OAO Irkutskenergo Annual report 2011
Transcription
OAO Irkutskenergo Annual report 2011
OAO Irkutskenergo Annual report 2011 Abbreviations Annual report 2011 ADR American Depositary Receipt FM Generating capacity functioning in forced mode AR Accounts receivable ASTEM Automated System of Technical and Economic Monitoring FS Feasibility study FTS Federal tariff service BHPP BM Bratskaya HPP G&M Goods and materials Balancing market HPP Hydroelectric power plant BraSU Bratsk State University HUC Housing and utility companies CCN Corporate computer network IFRS CCS Competitive capacity selection International Financial Reporting Standards CDW Chemically Desalinated Water IHPP Irkutsk HPP CI Capital investment ISTU National Research Irkutsk State Technical University CiP Construction in process KHPP Krasnoyarskaya HPP CMS Corporate management system KPI Key performance indicators CRC Corporate research center LBFR Lead-Bismuth Cooled Fast Reactor CS Company standard M&E Materials and equipment CTW Chemically Treated Water MEU Municipal unitary enterprise DAM Day-ahead market MICEX Moscow Interbank Currency Exchange DB District boiler stations MPP Mineral processing plant EB Executive board MRO Maintenance, repairs and operations EBWD Eniseisk basin water directorate NI CHPP Novo-Irkutskaya CHPP EDMS Electronic Document Management System NPV Net present value NRBC Non-regulated bilateral contract ELS E-Learning System NREPCC ERU Emission reduction unit Non-regulated electric power and capacity contract F&L Fuel and lubricants NZ CHPP Novo-Ziminskaya CHPP FAS Federal Antimonopoly Service ОАО ATB OAO Aziatsko-Tikhookeansky Bank FCSM Russia Federal committee for securities market OAO GPB OAO Gazprombank OAO RTS OAO Russian Trading System Exchange FEC Fuel & energy complex FEC Financial estimation center 2 OAO Irkutskenergo OOO IESbK Limited liability company Irkutskaya Energosbytovaya Kompaniya OOO IESK Limited liability company Irkutskaya Elektrosetevaya Kompaniya PEIP Production efficiency improvement program PP&E Property, plant and equipment PRDS Pressure reducing and desuperheating stations R&D Research and development RC Regulated energy purchase contracts S&A Subsidiaries and affiliates SF Salary fund SO UES OAO System operator of Unified Energy System TPOP Total production optimization program TPP Thermal power plant TS Tariff service UDCC Siberia United dispatch control center of Siberian energy systems UES Siberia United energy system of Siberia UI CHPP Ust-Ilimskaya CHPP UI HPP Ust-Ilimskaya HPP UIAS Unified Information and Analysis System VHI Voluntary health insurance WEM Wholesale energy market WMEC Wholesale market of energy and capacity OAO Irkutskenergo 3 Contents Annual report 2011 General profile of OAO Irkutskenergo 11 General information 12 Key operations of the Company 13 Results and expectations of Company development by business priorities Aims and objectives-2011 15 16 Main decisions of the Board of Directors and the General Meeting of Shareholders 18 Performance 22 Company Management 25 Corporate Management 26 The Management Board 32 Long-term investments 38 Shareholders' Equity and Securities 41 Information on securities issued by the Company 42 Stock market and dividends 44 Production efficiency improvement program 68 Procurement 71 Materials and spare parts 72 Fuel 74 Services 76 Investment activities 79 Capital investment development by programs 80 Implementation of investment plan by programs 82 Implementation of investment plan by sectors 84 Human resources and social policy 87 HR management 88 Investing in HR 91 Social policy 92 Subsidiaries and affiliates 95 Markets and sales organization 49 Environmental activity 99 Structure of major product sales 50 Heat energy sales 52 Sale of electric energy at WMEC 54 Tariff policy 56 Standardization and improvement of business processes 105 Legal relations 109 Production 61 Information on generating capacity 62 Production plan 64 4 OAO Irkutskenergo Risk management 113 Information technology 117 Financial and economic activities 123 Key financial and economic indicators 124 Financial Situation Analysis 130 Loan Portfolio Analysis 136 Appendix 1. Balance Sheet of OAO Irkutskenergo as of December 31, 2011 144 Appendix 2. Profit and loss statement of ОАО Irkutskenergo for 2011______________ 146 Appendix 3. Audit opinion________________________ Appendix 4. Implementation of income and expense budget ________________ Appendix 5. Implementation of cash flow budget _________________________ Appendix 6. Compliance with the Corporate Code of Conduct and Ethics _________ Appendix 7. Information on Large Transactions and Non-Arm’s Length Transactions ________________________ 148 151 156 160 170 OAO Irkutskenergo 5 Annual report 2011 Address to shareholders by the Chairman of the Board of Directors, OAO Irkutskenergo Dear shareholders! Although the last year was not very easy for the Russian economy, our Company continued to provide consumers with heat and electricity without interruptions or failures, as required by the Government and market regulators, by Shareholders and by the Board of Directors. The Company continued its steady and continuous development, securing its leading position in the Russian energy market. We successfully adjusted our philosophy to the reforms in the industry; we adapted well to the changing rules of the wholesale market and of the energy sales market, to stricter process safety and Company transparency requirements. The housing and utility complex of the Irkutsk Region and other regions required our close attention. And, last but not least, we speeded up the development of innovations. We are profitable, professional, have many unique technologies; we are developing fast and investing heavily into core operations and into new generation prospect; many of our projects are widely known and considered to be unprecedented. These projects include rotor wheels of the Bratskaya HPP, the Irkutsk and Angarsk closed-circuit heat supply plan and the construction of Lenskaya TPP. At the beginning of 2011, the Company started large-scale and long-term research works to develop new generation reactors: the Board of Directors approved the research and development task. The main issue was the development of the SVBR-1001 fast-neutron low-power nuclear reactor. The Board also approved 6 OAO Irkutskenergo the concept of innovative development program of OAO Irkutskenergo. In order to develop new approaches and achieve our goals, we need an organized group sharing the same views; therefore, the main advantage of our Company is its employees, and our main value is human life. In the past year, we continued to attach special importance to occupational safety, protection of employees and their professional development. Safe working conditions and health of employees remain a high priority. All of the planned social programs are being implemented fully in accordance with the collective agreement between the management and the labor union. The Company is the backbone of the Eastern Siberia economy and has been a good example of private-public partnership for many years. In 2011, the Company continued to fund long-term partnership programs aimed at providing health improvement and rehabilitation for children of the Irkutsk Region. For ten years, the Company has been one of the general sponsors of the Irkutsk regional branch of the national charity foundation Russian Children’s Fund (RCF). “Diabetes mellitus”, “Children and tuberculosis” and “Deaf children” are the main programs of the Fund supported by the Company. guest performance of the Saint Petersburg Mariinsky Theatre symphony orchestra directed by the famous conductor V. Gergiev and a guest performance of the Moscow Satyricon Theatre directed by K. Raikin. Every year, OAO Irkutskenergo sponsors the Baikal Economic Forum. Finally, I would like to thank the Company’s employees and partners. I hope that the professionalism of our employees will continue to ensure the Company’s success and competitiveness, resulting in steady income for the Shareholders and the State and in a generous remuneration for our employees. Chairman of the Management Board of OAO Irkutskenergo Vladimir Kiryukhin As part of the social and economic partnership with the Government of the Irkutsk Region, the Company funds socially important municipal facilities that need renovation or maintenance. For instance, in 2011, the Company provided the Administration of the city of Ust-Ilimsk with funds to ensure that there are enough places for children in preschool institutions; the city of Zheleznogorsk received money to reconstruct the central garden square of the city. During the year, the Company acted twice as a major sponsor of city events: a 1 - SVBR stands for the Russian acronym of lead-bismuth fast reactor. OAO Irkutskenergo 7 Annual report 2011 Address to shareholders by the CEO of OAO Irkutskenergo Dear shareholders! In the reporting period, our Company provided customers with heat and electricity without interruptions. The Company increased the quality and reliability of its services, upgraded its facilities and developed in compliance with the investment plans. We also implemented large-scale social projects. For instance, the Company helped the city of Irkutsk to prepare for the City Anniversary in 2011, assisting in infrastructure construction (130th district) and renovating several heating mains, including mains at the Lower Quay, a favorite recreation spot for many citizens and visitors of Irkutsk. Our production and financial performance also remained stable. In 2011, energy produced by OAO Irkutskenergo totaled 59.3 bln kWh (which is 3.4% less than in 2010), including 46.5 bln kWh from HPPs (-5%) and 12.8 bln kWh from TPPs (+2.8%). The Company’s net profit increased by 30% as compared with 2010 and amounted to RUB 12.3 bln. In 2011, OAO Irkutskenergo was successively selling energy at the wholesale market. Our main direct buyers are: UC RUSAL, ООО Irkutskenergosbyt, ОАО Krasnoyarskenergosbyt, ОАО Rusenergosbyt, ОАО Glavenergosbyt, ZАО Sibenergotrade, ООО Mechel-Energo, ОАО Siburenergomanagement. In 2011, actual investment development amounted to RUB 4.2 bln. The total volume of investment in 2011 remained the same as 2010. The main share of capital investment was allocated for the reliability program (70% of all investment). Efficient projects and measures aimed at generating capacity 8 OAO Irkutskenergo development accounted for 13% of total investment. As for strategic development, steps were taken and further measures are planned for increasing available and installed capacity. For example, projects concerning R-50 turbine transfer from the UI CHPP branch to the NI CHPP branch and an increase of available capacity at the CHPP11 branch were approved. Turbine units of CHPP-9 were remarked and certified, thus increasing the available capacity of CHPP-9 by 30 mW. In 2011, Irkutskenergo, the region’s main energy supplier, also started servicing apartment houses of the Irkutsk Region. OOO Irkutsk Utility Systems was founded to participate in this business. The Company has set an ambitious goal: to streamline the utilities market. Usolye-Sibirskoye was the first city chosen for the implementation of this project. A feasibility study for the acquisition of water supply and sewerage assets in the cities of Cheremkhovo, Zheleznogorsk and Usolye-Sibirskoye is being conducted. Besides, in December 2011, OAO Irkutskenergo expanded its geographic footprint to a new region: ZAO Baikalenergo (a subsidiary of OAO Irkutskenergo) and the Administration of Sayanogorsk (the Republic of Khakassia) signed a lease agreement for the Sayanogorsk heating network, as well as boiler stations and heating networks of the villages of Maina and Cheremushky. OAO Irkutskenergo strives to protect the environment taking into account the peculiarities of its facilities, the climate, the social and economic situation of the cities in the Irkutsk Region and the requirements of environmental legislation. This activity of OAO Irkutskenergo is aimed at minimizing the negative environmental impact of its operations. In 2011, actual environmental payments amounted to RUB 87.9 mln. Costs related to protection and efficient use of water resources, protection of the atmosphere and environmental protection (protection of land resources) against domestic and industrial waste as well as to site restoration amounted to RUB 1.2 bln. Costs related to major overhaul of wastewater treatment facilities and equipment for filtering and neutralization of hazardous substances, disposal and treatment of domestic and industrial waste amounted to RUB 146.9 mln. OAO Irkutskenergo successfully solves its primary tasks and sets itself ambitious goals. At the end of 2011, Lenskaya TPP construction project became one step closer to reality: after a public discussion in the city of Ust-Kut, the land plot selection act was approved, and a preliminary agreement concerning the location of the facility to be constructed was achieved. Potential consumers of the TPP include the Udokan copper deposit with a demand of 450 mW, the Chinea iron ore deposit (150-200 mW), the Kholodninski MPP (30 mW), the Eastern Siberia – Pacific Ocean oil pipeline and the Baikal-Amur Mainline. Thus we contribute to the development of Eastern Siberia and its great potential. CEO of OAO Irkutskenergo Evgeny Fedorov OAO Irkutskenergo 9 Notes On December, 29, the Irkutskaya HPP celebrated the 55th anniversary of connecting the first hydroelectric unit to the grid enterprises (Irkutsk Aluminum Smelter) and residential consumers of Irkutsk and nearby cities. The Irkutskaya HPP has produced 214.7 bln kWh of energy by the anniversary date. On December, 29, the Irkutskaya HPP, the first HPP in the Angara cascade and the first major HPP in Eastern Siberia, celebrated the 55th anniversary of connecting the first hydroelectric unit to the grid. In 1958, the last two units were commissioned ahead of schedule, and the HPP started operating at full rated capacity. On October 24, 1959, the Irkutskaya HPP was brought into routine operation. About RUB 279 mln were allocated for the re-equipment of the HPP. Protective relays, automatic equipment and the hydroelectric unit control system are being replaced, and oil circuit breakers have already been replaced with gasinsulated ones. As part of the HPP’s auxiliaries reconstruction project, electrical equipment and dozens of kilometers of power and control cable have been replaced. Design works on the reconstruction of concrete slabs in the turbine room (the works are scheduled for 2014) and of direct-current grid have begun. Within four years the construction of a new relay cabinet will be completed. Implementation of the Irkutskaya HPP project was a challenging task, for there was no experience in constructing such HPPs. A rock-fill dam with a core of clay was to be built, as well as a powerhouse of combined type in which 8 hydroelectric units were to be installed. Construction of a dam of this type was designed for the first time, and it was the biggest fill dam in the world. At present, the Irkutskaya HPP with a capacity of 662.4 MW produces 4.1 bln kWh of energy during an average water year. The time of use of installed capacity amounts to 6212 hours. The energy is used by power-consuming industry 10 OAO Irkutskenergo A great number of power engineers and builders gained experience at the construction of the HPP. Later they participated in construction of such industrial giants as the Bratskaya, Ust-Ilimskaya, Krasnoyarskaya HPPs and KAMAZ. The specialists successfully worked in Mongolia and Vietnam, in Iran and Siberia, and their work was highly appreciated everywhere. 1. General profile of OAO Irkutskenergo Annual report 2011 General information OAO Irkutskenergo is a joint stock company established by the Decree No. 721 of the President of the Russian Federation on Organizational Measures for Reorganization of State Enterprises and Voluntary Associations of State Enterprises Into Joint-Stock Companies of July 1, 1992. General profile Full name: Irkutsk Joint Stock Company of Energetics and Electrification Abbreviated name: OAO Irkutskenergo Registration number in the Uniform State Register of Legal Entities: 1023801003313 Registration date: July 12, 2002 CEO: E.V. Fedorov Chief accountant: G.M. Tolstykh Legal/postal address: 3 Sukhe-Batora Street, Irkutsk 664025, Irkutsk Region, Russian Federation; tel.: (3952)790-300; fax: (3953) 790-899 Regional committee on public statistics: 39 Chkalova Street, Irkutsk 664025 OAO Irkutskenergo is included in the register of legal entities whose share in a specific product market exceeds 35% as an entity which provides the following services: heat supply services (Order of Irkutsk regional department of Federal Antimonopoly Service No.2-r on Including Legal Entities Whose Share in a Specific Product Market Exceeds 35% in the Register, of February 21, 2002), water supply and drainage services (Order of Irkutsk regional department of Federal Antimonopoly Service No.3-r on Including Legal Entities Whose Share in a Specific Product Market Exceeds 35% in the Register, of March 24, 2006). OAO Irkutskenergo is a natural monopoly and is included in the Register of natural monopoly entities in fuel & energy complex. Section 1 “Electricity and (or) 12 OAO Irkutskenergo heat supply services”, registration number 38.1.1 (Regulation of the Federal Energy Committee of Russia No. 127/8 on Approval of the List of Natural Monopoly Entities in the Fuel & Energy Complex Included in Section 1 “Electricity and Heat Supply Services”, of December 19, 1997). Key operations of the Company Key operations of the Company under the Charter include: generation of electricity and heat for sales to consumers; ■ operation, installation, supervision, adjustment, technical upgrading and reconstruction of power plants, electric and heating equipment; ■ research and development, design, construction and use of new equipment and technologies; ■ energy supply services; ■ operation of heating networks; ■ foreign trade; ■ operation and maintenance of facilities under the authority of Rostekhnadzor. ■ In November, 2011, the Bratskaya HPP celebrated the 50th anniversary On November 28, 1961, the first hydroelectric unit was brought into operation. Since then, the Bratskaya HPP became the second in the world to have produced more than one trillion kWh of energy. The HPP is constantly upgraded. In 2010, the first stage of replacing rotor wheels (at 6 hydroelectric units) was completed. In 2011, the second stage of the project began. Within 5 or 6 years, the next six rotor wheels will be replaced. Veterans, today’s power engineers, honored guests and residents of Bratsk participated in the celebrations to mark the Bratskaya HPP anniversary. Residents of the city who won creative competitions as part of celebration of the 50th anniversary of the HPP were awarded prizes. On November 28, 2011, an official meeting was organized, and on November 29, there was a meeting of veterans of the Bratskaya HPP. On December 1, a research and practice conference “History of construction, experience in operation and prospects of the Bratskaya HPP” took place, and on December 2, there was an official meeting at the Bratsk-ART Theatre and Concert Centre. Builders of the Bratskaya HPP successfully carried out their task. Neither harsh climate, nor the novelty of the project and the relocation from other regions could hinder them. Today the specialists of the Bratskaya HPP continue the traditions started by power engineers who applied their knowledge and put effort into ensuring uninterrupted and reliable energy supply to the population and enterprises of the region. OAO Irkutskenergo 13 Contacts 14 OAO Irkutskenergo 2. Results and expectations of Company development by business priorities Annual report 2011 Aims and objectives - 2011 Aims and objectives-2011 In 2011, the following measures were taken and are planned for further implementation as part of strategic development of the Company: 1.Increasing available and installed capacity 2. Selling emission reduction units (ERU) under the Kyoto protocol After the government had made a statement on the coming review of a wholesale market model, the uncertainty about return on investments in the development of existing generating capacities significantly increased. In this connection, the Company reviewed the approach to assessing the economic efficiency of such projects. Only the implementation of the most effective projects (on transferring the R-50 turbine from the Company’s branch UI CHPP to the NI CHPP branch and on increasing the available capacity of the CHPP-11 branch) was approved. The decision on other less effective projects was delayed until return on them becomes more certain. As part of the first “Kyoto” project of the Company (Replacing rotor wheels of the Bratskaya HPP), a buyer was determined, and a bilateral ERU sales and purchase contract was concluded. Turbine units at stations No. 1, 5 and 6 of CHPP-9 were relabeled and their capacity was evaluated (total +30 MW). An agreement with the Russian Ministry of Energy was reached on changes to the List of facilities put into operation under the capacity supply agreements. These changes concern inclusion of facilities with a total capacity of up to 2.3 GW which are to be built by RUSAL and/or third party engaged by the Company according to its development strategy, as well as exclusion of facilities with similar total capacity which are to be built by other investors from the List. 16 OAO Irkutskenergo Negotiations with the Operator of carbon units (OJSC Sberbank of Russia) on approval of a tripartite agreement necessary for approval of ERU sales and purchase contract are underway. The second “Kyoto” project of the Company (Optimization of heat supply to Novo-Lenino District of Irkutsk) received positive expert opinion. An application for participation in the competition of “Kyoto” projects conducted by the Operator of carbon units was submitted and accepted. The set of supporting documents for the Company’s third “Kyoto” project (Optimization of heat supply system of Pravoberezhny District of Irkutsk) is being prepared. Since 2011, within the framework of extension of competence of OAO Irkutskenergo in promoting “Kyoto” projects, the Company now independently prepares and monitors the implementation of “Kyoto” projects from start to finish. 3. Innovative development of the Company 4. The Company’s participation in related business. According to the requirements of Minutes No. 4 of the meeting of the Government Commission on High Technology and Innovation as of August 3, 2010, the Program on Innovative Development and Modernization of the Company up to 2017 (hereinafter referred to as the Program) has been developed and approved by the Ministry of Education and Science of the Russian Federation, the Russian Ministry of Energy and the Ministry of Economic Development of the Russian Federation. The Program has been approved by the Company’s Board of Directors. A feasibility study for the acquisition of water supply and disposal facilities at Cheremkhovo, Zheleznogorsk and UsolyeSibirskoye in order to expand the influence area of OAO Irkutskenergo in the sphere of utilities is being conducted. OOO Irkutsk Utility Systems has been established to enable the Company to participate in this business. The main priority in the sphere of the Company’s innovative development is creation of a working prototype of a lead-bismuth cooled low-power fast neutron reactor (SVBR) and subsequent commercialization of the technology. A 50% stake of OAO AKME-Engineering has been purchased and the R&D plan for the project has been implemented. In implementing the Program, intensive research (involving higher education institutions) covering the following parts of the Program is conducted: Program for increasing energy efficiency; ■ Innovative energy saving measures; ■ Program for increasing environmental friendliness of production; ■ Negotiations with potential partners on establishing joint ventures producing electrical equipment in the Irkutsk Region are underway. Feasibility and economic efficiency of constructing the plant for production of modular integrated transformer substations in the Irkutsk Region have been assessed. Within this project potential sites for the plants are considered. 5. Developing measures for boosting production To increase sales of energy and capacity, a feasibility study has been conducted for the project on constructing a metallurgical mini-plant producing steel from scrap iron and steel of various capacities. Negotiations on cooperation with the main equipment vendors are conducted as part of the project implementation. The annual energy consumption may total 200-500 mln kWh. Program for increasing energy security; ■ Application of new technologies to production. ■ 6. Alternative fuel sources A pilot project on cofiring bark waste and coal at the boiler of station 9 TI and TS of the CHPP-6 (CHPP-7) branch is being implemented. OAO Irkutskenergo 17 Annual report 2011 Main decisions of the Board of Directors and the General Meeting of Shareholders January April The Board of Directors decided that Research & Development (R&D) should be viewed as one of the Company’s business priorities. In 2011, the R&D funding totaled RUB 1,526,000,000. The Board of Directors made the following decisions: The following main R&D spheres were approved: Development of nuclear low-power fast neutron reactor (SBVR -100); ■ Use of coal-water slurry fuel at the CHPP-12 branch of OAO Irkutskenergo; ■ Сofiring bark waste and coal at the section of Bratsk heating networks of the CHPP-6 branch of OAO Irkutskenergo; ■ Reducing minimum boiler load without using residual oil at the Novo-Ziminskaya CHPP branch of OAO Irkutskenergo; ■ Upgrading the centralized system of active power regulators at the Ust-Ilimskaya HPP branch of OAO Irkutskenergo; 1)Approve the concept of innovative development program of OAO Irkutskenergo and the new version of Regulations on the Information Policy of OAO Irkutskenergo. 2)On April 28, 2011, remove the following members of the Management Board of OAO Irkutskenergo from office before the end of their term: Evgeny Fedorov, Vyacheslav Stoyanov, Evgeny Novikov, Boris Rozenraukh, Evgeny Filsh. 3)Since April 29, 2011, appoint the following members to the Management Board of OAO Irkutskenergo: Evgeny Fedorov, Sergey Shperling, Evgeny Novikov, Evgeny Filsh, Vladimir Smagin. June ■ Introduction of Smart Grid technology. ■ February The Board of Directors approved a new version of Regulations on the Branches of OAO Irkutskenergo. March The Board of Directors approved the Program for cost reduction and increasing efficiency of OAO Irkutskenergo for 20112013. The Annual General Meeting of Shareholders made the following decisions: 1)Approve the annual report of OAO Irkutskenergo for 2010, approve the annual financial statements, including the profit and loss statement of OAO Irkutskenergo for 2010, approve new versions of internal documents regulating the work of regulatory bodies of OAO Irkutskenergo, such as Regulations on the Board of Directors of OAO Irkutskenergo, Regulations on the Management Board of OAO Irkutskenergo and Statement on the CEO of OAO Irkutskenergo. 2)Allocate the profit for 2010, totaling RUB 9,463,517 thousand, for the following purposes: dividend payments on the shares of OAO Irkutskenergo - RUB 554,856.41628 thousand; ■ 18 OAO Irkutskenergo investment activities and production purposes - RUB 1,022,329 thousand; ■ innovation development program (R&D) - RUB 1,526, 000 thousand; ■ regional social events - RUB 125,000 thousand; ■ payment of remuneration for work in the Board of Directors - RUB 6,000 thousand; ■ working capital financing - RUB 6,229,332 thousand. ■ 3)Pay out annual dividends on ordinary shares of OAO Irkutskenergo for 2010 in the amount of RUB 0.1164 per share no later than 60 days from the decision on payment was made. 4)Elect the following persons to the Board of Directors of OAO Irkutskenergo: Igor Ageichev, Oleg Deripaska, Evgeny Dod, Vladimir Kiryukhin, Boris Kovalchuk, Igor Lerner, Andrey Likhachev, Alexander Martynenko, Alexander Sergeev, Rashid Sharipov and Andrey Shishkin. 5)Elect the following persons to the Audit Commission of OAO Irkutskenergo: Galina Lavshuk, Stanislav Legenza, David Pogosbekov, Elena Talalykina, Irina Travkova. 6)Approve OOO FinExpertiza as the auditor of OAO Irkutskenergo for 2011. July The Board of Directors made the following decisions: 1)Appoint Vladimir Kiryukhin as the Chairman of the Board of Directors of OAO Irkutskenergo. 2)Approve the Program on Innovative Development and Modernization of OAO Irkutskenergo up to 2017. 3)Approve the purchase of shares of OAO AKME- Engineering in the amount OAO Irkutskenergo 19 Main decisions of the Board of Directors and the General Meeting of Shareholders Annual report 2011 comprising capital. 50% of the authorized 4)Approve the agreement between the shareholders of OAO AKME-Engineering and the State Atomic Energy Corporation ROSATOM. 5)Make changes to the credit policy of OAO Irkutskenergo for 2011 in order to increase the total credit limit. 6)Approve part-time work of Evgeny Fedorov, CEO of OAO Irkutskenergo, and of Vladimir Smagin, member of the Management Board of OAO Irkutskenergo, as members of the Board of Directors of OOO Vostsibugol Company. August The Board of Directors made the following decisions: 1)Elect the following persons to the Strategy and Restructuring Committee of the Board of Directors of OAO Irkutskenergo: Vladimir Kiryukhin, Vyacheslav Solomin, Evgeny Fedorov, Evgeny Novikov, Dmitry Shumeev, Ilnar Mirsiyapov and George Rizhinashvili. Appoint Vyacheslav Solomin as the Chairman of the Strategy and Restructuring Committee. 2)Elect the following persons to the Budget Committee of the Board of Directors of OAO Irkutskenergo: Vladimir Kiryukhin, Vyacheslav Solomin, Alexey Kondaurov, Evgeny Novikov, Evgeny Filsh and Vadim Nedotko. Appoint Vyacheslav Solomin as the Chairman of the Budget Committee. 3)Elect the following members to the Internal Audit Committee of the Board of Directors of OAO Irkutskenergo: Igor Lerner, Andrey Likhachev and Alexander Sergeev. Appoint Andrey Likhachev as the Chairman of the Audit Committee. 20 OAO Irkutskenergo 4)Elect the following members to the HR and Remuneration Committee of the Board of Directors of OAO Irkutskenergo: Igor Ageichev, Andrey Likhachev and Alexander Sergeev. Appoint Andrey Likhachev as the Chairman of the HR and Remuneration Committee. October The Extraordinary General Meeting of Shareholders approved supplementary agreements to electric energy and capacity sales and purchase agreements with OAO RUSAL Bratsk and OAO SUAL as non-arm's length transactions. November The Board of Directors approved the purchase of additional share issue of OAO AKME-Engineering. December The Board of Directors made the following decisions: 1)Approve Regulations on Credit Policy of OAO Irkutskenergo for 2012 and the new version of Regulations on Insider Information of OAO Irkutskenergo. 2)On December 29, 2011, remove Vladimir Smagin, a member of the Management Board of OAO Irkutskenergo, from office before the end of his term. Since December 30, 2011, appoint Oleg Prichko to the Management Board of OAO Irkutskenergo. OAO Irkutskenergo 21 Performance Annual report 2011 Performance Index 2010 2011 Change Energy production, mln kWh 61,420.4 59,328.4 -3.41% Including HPPs, mln kWh 48,920.3 46,480.5 -5.05% CHPPs, mln kWh 12,500.1 12,847.9 +2.78% Installed capacity of CHPPs + RGC, MW 3,872.35 3,879.3 +0.18% Installed capacity of HPPs, MW 9,002.4 9,002.4 -- Length of heating networks, km 1,714.054 1,714.288 0.234 Average number of workers, persons 8,072 8,046 -26 Average salary, RUB 38,084 42,824 112.4% Earnings, RUB mln 52,353 60,537 16% Production cost of goods, products, works and services 38,976 44,375 14% Gross profit, RUB mln 13,377 16,162 21% EBITDA, RUB mln 15,587 18,824 21% EBIT 13,119 16,098 23% Net profit, RUB mln 9,464 12,274 30% Market capitalization as of December 31 (under Russian Trading System methodology), RUB mln 123,474.6 71,492.6 -42.1% 22 OAO Irkutskenergo At the end of 2011, OAO Irkutskenergo entered the utilities market in UsolyeSibirskoye began with the start of the external management procedure of OAO Management Company Tvoi Vybor Kachestvo. OAO Irkutskenergo, which is the main energy resources supplier in the region, has become a new participant in the sphere of apartment buildings servicing in the Irkutsk Region. The enterprise has taken on a new task to streamline this market. Usolye-Sibirskoye has become the first city in which the public utilities project has been implemented. Specially for this purpose, OAO Irkutskenergo has created a new department responsible for public utilities system management. The Company has set a precedent, for generating companies had not acquired management companies before. OAO Irkutskenergo is a pioneer in this sphere. The creation of a vertically integrated structure will ensure better cash flow monitoring. Failures to pay are connected mainly with agents, in this case with management companies. According to experts, the company began to deal with this problem in order to establish control over the cash, large amounts of which pass through management companies and often stay there without reaching resource suppliers. The Company’s management made the decision to enter the public utilities market long ago, but it was only in October 2011 that this process OAO Irkutskenergo 23 Contacts 24 OAO Irkutskenergo 3. Company Management Annual report 2011 Corporate Management Management Structure General Meeting of Shareholders (supreme governing body) Audit Commission (5 members) Independent Auditor Board of Directors (collective elected body) 11 members Management Board (collective executive body) 5 members Audit Committee (3 members) HR and Remuneration Committee (3 members) Strategy and Restructuring Committee (7 members) CEO (sole executive body) Budget Committee (6 members) 26 OAO Irkutskenergo The General Meeting of Shareholders is the Company’s supreme governing body. The procedure and dates for holding the General Meeting of Shareholders are regulated by the Federal Law on JointStock Companies, as well as by the Charter and Regulations on the General Meeting of Shareholders of OAO Irkutskenergo. OAO Irkutskenergo 27 Annual report 2011 Corporate Management The Board of Directors 1. Name: Artem Volynets Year of birth: 1967 Position: CEO of OOO En+ Management Term of office: November 19, 2010 to June 24, 2011 2. Name: Oleg Deripaska Year of birth: 1968 Position: CEO of ZAO RUSAL Global Management B.V. CEO of OOO Basic Element Company Term of office: November 19, 2010 to June 24, 2011/ June 24, 2011 until the next Annual General Meeting of Shareholders 3. Name: Evgeny Dod Year of birth: 1973 Position: Chairman of the Management Board of OAO RusHydro Term of office: November 19, 2010 to June 24, 2011/ June 24, 2011 until the next Annual General Meeting of Shareholders 4. Name: Vladimir Kiryukhin Year of birth: 1956 Position: CEO of OOO En+ Development Term of office: November 19, 2010 to June 24, 2011/ June 24, 2011 until the next Annual General Meeting of Shareholders 5. Name: Boris Kovalchuk Year of birth: 1977 Position: Chairman of the Management Board of OAO INTER RAO UES Term of office: November 19, 2010 to June 24, 2011/ June 24, 2011 until the next Annual General Meeting of Shareholders 6. Name: Vyacheslav Kravchenko Year of birth: 1967 Position: CEO of OOO RN-Energo CEO of OAO United Energy Sales Company Term of office: November 19, 2010 to June 24, 2011 7. 28 Name: Igor Lerner Year of birth: 1978 Position: Project Manager, Chief Auditor of OOO En+ Management Term of office: November 19, 2010 to June 24, 2011/ June 24, 2011 until the next Annual General Meeting of Shareholders OAO Irkutskenergo The Board of Directors is the standing body responsible for tackling strategic issues of Company development, defining the main areas of Company development and making the most important decisions. Each member of the Board of Directors is personally responsible for its decisions. Members of the Board of Directors are elected by cumulative voting at the General Meeting of Shareholders. The Board of Directors ensures efficient operation of the Company’s executive bodies by supervising their activities. The activities of the Board of Directors are regulated by the Charter and Regulations on the Board of Directors of OAO Irkutskenergo. OAO Irkutskenergo 29 Annual report 2011 Corporate Management 8. Name: Andrey Likhachev Year of birth: 1965 Position: CEO of OAO MOEK Term of office: November 19, 2010 to June 24, 2011/ June 24, 2011 until the next Annual General Meeting of Shareholders 9. Name: Alexander Sergeev Year of birth: 1977 Position: Managing Director of OOO En+ Management Term of office: November 19, 2010 to June 24, 2011/ June 24, 2011 until the next Annual General Meeting of Shareholders 10. Name: Rashid Sharipov Year of birth: 1968 Position: Deputy CEO of OOO KFK-Consult Term of office: November 19, 2010 to June 24, 2011/ June 24, 2011 until the next Annual General Meeting of Shareholders 11. Name: Andrey Shishkin Year of birth: 1959 Position: Deputy Minister of Energy of the Russian Federation Term of office: November 19, 2010 to June 24, 2011/ June 24, 2011 until the next Annual General Meeting of Shareholders 12. Name: Igor Ageichev Year of birth: 1978 Position: Deputy CEO/ Director for Project Support of OOO En+ Development Term of office: June 24, 2011 until the next Annual General Meeting of Shareholders 13. Name: Alexander Martynenko Year of birth: 1976 Position: Economic and Financial Director of OOO EuroSibEnergo-Engineering Term of office: June 24, 2011 until the next Annual General Meeting of Shareholders Members of the Board of Directors do not own any shares of OAO Irkutskenergo. 30 OAO Irkutskenergo OAO Irkutskenergo 31 Corporate Management Annual report 2011 The Management Board 1. Name: Evgeny Fedorov Year of birth: 1978 Position: CEO of OAO Irkutskenergo Director of EuroSibEnergo PLC (part-time) CEO of OAO EuroSibEnergo (part-time) Term of office: June 9, 2010 to April 28, 2011/ April 29, 2011 - present 2. Name: Vyacheslav Stoyanov Year of birth: 1967 Position: Deputy CEO for Corporate Management of OAO Irkutskenergo Term of office: June 9, 2010 to April 28, 2011 3. Name: Evgeny Novikov Year of birth: 1959 Position: Deputy CEO for Energy Production – Chief Engineer of OAO Irkutskenergo Term of office: June 9, 2010 to April 28, 2011/ April 29, 2011 - ongoing 4. Name: Boris Rozenraukh Year of birth: 1948 Position: Deputy CEO for Strategy and Restructuring of OAO Irkutskenergo Term of office: June 9, 2010 to April 28, 2011 5. Name: Evgeny Filsh Year of birth: 1959 Position: Deputy CEO for Finance and Economy of OAO Irkutskenergo Term of office: June 9, 2010 to April 28, 2011/ April 29, 2011 - ongoing 6. Name: Sergey Shperling Year of birth: 1961 Position: Deputy CEO for Assets Protection of OAO Irkutskenergo Term of office: April 29, 2011 - present 7. Name: Vladimir Smagin Year of birth: 1953 Position: Deputy CEO for Development and Government Relations of OOO VostSibUgol Company Term of office: April 29, 2011 to December 29, 2011 8. Name: Oleg Prichko Year of birth: 1963 Position: Deputy CEO for Sales of Energy Resources of OAO Irkutskenergo Term of office: December 30, 2011 – present Members of the Management Board do not own any shares of OAO Irkutskenergo. 32 OAO Irkutskenergo The Management Board of the Company is a collective executive body of the Company. Members of the Management Board are employed by the Company on the basis of a fixed-term contract and are elected by the decision of the Board of Directors. The CEO of the Company performs the functions of the Chairman of the Management Board. The activities of the Management Board, as well as rights, obligations and responsibility of its members are regulated by the Charter and Regulations on the Management Board of OAO Irkutskenergo, as well as by employment contracts concluded by the Company with the members of the Management Board. OAO Irkutskenergo 33 Annual report 2011 Corporate Management CEO 1. Name: Evgeny Fedorov Year of birth: 1978 Position: CEO of OAO Irkutskenergo Director of EuroSibEnergo PLC (part-time) CEO of OAO EuroSibEnergo (part-time) Term of office: June 9, 2010 to June 9, 2012 The Audit Commission 1. Name: Igor Gankov Year of birth: 1968 Position: Head of Innovative Technologies of the Production and Technical Department of OAO EuroSibEnergo Term of office: June 28, 2010 to June 24, 2011 2. Name: Galina Lavshuk Year of birth: 1980 Position: Head of Corporate Relations of the Legal Department of OOO EuroSibEnergo-Consult Term of office: June 28, 2010 to June 24, 2011/ June 24, 2011 until the next Annual General Meeting of Shareholders 3. Name: Konstantin Sukhobayevsky Year of birth: 1981 Position: Head of Corporate Reporting Department of OOO EuroSibEnergo Term of office: June 28, 2010 to June 24, 2011 4. Name: Maria Tikhonova Year of birth: 1980 Position: Director of the Department of Economic and Property Relations in the Energy Industry of the Ministry of Energy of the Russian Federation Term of office: June 28, 2010 to June 24, 2011 5. Name: Irina Travkova Year of birth: 1963 Position: Head of Accounting Department of OOO EuroSibEnergo-Consult Term of office: June 28, 2010 to June 24, 2011/ June 24, 2011 until the next Annual General Meeting of Shareholders 6. Name: Stanislav Legenza Year of birth: 1971 Position: Director of the Krasnoyarsk branch of OOO EuroSibEnergo-Consult Term of office: June 24, 2011 until the next Annual General Meeting of Shareholders 34 OAO Irkutskenergo The CEO of the Company is responsible for managing the day-to-day operation of the Company. Cooperation between the CEO and the Management Board is based on the principle of separation of authority of the Company’s executive bodies: the sole executive body of the Company shall not make decisions on issues that are within competence of the collective executive body and the Board of Directors. The CEO of the Company shall perform his duties in compliance with the existing legislation of the Russian Federation, the Charter and Regulations on the CEO of OAO Irkutskenergo. The Audit Commission is a body responsible for monitoring the Company’s financial and business operations. The Audit Commission is elected by the General Meeting of Shareholders, comprises 5 members and is accountable to the General Meeting of Shareholders. The activities of the Audit Commission are regulated by the Charter and Regulations on the Audit Commission of OAO Irkutskenergo. OAO Irkutskenergo 35 Annual report 2011 Corporate Management The Audit Commission 7. Name: David Pogosbekov Year of birth: 1981 Position: Head of Commercial Department of OOO EuroSibEnergo-Consult Chief Commercial Officer of OAO EuroSibEnergo Term of office: June 24, 2011 until the next Annual General Meeting of Shareholders 8. Name: Elena Talalykina Year of birth: 1973 Position: Chief Accountant of OOO EuroSibEnergo-Consult Chief Accountant of OAO EuroSibEnergo (part-time) Term of office: June 24, 2011 until the next Annual General Meeting of Shareholders Members of the Audit Commission do not own any shares of OAO Irkutskenergo. The Independent Auditor of the Company assesses the Company’s financial and business operations in compliance with the laws of the Russian Federation on the basis of the contract. The General Meeting of Shareholders appoints the Company’s Auditor; the amount of the Auditor’s remuneration is determined by the Board of Directors. The General Meeting of Shareholders of OAO Irkutskenergo approved OOO Finexpertiza as the Auditor for 2011. Committees of the Board of Directors Four committees function under the Board of Directors of OAO Irkutskenergo. The activities of the Committees are regulated by the existing Russian legislation, the Charter and Regulations on the Committees of the Board of Directors of OAO Irkutskenergo. The Committees of the Board of Directors of OAO Irkutskenergo ensure cooperation of the Board of Directors and executive bodies of the Company on the following issues: Controlling the Company’s financial and business operations; ■ Increasing the efficiency of the Company’s budgeting process; ■ Developing principles and criteria for remuneration of the members and the Chairman of the Board of Directors, the members and the Chairman of the Management Board, the members of the Audit Commission; ■ Developing and implementing the Company’s strategy for increasing its efficiency, implementing the Company’s investment plans and programs. ■ 36 OAO Irkutskenergo Payment of remuneration to members of the Company’s bodies According to the decision of the Board of Directors, members of the Management Board may receive remuneration and (or) reimbursement for expenses related to performing the functions of members of the Management Board. The remuneration and reimbursement for expenses paid to all the members of the Company’s Management Board for 2011 totaled RUB 46,215,090.69. According to the decision of the General Meeting of Shareholders, members of the Board of Directors may receive remuneration and (or) reimbursement for expenses related to performing the functions of members of the Board of Directors. Criteria for determining the amount of remuneration paid for the fiscal year are specified by Regulations on Payment of Remuneration to the Members of the Board of Directors of OAO Irkutskenergo. The remuneration and reimbursement for expenses paid in 2011 to all the members of the Company’s Board of Directors for 2010 totaled RUB 1,331,769.23. OAO Irkutskenergo 37 Annual report 2011 Long-term investments Long-term investments (as of December 31, 2011) No. Index Unit 1. Long-term investments as of the beginning of the period RUB ‘000 16,377,058.48 17,862,520.87 2010 2011 2. Number of organizations in which OAO Irkutskenergo sold its stake Unit 0 2 3. Number of established companies Unit 0 0 4. Long-term investments as of the end of the period RUB ‘000 17,862,520.87 23,922,724.21 *in 2011, OOO IEF and OOO ATSK stopped operations due to restructuring in the form of their joining to OOO IESV and OOO Irkutskenergosbyt respectively. Commercial organizations in which OAO Irkutskenergo owns more than 20% equity (as of December 31, 2011) No. Name of commercial organization Share of OAO Irkutskenergo in the authorized capital, % Votes of OAO Irkutskenergo, % 1. ZAO Irmet 100.00 100.00 2. OOO IESV 100.00 100.00 3. OOO CERF 100.00 100.00 4. ZAO SibirEnergoTrade 100.00 100.00 5. ZAO Irkutskenergotrans 100.00 100.00 6. ZAO HydroEnergoServis-remont 100.00 100.00 7. ZAO Spetsenergoremont 100.00 100.00 8. ZAO Bratskenergoremont 100.00 100.00 9. ZAO Baikalenergo 100.00 100.00 10. ZAO Irkutskzoloproduct 100.00 100.00 11. OOO PO Irkutskenergo 100.00 100.00 12. OOO IGTSK 100.00 100.00 13. OOO Electrosbyt 100.00 100.00 14. OOO IC Irkutskenergo 100.00 100.00 15. OOO Irkutskenergosbyt 100.00 100.00 16. OOO Vostsibugolsbyt 100.00 100.00 17. ZAO Resursservisholding 99.99 99.99 18. OOO Baikalinvestenergo 99.77 99.77 19. ZAO Energo Paritet (currently in liquidation) 50.36 50.36 20. OAO AKME-Engineering 50 50 38 OAO Irkutskenergo In 2011, the volume of long-term investments increased by RUB 6,060,203.34 thousand due to the purchase of shares of OAO AKME-Engineering, additional contributions to the authorized capital of subsidiaries and affiliates: OAO AKMEEngineering and OOO PO Irkutskenergo. ZAO Baikalenergo and the Administration of Sayanogorsk sign a lease contract In December 2011, ZAO Baikalenergo (a subsidiary of OAO Irkutskenergo) and the Administration of Sayanogorsk (the Republic of Khakassia) signed a lease agreement for municipal heat supply facilities. The list of facilities includes the heating networks of Sayanogorsk, boiler stations and heating networks of the villages of Maina and Cheryomushki. Since January 1, 2012, the personnel of the municipal enterprise are transferred to ZAO Baikalenergo. Evgeny Fedorov, CEO of OAO Irkutskenergo: “Signing the lease agreement is a timely step that will improve the quality of the services we provide to the population and relations with the town’s utility companies. By expanding the geographical footprint of OAO Irkutskenergo, we introduce the quality standards of heating network operation in the neighboring region.” OAO Irkutskenergo 39 Contacts 40 OAO Irkutskenergo 4. Shareholders' Equity and Securities Information on securities issued by the Company Annual report 2011 Shares issue Date of issue prospectus No. registration 1. Volume Number of outof issue standing shares (RUB mln) (pcs.) Type of shares First issue (state registration number 34-1п-0018) November 23, 1.97 1992 2. Ordinary, registered, par value 1 RUB Second issue (state registration number 34-1-0066) January 27, 1994 3. 