02/10/2016 City Council Agenda Packet - Part 1
Transcription
02/10/2016 City Council Agenda Packet - Part 1
CITY OF ELGIN, ILLINOIS COUNCIL AGENDA CITY COUNCIL CHAMBERS Regular Meeting 7:00 P.M. February 10, 2016 Call to Order Invocation – Pastor Larry Henderson from Kingdom Advancement Center Pledge of Allegiance Roll Call Minutes of Previous Meetings – January 27, 2016 Recognize Persons Present Bids 1. 16‐002 2016 Street Rehabilitation – Eagle Heights South Project ($3,528,000) 2. 16‐003 2016 Water Main Replacement – Eagle Heights South Project ($2,377,778) 3. Job Order Contract Hemmens Auditorium Lights ($193,811) Other Business (O) 1. Public Hearing for Petition 26‐15 at 1110‐1190 South Randall Road, an application by Richport Property, LLC, requesting a Third Amendment to Annexation Agreement, Amendment to Ordinance G32‐10 and Development Plan Approval for the construction of a new retail building and new automatic car wash facility; and Final Plat Approval for the Resubdivision of Lot 2 within Elgin Wal‐Mart/Sam’s Club Subdivision. 2. Consideration of Petition 26‐15 at 1110‐1190 South Randall Road, an application by Richport Property, LLC, requesting a Third Amendment to Annexation Agreement, Amendment to Ordinance G32‐10 and Development Plan Approval for the construction of a new retail building and new automatic car wash facility; and Final Plat Approval for the Resubdivision of Lot 2 within Elgin Wal‐Mart/Sam’s Club Subdivision. City Council Agenda – February 10, 2016 3. 4. 5. 6. 7. Page 2 Consideration of Petition 20‐15 at 2500‐2535 Watermark Terrace, an application by Interstate Partners, LLC, requesting a Map Amendment and Planned Development approval to allow for the construction of a new luxury residential apartment complex known as Watermark at the Grove, and a Second Amendment to Ordinance G30‐08 providing for special regulations for graphics within the development. Resolution Repealing Resolution No. 15‐122 and Authorizing Execution of an Intergovernmental Agreement Between the Illinois State Toll Highway Authority, the Illinois Department of Transportation and the City of Elgin Regarding Improvements Relating to the Reconstruction of I‐90 Route 25 Interchange Improvements Resolution Authorizing Execution of an Agreement with Snap Consulting & Associates, LLC for Consulting Services in Connection with the City of Elgin's Diversity Program An Ordinance Granting a Conditional Use for a Social Service Counseling Center in the CC1 Center City District (25 South Grove Avenue, Suite 305) An Ordinance Providing for the Issuance of $25,000,000 General Obligation Corporate Purpose Bonds, Series 2016, of the City of Elgin, Kane and Cook Counties, Illinois, for the Purpose of Financing Various Capital Improvements, Including, but not Limited to, Street Improvements and Utility Projects, Providing for the Levy and Collection of a Direct Annual Tax for the Payment of the Principal of and Interest on Said Bonds and Authorizing the Sale of Said Bonds to the Purchaser Thereof **Consent Agenda (C) 1. Resolution Authorizing Execution of an Agreement with Industrial/Organizational Solutions, Inc. for Police Sergeant Exam Testing Services in Connection with the Design of Police Written Exam and Assessment Center Project 2. Resolution Accepting Grant of the Department of Justice FY2015 Edward Byrne Memorial Justice Assistance Grant Program for Technology‐Related Purchases and Ratifying the Execution of an Intergovernmental Agreement Relating thereto 3. Resolution Authorizing Purchase of Personnel Observation Device (POD) Camera from Perlmutter Purchasing Power and Purchase of Telescoping Mast from Floatograph Technologies, LLC 4. Resolution Authorizing Execution of a Service Agreement with Dixon Dance Academy, Inc. for Dance Instruction 5. Resolution Authorizing Execution of a Service Agreement with Sterling Symmetry Unlimited, Incorporated for Group Fitness Instruction and Classes City Council Agenda – February 10, 2016 6. 7. 8. 9. 10. 11. 12. Page 3 Resolution Authorizing Execution of a Service Agreement with Carrie Baldwin for Group Fitness Instruction and Classes Resolution Authorizing Execution of a Service Agreement with Midwest Academy of TaeKwon‐Do, Inc. for Martial Arts Classes Resolution Authorizing Execution of a Lease‐Purchase Agreement and Amendment to Lease‐Purchase Agreement with PNC Equipment Finance, LLC Regarding the Lease/Purchase of Golf Cars, Gas Golf Cars and Gas Vehicles Resolution Authorizing Execution of a Lease Agreement and Amendment to Lease Agreement with PNC Equipment Finance, LLC for GPS Units Resolution Accepting for Ownership and Maintenance Certain Public Improvements Within Randall Rose Auto Mall Subdivision Resolution Approving Final Plat of Subdivision for Tanglewood Subdivision An Ordinance Amending Chapter 2.40 Entitled "Fire Department" and Chapter 3.08 Entitled "Board of Fire and Police Commissioners" of the Elgin Municipal Code, 1976, as Amended Miscellaneous Business (M) 1. Boards and Commissions Minutes a. Bicycle & Pedestrian Advisory Committee, January 5, 2016 b. Emergency Telephone System Board, December 17, 2015 c. Human Relations Commission, January 5, 2016 d. Heritage Commission, January 5, 2016 e. Image Advisory Commission November 23, 2015 f. Planning and Zoning Commission January 4, 2016 g. Retiree Health Insurance Trust Fund, November 2, 2015 h. Sustainability Commission, September, October, November 2015 i. Committee of the Whole for January 13, 2016 j. City Council Minutes for January 13, 2016 2. Various Tax Reports a. Sales Tax b. Local Sales Tax c. State Income Tax d. State Use Tax e. Telecommunications Tax f. Alcoholic Tax Revenue City Council Agenda – February 10, 2016 Page 4 Announcements Next Committee of the Whole Meeting, Wednesday, February 24, 2016, at 6:00 p.m., in the City Council Chambers Next Regular Meeting of the Elgin City Council, Wednesday, February 24, 2016, at 7:00 p.m. in the City Council Chambers Adjournment **All matters listed under Consent Agenda are considered to be routine and non‐controversial by the City Council and will be enacted by one motion and one roll call vote. There will be no separate discussion of these items. If discussion is desired by a Council member or citizen, that item will be removed from the Consent Agenda and will be considered separately immediately after approval of the Consent Agenda. Citizens desiring discussion on any item listed under the Consent Agenda should contact a Council member prior to the meeting and request that the item be removed for discussion. The City of Elgin is subject to the requirements of the Americans with Disabilities Act of 1990. Individuals with disabilities who plan to attend this meeting and who require certain accommodations in order to allow them to observe and/or participate in this meeting, or who have questions regarding the accessibility of the meeting or the facilities, are requested to contact the Human Resources Department at (847) 931‐6076 or TT/TDD (847) 931‐5616 promptly to allow the City of Elgin to make reasonable accommodations for those persons. 1 AGENDA ITEM: MEETING DATE: February 10, 2016 ITEM: 2016 Street Rehabilitation – Eagle Heights South Project ‐ Bid 16‐002 ($3,528,000) OBJECTIVE: Improve storm and pavement infrastructure on several adjacent streets in the area of and in‐ cluding Royal Boulevard and Carol Avenue. RECOMMENDATION: Award the 2016 Street Rehabilitation – Eagle Heights South Project bid to Orange Crush, LLC Hillside, Illinois in the amount of $3,528,000. Two bids for the the Eagle Heights South water main replacement and street rehabilitation are being presented for consideration and approval. The project will replace two miles of water main, 750 feet of sewer and rehabilitate two miles of streets. The project will begin this March and is expected to be completed this November. Orange Crush, LLC is the lowest bidder for the street rehabilitation in the amount of $3.53M. BACKGROUND The Royal Boulevard/Carol Avenue area, along with the side streets included in the contract, was generally developed in the 1950s and 1960s. The area of this project is being completed under the Neighborhood Street Rehabilitation Program and includes Royal Boulevard from Tyler Creek to North McLean; Ruth Drive from Royal Boulevard to south end; Deborah Avenue from Royal Boulevard to Kimberly Avenue; Carol Avenue from Royal Boulevard to Diane Avenue; Diane Ave‐ nue from Royal Boulevard to Deborah Avenue, Scott Drive from Royal Boulevard to Kimberly Av‐ enue; Kimberly Avenue from Scott Drive to dead end just west of Deborah and Junior Place be‐ tween Diane Avenue to Scott Drive. This project will be completed after the water department replaces water main on these streets between March and June 2016. The city initiated its street rehabilitation program in the early 1980s and work began in the older, core central neighborhoods and has since expanded outward. The early program primarily fo‐ cused on restoring pavement, repairing damaged curb and gutter and correcting sidewalk trip hazards. Turf restoration was limited to topsoil replacement and seeding. The program evolved 1 into its present configuration which, in addition to restoring pavement, completely replaces curb and gutter; repairs all deteriorated sidewalk; replaces driveway approaches; repairs water main and, in this particular area, upgrades signage and the uses sod when restoring damaged turf ar‐ eas. OPERATIONAL ANALYSIS The project will include the removal and replacement of curb and gutter, sidewalk and drive ap‐ proaches, the repair of pavement base, pavement grinding and new riding surface of three inches of new bituminous concrete. The project will improve approximately 1.9 miles of streets. The project also includes replacing approximately 2,200 lineal feet of deficient storm sewer. Twenty bid packages were sold with the city receiving twelve bidders for the project. Bids ranged from a low of $3,528,000 to a high of $4,629,110.38. Orange Crush, LLC was the lowest respon‐ sive bidder. The completion date for the water main project is June 30 and the completion date 2 for the street project is November 18 based upon a construction start on the street work of July 1. This allows for some time extension of the water main project if it becomes necessary. The engineers estimate for the project is $4,366,870. Orange Crush completed the 2014 Neigh‐ borhood Street Rehabilitation contract for the Royal Boulevard and Garden Crescent area and has previously worked for the city on several other city street projects. Their work has provided a satisfactory product that the city ultimately accepted. INTERESTED PERSONS CONTACTED The “Invest in Elgin” campaign will include public outreach prior to commencing construction and through the construction project. FINANCIAL ANALYSIS The staff recommends awarding the 2016 Street Rehabilitation – Eagle Heights South Project to Orange Crush, LLC in the amount of $3,528,000. The city’s 2016 adopted budget anticipated this project and it will be funded with proceeds from the 2016 General Obligation bond issuance. In addition to the construction component, advertising and design engineering costs of $250,000 were incurred and construction administration costs of $387,808 will be incurred. The engineer‐ ing component will be presented to the city council separately and the agreement for construc‐ tion administration will include engineering efforts to oversee the water main replacement and street rehabilitation efforts. The water main project will be awarded separately via a separate memorandum to city council. BUDGET IMPACT FUND(S) ACCOUNT(S) PROJECT # AMOUNT BUDGETED AMOUNT AVAILABLE 2016 Bond 316‐0000‐795.93‐80 $15,000,000 $15,000,000 LEGAL IMPACT Notices were published in the Daily Herald on January 16, 2016 and on the city’s website. The bids were opened and read publicly on January 26, 2016. ALTERNATIVES The city council may choose to reject all bids. Additional direction will be necessary before the project could be repackaged and bid. 3 NEXT STEPS 1. Execute contract documents. 