Centrifugal Pump, ACP series
Transcription
Centrifugal Pump, ACP series
Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Erection Work, Operating and Maintenance Instructions Machine: Issued: Checked: Rev.0, Printed: 2010.08 Centrifugal Pump, ACP series Revision: Checked: Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions The operating manual is protected by copyright. All usual rights reserved. It must not be wholly or partly reproduced without authorization by Andritz AG. Contraventions shall entail damage claims and may have penal consequences. All rights shall also be reserved for any patents granted, registration of trade marks and technical modifications without prior notification. © 2010 Andritz Rev.0, Printed: 2010.08 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions TABLE OF CONTENTS 1 1.1 1.2 1.3 1.4 1.5 1.6 2 INTRODUCTION....................................................................................................... 6 Use .....................................................................................................................................................6 Standards and guidelines ...................................................................................................................6 How to use the manual ......................................................................................................................7 Warranty and guarantee ....................................................................................................................8 Manufacturer’s name and address ....................................................................................................9 Copyright ............................................................................................................................................9 SAFETY .................................................................................................................. 10 2.1 General safety regulations ...............................................................................................................10 2.2 Danger and warning signs ...............................................................................................................10 2.3 Designated use ................................................................................................................................ 11 2.4 General remarks on machine/plant safety ....................................................................................... 11 2.5 User’s obligations .............................................................................................................................12 2.6 General obligations of personnel .....................................................................................................14 2.7 Safety devices ..................................................................................................................................15 2.8 Personal protective apparel .............................................................................................................17 2.9 Safety at the machine installation site .............................................................................................18 2.10 Temperature .....................................................................................................................................18 2.11 Noise ................................................................................................................................................18 2.11.1 Noise levels (dB(A)) ............................................................................................................................... 19 2.12 Electrical equipment .........................................................................................................................20 2.13 Fluids (liquids, gases, vapor or smoke) ...........................................................................................20 2.14 Oils and greases and cleaning agents .............................................................................................21 2.15 Chemicals ........................................................................................................................................21 3 TECHNICAL DESCRIPTION .................................................................................. 23 3.1 General description ..........................................................................................................................23 3.1.1 Field of application ................................................................................................................................. 23 3.1.2 Design ..................................................................................................................................................... 24 3.2 Main components of the centrifugal pump .......................................................................................25 3.2.1 Centrifugal pump with base frame ......................................................................................................... 25 3.2.2 Centrifugal pump .................................................................................................................................... 26 3.2.3 Bearing support ...................................................................................................................................... 27 3.3 Type of seal ......................................................................................................................................29 3.3.1 Andritz cartridge mechanical seal - single .............................................................................................. 31 3.3.2 Andritz cartridge mechanical seal - double ............................................................................................ 32 3.3.3 Standard cartridge mechanical seal - single ............................................................................................ 34 3.3.4 Standard cartridge mechanical seal - double .......................................................................................... 36 3.3.5 Single standard mechanical seal ............................................................................................................. 38 3.3.6 Tandem standard mechanical seal........................................................... Error! Bookmark not defined. 3.3.7 Stuffing box packing............................................................................................................................... 40 3.4 Type specification ............................................................................................................................42 3.4.1 Applicable standards............................................................................................................................... 42 3.4.2 Model designation .................................................................................................................................. 42 3.5 Application limiting values ................................................................................................................43 3.6 Performance limits for bearing supports for different shaft material ................................................48 3.7 Technological description .................................................................................................................49 4 4.1 4.2 4.3 ERECTION AND TRANSPORT .............................................................................. 50 General ............................................................................................................................................50 Safety regulations ............................................................................................................................50 Haulage ............................................................................................................................................51 Rev.0, Printed: 2010.08 Page 3 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 4.4 Storage ............................................................................................................................................ 55 4.5 Installation ....................................................................................................................................... 56 4.5.1 Erection of the centrifugal pump ............................................................................................................ 57 4.5.2 Pipework................................................................................................................................................. 60 4.5.3 Aligning the coupling ............................................................................................................................. 61 4.6 Instruments ...................................................................................................................................... 62 4.7 Electrical equipment ........................................................................................................................ 63 4.8 Cold test .......................................................................................................................................... 64 5 5.1 5.2 5.3 5.4 5.5 6 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 7 START-UP .............................................................................................................. 66 General ............................................................................................................................................ 66 Safety regulations ............................................................................................................................ 66 Prerequisites for start-up ................................................................................................................. 67 Start-up ............................................................................................................................................ 69 Certificates....................................................................................................................................... 70 OPERATION ........................................................................................................... 71 General ............................................................................................................................................ 71 Safety regulations ............................................................................................................................ 71 Control via DCS ............................................................................................................................... 72 Starting ............................................................................................................................................ 72 Checks after initial start-up .............................................................................................................. 73 Normal operation ............................................................................................................................. 74 Centrifugal pump requirements (delivery head and flow rate) ........................................................ 75 Shutdown ......................................................................................................................................... 76 Operating malfunctions and troubleshooting ................................................................................... 77 MAINTENANCE ..................................................................................................... 81 7.1 General ............................................................................................................................................ 81 7.2 Safety regulations ............................................................................................................................ 81 7.3 Regular maintenance ...................................................................................................................... 82 7.4 Maintenance schedule .................................................................................................................... 84 7.5 Fasteners......................................................................................................................................... 85 7.6 Lubrication ....................................................................................................................................... 87 7.6.1 Oil lubrication......................................................................................................................................... 87 7.6.2 Grease lubrication................................................................................................................................... 90 7.7 Aligning the coupling ....................................................................................................................... 92 7.8 Installing and removing the pull-out unit .......................................................................................... 93 7.8.1 Removing the pull-out unit ..................................................................................................................... 94 7.8.2 Mounting the pull-out unit...................................................................................................................... 95 7.9 Changing the impeller and the front lining ....................................................................................... 96 7.10 Trimming the impeller ...................................................................................................................... 99 7.11 Changing the shaft seals ............................................................................................................... 100 7.11.1 Changing the Andritz cartridge mechanical seal-single and double ..................................................... 100 7.11.2 Changing the standard cartridge mechanical seal-single and double ................................................... 102 7.11.3 Changing the single standard mechanical seal ..................................................................................... 104 7.11.4 Changing the tandem standard mechanical seal ................................................................................... 106 7.11.5 Changing the stuffing box packing and the shaft protection sleeve ..................................................... 108 7.12 Changing the anti-friction bearings ............................................................................................... 112 7.13 Disassembly and disposal ............................................................................................................. 114 8 8.1 8.2 8.3 8.4 8.5 TECHNICAL DATA ............................................................................................... 116 Data sheet ..................................................................................................................................... 116 Characteristic curve ....................................................................................................................... 116 Dimensional drawing ..................................................................................................................... 116 Coupling ........................................................................................................................................ 117 Shaft seal ....................................................................................................................................... 117 Rev.0, Printed: 2010.08 Page 4 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Rev.0, Printed: 2010.08 Page 5 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 1 INTRODUCTION This manual is part of the ANDRITZ AG technical documentation for the pump. It is intended to provide the operator with the basic knowledge required for proper, safe and economical use of the equipment delivered by ANDRITZ AG. Observing these instructions helps avoid hazards and reduce repair and downtime costs, as well as increasing the reliability and useful life of the machines. 