Request for Proposal (RFP) - Software Technology Parks of India
Transcription
Request for Proposal (RFP) - Software Technology Parks of India
Software Technology Parks of India Request for Proposal for Computerization of STPI Request for Proposal (RFP) for Selection of System Integrator for Computerization of STPI Tender No. STPIN/PUR/QUO/13-14/04 dated 13th July, 2013 Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 1 Software Technology Parks of India Request for Proposal for Computerization of STPI CONTENTS SECTION 1: IMPORTANT DATES AND DATA SHEET ............................................................ 6 1.1. Important Dates ........................................................................................................... 6 1.2. Data Sheet ................................................................................................................... 6 SECTION 2: INTRODUCTION ................................................................................................... 9 2.1. About Software Technology Parks of India (STPI) ....................................................... 9 2.1.1. STPI - At a Glance ....................................................................................................... 9 2.1.2. Objectives and Functions of STPI ................................................................................ 9 2.2. Brief Scope of Work ................................................................................................... 10 2.3. Call for Tenders ......................................................................................................... 10 2.4. Definitions Used ......................................................................................................... 10 SECTION 3: BACKGROUND INFORMATION ........................................................................ 14 3.1. Project Background: ................................................................................................... 14 3.2. Solution Brief ............................................................................................................. 15 3.3. System Overview ....................................................................................................... 17 3.4. Solution Design Criteria: ............................................................................................ 21 3.5. Project Vision and Objectives..................................................................................... 22 3.6. Stakeholders .............................................................................................................. 23 SECTION 4: INSTRUCTIONS TO BIDDER(S)......................................................................... 24 4.1. 4.2. 4.3. 4.3.1. 4.3.2. 4.4. 4.4.1. 4.4.2. 4.4.3. 4.4.4. 4.5. 4.5.1. 4.5.2. 4.5.3. 4.5.4. 4.5.5. 4.6. 4.6.1. 4.6.2. 4.6.3. 4.7. 4.8. 4.9. 4.10. General Instructions to Bidder(s) ................................................................................ 24 Compliant Proposals / Completeness of Response .................................................... 24 Pre-Bid Meeting and Clarifications ............................................................................. 25 Pre-Bid Conference ................................................................................................... 25 Responses to Pre-Bid Queries and Issue of Corrigendum ......................................... 26 Key Requirements of the Bid...................................................................................... 26 Right to termination .................................................................................................... 26 Procurement of Tender ............................................................................................. 27 Earnest Money Deposit .............................................................................................. 27 Submission of Proposal ............................................................................................. 28 Preparation & Submission of Proposal ....................................................................... 30 Proposal Preparation Cost ......................................................................................... 30 Language of Proposal ................................................................................................ 30 Currency .................................................................................................................... 30 Proposal Submission Venue ...................................................................................... 31 Late Bids .................................................................................................................... 31 Evaluation Process .................................................................................................... 31 Evaluation committee(s) ............................................................................................. 31 Bid Opening ............................................................................................................... 32 Proposal Evaluation ................................................................................................... 32 Corruption or Fraudulent Practices............................................................................. 33 Confidentiality ............................................................................................................ 34 Bid Validity ................................................................................................................. 34 Clarifications on Bid and Authorized Representative .................................................. 34 Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 2 Software Technology Parks of India Request for Proposal for Computerization of STPI 4.11. Disqualification ........................................................................................................... 34 4.12. Modification, Substitution & Withdrawal of Proposal ................................................... 35 SECTION 5: PROPOSAL EVALUATION ................................................................................ 36 5.1. Pre-Qualification (PQ) Criteria.................................................................................... 36 5.2. Technical evaluation criteria ....................................................................................... 39 5.3. Financial Evaluation Criteria....................................................................................... 43 5.4. Confidentiality of Process ........................................................................................... 45 5.5. Corrections of Errors .................................................................................................. 45 SECTION 6: APPOINTMENT OF SYSTEM INTEGRATOR ..................................................... 46 6.1. Letter of Intent (LoI) ................................................................................................... 46 6.2. Award of Contract ...................................................................................................... 46 6.3. Performance Bank Guarantee.................................................................................... 46 SECTION 7: SCOPE OF WORK .............................................................................................. 48 7.1. Detailed Scope of Work ............................................................................................. 48 7.2. Design, Development and Deployment Phase ........................................................... 52 7.3. Data Digitization ......................................................................................................... 62 7.4. Data Migration............................................................................................................ 62 7.5. Business Intelligence and Data Warehousing ............................................................ 63 7.6. Provision of Hardware/ Software by Systems Integrator ............................................. 63 7.7. Disaster Recovery (DR) Site ...................................................................................... 64 7.8. Project Roll-out and Implementation Plan .................................................................. 64 7.9. Training ...................................................................................................................... 65 7.10. Operations & Maintenance Phase .............................................................................. 65 7.11. Compliance to General Specifications of the Solution ................................................ 67 7.12. Deliverables ............................................................................................................... 68 7.12.1. Solution/ Application Development Phase:...................................................................68 7.12.2. Operations and Maintenance (O&M) Phase.....................................................................69 SECTION 8: PROJECT TIMELINES AND MILESTONES ....................................................... 70 8.1. Project Timelines and Milestones ............................................................................... 70 SECTION 9: SERVICE LEVEL AGREEMENTS ...................................................................... 74 9.1. Service Level Agreements (SLAs).............................................................................. 74 9.2. Service Level Monitoring (SLM) ................................................................................. 75 SECTION 10: PAYMENT TERMS............................................................................................ 79 SECTION 11: GENERAL TERMS AND CONDITIONS OF CONTRACT ................................. 81 11.1. 11.2. 11.3. 11.4. 11.5. 11.6. 11.7. Interpretation .............................................................................................................. 81 Communications ........................................................................................................ 81 Project Timeline ......................................................................................................... 81 Systems Integrator’s Roles and Responsibilities ........................................................ 82 Systems Integrator’s Personnel ................................................................................. 84 STPI’s roles and responsibilities ................................................................................ 85 Liquidated Damages .................................................................................................. 85 Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 3 Software Technology Parks of India Request for Proposal for Computerization of STPI 11.8. Use of Contract Documents and Information .............................................................. 86 11.9. Taxes and Duties ....................................................................................................... 86 11.10. Intellectual Property Rights (IPR) ............................................................................... 87 11.11. Ownership and Title ................................................................................................... 87 11.12. Reverse Engineering.................................................................................................. 87 11.13. Confidentiality ............................................................................................................ 87 11.14. Copies ....................................................................................................................... 87 11.15. Software services and license agreements ................................................................ 88 11.16. Confidential information ............................................................................................. 88 11.17. Project Planning and Performance ............................................................................. 89 11.18. Product upgrades....................................................................................................... 90 11.19. Inspection and Testing ............................................................................................... 90 11.20. Commissioning and User Acceptance........................................................................ 90 11.21. Completion Time Guarantee ...................................................................................... 91 11.22. Care of IT products and/or services ........................................................................... 91 11.23. Defect liability ............................................................................................................. 91 11.24. Indemnity ................................................................................................................... 92 11.25. Limitation of Liability ................................................................................................... 92 11.26. Criminal Charges and Conviction ............................................................................... 93 11.27. Litigation .................................................................................................................... 93 11.28. Loss of or Damage to Property; Accident or Injury to Workers ................................... 93 11.29. Insurance ................................................................................................................... 94 11.30. Unforeseen Conditions............................................................................................... 94 11.31. Force majeure ............................................................................................................ 94 11.32. Extension of time for completion ................................................................................ 96 11.33. Suspension ................................................................................................................ 97 11.34. Termination ................................................................................................................ 97 11.35. Effects of Termination ................................................................................................ 99 11.36. Change Orders/Alterations/Variation .......................................................................... 99 i. Change Order .......................................................................................................... 100 ii. Procedures For Change Order ................................................................................. 101 iii. Conditions for Extra Work/Change Order ................................................................. 103 11.37. Exit management ..................................................................................................... 104 11.38. Arbitration ................................................................................................................ 109 11.39. Jurisdiction ............................................................................................................... 110 SECTION 12: ANNEXURE (FORMS AND FORMATS) ......................................................... 111 12.1. Covering Letter – Tender Document (Format) .......................................................... 111 12.2. Bid Check-List .......................................................................................................... 114 12.3. Earnest Money Deposit – Forwarding Letter ............................................................ 116 12.4. Pre-Qualification Document Check-List .................................................................... 118 12.5. Bidder Details .......................................................................................................... 122 12.6. Covering Letter – Technical Bid (Format) ................................................................. 124 12.7. Approach and Methodology ..................................................................................... 126 12.8. Team Composition and Task Assignments .............................................................. 127 12.9. Format Curriculum Vitae (CV) for Proposed Professional Staff ................................ 128 12.10. Format for Experience Details .................................................................................. 130 Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 4 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.11. Work Plan ................................................................................................................ 131 12.12. Resource Deployment Plan...................................................................................... 132 12.13. Covering Letter – Financial Bid (Format) .................................................................. 133 12.14. Format for Financial Quotations ............................................................................... 134 12.15. Format for filling Litigation Details ............................................................................ 136 12.16. Format for Performance Bank Guarantee ................................................................ 137 12.17. Format for Indemnity Bond ....................................................................................... 141 12.18. Non Disclosure Agreement ...................................................................................... 143 12.19. Detailed Bill of Material ............................................................................................ 146 12.20. Draft Agreement....................................................................................................... 147 12.21. Bank Guarantee for Earnest Money Deposit ............................................................ 150 Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 5 Software Technology Parks of India Request for Proposal for Computerization of STPI SECTION 1: IMPORTANT DATES AND DATA SHEET 1.1. Important Dates Date of Publication 13th July 2013 Sale of tender document – Start Date 13th July 2013 Sale of tender document – End Date 12th August 2013 till 17:00 HRS Last date for submission of written queries for clarifications on tender document 20th July 2013 till 17:00 HRS Pre-bid meeting 22th July 2013 at 14:30 HRS Last date for submission of Proposal 13th August 2013 till 15:00 HRS Bid Opening (pre-qualification) 13th August 2013 at 15:30 HRS 1.2. Data Sheet S. No 1. Clause Reference Evaluation Criteria (Section-5.3) Details The method of selection of System Integrator is one which qualify as per the pre-qualification and technical qualification criteria and has Lowest Commercial Quotes (L1) 2. Procurement Tender 4.4.2) of (Section- Tender and Functional Requirement Document (FRD) can be collected from the following address: The Director, Software Technology Parks of India, Ganga Software Technology Complex, Sector – 29, Noida - 201303 Tel: +91- 120-2470502 E-mail: comp@stpi.in by paying the document fee of Rs. 12,000/- (Indian Rupees Twelve Thousand Only) through Demand Draft/ Banker’s Cheque drawn in favor of “Software Technology Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 6 Software Technology Parks of India S. No Request for Proposal for Computerization of STPI Clause Reference Details Parks of India”, payable at Noida, from any Nationalized/ Scheduled Bank. The Tender Document can also be downloaded from website www.stpi.in, www.noida.stpi.in and www.eprocure.gov.in. Interested bidders may obtain the Functional Requirement Document (FRD) on date and address as mentioned above on submission of the document fee. The interested Bidders who have paid the document fee as part of the previous Tender i.e. STPIN/PUR/QUO/1213/07 dated 01.02.2013 are not required to pay the document fee again. They would be required to attach the proof of previous payment along with the bid. 3. Earnest Money Earnest Money Deposit of amount of INR 30,00,000/- (INR Deposit (Section- Thirty Lakh only) in the form of Bank Guarantee from a 4.4.3) Nationalised / Scheduled Bank as per Annexure XXI (Section 12.21) 4. 5. Project Timelines The total duration of the assignment is 45 calendar weeks and milestone for Rollout of the IT solution and 5 years of Operations and (Section-8) Maintenance of the Application. Pre-Bid Conference A pre-bid meeting will be held on above mentioned date at (Section-4.3) STPI, NOIDA. The name address and telephone number of the nodal officer is: The Director, Software Technology Parks of India, Ganga Software Technology Complex, Sector – 29, Noida - 201303 Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 7 Software Technology Parks of India S. No Request for Proposal for Computerization of STPI Clause Reference Details Tel: +91- 120-2470502 E-mail: comp@stpi.in All the Tender related queries should be received by STPI on or before dates as mentioned above in Section 1.1 through post or email. 6. Language proposal of Proposals should be submitted in English language (Section- 4.5.2) 7. 8. 9. Validity of Bid Proposals must remain valid for 180 days after the (Section-4.9) submission date. Proposal Submission Proposals must be submitted no later than date and time (Section-4.4.4) as mentioned above in Section 1.1 Number of copies of Two hard copies (one original and one copy) each of Preproposal (Section- qualification and Technical proposals. 4.4.4 ) One soft copy each of Pre-qualification and Technical proposal on separate non-editable CD. 10. Proposal Submission Address 4.4.4) (Section- The proposal submission address is: The Director, Software Technology Parks of India, Ganga Software Technology Complex, Sector – 29, Noida - 201303 Tel: +91- 120-2470502 E-mail: comp@stpi.in Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 8 Software Technology Parks of India Request for Proposal for Computerization of STPI SECTION 2: INTRODUCTION 2.1. About Software Technology Parks of India (STPI) 2.1.1. STPI - At a Glance India has earned itself a reputation of an IT superpower. Software Technology Parks of India has played a seminal role in accomplishing this status. Today, STPIs across over the country are synonymous with excellent Infrastructure and Statutory support. Software Technology Parks of India (STPI) was established on June 5, 1991. It was registered as an autonomous society under Societies Registration Act, 1860. Having its headquarter in New Delhi, STPI has 53 centres including 9 Directorates across the country. Out of these 53 centres, 45 centres are in Tier II and Tier III cities. STPI maintains internal engineering resources to provide consulting, training and implementation services. Services cover Network Design, System Integration, Installation and Maintenance of application networks and facilities in varied areas. STPI also adheres to ISO 9001:2008 standards. 2.1.2. Objectives and Functions of STPI The objectives of the Software Technology Parks of India are: i. To promote the development and export of software and software services including Information Technology (IT) enabled services/ Bio- IT. ii. To provide statutory and other promotional services to the exporters by implementing Software Technology Park (STP)/ Electronics Hardware Technology Park (EHTP) schemes and other such schemes which may be formulated and entrusted by the Government from time to time. iii. To provide Data Communication services including Value Added services to IT/IT enabled services (ITES) related industries. iv. To promote micro, small and medium entrepreneurs by creating conducive environment for entrepreneurship in the field of IT/ITES. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 9 Software Technology Parks of India Request for Proposal for Computerization of STPI 2.2. Brief Scope of Work This project would include development of a centralized and automated solution to facilitate the delivery of all internal and external activities of Software Technology Parks of India (STPI) and its various stakeholders. The application aims to support the STPI system and processes. This project is envisaged to strengthen the STPI system to ensure adequate and timely delivery/execution of all users related services as well as internal services. 2.3. Call for Tenders STPI invites sealed bids from eligible, reputed, qualified Indian IT firms with sound technical and financial capabilities for “Selection of System Integrator for Computerization of STPI”. Submission of bids shall be done after careful study and examination of the Tender document with full understanding of the project scope and its implications. The eligible Bidder should possess a valid CMM Level 5 certificates, positive net worth with an Annual Turnover of INR 150 Crore during each last three financial years i.e. F.Y. 200910, 2010-11 and 2011-12, of which INR 50 Crore should be from Software/Application development from operation from Indian client in India. Bidder shall also have similar experience that is in automation of the entire organization covering all the process and functions of its branches and sub-branches in the field of IT System Integration Projects including Implementation / Operations for Indian client in India. Along with the above, bidders must also have experience of developing software applications and deployment at a Data Centre. Proposals must be received not later than time, date and venue mentioned in the Data Sheet. Proposals that are received late WILL NOT be considered in this procurement process. STPI may ask the System Integrator to continue the project after 5 years (extension of O&M), if deemed fit by the STPI and mutually agreed by both the parties. The extension will be on annual basis for upto 5 years on same terms and conditions. 2.4. Definitions Used i. STPI - Software Technology Parks of India ii. MCIT - Ministry of Communications and Information Technology Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 10 Software Technology Parks of India Request for Proposal for Computerization of STPI iii. DeitY - Department of Electronics and Information Technology iv. GoI - Government of India v. “The Solution/ Application” means all the software and services, and/or other associated items, which the Bidder is required to supply to STPI as per the Tender. vi. “ Successful bidder/System Integrator (SI)”, SI means the Bidder whose proposal comes out successfully after the complete evaluation process and is awarded the Contract. vii. “STPI Portal” means the front-end for all user facing activities from service requests, utility payments to online interaction with concerned department officials viii. “Authorized Representative” shall mean any person authorized by either of the parties. ix. “Bidder / System Integrator / Contractor” means any firm offering the solution(s), service(s) and /or materials as required in the Tender. The word Bidder/ System Integrator when used in the pre-award period shall be synonymous with parties bidding for this Tender, and when used after award of the Contract shall mean the successful party with whom the STPI signs the agreement for rendering of services for implementation of this project. x. “Letter of Intent” means the letter issued by the purchaser conveying the intent to accept the bid, subject to depositing of Performance Bank Guarantee. xi. “Default Notice” shall mean the written notice of Default of the Agreement issued by one Party to the other in terms hereof. xii. “Law” shall mean any Act, notification, bylaws, rules and regulations, directive, ordinance, order or instruction having the force of law enacted or issued by the Central Government and/ or any other Government or regulatory authority or political subdivision of government agency. xiii. “Party” means the STPI or Bidder, individually and “Parties” mean the STPI and Bidder, collectively. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 11 Software Technology Parks of India xiv. Request for Proposal for Computerization of STPI “Proposal / Bid” means the Technical and Financial Proposals all together, i.e., complete proposal for the Project “Selection of System Integrator for Computerization of STPI” across all the Centres and Sub-Centres of STPI. xv. “Request for Proposal (RFP)” means this document and its annexure etc., seeking a set of solution(s), services(s), materials and/or any combination of them. xvi. “Requirements” shall mean and include schedules, details, description, statement of technical data, performance characteristics and standards (Indian & International) as applicable and specified in the Tender. xvii. “Termination Notice” means the written notice of termination of the Agreement issued by one Party to the other in terms hereof. xviii. “The Letter of Award of Work” means the signed order placed by the Purchaser on the Successful Bidder including all attachments and appendices thereto and all documents incorporated by reference therein. The terms and conditions of the Letter of Award of Work shall be part and parcel of the terms and conditions mentioned in the agreement which shall be signed between STPI and the successful bidder. xix. “The Contract Price” means the price payable to the Successful Bidder under the Letter of Award of Work for satisfactory performance of the Project “Selection of System Integrator for Computerization of STPI”. The deductions on account of penalties if any imposed on the System Integrator shall be deducted before release of payments as per schedule of payments. xx. “User Acceptance Test” is a process of testing the software designed, developed and implemented by the Bidder as per the requirements laid out in the FRD. The test procedures would lead to formal 'acceptance' of new or changed systems. User Acceptance Testing is a critical phase for the project and requires significant participation by the 'End Users'. (To be of real use, an Acceptance Test Plan should be developed in order to plan precisely, and in detail, the means by which 'Acceptance' will be achieved. The final part of the UAT can also include a parallel run to prove the system against the current system). xxi. “Service Level Agreement (SLA)” shall mean the agreements as defined in Section-9 . Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 12 Software Technology Parks of India xxii. Request for Proposal for Computerization of STPI “Agreement” means the Agreement to be signed between the successful bidder and the STPI, including all attachments, appendices, all documents incorporated by reference together with any subsequent modifications, the Tender, the bid offer, the acceptance and all related correspondences, clarifications, presentations. xxiii. “Transaction” shall mean end-to-end activity (a complete process) xxiv. All India rollout of the project means commissioning of the application at all the STPI locations including training and technical support / helpdesk as per the scope. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 13 Software Technology Parks of India Request for Proposal for Computerization of STPI SECTION 3: BACKGROUND INFORMATION 3.1. Project Background: The current operating environment at all the Directorates: a. Existing Applications Currently, STPI has a wide range of user oriented and internal services. Most of these services are manual and involve a lot of paper work. In the current scenario, STPI HQ and Centres have individual websites (primarily for information sharing purposes). These websites have downloadable forms for various activities related to the STPI. In case of support functions such as HR and Administration Group, Finance, Accounts and Billing Group applications do exist though with limited integration at various centres of STPI. Various applications have been developed by STPI to meet the requirements of departments. Currently these applications function independently. All modules are required to be developed in a new platform by System Integrator. A list of the few existing applications is given below: i. HRMS Application - This application is used by HR and Administration department for completing various HR activities. ii. EXIM – This software application is used at certain centres and sub centres for processing of applications received by the Statutory Services Group. This application acts as a database and has no an internal check or workflow management embedded in it. iii. Tally – This application is used for the Payroll, Job Costing, POS Invoicing. iv. Email Application (Existing email application will be retained by STPI) b. Existing Hardware and Network at STPI STPI is also into DataCom services and is also a Class-A ISP to facilitate the IT needs of industries/ institutions/ Government Organizations. At present STPI has a sizeable infrastructure in terms of Desktops/ Laptops at all STPI Centres and Sub-Centres. All the designated officials and the users are having either the Laptop / Desktop at the STPI offices all across the country. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 14 Software Technology Parks of India Request for Proposal for Computerization of STPI c. Existing Users* (Internal and External) at STPI i. About 6,000 External Users ii. About 600 Internal Users We estimate maximum concurrent users (Internal) as 50%. However, bidders are expected to size based on their experience and keeping in view the various SLA parameters. [*This is an indicative number and the actual number may vary] 3.2. Solution Brief System – Salient Features: This section highlights the salient features of the proposed solution for the computerization of STPI. The key components of solution architecture are as follows: a. STPI Front Office Portal and Application b. STPI Back Office Portal and Application c.. Service Delivery Gateway d. IT Infrastructure a. STPI Front Office Portal and Application The Front Office (FO) portal will be the user interface and delivery channel for providing access to STPI services to the users/employees of STPI. The transactions initiated by users and employees of STPI are routed to the Back Office system through a secured and reliable messaging infrastructure i.e. Service Delivery Gateway (SDG). STPI front office Portal is envisaged to act as the primary interface for access to all STPI activities (external and internal) and initiatives and services across various departments. It will enable consolidation of all electronic forms for services by various STPI departments. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 15 Software Technology Parks of India Request for Proposal for Computerization of STPI E-forms will allow online submission and receipt of applications for delivery of various services. An STPI user will be able to download the form via internet through personal computer and submit his/her application electronically. STPI estimates approx. 3 lakh eform transactions per quarter. b. STPI Back Office Portal and Applications Back Office (BO) System provides the user interface to the BO users (STPI employees), processing the transactions submitted through the service delivery channels. The services and the e-forms submitted to Front Office get routed through SDG to the Back Office where they are processed by STPI employees. Direct access to Back Office system is restricted to only SDG and all service delivery channels for STPI services. c. Service Delivery Gateway The Service Delivery Gateway is a critical element of the System Architecture, which provides secured and reliable message routing between STPI services delivery channels (e.g. Front Office portal) and the Back Office system. It is a secure conduit to carry out transactions between the users coming through the various service delivery channels, and the back offices of the STPI. The Gateway itself does not deliver any user services, or host e-Forms/ user related data. It only routes messages to and from the service delivery channels and service provider (Back Office System) in a secured and reliable manner. It is also the only channel for accessing the Back Office system. d. IT Infrastructure The IT infrastructure in the form of Internet Connectivity would be provided by STPI. All other infrastructure necessary for solution development, UAT and roll-out would be arranged and managed by the Systems Integrator. The System Integrator would provide brand new “enterprise class” hardware (from an application point of view) to make the solution “Go-Live”. The acceptance of the infrastructure lies solely with STPI. The Hardware provided by the System Integrator would be OEM supported and would be Application/ Platform Independent. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 16 Software Technology Parks of India Request for Proposal for Computerization of STPI 3.3. System Overview The system overview highlights the solution architecture* for the application for computerization of STPI is provided below: [ * This is a “Generic” Architecture] The architecture has the following key domains: a. Users b. Access Channels c. Application Components i. Gateways ii. Presentation Layer iii. Business Services Layer iv. Data Warehousing and Business Intelligence v. Security Layer Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 17 Software Technology Parks of India Request for Proposal for Computerization of STPI a. Users Various stakeholders i.e. STPI officials, Customers, etc would be able to interact with the proposed technology solution. The user interface should be Graphical User Interface. b. Access channels Access channels are the means through which STPI related information and services related will be available to the users in secured form. These include: Internet: Users and business users would be able to access the non-restricted areas of the application directly over secured channel. Intranet: Users of various STPI centres/ sub-centres would be able access the application through a secured channel. c. Application components i. Gateways The application would employ the following gateways: Web Gateway: A web gateway allows exchange of HTTP messages with other computer systems. The solution would utilize a web gateway to allow users to access the Browser-Based-Application. XML Gateway: An XML gateway allows exchange of XML messages with other computer systems. The application would utilize an XML gateway to route XML messages to/ from external applications. SMTP Gateway: An SMTP gateway provides the capability to send emails to Internet-type email addresses. The application would utilize an SMTP gateway to send emails to various stakeholders in order to update them on the status of their requests. ii. Presentation Layer The key components of the presentation layer include: Content Management: The application would serve as a platform for delivery of official centre-specific information to various stakeholders. The application would Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 18 Software Technology Parks of India Request for Proposal for Computerization of STPI employ content management processes to ensure that the content delivered through the application adheres to the uniform standards across the application. Personalization: The application would provide users with a customized and personalized front-end. It shall allow users to view the information & services based on the user category and user preferences (color, presentation theme) providing the user with a better quality and richer experience. Cache Management: Web caches would be maintained on the web servers to store previous responses. Web caches reduce the amount of information that needs to be transmitted across the network, as information previously stored in the cache can often be re-used, especially in the case of large files like images. This reduces bandwidth and processing requirements of the web server, and helps to improve responsiveness for users of the web. iii. Business Services Layer The application would offer the following services: • Application Services • Incubation Services • Statutory Services • Project Consultancy and Management • HRMS • Finance, Accounting and Billing • Quality Management • Others. (For further details refer the FRD Document) The following table highlights some of the modules with departmental mapping: Module Department Unit Management System EXIM Group DataCom Management System Operations Group and Business Solutions Group Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 19 Software Technology Parks of India Request for Proposal for Computerization of STPI Module Department HR and Administration Management System HR and Administration Group Financial Management System Finance, Accounts and Billing Group Incubation Management System Incubation Group Quality Management System Quality Group Project Management System Project Management and Consultancy Group Procurement Management System Purchase Group iv. Data Warehousing and Business Intelligence: The scope shall also include a Business Intelligence platform that will provide a dashboard for monitoring and measuring business metrics. The solution shall have the capability to generate customized MIS reports at various levels. The proposed DW/BI solution should provide a centralized repository for STPI services and in-house data. It is expected to serve as an MIS repository for STPI. In addition other external stakeholders within Government and other external stakeholders increasingly require complex analytical data inputs. Such requirements can be fulfilled through the DW/BI solution without stressing the operational systems that is likely to impacting their performance. The expected outcomes from the DW/BI solution would be as under: Generation of Standard Reports, Ad-Hoc Report, Customized & Exception Report etc. Facilitate Data Analysis Dashboard for the Senior Management Advanced Search Features Optimised Response Time Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 20 Software Technology Parks of India Request for Proposal for Computerization of STPI The DW/BI solution should have the minimum features: ETL Functionality User Friendly GUI for ease of use Re-usability of Components Capable of Deployment in Real Time and Batch Data Integration Requirements Metadata Management v. Security layer The application would have a centralized security management foundation that would enable delivery of application and data to internal users and external users in a secure manner. Users would be required to login using a username and password to access the application. Access to only those application resources would be provided that the user has authority to. STPI would have strategic control on the application and would control actions and access to resources of all users including privileged users such as application/database administrators. A host based security solution allowing policy-based control would be deployed for the same. The solution would intercept security-sensitive events in real-time and would evaluate their validity before passing control to the operating system. The solution would enable administrators to only have subsets of ‘root’/’super user’ authority and would thus prevent risk of information/data being misused by the administrators. It is expected that all the data shall be encrypted using standard 128-bit SSL standards while transmitting over the internet. Besides this, passwords and other identified confidential information may be store in the database using encryption algorithms. 3.4. Solution Design Criteria: The System Integrator would be required to design solution to meet the following design criteria: i. Scalability: All components of the system must support scalability to provide continuous growth to meet the requirements and demand of the STPI environment. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 21 Software Technology Parks of India ii. Request for Proposal for Computerization of STPI Availability: All the components of the system should have adequate redundancy to ensure high availability of the infrastructure and the application. iii. Inter-operability: The entire system/subsystem should be interoperable, in order to support information flow and integration with heterogeneous applications on various platforms across various stakeholders. The application should support open standards and should be interoperable with heterogeneous technologies. iv. Service Oriented: Service Oriented Architecture (SOA) helps ensure that a group of services are able to talk to each other. These services include Statutory Service Group, DataCom Group, Project Consultancy Group, HR and Administration Group, Finance, Accounts and Billing Group, Quality Management Group, Incubation Group and Purchase Group. v. Performance: The system should be designed to ensure high performance and compliant to the defined service levels. vi. Manageability: The application should provide an efficient way to deploy, configure, upgrade and monitor various STPI specific components and services. vii. Functionality: The application should provide a user-friendly interface. 3.5. Project Vision and Objectives The proposed system will enhance the efficiency, effectiveness and transparency in the overall functionality of STPI. The vision of the proposed system includes the following: i. Delivery of all STPI services in an integrated manner. ii. Increase the use of electronic forms and workflow in parallel with the current paper based processes for faster and better service. iii. Sharing of data/ information. iv. Provision for a common IT infrastructure through consolidation, centralization and standardization. v. Develop the policies and procedures for secure and appropriate access to STPI information by various constituents (e.g., users, other agencies). Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 22 Software Technology Parks of India Request for Proposal for Computerization of STPI vi. Move toward electronic collection and distribution of data and information. vii. Establish a single entry point for multiple services both within and between departments / agencies. viii. Automate the back-office applications (e.g., accounting, personnel, payroll, and procurement etc) used by most departments. ix. Increase data consolidation and analysis of department / agency information for efficient operations (e.g., performance measures, policy enhancement). x. Training of users and technical staff to keep up with changes in technology and systems, and to promote more effective use of technology resources. xi. Provide status reporting, status inquiry and acceptance of payment and various MIS reports as required by the STPI and other stakeholders. xii. Compliance with the Electronic Services Delivery Bill: Refer to Web-Link: http://www.mit.gov.in/sites/upload_files/dit/files/ElectronicsServicesDeliveryBill 2011_14711.pdf for further details) 3.6. Stakeholders The primary stakeholders of this project include: i. Software Technology Parks of India, An Autonomous Society of DeitY, MCIT, GoI. ii. Ministry of Communications and Information Technology, GoI (allocation of Business Rules Pertaining to Department of Electronics and Information Technology - DeitY). iii. Department of Electronics and Information Technology (DeitY), GoI. iv. Other Agencies such as Industry, Academia and Government organizations. v. Customers/ Applicants Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 23 Software Technology Parks of India Request for Proposal for Computerization of STPI SECTION 4: INSTRUCTIONS TO BIDDER(S) 4.1. General Instructions to Bidder(s) i. While every effort has been made to provide comprehensive and accurate background information and requirements and specifications, Bidders must form their own conclusions about the solution needed to meet the requirements. Bidders and recipients of this Tender may wish to consult their own legal advisers in relation to this Tender. ii. All information supplied by Bidders may be treated as contractually binding on the Bidders, on successful award of the assignment by the STPI on the basis of this Tender. iii. No commitment of any kind, contractual or otherwise shall exist unless and until a formal written contract has been executed by or on behalf of the STPI. Any notification of preferred bidder status by the STPI shall not give rise to any enforceable rights by the Bidder. The STPI may cancel this public procurement at any time prior to a formal written contract being executed by or on behalf of the STPI. iv. This Tender supersedes and replaces any previous public documentation & communications, and Bidders should place no reliance on such communications. v. Software Technology Parks of India (STPI), reserves the right to postpone or cancel a scheduled Tender opening at any time. vi. The Tender would be led only by the bidder to whom this Tender has been issued and cannot be transferred to any other entity. vii. Each bidder shall submit only one Proposal. The bidder who submits or participates in more than one Proposal will be disqualified. viii. A power of attorney in the name of the person/ representative signing the bid shall be submitted with the Pre-qualification Bid. ix. The STPI reserves the right to carry out the Capability Assessment of interested bidder(s) and the decision of the STPI shall be final in this regard. 4.2. Compliant Proposals / Completeness of Response a. Bidders are advised to study all instructions, forms, terms, requirements and other information in the Tender documents carefully. Submission of the bid shall be Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 24 Software Technology Parks of India Request for Proposal for Computerization of STPI deemed to have been done after careful study and examination of the Tender document with full understanding of its implications. b. Failure to comply with the requirements of this paragraph may render the Proposal non-compliant and the Proposal may be rejected. Bidders must: a. Include all documentation specified in this Tender. b. Follow the formats of this Tender and respond to each element in the order as set out in the Tender. c. Comply with all requirements as set out within this Tender. 4.3. Pre-Bid Meeting and Clarifications 4.3.1. Pre-Bid Conference a. STPI shall organize a Pre-Bid Conference on the date and time as mentioned in Section 1.1 at Software Technology Parks of India, Ganga Software Technology Complex, Sector – 29, Noida - 201303. b. The prospective bidders shall submit their bid queries in writing to STPI. All the queries should be received at STPI latest by date as mentioned in Section-1.1 through post or email (refer Data Sheet for address and email) only in the format as specified below. BIDDER’S REQUEST FOR CLARIFICATION Name and Address of the Organization submitting request Name and Position of Person submitting request Contact Details of the Organization / Authorized Representative Tel: Fax: Email: S. No Tender Reference(s) (Section, Page) Content of Tender requiring clarification Points of clarification required 1. 2. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 25 Software Technology Parks of India Request for Proposal for Computerization of STPI 4.3.2. Responses to Pre-Bid Queries and Issue of Corrigendum i. The STPI will endeavor to provide timely response to all queries. However, STPI makes no representation or warranty as to the completeness or accuracy of any response made in good faith, nor does STPI undertake to answer all the queries that have been posed by the bidders. ii. Queries received late may or may not be addressed during Pre-Bid Conference. Responses to relevant queries will be uploaded (in the form of corrigendum to the Tender document) on the website (www.stpi.in, www.noida.stpi.in and www.eprocure.gov.in). No agency would be intimated individually about the response of STPI. It is advisable for bidders to attend the pre-bid meeting. iii. The STPI may incorporate any changes in the Tender based on acceptable suggestions received during the Pre-Bid Conference. The decision of STPI regarding acceptability of any suggestion shall be final in this regard and shall not be called upon to question under any circumstances. iv. At any time prior to the last date for receipt of bids, STPI may, for any reason, whether at its own initiative or in response to a clarification requested by a prospective Bidder, modify the Tender Document by a corrigendum. v. The Corrigendum (if any) & responses / clarifications against the queries from bidders will be communicated only through website i.e. www.stpi.in, www.noida.stpi.in and www.eprocure.gov.in vi. Any such corrigendum shall be deemed to be incorporated into this Tender. vii. In order to provide prospective Bidders reasonable time for taking the corrigendum into account, STPI may, at its discretion, extend the last date for the receipt of Proposals. 4.4. Key Requirements of the Bid 4.4.1. Right to Termination Notwithstanding anything contained in this document, means Software Technology Parks of India (STPI) reserves the right to cancel the bid process without assigning any reason whatso-ever, at any time prior to signing the contract and the STPI will have no liability for Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 26 Software Technology Parks of India Request for Proposal for Computerization of STPI above-mentioned actions. The STPI also reserves the right to accept or reject any proposal(s). 4.4.2. Procurement of Tender The bidders are required to purchase the Tender from the following address only: The Director, Software Technology Parks of India, Ganga Software Technology Complex, Sector – 29, Noida - 201303 Tel: +91- 120-2470502 E-mail: comp@stpi.in The Tender document will be available for sale on all working days with in the dates as mentioned in Section 1.1, during office hours, by depositing Demand Draft/ Banker’s Cheque of Rs. 12,000/- (Indian Rupees Twelve Thousand Only), drawn in favor of “Software Technology Parks of India”, payable at Noida, on any nationalized/ scheduled bank. The Tender Document Fee is non-refundable and non-transferable. Kindly note that the Tender document would not be available at any other STPI Centre. Notice Inviting Tender/ Tender Document (along with details on Corrigendum, if any) would be made available for downloading at STPI Website www.stpi.in, www.noida.stpi.in and www.eprocure.gov.in. The interested Bidders who have paid the document fee as part of the previous Tender i.e. STPIN/PUR/QUO/12-13/07 dated 01.02.2013 are not required to pay the document fee again. They would be required to attach the proof of previous payment along with the bid. 4.4.3. Earnest Money Deposit The Bidder shall furnish, as part of its bid, a refundable EMD of INR 30, 00,000/- (Indian Rupees Thirty Lakh only) in the form of a Bank Guarantee from a Nationalised / Scheduled Bank, as per Section-12.21 Annexure XXI. The bid will be disqualified if the EMD or tender fee is not submitted by the bidder. Unsuccessful bidder’s EMD will be released as promptly as possible, but not later than 45 days after the award of the contract to the successful bidder. The successful bidder’s EMD Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 27 Software Technology Parks of India Request for Proposal for Computerization of STPI will be released after signing the Contract and deposit of PBG. No interest will be payable by the STPI on the amount of the EMD. The EMD may be forfeited in following cases: a. If a bidder withdraws his bid or increases his quoted prices during the period of bid validity or its extended period, if any; or b. In the case of a successful bidder, if it fails within the specified time limit to: i. Sign the Agreement or, ii. Furnish the required Performance Bank Guarantee. 4.4.4. Submission of Proposal a. The bidder is required to submit their proposals as per the formats in Section-12 of the Tender. b. All the pages of the pre-qualification documents, technical bid and the commercial bid should be numbered and signed and must bear company seal. c. The Bidder would submit the following along with their proposals: (1) Bid Submission Covering Letter (as per Annexure-I) (2) Bid Check-List (as per Annexure-II) (3) Earnest Money Deposit (EMD) Fee of INR 30,00,000/- (Indian Rupees Thirty Lakh Only) from Nationalized / Scheduled Bank would be submitted in the form of Bank Guarantee as per Section-12.21 Annexure XXI along with EMD Forwarding Letter (as per Annexure-III) (4) Technical Bid Covering Letter (as per Annexure-VI) (5) Financial Bid Covering Letter (as per Annexure-XIII) d. The bid shall be submitted in sealed envelopes as stated below: i. Envelope 1: Superscripted as “Envelope 1 – EMD in the form of Bank Guarantee, Document fee submission proof and Pre-Qualification Proposal for Selection of System Integrator for Computerization of STPI” at the top left corner, containing the following: 1) EMD (In form of Bank Guarantee as per Section-12.21 Annexure XXI); Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 28 Software Technology Parks of India Request for Proposal for Computerization of STPI 2) Proof of Submission of Document Fee 3) Pre-Qualification Proposal. (two Hardcopies - one original, one copy and one CD) 4) The Envelope would also contain Annexure-I to Annexure-V of Section-12. The Envelope would be duly sealed and stamped with a company seal. ii. Envelope 2: Superscripted as “Envelope 2 – Technical Proposal for Selection of System Integrator for Computerization of STPI” at the top left corner, containing the Technical Proposal (2 Hardcopies- one original, one copy and one CD). The Envelope would also contain Annexure-VI to Annexure-XII of Section-12. The Envelope would be duly sealed and stamped with a company seal. iii. Envelope 3: Superscripted as “Envelope 3 – Financial Proposal for Selection of System Integrator for Computerization of STPI” at the top left corner, containing the Financial Proposal. The Envelope would also contain Annexure-XIII, Annexure-XIV and Annexure-XIX of Section-12. The Envelope should be duly sealed and stamped with a company seal. iv. Envelope 4: Superscripted as “ Tender for Selection of System Integrator for Computerization of STPI”. Envelopes 1, 2 and 3 should be placed in this envelope and this envelope would be duly sealed and stamped with a company seal and would be addressed to: The Director, Software Technology Parks of India Ganga Software Technology Complex Sector – 29, Noida – 201303 Uttar Pradesh e. The outer envelope shall be clearly marked in Bold Letters – “DO NOT OPEN BEFORE 15:30 Hrs, 13th August 2013”. f. STPI shall not be responsible for misplacement, losing or premature opening of the outer envelope or any of the 3 (three) inner envelopes. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 29 Software Technology Parks of India g. Request for Proposal for Computerization of STPI All the envelopes shall be sealed properly and stamped with a company seal and shall bear the name of company, complete address. Stapled or temporarily sealed envelopes shall be considered as a case for Rejection of Proposal. h. The Technical Proposal shall contain all the Formats as prescribed in Section-12: Annexure-VI to Annexure-XII of this Tender, duly filled in each page along with all attachments/ schedules duly completed and duly signed by the authorized signatory of the bidder. i. The Financial proposal shall contain all the Formats as prescribed in Section-12: Annexure-XIII, Annexure-XIV and Annexure-XIX of this Tender, duly filled on each page along with all attachments/ schedules duly completed and duly signed by the authorized signatory of the bidder. j. If the proposal is not submitted in the format as prescribed in Section-12 of this Tender, the bid shall be considered as a case for rejection. 4.5. Preparation & Submission of Proposal 4.5.1. Proposal Preparation Cost The bidder shall bear all costs associated with the preparation and submission of its Proposal and STPI will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the proposal process. 4.5.2. Language of Proposal The Proposal, and all correspondence and documents related to the Proposal exchanged by the bidder and the STPI should be in English. Supporting documents and printed literature furnished by the bidder may be in any language other than English provided they are accompanied by an accurate translation of the relevant passages in English language. Supporting material, which is not translated in English, will not be considered for evaluation. For the purpose of evaluation and interpretation of the proposal, the English language translation shall prevail. 4.5.3. Currency The currency for the Proposal offer and the payments shall be in Indian Rupees (INR). Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 30 Software Technology Parks of India Request for Proposal for Computerization of STPI 4.5.4. Proposal Submission Venue Proposals must be submitted no later than date and time as mentioned in Section 1.1 at the following address: The Director, Software Technology Parks of India, Ganga Software Technology Complex, Sector – 29, Noida - 201303 Tel: +91- 120-2470502 E-mail: comp@stpi.in 4.5.5. Late Bids Any Bids received by STPI, after the deadline for submission of Bids prescribed in Tender will be summarily rejected and will be returned unopened to the Bidder. 4.6. Evaluation Process 4.6.1. Evaluation Committee(s) The Evaluation Committee(s) constituted by the STPI shall evaluate the technical and financial proposals. The Committee(s) may choose to conduct discussion with bidders as per procedures of Government of India. The decisions of the Evaluation Committee(s) in the evaluation of Technical and Financial bids shall be final. No correspondence will be entertained outside the process of discussion with the Committee(s). However, STPI reserves the right to modify the evaluation process at any time during the Tender process, without assigning any reason, whatsoever and without any requirement of intimating the bidders of any such change. STPI reserves the right to accept any bid and to annul the Tender process and reject all bids at any time prior to award of Contract, without thereby incurring any liability to the affected bidders or any obligation to inform the affected bidders of the grounds for STPI’s action. The Proposal will be first evaluated on the Pre-Qualification Criteria. After clearing the PreQualification Criteria, the bidder(s) will be eligible for Technical Evaluation. A minimum of 80 marks have to be scored out of a total of 100 marks in Technical Evaluation in order to qualify for the Financial Evaluation. In the financial evaluation, the bidder with the lowest quote will be awarded the project. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 31 Software Technology Parks of India Request for Proposal for Computerization of STPI 4.6.2. Bid Opening The Evaluation Committee or its authorized representative will open the proposals. Sequence of opening shall be as follows: a. On Bid opening date as mentioned in Section-1.1 the main sealed envelope i.e. Envelope-4, superscripted as “ Tender for Selection of System Integrator for Computerization of STPI” will be opened. Further, Envelope-1 containing Earnest Money Deposit (EMD), Document fee, submission proof and Pre-qualification Bid, etc will be opened b. Technical Bid of qualified bidder. c. Financial Bid of the Technically Qualified Bidder after completion of technical evaluation process. Venue for the opening of bids: Software Technology Parks of India, Ganga Software Technology Complex, Sector – 29, Noida – 201303 4.6.3. Proposal Evaluation The evaluation of the proposals will be carried out in three stages: a. Submission of EMD & Document Fee Receipt: The Evaluation Committee will check if the bidder has deposited Proof of payment against procurement of document and EMD in the form of BG. b. Pre-Qualification Evaluation: The bidder shall be examined prima facie to substantiate the compliance with the bidder’s eligibility criteria as set out for this project in terms of organizational, financial and technical experience etc. The bid will be rejected, in case it does not meet the Pre-qualification criteria. The next stage of the evaluation will be an assessment of the technical bid. c. Technical Evaluation: Short-listing of the Qualified Bidder(s) on the basis of PreQualification Criteria, the Evaluation Committee will proceed to a detailed evaluation of the Technical Bids of such qualified bidder(s) in order to determine whether they are substantially responsive to the requirements set forth in the Request for Proposal. In order to reach such a determination, Evaluation Committee will examine Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 32 Software Technology Parks of India Request for Proposal for Computerization of STPI the information supplied by the bidders, and shall evaluate the same as per the evaluation criteria specified in this Tender. d. At the time of Technical Bid Opening, the Evaluation Committee will open all the parts of Technical Proposal of Qualified Bidder(s) e. Evaluation Committee shall review the submitted proposal and a Proposal shall be disqualified at this stage if it does not respond to important aspects of the Tender or if it fails to comply with the technical requirements. f. The Bidders are required to make presentation on technical and operational aspect of the bid. g. After the Technical Evaluation is completed and approved by the competent authority, the Evaluation Committee shall notify the Bidder(s) about the status of their proposal. In case the proposal did not meet the minimum technical criteria and/ or were considered non responsive to the Tender the Financial Proposal will be returned unopened after completing the evaluation process. The Evaluation Committee shall simultaneously notify in writing to the bidders that have complied with the technical criteria specified in the Tender the date, time and location for opening the Financial Proposals. 4.7. Corruption or Fraudulent Practices a. In the event of the bidder engaging in any corrupt or fraudulent practices during the bidding process, as per the judgment of the STPI, the proposal will be rejected. Any decision in this regard will be final and binding on the bidder. b. For the purpose of this clause: “Corrupt Practice” means the offering, giving, receiving or soliciting of anything of value to influence the action of STPI officials in the selection process. It also includes bringing undue influence through any quarter or interfering directly or indirectly in the selection process to affect its outcome. c. “Fraudulent Practice” means a misrepresentation of facts in order to influence selection process to the detriment of the STPI officials. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 33 Software Technology Parks of India Request for Proposal for Computerization of STPI 4.8. Confidentiality a. The bidder shall keep the information related to this bid as confidential. The bidder shall note that the information will be used only for the purposes of this bid and shall not be disclosed to any third party for any reason whatsoever b. At all times during the performance of the services, the bidder shall abide by all applicable STPI’s security rules, policies, standards, guidelines and procedures. The bidder should note that before any of its employees or assignees is given access to the confidential information, each such employee and assignees shall agree to be bound by the term of this bid and such rules, policies, standards, guidelines and procedures. c. The bidder should keep confidential the terms and conditions of this contract and agreement, any amendment thereof, and any attachment or annexure hereof. 4.9. Bid Validity The bids submitted by bidders shall be valid for a period of 180 days from the last date of submission of the bid. On completion of the validity period (180 days), in case required, the STPI would solicit the bidder’s consent to an extension of the period of validity. The request and the responses thereto shall be made in writing by post or email. 4.10. Clarifications on Bid and Authorized Representative To assist in the examination, evaluations, and comparison of Proposals, the committee may, at its discretion, ask any Bidder for clarification of its Proposal. The request for clarification and the response shall be in writing by post or by facsimile, but no change in the price or substance of the Proposal shall be sought, offered, or permitted except as required to confirm the correction of arithmetic errors discovered by the committee in the evaluation of the Proposals. 4.11. Disqualification The bid proposal submitted by a bidder is liable to be disqualified if: a. Non submission of the Bid in accordance with the Tender. b. During validity of the bid or its extended period, if any, the bidder increases his quoted prices. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 34 Software Technology Parks of India Request for Proposal for Computerization of STPI c. Bid received in incomplete form or not accompanied by Earnest Money Deposit. d. Bid received after due date and time. e. Bid not accompanied by all requisite documents. f. Any conditional letter of acceptance of the contract. g. Bidder fails to enter into a contract within 15 days from the issue of Letter of Intent or within such extended period, as may be specified by STPI. h. Bidders may specifically note that while processing the tender documents, if it comes to our knowledge expressly or implied, that a bidder has intended to form a cartel resulting in delay / holding up the processing of tender then the bidders so involved are liable to be disqualified for this contract as well as for a further period of three years from participation in any of the tenders floated by the STPI. i. It is also clarified that if need arises the STPI would go in for appointment of outside party(ies) to undertake the work under the captioned tender. In case any party submits multiple bids or if common interests are found in two or more Bidders, then such Bidders are likely to be disqualified, unless additional bids / bidders are withdrawn immediately upon noticing such things. 4.12. Modification, Substitution & Withdrawal of Proposal a. No proposal may be modified or substituted subsequent to the deadline for submission of proposal. No proposal may be withdrawn in the interval between the deadline for submission of proposals and the expiration of the period of proposal validity specified by the bidder on the Proposal Form. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 35 Software Technology Parks of India Request for Proposal for Computerization of STPI SECTION 5: PROPOSAL EVALUATION 5.1. Pre-Qualification (PQ) Criteria The bidder is required to furnish the supporting documents as proof towards prequalification criteria, failing which the bid may be rejected. The bidder should comply with the following Eligibility Criteria for Pre-Qualification: S. Criteria Documents Required No. 1. The Lead Bidder should be registered a) Certificate of Incorporation under the Companies Act, 1956, and b) Memorandum of Association Lead Bidder should have been in c) Articles of Association existence for the last 5 years in the field of Software/ Application Development and Integration in India. 2 The Lead Bidder should have positive net worth and an overall annual a) Statutory Auditor’s Certificate mentioning: turnover of not less than INR 150 Crore Net-Worth, Annual Turnover and during each of the last three financial Turnover from software/ application years. Out of which INR 50 Crore development and Integration for should be from Software/ Application bidding entity. Development and Integration in each of the last three financial years from Indian operations. (F.Y. 2009-10, 201011 and 2011-12 respectively). b) Copy of the audited profit and loss account/ Statutory Auditors Certificated letter/ certified balance sheet/ annual report (reflecting overall turnover and the turnover specific to services/product lines) of the last three financial years counter signed by Statutory Auditor 3. The Lead Bidder must possess a valid Copy of valid CMM Level 5 Certificate Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 36 Software Technology Parks of India S. Criteria Request for Proposal for Computerization of STPI Documents Required No. Certification in the Capability Maturity Model (CMM Level 5). 4. The Lead Bidder should have an active Copy of valid ISO 9001:2008 certificate ISO 9001:2008 certification at the time or equivalent certification of submission of the bid ( lead bidder has to ensure that the certificate has to remain valid during the life cycle of the project) 5. The Lead Bidder should have minimum Self certificate signed by the Authorized 150 technically qualified professionals Representative of the Lead Bidder on its payrolls as on Bid Submission should be submitted. Date 6. The Lead Bidder must have experience The lead Bidders shall submit: in the following criteria: (i) The Lead Bidder should have (i) Work Order/ Agreement/ with addendums/ amendments (if similar experience (automation of any), highlighting the value of the entire organization covering all order. the process and functions of its (ii) Project Completion Certificate branches and sub-branches) in mentioning Project Description, the field of IT System Integration start & end date of the project Projects including Implementation and financial value of the project. / Operations with at least one completed IT project in last 3 years (from the date of publishing of Tender) worth INR 12 Crore in India for Indian client. (iii) Letter of acceptance by client / letter of appreciation by client / Satisfactory Certificate by client against each project or Performance mentioning Project description, start & end date of Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 37 Software Technology Parks of India S. Request for Proposal for Computerization of STPI Criteria Documents Required No. The Lead Bidder must have the project and financial value of similar experience (automation of the project. the entire organization covering all the process and functions of its branches and sub-branches) in the field of IT System Integration Projects including Implementation / Operations with at least 3 completed IT project in last 3 years (from the date of publishing of Tender) in India worth INR 6 Crore (each) or more in India for Indian client. 7. The Lead Bidder should have the The lead Bidders shall submit: experience of developing software (i) Work Order/ Agreement/ with applications and deployment at a Data addendums/ amendments (if any), Centre with a minimum of 250 users on highlighting the value of order. the same in last 3 years (from the date of publishing of Tender) in India for Indian client. (ii) Letter of acceptance by client / letter of appreciation by client / Satisfactory Performance Certificate by client against each project mentioning Project description, start & end date of the project and financial value of the project. (iii) Self Certificate for Number of Users with documentary proof Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 38 Software Technology Parks of India S. Request for Proposal for Computerization of STPI Criteria Documents Required No. 8. Banned or Blacklisted Companies by An undertaking to this effect, signed by any State / Central Government or any authorized signatory, has to be Government Institutions in India will not submitted by the lead Bidder. be eligible to participate. 9. The lead Bidder should have an office Supporting documents to be provided / in Delhi/NCR undertaking from an authorized signatory. 10. Permanent Account Number (PAN) of Supporting documents to be provided lead Bidder available from Income Tax authorities. 11. Consortium/Sub-Contracting only to the extent of data digitization is allowed. The lead Bidder is required to provide consortium agreement / letter from the sub-contractor for the same. 12. Power of Attorney 5.2. Technical Evaluation Criteria Technical proposals shall be evaluated for only those bidders who met the Pre-qualification criterion. The evaluation committee will evaluate the Technical Proposals on the basis of the technical evaluation criterion as provided below. During the technical evaluation, the responses provided in technical proposal will be evaluated out of 100 marks. The bidder will have to score at least 80% marks to be declared as technically qualified. Any proposal achieving a Technical Score less than 80% will be treated as “Not Technically Qualifying the Requirements” and will not be considered for further evaluation of the financial proposals. The bidder attaining Zero in any of the Technical Criteria may lead to disqualification of the Bid. Only the technically qualified bidders will be informed for opening of the financial bid. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 39 Software Technology Parks of India Request for Proposal for Computerization of STPI 5.2.1. Technical Evaluation Criteria – Compliance matrix A detailed evaluation of the bids shall be carried out in order to determine whether the bidders are competent enough and whether the bidder’s Proposal technically qualifies to the requirements set forth in the Tender. Bids received would be assigned scores based on the parameters defined in the table below: S. No 1. Criteria / Sub-Criteria Understanding of the Tender Description / Response expected Maximum from bidder marks Assumptions, Expectations, 5 Specimen/ Typical Output 2. Experience in handling similar For each project citation, the Projects (automation of the entire following marks would 15 be organization covering all the process awarded and functions of its branches and sub-branches) Integration in projects IT System including Project Value more than 25 Cr - 15 Marks implementation / operations should have been successfully completed in Project Value more than 12 Cr last 3 years (from the date of and less than or equal to 25 Cr publishing of Tender) in India for - 6 Marks Indian client Remark: Attach work order and Project Value more than 6 Cr completion certificate for each and less than or equal to 12 Cr project. Maximum of 10 project - 2 Marks citations only 3. Experience of managing applications and systems deployed No. of Users more than 1000 5 - 5 Marks at a Data Centre (of that particular Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 40 Software Technology Parks of India S. Request for Proposal for Computerization of STPI Criteria / Sub-Criteria No application or systems), Description / Response expected Maximum from bidder marks No. of Users more than 500 and successfully completed or ongoing less than or equal to 1000 in last 3 years (from the date of - 3 Marks publishing of Tender) No. of Users more than 250 and in India for Indian client less than or equal to 500 - 2 Marks Remark: Attach work order and/ or completion certificate for each project along with self certificate for No. of Users with documentary proof 4. Experience in handling Application No. of Projects more than 5 10 Development projects for distributed - 10 Marks environment worth INR 5 Crore or more in last 3 years in India for Indian client No. of Projects more than or equal to 3 and less than or Remark: Attach work order and equal to 5 completion certificate for each - 5 Marks project) 5. Experience in Maintenance of No. of Projects more than 10 15 software and database management - 15 Marks in India for Indian client in last 3 years No. of Projects more than 5 and less than or equal to 10 - 10 Marks Remark: Attach work order and completion project certificate for each No. of Projects more than or equal to 3 and less than or equal to 5 - 5 Marks Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 41 Software Technology Parks of India S. Criteria / Sub-Criteria No 6. Approach and Methodology Request for Proposal for Computerization of STPI Description / Response expected Maximum from bidder marks Assessment of technological & 15 managerial understanding of bidder based on criteria like a) Proposed Solution Architecture* b) Bidder’s Proposed Work Plan (as per Section-12.11) and Timelines c) Understanding of risk factors and mechanism to mitigate them 7. Details of Project Team and CVs of Bidder’s Resource Deployment Resources dedicated for this project 10 Plan (as per Section-12.12) and the details of the proposed resources for the entire duration of the project. 8. Un-priced Detailed Bill of Material Clear Item wise details as per (BOM) with description and Quantity Section-12.19** of complete IT Infrastructure 5 (Hardware and Software) 9. Technical Presentation before the To assess the complete solution technical evaluation committee 20 proposed by the bidder through direct interaction and clarifying queries (if any) Total Marks Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. 100 Page 42 Software Technology Parks of India Request for Proposal for Computerization of STPI * Solution Architecture: It should comprise of all the details of various components involved including the hardware, software, manpower etc. The solution should cover all the aspects of the application software & database regarding its design, performance, compatibility, robustness, security etc. and also how the same will be implemented and ensured. Any additional component, third party software’s working and functioning should also be given in detail. It should comprise of the server landscape. Also to be included are the abstract/ logical view of the complete system and also separately depicting the architecture/ design for network, system and security levels, including the complete O&M with generic specifications. ** If any upgrade is available at the time of delivery of items as specified in the BOM, the upgraded hardware/software shall be provided after the acceptance of STPI. 5.3. Financial Evaluation Criteria The Evaluation Committee will open and evaluate the Financial Proposal of the Technically Qualified Bidders. The Financial quotation should consist of the cost of all the software, hardware, manpower, operation & maintenance cost. The financial evaluation will take into account the information supplied by the Bidders in their financial proposal. 5.3.1. The Financial Bids will be opened by Evaluation Committee in the presence of Bidder(s)/ representative. The date and time of the same shall be communicated to all the Technically Qualified Bidders. 5.3.2. The Bidder offering the “Lowest Commercial Quotes (L1)” shall be awarded the contract and would be termed as “Systems Integrator”. 5.3.3. Methodology for Financial Evaluation I. For all financial bids a Weighted Average Cost would be arrived at, using the formula; Weights Service Charge (I) = 0.4 CAPEX + OPEX (II) = 0.6 Net Cost = 0.4 X (I X 9,50,000 X 5) + 0.6 X II + 10 X B Where Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 43 Software Technology Parks of India Request for Proposal for Computerization of STPI I is the weighted average transaction rate of Service charge quoted II is cost of CAPEX and OPEX being asked for by the bidder B – Man Month rate for additional work (1 Man-Month= 22 working days) for 10 months Currently about 9,50,000 annual transactions (for external users) are being estimated which may vary in future. II. Bidder with the lowest Net Cost would be considered as the L1 bidder. Example Financial Bid of Bidder A I Type of Service Per transaction rate of Service Charge Quoted (in Rs.) Weight a. High Volume Services Rs. 10.00 0.95 b. Low Volume Services Rs. 50.00 0.05 I Wt average charge (=0.95a + 0.05b) Rs. 12.00 II Cost of Core Components (in Rs.) Component Amount in figures (in Rs.) Amount in Words a. CAPEX Rs. 8,00,00,000.00 Eight Crore only b. OPEX Rs. 1,00,00,000.00 One crore only II Cost of Core Component (a + b) Rs. 9,00,00,000.00 Nine crore only B. Man-Month Rate Rs. 1,00,000.00 Net Cost of Financial Bid 0.4 X (Wt Average Charge X 9,50,000 X 5) + 0.6 X (Total of CAPEX & OPEX) + 10 X Man-Month rate Net Cost of Financial Bid Rs. 7,78,00,000.00 a. Project Cost Recovery for the System Integrator 7,12,500 Transactions (25% less than estimated) Estimated - 9,50,000 transactions 11,87500 Transactions (25% more than estimated) Through Service Rs. 4,27,50,000.00 Rs. 5,70,00,000.00 Rs. 7,12,50,000.00 Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 44 Software Technology Parks of India Request for Proposal for Computerization of STPI Charge b. 5.4. CAPEX + OPEX Rs. 9,00,00,000.00 Rs. 9,00,00,000.00 Rs. 9,00,00,000.00 Net Recovery Rs. 13,27,50,000.00 Rs. 14,70,00,000.00 Rs. 16,12,50,000.00 Additional Through change order Rs. 10,00,000.00 Rs. 10,00,000.00 Rs. 10,00,000.00 Confidentiality of Process Information relating to the examination, clarification, evaluation and comparison of Proposals, and recommendations for the award of the project shall not be disclosed to Bidders or any other persons not officially concerned with such process until the award to the System Integrator offering the lowest quotes has been announced. 5.5. Corrections of Errors Bidders are advised to exercise greatest care in entering the pricing figures. No requests regarding correction of mistakes in the financial bids will be entertained after the quotations are opened. All corrections like cutting or overwriting etc., if any, should be initialed by the person signing the tender form before submission, failing which the figures for such items may not be considered. Arithmetic errors in bids will be considered as follows: I. Where there is a discrepancy between the amounts in figures and in words, the amount in words shall govern. II. Where there is a discrepancy between the unit rate and the line item total resulting from multiplying the unit rate by the quantity, the unit rate will govern unless, in the opinion of the evaluation committee, there is obviously a gross error such as a misplacement of a decimal point, in which case the line item total will govern. III. Where there is a discrepancy between the amount mentioned in the bid and the line item total present in the Schedule of Prices, the amount obtained on totaling the line items in the Bill of Materials will govern. The amount stated in the proposal, adjusted in accordance with the above procedure, shall be considered as binding, unless it causes the overall tender price to rise, in which case the bid price shall govern. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 45 Software Technology Parks of India Request for Proposal for Computerization of STPI SECTION 6: APPOINTMENT OF SYSTEM INTEGRATOR 6.1. Letter of Intent (LoI) A letter of intent shall be issued in the first instance informing the System Integrator to the decision of the competent authority to accept his bid and the award letter shall be issued only after submission of Performance Bank Guarantee. In case of failure by the bidder to furnish the Performance Bank Guarantee within the specified period, STPI shall without prejudice to any other right or remedy available in law, be at liberty to forfeit the Earnest Money Deposit absolutely and the letter of intent shall be considered withdrawn. 6.2. Award of Contract On submission of the Performance Bank Guarantee, the Successful Bidder will be required to sign an agreement with STPI as per draft placed at Section-12.20 of the Tender on provisioning of Letter of Intent within the date as specified by STPI. The prospective bidder will be deemed to have entered in the contract only after formally signing contract documents and submission of Performance Bank Guarantee. 6.3. Performance Bank Guarantee i. System Integrator shall deposit an unconditional and irrevocable Performance Bank Guarantee (PBG) from a Nationalized bank/ Scheduled Bank is acceptable to STPI, payable on demand, for the due performance and fulfillment of the contract by the Systems Integrator, within 15 days from the date of issuance of LoI. The format of the Performance Bank Guarantee is given in Section-12.16, Annexure XVI ii. The Performance Bank Guarantee shall be denominated in the currency of the contract, i.e. Indian Rupees (INR). iii. This Performance Bank Guarantee will be valid for the entire Project Duration, i.e. period of 45 Weeks (Development Phase) + 5 years (Operation and Maintenance Phase, post Roll Out across all STPI centres) + 1 year from the award of the contract. The Performance Bank Guarantee amount would be 10% of the Total Contract Value. PBG is subject to the terms and conditions in the Performance Bank Guarantee, at the end of the above mentioned period, the Performance Bank Guarantee will lapse automatically. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 46 Software Technology Parks of India iv. Request for Proposal for Computerization of STPI All charges whatsoever such as premium; commission etc. with respect to the Performance Bank Guarantee shall be borne by the Systems Integrator. v. The Performance Bank Guarantee may be discharged / returned by the STPI, upon being satisfied that there has been due performance of the obligations of System Integrator under the contract. However, no interest shall be payable on the Performance Bank Guarantee. vi. In case of extension of the project timeline, the System Integrator has to submit the renewed PBG with the new validity before one week of the expiry of the old PBG. vii. In the event of the System Integrator being unable to service the contract for whatever reason, the STPI would evoke the PBG. Notwithstanding and without prejudice to any rights whatsoever of the STPI under the Contract in the matter, the proceeds of the PBG shall be payable to the STPI as compensation for any loss resulting from the Systems Integrator’s failure to complete its obligations under the Contract. The STPI will notify the System Integrator in writing of the exercise of its right to receive such compensation within 14 days, indicating the contractual obligation(s) for which the System Integrator is in default. viii. The STPI shall also be entitled to make recoveries from the System Integrator’s bills, performance bank guarantee, or from any other amount due to him, the equivalent value of any payment made to him due to inadvertence, error, collusion, misconstruction or misstatement. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 47 Software Technology Parks of India Request for Proposal for Computerization of STPI SECTION 7: SCOPE OF WORK 7.1. Detailed Scope of Work The scope of work for this project would include development of a centralized and automated solution to facilitate the delivery of all internal and external activities of Software Technology Parks of India (STPI) and its various stakeholders. The application aims to support the STPI system and processes. This project is envisaged to strengthen the STPI system to ensure adequate and timely delivery/execution of all users related services as well as internal services. A Functional Requirement Document (FRD) would be provided to the interested Bidder(s) to have a brief overview on the scope of the project. The System Integrator would be required to design, develop, implement and maintain an end-to-end solution for Computerization of STPI. The System Integrator bidders need to develop the solution/application in the premises of STPI, Noida only. The System Integrator would be required to revalidate the existing Systems Requirement Specification (SRS) which would be provided by STPI. Application will be used by STPI officials. The primary site for the hosting of the application would be Noida. The Disaster Recovery site would be Bangalore or the site decided by STPI. The Solution should be based upon the latest Open Standard/ Market Proven Technology(ies) at par with International Standards. The application software should be certified by STQC (or equivalent certification by a similar Government Agency) for the quality assurance. STPI shall bear the cost of certification. Scope of Work for the Computerization of STPI would include, but not limited to: i. The System Integrator would understand all the documents (including the FRD document) made available by STPI, re-validate existing System Requirement Specification Document (SRS) and prepare of a System Design Document (SDD). ii. The revalidated SRS and the prepared SDD would require acceptance of STPI. iii. The successful bidder would be required to Design, Develop and Integrate software and all related applications. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 48 Software Technology Parks of India iv. Request for Proposal for Computerization of STPI The successful bidder is required to ensure testing, modification and user acceptance of solution and should be responsible for the completion of Data Migration and Database Creation (along with Data Entry and Data Digitization). v. During Phase 1, the bidder should be responsible to carry out Pilot in 5 offices – Head Quarters: New Delhi, Noida, Bangalore, Hyderabad and Pune. The Project would be deemed to “Go-Live” upon successful completion of the pilot implementations. vi. On successful completion of the Pilot, the System Integrator would be required to initiate Phase 2 (after obtaining clearance from STPI on the satisfactory working in Phase 1) implementation at rest of the STPI centres. vii. At the time of User Acceptance Testing (UAT), the System Integrator would provide Brand New Enterprise Class Hardware. The hardware would include SAN, Servers, etc for the successful implementation of the proposed solution. An indicative list of equipments to be supplied by the selected System Integrator are as under: S. No. Component 1. Application Servers (Development, Test, Production) 2. Database Servers (Development, Test, Production) 3. BI & DW Servers (Development, Test, Production) 4. Tape Drive (with tapes)* 5. Router, Switches 6. Standalone Firewall with IPS, Antivirus 7. SAN Storage 8. Server Racks/ Blade enclosures 9. SLA Monitoring Tool 10. Licenses of recommended Systems Software, Tools (DW/BI/DMS), RDBMS and OS Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 49 Software Technology Parks of India S. No. Request for Proposal for Computerization of STPI Component 11. Backup Software 12. Data Replication Solution 13. Other Components as required by the Application * The backups are to be taken on tape drives on rotation and full backup to be taken for last 7 days which must be available at any point of time. viii. The selected system integrator is expected to bring in the computing infrastructure for DC and DR. The DR is expected to be 70% of DC capacity. The DC and DR build are out of scope of this Tender. ix. The client side infrastructure in terms of PCs/ laptops/ printers for users shall be arranged by STPI. x. The System Integrator shall bring in the PC/laptops, etc required for the onsite development team xi. Implementation of a DW/BI solution that provides a centralized repository for STPI services and in-house data that should facilitate Generation of Standard Reports, Ad-Hoc Report, Customized & Exception Report etc, data analysis, Dashboards for Senior Management, advanced Search Features and; optimized response time for reporting modules xii. Implementation of a Content & document management system shall be the sole responsibility of the Systems Integrator. xiii. Procurement of all software licenses, tools and their installation on the deployed hardware (including all licenses) would be perpetual licenses, and in the name of STPI. xiv. The System Integrator shall develop the Operational Procedures Manual, Acceptance Test Plan, Acceptance Test Specifications user manual, system manual, data dictionary, data definitions, training & knowledge transfer plans, relevant training modules and handholding support. xv. The System Integrator is required to submit Standard Operating Procedures (SOP) other manuals along with successful completion of all the trainings. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 50 Software Technology Parks of India xvi. Request for Proposal for Computerization of STPI On completion of Milestone 3, the successful bidder would be required to initiate Maintenance phase. xvii. The successful bidder shall impart necessary training to the nominated personnel of STPI. xviii. The entire infrastructure necessary for solution deployment at DC and DR would be procured, installed, configured and managed by the Systems Integrator. xix. Additional modules/ queries and reports have to be developed during the whole duration of the project as and when required by STPI. xx. The System Integrator shall also make provisions for interface with Department of Revenue, Reserve Bank of India (RBI), Ministry of Commerce, Commercial Intelligence, etc, as per the requirements of STPI. xxi. System Integrator shall provide the SLA monitoring tool to capture the service performance of the Solution and generate statistics for service levels. xxii. The developed solution/ application should have sufficient compatibility with mobile browsers to enable push/ pull of content and browsing features. The System Integrator shall setup a Web email messaging system with a mobile version (accessible from mobile phones using mobile browser or IMAP). xxiii. The System Integrator shall make provision for dedicated resources for the maintenance and support of application, xxiv. An onsite helpdesk support of 12*6 (9:00am-9:00pm) with at least 1 person to support for resolution of queries related to the application. The System Integrator will deploy tools to monitor and submit reports (as and when required by STPI) stating details like – issue, issue resolution time etc. No toll free number needs to be set up (The location for helpdesk shall be provisioned by STPI). The helpdesk shall Answer business/process and application level questions from all internal and external stakeholders. Receive and redirect technical support to System Integrator support team and follow up. Coordination with STPI and System Integrator for smooth running of solution. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 51 Software Technology Parks of India xxv. Request for Proposal for Computerization of STPI Escalate issues as required. Insurance, Warranty and Maintenance for all IT infrastructure/ Assets to be provided as part of the project for the entire period of the contract. The System Integrator shall interact with OEMs/ Concerned agencies for all insurance, warranty and maintenance related issues. xxvi. The System Integrator shall perform Operation & Maintenance, post Roll Out across all STPI centres for a period of 5 years. 7.2. Design, Development and Deployment Phase The proposed project on Computerization of STPI consists mainly of sixteen logical modules. The brief for each module is given below and for detailed information the interested Bidder(s) may refer FRD: 1. STPI National Portal: The STPI National Portal shall strictly follow the Standards and Guidelines for Indian Government Websites (GIGW). The key objective of the STPI National Portal is to provide following features and services but not limited to: i. STPI National Portal will act as a front-end for all user facing activities from service requests, utility payments to online interaction with concerned STPI officials. ii. It shall have feature through which various STPI website of centre and Directorates with their relevant information can be accessed. iii. It must include About STPI and reflect all the offerings of STPI in details, Who-is-who, STPI Contact details across locations, etc. iv. Query, Feedback, Help, Suggestions, Grievances, etc. submitted through online form. v. STPI portal shall also display nationwide vacancies(its related features), STPI Publications, STPI Reports, Circulars etc vi. Application which is to be developed is to be used through the same STPI National portal vii. All the internal and external activities are to be through STPI National Portal only. viii. STPI National Portal should act as a front end for all the employee related service requests. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 52 Software Technology Parks of India Request for Proposal for Computerization of STPI ix. The portal should allow management of the portal’s content through an administrative console. x. The user shall be allowed to fill and submit the e-forms. xi. The user should be able to track the status of the submitted e-Form. xii. The user should be allowed to download the approved letter, etc. xiii. Business Idea Competition: In addition to above, another integral part of STPI National Portal is a module named “Business Idea Competition” which has the basic purpose of organizing Competitions among Students/Entrepreneurs/ Educational Institutes/ individuals/ Incubators/ Start-up Units/etc for recognizing and promoting the “Best Business Idea/Innovation/product/etc” under various categories in the areas of ICT & Electronics domain. This said module shall explicitly describe the purpose of STPI for recognizing and promoting new ideas & innovations, rules and instructions for filing registrations/nomination, Policies, Definitions & Terminology, Screening and Selection Criteria as adopted for finalization of best idea/innovation, Best Awarded Innovative ideas of previous years, etc. The module shall have the facility to invite nominations/registrations for various innovations/ideas under pre defined award categories as announced by STPI. It shall also have all the related facilities like gathering all the information about the nominee, display of nominated innovation/idea/product/etc, status of nomination, awardees list, comments, queries, feedback, events, online help for user, etc / other facilities as decided by STPI. 2. e-Forms Creation System: The system shall allow creation/ deletion/ modification of eForms (Work-flow should be role based and online). 3. Unit Management System: The Unit Management System acts at the backend and processes all the service requests. This module will allow STPI officials to receive applications, thereafter approve, reject or forward for further verification and finally deliver the approved services to the users. For further details, refer FRD. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 53 Software Technology Parks of India Request for Proposal for Computerization of STPI 4. DataCom Management System: The DataCom Management System acts at the backend and processes all the service requests. This module will allow STPI officials to receive applications, thereafter approve, reject or forward for further verification and finally deliver the approved services to the users. The DataCom Management System should be designed to allow role based access to all the technical staff. There will be no direct interaction with the live network. Any access has to be allowed through the application portal only. All the activities/ events performed by the users will be recorded as logs (application). All the change management, configuration management, fault logging, inventory management, process management, data/ workflow management has to be made through the application. All the network monitoring, trouble shooting, analysis including future plan and design has to be done through application portal. For all the links (users and back-bone) the complete status and performance analysis has to be done through the application including the tickets management system generated automatically through the application. All the reports to be based on the live network data captured by the application. Any third party software, additional component required may be integrated with the application. i. ii. Operations Group - Maintenance of Networks / Troubleshooting Link Feasibility and Commissioning for new user - Radio Network & Fiber Optics Network iii. Network Analysis iv. User Id Creation v. Helpdesk Management vi. Upgradation/ Down gradation and Commissioning of Local loop – Fiber/ Radio vii. Preparation of Incident Report, RFO of the Incident and updating of FRMS viii. Preparation of Duty Roaster for Help Desk Staff ix. Up gradation/ Down gradation and commissioning of Backbone x. Termination of Local Loop – Fiber/ Radio xi. Termination of Co-Location xii. Maintenance of Networking Equipment Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 54 Software Technology Parks of India Request for Proposal for Computerization of STPI xiii. Bandwidth Module xiv. NIXI Payment Correspondence xv. CSME (CSM, CMDS) Services (Satellite services) xvi. Co-location Rack Service to Third party Telecom Service provider xvii. Disaster Recovery (DR) Services xviii. Co-location of server xix. Revision in existing tariff 5. HR and Administration Management System – This module will be used for internal functions at STPI. This module aid the HR and Administration Group perform all their employee related activities. i. Leave Travel Concession (Advance) ii. LTC Settlement iii. Earned Leave Encashment iv. STPI Certificate v. Annual Progress Appraisal Report vi. Forwarding of application through proper channels vii. Application for Passport viii. Permission to travel abroad ix. Tuition Fee x. Updation of family/Personal profile xi. Withdrawal from PPF/GPF xii. Buying of Softex Forms xiii. Purchase of Stationery xiv. Need of stationery by office employees xv. Purchase of House Keeping Goods Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 55 Software Technology Parks of India xvi. Approval of Loan xvii. Reimbursement of Local Conveyance xviii. Reimbursement of Overtime Request for Proposal for Computerization of STPI xix. Application for leave xx. Payment processing for vendors xxi. Reimbursements for Expense Claims-Staff xxii. Annual Property Return xxiii. Purchase/ Re-filling of Cartridge xxiv. Requisition of use for office vehicles xxv. Payment of TA/ DA xxvi. Pre-Recruitment Process xxvii. Post-Recruitment Process xxviii. Movable/immovable property declaration/permission xxix. Home Town Declaration xxx. Promotion Policy xxxi. Employee Code Generation xxxii. Parliamentary Policy xxxiii. RTI xxxiv. Resignation xxxv. Transfer xxxvi. Retirement xxxvii. Probation Clearance xxxviii. Suspension/ Penalties/ Issue of Memorandum xxxix. xl. Birthday Gift Cheque Court Cases Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 56 Software Technology Parks of India Request for Proposal for Computerization of STPI 6. Financial Management System - This module will be used for internal functions at STPI. This module aid the Finance, Accounts and Billing Group perform all their activity(ies). i. Booking in Tally of all Billing ii. Cash handling for Centre- Sale of Softex Forms iii. Cash handling for Centre- Settlement of Advances/ Loans made to Staff iv. CST Re-imbursement v. Maintenance of Records for Centres and Sub-centre vi. Disbursement of CST vii. Pay Bill (Salary) viii. Payment for Capital Purchases ix. Payment for Misc. Purchases and Imprest Settlement for Sub-Centres x. Payment for Misc. Purchases- by Centre Depts xi. Payment to Carriers of Centres and Sub-centres xii. Preparation of Annual Budget xiii. Fund Allocation for recurring expenses / Request for Balance Funds xiv. Fund Management xv. Project Accounting/ Billing xvi. Preparation of Balance Sheet xvii. Maturity of FD and investment of funds xviii. Payment of Advance/ Income tax xix. Payment of Tax and Liability xx. Co-Location Billing xxi. DataCom Billing-Centre xxii. DataCom Billing- Sub Centre Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 57 Software Technology Parks of India xxiii. EHTP Billing xxiv. Incubation Services- Centre xxv. Incubation Billing- Sub-centre xxvi. STP Billing-Newly Registered Units xxvii. Termination of service xxviii. Periodic Reviewing Request for Proposal for Computerization of STPI xxix. Revision in existing tariff xxx. STPI centre specific bank reconciliation reports and service-wise transaction reports. 7. Incubation Management System - The Incubation Management System acts at the backend and processes all the service requests. This module will allow departmental officials to receive applications, thereafter approve, reject or forward for further verification and finally deliver the approved services to the users i. Renting Furnished/ Semi-Furnished Raw Space ii. Terminate Incubation Service – Request from User iii. Maintenance of Area iv. Upsizing v. Downsizing vi. Extension of License term vii. Meetings 8. Quality Management System - This module will be used for internal functions at STPI. The employees of STPI will be able to access the e – Forms related to Quality Management on the STPI Portal. The Quality Management System also acts at the backend and processes all the service requests. This module will allow departmental officials to receive applications, thereafter approve, reject or forward for further verification and finally deliver the approved services to the users i. Change Requests (Procedures/Formats) ii. Conducting MRC Meetings Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 58 Software Technology Parks of India Request for Proposal for Computerization of STPI iii. Training iv. Coordinating Internal Audit v. Third Party Audit (Certification and Surveillance Audit) vi. Risk Management (Analysis, VAPT & Mitigation) vii. Corrective Action and Preventive Action Project Management System – This module will help the Project Consultancy Group 9. and Civil Group to manage their activities. This module will help in defining and structuring projects, tasks, and budgets which will aid in monitoring project status. i. Identification of Internal Projects by STPI Centre ii. Identification of Internal Projects by STPI HQ iii. Identification of External Projects by STPI Centre/ HQ iv. Implementation of Consultancy Projects/Project Management v. Operation and Maintenance Projects vi. Implementation of Turnkey Projects vii. Records Management viii. Training ix. Billing x. Funding xi. Final Settlement (Financial Closure of Project) and Inventory Settlement xii. Project Closure 10. Procurement Management System – STPI across the country are pursuing standard practices for procurement of goods & services following GFR & CVC Guidelines & internal Delegation of Powers to ensure that purchasing of the products and services is carried out according to the specified requirements. The key objective of Procurement Management System is to computerize the procurement activities including: Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 59 Software Technology Parks of India Request for Proposal for Computerization of STPI i. Planning & Procurement of capital equipments/items related to functioning of centre, maintenance contracts & other essential services at the most competitive prices and in a fair, just and transparent manner. ii. Selection and evaluation of vendors to ensure that they have capability to meet specified requirements. iii. Activity execution in a well-coordinated manner with least time and cost overruns. iv. Maintenance of records for systematic & integrated approach for procurement activity. 11. Admin Modules – The administrative module will help to define privileges for various user and groups. i. The module assists in Authentication ii. Ability to create new groups and assign Users to Group iii. Ability to update / view Group(s) Details (Member/Privilege counts) iv. Assigning/ Managing privileges to individual Users or User Groups v. Creation/ Modification of Users vi. Record retention schedule 12. Workflow Management System – This module would allow STPI to define different workflows for different types of jobs or processes. Once the task is complete, the workflow software ensures that the individuals responsible for the next task are notified and receive the data they need to execute their stage of the process. 13. Management Information System – This module will be used to provide regular inputs and information to the designated officials. It should have the capability to merge criteria/ integrate reports to produce reports with the desired outputs. It should include all the scheduled reports, on-demand reports, exception reports etc. All the reports of all the modules mentioned as a part of the Computerization of STPI project should be incorporated in the MIS module which would assist STPI in better control, monitoring and decision making for the future. 14. Document Management System – This module will be used to track and store electronic documents and/or images of paper documents. It is usually also capable of Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 60 Software Technology Parks of India Request for Proposal for Computerization of STPI keeping track of the different versions created by different users (history tracking). Document management systems shall provide storage, versioning, metadata, security, as well as indexing and retrieval capabilities. Scope of the successful bidder shall include digitization of 2 Lakh pages approximately. Payments shall be made for every subsequent 10,000 pages (as and when required) by furnishing relevant bills to STPI. STPI shall make payments for digitization of every subsequent 10,000 pages within 45 days of receipt of bill. 15. Asset Management / Inventory Management - STPI intends to manage its inventory using the proposed solution/ application which shall comprise of an asset/ inventory management module (digital/manual data shall be provided by STPI). It shall be able to provide the following: i. The module shall create a database of all the assets with STPI and the System Integrator with a unique identification against each asset. ii. As and when assets are allocated, re-allocated and/or de-allocated against an entity (resource/ team, etc) it shall be able to update/ append the database accordingly. iii. It shall also have the capability to track assets allocated to an entity as and when required by STPI. iv. In case a new asset is procured or an old asset is disposed off, the module shall have the capability to update the database accordingly. 16. E-Tendering - The scope of e-Tendering is the specification of business documents exchanged between a public sector buyer and an external supplier during the tendering and awarding phases in electronic public procurement. The basic requirements for eTendering includes, but not limited to, the following: i. Allow interested Bidder(s) to respond to tenders within the specified time-limit ii. User interface with a list of current tenders iii. Search facility based on various categories of tenders like organization, type of product etc. iv. Controlled access to tenders using passwords, user profiles and permissions v. Changes to the quotations Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 61 Software Technology Parks of India vi. Request for Proposal for Computerization of STPI Be able to track the number of Tender Downloads along with their respective IP Addresses and user details vii. User verification through user id & password and/ or digital signature (System Integrator will be responsible for implementing digital signatures in the solution) viii. Repository of previous tenders ix. User interface with a list of response to a particular tender x. Collaboration facilities enabling a number of people to work on creating a tender document or to evaluate tenders xi. Partially automated evaluation of tenders and award notification 7.3. Data Digitization Scope of the successful bidder shall include digitization of a 2 Lakh pages approximately. Also documents to be scanned and digitized may be in loose and bound form with one to eight pages per document with maximum size of A3. Data digitization shall be conducted at 9 STPI Directorates. Payments shall be made for every subsequent 10,000 pages (as and when required) by furnishing relevant bills to STPI. STPI shall make payments for digitization of every subsequent 10,000 pages within 45 days of receipt of bill. For payment purpose, lot of 10,000 pages shall be considered. 7.4. Data Migration Data from existing applications / legacy system at various STPI centres would need to be migrated to the proposed Solution/ Application. As part of migration activity, the standard data quality checks have to be in place. Some of the applications requiring Data Migration are mentioned below: a. HRMS Application - This application is used by HR and Administration department for completing various HR activities. b. EXIM Application c. Tally, etc. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 62 Software Technology Parks of India 7.5. Request for Proposal for Computerization of STPI Business Intelligence and Data Warehousing The scope of business Intelligence would involve a process to gather respective fields to transform it later into knowledge, which could further be used to understand the needs of all Stakeholders. The proposed DW/BI solution should provide a centralized repository for STPI services and in-house data. It is expected to serve as an MIS repository for STPI. In addition other external stakeholders within Government and other external stakeholders increasingly require complex analytical data inputs. Such requirements can be fulfilled through the DW/BI solution without stressing the operational systems that is likely to impacting their performance. The BI solution is expected to fulfill the below key objectives: i. Generation of Standard Reports, Ad-Hoc Report, Customized & Exception Report etc. ii. Facilitate data analysis iii. Dashboard for the Senior Management iv. Advanced Search Features v. Optimised response time The DW and BI solution should have the minimum features: i. ETL Functionality ii. User friendly GUI for ease of use iii. Re-usability of components iv. Capable of deployment in real time and batch data integration requirements v. Metadata management 7.6. i. Provision of Hardware/ Software by Systems Integrator The entire “Hardware Infrastructure and Software” as specified in Section-7.1 would be arranged and managed by the Systems Integrator. ii. The client side infrastructure in terms of PCs, laptops, printers, etc for users shall be arranged by STPI. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 63 Software Technology Parks of India iii. Request for Proposal for Computerization of STPI The System Integrator shall bring in the PC/laptops, etc which would be required for the onsite development team iv. At the time of User Acceptance Testing which will be done at Noida or place as decided by STPI the System Integrator would provide Brand New Enterprise Class Hardware for DC and DR. The hardware would include SAN, Servers, etc for the successful implementation of the proposed solution. v. As and when required during the project duration, the said Hardware/ Software would be updated/ upgraded to meet the Service Level Agreements (SLAs) at no additional cost to STPI. vi. The Hardware provided by the System Integrator would be OEM supported and would be Application/ Platform Independent. vii. The ownership rights of the Hardware/assets would lie solely with STPI. viii. All software to be deployed as part of the project would be in the name of the STPI and the original copy of the same shall be deposited by the successful bidder at the office of the STPI after signing of the contract and before the installation of the software at any of the sites. The licenses of all software should be perpetual. Note: Backbone connectivity would be provided by STPI 7.7. Disaster Recovery (DR) Site The System Integrator is required to build an active DR Site for the entire Solution/ Application. The DR site location and the requisite bandwidth for synchronous transfer of data would be provided by STPI. Currently Disaster Recovery site shall be at Bangalore or a location as decided by STPI. The System Integrator has to ensure meeting all of the defined SLA’s other than that pertaining to network breakdown. 7.8. Project Roll-out and Implementation Plan The project will commence within a week of awarding the contract. Application Development will start immediately while Data Collection, Digitization and Migration will be done in phases. The project will roll-out in two phases namely Pilot and Rollout. In the first phase (Pilot), 5 STPI centre will be covered: Head Quarters- New Delhi, Noida, Bangalore, Hyderabad and Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 64 Software Technology Parks of India Request for Proposal for Computerization of STPI Pune. After successful roll-out of first phase, the System Integrator will have to take a go ahead from STPI to start the second phase (Rollout) across all remaining STPI centre. 7.9. Training The System Integrator would be required to impart training to all the approx 600 STPI officials in batches across two locations at STPI premises, i.e. Delhi/ Noida and Bangalore/Chennai. The training would include the following: i. Class Room and Hands-on training to all STPI officials by trained instructor at STPI premises. ii. Need based training shall be provided by the System Integrator iii. Train-the-trainer: The 20 designated STPI officials, and Developer and System Administrator training to at least 10 STPI personnel covering all aspects of software development and maintenance. Training schedule and training manual should be made available to STPI one week before the scheduled training and would be provided to each participant during training (Training manual should contain all the modules and also should suffice clearly the roles and responsibilities of the different level of officials as acknowledged in the application software). In addition to the above, System Integrator shall also provide User Manual, User Guide, etc for the developed application. Context-sensitive help/ online help/ visual tutorial should be available with the application software for online understanding of software in an online mode 7.10. Operations & Maintenance Phase The scope of work during the O&M Phase would include, but not limited to, the following: i. Operations & Maintenance phase would be for 5 (five) years after successful completion of Milestone 3 as defined in Section 10- Payment Terms. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 65 Software Technology Parks of India ii. Request for Proposal for Computerization of STPI Ensuring security of the system at all times. Any updates required in line with any new guidelines/policy by Government of India would have to be adhered to by the System Integrator without any additional cost to STPI iii. The System Integrator shall remove the defects/ bugs and bring the system back to proper working condition & ensure that the system is in compliance to SLA’s at all times, without prejudice to terms and conditions under the contract at no additional cost to STPI. iv. Modifications, additions and updates to the existing system, which are part of the existing modules, will be the responsibility of the System Integrator at no additional cost to STPI. v. Procurement and Maintenance of all licenses/AMC for all Hardware, Software and tools required for successful running of the application suite. vi. Updates to all software components with the latest patches/version upgrades, as released by the concerned OEM players from time to time. vii. Ensure that the system performs in compliance to the SLA’s defined in the contract, and any updates to the hardware and software required will have to be the responsibility of the Systems Integrator viii. Updating and Maintenance of solution would include revising, editing web pages, addition of policy/circulars etc to keep the web portal up to date in consultation with STPI. ix. Design & Development of all reports, as requested by STPI x. Generation of regular reports in relation to SLA’s and transactions on a daily, weekly, monthly basis or as agreed with STPI xi. Any change request made by STPI which is in addition to the scope of work defined in this Tender, would be undertaken by the System Integrator without prejudice to terms and conditions under the contract. xii. Ensure that DR policy, Backup plan, and Contingency plan are in place and are approved by SPTI at all times. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 66 Software Technology Parks of India xiii. Request for Proposal for Computerization of STPI Taking regular data back-ups as decided by the department and necessary for smooth operations. xiv. Creation and Submission of detailed MIS reports as and when needed in the format specified by STPI. 7.11. Compliance to General Specifications of the Solution i. Consortium/Sub-Contracting to the extent of data digitization is allowed. ii. Application should have a standardized look and feel, in concurrence to the local factors and Government requirements. iii. Application should log all user actions and should have reporting facilities that can be utilized in system performance and security access controls monitoring. iv. Application should provide the capability for a user to log in once and be able to access all appropriate services. v. Application should support use of digital certificates/ digital signatures. vi. Application should provide the secured online payment services. vii. Application should be IPv4 and IPv6 compliant in all respects. viii. Application is aimed as a repository of information and transactional services offered by STPI. ix. STPI will accept the Solution/ Application developed by the System Integrator after conducting successful User Acceptance Testing (UAT) of the Solution/ Application. x. STPI also reserves the right to appoint a third party/agency to conduct the UAT on its behalf. xi. Any bugs identified during the UAT should be fixed by the System Integrator before acceptance of the software by STPI. xii. The SLA monitoring tools are required to be supplied and configured by the System Integrator to track and report the application performance metrics. xiii. Any new software or applications required for the successful development, successful User Acceptance Testing and for compliance of the SLA’s during the entire duration of the project will have to be managed by the Systems Integrator. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 67 Software Technology Parks of India Request for Proposal for Computerization of STPI xiv. Application should be Platform independent. xv. STPI requires 100% implementation of Bilingual (Hindi, English) features with Unicode support to the extent of Technology permits for GUI and reports xvi. All application software, hardware, data, plans, drawings, specifications, designs, reports and other documents procured or developed by the System Integrator in the execution of the contract shall remain the property of the STPI, right from the beginning of the contract, during the whole duration of the project and after the expiry or termination of the contract. xvii. The ownership shall also remain with the STPI in case the System Integrator fails to execute tasks to the satisfaction of the STPI. xviii. The STPI shall also remain the sole owner of the Hardware/ Software supplied at the time of UAT in case the contract is terminated for any other reasons. xix. System Integrator shall adhere to the W3C guidelines as mentioned in www.w3.org/security to meet compliance on usage (internal and external) for application development and O&M phase 7.12. Deliverables 7.12.1. Solution/ Application Development Phase: The selected System Integrator would be required to submit the following deliverables in hard copy/ soft copy (protected media)/ or both, as per the Solution/ Application Development Timelines. i. Detailed Project Plan including the Resource Deployment Plan ii. Revalidation of existing System Requirement Specification Report (SRS) iii. System Design Document (SDD) iv. Prototype of Application Software (cover basic screen layouts, fields, GUI of the application minus the business logics) v. Acceptance Testing Reports (Report on Beta Testing of the software) vi. Application software with source code in two sets (in protected media) along with source code and/ or license of third party API/ any other software used. vii. User Manual of the Application Software Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 68 Software Technology Parks of India viii. Request for Proposal for Computerization of STPI Technical Manual of the Application Software ix. Classroom, Hands-on, Train the trainer, developer & System Administrator Training on the application developed along with training, user and technical manual x. User Acceptance Testing (UAT) Report xi. Satisfactory certificate from the SPTI officials for Supply, Installation and Commission 7.12.2. Operations and Maintenance (O&M) Phase During Operations and Maintenance phase, System Integrator would be required to support the application for any bugs/ updations/ addition in the developed solution for which support should be available on call / email / telephone. During this phase, the selected System Integrator shall deploy the required resources (at least 2) onsite fulltime at STPI, Noida. i. Final version of the application software with source code in 2 sets of soft copy (protected media) and along with source code and/or license of third party API/ any other software used. ii. Software upgrades/ enhancements with source code. iii. Call Register (Online) - The System Integrator shall maintain a call register for logging complaints during post implementation support period. The System Integrator shall essentially provide complaint number for each complaint call made by the user. The solution shall generate an automated complaint ticket. iv. Reports - Following reports are to be provided for all the activities as and when required by STPI: • SLA attainment reports • Report on number of problems referred to support team and resolution status. • Report on number of software upgrades/ enhancements, bug fixes, patches etc • Any other Report as desired by STPI. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 69 Software Technology Parks of India Request for Proposal for Computerization of STPI SECTION 8: PROJECT TIMELINES AND MILESTONES 8.1. Project Timelines and Milestones The Project Timelines would start from the date of Issuance of LoI (Week “W0”). The tentative timelines for project rollout is as follows: 8.1.1. Milestone 1: Time of Completion (Elapsed in Weeks) S. No Activity Milestones 1. Award of Contract to SI & Signing of Contract Agreement 2. Project Kick-off Project KickMeeting with all the Off Stakeholders 3. Detailed Project Plan including Resource Deployment Plan W1 W2 W3 W4 W5 W6 W7 Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. W8 W9 W 10 W 11 W 12 W 13 W 14 Page 70 Software Technology Parks of India Request for Proposal for Computerization of STPI Time of Completion (Elapsed in Weeks) S. No Activity Milestones 4. W1 W2 W3 W4 W5 W6 W7 W8 W9 W 10 W 11 W 12 W 13 W 14 Revalidation of Milestone 1 existing SRS (System Requirement Specification) and Preparation of SDD (System Design Document) and their acceptance, Prototype of the Application Software and Acceptance of Prototype Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 71 Software Technology Parks of India Request for Proposal for Computerization of STPI b. Milestone 2: S. No. Milestones Activity 5. Database Creation 6. Development and Integration of Software/ Applications 7. Data Entry Digitization 8. Comprehensive training for Users 9. 10. Time of Completion (Elapsed in Weeks) W 14 W 15 W 16 W 17 W 18 W 19 W 20 W 21 W 22 W 23 W 26 W 27 W 28 W 29 W 30 W 31 W 32 W 33 W 34 W 35 W 24 W 25 and Hardware Supply, Installation & Commissioning Phase – I (Pilot Rollout in 5 STPI Centre Head Quarter (Delhi), Bangalore, Hyderabad, Noida, Pune) & UAT Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 72 Software Technology Parks of India c. Milestone 3: Time of Completion (Elapsed in Weeks) S. No. Activity 11. d. Request for Proposal for Computerization of STPI Milestones Phase - II: Implementation and Rollout remaining STPI Centres and Sub-Centres at W 36 W 37 W 38 W 39 W 40 W 41 W 42 W 43 W 44 W 45 Milestone 3 Milestone 4: Activity S. No. 12. Operations and Maintenance For 5 years** (After Commissioning) of Solution/ Application ** Management of Operations and Support is for 5 years - extendable based on STPI discretion. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 73 Software Technology Parks of India Request for Proposal for Computerization of STPI SECTION 9: SERVICE LEVEL AGREEMENTS 9.1. Service Level Agreements (SLAs) a. Intent: i. The aim of this agreement is to provide a basis for close co-operation between STPI and Systems Integrator, for support services to be provided by System Integrator to STPI, thereby ensuring a timely and efficient support service is available to STPI end users. The objectives of this agreement are detailed in Section-3.5. ii. This agreement is contingent upon each party knowing and fulfilling their responsibilities and generating an environment conducive to the achievement and maintenance of targeted service levels. b. Objective: i. To create an environment which is conducive to a co-operative relationship between System Integrator and STPI to ensure the effective support of end users. ii. To document the responsibilities of all parties taking part in the Agreement. iii. To ensure that STPI achieves the provision of a high quality of service for end users with the full support of Systems Integrator. iv. To define the commencement of the agreement, its initial term and the provision for reviews. v. To define in detail the service to be delivered by System Integrator and the level of service which can be expected by STPI, thereby reducing the risk of misunderstandings. vi. To detail via a question list, information System Integrator requires STPI to extract from end users prior to System Integrator involvement. vii. To institute a formal system of objective service level monitoring ensuring that reviews of the agreement are based on factual data. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 74 Software Technology Parks of India viii. Request for Proposal for Computerization of STPI To provide a common understanding of service requirements/capabilities and of the principles involved in the measurement of service levels. ix. To provide for all parties to the Service Level Agreement a single, easily referenced document which caters for all objectives as listed above. x. The SLAs would be applicable during the O&M Phase. xi. SLAs would be monitored on a quarterly basis and penalties would be imposed, in case of breach of any of the SLAs and the same would be deducted from the Quarterly Payment (QP). xii. On breach of any of the SLAs in a quarter, a penalty would be levied on the quarterly payment due to the System Integrator/ Successful bidder. For each breach a penalty of 5% of the quarterly payment due would be levied, with a maximum penalty not exceeding 30% of the quarterly payment. xiii. The amount of penalty under this Contract shall not exceed 30% of total equated quarterly installments (Remaining CAPEX and OPEX as mentioned in the Payment schedule) in case of non-compliance with SLAs. 9.2. Service Level Monitoring (SLM) 9.2.1. The Service level monitoring parameters on which the SLA shall be applicable are as under: S. No. SLM1 SLM2 Metric Expected Service Level Remarks Solution/ Application >=99.5% uptime Statistics from the SLA Monitoring tool to be deployed by the System Integrator/ Successful bidder Average Time taken Not later than 48 hours or For minor modifications/ for closure of Within mutually agreed updates (effort of 8 hours) modification/ timelines. updation required to the Solution/ Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 75 Software Technology Parks of India S. No. Metric Request for Proposal for Computerization of STPI Expected Service Level Remarks Application SLM3 Time taken for Within the timelines as STPI would require certain updation of content, mutually agreed. updates for circulars / press releases, notifications to be uploaded news and other on urgent basis the important items. turnaround time for which would be less than 2 hrs. SLM4 For vulnerability attacks due to which the whole website is defaced/not available /content changed/redirected SLM5 SLM6 Restore website Within 8 Action must be taken to hrs restore the website within 8 hrs of reporting/detection of Detection of Vulnerability such incident, else it would and information of same to website administrator be considered as a breach. and department officials Within 30 minutes Patch Management Within 24 hours of STPI’s Testing has to start (for Operating approval within 1 working day of System and release of patch subject Database) of approval of STPI and availability of system downtime. In case of non-availability of downtime, a mutually agreed timeline between selected SI and STPI shall be applicable. Results of testing along with recommendations should be submitted to STPI for approval Average page <=2 seconds (for static Measured over a leased loading time (time web page) circuit or equivalent of taken between click 256 kbps download and <=7 seconds (for data of the link to the 128 kbps upload. intensive web page i.e. complete loading of Automated Tests to be reports fetching more than performed daily during Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 76 Software Technology Parks of India S. No. Request for Proposal for Computerization of STPI Metric Expected Service Level Remarks the page) 100KB of data and BI complex analysis) SLM7 Browser compatibility SLM8 Solution (including Application and database) Backup Service SLM9 Disaster (DR) The solution/ application Browser related errors reported by users/ STPI should function properly should be resolved across browsers including within 7 days’ time. but not limited to; If the reported errors persist after the above • Internet Explorer 5.5 and mentioned time, it shall above treated as 1(one) • Mozilla Firefox 3.0 breach. • Google Chrome • Safari 4 and above SI should ensure that the The selected SI shall be back-up taken is required to take daily complete, consistent and backups and implement correct. replication as per agreed benchmark. The Solution/ Application In case of significant should be able to switch deviation of this SLA, seamlessly to DR site in STPI may consider case of primary site not termination of the being available. contract Recovery SLM10 Compliance Reports, monitoring peak hours Reports to be submitted Within 6 working hours SLA as and when required by of request submitted by STPI STPI. 9.2.2. In case of more than 10 breaches in a quarter or breach of a particular SLA metric consecutively in 2 (two) quarters, the System Integrator has to provide the reasons for such breaches to STPI in writing. In case of non-satisfactory reasons, STPI shall have the right to invoke full Performance Bank Guarantee and/ or call for termination of contract. For calculation of Penalty the total equated quarterly installments as mentioned in the Payment schedule will be considered. 9.2.3. STPI will arrive at the quantum of breaches and applicable penalties as per the terms & conditions of tender document before every due payment. The same will be Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 77 Software Technology Parks of India Request for Proposal for Computerization of STPI communicated to the System Integrator, in case of the disagreement the System Integrator would need to provide the justification in writing within one week to STPI. Based on the justification given by System Integrator, STPI would invoke/relax the penalty(ies) depending upon the merit of the case. The decision of STPI will be final and binding for all such cases. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 78 Software Technology Parks of India Request for Proposal for Computerization of STPI SECTION 10: PAYMENT TERMS i. STPI intend to pay service charge as quoted by the System Integrator, upon successful completion of rollout across all directorates. The service charge would be paid to the System Integrator on a quarterly basis for the transactions reported in the quarter. ii. System Integrator is expected to maintain data on the transaction volume without any manual intervention and prejudice and present a quarterly report on the transaction volume across each service, to claim the service charge. iii. There are two categories of services – High Volume and Low volume services. High Volume services are currently estimated at 95% of the total external transactions, while low volume services constitute 5% of external transactions. iv. No Service charge would be levied on the internal services consumed by STPI. v. Service Charge for Low Volume Service would be higher than the charge for High Volume Services. vi. Service charge quoted by the System Integrator should be inclusive of Service Tax, and any other transaction cost (like credit card processing fees etc). vii. Currently over 9,50,000 annual external transactions are estimated by STPI, and these transactions are expected to go up with time. It is also expected that the a few more services would be rolled out by STPI in due course of time, and the same service charge would be applicable to them, and paid accordingly. viii. Besides the Per Transaction rate for Service charge quoted, the bidders are expected to quote a CAPEX and OPEX which they intend to charge from STPI, for system use by STPI for internal purposes. ix. Bidder should also quote a man-month rate for additional work that is not in the current scope of work. x. In case a Bidder quotes Rs. 0/- or keeps it blank for the service charge, or CAPEX/OPEX or Man Month rate, the bid would be considered non-responsive, and the bidder would be dis-qualified. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 79 Software Technology Parks of India xi. Request for Proposal for Computerization of STPI Payment Schedule Payments will be released only on satisfactory completion of each Milestone as per the following schedule; S. No Payment Schedule Fee Payable Remarks 1. Milestone 1: Revalidation of 10% of the CAPEX existing SRS (System Requirement Specification), Preparation of SDD (System Design Document) and its acceptance, Prototype of the Application Software and Acceptance of Prototype Payable on successful completion & acceptance of Milestone 2. 2. Milestone 2: Commissioning of 15% of CAPEX Hardware/ System Software, successful UAT and “Go Live” for Pilot Phase, Submission of User Manual (SOP) and Training to the users Payable on successful completion & acceptance of Milestone 3. 3. Milestone 3: Successful roll-out at 25% of CAPEX all remaining centres Payable after 3 (Three) months of successful completion of Milestone 3. 4. Quarterly Payment post successful 50% CAPEX + OPEX Linked to SLA’s & completion of Milestone 3 divided into 20 payable on a quarterly quarterly installments basis. + Service Charge for transactions reported for the quarter. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 80 Software Technology Parks of India Request for Proposal for Computerization of STPI SECTION 11: GENERAL TERMS AND CONDITIONS OF CONTRACT 11.1. Interpretation In case of any ambiguity in the interpretation of any of the clauses in the tender document, the interpretation of the clauses by STPI shall be final and binding on all parties. 11.2. Communications Wherever Conditions provide for the giving or issuing of approvals, certificates, consents, determinations, notices, requests and discharges, these communications shall be: i. In writing and delivered against receipt; and ii. Delivered, sent or transmitted to the address for the recipient’s communications as stated in the Contract. 11.3. Project Timeline a. The System Integrator shall commence work on the Project within the period specified and without prejudice, the System Integrator shall thereafter proceed in accordance with the time schedule as specified in the Project Schedule (Section-8) and any refinements made in the Agreed and Finalized Project Plan. b. The System Integrator shall attain Completion of the project or of a part where a separate time for Completion of such part is specified in the Contract, within the time stated or within such extended time to which the System Integrator shall be entitled. c. The System Integrator can propose the changes in the timelines keeping in view the best interest of the project to STPI. In regards to the finalization of the proposed changes in timelines the STPI decision will be final and binding. The changes in the Project Timeline can be proposed during the entire duration of the project subject to approval of STPI, and if then also, after mutual agreement of revision of timelines, the completion of project milestones is not attained Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 81 Software Technology Parks of India Request for Proposal for Computerization of STPI within the stated time, it would attract penalty @0.4% of the Total Value to be disbursed up to attainment of Milestone-3 i.e. 50% of CAPEX Quoted as per the financial bid of the Bidder per week of delay in Milestone 1, Milestone 2 and Milestone 3, subject to a maximum of 4% beyond which the Contract may be liable for Termination. Further, STPI shall arrive at the applicable penalties as per the terms & conditions of Tender document before every due payment. The same will be communicated to the System Integrator, in case of the disagreement the System Integrator would need to provide the justification in writing within one week to STPI. Based on the justification given by System Integrator, STPI would invoke/relax the penalty(ies) depending upon the merit of the case. The decision of STPI will be final and binding for all such cases. d. The STPI may ask the System Integrator to continue the project after 5 years (extension of O&M), if deemed fit by the STPI and mutually agreed by both the parties. The extension will be on annual basis for upto 5 years on same terms and conditions. 11.4. Systems Integrator’s Roles and Responsibilities The System Integrator will be responsible for: i. Preparation of Detailed Project Plan in line with the overall plan provided in the Tender. The same should be prepared in consultation with the STPI ii. The solution/ Application developed by the System Integrator shall be Platform Independent. iii. The System Integrator would accept and do all the additions/ changes/ modifications in any forms/ module/ queries/ schemes etc. as suggested by STPI without any extra cost during the whole duration of the Project. iv. Handholding support and the complete training schedule shall be provided by the Systems Integrator. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 82 Software Technology Parks of India Request for Proposal for Computerization of STPI v. The System Integrator is required to do all the application development related work on his own hardware and software within the premises of STPI throughout Solution Development Phase. vi. The System Integrator would provide all the hardware and software (from an application point of view) to enable “Project Rollout”. vii. The System Integrator shall have the application certified by STQC (or equivalent certification by a similar Government Agency) for the quality assurance. viii. At the time of User Acceptance Testing (UAT), the System Integrator would provide Brand New Enterprise Class Hardware. ix. The System Integrator would be responsible for all the software, hardware related patch upgrades/ release upgrades or any other up-gradation required to successfully run the Project for the whole duration of the project. x. Procurement, installation and commissioning of the requisite hardware & system software as per the requirements as mentioned in this Tender xi. Keep all system software up to date by installing regular upgrades/ patches. xii. Provide requisite infrastructure & manpower at various locations and provide training and technical support to the STPI. xiii. Deployment of requisite resources for managing all the operations at various locations and a dedicated team for the project. xiv. Generation of MIS reports as per the requirements of STPI or related agencies etc. xv. Ensuring the SLAs for downtime of system, delivery of various services, errors in data entry, etc., as defined in the Tender, are adhered to. xvi. Training and assistance to the staff members of the STPI and related agencies for using the developed solution. xvii. Management and quality control of all services and infrastructure. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 83 Software Technology Parks of India Request for Proposal for Computerization of STPI xviii. Any other services which is required for the successful execution of the project. xix. Regular Backup as per the Back-Up Schedule defined by STPI. xx. Report any problem related to the Software and Hardware to STPI. xxi. Data Entry, Migration and Digitization required for the successful Testing, Modification and User Acceptance Testing inorder to achieve “Go-Live”. xxii. Latest version of the whole Solution/ Application should be transferred to STPI along with all the System Software (with all source codes), Hardware, necessary documents and files at the end of the Operation & Maintenance Phase. 11.5. Systems Integrator’s Personnel i. The bidder has to ensure the availability, suitability and adequacy of required resources for STPI during the Application Development Phase and the Operation & Maintenance phase so as to maintain the Service Level Agreement. ii. The bidder may propose the details (as per the format prescribed in AnnexureIX) of all the resources (indicative) required for the project as per their proposed solution. iii. Except as the STPI may otherwise agree, no changes shall be made in the Key Personnel as per details provided in the proposal without prior, written approval of STPI. iv. If, for any reason beyond the control of the Systems Integrator, it becomes necessary to replace any of the Key Personnel, the System Integrator shall forthwith provide, as a replacement a person with equivalent or better qualifications and experience, after taking prior written approval of STPI. v. If STPI: 1) Finds that any of the Personnel has committed serious misconduct or has been charged with having committed a criminal action, or 2) Has reasonable cause to be dissatisfied with the performance of any of the personnel, the System Integrator shall, at the STPI’s written request specifying Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 84 Software Technology Parks of India Request for Proposal for Computerization of STPI the grounds therefore, forthwith provide as a replacement a person with qualifications and experience acceptable to the STPI. vi. The System Integrator shall have no claim for additional costs arising out of or incidental to any removal and/or replacement of Personnel. 11.6. STPI’s roles and responsibilities It will be the responsibility of the STPI: i. To create a dedicated team for overall supervisory and co-ordination for the project including data supply, data verification, data analysis, MIS, etc. ii. Provide office space to the System Integrator along with Internet Facility and space for Help-Desk. iii. Approval/ Acceptance of revalidated the existing SRS and the preparation of System Design Document. iv. To monitor detailed SLAs and defined policies. v. To compile the feedback on application modules received from various users. vi. Freezing of change requests/ additions/ modification of application software. vii. To monitor the maintenance of proper records for inventory, stocks, receipt of infrastructure etc. viii. To monitor computation of penalties, release of payments. ix. Verification of data digitization. x. End user machines and backbone connectivity would be provided by STPI 11.7. Liquidated Damages System Integrator shall commence the work and shall execute the project as per time frame mutually agreed upon in the contract. If the completion of the project milestones is not attained within the stated time, it would attract penalty @0.4% of the Total Value to be disbursed up to attainment of Milestone-3 i.e. 50% of Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 85 Software Technology Parks of India Request for Proposal for Computerization of STPI CAPEX Quoted as per the financial bid of the Bidder per week of delay in Milestone 1, Milestone 2 and Milestone 3, subject to a maximum of 4% beyond which the Contract may be liable for Termination. Further, STPI shall arrive at the applicable penalties as per the terms & conditions of Tender document before every due payment. The same will be communicated to the System Integrator, in case of the disagreement the System Integrator would need to provide the justification in writing within one week to STPI. Based on the justification given by System Integrator, STPI would invoke/relax the penalty(ies) depending upon the merit of the case. The decision of STPI will be final and binding for all such cases. 