1,978,677 45.7 45,689,400 Ordinary, registered, par value 1 RUB Third issue (state registration number 34-1-00730) February 29, 1996 4,719.14 4,719,139,623 Ordinary, registered, par value 1 RUB On June 17, 2003, following the decision of FCSM of the Russian Federation all three issues of shares were united in one with the total number of shares of 4,766,807,700, state registration number 1-01-00041-А of June 17, 2003. Bond issues State registration number of securities issue (identification number) Date of issue Volume of prospectus registra- issue (RUB tion mln) Number of bonds (pcs.) 4-01-00041-А December 13, 2007 5,000,000 5,000 Documentary interest-bearing non-convertible bearer bonds of series 01, with compulsory centralized storage, par value 1,000 RUB 4В02-01-00041-А November 23, 2010 3,000 3,000,000 Documentary interest-bearing non-convertible exchange-traded bearer bonds of series BO-01,with compulsory centralized storage, par value 1,000 RUB 4В02-02-00041-А November 23, 2010 3,000 3,000,000 Documentary interest-bearing non-convertible exchange-traded bearer bonds of series BO-02, with compulsory centralized storage, par value 1,000 RUB 42 OAO Irkutskenergo The Company issued documentary interestbearing non-convertible bearer bonds of series 01 with the total value of RUB 5 bln in December 2008. The annual coupon rate was set at 15.5%. Later the Company repurchased the securities under irrevocable offer. In 2011, there were 3,500 outstanding documentary interestbearing non-convertible bearer bonds sold by the Company on the secondary market. Documentary interest-bearing nonconvertible bearer bonds are traded at the MICEX Stock Exchange (Closed Joint Stock Company “MICEX Stock Exchange”) in the Quote List А, 2nd level. In April 2011, the Company issued exchangetraded bonds of series BO-01 with total value of RUB 5 bln at the MICEX Stock Exchange. The annual coupon rate was set at 7.6%. The first coupon payment on these bonds was made in December 2011 in the amount of RUB 115,700 thousand. Exchange-traded bonds of series BO-01 are traded at the MICEX Stock Exchange in the Quote List А, 2nd level. Obligations to pay coupon on outstanding bond issues are fulfilled in a timely manner and in full. Registered issue of exchange-traded bonds of B0-02 series can be placed in the future in case of favorable market conditions if there is a need for additional borrowings. OAO Irkutskenergo 43 Structure of shareholders’ equity Annual report 2011 As of December, 2011, the shareholders’ equity comprises RUB 4,766,807.7 thousand and is represented by 4,766,807,700 outstanding ordinary registered shares. The nominal value of one share equals 1 ruble. The Company did not issue preferred shares. The Company's Charter does not stipulate a special right of the Russian Federation to participate in the management of the Company (“golden share”). American depository receipts (ADR) which are traded over-the-counter in the USA were issued for a part of OAO Irkutskenergo shares. One ADR is equivalent to 50 shares of OAO Irkutskenergo. In March 2011, the Russian Federation represented by the Federal Agency for State Property Management gave a 40% stake of OAO Irkutskenergo to OAO INTER RAO UES. No. Name of registered entity Share in the authorized capital, % 1. OAO EuroSibEnergo 50.19 2. OAO INTER RAO UES 40.007 3. ADR owners 0.51 4. Other shareholders 9.293 TOTAL 100 Stock market and dividends In 2011, shares of ОАО Irkutskenergo were traded at the MICEX Stock Exchange in the Quote List А, 1st level and on the trading platform of RTS in the Quote List А, 2nd level2. At the beginning of 2011, OAO Irkutskenergo shares’ quotations at MICEX equaled RUB 26.268, at the end of the year – RUB 14.998. Period RTS trading sessions volume (RUB, ‘000) MICEX SE trading sessions volume (RUB, ‘000) Q1 19,266 295,848 Q2 18,477 165,463 Q3 15,866 290,678 Q4 2,768 141,468 44 OAO Irkutskenergo 2 Since December 16, 2011, shares of ОАО Irkutskenergo have been excluded from the Quote List A, 2nd level of RTS due to termination of RTS operations upon reorganization through merger with ZAO “MICEX Stock Exchange”. OAO Irkutskenergo 45 Stock market and dividends Annual report 2011 RTS trading sessions volume (RUB, ‘000) MICEX SE trading sessions volume (RUB, ‘000) Turnover Period Number of issued shares Q1 4,766,807,700 813,350 11,781,597 0.26% Q2 4,766,807,700 865,300 7,753,334 0.18% Q3 4,766,807,700 821,600 13,952,635 0.31% Q4 4,766,807,700 155,000 8,173,541 0.17% Report on payment of declared dividends on OAO Irkutskenergo shares for the last 5 completed financial years Payout period Dividend per share (RUB) Payout information 2006 0.07517 Dividends are fully paid 2007 0.07522 Dividends are fully paid 2008* - - 2009 0.19 Dividends are fully paid 2010 0.1164 Dividends are fully paid 2011** - - * following the decision of the Annual General Meeting of Shareholders (June 19, 2009), the decision was made not to pay out the dividends on Company's shares for 2008. ** size of dividends for 2011 is not currently set. Dividends were paid within the periods specified by decisions of general meetings of shareholders and by the Charter of OAO Irkutskenergo. Dividend policy of OAO Irkutskenergo is formulated at the Annual General Meeting of Shareholders in compliance with recommendations of the Board of Directors of OAO Irkutskenergo. 46 OAO Irkutskenergo In the autumn of 2011, OAO Irkutskenergo became a shareholder in OAO AKMEEngineering The shareholder register of the public-private partnership OAO AKME-Engineering had to be modified as a 50% ownership interest was acquired by the coal and power company Irkutskenergo which is a subsidiary of OAO EuroSibEnergo. The remaining 50% interest belongs to the State Corporation Rosatom. OAO Irkutskenergo made the decision to acquire the shares of OAO AKME-Engineering in July 2011. At the end of August the Federal Antimonopoly Service of Russia accepted a bid by Irkutskenergo to acquire a 50% interest in OAO AKMEEngineering. In October the acquisition was approved by Rosatom as an equitable owner. history and relevant operational and managing experience. Essentially, Irkutskenergo represents the whole electric power system of Siberia. I’m convinced that this experience will serve as a backbone for OAO AKME-Engineering, especially in the times when the SVBR-100 project is going to its industrial phase. Evgeny Fedorov, CEO of OAO Irkutskenergo and OAO EuroSibEnergo: - Irkutskenergo as a key asset of EuroSibEnergo has a talent pool and technological capacity sufficient to carry out projects of any difficulty in the energy sector. Besides, the acquisition of OAO AKME-Engineering shares is in line with the plan to create a power-producing business cluster of EuroSibEnergo in the Irkutsk Region. Vladimir Petrochenko, CEO of OAO AKMEEngineering: - Being a public-private partnership and a rapidly developing asset, OAO AKME-Engineering has obtained a reliable shareholder with a 55-year OAO Irkutskenergo 47 Contacts 48 OAO Irkutskenergo 5. Markets and sales organization Annual report 2011 Structure of major product sales In compliance with the current legislation, OAO Irkutskenergo conducts energy and capacity sales at the wholesale market; heat energy sales at the regional market. The market for heat energy sales of OAO Irkutskenergo includes the following cities: Irkutsk, Angarsk, Shelekhov, Usolye-Sibirskoye, Cheremkhovo, Sayansk, Zima, Bratsk, Ust-Ilimsk, Zheleznogorsk and villages in the vicinity of these cities and towns. Heat energy for consumers in these cities is produced at CHPPs, boiler stations and electric boiler units forming part of the branches of OAO Irkutskenergo. Minor volumes of heat energy are being purchased from other generators: in Irkutsk — from ZAO Baikalenergo. Major industrial enterprises and housing and utilities companies (HUC) are the main consumers of heat energy. Heat energy sales are currently monopolized and regulated. Breakdown of major products output, ‘000 RUB ex VAT Type of product 2010 2011 Own electric energy 14,886,885 23,729,906* 59% Purchased electric energy 11,604,481 15,240,175 31% Electric capacity 12,931,045 8,642,631 -33% Heat energy 11,451,323 11,382,579 -0.6% 970,052 1,009,448 4.1% 51,792,410 59,879,844 15.6% Chemically treated water, charging Total * including power plants of medium pressure 50 OAO Irkutskenergo Change A year-on-year increase in revenue from energy sales was caused by efficient energy sales growth at the day-ahead market and balancing market. A decrease in revenue from capacity sales was due to changes of trade regulations at WMEC. A decrease in charges for heat energy in 2011 as compared to 2010 comprised 0.6% and is due to consumption decrease (-10.9%) and tariff growth (+10.3%). Growth in charges for heat carriers (chemically purified and charging water) reached 4.1%. The cause of charges growth despite consumption decrease (-11.1%) is tariffs growth (+15.1%). Reduction in consumption was caused by relatively high ambient air temperatures in 2011 (the highest for the last 4 years), while in 2010 ambient air temperatures were abnormally low (the lowest in 11 years). The average ambient winter temperature in 2011 was higher than in 2010 by 3.7°. Tariff growth was due to tariff decision of the Regional Tariff Service in the Irkutsk Region for 2011, considering the inflation factor. Besides, in 2011, consumption by large production plants also decreased. OAO Irkutskenergo 51 Heat energy sales Annual report 2011 Breakdown of heat generated by OAO Irkutskenergo in volume terms by consumer groups, ‘000 Gcal Consumer group TOTAL, including: Industrial companies, total: ОАО SUAL ОАО ILIM Group, branch in Bratsk ОАО Korshunovsky MPP ОАО ANHK 2010 2011 Change 12,421,375 12,392,027 -0.2% 4,755,159 4,679,379 -1.6% 107,408 110,191 2.6% 1,327,245 1,492,324 12.4% 106,384 106,638 0.2% 5.1% 1,382,005 1,453,115 ОАО Angarsk Polymer Plant 348,473 375,079 7.6% ООО Usolyekhimprom 418,781 124,646 -70.2% ОАО AEHK 173,225 147,740 -14.7% ОАО ILIM Group, branch in Ust-Ilimsk 353,635 309,887 -12.4% ОАО Sayanskhimplast 538,005 559,759 4.0% Housing and utilities (heat) 5,206,928 5,176,185 -0.6% Others 2,459,288 2,536,462 3.1% A decline in heat charges was caused by a reduction in heat consumption. Financial plan for heat charging and payments Unit 2010 2011 Receivables at the beginning of period (excluding prepayments) ‘000 RUB (VAT included) 1,515,631 1,975,168 Charged ‘000 RUB (VAT included) 14,657,223 14,622,592 Paid ‘000 RUB (VAT included) 14,192,244 14,845,188 96.8% 101.5% 5,442 36,090 Payment percentage Write off Payment percentage, incl. write off % ‘000 RUB (VAT included) 96.9% 101.8% Receivables at the end of period (excluding prepayments) ‘000 RUB (VAT included) 1,975,168 1,716,482 Change of receivables ‘000 RUB (VAT included) 459,537 -258,686 52 OAO Irkutskenergo % In 2011, payment percentage, not including receivables, amounted to 101.5%, which is 4.7% above the last year value. Receivables reduction was due to debt repayment by OOO Usolyekhimprom, repayment of overdue debts by OOO ATSC (caused by the reorganization of OOO ATSC through merger with OOO Irkutskenergosbyt), as well as an increase in the percentage of sales to housing and utilities (implementation of the program on direct settlements with consumers). OAO Irkutskenergo 53 Total sales at WMEC Revenue from energy sales (generated) RC Share in the total product output Charges ex VAT (‘000 RUB) Product sales at wholesale energy market Tariff (‘000 RUB / MW) Energy sales at wholesale market of energy and capacity (WMEC) Volume (mln kWh, MW) Annual report 2011 0 47,487,817 100% 56,657 416.6 23,605,011 50% 9,683 121.2 1,173,594 2% NRBC OTC 0 0 0% NRBC ETC 0 0 0% NRBC 23,985 455.9 10,935,170 23% DAM 22,989 500.1 11,496,247 24% Revenue from energy sales (purchased) 30,783 495.1 15,240,175 32% DAM 26,802 492.3 13,194,030 28% 3,981 513.9 2,046,145 4% 139,063 62.1 8,642,631 18% RC 30,645 49.7 1,522,971 3% NRBC OTC 24,251 52.5 1,273,519 3% NRBC ETC 2,410 143.5 345,929 1% 81,757 67.3 5,500,213 12% 141 888.6 124,895 0% Energy and capacity purchased at WMEC 30,787 443.8 13,663,456 Electric energy 30,787 443.0 13,638,641 227 109.4 24,815 Payments for ОАО SO UES services 0 , 1,161,674 Payments for services provided by infrastructure entities 0 , 54,005 ZAO CFR services 0 , 13,538 OAO ATS services 0 , 39,426 ZAO CFR fees, exchange services 0 , 1,041 BM Revenue from capacity sales FM and CCS Power plants of medium pressure Capacity 54 OAO Irkutskenergo In 2011, ОАО Irkutskenergo sold electric energy at the wholesale market through the following mechanisms: Sales at regulated tariffs based on regulated contracts (RC). ■ Sales at non-regulated prices determined by agreement of the parties in nonregulated bilateral contracts on electricity supply (NRBC). ■ Sales at unregulated prices determined by competitive selection of price bids of buyers and suppliers, carried out a day before delivery - day-ahead market (DAM). ■ Sales at unregulated prices determined by competitive selection of proposals, carried out no later than one hour prior to delivery - balancing market (BM). ■ Electric capacity was sold through the following mechanisms: Sales of capacity through competitive capacity selection (CCS). ■ Sales of capacity generated in forced mode (FM). ■ Sales of capacity under non-regulated over-the-counter bilateral contracts on electricity and capacity supply (NRBC OTC). ■ Sales of capacity under non-regulated exchange-traded bilateral contract on electricity and capacity supply (NRBC ETC). ■ Major buyers under direct contracts are: UC RUSAL, OOO Irkutskenergosbyt, OAO Krasnoyarskenergosbyt, OAO Rusenergosbyt, OAO Glavenergosbyt, ZAO Sibenergotrade, ООО Mechel-Energo, ОАО Siburenergomanagement. OAO Irkutskenergo 55 Annual report 2011 Sale of electric energy at WMEC Financial plan for electric energy charging and payments 2010 2011 Receivables at the beginning of period (excluding prepayments) * ‘000 RUB (VAT included) Unit 1,838,810 1,421,808 Charged ‘000 RUB (VAT included) 46,457,821 56,035,624 Paid ‘000 RUB (VAT included) 46,874,823 54,916,602 101% 98% 101% 98% Payment percentage Write off % ‘000 RUB (VAT included) Payment percentage, incl. write off % Receivables at the end of period (excluding prepayments)* ‘000 RUB (VAT included) 1,421,808 2,540,829 Change of receivables ‘000 RUB (VAT included) -417,002 1,119,022 * debit balance In 2011, the actual level of energy resources payments totaled 98%. The decline in the payment level was caused by growth of counteragents’ debts as well as increased volumes of carry-over payments at DAM. Tariff policy In 2011, state regulation of prices (tariffs) for electricity and heat power for 2012 was performed in accordance with Federal laws No. 36-FZ “On Electric Energy Industry”, of March 26, 2003, No. 190-FZ “On Heat Supply”, of July 27, 2010, Decree of the Government of the Russian Federation No. 109 “On Price Setting for Electric and Heat Energy in the Russian Federation”, of February 26, 2004. In order to prevent a sharp rise of prices in 2012, the Russian government adopted a package of measures to limit growth of regulated tariffs for electricity and heat energy and non-regulated prices in the liberalized market. It was decided to postpone the indexation of regulated tariffs on natural monopoly activities in the field of electricity and heat until the middle of the year (July), when there is a reduction in 56 OAO Irkutskenergo energy consumption. To avoid a sharp rise in case of one-time tariff increase and to reduce losses of energy companies, in 2012 tariffs will be increased in two stages, from the 1st of July and the 1st of September. Tariffs for heat energy for the Irkutsk Region consumers for 2012 were calculated based on the calculations and supporting materials presented by the departments in compliance with the Procedural guidelines approved by Order of FTS No. 20-e/2 of July 6, 2004, and Federal Law No. 190-FZ “On Heat Supply”, of July 27, 2010. Justified tariff proposals were sent to the Tariff Service of the Irkutsk Region. By Order No. 242-e/7 “On setting the limits on maximum tariff levels for heat energy supplied to consumers by energy-supplying organizations, on average by regions of Russia in 2012” of October 06, 2011 FTS set a limit on the maximum tariff growth level for consumers of the Irkutsk Region: 6% from July 01, 2012 and 4% from September 01, 2012. By Order No. 271-spr of December 29, 2011, FTS of the Irkutsk Region approved tariffs for heat supplied to consumers in the Irkutsk Region. Heat tariffs from July 01, 2012 and September 01, 2012 were approved at the maximum level; the increase amounted to 6% and 4% respectively. In accordance with the indexation formula for regulated prices approved by Order of FTS No.268-e/1 of October 30, 2009, the Company calculated the tariffs for electric power supplied by OAO Irkutskenergo in 2012 to the wholesale market under regulated contracts; the calculations were performed in UIAS template format and submitted to FTS. By Order No. 352-e/1 of December 15, 2011, FTS approved the tariffs for electricity and capacity supplied by OAO Irkutskenergo to the wholesale market under regulated contracts. The weighted average tariff for energy at 2011 balance comprises 114.272 RUB/ MWh, having decreased by 4.96% compared to 2011. The weighted average rate for capacity at 2011 balance amounts to 47 121.80 RUB per MW/month, increasing by 0.05%. A decline in the energy tariff rate was caused by the implementation by FTS of a set of measures adopted by the Russian government to limit the growth of regulated tariffs and non-regulated prices at the liberalized market. In accordance with paragraph 7 of Decree of the Government of the Russian Federation No. 1178 “On Price Setting in the Area of Regulated Prices (Tariffs) in the Electric Energy Industry” of December 29, 2011 regulated prices (tariffs) for electric energy (capacity) of suppliers to be sold at the wholesale market under regulated contracts for 2012 are determined by FTS under the established procedure without price indices. Besides, the reduction of energy tariff is caused by optimization of fuel mix, replacement of OAO Irkutskenergo 57 Tariff policy Annual report 2011 Approved 2011 Consumers Households (incl. VAT) from January 01, 2012 RUB/Gcal RUB/Gcal 612.33 612.33 from July 01, 2012 from September 01, 2012 % RUB/Gcal % RUB/Gcal % 100.0% 649.07 106.0% 675.03 104.0% 550.06 106.0% 572.06 104.0% Consumers paying for heat generation and transmission Hot water 518.92 518.92 100.0% Steam from 2.5 to 7 kg/sq.cm 610.50 610.50 100.0% 647.13 106.0% 673.02 104.0% Steam from 7 to 13 kg/sq.cm 623.02 623.02 100.0% 660.40 106.0% 686.82 104.0% Steam over 13 kg/sq.cm 645.05 645.05 100.0% 683.75 106.0% 711.10 104.0% the most expensive coal ranks with cheaper coal, using the most efficient loading of power plants, which led to an improvement in specific fuel consumption and reduction in natural fuel consumption. In accordance with the Rules of the wholesale electricity and capacity market approved by Decree of the Government of the Russian Federation No. 1172 of December 27, 2010, in 2012 all the electric energy (except electricity supplied to households) is sold at free (unregulated) prices. According to this Decree, electric capacity of HPP sold upon the results of the competitive capacity selection should be paid for at a price equivalent to a regulated tariff set by FTS; sale of HPP electric capacity under non-regulated bilateral contracts stipulates charging of penalties. Since April 1, 2011, FTS revised tariffs (downwards) for generating facilities supplying capacity and energy in a forced mode (including the power plants of OAO Irkutskenergo). On December 11, 2010, Government Decree No. 883 “On Amendments to Paragraph 8626 of the Regulations on the Wholesale Market of Energy and Capacity in the Transitional Period” of November 3, 2010 came into force; it stipulates the use of ceiling prices for competitive capacity selection during 2011 in all areas of free power transfer zones included in the second price zone. As a result of selection for 2011, the price was set at 126,368 RUB/MW per month. Based on Government Decree No.929 “On the Procedure for Performing State Regulation in Energy Industry, Terms of Performing and Terminating it…”of November 14, 2009, tariffs for energy (capacity) supply to the wholesale market in 2011 applicable under state tariff regulation were calculated in UIAS template format and submitted to FTS. By Order of FTS No. 846-e of December 29, 2011, the above mentioned tariffs for 2012 were approved at the level of 2011. Growth of tariffs on water supply and water disposal in 2012 compared to those set for 2011 Services Ust-Ilimsk Water supply 105.1% Water disposal 105.1% 58 OAO Irkutskenergo Angarsk 103% Irkutsk 106% 104.5% Markov village 101.4% In 2011, the Tariff Service of the Irkutsk Region approved tariffs for 2012 on water supply and water disposal provided by the UICHPP, CHPP-10 and NICHPP branches in Ust-Ilimsk, Angarsk, Irkutsk and Markov village. Planned commercial products of OAO Irkutskenergo in 2012 in the sphere of water supply and water disposal will amount to RUB 314.87 mln. In October 2011, CHPP-7 celebrated its 50th anniversary. CHPP-7 was built in 1960-1961 by Bratskgesstroy in order to provide sufficient heat energy to Bratskgeostroy construction enterprises and the residential sector of the villages of Padun and Energetik. Undoubtedly, the CHPP was a necessary facility, launching of the first boiler was eagerly awaited, but it was not the most important construction project compared to the giant Bratskaya HPP, power lines, Bratsk Timber Complex and BrAP, so the media paid little attention to its construction. During all the years of its operation, the enterprise worked steadily, avoiding any apparent limits for its customers. This was ensured by competent management of CHPP, technological discipline, skillful use of equipment, compliance with preventive maintenance schedules, and high professionalism of staff, their constant training both at the plant and at the training center of OAO Irkutskenergo. Since July 01, 2006, Bratsk heating networks ceased its independent existence and became a part of CHPP-6 as a section of heat sources and heating networks of CHPP-6. OAO Irkutskenergo 59 Contacts 60 OAO Irkutskenergo 6. Production Information on generating capacity Annual report 2011 Installed capacity Actual 2010 MW ОАО Irkutskenergo Actual 2011 Gcal/h MW Gcal/h 12,874.75 12,881.7 including HPP 9,002.40 9,002.4 CHPP+district boilers (DB) 3,872.35 13,260.0 Available capacity (MW) 3,879.3 12,927.97 Operating capacity (MW) Actual 2010 Actual 2011 Actual 2010 Actual 2011 12,148.52 12,026.51 10,072.89 10,089.8 including HPP 8,758.10 8,729.28 7,400.83 7,404.9 CHPP+district boilers (DB) 3,390.42 3,297.23 2,672.06 2,684.9 ОАО Irkutskenergo Number of boiler and turbine units Turbine (hydro) units Boiler units Number (items) (energy/ waterheating) Total CHPP TOTAL DB Total CHPP+DB Total HPP Total for OAO Irkutskenergo Productivity (ton/h, Gcal/h) energy water-heating Number (items) Capacity (MW) 111/0 28,405/17,660.2 -/0 59 3,881.3 2/5 150/102.8 -/ 304.3 - - 113/5 28,555/17,763.0 -/ 304.3 59 3,881.3 - - - 42 9,002.4 113/5 28,555/17,763.0 -/ 304.3 101 12,883.7 In 2011, the average annual installed capacity of the Company’s power plants changed due to commissioning of a turbine unit P-6-3.4/0.5-1 at st. No.2 (6 MW since January 01, 2011) of CHPP-12; remarking of a turbine unit PT-50-130/13 to PT-60-130/13 at st. No.1, a turbine unit at st. No.5 Т-50- 130 to Т-60-130, a turbine unit T-50-130 to Т-60-130 at st. No.6 of CHPP9 (30 MW since May 01, 2011) and removal from operation of a turbine unit P-25-66/4,5 AEG at st. No.4 area No.1 of CHPP-9 (19 MW since June 01, 2011) ■ 62 OAO Irkutskenergo The average annual installed capacity of Angara cascade HPPs did not change during the reporting period. ■ A decline in HPP available capacity by 28.82 MW in 2011 was due to increasing restrictions on BHPP pressure. ■ The average annual installed capacity of CHPPs decreased by 93.19 MW compared to the previous year, primarily due to limitations, mainly at CHPP-11 (lack of cooling towers under the project). ■ The average annual operating capacity of HPPs has remained at the level of 2010. ■ In 2011, the average annual operating capacity of CHPPs grew by 12.84 MW as repaired capacity decreased. ■ Capacity commissioning in 2011: Commissioning of TG-2 at CHPP-12 (R-63.4/0.5-1; 6 MW; since January 01, 2011) ■ Capacities removed from operations in 2011: Decommissioning of TG-4 area No.1 of CHPP-9 (P-25-66/4.5”AEG”; 19 MW; since June 01, 2011) ■ Decommissioning of boilers at Sverdlovskaya DB, Kirovskaya DB (since June 06, 2011, 290 Gcal/h, 6 water-heating, 8 energy boiler units) ■ Equipment remarking: Remarking of TG-1 at CHPP-9 (PT-50130/13 to PT-60-130/13, increase of nominal capacity by 10 MW since May 01, 2011) ■ Remarking of TG-5 at CHPP-9 (Т-50-130 to Т-60/65-130, increase of nominal capacity by 10 MW since May 01, 2011) ■ Remarking of TG-6 at CHPP-9 (Т-50-130 to Т-60/65-130, increase of nominal capacity by 10 MW since May 01, 2011) ■ OAO Irkutskenergo 63 Production plan Annual report 2011 Energy generation (mln kWh) Indices 2010 2011 Change Energy generation, total 61,420.4 59,328.4 -3.4% HPP 48,920.3 46,480.5 -5.0% TPP 12,500.1 12,847.9 +2.8% 1,995.2 1,941.4 -2.7% Supply from buses 59,425.2 57,387.0 -3.4% Including HPP 48,884.2 46,448.0 -5.0% TPP 10,541.0 10,939.0 3.8% Electric energy consumption for production needs 35.0 34.3 -2.1% Electric energy consumption for economic needs 38.2 38.6 +1.2% 539.1 517.0 -4.1% 58,812.9 56,797.1 -3.4% Electric energy consumption by auxiliaries Losses in plant-adjacent network Effective energy supply, total CHPP output 2010 2011 Change condensation 4,537.8 5,298.2 +16.8% heating production 7,962.3 7,549.8 -5.2% Energy output in 2011 declined compared to the previous period. HPP output was performed in compliance with UDCC of Siberia to cover the balance of Siberian UES by the reserves of water resources taking into account the accepted releases of EBWD. 64 OAO Irkutskenergo During the reporting period normal navigation expenses were provided at IHPP (1400-2000 m3/sec), U-IHPP (2786-3920 m3/sec), BHPP (1500-5010 m3/sec). Decline of energy output at Angara cascade HPP compared to the previous year was conditioned by: reduction of water resources by 5.454 bln kWh (as of January 01, 2012) in the reservoirs of Angara cascade compared to water reserves as of January 01, 2011; intermediate inflow to the Baikal lake and the Bratsk reservoir during the summer was below average; ■ load reduction in order to save water resources; ■ commissioning of the Boguchanskaya HPP scheduled for 2012. ■ Decrease of CHPP heating output was caused by a reduction in CHPP heat supply to consumers. A 16.8% increase in condensation cycle generation compared to the previous year was caused by: savings of water resources at Angara cascade HPPs for the upcoming filling of the Boguchansky reservoir; ■ loading of CHPP for closing Siberian UES power balance; ■ repair of HVL-500 in April-March, when at the request from OAO SO UES condensation cycle generation was increased (CHPP-10) to avoid exceeding the maximum permitted flow in the Bratsk-Irkutsk section. ■ In 2011, losses in plant-adjacent network decreased due to shorter periods of BHPP operation in SC mode (caused by the reconstruction of SC system) and a decline in HPP output. OAO Irkutskenergo 65 Production plan Annual report 2011 Heat generation (‘000 Gcal) Indices 2010 Heat output from collectors Purchased heat energy Losses in heating networks Heat consumption for economic purposes Effective heat output 2011 Change 25,768.0 23,275.7 -9.7% 489.7 374 -23.6% 3,069.8 2,848.7 -7.2% 184.5 179.3 -2.8% 23,003.4 20,621.6 -10.4% Heat output from collectors decreased due to a reduction in heating load as ambient temperature was higher than last year, as well as due to a decrease in consumer load in process steam. Heat losses in networks declined due to the implementation of measures for performance enhancement, as well as higher ambient temperatures in the 2011 heating period. Effective heat output fell due to the above mentioned reasons and a reduction in production of OOO Usolyekhimprom and implementation of energy efficiency measures by consumers (installation of heat meters). Specific consumption Indices Unit 2010 2011 Change Consumption of oil equivalent for electricity generation ‘000 toe 3,470.768 3,629.889 +159.121 Specific consumption of oil equivalent g/kWh 329.3 331.8 +2.5 Consumption of oil equivalent for heat production ‘000 toe 3,583.680 3,226.606 -357.074 Specific consumption of oil equivalent g/kWh 141.7 140.6 -1.1 Consumption of oil equivalent, total ‘000 toe 7,054.448 6,856.495 -197.953 Overall, in 2011, fuel economy at ОАО Irkutskenergo totaled 197,953 toe year-on-year. 66 OAO Irkutskenergo In comparison with 2010, specific consumption of oil equivalent changed due to the following reasons: (+2,5) g/kWh: ■ 1)HPP hydro-saving mode to fill the Boguchansky reservoir and repair of HVL-500 in April and March 2011 at the request of OAO SO UES resulted in a 16.8% increase in condensation cycle generation and reduction in the share of heating cycle production by 5.2%. 2)a 6% decrease in the share of highpressure CHPPs generation. (-1,1) kg/Gcal: ■ 1)24% reduction in heat output by heat steam boilers. 2)3% increase in the share of heat output by bleed steam of turbines. 3)1% increase in the share of heat output by high-pressure CHPPs. OAO Irkutskenergo 67 Production plan Annual report 2011 Production efficiency improvement program Area Subarea Reduction of operating expenses Increasing efficiency of equipment operation Saving, ‘000 RUB 5,738.0 Implementation of technical measures for improving technical conditions of equipment 1,947.6 Optimization of intraplant modes 10,272.8 Improvement of intraplant heat schemes 31,284.6 Optimization of centralized heat supply systems’ operation 90,597.6 Receiving additional revenue at capacity market 84,184.5 Reduction of environmental charges 14,641.3 Total for the Program excluding TPO 238,666.4 Implementation of measures within the TPO Program Total for the Program including TPO In 2011, PEIP was performed in the following areas: Reduction of operating expenses is ensured by optimization of technological processes of the active equipment and technological plans, which decreases operating expenses (materials, spare parts, chemicals etc). 333,700.0 Optimization of centralized heat supply systems’ operation is achieved by decreasing heat losses in heating networks. ■ ■ Increasing the efficiency of equipment operation: decreased fuel consumption is ensured by technological measures aimed at efficiency increase (increasing energy conversion efficiency (ECEP) of power plants, optimization of equipment and technological plans operating mode, maximum use of equipment and plans with the best power characteristics). Additional revenue at the capacity market is generated through minimizing penalties by increasing repair volumes of main and auxiliary generating equipment at CHPPs and HPPs, which are entities of the wholesale energy and capacity market. ■ ■ 68 OAO Irkutskenergo 95,033.5 Reduction of environmental charges was achieved by adjusting the standards for maximum allowable emissions of pollutants (CHPP-6) and removal and sale of ash and slag mixture from CHPP ash dumps. ■ Implementation of TPO program: workers and middle management are engaged in the Program, participating together in the TPO project (bottom-up initiative), which is aimed at reducing costs in all areas of its activities. ■ PEIP implementation excluding TPO comprised RUB 239 mln. PEIP implementation including TPO comprised RUB 334 mln. Specialists of OAO Irkutskenergo Ranked First and Second at Russian National Contest of Non-Destructive Testing Specialists NDT inspector of CHPP-9 metal control laboratory Dmitry Chikhachev and NDT inspector of CHPP-11 metal control laboratory Renat Karymov ranked first and second respectively at the regional level of the 8th Russian national contest of nondestructive testing specialists among Siberian organizations in the “Ultrasound testing method” nomination. The contest was held in Irkutsk as a part of the Unified conformity assessment system at facilities controlled by the Federal Service for Ecological, Technological and Nuclear Supervision (Rostekhnadzor) at the initiative of Russian association of non-destructive testing and technical diagnostics with the support of Rostekhnadzor. OAO Irkutskenergo 69 Contacts In November 2011 CHPP-1 area No. 1 in the heating unit of CHPP-9 celebrated its 60th anniversary Even today, area No. 1 (CHPP-1) as part of the heating unit of CHPP-9 remains one of the largest power plants in the region. The main objective of the plant is cogeneration of electricity, heat, hot water and process steam. Large-scale energy production in the Angara region started with CHPP-1. The city of Angarsk was built along with it. Only in November 1951, when the first CHPP turbine started generating electricity, it became possible to start seriously planning industrial facilities and construction of modern housing. The plant was built and installed in a fantastically short time: in 1961, CHPP-1 became fully operational, becoming the largest and most modern plant from the Urals to the Far East. Being installed under a quite complex 70 OAO Irkutskenergo technological system, designed for consumers of steam on five parameters, it was marked by a high level of backup power for consumers. Engineers working at CHPP-1 easily mastered simpler technologies at other power plants. Many managers of OAO Irkutskenergo, CEOs and directors of other departments gained experience at the Angarskaya CHPP. The city of Angarsk grew on the CHPP-1 power. 110 kV transmission line to the construction site of the future of the Irkutskaya HPP was run from this power plant. In addition to electricity and heat, the power plant was the first in the country to start producing additional products: slag used as raw material for manufacturing building panels. CHPP-1 provided energy for construction of the Irkutskaya HPP and became a source of human resources throughout the entire energy system. 7. Procurement Materials and spare parts Annual report 2011 (‘000 RUB ex VAT) M&E write off Indices Stock reserve at the beginning of the period M&E supply Total Into production External sales Total 627,220 1,995,393 2,057,127 1,964,316 50,146 Materials for repairs 207,363 1,197,068 1,185,936 1,130,669 38,085 47,639 406,135 405,156 381,571 10,802 0 62,890 62,890 62,890 0 372,218 392,190 466,034 452,077 1,259 Materials for operation including F&L (operation) Materials for investment activities In 2011, the Company purchased materials in the amount of RUB 1,995.4 mln. Under the “Operation” item the Company purchased and delivered goods and materials to the branches in the amount of RUB 406.135 mln, including fuel and lubricants in the amount of RUB 62.9 mln; under the “Repair” item the supply of goods and materials amounted to RUB 1,197.1 mln, under “Materials for investment activities” - RUB 392.2 mln. Price growth rate excluding fuel and lubricants (compared to 2010) comprised 8.1%. Write-off of materials in 2011 amounted to RUB 2,057.13 mln, including the “Operation” item in the amount of RUB 405.2 mln, the “Repair” item – RUB 1,186 mln, “Materials for investment activities” - RUB 466 mln. 72 OAO Irkutskenergo Stock reserve at the end of 2011 totaled RUB 565.5 mln, having decreased by RUB 61.7 mln. At the beginning of 2011, debt balance comprised RUB 325.9 mln. At the end of 2011, debt balance reached RUB 327 mln. Other disposal Stock reserve at the end of the period Change in stock reserve 42,664 565,486 -61,734 17,182 218,495 11,132 12,784 48,618 979 0 0 0 12,698 298,373 -73,845 In Q4 2011, payables for materials and spare parts increased by RUB 80 mln. At the beginning of 2011, receivables totaled RUB 3.6 mln (advances from OOO “TH” IETrade”). At the end of 2011, receivables reached RUB 80 mln, including: RUB 14.7 mln - advance payment under the contract agreement with OOO EuroSibEnergo-Engineering ■ RUB 65.23 mln– advance payments from OOO “TH” IETrade”. ■ OAO Irkutskenergo 73 Fuel Annual report 2011 Fuel reserves and consumption Reserves as of January 01, 2011 (‘000 toe) Reserves as of December 31, 2011 (‘000 toe) Fuel, total 6,856.5 Coal, total: 2,452.4 2,635.6 6,840.7 Cheremkhovsky 237.6 240.9 720.2 Azeysky 239.5 396.8 823.4 1,021.7 1,015.5 3,123.2 Borodinsky 113.7 41.0 65.9 Irbeisky 612.2 597.2 1,133.5 Zheronsky 144.9 321.0 506.7 Golovinsky 82.9 23.3 411.2 Mugunsky Pereyaslovsky 56.7 Fuel oil, total 5.1 Gas, total In 2011, the volume of consumed coal was lower than in 2010 by 344.9 thousand tons (2.9%). Gas consumption comprised 3.944 mln cubic meters. Fuel oil consumption thousand tons. OAO Irkutskenergo 5.5 11.1 4.7 In 2011, the amount of coal supplied to power plants was lower than in 2010 by 279.4 thousand tons (2.3%). 74 Fuel consumption in 2011 (‘000 toe) totaled 7.985 The major suppliers of coal in 2011 were: OOO Vostsibuglesbyt – supplier of Azeysky, Mugunsky, Cheremkhovsky, Golovinsky, Irbeisky, Zheronsky coals. ОАО SUEK - supplier of Borodinsky coal. ОАО Krasnoyarskkraiugol – supplier of Pereyaslovsky coal. In 2011, OAO Irkutskenergo continued to implement the project on improving fuel balance and supply aimed at: Creating fuel supply at CHPP storages, sufficient for entering the wholesale market of energy and capacity; ■ Reducing the costs related to fuel transportation to CHPP (negotiating with carriers (owners of railcars) on reducing tariff rates); ■ Providing stable coal supply to CHPPs from own mines. ■ OAO Irkutskenergo 75 Services Annual report 2011 Services, ‘000 RUB Indices 2010 2011 573,169 595,766 3.94% 13,265 3,484 -73.74% Purchased heat energy 420,619 340,158 -19.13% Electrical energy purchased from ООО Irkutskenergosbyt 960,393 1,096,185 14.14% 22,324 5,565 -75.07% Other services 1,991,905 2,032,345 2.03% TOTAL 3,981,675 4,073,503 2.31% Water External energy Services related to energy transmission to ОАО IESK Actual costs under the «Services» item for the period amounted to RUB 4,073.5 mln. In order to ensure a uniform procedure for planning the demand for services, preparation of a comprehensive annual procurement program, selection of suppliers, analysis of the effectiveness of service provision to OAO Irkutskenergo and its subsidiaries, the Company developed the Company Standard “Procedure for determining and satisfying the demand for services”. The Company implements the process of determining prices of services upon benchmarking results. 76 OAO Irkutskenergo Change OAO Irkutskenergo 77 Contacts 78 OAO Irkutskenergo 8. Investment activities Capital investment development by programs Annual report 2011 Capital investment development by programs (‘000 RUB ex VAT) No. Investment sector 1 Development program 2 Actual development within the period Construction in progress Including at the beginconstruction ning of the Total capital and installaperiod investments tion Equipment Other 59,402 560,741 20,716 36,280 503,745 Efficient and payback projects 1,545,722 553,989 369,545 123,346 61,098 3 Program on reliability assurance 1,138,288 2,966,396 1,303,319 1,240,634 422,401 4 Program on technical connection of consumers 5,895 4,634 5 Others 145,764 121,007 34,371 6 Non-industrial construction 140,418 7,105 7 Total 2011 3,029,594 4,215,133 8 Total 2010 2,426,753 9 Change year-on-year 602,841 43,284 43,352 1,325 5,822 1,732,585 1,444,869 1,037,679 4,323,264 1,971,684 1,726,260 625,320 -108,131 -239,099 -281,391 412,359 As of the end of the year, construction in progress amounted to RUB 2,805.3 mln, which is 8% less than in the previous year. The decline was caused by completion of large projects commissioned in 2011, including: Construction of heating main No.6 from the main building of CHPP-9 to NO-470 ■ 80 OAO Irkutskenergo 1,261 of heating main No.2 of CHPP-10 (capital investments in 2011 totaled RUB 270.7 mln); Construction of facilities for changing the coal supply process from the coal storage of area No. 1 of CHPP-9 (RUB 96.3 mln was invested in 2011). ■ The actual development of investments in 2011 amounted to RUB 4,215.13 mln. Total investments in 2011 remained at the level of 2010. Putting into operation of fixed assets Construction in progress at the end of the period 65,411 554,731 1,401,478 696,679 2,843,377 1,257,111 5,495 400 116,033 150,091 1,325 146,240 4,433,119 2,805,252 3,715,479 3,029,594 717,640 -224,342 Investments to the program for reliability assurance made the largest share of total capital investments (70% of total investments). Effective projects and activities under program on generating capacity development amounted to 13% of total investments. OAO Irkutskenergo 81 Annual report 2011 Implementation of investment plan by programs Implementation of investment plan by programs Total capital investments No. Total capital investments 1 Development program 2 Efficient and payback projects 3 Program on reliability assurance 4 Program of regional administration 5 Program on technical connection of consumers 6 Others 7 Non-industrial construction TOTAL Program on reimbursement of increasing energy consumption (development program) amounted to 560.7 mln RUB This is a target program aimed at increasing available and installed capacity of the system to cover the forecasted energy deficit related to the industry development in the Irkutsk Region. The following measures were taken in 2011: Installation of a turbine unit at N-ICHPP (RUB 21.5 mln); ■ Package of measures for increasing the capacity of CHPP-9 (RUB 28.2 mln); ■ 82 OAO Irkutskenergo 2010 2011 Change 88,093 560,741 472,648 821,800 553,989 -267,811 2,946,809 2,966,396 19,545 21,010 -21,010 5,895 5,895 440,792 121,007 -319,785 4,760 7,105 2,387 4,323,264 4,215,133 -108,131 At the end of the year, the Company purchased the designs of a working prototype of a generating unit with a SVBR100 reactor unit (RUB 468.8 mln). Investments in the program on efficient and payback projects amounted to RUB 554 mln The program includes projects aimed at increasing the income and reducing the Company’s expenses by upgrading production capacities, expanding the electricity and heat market, taking measures for production optimization. Criteria for estimating the projects’ efficiency when including them in the program are positive NPV and discounted payback period of Total fixed assets 2010 2011 Change 221,089 65,411 -155,678 474,721 1,401,478 926,757 2,641,571 2,843,377 201,806 0 5,495 5,495 373,810 116,033 257,777 4,288 1,325 -2,963 3,715,479 4,433,119 717,640 up to 7.2 years. Approximately 86% of investments under the program were allocated for implementing large-scale efficient projects, for instance: The Company completed the construction of heating main No.6 in Angarsk under the “Small South” project (RUB 270.7 mln); ■ Reconstruction of heating network in the city of Bratsk (RUB 99.7 mln); ■ Implementation of the project on transfer of the boiler to cofiring of bark waste at CHPP-6 (RUB 66.8 mln); ■ Implementation of total production optimization and production efficiency improvement program (RUB 47.6 mln). ■ OAO Irkutskenergo 83 Annual report 2011 Implementation of investment plan by programs Investments in the program for reliability assurance amounted to RUB 2,966.4 mln Other investments amounted to RUB 121 mln The program includes projects aimed at improving the reliability of property, plant and equipment by upgrading and reconstructing them. The largest share (56%) of investments under this program is represented by acquisition of land and property as a way of collecting receivables and measures for information technology development. In 2011, the structure of investments in reliability comprised: Reconstruction of CHPP equipment – RUB 1,628.3 mln; ■ Reconstruction and upgrading of HPP equipment – RUB 756.4 mln; ■ Reconstruction of heating networks – RUB 565.2 mln. ■ Non-industrial construction Investments totaled RUB 7.1 mln. The Company started implementing social projects: construction of a kindergarten and an apartment building in the Solnechny district Implementation of investment plan by sectors (‘000 RUB ex VAT) Properties 2010 2011 TPPs 2,018,700 1,904,282 94.3% HPPs 800,710 805,370 100.6% 1,344,259 974,683 72.5% 154,835 523,693 338.2% 4,760 7,105 149.3% 4,323,264 4,215,133 97.5% Heating networks Other Non-industrial Total The bulk of capital investments (45%) were allocated to thermal power plants. Capital investments in CHPPs decreased by 5.7% year-on-year. 84 OAO Irkutskenergo Change The HPP share remained at the level of 2010 and amounted to 19%. The share of heating networks decreased by 27.5% YOY to 23% In October 2011, OAO Irkutskenergo put into operation heating main No.6 from the main building of CHPP-9 to fixed support No.470 of heating main No.2 of CHPP-10 In Angarsk, OAO Irkutskenergo commissioned heating main No. 6 from the main building of CHPP-9 to fixed support No. 470 of heating main No.2 of CHPP-10, which will improve the performance of CHPP-9 due to the increased heatgeneration mode and elimination of the existing limits on electricity output of the given power plant. Within the framework of the project, aboveground double pipelines (diameter = 1,000 and 800 mm, length = 10.36 km) were assembled and installed. Special crossings of the East Siberian Railway and highways of federal and regional significance were built. The project also included construction of a modern automatic pump station, including pump units produced by Grundfos. The cost of construction ran to RUB 1.2 billion. After hydrostatic tests of the pipelines and individual tests of the equipment, the heating main was put into operation for the integration test and performance adjustment. Currently the heating main is used for heat supply to Angarsk. Besides, on CHPP-9, new facilities were put into operation so as to change the coal-feeding process from the coal storage of Area 1, CHPP-9. Accordingly, the current coal-feeding system from the coal storage was replaced by the fuel conveying system (which eliminates an intermediate link of the coal transportation in railcars). A transfer crane, which exceeded its useful life, was discarded, which resulted in increased reliability of the power plant. Heating main No.6 enhances the reliability of heat supply to Angarsk, ensures further development of the city as it allows connection of new energy consumers. In the long run, it offers an opportunity to move to the third stage of the Small South project involving heat supply to Irkutsk from CHPP-10. OAO Irkutskenergo 85 Contacts 86 OAO Irkutskenergo 9. Human resources and social policy HR management Annual report 2011 reviewed the succession plans. Plans for the branches and the Executive Board, as well as for senior managers of the Executive Board and the branches for 2012 were developed and approved; The Company’s HR management is based on building an efficient system of HR management and staff development, aimed at ensuring reliable and efficient operation. In 2011, the HR management office fulfilled the following tasks: measures were taken to improve working conditions at the branches according to the plan. The implemented measures mainly included repair works in utility and staff rooms, installation of ventilation system and air conditioners, as well as acquisition of wardrobes for workwear; students undertaking additional education programs at the Corporate Education and Research Center of OAO Irkutskenergo at IrSTU (KUIC) undergo stipendiary practical training at the Company's branches and are subsequently hired. In 2011, 27 graduates were employed by the Company; ■ ■ to improve production culture and the system of incentives and to establish a common corporate culture promoting the Company's operational efficiency, an annual contest aimed at assessing production culture was held with the commission visiting the branches; at the beginning of 2011, a cooperation agreement with Bratsk State University was concluded. Under this agreement, a Corporate Education and Research Center at BrSTU hosting additional education programs in accordance with business requirements was established in the 4th quarter 2011; ■ ■ during 2011, the pre-shift monitoring of psychophysiological state of operating personnel was conducted at all branches in order to reduce the number of industrial accidents caused by the actions of the personnel. In the rooms for psychological relaxation, group and individual activities are organized in order to provide psychological support to personnel, maintain their health and appropriate performance, accelerating the rehabilitation process after excessive workload, stresses and exhaustion, as well as for developing self-regulation skills; ■ succession planning ensures constant search for potential leaders among the Company's employees and identifying the talent pool so that the Company will have enough managers in the future. At the end of 2011, meetings at the branches were held, at which the Executive Board ■ 88 OAO Irkutskenergo to create a common information space and ensure timely monitoring of corporate HR management events, the “HR management” subsection was organized within the “Personnel” section at the corporate portal. ■ To improve the personnel incentive system, employees are rewarded for KPI implementation on the basis of their quarterly performance. In order to find additional reserves for improving the Company's performance in the wholesale energy market by direct personnel involvement in the final production results, additional incentives have been provided to the personnel employed in the wholesale energy market since May 1, 2009. The Company provides the participants of the TOP project who submit economically effective proposals with financial incentives amounting to 18% of actual savings. OAO Irkutskenergo 89 HR management Annual report 2011 Average headcount and average monthly salary Indicators 2010 2011 Change Average headcount, persons 8,072 8,046 -26 Average monthly salary, RUB 38,084 42,824 112.4% During 2011, the average headcount decreased by 26 employees (-0.3%) compared to 2010 due to downsizing. In 2011, there was a 12.4% year-on-year increase in average monthly salary caused by: quarterly basic salary indexation in line with an increase in the consumer price index in the Russian Federation (+8.8%); ■ increase in quarterly bonuses for KPI implementation (+1.9%); in 2010, quarterly bonus amounted to 13.1%, and in 2011 it comprised 14.1%; ■ increase in the annual bonus. ■ Changes in the headcount (persons) Categories of employees 2010 Total headcount as of December 31, 2011, including: 8,206 7,962 Managers and specialists 3,141 2,967 Officers 44 39 Workers 5,021 4,956 90 OAO Irkutskenergo 2011 Investing in HR Personnel training and development is necessary for maintaining high performance and career advancement. The Company provides all its employees with an opportunity to receive training regardless of their position and experience. In 2011, 2,461 employees received various kinds of training, and there were 19 corporate seminars. In 2011, actual costs related to employee training amounted to RUB 52,629,000 (the planned cost was RUB 68,950,000). The economy was achieved by improving the training program. Corporate personnel training remains one of the Company’s priorities. It includes not only seminars, but also various training programs: as part of the Company’s project “Development of Production System of OAO Irkutskenergo”, 18 employees of the Company’s branches, subsidiaries and affiliates were selected, and their training according to the annual modular program “Training corporate production system coaches” began; ■ to train corporate coaches, modular education program “Basic methodology of training” for the Company’s psychologists and employees was organized. As a result, 11 coaches underwent training and certification and new training courses, such as “Project management”, “Change management”, “Conflict management”, “Management tools”, “Public speaking skills”,“Effective business communication”, “Team leadership”, etc. were developed; ■ OAO Irkutskenergo 91 Investing in HR Annual report 2011 as for the corporate development program, the competition “My career-2011” started in two categories this year. The “Strategist” category included teams of participants guided by advisers and working on project topics suggested by top managers (18 persons); the “Start up” category included participants who worked on their own projects independently (17 persons). While working on projects, the participants took modular courses, such as “Team building”, “Intellectual team”, “Project management” and “Elocution”, as well as received training via e-learning system. Costs related to the implementation of these programs totaled RUB 527 thousand; ■ open contests for participating in the succession planning program “Leadership generation” and the corporate training program for technical managers “School of a technical leader” were held. Groups for each program comprised 12 persons. During the year, modular training involving leading business coaches was conducted. It also included practical off-the-job training. In 2011, the cost of programs amounted to RUB 1,871 thousand. ■ Social policy The planned social programs are implemented in accordance with the collective agreement between the management and the labor union. In 2011, 638 people improved their health at health resorts under the Voluntary Health Insurance system. Related expenses totaled RUB 9.2 million. In 2011, measures for creating safe working conditions, organization of leisure, improving employees’ health, reducing the incidence of diseases and loss of working hours, as well as non-productive costs associated with paying sickness benefits resulted in the following: In accordance with the Regulations on granting privileges when issuing resort vouchers to the employees, members of their families and non-working retirees, 2,967 people (including 938 children) got the resort vouchers to health resorts, recreation centers and children's holiday camps in 2011. Related expenses totaled to RUB 28.8 million and were paid out of the 2011 income. the share of employees who are on sick leave decreased by 0.49% compared to 2010 and amounted to 2.7%; ■ loss of working hours related to temporary disability per employee decreased by 1.25 days compared to 2010 and amounted to 6.7 days. ■ 92 OAO Irkutskenergo In 2011, in accordance with the Company's current program for housing provision to young professionals, 42 young professionals received rent subsidy for paying the initial installment to the mortgage. RUB 12.4 million was allocated for this purpose. To retain young professionals in the Company, in accordance with the applicable Company Standard on leasing residential premises rented by OAO Irkutskenergo to young professionals, 120 young professionals received rented apartments in 2011. Since June 1, 2010, the Company Standard on subsidized meals for the employees at non-office positions is in place. In 2011, the Company allocated RUB 39.3 million for this purpose. OAO Irkutskenergo has established a system of social protection for employees and non-working retirees, including financial support for low-income families of employees and organization of leisure of employees and members of their families, as well as promoting physical culture and sport activities. OAO Irkutskenergo 93 Contacts First cooperation agreements are signed between OAO Irkutskenergo and postgraduate students of National Research Irkutsk State Technical University On October 27, the first cooperation agreements between OAO Irkutskenergo and postgraduate students of National Research Irkutsk State Technical University were signed. Apart from scholarship, young researchers will receive support, including access to power plant equipment and technical library; they will also be provided with an opportunity to have regular consultations with the employees of the coal and energy company. The agreement also guarantees that the young researchers will be employed by the energy holding company. 