1.1 Use Target group This operating manual is intended for users with a knowledge of mechanical engineering and is for the exclusive use of the operator of the mill and his personnel. Personnel entrusted with work on the machine must have read and understood these operating instructions and comply with them. This refers in particular to the following tasks: Handling, starting and stopping Troubleshooting Maintenance and upkeep Haulage Maintenance and disposal of process materials, cleaning of machine and area around the machine. The following sections are especially important: The Chapter on SAFETY, The safety instructions contained in various other chapters Supplementary instructions The mill operator shall complete this manual by adding national regulations on safety at work, health protection and environmental protection. Instructions on any special operational conditions concerning work organization, sequence of work/operations and the personnel assigned to the job shall also be added. This also includes instructions on supervising and reporting obligations. Safekeeping Keep the entire operating manual near the place where the machine is installed and within easy reach. 1.2 Standards and guidelines The pump is delivered together with a CE declaration of conformity according to Machinery Directive 2006/42/EC Annex II, 1.A. It is confirmed that European standards (harmonized) EN 809 and EN ISO 12100, Parts1 and 2, have been observed. Auxiliary electrical equipment supplied, such as motors, measuring instruments, ... carry a CE marking (if they fall within the scope of a guideline, for example the low-voltage or EMV guideline). Rev.0, Printed: 2010.08 Page 6 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 1.3 How to use the manual Presentation Chapter and paragraph headings are printed in capitals in the continuous test SAFETY Designations of indicating and handling elements are written in inverted commas in the continuous text. Operate switch “xxx” Pictograms Lists without numbering do not require operations to be carried out in a certain order. The following pictograms are used in the manual: Warning signs. Warning signs are shown with an explanation of the type of the hazard. The meaning of the different graduations of hazards is described in the Chapter on SAFETY. Marks an instruction on handling of the machine of system. Marks a useful piece of information Work steps (operations) Rev.0, Printed: 2010.08 Marks a cross-reference to another Chapter with absolute path indication. e.g. /ACP-Pump/SAFETY Work steps are presented in tables. Work steps are numbered and must be carried out in the order specified. Page 7 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Item numbers 411.2 The item numbers shown in this format refer to the assembly drawing and the parts list. Numbering of pages, tables and figures Pages consecutive numbering of Chapters 2-1 Tables Figures Tab. + Continuous numbering of Chapters Fig. + Consecutive numbering of Chapters Tab.2-1 Fig.2-1 Tab. Table Fig. Figure Abbreviations 1.4 Warranty and guarantee Andritz AG’s general terms of delivery and sale shall apply. Guarantee and liability claims on Andritz AG shall become void if personal injury or material damage is caused by one or several of the following: Use of the machine/system for any purpose other than its designated use. Non-conformity of erection work, start-up and handling of the machine/system. Non-observance of the safety instructions in the manual. Non-authorized structural changes to the machine/system. Non-observance of the maintenance and upkeep instructions. In the event of a claim for repair under guarantee, ANDRITZ AG reserves the right to assess the damage to the machine/system. Rev.0, Printed: 2010.08 Page 8 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 1.5 Manufacturer’s name and address Andritz AG Stattegger Strasse 18 A-8045 Graz Our service department will be pleased to help you and can be contacted at: Andritz AG Stattegger Strasse 18 A-8045 Graz Service department for pumps Tel.: +43/316-6902-2706 Fax: +43/316-6902-413 Email: Johann.Strasser@andritz.com In case of emergency outside working hours Tel.: +43 316 6902-0 1.6 Copyright The operating manual is protected by copyright. All usual rights reserved. It must not be wholly or partly reproduced without authorization by Andritz. All rights shall also be reserved for any patents granted, registration of trade marks and technical modifications without prior notification. 2010 Andritz AG Rev.0, Printed: 2010.08 Page 9 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 2 SAFETY 2.1 General safety regulations The chapter on safety contains general safety regulations which must be observed when working on the machine/plant. In addition, the chapters in the operating manual contain further safety regulations. These are marked by DANGER SIGNS. Safety instructions on components not supplied by Andritz AG are contained in the descriptions of the components ( /ACP-PUMP/SUPPLIER DOCUMENTATION). The safety instructions supplement ANDRITZ AG’s operating instructions. All safety instructions must be observed. Disregarding the safety instructions may cause a risk to life and limb, environmental pollution hazards and damage to property. 2.2 Danger and warning signs The entire SAFETY chapter is of extreme importance and relevant to safety. The information in this chapter, therefore, is not marked with special danger symbols. The Chapters on ERECTION WORK, START-UP, OPERATION and MAINTENANCE in this Manual are marked by a pictogram. The following warning signs are used: DANGER This symbol indicates there may be a risk to life and limb. Non-compliance with the warning signs may lead to serious health problems or even fatal injuries, and can cause extensive damage to property. This symbol points to an imminent health risk, as well as a risk of environmental pollution and of damage to property. WARNING Non-compliance with the warning sign may cause moderate health problems and/or extensive environmental pollution and damage to property. This symbol points to a dangerous situation. Non-observance of these signs may cause environmental pollution and damage to property. CAUTION Further symbols and pictograms used are described under INTRODUCTION. Rev.0, Printed: 2010.08 Page 10 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 2.3 Designated use The centrifugal pump should only be used according to the specifications forming part of the purchase order. Any change in the application must be checked by the operator and, if necessary, approved by Andritz AG. Non-observance of the application can lead to environmental or property damage, or to personal injury. Any modifications to the scope of supply made without the agreement of Andritz AG are considered contrary to the designated use. The term designated use shall also include adherence to the operating instructions, observance of the operating, inspection and maintenance conditions and of the regulations on cleaning and upkeep. Please also observe the type specification ( /TECHNICAL DESCRIPTION/TYPE SPECIFICATION Chapter 3.5), and the operating limits ( /TECHNICAL DESCRIPTION/OPERATING LIMITS Chapter 3.6) 2.4 General remarks on machine/plant safety The centrifugal pump has been built in accordance with state-of-the-art standards and the recognized safety rules. Nevertheless, its use may constitute a risk to life and limb of the user of third parties, of cause damage to the machine/plant and to other material property. The centrifugal pump may only be operated when in perfect condition and with due consideration to safety and the risks involved. All protective devices and the emergency cut-out devices must be in place and fully functional. Malfunctions and unforeseen changes in the centrifugal pump must be remedied immediately. Rev.0, Printed: 2010.08 Page 11 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 2.5 User’s obligations Designated use The user of the centrifugal pump is responsible for its designated use. Work instructions In addition to the operating instructions, applicable legal stipulations and other rules governing the safety at work, health and environmental protection must be observed and personnel instructed in them. Qualification of assigned personnel The centrifugal pump may only be operated, maintained and serviced by authorized, skilled personnel with hands-on training. Personnel must not be below the legal minimum age. Any person undergoing training, serving an apprenticeship or being instructed must not work on the centrifugal pump except under the supervision of an experienced person. Instructions The user’s operating and maintenance personnel will be instructed by manufacturer personnel or his contractual distributor upon completion of installation work. The user undertakes to have new, additional operating and maintenance personnel instructed in machine and maintenance of the centrifugal pump to the same extent and applying the same care, and with due consideration to the safety instructions. Workers entrusted with the transportation, erection work and start-up of the centrifugal pump must have read and understood the operating instructions, especially the chapter on SAFETY, the safety instructions concerning a certain activity, as well as the safety instructions issued by sub-suppliers. Definition of areas of responsibility The user shall be responsible for: Rev.0, Printed: 2010.08 definition of the machine operator’s responsibility and his right to give instructions Definition of the contents and responsibility for keeping the records on functioning and any failure of the monitoring equipment (log book) Personnel areas of responsibility in terms of operating, Tooling, maintenance and upkeep. Page 12 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Inspections The operator undertakes Attaching safety devices The user shall ensure that the following equipment, regulations, symbols and instructions are mounted in the production area; High-voltage protection Rev.0, Printed: 2010.08 To check at regular interval whether the safety instructions and regulations governing work on the centrifugal pump are observed. To carry out regular training to confirm the level of knowledge of the operating and maintenance personnel. Safety devices and regulations (see Chapter 2.7) Fire prevention regulations Markings on the floor for driveways, protective fencing and danger areas (yellow) Fencings and covers Railings (foot, center and chest height) Emergency lighting Emergency-off switch Repair switch for drive motors Signs on fire-fighting equipment Signs for emergency calls Direction arrows to exits Direction arrows to escape routes Signs to first-aid post The operator shall provide suitable earthing and high-voltage protection equipment. Page 13 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 2.6 General obligations of personnel To avoid personal and material damage anybody working on the machine shall Rev.0, Printed: 2010.08 Observe the safety instructions in the operating regulations and on the centrifugal pump itself. Stop and secure the centrifugal pump in case of a safety-relevant functional disorder. Report disorders and have them repaired immediately. Do not perform any work in a manner disregarding safety considerations. Use only the machine accesses, paths and passages foreseen for this purpose. Do not touch moving and rotating parts and/or reach out beyond them. Keep the machine and the work place clean. Do not place tools or other objects on the centrifugal pump. Do not wear any garments/pieces of jewelry which might get stuck on rotating/moving pump parts; this includes ties, scarves, rings and necklaces. Not wear long hair down. Familiarize yourself with the function and any failure of machine monitoring equipment (log book) before starting work. Refrain from smoking in the vicinity of the centrifugal pump. Personal protective apparel must be worn when working on the centrifugal pump. (see Section 2.8) Due to the high temperatures, high pressure and humidity, people wearing glasses may find that their glasses steam up, thus exposing the wearer to a risk of injury. The operating personnel must be acquainted with the safety data sheets in order to be able to recognize how dangerous the chemicals can be. In order to identify the risks of high pressure (up to 25 bar), the personnel must know the technical data of the centrifugal pump, as well as its place of installation. Page 14 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 2.7 Safety devices The centrifugal pump must not be operated without effective safety equipment. Safety equipment must not be circumvented, dismantled or made unserviceable during operations. The safety equipment is there to protect operating personnel. Safety equipment and access thereto must be kept free. Safety covers The centrifugal pump must not be operated without safety covers mounted. Check in particular that the coupling guard does not have any deformations! Fig. 2-1 shows the protective covers for the centrifugal pump. Safe guard for sealing chamber Coupling guard Fig. 2-1 Safety covers at the ACP pump Rev.0, Printed: 2010.08 Page 15 of 117 Earthing Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Indicative, warning Indicative, warning and prohibiting signs must be observed. They must be and prohibiting signs Checked regularly for legibility and completeness and they must not be removed or obstructed. The following indicative, warning and prohibiting signs are attached to the machine. Hot surface Chemicals: If the pump is used in the chemicals sector, the operator must mount appropriate safety instructions on the plant. Examples of signs required where chemicals are used: Warning against toxic substances Emergency-off switch, safety shutdown Rev.0, Printed: 2010.08 Caustic substances The pump is usually part of a plant or system. The operator is responsible for installation of EMERGENCY OFF/STOP devices so that the plant can be brought to a halt in an emergency. Page 16 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 2.8 Personal protective apparel General protective apparel Operating personnel must use and carry personal protective equipment along with them in accordance with the national regulations or as specified by the plant operator. It should be compulsory to wear hard-toed boots throughout the entire mill premises. In addition to the regulations applying, we recommend using the following safety equipment for certain work: Activity Safety equipment Time spent in the immediate vicinity of the machine while it is running Taking pulp samples Field installation and maintenance work for which parts of the machine have to be removed Tab. 2-1 recommended safety equipment for certain work Key to symbols Tab. 2-2 Protective clothing to prevent the pulp from coming into contact with the skin Safety shoes as protection against foot injuries Gloves to prevent hand injuries Ear protection to prevent damage to hearing Goggles to prevent eye injuries Standard hard hat as protection against head injuries Purpose of the safety equipment Rev.0, Printed: 2010.08 Page 17 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 2.9 Safety at the machine installation site Adequate lighting must be provided (industrial lighting). The foundations must be sized to withstand the loads caused by the centrifugal pump. The customer will be provided with a load plan. The pump must be easily accessible. The operator must provide safe means of access (e.g. ladders, platforms…) Area around machine and marked escapes to be kept clear. Area around machine must be marked as danger zone. Make sure machine and surrounding area are kept clean. In particular, oil and grease on the floor and on machine elements may cause slipping. Thus, they present a considerable risk of injuries, particularly in combination with tools. The floor around the centrifugal pump must be provided with a non-slip finish. In order to prevent any falls from or damage to the machine, it is forbidden to climb onto machine elements or on the machine (except for the treading areas provided). Use ladders or similar equipment in accordance with recognized standards. Ramps, platforms and lifts must be used to avoid injury or excessive physical effort. 2.10 Temperature As the temperature of the medium can exceed 73°C, the housing and covers prevent from direct contact with the medium. Danger symbols mounted on the machine warn against the hot surface. It is compulsory to wear personal safety equipment in the immediate vicinity of the pump. The operator is responsible for informing new personnel on the danger of burns and for implementing further safety mwasures, e.g. insulation or access restrictions. No maintenance work should be carried out until the hot surface has cooled down. The centrifugal pump can be designed for a media temperature of up to180°C. If media with temperatures higher than 65°C are to be pumped, the operator must take the necessary safety measures (e.g. safety devices, protective gloves, training of operating staff, etc.). 