11.8. Use of Contract Documents and Information i. The System Integrator shall not disclose the Contract or any provision thereof or any specification, plan, drawing, pattern, sample or information furnished by or on behalf of the STPI in connection therewith, to any person other than a person employed by the System Integrator in the performance of the Contract. ii. The System Integrator shall, only with a prior written consent of STPI, make use of any document or information made available for the project, except for purposes of performing the Contract. iii. All project related documents issued by STPI, other than the Contract itself, shall remain the property of the STPI and shall be returned (in all copies) to STPI, on completion of the Systems Integrator’s performance under the Contract if so required by STPI. 11.9. Taxes and Duties The System Integrator shall be entirely responsible for all taxes, duties, levies, license fees, octroi, etc., as applicable as per the statutory requirements throughout the duration of the project for all products and services. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 86 Software Technology Parks of India Request for Proposal for Computerization of STPI 11.10. Intellectual Property Rights (IPR) During the Operation phase, the responsibility to maintain the IPR of the Application(s) provided by the System Integrator would lie with the System Integrator and the System Integrator will transfer the IPR to the STPI or its nominated agency during the Transfer stage. 11.11. Ownership and Title Title to the minor enhancements, point updates and documentation, including ownership rights to patents, copyrights, trademarks and trade secrets therein shall be the exclusive property of the STPI. 11.12. Reverse Engineering The operator shall not reverse engineer any minor, major enhancement or point update. 11.13. Confidentiality The System Integrator hereby acknowledges that the minor enhancements, point updates, and documentation may contain information that may be trade secret and proprietary to the STPI. The System Integrator hereby agrees not to disclose such information except to persons and organizations expressly authorized by STPI to receive such information. The System Integrator shall not remove or alter any copyright notices or proprietary legends affixed by the STPI to such minor enhancements, point updates or documentation. 11.14. Copies The System Integrator shall make available to the STPI an additional copy of the minor enhancements, point updates and documentation for back-up as and when needed by STPI for all proposed applications (solution/ application and custom-made developments): i. A copy of the application with current source code (and the means of compiling that code) Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 87 Software Technology Parks of India Request for Proposal for Computerization of STPI ii. A copy of all applications and all versions of source code (and the means of compiling that code) iii. A copy of the source code for each application upgrade acquired (and the means of compiling that code) iv. Copies of the current and upgrade design documents or technical documents that can be used by IT staff in supporting the applications or in making modifications to existing code. v. Any other artifacts created for/ during the assignment 11.15. Software services and license agreements The licenses of all software to be deployed as part of the project would be perpetual licenses and in the name of the STPI and the original copy of the same shall be deposited by the System Integrator at the office of the STPI after signing of the contract and before the installation of the software at any of the sites. 11.16. Confidential information i. The STPI (“the Disclosing Party”) and the System Integrator (“the Receiving Party”) shall keep confidential and shall not, without the written consent of the other Party hereto, divulge to any third party any documents, data or other information furnished directly or indirectly by the other party hereto in connection with the Contract (Confidential Information), whether such information has been furnished prior to, during or following termination of the Contract. ii. The System Integrator is deemed to be the Receiving Party of Confidential Information generated by the System Integrator itself in the duration of the performance of its obligations under the Contract and relating to the businesses, finances, vendors, employees, or other contracts of the STPI iii. The STPI shall not, without the System Integrator’s prior written consent, use any Confidential Information received from the System Integrator for any purpose other than the operation and maintenance of the project. Similarly, the System Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 88 Software Technology Parks of India Request for Proposal for Computerization of STPI Integrator shall not, without the STPI’s prior written consent, use any Confidential Information received from the STPI for any purpose other than those that are required for the performance of the Contract. 11.17. Project Planning and Performance i. The Agreed and Finalized Project Plan (in case of changes, if any) will be prepared by the System Integrator and approved by the STPI. ii. If required, the impact on the Implementation Schedule of modifications agreed during finalization of the Agreed and Finalized Project Plan shall be incorporated in the Contract by amendment. iii. System Integrator shall undertake to supply, install, test, and commission the Services in accordance with the Agreed and Finalized Project Plan. iv. The progress report and other reports shall be prepared by the System Integrator and submitted to the STPI in the format and frequency specified. v. If at any time the System Integrator’s actual progress falls behind the project schedule described in the Agreed and Finalized Project Plan, or it becomes apparent that it will so fall behind, the System Integrator shall, at the request of the STPI, prepare and submit to STPI a revised project schedule, taking into account the prevailing circumstances, and shall notify STPI of the steps being taken to expedite progress so as to attain completion of the facilities within the stated time for completion. vi. The Department, as per rules, through its officials can undertake audit of the information provided by the System Integrator at any point of time. The System Integrator must provide support and access to the data and its offices meant for the project. In case of any dispute, STPI’s decision will be final and binding on the System Integrator. vii. In case the STPI through audit or otherwise finds that the System Integrator has purposefully committed any irregularity, STPI has the right to terminate the contract with immediate effect and revoke the PBG. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 89 Software Technology Parks of India Request for Proposal for Computerization of STPI 11.18. Product upgrades At any point during performance of the Contract, should technological advances be introduced by the System Integrator for the IT Services originally offered by the System Integrator in its bid and is still to be delivered, the System Integrator shall be obligated to offer to the STPI the latest versions of the available technology having equal or better performance or functionality at the same or lesser unit prices. 11.19. Inspection and Testing The STPI reserves the right of inspection of processes being followed by the System Integrator anytime during the whole duration of the project. The STPI reserves the right to inspect, test and, wherever necessary, reject the software delivered and deployed at Project Site as provided by STPI. This shall in no way be limited or waived by reason of the Hardware having previously been inspected, tested and passed by the STPI or its representative prior to the Hardware supply. 11.20. Commissioning and User Acceptance i. Commissioning of the Project shall be commenced by the System Integrator immediately after Acceptance Certificate is issued by STPI. The STPI shall depute the personnel and provide all materials and information reasonably required to enable the System Integrator to carry out its obligations with respect to Commissioning of project. Production use of the IT or Services shall not commence prior to the start of the formal Acceptance Testing. ii. The User Acceptance Tests shall be the primary responsibility of the STPI, but shall be conducted with the full cooperation of the System Integrator during Commissioning of the Solution to ascertain whether they conform to the requirements and meets the standard of performance quoted in the System Integrator’s bid, including, but not restricted to, the functional and technical performance requirements. If for reason attributable to the STPI, the Acceptance Test of the Solution cannot be successfully completed within the period specified, from the date of Installation or any other period agreed upon in Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 90 Software Technology Parks of India Request for Proposal for Computerization of STPI writing by the STPI and the Systems Integrator, the System Integrator shall be deemed to have fulfilled its obligations with respect to the technical and functional aspects. iii. If the Solution fails to pass the User Acceptance Test(s) then STPI may consider terminating the contract, unless or otherwise the failure to achieve the Acceptance within the specified time period is due to internal delays or any other reasons attributed to STPI. 11.21. Completion Time Guarantee The System Integrator guarantees that it shall complete the Commissioning of project within the time periods specified in the Implementation Schedule and/ or Agreed and Finalized Project Plan or within such extended time to which the System Integrator shall be entitled to. 11.22. Care of IT products and/or services The System Integrator shall be responsible for the care and custody of the IT Products/ Solution and/or Services or any part thereof for the whole duration of the project, and shall make good at its own cost any loss or damage that may occur to the IT Products/ Solution and/or Services or the relevant part thereof from any cause whatsoever during such period. 11.23. Defect liability The System Integrator warrants that all Services/ Products to be delivered under this contract: i. Shall be free from defects in the design and workmanship; ii. Are newly manufactured, unused, and incorporate all recent material improvements in design; iii. Complies with or exceeds the technical specifications; and Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 91 Software Technology Parks of India Request for Proposal for Computerization of STPI iv. Commercial warranty provisions of products supplied under the contract shall apply to the extent that they do not conflict with the provisions of this Contract. 11.24. Indemnity The System Integrator hereby represents and warrants that: i. The Services/Products as supplied, installed, tested and accepted; ii. Use of the Services/Products in accordance with the Contract; and iii. Copying of the Software and Documentation provided to the STPI in accordance with the Contract. iv. Do not and will not infringe any Intellectual Property Rights held by any third party and that it has all necessary rights or at its sole expense shall have secured in writing all transfers of rights and other consents necessary to make the assignments, licenses, and other transfers of Intellectual Property Rights and the warranties set forth in the Contract, and for the STPI to own or exercise all Intellectual Property Rights as provided in the Contract. v. Without limitation, the System Integrator shall secure all necessary written agreements, consents, and transfers of rights from its employees and other persons or entities whose services are used for Project execution. 11.25. Limitation of Liability Except in cases of criminal negligence or willful misconduct and Intellectual Property Rights Indemnity claims: i. Neither Party shall be liable to the other Party, whether in contract, tort, or otherwise, for any indirect or consequential loss or damage, loss of use, loss of production, or loss of profits or interest costs, which may be suffered by the other Party in connection with the Contract, other than specifically provided as any obligation of the Party in the Contract, and ii. The aggregate liability of the System Integrator to the STPI, whether under the Contract, in tort or otherwise, shall not exceed the Contract Price, provided that Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 92 Software Technology Parks of India Request for Proposal for Computerization of STPI this limitation shall not apply to any obligation of the System Integrator to indemnify the STPI with respect to patent infringement. 11.26. Criminal Charges and Conviction The System Integrator warrants that it has disclosed and will continue to disclose during the term of this Contract full details of all criminal convictions and all pending criminal charges against it or any of its personnel and associates that would reasonably be expected to adversely affect the System Integrator or the Systems Integrator’s capacity to fulfill its obligations under this contract. 11.27. Litigation The bidder should provide information on any litigation (Section-12.15, Annexure XV). If at any stage of bidding process or during the currency of the contract, any suppression / concealment/ falsification of such information comes to the knowledge of STPI, the STPI shall have the right to reject the bid & forfeit the EMD, evoke the PBG or terminate the contract, as the case may be, without any compensation to the bidder. Any payments due to the System Integrator shall also be forfeited. The decision of STPI shall be final and binding in this regard. 11.28. Loss of or Damage to Property; Accident or Injury to Workers The System Integrator shall abide by the job safety, insurance, customs, and immigration measures prevalent and laws in force in the India The System Integrator shall indemnify and hold the STPI and its employees and officers harmless from and against any and all suits, actions or administrative proceedings, claims, demands, losses, damages, costs, and expenses of whatsoever nature, including attorney’s fees and expenses, in respect of the death or injury of any person or loss of or damage to any property by reason of the negligence of the System Integrator or its employees, officers or agents. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 93 Software Technology Parks of India Request for Proposal for Computerization of STPI 11.29. Insurance The System Integrator shall maintain standard forms of comprehensive insurance including liability insurance, system and facility insurance and any other insurance for the personnel, assets, data, software, etc. for the entire duration of the service contract and submit the list of all the insured items to the STPI prior to the start of operations. 11.30. Unforeseen Conditions If, during the execution of the Contract, the System Integrator shall encounter on the Site any physical conditions other than climatic conditions, or artificial obstructions that could not have been reasonably foreseen prior to the date of the Contract by an experienced System Integrator on the basis of reasonable examination of the data relating to the Project and on the basis of information that it could have obtained from a visual inspection of the Site if access thereto was available, or other data readily available to it relating to the project, and if the System Integrator determines that it will in consequence of such conditions or obstructions incur additional cost and expense or require additional time to perform its obligations under the Contract that would not have been required if such physical conditions or artificial obstructions had not been encountered, the System Integrator shall promptly, and before performing additional work or using additional Systems Integrator’s Equipment, notify the STPI in writing of: i. The physical conditions or artificial obstructions on the Site that could not have been reasonably foreseen; ii. The additional work required, including the steps which the System Integrator will or proposes to take to overcome such conditions or obstructions; iii. The extent of the anticipated delay; and iv. The additional cost and expense that the System Integrator is likely to incur. 11.31. Force majeure i. Neither Party to this Agreement or to the SLA shall be liable to the other for any loss or damage which may be suffered by the other due (directly) to the extent Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 94 Software Technology Parks of India Request for Proposal for Computerization of STPI and for the duration of any cause beyond the reasonable control of the Party unable to perform ("Force Majeure") events such as but not limited to acts of God not confined to the premises of the Party claiming the Force Majeure, flood, drought, lightning or fire, earthquakes, strike, lock-outs beyond its control, labor disturbance not caused at the instance of the Party claiming Force Majeure, acts of government or other competent authority, war, terrorist activities, military operations, riots, epidemics, civil commotions etc. No failure, delay or other default of any System Integrator to either Party shall entitle such Party to claim Force Majeure. ii. The Party seeking to rely on Force Majeure shall promptly, within 2 days, notify the other Party of the occurrence of a Force Majeure event as a condition precedent to the availability of this defense with particulars detail in writing to the other Party and shall demonstrate that it has and is taking all reasonable measures to mitigate the events of Force Majeure. iii. In the event the Force Majeure substantially prevents, hinders or delays the Systems Integrator's performance of Services necessary for the operation of Project’s critical business functions for a period in excess of 5 days, the STPI may declare that an emergency exists. The STPI will issue a notice to the System Integrator to resume normal services at all affected sites and for all operations within a period of 7 days. In the event that the System Integrator is not able to resume services within the next 7 days, the STPI may terminate the Agreement and/or obtain substitute performance from an alternate Systems Integrator. However, the event of Force Majeure is to be reviewed under two categories i.e. prior to commencement of operations and post commencement of operations respectively. iv. Prior to commencement of operations: If the event of Force Majeure occurs prior to commencement of operations and continues for a period in excess of 10 days, then the STPI will grant a period of 7 days to the System Integrator to resume normal activities under this Agreement. In case the default continues, then the STPI may discuss the issue with the System Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 95 Software Technology Parks of India Request for Proposal for Computerization of STPI Integrator and revise the existing timelines for the Project. If the System Integrator does not complete the Project in accordance with the revised timeless, the STPI will have the option to invoke the EMD / Performance Bank Guarantee and/or terminate this Agreement v. Post commencement of operations: If Force Majeure occurs post commencement of operations and continues for a period in excess of five days, then the STPI will grant a period of 7 days to the System Integrator to resume normal services under this Agreement. In case the default continues, the STPI may grant an extension of time to the System Integrator for rectifying the situation. However, the STPI will deduct for each day of the extension period a percentage proportionate to the number of days and the affected areas/s from the next payable amount as per Payment Schedule. If there is any further delay despite the extended period, the STPI will have the option to invoke the EMD / Performance Bank Guarantee and/or terminate the Agreement. vi. Notwithstanding the terms of this section, the failure on the part of the System Integrator under the SLA or Project Engagement Definition under the SLA to implement any disaster contingency planning and back-up and other data safeguards in accordance with the terms of the SLA or Project Engagement Definition against natural disaster, fire, sabotage or other similar occurrence shall not be an event of Force Majeure. 11.32. Extension of Time for Completion The Time for Completion shall be considered for extension, if any of the Milestone is delayed or impeded in the performance of obligations of System Integrator under the contract by reason of any of the following: i. Any occurrence of Force Majeure or unforeseen conditions ii. Any changes in laws and regulations iii. Any internal delays on the part of STPI. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 96 Software Technology Parks of India Request for Proposal for Computerization of STPI iv. By such period as shall be fair and reasonable in all the circumstances and as shall fairly reflect the delay or impediment sustained by the Systems Integrator. 11.33. Suspension i. No order of suspension of implementing System Integrator would be issued by the STPI, except after conducting an enquiry by STPI, authorized in this regard. ii. The grounds for suspension of implementing System Integrator may include inter alia: 1) Contravention of the conditions/clauses as would be specified in the Contract. 2) Inability to perform the duties and requirements as would be specified in the contract. 11.34. Termination The STPI, without prejudice to any other rights or remedies it may possess, may terminate the Contract forthwith in the following circumstances by giving a notice of termination of 30 days and its reasons therefore to the Systems Integrator: i. If the System Integrator becomes bankrupt or insolvent, has a receiving order issued against it, compounds with its creditors, or, if the System Integrator is a corporation, a resolution is passed or order is made for its winding up, (other than a voluntary liquidation for the purposes of amalgamation or reconstruction), a receiver is appointed over any part of its undertaking or assets, or if the System Integrator takes or suffers any other analogous action in consequence of debt; ii. If the Systems Integrator, in the judgment of the STPI has engaged in corrupt, fraudulent, coercive or collusive practices in competing for or in executing the Contract, including but not limited to willful misrepresentation of facts concerning ownership of Intellectual Property Rights in, or proper authorization and/or licenses from the owner to offer the hardware, software, or materials provided under the Contract. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 97 Software Technology Parks of India Request for Proposal for Computerization of STPI iii. If the System Integrator is unable to deliver the services as per the SLA’s defined in section 9, then STPI may serve a 30 days written notice for curing the breach. In case, the breach of SLA’s continues after the expiry of such notice period, STPI will have the option to terminate this Contract. iv. If the Systems Integrator: 1) Has abandoned or repudiated the Contract; 2) Has without valid reason failed to commence work on the project promptly; 3) Persistently fails to execute the Contract in accordance with the Contract or persistently neglects to carry out its obligations under the Contract without just cause; 4) Refuses or is unable to provide sufficient Documentation, Services, or labor to execute and complete the project in the manner specified in the Agreed and Finalized Project Plan v. Then the STPI may, without prejudice to any other rights it may possess under the Contract, give a notice to the System Integrator stating the nature of the default and requiring the System Integrator to remedy the same. If the System Integrator fails to remedy or to take steps to remedy the same within Thirty (30) days of its receipt of such notice, then the STPI may terminate the Contract forthwith by giving a notice of termination to the System Integrator 1) Upon receipt of the notice of termination, the System Integrator shall, either immediately or upon such date as is specified in the notice of termination, 2) Cease all further work, except for such work as the STPI may specify in the notice of termination for the sole purpose of protecting that part of the project already executed, or any work required to leave the Site in a clean and safe condition; 3) Deliver to the STPI the part of the project executed by the System Integrator up to the date of termination; Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 98 Software Technology Parks of India Request for Proposal for Computerization of STPI 4) To the extent legally possible, assign to the STPI all rights, title and benefit of the System Integrator to the Project as of the date of termination, and, as may be required by the STPI 5) Deliver to the STPI all drawings, specifications, and other documents prepared by the System Integrator as of the date of termination in connection with the Project. 11.35. Effects of Termination i. In the event that STPI terminates this Agreement pursuant to failure on the part of the System Integrator to comply with the conditions as contained in this Clause and depending on the event of default, Performance Guarantee furnished by System Integrator may be forfeited. ii. Upon termination of this Agreement, the Parties will comply with the Exit Management Schedule set out as Schedule III of this Agreement. iii. In the event that STPI or the System Integrator terminates this Agreement, the compensation will be decided in accordance with the Terms of Payment Terms set out under Section 10. iv. STPI agrees to pay System Integrator for i) all charges for Services System Integrator provides and any Deliverables and/or system (or part thereof) System Integrator delivers through termination, and ii) reimbursable expenses System Integrator incurs through termination. If STPI terminates without cause, STPI also agrees to pay any applicable adjustment expenses System Integrator incurs as a result of such termination (which System Integrator will take reasonable steps to mitigate). 11.36. Change Orders/Alterations/Variation The System Integrator agrees that the requirements of the Bidding Documents are minimum requirements and are in no way exhaustive and guaranteed STPI. It shall be the responsibility of the System Integrator to meet all the requirements contained in the Bidding Documents and any upward revisions and/or additions of quantities, Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 99 Software Technology Parks of India Request for Proposal for Computerization of STPI specifications sizes given in Specifications and drawings etc. of the Bidding Documents required to be made during execution of the works shall not constitute a change order and shall be carried out without a change order and shall be carried out without any time and cost effect to STPI. Further upward revisions and or additions required make System Integrator selected equipment and installation procedures to meet Bidding Documents requirements expressed and to make entire facilities safe, operable and as per specified codes and standards shall not constitute a change order and shall be carried out without any time and cost effect to STPI. Any upward revision and/or additions consequent to errors, omissions, ambiguities, discrepancies in the specification and Drawings etc. of the Bidding Documents which the System Integrator had not brought out to the STPI’s notice in his Tender shall not constitute a change order and such upward revisions and/or addition shall be carried out by System Integrator without any time and cost effect to STPI. I. Change Order a. The change order will be initiated only in case (i) the STPI directs in writing the System Integrator to include any addition to the scope of work covered under this Contract or delete any part of the scope of the work under the Contract, (ii) System Integrator requests to delete any part of the work which will not adversely affect the operational capabilities of the facilities and if the deletions proposed are agreed to by the STPI and for which cost and time benefits shall be passed on to the STPI, (iii) the STPI directs in writing the System Integrator to incorporate changes or additions to the Design Criteria requirements already covered in the Contract. b. Any changes required by the STPI over and above the minimum requirements given in the specifications and drawings etc. included in the Bidding Documents before giving its approval to detailed design or Engineering for complying with design criteria and changes required to ensure systems compatibility and reliability for safe (As per codes, standards and recommended practices referred in the Bidding Documents) and trouble free operation shall not be construed to be change in the Scope of work under the Contract. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 100 Software Technology Parks of India Request for Proposal for Computerization of STPI c. Any change order as stared in Clause 11.36.1.b. comprising an alteration which involves change in the cost of the works (which sort of alteration is hereinafter called a “Variation”) shall be the Subject of an amendment to the Contract by way of an increase or decrease in the Contract Price and adjustment of the implementation schedule if any. d. If the Contract provides applicable rates for the valuation of the variation in question the Contract price shall subject to Clause 11.36.1.b. be increased or decreased in accordance with those rates. e. If parties agree that the Contract does not contain applicable rates or that the said rates are inappropriate or the said rates are not precisely applicable to the variation in question, then the parties shall negotiate a revision of the Contract Price which shall represent the change in cost of the works caused by the Variations. Any change order shall be duly approved by the STPI in writing. f. If there is a different of opinion between the System Integrator and STPI’s Representative whether a particular work or part of the work constitutes a change order or not, the matter shall be handled in accordance with the procedures set forth in Clause 11.36.2.k. g. Within ten (10) working days of receiving the comments from the STPI or the drawings, specification, purchase requisitions and other documents submitted by the System Integrator for approval, the System Integrator shall respond in writing, which item(s) of the Comments is/are potential changes(s) in the “Scope of work” of the Tender document covered in the Contract and shall advise a date by which change order (if applicable) will be submitted to the STPI. II. Procedures For Change Order a. During detailed Engineering and subsequently, if the System Integrator observes that any new requirement which is other than that required for meeting the design criteria is not specific or intended by the Contract has been stipulated by the STPI, while approving the specifications, calculations, purchase requisitions, other documents etc. he would verbally discuss the matter with STPI’s Representative. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 101 Software Technology Parks of India Request for Proposal for Computerization of STPI b. In case such requirement arises from the side of the System Integrator, he would also verbally discuss the matter with STPI’s Representative giving reasons thereof. c. In either of the two cases as explained in Clause 11.36.2 (a) and (b) above, the representatives of both the parties will discuss on the new requirement for better understanding and to mutually decide whether such requirement constitutes a change order or not. d. If it is mutually agreed that such Requirement constitutes a “Change Order” then a joint memorandum will be prepared and signed by the System Integrator and STPI to confirm a “Change Order” and basic ideas of necessary agreed arrangement. e. System Integrator will study the work required in accordance with the joint memorandum under Clause 11.36.2.(d) and assess Subsequent schedule and cost effect, if any. f. Upon completion of the study referred to above under Clause 11.36.2.(e), the results of this study along with all relevant details including the estimated time and cost effect thereof with supporting documents would be submitted to the STPI to enable the STPI to give a final decision whether System Integrator should proceed with the change order or not in the best interest of the works. g. The estimated cost and time impact indicated by System Integrator shall be considered as a ceiling limit and shall be provisionally considered for taking a decision to implement change order. h. The time impact applicable to the Contract shall be mutually agreed, subsequently, on the basis of the detailed calculations supported with all relevant back up documents. i. In case System Integrator fails to submit all necessary substantiation/calculations and back up documents, the decision of the STPI regarding time and cost impact shall be final and binding on the System Integrator. j. If STPI accepts the implementation of the change order under Clause 11.36.2 (f) above in writing, which would be considered as change order, then System Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 102 Software Technology Parks of India Request for Proposal for Computerization of STPI Integrator shall commence to proceed with the relevant work stipulated in the change order pending final agreement between the parties with regard to adjustment of the Contract Price and the Construction Schedule. k. In case, mutual agreement under Clause 11.36.2 (d) above, i.e. whether new requirement constitutes the change order or not, is not reached, then System Integrator in the interest of the works, shall take up the implementation of the work, if advised in writing to do so by STPI’s Representative pending settlement between the two parties to the effect whether such requirement constitutes a change order or not as per the terms and conditions of Contract documents. The time and cost effects in such a case shall be mutually verified and recorded. Should it establish that the said work constitutes a change order, the same shall be compensated taking into account the records kept in accordance with the Contract. The System Integrator shall submit necessary back up documents for the change order showing the break-up of the various elements (e.g. Engineering, Procurement, Development, Installation, etc.) constituting the change order for the STPI’s review. If no agreement is reached between the STPI and System Integrator within 60 days after STPI’s instruction in writing to carry out the change concerning the increase or decrease in the Contract price and all other matters described above, either party may refer the dispute to arbitration. III. Conditions for Extra Work/Change Order The provisions of the Contract shall apply to extra work performed as if the Extra work / Change order has been included in the original Scope of work. However, the Contract Price shall increase / decrease and the Construction Schedule shall be adjusted on account of the Extra work / Change orders as may be mutually agreed in terms of provisions set forth in Clause 11.36.1 through 11.36.2 above. The System Integrator obligations with respect to such work remain in accordance with the Contract. The extra work shall not be included in the Contract price for the purpose of calculations of liquidated damages. For Extra works/ Change order, if implemented on day work basis, cost of testing shall also be payable by the STPI. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 103 Software Technology Parks of India Request for Proposal for Computerization of STPI 11.37. Exit management i. Purpose a. This clause sets out the provisions which will apply on expiry or termination of the “Contract Agreement”, the “Project Implementation, Operation and Management SLA (Service Level Agreement)” and “SOW (Scope of Work)”. b. In the case of termination of the Project Implementation and/or Operation and Management SLA or SOWs due to illegality, the Parties (‘STPI’, ‘Systems Integrator’) shall agree at that time whether, and if so during what period, the provisions of this clause shall apply. c. The Parties shall ensure that their respective associated entities, in case of the STPI or its nominated agencies and Systems Integrator, carry out their respective obligations set out in this Exit Management Clause. ii. Transfer of Assets a. The System Integrator shall be entitled to use the Facilities for the duration of the exit management period. b. The STPI during the Project Implementation Phase and Operation and Management Phase shall be entitled to serve notice in writing on the System Integrator at any time during the exit management period requiring the System Integrator to provide the STPI with a complete and up to date list of the Assets within 30 days of such notice. All the Assets detailed in the list shall be transferred to STPI within the time period as indicated to the System Integrator by STPI. c. Upon service of a notice as mentioned in point above, the following provisions shall apply: a) In the event, if the Assets to be transferred are mortgaged to any financial institutions by the Systems Integrator, the System Integrator shall ensure that all such liens and liabilities have been cleared beyond doubt, prior to such Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 104 Software Technology Parks of India Request for Proposal for Computerization of STPI transfer. All documents regarding the discharge of such lien and liabilities shall be furnished to the STPI or its nominated agencies. b) All risk in and title to the Assets to be transferred to be purchased by the STPI or its nominated agencies pursuant to Clause (ii) above, shall be transferred to the STPI or its nominated agencies, on the last day of the exit management period. c) That on the expiry of this clause, the System Integrator and any individual assigned for the performance of the services under this clause shall handover or cause to be handed over all Confidential Information and all other related materials in its possession, including all the hardware supplied by System Integrator under this clause to the STPI. d) That the products and technology delivered to the STPI during the contract term or on expiry of the contract duration should not be sold or re-used or copied or transferred by System Integrator without prior written notice and approval of the STPI. All hardware supplied on upfront payment basis, software & documents etc. used by System Integrator for the STPI shall be the legal properties of the STPI. iii. Cooperation and Provision of Information During the exit management period: a. The System Integrator will allow the STPI or its nominated agencies access to information reasonably required to define the then current mode of operation associated with the provision of the services to enable it to assess the existing services being delivered; b. Promptly on reasonable request by the STPI or its nominated agencies, the System Integrator shall provide access to and copies of all information held or controlled by it, the Project Implementation, the Operation and Management SLA and SOWs relating to any material aspect of the services (whether provided by Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 105 Software Technology Parks of India Request for Proposal for Computerization of STPI the Systems Integrator). The STPI or its nominated agencies shall be entitled to copy all such information. Such information shall include details pertaining to the services rendered and other performance data. The System Integrator shall permit the STPI or its nominated agencies and/or any Replacement System Integrator to have reasonable access to its employees and facilities as reasonably required to understand the methods of delivery of the services employed by the System Integrator and to assist appropriate knowledge transfer. iv. Confidential Information, Security and Data a. The System Integrator will promptly on the commencement of the exit management period supply to the STPI or its nominated agencies the following: 1) Information relating to the current services rendered and user satisfaction surveys and performance data relating to the performance in relation to the services; 2) Documentation relating to Intellectual Property Rights; 3) The STPI data and confidential information; 4) All current and updated departmental data as is reasonably required for purposes of STPI or its nominated agencies transitioning the services to its System Integrator in a readily available format; and 5) All other information (including but not limited to documents, records and agreements) relating to the services reasonably necessary to enable STPI or its nominated agencies, or its System Integrator to carry out due diligence in order to transition the provision of the Services to STPI or its nominated agencies, or its System Integrator (as the case may be). b. Before the expiry of the exit management period, the System Integrator shall deliver to the STPI or its nominated agencies all new or up-dated materials from the categories and shall not retain any copies thereof, except that the System Integrator shall be permitted to retain one copy of such materials for archival purposes only. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 106 Software Technology Parks of India Request for Proposal for Computerization of STPI c. Before the expiry of the exit management period, the STPI or its nominated agencies shall deliver to the System Integrator all forms of System Integrator confidential information which is in the Possession or Control of the STPI or its nominated agencies or its users. v. Employees a. Promptly on reasonable request at any time during the exit management period, the System Integrator shall, subject to applicable laws, restraints and regulations (including in particular those relating to privacy) provide to the STPI or its nominated agencies a list of all employees (with job titles) of the System Integrator dedicated to providing the services at the commencement of the exit management period; b. Where any national, regional law or regulation relating to the mandatory or automatic transfer of the contracts of employment from the System Integrator to the STPI or its nominees, or a Replacement System Integrator ("Transfer Regulation") applies to any or all of the employees of the Systems Integrator, then the Parties shall comply with their respective obligations under such Transfer Regulations. c. To the extent that any Transfer Regulation does not apply to any employee of the Systems Integrator, the STPI or its nominated agencies, or its Replacement System Integrator may make an offer of employment or contract for services to such employee of the System Integrator and the System Integrator shall not enforce or impose any contractual provision that would prevent any such employee from being hired by the STPI or its nominated agencies or any Replacement Systems Integrator. vi. Transfer of Certain Agreements On request by the STPI or its nominated agencies, the System Integrator shall effect such assignments, transfers, innovations, licenses and sub-licenses as required in favor of the STPI or its nominated agencies, or its Replacement System Integrator in relation to any equipment lease, maintenance or service provision agreement between System Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 107 Software Technology Parks of India Request for Proposal for Computerization of STPI Integrator and third party lessors, Systems Integrator/Successful Bidders, or Systems Integrator, and which are related to the services and reasonably necessary for the carrying out of replacement services. vii. Right of Access to Premises a. At any time during the exit management period, where Assets are located at the Systems Integrator’s premises, the System Integrator will be obliged to give reasonable rights of access to the STPI or its nominated agencies, and/or any Replacement Systems Integrator. b. The System Integrator shall also give the STPI or its nominated agencies, or any Replacement System Integrator right of reasonable access to the Systems Integrator’s premises and shall procure the STPI or its nominated agencies and any Replacement System Integrator rights of access to relevant third party premises during the exit management period and for such period of time as is reasonably necessary to migrate the services to the STPI or its nominated agencies, or a Replacement Systems Integrator. viii. General Obligations of the System Integrator a. The System Integrator shall provide all such information as may reasonably be necessary to effect handover as practicable in the circumstances to the STPI or its nominated agencies or its replacement System Integrator and which the System Integrator has in its possession or control at any time during the exit management period. b. The System Integrator shall commit adequate resources to comply with its obligations under this Exit Management Clause. ix. Exit Management Plan a. The System Integrator shall provide the STPI or its nominated agencies with a recommended exit management plan ("Exit Management Plan") which shall deal with at least the following aspects of exit management as a whole and in relation to the Project Implementation, the Operation and Management SLA and SOWs. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 108 Software Technology Parks of India Request for Proposal for Computerization of STPI 1) A detailed programme of the transfer process that could be used in conjunction with a Replacement System Integrator including details of the means to be used to ensure continuing provision of the services throughout the transfer process or until the cessation of the services and of the management structure to be used during the transfer; and 2) Plans for communication with such of the Systems Integrator's staff, suppliers, users and any related third party as are necessary to avoid any material detrimental impact on STPI’s operations as a result of undertaking the transfer; and 3) If applicable, proposed arrangements for the segregation of the Systems Integrator's networks from the networks employed by the STPI or its nominated agencies and identification of specific security tasks necessary at termination; and 4) Plans for provision of contingent support to the STPI or its nominated agencies, and Replacement System Integrator for a reasonable period after transfer for the purposes of providing service for replacing the Services. b. Exit Management Plan shall be presented by the System Integrator to and approved by the STPI or its nominated agencies. c. During the exit management period, the System Integrator shall use its best efforts to deliver the services. d. Payments during the Exit Management period shall be made in accordance with the Terms of Payment Clause. e. The Exit Management plan shall be furnished in writing to the STPI within 90 days. 11.38. Arbitration i. All disputes, differences, claims and demands arising under this contract agreement shall be referred to arbitration of a sole arbitrator to be appointed by the Director General, STPI. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 109 Software Technology Parks of India Request for Proposal for Computerization of STPI ii. The provisions of the Arbitration and Conciliation Act, 1996 shall be applicable and the award made there under shall be final and binding upon the parties hereto, subject to legal remedies available under the law. Such differences shall be deemed to be a submission to arbitration under the Indian Arbitration and Conciliation Act, 1996, or of any modifications, Rules or re-enactments thereof. 11.39. Jurisdiction i. If any dispute of any kind whatsoever, and not resolved through arbitration, arises between the STPI and the System Integrator in connection with or arising out of the Contract, including without prejudice to the generality of the foregoing, any question regarding its existence, validity, or termination, the parties shall seek to resolve any such dispute or difference by mutual consultation. If the parties fail to resolve such a dispute or difference by mutual consultation then all the litigation and proceedings, if arises at any time should be subject to jurisdiction of Delhi High Court only. ii. This guarantee shall be governed by and construed in accordance with the Indian Laws and STPI hereby submit to the exclusive jurisdiction of courts of Justice in India for the purpose of any suit or action or other proceedings arising out of this guarantee or the subject matter hereof brought by you may not be enforced in or by such count Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 110 Software Technology Parks of India Request for Proposal for Computerization of STPI SECTION 12: ANNEXURE (FORMS AND FORMATS) 12.1. Covering Letter – Tender Document (Format) Annexure-I To be submitted on the Letterhead of the responding firm) {Place} {Date} To, The Director, Software Technology Parks of India, Ganga Software Technology Complex, Sector – 29, Noida - 201303 Ref: Tender no ___________ dated ________ Subject: Covering Letter for the proposal for “Selection of System Integrator for Computerization of STPI”. Dear Sir, 1. Having examined the Tender document, we, the undersigned, herewith submit our proposal in response to your Tender no._____________________dated ____________ for “Computerization of STPI”, in full conformity with the said Tender document. 2. We have read the provisions of the Tender document and confirm that these are acceptable to us. We further declare that additional conditions, variations, deviations, if any, found in our proposal shall not be given effect to. 3. We agree to abide by this proposal, consisting of this letter, the detailed response to the Tender and all attachments, for a period of 180 days from the closing date fixed for submission of proposals as stipulated in the Tender document. 4. The Earnest Money Deposit of INR 30.00 Lakh submitted by us in the form of Bank Guarantee shall be forfeited and the contract would be liable for termination, if we Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 111 Software Technology Parks of India Request for Proposal for Computerization of STPI do not submit the requisite Performance Bank Guarantee within 15 days of issuance of Letter of Intent for “Computerization of STPI”. 5. We would like to declare that we are not involved in any major litigation that may have an impact of affecting or compromising the delivery of services as required under this assignment and we are not under a declaration of ineligibility for corrupt or fraudulent practices. 6. We would like to declare that there is no conflict of interest in the services that we will be providing under the terms and conditions of this Tender. 7. We hereby declare that all the information and statements made in this proposal are true and accept that any misrepresentation contained in it may lead to our disqualification. 8. We understand STPI is not bound to shortlist/ accept any proposal received during the Bid Process. 9. Our correspondence details with regards to this proposal are: S.No. Information Details 1. Name of responding firm: 2. Address of responding firm: 3. Name, Designation and Address of the contact person to whom all references shall be made regarding this Tender: 4. Telephone no. of contact person: 5. Mobile no. of contact person: 6. Fax no. of contact person: Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 112 Software Technology Parks of India 7. Request for Proposal for Computerization of STPI E-mail address of contact person: We hereby declare that our proposal submitted in response to this Tender is made in good faith and the information contained is true and correct to the best of our knowledge and belief. Yours sincerely, (Signature) Name of the Authorized signatory: Designation of Signatory: Seal Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 113 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.2. Bid Check-List Annexure-II Bidder is advised to ensure that the following requirements have been complied in their bid. 1. Please tick whichever is applicable. 2. Please follow guidelines for bidding given in the Tender. 3. The checklist duly filled and signed must be submitted in envelope 1. GENERAL 1. Has the bid document and required formats been submitted separately: i. 2. ii. Envelop 2: Technical Proposal Yes No iii. Envelope 3: Financial Proposal Yes No Details of the EMD:(i) (ii) (iii) (iv) 3. Envelop 1: EMD, Document Fee Receipt and Pre-Qualification Proposal Yes No Name of the Bank Amount BG number & date Validity date Have corrections if any, been attested by the authorized person? Yes 4. No Have the rates, prices, totals, amount, been checked thoroughly? Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 114 Software Technology Parks of India Request for Proposal for Computerization of STPI Yes 5. Has it been ensured that no price/amount of any Item(s) is mentioned in the Technical bid? Yes 8. No Does the bidder comply with the bid validity of 180 days Yes 10. No Does the bidder meet the eligibility criteria? Yes 9. No No Is the Power of Attorney provided? Yes No (Signature) Name of the Authorized signatory: Designation of Signatory: Seal Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 115 Software Technology Parks of India Request for Proposal for Computerization of STPI Annexure-III 12.3. Earnest Money Deposit – Forwarding Letter ___________ (Location) ______________ (Date) From (Name & Address of the Bidder) To Director, ____________________________ Software Technology Parks of India, ____________________________ Ganga Software Technology Complex, ____________________________ Sector – 29, ____________________________ Noida – 201303 Dear Sir/Madam, Sub: EMD for “Selection of System Integrator for Computerization of STPI” Ref.: Tender dated __________. We, M/s__________________________________, having read and examined in detail the Tender document and amendments for “Selection of System Integrator for Computerization of STPI” to Software Technology Parks of India. We M/s _______________ hereby submit EMD of Rs. 30,00,000/- (Rupees Thirty Lakh Only) in the form of Bank Gurantee. The details are as under: a. Name of Issuing Bank : b. BG No. c. Amount : d. Dated : : Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 116 Software Technology Parks of India Request for Proposal for Computerization of STPI We M/s __________________ having read and understand the clauses of Tender towards forfeiture of EMD. Yours sincerely, (Signature) Name of the Authorized signatory: Designation of Signatory: Seal Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 117 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.4. Pre-Qualification Document Check-List Annexure-IV ____________ (Location) ____________ From (Name & Address of the Bidder) (Date) To, Director, ____________________________ Software Technology Parks of India, ____________________________ Ganga Software Technology Complex, ____________________________ Sector – 29, ____________________________ Noida – 201303 Sub: Pre-Qualification Document Check-List for “Selection of System Integrator for Computerization of STPI” Dear Sir/Madam, We, M/s__________________________________, confirm that we meet the prequalification criteria listed in the Bid no: ____________ dated __________. We are submitting the following documents for our eligibility. S. No. Criteria (Section-5.1: Pre-qualification Criteria) 1. The Lead Bidder should be registered under the Companies Act, 1956, and Lead Bidder should have been in existence for the last 3 years in the field of Software/ Application Development and Integration in India Compliance Type of Document (Complied/Not Documentary Annexed Complied) Evidence at Page Provided No. YES / NO Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 118 Software Technology Parks of India Request for Proposal for Computerization of STPI S. No. Criteria (Section-5.1: Pre-qualification Criteria) 2. 3. The Lead Bidder should have positive net worth and an overall annual turnover of not less than INR 150 Crore during each of the last three financial years. Out of which INR 50 Crore should be from Software/ Application Development and Integration in each of the last three financial years from Indian operations. (FY 2009-10, 2010-11 and 2011-12 respectively). The Lead Bidder must possess a valid Compliance Type of Document (Complied/Not Documentary Annexed Complied) Evidence at Page Provided No. YES / NO YES / NO Certification in the Capability Maturity Model (CMM Level 5). 4. The Lead Bidder should have an active ISO YES / NO 9001:2008 certification at the time of submission of the bid ( lead bidder has to ensure that the certificate has to remain valid during the life cycle of the project) 5. The Lead Bidder should have minimum 150 YES / NO technically qualified professionals on its payrolls as on Bid Submission Date 6. The Lead Bidder must have experience in the YES / NO following criteria: (i) The Lead experience Bidder should (automation of have similar the entire organization covering all the process and functions of its branches and sub-branches) in the field of IT System Integration Projects including Implementation / Operations with at least one completed IT project in last 3 years Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 119 Software Technology Parks of India Request for Proposal for Computerization of STPI S. No. Criteria (Section-5.1: Pre-qualification Criteria) Compliance Type of Document (Complied/Not Documentary Annexed Complied) Evidence at Page Provided No. (from the date of publishing of Tender) worth INR 12 Crore in India for Indian client. OR (ii) The Lead Bidder must have similar experience (automation of the entire organization covering all the process and functions of its branches and sub-branches) in the field of IT System Integration Projects including Implementation / Operations with at least 3 completed IT project in last 3 years (from the date of publishing of Tender) in India worth INR 6 Crore (each) or more in India for Indian client. 7. Experience of managing applications and YES / NO systems deployed at a Data Centre (of that particular application or systems), successfully completed or ongoing in last 3 years (from the date of publishing of Tender) in India for Indian client 8. Banned or Blacklisted Companies by any State / Central Government or any YES / NO Government Institutions in India will not be eligible to participate. 9. The lead Bidder should have an office in YES / NO Delhi/NCR 10. Permanent Account Number (PAN) of lead YES / NO Bidder available from Income Tax authorities. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 120 Software Technology Parks of India S. No. Criteria (Section-5.1: Pre-qualification Criteria) 11. Consortium/Sub-Contracting to the extent of data digitization is allowed. Request for Proposal for Computerization of STPI Compliance Type of Document (Complied/Not Documentary Annexed Complied) Evidence at Page Provided No. YES / NO The lead Bidder is required to provide consortium agreement / letter from the subcontractor for the same. 12. Power of Attorney provided YES/NO Yours sincerely, (Signature) Name of the Authorized signatory: Designation of Signatory: Seal Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 121 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.5. Bidder Details Annexure-V S.No. Parameters Response 1. Name and Organization address of 2. Year of establishment 3. Name and address of the banker 4. Contact person a) Name & Designation b) Mobile No., Office Telephone No. c) E-mail ID. 5. Financial Information Business Results Sales Turnover (Rs Lakh) Profit Tax after Turnover from activity related to Application/ Solution Development in (Rs in Lakh) (Rs. In Lakh) FY 2011-12 FY 2010-11 FY 2009-10 6. Details of similar project executed for the Government organization, if any. a) Project 1 b) Project 2 Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 122 Software Technology Parks of India S.No. Parameters Request for Proposal for Computerization of STPI Response n) Project n... 7. 