2. Issue notice to proceed. 3. Deliver notices of construction to each property within the project limits. 4. Complete construction scheduled in 2016. Originators: Final Review: Joseph Evers, City Engineer Debra Nawrocki, Chief Financial Officer William A. Cogley, Corporation Counsel/Chief Development Officer Richard G. Kozal, Assistant City Manager/Chief Operating Officer Sean R. Stegall, City Manager ATTACHMENTS A. Bid Summary Sheet 4 ATTACHMENT A 2016 Street Rehabilitation Eagle Heights South Summary of Bids January 26, 2016 Bidder Orange Crush Bid $3,528,000.00 Schroeder Asphalt Services $3,611,505.58 Arrow Road $3,615,869.73 Landmark Contractors $3,817,342.75 G & M Cement Construction $3,844,017.68 R.W. Dunteman $3,964,605.26 ALamp Concrete $4,253,927.44 Triggi Construction $4,350,161.79 J. Congdon Sewer $4,365,587.00 Copenhaver Construction $4,448,834.80 Martam Construction $4,476,567.90 Glenbrook Excavating $4,629,110.38 Engineer’s Estimate $4,366,870.00 2 AGENDA ITEM: MEETING DATE: February 10, 2016 ITEM: Water Main Replacement ‐ Eagle Heights South Project – Bid 16‐003 ($2,377,778) OBJECTIVE: Improve the city’s infrastructure with replacement of aging water main in the southern portion of the Eagle Heights Subdivision. RECOMMENDATION: Award the 2016 Water Main Replacement – Eagle Heights South project to J. Congdon Sewer Service, Inc. of Carol Stream, Illinois in the amount of $2,377,778. Two bids for the the Eagle Heights South water main replacement and street rehabilitation are being presented for consideration and approval. The project will replace two miles of water main, 750 feet of sewer and rehabilitate two miles of streets. The project will begin this March and is expected to be completed this November. J. Congdon Sewer Service, Inc. is the low bidder in the amount of $2.37M for the water main re‐ placement component of the project. BACKGROUND The city has approximately 500 miles of water main throughout the distribution system to con‐ vey potable water from the treatment plants to consumers. These water mains deteriorate over time due to various issues including the surrounding soil characteristics, age of the pipe, mate‐ rials available when originally constructed and hydraulic characteristics in the distribution sys‐ tem. The number of water main breaks in the southern portion of the Eagle Heights Subdivision has been significant and over the recent years this has continued being a problem as the age of the mains increase. There has also been an increasing number of resident complaints relating to the condition of the subdivision infrastructure, including the roads and water mains. Due to the poor condition of the water mains in the subdivision, it was determined to be in the best inter‐ est of the water distribution system to complete a full replacement throughout the subdivision. This water main replacement project will be the first phase of neighborhood improvements for the area, with a street resurfacing project anticipated immediately following the water main replacement. Replacement of the water mains prior to the street resurfacing will decrease the number of main breaks and required street repairs once the street rehabilitation is completed. A map of the area for water main replacement is below. OPERATIONAL ANALYSIS The project will include the replacement of failing water main with the installation of approxi‐ mately 2,100 feet of twelve inch water main on Royal Boulevard and 8,600 feet of eight inch water main on all of the roads south of Royal Boulevard, as well as replacement of the fire hy‐ drants, valves and city portion of the services along the route. The project will include roadway patching and landscape restoration in areas affected by construction. In addition to the water main work, there will be approximately 750 feet of sanitary sewer replacement in the subdivi‐ sion to address joint offsets, minor pipe failures and flow issues in sections of sewer. The lowest bid was submitted by J. Congdon Sewer Services, Inc. of Carol Stream, Illinois. J. Congdon has previously done satisfactory work for the city of Elgin. See Attachment A and B for the recommendation letter and bid tabulation prepared by Civiltech Engineering, the consult‐ ant design engineer. INTERESTED PERSONS CONTACTED The “Invest in Elgin” campaign will include public outreach prior to commencing construction and through the construction project. 2 FINANCIAL ANALYSIS There were eleven bids received for the project with bids ranging from a low bid of $2,377,778 to a high bid of $3,292,623. Staff recommends awarding the contract to the lowest responsible bidder, J. Congdon Sewer Services, in the amount of $2,377,778. This project will require construction engineering oversight to ensure that the infrastructure improvements meet the design requirements. Staff will be proposing a Construction Engineer‐ ing Services contract with Civiltech Engineering to the council in the near future. BUDGET IMPACT FUND(S) ACCOUNT(S) PROJECT #(S) 2016 Bond 316‐4000‐795.93‐41 AMOUNT BUDGETED $10,000,000 AMOUNT AVAILABLE $10,000,000 LEGAL IMPACT Notices were published in the Daily Herald on January 7, 2016 and on the city’s website. The bids were opened and read publicly on January 26, 2016. ALTERNATIVES The city council may choose to reject the bid. Additional direction to staff would be necessary in order to restart the bid process. NEXT STEPS 1. Execute contract documents. 2. Issue Notice to Proceed. 3. Complete scheduled construction scheduled by July 2016. 3 Originators: Final Review: Eric B. Weiss, Senior Engineer Kyla B. Jacobsen, Water Director Gregory J. Rokos, Public Services Director Debra Nawrocki, Chief Financial Officer William A. Cogley, Corporation Counsel/Chief Development Officer Richard G. Kozal, Assistant City Manager/Chief Operating Officer Sean R. Stegall, City Manager ATTACHMENTS A. B. Civiltech Engineering – Letter Recommending Award of Contract Bid Tabulation 4 3 AGENDA ITEM: MEETING DATE: February 10, 2016 ITEM: Hemmens Auditorium Lights – Job Order Contract Bid ($193,811) OBJECTIVE: Replace the house lighting in the Hemmens auditorium. RECOMMENDATION: Approve contract with F. H. Paschen for lighting replacement in the auditorium in the amount of $193,811. The Hemmens Cultural Center’s auditorium is still using its original light fixtures from 1969. The bulbs used for these fixtures are no longer being manufactured and no replacements will be avail‐ able once existing supplies are exhausted. Replacement fixtures using LED lighting are being rec‐ ommended. The LED fixtures will provide ten years of service, eliminating the need for the staff to regularly replace light bulbs in the fixtures located 30‐40 feet above the seating area. BACKGROUND The Hemmens auditorium was opened in 1969. The house lights in the auditorium are the original light fixtures that were installed when the building was built. The original fixtures were a 750 watt incandescent fixture, which light bulbs were phased out several years ago so. The fixtures now use a 500 watt bulb which will also be phased out soon. These light fixture hang from the ceiling, 30 to 40 feet above the seating. Given the relatively short life span of an incandescent bulb these light fixtures need to be serviced on a regular basis. Over the years, the heat generated by the incandescent lights and the regular changing of light bulbs has damaged the light sockets and other parts of the fixtures to the point where some no longer work and are beyond repair. OPERATIONAL ANALYSIS The new light fixtures proposed for the auditorium are LED fixtures with full range DMX dimming that is compatible with the other lighting equipment in the auditorium. The LED fixtures should provide ten years or more of maintenance‐free service—a major advantage given the difficulty accessing the fixtures. The LED fixtures will also provide a significant reduction in energy use with the new LED fixture drawing about 100 watts at full power. For this project, the staff is using the Job Order Contracting (JOC) process. The JOC process was originally selected to try and meet a very tight time schedule for completion last year. Due to the complexity of the project and lack of funding, this project was not completed in 2015. The JOC contractor not only will complete the project but will provide the regular oversight and project management services that are necessary to complete the project within the small time frame that is available. The city of Elgin has successfully used the JOC process on several projects. INTERESTED PERSONS CONTACTED None. FINANCIAL ANALYSIS The staff recommends awarding the contract to the JOC contractor, F. H. Paschen in the amount of $193,811. BUDGET IMPACT FUND(S) ACCOUNT(S) PROJECT #(S) AMOUNT BUDGETED AMOUNT AVAILABLE Riverboat 275‐0000‐791.93‐36 M00033 $200,000 $200,000 LEGAL IMPACT The process for acquiring these renovating/remodeling projects is utilizing the job order contract‐ ing (JOC) process which has been used successfully on several projects. This process was publicly bid through the city of Naperville and is offered to other municipal governments through a coop‐ erative purchasing agreement. The city’s procurement ordinance expressly authorizes “pur‐ chases made pursuant to any joint purchasing program sponsored by the state or other govern‐ mental agency or association.” ALTERNATIVES 1. The city council may choose not to award the project to the JOC contractor, F. H. Paschen and start the process of a traditional bid. 2. The city council may choose to do nothing and leave the lighting in its current condition. NEXT STEPS Once the bid is awarded, issue a purchase order and complete the project. 