94 OAO Irkutskenergo Evgeny Fedorov, CEO of OAO Irkutskenergo and OAO EuroSibEnergo: ‘Like many other energy companies, OAO Irkutskenergo often faces the situation when graduates of higher education institutions do not always meet the requirements imposed by the production process. This is why we tackle this problem in our own way which differs from the common practice. In 2008, we established the Corporate Education and Research Center (KUIC) at Irkutsk State Technical University. And in April 2011, the En+ Group and the University concluded the strategic partnership agreement. Now OAO Irkutskenergo has made another step forward, having decided to make efforts and invest in training provided not only to students, but also to postgraduates. This is the first year, the start of the project which, I think, will significantly enhance our talent pool.’ 10. Subsidiaries and affiliates Annual report 2011 Subsidiaries and affiliates OAO Irkutskenergo has 20 subsidiaries and affiliates. Through its subsidiaries, OOO Baikalinvestenergo and ZAO Resursservisholding, OAO Irkutskenergo manages 9 companies producing, preparing and supplying Irbeysky, Zheronsky, Cheremkhovsky and Tulunsky coal. The subsidiaries operate in the Irkutsk Region and Krasnoyarsky District. The Company is the sole founder of several non-profit organizations including the “ANO HK BAIKAL-ENERGIYA” bandy club and the training center NNOU TC Irkutskenergo. To improve the management of the Company’s subsidiaries and affiliates, the following measures were taken in 2011: Meetings of the Balance Committee were held to assess the performance of the Company’s subsidiaries and affiliates in 2010 and in the first six months of 2011. Based on the operating results, the Company’s management set strategic and tactical objectives for the subsidiaries and affiliates, as well as put forward recommendations for improving their operations. ■ A new list of KPIs for assessing operations of the subsidiaries and affiliates in 2011 was developed and approved. ■ The Company Standard “The procedure for preparing the issue of net profit distribution of the subsidiaries and affiliates of OAO Irkutskenergo” was updated. ■ 96 OAO Irkutskenergo The most significant tasks implemented by OAO Irkutskenergo in cooperation with its subsidiaries and affiliates in 2011 are as follows: Annual meetings of shareholders (stakeholders) were held in all subsidiaries and affiliates of OAO Irkutskenergo; issues of distribution/allocation of subsidiaries and affiliates’ net profit for 2010 were considered, and decisions on them were made. ■ In the 4th quarter 2011,OAO Irkutskenergo purchased 50% of voting shares of OAO AKME-Engineering. ■ As part of preparation for the 350th anniversary of Irkutsk, OAO Irkutskenergo completed the reconstruction of the heating main on the Lower Quay of Irkutsk in the summer of 2011 OAO Irkutskenergo completed the reconstruction of the heating main in Irkutsk in the segment of the Lower Quay between the Kirovskaya district boiler station and the Dekabrskih Sobitiy Street. The segment was 560 meters long. Replacement of the segment was caused by the need for decommissioning the segment of the heating network under the square where the Eternal Flame memorial is situated; this segment had been in operation for over 40 years. The cost of reconstruction amounted to over RUB 170 millions. Engineering structures in the segment were completely replaced, and the diameter of pipes was increased from 800 to 1,000 millimeters. OAO Irkutskenergo 97 Contacts 98 OAO Irkutskenergo 11. Environmental activity Environmental activity Annual report 2011 OAO Irkutskenergo is engaged in environmental activity, taking into consideration the nature of its facilities, as well as the nature, climate, social and economic features of cities in the Irkutsk Region. The Company’s activity meets the requirements of the applicable legislation and is aimed at reducing the negative environmental impact of the Company’s operations. Name Unit 2010 2011 2011 / 2010 1 Atmospheric emission tons 278,863.112 287,809.259 103.2% 2 Water consumption ‘000 m³ 518,144.69 519,099.75 100.2% 3 Water disposal ‘000 m³ 315,207.80 331,661.41 105.2% 4 Consumer and industrial waste tons 1,666,634.396 1,759,762.163 105.59% – including ash and slag tons 1,646,850.097 1,738,711.94 105.58% 5 Ash and slag sales to consumers tons 943,403 956,470 101.39% 6 Share of the sold ash and slag in the amount of ash and slag generated by the Company % 57.28 55.01 Environmental payments In 2011, actual environmental payments totaled RUB 87.908 million, including: payment for allowable and temporarily approved emission and waste disposal amounting to RUB 87.144 million. ■ payment for emission and waste disposal which exceed the limit, amounting to RUB 0.764 million. ■ Environmental expenses amounted to RUB 1,164,555.2 thousand. ■ 100 OAO Irkutskenergo As of the end of 2011, OAO Irkutskenergo had the following environmental indicators: Causes Lower quality of fuel burnt by the Company (the weighted average ash content increased from 15.0% to 16.0%, sulphur content increased from 0.83% to 0.91%) Increase in electrical energy distribution at CHPPs Lower quality of fuel burnt by the Company (the weighted average ash content increased from 15.0% to 16.0%) OAO Irkutskenergo 101 Environmental activity Annual report 2011 Investing in environmental protection Branch Area 1 of CHPP-9 CHPP-9 Shelekhovsky area of NI CHPP Measure Expansion of the existing ash-disposal area. Second stage of the II startup facility. 256 Developing the variants of ash and slag storage. 825 Reconstruction of ash and slag disposal area with a circulating hydraulic ash removal system. Switching the ash collectors of the boiler units at stations 1-7 to intensive irrigation CHPP-6 CHPP-10 NI CHPP Reconstruction of ash-and-slag and clarified water pipelines Building up the bund wall of the 2nd section of the ash disposal area to the point 414.0 Reconstruction of the ash disposal area when filled to the point 435.0 Remediation of ash screen schemes NZ CHPP CI (excluding VAT), RUB thousand Reconstruction of electrostatic precipitator of the boiler unit at station 4 Ash and slag dump 98 2,762 15,614 2,712 690 5,000 83,506 630 UI CHPP Reconstruction of hydraulic ash removal pipelines of clarified water from pumping station No.1 to the discharge station, with setting them on supports 5,135 CHPP-6, CHPP-10, NI CHPP, NZ CHPP and UI CHPP Improvement of financial base of industrial and environmental control 1,970 TOTAL 102 OAO Irkutskenergo 119,198 Current expenses amounted to RUB 898,471.9 thousand, including the expenses arising from: protection and efficient use of water resources RUB 293,971.4 thousand; ■ protection of the atmosphere RUB 347,932.9 thousand; ■ environmental protection (of land resources) from consumer and industrial waste RUB 250,667.6 thousand; ■ land reclamation RUB 5,900 thousand. ■ Expenses related to major repair of fixed assets involved in environmental protection amounted to RUB 146,885.3 thousand, including repair of: facilities, units and equipment for wastewater treatment and efficient use of water resources RUB 59,946.5 thousand; ■ facilities, units and equipment for separation and processing of toxic air pollutants RUB 86,010.5 thousand; ■ facilities, units and equipment for processing of consumer and industrial waste RUB 928.3 thousand. ■ OAO Irkutskenergo 103 Contacts OAO Irkutskenergo celebrated the Water Day On March 22, on the occasion of the World Water Day, OAO Irkutskenergo presented children with aquariums. Orphanages in the Company’s operating regions participated in this environmental charity event. Among others, the orphanages in Irkutsk, Bratsk, Cheremkhovo, Tulun and Sludianka, as well as the children’s environmental and biological research station in Divnogorsk were presented with aquariums. The event was mainly aimed at increasing children’s and public awareness of the importance of pure water in daily life. Evgeny Fedorov, CEO of OAO Irkutskenergo, pointed out, ‘Aquarium is like a small ecosystem, 104 OAO Irkutskenergo and life in it directly depends on water quality. OAO Irkutskenergo operates three major HPPs regulating the Angara. Children will look after the aquariums and maintain life in them. Similarly, we take care of the larger bodies of water. Few people pay attention to it, but hydraulic power engineers are really more concerned with environmental issues and conservation of aquatic life than with kilowatt-hour output. We believe that promoting a responsible attitude to water resources and setting an example to the children is one of our pleasant duties.’ Reference: the World Water Day has been annually observed on March, 22 since 1993. It was established by the resolution of the United Nations General Assembly. 12. Standardization and improvement of business processes Annual report 2011 Standardization and improvement of business processes In 2011, the Company’s main objectives in management standardization and organization, as well as in developing mechanisms for continuous improvement of business processes were achieved. Changes in the structure and scope of responsibility during the implementation of top level business processes were reflected in the main regulatory document of OAO Irkutskenergo, the Order on sharing functional responsibility among the CEO, deputy CEOs and directors for functional business areas. the procedures for document management in implementing the “Repair management”, “Property management” and “HR management” business processes were improved, and the related Company Standards were amended; ■ proposals for improving the “HR management” business process were formulated and prepared for implementation; ■ the “Preparing the statistical reports of the Company” business process was developed; ■ building of a system for detecting inconsistencies and overlapping of functions in corporate standards started; In the sphere of management and improvement of business processes, the following measures were taken: ■ models and regulatory corporate standards for the Company’s critical business processes were updated, taking into consideration the changes in the structure and scope of responsibility and functions of departments; ■ ■ Company Standards underwent expert examination; over 30 standards regulating business processes that are critical for the Company’s operations were reviewed and/or introduced; the project “Improvement of production system of OAO Irkutskenergo” is being implemented. It is aimed at elimination of waste, reduction of resource consumption and improving performance; the project is based on the principles of lean production and engagement of all management levels. It covers all branches of OAO Irkutskenergo and several service subsidiaries; ■ building of an express system for collecting information on business process bottlenecks, as well as for developing and implementing measures for eliminating them started at the corporate portal; ■ pilot implementation of the ARIS PPMbased system for monitoring the efficiency of the “M&E procurement management” and “Implementation of quickly paid off low-cost offers” business processes was carried out; ■ proposals for stimulating and increasing efficiency of the process of signing contracts for inventory supply and providing services and performing works have been formulated and are implemented; ■ 106 OAO Irkutskenergo within the implementation of quickly paid off low-cost measures (TPO measures), the Company saved about RUB 95 million. ■ OAO Irkutskenergo 107 Contacts 108 OAO Irkutskenergo 13. Legal relations Annual report 2011 In 2011, OAO Irkutskenergo filed 493 lawsuits for the total amount of RUB 1,507,966,554.49; 434 of these for the total amount of RUB 1,319,419,365.41 were examined. Claims of OAO Irkutskenergo were settled in the total amount of RUB 1,313,612,862.42. 59 lawsuits for the total amount of RUB 188,547,189.08 are being examined. Legal relations In 2011, 112 lawsuits for the total amount of RUB 147,766,929.90 were brought against OAO Irkutskenergo; 90 of these for the total amount of RUB 37,802,495.75 were examined. Claims for the total amount of RUB 20,600,623.46 were settled. 22 lawsuits for the total amount of RUB 109,964,434.15 are being examined. 430 lawsuits out of 493 were brought by Energosbyt (the branch of OAO Irkutskenergo) claiming for collecting the debts under energy supply agreements for the total amount of RUB 1,271,422,284.35. 387 lawsuits out of the examined ones for a total amount of RUB 1,186,818,905.70 were settled in full. OAO Irkutskenergo wins the competition “Best power generating organization of high social efficiency in 2011” OAO Irkutskenergo was recognized as the winner in the category “Best power generating organization of high social efficiency” according to the results of the first round of the industrial competition “High social efficiency energy company-2011”. The competition “Russian Organization of High Social Efficiency” is held in accordance with Order No. 265r of the Government of the Russian Federation of March 4, 2009 and is supported by interested federal executive bodies, executive bodies of subjects of the Russian Federation, national trade union associations and national employers' associations. The competition is aimed at increasing public awareness of the importance 110 OAO Irkutskenergo of social issues at the level of organizations, showing concrete examples of tackling social issues and encouraging organizations and companies to adopt good practices in this sphere. Evgeny Fedorov, CEO of OAO Irkutskenergo: ‘OAO Irkutskenergo has already been awarded by organizers of national competition “Organization of High Social Efficiency” more than once. But it is important for us to know that the Company’s efforts aimed at supporting social events for both its employees and residents of the Irkutsk Region are recognized by All-Russian association of employers in the power industry and the public association “All-Russian Electricity Trade Union” .’ OAO Irkutskenergo 111 Contacts 112 OAO Irkutskenergo 14. Risk management Risk management Annual report 2011 The Company constantly improves the integrated risk management system using up-todate threat and opportunity management methods. Increasing the efficiency of the risk management system makes risk management process more transparent and controllable, which will improve the Company’s operations. In 2011, the following risk management measures were undertaken: efficiency of measures aimed at increasing reliability and forming part of the investment program was evaluated based on risk management principles (over 450 projects). The implementation of these measures is scheduled for 2012. Evaluation of measures for 2013 has also started; ■ proposals for property insurance for OAO Irkutskenergo and OOO Vostsibugol Company based on risk management principles were developed according to the Company standard 011.573.067-2011 “Organization of insurance coverage”; ■ the Risk Committee approved the plan for improving property insurance for 20122013; ■ the procedure for selection of production services to be financed was improved; ■ the procedure for selection, evaluation and ranking of capital construction projects aimed at maintaining reliability was improved and uniform methodology for all projects was set; ■ the method for non-financial assessment was developed; ■ risk the risk management module for the Corporate management system was developed; ■ the Company’s key risk chart was updated. ■ 114 OAO Irkutskenergo Following the publication of Government Resolution No. 1172 “On Approval of the Rules for the Wholesale Market of Electric Power and Capacity and on Amending Certain Acts of the Government…,” dated 27 December 2010 (published on April 5, 2011, certain rules come into effect on January 1, 2011), one of the key risks identified in 2010 (Prohibition of selling HPP capacities at market prices) occurred. The annual estimated loss exceeded RUB 5 billion. The Company’s key risks for 2012 and assessment of their probability and potential damage to the Company are shown in table 12.1. The Company’s key risks Changes in rules on sales at the market of electric energy and capacity remain the key risks. Risk: Decrease in the average annual price for electrical energy sold by OAO Irkutskenergo at day-ahead market by more than 15% Probability: High Potential damage for the year, RUB mln: Up to 450 Risk: Decline in income from sales of emission reduction units (ERU) to the level lower than the one stipulated by the Business plan Probability: Medium Potential damage for the year, RUB mln: Up to 720 BHPP and KHPP provided system services related to reactive power regulation in 2011 In 2011, the Bratskaya HPP of OAO Irkutskenergo and OAO Krasnoyarskaya HPP provided system services related to reactive power regulation without energy production. Based on the results of selection of suppliers made on July 11, the System Operator of UES made a decision that four generating companies (OAO Irkutskenergo, OAO Krasnoyarskaya HPP, OAO RusHydro and OAO TGK-1) should provide these services. Selection of suppliers of services related to reactive power regulation without energy production was made in accordance with Order of the Government of the Russian Federation No.117 of March 3, 2010 “On the Procedure for Selection of Energy Industry Entities and Electric Energy Consumers Providing Services on Ensuring the System Reliability and on Approval of Amendments to the Acts of the Government of the Russian Federation on the Issues of Providing System Reliability Services”. Evgeny Fedorov, CEO of OAO EuroSibEnergo: “Providing services for reactive power regulation with the use of generating equipment of the Bratskaya and Krasnoyarskaya HPPs is possible due to a special operating mode of the hydroelectric generator, the synchronous compensation mode. This is important for the consumers of UES of Siberia as it provides them with the necessary voltage level. At the same time, for us this means the possibility to unlock the potential of HPPs.“ OAO Irkutskenergo 115 Contacts 116 OAO Irkutskenergo 15. Information technology Information technology Annual report 2011 Tasks, problems, results and improvement of operations in the reporting period Introduction of corporate management system based on the 1C: Enterprise 8.2 platform. ■ To create a common information space for reflecting financial and business operations and integrating the Company’s management in general, the Company continued introducing a corporate management system based on the 1C: Enterprise 8.2 platform which covers a range of business processes including financial, tax and management accounting, accounting under IFRS, cash and investments management, budgeting, material and technical equipment and maintenance, repairs and operation of equipment. Technical specifications for financial and tax accounting, investments management, budgeting and management accounting were drafted. Development and test operation were carried out in the spheres of financial and tax accounting, material and technical equipment and maintenance, repairs and operation of equipment in the pilot and roll-out areas (i.e. the Executive Board and all branches). Electronic system ■ document management In order to optimize and unify document management processes and implementation control, the electronic document management system was put to pilot operation at the following enterprises of the Company and OOO Vostsibugol Company: OOO Irkutskenergosbyt, OOO Bratskenergoremont, ZAO GES-Remont, OOO IC Irkutskenergo, ZAO Irkutskenergotrans, NNOU UC Irkutskenergo, ZAO SER, 118 OAO Irkutskenergo OOO Olkhon, OOO PO Irkutskenergo, OOO Trailing, OOO Park-Hotel Burduguz, OOO IESV, ZAO Baikalenergo, OOO IGTSK, ZAO Irkutskzoloproduct, ZAO IRMET and OOO TD IEtrade. System of Technical and Economic Indices of the main CHPP equipment (AS TEI) ■ To enable automatic gathering of initial data, data from material, heat and electricity balances, calculation of actual, nominal and reference indices and reserves of fuel economy, an Automated System of Technical and Economic Indices (AS TEI) was brought into full operation at the Novo-Ziminskaya CHPP and CHPP-11 branches and TI and TS of Padunsky area of CHPP-6. Technical specifications for development and introduction of AS TEI were drafted. Models at the CHPP-12 and CHPP-16 branches and Shelekhovsky area of Novo-Irkutskaya CHPP were adjusted. Introduction of automated legal service management system ■ To improve the Company’s financial results, image and investment attractiveness by using up-to-date information technologies in the work of legal service and ensure ‘transparent’ performance, the specialists of legal services have developed a technical specification and project for the automated legal service management system. Centralization of accounting subsidiaries and affiliates ■ in To standardize the accounting process and preparation of financial statements, the subsidiaries and affiliates of OAO Irkutskenergo unified accounting systems of the following pilot enterprises: ZAO IRMET, ZAO SER, OOO PO Irkutskenergo, OOO IC Irkutskenergo and ZAO Irkutskzoloproduct. Roll-out of an automated workshop storage facilities management system (AWSF MS) at OOO Vostsibugol Company and coal companies ■ To establish uniform principles of bidding and keeping record of inventory in the Company and OOO Vostsibugol Company, as well as to receive timely and accurate information on inventory supply process of OOO Vostsibugol Company, roll-out of AWSF MS at OOO Vostsibugol Company was prepared. This included examination and drafting technical specifications for further development of the system in terms of its integration with automated systems of OOO Vostsibugol Company. OAO Irkutskenergo 119 Annual report 2011 Reconstruction of server room of the Executive Board of OAO Irkutskenergo Information technology Upgrading data transmission network of OAO Irkutskenergo ■ ■ The facility was commissioned. The XDM technology which ensures bandwidth up to 10 GB/sec was implemented at the trunk channels of OAO Irkutskenergo’s CCN data transmission network. Engineering infrastructure (uninterruptible power supply, ventilation and air conditioning, monitoring of server room engineering systems and structured cable system) allows placing up to ten racks with equipment for centralizing corporate information services. Protection of equipment and processed information is ensured by access monitoring systems, as well as video monitoring and automatic gaseous fire suppression systems. The switch core of branches was upgraded in order to create failure-proof connection pattern for CCN segments of the branches. In order to create absent CCN segments at the branches to connect workplaces to CCN, a structured cable system was installed at the Ust-Ilimskaya CHPP branch. In November 2011, OAO Irkutskenergo and Voith Hydro signed a contract for replacing turbine rotors of the Bratskaya HPP implementation, the Company became one of the winners of the first contest of joint projects held in 2010 under the Kyoto Protocol. Within the framework of the VII Baikal Economic Forum, OAO Irkutskenergo and Voith Hydro GmbH&Co. KG (Sankt Pölten, Austria) signed a contract for replacing another six turbine rotors of the Bratskaya HPP. The delivery of the first turbine rotor is scheduled for September, 2013. The sixth one will be delivered in March, 2016. At the end of 2010, the installation of the previous six new turbine rotors of the Bratskaya HPP, which began in 2006, was completed (they were manufactured by OAO Power Machines). The replacement of turbine rotors increased the performance of the turbines up to 95.3%. Besides, due to the project Evgeny Fedorov, CEO of OAO EuroSibEnergo and OAO Irkutskenergo: ‘OAO EuroSibEnergo attaches great importance to effective upgrading of HPPs. Therefore, in order to increase economic efficiency of the equipment and to improve reliability and safety of HPPs, we decided to replace another six turbine rotors of the Bratskaya HPP. Moreover, by now, 10 of the 12 hydroelectric generators of the Krasnoyarskaya HPP have been fully upgraded, and the Ust-Ilimskaya and Irkutskaya HPPs are undergoing the scheduled upgrading of the equipment. ’ 120 OAO Irkutskenergo OAO Irkutskenergo 121 Contacts 122 OAO Irkutskenergo 16. Financial and economic activities Annual report 2011 Key financial and economic indicators Key financial and economic indicators (RUB mln) Indicator 2010 2011 Revenue from sales 52,353 60,537 16% Cost of goods, products, works and services 38,976 44,375 14% Gross profit 13,377 16,162 21% EBITDA 15,587 18,824 21% EBIT 13,119 16,098 23% 9,464 12,274 30% Net profit Change In 2011, sales revenue increased by RUB 8,184 mln (+16%) year-on-year. The main factor driving this growth was sale of all generated electricity and capacity (except for the volumes supplied to households) in the wholesale market at higher unregulated prices. Cost of goods, products, works and services in 2011 grew by RUB 5,399 mln (+14%) yearon-year as a result of an increase in fuel prices by 17.4% and in the volume of electricity purchased at the international market. The Company’s profit before income tax for 2011 amounted to RUB 15,532 mln. Accrued income tax for the reporting period comprised RUB 3,366 mln, the effective tax rate was 21%. Net profit amounted to RUB 12,274 mln and net profit margin totaled 20.3%. Other income and expenses (RUB mln) Indicator 2010 2011 Social expenses -120 -126 6% Provision for doubtful debts -489 -239 -51% Other income and expenses 720 301 -58% -258 -64 -75% TOTAL 124 OAO Irkutskenergo Change In 2011, other income and expenses increased by RUB 194 mln compared to 2010, including: in 2010, the Company reflected financial results from sale of OAO Irkutskenergo shares purchased during the reorganization at OOO CHPP-10 (-369 mln RUB); ■ provision for doubtful debts (RUB -239 mln): ■ 1)provision for impairment of securities was recovered - loan repayment of OOO IEF and ZAO Irkutskenergostroy (RUB +337 mln); 2)the Company accrued provision for doubtful debts for supplied energy (RUB -576 mln) - 87 mln RUB above 2010; 3)other income / expenses amounted to RUB 301 mln, which is RUB 419 mln less than in 2010: in accordance with the rules of the wholesale market in 2010 the Company received compensation for the power quality (RUB 451 mln), since 2011 power quality is considered when determining the amount of power supply; An increase in interest receivable (RUB +158 mln) was caused by the growth of provided loans year-on-year. A decrease in interest payable (RUB -332 mln) was due to lower loan portfolio and lower weighted average interest rates on loans (2010 actual - 7.46%, 2011 actual 7.13%). Operating profit (EBITDA) in 2011 increased by 21% year-on-year as a result of an increase in profit margin2 from sales of energy by 47% despite an increase in fixed costs by 7%. ² revenue (electricity + heat) - expenses (fuel + purchased electricity) OAO Irkutskenergo 125 Annual report 2011 Key financial and economic indicators Profitability indicators Indicator Unit 2010 2011 Change Sales margin % 26 27 1 Net profit margin % 18 20 2 Return on assets % 13 14 1 Return on equity % 17 18 0 Net profit per share RUB 1.99 2.57 30% Profitability increase in 2011 year-on-year was caused by an increase in profit margin by RUB 8,365 mln. Turnover indicators (days) Indicator 2010 2011 Change Fuel reserves turnover 80 81 1 Accounts receivable (less than 1 year) turnover 22 19 -3 Accounts payable turnover 36 41 5 Accounts receivable turnover decreased in 2011 by 3 days year-on-year, which was caused by growth of revenue from electricity sales by RUB 12,479 mln with a slight increase in accounts receivable compared to 2010 (+2%). ■ Accounts payable turnover increased by 5 days year-on-year due to an increase in accounts payable to suppliers and contractors. ■ 126 OAO Irkutskenergo OAO Irkutskenergo 127 Annual report 2011 Key financial and economic indicators Liquidity ratios January 01, January 01, 2011 actual 2012 actual Ratio Change Current liquidity ratio 1.14 1.01 -12% Acid test ratio 0.75 0.72 -5% Cash ratio 0.04 0.01 -84% Debt to equity ratio 0.29 0.26 -10.1% Accounts payable to accounts receivable ratio 0.76 0.83 9.3% Liquidity ratios declined compared to the previous period mainly due to an increase in accounts payable and short-term borrowings. At the same time, they stay within the normative values that characterize the financial solvency of the Company. Debt to equity ratio declined as a result of an increase in net income by RUB 2,180 mln (+30%) and a reduction in long-term borrowings by RUB 1,180 mln. Accounts payable to accounts receivable ratio increased by 9% due to an increase in accounts receivable in 2011 relative to 2010 by 54% with an increase in accounts receivable by 41%. 128 OAO Irkutskenergo OAO Irkutskenergo 129 Annual report 2011 Financial Situation Analysis Cash flow analysis, indirect method (RUB mln) Indicator 2010 2011 234 271 37 10,888 14,318 3,430 9,464 12,274 2,810 -1,044 -681 362 2,468 2,726 258 -11,295 -15,272 -3,977 348 -837 -1,184 -373 -283 91 Change in accounts receivable -43 -1,055 -1,012 Change in accounts payable 294 600 306 Other 470 -99 -569 -8,603 -14,036 -5,433 Change in fixed assets and construction in progress -4,324 -4,215 109 Change in long-term financial investments -4,495 -9,896 -5,401 216 75 -141 -3,039 -399 2,640 Change in long-term borrowings -3,351 -1,365 1,985 Change in short-term borrowings 315 962 647 -3 4 8 444 740 296 37 -214 -251 271 57 -214 Cash at the beginning of period Capitalized earnings Retained earnings of the reporting period Retained earnings from prior years Depreciation Outflows Operating activities Change in inventories Investment activities Other cash flows from financing activities Financing activities Debt to shareholders Change in non-monetary items Free cash flow Cash at the end of period: 130 OAO Irkutskenergo Change In 2011, the Company received net income of RUB 12,274 mln. Retained earnings from prior years decreased by dividend payouts (RUB -555 mln) and payments for regional social events (RUB -126.5 mln). Operating activities reflect the impact of changes in working capital on cash flow: an increase in fuel reserves led to a decline in cash flow by RUB 283 mln; ■ an increase in consumer debt reduced cash flow by RUB 1,055 mln; ■ growth of accounts payable in 2011 increased cash flow by RUB 600 mln; ■ reduction in cash flow under other items comprised RUB 99 mln. ■ OAO Irkutskenergo 131 Financial Situation Analysis Annual report 2011 Cash outflow for investment activities comprised RUB 14,036 mln, including: Implementation of investment program mln 4,215 including: Heating main No.6 from the main building of CHPP-9 to the fixed support No. 470 of heating main No.2 of CHPP-10 271 Reconstruction of the 500 kW standard unit of the Ust-Ilimskaya HPP 133 Re-equipment of heating grid of 6 collectors from Kirovskaya DB to ТB-7Е 115 Reconstruction of the heating main ТК-6а-ТК-27u-ТК-21v 100 Replacement of transformers OCG-210000/500 with ОRCО-210000/500 100 Construction of facilities to change the coal-feeding process from the coal storage of section No. 1 at CHPP-9 ( belt conveyors No. 12,13) 96 Reconstruction of boiler units for heat supply of heating main No.6 18 Other projects with capital investments under RUB 100 mln 12 Development program 561 Cost management and total production optimization 54 Corporate computer network 43 Projects costing less than RUB 100 mln aimed at reliability assurance 2,712 Long-term financial investments 9,896 including: Loans to subsidiaries increased by RUB 2,320 mln, of which: ■ 1) OOO Vostsibuglesbyt 2) OOO (RUB 1,178 mln); Company Vostsibugol (RUB 1,278 mln); 3) repayment of loans by other subsidiaries (RUB 136 mln); Loan to LLC EuroSibEnergo-Consult (RUB 1,070 mln); ■ acquisition of shares in OAO IESK (RUB 5,662 mln) and OAO AKME Engineering (RUB 393 mln); ■ acquisition of designs of the SVBR-100 reactor (RUB 451 mln). ■ 132 OAO Irkutskenergo Cash outflows from financing activities amounted to RUB (-399) mln and resulted from repayment of borrowings. Change in non-monetary items reflects change in allowance for doubtful accounts, deferred tax assets and liabilities. The Company’s free cash flow for 2011 comprised RUB (-214) mln. On January 1, 2012, cash balances in the Company’s accounts amounted to RUB 57 mln. OAO Irkutskenergo 133 Annual report 2011 Financial Situation Analysis Analysis of income and expense budget (RUB mln) Indicator 2010 2011 Change Revenue 52,353 60,537 16% Main products 51,844 60,005 16% 509 532 5% Production costs 38,976 44,375 14% Gross margin 13,377 16,162 21% Other income and expenses -1,313 -630 -52% 160 317 99% Interest payable -1,215 -883 -27% Social expenses -120 -126 -5% Provision for doubtful debts -489 -239 51% Other income and expenses 720 301 58% 12,064 15,532 29% Deferred tax assets 271 148 -45% Deferred tax liabilities 225 40 -82% Income tax 2,646 3,366 28% Net income 9,464 12,274 30% Current income and expenses Other products Interest receivable Profit before income tax In 2011, gross profit increased by RUB 2,785 mln (+21%) year-on-year due to revenue growth of 16% despite an increase in production costs by 14%. Profit before income tax for 2011 amounted to RUB 15,532 mln, which is RUB 3,468 mln higher than in 2010. 134 OAO Irkutskenergo In 2011, income tax reached RUB 3,366 mln, which is RUB 720 mln higher compared to 2010, due to an increase in tax base. As a result, net income for 2011 increased by RUB 2,810 mln (+30%) year-on-year. OAO Irkutskenergo 135 Loan Portfolio Analysis Annual report 2011 Brief credit history of ОАО Irkutskenergo (‘000 RUB) Creditor bank Credit portfolio as of January 01, 2011 Credit portfolio Repayments as of December 31, 2011 Receipts OAO GPB branch 4,281,500 24,292,608 25,574,100 3,000,008 ОАО Sberbank of Russia 2,127,000 6,380,000 5,187,000 3,320,000 ОАО AKB Svyaz-Bank 2,090,000 4,020,000 5,110,000 1,000,000 ОАО AKB Rosbank 990,000 2,068,000 3,058,000 0 ZAO GLOBEXBANK 100,000 0 100,000 0 1,000,000 520,000 1,520,000 0 0 2,079,640 2,079,640 0 10,588,500 39,360,248 42,628,740 7,320,008 3,500 3,000,000 10,592,000 42,360,248 ZАО Raiffeisenbank ОАО TransCreditBank Total loans: Bonded loans TOTAL: As of January 01, 2011, the credit portfolio of OAO Irkutskenergo including bonded loans comprised RUB 10,592 mln. Borrowings in 2011 were conducted under the credit policy of OAO Irkutskenergo, approved by the Board of Directors (Minutes of the Board of Directors No. 53 (206) as of December 30, 2010). 136 OAO Irkutskenergo 3,003,500 42,628,740 10,323,508 In 2011, OAO Irkutskenergo attracted credit resources totaling RUB 39,360.25 mln to increase working capital for financing operating activities and refinancing of the Company’s current financial obligations . In 1H 2011, the Company refinanced part of financial debt by placing 3-year commercial bonds of B0-01 series totaling RUB 3,000 mln. The coupon rate till maturity was set at 7.6% per annum, indicating a successful hedging of risks from increasing lending rates for the Company until April 2014. Due to the expiration of validity of lines of credit and early termination of loan agreements in 2011, reduction of credit limits of the Company comprised RUB 8,500 mln, including: RUB 1,000 mln in ZAO GLOBEXBANK; ■ RUB 500 mln in OAO Dalnevostochny Bank; ■ RUB 1,000 mln in OAO Sberbank of Russia; ■ RUB 2,500 mln in OAO GPB; ■ RUB 1,000 mln in OAO AKB Rosbank; ■ RUB 1,000 mln in OAO AKB Svyaz-Bank; ■ RUB 1,500 mln in OAO TransCreditBank. ■ OAO Irkutskenergo 137 Annual report 2011 Loan Portfolio Analysis In order to refinance the lines of credit whose validity expired in 2011, as well as to receive credit resources under more favorable terms and increase the share of short-term loans to improve the credit portfolio structure, in 2011, ОАО Irkutskenergo held six tenders on opening of revolving credit lines and conclusion of overdraft loan agreements. As a result, the Company concluded the following new loan agreements with the credit limit totaling RUB 11,500 mln: Credit limit, Validity period, Bank RUB mln years OAO GPB 1,000 1 OAO GPB 500 3 OAO GPB 1,500 3 OAO GPB 1,500 3 OAO GPB 1,000 3 OAO GPB 500 3 OAO GPB 1,000 3 OAO GPB 500 3 OAO GPB 500 3 OAO Sberbank of Russia 500 3 OAO Sberbank of Russia 1,000 1 ОАО AKB Svyaz-Bank 1,000 1 ОАО Bank VTB 1,000 2 In 2011, the Company signed an overdraft loan agreement with OAO GPB and began to actively use another flexible form of borrowings to cover short-term cash shortages. As of December 31, 2011, the total credit limit on all the agreements amounted to RUB 21,800 mln. 138 OAO Irkutskenergo Overall, considering long-term borrowed funds, changes of the average interest rate correlate with fluctuations in market interest rates on short-term bank loans. In 2011, the weighted average interest rate on the credit portfolio of OAO Irkutskenergo was lower than the refinancing rate and the average rate of short-term financing of entities according to the Bank of Russia. 10 14 9 12 8 % p.a. 6 8 5 6 4 3 RUB bln 10 7 4 2 2 1 0 0 Jan Feb March April May Principal June July Aug Sept Oct Nov Dec Jan Rate on short-term borrowing for entities Refinancing rate Weighted average rate for IE In 1H 2011, obligations under loan agreements of third parties, where OAO Irkutskenergo acted as a guarantor, were fulfilled before maturity. In November and December, in order to secure obligations under government contracts, the Company issued a series of guarantees for subsidiaries that won in open tenders for performing certain works. OAO Irkutskenergo 139 Notes In April 2011, OAO Irkutskenergo successfully completed placement of threeyear bonds OAO Irkutskenergo successfully placed documentary interest-bearing non-convertible exchange-traded three-year bearer bonds of BO01 series with a total nominal value of RUB 3 bln and a maturity of 1092 days from the date of the placement. The raised funds will be used for loan portfolio refinancing, current funding and investments in improving reliability of production. 140 OAO Irkutskenergo CEO of OAO Irkutskenergo Evgeny Fedorov: “The successful placement of bonds exceeding the total demand more than five-fold reflects the Company’s high credibility. Currently, there is a certain lack of offers such as ours at the stock exchange in the electricity sector.” Contacts OAO Irkutskenergo 141 Contacts 142 OAO Irkutskenergo Appendices Balance Sheet of OAO Irkutskenergo as of December 31, 2011 Appendix 1. Comments Item Line As of Decem- As of Decem- As of Decemcode ber 31, 2011 ber 31, 2010 ber 31, 2009 ASSETS I. Non-current assets Intangible assets 1110 Research and development results 1120 2.1.2. Fixed assets 1130 42,967,883 40,768,821 36,919,813 including: 2.1. Fixed assets 1131 40,162,631 37,739,227 34,493,060 2.2. Construction in progress 1132 2,805,252 3,029,594 2,426,753 Income investments 1140 3.1. Financial investments 1150 31,763,923 21,868,187 19,811,185 Deferred tax assets 1160 1,069,626 922,048 651,329 Other non-current assets 1170 106,964 128,691 69,661 Total for Section 1 1100 75,908,396 63,687,747 57,451,988 1210 3,205,159 2,689,119 2,390,743 II. Current assets 4.1. Inventories including: 4.1. Raw materials and other similar inventories 1211 3,017,689 2,550,291 2,291,255 4.1. Finished products and products for resale 1212 4,558 4,660 4,029 4.1 Other inventories and expenses 1214 182,912 134,168 95,459 VAT recoverable 1220 27,679 34,082 30,146 5.1. Accounts receivable 1230 7,965,976 5,748,157 5,971,882 5,173,985 4,759,943 including: 5.1. Buyers and customers 1231 5,649,789 5.1. Promissory notes receivable 1232 121,461 5.1. Advances paid 1233 190,262 76,097 764,144 5.1. Other debtors 1234 2,004,464 498,075 447,795 144 OAO Irkutskenergo Annual report 2011 3.1. Comments Financial investments (except cash equivalents) 1240 8,400 8,400 383,893 Cash and cash equivalents 1250 57,316 271,168 233,942 Other current assets 1260 Internal settlements 1270 Total for Section II 1200 11,264,530 8,750,926 9,010,606 BALANCE 1600 87,172,926 72,438,673 66,462,594 Item Line As of Decem- As of Decem- As of Decemcode ber 31, 2011 ber 31, 2010 ber 31, 2009 LIABILITIES III. Capital and reserves Authorized capital (share capital, authorized fund, paid-up capital) 1310 Treasury shares 1320 4,766,808 4,766,808 4,766,808 (1,229,643) Revaluation of non-current assets 1340 29,564,147 29,005,742 26,901,425 Additional capital (ex revaluation) 1350 896,206 896,206 896,206 Reserved capital 1360 1,191,702 1,191,702 1,191,702 Retained earnings (loss) of the previous years 1370 20,451,138 20,791,723 12,269,749 Retained earnings (loss) of the reporting period 1380 12,273,551 Total for Section III 1300 69,143,552 56,652,181 44,796,247 Loans and borrowings 1410 6,155,315 7,334,899 10,666,432 Deferred tax liabilities 1420 720,722 680,812 455,770 Estimated liabilities 1430 185,910 1,312,887 6,876,037 8,201,621 12,435,089 IV. Long-term liabilities 5.3. 