2.11 Noise The total noise emissions from all machines in the production room can restrict spoken communication and impair hearing. The machine is designed such that no operator is required in the immediate vicinity of the machine. Appropriate hearing protection should be worn throughout maintenance and adjusting work while the machine is running. Rev.0, Printed: 2010.08 Page 18 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 2.11.1 Noise levels (dB(A)) 990 u/min 1180 u/min 1450 u/min 1780 u/min ACP 65-315 70 70 72 75 ACP 100-500 70 70 72 76 ACP 65-250 70 70 71 ACP 100-315 70 70 ACP 125-400 70 ACP 150-500 3000 u/min 3560 u/min 80 83 73 79 83 71 75 82 84 70 73 76 70 72 76 77 ACP 100-250 70 70 72 76 81 84 ACP 125-315 70 71 73 77 ACP 150-400 70 72 75 78 ACP 200-500 70 73 77 79 ACP 300-700 70 76 ACP 125-250 70 71 75 79 82 85 ACP 150-315 70 70 71 75 ACP 200-400 70 73 76 79 ACP 400-700 70 75 ACP 250-315 70 71 73 77 ACP 300-400 70 72 75 78 ACP 450-550 70 73 ACP 600-700 70 74 Rev.0, Printed: 2010.08 Page 19 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 2.12 Electrical equipment All work on the electrical equipment, without exception, must be carried out by skilled electricians. Any form of contact with electrical equipment may cause fatal injuries. Before beginning any maintenance or repair work, the operator must disconnect the energy supply to all drives securely. This can be achieved with a maintenance switch, lockable racks in the MCC, or with other suitable measures that comply with the safety regulations. Employees performing work on live parts should be accompanied by an assistant who can operate the emergency switch if necessary. Users of medical electronic equipment, such as pacemakers, must not enter the electric danger zone. Earthing Machine must be earthed to avoid electrostatic loading. Machine, gears and motors must be connected to the earthing system. Machine must be earthed to avoid electrostatic loading. Proper earthing must be restored after conducting maintenance work (e.g. check and set the earthing resistance) 2.13 Fluids (liquids, gases, vapor or smoke) Unintentional chemical reactions may take place in the medium during a prolonged standstill and hazardous fumes may be produced. The machine must be thoroughly cleaned after prolonged stoppages. The area must be adequately ventilated. Before beginning work on the machine, ensure that no liquids, gases, vapors or smoke can enter the working area from feed pipes, discharge pipes or shafts. If it is not possible to reliably exclude the risk of liquids, gases, vapours or smoke flowing in, all persons working in the danger zone must be quipped with a safety harness and a safety rope. Each worker must be monitored by a second person outside the danger zone. It must always be possible to evacuate a worker from the danger zone without delay. Any leakage (e.g. at the shaft seal) of hazardous media (e.g. explosive, toxic, hot) must be drained off in such a way that there is no risk to individuals, nor to the environment. Any legal regulations must be observed. Rev.0, Printed: 2010.08 Page 20 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 2.14 Oils and greases and cleaning agents The safety instructions for the products concerned must be observed when handling oil, grease and other chemical substances. Suitable skin protection is required when handling aggressive media. See manufacturers’ information for the type of skin protection required. Also observe relevant requirements for disposal 2.15 Chemicals The centrifugal pump can be used in the chemical sector (except in chlorine bleaching and in the chlorine dioxide area) of the pulp and paper industry. The following chemicals can be pumped: Hydrogen peroxide H2O2 Caustic soda (sodium hydroxide) (NaOH) Silicate DTPA Hydrogen peroxide (H2O2) and caustic soda (NaOH) can irritate or even burn the skin and mucous membrane, particularly the eyes, and can also lead to inflammations of the respiratory system. In addition, please note that hydrogen peroxide (H2O2) is not combustible, but enhances the combustibility of other substances. Reactions In reactions with other substances, hydrogen peroxide (H2O2) and caustic soda (NaOH) can lead to highly exothermic reactions, heat generation, and danger of ignition or generating of inflammable gases or vapours, even to a risk of explosion. Safety data sheets If chemicals are used, the measures prescribed in the safety data sheets for the individual chemicals must be observed. The user shall be responsible for the following, among other things: Rev.0, Printed: 2010.08 Staff wearing personal safety attire, particularly adequate eye protection Installing water connections and emergency showers in order to rinse the eyes or skin under running water in the event of an emergency and have a source of drinking water if any chemicals are inadvertently swallowed. Providing medical treatment in emergencies Preventing any chemical reactions that can lead to a risk of fire or explosion Regular training on the properties and handling regulations for the chemicals used. Mounting of safety signs on the plant (e.g. warning against toxic or corrosive substances) Mounting devices for flushing the pump (e.g. the inlet flange) in order to Page 21 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions clean the pump from aggressive media. Rev.0, Printed: 2010.08 Interlocking the chemical feed so that no more chemicals can flow into the pump when pump is shut down. Emptying the vent line safely to prevent from possible contact with chemicals. Page 22 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3 Technical Description 3.1 General description 3.1.1 Field of application The centrifugal pump is used in continuous operation to pump specified liquids and various pulps in the paper industry. (See chapter headed Technical Data) Fig. 3-1 Centrifugal pump Rev.0, Printed: 2010.08 Page 23 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.1.2 Design This spiral casing centrifugal pump is carried out in process design. The impeller, the wear lining, the casing cover and the stuffing box body with the shaft seals and the bearing support can be assembled and disassembled without detaching the suction and delivery pipes. Impeller(230)) Function: Accelerating the medium by charging it with energy. Design: Semi-open impeller with vanes on the back. Spiral casing (102) Function: Guiding the medium with a favorable flow pattern, converting speed energy into pressure energy. Design: Pressure-sealed pump casing with delivery and suction channels. Suction and delivery flange. Holds the bearing housing with bearing assembly, shaft and impeller. Standard design . . . . . . . . . . . . . . . . . . . . . . . . . . single spiral casing Special design . . . . . . . . . . . . . . . . . . . . . . . . . . . Double spiral casing Pump shaft (211) Function: Holding the impeller, shaft seal, bearing assembly and coupling. Transmitting the drive energy to the impeller and thus, to the medium. Design: Sturdily dimensioned drive shaft Bearings Function: Interface between stationary and rotating parts. Absorption of axial and radial forces. Design: Impeller side: . . . Two angular contact ball bearings (321.1) with steel cage. Drive side. . . . . One deep groove ball bearings (321.2) with steel cage. Shaft seal Rev.0, Printed: 2010.08 Depending on operating requirements, there is a choice of eight different shaft seals: Andritz cartridge mechanical seal - single Andritz cartridge mechanical seal - double Standard cartridge mechanical seal - single Standard cartridge mechanical seal – double Single standard mechanical seal Tandem mechanical seal Stuffing box packing Dynamic shaft seal Page 24 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.2 Main components of the centrifugal pump 3.2.1 Centrifugal pump with base frame A C B D Fig. 3-2 E Main components of the centrifugal pump Item Component A B Centrifugal pump, complete Coupling (840) C Coupling guard (681) D Base frame (891) E Sliding rail (593) Tab. 4-1 F Item Component F Motor (800) Main components of the centrifugal pump Rev.0, Printed: 2010.08 Page 25 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.2.2 Centrifugal pump 102 135.1 230 161 430 330 183 680 554.1, 920.1, 902.1 Fig. 4-3 Main section - centrifugal pump Item Component Item Component Volute casing 135.1 Front lining 330 102 680 Bearing support Safety guard for sealing chamber 230 Impeller 183 Supporting leg 430 Shaft seal 161 Casing Cover Tab. 4-2 Principal section ACP pump Rev.0, Printed: 2010.08 Page 26 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.2.3 Bearing support 350 636.1 321.1 321.2 636.1 211 550.2 421.2 507.2 550.1 421.1 507.1 904.2 672 904.1 Fig. 4-4 Item Component 350 211 Bearing housing Shaft 321.1 Angular contact ball bearing 321.2 Deep groove ball bearing 550 Splash ring washer (550.1,550.2) 507 Splash ring (507.1,501.2) Tab. 3-3 903.2 Grease lubrication Item Component 421 Rotary shaft seals (421.1, 421.2) 672 Vent screw 642 Oil level indicator 636.1 Grease lubricating nipple 904 Set screw Main components for the bearing support Rev.0, Printed: 2010.08 Page 27 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 350 903.3 321.1 321.2 903.4 211 423.2 914.10 411.10 423.1 672 914.11 411.11 633 Fig. 3-5 Oil lubrication 642 Item Component Bearing housing Shaft Item Component 672 Plug Vent screw 321.1 Angular contact ball bearing 914 Socket head cap screw 321.2 Deep groove ball bearing 411 Sealing washer 633 Constant level oiler (option) 350 211 423 Bearing isolator (423.1,423.2) 642 Oil level indicator (option) Tab. 3-4 903 Main components for the bearing support Rev.0, Printed: 2010.08 Page 28 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.3 Type of seal Fig. 3-6 Andritz cartridge mechanical seal - single Fig. 3-7 Andritz cartridge mechanical seal - double Fig. 3-8 Standard cartridge mechanical seal - single Fig. 3-9 Standard cartridge mechanical seal - Double Type: A1 Type: A3 Type: A2 Fig. 3-10 Single mechanical seal Rev.0, Printed: 2010.08 Fig. 3-11 Single mechanical seal Page 29 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Not available yet Fig. 3-14 Stuffing box packing Rev.0, Printed: 2010.08 Fig. 3-15 Dynamic shaft seal Page 30 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.3.1 Andritz cartridge mechanical seal - single Function: Seal between medium and the atmosphere. The mechanical seal is lubricated by the medium to be pumped. 433.1 Atmosphere Medium 914.1 Fig. 3-16 Andritz cartridge mechanical seal - single Item Component Item 433.1 Mechanical seal Component 914.1 Screw Tab. 3-5 Andritz cartridge mechanical seal - single Application limits: T max: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100°C p max: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 bar n max:. . . . . . . . . . . . . . . . . . . . . . . 3000 r.p.m. (3600 r.p.m. at 60 Hz) Bearing suppport size 42 48 60 75 100 Shaft diameter D[mm] 42 48 60 75 100 Seal diameter D1[mm] 53 60 70 85 115 Tab. 3-6 Sizes - Andritz cartridge mechanical seal – single Rev.0, Printed: 2010.08 Page 31 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.3.2 Andritz cartridge mechanical seal - double Function: Seal between medium and the atmosphere by sealing water between the medium-side and the atmosphere-side seal in order to guarantee functioning of the mechanical seal within special application limits. 433.1 Atmosphere Medium 914.1 Fig. 3-17 Andritz cartridge mechanical seal - double Item Component Item 433.1 Mechanical seal Tab. 3-4 Component 914.1 Screw Andritz cartridge mechanical seal - single Application limits: T max: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100°C p max:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 bar n max:. . . . . . . . . . . . . . . . . . . . . . . 3000 r.p.m. (3600 r.p.m. at 60 Hz) Bearing suppport size 42 48 60 75 100 Shaft diameter D[mm] 42 48 60 75 100 Seal diameter D1[mm] 53 60 70 85 115 Sealing water pressure [bar] 0.5-12 0.5-12 0.5-12 0.5-12 0.5-12 Sealing water quantity [1/min] Tab. 3-7 2 3 3 4 4 Sizes - Andritz cartridge mechanical seal – single Rev.0, Printed: 2010.08 Page 32 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Sealing water data: Pressure 0.5 bar min. - 12 bar max. Quality Pure water Mechanical contamination: 80 microns max. Temperature 10°C min. - 30°C max. Solids content 2 mg/l max. Tab. 3-8 Monitoring Sealing water data for Andritz cartridge mechanical seal In order to guarantee proper operation the sealing water must be monitored with suitable monitoring units according to the diagrams (Fig. 4-18, Fig. 4-19). Sealing water connection and monitoring for the tandem mechanical seal: Fig. 3-18 Unpressurised Rev.0, Printed: 2010.08 Fig. 3-19 Pressurised Page 33 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.3.3 Standard cartridge mechanical seal - single Function: Seal between medium and the atmosphere. The mechanical seal is lubricated by the medium to be pumped. 412.5 902.4, 920.4, 554.4 433 .1 504 551.2 Atmosphere Medium 914.1 145 Fig. 3-20 Andritz cartridge mechanical seal - single Item Component Item Component 145 Adapter 433.1 Mechanical seal 412.5 O-ring 914.1 Screw 504 902.4 Bolt Spacer Tab. 3-9 Standard cartridge mechanical seal - single Application limits: T max: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100°C p max:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 bar n max:. . . . . . . . . . . . . . . . . . . . . . . 3000 r.p.m. (3600 r.p.m. at 60 Hz) Rev.0, Printed: 2010.08 Page 34 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Bearing suppport size 42 48 60 75 100 Shaft diameter D[mm] 42 48 60 75 100 Seal diameter D1[mm] 53 60 70 85 115 Sealing water pressure [bar] 0.5-12 0.5-12 0.5-12 0.5-12 0.5-12 2 Sealing water quantity [1/min] 3 3 4 4 Tab. 3-10 Sizes - Standard cartridge mechanical seal – single Sealing water data: Pressure 0.5 bar min. - 12 bar max. Quality Pure water Mechanical contamination: 80 microns max. Temperature 10°C min. - 30°C max. Solids content 2 mg/l max. Tab. 3-11 Sealing water data for standard mechanical seal Monitoring In order to guarantee proper operation the sealing water must be monitored with suitable monitoring units according to the diagrams (Fig.4-21, Fig. 4-22). Sealing water connection and monitoring for the tandem mechanical seal: Fig. 3-21 Unpressurised Rev.0, Printed: 2010.08 Fig. 3-22 Pressurized Page 35 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.3.4 Standard cartridge mechanical seal - double Function: Seal between medium and the atmosphere by sealing water between the medium-side and the atmosphere-side seal in order to guarantee functioning of the mechanical seal within special application limits. 902.4,920.4, 554.4 433.1 504 551.2 Atmosphere Medium 914.1 412.5 145 Fig. 3-23 Andritz cartridge mechanical seal - double Item Component Item Component 145 Adapter 433.1 Mechanical seal 412.5 O-ring 914.1 Screw 504 902.4 Bolt Spacer Tab. 3-12 Andritz cartridge mechanical seal - single Application limits: T max: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100°C Rev.0, Printed: 2010.08 p max: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 bar n max: . . . . . . . . . . . . . . . . . . . . . 3000 r.p.m. (3600 r.p.m. at 60 Hz) Page 36 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Bearing suppport size 42 48 60 75 100 Shaft diameter D[mm] 42 48 60 75 100 Seal diameter D1[mm] 53 60 70 85 115 Sealing water pressure [bar] 0.5-12 0.5-12 0.5-12 0.5-12 0.5-12 Sealing water quantity [1/min] 2 3 3 4 4 Tab. 3-13 Sizes - Andritz cartridge mechanical seal – single Sealing water data: Pressure 0.5 bar min. - 12 bar max. Quality Pure water Mechanical contamination: 80 microns max. Temperature 10°C min. - 30°C max. Solids content 2 mg/l max. Tab. 3-14 Sealing water data for tandem mechanical seal Monitoring In order to guarantee proper operation the sealing water must be monitored with suitable monitoring units according to the diagrams (Fig. 3-24, Fig. 3-25). Sealing water connection and monitoring for the tandem mechanical seal: Fig. 3-24 Unpressurised Rev.0, Printed: 2010.08 Fig. 3-25 Pressurized Page 37 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.3.5 Single standard mechanical seal Function: Seal between medium and the atmosphere. The mechanical seal is lubricated by the medium to be pumped. 145 Type: A1 504 551.2 433.1 Atmosphere Medium Type: A2 914.1 412.5 509 145 433.1 Type: A3 Medium Atmosphere 914.1 914.12 412.5 Fig. 3-26 Single mechanical seal Rev.0, Printed: 2010.08 Page 38 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Item Component Item 145 Adapter 433.1 Mechanical seal (MG12) 504 Component 412.5 O-ring 914.1 Screw Spacer Tab. 3-15 Single standard mechanical seal – type A1-MG12S14 Item Component Item 145 Adapter 433.1 Mechanical seal (MG12) Component 412.5 O-ring 914.1 Screw Tab. 3-16 Single standard mechanical seal – type A2- 578 Item Component Item Component 145 Adapter 433.1 Mechanical seal (MG12) 412.5 O-ring 914.1 Screw 509 914.12 Screw Fastening ring Tab. 3-17 Single standard mechanical seal – type A3 – SR6 Application limits: T max:. . . . . . . . . . . . . . . . . . . . .. . . . . . .. . . . . . . . . . . . . . . . . . 