2 Originators: Final Review: Rich Hoke, Building Maintenance Superintendent Debra Nawrocki, Chief Financial Officer William A. Cogley, Corporation Counsel/Chief Development Officer Richard G. Kozal, Assistant City Manager/Chief Operating Officer Sean R. Stegall, City Manager ATTACHMENTS A. Proposal 3 Contractor Price Proposal Details - Category Date: 6/30/2015 Job Order #:: 032789.00 Title: City of Elgin - Auditorium Lights Contractor: F. H. Paschen, S. N. Nielsen & Associates LLC Job Order Value: $193,810.64 Proposal Name: City of Elgin - Auditorium Lights Proposal Value: $193,810.64 CSI Number Mod UOM Description LineTotal Plaster Repair 1 09 01 20 00-0017 SF Cut And Patch Hole To Match Existing, > 250 SF To 500 SF Qty Installation 360.00 Unit Price X $3,771.28 Factor Total $9.64 X 1.0867 $3,771.28 Contractor Notes: Cut out plaster ceiling at under side of balcony and control booth. New light fixtures are larger than existing so plaster will need to be cut out, patched, and blended to existing. 2 09 91 23 00-0158 SF Paint Interior Drywall/Plaster Ceiling, 1 Coat Primer, Brush/Roller Work Qty Installation 2,650.00 X Unit Price Factor Total $0.67 X 1.0867 $1,929.44 $1,929.44 Contractor Notes: Prime underside of balcony and control booth after plaster patching is complete. 3 09 91 23 00-0158 0312 MOD For Quantities > 2500 To 5000, Deduct Qty Installation 4 09 91 23 00-0160 SF 2,650.00 X Unit Price ($86.39) Factor Total ($0.03) X 1.0867 ($86.39) Paint Interior Drywall/Plaster Ceiling, 2 Coats Paint, Brush/Roller Work Qty Installation 2,650.00 X Unit Price Factor Total $1.25 X 1.0867 $3,599.69 $3,599.69 Contractor Notes: Paint underside of balcony and control booth after plaster patching is complete. 5 09 91 23 00-0160 0312 MOD For Quantities > 2500 To 5000, Deduct Qty Installation 2,650.00 X Unit Price ($172.79) Factor Total ($0.06) X 1.0867 ($172.79) Subtotal for Plaster Repair: $9,041.23 Theater Lighting Replacement Contractor Price Proprosal Details - Category 1 of 3 CSI Number Mod UOM Description LineTotal CCF Scaffolding With Bracing Accessories - Area Based On 3' Wide x 7' Long Sections (CCF / Month) Theater Lighting Replacement 6 01 54 23 00-0005 Qty Installation 180.00 Unit Price X Factor Total $18.03 X 1.0867 $3,526.78 $3,526.78 Contractor Notes: Scaffolding materials for (3) scaffold towers to be built in the theater. Towers to be 10' x 10' and approx 60' tall. 7 01 54 23 00-0009 CCF Scaffolding Erection And Dismantling - Height 41' To 60' Per CCF Of Scaffolding And Accessories. Cost Includes Both Erection And Dismantling Of Scaffolding Qty Installation 900.00 Unit Price X Factor Total $57.39 X 1.0867 $56,129.14 $56,129.14 Contractor Notes: Erect and dismantle scaffolding towers multiple times throughout project to access all fixture locations on theater ceiling. Estimated (5) re-locations per tower. 8 01 66 19 00-0007 CY Handling Material For Over 125' Per CY Of Material Per 125'Note: For delivery, demo or miscellaneous moving required by owner Qty Installation 667.00 Unit Price X Factor Total $3.49 X 1.0867 $2,529.65 $2,529.65 Contractor Notes: Carry scaffolding by hand into theater and remove when finished. 9 01 74 19 00-0010 EA 6 CY Dumpster (1 Ton) "Construction Debris"Note: Includes delivery of dumpster, rental cost, pick-up cost, hauling, and disposal fee. Non-hazardous material. Qty Installation 2.00 Unit Price X $565.87 Factor Total $260.36 X 1.0867 $565.87 Contractor Notes: Disposal of construction debris. 10 26 05 33 00-0712 LF 3/4" EMT Conduit, Mounted Exposed On Flat Wall Qty Installation 320.00 Unit Price X $1,352.72 Factor Total $3.89 X 1.0867 $1,352.72 Contractor Notes: Install conduit for cabling at stage area per drawings. 11 26 05 33 00-0723 EA 3/4" EMT 90 Degree Elbow Qty Installation 8.00 $84.24 Unit Price X Factor Total $9.69 X 1.0867 $84.24 Contractor Notes: conduit fittings 12 26 05 33 00-0745 EA 3/4" EMT Compression Coupling Qty Installation 30.00 $169.53 Unit Price X Factor Total $5.20 X 1.0867 $169.53 Contractor Notes: Conduit fittings 13 26 05 33 00-0778 EA 3/4" EMT Box Connector, Compression Qty Installation 10.00 Unit Price X $65.96 Factor Total $6.07 X 1.0867 $65.96 Contractor Notes: conduit fittings Contractor Price Proprosal Details - Category 2 of 3 CSI Number Mod UOM Description LineTotal Dimmable Lighting Controls, Wall Box Wireless Transmitter (Lutron RTA-WX-2B-WH) $13,961.08 Theater Lighting Replacement 14 26 09 23 00-0096 EA Qty Installation 57.00 Unit Price X Factor Total $225.39 X 1.0867 $13,961.08 Contractor Notes: Supply and install new threw breakers and connect to lighting control panel per drawings. 15 26 51 13 00-0180 EA Open/Baffle, Recessed Fixture Trim Qty Unit Price $1,739.61 Factor Total Installation 26.00 X $50.87 X 1.0867 $1,437.29 Demolition 26.00 X 10.7 X 1.0867 $302.32 Contractor Notes: Recessed fixture trim 16 26 51 13 00-0290 EA 171 Watt LED, 4' Length, High Bay Fixture Qty Unit Price $68,468.23 Factor Total Installation 31.00 X $1,942.33 X 1.0867 $65,432.63 Demolition 31.00 X 90.11 X 1.0867 $3,035.60 Contractor Notes: Remove (31) existing fixtures on theater ceiling and replace with new LED fixtures. 17 26 56 26 00-0027 EA 15 Watt LED Recessed Uplight Qty $21,007.00 Unit Price Factor Total Installation 26.00 X $621.22 X 1.0867 $17,552.07 Demolition 26.00 X 122.28 X 1.0867 $3,454.92 Contractor Notes: Remove (26) existing recessed lights and replace with new LED recessed lights. 18 27 14 13 13-0015 PR Certify And Document 1-Pair Of A Copper Communications Cable Qty Installation 57.00 Unit Price X Factor Total $9.17 X 1.0867 $568.01 $568.01 Contractor Notes: Test, certify, and terminate lighting control cables in control cabinet. 19 27 14 13 16-0069 MLF 2-Pair 24 AWG, Category 3, Indoor Telecommunications Plenum Cable, Installed Exposed Qty Installation 11.70 Unit Price X Factor Total $1,148.43 X 1.0867 $14,601.59 $14,601.59 Contractor Notes: Install communication/data cabling between all light fixtures and lighting control cabinet. 0 Subtotal for Theater Lighting Replacement: $184,769.41 Grand Total: $193,810.64 This work order proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding of the line totals and sub-totals. The Percent of NPP on this Proposal: Contractor Price Proprosal Details - Category 0.00 3 of 3 February 10, 2016 TO: Mayor and Members of the City Council FROM: Sean R. Stegall, City Manager Sarosh B. Saher, AICP, Senior Planner SUBJECT: Public Hearing to Consider a Third Amendment to Annexation Agreement Final Plat of Subdivision for the Resubdivision of Lot 2 of Elgin Wal-Mart/Sam’s Club Subdivision Development Plan Approval By Richport Property LLC – S. Randall Outlot, a Series of Richport Property LLC (Petition 26-15) SUMMARY Allow Richport Property, LLC to resubdivide Lot 2 within Elgin Wal-Mart/Sam’s Club Subdivision; and request Planned Development Approval to develop a 9,470 square foot multitenant retail building on resultant Lot 1 (1190 South Randall Road). A 3,550 square foot carwash building will be constructed on resultant Lot 2 (1180 South Randall Road). Mayor and Members of City Council February 10, 2016 Page 2 The annexation agreement requires that development of outlots within the subdivision be approved through Planned Development approval. The developer is also requesting that the additional land uses that were approved for the first retail building along Bowes Road be permitted uses on these resultant lots along Randall Road. The inclusion of the additional land uses requires a third amendment to the Annexation Agreement and Planned Development Ordinance G32-10. BACKGROUND The Elgin Wal-Mart and Sam’s Club shopping center was annexed and zoned in 2006. That approval included the establishment of a Wal-Mart store (opened October 2011), a Sam’s Club store (opened September 2012), and other retail and commercial establishments on seven additional outlots. That approval also required that any development upon the outlots be approved through a public hearing before the Planning & Zoning Commission with final approval by the City Council. In 2011, Lot 9 (1040 South Randall Road) was developed with a Sam’s Club Motor Vehicle Service Station and in 2012/2013, Lots 3 and 4 (1020-1030 South Randall Road) were developed with a Portillo’s Restaurant and Lot 10 (2415 Bowes Road) was developed with a multi-tenant retail building. The subject property is Lot 2 of the recorded subdivision, and it is located south of the Sam’s Gas Station with frontage along Randall Road. The following actions are requested: I. Final Plat of Subdivision for the Resubdivision of Lot 2 Lot 2 is currently one of ten lots within the “Elgin Wal-Mart/Sam’s Club Subdivision.” The lot is approximately 227,456 square feet (5.2217 acres) in land area. At the time of annexation, the lot was configured with the intention of being resubdivided into customized smaller lots to suit new development as and when contemplated. The resubdivision proposes the creation of five lots ranging in land area from 30,859 square feet (0.71 acre) to 59,896 square feet (1.37 acres). The lots will be provided with access from the private drive that runs along their westerly (rear) frontage. The private drive is designed to provide all lots within the subdivision with access to Randall Road. Cross-access drives are proposed to increase the connectivity between the lots. Each lot will be provided with the necessary utility connections. Stormwater run-off will be managed by the regional detention facility that is located at the southwest corner of the subdivision. At this time, only the development of resultant Lots 1 and 2 is contemplated. Lots 3, 4 and 5 are proposed to remain vacant and will be developed when land uses including potential personal services providers, mid-value dine-in restaurants and mid-value quick service restaurants are requested. Mayor and Members of City Council February 10, 2016 Page 3 II. Planned Development Approval A. Lot 1 (1190 South Randall Road) – New Multi-Tenant Retail Building The developer proposes to construct a new a 9,470 square foot multi-tenant retail building on the 54,809 square foot (1.26 acre) lot. Recall that in 2013, the developer also proposed and constructed a retail building adjacent to the Portillo’s Restaurant. The building is proposed to contain a minimum of three tenant spaces with the flexibility to reconfigure the interior to add additional tenants. The building will face Randall Road and will be designed with storefronts on three sides. Service entrances and the attached masonry trash enclosure will be located at the rear (west) side of the building facing the interior of the subdivision. The site is proposed to be landscaped with a combination of trees and shrubs along its periphery and an outdoor patio at the southeast corner of the building. Vehicle and bicycle parking will be provided on the lot. Pedestrian connection will be provided between the retail