT
10. Ministerio de Fomento
Levante Highway Powerlines, voltage 132 KV section with 95 supports on a
total stretch of 18.25 Km | Teruel & Zaragoza
11. Comunidad de Madrid
M-501 link road Powerlines, Voltage 132 KV, C-18 type supports,
total length of 11.5 Km | Madrid
12. Administrador Infraestructuras
High Speed Train Powerlines Cordoba – Málaga, Section: Bobadilla
Section – Gobantes Tunnel, voltage 72 KV type C supports and a total length
of 11 Km.| Málaga
Ferroviarias (ADIF)
13. Ministerio de Fomento
Power Lines for Valencia Port Railway line, voltage 72 KV, type C supports ,
total length 9.41 Km.| Valencia
14. SEPES, Entidad Pública Empresarial
Overhead power Line for the Industrial Urbanization ¨Cañada Ancha¨
Substation, Voltage of 66 KV and 24 Km Length | Cádiz
de Suelo Industrial
15. SEPIVA Generalitat Valenciana
Overhead power Line for the “La Mezquita” Industrial Area Substation,
Voltage 66 KV , total length 33.3 Km.| Castellón
16. Administrador Infraestructuras
High Speed Railway Power Lines between Córdoba & Málaga, Section 92- Río
Guadalhorce, Voltage 66 KV, Total Length 4.4 Km. .| Córdoba
Ferroviarias (ADIF)
33
REFERENCES
POWERLINES AND SUBSTATIONS
CLIENT
PROJECT
17. Ministerio de Fomento
Líneas eléctricas de la variante de la carretera N-I tramo Villafria – Rubena,
tensión de servicio 45 KV con una longitud de 4,95 Km.| Burgos
18. Administrador Infraestructuras
Power lines for Railway Construction base in Madrid, Voltage 45 KV, Total
Length 12 Km.| Madrid
Ferroviarias (ADIF)
19. Iberdrola
Underground High-Voltage Powerlines in Navalcarnero, for the Railway lines
between Móstoles Central & Navalcarnero, Voltage 45 KV, Moraleja Line 2-R.
Guadarrama. | Madrid
20. Redas Elektrik Dagitim Pazarlama
Substation of the Cykara Hidroelectric Power Plant, 40 MW, Input Voltage 18
KV , Output Voltage 132 KV. | Turkey
Sanayi ve Ticaret Anonim Sirketi
WATER TREATMENT PLANTS
CLIENT
PROJECT
21. Aguas de Las Cuencas
Technical Project and Implementation of the Desalination Plant
Oropesa del Mar | Castellón
Mediterráneas (Acuamed)
22. Infraestructuras de Aguas de
Castilla – La Mancha. Aguas del Tajo
23. Egmasa
Turnkey Project of Water Treatment Stations in several
municipalities | Castilla La Mancha
Design and Construction of a wastewater treatment station
in Bolonia | Cádiz
INDUSTRIAL PLANTS & BUILDINGS
CLIENT
PROJECT
24. Airbus Operations, S.L
Construction of Parking area in the South Zone of the EADS Factory in
Getafe | Madrid
25. Airbus Operations, S.L
Remodeling of the A320 HTTP building to include industrial building plus
HTTP assembly facilities for Airbus A350 in Getafe| Madrid
26. Toquero Expres, S.A
Industrial Workshop Buildings in San Fernando
de Henares | Madrid
27. SEPES Entidad Publica de Suelo
40 Industrial Buildings in Agüimes | Canary Islands
28. Clasa (Centros Logisticos
Construction of a Warehouse with two modules with offices in Plot II-3
of the Air Cargo Centre in Barcelona Airport | Cataluña
Aeroportuarios, S.A.)