100°C p max:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 bar n max:. . . . . . . . . . . . . . . . . . . . . . . 3000 r.p.m. (3600 r.p.m. at 60 Hz) Bearing support size 42 48 60 75 100 Shaft diameter D[mm] 42 48 60 75 100 Seal diameter D1[mm] 53 60 70 85 115 Tab. 3-18 Sizes – Single standard mechanical seal Rev.0, Printed: 2010.08 Page 39 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.3.6 Stuffing box packing Function: Seal between medium to be conveyed and the atmosphere formed by packing rings and sealing water. 451 902.4 920.4 554.4 458 412.8 524 461 914.1 452 Fig. 3-30 Stuffing box packing Item 412.5 Component Item Component 451 452 Stuffing box casing Stuffing box gland 461 524 Stuffing box packing Shaft protection sleeve 458 Sealing water ring 412.5/8 O-ring 902.4 Bolt 914.1 Tab. 3-24 Screw Stuffing box packing Bearing suppport size 42 48 60 75 100 Shaft diameter D[mm] 42 48 60 75 100 Seal diameter D1[mm] 53 60 70 85 115 Packing diameter D2[mm] 65 70 100 130 Packing [mm] 10x10 10 x10 10x10 12x12 12x12 1+3 1+3 2+3 2+3 Number 80 2+3 Sealing water pressure [bar] 3-5 3-5 3-5 3-5 3-5 Sealing water quantity [l/min] 2 3 3 3 4 Tab. 3-25 Sizes - Stuffing box packing Rev.0, Printed: 2010.08 Page 40 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Sealing water data: Sealing water pressure 3 - 5 bar +inlet pressure Quality Pure water Mechanical contamination: 80 microns max. Temperature 10°C min. - 30°C max. Solids content 2 mg/l max. Tab. 3-26 Monitoring Sealing water data for stuffing box packing In order to guarantee proper operation the sealing water must be monitored with suitable monitoring units according to the diagram (Fig. 3-22). Sealing water connection and monitoring for the stuffing box: Fig. 3-31 Unpressurised Rev.0, Printed: 2010.08 Page 41 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.4 Type specification 3.4.1 Applicable standards Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .ISO 2858 Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .ISO 5199 Inspection (Q, H, NPSH) . . . . . . . . . . . . . . . . . . . . . ISO 9906 Class Product safety . . . . . . . . . . . . . . . .EN 809, EN 12100-1, ISO 12100-2 Flanged drilling . . . . . . . . . . ISO 2084, PN 10 (DIN 2501, SFS 2123) . . . . . . . . . . . . . . . . . . . . . . . ISO 2084, PN 16 (DIN 2501, SFS 2123) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .ISO 2084, PN 25 Special flange bore . . . . . . . . . . . . . . . . . . . . . . . . . . . JIS B2210 10K Special flange bore . . . . . . . . . . . . . . . . . . . . . . . . . . . JIS B2210 16K Special flange bore . . . . . . . . . . . . . . . . . . . . . ANSI B 16.1 Class 125 Special flange bore . . . . . . . . . . . . . . . . . . . . . ANSI B 16.5 Class 150 3.4.2 Model designation ACP 400 - 700 Impeller diameter in Q and H optimum Nominal width of delivery branch (mm) Centrifugal pump Series ACP Fig. 4-33 Type code Type plate Each centrifugal pump has a type plate mounted on the spiral casing showing the main pump data. Q Flow rate ( m3/h) H Head (m) P Motor output (kW) n Motor speed (rpm) C Consistency (%) Spec. gravity (kg/m3) pmax Max. permitted pump pressure at 20°C tmax Max. permitted medium temperature at pmax 20°C Fig. 3-34 Type plate Rev.0, Printed: 2010.08 Page 42 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.5 Application limiting values The limit values shown in the present Chapter should not be exceeded under any circumstances! CAUTION The limit values shown for the centrifugal pump Series “ACP” stated in the present Chapter should not be exceeded under any circumstances. Pressure limit value The maximum permitted pressure for each pump as stated on the rating plate should not be exceeded. Temperature limit value The maximum permitted operating temperature for each pump as stated on the rating plate should not be exceeded. Spiral casing made of steel casing Material 1.4460 Material 1.4408 Temperature [0C] Spiral casing made of steel casing Material 1.4460 Material 1.4408 Temperature [0C] Fig. 3-35 Application limiting values Rev.0, Printed: 2010.08 Page 43 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Shaft seal The application limit for the appropriate shaft seal (Andritz cartridge mechanical seal – single / double, Standard cartridge mechanical seal – single / double, Single standard mechanical seal, Tandem standard mechanical seal, Stuffing box packing, Dynamic shaft seal) can be obtained in writing from the pump manufacturer and is also shown in the data sheet (see Chapter on “Technical Date”) Material to be conveyed/medium The centrifugal pump ACP is used to pump non-combustible liquids and pulps. Before planning the use of combustible liquids (solvent, petrol, alcohol etc.), it is essential to consult ANDRITZ AG beforehand! Lower flashpoints of combustible liquids can lead to hazards due to fire or explosion. Zone allocation Rev.0, Printed: 2010.08 The ACP centrifugal pump is not intended for use in a potentially explosive environment / atmosphere. The ACP centrifugal pump is intended for use outside a zone, according to guideline 1999/92/EG (gases/vapors and dust). A change of zone e.g. to zone 2 or zone 22 must be documented in writing and can entail additional costs as well as delays in delivery. Page 44 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Permitted forces and torques The permitted forces and torques according to Table (Tab.3-27) should not be exceeded. As a general principle, the suction and delivery pipes must be connected up stress-free. We recommend checking this item before initial start-up. The values stated apply to the spiral casing made of steel casing with base frame grouted in. For other designs, the following figures apply: Spiral casing made of grey cast iron with frame grouted in…………………35% of the figures stated Spiral casing made of steel casting Frame not grouted in…………………70% of the figures stated essure Flange Force N Diameter DN 25 32 40 50 65 80 100 125 150 200 250 300 350 400 450 500 550 600 Fy 700 850 1 000 1350 1 700 2 050 2 700 3 200 4 050 5 400 6 750 8 050 9 400 10 750 12 100 13 450 14 800 16 150 Rev.0, Printed: 2010.08 Fz 850 1 050 1 250 1 650 2 100 2 500 3 350 3 950 5 000 6 700 8 350 10 000 11 650 13 300 14 950 16 600 18 250 19 900 Fx 750 900 1 100 1 500 1 850 2 250 3 000 3 550 4 500 6 000 7 450 8 950 10 450 11 950 13 450 14 950 16 450 17 950 Torque N.m ΣFb 1 300 1 650 1 950 2 600 3 300 3 950 5 250 6 200 7 850 10 450 13 050 15 650 18 250 20 850 23 450 26 050 28 650 31 250 My 600 750 900 1 000 1 100 1 150 1 250 1 500 1 750 2 300 3 150 4 300 5 500 6 900 8 500 10 250 12 200 14 400 Mz 700 850 1 050 1 150 1 200 1 300 1 450 1 900 2 050 2 650 3 650 4 950 6 350 7 950 9 800 11 800 14 050 16 600 Mx 900 1 100 1 300 1 400 1 500 1 600 1 750 2 100 2 500 3 250 4 450 6 050 7 750 9 700 11 950 14 450 17 100 20 200 ΣMb 1 300 1 600 1 900 2 050 2 200 2 350 2 600 3 050 3 650 4 800 6 550 8 900 11 400 14 300 17 600 21 300 25 300 29 900 Page 45 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Suction Flange Force N Diameter DN 25 32 40 50 65 80 100 125 150 200 250 300 350 400 450 500 550 600 Tab. 3-27 Fy 750 900 1 100 1 500 1 850 2 250 3 000 3 550 4 500 6 000 7 450 8 950 10 450 11 950 13 450 14 950 16 450 17 950 Fz 700 850 1 000 1 350 1 700 2 050 2 700 3 200 4 050 5 400 6 750 8 050 9 400 10 750 12 100 13 450 14 800 16 150 Fx 850 1 050 1 250 1 650 2 100 2 500 3 350 3 950 5 000 6 700 8 350 10 000 11 650 13 300 14 950 16 600 18 250 19 900 Torque N.m ΣFb 1 300 1 650 1 950 2 600 3 300 3 950 5 250 6 200 7 850 10 450 13 050 15 650 18 250 20 850 23 450 26 050 28 650 31 250 My 600 750 900 1 000 1 100 1 150 1 250 1 500 1 750 2 300 3 150 4 300 5 500 6 900 8 500 10 250 12 200 14 400 Mz 700 850 1 050 1 150 1 200 1 300 1 450 1 900 2 050 2 650 3 650 4 950 6 350 7 950 9 800 11 800 14 050 16 600 Mx 900 1 100 1 300 1 400 1 500 1 600 1 750 2 100 2 500 3 250 4 450 6 050 7 750 9 700 11 950 14 450 17 100 20 200 ΣMb 1 300 1 600 1 900 2 050 2 200 2 350 2 600 3 050 3 650 4 800 6 550 8 900 11 400 14 300 17 600 21 300 25 300 29 900 Permitted forces and torques at the pump flange Rev.0, Printed: 2010.08 Page 46 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Z Y *) F ...Vector sum of forces from: X Z FX, FY and 0.47 * Fz at the delivery flange and FX, FY and 1.0 * Fz at the suction flange Y X **) M ...Vector sum of torques: MX, MY and Mz Fig. 3-36 Coordinates systems for forces and torques at delivery and suction flange Pump Type Diam. Suction Side Flange [mm] Diam. Pressure Side Flange [mm] ACP 65-315 ACP 100-500 100 150 65 100 ACP 65-250 ACP 100-315 ACP 125-400 ACP 150-500 80 125 150 200 65 100 125 150 ACP 100-250 ACP 125-315 ACP 150-400 ACP 200-500 ACP 300-700 125 150 200 250 350 100 125 150 200 300 ACP 125-250 ACP 150-315 ACP 200-400 ACP 400-700 150 200 200 450 125 150 200 400 ACP 250-315 ACP 300-400 ACP 450-550 250 300 450 250 300 450 ACP 600-700 600 600 Fig. 3-37 Diameters of suction and pressure side flanges Rev.0, Printed: 2010.08 Page 47 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.6 Performance limits for bearing supports for different shaft material The performance limit shown in the table for different shaft materials must be observed! Material:1.4462 Tmax=1800C Material:1.4404 Tmax=1300C Material:1.4462 Tmax=600C Material:1.4404 Tmax=1000C Shaft performance limits (kW) Tab. 3-28 Bearing support 42 48 n = 1000 rpm 70 85 n = 1200 rpm 80 60 75 100 230 720 105 270 870 n = 1500 rpm 100 135 330 1180 n = 1800 rpm 125 165 420 1300 n = 3000 rpm 200 - - - n = 3600 rpm 240 - - - n = 1000 rpm 135 175 445 1550 n = 1200 rpm 155 205 520 1880 n = 1500 rpm 205 270 650 2300 n = 1800 rpm 245 340 780 - n = 3000 rpm 400 540 - - n = 3600 rpm 470 - - - n = 1000 rpm 115 151 380 1320 n = 1200 rpm 130 180 450 1580 n = 1500 rpm 170 235 570 1950 n = 1800 rpm 195 280 660 - n = 3000 rpm 345 450 - - n = 3600 rpm 400 - - - n = 1000 rpm 108 140 350 1250 n = 1200 rpm 125 165 420 1480 n = 1500 rpm 160 215 530 1850 n = 1800 rpm 210 260 660 - n = 3000 rpm 325 425 - - n = 3600 rpm 380 - - - Performance limits for different shaft material The shaft material used for each bearing support is shown in the Technical Data Sheet for the individual pump. In case the bearing support is to be used under conditions beyond the values shown in the table (Tab. 4-30), the manufacturer must be contacted first of all and a written response requested. Rev.0, Printed: 2010.08 Page 48 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 3.7 Technological description Definition The centrifugal pump is to be used for an application according to the purchase order specification to convey specified media observing the manufacturer’s instructions. If any changes are made and the pump is to be used for an application not specified, the manufacturer must be contacted beforehand. (e.g. ATEX sector) Fig. 3-38 Centrifugal pump Supply of medium The medium reaches the impeller through a suction pipe that connects up to the horizontal axial flange. Pressure increase The medium is drawn in by the single-flow impeller in axial direction. In the impeller, the medium undergoes radial acceleration–thus obtaining speed energy-due to the rotational energy and the shape of the blades (changing from axial to radial).In the spiral casing the speed energy is converted into pressure energy. The medium then enters the delivery pipe, which is converted into pressure energy. The medium then enters the delivery pipe, which is connected to the vertical outlet flange. Rev.0, Printed: 2010.08 Page 49 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 4 ERECTION and TRANSPORT 4.1 General This chapter describes certain steps for transport, storage and installation of the centrifugal pump which may be the responsibility of the user. Activities which are carried out by ANDRITZ AG, including works assembly, are not the subject of this description. 4.2 Safety regulations Disregarding the safety regulations may cause a risk to life and limb and damage to the machine or its components. All safety instructions in this Chapter must be strictly observed. DANGER General safety Instructions All applicable accident prevention rules must be observed. Do not exceed permissible crane loads and weights on lifting gear and ropes/shackles. Secure loads against falling down. Do not step or walk below suspended loads. Standing below suspended loads is dangerous and thus forbidden. Jerking must be avoided. This refers especially to the handling of pre-assembled machines. Qualification of assigned personnel Transport and unloading to be carried out by personnel especially skilled with such work. Workers entrusted with lifting and conveying equipment must have the required national qualification. Start-up may only be carried out by trained, skilled workers. Personal Protective apparel The following protective equipment must be worn when carrying out start-up and transport work: Hard hat Protective gloves Protective shoes Goggles Tools Only use tools of a reputable brand and in good condition for any work performed on the centrifugal pump. Rev.0, Printed: 2010.08 Page 50 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 4.3 Haulage During transport of the centrifugal pump or loading/unloading (pump may fall). DANGER The loading equipment must bear the name of the manufacturer, the type of material and the permitted load! Do not lift machine and transport crates except at the points marked for lifting by crane or forklift. Do not step or walk below suspended loads. Supply The centrifugal pump is supplied pre-assembled. Machine components and auxiliary material are packed in crates. Transport sizes and weights are stated in the shipping documents. Largest supply weights: /CENTRIFUGAL PUMP/TECHNICAL DATA Acceptance Rev.0, Printed: 2010.08 Check whether supply is complete (against shipping documents and packing list) and in perfect condition. In the event of transport damage or short supply, do not accept goods but notify forwarder and ANDRITZ AG’s shipping department. If there is a hidden defect, notify forwarder and ANDRITZ AG’s shipping department within two weeks. Page 51 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Lifting the entire centrifugal pump The complete centrifugal pump should only be raised as follows after unpacking: The complete centrifugal pump should only be raised if the lifting devices have been attached under the suction and delivery flanges. The lifting devices must be short enough to prevent the centrifugal pump from tilting (Fig. 4-1). Take care to maintain the balance CAUTION Never lift the complete centrifugal pump at the bearing support window only. This could cause a risk to life and limb and damage to the pump. DANGER Fig. 4-1 Lifting the entire centrifugal pump Rev.0, Printed: 2010.08 Page 52 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Lifting the centrifugal pump with free shaft The centrifugal pump with free shaft should only be raised as follows: The pump should only be lifted if the lifting devices have been mounted under the suction branch and at the shaft end. The lifting devices must be short enough to prevent the pump from tilting. Take care to maintain the balance CAUTION Fig. 4-2 Lifting the centrifugal pump Rev.0, Printed: 2010.08 Page 53 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Lifting the pull-out unit Attach lifting slings at the points marked in Fig.5-3 Through the bearing support windows Between the coupling half and the bearing cover Secure sling to lifting hook and tension slightly. Take care to maintain the balance CAUTION Fig. 4-3 Lifting the pull – out unit Rev.0, Printed: 2010.08 Page 54 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 4.4 Storage Short-term storage If the pump is to be stored for less than three months before erection work begins, please observe the following storage instructions. Long-term storage CAUTION Rev.0, Printed: 2010.08 Store the centrifugal pump in a dry place, with suitable protection against dirt and corrosion. Packing should not be removed until erection work begins. If there is no oil or grease in the bearing housing, it must be filled with oil or grease to protect the bearing assembly against corrosion. Rotate the pump shaft manually every 2 weeks to prevent damage to the shaft bearing assembly. If the pump is to be stored for more than three months before erection work begins, please observe the following storage instructions. Store the centrifugal pump in a dry place, with suitable protection against dirt and corrosion. Incidentals should be protected against damage and unauthorized withdrawal by storing in a lockable room. Drain any liquid from the centrifugal pump. Rotate the pump shaft manually every 4 weeks to prevent