building and the existing bicycle path along Randall Road. The elevations of the building are designed in brick and cultured stone, with awnings or trellises over storefront windows, brackets within the soffits and architectural roof shingles to provide variety and interest in the elevation. Decorative building lighting in the form of sconce light fixtures are proposed at each storefront bay. The end bays of the building will be highlighted with hipped roofs. Each storefront bay is provided with space for an optional wall mounted graphic as and when the need arises. The lot is proposed to contain one free-standing monument graphic facing Randall Road and will contain the names and logos of the tenants located within the building. The graphic is designed with a masonry base that matches the material of the building. B. Lot 2 (1180 South Randall Road) – Fuller’s Automated Car Wash The developer proposes to construct a new a 3,550 square foot automated carwash on the 38,616 square foot (0.89 acre) lot. The carwash will be configured as an automated tunnel carwash facility with its entrance on the north side and exit on the south side of the building. The three pay stations will be provided access by means of stacking lanes designed to accommodate five cars each for a total of 15 cars. Overflow traffic to the lot will be accommodated by the private drive within the subdivision. The lot will have a detached trash enclosure located along the westerly service drive to the building. The elevations of the building are designed primarily in brick and stone stamped precast panels that will be painted. The longer elevations will be divided into bays containing windows to break up the monotony of an otherwise blank wall. Horizontal bands are proposed to create additional interest in the elevations. The entrance to the offices and employee spaces within the building is surmounted by a large architectural metal arched roof to help break up the height and façade of the Mayor and Members of City Council February 10, 2016 Page 4 building. Decorative building lighting in the form of sconce light fixtures are proposed on the façade of the building. 12 vacuum stalls are proposed on the east side of the building which are accessible after exiting the tunnel car wash. The vacuum stalls will be covered with an arched metal roof designed to match the building’s architectural roof. A brick screen wall located on the east side of the stalls is proposed to screen the activity and head lights from shining onto Randall Road and the residential property to the east. The site is proposed to be landscaped with a combination of trees and shrubs along its periphery. Vehicle parking will be provided on the lot. Due to the vehicleintensive nature of the land use, no bicycle parking or pedestrian connection to Randall Road is proposed on this lot. The lot is proposed to contain one free-standing monument graphic facing Randall Road and will contain an electronic LED message center panel with the name and messages related to the carwash facility. The graphic is designed with a masonry base that matches the material of the building. Additional free-standing directional graphics are proposed at the entrance to and exit from the property. The building is proposed to contain wall-mounted graphics on each elevation requiring departures from the requirements of the graphics ordinance. C. Additional Permitted Uses The land uses allowed on the property are governed by Ordinance G32-10. The developer is requesting approval of an amendment to the planned development ordinance as it relates to the development of the five resultant commercial lots fronting Randall Road in the same manner as was approved for the retail building fronting Bowes Road. Specifically, the amendment would add 11 additional permitted uses to the list of uses that could occupy any of the five lots. The planned development ordinance which regulates development within the entirety of the Wal-Mart and Sam’s Club shopping center was approved in 2006 and later amended in 2010 and 2014. The ordinance currently provides for a number of land uses that are permitted and additional land uses that could be established following the grant of a conditional use process by City Council. To increase the likelihood of leasing the space within the proposed retail building, the developer is requesting that the following additional uses be allowed to locate within the building as of right. These uses would have to comply with all other provisions of the planned development and the Elgin Zoning Ordinance, including but not limited to the parking and graphics requirements. Amendments to the Annexation Agreement and Planned Development Ordinance G32-10 will be required to allow for these uses to be established on the property. Computer programming, data processing and other related services Electrical and electronic repair shops Mayor and Members of City Council February 10, 2016 Page 5 Home healthcare services Legal Services Management and public relations services Offices and clinics of dentists Offices and clinics of doctors of medicine Offices and clinics of doctors of osteopathy Offices and clinics of other health practitioners Medical and dental laboratories accessory to a medical or dental office Physical fitness facilities Car wash (as a principal use) PLANNED DEVELOPMENT DEPARTURES AND EXCEPTIONS A planned development may be granted certain departures from the normal standards, regulations, requirements, and procedures of the zoning ordinance. Elgin Walmart/Sam’s Club Subdivision was approved in 2006, with a number of departures from the standard requirements of the zoning and subdivision regulations as they related to number of principal buildings per zoning lot, building and vehicle use area setbacks, and graphics. As part of the subject planned development application for the development of Lots 1 and 2 of Resubdivided Lot 2 of the overall subdivision, the applicant is requesting the following departures from the Zoning Ordinance: 1. 19.12.300 (E) Principal Buildings per Zoning Lot. In the AB Area Business Districts, no more than one principal building is allowed on a zoning lot. The applicant is proposing to subdivide Lot 2 into five lots of record and to develop each resultant lot with at least five buildings. 2. Section 19.35.435 (E)(2)(b) Vehicle Use Area Interior Setback. The AB Area Business District requires vehicle use areas such as driveways or paved parking lots to be set back no less than 6 feet from an interior lot line. The development proposes to locate the interior vehicle use areas at lot lines that are common to adjacent lots of record within the same zoning lot. The departure applies to the development of both Lots 1 and 2 along their westerly lot lines and Lot 1 along its northerly lot line. It should be noted that landscape yards containing adequate landscape material will be provided immediately adjacent to the subject lots where this departure is granted to provide the necessary visual relief between lots. Specifically, these areas are located on the larger lot to the west on which the Walmart store is located, and on Lot 2 along the common lot line between Lots 1 and 2. 3. Section 19.50.080.D: Wall and Integral Roof Graphics. With respect to the retail building on Lot 1 – the maximum number of wall graphics and integral roof graphics permitted by the zoning ordinance is 2 for each occupant located on Mayor and Members of City Council February 10, 2016 Page 6 the ground floor of a building. The applicant is requesting wall graphics for each tenant on the front and rear elevation of the building with the addition of wall graphics for the two corner tenants on the north and south (side) elevations of the building. The additional number of graphics require a departure from the requirements of the graphics ordinance. With respect to the carwash facility on Lot 2 - The maximum number of wall graphics and integral roof graphics permitted by the zoning ordinance is 2 for each occupant located on the ground floor of a building. The applicant is requesting a total of four wall graphics on the carwash facility on Lot 2. The four graphics are proposed to be located on each elevation of the building. 4. 19.50.070.D.3: Monument Graphics – Surface Area: The maximum surface area of a monument graphic on a street with a speed limit of 45 to 50 miles per hour is 80 square feet. The applicant is requesting a maximum surface area of 92.5 square feet (15% departure) for the monument graphic on Lot 1 and a surface area of 95.0 square feet (19% departure) for the monument graphic on Lot 2, both of which require a departure from the requirements of the graphics ordinance. 5. Section 19.50.090.C: Special Street Graphics – Directional Graphics: The maximum surface area for a directional graphic permitted by the zoning ordinance is no greater than 4 square feet on multilane roads and on any highway with a posted travel speed of 35 miles per hour or greater. The applicant is requesting a maximum surface area of 7.5 square feet for the directional graphics at the entry and exit to the car wash facility on Lot 2. It should be noted that the base of the directional graphic is excluded from the calculations of the surface area of the graphic. 6. Section 19.50.090.D: Special Street Graphics – Drive-Through Facility Graphic: A maximum of two drive-through facility graphics per business are permitted by the zoning ordinance on a zoning lot. The applicant is requesting one drive-through facility graphic per drive-through lane at the carwash facility on Lot 3, for a total of three graphics, thereby requiring a departure from the requirements of the zoning ordinance. It should be noted that the number and surface area of drive-through facility graphics do not limit the number or surface area of other allowable signage on a zoning lot. COMMENTS FROM OTHER CITY DEPARTMENTS The following are additional comments and/or requirements provided by other city departments regarding the applicability of life/safety and other codes and whether or not that applicability materially affects the project plans. The comments are divided into those that are required to be addressed either prior to obtaining the requested zoning relief or prior to obtaining a final Certificate of Occupancy. 