Buks6r 0g Berging to build world`s first LNG tugs
Transcription
Buks6r 0g Berging to build world`s first LNG tugs
I ITUGS I THE W0RLD'S TOWTNG F0f the l.rtest ne\'^/s |IRSI tNc powered escoft tugs have been ordered by Norwegian company Bukser og mafitimejournal.rom Buks6r 0g Berging to build world's first LNG tugs Befging AS. They will f ulfil the towage contract recently announced by the oil and gas company Statoil ASA, Io serve the Karsto gas processing plant on behalf of operator Gassco (MJ - towlines January 2012). Sanmar Denizcilik AS has been entfusted with the construction of the new vessels in their new yard in Tuzla Bay, lstanbul, with delivery scheduled for late in 2013. Ihe tugs have been designed in house by Buksdr og Berging, in cooperation with Marin Design AS of Kolvareid, Norway. Ploject partners Rolls-Royce Marine (Norway) have signed a contract to deliver highly elficient engines and propulsion svstpms fnr thp vpqspls The project was developed in close contact with Rolls-Royce, The Bukser og Bergn ng LNG fuelled tugs wilL be the f nt in the world giving them a unique opportunity to understand and adhere to the gas system, and one AGA Cryo LNc stepless ramp up time from 0 to 1000/0 operational requifements. tank with an load, and are easy to service and Rolls-Royce will supply two Befgen C6 lng engrnes, two Aquamaster LNG system based on two coldboxes. maintain. The Bergen gas fuelled engines . Compliant with Tier lll regulations Buksdr og Berging AS commercial director Vetle Sverdrup said, "We The LNG system is designed by US35 pfopulsion units, RR Acon control can operate on low load without any AGA Cryo and integrated and monitoring equipment for the festriction, have a very quick and Rolls-Royce propulsion system. This with the wanted to base the design of the new tugs on the spark ignition lean burn engine concept, with the ability to single tank LNG system has full gas accommodate direct drive in addition redundancy approved by NMD to a low emission profile. The (Norwegian Maritime Directorate) propulsion system on high ie; no diesel back up is required. performance escort tugs needs to The fuel system is designed for accommodate rapid load pick up over weekly bunkering to be carried out by the entife load range." the tug crew and takes approximately It is anticipated that the new hull 45 minutes. and propulsion system will achieve up The operational benefits of a gas fuelled propulsion system are a to 200/r highef thrust efficiency. cleaner engine room, less waste oil designs, and achieve a bollard pull of and no'switch over' problems. at least 65 tons. The tugs will have an Environmental benefits with Spark overall length of 38.00m, a beam of compared to standard escort tug lgnition gas engines incorporated in 14.50m and draft of 7.50m, with the new design are: . 920/o reduced NOx emission accommodation for five persons. In . shiphandling, the tugs will be 170/o reduced GHG emission . 98-100V0 feduced SOx emission . 980/o reduced particulates Ihis Rolls Royce graphic shows the location of the Bergen LNG engines, the drive lrne and LNG tank. addition to escort duties and equipped for fire fighting and pollution control duties.