damage to the shaft bearing assembly. If the centrifugal pump has a casing of grey cast iron and a stuffing box packing, remove the packing cord and coat the stuffing box body with an anti-rust agent. If there is no oil or grease in the bearing housing, it must be filled with oil or grease to protect the bearing assembly against corrosion. The grease or oil in the bearing housing must be renewed before start-up. Anti-rust agents must be removed entirely. Page 55 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 4.5 Installation General Installation takes place in accordance with the sequence plan defined by ANDRITZ AG. Disregarding the sequence plan and the installation instructions may result in hazardous situations causing a danger to life and limb and in machine damage. WARNING The sequence of erection work is important and must be strictly observed. Implementation of the various steps must be documented in the certificate of completion of erection work. The sequence of erection work is shown in step-by-step tables. Individual activities are numbered in their order of precedence. Preservation Those machine components which are not corrosion-resistant should be protected against corrosion with preserving grease. The preservative grease need not be removed. Required documentation at installation site The following supplementary documentation must be available at the beginning of erection work. Foundation and arrangement drawing Assembly drawings Documentation on electrical, measuring and control equipment Parts lists Packing lists for each individual delivery Space requirement for erection work, operation and maintenance will be defined Together with the ANDRITZ AG representative in charge before the beginning of erection work. Ambient temperature during erection work should not be less than 10-15˚ C. Rev.0, Printed: 2010.08 Page 56 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 4.5.1 Erection of the centrifugal pump Foundation The foundation should be made according to ANDRITZ AG’s foundation plan. The following preparations have to be made prior to placing the centrifugal pump on the foundation: Mark axes and levels on the foundation. Check the finish of the foundation before beginning erection work. Mounting and foundation work The foundations are to be laid according to the following table. Step 1 2 3 4 5 6 7 Activity Lift centrifugal pump onto the foundation and place on the support rails. Height of support rails: 50-100mm Raise the pump according to Chapter 4.3,Fig.4-1 Align axes and height of the pump according to the plant requirements. Transfer the fastening points from the base frame to the foundation. Drill block holes and insert dowels. Insert the threaded rod (Item 5) from above and screw on 2 washers and 2 hexagon nuts (Items 4, 6) between the foundation and the base frame. Screw threaded rod (Item 5) into the dowel and tighten with the fastening nut (Item 6). Raise pump unit with the setting nuts (Item 4) and remove the support rails. Set the pump unit with setting nuts and tighten on the base frame with the fastening nuts (Item 3). Cut off and debar the threaded rod with 5 mm allowance. (see Fig. 4-4) Grout base frame in firmly up to the top edge of the special section tube with non-shrinking cast concrete and leave to set (Approx. 2 days). At least concrete strength category according to EN206-1. C16/20 Tab. 4-1 Foundations Rev.0, Printed: 2010.08 Page 57 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Step 8 Activity Mounting the motor: Draw the drilling coupling half flush onto the motor stub and secure on the feather key with a set screw. Mount motor on motor base frame (893). If there are no fastening threads in the motor base frame, transfer the bore holes from the motor and drill the threads accordingly. The axle height of the motor is established by the spacers (898.1). If the centrifugal pump is ordered specifying the motor, the correct spacers will be mounted. Due to the centrifugal pump or components of the centrifugal pump falling during transport on installation site. DANGER Raise centrifugal pump according to the transport instructions in Chapter 4.3. Do not step or walk below suspended loads. Due to parts of the body being jammed or crushed during installation work. Wear your personal protective apparel. DANGER Transport devices that are forgotten may result in risks to life and limb and in damage to the machine. Remove all transport devices. WARNING Rev.0, Printed: 2010.08 Page 58 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Fig. 4-4 Lifting the pull – out unit Item Component Item Component 1 Cast concrete according to EN206-1, C16/20 5 Threaded rod 2 Foundation 6 Fastening nuts 3 Fastening nuts 7 Flush anchor 4 Adjusting nut Rev.0, Printed: 2010.08 Page 59 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 4.5.2 Pipework If pipework is not mounted professionally. DANGER This can result in risks to life and limb and in damage to the machine. Under no circumstances should the centrifugal pump be used to support a pipe! If there is risk of dangerous backflow after the pump is shut down, a reflux check device must be installed in the delivery pipe! WARNING Support When planning the pipework, a supplement must be included for heat expansion. Pipes should always be mounted stress-free. During erection work ensure that the pipes are supported in such a way that no forces, vibrations or weight can be transferred to the pump. Maximum permitted forces and torques that the pump can absorb can be found in the Chapter headed "Technical Description" under "Permitted load on supports". The suction and delivery pipes should be supported in such a way that the weight of the pipe is not transferred to the centrifugal pump. Rev.0, Printed: 2010.08 Page 60 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 4.5.3 Aligning the coupling Data on the coupling used (tolerances, application limits, aligning information, etc.) can be found in the manufacturer's operating instructions. /CENTRIFUGAL PUMP ACPxxxx/ SUPPLIER DOCUMENTATION/COUPLING) 5 1 Fig. 4-5 4 3 Electronic aligning Item Component 1 2 Hub - pump side Hub - motor side 3 Spacer sleeve 2 5 Fig. 4-6 Item 4 5 Conventional aligning Component Flexible part Coupling aligning device The coupling must be aligned with a suitable device. The tolerances observed when aligning the coupling are to be recorded in the erection work report on the coupling. After the coupling has been set, it must be fitted with a coupling guard according to the regulations issued by the authorities. Rev.0, Printed: 2010.08 Page 61 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Suction pipe The following must be observed at the suction pipe: The suction pipe should be kept as short as possible to maintain pipe friction losses at a minimum. Run a pressure test to check the pipe for leaks. The suction pipe should rise or fall slightly towards the centrifugal pump, If a reducing piece is installed directly upstream of the centrifugal pump, the narrowing section thereof should always be at the bottom (Fig. 4-7). Inlet points in the suction pipe should be located at a distance from the centrifugal pump suction flange that is equivalent to a minimum of 5 times the diameter of the suction pipe. For safety reasons the pump must be prevented from starting up while it is opened. (lockable maintenance switch or main switch) Cleaning opening with cover Suction branch (Special accessories) Fig. 4-7 suction pipe After connecting up the suction and delivery pipes stress-free, check alignment of the unit and rotate the impeller by hand. 4.6 Instruments Rev.0, Printed: 2010.08 According to the manufacturers' instructions, the sealing water monitoring unit is to be connected to the sealing water system and to the connections provided at the centrifugal pump. Special accessories (temperature monitoring, vibration measurements, etc.) are to be connected up to the centrifugal pump according to the manufacturer's instructions. Please contact Andritz AG if you have special requirements. Page 62 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 4.7 Electrical equipment Motor and instruments are to be connected up according to the operating instructions provided by the appropriate supplier. /CENTRIFUGAL PUMP ACPxxxx/ SUPPLIER DOCUMENTATION/... The electrical equipment must be installed such that there is no risk of injury to personnel, nor of damage to machines. All regulations in this respect must be observed. Earthing Rev.0, Printed: 2010.08 In addition to protective earthing, the following measures must be observed to protect machine components: Shielded power cables (3-core) with separate protective earth cable for frequency converter drives. The shield for high frequency is to be applied to the motor and to the frequency converter. All machine parts and frequency-inverter fed motors are to be connected with earthing straps. The non-drive side of the motor must have insulated bearings. Frequency converter outlets are fitted with du/dt filters. The regulations issued by the manufacturer of the frequency converter must be observed. Specified cable: NYCWY for all frequency inverter drives. NYCWY is used as power and control cable in all plants, buildings, outdoors, underground, and in water. The use of NYCWY cables is described in VDE 0298 Part 1, the current carrying capacity in HD 603 S1 and VDE 0276 Part 1000. Design: Single or multi-wire conductors, with concentric, ceander-shaped, non insulated copper wire, counter-coil made of copper strip under the outer covering. PVC-core insulation, different core colors according to VDE 0293, common core shielding, outer covering of PVC, standard color black, flame retardant. Cable configuration according to VDE 0295/IEC 60228. Technical data: Minimum bending radius . . . . . . . . . . . . . . . . . . . .12 x cable diameter Temperature range on installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -5°C to +50°C after installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -40°C to +70°C Nominal voltage (U0/U) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.6/1.0 kV Test voltage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 kV Identification code of core . . . . . . . . . . . . . . . . . . . . . . . . . . VDE 0293 Page 63 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 4.8 Cold test Prerequisites The following utilities must be available: Electric power Water Lubrication First filling of lubricant and recording of all further lubrication procedures according to the section headed “Lubrication” in the MAINTENANCE chapter. Machine may be damaged if inappropriate oil or grease grades are used as first filling. CAUTION Cold test Only use oils or greases with the properties listed in the lubrication schedules. Cold test is to be carried out together with the customer’s authorized representative. The work steps listed in the cold test certificate shall be carried out for the cold test, and documented. /ATTACHMENT/CERTIFICATES AND BLOCK DIAGRAMS The cold test should be performed according to the following table. Step Activity Rev.0, Printed: 2010.08 1 To avoid damage to the impeller and the shaft seal, check the pump for any debris. Check by rotating the pump manually through one complete revolution before start-up. 2 Visual check on the pump, particularly the coupling guard, for any deformations. 3 Check whether the bearings have been filled with lubricant. Re-lubricate as described in the Chapter on "Maintenance". 4 Turn on the sealing water supply (tandem mechanical seal, packing). Page 64 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Step Activity 5 Check direction of rotation without medium: Remove the intermediate sleeve of the coupling (see section 4.5.3). Switch the motor and off briefly in order to check the direction of rotation. The motor must rotate in the direction of the arrow provided on the pump casing. Lock out motor Remove the intermediate sleeve of the coupling according to section 4.5.3. Mount coupling guard Switch the motor on and off briefly in order to check the direction of rotation. 6 7 8 Check of rotation with • Thedirection motor must rotate in themedium: direction of the arrow provided on the pump casing. chest, open suction and delivery valves • Fill Lock out motor Open sealing water pipe • Remove the intermediate sleeve of the coupling according to Switch the5.5.3. motor on and off briefly in order to check the section direction of rotation. Mount coupling guard • The motor must rotate in the direction of the arrow provided on the pump casing. Caution: Rotating parts, e.g. the coupling! • Mount coupling guard Fill chest, open suction and delivery valves so that the pump is filled with the medium. Switch motor on and observe for a brief period to see whether everything is running properly. Final inspection The customer and the erection work supervisor shall conduct a final inspection of the installation on completion of the cold tests. Certificates The following certificates are issued after completion of the ISO cold test Rev.0, Printed: 2010.08 Cold test certificate Certificate of completion of erection work. Page 65 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 5 START-UP 5.1 General Initial start-up of the centrifugal pump shall be prepared and carried out by the Contractor or by ANDRITZ AG personnel. Start-up takes place in accordance with the start-up sequence plan and ANDRITZ AG’s start-up routines. Practical training at the machine should also be provided during start-up. Participants must receive instruction on the theory beforehand. 5.2 Safety regulations Disregarding the safety regulations may cause a risk to life and limb and damage to the machine or its components. All safety instructions in this Chapter must be strictly observed. DANGER General safety instructions Start-up shall be carried out under the control of ANDRITZ AG’s start-up supervisor or by the Buyer. All applicable accident prevention rules must be observed. Qualification of assigned personnel Start-up may only be carried out by trained, skilled workers. Personal protective apparel The following protective equipment must be worn when carrying out start-up and erection work: Hard hat Protective shoes Goggles Gloves must be worn when handling aggressive media such as oil, cleaning agent, chemicals, lubricants, white water, etc. Rev.0, Printed: 2010.08 Page 66 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 5.3 Prerequisites for start-up The following must be checked before start-up: Motor may be started up unintentionally. Risk to life and limb and risk of damaging the machine or its DANGER components. DANGER Check for leaks Take care that the motor cannot be started up! The pump and pipework must be leak proof before start-up. Leaks, particularly in the suction pipe, can reduce performance of the pump substantially and interfere with filling of the pump before start-up. Parts of the pump which are under pressure are not considered pressure vessels in terms of the official regulations on pressure vessels. Sense of rotation of motor Before start-up check that the motor is rotating in the right direction. Before checking the sense of rotation of the motor, it is essential to remove the coupling spacer. CAUTION Free rotation The motor must rotate in the direction of the arrow provided on the motor casing. The pump must be able to rotate freely. Here the two coupling halves should be separated from one another. By rotating the pump end coupling half the operator can check whether the shaft can be rotated freely. Rev.0, Printed: 2010.08 Page 67 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Aligning the coupling A further check should be performed to ensure that the coupling is properly aligned. Coupling alignment should then be verified in writing. For assembly and disassembly of the coupling, as well as the tolerances to be observed here, please see: /CENTRIFUGAL PUMP/SUPPLIER DOCUMENTATION/COUPLING Pump lubrication Before start-up, check the lubricant (oil or grease) to be used for the pump and the drive bearing. Due to the pump not being lubricated correctly! DANGER This can result in risks to life and limb and in damage to the machine. The pump should never be operated without a suitable lubricant! If the pump is kept in storage for a longer period before being put into operation, dirt and water may enter the pump kin the meantime. If there are substantial fluctuations in temperature, there may be some condensation. Shaft seal and sealing water Some parameters must be checked in order to ensure that the box mechanical seal is functioning well. Rev.0, Printed: 2010.08 Only clean water from an external source should be used. The maximum particle size of 80 microns must not be exceeded. The maximum solids content of 2 mg/l (ppm) must not be exceeded. The stuffing box mechanical seal must have an adequate supply of sealing water. Throughput 3-5 l/min Page 68 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 5.4 Start-up CAUTION Starting up the centrifugal pump Machine may be damaged by inappropriate starting. All electric interlocks must be functional and checked. If all preliminary requirements (see Chapter 5.3) have been fulfilled, the pump can then be started up according to the following table: Prerequisites 1 Suction pipe and pump casing must be filled with the medium. 