1. Fire Department Comments that materially affect the site and/or building plans No Comments Mayor and Members of City Council February 10, 2016 Page 7 Comments that will be addressed during the Plan Review/Permitting process Not Applicable 2. Community Development – Building and Development Division Comments that materially affect the site and/or building plans We do not have any comments at this time. We may generate comments during plan review when a permit application and plans are submitted for permit. Comments that will be addressed during the Plan Review/Permitting process Not Applicable 3. Community Development – Code Enforcement Division Comments that materially affect the site and/or building plans Code Enforcement has no concerns or comments for this project at this time. Comments that will be addressed during the Plan Review/Permitting process Not Applicable 4. Public Works - Engineering Division Comments that materially affect the site and/or building plans No comments that specifically affect the zoning of the project. In general, the preliminary design is acceptable. Comments that will be addressed during the Plan Review/Permitting process Not Applicable 5. Police Department Comments that materially affect the site and/or building plans No issues. Comments that will be addressed during the Plan Review/Permitting process Not Applicable 6. Public Works – Parks and Open Space Maintenance Comments that materially affect the site and/or building plans Not Applicable Comments that will be addressed during the Plan Review/Permitting process Not Applicable Mayor and Members of City Council February 10, 2016 Page 8 7. Water Department Comments that materially affect the site and/or building plans No comments that specifically affect the zoning of the project Comments that will be addressed during the Plan Review/Permitting process Not Applicable ADDITIONAL PERMITS/APPROVALS REQUIRED The developer must apply for and receive all necessary building and occupancy permits for each individual lot as required by the City of Elgin. RECOMMENDATION DETAIL At its January 4, 2016 meeting the Planning & Zoning Commission concurred with staff and recommend approval of Petition 26-15, subject to the following conditions: 1. Substantial conformance to the development application and attached documentation dated November 20, 2015, prepared by Philip J. Salerno II of Clingen Callow & McLean, LLC, attorney for Richport Property, LLC – S. Randall Outlot and including the following documents: a. Consent and Disclosure b. Statement of Purpose and Conformance 2. Substantial conformance to the ALTA/ACSM Land Title Survey of Lot 2 of Elgin Wal-Mart/Sam’s Club Subdivision prepared by TFW Surveying and Mapping, Inc. dated December 15, 2014 and last revised on February 12, 2015. 3. Substantial conformance to the Final Plat of Subdivision for the Resubdivision of Lot 2 of the Elgin Wal-Mart/Sam’s Club Subdivision prepared by Atwell dated November 20, 2015, and last revised on December 29, 2015; and associated Preliminary Engineering Plans for the “Proposed Lot 2 Resubdivision,” Sheets C01–C-03 also prepared by Atwell and dated November 19, 2015 and last revised on December 29, 2015. 4. Substantial conformance to the development plans as they relate to the development of resultant Lot 1 for the construction of the new multi-tenant retail building including the following documents: a. Site Location Plan prepared by Atwell dated November 19, 2015 and last revised on December 29, 2015 b. Landscape Plan prepared by Atwell dated November 19, 2015 and last revised on December 29, 2015 Mayor and Members of City Council February 10, 2016 Page 9 c. d. e. f. g. Building Floor Plans and elevations Sheets A-1.0, A-3.0 and A3.1 prepared by Jensen & Jensen, Architects, P.C. dated November 3, 2015 Monument graphics exhibit prepared by Olympic Signs page 10 of 10 dated February 16, 2012 and last updated on December 23, 2015 Exterior Site and Building Lighting Plans and specifications prepared by Jensen & Jensen, Architects, P.C. dated November 3, 2015 Preliminary Engineering Plans for the Proposed Retail Shops – Lot 1 of Elgin Wal-Mart/Sam’s Club Resubdivision, Sheets C-01 through C-06, prepared by Atwell, dated November 19, 2015 and last revised on December 29, 2015 The retail building shall be permitted the installation of wall mounted graphics on the rear elevation of the building (facing the interior of the lot). These graphics shall be designed in surface area and dimensions that match the primary wall mounted signs located on the front elevation of the building, and shall not exceed the maximum allowable surface area allowed by the by Chapter 19.50 of the zoning ordinance. 5. Substantial conformance to the development plans as they relate to the development of resultant Lot 2 for the construction of the new Fuller’s Carwash facility including the following documents: a. Perspective views of Fuller’s Carwash, prepared by GEA Architects, Ltd, undated. b. Site Plan, prepared by GEA Architects, Ltd, last revised on December 23, 2015 c. Landscape Plan, prepared by ARC Design Resources, Inc for GEA Architects, Ltd, last revised on December 24, 2015 d. Building Elevations and Floor Plans, Building and Site Lighting, and Graphics, Sheets 2-8 prepared by GEA Architects, Ltd darted November 20, 2015. e. Monument Graphics and Wall Mounted Graphic Specifications prepared by Grate Signs, Inc. dated July 7, 2015 and last revised December 29, 2015. f. Preliminary Engineering Submittal for Fuller’s Carwash on Lot 2 of Elgin Wal-Mart/Sam’s Club Resubdivision, Sheets C01 through C05, prepared by GEA Architects, Ltd and dated November 19, 2015 6. Compliance with all applicable codes and ordinances. On a motion to recommend approval and to adopt specific findings of fact, the vote of the Planning & Zoning Commission was seven (7) yes and zero (0) no. Mayor and Members of City Council February 10, 2016 Page 10 Respectfully Submitted, Sarosh Saher, AICP, Senior Planner Community Development Department 1110-1190 South Randall Road FINDING OF FACT PETITION 26-15 January 4, 2016 RECOMMENDATION & FINDINGS OF FACT OF THE COMMUNITY DEVELOPMENT DEPARTMENT AND THE PLANNING & ZONING COMMISSION CITY OF ELGIN, ILLINOIS OVERVIEW Richport Property, LLC proposes to resubdivide Lot 2 within Elgin Wal-Mart/Sam’s Club Subdivision; and request Planned Development Approval to develop a 9,470 square foot multitenant retail building on resultant Lot 1 (1190 South Randall Road) and a 3,550 square foot carwash building on resultant Lot 2 (1180 South Randall Road). The annexation agreement requires that development of outlots within the subdivision be approved through Planned Development approval. The developer is also requesting the inclusion of additional land uses on the resultant lots from what are currently provided within the established planned development ordinance. The inclusion of the additional land uses will require a 3rd amendment to the Annexation Agreement and Planned Development Ordinance G32-10. GENERAL INFORMATION Petition Number: 26-15 Requested Action: Final Plat of Subdivision for the Resubdivision of Lot 2 Planned Development Approval 3rd Amendment to Annexation Agreement and Amendment to Ordinance G32-10 Current Zoning: PAB Planned Area Business District ARC Arterial Road Corridor Overlay District Existing Use: Vacant and Undeveloped Proposed Use: New Retail Building on Lot 1 New Automated Car Wash Facility on Lot 2 Property Location: 1110-1190 South Randall Road Applicant and Owner: Richport Property LLC – S. Randall Outlot, a Series of Richport Property LLC Findings of Fact Petition 26-15 January 4, 2016 Staff Coordinator: Sarosh B. Saher, AICP, Senior Planner LIST OF EXHIBITS ATTACHED A. B. C. D. E. F. Aerial/Location Map Zoning Map Parcel Map Site Photos Development Application and Attachments Draft Ordinances BACKGROUND The Elgin Wal-Mart and Sam’s Club shopping center was annexed and zoned in 2006. That approval included the establishment of a Wal-Mart store (opened October 2011), a Sam’s Club store (opened September 2012), and other retail and commercial establishments on seven additional outlots. That approval also required that any development upon the outlots be approved through a public hearing before the Planning & Zoning Commission with final approval by the City Council. In 2011, Lot 9 (1040 South Randall Road) was developed with a Sam’s Club Motor Vehicle Service Station and in 2012/2013, Lots 3 and 4 (1020-1030 South Randall Road) were developed with a Portillo’s Restaurant; and Lot 10 (2415 Bowes Road) was developed with a multi-tenant retail building. The subject property is Lot 2 of the recorded subdivision; is located south of the Sam’s Gas Station and has frontage along Randall Road. The following actions are requested: I. Final Plat of Subdivision for the Resubdivision of Lot 2 Lot 2 is currently one of ten lots within the “Elgin Wal-Mart/Sam’s Club Subdivision.” The lot is approximately 227,456 square feet (5.2217 acres) in land area. At the time of annexation, the lot was configured with the intention of being resubdivided into customized smaller lots to suit new development as and when contemplated. The resubdivision proposes the creation of five lots ranging in land area from 30,859 square feet (0.71 acre) to 59,896 square feet (1.37 acres). The lots will be provided with access from the private drive that runs along their westerly frontage. The private drive is designed to provide all lots within the subdivision with access to Randall Road. Cross-access drives are proposed to increase the connectivity between the lots. Each lot will be provided with the necessary utility connections. 2 Findings of Fact Petition 26-15 January 4, 2016 Stormwater run-off will be managed by the regional detention facility that is located at the southwest corner of the subdivision. At this time, only the development of resultant Lots 1 and 2 is contemplated. Lots 3, 4 and 5 are proposed to remain vacant and will be developed when land uses including potential personal services providers, mid-value dine-in restaurants and mid-value quick service restaurants are requested. II. Planned Development Approval A. Lot 1 (1190 South Randall Road) – New Multi-Tenant Retail Building The developer proposes to construct a new a 9,470 square foot multi-tenant retail building on the 54,809 square foot (1.26 acre) lot. Recall that in 2013, the developer also proposed and was approved the construction of a retail building adjacent to the Portillo’s Restaurant. The building is proposed to contain a minimum of three tenant spaces with the flexibility to reconfigure the interior to add additional tenants. The building will face Randall Road and will be designed with storefronts on three sides. Service entrances and the attached masonry trash enclosure will be located at the rear (west) side of the building facing the interior of the subdivision. The site is proposed to be landscaped with a combination of trees and shrubs along its periphery and an outdoor patio at the southeast corner of the building. Vehicle and bicycle parking will be provided on the lot. Pedestrian connection will be provided between the retail building and the existing bicycle path along Randall Road. The elevations of the building are designed in brick and cultured stone, with awnings or trellises over storefront windows, brackets within the soffits and architectural roof shingles to provide variety and