8. Whether ISO 9001 – (Please Tick) 2008 certified (only for Yes information) No No. of support offices in India. Yours Sincerely, (Signature) Name of the Authorized signatory: Designation of Signatory: Seal Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 123 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.6. Covering Letter – Technical Bid (Format) Annexure-VI __________ (Location) __________ (Date) From (Name & Address of the Bidder) To Director, ____________________________ Software Technology Parks of India, ____________________________ Ganga Software Technology Complex, ____________________________ Sector – 29, ____________________________ Noida – 201303 Dear Sir/Madam, Sub: Covering Letter for Technical Bid for the proposal for “Selection of System Integrator for Computerization of STPI” Ref.: Tender dated __________. 1. We, the undersigned, having read and examined in detail all the Tender document of the subject Tender, do propose hereby to provide the Computerization of Software Technology Parks of India (STPI). 2. We declare that all the services will be performed strictly in accordance with the Tender document including the letter conveying the modifications in the Tender document after Pre-bid meeting and contract irrespective of whatever has been stated to the contrary anywhere in our bid. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 124 Software Technology Parks of India Request for Proposal for Computerization of STPI 3. We confirm having submitted the information as required in the Tender document including the letter conveying the modifications in the Tender document after Prebid meeting. In case any further clarification/documentary proof in this regard before evaluation of our bid, we agree to furnish the same in time. 4. We hereby declare that, in case the Contract is awarded to us, we shall submit Earnest Money Deposit, Performance Bank Guarantee and Bank Guarantees as described in this Tender. 5. Our Proposal is binding upon us and subject to the modifications resulting from contract negotiations, up to expiration of the validity period of the Proposal. 6. We undertake that, in competing for (and, if the award is made to us, in executing) the above contract, we will strictly observe the laws against fraud and corruption in force in India namely "Prevention of Corruption Act 1988". 7. We understand that STPI is not bound to accept any Proposal received. Yours sincerely, (Signature) Name of the Authorized signatory: Designation of Signatory: Seal Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 125 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.7. Approach and Methodology Annexure-VII 1. Solution Proposed 2. Understanding of the project 3. Technical Approach and Methodology Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 126 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.8. Team Composition and Task Assignments Annexure-VIII Please indicate composition of teams separately for Implementation and Post Implementation phases: Name of Staff Firm Area of Expertise Position Task Assigned Assigned This information should be provided for all key staff, such as team leaders, project managers, technical support staff, etc. The relevant CV’s of the professional staffs mentioned above are also required to be given in the format provided under this section. (Signature) Name of the Authorized signatory: Designation of Signatory: Seal Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 127 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.9. Format Curriculum Vitae (CV) for Proposed Professional Staff Annexure-IX 1. Proposed Position [only one candidate shall be nominated for each position]: 2. Name of Firm [Insert name of firm proposing the staff]: 3. Name of Staff [Insert full name]: 4. Date of Birth: Nationality: 5. Education [Indicate college/university and other relevant specialized education of staff member, giving names of institutions, degrees obtained, and dates of obtainment]: 6. Membership of Professional Associations: 7. Other Training [Indicate significant training since degrees under “5 – Education” were obtained]: 8. Countries of Work Experience: [List countries where staff has worked in the last ten years]: 9. Languages [For each language indicate proficiency: good, fair, or poor in speaking, reading, and writing]: 10. Employment Record [Starting with present position, list in reverse order every employment held by staff member since graduation, giving for each employment (see format here below): dates of employment, name of employing organization, positions held, Project handled.]: From [Year]: To [Year]: Employer: Positions held: Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 128 Software Technology Parks of India Request for Proposal for Computerization of STPI Works Undertaken that Best Illustrates Detailed Tasks Assigned [List all performed tasks under to Capability to Handle the Tasks Assigned be [Among the assignments in which the staff has this been involved, indicate the following information for assignment] those assignments that best illustrate staff capability to handle the project] Name of assignment or project: Year: Location: Client: Main project features: Positions held: Activities performed: 11. Staff is resident / native of: 12. Certification: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged. Date: [Signature of staff member or authorized representative of the staff]: Day/Month/Year: Full name of authorized representative: Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 129 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.10. Format for Experience Details Annexure-X Name of the Assignment Name of the client Location of the country Project and the Start date and End Date Name of the associated consultants, if any Number of staff and the duration of the project in man months/ man days Approximate value of services Names of the Senior staff involved and function performed Narrative Description of the Project/ present status Technology used Number of locations Other Project Details (Broad details) Contact Person Designation Phone No Yours sincerely, (Signature) Name of the Authorized signatory: Designation of Signatory: Seal Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 130 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.11. Work Plan Annexure-XI Staff input (in the form of a bar chart) S. No. Activity Total 1 2 3 4 5 6 7 8 9 10 11 12 Months 1. 2. 3. 4. Sub Total Total Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 131 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.12. Resource Deployment Plan Annexure-XII S.No Staff inputs in week ** (in the form of a bar chart) Name of Staff * 1 2 3 4 5 6 7 8 9 10 11 12 N Total Staff man-month proposed Total 1. 2. 3. Sub Total Total * For Professional Staff the input should be indicated individually; for support staff it should be indicated by category ** Weeks are counted from the start of the assignment. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 132 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.13. Covering Letter – Financial Bid (Format) Annexure-XIII __________ (Location) __________ (Date) From (Name & Address of the Bidder) ____________________________ ____________________________ ____________________________ ____________________________ To The Director, Software Technology Parks of India, Ganga Software Technology Complex, Sector – 29, Noida – 201303 Dear Sir/Madam, Sub: Covering Letter for the proposal for “Selection of System Integrator for Computerization of Software Technology Parks of India (STPI)” We, the undersigned, offer to provide the services as required in the above in accordance with your Tender dated ________ including the letter conveying the modifications in the Tender document after Pre-bid meeting and our Proposal (Technical and Financial). Our Proposal is binding upon us and subject to the modifications resulting from contract negotiations, up to expiration of the validity period of the Proposal, i.e. [Date_____]. We undertake that, in competing for (and, if the award is made to us, in executing) the above contract, we will strictly observe the laws against fraud and corruption in force in India namely "Prevention of Corruption Act 1988". We understand that STPI is not bound to accept any Proposal received. Yours sincerely, (Signature) Name of the Authorized signatory: Designation of Signatory: Seal Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 133 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.14. Format for Financial Quotations Annexure-XIV A. Main Cost Elements of the STPI computerization project I Type of Service Per Transaction Rate of Service Charge Quoted (in Rs.) Weight a. High Volume Services 0.95 b. Low Volume Services 0.05 I Weighted Average Rate 0.95 X a + 0.05 X b High volume services currently are – Issue of Import Certification, Export Certification, Performance Monitoring (APR/MPR/QPR) & typically form 95% of all external transactions. All other EXIM services like are treated as Low volume services. The quoted charges shall be inclusive of all applicable taxes, duties and other charges. Cost of Core Components II Cost of Core Components in Rs. Component a. CAPEX b. OPEX (total for entire service period) II Cost of Core Components (a + b) Figures Words CAPEX and OPEX quoted in II, should be what is being desired by the Bidder from STPI (inclusive of all applicable taxes, duties and other charges) besides the service charge quoted for external transactions. This cost should not be included while calculating the service charge quoted in I, and man-month rate quoted in B. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 134 Software Technology Parks of India Request for Proposal for Computerization of STPI B. Man-month rate for additional module/ development effort = Rs. ___________ Note:1. All the quoted charges shall be inclusive of all applicable taxes, duties and other charges. 2. It is expected that STPI might go for additional module/ development effort for 10 Man-months besides the current Scope of Work. 3. L-1 bidder will be selected as per the Financial Evaluation criteria defined in Clause no. 5.3 4. The rate of the Government levies/duties/taxes on the complete cost as applicable on the date of opening of price bids will be considered for evaluation. In case there is variation in the statutory levies/taxes during the contract, the same will be payable at actual as per original delivery schedule. Yours sincerely, (Signature) Name of the Authorized signatory: Designation of Signatory: Seal Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 135 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.15. Format for filling Litigation Details Annexure-XV The bidder is required to provide the details of ANY LITIGATION in the following format. S. No. Type of work Initiated By Amount involved in Dispute Stage of Litigation Remarks 1. 2. 3. 4. 5. 6. N Yours sincerely, (Signature) Name of the Authorized signatory: Designation of Signatory: Seal Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 136 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.16. Format for Performance Bank Guarantee Annexure-XVI Ref.No._____________________________ Bank Guarantee No _____________ Dated______________ To, The Director, Software Technology Parks of India, Ganga Software Technology Complex, Sector – 29, Noida - 201303 Dear Sir, 1. In consideration of Software Technology Parks of India, having its office at Ganga Software Technology Complex, Sector – 29, Noida - 201303 (hereinafter referred to as ‘STPI’, which expression shall, unless repugnant to the context or meaning thereof, include all its successors, administrators, executors and assignees) after receipt of the Letter of Intent (LOI) __________________________ dated having _______________ its registered/head with office M/s at ______________________(hereinafter referred to as the SYSTEMS INTEGRATOR) which expression shall, unless repugnant to the context or meaning thereof include all its successors, administrators, executors and assignees) and STPI having agreed that the SYSTEM INTEGRATOR shall furnish to STPI a performance guarantee for 10% of the Total Project Cost for the faithful performance of the entire CONTRACT. 2. We (name of the bank) ______________________________ registered under the laws of _______ having head / registered office at __________________________ (hereinafter referred to as "the Bank", which expression shall, unless repugnant to the context or meaning thereof, include all its successors, administrators, executors and permitted assignees) do hereby guarantee and undertake to pay immediately on Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 137 Software Technology Parks of India Request for Proposal for Computerization of STPI first demand in writing any / all moneys to the extent of 10% of the Total Project Cost without any demur, reservation, contest or protest and / or without any reference to the SYSTEMS INTEGRATOR. Any such demand made by STPI on the Bank by serving a written notice shall be conclusive and binding, without any proof, on the bank as regards the amount due and payable, notwithstanding any dispute(s) pending before any Court, Tribunal, Arbitrator or any other authority and / or any other matter or thing whatsoever, as liability under these presents being absolute and unequivocal. We agree that the guarantee herein contained shall be irrevocable and shall continue to be enforceable until it is discharged by STPI in writing. This guarantee shall not be determined, discharged or affected by the liquidation, winding up, dissolution or insolvency of the SYSTEM INTEGRATOR and shall remain valid, binding and operative against the bank. 3. The Bank also agrees that STPI at its option shall be entitled to enforce this Guarantee against the Bank as a principal debtor, in the first instance, without proceeding against the SYSTEM INTEGRATOR and notwithstanding any security or other guarantee that STPI may have in relation to the SYSTEMS INTEGRATOR’s liabilities. 4. The Bank further agrees that STPI shall have the fullest liberty without our consent and without affecting in any manner our obligations hereunder to vary any of the terms and conditions of the said CONTRACT or to extend time of performance by the said SYSTEMS INTEGRATOR(s) from time to time or to postpone for any time or from time to time exercise of any of the powers vested in STPI against the said SYSTEMS INTEGRATOR(s) and to forbear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said SYSTEMS INTEGRATOR(s) or for any forbearance, act or omission on the part of STPI or any indulgence by STPI to the said SYSTEMS INTEGRATOR(s) or any such matter or thing whatsoever which under the law relating to sureties would, but for this provision, have effect of so relieving us. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 138 Software Technology Parks of India Request for Proposal for Computerization of STPI 5. The Bank further agrees that the Guarantee herein contained shall remain in full force during the period that is taken for the performance of the CONTRACT and all dues of STPI under or by virtue of this CONTRACT have been fully paid and its claim satisfied or discharged or till STPI discharges this guarantee in writing, whichever is earlier. 6. This Guarantee shall not be discharged by any change in our constitution, in the constitution of STPI or that of the SYSTEMS INTEGRATOR. 7. The Bank confirms that this guarantee has been issued with observance of appropriate laws of the country of issue. 8. The Bank also agrees that this guarantee shall be governed and construed in accordance with Indian Laws and subject to the exclusive jurisdiction of Indian Courts of Delhi. 9. Notwithstanding anything contained herein above, our liability under this Guarantee is limited to Indian Rs. (in figures) ______________ (Indian Rupees (in words) ____________________) and our guarantee shall remain in force until ______________________(indicate STPI date of expiry of bank guarantee). Any claim under this Guarantee must be received by us before the expiry of this Bank Guarantee. If no such claim has been received by us by the said date, the rights of STPI under this Guarantee will cease. However, if such a claim has been received by us within the said date, all the rights of STPI under this Guarantee shall be valid and shall not cease until we have satisfied that claim. In witness whereof, the Bank through its authorized officer has set its hand and stamp on this........ day of ........2013 at ..................... WITNESS NO. 1 -------------------------(Signature) Full name and official address (in legible letters) ------------------------(Signature) Full Name, Designation and Address (in legible letters) with Bank stamp Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 139 Software Technology Parks of India Request for Proposal for Computerization of STPI Attorney as per power of Attorney No............... WITNESS NO. 2 Dated…………………. -------------------------(Signature) Full name and official Address (in legible letters) Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 140 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.17. Format for Indemnity Bond Annexure-XVII (To Be Furnished on a Rs. 100 Non-Judicial Stamp Paper) THIS BOND is made on this ……… day of …………, 2013 by M/s…………………. through Sh……………………………….. duly authorized representative of the …………………. (hereinafter referred to as ………………….. which expression shall unless context requires different or another meaning, include its successors, administrators and assigns) in favor of the Software Technology Parks of India, DeitY, GoI (hereinafter called “The Authority” which expression shall include its successors and assigns). WHEREAS …………… has entered into an agreement executed on ………………………., 2013 with the Authority (hereinafter referred to as “The said Agreement”) for the complete Computerization of STPI as per the specifications mentioned in the Tender document. AND WHEREAS M/s.….………. has to indemnify the STPI against any loss or damage that STPI may sustain on account of infringement of Copyright Act or any other law for the time being in force with respect to Application software used, developed, modified, supplied to, or usage thereof by STPI or on any account as aforesaid. Now therefore, in consideration of the said Agreement, the executants………….. hereby undertakes to indemnify STPI and shall always keep it indemnified against any loss, damage that it may sustain or any claim made against it or any proceedings that may be taken out against it for the usage of the Application Software maintained, developed, and the software packages/tools used or supplied/used including infringement of any provisions of the Copyright Act 1957, or any law or statue for the time being in force, on account of sale, supply and usage of the Application Software by STPI etc. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 141 Software Technology Parks of India Request for Proposal for Computerization of STPI Now, therefore, in witness thereof the executant Company has set its hand through its authorized representative on the day, month and the year first mentioned herein above. EXECUTANT For M/s Authorised representative Witness: 1. 2. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 142 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.18. Non Disclosure Agreement Annexure-XVIII NON-DISCLOSURE AGREEMENT THIS AGREEMENT is made on this the ____ day of _______ 2013 at ________, India. BETWEEN Software Technology Park of India having its office at Noida, India hereinafter referred to as STPI, which expression shall, unless the context otherwise requires, include its permitted successors and assigns); AND ___________, a Company incorporated under the Companies Act, 1956, having its registered office at ___________ (hereinafter referred to as ‘the System Integrator (SI)’ which expression shall, unless the context otherwise requires, include its permitted successors and assigns). Each of the parties mentioned above are collectively referred to as the ‘Parties’ and individually as a ‘Party’. WHEREAS: 1. STPI is desirous to implement the project of Computerization of STPI 2. STPI and System Integrator have entered into a Master Services Agreement dated _____________(the “MSA”) as well as a Service Level Agreement dated ___________ (the “SLA”) in furtherance of the Project. 3. Whereas in pursuing the Project (the “Business Purpose”), a Party (“Disclosing Party) recognizes that they will disclose certain Confidential Information (as defined hereinafter) to the other Party (“Receiving Party”). Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 143 Software Technology Parks of India Request for Proposal for Computerization of STPI 4. Whereas such Confidential Information (as defined hereinafter) belongs to Receiving Party as the case may be and is being transferred to the Disclosing Party to be used only for the Business Purpose and hence there is a need to protect such information from unauthorized use and disclosure. NOW THEREFORE, in consideration of the mutual covenants, promises, assurances, representations and provisions set forth herein, the Parties hereto agree as follows: OBLIGATIONS OF THE RECEIVING PARTY The Receiving Party shall: (a) use the Confidential Information only for the Business Purpose and shall hold the confidential Information in confidence using the same degree of care as it normally exercises to protect its own proprietary information, taking into account the nature of the Confidential Information, and (b) grant access to Confidential Information only to its employees on a ‘need to know basis’ and restrict such access as and when not necessary to carry out the Business Purpose. (c) cause its employees to comply with the provisions of this Agreement; (d) reproduce Confidential Information only to the extent essential to fulfilling the Business Purpose, and (e) prevent disclosure of Confidential Information to third parties; (f) disclose the Confidential Information to its consultants/contractors on a need to know basis; provided that by doing so, the Receiving Party agrees to bind such consultants/ contractors to terms at least as restrictive as those stated herein. (g) upon the Disclosing Party's request, the Receiving Party shall either return to the disclosing party all Confidential Information or shall certify to the disclosing party that all media containing Confidential Information have been destroyed. (h) not to remove any of the other Party’s Confidential Information from the premises of the Disclosing Party without prior written approval. (i) exercise extreme care in protecting the confidentiality of any Confidential Information which is removed, only with the Disclosing Party’s prior written Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 144 Software Technology Parks of India Request for Proposal for Computerization of STPI approval, from the Disclosing Party’s premises. Each Party agrees to comply with any and all terms and conditions the disclosing party may impose upon any such approved removal, such as conditions that the removed Confidential Information and all copies must be returned by a certain date, and that no copies are to be made off of the premises. (j) Upon the Disclosing Party’s request, the Receiving Party shall promptly return to the Disclosing Party all tangible items containing or consisting of the disclosing party’s Confidential Information all copies thereof. For and on behalf of [ System Integrator ] Witness:1. 2. For and on behalf of Software Technology Parks of India (STPI) Witness:1. 2. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 145 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.19. Detailed Bill of Material Annexure-XIX S. No. Item Name Specification Quantity 1. 2. 3. -- Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 146 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.20. Draft Agreement Annexure-XX This agreement is executed at New Delhi on this ……… day ……….. of……………………., 2013 between the Software Technology Parks of India (STPI), registered as an autonomous society under Societies Registration Act, 1860 (hereinafter referred to as “The Authority”) which expression shall unless the context requires another or different meaning include its successors and assigns and M/s ……………………………………………… which expression shall unless, the context requires another or a different meaning include its successors, heirs, legal representatives, executors, administrators and assigns of the other part. 2. WHEREAS the Authority is desirous of assigning the work of complete computerization of STPI in accordance with the application requirements specified in the Tender document and further freezed in the revalidated existing SRS document along with the prepared SDD and any other document executed from time to time. AND WHERAS M/s.…………., shall depute its personnel to STPI with prior approval from the STPI to carry out all the tasks required the Computerization of STPI and as mentioned in the Tender document. 3. AND WHERAS M/s.…………., has submitted his offer through bid for the said work which has been executed by the authority subject to all the terms and conditions specified in the Tender document annexed to this agreement. 4. M/s.…………. shall provide the complete equipments/material required for Computerization of STPI as document, to be carried out every day for STPI and coordinate deputed by the STPI to the satisfaction of the User wings Coordinating officer for the project. services and per the Tender with the officers as well as the 5. M/s. ------------- shall submit resumes of the levels of Project Leader, Team Members, Database Administrator, Systems Analyst, Training/Document expert and other experts. STPI shall have the right to select or reject the Manpower offered and may insist for change without assigning any reason at the Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 147 Software Technology Parks of India Request for Proposal for Computerization of STPI start of the assignment or during the currency of the agreement. The manpower will be deputed to work for STPI. 6. M/s. ………… shall adhere to the STPI Calendar and STPI office timings and shall ensure that in case required the personnel will function beyond office hours to meet the targets agreed mutually. 7. M/s.………… shall deploy the project team to function from the STPI premises and in case M/s…………. proposes any change during the term of the Computerization of STPI, the same will of the similar skill level and experience and shall be with prior approval of STPI. The replacements shall not be frequent. In case it is found by STPI that personnel deputed by M/s…………….does not perform as per the requirements of STPI the same shall be replaced immediately on request. 8. In case M/s. -------------is not able to depute the personnel of the skill and experience level as required then M/s ………… shall also pay a penalty for delay in the services as per the terms specified in the Service Level Agreement or the contract shall be liable to be terminated. 9. M/s. ………….. shall also advise the “networking, hardware and system software” infrastructure which may be required for the implementation of the application as per requirements of STPI and shall also quote the price of the same if it is proprietary product. 10. The Work place for the project team members shall be STPI, Noida or any other office as intimated by the STPI. 11. All the terms and conditions as stated in the Tender Document/Work order No -------------------dated------------ shall form part of this Agreement and binding to M/s. ….……….. 12. In case of any dispute arising out of or relating to the terms and conditions of this agreement during the currency of the agreement or completion of the assignment or abandonment, the decision of STPI or any other Officer authorized by him shall be final and binding. All the litigation and proceedings, if arises at any time should be subject to jurisdiction of Delhi High Court. 13. In witness whereof this deed has been executed by the parties on the date, month and year mentioned herein above. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 148 Software Technology Parks of India Request for Proposal for Computerization of STPI For and on behalf of [ Bidder ] Witness:1. 2. For and on behalf of Software Technology Parks of India (STPI) Witness:1. 2. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 149 Software Technology Parks of India Request for Proposal for Computerization of STPI 12.21. Bank Guarantee for Earnest Money Deposit Annexure-XXI Bank Guarantee Format for Furnishing EMD Whereas ……………… (hereinafter called the “tenderer”) has submitted their offer dated…………… for the supply of ……………… hereinafter called the “tender”) against the purchaser’s tender enquiry No. ……………………………………… KNOW ALL MEN by these presents that WE ……………… of ………………… having our registered office at …………… are bound unto …………………. (hereinafter called the “Purchaser) in the sum of ………………………… for which payment will and truly to be made to the said Purchaser, the Bank binds itself, its successors and assigns by these presents. Sealed with the Common Seal of the said Bank this……… day of <<month>>, 2013. THE CONDITIONS OF THIS OBLIGATION ARE: (1) If the tenderer withdraws or amends, impairs or derogates from the tender in any respect within the period of validity of this tender. (2) If the tenderer having been notified of the acceptance of his tender by the purchaser during the period of its validity:a. If the tenderer fails to furnish the Performance Security for the due performance of the contract. b. Fails or refuses to accept/execute the contract. WE undertake to pay the Purchaser up to the above amount upon receipt of its first written demand, without the Purchaser having to substantiate its demand, provided that in its demand the Purchaser will note that the amount claimed by it is due to it owing to the occurrence of one or both the two conditions, specifying the occurred condition or conditions. Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 150 Software Technology Parks of India Request for Proposal for Computerization of STPI This guarantee will remain in force upto and including 45 days after the period of tender validity and any demand in respect thereof should reach the Bank not later than the above date. ……………………………. (Signature of the authorized officer of the Bank) …………………………………………………………. …………………………………………………………. Name and designation of the officer …………………………………………………………. Seal, name & address of the Bank and address of the Branch Any use, dissemination, forwarding, printing, or copying of this confidential document without the prior permission of STPI is strictly prohibited. Page 151