5.3. Other liabilities 1450 Total for section IV 1400 OAO Irkutskenergo 145 Balance Sheet of OAO Irkutskenergo as of December 31, 2011 Appendix 1. V. Short-term liabilities 5.3. Loans and borrowings 1510 4,233,212 3,271,283 2,956,323 5.3. Accounts payable 1520 6,651,719 4,312,902 6,274,224 including: 5.3. suppliers and contractors 1521 2,847,373 2,247,385 1,953,337 5.3. employee benefit obligations 1522 216,662 161,712 137,492 5.3. debts to state non-budgetary funds 1523 41,555 29,451 26,804 5.3. taxes and duties payable 1524 1,933,457 1,364,309 1,820,545 5.3. other creditors 1525 108,044 58,576 1,380,702 5.3. promissory notes payable 1526 1,087,412 225,828 688,133 5.3. advances received 1527 411,620 224,465 262,764 5.3. dividends payable 1528 5,596 1,176 4,447 Future income 1530 9 686 711 Estimated liabilities 1540 268,397 7. Other liabilities 1550 Internal settlements 1560 Total for section V 1500 11,153,337 7,584,871 9,231,258 BALANCE 1700 87,172,926 72,438,673 66,462,594 Profit and loss statement of ОАО Irkutskenergo for 2011 Appendix 2. Comments Item Line code For reporting period Year-on-year Revenue 2110 60,537,034 52,352,844 including sales of: 146 electrical energy 2111 47,612,712 39,422,411 heat energy 2112 11,382,579 11,451,323 system charge 2113 745,768 693,697 chemically treated water and condensate 2114 263,680 276,355 other services 2115 532,295 509,058 OAO Irkutskenergo Annual report 2011 6. Cost of goods sold 2120 (41,578,053) electrical energy 2121 (28,262,123) (23,884,967) heat energy 2122 (11,784,044) (11,336,433) system charge 2123 (697,835) (587,475) chemically treated water and condensate 2124 (237,767) (219,690) other services including sales of: (36,588,536) , 2125 (596,284) (559,971) Gross income (loss) 2100 18,958,981 15,764,308 6. Commercial expenses 2210 (323,843) (253,188) 6. Administrative expenses 2220 (1,468,976) (1,209,060) EBIT 2200 17,166,162 14,302,060 Dividends 2310 , 5,455 Interest receivable 2320 317,325 159,572 Interest payable 2330 (882,852) (1,214,526) Other income 2340 1,380,154 1,905,765 Other expenses 2350 (2,654,100) (3,094,481) Profit (loss) before income tax 2300 15,326,689 12,063,845 Income tax 2410 (3,324,572) (2,631,461) including: permanent tax liabilities (assets) 2421 151,566 173,063 Change in deferred tax liabilities 2430 (39,910) (225,042) Change in deferred tax assets 2450 147,578 270,719 Others 2460 163,766 (14,544) 2400 12,273,551 9,463,517 Result from revaluation of non-current assets not included in net profit (loss) for the period 2510 891,771 2,208,809 Result from other operations not included in net profit (loss) for the period 2520 Aggregate financial results of the period 2500 13,165,322 11,672,326 Basic earnings (loss) per share 2900 0.00257 0.00198 Diluted earnings (loss) per share 2910 Net profit (loss) FOR REFERENCE: OAO Irkutskenergo 147 Audit opinion Appendix 3. AUDIT OPINION ON FINANCIAL STATEMENTS OF OAO IRKUTSKENERGO FOR THE YEAR 2011 FINEXPERTIZA AUDIT AND CONSULTING GROUP 148 OAO Irkutskenergo Annual report 2011 TO SHAREHOLDERS COMPANY OVERVIEW Company name: Open joint stock company IRKUTSKENERGO (OAO IRKUTSKENERGO) State registration number (OGRN) 1023801003313 Location: 3, Sukhe-Batora Str., Irkutsk, 664025, Irkutsk Region, Russian Federation DATA ON AUDITOR Company name: Limited Liability Company FinExpertiza (OOO FinExpertiza) State registration number (OGRN) 1027739127734 Location: bld.1, 69, Prospect Mira, Moscow, 129110, Russian Federation Name of self-regulatory auditing organization: Non-commercial partnership Audit Chamber of Russia (certificate No. 4209 dated December 28, 2009) Number in the register of auditors and audit organizations of selfregulatory auditing organization: 10201028038 We have audited the accompanying financial statements of OAO IRKUTSKENERGO, which comprise: Balance sheet as of December 31, 2011; Profit and loss statement for 2011; ■ Statement of changes in equity for 2011; ■ Cash flow statement for 2011; ■ Other appendices to Balance Sheet and Profit and Loss statement; ■ Explanatory note. ■ ■ RESPONSIBILITY OF THE AUDITED COMPANY FOR THE FINANCIAL STATEMENTS Management of OAO Irkutskenergo is responsible for the preparation and fair presentation of these financial statements in accordance with applicable reporting standards, and for such internal control as management determines is necessary to enable the preparation of financial statements that are free from material misstatement, whether due to fraud or error. OAO Irkutskenergo 149 Appendix 3. Audit opinion AUDITOR’S RESPONSIBILITY Our responsibility is to express an opinion on these financial statements based on our audit. We conducted our audit in accordance with Federal Standards on Auditing. Those standards require that we comply with ethical requirements and plan and perform the audit to obtain reasonable assurance about whether the financial statements are free from material misstatement. The audit involves performing procedures for obtaining audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor’s judgement, including assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In assessment of those risks, the auditor considers internal control relevant to the entity’s preparation and fair presentation of financial statements in order to select audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. The audit also included evaluating the appropriateness of accounting policies used and the reasonableness of accounting estimates made by management, as well as evaluation of overall presentation of the financial statements. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our qualified audit opinion. QUALIFIED OPINION In our opinion, the financial statements present fairly, in all material aspects, the financial position of OAO Irkutskenergo as of December 31, 2011, and its financial performance and its cash flows for 2011 in accordance with applicable reporting standards. Project manager of Department for general, insurance and investment audit OOO FinExpertiza N.P. Makhova Acts under power of attorney No. 023-01/12 dated January 31, 2012 valid till June 30, 2012 Qualification certificate for performing auditing activities No. K005166 Principal Number of Registration Entry in the auditors’ register: No. 29701044832 March 13, 2012 150 OAO Irkutskenergo Implementation of income and expense budget Item 2010 Appendix 4. Deviation from 2010 actual 2011 Income and expenses from ordinary activities Revenue (net) from sale of goods, products, works and services 52,352,844 60,537,034 8,184,190 16% Main products 51,843,786 60,004,739 8,160,953 16% Revenue from heat sales 12,421,375 12,392,027 -29,348 0% 4,755,159 4,680,378 -74,781 -2% Industrial plants (largest consumers) SUAL Ilim Group, Bratsk Korshunovsky Mineral Processing Plant 107,408 110,191 2,783 3% 1,327,245 1,492,324 165,079 12% 106,384 106,638 255 0% 1,382,005 1,453,115 71,110 5% Polymer plant 348,473 375,079 26,606 8% Usolyekhimprom 418,781 124,646 -294,135 -70% AEHK 173,225 147,740 -25,485 -15% Ilim Group, Ust-Ilimsk 353,635 310,886 -42,749 -12% Sayanskhimprom 538,005 559,759 Heat resellers 448,158 ANHK 21,754 4% -448,158 -100% Housing and utilities companies (HUC) 4,881,406 5,175,903 294,497 6% Other consumers 2,336,651 2,535,746 199,094 9% 14,863,894 23,605,011 8,741,117 59% RUSAL 4,900,125 10,540,575 5,640,450 115% IESC (ОАО Irkutskenergosbyt) 1,329,294 1,054,407 -274,887 -21% Other (electricity) 8,634,475 12,010,029 3,375,554 39% 124,895 124,895 0% 3,612,703 31% Revenue from electricity sales Revenue from electricity sales at the regulated energy market Revenue from sales of purchased electricity 11,627,472 15,240,175 DAM 10,685,970 13,194,030 2,508,060 23% 941,502 2,046,145 1,104,643 117% BM Revenue from sales of own capacity 12,931,045 8,642,631 -4,288,414 -33% RUSAL 3,648,150 2,716,218 -931,932 -26% IESC (ОАО Irkutskenergosbyt) 4,222,404 2,142,770 -2,079,634 -49% OAO Irkutskenergo 151 Appendix 4. other Other products, works and services Non-core activities Other activities Production efficiency improvement program (additional income) Services of ОАО Irkutskenergo for IESC Implementation of income and expense budget 5,060,492 3,783,643 -1,276,848 -25% 509,058 532,295 23,237 5% 78,248 91,919 13,671 17% 430,810 440,376 9,566 2% 0 0 0 0 48,434 48,929 495 1% Other products, works and services 382,376 391,447 9,071 2% Costs of goods, products, works and services 38,976,071 44,375,277 5,399,206 14% Costs of goods sold 36,231,190 41,393,364 5,162,174 14% Material expenses 399,759 446,362 46,603 12% Materials for maintenance and operation 323,203 353,965 30,762 10% Fuel and lubricants 76,556 92,397 15,841 21% Salaries and other payments to regular employees 3,959,493 4,857,601 898,108 23% Salaries of operational personnel 2,290,182 2,494,279 204,097 9% Salaries of maintenance personnel 753,539 886,013 132,474 18% Unified social tax 655,760 949,288 293,528 45% Other payments to personnel 260,012 528,021 268,009 103% Fuel for technological purposes 8,664,709 9,862,611 1,197,902 14% coal 8,573,410 9,771,951 1,198,541 14% gas 3,837 7,592 3,755 98% fuel oil 87,462 83,068 -4,394 -5% Energy 12,254,275 15,078,468 2,824,193 23% energy for economic needs 13,265 3,484 -9,781 -74% 10,859,998 13,638,641 2,778,643 26% electricity purchased from IESbC 960,393 1,096,185 135,792 14% purchased heat 420,619 340,158 -80,461 -19% Water 573,169 595,766 22,597 4% electricity purchased at WEM Depreciation 2,401,832 2,667,620 265,788 11% Repair and technical maintenance 4,065,299 3,818,108 -247,191 -6% Services of repair contractors 3,072,725 2,699,706 -373,019 -12% 152 OAO Irkutskenergo Annual report 2011 Materials for repairs 992,574 1,118,402 125,828 13% Rent 431,272 345,351 -85,921 -20% 25,955 901 -25,054 -97% Other rent 405,317 344,450 -60,867 -15% Funds for insurance 197,475 210,696 13,221 7% Other expenses 3,283,907 3,510,781 226,874 7% Electric capacity 68,490 24,815 -43,675 -64% capacity purchased under NRBC 68,490 24,815 -43,675 -64% 1,043,292 1,215,726 172,434 17% 993,042 1,161,674 168,632 17% Lease payments Services on electricity transmission of FGC Payments for services of SO UES Payments for services of CFS and ATS Services IESC services on electricity transmission Other services Registration of property Personnel training 50,250 54,052 3,802 8% 2,014,229 2,037,958 23,729 1% 22,324 5,565 -16,759 -75% 1,991,905 2,032,393 40,488 2% 16,713 12,942 -3,771 -23% 38,892 36,417 -2,475 -6% Other expenses within production costs 160,054 250,977 90,923 57% Adjustments in production costs -57,763 -68,054 -10,291 18% 0 0 0 0 198,036 272,449 74,413 38% Salaries and other payments to regular employees 12,593 14,742 2,149 17% Salaries of operational personnel Program on improvement of production efficiency Commercial expenses 11,128 12,637 1,509 14% Unified social tax 1,465 2,070 605 41% Depreciation 3,438 2,550 -888 -26% Rent 3,970 4,475 505 13% 177,955 250,677 72,722 41% General and administrative expenses 947,575 1,086,931 139,356 15% Salaries and other payments to regular employees 629,004 823,535 194,531 31% Salaries of operational personnel 562,779 664,495 101,716 18% 62,059 85,458 23,399 38% Other, total Unified social tax OAO Irkutskenergo 153 Appendix 4. Other payments to personnel Implementation of income and expense budget 4,166 73,582 69,416 1,666% Depreciation 62,815 56,151 -6,664 -11% Travel expenses 24,920 20,714 -4,206 -17% Personnel expenses 21,695 15,765 -5,930 -27% 9,705 12,906 3,201 33% 843 2,242 1,399 166% Communication services 34,287 32,314 -1,973 -6% Leasing and operating expenses 21,717 17,479 -4,238 -20% Transport expenses 33,201 56,367 23,166 70% Security services 12,707 14,812 2,105 17% 275 0 -275 -100% Other 96,406 34,646 -61,760 -64% materials for operation 13,951 14,029 78 1% services 13,792 12,552 -1,240 -9% energy 2,403 3,264 861 36% 66,260 4,801 -61,459 -93% Information and consulting services Insurance expenses (VMI and insurance of contract employees’ life) Representation expenses other expenses Taxes, except income tax 1,599,270 1,622,533 23,263 1% Property tax 610,791 671,506 60,715 10% Water tax 719,209 691,700 -27,509 -4% Land tax 180,332 170,516 -9,816 -5% 87,136 87,905 769 1% Pollution charge Transport tax Gross profit Other income and expenses from sale of fixed assets from sale of securities from sale of other assets (including assignment agreement ) dividends Provision for doubtful debts Provision for securities impairment 154 OAO Irkutskenergo 1,802 906 -896 -50% 13,376,773 16,161,757 2,784,984 21% -257,971 -64,004 193,967 -75% -7,291 -3,747 3,544 -49% -369,252 79 369,331 -100% 16,703 26,322 9,619 58% 5,455 0 -5,455 -100% -489,458 -576,185 -86,727 18% 0 337,201 337,201 100% Annual report 2011 Social expenses -119,651 -126,063 -6,412 5% 450,515 89,734 -360,781 -80% Income/ (Loss) from write-off of payables/ receivables 9,148 -20,473 -29,621 -324% Income/ (Loss) from revaluation of foreign currency 0 -141,548 -141,548 100% Other 245,860 350,676 104,816 43% Interest receivable 159,556 317,310 157,754 99% For use by a credit institution of the funds in the account of the Company in this credit institution (deposits) 6,256 33,776 27,520 440% For providing funds under loan agreement 153,300 283,534 130,233 85% 1,214,519 882,851 -331,668 -27% 40,694 306,246 265,552 653% Fines, penalties and forfeitures Interest payable On bonds, promissory notes and other issued securities, including discount at placement For funds received under loan agreement For use of bank loans Income (loss) before income tax 133,576 165,470 31,894 24% 1,040,248 411,135 -629,114 -60% 12,063,840 15,532,212 3,468,372 29% Deferred tax assets 270,719 147,578 -123,141 -45% Deferred tax liabilities 225,041 39,910 -185,131 -82% Income tax 2,646,000 3,366,327 720,327 27% Net profit 9,463,518 12,273,553 2,810,035 30% Payments from retained earnings 1,221,957 1,706,087 484,130 40% Dividends 905,693 554,856 -350,837 -39% Expenses for investment activities 178,151 1,022,329 844,178 474% Other payments from profit 138,113 128,902 -9,211 -7% 4,324,230 4,215,133 -109,097 -3% EBITDA 15,586,886 18,824,074 3,237,188 21% EBIT 13,118,802 16,097,753 2,978,951 23% OAO Irkutskenergo 155 Investment budget Balance at the beginning Change in liabilities Liabilities at the end of the period New liabilities Liabilities at the beginning of the period Item Payments, total Implementation of cash flow budget Appendix 5. 271,168 Operating activities Inflows from operating activities 3,724,984 72,512,282 70,980,325 5,256,940 1,531,956 Inflows from core activities 3,415,034 71,453,817 69,897,599 4,971,252 1,556,217 Inflows from heat sales 1,975,168 14,609,102 14,835,096 1,749,174 -225,994 -95,241 -219,957 Industrial plants (largest consumers) SUAL Ilim Group, Bratsk Korshunovsky Mineral Processing Plant ANHK Polymer plant Usolyekhimprom AEHK Ilim Group, Ust-Ilimsk Sayanskhimprom Housing and utilities companies (HUC) 124,716 5,522,846 5,742,803 944 130,025 130,129 840 -104 20,413 1,760,943 1,776,198 5,158 -15,256 11,493 125,833 133,200 4,126 -7,366 -81,697 1,714,676 1,738,585 -105,606 -23,909 336 442,593 445,658 -2,729 -3,065 151,987 147,082 298,540 529 -151,458 -1,995 174,334 177,057 -4,718 -2,723 8,386 366,845 380,807 -5,576 -13,962 14,850 660,515 662,629 12,737 -2,113 -29,821 1,462,626 6,094,076 6,123,897 1,432,805 Other consumers 387,825 2,992,180 2,968,396 411,609 23,784 Inflows from electricity sales 900,798 45,909,380 45,064,153 1,746,024 845,226 RUSAL (electricity) -10,934 12,447,804 12,354,810 IESbC (electricity) Other (electricity) Inflows from IESbC (electricity of SD CHPP) Inflows from capacity sales RUSAL (capacity) 82,061 92,995 1,009,676 172,663 172,663 911,732 32,279,236 31,699,668 0 18,059 1,182,339 140,326 521,009 10,795,010 8,367 2,855,045 1,491,300 579,568 138,854 19,530 1,472 9,859,495 1,456,524 935,514 3,029,284 -165,872 -174,239 IESC (capacity) -20,476 2,439,006 2,361,916 56,614 77,090 Other (capacity) 533,118 5,500,959 4,468,295 1,565,782 1,032,664 Inflows from other sales 309,950 1,058,465 1,082,726 285,689 -24,261 3,375 10,242 10,876 2,741 -634 109,271 85,863 137,443 57,691 -51,580 8,124 55,331 54,974 8,481 357 Inflows from sales of goods and materials Penalties and fines imposed Inflows from services provided to IESbC 156 OAO Irkutskenergo Annual report 2011 Return of payments under agency contract for heat (from IESC) 1,752 91,605 71,466 21,891 20,139 Rent 24,361 246,816 260,263 10,914 -13,447 from S&A 17,121 217,946 195,295 39,771 22,650 7,240 28,870 64,967 -28,857 -36,097 163,066 568,609 547,705 183,970 20,904 3,247,229 56,119,256 54,646,507 4,719,978 1,472,749 from third-party companies Other inflows from other sales Outflows on operating activities Fuel and transport 82,844 12,387,841 12,095,224 375,462 292,617 Coal 64,152 12,033,956 11,781,594 316,515 252,363 24,984 19,646 Fuel oil 5,339 113,050 93,404 Fuel transportation 1,534 120,839 112,037 10,337 8,802 Fuel and lubricants 11,792 111,036 101,392 21,437 9,644 Gas Salary 27 8,959 6,797 2,189 2,162 161,712 4,333,030 4,360,756 133,986 -27,726 136,931 Materials and spare parts 60,330 1,653,046 1,516,116 197,260 Materials for maintenance and operation 23,453 294,569 261,841 56,180 32,727 Materials and spare parts for repairs 36,884 1,342,986 1,239,095 140,776 103,892 Other materials Contractors’ services on repairs Water Energy energy for economic needs -7 15,491 15,180 304 312 380,072 3,161,621 3,199,365 342,328 -37,744 52,460 688,365 679,951 60,874 8,414 575,945 17,744,479 17,838,193 482,231 -93,714 1,788 3,373 2,323 electricity purchased at WEM 393,331 16,017,881 15,948,982 462,230 68,899 electricity purchased from IESC 126,157 1,299,388 1,449,410 -23,865 -150,022 purchased heat 55,406 423,099 438,013 40,492 -14,914 Electric capacity 2,938 32,585 29,010 6,512 3,575 Infrastructure services at WME 187,839 1,435,543 1,506,009 117,372 -70,466 Monthly fee of RAO UES 185,910 0 185,910 0 -185,910 114,250 Payments for services of SO UES Payments for services of CFS and ATS Registration of property Services IESC services on electricity transmission Other services 1,050 4,111 0 1,370,775 1,256,525 114,250 1,929 64,768 63,574 3,123 1,194 -355 15,384 14,184 845 1,200 413,480 3,092,882 2,895,608 610,753 197,273 6,798 6,567 13,364 1 -6,797 406,682 3,086,315 2,882,244 610,753 204,071 OAO Irkutskenergo 157 Implementation of cash flow budget Appendix 5. Taxes 1,326,323 10,767,613 Water tax 9,650,474 2,443,462 1,117,139 521,520 172,379 1,214,438 692,918 693,899 Unified social tax 23,021 1,021,666 1,006,737 37,950 14,929 Land tax 40,707 279,299 304,915 15,091 -25,616 Pollution charge 27,957 87,906 87,148 28,715 758 907 1,885 2,203 589 -318 Transport tax Income tax -27,260 3,377,919 2,928,903 421,756 449,016 VAT 935,804 4,111,840 3,970,081 1,077,563 141,759 15,091 Property tax 152,808 671,506 656,415 167,899 Other taxes 0 103 103 0 0 Current tax penalties and fines 0 1051 1051 0 0 0 243,073 243,073 0 0 332 35,426 35,304 454 122 Insurance payments Expenses on non-production area Personnel training Payments on non-operating expenses Other expenses Settlements under agency contract with IESC -153 49,283 48,717 413 565 0 337,044 337,044 0 0 0 95,037 153,742 -58,705 -58,705 3,463 47,005 43,739 6,729 3,266 1,182,600 10,684,494 3,954,754 Financial result 16,333,818 Investment activities Inflows from investment activities 6,729,740 5,137,355 Inflows from sales of securities (except promissory notes), equity units, shares, stocks. Interests and dividends receivable 2,147,830 0 33,260 209,866 308,059 92,014 425,911 216,045 22,322 121,631 2,970 140,983 118,661 4,349,722 4,674,677 972,740 8,051,659 3,701,937 0 32,987 81,616 -48,629 -48,629 Interest received Inflows from sale of third-party promissory notes Receipt of given loans Other inflows from investment activities 2,114,570 -33,260 Outflows on investment activities 645,471 9,899,521 16,364,452 -5,819,460 -6,464,931 Investment program 645,471 4,352,008 4,432,049 565,430 -80,041 Services of building contractors 402,102 2,062,990 2,039,369 425,723 23,621 Materials and equipment for investment activities 253,772 2,070,717 2,201,639 122,850 -130,922 Information technology -10,403 218,301 191,041 16,857 27,260 0 393,300 6,809,739 -6,416,439 -6,416,439 Purchase of securities (except promissory notes), equity units, shares, stocks 158 OAO Irkutskenergo Annual report 2011 Granting of loans 0 4,674,629 4,675,809 -1,180 -1,180 Research and development 0 484,003 451,275 32,729 32,729 Other investment expenses 0 -4,420 -4,420 0 0 Financial result -15,181,852 Financing activities Inflows from financing activities 0 1,838,022 1,838,022 0 0 Promissory notes of ОАО Irkutskenergo (issue) 0 1,828,753 1,828,753 0 0 Other inflows from financing activities Outflows on financing activities Interests payable Lease payments Retirement of promissory notes of ОАО Irkutskenergo Purchase of third-party promissory notes Dividends Other outflows on financial activities 0 9,269 9,269 0 0 263,044 3,853,288 2,935,348 1,180,985 917,940 14,183 882,879 832,042 65,019 50,836 -465 1,063 -38 636 1,101 225,828 1,828,753 967,170 1,087,412 861,583 22,322 121,631 121,631 22,322 0 1,176 554,856 550,436 5,596 4,420 0 464,106 464,106 0 0 -268,492 10,323,508 -268,492 Financial result -1,097,326 Free cash flow 54,641 Credits and loans (+receipt/-repayment) 10,592,000 current credits 10,588,500 -3,268,492 7,320,008 -3,268,492 loans 3,500 3,000,000 3,003,500 3,000,000 bonds 0 0 0 0 Balance at the end 57,317 OAO Irkutskenergo 159 Appendix 6. Compliance with the Corporate Code of Conduct and Ethics Corporate Code of Conduct General Meeting of Shareholders 1 Shareholders shall be notified of the General Meeting of Shareholders no later than 30 days before the Meeting date regardless of agenda items unless the law stipulates a longer term 2 Shareholders shall have access to the list of individuals eligible for participation in the General Meeting of Shareholders, starting from the date of notification on the General Meeting of Shareholders till the closure of an ordinary General Meeting of Shareholders, and in case if the General Meeting of Shareholders is in the form of absentee ballot - before the closing date for receipt of ballots 3 Shareholders shall have access to information (materials) to be submitted during preparation for the General Meeting of Shareholders by electronic means, including the Internet 4 Shareholders may include an item in the agenda of the General Meeting of Shareholders or require convening of the General Meeting of Shareholders without submitting an extract from the Shareholder Register in case if the shareholder’s rights are recorded in the Shareholder Register. In case if the shareholder’s rights are recorded on the custody account, submission of a custody account statement is sufficient to exercise the rights mentioned above 5 The Company’s Charter or internal documents shall require that the CEO, members of the Board of Directors, the Management Board and the Audit Commission, as well as the Company Auditor shall attend the General Meeting of Shareholders 6 Candidates shall attend the General Meeting of Shareholders considering issues of their election to the position of CEO, to the Board of Directors, the Management Board, the Audit Commission, as well as the issue of approval of the Company Auditor 7 Internal documents of the Company shall stipulate the procedure for registration of participants of the General Meeting of Shareholders Board of Directors 8 The Company’s Charter shall empower the Board of Directors to approve the Company’s annual business plan 9 The Company’s risk management policy shall be approved by the Board of Directors 10 The Company’s Charter shall empower the Board of Directors to make a decision on suspending the powers of the CEO appointed by the General Meeting of Shareholders 11 The Company’s Charter shall empower the Board of Directors to define qualification requirements and the amount of remuneration of the CEO, members of the Management Board and chief executives of the Company’s main departments 12 The Company’s Charter shall empower the Board of Directors to approve the terms and conditions of contracts with the CEO and members of the Management Board 13 The Company’s Charter or internal documents shall require that votes of members of the Board of Directors are not to be considered when approving the terms and conditions of contracts with the CEO (Managing Company, Manager) and with members of the Management Board in case if these members of the Board of Directors are the CEO and members of the Management Board 14 The Company’s Board of Directors shall include at least three independent directors who meet the requirements of the Corporate Code of Conduct 160 OAO Irkutskenergo Annual report 2011 Compliance/non-compliance Comments Complied with Charter, article 9, paragraph 9.26 Complied with Charter, article 5, paragraph 5.1 Complied with The materials are disclosed on the corporate website at www. irkutskenergo.ru; they also can be sent to shareholders at their request Complied with Charter, article 5, paragraph 5.1 Complied with Regulations on the Board of Directors, article 6; Regulations on the General Meeting of Shareholders, article 27, paragraph 2 Provisions of Regulations on the General Meeting of Shareholders are complied with Regulations on the General Meeting of Shareholders, article 27, paragraph 1 Complied with Regulations on the General Meeting of Shareholders, articles 39-40 Complied with Charter, article 10, paragraph 10.2 Complied with Regulations on the Board of Directors, article 6; Regulations on the procedures for internal control over financial and business operations, article 2, paragraph 2.2 In accordance with the Charter, the CEO is appointed by the Board of Directors Charter, article 10, paragraph 10.2 Complied with Charter, article 10, paragraph 10.2 Complied with Charter, article 10, paragraph 10.2 Complied with Established practice of corporate conduct Complied with Established practice of corporate conduct OAO Irkutskenergo 161 Appendix 6. Compliance with the Corporate Code of Conduct and Ethics 15 Individuals who have been found guilty of financial crimes, crimes against the state, interests of government service or service in local authorities, or who have been subjected to administrative sanctions for illegal actions in the spheres of business or finance, taxation, or securities market, shall not be elected as members of the Board of Directors 16 Individuals being shareholders, the CEO (or Manager), members of an executive body or employees of a legal entity competing with the Company shall not be elected as members of the Board of Directors 17 The Company’s Charter shall require that the Board of Directors should be elected by cumulative voting 18 The Company’s internal documents shall require that members of the Board of Directors should avoid any actions that may lead to conflict of their interests and the Company’s interests. If such conflict arises, members of the Board of Directors shall disclose this information to the Board of Directors 19 The Company’s internal documents shall require that members of the Board of Directors should notify the Board of Directors in the written form of their intention to make a transaction in securities of a company where they are members of the Board of Directors or of its subsidiaries (affiliates), as well as should disclose information on such transactions which have been already made 20 The Company’s internal documents shall require that meetings of the Board of Directors should be held no less than once every six weeks 21 Meetings of the Board of Directors shall be held no less than once every six weeks within the reporting year 22 The Company’s internal documents shall establish the procedure for holding the meetings of the Board of Directors 23 The Company’s internal documents shall require that the Board of Directors should approve the Company’s transactions amounting to 10 or more percent of the Company’s assets except common business transactions 24 The Company’s internal documents shall a) empower the Board of Directors to obtain from the executive bodies and chief executives of the Company’s departments any information necessary for performing their functions, and b) establish responsibility in case if the required information is not submitted 25 Establishing the Strategic Planning Committee of the Board of Directors or delegating the functions of this Committee to another Committee (except the Audit Committee and the HR and Remuneration Committee) 26 Establishing the Audit Committee of the Board of Directors which recommends the Company’s Auditor to the Board of Directors and interacts with him and the Company’s Audit Commission 27 Only independent and non-executing directors can be elected to the Audit Committee 28 The Audit Committee shall be managed by an independent director 29 All of the Company’s internal documents shall stipulate access of the Audit Committee members to any of the Company’s documents and data in case if they adhere to the non-disclosure agreement 30 Establishing the HR and Remuneration Committee of the Board of Directors which determines the criteria for selection of candidates to the Board of Directors and develops the Company’s remuneration policy 31 The HR and Remuneration Committee shall be managed by an independent director 32 Officials of the Company shall not be elected to the HR and Remuneration Committee 33 Establishing the Risk Committee of the Board of Directors or delegating the functions of this Committee to another Committee (except the HR and Remuneration Committee) 34 Establishing the Conflict Management Committee of the Board of Directors or delegating the functions of this Committee to another Committee (except the Audit Committee and the HR and Remuneration Committee) 35 Officials of the Company shall not be elected to the Conflict Management Committee 36 The Conflict Management Committee shall be managed by an independent director 162 OAO Irkutskenergo Annual report 2011 Complied with According to the established practice, these facts are to be revealed during consideration of candidates Complied with According to the established practice, these facts are to be revealed during consideration of candidates Complied with Charter, article 10, paragraph 10.7 Complied with Regulations on the Board of Directors, article 6 Complied with Regulations on the Board of Directors, article 6; Regulations on Information Policy, article 4, paragraph 4.3 Regulations on the Board of Directors are complied with Complied with There were 19 meetings of the Board of Directors in 2011 Complied with Regulations on the Board of Directors, articles 12-24 Complied with Charter, article 10, paragraph 10.2 Complied with Established practice of corporate conduct Complied with Regulations on the Strategy and Restructuring Committee Complied with Regulations on the Audit Committee Complied with Regulations on the Audit Committee, paragraphs 2, 2.4 Complied with Regulations on the Audit Committee, paragraphs 2, 2.4 Complied with Regulations on the Audit Committee, paragraphs 2, 3.5 Complied with Regulations on the HR and Remuneration Committee Complied with Regulations on the HR and Remuneration Committee, paragraphs 5, 5.4 Complied with Regulations on the HR and Remuneration Committee, paragraphs 5, 5.4 The Committee has not been established The Committee has not been established This requirement will be considered when establishing the Committee This requirement will be considered when establishing the Committee OAO Irkutskenergo 163 Appendix 6. Compliance with the Corporate Code of Conduct and Ethics 37 The Company’s internal documents approved by the Board of Directors shall establish the procedure for the Committees’ establishment and functioning 38 The Company’s Charter shall establish the procedure for determining the quorum of the Board of Directors which will ensure mandatory attendance of independent directors at the meetings of the Board of Directors Executive bodies 39 Establishing a collective executive body (Management Board) of the Company 40 The Company’s Charter or internal documents shall require that the Management Board approve any transactions in real estate property, receiving loans, unless such transactions are treated as large or common business transactions 41 Internal documents of the Company shall stipulate the procedure for obtaining approval for operations not provided for by the Company’s business plan 42 Individuals being shareholders, the CEO (or Manager), members of an executive body or employees of a legal entity competing with the Company shall not be elected as members of the Company’s executive bodies 43 Individuals who have been found guilty of financial crimes, crimes against the state, interests of government service or service in local authorities, or who have been subjected to administrative sanctions for illegal actions in the spheres of business or finance, taxation, or securities market, shall not be elected as members of the Company’s executive bodies. In case if a Managing Company or a Managing Director perform the functions of a sole executive body, the CEO and members of the Management Board of the Managing Company shall comply with the requirements for the CEO or members of the Management Board of the Company 44 The Company’s Charter or internal documents shall prohibit the Managing Company (Managing Director) to perform similar functions in a competing entity or have any other contractual relations with the Company apart from providing the services of a Managing Company (Managing Director) 45 The Company’s internal documents shall stipulate that members of the Executive bodies should avoid any actions that may lead to a conflict of their interests and the Company’s interests. If such conflict arises, members of the Executive bodies shall disclose this information to the Board of Directors 46 The Company’s Charter or internal documents shall establish the criteria for selection of a Managing Company (Managing Director) 47 Executive bodies of the Company shall provide the Board of Directors with monthly reports on their activities 48 Any agreements concluded between the Company and CEO (Managing Company, Managing Director) and members of the Management Board shall establish responsibility for violation of information disclosure clauses Company Secretary 49 The Company shall employ a qualified official (Company Secretary) who is responsible for ensuring that the Company’s bodies and officials fulfill procedural requirements protecting the Company shareholders’ rights and legal interests 50 The Company’s Charter or internal documents shall establish the procedure for appointment of the Company Secretary and his responsibilities 51 The Company’s Charter shall establish requirements for candidates for the position of the Company Secretary 164 OAO Irkutskenergo Annual report 2011 Complied with Regulations on the Budget Committee, Regulations on the Strategy and Restructuring Committee, Regulations on the Audit Committee and Regulations on the HR and Remuneration Committee have been approved by the Board of Directors Complied with Charter, article 10, paragraph 10.11 Complied with Charter, article 9, article 11 Complied with Charter, article 11, paragraph 11.10 Complied with Charter, article 10, paragraph 10.2 Complied with Charter, article 11, paragraph 11.3 Complied with According to the established practice, these facts are to be revealed during consideration of candidates Complied with The power of a sole executive body is exercised by the CEO according to the Regulations on the CEO Complied with Regulations on the CEO, article 3; article 11, paragraph 11.10 Regulations on the Executive Board, article 3 Criteria have not been established The power of a sole executive body is exercised by the CEO according to the Regulations on the CEO Regulations on the CEO are complied with Charter, article 11, paragraph 11.11 Complied with Regulations on Insider Information, article 8 Complied with These functions are performed by the Corporate Governance Department and the Secretary of the Board of Directors Complied with Regulations on the General Meeting of Shareholders, Regulations on the Board of Directors, Regulations on the Corporate Governance Department Complied with Requirements for candidates on the position of the Secretary of the Board of Directors are established in the Regulations on the Board of Directors OAO Irkutskenergo 165 Appendix 6. Compliance with the Corporate Code of Conduct and Ethics Significant Corporate Actions 52 The Company’s Charter or internal documents shall require approval of a large transaction before it is made 53 An independent appraiser shall be involved for estimation of the market value of property being the subject of a large transaction 54 The Company’s Charter shall prohibit to carry out any actions aimed at protection of interests of members of the Executive bodies and members of the Board of Directors, as well as threatening the position of shareholders (including prohibiting the Board of Directors from making a decision on issuing additional shares, convertibles or securities granting a right to purchase the Company’s shares before the expected period for shares purchase expires, even if the right to make such a decision is established by the Charter) in case of acquisition of a large stake in the Company (takeover) 55 The Company’s Charter shall require that an independent appraiser should be involved in the analysis of current market value of shares and possible changes in it upon the takeover 56 The Company’s Charter shall require that in case of takeover, a purchaser should offer the shareholders to sell the Company’s common shares (convertibles) they own 57 The Company’s Charter or internal documents shall require that in case of reorganization an independent appraiser should be involved to determine the swap ratio Information Disclosure 58 The Board of Directors approved an internal document establishing the rules and approaches to information disclosure applied by the Company (Regulations on Information Policy) 59 The Company’s internal documents shall establish mandatory disclosure of information on: a) goals of shares placement; b) persons intending to purchase the placed shares (including large stakes); c) probable participation of the Company’s top officials in purchase of the Company’s shares 60 The Company’s internal documents shall contain the list of information, documents and materials to be provided to shareholders for dealing with agenda items at the General Meeting of Shareholders 61 The Company shall have its own website and regularly disclose information on the website 62 The Company’s internal documents shall require disclosure of information on: a) any transactions with individuals treated as senior executives under the Charter; b) any transactions with organizations where the Company’s officials directly or indirectly own 20 or more percent of the authorized capital of the Company or whereon such individuals may have substantial influence 63 The Company’s internal documents shall require disclosure of information on any transactions that may have a significant impact on the market value of the Company’s shares 64 The Board of Directors approved an internal document regulating the use of material information on the Company’s activities, shares and other securities, as well as any transactions in them in case if this information is confidential and its disclosure may have a significant impact on the market value of the Company’s shares and other securities Control over financial and economic activities 65 The Board of Directors approved procedures for internal audit of the Company’s financial and business operations 66 The Company shall establish a special unit ensuring that internal audit procedures are performed (Internal Audit Department) 67 The Company’s internal documents shall require that the Board of Directors should define the structure and composition of the Internal Audit Department 166 OAO Irkutskenergo Annual report 2011 Complied with Charter, article 10, paragraph 10.2 Complied with Requirements of the applicable legislation are met No prohibition No requirements No requirements No requirements Established by the applicable legislation Complied with Regulations on Information Policy No requirements Complied with Charter, article 9, paragraph 9.31 Article 13, paragraphs 13.6-13.8; Regulations on the General Meeting of Shareholders, articles 25, 26 Complied with www.irkutskenergo.ru Complied with Regulations on Information Policy, article 4, paragraph 4.3 Complied with Regulations on Insider Information, article 10 Complied with Regulations on Insider Information Complied with Regulations on the Audit Commission; Regulations on Control and Internal Audit Department; Regulations on Internal Control Department Complied with Audit Commission; the Internal Audit Department; the Internal Control Department Complied with Charter, article 12; Regulations on the Audit Commission OAO Irkutskenergo 167 Appendix 6. Compliance with the Corporate Code of Conduct and Ethics 68 Individuals who have been found guilty of financial crimes, crimes against the state, interests of government service or service in local authorities, or who have been subjected to administrative sanctions for illegal actions in the spheres of business or finance, taxation, or securities market, shall not be members of the Internal Audit Department 69 Individuals being members of the Company’s executive bodies as well as shareholders, the CEO (or Manager), members of an executive body or employees of a legal entity competing with the Company shall not be members of the Internal Audit Department 70 The Company’s internal documents shall set the deadlines for submission of documents and materials to the Internal Audit Department for assessment of financial and business operations, as well as responsibility of the Company’s officials and employees for failing to submit the required documents in time 71 The Company’s internal documents shall require that the Internal Audit Department should notify the Audit Committee of any discovered violations. In case if the Audit Committee has not been established, the Internal Audit Department should notify the Board of Directors. 72 The Company’s Charter shall require that the Internal Audit Department should make a preliminary estimation of feasibility of any operations not provided for by the Company’s business plan (unusual operations) 73 The Company’s internal documents shall establish procedures for obtaining approval of the Board of Directors for an unusual operation 74 The Board of Directors approved an internal document establishing procedures for auditing business processes of the Company by the Audit Commission 75 The Audit Committee shall review the Auditor’s report before it is submitted to the shareholders at the General Meeting of Shareholders Dividends 76 The Board of Directors approved an internal document according to which the Board of Directors accepts recommendations on the size of dividends (Regulations on Dividend Policy) 77 Regulations on Dividend Policy shall establish: a) the procedure for determining the minimum portion of the Company’s net profit allocated for dividend payments and b) conditions for non-payment or partial payment of dividends on preference shares (their size is stipulated in the Company’s Charter) 78 Data on the Company’s dividend policy and changes thereof shall be published: a) in a periodical intended for publication of notifications of General Meetings of Shareholders in accordance with the Company’s Charter, and b) on the Company’s website 168 OAO Irkutskenergo Annual report 2011 Complied with According to the established practice, these facts are to be revealed during consideration of candidates Complied with Charter, article 10, paragraph 10.2 The deadlines are not set Complied with Regulations on the Audit Commission, article 6 No requirements Complied with Charter, article 10, paragraph 10.2 Complied with Regulations on the Audit Commission Complied with Regulations on the Audit Committee, article 3, paragraph 3.1 No requirements No requirements The requirement will be considered during preparation of the Regulations on Dividend Policy The requirement will be considered during preparation of the Regulations on Dividend Policy OAO Irkutskenergo 169 Appendix 7. Information on Large Transactions and Non-Arm’s Length Transactions In 2011, OAO Irkutskenergo did not make any large deals. In 2011, OAO Irkutskenergo made the following transactions subject to approval by the Company’s authorized bodies as non-arm’s length transactions under the applicable legislation: Transaction Description (subject, value, and term of agreement) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Transaction Value Extraordinary General Meeting of Shareholders, Minutes No. 27 dated October 06, 2011 Related party: member of the Board of Directors of OAO Irkutskenergo, O.V. Deripaska Counterparty: OAO RUSAL Bratsk (Buyer) Conclusion of supplementary agreement No. 1 to the electricity and capacity sales and purchase Changes in pricing conditions agreement. Counterparty: OAO SUAL (Buyer) Conclusion of supplementary agreement No. 1 to the electricity and capacity sales and purchase Changes in pricing conditions agreement. Minutes No. 56 (209) of the Board of Directors, dated February 11, 2011 Related party: OAO EuroSibEnergo, a shareholder of OAO Irkutskenergo owning more than 20% of shares Counterparty: ZAO GES-remont (Seller) ZAO GES-remont shall sell and OAO Irkutskenergo shall take ownership of and pay for movable property RUB 61,663.34, incl. VAT-18% (RUB 9,406.34) previously in use. ZAO GES-remont shall sell and OAO Irkutskenergo shall take ownership of and pay for movable property RUB 24,159. 86, incl. VAT-18% (RUB 368.40) previously in use. ZAO GES-remont shall sell and OAO Irkutskenergo shall take ownership of and pay for movable property RUB 306,446.65, incl. VAT (RUB 46,746.10) previously in use. Counterparty: OOO EC Irkutskenergo (Buyer) OAO Irkutskenergo shall sell, and OOO EC Irkutskenergo shall buy a PPU-3A type Mobile Electrotechnical RUB 3,514,425.62, incl. VAT (RUB 536,098.82) Laboratory on a Fiat Ducato basis, according to the terms of agreement. OAO Irkutskenergo shall transfer movable property to OOO EC Irkutskenergo. RUB 235,200, incl. VAT (18% - RUB 35,877.97) Counterparty: Irkutskenergosbyt (Seller) RUB 5,258,850, incl. VAT (18% - RUB 683,650.50) Assets transferred to OAO Irkutskenergo. Real estate transferred to OAO Irkutskenergo. RUB 8,217,700, incl. VAT (18% - RUB 1,068,301) RUB 7,240,000, incl. VAT (18% - RUB 1,104,406.77) Real estate transferred to OOO Irkutskenergosbyt. Counterparty: Bratskenergoremont (Seller) ZAO Bratskenergoremont shall supply (transfer) to OAO Irkutskenergo spare parts for CHPP-6 equipment, RUB 1,611,713.63, which is an Irkutskenergo Central Area branch. incl. VAT (18%, RUB 245,854.62) Counterparty: ZAO SibirEnergoTrade (Seller) ZAO SibirEnergoTrade transfers real estate and land plots to OAO Irkutskenergo. RUB 21,436,714.15 ZAO SibirEnergoTrade transfers real estate to OAO Irkutskenergo RUB 40,269,174.99, incl. VAT (18%, RUB 7,248,451.32) Counterparty: ZAO MAREM+ (Buyer) OAO Irkutskenergo shall transfer (supply) to ZAO MAREM+ electric power and capacity, and the Seller shall RUB 1,108,020.00, incl. VAT buy and pay for electric power and capacity in accordance with the terms of Agreement, the Rules, and RUB 2,265,600.00, incl. VAT Specifications to the electric power and capacity sale and purchase agreement as well as with the Register RUB 3,052,896.00, incl. VAT of Transactions created by the Exchange on the basis of requests RUB 2,671,567.20, incl. VAT Counterparty: OOO HPP-Engineering (Contractor) Reconstruction of the main control panel (IHPP). RUB 12,390,000, incl. VAT – RUB 1,890,000 Reconstruction of the remote control channel of the centralized system of active and reactive power RUB 4,130,000, incl. VAT (RUB 743,400) regulators, replacement of the automatic frequency and power control terminal (U-I HPP). Reconstruction of the remote control channel of the centralized system of active and reactive power RUB 4,130,000, incl. VAT (RUB 743,400) regulators, replacement of the automatic frequency and power control terminal (U-I HPP). Counterparty: OOO Irkutskenergosbyt (Buyer) OAO Irkutskenergo shall transfer (supply) electric energy and capacity to OOO Irkutskenergosbyt, and the Total: Buyer shall buy and pay for electric energy and capacity in accordance with the terms of Agreement, the RUB 1,530,045,309.50, incl. VAT Rules, the Specifications to the forward supply contract and with the Transaction Register created by the Exchange on the basis of the Seller’s and Buyer’s requests and other internal documents of the Exchange. According to the Register, 68 transactions were made. Counterparty: ZAO Bratskenergoremont (Borrower) OAO Irkutskenergo grants a loan until December 31, 2011 (inclusive), at a 8.5% p.a. interest rate. RUB 7,000,000 The loan shall be repaid by December 31, 2011. Counterparty: ZAO Irkutskzoloproduct (Borrower) OAO Irkutskenergo grants a loan until December 31, 2012 (inclusive), at a 8.5% p.a. interest rate. RUB 17,500,000 The loan shall be repaid by December 31, 2012 Prolongation of loan agreement No. 615 dated September 09, 2010. Agreement valid RUB 4,500,000 until December 31, 2011 170 OAO Irkutskenergo 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 Counterparty: OOO EC Irkutskenergo (Borrower) OAO Irkutskenergo grants a loan until December 31, 2011 (inclusive), at a 8.5% p.a. interest rate. The loan shall be repaid by December 31, 2011. ZAO Baikalenergo (Borrower) OAO Irkutskenergo grants a loan until December 31, 2014 (inclusive), at a 8.5% p.a. interest rate. The loan shall be repaid by December 31, 2014. Prolongation of loan agreement No. 1354 dated September 09, 2010 until 31.12.2014. The loan shall be repaid by December 31, 2014. Counterparty: ZAO Irkutskenergotrans (Borrower) OAO Irkutskenergo grants a loan until December 31, 2015 (inclusive), at a 8.5% p.a. interest rate. The loan shall be repaid by December 31, 2015 Counterparty: OOO Irkutskenergosbyt (Buyer) OAO Irkutskenergo shall transfer capacities to OOO Irkutskenergosbyt RUB 15,051,000 RUB 43,000,000 RUB 70,000,000 RUB 33,600,000 RUB 81,985,970.43, incl. VAT RUB 63,684,333.43, incl. VAT RUB 183,762,209.54, incl. VAT Counterparty: OAO INTER RAO UES (Buyer) Related parties: E.V. Dod, B.Yu. Kovalchuk, members of the Board of Directors of OAO Irkutskenergo OAO Irkutskenergo shall transfer (supply) electric energy and capacity to OAO INTER RAO UES, and OAO RUB 2,802,000 net of VAT INTER RAO UES shall buy and pay for electric power and capacity according to the terms of Agreement, Rules, Specifications to the electric power and capacity sale and purchase agreement and to the Register of Transactions formed by the Exchange on the basis of the Seller’s and Buyer’s requests, as well as in compliance with other internal Exchange documents. Minutes No.58 (211) of the Board of Directors dated April 22, 2011 Counterparty: OAO SO UES (Contractor) Related party: R.R. Sharipov, member of the Board of Directors of OAO Irkutskenergo Supplementary contract to the agreement No. ODU-197, dated November 10, 2008, providing for dispatch No changes in the service prices under the main control services in exchange for payment. agreement Minutes No.62 (215) of the Board of Directors dated July 15, 2011 Counterparty: OOO EuroSibEnergo-Consult (Seller) Related party: OAO EuroSibEnergo, shareholder of OAO Irkutskenergo, owning more than 20% of shares. 