interest in the elevation. Decorative building lighting in the form of sconce light fixtures are proposed at each storefront bay. The end bays of the building will be highlighted with hipped roofs. Each storefront bay is provided with space for an optional wall mounted graphic as and when the need arises. The lot is proposed to contain one free-standing monument graphic facing Randall Road and will contain the names and logos of the tenants located within the building. The graphic is designed with a masonry base that matches the material of the building. B. Lot 2 (1180 South Randall Road) – Fuller’s Automated Car Wash The developer proposes to construct a new a 3,550 square foot automated carwash on the 38,616 square foot (0.89 acre) lot. 3 Findings of Fact Petition 26-15 January 4, 2016 The carwash will be configured as an automated tunnel carwash facility with its entrance on the north side and exit on the south side of the building. The three pay stations will be provided access by means of stacking lanes designed to accommodate five cars each for a total of 15 cars. Overflow traffic to the lot will be accommodated by the private drive within the subdivision. The lot will have a detached trash enclosure located along the westerly service drive to the building. The elevations of the building are designed primarily in brick and stone stamped precast panels that will be painted. The longer elevations will be divided into bays containing windows to break up the monotony of an otherwise blank wall. Horizontal bands are proposed to create additional interest in the elevations. The entrance to the offices and employee spaces within the building is surmounted by a large architectural metal arched roof to help break up the height and façade of the building. Decorative building lighting in the form of sconce light fixtures are proposed on the façade of the building. 12 vacuum stalls are proposed on the east side of the building which are accessible after exiting the tunnel car wash. The vacuum stalls will be covered with an arched metal roof designed to match the building’s architectural roof. A brick screen wall located on the east side of the stalls is proposed to screen the activity and head lights from shining onto Randall Road and the residential property to the east. The site is proposed to be landscaped with a combination of trees and shrubs along its periphery. Vehicle parking will be provided on the lot. Due to the vehicle-intensive nature of the land use, no bicycle parking or pedestrian connection to Randall Road is proposed on this lot. The lot is proposed to contain one free-standing monument graphic facing Randall Road and will contain an electronic LED message center panel with the name and messages related to the carwash facility. The graphic is designed with a masonry base that matches the material of the building. Additional free-standing directional graphics are proposed at the entrance to and exit from the property. The building is proposed to contain wall-mounted graphics on each elevation requiring departures from the requirements of the graphics ordinance. C. Additional Permitted Uses The land uses allowed on the property are governed by Ordinance G32-10. The developer is requesting approval of an amendment to the planned development ordinance as it relates to the development of the five resultant commercial lots. Specifically, the amendment would add 11 additional permitted uses to the list of uses that could occupy any of the five lots. 4 Findings of Fact Petition 26-15 January 4, 2016 The planned development ordinance which regulates development within the entirety of the Wal-Mart and Sam’s Club shopping center was approved in 2006 and later amended in 2010 and 2014. The ordinance currently provides for a number of land uses that are permitted and additional land uses that could be established following the grant of a conditional use process by City Council. To increase the likelihood of leasing the space within the proposed retail building, the developer is requesting that the following additional uses be allowed to locate within the building as of right. These uses would have to comply with all other provisions of the planned development and the Elgin Zoning Ordinance, including but not limited to the parking and graphics requirements. Amendments to the Annexation Agreement and Planned Development Ordinance G32-10 will be required to allow for these uses to be established on the property. Computer programming, data processing and other related services Electrical and electronic repair shops Home healthcare services Legal Services Management and public relations services Offices and clinics of dentists Offices and clinics of doctors of medicine Offices and clinics of doctors of osteopathy Offices and clinics of other health practitioners Medical and dental laboratories accessory to a medical or dental office Physical fitness facilities Car wash (as a principal use) FINDINGS After due notice as required by law, the Planning & Zoning Commission conducted a public hearing in consideration of Petition 26-15 on January 4, 2016. Testimony was presented at the public hearing in connection with the application. The Community Development Department submitted a Planned Development Review to the Planning & Zoning Commission dated January 4, 2016. The Community Development Department and Planning & Zoning Commission have offered the following findings regarding the application against the standards for planned developments. A. Site Characteristics Standard. The suitability of the subject property for the intended planned development with respect to its size, shape, significant natural features (including topography, watercourse and vegetation), and existing improvements. 5 Findings of Fact Petition 26-15 January 4, 2016 Findings. Lot 2 of the overall subdivision comprises of a land area of 227,456 square feet (5.2217 acres). Following resubdivision of Lot 2, the land area of resultant Lot 1 will be 54,809 square feet (1.26 acres) and that of resultant Lot 2 will be 38,616 square feet (0.89 acres). The resultant lots are suitable for the intended planned development with respect to the site characteristics standard. The property is relatively flat with no significant natural features. The high elevation point on the east side of the property is 802 feet and the low elevation point on the west side of the property is 797 feet for a total relief of 5 feet. The property is currently vacant. B. Sewer and Water Standard. The suitability of the subject property for the intended planned development with respect to the availability of adequate municipal water, wastewater treatment, and storm water control facilities. Findings. The subject property is suitable for the intended planned development with respect to the sewer and water standard. The subject properties are served with municipal sanitary sewer and water systems. Stormwater control facilities located on the southwest portion of the subdivision have been designed to serve the larger subdivision in accordance with the City of Elgin and Kane County Stormwater Management Ordinances. C. Traffic and Parking Standard. The suitability of the subject property for the intended planned development with respect to the provision of safe and efficient on-site and offsite vehicular circulation designed to minimize traffic congestion. Findings. The subject property is suitable for the intended planned development with respect to the traffic and parking standard. The lots have frontage along, but no direct access to Randall Road. Randall Road is an Arterial Street connecting the west side of Elgin with the surrounding communities to the north and south. Each resultant lot will have indirect access to Bowes and Randall Roads by means of the existing private access drive that is located at the west side of the lots and extends through the larger commercial subdivision. The locations of the access points to Bowes and Randall Roads, and the required improvements to those roads, have been installed in accordance with an intergovernmental agreement between the City of Elgin and Kane County. Lot 1 On site vehicle circulation for Lot 1 will be accommodated via two-way drive aisles around the perimeter of the retail building. Pedestrian and bicycle access for Lot 1 will be accommodated by sidewalks around the perimeter of the building with a direct connection to the existing bicycle path located along the east property line (along Randall Road). The site will be provided with 67 vehicle parking spaces and 3 bicycle parking spaces. The number of parking spaces exceeds the retail requirement for number of 6 Findings of Fact Petition 26-15 January 4, 2016 spaces to accommodate future land uses such as restaurants that require a greater number of spaces. Lot 2 On site vehicle circulation for Lot 2 will be accommodated via a one-way drive aisle to direct vehicle circulation through the tunnel carwash. The curb has been left open ahead of the carwash building to allow traffic to bypass the tunnel if necessary. The site will be provided with 41 vehicle parking spaces. Due to the vehicle-intense nature of the land use, no bicycle parking is proposed. The configuration of the drive-through provides sufficient on-site stacking space such that an overflow of queued vehicles will be accommodated within the subdivision and not create a negative impact on surrounding rights-of-way. D. Zoning History Standard. The suitability of the subject property for the intended planned development with respect to the length of time the property has remained undeveloped or unused in its current zoning district. Findings. The subject property is suitable for the intended planned development with respect to the length of time the property has remained undeveloped or unused in its current zoning district. The subdivision in which the subject properties are located was annexed and zoned PAB Planned Area Business District in 2006 under Ordinance No. G114-06. In 2007, planned development approval was granted to allow for the construction of a JC Penny’s retail store on Lot 1 of the subdivision through Ordinance G101-07. However, due to the subsequent downturn in the economy, the store was never built and the lot continues to remain vacant. In 2010, the planned development ordinance was amended in its entirety to modify the site plan, landscape plan, and building elevations of the Walmart and Sam’s Club buildings to match branding, store layout, and material requirements of the respective companies, and to amend the allowable land uses for the seven outlots within the subdivision. These amendments were articulated in Ordinance No. G32-10. In 2011, planned development approval was granted to allow for the construction of the Sam’s Club Motor Vehicle Service Station through Ordinance G44-11. In 2012, planned development approval was granted for the construction of Portillo’s Restaurant and initial site design improvements for the Retail building adjacent to the restaurant (2415 Bowes Road) through Ordinance G43-12. Final planned development approval was granted for the construction of the retail building through Ordinance G6412. 