2 The pump casing must be vented with the vent screw (903.5) 3 The shaft seal must have an adequate supply of sealing water. 4 6 There must be sufficient sealing water escaping from the stuffing box (30-80 drops/min). The mechanical seal must have a supply of sealing water. The flow of sealing water should only be throttled at the outlet. The valve in the suction pipe is fully open. 7 The valve in the delivery pipe is completely closed. 5 8 Start up pump and open the delivery side valve far enough to obtain the desired flow rate. 9 Check stuffing box to see whether enough liquid is coming out. If not, the stuffing box gland must be slackened right away. If the packing material still becomes too hot after the gland has been slackened, the operator must shut down the pump and look for the cause of the problem. When the stuffing box has been running for approx. 10 minutes without any problems, it can then be tightened again moderately. To set the stuffing box, see Chapter on “Maintenance”. Tab. 5-1 Starting up the centrifugal pump DANGER Rev.0, Printed: 2010.08 If the pump runs dry! This can result in risks to life and limb and in damage to the machine. The pump should never be allowed to run dry under any circumstances, not even briefly. Page 69 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Fist trial run Functioning of the pump must be monitored carefully during the first few Hours in operation. Particular attention must be paid to the following: Temperature of the shaft seal Required amount of sealing water to the shaft seal Bearing temperature and vibration Pressure and flow rate in the pump If there are any unusual noises, it is essential to look for the cause without delay and then eliminate the problem! CAUTION After start-up, the centrifugal pump is handed over to the mill operator in a complete, reliable condition and ready for operation. 5.5 Certificates The following certificates must be completed and signed after start-up: Rev.0, Printed: 2010.08 Start-up certificate: Provisional acceptance certificate: Page 70 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 6 OPERATION 6.1 General This chapter describes the activities required for starting, operating and stopping the centrifugal pump. Possible malfunctions and troubleshooting methods are also presented. 6.2 Safety regulations Disregarding the safety regulations may cause a risk to life and limb and damage to the machine or its components. All safety instructions in this Chapter must be strictly observed. DANGER General safety instructions All applicable accident prevention rules must be observed. Qualification of assigned personnel The equipment may only be operated by qualified personnel. Operating personnel must know where the emergency-off switches and the escape routes are located. Operating the centrifugal pump is not permitted without all the required safety devices Operating personnel must have been instructed in the function and possible failure of machine monitoring equipment, and in carrying out maintenance and inspection work (shift log book, maintenance inspection records). Personal Protective apparel Rev.0, Printed: 2010.08 The following personal protective equipment/apparel shall be used when performing work on the machine (e.g. troubleshooting): Hard hat Protective gloves Protective shoes Goggles Page 71 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 6.3 Control via DCS The centrifugal pump can be started up and operated entirely from the DCS. There is no permanent workspace provided at the pump. 6.4 Starting Prerequisites All preliminary requirements for start-up must be fulfilled before switching on the pump. See: “Start-up” chapter Before starting the centrifugal pump, the following parameters must be fulfilled: The valve in the suction pipe must be fully open.. Suction pipe and pump casing must be filled with the medium to be pumped. If the pump runs dry! This can result in risks to life and limb and in damage to the machine. DANGER The pump should never be allowed to run dry under any circumstances, not even briefly. CAUTION Rev.0, Printed: 2010.08 The shaft seal must have an adequate supply of sealing water. Sealing water quantities: see chapter headed “Description”. With stuffing box seals, there must be sufficient sealing water escaping from the stuffing box. (30-80 drops/min) Immediately after starting up the pump, open the valve in the delivery pipe far enough to obtain the desired flow rate. The required flow rate must always be set using the valve on the delivery side! If the operating pressure (see instruments) is not obtained within a short time, the pump must be stopped again and the cause of the problem found! Page 72 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Automatic starting When using the group start, all of the steps required are implemented automatically by the DCS. Manual start Carry out the following steps for manual start. Step 1 2 3 Activity Open suction-side valve Switch on motor Open delivery-side valve Tab. 6-1 Manual start 6.5 Checks after initial start-up The following items must be checked after initial start-up: CAUTION Rev.0, Printed: 2010.08 Temperature of the shaft seal Required amount of sealing water and required sealing water pressure to the shaft seal Bearing temperature and vibration Pressure and flow rate in the pump If there are any unusual noises, it is essential to look for the cause without delay and then eliminate the problem! Page 73 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 6.6 Normal operation Do not operate without all safety devices ON. DANGER While the pump is in operation the operating personnel should record the relevant data (shift record and data sheets). Activities during normal operations Once per shift The following work has to be performed per shift in normal operation. Component Centrifugal pump, complete Activity Visual check (sealing water, etc.) Tab. 6-2 Activities to be performed in every shift Rev.0, Printed: 2010.08 Page 74 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 6.7 Centrifugal pump requirements (delivery head and flow rate) Sizing The pump sizing (delivery head/flow rate0 refers to the values shown on the pump’s type plate. The values obtainable for head and flow rate can be read off the impeller diameter and the defined operating speed is shown in the performance diagram. If the impeller diameter or speed of the pump is changed, the duty point moves to a different performance curve for head and flow rate. Performance change during operation The power consumption point on the curve can be changed by opening or closing the valve in the delivery pipe further or by altering the pump speed. Do not operate the pump with the valves closed as this may cause damage to the pump! CAUTION Changing the Operating parameters Too low NPSH plant value can cause damage to the impeller! If the operating parameters for which the pump has been sized are changed, the following considerations should also be taken into account: Rev.0, Printed: 2010.08 All parameters for the pump (pressure, impeller diameter…) were sized for the original duty point. These factors should be fully checked for the new operating conditions. The centrifugal pump can be operated for a short time with the delivery valve closed. For continuous operation, however, a minimum flow rate is required. The curve shown in the performance diagram for the required suction pressure (set NPSH pump begins at the point of the permitted continuous minimum flow rate. The inlet characteristics of the system (actual NPSH plant), as well as the drive motor and shaft outputs, must always be checked under changed operating conditions. The efficiency of the pump is the deciding factor in its overall service life, thus the power requirement of the pump must be checked. The performance diagram is based on values with clean water. If other liquids are pumped, the data on delivery head and flow rate, as well as power requirement, may change. These factors were taken into account when the pump was originally selected and should also be considered in the light of any new operating conditions. Page 75 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 6.8 Shutdown Automatic shutdown When using the group stop, all necessary steps are carried out automatically with the DCS. Brief manual shutdown Carry out the following steps to shut the centrifugal pump down manually for a brief period: Stop the pump motor Close the valve in the delivery pipe if necessary Do not switch on the motor during reverse motion by the pump! CAUTION Manual shutdown, e.g. for service purposes Carry out the following steps to shut the centrifugal pump down manually for a longer period: Stop the pump motor Close the valve in the delivery pipe Close the valve in the suction pipe Relieve the pressure in the pump and drain it Flush the pump out if aggressive media are pumped Close sealing water feed If there is a danger of the pump liquid freezing, the pump and pipe should be emptied! CAUTION Rev.0, Printed: 2010.08 Page 76 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 6.9 Operating malfunctions and troubleshooting Malfunction Pump is not pumping medium Insufficient delivery head Possible cause Insufficient pre-filling of pump Steam bubbles forming in suction pipe (NPSH plant) Pressure difference between inlet pressure and steam pressure is too low Air entering the suction pipe, suction port or shaft seal Suction pipe, suction valve or impeller are clogged Speed too low Flow resistance in the pipe is greater than the delivery head generated at the pump Unexpected air/gas content in pumping medium Unexpectedly high viscosity in the medium Suction pipe, suction valve or impeller are clogged Speed too low Wrong direction of rotation Flow resistance in the pipe is greater than the delivery head generated at the pump Pump parts coming into contact with pressure are worn, damaged or clogged Delivery-side valve partly open or closed Remedy Repeat pre-filling of the pump and suction pipe Check the suction pipe Check the suction pipe and the shaft seal Check the suction pipe and the entire pump for clogging Check the speed requirements Check the resistance in the pipe Contact Andritz AG for further instructions Contact Andritz AG for further instructions Check the suction pipe and the entire pump for clogging Check the speed requirements Change sense of rotation of the motor Check and minimize the pipe resistance Check the pump and change any worn or damaged parts if necessary Open valve Tab. 6-3 Operating malfunctions and troubleshooting Rev.0, Printed: 2010.08 Page 77 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Malfunction Inadequate or irregular flow rate High power loss Possible cause Steam bubbles forming in the suction pipe Wrong direction of rotation Net positive suction height (NPSH plant ) is too low Pressure difference between NPSH plant and NPSH pump is too low Air inlet in the suction pipe, suction port or shaft seal Unexpected air/gas content in pumping medium Unexpectedly high viscosity in the medium Suction pipe, suction valve or impeller are clogged Flow resistance in the pipe is greater than the delivery head generated at the pump Pump parts coming into contact with pressure are worn, damaged or clogged Bearing damaged Speed too high Wrong direction of rotation Flow resistance in the pipe is greater than the delivery head generated at the pump Unexpected specific gravitation in pumping medium Unexpectedly high viscosity in the medium Pump shaft bent or running off center Rotating objects or pump parts causing friction in the pump Pump parts coming into contact with pressure are worn, damaged or clogged Remedy Repeat pre-filling of the pump and suction pipe Change sense of rotation of the motor Check whether the suction valve is fully open and the suction pipe clear Check the suction pipe Check the suction pipe and the shaft seal Contact Andritz AG for further instructions Contact Andritz AG for further instructions Check the suction pipe and the entire pump for clogging Check the resistance in the pipe Check the pump and change any worn or damaged parts if necessary Disassemble the pump and change the bearings Check the motor speed Check the sense of rotation of the motor Check the resistance in the pipe Contact Andritz AG for further instructions Contact Andritz AG for further instructions Replace the pump shaft and bearing Disassemble and check the inside of the pump Check the pump and change any worn or damaged parts if necessary Tab. 6-3 Operating malfunctions and troubleshooting Rev.0, Printed: 2010.08 Page 78 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Malfunction Excessive noise and/or vibration Possible cause Pressure difference between NPSH plant and NPSH pump is too low Unexpected air/gas content in pumping medium Air inlet in the suction pipe, suction port or shaft seal Suction pipe, suction valve or impeller are clogged Speed too low Flow resistance in the pipe is greater than the delivery head generated at the pump The pump flow rate is below the permitted minimum level (cavitation) The foundation is too weak Pump is subjected to additional load if the pipe is not adequately supported Pump and motor are not in true alignment Broken or eccentric pump shaft Rotating objects or pump parts causing friction in the pump Pump parts coming into contact with pressure are worn damaged or clogged Bearing worn or loose Insufficient or excessive lubrication Impeller damaged or unbalanced Remedy Check the suction pipe Contact Andritz AG for further instructions Check the suction pipe and the shaft seal Check the suction pipe and the entire pump for clogging Check the speed requirements Check the resistance in the pipe Check the requirements of the pump system Reinforce the foundation Check pipe support Check pump/motor alignment or re-align Replace the pump shaft and bearing Disassemble and check the inside of the pump Check the pump and change any worn or damaged parts if necessary Disassemble the pump and replace the bearings if necessary Check that pump has appropriate lubrication Disassemble the pump and replace the impeller if necessary Tab. 6-3 Operating malfunctions and troubleshooting Rev.0, Printed: 2010.08 Page 79 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Malfunction Excessive wear on bearing Pump overheating/jamming Possible cause Remedy Pump and motor are not in true alignment Check pump/motor alignment or re-align Broken or eccentric pump shaft Rotating objects or pump parts causing friction in the pump Impeller damaged or unbalanced Insufficient or excessive lubrication Bearing not installed properly or dirty Replace the pump shaft and bearing Disassemble and check the inside of the pump Disassemble the pump and replace the impeller if necessary Check that pump has appropriate lubrication Replace bearing assembly if necessary and check the lubricating system for contamination Mount new original bearing Wrong bearing or not the original bearing mounted in the pump Delivery-side valve closed Insufficient pre-filling of pump Pressure difference between NPSH plant and NPSH pump is too low The pump flow rate is below the permitted minimum level (cavitation) Pump and motor are not in true alignment Bearing worn or loose Broken or eccentric pump shaft Impeller damaged or unbalanced Rotating objects or pump parts causing friction in the pump Flow resistance in the pipe is greater than the delivery head generated at the pump Open valve Repeat pre-filling of the pump and suction pipe Check the suction pipe Check the requirements of the pump system Check pump/motor alignment or re-align Disassemble the pump and replace the bearings if necessary Replace the pump shaft and bearing Disassemble the pump and replace the impeller if necessary Disassemble and check the inside of the pump Check and minimize the pipe resistance Tab. 6-3 Operating malfunctions and troubleshooting Rev.0, Printed: 2010.08 Page 80 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7 MAINTENANCE 7.1 General This chapter describes the maintenance and upkeep of the centrifugal pump, which is the responsibility of the machine/mill operator. All activities mentioned in this chapter must be performed at the correct time. The ANDRITZ AG service department is at your disposal for troubleshooting, as well as for extensive maintenance and