500,000 ordinary registered shares of OAO AKME-engineering, state registration number of the issue RUB 53,300,000 1-01-13963-А, with a par value of one ruble per share, are transferred to OAO Irkutskenergo. Counterparty: SC Rosatom Related party: OAO INTER RAO UES, a shareholder of OAO Irkutskenergo, owning more than 20% of shares Agreement on the procedures for joint management of OAO AKME-engineering Counterparty: OOO EuroSibEnergo-Consult (Cedent) Related party: OAO EuroSibEnergo, a shareholder of OAO Irkutskenergo, owning more than 20% of shares. OOO EuroSibEnergo-Consult transfers the rights under the loan agreement to OAO Irkutskenergo, entitling RUB 595,000,000 it to receive RUB 595,000,000 from OAO AKME-engineering as loan repayment Counterparty: OAO AKME-engineering (Borrower) OAO Irkutskenergo grants a loan, to be repaid by December 31, 2015 RUB 355,000,000 Counterparty: OOO EuroSibEnergo-Consult (Copyright owner) OOO EuroSibEnergo-Consult transfers to OAO Irkutskenergo R&D results concerning the Construction of a RUB 177,000,000, incl. VAT (RUB 27,000,000) Working Prototype of a Power Generating Unit with a SVBR-100 Reactor. Counterparty: OOO EuroSibEnergo-Consult, OAO OKB GIDROPRESS OOO EuroSibEnergo-Consult transfers its rights with the consent of OAO OKB GIDROPRESS to OAO RUB 274,274,740 Irkutskenergo, who accepts the rights and liabilities of the former and becomes a party to the Research and Development Agreement No. 03015, dated April 01, 2010, which had been concluded between OOO EuroSibEnergo-Consult and OAO OKB GIDROPRESS Counterparty: OOO EuroSibEnergo-Consult (Customer), OAO AKME-engineering (Contractor) OOO EuroSibEnergo-Consult transfers its rights and liabilities, and OAO Irkutskenergo (New customer) accepts the rights and liabilities of the former and becomes a party to the Consultation Contract No. 1/03015, dated April 01, 2010, concluded between OOO EuroSibEnergo-Consult and OAO AKME-engineering. Counterparty: OOO EC Irkutskenergo (Buyer) Transfer of movable property to OOO EC Irkutskenergo RUB 119,800, incl. VAT (18% - RUB 18,274) Counterparty: ZAO Irkutskenergotrans (Seller) Transfer of movable property (general and emergency ventilation of indoor parking spaces of the RUB 3,290,600, incl. VAT (18% - RUB 501,956) Irkutskaya HPP utilities) to OAO Irkutskenergo. Counterparty: OOO Irkutskenergosbyt (Seller) Transfer of real estate RUB 10,351,871.35, incl. VAT (18%). Counterparty: ZAO Baikalenergo (Borrower) OAO Irkutskenergo grants a loan for the period from March 22, 2011 to December 31, 2012 (inclusive), at RUB 63,000,000 an interest rate determined by the Agreement. The loan is to be repaid by December 31, 2012. Minutes No.63 (216) of the Board of Directors dated July 21, 2011 Counterparty: OOO Irkutsk Utility Systems (Borrower) Related party: OAO EuroSibEnergo, a shareholder of OAO Irkutskenergo, owning more than 20% of shares OAO Irkutskenergo grants a loan for the period from the effective date to December 31, 2012, at a 7.7% RUB 300,000,000.00 p.a. interest. The loan is to be repaid by December 31, 2012 Counterparty: OOO Vostsibuglesbyt (Borrower) OAO Irkutskenergo grants a loan for the period from the effective date to August 31, 2014, at a 8.6% p.a. RUB 1,178,000,000.00 interest. The loan is to be repaid by August 31, 2014 OAO Irkutskenergo 171 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 Counterparty: OOO EuroSibEnergo-Consult (Borrower) OAO Irkutskenergo grants a loan for the period from the effective date to July 03, 2016, at a 8.0% p.a. RUB 1,070,000,000.00 interest. The loan is to be repaid by July 03, 2016 Minutes No.64 (217) of the Board of Directors dated August 19, 2011 Counterparty: Gazprombank (Open Joint-Stock Company) Related party: OAO INTER RAO UES, a shareholder of OAO Irkutskenergo, owning more than 20% of shares Approve a transaction by OAO Irkutskenergo: supplementary agreement No.1 to Loan Agreement No.3510005-КЛ dated March 22, 2011 on opening a line of credit (GPB (OAO)) Approve a transaction by OAO Irkutskenergo: supplementary agreement No.1 to Overdraft Agreement No.3511-002-0В dated January 31, 2011 between the Company and GPB (OAO) Counterparty: OAO IESK (Buyer) Related parties: A.Yu. Sergeev, A.V. Martynenko, members of the Board of Directors of OAO Irkutskenergo Transfer of 19 land plots to OAO IESK. RUB 1,101,147.00 Minutes No.65 (218) of the Board of Directors dated September 09, 2011 Counterparty: ZAO Baikalenergo (Buyer) Related party: OAO EuroSibEnergo, a shareholder of OAO Irkutskenergo, owning more than 20% of shares. OAO Irkutskenergo shall transfer movable property to ZAO Baikalenergo, and ZAO Baikalenergo shall RUB 9,816,200.04, accept this property and pay for it incl. VAT (18%, RUB 1,497,386.45) OAO Irkutskenergo shall transfer movable property (vehicles) to ZAO Baikalenergo, and ZAO Baikalenergo RUB 38,758,897.54, shall accept this property and pay for it. incl. VAT (18%, RUB 5,912,374.20) Counterparty: OOO Irkutskenergosbyt (Buyer) OAO Irkutskenergo transfers movable property to OOO Irkutskenergosbyt, and OOO Irkutskenergosbyt RUB 20,717,088, accepts the Property and pays for it incl. VAT 18% - RUB 3,160,233.76 Counterparty: OOO Rudoremontnyj Zavod (Buyer) OAO Irkutskenergo shall supply manganese scrap produced during its operations RUB 100,000 (VAT-free) Counterparty: OOO Vostsibugol Company (Seller) OAO Irkutskenergo purchased movable property RUB 950,000, incl. VAT – RUB 144,915.25 Counterparty: ZAO Irkutskenergoremont (Borrower) OAO Irkutskenergo grants a loan for the period from the effective date to December 31, 2012, at a 7.5% RUB 70,000,000 p.a. interest. The loan is to be repaid by December 31, 2012. Counterparty: ZAO Baikalenergo (Borrower) OAO Irkutskenergo grants a loan at a 7.7% p.a. interest. The loan is to be repaid by December 31, 2014 RUB 41,165,000 Counterparty: OOO IGTSK (Borrower) OAO Irkutskenergo grants a loan at a 7.7% p.a. interest. The loan is to be repaid by December 31, 2013 RUB 110,000,000 OAO Irkutskenergo grants a loan at a 7.7% p.a. interest. The loan is to be repaid by December 31, 2020 RUB 110,000,000 Counterparty: ZAO Baikalenergo (Borrower) OAO Irkutskenergo grants a loan at a 7.7% p.a. interest. The loan is to be repaid by December 31, 2013 RUB 233,006,000 Counterparty: OOO TD IETrade (Supplier, Contractor, Customer) In 2010, the value of goods supplied was approximately RUB 200 mln (two hundred million), incl. VAT. RUB 200,000,000, incl. VAT. In 2011, the value of goods supplied was approximately RUB 180 mln (one hundred eighty million), incl. VAT. RUB 180,000,000, incl. VAT Technical support of the corporate computer network and provision of access to business applications RUB 5,742,432.12, incl. VAT – RUB 875,964.24 (financial and business operations) installed on the equipment of OAO Irkutskenergo Under the Agreement, OAO Irkutskenergo shall provide services related to acceptance, storage, sale of Cost of services per tonne is RUB 500, petroleum products (diesel fuel, gasoline, lubricants) and fuelling at the filling stations owned by OOO TD incl. VAT (18%, RUB 76.27) IETrade in exchange for payment. Counterparty: OOO Vostsibugol Company (Lessee) OAO Irkutskenergo leases diesel locomotives to OOO Vostsibugol Company under supplementary RUB 1,090,792.00, agreement No.1 to the contract No.64/T12-10 dated February 03, 2011 incl. VAT (18% - RUB 166,392.00) Counterparty: OOO Vostsibugol Company (Contractor) OOO Vostsibugol Company provides services: 1. shunting of open wagons loaded with coal on the fuel RUB 390,152.45, incl. VAT (RUB 59,514.78) delivery tracks, maintenance of 1,852 meters of railroad track; maintenance of 4 railroad switches per month. Counterparty: OOO Vostsibugol Company (Lessor) OOO Vostsibugol Company leases out premises under supplementary agreement No.2, dated May 26, RUB 762,482.60, incl. VAT (18%, RUB 2011, to the Real Estate (Premises) Leasehold Agreement dated December 04, 2009 116,310.91) per month Counterparty: OOO Irkutskenergosbyt (Customer) Provision of access to business applications (financial and business operations) installed on the equipment RUB 1,551,412.67, incl. VAT (18% - RUB of OAO Irkutskenergo. 236,656.16) per month Counterparty: OOO IGTSK (Customer) Provision of access to business applications (financial and business operations) installed on the equipment RUB 17,550.78, incl. VAT (RUB 2,677.24) of OAO Irkutskenergo. Routine maintenance and technical support of network equipment. per month Counterparty: OOO IESV (Customer) Provision of access to business applications (financial and business operations) installed on the equipment RUB 260,399.64, incl. VAT (18%). of OAO Irkutskenergo. Counterparty: ZAO Bratskenergoremont (Customer) The Agreement provides for access to business applications (financial and business operations) installed RUB 122,859.12, incl. VAT: 18,741.24 on the equipment of OAO Irkutskenergo. Counterparty: ZAO Baikalenergo (Customer) The Agreement provides for access to business applications (financial and business operations) installed RUB 936,820.44, incl. VAT: RUB 142,904.76 on the equipment of OAO Irkutskenergo 172 OAO Irkutskenergo 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 Counterparty: GidroEnergoServis-remont (Customer) Technical support of the corporate computer network and provision of access to business applications RUB 307,376.52, incl. VAT (RUB 46,887.96) (financial and business operations) installed on the equipment of OAO Irkutskenergo Counterparty: ZAO Spetsenergoremont (Customer) Technical support of the corporate computer network and provision of access to business applications RUB 564,471.96, incl. VAT: RUB 86,105.88 (financial and business operations) installed on the equipment of OAO Irkutskenergo. Counterparty: ZAO Irkutskzoloprodukt (Customer) Technical support of the corporate computer network and provision of access to business applications RUB 410,271.84, incl. VAT (RUB 62,583.84 ) (financial and business operations) installed on the equipment of OAO Irkutskenergo. Counterparty: ZAO IRMET (Customer) Technical support of the corporate computer network and provision of access to business applications RUB 192,521.88, incl. VAT (RUB 29,367.72) (financial and business operations) installed on the equipment of OAO Irkutskenergo Counterparty: ZAO Irkutskenergotrans (Customer) Technical support of the corporate computer network and provision of access to business applications RUB 338,950.56, incl. VAT (RUB 51,704.28) (financial and business operations) installed on the equipment of OAO Irkutskenergo. Counterparty: OOO Engineering Center Irkutskenergo (Customer) Technical support of the corporate computer network and provision of access to business applications RUB 1,728,386.88, incl. VAT (RUB 263,652.24) (financial and business operations) installed on the equipment of OAO Irkutskenergo. Counterparty: OOO Pozharnaya Okhrana Irkutskenergo (Irkutskenergo Firefighting Service) (Customer) Provision of access to business applications (financial and business operations) installed on the equipment RUB 362,976.36, incl. VAT (RUB 55,369.32 of OAO Irkutskenergo Counterparty: OOO Vostsibuglesbyt (Customer) Technical support of the corporate computer network, routine maintenance of workplaces, access to RUB 1,110,755.28, incl. VAT (RUB 169,437.24) business applications installed on the equipment of OAO Irkutskenergo Technical support of the corporate computer network, technical support and routine maintenance of RUB 8,939,073, incl. VAT (RUB 1,363,587.36) workplaces, access to business applications installed on the equipment of OAO Irkutskenergo. Counterparty: OOO Trailing (Customer) The Agreement provides for access to business applications (financial and business operations) installed RUB 275,932.44, incl. VAT (RUB 42,091.44) on Contractor’s equipment. Counterparty: OOO Irbeysky Razrez (Customer) Access to business applications (financial and business operations) installed on Contractor’s equipment RUB 194,316.60, incl. VAT (RUB 29,641.56) was provided. Counterparty: OOO ATSK (Customer) Amendments to paragraph 4.1 of the Hardware and Software Support Agreement, to be as follows: “The RUB 55,432.08 per year charge for services under the Agreement is RUB 4,619.34 per month, incl. VAT (18%, RUB 704. 65)”. Counterparty: OOO ATSK (Agent) OOO ATSK shall perform the followning legal and other actions on behalf and at the expense of OAO Remuneration amounting to 2 % Irkutskenergo: to receive payment from OAO Irkutskenergo’s consumers for heat provided after January (incl. VAT) of the payments 01, 2011 Counterparty: OOO ATSK (Principal) OAO Irkutskenergo shall perform the followning legal and other actions on behalf and at the expense of Remuneration amounting to 2 % OOO ATSK: to receive payment from OOO ATSK’s consumers (in the City of Angarsk and Angarsk District (incl. VAT) of the payments (Meget village)) for heat provided until December 31, 2010. Counterparty: OOO Tsentralizirovannaya Energoremontnaya Firma (Customer, Contractor) Running repairs of external heating networks, with a channel length of 36,055 meters, in the Severny and RUB 24,833,502.38, Baikalsk districts of the City of Angarsk, in accordance with the technical specifications. incl. VAT (18%, RUB 3,788,161.38) Maintenance of external heating networks, with a channel length of 36,055 meters, in the Severny and RUB 22,367,461.33, Baikalsk districts of the City of Angarsk. incl. VAT (18%, RUB 3,411,985.63) According to the service agreement on heat transfer, OOO CERF shall provide heat transfer services RUB 22,367,461.33, through heat networks to consumers located in Severny and Baikalsk districts of the City of Angarsk incl. VAT (18%, RUB 3,411,985.63) Counterparty: OOO EC Irkutskenergo (Contractor) Provision of services concerning process safety inspection, technical diagnosis and power equipment RUB 16,804,623.08 metal checks (boiler units, vessels, pipelines, electric equipment, turbine units). Provision of industrial services to the branches of OAO Irkutskenergo concerning monitoring of RUB 84,836,218.00 wastewater and surface water, potable, domestic and industrial water supply, emissions, air and working conditions. The Contractor (OOO EC Irkutskenergo) shall, at request of the Client (OAO Irkutskenergo), perform No changes design and survey work: District Heating Network of the 4th District (Code III). Reconstruction of the heating pipelines from TK-21 to r.h. at 1-23 Komsomolskaya St., 1-9 and 2-24 Ryabinovaya St. and 2-6 Tsvetochnaya St. Provision of services: Development of repair plans and their analysis for the buildings and structures, RUB 1,019,520.00 data input into AESMS and IMS databases. Preparation and updates of the schedule of buildings and structures examination and certification. Updates and synchronization of repair plans and service plans with examination protocols and requirements of the supervisory authorities. Provision of services: Methodological help to branches and services of OAO Irkutskenergo concerning RUB 1,463,200.00 ensuring process safety during lifting machines operation, development and adjustment of technical condition database for the fleet of lifting machines Performance of works: Adjustment of main and auxiliary equipment at the N-I CHPP branch of OAO RUB 1,323,246.34 Irkutskenergo Provision of services: Vibration-based diagnostics of power transformers at the N-I CHPP and CHPP-9 RUB 1,166,224.92 branches of OAO Irkutskenergo OAO Irkutskenergo 173 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 Performance of works: Tests concerning the burning of the 50/50 Irbeysk brown coal and Zheronsk black coal mix in the BKZ-420-140PT-2U-ICHPP boiler units Performance of works concerning evaluation of working conditions at workplaces of the N-I CHPP branch of OAO Irkutskenergo in 2011 Performance of works: Reconstruction of boiler units st. No.8 (ceiling wall replaced), No.10 (the lower radiant section replaced), No.13 (first-stage water economizer replaced), No.15 (ceiling wall replaced). Provision of services to OAO Irkutskenergo: Tests of ash collecting equipment of the boilers of st. No.1-7 at the Novo-Irkutskaya CHPP branch of OAO Irkutskenergo (Shelekhovsky area). Provision of services to OAO Irkutskenergo: Tests of thermal insulation of two turbines at the NovoIrkutskaya CHPP branch of OAO Irkutskenergo (Shelekhovsky area). Provision of services to OAO Irkutskenergo concerning the certification of thermal insulation of equipment at the Novo-Irkutskaya CHPP branch of OAO Irkutskenergo (Shelekhovsky area). Performance of works as required by OAO Irkutskenergo: Tests of ash collectors of boiler units of st. No.15 at the CHPP-16 branch of OAO Irkutskenergo. Provision of services to OAO Irkutskenergo concerning a quantitative chemical analysis of wastewater at the CHPP-11 branch of OAO Irkutskenergo. Provision of services: quality control of potable water and hot water supply and hydrogen sulfide detection at the CHPP-11 branch of OAO Irkutskenergo Provision of services: Development of measures for increasing reliability and improving the operation of power equipment and auxiliary devices at the branches of OAO Irkutskenergo Provision of services: Calculating the Strength and Homing Action of Steam Pipelines Hanger and Support System of ROU 40/11 at the CHPP-12 branch of OAO Irkutskenergo Provision of services concerning a quantitative chemical analysis of ground water in observation wells located at the RGK water inlet, CHPP-7 water inlet and TI&TS area and CHPP-6 TI&TS area (OAO Irkutskenergo branches), in accordance with the license agreements in 2011 Design works for a facility at the CHPP-10 branch of OAO Irkutskenergo: High-Pressure Direct-Flow Boiler Unit No.7. Reconstruction, replacing burners with turning ones. Provision of services: Experimental and Design Estimation of Anti-Lightning Protection, Earthing System and Electromagnetic Situation of CHPP-9 area No.1, CHPP-12, N-I CHPP, I HPP and Development of Measures for Improvement Provision of services to OAO Irkutskenergo concerning Certification of Thermal Insulation of equipment at the CHPP-12 branch of OAO Irkutskenergo Provision of services to OAO Irkutskenergo concerning Certification of Thermal Insulation of 2.5 kg*s/ sq. cm Steam Pipelines and Main Boiler Pipelines at the CHPP-12 branch of OAO Irkutskenergo (Shelekhovsky area). Provision of services concerning Comprehensive tests of ash collector and recommendations on increases in operating efficiency of boiler units TP-30 stations No. 7,8; BKZ-75-39 FB st. No.9,10,11 at the CHPP-12 branch of OAO Irkutskenergo. Provision of services concerning the examination of gas and air flow ducts of the boilers at CHPPs of OAO Irkutskenergo Provision of services concerning the analysis and measurement of adverse workplace factors in production rooms of chemical department laboratories at the CHPP-11 branch of OAO Irkutskenergo. Provision of services: taking ash dust samples after the ash collectors of boiler units at the CHPP-6, N-I CHPP, Sh.A. N-I CHPP, U-I CHPP branches of OAO Irkutskenergo. Provision of services concerning the development of KhARG Oil Pro Information and Analysis System, an oil-filled equipment database (network version) Performance of works concerning the Geodetic Monitoring of the hanging overpass over the Angara river (heating main No.4 from DB Sverdlovskaya to the Right Bank, inv. No. 22131369) of the UTS NI CHPP branch of OAO Irkutskenergo. Performance of works on the project: Geodetic Monitoring of the cable pipeline overpass over the Ushakovka River (6th pipe box heating grid from CHPP IZTM to TB-7Е, inv. No.22130518) of the UHS NI CHPP branch of OAO Irkutskenergo Provision of services concerning Maintenance of ash collecting boiler equipment of the CHPP-11 branch of OAO Irkutskenergo. Provision of services concerning Certification of thermal insulation and brickwork of boilers of st. No. 1, 5 at the CHPP-11 branch of OAO Irkutskenergo. Design and survey works: District heating network of the 4th district from heat chambers 51, 52, 56, 58, 59, upgrade of the heating network segment from ТК-56 to ТК-59 (inv. No. 1480403041209). Provision of services concerning maintenance of relay protection and automation systems of the heating network at the Novo-Irkutskaya CHPP branch of OAO Irkutskenergo. Services concerning monitoring of the Angara river water pollution within the CHPP-9 water usage area of OAO Irkutskenergo. Services concerning monitoring of the Angara river water pollution within the CHPP-10 water usage area of OAO Irkutskenergo. Performance of works: Maintenance of RP&A Systems of the Usolskaya VL-110 kV (Usolye-Sibirskoye), Usolskaya SS and of GRU-6 kV consumer units No.1,2 at the CHPP-1 branch of OAO Irkutskenergo. Performance of works: Maximum capacity tests of boiler chimneys st. No. 1 and 2 at the N-I CHPP branch of OAO Irkutskenergo (1st and 2nd construction stages). Services concerning Test firing of waste from processing facilities mixed with project fuel in the boiler st. No.10 at the CHPP-12 branch of OAO Irkutskenergo Performance of works: Surveying subsidence and tilt of the chimney of the autonomous gas boiler station, located within the Gidrostroitel electrical boiler station area in the city of Bratsk. Services concerning pollution monitoring at the Ust-Ilimsk reservoir and of the Angara river in the U-I CHPP water usage area of OAO Irkutskenergo. 174 OAO Irkutskenergo RUB 1,263,852.37 RUB 960.995.16 RUB 1,014,800.00 RUB 562,468.96 RUB 294,211.91 RUB 588,745.38 RUB 707,937.13 RUB 240,381.05 RUB 29,209.86 RUB 2,076,800.04 RUB 236,000.00 RUB 31,913.38 RUB 1,534,000.00 RUB 3,374,945.38 RUB 233,193.65 RUB 703,101.67 RUB 582,704.64 RUB 1,263,894.84 RUB 69,069.87 RUB 197,615.61 RUB 198,757.16 RUB 1,121,000.00 RUB 177,000.00 RUB 1,651,342.00 RUB 589,671.30 RUB 826,000.00 RUB 1,985,188.85 RUB 571,285.53 RUB 540,158.12 RUB 1,108,061.91 RUB 1,061,994.30 RUB 589,712.36 RUB 118,000.00 RUB 544,716.93 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 Performance of works: Test firing of high-sulphur Mugunsk coal in the boiler of st. No.6 at the U-I CHPP branch of OAO Irkutskenergo. Provision of services concerning the certification of thermal insulation of boilers of st. No.17 at the CHPP-9 branch of OAO Irkutskenergo. Services concerning the technical diagnosis and inspection of industrial safety of the CHPP-Left Bank segment of heating main No.4219. Performance of works: Certification of working conditions at the U-I CHPP branch of OAO Irkutskenergo in 2011. Services to OAO Irkutskenergo concerning monitoring of the Kaya river water pollution within the NovoIrkutskaya CHPP water usage area of OAO Irkutskenergo. Servicing of AURA-128 recorders at the CHPP-9 branch of OAO Irkutskenergo. Performance of works: Functional (heating) tests for heat losses within heating network in Leninsky district of the City of Irkutsk Provision of services concerning the certification of thermal insulation of heat and power equipment, units No.1 and 3 at the CHPP-10 branch of OAO Irkutskenergo Operational services concerning the optimization of heat generation and transportation technologies. Provision of services concerning measurements of humidity and dew point temperature of flue gases for coals with different sulphur content (Mugunsk coals), at the CHPP-11 branch of OAO Irkutskenergo. Services: Hydraulic tests of the heating network at the N-Z CHPP branch of OAO Irkutskenergo in the city of Zima and creation of a piezometric graph. Performance of works: Certification of thermal insulation of turbine equipment at the CHPP-6 branch of OAO Irkutskenergo. Performance of works: Certification of thermal insulation of boiler equipment at the CHPP-6 branch of OAO Irkutskenergo. Performance of works: Test firing of a Zheronsk and Irbeysk (Sputnik formation) coal mix in the BKZ-320140PT boiler at the CHPP-6 branch of OAO Irkutskenergo Performance of works: Inspection and certification of thermal insulation of the boiler unit of st. No.1 at the N-I CHPP branch of OAO Irkutskenergo. Performance of works concerning the creation of a system for monitoring deviations in remote control parameters for OAO Irkutskenergo branches. Services: Tests of operational HAR system at the CHPP-11 branch of OAO Irkutskenergo, creation of parameter charts. Performance of works for OAO Irkutskenergo concerning the inspection and certification of thermal insulation of turbine unit No.3 and auxiliary equipment at the N-I CHPP branch of OAO Irkutskenergo. Services to OAO Irkutskenergo concerning preparation and inspection of laboratories at OAO Irkutskenergo branches to assess the status of measurements. Services concerning analytical soil quality control in sanitary zone of the RGK ash disposal area, of CHPP-7 ash disposal area and CHPP-6 ash disposal area. Provision of services concerning inspection of technical equipment at the Novo-Ziminskaya CHPP branch of OAO Irkutskenergo in 2011. Services concerning data gathering for calculating the combinatorial water pollution index for the Rassokha river within the CHPP-16 water usage area of OAO Irkutskenergo. Provision of services to OAO Irkutskenergo: potable water, wastewater and natural surface water control services for the Ust-Ilimskaya CHPP branch of OAO Irkutskenergo. Provision of services concerning qualitative chemical analysis of ground waters in observation wells of OAO Irkutskenergo branches: area No.1 of CHPP-9, CHPP-9, UTS N-I CHPP, N-I CHPP Shelekhovsky area, N-I CHPP, CHPP-6 (central area), TI&TS area of CHPP-6 (CHPP-7), TI&TS area of CHPP-6 (RGK), CHPP-10, CHPP-11, CHPP-12, CHPP-16, N-I CHPP, U-I CHPP, in 2011. Provision of services concerning technical diagnosis of pipelines at the CHPP-6 branch of OAO Irkutskenergo. Services concerning tests of newly installed sample conditioners of OAO Irkutskenergo branches (N-I CHPP, CHPP-6, CHPP-12). Services to OAO Irkutskenergo concerning analysis of changes in coal quality. Services concerning analytical soil quality control in the sanitary protection zone of the ash disposal area at the Novo-Ziminskaya CHPP branch of OAO Irkutskenergo. Development of project and design documentation concerning a facility within area No.1 at the CHPP-9 branch of OAO Irkutskenergo: Steam, Water and Oxygen Treatment, Conservation and Passivation of Main Equipment Surfaces. Development of design and project documents concerning a facility at the CHPP-9 branch of OAO Irkutskenergo: Steam, Water and Oxygen Treatment, Conservation and Passivation of Main Equipment Surfaces. Services concerning environmental analysis of soil quality in the sanitary zone of ash disposal area at the Novo-Irkutskaya CHPP Shelekhovskiy area (a branch of OAO Irkutskenergo). Services concerning the analysis of factors causing the concentration of substances at the sewage lift stations at the industrial area and ash disposal area of the CHPP-11 branch of OAO Irkutskenergo to exceed the maximum allowable level in 2011. Services concerning environmental analysis of soil quality in the sanitary zone of the ash disposal area at CHPP-12 (a branch of OAO Irkutskenergo). Services concerning environmental analysis of soil quality in the sanitary zone of the ash disposal area at CHPP-10 (a branch of OAO Irkutskenergo). Works concerning development of solutions and industrial testing of polymict sand and other resource production from ash and slag generated at the CHPP-9 and CHPP-10 branches of OAO Irkutskenergo. Services concerning quantitative chemical analysis of fluorogypsum slurry quality, dumped at the ash disposal area of the CHPP-9 branch of OAO Irkutskenergo. RUB 1,002,863.62 RUB 188,755.57 RUB 1,084,447.09 RUB 612,429.95 RUB 159,872.45 RUB 872,962.40 RUB 1,120,088.99 RUB 1,132,164.57 RUB 18,598,861.26 RUB 886,714.73 RUB 1,121,000.00 RUB 1,120,326.79 RUB 1,061,383.87 RUB 1,061,654.73 RUB 141,566.68 RUB 472,000.00 RUB 853,928.59 RUB 305,997.15 RUB 816,904.09 RUB 58,617.39 RUB 1,767,286.00 RUB 130,195.61 According to the service price list for 2011 RUB 1,876,472.82 RUB 673,189.36 RUB 531,981.54 RUB 571,521.88 RUB 32,237.41 RUB 767,000.00 RUB 1,003,000.00 RUB 73,346.92 RUB 35,714.72 RUB 32,237.41 RUB 32,237.41 RUB 1,503,140.81 RUB 179,598.97 OAO Irkutskenergo 175 165 RUB 42,420.79 166 Services to OAO Irkutskenergo concerning environmental analysis of soil quality in the sanitary zone of the ash disposal area at the Novo-Irkutskaya CHPP of OAO Irkutskenergo. Provision of services concerning technical diagnosis and inspection of pipelines at the end of their economic life: RS-15 from TK-14 МS-2 to ТК-5 RS-15; RS-21 from ТК-20 МS-2 to ТК-1 RS-21; RS-14 ТК-13 МS-2 to ТК-9 RS-14. 167 Provision of services concerning technical diagnosis and inspection of pipelines at the end of their economic life: from TNS-2B to Sosnovskaya poultry farm. 168 The Contractor (OOO EC Irkutskenergo) shall develop project and design documents, as requested by the Client (OAO Irkutskenergo), including passing the industrial safety inspection concerning Steam, Water and Oxygen Treatment, Conservation and Passivation of Main Equipment Surfaces in the main building of U-I CHPP. 169 Project and design documents for a facility at the CHPP-6 branch of OAO Irkutskenergo: Creation of a backup remote control system at the CHPP-6 branch of OAO Irkutskenergo. 170 The Contractor shall provide the followning services at the request of the Client (OAO Irkutskenergo): Functional (heating) tests of the PT-80/100-130/13 steam turbine st. No. 3 of the Novo-Ziminskaya CHPP branch of OAO Irkutskenergo. 171 Services: Functional (heating) tests of the PT-80/100-130/13 steam turbine No.1 of the Novo-Ziminskaya CHPP branch of OAO Irkutskenergo. 172 Working projects of a backup remote control system to be created at the N-Z CHPP branch of OAO Irkutskenergo: Remote control complex Introduction of a Backup Remote Control System at the N-Z CHPP branch of OAO Irkutskenergo. 173 Performance of boiler tests to measure dew points while firing coals with different sulphur content (Mugun coal) st. No.2 of the N-I CHPP branch of OAO Irkutskenergo. 174 Performance of heating tests of boiler of st. No.2 at the N-I CHPP branch of OAO Irkutskenergo (Shelekhovsky area), creating parameter charts and measuring the dew point. 175 Performance of works: Tests and setup of scrubber intensive spraying system, including ash collector and flue gas pretreatment tests at the N-I CHPP branch of OAO Irkutskenergo (Shelekhovsky area). 176 Performance of works: Operational tests of burner equipment of BКZ- 75-39FB boiler units st. No.1 and 2 at the N-I CHPP branch of OAO Irkutskenergo (Shelekhovsky area). 177 Provision of services: Provision of the Poseidon diving boat and a boat driver to transport employees of the Client across the Ust-Ilim reservoir 178 Performance of works: Functional (heat) tests of 1st difficulty category of BKZ-320-140 boiler units st. No. 3,4,8. Determining the power parameters of boiler units at the CHPP-6 branch of OAO Irkutskenergo. 179 Provision of services: Technical diagnosis and industrial safety inspection of the underground heating network pipelines of the Ust-Ilimskaya CHPP branch of OAO Irkutskenergo in the right-bank part of the city of Ust-Ilimsk. 180 Develop project and design documentation for a facility at the Novo-Ziminskaya CHPP branch of OAO Irkutskenergo: Auxiliary equipment for boiler units, incl. environmental protection Steam, Water and Oxygen Treatment, Conservation and Passivation of Main Equipment Surfaces. 181 Provision of services concerning the certification of a GP-160 kg/sq. cm hydraulic press. 182 Provision of services concerning the technical support of the corporate computer network. 183 Provision of services: Development and implementation of measures to reduce the limitations of ash collecting equipment at the CHPP-10 branch of OAO Irkutskenergo. Counterparty: ZAO Irkutskzoloprodukt (Agent/Contractor) 184 Performance of certain measures to organize the sale of flue ash after the electric filters of boilers at CHPP-9 area No.1, Novo-Irkutskaya CHPP (N-I CHPP). 185 Performance of certain measures to organize the sale of ash and slag mixes resulting from coal firing and stored at the ash disposal areas of CHPP-9, CHPP-9 area No.1, Novo-Irkutskaya CHPP Shelekhovsky area, Novo-Ziminskaya CHPP, CHPP-6, Ust-Ilimskaya CHPP, CHPP-10 (branches of OAO Irkutskenergo). 186 Transport organization services to remove ash and slag mixes from the ash disposal areas of CHPP-9, CHPP-9 area No.1, Novo-Irkutskaya CHPP Shelekhovsky area, Novo-Ziminskaya CHPP, CHPP-6, UstIlimskaya CHPP, and CHPP-10 187 Performance of certain measures to organize fly ash sales from boilers of st. No.1-4 of TI&TS at the CHPP-6 branch of OAO Irkutskenergo. 188 Services, in exchange for payment: loading of dry ash and usage of part of a railroad track (16.00 l.m.) for its sale. 189 Provision of services concerning transportation of ash and slag mix from and within the ash disposal areas of CHPP-9, CHPP-9 area No.1, Novo-Irkutskaya CHPP Shelekhovsky area, Novo-Ziminskaya CHPP (N-Z CHPP), CHPP-6, Ust-Ilimskaya CHPP (U-I CHPP), and CHPP-10, under the conditions laid down by this agreement; the Client shall pay for these services. Area, transportation volume and cost of services are to be specified in the requests. Counterparty: ZAO GES-Remont (Contractor) 190 Auxiliary works for controlling the metal of G-1 cross-connection, inv. No. 00040601. 191 Inspection of concrete-rock contact zone at the main dam of the Bratskaya HPP (auxiliary well drilling, 13 wells) Counterparty: ZAO Irkutskenergotrans (Contractor, Client) 192 ZAO Irkutskenergotrans shall transport passengers by car 193 Supplementary agreement No.2 to contract No.16/М, on medical examination, dated December 31, 2009: the term of agreement is prolonged until December 31, 2011. The fee for medical examination is 28.80, incl. VAT (4.39 ). 194 Supplementary agreement No.16 to the passenger and freight automobile transportation contract No.866 dated April 01, 2005: passenger and freight transportation, services of special vehicles, machines and equipment are billed according to the vehicle, machines and equipment service price list. RUB 2,770,504.30 176 OAO Irkutskenergo RUB 2,766,002.60 RUB 531,000.00 RUB 167,061.82 RUB 589,497.20 RUB 589,497.20 RUB 177,377.85 RUB 1,119,888.19 RUB 507,031.01 RUB 471,748.15 RUB 509,461.60 Hourly fee: RUB 1,985.54 RUB 2,123,952.12 RUB 881,133.14 RUB 495,600.00 RUB 59,609.91 RUB 1,728,386.88 RUB 1,415,712.85 RUB 11,682,000, incl. VAT RUB 71,474.29, incl. VAT RUB 103,309,000, incl. VAT RUB 7,080, incl. VAT RUB 213.67 per car per hour RUB 103,309,000, incl. VAT RUB 782,559.06 RUB 1,333,400.00 According to the price list RUB 407,555.70 According to the price list 195 ZAO Irkutskenergotrans shall perform the transportation of freight according to the route. 196 ZAO Irkutskenergotrans shall perform the transportation of passengers to and from the Druzhba children’s recreation camp. Supplementary agreement No.1 to the passenger automobile transportation agreement No.300/ ПП dated January 01, 2011. Counterparty: OOO Irkutskenergosbyt (Client, Agent) OAO Irkutskenergo shall calculate the last-resort supplier sales price increase for 2012 and discuss it with the regulatory body (tariff service), promptly providing OOO Irkutskenergosbyt with the result. Since January 01, 2011, legal and actual actions to sell heat energy to OAO Irkutskenergo consumers. Remuneration: January - 1.69 %; February - 1.46%; March - 1.35%; April - 1.57%; May - 1.99%; June2.18%; July -2.45 %; August - 2.61 %; September-2.09%; October- 1.77%; November - 1.43%; December - 1.15% Since January 01, 2011, legal and actual actions to sell cold water to OAO Irkutskenergo consumers, to provide water supply services, wastewater removal, and sewage treatment. Remuneration: January-2.66 %, February - 2.96 %, March - 2.75 %, April - 2.91 %, May - 3.08 %, June- 2.99 %, July - 3.35 %, August 3.36 %, September - 2.95 %, October - 3.29 %, November - 3.13 %, December - 2.49 %. Counterparty: OOO Pozharnaya Okhrana Irkutskenergo (Firefighting Service) (Contractor) A supplementary agreement on changes in the fees for the services of OOO Pozharnaya Okhrana Irkutskenergo specified in the fire safety services agreement dated December 29, 2006. Changes in service prices of OOO Pozharnaya Okhrana Irkutskenergo under the agreement on maintaining readiness of emergency response personnel and equipment in case of oil and petroleum product spills and on the relevant emergency response activities, No.6-PB/09 dated June 01, 2009. A set of works performed: Installation of fire alarm systems at the of Novo-Irkutskaya CHPP branch of OAO Irkutskenergo, Shelekhovsky area. The subject of agreement is repair works: Repair of fire alarm systems at the production facilities of CHPP-12 in 2011. The subject of agreement is design works concerning a facility at the CHPP-11 branch of OAO Irkutskenergo: Fire alarms of Building THC-1 and Building THC-2. Inspection and tests of outdoor fixed fire escape ladders and roof railings of CRGK and TI&TS buildings and constructions at the CHPP-6 branch of OAO Irkutskenergo, certificates concerning further use were issued. The subject of the supplementary agreement is the change in the price of works under the agreement. The subject of agreement is services concerning measures for fire prevention at the heating networks of CHPP-11 (branch of OAO Irkutskenergo). Change in the price of services provided by OOO Pozharnaya Okhrana Irkutskenergo concerning routine inspections and maintenance of automatic fire suppression system and fire alarms. The subject of agreement is organization of training process and fire safety training for the personnel of CHPP-16 (branch of OAO Irkutskenergo). The subject of agreement is organization of training process and fire safety training for the personnel of CHPP-11 (branch of OAO Irkutskenergo) Provision of services concerning service and maintenance of fire extinguishers owned by the N-I CHPP branch of OAO Irkutskenergo. The followning repairs: overhaul of user devices in the boiler and turbine house, of the ORION fire alarm, of remote surveillance software and hardware, of the analog video cameras, of the radio center and UVKRadio complex, overhaul of the radio center at the Novo-Ziminskaya CHPP branch of OAO Irkutskenergo Development of project and design documents concerning the Fire Detection System of the Fuel Conveying System, with a Main Fuel Panel Alarm, for the Fuel Conveying System at the CHPP-16 branch of OAO Irkutskenergo The subject of agreement is construction and installation works concerning a facility at the CHPP-12 branch of OAO Irkutskenergo : Integrated Security System of CHPP-12 The subject of agreement is the provision of services concerning tests of outdoor fire escape ladders of CHPP-10 boiler and turbine houses, fuel conveying house, hydrotechnical house and chemical facility. The subject of agreement is the provision of services concerning tests of outdoor fire escape ladders and railings of administrative buildings and production facilities at the Shelekhovsky area of Novo-Irkutskaya CHPP. The subject of agreement is the provision of services concerning service and maintenance of fire extinguishers at the CHPP-16 branch of OAO Irkutskenergo The subject of agreement is the provision of services concerning support for hardware and software of the corporate computer network. The subject of agreement is service and maintenance of fire extinguishers (technical inspection and certification, charge or recharge, repair) at the Ust-Ilimskaya HPP branch of OAO Irkutskenergo. The subject of agreement is the organization of training and fire safety training for the personnel of CHPP16 (branch of OAO Irkutskenergo). The subject of agreement is the provision of services concerning tests of outdoor fire escape ladders and roof railings of buildings at the Ust-Ilimskaya CHPP The subject of agreement is provision of services concerning the optimization of the automatic fire suppression system of the fuel conveying facility at CHPP-12. The subject of agreement is changes in the price of works performed under the agreement due to an increase in the amount of works. Counterparty: OOO EC Irkutskenergo (Lessee) Lease of non-residential premises with a total area of 33.8 sq.m. Lease of non-residential premises with a total area of 1,336.45 sq.m. 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 RUB 9,982.04 net of VAT per unit of cargo transported RUB 699,664.60, incl. VAT - RUB 106,728.50 RUB 3,210,911, incl. VAT Agent’s remuneration Agent’s remuneration RUB 150,068,004.64 per year, plus VAT (18%, RUB 27,012,240.84) RUB 4,959,610.80 per year, incl. VAT (18%, RUB 756,550.80) RUB 750,000.00, plus VAT (18%, RUB 135,000.00) RUB 442,499.99, incl. VAT (18%, 67,500) RUB 90,000.00 plus VAT (18%, RUB 16,200.00). RUB 578,852.54, incl. VAT (18%, RUB 88,299.54) RUB 371,683.48, incl. VAT (18%, RUB 56,697.48) RUB 59,000.00 per month, incl. VAT (18%, RUB 9,000.00) RUB 28,189.02 per month, incl. VAT – RUB 4,300.02 RUB 64,921.00, incl. VAT (18%, RUB 9,903.20) RUB 1,200.06, incl. VAT (18%, RUB 183.06) RUB 204,000.00, net of VAT. RUB 1,097,400.00, incl. VAT (18%, RUB 167,400.00) RUB 519,200.00, incl. VAT (18%, RUB 79,200.00) RUB 1,690,000, plus VAT (18%, RUB 304,200) RUB 245,608.74, incl. VAT (18%, RUB 37,465.74 ) RUB 86,671.00, incl. VAT (18%, 13,221.00) RUB 106,200.00, incl. VAT (18%, RUB 16,200.00) RUB 30,248.03 per month, incl. VAT (18% - RUB 4,614.11) According to OOO PO Irkutskenergo tariffs RUB 76,187.88, Incl. VAT (18%, RUB 11,621.88) RUB 389,400, incl. VAT (18%, RUB 59,400) RUB 353,935.10, incl. VAT (18%, RUB 53,990.10) RUB 941,074.00, incl. VAT (18%, RUB 169,393.32) RUB 30,643.67, incl. VAT (18%, RUB 4,674.46) RUB 3,882,068.74, incl. VAT (18%, RUB 592,179.94) OAO Irkutskenergo 177 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 Lease of real estate: buildings and non-residential premises in the buildings. Lease of movable property (furniture, office equipment, computers, machinery and other equipment). Counterparty: ZAO Bratskenergoremont (Lessee) Lease of real estate: buildings and non-residential premises in the buildings. Lease of movable property: furniture, office equipment, computers, machinery and other equipment to be used in production. Lease of vehicles without driving or operating services. Counterparty: ZAO GES-Remont (Lessee) Lease of real estate: buildings and non-residential premises in the buildings. Lease of furniture, office equipment, computers, machinery and other equipment to be used in production and for achieving commercial results in accordance with the construction and operating parameters of the property. Counterparty: ZAO Baikalenergo (Lessee) Lease of real estate: buildings and non-residential premises in the buildings. Lease of furniture, office equipment, computers, machinery and other equipment. Lease of vehicles and special equipment without driving or operating services. Counterparty: ZAO Spetsenergoremont (Contractor) Running repairs of boiler units No.1-6 (N-I CHPP) Repairs and production of spare parts in machinery and repair shops (N-I CHPP) Repair of pavement of the coal unloading ramp at the ShA of N-I CHPP Repair of equipment for all facilities (pipelines and valves, PRDS). (CHPP-11) Repair of pumps at the boiler station (N-I CHPP) Repair of ash collector systems (N-I CHPP) Removal of warm air pipelines to shower rooms. Main plant building. CHPP-10 Elimination of defects in main and auxiliary equipment of BU BTH, CHPP-10 Elimination of defects in main and auxiliary equipment of TU BTH, CHPP-10. Maintenance of plant compressors (Compressors Б and В), CHPP-10 Removal of downdraft equipment of b/u of st. No.13 at CHPP-10 Repairs of TMD, ETD, producing spare parts at CHPP-9 Repair of air ducts of boilers No.3,6 at CHPP-9 Construction of scaffolding at the BC equipment of CHPP-9 Repair of electrical equipment of CHPP-9 Repair of general pumps, pumps of TRU-1 and 2, HGU-1 and 2 at CHPP-9 Repair and maintenance of the general pumping equipment at CHPP-9 Control of BC equipment metal at CHPP-9 Repair of pumps and heating units No. 1-2, 5-10 at CHPP-9 Boiler cleaning in area No.1 of CHPP-9 Construction of inventory scaffolding during the elimination of defects of the area No.1 equipment at CHPP-9 Emergency repair of boiler units No.1-8 (N-I CHPP) HU equipment repairs at CHPP-11 TG-1, TG-7 equipment repairs at CHPP-11 Standard repairs of boilers No.1,3 at CHPP-11 Standard repairs of boiler No.6, repairs of the system of hydraulic ash removal equipment (external, internal), sewerage system and fuel oil system at CHPP-11 Repair of details and spare parts in machinery and repair shops at CHPP-11 Repair of general equipment (pipelines and valves, PRDS). (CHPP-11) Running repair of auxiliary chemical water treatment pumps, overhaul of auxiliary chemical water treatment pumps (N-Z CHPP) Medium repair of boiler equipment st. No.2 (repair of chain feeders, hammer mills, screw conveyor, dampers, fuel oil burners) (N-Z CHPP) Medium repair of boiler equipment st. No.2 (repair of rotating parts, water economizer, air heater) (N-Z CHPP) Repair of hydraulic ash removal pipelines, LK 2,3 compressed air pipelines. (N-Z CHPP) Running repair of the BKZ-420-140-6 boiler equipment st. No.1. (N-Z CHPP) Overhaul of the BKZ-420-140-7 boiler equipment st. No.4 (repair of chain feeders, hammer mills, screw conveyor). (N-Z CHPP) Overhaul of the BKZ-420-140-7 boiler equipment st. No.4 (repair of machinery, raw coal storages, VZP). (N-Z CHPP) Repair of pumps of feeder-deaeration units at CHPP-9 Running repair of ABE and preparation of RNP, PVM diagnosis at CHPP-9 Vibration-based diagnostics and vibro-adjustment of equipment at CHPP-9 area No.1 Repair of boilers of st. No.4,14 at CHPP-9 area No.1 Running repair (technical diagnosis) of turbine unit No.1 (N-I CHPP) Elimination of defects arising during the operation of main and auxiliary equipment of BU KTC (CHPP-10) Elimination of defects arising during the operation of main and auxiliary equipment of TU KTC (CHPP-10) 178 OAO Irkutskenergo RUB 13,653,264.51, incl. VAT. RUB 16,781,658.54, incl. VAT. RUB 6,100,934.16, incl. VAT RUB 1,404,955.34, incl. VAT. RUB 109,109.68, incl. VAT RUB 3,143,662.67, incl. VAT RUB 346,772.14, incl. VAT RUB 5,541,779.56, incl. VAT. RUB 462,397.97, incl. VAT RUB 4,200,378.13, incl. VAT RUB 767,000, incl. VAT: 117,000 RUB 708,000.00, incl. VAT: RUB 108,000.00 RUB 2,301,000.00, incl. VAT: RUB 351,000.00 RUB 324,962.56, incl. VAT: RUB 49,570.56 RUB 1,650,796.4, incl. VAT: RUB 251,816.4 RUB 590,000, incl. VAT: 90,000 RUB 112,095.28, incl. VAT: RUB 17,099.28 RUB 590,000, incl. VAT: RUB 90,000 RUB 590,000, incl. VAT: RUB 90,000 RUB 353,998.85, incl. VAT: RUB 53,999.82 RUB 112,072.86, incl. VAT: RUB 17,095.86 RUB 2,755,300.00, incl. VAT: RUB 420,300.00 RUB 991,194.10, incl. VAT: RUB 151,199.10 RUB 1,888,171.10, incl. VAT: RUB 288,026.10 RUB 2,881,547.02, incl. VAT: RUB 439,558.02 RUB 1,455,216.12, incl. VAT: RUB 221,982.12 RUB 489,695.28, incl. VAT: RUB 74,699.28 RUB 141,600.00, incl. VAT: RUB 21,600.00 RUB 2,896,337.14, incl. VAT: RUB 441,814.14 RUB 543,508.00, incl. VAT: RUB 82,908.00 RUB 549,290.00, incl. VAT: RUB 83,790.00 RUB 2,360,000, incl. VAT: RUB 360,000 RUB 1,967,983.94, incl. VAT: RUB 300,200.94 RUB 1,081,611.6, incl. VAT: RUB 164,991.6 RUB 2,931,383.14, incl. VAT: RUB 447,160.14 RUB 1,716,111.76, incl. VAT: RUB 261,779.76 RUB 2,875,919.60, incl. VAT: RUB 438,699.60 RUB 324,962.56, incl. VAT: RUB 49,570.56 RUB 573,880,02, incl. VAT: RUB 57,541.02 RUB 1,601,773.30, incl. VAT: RUB 244,338.30 RUB 1,757,558.08, incl. VAT: RUB 268,102.08 RUB 2,236,100, incl. VAT: RUB 341,100 RUB 1,531,057, incl. VAT: RUB 233,551.08 RUB 2,633,890.98, incl. VAT: RUB 401,779.98 RUB 2,598,533.52, incl. VAT: RUB 396,389.52 RUB 1,829,853.14, incl. VAT: RUB 279,130.14 RUB 2,407,230.68, incl. VAT: RUB 67,204.68 RUB 648,987.02, incl. VAT: RUB 98,998.02 RUB 2,688,032.92, incl. VAT: RUB 410,038.92 RUB 601,800, incl. VAT: RUB 91,800 RUB 590,000, incl. VAT: RUB 90,000 RUB 354,000, incl. VAT: RUB 54,000 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 Construction and dismantling of scaffolding where required by equipment repairs. B/u of st. No.8,7. ENIN gas treatment facility (CHPP-10) Technical maintenance of CWT equipment (CHPP-11) Repair of the atmospheric deaerator No.3, ShMN, BO-4А (CHPP-11) Overhaul of the heating network. Facilities for daily preventive maintenance of cars, one line. (CHPP-10) Overhaul of the fire water pipeline and of the water supply pipeline. Facilities for daily preventive maintenance of cars, one line. (CHPP-10) Cleaning of boilers st. No.1,2 (N-Z CHPP) Standard repairs of boiler No.6, repair of the hydraulic ash removal system (external, internal), sewerage system, fuel oil system, replacement of sewage pipe box for boilers No.5,9 (change in work type) (CHPP-11) Medium repair of the BKZ 75 39fb boiler st. No.4 in the ShA of N-I CHPP Standard repairs of turbine units st. No.3,4 (CHPP-11) Repair of turbine house equipment at CHPP-11 Standard repairs of boiler unit st. No.5 (TP-85) at CHPP-11 Repair of the hydraulic ash removal system (external, internal) and general equipment of CHPP-11 Repair of BH, TH of CHPP-11 Repair of equipment parts and spare parts at EH, TAM, CHP, CF of CHPP-11 Partial replacement and repair of cold air delivery ducts before the heaters of boiler unit No.4. Replacement of the vibration system hammers of the precipitator, furnace Б of boiler unit No.4 (N-I CHPP) Repair of flue-gas pumps, blast air fans, hot blast fans and NUVM of boilers No.1-8 Running repair of DSP No.2-10, DSA No.1,2, DSV No.1-8 (N-I CHPP) Running repair of general water pipelines (N-I CHPP) Running repair of general main steam and feed water pipelines (N-I CHPP) Running repair of BKZ 75 39FB boiler No. 2 in the ShA of N-I CHPP Technological service of CWT pumping equipment (CHPP-11) Repair of BU 1-8 pumping equipment (CHPP-11) Repair of pipelines of the rear wall sloping bottom, boiler No.8 (CHPP-11) Heating main No.6 from the main building of CHPP-9 to NO-470 of CHPP-10 heating main No.2. Repair of boiler No.18, HAR equipment and PAH dust removers of CHPP-9 (area No.1) Repair of generators 16,18 and electrical equipment at CHPP-9 (area No.1) Repair of ABE at CHPP-9 Running repair of MIASS-800/40 dredger equipment (CHPP-9) Repair of KА-1, 2 TP-10, BU-5, 10, 11, 13, 16, KP-24 heating equipment. (CHPP-10) Repair of heating registers. Repair of heating pipelines (Facilities for daily preventive maintenance of cars, one line). (CHPP-10) Replacement of DrN ignition boiler equipment. Replacement of DrN-1А. Replacement of DrN No.1,2 of the 2nd line ash-pump station. (CHPP-10) Running repair of LPS of turbine units No.1,2,3,4. (CHPP-10) Running repair of brickwork (boilers No.1,2,3,4,9,10,11,12,15,16). (CHPP-10) Running repair of boiler house valves (boilers No.2,3,4,9,10,11,12,15,16). (CHPP-10) Standard repairs of HAR at CHPP-10 Routine technical certification of boiler unit No.2 (N-I CHPP) Repair of 0.4 kV electrical motors of the pumping house and bomb shelter, repair of 0.4 kV electrical m/g motors, repair of electrical motors in the fire pumping house, repair of CWT 0.4 kV electrical motors, repair of boiler house 0.4 kV electrical motors. (N-Z CHPP) Cleaning of network horizontal heaters No.1,2 and of turbine unit PT-80-130 condensers No. 1,2,3. (N-Z CHPP) Repair of chart No.3 drainage at the ash disposal area. (N-Z CHPP) Overhaul of centrifugal scrubber transition zone No.1,2,3, boiler unit No.1, to centrifuges No.1,2,3,4,5 boiler unit of st. No. 2, to centrifugal scrubbers No.1,2,3,4,5 boiler unit No.3, precipitator of boiler unit No. 4, centrifugal scrubber No.1,2,3,4,5,6 boiler unit No.2. (N-Z CHPP) Overhaul of WEC 1 stage, “bottom point” drainage of boiler 2 walls. (N-Z CHPP) Running repair of electrical equipment of boiler units No.1,12,13, overhaul of precipitator equipment of boiler No. 17, repair of vibration mechanisms including replacement of reduction drives and electrical motors of the precipitator of boiler unit st. No. 17 at the CHPP-9 area No.1 Reconstruction of belt-type conveyors, electrical motors switched to dust-protected variants. (CHPP-10) Repair of CN-400-150 water feeders of the fire pumping house (N-I CHPP) Overhaul of the heating network. Overhaul of the fire pipeline, service water pipeline. Facilities for daily preventive maintenance of cars, one line. (CHPP-10) Construction and dismantling of scaffolding where required for equipment repairs. Steam separators, exhaust fans of boiler units st. No. 1,2,3,4,11,13,14,15,16,TG-1,2,7,8. (CHPP-10) Repair of exhaust fan equipment of boilers st. No. 2,3,8,10,12,14,16. (CHPP-10) Running repair of heating surfaces equipment, boiler units st. No. 2,3,6,8,10,12,14,16. (CHPP-10) Construction and dismantling of scaffolding where required for equipment repairs. Boiler units st. No. 4, exhaust fans of boiler units st. No. 3. (CHPP-10) Replacement of the ZPPKh-3 bolt, nozzles, BROU I pipelines, conversion zone of the middle radiant section, convection superheater, replacement of conversion zone of the middle radiant section, conversion zone of the lower radiant section pipeline parts. Station pipelines VD unit No.2, boiler unit st. No. 3. (CHPP-10) RUB 110,237.96, incl. VAT: RUB 16,815.96 RUB 118,069.62, incl. VAT: RUB 18,010.62 RUB 1,697,786.36, incl. VAT: RUB 258,984.36 RUB 1,606,979.46, incl. VAT: RUB 245,132.46 RUB 1,173,771.96, incl. VAT: RUB 174,049.96 RUB 112,808.00, incl. VAT: RUB 17,208.00 RUB 1,716,111.76, incl. VAT: RUB 261,779.76 RUB 5,900,000.00, incl. VAT: RUB 900,000.00 RUB 2,717,158.86, incl. VAT: RUB 414,481.86 RUB 1,578,024.62, incl. VAT: RUB 240,715.62 RUB 3,530,766.00, incl. VAT: RUB 538,591.50 RUB 736,524.14, incl. VAT: RUB 112,351.14 RUB 2,714,207.68, incl. VAT: RUB 414,031.68 RUB 1,328,507.72, incl. VAT: RUB 202,653.72 RUB 560,500, incl. VAT: RUB 85,500 RUB 472,003, incl. VAT: RUB 72,000.54 RUB 412,999.56, incl. VAT: RUB 62,999.93 RUB 1,003,000, incl. VAT: RUB 153,000 RUB 825,999.99, incl. VAT: RUB 126,000 RUB 823,640.00, incl. VAT: RUB 125,640.00 RUB 353,104.38, incl. VAT: RUB 53,863.38 RUB 2,572,869.64, incl. VAT: RUB 392,471.64 RUB 76,700, incl. VAT: RUB 11,700 Changes in terms RUB 2,678,544.54, incl. VAT: RUB 408,591.54 RUB 2,906,796.57, incl. VAT: RUB 443,409.65 RUB 9,062,447.20, incl. VAT: RUB 1,382,407.2 RUB 318,598.82, incl. VAT: RUB 48,599.82 RUB 2,831,964,6, incl. VAT: RUB 431,994,6 RUB 2,243,791.24, incl. VAT: RUB 342,273.24 RUB 147,500, incl. VAT: RUB 22,500 RUB 2,148,522.76, incl. VAT: RUB 327,740.76 RUB 1,304,438.08, incl. VAT: RUB 198,982.08 RUB 2,770,998.72, incl. VAT: RUB 422,694.72 RUB 1,935,321.54, incl. VAT: RUB 295,218.54 RUB 118,000, incl. VAT: RUB 18,000 RUB 1,528,100.00, incl. VAT: RUB 233,100.00 RUB 1,439,600.00, incl. VAT: RUB 219,600.00 RUB 590,000.00, incl. VAT: RUB 90,000.00 RUB 2,584,200.00, incl. VAT: RUB 349,200.00 RUB 1,298,000.00, incl. VAT: RUB 198,000.00 RUB 2,301,985.30, incl. VAT: RUB 351,150.30 RUB 584,100.00, incl. VAT: RUB 89,100.00 RUB 212,400, incl. VAT: RUB 32,400 RUB 2,295,286.44, incl. VAT: RUB 350,128.44 RUB 1,546,257.84, incl. VAT: RUB 235,869.84 RUB 2,278,124.52, incl. VAT: RUB 347,510.52 RUB 3,752,400, incl. VAT: RUB 572,400 RUB 236,000, incl. VAT: RUB 36,000 RUB 37,970.04, incl. VAT: RUB 5,792.04 OAO Irkutskenergo 179 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 Replacement of HPH-7,8 studs in unit 2. (CHPP-10) Construction and dismantling of scaffolding where required for equipment repairs. Boiler unit st. No. 4, steam separator, exhaust fan of the boiler unit st.No.4.