7 Findings of Fact Petition 26-15 January 4, 2016 In 2014, Ordinance G32-10 was amended to provide for additional permitted uses within the retail building at 2415 Bowes Road through Ordinance G72-14. E. Surrounding Land Use and Zoning Standard. The suitability of the subject property for the intended planned development with respect to consistency and compatibility with surrounding land use and zoning. Findings. The subject property is suitable for the intended planned development with respect to consistency and compatibility with surrounding land use and zoning. The lots immediately to the north, south and west of the subject properties are within the Walmart and Sam’s Club shopping center, also zoned PAB Planned Area Business District. Lot 8, located at the southwest corner of the subdivision, is developed with stormwater management facilities and allows for the protection of the unnamed stream which is tributary to Otter Creek. The area located to the south of the shopping center subdivision is located within unincorporated Kane County. The area is in agricultural use and is designated for commercial development when annexed to the City of Elgin. The area located to the west of the shopping center is zoned PMFR Planned Multiple Family Residence District and PCF Planned Community Facility District. The PMFR District is developed with townhomes in The Reserve Subdivision. The PCF District contains floodplain and wetland areas associated with the Otter Creek watershed and stormwater management facilities serving The Reserve Subdivision. The areas located to the east of the subject properties and the shopping center, across Randall Road, are zoned PMFR Planned Multiple Family Residence District and PAB Planned Area Business District. The PMFR District is improved with townhomes in the Willowbay Subdivision. The PAB District is developed with a bank, a child day care center, and a commercial/office subdivision known as Bowes Commons. The area located to the north of the subject properties and the shopping center, across Bowes Road, is zoned SFR2 Single Family Residence District and PAB Planned Area Business District. The SFR2 District is improved with single-family homes which are part of the Columbine Subdivision. The PAB District is improved with a restaurant with additional unimproved vacant commercial property to the north. F. Trend of Development Standard. The suitability of the subject property for the intended planned development with respect to consistency with an existing pattern of development or an identifiable trend of development in the area. 8 Findings of Fact Petition 26-15 January 4, 2016 Findings. The subject property is suitable for the intended planned development with respect to consistency with an existing pattern of development or an identifiable trend within the area. The subject properties are located in the Randall Road corridor, in an area developing with commercial uses. G. Planned Development Districts Standard. The suitability of the subject property for the intended planned development with respect to conformance to the provisions for the purpose and intent, and the location and size of a zoning district. The applicant is requesting approval of a planned development in an existing PAB Planned Area Business District. The purpose and intent of the provision of planned developments is to accommodate unique development situations. For planned development districts, the planned development should demonstrate the following characteristics: 1. 2. 3. An opportunity to realize a development of demonstrated need with respect to the types of environment available to the public that would not be possible under the strict application of the other chapters of this title [Zoning Ordinance]; A creative approach to the use of land and related improvements resulting in better design and construction of aesthetic amenities; and The preservation of significant natural features including topography, watercourses, wetlands, and vegetation. The proposed retail building and carwash facility are part of a larger planned commercial subdivision. Planned development review and approval of the proposed project is required pursuant to PAB Planned Area Business District Ordinance No. G32-10. The proposals for the retail building and carwash conform to the architectural standards of the PAB District and the Zoning Ordinance. H. Comprehensive Plan Standard. The suitability of the subject property for the intended planned development with respect to conformance to the goals, objectives, and policies of the official comprehensive plan. Findings. The subject property is suitable for the intended planned development with respect to the Comprehensive Plan Standard. The subject property is designated “Highway Commercial” in the City’s Comprehensive Plan and Design Guidelines dated 2005. Areas designated Highway Commercial typically serve surrounding neighborhood areas, but also larger trade areas connected by the arterial street system. They may include all of the commercial uses found in the mixed-use centers. In addition, they typically include highway-serving uses such as fast 9 Findings of Fact Petition 26-15 January 4, 2016 food restaurants, auto-oriented uses such as tire stores, service stations, auto parts stores, and other stand-alone retail uses. These commercial areas are generally auto dominated with few pedestrian amenities. The proposed land uses are in keeping with the objectives and policies of this comprehensive plan designation. I. Natural Preservation Standard. The suitability of the subject property for the intended planned development with respect to the preservation of all significant natural features including topography, watercourses, wetlands, and vegetation. Findings. The subject property is suitable for the intended planned development with respect to the Natural Preservation Standard. The subject properties contain no natural features. However, the applicant proposes to install landscaping material on each resultant lot currently being proposed for development. J. Internal Land Use. The suitability of the subject property for the intended planned development with respect to the land uses permitted within the development being located, designed, and operated so as to exercise no undue detrimental influence on each other or on surrounding property. Findings. The subject property is suitable for the intended planned development with respect to the internal land use standard. No evidence has been submitted or found that the proposed retail building and carwash facility would be located, designed, or operated in a manner that will exercise undue detrimental influence on itself or surrounding property. Instead, the applicant has proposed a site configuration that will ensure ample on-site stacking space for the drivethrough carwash facility as well as the potential to restrict overflow traffic within the subdivision in addition to proposing many site features to minimize conflicts between pedestrians, bicycles, and vehicles. PLANNED DEVELOPMENT DEPARTURES AND EXCEPTIONS A planned development may be granted certain departures from the normal standards, regulations, requirements, and procedures of the zoning ordinance. Elgin Walmart/Sam’s Club Subdivision was approved in 2006, with a number of departures from the standard requirements of the zoning and subdivision regulations as they related to number of principal buildings per zoning lot, building and vehicle use area setbacks, and graphics. As part of the subject planned development application for the development of Lots 1 and 2 of Resubdivided Lot 2 of the overall subdivision, the applicant is requesting the following departures from the Zoning Ordinance: 10 Findings of Fact Petition 26-15 January 4, 2016 1. 19.12.300 (E) Principal Buildings per Zoning Lot. In the AB Area Business Districts, no more than one principal building is allowed on a zoning lot. The applicant is proposing to subdivide Lot 2 into five lots of record and to develop each resultant lot with at least five buildings. 2. Section 19.35.435 (E)(2)(b) Vehicle Use Area Interior Setback. The AB Area Business District requires vehicle use areas such as driveways or paved parking lots to be set back no less than 6 feet from an interior lot line. The development proposes to locate the interior vehicle use areas at lot lines that are common to adjacent lots of record within the same zoning lot. The departure applies to the development of both Lots 1 and 2 along their westerly lot lines and Lot 1 along its northerly lot line. It should be noted that landscape yards containing adequate landscape material will be provided immediately adjacent to the subject lots where this departure is granted to provide the necessary visual relief between lots. Specifically, these areas are located on the larger lot to the west on which the Walmart store is located, and on Lot 2 along the common lot line between Lots 1 and 2. 3. Section 19.50.080.D: Wall and Integral Roof Graphics. With respect to the retail building on Lot 1 – the maximum number of wall graphics and integral roof graphics permitted by the zoning ordinance is 2 for each occupant located on the ground floor of a building. The applicant is requesting wall graphics for each tenant on the front and rear elevation of the building with the addition of wall graphics for the two corner tenants on the north and south (side) elevations of the building. The additional number of graphics require a departure from the requirements of the graphics ordinance. With respect to the carwash facility on Lot 2 - The maximum number of wall graphics and integral roof graphics permitted by the zoning ordinance is 2 for each occupant located on the ground floor of a building. The applicant is requesting a total of four wall graphics on the carwash facility on Lot 2. The four graphics are proposed to be located on each elevation of the building. 4. 19.50.070.D.3: Monument Graphics – Surface Area: The maximum surface area of a monument graphic on a street with a speed limit of 45 to 50 miles per hour is 80 square feet. The applicant is requesting a maximum surface area of 92.5 square feet (15% departure) for the monument graphic on Lot 1 and a surface area of 95.0 square feet (19% departure) for the monument graphic on Lot 2, both of which require a departure from the requirements of the graphics ordinance. 