repair work. (/CENTRIFUGAL PUMP/INTRODUCTION) Workers trained and authorized by Andritz AG may also carry out repairs on site after obtaining consent from AAG. 7.2 Safety regulations Disregarding the safety regulations may cause a risk to life and limb and damage to the machine or its components. All safety instructions in this Chapter must be strictly observed. DANGER General safety Instructions All applicable accident prevention rules must be observed. Sufficient spaced for maintenance work must be included right away in the arrangement drawing. Maintenance and upkeep must not be performed when the machine is in operation, all feed pipes must be closed beforehand. Do not exceed permissible crane loads and weights on lifting gear and ropes/shackles. Secure loads against falling down. Do not step or walk below suspended loads. Standing below suspended loads is dangerous and thus forbidden. If chemicals are used it is crucial to flush out the pump before starting maintenance work in order to avoid chemical burns. Use only genuine spare parts. It is forbidden to repair leaks and defects by plugging, hammering, painting or impregnating! Energy supply Before beginning any maintenance or repair work the operator must disconnect the energy supply to all drives securely. This can be achieved with a maintenance switch, lockable racks in the MCC, or with other suitable measures that comply with the safety regulations. Qualification of assigned personnel Maintenance and upkeep must be carried out by trained and skilled personnel. Work on the electrical equipment must be carried out without exception by skilled electricians. Rev.0, Printed: 2010.08 Page 81 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Personal protective apparel The following protective equipment must be worn when carrying out cleaning and maintenance: Lighting 7.3 Hard hat Protective gloves Protective shoes Goggles The operator shall ensure that adequate lighting is provided (with extra-low voltage bulbs) during service and repair work. Regular maintenance CAUTION Regular monitoring of operations and performance of the centrifugal pump will allow the operator to detect any need for maintenance and repairs in good time. This guarantees a high level of efficiency, a trouble-free operating sequence, and minimizes the maintenance costs! The discharge pressure, flow rate and power consumption should be monitored continuously. For machines operating continuously (24 hours/day, 7 days/week), a prescheduled maintenance period every two weeks is recommended. During these periods the machine should be shut down, thoroughly cleaned and checked for wear. Machines operating less than 24 hours per day should be subjected to these routine checks and cleaned at each stoppage. General machine Checks Rev.0, Printed: 2010.08 The following checks should be made when the machine is at a standstill: Component Checks Shaft seal Leaks and wear Bearing Lubricant quantity (oil level) Static seals Leaks Coupling Wear on the coupling pads Complete pump Visual check Tab. 7-1 General machine checks Page 82 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions In the course of general machine checks all additional units should also be checked to guarantee that the entire plant functions satisfactorily. For these checks, the attached manufacturer’s maintenance and upkeep instructions must be observed. /FANPUMP/SUPPLIER DOCUMENTATION Malfunctions and unforeseen modifications found during these checks must be eliminated immediately Cleaning Clean the impeller by hosing down or brushing when at standstill. Contact with the pulp may cause skin damage and burning. Persons handling the pulp should not suffer from an allergic condition to such substances. WARNING Personal protective apparel must be worn. Do not use caustic agents fro cleaning. Make sure no water, steam or other cleaning medium enters electrical plant components. CAUTION Rev.0, Printed: 2010.08 Page 83 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.4 Maintenance schedule In addition to the work outlined below, maintenance and word required for normal operations (/CENTRIFUGAL PUMP/OPERATION/NORMAL OPEATION) must also be carried out. Monthly The following maintenance work is to be carried out at monthly intervals. Component Bearings Volute casing (upper part – lower part) Shaft with bearing Coupling Activity Check temperature Measure vibrations Oil level Grease level is to be checked Check for strange noises Check for corrosion and wear Stuffing box seal Mechanical seal Pipework Complete pump Check for smooth running Check alignment Check pads for wear Check for leaks Check for wear Check for leaks Check for leaks Cleaning Tab. 7-2 Monthly maintenance work 6-monthly Annually The following maintenance work is to be carried out at 6-monthly intervals Component Activity Complete pump Motor Check mounting of pump on the foundation Check mounting of motor on the foundation Tab. 7-3 -monthly maintenance work The following maintenance work is to be carried out at annual intervals. Component Complete pump Activity Complete service according to instructions form Andritz AG (Oil change Grease change, impeller check, etc.) Tab. 7-4 Annual maintenance work Rev.0, Printed: 2010.08 Page 84 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.5 Fasteners Screw material Bolts and screws are manufactured in several classes of material. The heads of these screws and bolts are marked to identify the strength class of the screw or bolt. Damaged or lost fasters should only be replaced with fasteners of the same material. Check Unless they are suitably tightened, screws can work loose or fail under operating conditions. In the course of maintenance work, all fastening screws must be checked. Tighten During the first six months: After the first six months: every 2 to 21/2 months semi-annually During checks and maintenance work it is imperative to tighten all fastening screws to the torque specified for each screw in the drawings or in the table below. Pre-stressing forces and tightening torques in the table apply to normal screw connections. Please contact Andritz AG in the event of special requirements. The thread and screw head should be lubricated with an appropriate lubricant (for example Molyslide Plus from Loctite). Tab. 7-5 Tightening Torques and Pre-stressing Forces for Rigid Screws(Normal thread) Rev.0, Printed: 2010.08 Page 85 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Wrong torque tightening may cause machine damage and hazards leading to personal injury. CAUTION Rev.0, Printed: 2010.08 The above pre-stressing forces and tightening torques must be observed. Page 86 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.6 Lubrication 7.6.1 Oil lubrication During works assembly the bearings and the oil chamber are filled with a preserving oil providing protection for approximately 6 months. CAUTION Before start-up, oil must be filled up to the middle of the oil inspection glass according to the table (Tab.7-6) There is no need to remove the preserving oil. Lubricating oil brands Lubricating oils Viscosity: 64 cST at 40°C (ISO VG68) Manufacturer Tab.7-6 warning CAUTION Rev.0, Printed: 2010.08 Type BP BP Energol HLP 68 Esso Teresso 68 Mobil D.T.E. Heavy Medium Shell Shell Tellus Oil S 68 Castrol Hyspin AWS 68 Lubricating oil brands If the surface temperature of the bearing housing rises above 800C, Andritz AG should be consulted. Bearing damage may be caused by using the wrong oil! Use only grades according to Tab.8-6. Do not mix different brands or grades of oil. Page 87 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Oil change The first oil change should be carried out after approximately 200 operating hours. After this oil changes should be performed according to Tab. 8-7. Pump speed (n) 1000-1800 rpm 3000-3600 rpm Oil change interval Annually 6-monthly Tab. 7-7 Oil change intervals The oil should be changed at operating temperature. The oil change should be performed according to the following table. Step 1 2 3 4 Activity Open hexagon head screw plug (903.1).and drain the used oil off into a container (suitable size for the oil quantity). Screw in hexagon head plug screws (903.1) again with a new seal (411.1). Dispose of used oil according to the appropriate regulations. Fill in the fresh oil at the vent screw (672).up to the middle of the oil level glass (642). Tab. 7-8 Change oil 672 642 411.1, 903.1 Fig. 7-1 Bearing housing – oil lubrication Rev.0, Printed: 2010.08 Page 88 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Oil quantities The following oil quantities are required, depending on the pump size: Bearing size BS42 BS48 BS60 BS75 BS100 Pump type ACP 100-250 ACP 125-250 ACP 65-315 ACP 100-315 ACP 125-315 ACP 150-315 ACP 125-400 ACP 150-400 ACP 100-500 ACP 200-400 ACP 300-400 ACP 150-500 ACP 200-500 ACP 450-550 ACP 300-700 ACP 400-700 ACP 600-700 Oil quantity (litres) 1 1.7 2.5 6.6 8 Tab. 7-8 Oil quantities The oil level may drop during operation. If an oil level controller is installed, this too must be filled with oil. Rev.0, Printed: 2010.08 Page 89 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.6.2 Grease lubrication The bearings are filled with grease during works assembly. The bearings should be topped up with approx. 2 to 10 g of grease before being put into operation. WARNING Grease types The following lubricating greases should be used for operating conditions at which the surface temperature of the bearing housing is less than +80˚C. Manufacturer Type Exxon Mobil EXXON Beacon 2 Mobilux EP2 Shell SHELL Alvania R3 Shell SHELL Alvania G3 SKF SKF LGMT2 FAG FAG Arcand L71V Tab.7-9 Grease type If the surface temperature of the bearing housing rises above +80˚C Andritz AG should be consulted. WARNING Lubrication The bearings should be re-greased according to the following table. Re-lubrication interval1)(hour) Bearing housing temperature<600C Impeller Coupling Impeller Coupling 740 980 1480 2950 side side side side rpm rpm rpm rpm BS42 85 55 25 15 14000 1000 6500 2500 BS48 135 85 30 20 12000 8000 6000 2000 BS60 230 150 40 25 10000 7500 5000 BS75 300 180 50 30 10000 7500 5000 BS100 500 300 75 55 8500 6000 4000 1) Each 150C increase in the surface temperature reduces the lubricating interval by half Tab. 7-10 Lubrication schedule Bearing First lubrication (g) Re-lubrication (g) Bearing damage may be caused by incorrect lubrication. Different grades of grease should not be mixed. CAUTION Rev.0, Printed: 2010.08 Use only oil grades according to Tab.7-9. Page 90 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Grease change The old grease should be cleaned off the bearing housing after approximately 24,000 operating hours. Then fill the bearing with fresh grease. The grease in the bearings is to be changed according to the `following table. 672 636.1 636.2 903.2 411.2 903.1 411.1 Fig. 7-2 Grease lubricating at the bearing Step 1 2 3 4 Activity Remove the screwed drain plug (903.1) Extract the old grease by suction through the bore holes (903.1). Use a suction device with a flexible suction pipe to extract the grease. Insert the screwed drain plug (903.1) with. new sealing rings(411.1). Top up with fresh grease at the grease nipples (636.1/2) . Grease grade and quantity are should in the Tables(Tab.7-9,Tab.7-9) Tab. 7-10 Grease change Rev.0, Printed: 2010.08 Page 91 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.7 Aligning the coupling The coupling alignment must be checked after each of the following assembly steps and corrected if necessary. In particular: After mounting and before grouting in the pump After grouting in After installing the pipe work After the trial run with water When the bearing support is replaced by a new bearing support If the alignment changes during production, the pump can also be aligned at operating temperature. The coupling must be aligned as described in the chapter on “Erection work” Aligning tolerances Permitted tolerances /CENTRIFUGAL PUMP/SUPPLIER DOCUMENTATION/COUPLING Check Rev.0, Printed: 2010.08 The coupling pads should be checked at least every 4000 to 6000 operating hours. Page 92 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.8 Installing and removing the pull-out unit Preparations The following parts must be prepared before starting to disassemble the pull-out unit: Tools Lifting gear Belts, ropes Replacement parts The pump must be thoroughly cleaned before carrying out any maintenance work. Complete the following work before starting to remove the unit itself: Step 1 2 3 4 Activity Shut down all drives at all poles an secure against accidental start.. Remove the hoses leading to the shaft seal. Remove coupling guard (681), Remove the intermediate coupling piece after loosening the screws. Tab.7-11 Activities before removal Limbs can be trapped or crushed during disassembly work. Wear your personal protective apparel. DANGER Rev.0, Printed: 2010.08 Page 93 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.8.1 Removing the pull-out unit The pull-out unit comprises the complete bearing support (330), casing cover (161), the shaft seal (430), and impeller (230). Remove the pull-out unit according to the following table: Step 1 2 3 Activity Detach bolts (920.3) connecting to the spiral casing (102). Detach bolts (901.3) connecting to supporting leg (183). Attach lifting slings according to Fig. 7-3: Through the bearing support windows Between the coupling half and the bearing housing (350) Secure sling to lifting hook and tension slightly. Caution: Take care to maintain the balance Push the pull-out unit out with the forcing screws (901.2). Set the pull-out unit down in the assembly area. 4 5 Tab.7-12. Removing the pull-out unit Fig.7-3 Lifting the pull-out unit Rev.0, Printed: 2010.08 Page 94 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.8.2 Mounting the pull-out unit Install the pull-out unit according to the following table: Step 1 2 3 4 5 6 7 8 9 Activity Check the impeller (230) and the front lining (135) visually for any defects. Rotate the shaft manually through a complete revolution and check that it is running smoothly. Replace O-ring (412.1) and grease lightly with silicone grease. Turn forcing screws (901.2) back. Attach lifting sling according to Tab. 7-12. Install pull-out unit in the spiral casing (102) and secure with the nuts (920.1). Screw in support leg bolts (901.3) and tighten. Rotate pump manually through a complete revolution and check that it rotates freely and smoothly. If the pump does not rotate smoothly, check the gap between the impeller (230) and the front lining (135). Mount the coupling reduction sleeve (840) and check the alignment. Mount coupling guard (681) and sealing guard.. 10 Tab.7-12. Removing the pull-out unit Rev.0, Printed: 2010.08 Page 95 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.9 Changing the impeller and the front lining GEFAHR Danger of injury at the impeller! Impellers may have very sharp edges, particularly when they are worn. Wear protective clothing and gloves! Limbs can be trapped or crushed during disassembly work! Wear your personal protective apparel! GEFAHR Proceed according to the following table when changing the impeller (230) and the front lining (135).: Step 1 2 3 4 5 6 7 8 Procedure Switch off pump (according to Chapter on "Operation"). Remove pull-out unit according to Section 7.8.1. Open locking plate (931) and impeller nut (901.4). Pull off impeller (230) by pushing it off the casing cover (161). Detach bolts (920.2) at the front lining (135). Push front lining out with forcing screws. Set up pull-out unit vertically with the impeller side up Mount new impeller (230) so that there is a gap of 0.5-1.5mm (according to impeller diameter) between the casing cover (161) and the vanes on the back of the impeller. This gap is obtained by inserting spacers (551.2) of various thicknesses (0.3 - 1.0 mm). 9 Mount new lock washer (931), tighten impeller nut (901.4) and secure. Screw stud bolts (902.2) into the lining and mount the required spacers. Turn back forcing screws and mount front lining in spiral casing (102). Tighten bolts with torque wrench. The gap between impeller (230) and front lining (135) should be 03~0.6mm. Mount pull-out unit according to Section 7.8.2. Start up pump according to Chapter on "Operation". 