(CHPP-10) Running repair of brickwork of the boiler unit st. No. 4. (CHPP-10) Technical diagnosis of 2-OB, 4-OB. Heating unit. (CHPP-10) Construction and dismantling of scaffolding where required for equipment repairs. Boiler units at No. 4, steam separator, exhaust fan of boiler units st. No. 3. (CHPP-10) Running repair of LPR pipeline equipment of turbine units No.5,6,7,8. (CHPP-10) Repair of station high-pressure pipelines. (CHPP-10) Overhaul of boiler unit No.4 (N-I CHPP) Repair of dry ash release equipment (N-I CHPP) Elimination of defects arising during the operation of main and auxiliary BH BTH equipment. (CHPP-10) Construction and dismantling of scaffolding where required for repairs of exhaust fans, steam separators,at boiler units st. No. 5,6,7,8,10,12, TU-3,4,5,6. (CHPP-10) Replacement of burner No.3, boiler unit st. No. 14. (CHPP-10) Running repair of valves, boiler units st. No. 1,5,6,7,13,14. (CHPP-10) Running repair of LPR equipment of turbine generators No.5,6,7,8. (CHPP-10) Repair of BU 1, 2, 5, 10, 11, 13, 16 pipelines. Repair of WEC BU10. Replacement of safety valves BU 2, 3, 16. Replacement of the BROU-I BU 10,11 silencers. Replacement of the BU 1,2 feeding unit supports. Repair of BU10 feeding water pipelines supports. Repair of CIS OPS pipeline. Rerouting of the DOU 100/14 KА2 pipeline. Repair of ash pits including replacement of BU 13 screw conveyors. (CHPP-10) Running repair of brickwork (boiler units st. No.1,2,3,4,9,10,11,12,15,16). (CHPP-10) Installation of a LCR at the drainage pipeline from h.p.superheater to l.p.superheater. (CHPP-10) Construction and dismantling of scaffolding where required for repairs of exhaust fans, steam separators, boiler units No. 1,2,3,4,11,13,14,15,16, TG-1,2,7,8. (CHPP-10) Repair of high-pressure boiler units No. 1,16 at CHPP-9 area No.1 Medium repair of TP-81 boiler unit st. No. 6 at CHPP-9 Running repair of precipitators, boiler unit st. No. 17 at CHPP-9 area No.1 Repair of earthing OU-220 kV equipment. (N-I CHPP) Overhaul of the EP-3-25/75 ejector. (N-Z CHPP) Installation of electrical motors servicing platforms at PEN-0,1, servicing platforms for boilers st. No. 1,2,3 (N-Z CHPP) Overhaul of the flue-gas duct 4 Б. (N-Z CHPP) Replacement the 2P-3 bolt of the boiler unit st. No. 3. (N-Z CHPP) Medium repair of boiler unit BKZ 75 39FB st. No.3 in the ShA of N-I CHPP Running repair of boiler unit BKZ 75 39FB st. No.5 in the ShA of N-I CHPP Running repair of boiler unit BKZ 75 39FB st. No.6, replacement of gas duct from DS to scrubbers in the ShA of N-I CHPP Running repair of boiler unit BKZ 75 39FB st. No.7, replacement of gas duct from DS to scrubbers in the ShA of N-I CHPP Standard repair of turbine unit st. No. 6 (CHPP-11) Standard repair of boiler units No.1,3. CHPP-11 (scope of work increased by 30%) Repair of parts and spare parts of CHPP-11 boiler house equipment Repair of parts and spare parts of CHPP-11 turbine house equipment Repair of CHPP-11 turbine equipment. (CHPP-11) Standard repair of turbine unit st. No. 2. (CHPP-11) Repair of ITR valves (CHPP-11) Emergency repair of boilers (N-I CHPP) Overhaul of the EP-3-25/75 ejector (EVD-5). (N-Z CHPP) Overhaul of the circulation pump 1 B, turbine room equipment. (N-Z CHPP) Routine technical certification of furnace metal constructions of boiler unit No.5 (N-I CHPP) Overhaul of steam pipelines 9, 15 hanger-support system. (N-Z CHPP) Overhaul of СВ-8 bolt, turbine room equipment, overhaul of potable/service water pipeline flow meters. (N-Z CHPP) Repair and partial replacement of wash water pipelines. Manufacturing and installation of seals for washing pumps. (N-I CHPP) Repair of water economizer of boiler unit No.5. (N-I CHPP) Maintenance of compressor No.3 in the boiler room. (CHPP-10) Repair of PVD-8 unit 7, separation of OS and MFS TA-7 drainages, repair of TU-7 II inlet. (CHPP-10) Repair of ash hopper brickwork, boiler unit st. No. 13. (CHPP-10) Technical diagnosis of pipelines of the boiler unit st. No. 10. (CHPP-10) Repair of LRP bracers, boiler unit st. No. 5. (CHPP-10) Construction and dismantling of scaffolding where required for repairs of exhaust fans, steam separators of boiler units st. No. 1,2,3,4,11,13,14,15,16, TG-1,2,7,8. (CHPP-10) Repair of heating surfaces of the boiler unit st. No. 7. (CHPP-10) Partial technical inspection and thickness measurement of BZK-1,2 walls (N-I CHPP) 180 OAO Irkutskenergo RUB 82,998.84, incl. VAT: RUB 12,660.64 RUB 92,259.48, incl. VAT: RUB 14,073.48 RUB 56,787,5, incl. VAT: RUB 8,662,0 RUB 200,544.54, incl. VAT: RUB 30,591.54 RUB 110,237.96, incl. VAT: RUB 16,815.96 RUB 2,426,811.6, incl. VAT: RUB 370,191,6 RUB 947,286.30, incl. VAT: RUB 144,501.3 RUB 3,752,400, incl. VAT: RUB 572,400 RUB 236,000, incl. VAT: RUB 36,000 RUB 590,000, incl. VAT: RUB 90,000 RUB 1,275,596.52, incl. VAT: RUB 194,582.52 RUB 87,581.96, incl. VAT: RUB 13,359.96 RUB 2,159,102.64, incl. VAT: RUB 329,354.64 RUB 25,588.3, incl. VAT: RUB 3,903.3 RUB 13,575.9, incl. VAT: RUB 2,070.9 RUB 86,368.92, incl. VAT: RUB 13,174.92 RUB 364,531.5, incl. VAT: RUB 55,606.5 RUB 2,687,989.26, incl. VAT: RUB 10,032.26 RUB 1,522,250.74, incl. VAT: RUB 232,207.74 RUB 1,348,100.00, incl. VAT: RUB 53,100.00 RUB 348,100.00, incl. VAT: RUB 53,100.00 RUB 1,180,000, incl. VAT: RUB 180,000 RUB 117,014.70, incl. VAT: RUB 17,849.70 RUB 218,300.00, incl. VAT: RUB 33,300.00 RUB 424,861.36, incl. VAT: RUB 64,809.36 RUB 2,783,918.54, incl. VAT: RUB 424,665.54 RUB 2,006,000.00, incl. VAT: RUB 306,000.00 RUB 687,396.02, incl. VAT: RUB 104,587.02 RUB 1,608,789.58, incl. VAT: RUB 245,405.58 RUB 1,923,400.00, incl. VAT: RUB 293,400.00 RUB 1,117,704.26, incl. VAT: RUB 170,497.26 RUB 3,361,234.72, incl. VAT: RUB 512,730.72 RUB 2,928,913.40, incl. VAT: RUB 446,783.40 RUB 815,285.60, incl. VAT: RUB 124,365.60 RUB 1,824,802.74, incl. VAT: RUB 278,359.74 RUB 667,167, incl. VAT: RUB 101,771.28 RUB 873,178.76, incl. VAT: RUB 133,196.76 RUB 1,156,400, incl. VAT: RUB 176,400 RUB 117,014.70, incl. VAT: RUB 17,849.70 RUB 97,686.30, incl. VAT: RUB 14,901.30 RUB 82,597.64, incl. VAT: RUB 12,599.64 RUB 2,442,786.44, incl. VAT: RUB 372,628.44 RUB 70,132.12, incl. VAT: RUB 10,698.12 RUB 613,600, incl. VAT: RUB 93,600 RUB 1,062,000, incl. VAT: RUB 162,000 RUB 340,496.52, incl. VAT: RUB 51,940.15 RUB 132,045.54, incl. VAT: RUB 20,142.54 RUB 77,052.82, incl. VAT: RUB 11,753.82 RUB 1,120,917.4, incl. VAT: RUB 170,987.4 RUB 353,886.01, incl. VAT: RUB 53,982.61 RUB 152,607.04, incl. VAT: RUB 23,279.04 RUB 1,612,544.34, incl. VAT: RUB 245,981.34 RUB 236,000, incl. VAT: 36,000 RUB 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 Replacement of IPU ROU 140/100, repair of fast-response PRDS 140/10 No. 2 P-12 bolt. Repair of DS3А,Б downflow flue (CHPP-11) Repair of RPK du 225 of the boiler unit st. No.3 in mechanical and repair shops (CHPP-11) Standard repair of boiler unit No.9. (CHPP-11) Repair of HWSU equipment. (CHPP-11) Technical diagnosis of pipeline No.7002 (MSKKh heating water) (N-I CHPP) Reconstruction of 0.4 kV KL from TP-67 to Pursey electrical boiler station, CHPP-6 branch of OAO Irkutskenergo Maintenance building No.4 design (CHPP-6) Factory repair of pipeline valves. (CHPP-10) Repair and maintenance of boiler and auxiliary equipment of CHPP-6 CA Overhaul of fire safety valves of the generator switchgear control center, repair of cable space automated fire suppression system valves of UU-1G, 2G, 3G, 4G control centers, of the GRU-10, 5 kV Du200 Ru10 generator switchgear (U-I CHPP) Repair of cooling valves and pipelines, tests of peaking network water heater samplers, of vacuum network feeding deaerators, of drainage high-pressure extension tanks (2nd stage), repair of valves, gates and firefighting water pipelines of the turbine house, repair of impulse line valves and pipelines of peaking heaters (2nd stage) BTH (U-I CHPP) Maintenance of boiler units st. No. 1-7, cabling and piping (compressed air, oxygen, low-voltage welding network) of BTH, standby of repair personnel on weekends and holidays (U-I CHPP) Comprehensive servicing of internal HAR and of BH BTH ash-pump house equipment (U-I CHPP) Maintenance of EC electrical equipment, standby of repair personnel on weekends and holidays (U-I CHPP) Comprehensive servicing of chemical facility equipment (U-I CHPP) Overhaul of DOZHD system pipelines of belt conveyors No.7 and 8 (N-Z CHPP) Repair of air turboblower No.2 (boiler house auxiliary equipment). (N-Z CHPP) Maintenance of CHPP-11 CWT Elimination of defects in CHPP-11 boiler house (additional works) Repair of CHPP-11 HWSU equipment Repair of pipe racks of steam pipelines to the Oil refinery and to 110 kV OSG, repair of roads and platforms at CHPP-9 Repair of thermal insulation of LRP ash hopper. Repair of brickwork of LRP ash hopper, boiler unit st. No. 5, CHPP-10 Replacement of TA-6 HPC end seals, CHPP-10. Elimination of defects arising during the operation of BH BTH main and auxiliary equipment. (CHPP-10) Elimination of defects arising during the operation of BH BTH main and auxiliary equipment. (CHPP-10) Repair of exhaust fan equipment of boiler units st. No. 2,3,8,10,12,14,16 (CHPP-10) Running repair of LPR equipment of turbine units No. 5,6,7,8. (CHPP-10) Replacement of CRH steam desuperheater of boiler unit st. No. 11, bl. 6. (CHPP-10) Counterparty: ZAO Bratskenergoremont (Contractor) Repair of flue-gas ducts of boiler units st. No. 1-5, BTH 7 (U-I CHPP) Repair of cleaning equipment of BTH boiler units st. No. 1-7 (U-I CHPP) Repair of RCSC, PPL, CP-BP dust chutes of boiler units No. 1-5, BTH 7 (U-I CHPP) Repair of mill fans of boilers No.1-5, 7, BTH 7 (U-I CHPP) Overhaul and running repair of CHP, BTH BH and TH electrical motors (U-I CHPP) Overhaul of TGV-200 М turbine generator st. No.6, repair of STV-300 working generator (U-I CHPP) Comprehensive servicing of internal HAR and of BH BTH ash-pump house equipment (U-I CHPP) Repair of MMT-2000/2590/730 mills and dust separators of BKZ-420-140 boilers st. No. 1-5, 7 (U-I CHPP) Comprehensive servicing of equipment at clarified water pumping station No. 1 and 2, circulating pump station No. 1, of BH BTH oil station and ABE pumps, of electrical house equipment (U-I CHPP) Repair of CHP-TI heating and mechanical equipment (CHPP-6 TI&TS) Repair of BTH-TI heating and mechanical equipment (CWT) (CHPP-6 TI&TS) Repair of turbine unit st. No. 1, 2 BTH-TI (CHPP-6 TI&TS) Repair of TI&TS electrical equipment (CHPP-6 TI&TS) Repair of boiler units PK st. No.1,2; BK st. No.3-5, ESRB of Galachinskaya District Boiler House Department (CHPP-6 TI&TS) Repair of ABE (pumps) of Galachinskaya District Boiler House Department (CHPP-6 TI&TS) Repair of ABE and pipelines of Galachinskaya District Boiler House Department (CHPP-6 TI&TS) Repair of BTH-TI pipelines (CHPP-6 TI&TS) Repair of ShMT BTH-TI of boiler units st. No.1-7, 9 (CHPP-6 TI&TS) Repair of BTH-ТI HWTC (CHPP-6 TI&TS) Repair of lifting machinery of heat generators and heating networks (CHPP-6 TI&TS) Repair of BTH-ТI boiler unit st. No.7 (CHPP-6 TI&TS) Repair of CWT heating and mechanic equipment of Galachinskaya District Boiler House Department (CHPP-6 TI&TS) Repair of heating and mechanic equipment of Galachinskaya District Boiler House Department TP (CHPP-6 TI&TS) RUB 428,800.00, incl. VAT: RUB 64,800.00 RUB 177,000.00, incl. VAT: RUB 27,000.00 RUB 1,100,844.42, incl. VAT: RUB 167,925.42 RUB 963,665.88, incl. VAT: RUB 146,999.88 RUB 413,000, incl. VAT: RUB 63,000 RUB 1,003,000, incl. VAT: RUB 153,000 RUB 41,300,000, incl. VAT: RUB 6,300,000 RUB 589,962.38, incl. VAT: RUB 89,994.26 RUB 2,107,686.55, incl. VAT: RUB 321,511.51 RUB 112,090.56, incl. VAT: RUB 17,098.56 RUB 482,611.74, incl. VAT: RUB 73,618.74 RUB 1,758,188.65, incl. VAT: RUB 268,198.27 RUB 2,747,623.51, incl. VAT: RUB 419,129.01 RUB 2,194,670.65, incl. VAT: RUB 334,780.27 RUB 2,198,204.50, incl. VAT: RUB 335,319.33 RUB 389,400.00, incl. VAT: RUB 59,400.00 RUB 2,920,741.90, incl. VAT: RUB 445,536.90 RUB 141,478.46, incl. VAT: RUB 21,518.46 RUB 460,200.00, incl. VAT: RUB 70,200.00 RUB 1,334,020.68, incl. VAT: RUB 203,494.88 RUB 4,483,844.24, incl. VAT: RUB 683,976.24 RUB 494,365.72, incl. VAT: RUB 75,411.72 RUB 590,000, incl. VAT: RUB 90,000 RUB 354,000, incl. VAT: RUB 54,000 RUB 29,713.58, incl. VAT: RUB 4,532.58 RUB 134,115.26, incl. VAT: RUB 20,458.26 RUB 82,907.98, incl. VAT: RUB 12,646.48 RUB 2,064,994, incl. VAT: RUB 314,999.10 RUB 1,769,890.26, incl. VAT: RUB 269,983.26 RUB 1,710,885.54, incl. VAT: RUB 260,982.54 RUB 1,061,930.38, incl. VAT: RUB 161,989.38 RUB 2,259,563.12, incl. VAT: RUB 344,679.12 RUB 2,595,916.22, incl. VAT: RUB 395,987.22 RUB 2,745,105.27, incl. VAT: RUB 418,744.87 RUB 4,955,769.90, incl. VAT: RUB 755,964.90 RUB 2,755,127.53, incl. VAT: RUB 420,273.69 RUB 2,668,703.34, incl. VAT: RUB 407,090.34 RUB 1,524,265, incl. VAT: RUB 232,515 RUB 1,524,265.44, incl. VAT: RUB 232,515.44 RUB 5,014,871.38, incl. VAT: RUB 764,980.38 RUB 2,358,029.40, incl. VAT: RUB 359,699.40 RUB 2,358,029.40, incl. VAT: RUB 359,699.40 RUB 1,220,626.22, incl. VAT: RUB 186,197.22 RUB 1,915,989.60, incl. VAT: RUB 292,269.60 RUB 1,303,223.86, incl. VAT: RUB 198,796.86 RUB 1,347,656.76, incl. VAT: RUB 205,574.76 RUB 741,989.90, incl. VAT: RUB 113,184.90 RUB 2,303,879.20, incl. VAT: RUB 351,439.20 RUB 648,949.26, incl. VAT: RUB 98,992.26 RUB 2,579,331.32, incl. VAT: RUB 393,457.32 OAO Irkutskenergo 181 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 Repair of HWTC (pumps) BTH-TI (CHPP-6 TI&TS) Repair of boiler units st. No. 1, 2, 4, 5, 9 BTH-TI (CHPP-6 TI&TS) Maintenance of RTS-1, 2 heating networks (CHPP-6 TI&TS) Repair of heating and mechanic equipment of RTS-1, electrical boiler houses (CHPP-6 TI&TS) Factory repair of heat generator and heating network valves at CHPP-6 (TI&TS) Elimination of defects and non-scheduled repairs of TI&TS heating and mechanical equipment. (CHPP-6 TI&TS) Mechanical treatment and repair of aggregates and details in repair and mechanical shops, heat generators and heating networks of the Central area (CHPP-6 TI&TS) Mechanical treatment and repair of aggregates and details in repair and mechanical shops, heat generators and heating networks of the Padunsky area (CHPP-6 TI&TS) Maintenance of heat generators and heating networks equipment (CHPP-6 TI&TS) Repair of electrical equipment of District Boiler House Department (CHPP-6 TI&TS) Repair of electrical equipment of heat generators (CHPP-6 TI&TS) Repair of electrical equipment of heat generators and heating networks (CHPP-6 TI&TS) Construction and dismantling of wooden and metal scaffolding for repairs of steam-turbine units st. No. 1–5 and auxiliary turbine equipment of CHPP-6 CU Construction and dismantling of wooden and metal scaffolding for repairs of boiler units st. No. 1-10, of auxiliary boiler equipment, electrical equipment, lifting machinery and fuel conveying house equipment (CHP) (CHPP-6 CU) Repair of ABE, ATE, FCH lights at CHPP-6 CU. (CHPP-6 CU) Repair of auxiliary turbine equipment (ATE) valves: repair of auxiliary machinery, preparations for metal control of hydrogen receivers No.2 and 3. (CHPP-6 CA) Repair of I&ACS equipment, repair of outdoor switchgear (OGS) Т-1,2 transformers, repair of switches, circuit breakers, 6 kV reactors. Repair of 2 section of GRU-6 kV operating bus bar system, maintenance and repair of AFAS and AFSS cutouts of LK-3,4,11,14,10,13,12, LP-3,4,5 FCH galleries. (CHPP-6 CU) Boiler units st. No. 1-10. Repair of exhaust fans (exhausters, forced draft fans, flue-gas recirculation fans). (CHPP-6 CU) Repair and maintenance of the automated water firefighting system and automated fire alarm system (AFAS) of ABE CHPP-6 CU cable rooms Running repair of lights and cable lines of boiler units st. No. 1-10, of steam turbine units No.1-5. Repair of outside lights of CHPP-6 CU CHPP-6 territory Maintenance of CHPP-6 CU electrical equipment Construction and dismantling of wooden and metal scaffolding for repairs of boiler units st. No. 3, 5; for special repairs of boiler units st. No. 3, 5, CHPP-6 CU Boiler units st. No.1-10, auxiliary boiler equipment. Repair of pipelines, precipitators, high-pressure pipelines, valves, boiler fittings at CHPP-6 CU Repair of boiler units st. No. 1-10, auxiliary boiler equipment (ABE), boiler unit at industrial site No.1, steam ducts 1,2 of CHPP-6 CU Boiler units st. No. 1-10. Repair of ash tanks, slag screw conveyors of CHPP-6 CU Overhaul of auxiliary boiler equipment (ABE) and auxiliary turbine equipment (ATE) power cables. Running repair of lights and cable lines of auxiliary turbine equipment (ATE) and fuel conveying house (FCH). Running repair of lights in administrative and maintenance buildings, on auxiliary premises, in workshops and staff rooms of CHPP-6 CU Repair of 6 and 0.4 kV electrical motors, starting control equipment and modules, RUSN-6/0.4 kV, boiler units st. No. 1-10, auxiliary boiler equipment (ABE), auxiliary turbine equipment (ATE) and fuel conveying house (FCH), steam turbine units (STU) st. No. 1-5 of CHPP-6 CU Steam turbine units (STU) st. No.1-5. Repair of valves, oil pumps and oil systems of STUs No. 4, 5. Repair of valves, wastewater treatment facilities, safety valves, steam turbine unit st. No.3. Repair of discharge and condensate pumps (SlN, KNT), STU st. No.1. Repair of low-pressure heaters, main ejector, discharge and condensate pumps of CHPP-6 CU Auxiliary boiler equipment (ABE). Repair of water return pumps of THM shaft cooling and valves (ATE). Repair of pumps. CHPP-6 CU Boiler unit st. No.1-10. Repair of dust suppression system, running repair of tangential hammer mills (THM), CHPP-6 CU Installation of BSSDZ safety device in 9R RUSN section (CHPP-6) 35kV OSG TI&TS CHPP-6 distribution automates of sections I, II (35 kV bars of MiCOM Р922 terminals) (CHPP-6) Repair of ash handling systems, boilers No.1-7 BTH (U-I CHPP) Repair of high-pressure valves of turbine units st. No. 1-6 BTH (U-I CHPP) Repair of BTH ATE oil pumps, flow-control pumps, bearing boxes and couplings (U-I CHPP) Running repair of BTH ATE pumps (U-I CHPP) Repair of fans, BTH boiler units st. No.1-7 (U-I CHPP) Repair of BTH ATE low-pressure and medium-pressure valves and pipelines (U-I CHPP) Repair of CF CWT equipment (U-I CHPP) Repair of CF desalinization facility equipment (U-I CHPP) Repair of firefighting pipelines and HAR equipment (CHPP-6 TI&TS) Repair of Galachinskaya District Boiler House Department pipelines (CHPP-6 TI&TS) Reconstruction of pavement after the repairs of district heating network of the second district, ТК-23-ТP-3 RTS-1 portion of distribution network. (CHPP-6 TI&TS) Reconstruction of pavement after the repairs of RTS-2 networks. (CHPP-6 TI&TS) 182 OAO Irkutskenergo RUB 1,808,057.36, incl. VAT: RUB 275,805.36 RUB 1,821,188.40, incl. VAT: RUB 277,808.4 RUB 834,204.54, incl. VAT: RUB 127,251.54 RUB 834,204.54, incl. VAT: RUB 127,251.54 RUB 590,000, incl. VAT: RUB 90,000 RUB 1,180,000, incl. VAT: RUB 180,000 RUB 2,098,040.00, incl. VAT: RUB 320,040 RUB 2,524,020, incl. VAT: RUB 385,020 RUB 2,154,678.82, incl. VAT: RUB 328,679.82 RUB 2,491,174.7, incl. VAT: RUB 380,009.7 RUB 2,371,158.08, incl. VAT: RUB 361,702.08 RUB 2,433,774.78, incl. VAT: RUB 371,253.78 RUB 2,525,571.76, incl. VAT: RUB 385,256.71 RUB 2,163,553.81, incl. VAT: RUB 330,033.63 RUB 4,365,989.42, incl. VAT: RUB 665,998.38 RUB 2,220,488.53, incl. VAT: RUB 338,718.59 RUB 2,850,098.78, incl. VAT: RUB 434,760.83 RUB 2,622,919.19, incl. VAT: RUB 400,106.32 RUB 2,951,007.73, incl. VAT: RUB 450,153.72 RUB 2,813,277.16, incl. VAT: RUB 429,143.98 RUB 1,556,967.05, incl. VAT: RUB 237,503.45 RUB 1,815,559.95, incl. VAT: RUB 276,949.82 RUB 2,229,714.70, incl. VAT: RUB 340,125.97 RUB 2,359,999.22, incl. VAT: RUB 359,999.88 RUB 2,371,018.80, incl. VAT: RUB 361,680.83 RUB 2,637,110.23, incl. VAT: RUB 402,271.05 RUB 2,542,149.86, incl. VAT: RUB 387,785.57 RUB 2,744,537.49, incl. VAT: RUB 418,658.26 RUB 1,864,941.69, incl. VAT: RUB 284,482.63 RUB 2,705,315.52, incl. VAT: RUB 412,675.25 RUB 88,500, incl. VAT: 13,500.00 RUB 22,420, incl. VAT: 3,420 RUB 1,887,861.94, incl. VAT: RUB 287,978.94 RUB 1,179,917.40, incl. VAT: RUB 179,987.40 RUB 938,057.52, incl. VAT: RUB 143,093.52 RUB 1,474,880.82, incl. VAT: RUB 224,981.82 RUB 2,005,962.24, incl. VAT: RUB 305,994.24 RUB 943,977.58, incl. VAT: RUB 143,996.58 RUB 1,710,983.48, incl. VAT: RUB 260,997.48 RUB 1,179,865.48, incl. VAT: RUB 179,979.48 RUB 1,988,231.56, incl. VAT: RUB 303,289.56 RUB 613,571.68, incl. VAT: RUB 93,595.68 RUB 3,135,247.02, incl. VAT: RUB 478,258.02 RUB 239,315.80, incl. VAT: RUB 36,505.80 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 Repair of steam and feeding water pipelines and vessels of BTH boiler units st. No. 1-7. (U-I CHPP) Repair of firing system, water economizer and air heater of BTH boilers st. No.1-7. (U-I CHPP) Repair of pipelines and low and medium-pressure valves of BTH boilers st. No.1-7. (U-I CHPP) Repair of BTH ejectors, condensers and deaerators. (U-I CHPP) Maintenance of heating surfaces of BKZ-420-140 boilers st. No. 1-7 and updates of the electronic status register (BTH U-I CHPP) Repair of firefighting pipelines and HAR equipment (CHPP-6 TI&TS) Repair of luminescent lights in administrative buildings of EC-TI (CHPP-6 TI&TS) Maintenance of heat generators and heating network equipment (CHPP-6 TI&TS) Repair of BTH-TI boiler st. units No. 6 (CHPP-6 TI&TS) Repair of TI&TS equipment (CHPP-6 TI&TS) Maintenance of RTS-1 heating networks (CHPP-6 TI&TS) Repair of main steam pipelines valves and feeding water pipelines of BTH boilers No.1-7 (U-I CHPP) Repair of high-pressure valves within BTH boiler units st. No.1-7 (U-I CHPP) Repair of shot-blast cleaning system of boiler units st. No.1-5, 7 and hydraulic ash removal systems of BTH boiler unit st. No. 3 (U-I CHPP) Repair of steam ducts and pipelines within BTH turbines st. No. 1-6 (U-I CHPP) Upgrade of desalinization unit, replacement of backwash node valves (U-I CHPP) Reconstruction of valves of desalinization “chains” No. 5-9 (U-I CHPP) Repair of gas ducts, precipitators, pulverized coal system as part of overhaul of the boiler unit st. No. 3 at CHPP-6 CU Repair of fuel oil cycle pipelines and valves, mountings, metal framework, ladders, service platforms as part of overhaul of boiler unit st. No. 3 at CHPP-6 CU Overhaul of complete power line, AGP TG-6, AC and DC electrical motors, launching automates, RTZO, PR-9000, ShKA modules of turbine generators st. No.1-6, valve modules of boiler units st. No.1-7, 0.4 kV electrical motors (U-I CHPP) Running repair of AC and DC electrical motors, LA, RTZO, PR-9000, ShKA modules of turbine generators st. No.1-6, valve modules of boiler units st. No.1-7, 0.4 kV electrical motors with stator winding fully replaced (U-I CHPP) Overhaul and running repair of BMPE-10, BKE-10, AVM-4, 15, 20, E-16 types oil switches (U-I CHPP) Overhaul of 6-0.4 kV cable lines, repair of lighting networks at auxiliary facilities (U-I CHPP) Running repair of 6-0.4 kV cable lines, repair of lighting networks in the engineering house and outdoor lighting networks (U-I CHPP) Overhaul of 6-0.4 kV cable lines, repair of lighting networks in the engineering house and outdoor lighting networks (U-I CHPP) Replacement of main and section circuit breakers of AVM type in the 0.4 kV RGK section. (CHPP-6) Upgrade of AVМ-10 circuit breakers. (CHPP-6) 6 kV switchgear (turnkey). Replacement of BMG-133 oil circuit breakers with BB/TEL-10-20/630 vacuum circuit breakers. (CHPP-6) Replacement of oil circuit breakers with vacuum circuit breakers in the RGK 6 kV switchboard. (CHPP-6) Repair of rotating parts and pulverized coal system of BTH BKZ-420-140 boiler st. No.3 (U-I CHPP) Repair of TI&TS premises. (CHPP-6 TI&TS) Boiler units st. No. 13,14,15,16. Factory repair of RCSC b/u screw conveyors. (CHPP-10) Boiler unit st. No.3. Repair of pulverized coal system (PCS) mechanisms, dampers CHPP-6 CU Overhaul of boiler unit st. No.3 CHPP-6 CU Boiler unit st. No.5. Repair of pulverized coal system (PCS) mechanisms, dampers CHPP-6 CU Overhaul of boiler unit st. No.5 CHPP-6 CU Repair of a section of slag pipeline No.1 at 5-8,5 100 m markers, including replacement, turning of slag pipelines between markers 12 and 19. Repair of slag pipeline No. 4, replacement of the section between markers 1 and 4, turning of the section between markers 4 and 8, 5 CHPP-6 CU Manufacture of spare parts for the overhaul of boiler unit st. No. 3, CHPP-6 CU Manufacture of spare parts for the repair of boiler units st. No.1-10, auxiliary turbine equipment of CHPP-6 CU Overhaul of boiler unit st. No. 5. Repair of gas ducts, gas inlets, air ducts, dampers, mountings and metal framework of the boiler, dust and coal storages, multicyclone collectors and pipelines. CHPP-6 CU Repairs and elimination of defects of heating and mechanical equipment at CHPP-6 CU Maintenance of turbines and auxiliary turbine equipment. CHPP-6 CU Maintenance of boilers and auxiliary boiler equipment, slag pipelines and ash and slag disposal area of CHPP-6 CU Main building, Г row, axes 33-39, markers. + 34.00. Repair of wall panels CHPP-6 CU Garage building, car spaces and MD warehouse. Repair of SBK CCR windows. Repair and repair of staircase window frames (auxiliary CrM and Subject Property building). Repair and replacement of window frames (4th floor, workshops). Water pipeline segment in Vysotny village, along Globusnaya St., from WPS OLP-36 to VK 2-1. (U-I CHPP) External cleaning of boiler units st. No.1, 3, 6, 7, cleaning of BTH chimney breeching. (U-I CHPP) Reconstruction of main heating network from TP-3 heating point to hall 2 (recontstruction of BUG-3 and BUSN). (CHPP-6) RUB 1,368,658.40, incl. VAT: RUB 208,778.40 RUB 1,215,326.84, incl. VAT: RUB 185,388.84 RUB 1,651,988.20, incl. VAT: RUB 251,998.20 RUB 1,463,198.82, incl. VAT: RUB 223,199.82 RUB 513,300.00, incl. VAT: RUB 78,300.00 RUB 1,061,893.80, incl. VAT: RUB 161,983.80 RUB 60,057.28, incl. VAT: RUB 9,161.28 RUB 1,472,636.46, incl. VAT: RUB 224,639.46 RUB 1,205,820.76, incl. VAT: RUB 183,938.76 RUB 2,666,686.72, incl. VAT: RUB 406,782.72 RUB 2,502,777.64, incl. VAT: RUB 381,779.64 RUB 1,710,925.66, incl. VAT: RUB 260,988.66 RUB 1,828,863.12, incl. VAT: RUB 278,979.12 RUB 943,956.34, incl. VAT: RUB 143,993.34 RUB 625,363.42, incl. VAT: RUB 95,394.42 RUB 460,200, incl. VAT: 70,200 RUB 849,600, incl. VAT: 129,600 RUB 3,657,978.48, incl. VAT: RUB 557,996.72 RUB 336,291.20, incl. VAT: RUB 51,298.66 RUB 165,098.22, incl. VAT: RUB 330,269.22 RUB 651,916.22, incl. VAT: RUB 251,987.22 RUB 038,389.38, incl. VAT: RUB 158,398.38 RUB 246,055.22, incl. VAT: RUB 190,076.22 RUB 722,718.58, incl. VAT: RUB 262,787.58 RUB 2,076,753.98, incl. VAT: RUB 316,792.98 RUB 145,140, incl. VAT: RUB 22,140 RUB 189,154, incl. VAT: RUB 28,854 RUB 285,560, incl. VAT: RUB 43,560 RUB 790,600, incl. VAT: RUB 120,600 RUB 2,359,981.12, incl. VAT: RUB 359,997.12 RUB 2,713,994.10, incl. VAT: RUB 413,999.10 RUB 1,887,944.01, incl. VAT: RUB 287,991.46 RUB 1,710,997.04, incl. VAT: RUB 260,999.55 RUB 2,563,772.50, incl. VAT: RUB 391,083.94 RUB 2,279,424.62, incl. VAT: RUB 347,708.84 RUB 2,103,960.12, incl. VAT: RUB 320,943.07 RUB 1,179,905.61, incl. VAT: RUB 179,985.60 RUB 1,178,161.56, incl. VAT: RUB 179,719.56 RUB 1,152,044.62, incl. VAT: RUB 175,735.62 RUB 3,598,994.09, incl. VAT: RUB 548,999.10 RUB 354,000, incl. VAT: RUB 54,000 RUB 1,694,710.15, incl. VAT: RUB 258,515.11 RUB 2,790,787.26, incl. VAT: RUB 425,713.31 RUB 4,008,172.80, incl. VAT: RUB 611,416.19 RUB 1,180,000.01, incl. VAT: RUB 180,000 RUB 1,416,000, incl. VAT: RUB 216,000 RUB 342,188.20, incl. VAT: RUB 52,198.20 RUB 20,650,000, incl. VAT: RUB 3,150,000 OAO Irkutskenergo 183 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 Repair of valves of BTH boiler unit st. No.3. (U-I CHPP) Boiler units st. No. 3,6,7, 8,10. Repair of PCS (Pulverized-coal system), mill fans of b/u No. 1, 2, 4, 6, 10. Repair of exhaust mechanisms (flue-gas fans, forced-draft fans, gas recirculation fans). CHPP-6 CU Factory repair of 10 reduction drives, as part of low-level ATPMS repair works, unit No. 1. (CHPP-10) Manufacturing of bunkers No. 1, 2 to replace bunkers in wastewater treatment facilities building on the left-bank area, ТВСК area (U-I CHPP) Upgrade of technical fuel metering nodes U-I CHPP Gas-cleaning unit of boiler No. 4 inv. No. 728714: Reconstruction of Precipitator of Boiler No. 4. (N-Z CHPP) Reconstruction of pavement and grass lawns after the repair of RTS-1, RTS-2 heating networks in the city of Bratsk. (CHPP-6 TI&TS) Maintenance of heat generators and heating networks equipment (CHPP-6 TI&TS) Repair of BTH-TI boiler units st. No. 1-7, 9. (CHPP-6 TI&TS) Repair of boiler unit PK st. No.2; VК No. 3-5 of Galachinskaya District Boiler House Department (CHPP-6 TI&TS) Repair of fans and pipelines of drainages and air vents of peaking water heaters and heating network (2nd stage), repair of valves and pipelines of drainages and main steam pipeline bypasses, pair 8, pair 18, turbine units st. No.3, 5, 6, cleaning of drainage channel of the main building of the turbine department, BTH row А-Б marker 0.00 axes 2-27 (U-I CHPP) Factory repair of orifice plates Du 400, Du 300, Du 150, Du 100. (CHPP-10) Factory repair of orifice plates Du 400, Du 300, Du 150, Du 100. (CHPP-10) Installation of submersed Yokogawa ZR oxygen analyzer at BU No.2. (CHPP-6) Counterparty: ZAO Baikalenergo (Contractor) Maintenance of equipment and heating networks. (HNS N-I CHPP) Maintenance of equipment and heating networks. (HNS N-I CHPP) Scheduled repair of hoists, vibration diagnosis of required volume heating network equipment (HNS N-I CHPP) Emergency repair of damaged heating network sections and heating network equipment (HNS N-I CHPP) Emergency repairs of damaged heating network sections and heating network equipment (HNS N-I CHPP) Repair of heating network along 61 Nevsky St., 48 Trilisser St., from TK 23D to TK 23D-12-2 (along 48 Trilisser St. from ТК 23d-2 to ТК 23d-6). (HNS N-I CHPP) Repair of h/n along Kievskaya St. from ТК 6-16-b to ТК 6-32-b (Kievskaya St. from ТК6-24B to ТК6-32B) (HNS N-I CHPP) Maintenance of electrical house pumps, motors, soft starters, variable frequency drives. (HNS N-I CHPP) Repair of h/n along Lermontov St., from Academic Science branch to Organic Chemistry Institute (Favorsky St. TK60-2 to TK60-4). (HNS N-I CHPP) Scheduled repair of heating networks required volume equipment. (HNS N-I CHPP) Emergency repairs of damaged heating networks section and heating network equipment. (HNS N-I CHPP) Repair (replacement and raising) of manholes. (HNS N-I CHPP) Repair of CSG doors and locks, repairs in the canteen for the personnel of RTS-1 DB Sverdlovskaya, 2nd stage, inv. No. 22110419. (HNS N-I CHPP) Repair of h/n Ledovskogo 1.8(TK 27Н-6 to ТK 27Н-8, Depovsky 6) Inv. No. 00092827, repair of h/n of r/b 10 Krasnokazachya (from ТK 18D-3”-7-2 to 10 Krasnokazachya) Inv. No. 00091483. (HNS N-I CHPP) Counterparty: ZAO GES-Remont (Contractor) Water turbine PL-577-VB-720. Reconstruction of regulation system (inv. No. 054359, No.8), water turbine PL-577-VB-720. Reconstruction of regulation system (inv. No. 054352, No.1) (IHPP) Overhaul of relay room (RP-220) TWS building. (BHPP) Overhaul of electrical house building diagnosis group. (BHPP) Overhaul of HPP building as part of overhaul of the G-1 HPP. (BHPP) Overhaul of anti-corrosion coating of h/t 31 equipment. (BHPP) Reinforcement of crossbearing during running repairs of G 13. (BHPP) Reinforcement of crossbearing during running repairs of G 11. (BHPP) Overhaul hydraulic lifting machine 22/250 of G-9. (BHPP) Repairs and elimination of plant, property and equipment defects: deicing of segmental gates No. 2, No. 8, No. 9 of the main dam floodgate (request No. 3), repair of G-9 hydrogenerator rotor poles (request No. 4). (BHPP) Running repair of AODCTN-267,000/500 autotransformer No.1 АТ, No.2 АТ. (BHPP) Repair of anti-corrosion coatings of OSG-500 kV bus bar systems No. 1 and 2, facility: OSG-220 kV and OSG-500 kV mains. (BHPP) Cleaning of ТВС gallery drainage in the GA 13-16 area, as part of current repairs of hydroelectric units. (BHPP) Repair of auxiliary electrical equipment at the Irkutskaya HPP Maintenance of electrical equipment and lights at the Irkutskaya HPP Maintenance of auxiliary water turbine and machinery equipment at the Irkutskaya HPP Complete disassembly and overhaul of hydroelectric unit st. No.9 (incl. replacement of turbine cover fixing system). (U-I HPP) Complete disassembly and overhaul of hydroelectric unit st. No.14 (incl. replacement of turbine cover fixing system).(U-I HPP) 184 OAO Irkutskenergo RUB 1,120,987.02, incl. VAT: RUB 170,998.02 RUB 944,908.26, incl. VAT: RUB 144,138.55 RUB 100,295.82, incl. VAT: RUB 15,299.36 RUB 1,038,400.00, incl. VAT: RUB 158,400.00 RUB 94,400, incl. VAT: RUB 14,400 RUB 55,460,000.00, incl. VAT: RUB 8,460,000.00 RUB 4,660,920.94, incl. VAT: RUB 710,987.94 RUB 1,714,536.46, incl. VAT: RUB 261,539.46 RUB 2,957,808.06, incl. VAT: RUB 451,191.06 RUB 2,053,836.02, incl. VAT: RUB 313,297.02 RUB 436,568.14, incl. VAT: RUB 66,595.14 RUB 457,826.91, incl. VAT: RUB 69,838 RUB 306,774.22, incl. VAT: RUB 46,796.07 RUB 30,680, incl. VAT: RUB 4,680 RUB 1,121,234.82, incl. VAT: RUB 171,035.82 RUB 12,028,645.06, incl. VAT: RUB 1,834,878.06 RUB 511,188.98, incl. VAT: RUB 77,977.98 RUB 5,900,000, incl. VAT: RUB 900,000 RUB 2,997,200, incl. VAT: RUB 457,200 RUB 3,127,000, incl. VAT: RUB 477,000 RUB 848,173.82, incl. VAT: RUB 281,924.82 RUB 1,979,223.72, incl. VAT: RUB 301,915.48 RUB 1,180,000, incl. VAT: RUB 180,000 RUB 11,889,565.54, incl. VAT: RUB 1,813,662.54 RUB 5,900,000, incl. VAT: RUB 900,000 RUB 1,053,740, incl. VAT: RUB 160,740 RUB 264,202, incl. VAT: RUB 40,302 RUB 3,376,249.04, incl. VAT: RUB 515,021.04 RUB 10,373,477.94, incl. VAT: RUB 1,582,394.94 RUB 1,947,000.00, incl. VAT: RUB 297,000.00 RUB 920,400.00, incl. VAT: RUB 140,400.00 RUB 2,512,566.92, incl. VAT: RUB 383,272.92 RUB 1,661,257.10, incl. VAT: RUB 253,412.10 RUB 189,826.31, incl. VAT: RUB 28,956.56 RUB 481,959.71, incl. VAT: RUB 73,519.28 RUB 480,549.10, incl. VAT: RUB 73,304.00 RUB 205,742.74, incl. VAT: RUB 31,384.49 RUB 39,315.24, incl. VAT: RUB 5,997.24 RUB 31,664.51, incl. VAT: RUB 4,830.18 RUB 472,692.66, incl. VAT: RUB 72,105.66 RUB 3,416,737.88, incl. VAT: RUB 521,197.30 RUB 2,056,826.46, incl. VAT: RUB 313,753.19 RUB 896,801.23, incl. VAT: RUB 136,800.19 RUB 15,910,941.82, incl. VAT: RUB 2,427,092.82 RUB 15,892,061.82, incl. VAT: RUB 2,424,212.82 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 Standard running repair of hydroelectric units st. No. 1, 2, 5, 6, 12, 13, 16 (a total of seven) (incl. replacement of turbine cover fixing system), of hydroelectric units st. No. 3, 10, 15; repair of hydroelectric units No. 7, 8, 11. (U-I HPP) Repair of main electrical equipment: running repair of OSG-110 kV electrical equipment; running repair of OSG -220kV electrical equipment of the Irkutskaya HPP Overhaul of hydroelectric unit No.1. (BHPP) Overhaul of hydroelectric generator No.1. (BHPP) Overhaul of 220/250 hydraulic lift tu G-13. (BHPP) Overhaul of hydroelectric unit No. 2. (BHPP) Replacement of adjusting ring pins of water turbine No. 6. (BHPP) Overhaul of hydroelectric generator No.2. (BHPP) Running repair of electrical systems of hydroelectric generators. (BHPP) Running repair of auxiliary equipment within electrical systems of hydroelectric generators. (BHPP) Overhaul of VVD-220B, VVB-220B, A air circuit breakers. (BHPP) Repair of strain gage network of the main (concrete) dam, incl. well drilling and installation of tensometers. (BHPP) Overhaul of HPP building as part of hydroelectric unit No.2 overhaul. (BHPP) Overhaul of anti-corrosion coating of h/t No.2 equipment. (BHPP) Repair of VVD-220B/VVB-220А12 type air circuit breakers. (BHPP) Running repair of TFZM 220 kV and 500 kV power transformers. (BHPP) Routing maintenance and control of gas-insulated circuit breakers (BHPP) Running repair of ORCO-210000/500 type power transformers. (BHPP) Repair and reinforcement of the bearing cross-arm during the running repair of h/t No. 10. (BHPP) Running repair of TC-300,000/220 type power transformers (11 units). (BHPP) Running repair of SN transformers (30 units). (BHPP) Running repair of KRU-6 kV (general balance-of-plant needs). (BHPP) Repairs and elimination of plant, property and equipment defects: Inspection and adjustment of the lower pilot bearing (turbine bearing) of h/t 9 (Request No.1). (BHPP) Repairs and elimination of plant, property and equipment defects: repair of G6 auxiliary generator (Request No. 2). (BHPP) Overhaul, incl. full disassembly, of hydroelectric unit st. No. 9 (incl. replacement of turbine cover bolts). (U-I HPP) Overhaul, incl. full disassembly, of hydroelectric unit st. No.14 (incl. replacement of turbine cover bolts). (U-I HPP) Standard running repair of hydroelectric units st. No. 1, 2, 5, 6, 12, 13, 16, a total of seven units (incl. replacement of turbine cover bolts); of hydroelectric units st. No. 3, 10, 15; repair of hydroelectric units st. No. 7, 8, 11. (U-I HPP) Repair of main electrical equipment: running repair of OSG-110 kV electrical equipment; running repair of OSG-220 kV electrical equipment at the Irkutskaya HPP Overhaul of hydroelectric unit No.1. (BHPP) Overhaul of hydroelectric generator No.1. (BHPP) Overhaul of tn G-13 220/250 hydraulic lift. (BHPP) Overhaul of hydroelectric unit No.2. (BHPP) Replacement of adjusting ring pins of water turbine No.6. (BHPP) Overhaul of hydroelectric generator No.2. (BHPP) Running repair of electrical systems of hydroelectric generators. (BHPP) electrical systems. (BHPP) Running repair of auxiliary equipment within electrical systems of hydroelectric generators. (BHPP) Overhaul of VVD-220B, VVB-220B, A air circuit breakers. (BHPP) Repair of strain-gauge network of the run-of-the-river (concrete) dam including well drilling and installation of tensometers. (BHPP) Overhaul of HPP building and overhaul of hydroelectric unit No.2. (BHPP) Overhaul of anti-corrosion coating of equipment of h/t No.2. (BHPP) Repair of VVD-220B/VVB-220A12 type air circuit breakers. (BHPP) Current repairs of TFZM 220 kV and 500 kV current transformers. (BHPP) Ongoing maintenance and routine check of gas-insulated circuit-breakers. (BHPP) Current repairs of ORCO-210000/500 type power transformers. (BHPP) “Reconstruction of 500 kV standard unit. Reconstruction of 5T unit. Automatic control system for 9G, 10G generators and 5T transformer”. (U-I CHPP) Repair of АРЗ grooves and bolt and of the water pipeline of aggregate sections No. 2,7 of the run-of-the-river dam (BHPP) Current repairs of shear keys of the run-of-the-river dam (BHPP) Elimination of property, plant and equipment defects: Surface preparing for inspection of metal of MNU G-1 boiler (Request No. 3). (BHPP) Elimination of property, plant and equipment defects: Surface preparing for inspection of metal of MNU G-1 boiler (Request No. 4). (BHPP) Changing of pins of shift ring of water turbine No. 4, inspection of turbine cover bolts and turbine bearing of h/t No. 18. (BHPP) Current repairs of VL 220kV and 500 kV connective equipment. (BHPP) RUB 25,862,107.20, incl. VAT: RUB 3,945,067.20 RUB 2,546,772.57, incl. VAT: RUB 388,490.73 RUB 19,773,009.84, incl. VAT: RUB 3,016,221.84 RUB 6,546,720.22, incl. VAT: RUB 998,652.24 RUB 480,549.10, incl. VAT: RUB 73,304.10 RUB 21,825,159.64, incl. VAT: RUB 3,329,261.64 RUB 620,671.74, incl. VAT: RUB 94,678.74 RUB 7,251,813.75, incl. VAT: RUB 1,106,208.88 RUB 2,997,574.06, incl. VAT: RUB 457,257.06 RUB 2,997,728.64, incl. VAT: RUB 457,280.64 RUB 2,284,244.09, incl. VAT: RUB 348,444.01 RUB 1,466,810.80, incl. VAT: RUB 223,750.80 RUB 2,791,894.16, incl. VAT: RUB 425,882.16 RUB 1,661,257.10, incl. VAT: RUB 253,412.10 RUB 666,733.34, incl. VAT: RUB 101,705.09 RUB 342,872.80, incl. VAT: RUB 52,302.63 RUB 602,187.82, incl. VAT: RUB 91,859.16 RUB 2,532,675.30, incl. VAT: RUB 386,340.30 RUB 553,625.44, incl. VAT: RUB 84,451.34 RUB 2,796,386.42, incl. VAT: RUB 426,567.42 RUB 733,706.30, incl. VAT: RUB 111,921.30 RUB 291,562.66, incl. VAT: RUB 44,475.66 RUB 183,331.88, incl. VAT: RUB 27,965.88 RUB 217,069.53, incl. VAT: RUB 33,112.30 RUB 15,910,941.82, incl. VAT: RUB 2,427,092,82 RUB 15,892,061.82, incl. VAT: RUB 2,424,212.82 RUB 25,862,107.20, incl. VAT: RUB 3,945,067.20 RUB 2,546,772.57, incl. VAT: RUB 388,490.73 RUB 19,773,009.84, incl. VAT: RUB 3,016,221.84 RUB 6,546,720.22, incl. VAT: RUB 998,652.24 RUB 480,549.10, incl. VAT: RUB 73,304.10 RUB 21,825,159.64, incl. VAT: RUB 3,329,261.64 RUB 620,671.74, incl. VAT: RUB 94,678.74 RUB 7,251,813.75, incl. VAT: RUB 1,106,208.88 RUB 2,997,574.06, incl. VAT: RUB 457,257.06 RUB 2,997,728.64, incl. VAT: RUB 457,280.64 RUB 2,284,244.09, incl. VAT – RUB 348,444.01 RUB 1,466,810.80, incl. VAT – RUB 223,750.80 RUB 2,791,894.16, incl. VAT – RUB 425,882.16 RUB 1,661,257.10, incl. VAT – RUB 253,412.10 RUB 666,733.34, incl. VAT – RUB 101,705.09 RUB 342,872.80, incl. VAT – RUB 52,302.63 RUB 602,187.82, incl. VAT – RUB 91,859.16 RUB 2,532,675.30, incl. VAT – RUB 386,340.30 RUB 3,330,000.00, plus VAT – RUB 599,400.00 RUB 1,003,000.00, incl. VAT - RUB 153 000,00 RUB 651,833.18, incl. VAT – RUB 99,432.18 RUB 138,203.96, incl. VAT – RUB 21,081.96 RUB 138,203.96, incl. VAT – RUB 21,081.96 RUB 798,149.64, incl. VAT – RUB 121,51.64 RUB 548,055.72, incl. VAT – RUB 83,601.72 OAO Irkutskenergo 185 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 Inspection of bottom pilot bearer (turbine bearing) of G-1hydroelectric generator. (BHPP) Repair of utility rooms of covered warm storage building of Procurement Department. (BHPP) Current repairs of OPN-220kV and 500 kV surge suppressors. (BHPP) Insulation of G-18transformers. (BHPP Current repairs of 220 kV and 500 kV bus network. (BHPP) Current repairs of NKF-220 type 500 kV voltage transformer. (BHPP) Repair of offices (director’s and chief engineer’s offices, reception area) in the administration building. (BHPP) Repair and illumination of the front of the hydrometallurgical shop. (BHPP) Anticorrosive treatment of intake portal metal framework ORU-500. (BHPP) Repair of foundation coating of op con building of the motor transport service of the Bratskaya HPP. Counterparty: ООО EC Irkutskenergo (contractor) Reconstruction of control panel 1 (inv. No.147485) at the facility of CHPP-10 branch of OAO Irkutskenergo. Installation of automatic process control system for power-generating unit No.1. Reconstruction of control system of boiler unit st.No.3. (CHPP -6) Implementation of full-featured automatic process control system of BKZ-420 b/u st.No.4. (N-I CHPP) Reconstruction of monitoring and control system of boiler unit st.No.3. (CHPP -6) High pressure direct flow boiler unit 7. Reconstruction and replacement of burners with turning ones (CHPP -10) Reconstruction of boiler unit st. No.8 and replacement of ceiling wall, reconstruction of boiler unit st. No.10 and replacement of lower radiant section, reconstruction of boiler unit st. No. 13 and replacement of first stage water economizer (inv. No.140184), reconstruction of boiler unit st. No.15 and replacement of ceiling wall. (CHPP -10) Installation of RPA connections I, II systems of ORU-110 kV bus bars. (CHPP -9) Relay cabinet on 110 kV open switchgear. (CHPP -9) Upgrade of control system of b.u. st. No.8 from traditional to microprocessor-based (automatic process. control system of b.u. No.8) (“turnkey”). (CHPP -11) Steam, water and oxygen treatment, conservation and passivating treatment of boiler unit heating surface in the main building (design and survey). (U-I CHPP) CHPP -6: Installation of backup remote control system (RCS). (CHPP -6) Automatic dispatcher control system of pump stations for right bank of Ust-Ilimsk heat supply. (U-I CHPP) Automatic dispatcher control system of pump stations for right bank of Ust-Ilimsk heat supply. (U-I CHPP) Counterparty: ООО Pozharnaya Okhrana Irkutskenergo (contractor) Design works at the facility of the CHPP -11 branch