29. Ministry of Defence (Army)
Industrial Warehouse, Villaverde | Madrid
30. Saargummi Iberica, S.L.
Industrial Building in Loeches | Madrid
34
REFERENCES
INSTALLATIONS
CLIENT
PROJECT
31. Renfe Operadora
Edificio Caracola 20, Renfe | Madrid
Air conditioning, electricity (LV), structured
cabling, megaphones, anti-intrusion system,
plumbing and PCI
32. Army
Warehouse for Automatic Palletizing ,
Army | Madrid
Air conditioning, electricity (LV), selfsupporting structure with special mechanized
system of automatic palletizing
33. Madrid City Hall,
Health Care Council
Tajo Hospital | Aranjuez
34. Madrid City Hall,
Health Care Council
Health Centre in Vallecas | Madrid
Air conditioning, electrical and mechanical
installations, structured cabling, voice and
data systems
Air conditioning, heating, electricity (LV &
MV) and transformer stations, structured
cabling, megaphones, anti-intrusion system,
PCI, gas, plumbing, drainage, lifts and
generator
35. Social Security Treasury
Social Security Treasury Building in
Pozuelo | Madrid
Air conditioning, heating, electricity (LV &
MV) and transformer stations, structured
cabling, megaphones, anti-intrusion system,
PCI, gas, plumbing, drainage, lifts and
generator
36. Comarcal de la Axarquía
Emergency Area in the Comalcal de la
Axarquía de Vélez Hospital | Málaga
Air conditioning, heating, electricity (LV &
MV), structured cabling, megaphones, antiintrusion system, PCI, gas, plumbing,
drainage, lifts and generator
Speciality Health Care Centre in
Tarancón | Cuenca
Air conditioning, electricity (MV and LV),
structured cabling, megaphones, antiintrusion system, plumbing, sanitation,
medical gases, PCI, elevators and generator
38. Army
Parachute Brigade of the Army
– BRIPAC | Madrid
Heating (Power Plant), air conditioning, ACS,
PCI, natural gas, compressed air and steam
generation
39. Palacios & Villafranca
Palacios & Villafranca Geriatric
Centre | Sevilla
Air conditioning, heating, electricity (LV &
MV). and Transformer stations, structured
cabling, megaphones, anti-intrusion systems,
PCI, gas, plumbing, drainage, lifts and
generator
Air conditioning, heating, electricity (LV &
MV) and Transformer stations, structured
cabling, megaphones, anti-intrusion systems,
PCI, gas, plumbing, sanitation and generators
Hospital
37. Castilla La Mancha
Health Care Centre
City Hall
40. Pinto City Hall
Multi-Sport Centre, Príncipe de Asturias,
Pinto | Madrid
41. Generalitat Valenciana
Investigation Centre for the Prevention
of Disease & Promotion of
Public Health | Valencia
Ministry of Health
INSTALLATIONS
Air conditioning, electricity (medium and low
voltage), structured cabling, megaphones,
intrusion, plumbing, drainage, gas, PCI,
elevators and generator
35
REFERENCES
INSTALLATIONS
CLIENT
PROJECT
INSTALLATIONS
42. Generalitat Valenciana
Doctor Pesset Hospital | Valencia
Air conditioning and generators
Natzaret Health Care Centre | Valencia
Air conditioning, electricity (medium and low
voltage), structured cabling, megaphones,
intrusion, plumbing, drainage, gas, PCI and
generator
44. Coslada City hall
Multi-Sport Facilities| Coslada
Equipment rooms, bathrooms, plumbing and
fire cisterns and Spa purifying area, chillers,
solar panels, etc…
45. Canal Isabel II
Water Purification Laboratory &
Mirrored Telecontrol, Communications
& Systems building | Madrid
46. Renfe - ADIF
Sub-urban RailwayStations Adif de
Miranda de Ebro & Entrevías, Segovia
High Speed Railway Station | Various
Quality sewage labs, sludge, effluent and low
activity laboratory divided sampling area,
common services and common services in
booth located outside. energy,
communications, computer systems, and
operations zones, command posts and
reinforcement and control center
Air-conditioning, anti-fire system, gas,
plumbing and sanitation, Low voltage power,
electrical generator installation
47. Renfe - ADIF
Sub-urban Railway Stations: Sanlúcar La
Mayor, Benacazón & Villanueva del
Ariscal | Sevilla
Ministry of Health
43. Generalitat Valenciana
Ministry of Health
Electrical installations, plumbing, drainage
systems, fire protection, air-conditioning,
controls and special systems, catenary
modification, substation installation
CONTROL SYSTEMS
CLIENT
PROJECT
48. AENA
Control System and Beaconing, Malaga Airport | Málaga
49. AENA
SMP System Maintenance in various Airports | Varios
50. ADIF
Railway Station Installations T4- Chamartín | Madrid
36
Avd. Quitapesares 11
Pol. Emp. Villapark
28670 Villaviciosa de Odón
Madrid, España
+34 91 571 86 46
| assigniaindustrial@assignia.com |
www.assignia.com
20140616