10 11 Tab. 7-13 Changing the impeller and the front lining Rev.0, Printed: 2010.08 Page 96 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 1 2 Fig. 7-4 Gaps according to impeller diameter Rev.0, Printed: 2010.08 Page 97 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 102 412.2 161 412.1 902.2 135 230 931 901.4 551.2 Fig. 7-5 Impeller and location of gaps Rev.0, Printed: 2010.08 Page 98 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.10 Trimming the impeller The various pump service data are obtained with different impeller diameters. The required diameter for various service data can be found in the pump characteristic diagram or in the data sheet. Before changing an impeller, it must be turned down to the required impeller diameter first of all. When trimming down the impeller vanes, proceed according to the following table: Step 1 2 3 4 Procedure Use spare impeller (always has full diameter and is balanced). Determine the required diameter from the documentation or the new diameter from the characteristic curve. Mark the new diameter on the vane, mill down to the impeller base (leave impeller base with full diameter) and debar. Impellers for speed n=3000rpm and impellers with full diameter greater than 400mm must be statically rebalanced. Tab. 7-15 Turning the impeller Rev.0, Printed: 2010.08 Page 99 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.11 Changing the shaft seals 7.11.1 Changing the Andritz cartridge mechanical seal-single and double To avoid greater damage the mechanical seal must be replaced immediately if there is leakage on the atmospheric side. The pump must always be shut down under the following conditions in order to avoid serious damage: DANGER Sealing water leaking on the atmospheric side Abnormal consumption of sealing water Drop in sealing water pressure Conveying medium in the sealing water If hot and aggressive pumping medium leaks, this may cause a risk to life and limb and damage to the machine or its components. The machine should only be disassembled by qualified and authorized personnel. Change the mechanical seal (433.1) according to the following table: Step 1 2 3 4 5 6 7 8 9 10 11 Procedure Shut down pump according to Chapter on “Operation”. Remove pull-out unit according to Section 7.8.1. Remove impeller as Section 7.9. Loosen screws (914.1) Remove cartridge (433.1) by means of forcing screws. CAUTION: Take care not to lose the spacer plates (551.2) Inspect seal and try to find the reason for the fault (dry running, wear, etc.). if necessary, consult specialists at the seal supplier company. Clean all parts and mount a new seal. Secure cartridge in casing cover (161) with the screws (914.1) Mount spacers (551.2) and impeller (230). Check gap between impeller back vanes and the casing cover (161). As Section 7.9. Mount impeller according to Section 7.9. Mount pull-out unit according to Section 7.8.2. Start up pump according to Chapter on “Operation”. Tab. 7-16 Changing the Andritz cartridge mechanical seal – single and double Rev.0, Printed: 2010.08 Page 100 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 433.1 551.2 Medium Atmosphere 914.1 161 Fig. 7-6 Changing the Andritz cartridge mechanical seal - single 551.2 433.1 Atmosphere Medium 914.1 161 Fig. 7-7 Changing the Andritz cartridge mechanical seal - double Rev.0, Printed: 2010.08 Page 101 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.11.2 Changing the standard cartridge mechanical seal-single and double To avoid greater damage the mechanical seal must be replaced immediately if there is leakage on the atmospheric side. The pump must always be shut down under the following conditions in order to avoid serious damage: Sealing water leaking on the atmospheric side Abnormal consumption of sealing water Drop in sealing water pressure Conveying medium in the sealing water DANGER If hot and aggressive pumping medium leaks, this may cause a risk to life and limb and damage to the machine or its components. Change the mechanical seal (433.1) according to the following table: Step Procedure 1 Shut down pump according to Chapter on “Operation”. 2 Remove pull-out unit according to Section 7.8.1. 3 Remove impeller as Section 7.9. 4 Loosen nuts (920.4) Separate cartridge1) (433.1) and adapter (145). CAUTION: Take care not to lose the spacer plates (551.2 and 504) 5 Loosen nuts (920.1), remove casing cover (161) by means of forcing screws. 6 Take the seal (433.1) out of pump shaft, Inspect seal and try to find the reason for the fault (dry running, wear, etc.). If necessary, consult specialists at the seal supplier company. 6 Clean all parts and change a new seal. 7 Assemble the new seal and casing cover in reverse order. 8 Mount spacers (504 and 551.2) and impeller (230). Check gap between impeller back vanes and the casing cover (161). As Section 8.9. 9 Mount impeller according to Section 7.9. 10 Mount pull-out unit according to Section 7.8.2. 11 Start up pump according to Chapter on “Operation”. 1) Different cartridge seal may have different mounting and dismounting way, please see the individual instruction. Tab. 7-17 Changing the Standard cartridge mechanical seal – single and double Rev.0, Printed: 2010.08 Page 102 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 920.4 504 551.2 433.1 Medium Atmosphere 145 161 Fig. 7-8 Changing the Standard cartridge mechanical seal - single 920.4 504 551.2 433.1 Medium Atmosphere 145 161 Fig. 7-9 Changing the Standard cartridge mechanical seal - double Rev.0, Printed: 2010.08 Page 103 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.11.3 Changing the single standard mechanical seal To avoid greater damage the mechanical seal must be replaced immediately if there is leakage on the atmospheric side. DANGER If hot and aggressive pumping medium leaks, this may cause a risk to life and limb and damage to the machine or its components. Change the mechanical seal (433.1) according to the following table: Step 1 2 3 4 5 6 7 9 10 11 Procedure Shut down pump according to Chapter on “Operation”. Remove pull-out unit according to Section 7.8.1. Remove impeller as Section 7.9. Loosen screws (914.12)1) Remove seal (433.1) CAUTION: Take care not to lose the spacer plates (551.2 and 504 )2) Inspect seal and try to find the reason for the fault (dry running, wear, etc.). If necessary, consult specialists at the seal supplier company. Clean all parts and assemble a new seal in reverse order.. Mount spacers (551.2 and 504)2) and impeller (230). Check gap between impeller back vanes and the casing cover (161). As Section 7.9. Mount impeller according to Section 7.9. Mount pull-out unit according to Section 7.8.2. Start up pump according to Chapter on “Operation”. 1) only type A3 SR6 seal has 914.14 2) type A1 MG12 seal no need 504 Tab. 7-18 Changing the Single standard mechanical seal Rev.0, Printed: 2010.08 Page 104 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 504 551.2 Type: A1 433.1 Type: A2 Medium Atmosphere 551.2 433.1 Type: A3 Medium Atmosphere 914.12 Fig. 7-10 Changing the Single standard mechanical seal Rev.0, Printed: 2010.08 Page 105 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.11.4 Changing the tandem standard mechanical seal To avoid greater damage the mechanical seal must be replaced immediately if there is leakage on the atmospheric side. The pump must always be shut down under the following conditions in order to avoid serious damage: Sealing water leaking on the atmospheric side Abnormal consumption of sealing water Drop in sealing water pressure Conveying medium in the sealing water DANGER If hot and aggressive pumping medium leaks, this may cause a risk to life and limb and damage to the machine or its components. Change the mechanical seal (433.1) according to the following table: Step 1 2 3 4 5 6 7 8 9 10 11 12 13 1) Procedure Shut down pump according to Chapter on “Operation”. Remove pull-out unit according to Section 8.8.1. Remove impeller as Section 8.9. Remove mechanical seal (433.1) on medium side according to section 8.11.3. Loosen screws (914.2),pull back the sealing casing (441) Loosen nuts (920.1), remove casing cover (161) by means of forcing screws. Loosen screws (904), remove set collar (506)1), Remove mechanical seal (433.2) Inspect seal and try to find the reason for the fault (dry running, wear, etc.). If necessary, consult specialists at the seal supplier company. Clean all parts and assemble two new seals in reverse order.. Mount spacers (551.2 and 504)2) and impeller (230). Check gap between impeller back vanes and the casing cover (161). As Section 8.9. Mount impeller according to Section 8.9. Mount pull-out unit according to Section 8.8.2. Start up pump according to Chapter on “Operation”. only type B3 seal has not 506; 2) type B1 seal no need 504 Tab. 7-19 Changing the Tandem standard mechanical seal Rev.0, Printed: 2010.08 Page 106 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 504 551.2 914.2 441 Type: B1 904 433.1 Type: B2 433.2 506 904 Medium Atmosphere 914.2 441 904 Type: B3 433.1 Medium 433.2 412.6 Atmosphere Fig. 7-11 Changing the Tandem standard mechanical seal Rev.0, Printed: 2010.08 Page 107 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.11.5 Changing the stuffing box packing and the shaft protection sleeve The stuffing box packing is a wear part. When the stuffing box gland (452) is approximately 5mm from the parallel surface of the stuffing box casing (451), the packing must be changed. Removing the stuffing box packing When changing the stuffing box packing (461) and shaft protection sleeve (524), proceed according to the following table: Step 1 2 3 4 5 6 7 8 9 Procedure Shut down pump according to Chapter on “Operation”. Remove pull-out unit according to Section 7.8.1. Remove impeller as Section 7.9. Loosen nuts (920.4) and pull back the stuffing box gland(452) Remove old stuffing box packing (461) and pull out of the sealing water ring (458). Clean the stuffing box gland, sealing water ring and packing area thoroughly. Check shaft protection sleeve (524) and replace if worn. Notches or grooves on the surface of the shaft protection sleeve cause excessive wear on the stuffing box packing! Remove spacers (551.2) and shaft protection sleeve (524). Lubricate new original shaft protection sleeve (524) with new o-ring (912.6) using special grease and push onto the shaft up to the shaft collar. Tab. 7-18 Changing the stuffing box packing Rev.0, Printed: 2010.08 Page 108 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 412.6 452 452 452 452 920.4 551.2 912.6 524 461 428 451 Fig. 7-12 Changing the Stuffing box packing Rev.0, Printed: 2010.08 Page 109 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Installing the stuffing box packing Proceed according to the following table when installing the packing: Step 1 2 3 4 5 6 7 8 Procedure Mark packing (see Fig.8-17) and cut to the appropriate length. Keep stuffing box clean, do not stretch or squash stuffing box when measuring and cutting. Wrap the packing round the shaft protection sleeve, then push the first packing ring into the stuffing box, starting at the butt joint. The ends of the ring must form a butt joint with no gap. Push the first packing rings right in using a suitable tool. Install the remaining packing rings and the sealing water ring (458). Mount the remaining packing rings with the butt joints offset by 120 degrees. When the stuffing box gland (452) has been installed, tighten all screws evenly according to the following setting guidelines. Mount impeller according to Section 8.9. Mount pull-out unit according to Section 8.8.2. Start up pump according to Chapter on “Operation”. Tab. 7-19 Installing the stuffing box packing Flush joint, no gap Packing cord Packing marking Fig. 7-13 Marking packing stuffing box packing Rev.0, Printed: 2010.08 Page 110 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Setting the stuffing box The following settings must be observed: Never tighten the stuffing box gland so far that drainage of sealing water is brought to a complete halt. At least a few drops should drain off per minute in order to avoid excessive friction and wear on the shaft. Set the stuffing box such that the shaft protection sleeve at the stuffing box gland is always moist. The stuffing box should be checked every 15 minutes during the first few hours in operation. The stuffing box should leak excessively at start-up and be adjusted for a normal slow leak after the running-in period (approx. 12 hrs)... Loosen the screw at the stuffing box gland if the stuffing box overheats. Do not tighten gland nuts more than 1/6 of a turn in 15 minutes running time. The stuffing box will be damaged if the stuffing box gland is screwed too tight. CAUTION Rev.0, Printed: 2010.08 Only use the tools intended for this purpose! Page 111 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.12 Changing the anti-friction bearings The anti-friction bearings are designed for continuous operation under full load for approximately 50000 operating hours. Higher bearing temperature and vibration at the bearing support are a sign of impending bearing damage. If these symptoms occur, the bearing must be changed. Change the anti-bearings according to the following table: Step 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1) Grease lubrication; Tab. 7-20 Rev.0, Printed: 2010.08 Procedure Shut down pump according to Chapter on “Operation”. Remove pull-out unit according to Section 7.8.1. Remove impeller according to Section 7.9. Dismount shaft seal according to Section 7.11. Remove bearing cover (360), splash ring (507.1/2)1), splash ring washer (550.1/2)1), radial seals (421.1/2)1), bearing isolator (423.1/2)2). Dismount shaft(211), including anti-friction bearing parts(321.1/2), locking plate (931.1) and locking nut (923), oil splash ring (508) Remove the bearing parts on the shaft. Clean the parts to be re-used and prepare new parts (anti-bearings, radial seals, splash ring, bearing isolator) Install the angular contact ball bearings (321.1)onto the shaft by heating (approx.800C), tighten the inner rings of the angular contact ball bearings using the locking plate (931.1) and locking nut (923), Install the oil splash ring (508) Install the deep groove ball bearing (321.2) onto the shaft by hearing (approx.800C) Install the bearing housing vertically with the pump side upwards. Raise shaft vertically on the pump side with ring bolt and from above by turning into the bearing housing. Mount bearing cover (360), with new O-ring (412.1), and new splash ring (507.1/2)1), new splash ring washer (550.1/2)1), new radial seals (421.1/2)1), new bearing isolator (423.1/2)2). Check shaft by rotating in manually. Re-install the bearing support in reverse order. 2) Oil lubrication Changing the anti-friction bearings Page 112 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 321.1 360 636.1 412.1 508 931.1 321.2 636.2 550.1, 421.1, 507.1 550.1 421.1 507.1 211 904.2 923 904.1 Fig. 7-14 Bearing support-Grease lubrication 903.3, 411.3 903.4, 411.4 423.2 423.1 914.10 411.10 914.11 411.11 Fig. 7-15 Bearing support-Oil lubrication Rev.0, Printed: 2010.08 Page 113 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 7.13 Disassembly and disposal DANGER The machine must be disconnected from the power source before disassembly! The machine should only be disassembled by qualified and authorized personnel. If the machine/plant is to be shut down, the following must be taken into account for subsequent disposal: Machine parts • The machine components must be disassembled according to the various materials, lubricant fillings and various forms of contamination. • The materials must be disposed of in accordance with the applicable legislation on waste disposal. • Proof must be brought of the properties and the disposal route of various materials according to the applicable regulations on proof recovery and disposal (e.g. statement and entry in register). Plastic parts WARNING Additives Rev.0, Printed: 2010.08 • Limitations due to the material used • Limitations due to contact with the process water (contamination) • Limitations due to contact with the ambient air (contamination) Compile the necessary documents before disposal and dispose of the materials according to the regulations, observing the documents. Plastic parts are flammable. Observe the local fire protection regulations. When separating the materials, do not work with welding devices or equipment that sparks. Oil, utilities and cleaning agents must also be disposed of according to the local provisions and in compliance with the appropriate manufacturer regulations. Page 114 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions Other metal groups to be separated are: • Surface-treated sheet steel, such as powder-coated or wet-painted covers, etc. • Surface-coated construction steel, such as rotating parts, gratings, bolts, etc. • Copper (electrical grade copper or silver-coated electrical grade copper), such as bush bars, connecting straps, connections pieces, etc. • Cables • Built-in units Rev.0, Printed: 2010.08 Page 115 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions 8 TECHNICAL DATA 8.1 Data sheet 8.2 Characteristic curve 8.3 Dimensional drawing Rev.0, Printed: 2010.08 Page 116 of 117 Centrifugal Pump, ACP series Erection Work, Operating and Maintenance Instructions SUPPLIER DOCUMENTATION 8.4 Coupling 8.5 Shaft seal Rev.0, Printed: 2010.08 Page 117 of 117