of ОАО Irkutskenergo’s: Security and fire alarms at Building of TNS-1, Building of TNS-2 facilities Installation of security and fire alarms (SH.A. of NI-CHPP) construction and assembly operations, start-up work, equipment at the N-I CHPP branch Counterparty: ZAO IRMET (contractor) Design works: Automated system of commercial heat energy metering (ASCHEM). (CHPP -10) Reconstruction of heat energy meter station at CHPP -7 (Heat energy and heat conductor meter station steam lead 6 at No.1). (CHPP -6) Installation of heat energy metering station CTP-27/2. (CHPP -6) Installation of heat energy metering station CTP-27/3. (CHPP -6) Installation of heat energy metering station CTP-27/4. (CHPP -6) Counterparty: ZAO Irkutskenergoremont (contractor) Current repairs of o. deaerators No.2-10, MP deaerators No.1,2; HP deaerators No.1-8. (N-I CHPP) Current repairs of boiler units No.1-6. Technical diagnosis of main boilers MB-4, MB-5, MB-6. (N-I CHPP) Current repairs of general main steam and feedwater pipelines. (N-I CHPP) Current repairs of PRDS. (N-I CHPP) Current repairs of ash collectors. (N-I CHPP) Repairs of rotating elements of pulverizing fans of boiler units No. 5-8. (N-I CHPP) Emergency repair of boiler unit No.1. (N-I CHPP) Additional amount of works during overhaul of turbine unit st. No.4. (CHPP-11) Current repairs of t/u st. No.1 (PT-25-90/10 UTMZ), t/u st. No. 7 (R-50-130) (CHPP-11) Current repairs of BTH electric feed pump -1, 2, 3, 4, 5, 6. (U-I CHPP) Expanded current repairs of BTH turbine unit st. No.6. (U-I CHPP) Current repairs of BTH turbine unit st. No.No.1, 3, 4, 5. (U-I CHPP) Repair of electric motors 6 kV of boiler units No.1, 2, 3, 4. (N-I CHPP) Repair of electric motors 6 kV of boiler units No.5, 6, 7, 8. (N-I CHPP) Repair of electric motors 6 kV of turbine units No.1, 2, 3, 4. (N-I CHPP) Repair of generators of turbine units No.1 and 3. (N-I CHPP) Repair of generators of turbine units No.2,4,5. (N-I CHPP) Repair of 220 kV, 15 kV OTU-220 kV transformers; OTU-220 kV power lines; metal frameworks. General equipment. (N-I CHPP) Repair of RU-6/0.4 kV electrostatic precipitator units. Repair of 6/0,4 kV RU-6/0,4 kV transformers. Renovation of lacquer coating. General equipment. (N-I CHPP) Repair of 6 kV electric motors of turbine unit No. 5. Repair of 6 kV electric motors in the fuel and transportation department. (N-I CHPP) 186 OAO Irkutskenergo RUB 118,253.70, incl. VAT – RUB 18,038.70 RUB 211,220.00, incl. VAT – RUB 32,220.00 RUB 97,764.18, incl. VAT – RUB 14,913.18 RUB 16,908.22, incl. VAT – RUB 2,579.22 RUB 768,255.52, incl. VAT- RUB 117,191.52 RUB 116,481.34, incl. VAT- RUB 17,768.34 RUB 1,297,999.00, incl. VAT – RUB 197,999.85 RUB 2,230,065.48, incl. VAT – RUB 340,179.48 RUB 2,312,621.82, incl. VAT – RUB 352,772.82 RUB 613,600.00, incl. VAT – RUB 93,600.00 RUB 32,600,000, plus VAT – RUB 5,868,000 RUB 15,576,000, incl. VAT – RUB 2,376,000 RUB 12,508,000, incl. VAT – RUB 1,908,000 RUB 15,576,000, incl. VAT – RUB 2,376,000 RUB 860,000, incl. VAT – RUB 154,800 RUB 860,000, incl. VAT - RUB 154,800 RUB 26,314,000, incl. VAT – RUB 4,014,000 RUB 16,520,000, incl. VAT – RUB 2,520,000 RUB 19,588,000, incl. VAT – RUB 2,988,000 RUB 531,000, incl. VAT – RUB 81,000 RUB 167,061.82, incl. VAT – RUB 25,484.01 RUB 30,545,739.60, incl. VAT – RUB 4,659,519.60 RUB 27,906,957.52, incl. VAT – RUB 4,256,993.52 RUB 106,200.0, incl. VAT – RUB 16,200.0 / Based on appraisal RUB 885,000.0, incl. VAT – RUB 135,000 RUB 1,180,000.00, incl. VAT – RUB 180,000 RUB 682,040, incl. VAT – RUB 104,040 RUB 645,460, incl. VAT – RUB 98,460 RUB 651,360, incl. VAT – RUB 99,360 RUB 476,720, incl. VAT – RUB 72,720 RUB 1,003,000, incl. VAT – RUB 153,000 RUB 1,286,196.46, incl. VAT – RUB 196,199.46 RUB 1,003,000, incl. VAT – RUB 153,000 RUB 1,003,000, incl. VAT – RUB 153,000 RUB 766,997.46, incl. VAT – RUB 116,999.61 RUB 2,006,000, incl. VAT – RUB 306,000 RUB 365,800, incl. VAT – RUB 55,800 RUB 461,742.14, incl. VAT – RUB 70,435.24 RUB 1,365,282.82, incl. VAT – RUB 208,263.48 RUB 1,998,997.28, incl. VAT – RUB 304,931.79 RUB 3,114,493.73, incl. VAT – RUB 475,092.26 RUB 1,381,165.01, incl. VAT – RUB 210,686.19 RUB 1,959,980, incl. VAT – RUB 298,980 RUB 1,967,060, incl. VAT – RUB 300,060 RUB 1,609,520, incl. VAT – RUB 245,520 RUB 1,980,040, incl. VAT – RUB 302,040 RUB 2,213,680, incl. VAT – RUB 337,680 RUB 1,628,400, incl. VAT – RUB 248,400 RUB 1,593,000, incl. VAT – RUB 243,000 RUB 1,740,500, incl. VAT – RUB 265,500 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 Additional amount of works on eliminating the defects found during inspection of turbine unit st. No.4 (Т-50-130). (CHPP-11) Current repairs of t/u st. No.1 (PT-25-90/10 UTMZ)and t/u st. No.7 (R-50-130). (CHPP-11) Elimination of defects found during inspection of turbine unit st. No.4. (CHPP-11) Dynamic balancing of rotating elements of turbines, generators, electric motors, rotary mechanisms on the 9719B type machines in the workshops of ZAO Irkutskenergoremont. (CHPP-11) Repair of pipe lines of oil film bearings in OGS cable tunnels and galleries at the Bratskaya HPP. Repair of ash handling bunkers of boiler units st. No.1-7. (U-I CHPP) Replacement of outlet header of stage IV superheater of b. u. st. No.7, repair of b. u. st. No.3. (U-I CHPP) Repair of furnaces of boiler units st. No.1-5, 7. (U-I CHPP) Repair of boiler units st. No.1-5, 7, repair of ash collectors of boiler unit st. No.3. (U-I CHPP) Repair of fire water pipelines, repair of condensing unit. (U-I CHPP) Factory repair of electrical equipment. (N-I CHPP) Maintenance of main and auxiliary equipment of BTH turbine house. (CHPP-10) Repair of failure on heating and mechanical equipment in the workshops for CHPP-10 Maintenance of central heating station equipment on CHPP-9 Depot repair of electrical equipment on heat network section of CHPP-9 Inspection of metal of TH equipment in area No.1 at CHPP-9 Inspecting of metal of BH equipment in area No.1 at CHPP-9 Vibration-based diagnostics and balancing of main and auxiliary equipment in area No.1 at CHPP-9 Repair of heating and mechanical equipment in the repair depot of electrical shop of ZAO Irkutskenergoremont, area No.1. (CHPP-9) Replacement of traversee on busline TG-5 (OTU-220 кВ). Repair of servicing platforms for T-3, OT-3, VT-3 (general equipment). (N-I CHPP) PUT-1 heating network makeup node: repair of DS-300 deaerator columns; PUT No.2 heating makeup node: repair of PSV-315 vertical-type boilers; PUT-2 heating network makeup node: repair of DS -300 deaerator columns; Pipe line of electric feed pump PEN-1: metal clearing for carrying out technical inspection; Balance line of o. deaerators before UVR-2 bolt: metal clearing for carrying out technical inspection; BUG-1 city boiler station, BP-2,3 peaking water heater: metal clearing operation for carrying out technical inspection of condensate pipeline; Network pipeline of BUP-2 boiler station of pipeline maintenance depot: metal clearing for carrying out technical inspection; Heating steam pipeline of o. deaerators (after primary flow transducer-5): metal clearing for carrying out technical inspection; Repair of inlet header of transfer pump (VDR-6 bolt removal); Repair and replacement of vented steam pipeline 1,2 at by RDR-2; Repair of condensate return piping and installation of metering devices. (CHPP-6 CU) Steam-turbine unit (STU) st. No.1: repair of steam distributor of high pressure cylinder (HPC), low pressure cylinder (LPC), supports, high pressure – low pressure rotor (HPR-LPR) coupling, automatic control subsystems (ACS), oil-hydrogen generator gasket system; Steam-turbine unit (STU) st. No.3: repair of steam distributor of high pressure cylinder (HPC), low pressure cylinder (LPC), supports, high pressure – low pressure rotor (HPR-LPR) coupling, automatic control subsystems, oil-hydrogen generator gasket system. (CHPP-6 CU) Steam-turbine unit (STU) st. No.2: repair of steam distributor, bearings, supports, high pressure generator rotor (HPR-RG) coupling, shaft train aligning. Repair of oil-hydrogen generator gasket system; Steam-turbine plant (STU) st. No.5: repair of steam distributor, bearings, support, high pressure generator rotor (HPR-RG) coupling, shaft train aligning. Repair of oil-hydrogen generator gasket system, automatic control subsystems. (CHPP-6 CU) Steam-turbine unit (STU) st. No.2: repair of flow range of HPC high pressure cylinder and replacement of the carrier ring of the orifice plate No.1. (CHPP-6 CU) Overhaul of electric feed pump No.4 (PEN-4), repair of bearings in the electric motor. Repair of pipeline, hanger-support system, pumps, ladders, servicing platforms for auxiliary turbine equipment (CHPP-6 CU) Boiler plant st. No.3: leveling of furnace-wall tubes under repair request form; rebuilding of studding of the bottom part of furnace-wall tubes; preparing the metal of heating surfaces for acceptance test; repair of feed-water economizer proofing; repair of air pipes of cool air duct on suction part of 3A, 3B (DB-3A,B) forced draft fans and repair of supporting skirt on 4 meters mark; preparing for metal inspection and repair of blow case, main steam pipeline, delivery pipeline. Boiler plants st. No. 1-10: repair of heating surfaces. (CHPP-6 CU) Boiler plant (KU) st. No.5: leveling of furnace-wall tubes under repair request form; rebuilding of studding of the bottom part of furnace-wall tubes. Preparing the metal of heating surfaces for acceptance test; Repair of feed-water economizer proofing. Leveling of I - IV stage furnace-wall tubes and coils of the superheater, spacing parts replacement. Repair of hanger-support system. Rebuilding of “proofs” in operating zone of convection surface blower on festoon-type tubes and III, IV stage blocks. Preparing for metal inspection and repair of blow case, main steam pipeline, delivery pipeline. (CHPP-6 CU) Boiler plant st. No.1-10: repair of pipeline, hanger-support system, gas ducts, air pipes of boiler units st. No.1-8,10. Auxiliary boiler equipment (ABE): repair of pipeline, hanger-support system. Heat network makeup node (PUT-1): repair of pipeline, hanger-support system. City boiler station (BUG-2): repair of pipeline, hanger-support system. Delivery pipeline: repair of pipeline, hanger-support system. (CHPP-6 CU) Steam-turbine unit (STU) st. No.2: repair of nods of automatic control system (ACS), static and dynamic rating of ACS; Steam-turbine unit (STU) st. No.4: repair of steam distributor, bearings, supports, high pressure – low pressure rotor (HPR-LPR) coupling, nods of automatic control system (ACS), oil-hydrogen generator gasket system. (CHPP-6 CU) Reconstruction of deaerators 1,2 at st.No.1,2. (design and survey works). (CHPP-11) RUB 461,742.14, incl. VAT – RUB 70,435.24 RUB 1,365,282.82, incl. VAT – RUB 208,263.48 RUB 461,742.14, incl. VAT – RUB 70,435.24 RUB 566,400.00, incl. VAT - RUB 86.400,00 RUB 1,126,897.64, incl. VAT – RUB 171,899.64 RUB 3,775,819.78, incl. VAT– RUB 575,972.51 RUB 1,849,036.40, incl. VAT – RUB 282,056.40 RUB 2,597,971.78, incl. VAT – RUB 396,300.78 RUB 2,737,579.94, incl. VAT – RUB 417,596.94 RUB 566,385.84, incl. VAT – RUB 86,397.84 RUB 1,416,000, incl. VAT – RUB 216,000 RUB 943,992.21, incl. VAT – RUB 143.998,81 RUB 2,301,000, incl. VAT – RUB 351,000 RUB 1,793,869.30, incl. VAT – RUB 273,641.08 RUB 1,180,000, incl. VAT – RUB 180,000 RUB 2,099,258.94, incl. VAT – RUB 320,225.94 RUB 1,160,034.40, incl. VAT – RUB 176,954.40 RUB 1,398,958.44, incl. VAT – RUB 213,400.44 RUB 1,652,000.00, incl. VAT – RUB 252,000.00 RUB 413,000, incl. VAT – RUB 63,000 RUB 1,415,993.96, incl. VAT – RUB 215,999.08 RUB 1,954,693.02, incl. VAT – RUB 298,173.51 RUB 2,037,081.78, incl. VAT – RUB 310,741.28 RUB 2,311,340.08, incl. VAT – RUB 352,577.30 RUB 2,025,650.12, incl. VAT – RUB 308,997.47 RUB 2,286,014.97, incl. VAT – RUB 348,714.15 RUB 1,717,346.30, incl. VAT – 261,968.08 RUB RUB 1,948,592.08, incl. VAT – RUB 297,242.86 RUB 2,032,731.46, incl. VAT – RUB 310,077.68 RUB 1,416,000.0, incl. VAT – RUB 216,000.0 OAO Irkutskenergo 187 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 Reconstruction of injection unit and installation of rotating valves on boiler unit st. No.7 (design and survey works). (CHPP-11) Repair of equipment (steam and water boilers) RTS-1, RTS-2 of section TVSK. (U-I CHPP) Repair of generators of turbine unit st. No.1-5, 7,8 and coupling transformers 1,2,3,4,5. (CHPP-11) Overhaul of EC&I equipment of boiler st. No.1, current repairs of EC&I equipment of boiler st. No.2, current repairs of EC&I equipment of boiler st. No.3, 4, current repairs of EC&I equipment of turbine st. No.1. (N–З CHPP) Repair of heating and mechanical equipment in the workshops of ZAO IER. (N-Z CHPP) Repair of heating and mechanical equipment in the workshops of ZAO IER. (N-Z CHPP) Capital repair of TSZP-2500/15 VUZ, TD-10000/20U1 (TSN 8T) transformers by factory repair division for the Irkutskaya HPP Extended overhaul of hydroelectric generator 1160/180-72 st. No.8 inv.054367 (electr. equipment) at the IHPP Overhaul of segments of VGP, NGP of h/g 1160-180-72 at the Central repair factory for the Irkutskaya HPP Repair of electrical equipment by factory repair division for the Irkutskaya HPP Extended overhaul of hydroelectric generator 1160/180-72 st. No.8 at the Irkutskaya HPP Vibro-diagnostic works on hydroelectric units st. No.1-8, vibration monitoring of auxiliary equipment at the Irkutskaya HPP Replacement of rotary car dumper No.2. (CHPP-10) Repair of 6 kV electric motors, up to 1000 V and 6 kV, condition based, central heating station, CHPP-9 area No.1 Current and medium repairs and overhaul of central heating station equipment at CHPP-9 Repair of TI&C equipment of boiler unit No.3 at CHPP-9 Contingency works and elimination of defects of TH main equipment at CHPP-9 Current repairs and elimination of defects of CWT and CHS instruments, equipment, electric drivers at CHPP-9 Vibro-diagnostic and vibro-adjusting works during repairs of main and auxiliary equipment. (CHPP-9) Contingency works and elimination of defects of BH main equipment at CHPP-9 Current repairs of TI&C equipment on main equipment in CF in area No.1 of CHPP-9 Current repairs of TI&C equipment on main equipment in BH, KTS Energiya and automated working station of technical engineering department of area No.1 of CHPP-9 Current repairs of TI&C equipment on auxiliary equipment in TH of area No.1 of CHPP-9 Repair of deaerators No.17,19 and high-stage heaters No.4, 5 of turbine unit No.12 in area No.1 of CHPP-9 Current repairs and elimination of defects of instruments, equipment, electric drivers of turbine units 3,4,5,8 at CHPP-9 Overhaul of circulation pumps and BTH ATE pumps (U-I CHPP) Repair of platforms of 2nd line peaking water heaters, demounting OD-1-8, bellows of pipeline of built-in bundle and condenser of turbine st. No.5, funnel discharge tube on feeding water in axes 19-24, line B of BTH (U-I CHPP) Replacement of steam-circulating tubes from outlet chamber of medium hot package to pressure relief valve and replacement of pressure relief valve of boiler unit No.3. (CHPP-11) Replacement of bed frame of the drive of ball pulverizer-4A of boiler unit No.4. (CHPP-11) Repair of generators of turbine units st. No.1-5, 7,8 and coupling transformers 1, 2, 3, 4, 5. (CHPP-11) Factory repair of electrical equipment. (part of the heat network of N-I CHPP) 150000 kW feed water unit st. No.5, No.8. Capital repair of 350, 3800, 3000 rpm. PEN-5A, PEN -5V, PEN -8B electric motors of АТМ. (CHPP-10) Factory repair of electrical equipment. (CHPP-10) Low pressure station pipelines of 150000 kW power-generating unit No.7. Installation of recycled water collector in additional building of block 7. (CHPP-10) Low pressure station pipelines of 150000 kW power-generating unit No. 6. Installation of recycled water collector in additional building of block 6. (CHPP-10) Overhaul of 130 DPV-8/23 pump, river-water pump house (CNV-1 BNS). (CHPP-10) Preparation for technical diagnosis D1,2 ata No.1,3. (CHPP-11) Repair of dust pipe of cyclone collectors – МВ vibrating separator mill, cyclone separator of boiler unit 3A,B, air ducts of hot and preheated air of boiler unit 3A,B, repair of dust pipe cyclone collector – МВ vibrating separator mill, cyclone separator of boiler unit 4A,B, air ducts of hot and preheated air of boiler unit 4A,B, repair of dust pipe of cyclone collector - МВ vibrating separator mill, cyclone separator of boiler unit 5A,B, ducts of hot and preheated air of boiler unit 5A,B. (CHPP-11) Vibration-based diagnostics and balancing of turbine units No.1, 2, 3, 4, 5 (N-I CHPP) Analysis of thermal expansion of cylinders of turbine units st. No.1, 2, 3, 4, 5. Balancing of rotary mechanisms of fuel supply system (N-I CHPP) Repair of auxiliary boiler equipment of the shop of Galachinskaya district boiler station (CHPP-6 TI&TS) Repair of boiler unit st. No.7 BTH-TI. (CHPP-6 TI&TS) Repair of boiler units st. No.3, 4, 5 shop of Galachinskaya district boiler station. (CHPP-6 TI&TS) Repair of ATBE, BTH pipelines -TI. (CHPP-6 TI&TS) Repair of heating and mechanical equipment of electric boiler station (CHPP-6 TI&TS) Vibro-adjusting equipment testing of heat sources and networks (CHPP-6 TI&TS) Elimination of defects and unscheduled repairs of heating surfaces, boiler fittings and pipelines of TI&TS. (CHPP-6 TI&TS) Changes in contract value due to an increase in the amount of work. (CHPP-6 TI&TS) Current repairs of turbine generators TV-60-2 No.1, TV-150-2 No.2, 4, 5, 7, 8. Overhaul of TV-150-2 turbine generators No.3, 6. (CHPP-10) 188 OAO Irkutskenergo RUB 377,600.0, incl. VAT – RUB 57,600.0 / Based on appraisal RUB 1,587,037.46, incl. VAT – RUB 242,090.46 RUB 2,360,000, incl. VAT – RUB 360,000.00 RUB 1,238,987.02, incl. VAT – RUB 188,998.02 RUB 1,062,000.00, incl. VAT – RUB 162,000.00 RUB 354,000.00, incl. VAT – RUB 54,000.00 RUB 1,101,654.42, incl. VAT – RUB 168,048.98 RUB 834,496.48, incl. VAT – RUB 127,296.07 RUB 1,037,086.9, incl. VAT – RUB 158,199.70 RUB 283,200.00, incl. VAT – RUB 43,200.00 RUB 5,073,570.06, incl. VAT – RUB 773,934.42 RUB 2,284,481.03, incl. VAT – RUB 348,480.16 RUB 33,378,153.99, plus VAT – RUB 6,008,067.72 RUB 2,854,350.58, incl. VAT – RUB 435,409.41 RUB 2,239,435.25, incl. VAT – RUB 341,608.77 RUB 1,720,572.11, incl. VAT – RUB 262,460.15 RUB 1,923,154.56, incl. VAT – RUB 293,362.56 RUB 548,700.00, incl. VAT – RUB 83,700.00 RUB 212,030.66, incl. VAT – RUB 32,343.66 RUB 548,700.00, incl. VAT – RUB 83,700.00 RUB 1,346,380.00, incl. VAT – RUB 205,380.00 RUB 1,586,934.80, incl. VAT – RUB 242,074.80 RUB 876,740.00, incl. VAT – RUB 133,740.00 RUB 2,005,998.82, incl. VAT – RUB 305,999.82 RUB 1,944,640.00, incl. VAT – RUB 296,640.00 RUB 1,480,878.37, incl. VAT – RUB 225,896.70 RUB 171,061.06, incl. VAT – RUB 26,094.06 RUB 955,800, incl. VAT – RUB 145,800.00 RUB 542,800, incl. VAT – RUB 82,800 RUB 2,360,000, incl. VAT – RUB 360,000.00 RUB 731,600, incl. VAT – RUB 111,600 RUB 566,141.44, incl. VAT – RUB 86,360.56 RUB 2,053,200, incl. VAT – RUB 313,200 RUB 69,616.37, incl. VAT – RUB 10,619.45 RUB 69,616.37, incl. VAT – RUB 10,619.45 RUB 681,899.58, incl. VAT – RUB 104,018.58 RUB 121,558.12, incl. VAT – RUB 18,542.76 RUB 1,964,700, incl. VAT – RUB 299,700 RUB 2,359,625.96, incl. VAT – RUB 359,942.94 RUB 1,239,000, incl. VAT – RUB 189,000 RUB 1,579,334.42, incl. VAT – RUB 240,915.42 RUB 943,359.26, incl. VAT – RUB 143,902.26 RUB 1,386,756.06, incl. VAT – RUB 211,539.06 RUB 757,654.4, incl. VAT – RUB 115,574.4 RUB 385,547.3, incl. VAT – RUB 58,812.3 RUB 835,297.22, incl. VAT – RUB 127,418.22 RUB 11,180,000, incl. VAT – RUB 180,000 RUB 63,727.08, incl. VAT – RUB 9,721.08 RUB 77,669,836.58, incl. VAT – RUB 1,169,975.07 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 Boiler unit st. No.9. Repair of upper radiant section. (CHPP-10) Low pressure station pipelines of 150000 kW power-generating unit No.7. Replacement of recycled water collector in additional building, block 7. (CHPP-10) Low pressure station pipelines of 150000 kW power-generating unit No.6. Replacement of recycled water collector in additional building, block 6. (CHPP-10) Overhaul of steam turbine 2 with 3-phase current generator TV-2-150-2. (CHPP-10) Overhaul of TM-400/10 transformer No.2 in the workshops. (Part of the heat network of CHPP-11) Current repairs of PT-80-130/13 turbine unit equipment st. No.1, current repairs of PT-80-130 turbine unit equipment st. No.2. (N-ZCHPP) Current repairs PT-80-130/13 turbine unit equipment st. No.3, current repairs of DSP-500 deaerator st. No.No.1, 2, 3, peaking water heater No.No.1, 2, 3, 4, 5, 6, 7, 8. Capital repair of equipment of booster pumping station. (N-ZCHPP) Current repairs of equipment of BKZ 420-140-6 boiler unit st. No. 1, current repairs of equipment of BKZ420-140-6 boiler unit st. No. 2. (N-ZCHPP) Current repairs of equipment of BKZ 420-140-6 boiler unit st. No.3, overhaul of equipment of BKZ- 420140-7 boiler unit st. No.4. (N-ZCHPP) Repair of pipelines of condensate cooler housing of continuous blowdown controller of auxiliary equipment of boiler room. (N-ZCHPP) Repair of BKZ-420-140-6 boiler unit st. No.3. (N-ZCHPP) Repair of auxiliary equipment of boiler-room, drencher curtain of belt conveyor 2. (N-ZCHPP) Repair of turbine generator st. No.1, 2, 3. (N-ZCHPP) Repair of heating surfaces of boiler units st. No.No.1-4. (N-ZCHPP) Repair of pipeline for acid cleaning of BTH boiler unit st. No.No.1-7 (in axes 2-24, line G-G) (U-I CHPP) Overhaul of feed pump PEN-7. (U-I CHPP) Repair of pipelines of oil film bearings in OGS cable tunnels and galleries at the Bratskaya HPP Vibration-based diagnostics and vibro-adjusting works during repair of power-generating equipment (h.a. No.1, 2, 6, 7) at the BHPP Repair of main elements of boiler unit No.1 (BKZ-160/100). Repair of furnace burners of boiler unit No.1 (BKZ-160/100). Repair of Venturi tubes of boiler unit No.1 (BKZ-160/100). Replacement of front and radial plating SHBM-1 “A” of BKZ-160/100 boiler unit st. No.1. Replacement of front and radial plating SHBM-1 “B” of boiler unit BKZ-160/100 st. No.1. Repair of water economizer of boiler unit TP-85 st. No.6, repair of Venturi tubes of boiler unit No.6 (TP-85), Repair of air ducts for hot and preheated air, replacement of compensator of boiler unit TP-81 st. No.8 – change in the type of works. (CHPP-11) Vibration-based diagnostics and balancing of steam-turbine unit (STU) st. No.2 before and after repairs. (CHPP-6 CU) Design of hanger-support system of network pipeline BUG-1 (BP-2, 3); hanger-support system of pipeline 10-16 at ( before 2primary flow transducer-1); hanger-support system of balance line O. deaerator (after primary flow transducer -5). (CHPP-6 CU) Elimination of defects of heating and mechanical equipment. (CHPP-6 CU) Hydroelectric unit st. No.8: metal inspection and defect detection of nodes of h/u. Hydroelectric generators No.1-8: inspection of babbitt-lined segments at the Irkutskaya HPP Overhaul of hydroelectric unit st. No.8: disassembling, repair and assembly of h/g at the IHPP Reconstruction of boiler st. No.8 (N-I CHPP) Current repairs of turbine unit No.1 (N-I CHPP) Reconstruction of deaerators 1,2 at st. No. 1, 2 (design and survey works). (CHPP-11) Repairing of pulverizing systems of boiler unit st. No. 1-7 at Shelekhovsky area of the N-I CHPP Current repair of turbine unit st. No.2 (PT-25-90 /10). Current repair of turbine unit st. No. 3 (PT-65/75-130 LMZ). Current repair of turbine unit st. No. 4 (Т-50-130 UTMZ). (CHPP-11) Replacing of pipe system of low pressure preheaters -3, 4 for turbine unit No. 6, 8; integrated bundle for the condenser of turbine unit st. No. 8. (CHPP-11) Current repair of turbine unit st. No. 5 (Р-50-130). Current repair of turbine unit st. No. 6 (Т-50-130 UTMZ). (CHPP-11) Overhaul of mesh filters at the inlets of circulating pumps. (N-I CHPP) Capital repairs of 6 kV electric motors for BH at CHPP-9 Preparing turbine shop pipelines, hydraulic ash removal, and compressed air receivers at CHPP-9 for technical diagnostics and inspection of metal Overhaul of generators at CHPP-9 Current repair of TI&C equipment on TH auxiliary equipment at area No. 1 of CHPP-9 Current repair of TI&C equipment on BH auxiliary equipment at area No. 1 of CHPP-9 Vibration-based diagnostics and vibration set up works during repairs of main and auxiliary equipment of CHPP-9 Repairs of turbine unit st. No. 7, including replacement of blades of 25, 27 stages and bellows of steam supply pipes at CHPP-9 Repairs of turbine units st. No. 1, 5, 7, 9, 10, 11, and 12, as well as overhaul of EFP st. No. 3 at section No. 1 CHPP-9 Repairs of turbine generators st. No. 1, 5 at area No. 1 CHPP-9 Repairs of boiler units B/U st. No. 6, 9 BTH- remote metering (CHPP-6 remote metering and remote alarm) Repairs of high pressure preheaters equipment, raw water tanks No. 1, 2; TH fittings and pipelines at CHPP-9, area No. 1 Routine repairs of TI&C equipment on TH main equipment at CHPP-9 area No.1 Repairs and replacement of air preheaters st. b.u. at CHPP-9, area No. 1 RUB 420,064.09, incl. VAT – RUB 64,077.57 RUB 84,920.54, incl. VAT – RUB 12,953.98 RUB 84,920.54, incl. VAT – RUB 12,953.98 RUB 7,750,014.62, incl. VAT – RUB 1,182,205.62 RUB 88,500, incl. VAT - RUB 13,500 RUB 1,888,381.48, incl. VAT – RUB 297,295.48 RUB 1,526,668.66, incl. VAT – RUB 232,881.66 RUB 1,999,261.02, incl. VAT – RUB 304,972.02 RUB 1,732,635.30, incl. VAT – RUB 264,300.30 RUB 94,356.34, incl. VAT – RUB 14,393.34 RUB 117,831.26, incl. VAT – RUB 17,974.26 RUB 68,271.26, incl. VAT – RUB 10,414.26 RUB 2,131,369.10, incl. VAT – RUB 325,124.10 RUB 6,137,480.90, incl. VAT – RUB 936,225.90 RUB 495,582.30, incl. VAT – RUB 75,597.30 RUB 412,864.56, incl. VAT – RUB 62,979.34 RUB 1,126,897.64, incl. VAT – RUB 171,899.64 RUB 589,931.80, incl. VAT – RUB 89,989.60 RUB 1,814,490.32, incl. VAT – RUB 276,786.66 RUB 460,399.05, incl. VAT – RUB 70,230.36 RUB 471,915.81, incl. VAT – RUB 71,987.16 RUB 584,100, incl. VAT - RUB 71,987.16 RUB 330,087.50, incl. VAT – RUB 50,352.33 RUB 1,066,216.10, incl. VAT – RUB 162,643.13 RUB 110,424,860.14, incl. VAT – RUB 16,844,470.19 RUB 1,062,000, incl. VAT – RUB 162,000 No changes in the total cost under the agreement RUB 938,100.0, incl. VAT - RUB 143,100.00 RUB 1,957,979.90, incl. VAT - RUB 298,674.90 RUB 1,416,000.00, incl. VAT - RUB 216,000.00 RUB 1,582,398.88, incl. VAT - RUB 241,382.88 RUB 235,998.82, incl. VAT - RUB 35,999.82 RUB 1,651,975.22, incl. VAT - RUB 251,996.22 RUB 2,124,000.0, incl. VAT - RUB 324 000,0 RUB 1,769,916.22, incl. VAT - RUB 269,987.22 RUB 3,725,258.82, incl. VAT - RUB 568,259.82 RUB 4,130,000.0, incl. VAT - RUB 630,000.00 RUB 2,395,287.90, incl. VAT - RUB 365,382.90 RUB 578,200.0, incl. VAT - RUB 88,200.00 RUB 5 640,400.00, incl. VAT - RUB 860,400.00 RUB 1,274,400.00, incl. VAT - RUB 194,400.00 RUB 1,605,430.12, incl. VAT - RUB 244,896.12 RUB 1,957,620.00, incl. VAT - RUB 298,620.00 RUB 1,982,400.00, incl. VAT - RUB 302,400.00 RUB 2,005,974.04, incl. VAT - RUB 305,996.04 OAO Irkutskenergo 189 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 Metal control for BH equipment at CHPP-9 Routine repair and elimination of defects of instruments, equipment, and electric drives of the electric boiler station and electric shop at CHPP-9 Routine repair and elimination of defects of instruments, equipment, and electric drives of the boiler units No. 1 - 11 at CHPP-9 Repair of the instruments, equipment, and electric drives for auxiliary equipment of BH and TH at CHPP-9 Repair of the LK-1A,1B, 5 belt conveyors at CHPP-9 Vibration set-up works. TU - 2, 3, 4, and 6. (CHPP-10) 150,000 kW feed water unit st. No. 5, No. 8. Overhaul of the 3500,3800,3000 rpm. PEN-5А, PEN-5В, PEN-8Б electric motors ATM. (CHPP-10) Repairs of heating surfaces BU-3 PK-24 and BU-13 PK-24. (CHPP-10) Heating unit. Inv. No. 140291. Replacement of BU drain pipeline of the unit st. No. 1. (CHPP-10) ARU of boiler unit st. No. 2, 3, 5, 14, and 16. Repairs of ARU. Repairs of inlet gas ducts. ARU of boiler unit st. No. 8. Repairs of ARU. Emulgator of boiler unit st. No. 13. Repairs of ARU. Repairs of inlet gas ducts. (CHPP-10) Repairs of heating and mechanical equipment of BU-11 KP-24, BU-16 KP-24. (CHPP-10) Hydraulic ash removal equipment. Repairs of sealing water pipeline to ash-pumps of the first line. Building of heat distributing unit 2 with heat lines from unit 1 to HDU-2. Replacing technical water collector in Hot water accumulating tank. (CHPP-10) Overhaul of TV-150-2 turbine generators No. 3, 6. (CHPP-10) Current repair of TU-7. (CHPP-10) Control of the turbine No. 2 rotor from the axial channel side. (CHPP-10) Boiler unit No. 2 (BKZ-420-140-6). Reconstruction. (N-ICHPP) Boiler reconstruction st. No. 8. (N-ICHPP) Reconstruction of sparger No. 3 with expander and piping. (CHPP-9) Drain pipes from continuous blowdown expanders No. 1, 2, and 3 for boilers of 1 and 2 lines. (CHPP-9) Eliminating the defects of the HPR-MPR bearing support turbine unit st. No. 3 turbine shop. (CHPP-11) Repairs of furnace wall tubes of the boiler unit st. No. 6, fire pipeline (rows B and V, axis 17-18, elevation 0-12 m) of BTH. (U-ICHPP) Equipment repairs (crashers SMD-98А st. No. DMD-A, DMD-B, rotary car dumper VRS-125 B) central heating station (U-ICHPP) Boiler unit repair st. No. 4, preparing for metal control of steam supply bended pipes, pipelines within boiler 4 and manifolds. (N-ZCHPP) Repairs of 6 kV electric motors of the boiler department, 6 kV electric motors of ash-pump station No. 1, and of 6 kV electric motors of the booster pump station. (N-ZCHPP) Repair of the BKZ-420-140-6 boiler unit st. No. 1, repair of the BKZ-420-140-6 boiler unit st. No. 2, of the BKZ-420-140-6 boiler unit st. No. 3, of the second stage water economizer, including replacement of bends and pipes passing through the shotcrete layer of the BKZ-420-140- 6 boiler unit st. No. 2, repairing fire suppression manifolds of the tail part of the BKZ-420-140-6 boiler unit st. No. 2. (N-ZCHPP) Repairs of the regulating valves of the high pressure cylinder, low pressure cylinder, isolating valve, regulating system of PT-80-130/13 turbine units st. No. 1, repairs of the regulating system of the PAT-80130/13 turbine units st. No. 1, 2. (N-ZCHPP) Repairs of the PSN-3 pump for the turbine room equipment, repairs of the high pressure heaters No.5, 6, and 7, PT-80-130 turbine unit st. No. 2, repairs of the steam pipe support-hanging system up to the PRDS 140/9 st. No. 1,2, repairs of the heaters of the PT-80-130 turbine units st. No. 1, 2 and turbine room equipment, replacement of pipes of chemically treated water heater No. 1, turbine room equipment (N-ZCHPP) Repairs of the fire water pipeline, axis 1-2, row В-Е, elevation 0.00-8.00 BTH. (U-ICHPP) Repairs of the TVF-60-2 turbine generator of st. No. 6. (CHPP-11) Repairs of the 6 kV electric motors of the TH, BH, hot water supply unit. (CHPP-11) Repairs of the АТ-1, 2 and cooling systems, Repairing of the Т-6, 7, 8А, 8B and cooling systems of CHPP-11 Repairs of boiler units st. No. 5 (TP-85). (CHPP-11) Factory repairs of the heating and mechanical equipment, Shelekhovsky area of the N-I CHPP Factory repairs of the electrical and mechanical equipment, Shelekhovsky area of the N-I CHPP Overhaul of the АR-6-5 turbine st. No. 1, routine repairing of the turbines АР-6-3 st. No. 2 and No. 3 at Shelekhovsky area of the N-I CHPP Routine repairs of the turbine units st. No. 2, 5, 6 at CHPP-9 Repairs of the TI&C equipment of the turbine unit st. No. 1 at area No. 1 CHPP-9 Repairing of the LK-2B, 3B, including replacement of the conveyor belt at CHPP-9 Direct flow high pressure boiler unit 13 (PK-24). Reconstruction and replacement of 1 stage water economizer. (CHPP-10) Routine repairs of the 110 kV, 35 kV transformers. Open transformer units, facility 1...8. Spare system transformer TR-А,B. Open switchgear 110 kV SS. Water inlet 2. (CHPP-10) Washing of oil system ТМS LN TV-2-150-2 steam turbine 2 with three phase current generator. (CHPP-10) Repairs of heating surfaces of BU-3 PK-24 and BU-13 PK-24. (CHPP-10) Current repairs of ТV-2-150-2 steam turbine 8 with three phase current generator. (CHPP-10) Current repairs of ТV-2-150-2 steam turbine 6 with three phase current generator. (CHPP-10) Reconstruction of the platen superheater of the boiler unit, type TP-81 st. No. 6. (CHPP-9) Current repairs of the auxiliary equipment for the Irkutskaya HPP Current repairs of the ЗG-8G SVI 1160-180-72 hydroelectric generators (mechanical part) at the Irkutskaya HPP Current repairs of the 1Т-8Т transformers at the Irkutskaya HPP 190 OAO Irkutskenergo RUB 1,710,995.23, incl. VAT - RUB 260,999.27 RUB 987,642.30, incl. VAT - RUB 150,657.30 RUB 4,109,938.82, incl. VAT - RUB 626,939.82 RUB 5,197,900.00, incl. VAT - RUB 792,900.00 RUB 894,402.24, incl. VAT - RUB 136,434.24 RUB 2,839,157.88, incl. VAT - RUB 433,091.88 RUB 566,141.44, incl. VAT - RUB 86,360.56 RUB 2,536,903.24, incl. VAT - RUB 386,985.24 RUB 115,136.31, incl. VAT - RUB 17,563.17 RUB 2,914,432.55, incl. VAT - RUB 444,574,46 RUB 3,563,250.72, incl. VAT - RUB 543,546.72 RUB 79,779.99, incl. VAT - RUB 12,169.83 RUB 4,207,879.79, incl. VAT - RUB 641,879.97 RUB 1,740,183.76, incl. VAT - RUB 265,451.76 RUB 165,348.49, incl. VAT - RUB 25,222.65 RUB 7,611,000.00, incl. VAT - RUB 1,161,000.00 RUB 110,424,860.14, incl. VAT - RUB 16,844,470.19 RUB 295,000.00, incl. VAT - RUB 45,000.00 RUB 354,000.00, incl. VAT - RUB 54,000.00 RUB 68,440.00, incl. VAT - RUB 10,440.00 RUB 117,578.74, incl. VAT - RUB 17,935.74 RUB 1,415,886.72, incl. VAT - RUB 215,982.72 RUB 647,820.00, incl. VAT - RUB 98,820.00 RUB 1,652,000.00, incl. VAT - RUB 252,000.00 RUB 2,559,420.00, incl. VAT - RUB 390,420.00 RUB 1,050,200.00, incl. VAT - RUB 160,200 RUB 1,711,000.00, incl. VAT - RUB 261,000.00 RUB 74,340.00, incl. VAT - RUB 11,340.00 RUB 935,919.36, incl. VAT - RUB 142,767.36 RUB 1,111,788.92, incl. VAT - RUB 169,594.92 RUB 642,749.54, incl. VAT - RUB 98,046.54 RUB 4,783,579.58, incl. VAT - RUB 729,698.58 RUB 2,124,000.00, incl. VAT - RUB 324,000.00 RUB 708,000.00, incl. VAT - RUB 108,000.00 RUB 1,410,100.00, incl. VAT - RUB 215,100.00 RUB 6,650,480.00, incl. VAT - RUB 1,014,480.00 RUB 1,172,920.00, incl. VAT - RUB 178,920.00 RUB 354,000.00, incl. VAT - RUB 54,000.00 RUB 5,038,600.00, incl. VAT - RUB 768,600.00 RUB 4,366,000, incl. VAT - RUB 666,000 RUB 112,097.64, incl. VAT - RUB 17,099.64 RUB 2,536,903.24, incl. VAT - RUB 386,985.24 RUB 1,710,897.34, incl. VAT - RUB 260,984.34 RUB 7,669,739.22, incl. VAT - RUB 1,169,960.22 RUB 3,184,820.00, incl. VAT - RUB 485,820.00 RUB 530,989.75, incl. VAT - RUB 80,998.44 RUB 3,917,303.91, incl. VAT - RUB 597,554.83 RUB 969,665.65, incl. VAT - RUB 147,915.10 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 Repairing of EC&I equipment (control technical system of the N-I CHPP) Reconstruction of the injection unit with installation of rotating valves at boiler unit st. No. 7. (design and research works). (CHPP-11) Overhaul of boiler unit No. 4. (N-I CHPP) Replacing bottom parts of the furnace walls of the boiler unit st. No. 7. (U-ICHPP) Reconstruction of the pipelines for fast-response pressure-reducing and desuperheating station 140/10 No. 2, 3 from the lower side and elevating from - 3.2 m to elevation of 5.0 m. CHPP-11 (construction, installation, and start up works). (CHPP-11) Repairs for steel structures technical examination, boiler unit st. No. 2, 5, BTH (U-ICHPP) Repairs of the regulating valve No. 3 of the turbine unit st. No. 1 BTH. (U-ICHPP) Technical upgrade of the 220 V open switchgear and replacement of T-1 transformer with ТRDN-80000/220/6.3/6.3 transformer and replacement of relay protection and automatic device of unit No. 1. (N-I CHPP) Reconstruction of the cross connection between boilers st. No. 5, 6, 7, and 8 (superheated steam and feed water). (N-I CHPP) Partial technical examination and measuring walls thickness of BZPV-1, BZPV-2, and BZPV-3 feeding water storage tanks. Full technical examination of oil tanks No. 5, No. 6. (N-I CHPP) Testing of the turbine units No. 2, 4 ADS, including registering parameters and adjusting according to the factory data. (N-I CHPP) Current repairs of the general network water pipelines. (N-I CHPP) Repairs of the supply pipes from automatic shut-off valve to high pressure cylinder turbine unit st. No. 1 BTH. (U-ICHPP) Repairs of the heating pipeline, including dismantling of pipeline put out of operation in BTH. (U-ICHPP) Vibration-adjusting works during repairs st. turbine units No. 6, 8. (CHPP-11) Repairs and elimination of defects of heating and mechanical equipment. (CHPP-6 CC) Cleaning of steam superheater III-IV boiler unit st. No. 3 BTH (U-ICHPP) Current repairs of the turbine st. No. 6, repairing of the turbine bearing support st. No. 6 BTH (U-ICHPP) Boiler unit st. No. 2 Repairs of the heating surfaces. Boiler unit st. No. 5. Repairs of the heating surfaces. Restoration of the ceiling beams. (CHPP-10) Boiler unit st. No. 5. Repairs of the lower radiant part. Replacing the ash hopper of the lower radiant part. (CHPP-10) Repairs of the heat and moisture exchanger at CHPP-9 Repairs of the equipment and pipelines in TH at area No. 1 CHPP-9 Repairs of the instruments, equipment, and electric drives, adjusting new instruments in BH, TH of CHPP-9 Overhaul of the TDC-125000/110 transformer at CHPP-9 Overhaul of turbine unit st. No. 1 at area No. 1 CHPP-9 Repairs of boiler unit No. 3 additional scope CHPP-9 Repairs of electric motors at CHPP-9 area No. 1 Current and medium repairs and overhaul of the central heating station equipment at CHPP-9 Overhaul of the of the TI&C equipment of boiler unit st. No. 17 at area No. 1 CHPP-9 Technical renovation of the heating networks of 5 manifold from TK-4Е to TK-4D (section from TK-4Е to tD) (control technical system of the N-I CHPP) Turbine unit No. 6 (Work shops relocation). (N-I CHPP) Boiler unit No. 2 (BKZ-420-140-6). Reconstruction. (N-I CHPP) Emergency works. Balancing hydroelectric unit st. No. 1 after the overhaul. (BHPP) Repairs of the drum of the boiler unit st. No. 3 BTH (U-ICHPP) Repairs of hood sealing of the turbine unit st. No. 4 BTH. (U-ICHPP) Current repairs of turbine unit No. 3. (N-I CHPP) Repairs of the automation equipment of turbine units st. No. 2, 3, chemical control board, auxiliary equipment of the boiler department, and fuel feeding shop. (N-ZCHPP) Capital repairs of defective sections of the dust ducts of the BKZ-420-140-7 boiler unit st. No. 4 (N-ZCHPP) Repairs of the water economizer of the BKZ 420-140-6 boiler st. No. 2 (N-ZCHPP) Repairs of boiler unit st. No. 3 BTH -remote metering. (CHPP-6 remote metering and remote alarm) Repairs of turbine unit st. No. 8 (Т-100-130). (CHPP-11) Repairs of boiler units st. No. 4, 8, 9. (CHPP-11) Overhaul of pumps CN-3 N2P No. 1, CN 10 N2P No. 2, VS-10 N2P rotating water filters No. 2. (CHPP-10) Replacing segments of the end seals of the high pressure cylinder TU-6. (CHPP-10) Boiler unit st. No. 8, 9. Repairs of the heating surfaces. Restoration of the ceiling beams of the boiler unit. (CHPP-10) Repairs of the ceiling steam super heater of the boiler st. No. 2 (additional work). (N-ZCHPP) Repairing gate valves of gravity channels. (N-I CHPP) Cleaning superheated steam and feed water pipelines, cross links manifold of boiler units No. 5, 6. (N-I CHPP) Overhaul of the turbine unit st. No. 7 at CHPP-9 Development of repair documentation for area No. 1 CHPP-9 Overhaul of the boiler unit st. No. 17 at area No. 1 CHPP-9 Repairs of pipelines, PNSV raw water supply pumps No.1, 2 and raw water unit fittings at BTH. (U-ICHPP) Vibration-based examination of the Т-110-130 turbine unit st. No. 5 BTH. (U-ICHPP) Current repairs of steam turbine 3 with 3 phase current generator. (CHPP-10) Current repairs of ТV-2-150-2 steam turbine 4 with three phase current generator. (CHPP-10) RUB 8,732,000, incl. VAT - RUB 1,332,000 No changes in the total cost under the agreement RUB 7,327,800.00, incl. VAT - RUB 1,117,800 RUB 5,664,000, incl. VAT - RUB 864,000 RUB 3,245,000.00, incl. VAT - RUB 495,000.00 RUB 625,153.38, incl. VAT - RUB 95,362.38 RUB 56,608.95, incl. VAT - RUB 8,635.26 RUB 10,620,000.00, incl. VAT - RUB 1,620,000.00 RUB 20,060,000, incl. VAT - RUB 3,060,000.00 RUB 590,000.00, incl. VAT - RUB 90,000 RUB 1,298,000.00, incl. VAT - RUB 198,000 RUB 1,003,000.00, incl. VAT - RUB 153,000 RUB 48,376.46, incl. VAT - RUB 7,379.46 RUB 153,387.02, incl. VAT - RUB 23,398.02 RUB 572,300.00, incl. VAT - RUB 87,300.00 RUB 649,000, incl. VAT - RUB 99,000 RUB 63,720.00, incl. VAT - RUB 9,720.00 RUB 1,534,000.00, incl. VAT - RUB 234,000.00 RUB 2,477,776.76, incl. VAT - RUB 377,965.95 RUB 4,837,912.68, incl. VAT - RUB 737,986.68 RUB 1,293,280.00, incl. VAT - RUB 197,280.00 RUB 1,817,200.00, incl. VAT - RUB 277,200.00 RUB 4,342,401.18, incl. VAT - RUB 662,400.18 RUB 1,038,322.12, incl. VAT - RUB 158,388.12 RUB 7,268,800.00, incl. VAT - RUB 1,108,800.00 RUB 767,000.00, incl. VAT - RUB 117,000.00 RUB 1,121,000.00, incl. VAT - RUB 171,000.00 RUB 6,371,998.49, incl. VAT - RUB 971,999.77 RUB 1,805,400.00, incl. VAT - RUB 275,400.00 RUB 31,860,000.00, incl. VAT - RUB 4,860,000.00 RUB 21,240,000.00, incl. VAT - RUB 3,240,000.00 RUB 1,194,496.3, incl. VAT - RUB 182,211.3 RUB 53,407.64, incl. VAT - RUB 8,146.93 RUB 312,668.14, incl. VAT - RUB 264,973.00 RUB 41,300.00, incl. VAT - RUB 6,300.00 RUB 2,230,200.00, incl. VAT - RUB 340,200 RUB 2,303,158.22, incl. VAT - RUB 351,329.22 RUB 1,657,900,00, incl. VAT - RUB 252,900.00 RUB 2,249,427.10, incl. VAT - RUB 340,082.10 RUB 2,012,887.66, incl. VAT - RUB 307,050.66 RUB 5,015,000.00, incl. VAT - RUB 765,000.00 RUB 4,838,000.00, incl. VAT - RUB 738,000.00 RUB 1,120,877.28, incl. VAT - RUB 170,981.28 RUB 58,959.88, incl. VAT - RUB 8,993.88 RUB 2,501,552.8, incl. VAT - RUB 381,592.8 RUB 6,683,457.46, incl. VAT - RUB 1,019,510.46 RUB 295,000.00, incl. VAT - RUB 45,000.00 RUB 436,600.00, incl. VAT - RUB 66,600 RUB 7,847,000.00, incl. VAT - RUB 1,197,000.00 RUB 690,300.02, incl. VAT - RUB 105,300 RUB 10,029,273,12, incl. VAT - RUB 1,529,889.12 RUB 436,595.81, incl. VAT - RUB 66,599.36 RUB 99,120.00, incl. VAT - RUB 15,120.00 RUB 1,740,485.84, incl. VAT - RUB 265,497.84 RUB 7,705,379.94, incl. VAT - RUB 1,175,396.94 OAO Irkutskenergo 191 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 Current repairs of steam turbine 1 with three phase current generator. (CHPP-10) Washing oil system with washing solution ТМS LN ТV-2-150-2 steam turbine 6 with three phase current generator. (CHPP-10) Boiler unit st. No. 16. Repairing convection superheater. (CHPP-10) Repairs of heating surfaces of BU-3 PK-24 and BU-13 PK-24. (CHPP-10) Current repairs TU-5. (CHPP-10) Technical diagnostics and industrial safety inspection for oil pressure unit boiler st. No. 7 serial No. 15757. (BHPP) Repairs of steam-fluid pipelines in cable tunnels, galleries, and open switchgear boxes (additional works). (BHPP) Routine repairing of the ZG-8G SVI 1160-180-72 hydroelectric generators (electrical part) at the Irkutskaya HPP Changes in contract price because of an increase in the scope of works. (CHPP-6 remote metering and remote alarm) Repairs of turbine unit No. 2 (generator rotor removal). (N-I CHPP) Repairs of drum, furnace of the boiler unit st. No. 7 BTH (U-I CHPP) Repairing heating and mechanical equipment at the CHPP-9 branch of OAO Irkutskenergo (area No. 1) at the Central Plant of the ZAO Irkutskenergoremont. (CHPP-9 area 1) Repairing works and development of repair documentation for Repairs of pressure-reducing and desuperheating station 100/4.5, Repairs of steam pipe 13 at and replacing it with PB No. 1, 2 and HSS, Repairing belt conveyer 9А with permanent magnet generator for replacing gear and electric motor. (CHPP-9) Repairs of side wall and flue duct slope of the boiler st. 2. (additional works). (N-ZCHPP) Repairs of instruments, equipment, electric drives of the boiler unit st. No. 6 (special repairs) at CHPP-9 Repairs of instruments, equipment, electric drives of the boiler unit st. No. 6 at CHPP-9 Medium repairs of the ТP-81 boiler unit st. No. 6 at CHPP-9 Replacing slurry pipelines of the hydraulic ash removing system of the 1 line (N-I CHPP) Overhaul of turbine generator 3 gas and oil coolers and its SFA (N-I CHPP) Overhaul of a steam pipeline at NHH-1 turbine generator 4 and replacement of compensators. (N-I CHPP) Repairs of injecting steam cooler of the boiler unit st. No. 2, repairs of boiler unit steam superheater st. No. 3 BTH (U-I CHPP) Repairs of sliding surfaces of the front support. TU-6. (CHPP-10) Steam turbine 1 with three phase current generator. Repairs of the isolating valve. (CHPP-10) Repairs and elimination of defects of heating and mechanical equipment at the central repairing plant. (CHPP-10) Overhaul of boiler unit No. 6. (N-I CHPP) Current repairs of turbine unit No. 5. (N-I CHPP) Emergency works. Balancing hydroelectric unit st. No. 1 after the overhaul. (BHPP) Repairs of the drum of the boiler unit st. No. 3 BTH (U-ICHPP) Repairs of hood sealing of turbine unit st. No. 4 BTH. (U-ICHPP) Current repairs of turbine unit No. 3. (N-I CHPP) Repairs of the EI&C equipment of turbine units st. No. 2, 3, chemical control board, auxiliary equipment of the boiler department, and fuel feeding shop. (N-ZCHPP) Overhaul of defective sections of the dust ducts of the BKZ-420-140-7 boiler unit st. No. 4. (N-ZCHPP) Repairs of water economizer of the BKZ 420-140-6 boiler st. No. 2. (N-ZCHPP) Repairs of boiler unit st. No. 3 BTH-remote metering (CHPP-6 remote metering and remote alarm) Heating main No. 6 from the main building of CHPP-9 to fixed support No.470 of heating main No. 2. (CHPP-10) Counterparty: ZAO Irkutskenergoremont (Lessee) Returning of the leased property: two non-residential premises with the area of 55.38 sq.m at the elevation of 0.0, row М-L, grids 18-19 in a separate reinforced concrete production facility within the main building. Counterparty: OOO EuroSibEnergo-engineering (Contractor) Station turbine unit No. 6. (N-ICHPP) Reconstructing 6 and 0.4 kV station auxiliaries system. Startup complex. (I HPP) Construction of a heat pump unit and associated utilities at the industrial site of the wastewater treatment facilities in the city of Baikalsk. (control technical system of the N-I CHPP - design and exploration, construction and installation, and start-up works) Upgrade of the oil pressure unit of BHPP hydroelectric units Development of the project Boiler Unit No. 1. Precipitator Reconstruction. (CHPP-6) Conducting a feasibility study for the Lenskaya thermal power station Counterparty: OAO Uralpromenergoproekt (Contractor) Distribution heating network from TP-9 of the heat main CHPP - New City to the electric boiler at substation No. 3 (design and exploration works). (U-ICHPP) Topping of the bund wall of the II section of the ash disposal area up to the elevation of 414.0 m. (CHPP-6) Counterparty: OOO IrkutskEnergoProekt (Contractor) Performing design and exploration works for the OAO Irkutskenergo facility: Kindergarten for 150 places in Solnechny District. The scope of works is stipulated in the contact and the approved Specifications for development of design and engineering documentation. Reconstruction of the heating network from the TK-161 heat collector to Kirovskaya DB in Tsesovskaya Naberezhnaya street. (control technical system of the N-I CHPP - design and exploration works) Re-equipment of the 12 collector heating network from TK-36 heat collector to the TK-42 heat collector in Irkutsk in Garazhnaya Naberezhnaya street. (control technical system of the N-I CHPP - design and exploration) 192 OAO Irkutskenergo RUB 1,769,950.44, incl. VAT - RUB 269,992.44 RUB 112,097.64, incl. VAT - RUB 17,099.64 RUB 94,409.44, incl. VAT - RUB 14,401.44 RUB 167,580.06, incl. VAT - RUB 25,563.06 RUB 1,740,498.82, incl. VAT - RUB 265,499.82 RUB 114,439.31, incl. VAT - RUB 17,456.84 RUB 5,999.12, incl. VAT - RUB 915,12 RUB 2,117,378.18, incl. VAT - RUB 322,989.89 RUB 1,534,000.00, incl. VAT - RUB 234,000.00 RUB 354,000.00, incl. VAT - RUB 54,000.00 RUB 501,466.96, incl. VAT - RUB 76,494.96 RUB 560,854.00, incl. VAT - RUB 85,554.00 RUB 961,700.00, incl. VAT - RUB 146,700.00 RUB 2,402,290.02, incl. VAT - RUB 366,451.02 RUB 991,200.0, incl. VAT - RUB 151,200.00 RUB 480,260.00, incl. VAT - RUB 73,260.00 RUB 11,505,000.00, incl. VAT - RUB 1,755,000.00 RUB 3,304,000.00, incl. VAT - RUB 504,000.00 RUB 707,998.82, incl. VAT - RUB 107,999.82 RUB 1,045,392.68, incl. VAT - RUB 159,466.68 RUB 348,084.66, incl. VAT – RUB 53,097.66 RUB 113,061.70, incl. VAT - RUB 17,246.7 RUB 102,429.90, incl. VAT - RUB 15,624.90 RUB 1,180,000.00, incl. VAT - RUB 180,000.00 RUB 4,720,000.00, incl. VAT - RUB 720,000.00 RUB 2,023,700.00, incl. VAT - RUB 308,700.00 RUB 53,407.64, incl. VAT - RUB 8,146.93 RUB 312,668.14, incl. VAT - RUB 264,973.00 RUB 41,300.00, incl. VAT - RUB 6,300.00 RUB 2,230,200.00, incl. VAT - RUB 340,200 RUB 2,303,158.22, incl. VAT - RUB 351,329.22 RUB 1,657,900,00, incl. VAT - RUB 252,900.00 RUB 2,249,427.10, incl. VAT - RUB 340,082.10 RUB 2,012,887.66, incl. VAT - RUB 307,050.66 RUB 3,369,185.6, incl. VAT - RUB 513,943.52 RUB 45,598.92 per month, incl. VAT-18% - RUB 6,955.77 RUB 2,950,000.00, incl. VAT - RUB 450,000.00 RUB 27,966,000, incl. VAT - RUB 4,266,000 RUB 21,240,000.00, incl. VAT - RUB 3,240,000.00 RUB 34,806,460, incl. VAT - RUB 5,309,460 RUB 1,098,332.20, incl. VAT - RUB 167,542.20 RUB 46,541,087, incl. VAT - RUB 7,099,488 RUB 3,606,042.24, incl. VAT - RUB 550,074.24 No changes in the price RUB 20,500,000.00, plus VAT-18% - RUB 3,690,000.00 RUB 18,939,000.00, incl. VAT - RUB 2,889,000.00 RUB 7,292,400.00, incl. VAT - RUB 1,112,400.00 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 Re-equipment of the heating network and replacement of expansion glands. (control technical system of RUB 2,289,200.00, incl. VAT - RUB 349,200.00 the N-I CHPP - design and exploration) Reconstruction of the heating network from heat collector TK-48 to heat collector TK-0 of the RUB 2,312,800.00, incl. VAT - RUB 352,800.00 Sverdlovskaya DB. (control technical system of the N-I CHPP - design and exploration) Performing design works for local heating network of the Severny district: heating network from heat RUB 2,714,000.00, incl. VAT - RUB 414,000.00 collector ТК21 in Nahimovskaya street, from heat collector TK-39 in Smolenskaya street, heating network from heat collector TK-16 in Severnaya street, heating network from heat collector TK-4 in Michurin street, heating network from heat collector TK-39 in Smolenskaya street Performing design works for the facility: Local heating network of Staro-Baikalsk and Baikalsk districts: RUB 10,738,000, incl. VAT - RUB 1,638,000 heating network in Khlebozavodskaya street, heating network in Volodarskogo street, heating network in Sadovoe Koltso street. Reconstruction of the 12 collector heating network form heat collector TK-42 to heat collector TK-72 RUB 4,071,000.0, incl. VAT - RUB 621,000.00 (Irkutsk, Garazhnaya street). (control technical system of the N-I CHPP - design and exploration) Development of design and engineering documentation at the following facility at the Novo-Irkutskaya RUB 9,027,000.00, incl. VAT - RUB 1,377,000.00 CHPP branch of OAO Irkutskenergo: heating main No. 4 from N-I CHPP to support Н-8, Irkutsk Counterparty: OOO GES-engineering (Contractor) Performing works at the following facilities of the Irkutskaya HPP branch of OAO Irkutskenergo: RUB 6,845,000, plus VAT-18 % - RUB 1,232,100 Hydroelectric generator No. 1 1180-160-72. Replacement of thyristor excitation system; Hydroelectric generator No. 8 1180-160-72. Replacement of thyristor excitation system Counterparty: OAO Krasnoyarskenergosbyt (Purchaser) OAO Irkutskenergo shall transfer the capacities to OAO Krasnoyarskenergosbyt RUB 133,321,669.88, incl. VAT OAO Irkutskenergo shall transfer the capacities to OAO Krasnoyarskenergosbyt RUB 133,321,669.88, incl. VAT Changing the capacity price under the sales and purchase agreement RUB 133,321,669.88, incl. VAT Changing the capacity price under the sales and purchase agreement RUB 133,321,669.88, incl. VAT Counterparty: OAO Irkutsenergosbyt (Purchaser) OAO Irkutskenergo shall transfer (supply) capacity, and OOO Irkutsenergosbyt shall accept and pay for Total amount: capacity in accordance with the terms of Agreement, the Rules, and Specifications to the capacity sales and RUB 363,097,752.80, incl. VAT purchase agreement, as well as with the Register of Transactions created by the Exchange on the basis of requests and other internal Exchange documents. According to the register, 6 transactions were approved. OAO Irkutskenergo shall transfer capacity, and OOO Irkutsenergosbyt shall accept and pay for capacity. Total amount: According to the register, 6 transactions were approved. RUB 377,652,192.44, incl. VAT OAO Irkutskenergo shall transfer electric energy, and OOO Irkutsenergosbyt shall accept and pay for it. RUB 127,626,912.00, no VAT Counterparty: OOO PO Irkutskenergo OAO Irkutskenergo shall make the following additional contribution to the authorized capital of OOO RUB 4,670,000 PO Irkutskenergo: land lot with the area of 1.664 sq. m, class: settlement lands, cadastral number 38:06:010902:1197, address: Irkutsk Region, Irkutsk District, near the Novo-Irkutskaya CHPP. Counterparty: OAO RusGidro (Contractor) Related party: members of the Board of directors of OAO Irkutskenergo: E.V. Dod, B.Yu. Kovalchuk, R.R. Sharipov Provision of consulting services regarding conducting a workshop for the workers of OAO Irkutskenergo on RUB 12,000.00, incl. VAT - 18% - RUB 1,830.51 the subject: Contract Work in the Power Industry for Contract Managers, according to the workshop program. Provision of consulting services regarding conducting a workshop for the workers of OAO Irkutskenergo on the RUB 35,000, incl. VAT - 18% - RUB 5,338.98 subject: Vibration Monitoring of the Water Turbine Equipment Condition, according to the workshop program. Provision of consulting services regarding conducting a workshop for the workers of OAO Irkutskenergo RUB 60,000.00, incl. VAT - 18% - RUB 9,152.54 on the subject: Operational Control of the Modes of the HPP Main Equipment (hydroelectric unit shift engineers), according to the workshop program. Provision of consulting services regarding conducting a workshop for the Customer workers on the subject: RUB 106,000.00, incl. VAT - 18% - RUB Geodetic Monitoring of the Condition of the Dam - Foundation System, according to the workshop program. 16,169.49 Minutes of the Board of Directors No. 66 (219) dated September 16, 2011 Related party: OAO EuroSibEnergo, a shareholder of OAO Irkutskenergo owning more than 20% of shares. Counterparty: OOO Vostsibugol Company (Borrower) Granting a loan to OAO Irkutskenergo for the period from the effective date to September 1, 2013 inclusive, RUB 1,278,000,000.00 at a 8.0% p.a. interest. The loan is to be repaid by September 1, 2013. Counterparty: OOO EC Irkutskenergo (Contractor) Development of the design and engineering documentation (OAO Irkutskenergo) for the facility of the RUB 219,140.22 Irkutskaya HPP branch of OAO Irkutskenergo: Remote control backup system Development of the design and engineering documentation (OAO Irkutskenergo) for the facility of the CHPP-6 RUB 167,061.82 branch of OAO Irkutskenergo: Installation of a remote control backup system for CHPP-6 of OAO Irkutskenergo Development of the design and engineering documentation (OAO Irkutskenergo) for the facility of the RUB 215,220.06 Novo-Irkutskaya CHPP branch of OAO Irkutskenergo: Installation of a remote backup system Provision of consulting services (OAO Irkutskenergo): Performance of functional (heating) tests of heating RUB 1,061,306.77 main No.3 from CHPP-9 Performance of works (OAO Irkutskenergo): Checking the condition of the bending of the stator end RUB 600,000.00 winding of the hydroelectric generator of the Type VGS (vertical synchronous hydroelectric generator) 1190/215-48 HL4 of the Ust-Ilimskaya HPP The provision of services (OAO Irkutskenergo) regarding the water quality analysis of the waste water RUB 3,172.64 drainage of the CHPP-11 branch of OAO Irkutskenergo in 2011. Provision of services (OAO Irkutskenergo) regarding evaluation of working conditions at workplaces at the RUB 49,396.95 CHPP-10 branch of OAO Irkutskenergo in 2011. Provision of services (OAO Irkutskenergo) regarding evaluation of working conditions at workplaces at the RUB 204,066.27 CHPP-16 branch of OAO Irkutskenergo in 2011. Performance of work (OAO Irkutskenergo) on conducting measurements and assessment of harmful RUB 19,337.78 production factors at the Irkutskaya HPP branch of OAO Irkutskenergo in 2011. OAO Irkutskenergo 193 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 Performance of work (OAO Irkutskenergo): Topographic survey of the ash and slag residuals at area No.3 of the N-ZCHPP branch of OAO Irkutskenergo Performance of work (OAO Irkutskenergo): Test firing of the mixture of Mugunsky and Irbeysky highsulphur coal in two boilers BKZ-420-140, BKZ-500-140 at the N-I CHPP branch of OAO Irkutskenergo Provision of services (OAO Irkutskenergo): Laboratory examination of metal elements of the heating equipment of OAO Irkutskenergo Provision of services (OAO Irkutskenergo): Inspection of technical condition of the water-supply system and the water disposal system including the development of the hydrologic inventory of thermal power stations and water supply systems Provision of services (OAO Irkutskenergo): Organization and monitoring of the steam and oxygen treatment and the passivating treatment of the heating and mechanical equipment of OAO Irkutskenergo Provision of services (OAO Irkutskenergo): Technical diagnostics and expert examination of industrial safety of the underground heating system pipelines (installed in the right bank part of the city of UstIlimsk) of the Ust-Ilimsk CHPP branch OAO Irkutskenergo Development of the design and engineering documentation (OAO Irkutskenergo) for the facility at the Novo-Ziminskaya CHPP branch of OAO Irkutskenergo: The auxiliary equipment of the boiler room, including environmental protection, inventory No.045201; Development and implementation of the scheme of steam and oxygen treatment, the passivating treatment and preservation of the heating surfaces of boiler units Performance of work (OAO Irkutskenergo): Evaluation of working conditions at workplaces at the U-I CHPP branch of OAO Irkutskenergo in 2011. Counterparty: ZAO Spetsenergoremont (Contractor) Repair of the pipelines of BU 1, 2, 5, 10, 11, 13, and 16. Repair of the water economizer on BU10. Replacement of protection fittings on BU 2, 3, 16. Replacement of BROU-I silencers on BU 10, 11. Replacement of feeding unit supports of boiler units 1, 2. Repair of the hanger-support system of the feed-water piping BU10. Repair of the hanger-support system of the pipeline HPP BU10. Realignment of the pipeline of the distillation demineralization plant (DDP) 100/14 BU 2. Repair of the ash pit including replacement of screw conveyors, BU 13. (CHPP-10) Current repair of the setting (Boiler unit (b/u) No. 1, 2, 3, 4, 9, 10, 11, 12, 15, 16). (CHPP-10) Repair of the heating network equipment of blocks No.1-8. (CHPP-10) Current repair of valves in the boiler room (b/u of st. No. 2, 3, 4, 9, 10, 11, 12, 15, 16). (CHPP-10) Current repair of the boiler unit valves, st. No. 1, 5, 6, 7, 13, 14. (CHPP-10) Construction and dismantling of scaffolding where required by equipment repairs. ARU of boiler unit st. No.1. (CHPP-10) Current repair of brickwork of b/u No. 5, 6, 7, 8, 13, 14. (CHPP-10) Current repair of brickwork of b/u No. 1, 2, 3, 4, 9, 10, 11, 12, 15, 16. (CHPP-10) Standard repair of the TG-8 turbine generator (CHPP-11) Construction and dismantling of scaffolding where required by equipment repairs. B/u st. No.1, 8, 10 and ARU at the boiler unit st. No.1 at CHPP-9 Overhaul of the boiler unit No.6. (N-I CHPP) Standard repair of boiler unit No.8; repair of the general shop equipment; repair of the hydraulic ash removal system (external). Repair of the hydraulic ash removal system (internal). (CHPP-11) Maintenance of the chemical water treatment system of CHPP-11 Standard repair of boiler unit No.4 of CHPP-11 Repair of components and spare parts of the equipment of the CHPP-11 turbine shop Counterparty: ZAO Bratskenergoremont (Contractor) Elimination of defects of the heating and mechanical equipment. (CHPP-6) Placing shotcrete onto the radiant-section tubes of the boiler unit furnace (BU) st. No.5. (CHPP-6) Unscheduled repairs elimination of defects of the heating and mechanical equipment. (CHPP-6) Unscheduled repairs elimination of defects of the electrical equipment. (CHPP-6) Unscheduled repairs elimination of defects of the heating and mechanical equipment at the factory. (CHPP-6) Unscheduled repairs elimination of defects of the heating and mechanical equipment. (CHPP-6) Repair of the valves of the main steam pipeline (MSP) drainage of the turbine unit st. No.6 DN65 NP140 (Du65 Ru140), repair of driving heads and electric drivers of the gate valves of the main steam gate valve (MSGV) of the turbine unit st. No.6 BTH (U-ICHPP) Repair of heat insulation of auxiliary chemical equipment; repair of heat insulation and metal coating of the steam supply pipelines and the high pressure cylinder (HPC) bottom of the turbine unit st. No.5 BTH (U-ICHPP) Change in the cost of the contract because of an increase in the work volume. (CHPP-6 RM and RA) Overhaul of the boiler unit st. No. 3 BTH-RM. (CHPP-6 RM and RA) Mechanical cleaning of boiler equipment st. No.7 based on the results of inspection of the BTH. (U-ICHPP) Renovation of the storage tank paint coating st. No. 1, 2 of the BTH. (U-ICHPP) Repair of the MSP and the high pressure valves of the turbine unit st. No.3 (U-ICHPP) Repair of the steam supply pipes of the turbine unit st. No.5, preparation for the control of metal, BTH (U-ICHPP) Repair of the top coat of the DN 530 mm pipelines of the main pipeline from the heat collector ТК-2 to the heat collector ТК-4 KPD Repair of the heat-insulating layer of the DN 820 mm pipelines of the main pipeline of the main from CHPP to the left bank of РТС-2. (U-ICHPP) Counterparty: ZAO GES-Remont (Contractor) Overhaul of water turbine No.7. (BHPP) Overhaul of hydroelectric generator No.7. (BHPP) Overhaul of disconnectors of RONZ 500/2000, 220/2000, RNDZ 220/1000 types. (BHPP) Vertical planning of the territory including the installation of gutters and perimeter walks of the Firedepartment building. (BHPP) 194 OAO Irkutskenergo RUB 118,000.00 RUB 998,078.99 RUB 421,209.9 RUB 465,032.64 RUB 468,625.74 No changes in the cost of services under the contract. No changes in the cost of services under the contract. No changes in the cost of services under the contract. RUB 124,305.92, incl. VAT - RUB 18,961.92 RUB 216,682.22, incl. VAT - RUB 33,053.22 RUB 1,311,732.84, incl. VAT - RUB 200,094.84 RUB 60,880.92, incl. VAT - RUB 9,286.92 RUB 60,880.92, incl. VAT - RUB 9,286.92 RUB 46,417.66, incl. VAT - RUB 7,080.66 RUB 106,080.82, incl. VAT- RUB 16181,82 RUB 128,538.58, incl. VAT - RUB 19,607.58 RUB 1,419,253.26, incl. VAT - RUB 216,496.26 RUB 560,500.0, incl. VAT - RUB 85,500.00 RUB 4,908,800, incl. VAT - RUB 748,800 RUB 1,877,109.78, incl. VAT - RUB 286,338.78 RUB 143,218.96, incl. VAT - RUB 21,846.96 RUB 1,785,322.30, incl. VAT - RUB 272,337.30 RUB 2,360,003.54, incl. VAT - RUB 360,000.54 RUB 1,116,280, incl. VAT - RUB 170,280 RUB 1,710,918.45, incl. VAT - RUB 260,987.56 RUB 271,400, incl. VAT - RUB 41,400 RUB 171,100, incl. VAT - RUB 26,100 RUB 236,000, incl. VAT - RUB 36,000 RUB 106,200, incl. VAT - RUB 16,200 RUB 55,458.82, incl. VAT - RUB 8,459.82 RUB 454,278.76, incl. VAT - RUB 69,296.76 RUB 45,709.66, incl. VAT - RUB 6,972.66 RUB 2,284,273.50, incl. VAT - RUB 348,448.50 RUB 330,372.86, incl. VAT - RUB 50,395.86 RUB 129,798.82, incl. VAT - RUB 19,799.82 RUB 106,196.46, incl. VAT - RUB 16,199.46 RUB 76,695.28, incl. VAT - RUB 11,699.28 RUB 407,100.00, incl. VAT - RUB 62,100.00 RUB 21,825,159.64, incl. VAT - RUB 117,191.52 RUB 7,130,546.53, incl. VAT - RUB 1,087,710.49 RUB 1,172,724.17, incl. VAT - RUB 178,890.13 RUB 197,060.00, incl. VAT - RUB 30,600.00 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 Overhaul of the HPP building, including overhaul of water turbine No.7. (BHPP) RUB 2,449,120.68, incl. VAT - RUB 373,594.68 Overhaul of anti-corrosion protection AKZ G-7. (BHPP) RUB 1,885,585.72, incl. VAT - RUB 287,631.72 Floors repair in the Bratskaya HPP building, elev. 301.306 m. (BHPP) RUB 4,967,800.00, incl. VAT - RUB 757,800.00 Repairs for eliminating defects of property, plant and equipment: Surface preparation for the metal RUB 39,388.40, incl. VAT - RUB 6,008.40 control of the boiler of the oil pressure unit MNU G-7 (Request No.5). (BHPP) Repairs for eliminating defects of property, plant and equipment: Installation of the V-BRAZ-12 cable RUB 41,102.94, incl. VAT - RUB 6,269.94 (Request No.6). (BHPP) Repairs for eliminating defects of property, plant and equipment: Repair of the load-bearing crossbar RUB 455,306.66, incl. VAT - RUB 69,453.56 including water turbine No.18 strengthening (Request No.7). (BHPP) Repairs for eliminating defects of property, plant and equipment: Inspection of the seal of the lower pilot RUB 199,556.88, incl. VAT - RUB 30,440.88 bearing (turbine bearing) of the hydroelectric generator G-18 (Request No.8). (BHPP) Repairs for eliminating defects of property, plant and equipment: Inspection and replacement of the seal RUB 23,188.18, incl. VAT - RUB 3,537.18 of the hydroelectric generator G-18 oil-catch tank (Request No.9). (BHPP) Repairs for eliminating defects of property, plant and equipment: Replacement of air coolers in the RUB 55,771.52, incl. VAT - RUB 8,507.52 hydroelectric generator G-18 cold air chamber (Request No.10). (BHPP) Repairs for eliminating defects of property, plant and equipment: Replacement of water turbine 18 RUB 494,023.52, incl. VAT - RUB 75,359.52 adjusting ring pins (Request No.11). (BHPP) Repairs for eliminating defects of property, plant and equipment: Replacement of forks and fixing of the RUB 40,583.19, incl. VAT - RUB 6,190.66 driveline pins of the regulating system G-5 (Request No.12). (BHPP) Repairs for eliminating defects of property, plant and equipment: Replacement of forks and fixing of the RUB 30,436.79, incl. VAT - RUB 4,642.90 driveline pins of the regulating system G-6 (Request No.13). (BHPP) Repairs for eliminating defects of property, plant and equipment: Replacement of the joining kinematics RUB 212,029.86, incl. VAT - RUB 32,343.54 bushings of the actuating motor of the regulating system with the adjusting ring of the guide vanes of water turbine 8. (Request No.14). (BHPP) Repairs for eliminating defects of property, plant and equipment: Replacement of the seal of the water RUB 101,572.25, incl. VAT - RUB 15,494.07 turbine 13 lower pilot bearing. (Request No.15). (BHPP) Counterparty: OOO Pozharnaya Okhrana (Firefighting Service) (Contractor) Overhaul of the fire alarm system in sections of the cable gallery, the intermediate story and shafts RUB 784,700.00, incl. VAT - RUB 119,700.00 No.1-15 at the Shelekhovsky section of the N-I CHPP Fire and security alarm at the facilities: Building of the heat pump station ТNS-1, Building of the heat pump RUB 1,003,000.00, incl. VAT - RUB 153,000.00 station ТNS-2. (construction and installation work, start-up work, equipment). (CHPP-11) Counterparty: ZAO Irkutskenergoremont (Contractor) Repair of the electric motor stator winding of ESP (electrical submersible pump) -1. (CHPP-6) RUB 1,156,302.65, incl. VAT - RUB 176,385.15 Repairs for eliminating defects of heating and mechanical equipment. (CHPP-6) RUB 271,400, incl. VAT - RUB 41,400 Repairs for eliminating defects of heating and mechanical equipment. (CHPP-6) RUB 188,800, incl. VAT - RUB 28,800 Repair of the steam supply pipes of the high pressure cylinder of the turbine unit st. No. 5 BTH. (U-ICHPP) RUB 342,176.40, incl. VAT - RUB 52,196.40 Replacing bottom parts of the screens of the boiler unit st. No.7. (U-ICHPP) RUB 7,352,572.92, incl. VAT - RUB 1,121,578.92 Repair of support No.4, HPR-MPR couplings , washing of the regulating oil system of the turbine unit st. RUB 200,598.82, incl. VAT - RUB 30,599.82 No.6 BTH (U-ICHPP) Replacement of the pipes of the furnace and the vapour superheater of boiler unit No.4 (N-I CHPP) RUB 767,000.00, incl. VAT - RUB 117,000 Boiler unit st. No.2 Repairs of the heating surfaces. Boiler unit st. No.5. Repairs of the heating surfaces. RUB 112,817.44, incl. VAT - RUB 17,209.44 Restoration of the ceiling beams. (CHPP-10) Repair of the condenser of the TG-8 turbine generator. Repair of stiffening ribs, the incoming inspection RUB 1,767,640.00, incl. VAT - RUB 269,640.00 of the brass tube (additional volume up to 30%). (CHPP-11) Repair of the oil cooler of the TG-8 turbine generator. Repair of the oil tank of the TG-3 turbine generator. RUB 330,400.00, incl. VAT - RUB 50,400.00 (CHPP-11) Elimination of leaks of the cut-off and control valves of the ТG-1turbine generator. (CHPP-11) RUB 101,480.00, incl. VAT - RUB 15,480.00 Repair of the electric motor stator winding of ESP -1. (CHPP-6) RUB 1,156,302.65, incl. VAT - RUB 176,385.15 Repairs for eliminating defects of heating and mechanical equipment. (CHPP-6) RUB 271,400, incl. VAT - RUB 41,400 Repairs for eliminating defects of heating and mechanical equipment. (CHPP-6) RUB 188,800, incl. VAT - RUB 28,800 Repair of the turbine generator st No.6 (special repairs) at CHPP-9 RUB 647,820.00, incl. VAT - RUB 98,820.00 Repairs of the impulse line Pressure before the last stage of the turbine generator high pressure cylinder RUB 672,600.00, incl. VAT - RUB 102,600.00 st. No. 8 at CHPP-9 Generator rotor inlet and outlet st. No. 1 at CHPP-9 RUB 348,100.00, incl. VAT - RUB 53,100.00 Metal control during the elimination of defects of the boiler unit st. No. 5 (additional scope up to 30 %) (CHPP-11) RUB 2,113 996.89, incl. VAT - RUB 322,474.10 Repairs of the shut-off and control valve No. 1 at turbine unit st. No. 5 of BTH (U-I CHPP) RUB 135,700.00, incl. VAT - RUB 20,700.00 Repairs of the float level indicators for the condenser and low pressure preheater with valves of the RUB 114,923.00, incl. VAT - RUB 17,532.00 turbine unit st. No. 1. (CHPP-9 area 1) Repairs of pipes of the furnace and steam superheater of boiler unit No. 4 (N-I CHPP) RUB 767,000.00, incl. VAT - RUB 117,000.00 Repairs of the turbine unit condenser st. No. 1. (CHPP-9 section 1) RUB 112,100.00, incl. VAT - RUB 17,100.00 Repairs of the float level indicators for the condenser and low pressure preheater with valves of the RUB 114,923.00, incl. VAT - RUB 17,532.00 turbine unit st. No. 1. (CHPP-9 area 1) Counterparty: OOO IrkutskEnergoProekt (Contractor) Adjustment of the design and cost estimates for the facility of the CHPP-11 branch of OAO Irkutskenergo: RUB 990,000.00, Implementing muffle ignition and lighting up of the boiler unit flare TP-81 st. No. 7 plus VAT-18% - RUB 178,200.00 Transactions on credit lines are made on October 24-26, 2011 before approval (approved in 2012) Related party: OAO INTER RAO UES, a shareholder of OAO Irkutskenergo owning more than 20 % of shares. Counterparty: Gazprombank (OAO) (creditor) The creditor shall open a line of credit for the borrower in the amount and on the conditions stipulated by RUB 8,550,850,000 the agreements, and the borrower is obliged to pay back the loan under the credit line, pay the interest and settle other liabilities stipulated by the agreements. OAO Irkutskenergo 195 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 Minutes of the Board of Directors No. 68 (221) dated November 28, 2011 Related party: EuroSibEnergo, a shareholder of OAO Irkutskenergo owning more than 20 % of shares. Counterparty: OOO IESV (Purchaser) Transferring to OOO IESV the following movable property: HPP communication and alarm (cable network), RUB 298,771, incl. VAT-18% - RUB 45,575.24 telephone network of the 43 apartment house of the 1 HPP settlement; telecommunications system of the residential house in Gidrostroiteley street, 13, 15. Counterparty: ZAO Baikalenergo (Borrower) Approve the supplementary agreement to the loan agreement No. 1119 dated August 29, 2011 with ZAO RUB 240,206,000 Baikalenergo on the following terms: Paragraph No. 1.2 of the agreement should have the following wording: “1.2. The total loan amount is RUB 240,206,000 (two hundred and forty million two hundred and six thousand).” Counterparty: OAO SUAL (Company) Related party: member of the Board of Directors of OAO Irkutskenergo, O.V. Deripaska Under the Agreement No. 737 on compressed air supply from OAO SUAL compressing stations dated RUB 579,501, incl. VAT September 16, 2002, OAO SUAL shall supply compressed air to OAO Irkutskenergo via the connected network. Determining the parameter of wastewater discharges from the Shelehovski area of the Novo-Irkutskaya RUB 621,936, incl. VAT CHPP branch of OAO Irkutskenergo (CHPP-5 of the city of Shelehov) and receiving industrial and storm wastewater from CHPP-5 of the city of Shelehov into the accumulating pond of IRKAZ SUAL Supplying potable water and receiving wastewater from September 16, 2002. Potable water is supplied RUB 13,931,944, incl. VAT form the water pipe of OAO SUAL to OAO Irkutskenergo in the approved volumes and according to the approved specifications Counterparty: OAO Irkutsenergosbyt (Cedent) Related party: EuroSibEnergo, a shareholder of OAO Irkutskenergo owning more than 20 % of shares. OOO Irkutsenergosbyt transfers the rights to OAO Irkutskenergo entitling it to demand debt payment for RUB 5,000,000 consumed electric energy for June, 2011 from Limited Liability Company Bratskvodosistema. OOO Irkutsenergosbyt transfers the rights to OAO Irkutskenergo entitling it to demand debt payment for RUB 6,807,731.90 consumed electric energy for July, 2011 from Limited Liability Company Bratskvodosistema. Counterparty: OAO Irkutsenergosbyt (Buyer) OAO Irkutskenergo shall transfer electric energy to OOO Irkutsenergosbyt, and OOO Irkutsenergosbyt shall RUB 648,888,372.00, incl. VAT accept electric energy and pay for it Counterparty: ZAO SibirEnergoTrade (Seller) ZAO SibirEnergoTrade transfers the property to OAO Irkutskenergo, and OAO Irkutskenergo accepts Property: RUB 50,535,672.59, incl. VAT the property (heating networks, sewerage networks, water pipelines networks, land lots, and movable Land plots: RUB 6,411,619.06, no VAT property) and pays for it. Counterparty: OOO EC Irkutskenergo (Contractor) Providing services on measuring harmful industrial factors caused by transformer substation No. 1102 RUB 18,464.57, incl. VAT-18% - RUB 2,816.63 Preparing the designs for the backup remote control system for the facility of the Novo-Ziminskaya No changes in the price of works under the CHPP branch of OAO Irkutskenergo: Remote control equipment complex Creating Backup Remote Control agreement System for N-Z CHPP of OAO Irkutskenergo Performing works on developing technical solutions and conducting pilot tests of the technology of No changes in the price of works under the producing polymict sand and other valuable materials from ash and slag generated at CHPP-9; CHPP -10 agreement of OAO Irkutskenergo Developing upon the client’s request design and engineering documentation for the facility of the NovoNo changes in the price of works under the Irkutskaya CHPP branch of OAO Irkutskenergo Creating Backup Remote Control System agreement Providing services on sampling fly-ash after ash collectors of the boiler units at the following branches of RUB 191,830.20, incl. VAT-18% - RUB 29,262.23 OAO Irkutskenergo: CHPP-6, CHPP-16, N-I CHPP, Shelekhovsky area of N-I CHPP, U-I CHPP Counterparty: OOO PO Irkutskenergo (Contractor) The subject of the supplementary agreement is changes in the price of the services of OOO Pozharnaya RUB 144,488,001.12, Okhrana Irkutskenergo in the sphere of fire safety, w/o No. dated December 29, 2006. plus VAT-18% - RUB 26,007,840.20 The subject of the agreement is provision of services on fire alarm facilities maintenance at the materials RUB 282,967.54, incl. VAT - RUB 43,164.54 warehouse at the CHPP-16 branch of OAO Irkutskenergo The subject of the agreement is maintenance of fire extinguishers (technical inspection, charging or According to OOO PO Irkutskenergo tariffs recharging, and repairs) The subject of the agreement is training process and fire safety training for the personnel of the CHPP-16 RUB 35,159.28, incl. VAT-18% - RUB 5,363.28 branch of OAO Irkutskenergo Counterparty: OAO AKME-engineering Related party: member of the Board of Directors of OAO Irkutskenergo, O.V. Deripaska OAO AKME-engineering shall transfer 21,250,000 (twenty one million two hundred and fifty thousand) RUB 340,000,000, no VAT ordinary registered shares of the Joint Stock Company AKME-engineering (State registration number of the issue: 1-01-13963-A-001D) to OAO Irkutskenergo. The nominal value of one share is one ruble Minutes of the Board of Directors No. 69 (222) dated December 19, 2011 Related party: EuroSibEnergo, a shareholder of OAO Irkutskenergo owning more than 20 % of shares. Counterparty: Regional State Public Organization Energy and Resources Conservation Center (State customer) OAO Irkutskenergo shall be responsible to the Regional State Public Organization Energy and Resources RUB 1,199,984 Conservation Center and ensure that ZAO IRMET fulfills its obligations under the State (municipal) contract. Beneficiary: CSC IRMET. Counterparty: OOO IrkutskEnergoProekt (Customer, Contractor) Technical support of the corporate computer network and providing access to business-applications for RUB 42,751.80, incl. VAT - RUB 6,521.46 the financial and business operations that are installed on OAO Irkutskenergo equipment Developing design and engineering documentation for the facility of the CHPP-11 branch of OAO RUB 8,850,000.00, incl. VAT - RUB 1,350,000.00 Irkutskenergo: Main Line No. 2 (section from heat collector ТК-2-1 to heat collector ТК-2-14) 196 OAO Irkutskenergo Counterparty: ZAO Spetsenergoremont (Lessee) 1078 Leasing a land plot of settlement lands with the area of 1,349 sq.m, located at the following address: Irkutsk region, Irkutsk, Baikalskaya street, lot 259 Counterparty: OOO Olkhon (Borrower) 1079 Supplementary agreement No. 2 to loan agreement No. 1027 dated June 22, 2006 on changing paragraph 3.2. of the agreement: “The Borrower shall repay the loan by December 31, 2012” Counterparty: OOO Irkutskenergosvyaz (Borrower) 1080 Changing the loan period: the loan is provided for the period from February 20, 2008 to December 31, 2013, inclusively, with interest, provided for by the agreement. Loan repayment period - no later than December 31, 2013. Counterparty: OOO Irbeysky Razrez (Borrower) 1081 Changing the loan period: OOO Irbeysky Razrez shall repay the loan by December 31, 2013. 1082 Changing the loan period: OOO Irbeysky Razrez shall repay the loan by December 31, 2013. 1083 Changing the loan period: OOO Irbeysky Razrez shall repay the loan by December 31, 2013. Counterparty: OOO Vostsibugol Company (Borrower) 1084 Changing loan period: the loan is provided for the period from September 09, 2010 to December 31, 2013, inclusively, with interest, provided for by the agreement. Loan repayment period: no later than December 31, 2013. Counterparty: OOO Irkutskzoloproduct (Borrower) 1085 Changing loan period: the loan is provided for the period from September 09, 2010 to December 31, 2013, inclusively, with interest, provided for by the agreement. Loan repayment period: no later than December 31, 2013. Counterparty: OOO TH Irkutskenergotrade (Borrower) 1086 Changing loan period: the loan is provided for the period from June 24, 2009 to December 31, 2013, inclusively, with interest, provided for by the agreement. Loan repayment period: no later than December 31, 2013. Counterparty: ZAO Resursserviceholding (Borrower) 1087 Changing loan period: the loan is provided for the period from July 12, 2010 to December 31, 2013, inclusively, with interest. Loan repayment period: no later than December 31, 2013. Counterparty: ZAO Irkutskenergoremont (Contractor) 1088 Current repair of turbine unit st. No. 1 (PT-25-90/10 UTMZ), Routine repairing of the turbine unit st. No. 7 (R-50-130) (changing the scope of works by up to 30 % of the contract price). (CHPP-11) 1089 Eliminating defects of automatic control system of TG-8 (Т-100-130). (CHPP-11) 1090 Boiler unit No. 6 (BKZ-500-140-1). Reconstruction (replacing sections of heating surface pipes) (N-I CHPP) 1091 Repairs of burners of the boiler unit st. No. 5 of BTH (U-I CHPP) 1092 Repairs of the pipelines within the boiler, boiler unit st. No. 7 BTH (U-I CHPP) 1093 Reconstruction of the pipelines for fast-response pressure-reducing and desuperheating station 140/10 No. 2, 3 from the lower side including elevating from - 3.2 m to elevation of 5.0 m. CHPP-11. (construction and installation works, start-up works) 1094 Control of the TH equipment metal. (CHPP-9 section No. 1) 1095 Repairs of the heating and mechanical equipment at the central repairing plant. (CHPP-9 section No. 1) 1096 Repairs of the pipelines for pairs 1.2 of the first line. (CHPP-9 section No. 1) 1097 Current repairs of turbine units No. 2, 4. (N-I CHPP) 1098 Overhaul of the recycled water pipeline of generator gas coolers at turbine generator No. 4. (N-I CHPP) 1099 Overhaul of the hydroelectric generator 1160/180-72 st. No. 1 (electrical part) at the Irkutskaya HPP 1100 Overhaul of the hydroelectric generator 1160/180-72 st. No. 1 (mechanical part) at the Irkutskaya HPP 1101 Repairs of the boiler unit burners st. No. 4 BTH. (U-ICHPP) 1102 Replacement the upper part of the right and left radiant-section of the boiler unit st. No. 2 (design and construction and installation). (CHPP-11) 1103 Repairs of the heating network pipelines from the pump unit regulating network water pressure (PRN) to the pipe rack of the heating network of BTH (U-I CHPP) 1104 Factory repairs of the heating and mechanical equipment. (CHPP-10) 1105 Replacing segments of the end seals of the high pressure cylinder of TG-4. TV-2-150-2 steam turbine 4 with a three phase current generator. (CHPP-10) 1106 Boiler unit st. No. 8, 9. Repairs of the heating surfaces. Restoration of the ceiling beams of the boiler unit. (CHPP-10) 1107 Oil system washing with washing solution ТМS LN. TV-2-150-2 steam turbine 4 with a three phase current generator. (CHPP-10) 1108 Repairs of the main elements of boiler units st. No. 1, 2, 3, 4, 5, 7, 8, 10, and 11 at CHPP-9 1109 Factory repairs of the electrical and mechanical equipment. (CHPP-10) Counterparty: OOO EuroSibEnergo-engineering (Contractor) 1110 Developing design and engineering documentation for the facility of a branch of OAO Irkutskenergo: Turbine unit No. 6 at the Novo-Irkutskaya CHPP 1111 Increasing the price of construction works performed under the agreement “Reconstructing 6 and 0.4 kV station auxiliaries. 4 start-up facility” Counterparty: ZAO Baikalenergo (Contractor) 1112 Repairs of the fire suppression system of the Kirovskaya DB. (control technical system of the N-I CHPP) 1113 Repairs of the Novo-Lenino heating network (R. Luxemburg street from heat collector ТК 24-4-5-5-9 to heat collector ТК24-4-5-15). (control technical system of the N-I CHPP) 1114 Emergency repairs of the damaged sections of the heating networks and associated equipment. (control technical system of the N-I CHPP) RUB 4,666.10, incl. VAT - RUB 711.77 per month RUB 180,000,000 RUB 189,000,000 RUB 47,000,000 RUB 55,000,000 RUB 300,000,000 RUB 1,175,000,000 RUB 4,500,000 RUB 500,000,000 RUB 1,200,000,000 RUB 1,684,416.28, incl. VAT - RUB 256,994.86 RUB 430,700, incl. VAT - RUB 65,700.00 RUB 7,393,999.18, incl. VAT - RUB 1,127,898.18 RUB 389,392.92, incl. VAT - RUB 59,398.92 RUB 483,772.86, incl. VAT - RUB 73,795.86 No changes in the price of works under the agreement RUB 113,280, incl. VAT - RUB 17,280 RUB 588,820, incl. VAT - RUB 89,820 RUB 114,460, incl. VAT - RUB 17,460 RUB 2,418,998.82, incl. VAT - RUB 368,999.82 RUB 236,000.00, incl. VAT - RUB 36,000.00 RUB 802,337.06, incl. VAT - RUB 122,390.40 RUB 589,974.3, incl. VAT - RUB 89,996.08 RUB 395,295.28, incl. VAT - RUB 60,299.28 RUB 14,750,000.00, incl. VAT - RUB 2,250,000.00 RUB 247,779.24, incl. VAT - RUB 37,796.94 RUB 1,062,000.00, incl. VAT - RUB 162,000.00 RUB 58,959.88, incl. VAT - RUB 8,993.88 RUB 323,828.58, incl. VAT - RUB 49,397.58 RUB 112,097.64, incl. VAT - RUB 17,099.64 RUB 531,000.00, incl. VAT - RUB 81,000.00 RUB 1,180,000.0, incl. VAT - RUB 180,000.00 RUB 42,600,000, incl. VAT-18% - RUB 7,668,000 RUB 979,400, incl. VAT - RUB 149,400 RUB 167,840.84, incl. VAT - RUB 774,000.00 RUB 5,074,000, incl. VAT - RUB 25,602.84 RUB 9,440,000, incl. VAT - RUB 1,440,000 OAO Irkutskenergo 197 Counterparty: ZAO Bratskenergoremont (Contractor) 1115 Technical maintenance of the heat sources and heating networks equipment. (CHPP-6 remote metering and remote alarm) 1116 Reconstruction of the main heating line from heat point TP-3 to pavilion 2 (reconstruction of BUG-3 boiler unit and in-house needs heating water converter plant auxiliaries). (CHPP-6) 1117 Repairs of the heat insulation and metal cover of the steam supply pipelines of the middle pressure cylinder of the turbine st. No. 5 BTH. (U-ICHPP) 1118 Repairs of the valves for the switching main No. 6, fire suppression control units (elevation 0.00, 12.00) of the BTH main building (U-I CHPP) 1119 Repairs of the heating pipes from the main building to the maintenance building, adjoining of the bulldozer garage gates for the central heating station. (U-ICHPP) 1120 Installation of pull-out injectors at the boiler unit st. No. 4. (CHPP-6) 1121 Installation of pull-out injectors at the boiler unit st. No. 5. (CHPP-6) 1122 Installation of BSU-20 discharge unit at BU st. No. 10. (CHPP-6) 1123 Gas treating unit of boiler No. 4 inv. No. 728714. Reconstruction of the precipitator of boiler 4. (N-ZCHPP) 1124 Repairs for elimination of defects of heating and mechanical equipment. (CHPP-6) 1125 Unscheduled factory repairs and elimination of defects of heating and mechanical equipment. (CHPP-6) 1126 Repairs of the heating network pipelines of the pump unit regulating network water pressure (PRN) of BTH. (U-ICHPP) Counterparty: ZAO Spetsenergoremont (Contractor) 1127 Replacing bends of the steam pipeline of the cross link between boiler unit 1 - turbine generator 1 and boiler unit 2 - turbine generator 2. (N-ZCHPP) 1128 Current repairs of boiler unit brickwork st. No. 5, 6, 7, 8, 13, and 14. (CHPP-10) 1129 Current repairs of boiler unit brickwork st. No. 5, 6, 7, 8, 13, and 14. (CHPP-10) 1130 Current repairs of boiler unit brickwork No. 1, 2, 3, 4, 9, 10, 11, 12, 15, and 16. (CHPP-10) 1131 Repairing of the exhaust fan equipment for the boiler unit st. No. 2, 3, 8, 10, 12, 14, and 16. (CHPP-10) 1132 Repairing of the pipelines (station high pressure pipelines of 60,000 kW power generating unit No. 1. Station high pressure pipelines of 150,000 kW power generating unit No. 3. Station high pressure pipelines of 150,000 kW power generating unit No. 5. Station high pressure pipelines of 150,000 kW power generating unit No. 7). (CHPP-10) 1133 Current repairs of the heating surface equipment of boiler units 2, 3, 6, 8, 10, 12, 14, and 16. (CHPP-10) 1134 Current repairs of boiler unit brickwork, b/u No. 5, 6, 7, 8, 13, and 14. (CHPP-10) 1135 Current repairs of the hydraulic ash removing equipment (CHPP-10) 1136 Repairing of the lighting system for the booster pump station control technical system of the N-I CHPP 1137 Boiler cleaning devices precipitators No.1-4, 12-18. (CHPP-9 section No. 1) 1138 Boiler cleaning devices of boilers No.1-4,12-18. (CHPP-9 section No. 1) 1139 Current repairs of electric equipment of the boiler units st. No. 2, 3, 15. (CHPP-9 area No. 1) 1140 Repairs of high pressure boiler units No. 2, 15 at a branch of OAO Irkutskenergo. (CHPP-9 area No. 1) 1141 Construction and dismantling of scaffolding where required by equipment repairs. Boiler units 1, 2, 6, 7, 8, and 10. (CHPP-10) 1142 Works on eliminating defects arising during the operation of main and auxiliary equipment of BTH. (CHPP-10) 1143 Current repairs of brickwork of the drum dust-coal boiler unit No. 2. (CHPP-10) 1144 Repairs of pipelines. (CHPP-10) 1145 Repairs of the heat and mechanical equipment of BU-1, 2 TP-10. Bu-5, 10, 11, 13, 16 KP-24. (CHPP-10) 1146 Manufacturing parts and spare parts in the machinery and repair shop when performing standard repairs of equipment. (CHPP-10) 1147 Repairs of heating surfaces of high pressure direct flow boiler unit 7, inv. No. 140178. Replacing: bend of the upper - middle radiant sections, orifice plates, injection nozzles of steam valves, lower radiant section; injection nozzles in the transition zone, upper radiant section; cold industrial steam superheating injection nozzles; RD fast-response pressure-reducing and desuperheating station-I. (CHPP-10) 1148 Current repairs of brickwork of boiler units 7, 10. CHPP-10 1149 Repairs of the pipelines (station high pressure pipelines of 60000 kW power generating unit No. 1. Station high pressure pipelines of 150000 kW power generating unit No. 3. Station high pressure pipelines of 150000 kW power generating unit No. 5. Station high pressure pipelines of 150000 kW power generating unit No. 7.) CHPP-10 1150 Current repairs of low pressure rotor equipment of turbine units No. 5, 6, 7, and 8. (CHPP-10) 1151 Current repairs of low pressure rotor equipment of turbine units No. 1, 2, 3, and 4. (CHPP-10) 1152 Repairs and manufacturing parts in the machinery and repair shop (Shelekhovsky section of the N-I CHPP) 1153 Repairs and manufacturing parts and spare parts for BTH equipment at CHPP-11 1154 Eliminating defects within the additional scope of work at BH (repairs of RAS building, compressed air pipelines, heating registers). Repairs of the rear wall of the boiler unit st. No. 8 (ТП-81) and replacement of furnace wall pipe at the second unit; repairing of the one-way valve Du -225 of the boiler unit st. No. 5. (CHPP-11) 1155 Repairs of equipment VG-1, 2, 3 1156 Repairs of the hydraulic ash removal system (external, internal). Repairs of the shop equipment (other, pipelines and valves of the pressure-reducing and desuperheating station and fast-response pressurereducing and desuperheating station). (CHPP-11) 1157 Repairs of boiler unit No. 4 CHPP-11 (changes in the scope and types of works) (CHPP-11) Counterparty: OOO Pozharnaya Okhrana Irkutskenergo (Contractor) 1158 Repairs of the security and fire alarm of the booster pump station control technical system. (N-I CHPP) 198 OAO Irkutskenergo RUB 1,742,649.96, incl. VAT - RUB 265,827.96 RUB 22,585,200, incl. VAT - RUB 3,445,200 RUB 271,369.32, incl. VAT - RUB 41,395.32 RUB 401,166.96, incl. VAT - RUB 61,194.96 RUB 123,890.56, incl. VAT - RUB 18,898.56 RUB 114,312.5, incl. VAT - RUB 17,437.50 RUB 114,312.5, incl. VAT - RUB 17,437.50 RUB 145,140, incl. VAT - RUB 22,140 RUB 71,614,838.38, incl. VAT - RUB 10,924,297.38 RUB 1,116,280.00, incl. VAT - RUB 170,280.00 RUB 590,000.00, incl. VAT - RUB 90,000.00 RUB 389,390.56, incl. VAT - RUB 59.398,56 RUB 2,773,000.00, incl. VAT - RUB 423,000.00 RUB 1,097,336.28, incl. VAT - RUB 167,390.28 RUB 106,080.82, incl. VAT - RUB 16,181.82 RUB 128,538.58, incl. VAT - RUB 19,607.58 RUB 29,713.58, incl. VAT - RUB 4,532.58 RUB 76,919.48, incl. VAT - RUB 11,733.48 RUB 30,825.14, incl. VAT - RUB 4,702.14 RUB 99,610.88, incl. VAT - RUB 15,194.88 RUB 229,474.60, incl. VAT - RUB 3,504.60 RUB 885,000,135,000, incl. VAT - RUB 135,000.00 RUB 566,400, incl. VAT - RUB 86,400 RUB 566,400, incl. VAT - RUB 86,400 RUB 1,594,155, incl. VAT - RUB 243,176 RUB 2,774,143.42, incl. VAT - RUB 423,174.42 RUB 1,151,769.68, incl. VAT - RUB 175,693.68 RUB 590,000.00, incl. VAT - RUB 90,000.00 RUB 118,634.84, incl. VAT - RUB 18,096.84 RUB 141,220.04, incl. VAT - RUB 21,542.04 RUB 18,396.20, incl. VAT - RUB 2,806.20 RUB 4,720,000.00, incl. VAT - RUB 720,000.00 RUB 169,84.88, incl. VAT - RUB 25,868,88 RUB 282,587.58, incl. VAT - RUB 43,106.58 RUB 65,615.08, incl. VAT - RUB 10,009.08 RUB 51,176.60, incl. VAT - RUB 7,806.60 RUB 25,588.3, incl. VAT - RUB 3,903.30 RUB 849,600.00, incl. VAT - RUB 129,600.00 RUB 1,560,456.78, incl. VAT - RUB 238,035.78 RUB 866,402.02, incl. VAT - RUB 132,163.02 RUB 476,396.68, incl. VAT - RUB 72,670.68 RUB 1,357,912.14, incl. VAT - RUB 207,139.14 RUB 2,119,842.86, incl. VAT - RUB 323,365.86 RUB 253,080.50, incl. VAT - RUB 38,605.50 1159 Integrated re-equipment plan for the following systems: automatic fire alarm, fire suppression system in RUB 19,824,000.00, the production facilities and administrative premises of BHPP incl. VAT - RUB 3,024,000.00 Counterparty: ZAO GES-remont (contractor) 1160 Repairs of the fire suppression system in cable corridors No.1-3. of the Irkutskaya HPP RUB 778,800.00, incl. VAT - RUB 118,800.00 1161 Repairs of the emergency oil drain pipeline. Transformer area of the Irkutskaya HPP RUB 106,200.00, incl. VAT - RUB 16,200 1162 Electric boiler station of the first HPP settlement. Repairs of the valves of electric boilers at the Irkutskaya HPP RUB 300,900.00, incl. VAT - RUB 45,900.00 1163 PL577-VB-720 water turbine st. No. 1 - overhaul at the Irkutskaya HPP RUB 531,000.00, incl. VAT - RUB 95,580.00 1164 Current repairs of the power transformer of OCG-210000/500 type: 3T phase A, B, C. (BHPP) RUB 326,998.06, incl. VAT - RUB 49,881.06 1165 Replacing wooden walkways at the run-of-river dam galleries. (BHPP) RUB 466,100.00, incl. VAT - RUB 71,100.00 1166 Inspection of the rotor wheel, overlay welding of cavitation damages of water turbine 16. (BHPP) RUB 1,651,800.33, incl. VAT - RUB 251,969.54 1167 Replacing turbine bearing gasket at water turbine No. 9. (BHPP) RUB 118,254.24, incl. VAT - RUB 18,038.78 1168 Repairs of the cable structures and replacement of 0.4 and 6 kV cables. (BHPP) RUB 1,097,400.00, incl. VAT - RUB 167,400.00 1169 Overhaul of the hydraulic elevator 220/500 t G-2. (BHPP) RUB 453,678.60, incl. VAT - RUB 69,205.21 1170 Replacing the oil pressure unit boiler at water turbine 2. (BHPP) RUB 557,758.85, incl. VAT - RUB 85,081.86 1171 Repairs of the steel structures of ladders and platforms of the boiler house at the dam body and receiving RUB 536,900.00, incl. VAT - RUB 81,900.00 wells. (BHPP) 1172 Repairs of the electric part of the V-21Т cell and of the V-22Т cell. (BHPP) RUB 39,340.02, incl. VAT - RUB 6,001.02 1173 Current repairs of the АОDCТN-267000/500 automatic transformer st. No. 1АТ (phases A, B, C) st. No. 2АТ RUB 1,791,881.92, incl. VAT - RUB 273,337.92 (phases A, B, C). (BHPP) 1174 Repairs of the load bearing cross (including reinforcing) during current repairs of water turbine No. 2. (BHPP) RUB 323,505.86, incl. VAT - RUB 49,348.35 1175 Inspection of the rotor wheel, overlay welding of cavitation damages, installation and dismantling of RUB 1,651,320.79, incl. VAT - RUB 251,869.39 wooden overhead scaffoldings during current repairs of water turbine 17. (BHPP) 1176 Repairing cracks in the rotor wheel during current repairs of water turbine 7. (BHPP) RUB 825,211.89, incl. VAT - RUB 125,879.78 1177 Renovation of HPP building near MP-1 (painting walls and ceiling) elev. 306. (BHPP) RUB 1,846,910.04, incl. VAT - RUB 281,732.04 1178 Repairs and partial replacement of the open switchgear cable trays. (BHPP) RUB 866,402.02, incl. VAT - RUB 132,163.02 1179 Current repairs of the run-of-river dam keys (additional works). (BHPP) RUB 5,931.86, incl. VAT - RUB 904.86 1180 Renovation of offices (Director’s office, the office of the leading engineer, and reception area) in the RUB 319,433.08, incl. VAT - RUB 48,727.08 administration building (additional works). (BHPP) Counterparty: ZAO IRMET (Contractor) 1181 Mobile heat energy metering units of the control technical system CHPP-9 RUB 5,255,720.00, incl. VAT - RUB 801,720.00 Counterparty: OOO DC Irkutskenergo (Executor / Contractor) 1182 Reconstruction of the instrumentation and control system of the boiler unit st. No. 3. (CHPP-6) RUB 15,576,000, incl. VAT - RUB 2,376,000 1183 Providing services on measuring harmful industrial factors caused by transformer substation No. 1102 RUB 18,464.57, incl. VAT - RUB 2,816.63 Kindergarten for 150 places in Solnechny District, Oktyabrsky region. (EB of IE) 1184 Implementing the full scale automation system of the BKZ-420 boiler unit st. No. 4 N ICHPP, a set of works RUB 11,840,600.11, incl. VAT - RUB 1,806,193.24 Counterparty: OAO IESK Related party: Members of the Board of Directors of OAO Irkutskenergo A. Yu. Sergeev and A.V. Martynenko 1185 OAO Irkutskenergo shall transfer, and IESK shall accept the rights and obligations of OAO Irkutskenergo RUB 210,051.00 and become a party to the Agreement between OAO Irkutskenergo and the Student. Counterparty: ZAO Irkutskzoloproduct (Executor) Related party: EuroSibEnergo, a shareholder of OAO Irkutskenergo owning more than 20 % of shares. 1186 Change in the monthly fee under the agreement on providing services on removal of ash and slag from ash RUB 145 not including VAT per cubic meter of disposal areas (in exchange for payment). removed ash and slag Counterparty: OOO Baikalinvestenergo (Purchaser) 1187 Concluding supplementary agreement No. 1 to the securities sale and purchase agreement: paragraph 3.1 of the Agreement is to be as follows: “3.1. The Buyer shall pay for shares under the Agreement no later than December 31, 2013.” Minutes of the Board of Directors No. 70 (223) dated December 23, 2011 Related party: member of the Board of Directors of OAO Irkutskenergo O.V. Deripaska Counterparty: OAO RUSAL Sayanogorsk (Purchaser) 1188 OAO Irkutskenergo shall transfer electric energy to OAO RUSAL Sayanogorsk RUB 1,153,152,000.00, no VAT Minutes of the Board of Directors No. 71 (224) dated December 27, 2011 Related party: EuroSibEnergo, a shareholder of OAO Irkutskenergo owning more than 20 % of shares. Counterparty: OOO CHPP-10 (Purchaser) 1189 Concluding supplementary agreement No. 1 to the securities sale and purchase agreement: paragraph 3.1 of the Agreement is to be as follows: “3.1. The Buyer shall pay for shares under the Agreement no later than December 31, 2013.” OAO Irkutskenergo 199 OAO Irkutskenergo 3 Sukhe-Batora Street, Irkutsk, Irkutsk Region, 664025, Russia Tel: (3952) 790-300, 790-061 Fax: (3952) 790-899 Email: idkan@irkutskenergo.ru Website: www.irkutskenergo.ru Phone number and email of the corporate management department: Head of the department: Svetlana Stepanova Tel: (3952) 790-061 Email: Stepanova_SV@irkutskenergo.ru Registrar: OAO Registrar R. O. S. T. P. O. box 9, 18/13 Stromynka Street, Moscow 107996 Tel/Fax: (495) 771-73-35, 771-73-34 Irkutsk branch of OAO Registrar R. O. S. T. Office 302А, 6 Lenina Street, Irkutsk 664000 Tel/Fax: (3952) 20-33-40 Email: regrost@mail.ru Bratsk branch of OAO Registrar R. O. S. T. Office 410, 53 Gidrostroiteley Street, Bratsk 665712 Tel/Fax: (3953) 35-95-82 Publication: Annual Report of OAO Irkutskenergo for 2011 Format: 206x145 mm, volume: 200 pages Offset printing. Passed for printing on May 12, 2012 500 copies Produced by: Na Chekhova Instant Printery 10 Chekhova Street, Irkutsk 664011, Russia Tel/Fax: (3952) 209056, 209355 Email: info@baikalprint.ru Website: www.baikalprint.ru 200 OAO Irkutskenergo