5. Section 19.50.090.C: Special Street Graphics – Directional Graphics: The maximum surface area for a directional graphic permitted by the zoning ordinance is no greater than 4 square feet on multilane roads and on any highway with a posted travel speed of 35 miles per hour or greater. The applicant is requesting a maximum surface area of 7.5 11 Findings of Fact Petition 26-15 January 4, 2016 square feet for the directional graphics at the entry and exit to the car wash facility on Lot 2. It should be noted that the base of the directional graphic is excluded from the calculations of the surface area of the graphic. 6. Section 19.50.090.D: Special Street Graphics – Drive-Through Facility Graphic: A maximum of two drive-through facility graphics per business are permitted by the zoning ordinance on a zoning lot. The applicant is requesting one drive-through facility graphic per drive-through lane at the carwash facility on Lot 3, for a total of three graphics, thereby requiring a departure from the requirements of the zoning ordinance. It should be noted that the number and surface area of drive-through facility graphics do not limit the number or surface area of other allowable signage on a zoning lot. RECOMMENDATION DETAIL With respect to Petition 26-15, the Community Development Department and the Planning & Zoning Commission recommend approval, subject to the following conditions: 1. Substantial conformance to the development application and attached documentation dated November 20, 2015, prepared by Philip J. Salerno II of Clingen Callow & McLean, LLC, attorney for Richport Property, LLC – S. Randall Outlot and including the following documents: a. Consent and Disclosure b. Statement of Purpose and Conformance 2. Substantial conformance to the ALTA/ACSM Land Title Survey of Lot 2 of Elgin Wal-Mart/Sam’s Club Subdivision prepared by TFW Surveying and Mapping, Inc. dated December 15, 2014 and last revised on February 12, 2015. 3. Substantial conformance to the Final Plat of Subdivision for the Resubdivision of Lot 2 of the Elgin Wal-Mart/Sam’s Club Subdivision prepared by Atwell dated November 20, 2015, and last revised on December 29, 2015; and associated Preliminary Engineering Plans for the “Proposed Lot 2 Resubdivision,” Sheets C01–C-03 also prepared by Atwell and dated November 19, 2015 and last revised on December 29, 2015. 4. Substantial conformance to the development plans as they relate to the development of resultant Lot 1 for the construction of the new multi-tenant retail building including the following documents: a. Site Location Plan prepared by Atwell dated November 19, 2015 and last revised on December 29, 2015 b. Landscape Plan prepared by Atwell dated November 19, 2015 and last revised on December 29, 2015 12 Findings of Fact Petition 26-15 January 4, 2016 c. d. e. f. g. Building Floor Plans and elevations Sheets A-1.0, A-3.0 and A3.1 prepared by Jensen & Jensen, Architects, P.C. dated November 3, 2015 Monument graphics exhibit prepared by Olympic Signs page 10 of 10 dated February 16, 2012 and last updated on December 23, 2015 Exterior Site and Building Lighting Plans and specifications prepared by Jensen & Jensen, Architects, P.C. dated November 3, 2015 Preliminary Engineering Plans for the Proposed Retail Shops – Lot 1 of Elgin Wal-Mart/Sam’s Club Resubdivision, Sheets C-01 through C-06, prepared by Atwell, dated November 19, 2015 and last revised on December 29, 2015 The retail building shall be permitted the installation of wall mounted graphics on the rear elevation of the building (facing the interior of the lot). These graphics shall be designed in surface area and dimensions that match the primary wall mounted signs located on the front elevation of the building, and shall not exceed the maximum allowable surface area allowed by the by Chapter 19.50 of the zoning ordinance. 5. Substantial conformance to the development plans as they relate to the development of resultant Lot 2 for the construction of the new Fuller’s Carwash facility including the following documents: a. Perspective views of Fuller’s Carwash, prepared by GEA Architects, Ltd, undated. b. Site Plan, prepared by GEA Architects, Ltd, last revised on December 23, 2015 c. Landscape Plan, prepared by ARC Design Resources, Inc for GEA Architects, Ltd, last revised on December 24, 2015 d. Building Elevations and Floor Plans, Building and Site Lighting, and Graphics, Sheets 2-8 prepared by GEA Architects, Ltd darted November 20, 2015. e. Monument Graphics and Wall Mounted Graphic Specifications prepared by Grate Signs, Inc. dated July 7, 2015 and last revised December 29, 2015. f. Preliminary Engineering Submittal for Fuller’s Carwash on Lot 2 of Elgin Wal-Mart/Sam’s Club Resubdivision, Sheets C01 through C05, prepared by GEA Architects, Ltd and dated November 19, 2015 6. Compliance with all applicable codes and ordinances. On the recommendation to approve the petition, the vote of the Planning & Zoning Commission was seven (7) yes and zero (0) no. Therefore, the motion to recommend approval of Petition 26-15 was adopted. 13 Findings of Fact Petition 26-15 January 4, 2016 s/ Robert Siljestrom Robert Siljestrom, Chairman Planning & Zoning Commission s/ Sarosh Saher Sarosh Saher, AICP, Secretary Planning & Zoning Commission 14 Columbine Dr Umbdenstock Rd Red Barn Ln Ln ia n t aC Ve ne t Cir Medinah Trl s Me oe Tah Bowes Rd Na nt uc k Co ra lC v Delta Ct da Annan Delta Dr le D r Re se r ve Dr Randall Rd Subject Property et Dr Petition 26-15 Cove Ct Camden Bay Ct Navy n tto Co EXHIBIT A Map prepared by City of Elgin Department of Community Development od wo Dr Aerial/Location Map . 0 120 240 480 720 960 Feet CF Ct PMFR Cr an e Pt PAB Randall Rd Subject Property Bowes Rd Petition 26-15 PCF RC3 Residence Conservation 3 Delta Ct PMFR RC1 Cove Ct PRC Planned Residence Conservation Way 2 aResidence Ann SFR2 Single Family PSFR1 Planned Single Family Residence 1 v Dr CF Camden Bay SFR1 Single Family Residence 1 lC Cora ale Annand Delta Dr Dr RC2 Residence Conservation 2 Re se r RC1 Residence Conservation 1 ve Legend PMFR CF Baltusrol Dr Columbine Dr Red Barn Ln Tahoe Trl e Umbdenstock Rd Venetian Ln SFR2 Cir Ra vi n PRC Mesa Ct PSFR2 CF h Medina Ha rv es tV ly PSFR2 PSFR2 Planned Single Family Residence 2 PMFR TRF Two Family Residence CF PTRF Planned Two Family Residence Emily Ln MFR Multiple Family Residence PMFR Planned Multiple Family Residence RB Residence Business PRB Planned Residential Business CF NB Neighborhood Business PNB Planned Neighborhood Business AB Area Business RC1 PAB Planned Area Business CC1 Center City 1 CC2 Center City 2 RC1 PCC Planned Center City ORI Office Research Industrial PORI Planned Office Research Industrial GI General Industrial PGI Planned General Industrial CI Commercial Industrial CF Community Facility Hopps Rd PCF Planned Community Facility CF FRP Fox River Preservation EXHIBIT B Map prepared by City of Elgin Department of Community Development PMFR Zoning Map . 0 145 290 580 870 1,160 Feet Subject Property 1110-1190 S. Randall Rd. Petition 26-15 0628351004 Randall Rd Delta Ct Delta Dr Cove Ct k Rd Umbdenstoc Camden Bay EXHBIIT C City of Elgin Department of Community Development ¯ Parcel Map 0 40 80 160 240 320 Feet SITE LOCATION EXHIBIT 1110‐1190 South Randall Road Petition 26‐15 Subject Property Site Location Perspective View SITE LOCATION EXHIBIT 1110‐1190 South Randall Road Petition 26‐15 View of property looking north View from property looking west towards Walmart Store View of property looking south View of property looking east along Randall Road Site Pictures ‐ 1 1110-1190 South Randall Road DEVELOPMENT APPLICATION AND ATTACHMENTS PETITION 26-15 CONSENT AND DISCLOSURE The undersigned, being duly authorized, hereby states as follows: 1. The Property is legally described as follows: LOT TWO (2) IN ELGIN WAL-MART/SAM'S CLUB SUBDIVISION OF PART OF THE SOUTHWEST 1/4 OF SECTION 28, TOWNSHIP 41 NORTH, RANGE 8 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT THEREOF, RECORDED DECEMBER 6, 2011 AS DOCUMENT 2011K73547 IN KANE COUNTY, ILLINOIS 2. The Owner of Record of the Property is Richport Property, LLC - S. Randall Outlot, a scries of Richport Property, LLC, an Illinois limited liability company. 3. The Manager of Richport Property, LLC - S. Randall Outlot is R&S Growth Management, LLC, a Delaware limited liability company, and the name of its manager, his address and telephone number is as follows: Richard J. Portillo - Manager 18W140 Butterfield Road, Suite 940 Oak Brook Terrace, Illinois 60181 Phone: (630) 884-8718 4. I am one of the attorneys for Richport Property, LLC - S. Randall Outlot. 5. Richport Property, LLC - S. Randall Outlot, as Owner of Record, has authority to proceed before the City of Elgin as to the re-subdivision of the Property as well as the proposed Map Amendment for Planned Development and additional uses of the Property, within the existing zoned PAB Planned Area Business District. Pl*fflip/J. Salejtfo II Date: November 20, 2015 {00274311.DOCX /v. 1 STATEMENT OF PURPOSE AND CONFORMANCE DEPARTMENT OF CODE ADMINISTRATION CITY OF ELGIN Planned Development as a Map Amendment For its Statement of Purpose and Conformance, the Applicant, Richport Property, LLC – S. Randall Outlot, states as follows: A. Nature and Reason 1. The Applicant seeks approval to resubdivide the subject Property into five (5) contiguous lots, obtain certain zoning relief to provide for additional uses of the Property, and gain approval of the proposed planned development as a map amendment. a. Non-Residential Property: i. The Applicant intends to develop a multi-tenant retail building on Lot 1 of the proposed resubdivision and a Fuller’s Car Wash, a full service carwash, on Lot 2. The remaining three lots are intended to be developed with tenants that will provide useful products and services to the surrounding community, including without limitation, potential personal services providers, mid-value dine-in restaurants and mid-value quick service restaurants. The Applicant will continue to own all 5 lots and enter ground leases with each tenant. ii. Lot 1 As noted above, Lot 1 will be developed as a multi-tenant building. At this time the specific users of the building cannot be identified, however as the lease agreements are executed, marketing and operation information will be shared with the City of Elgin. Lot 2 Fuller’s Carwash will be developed on Lot 2. Fuller’s Carwash is a full service family owned operation that specializes in automobile washing and detailing. Fuller's Full-Service Carwashes have served the Chicagoland area for over 70 years and was founded in 1946. This location will include a fully automated washing operation and will have detailing services as well. Fuller’s Carwash currently operates 11 locations within the Chicagoland area. iii. Lot 1 As leases are entered into the applicant will be better able to project hours of operation. Lot 2 Fuller’s Carwash typical hours of operation are Monday through Sunday from 7 a.m. to 10 p.m. {00276323.DOCX /v. 1 } 1 iv. Lot 1 The applicant will be better able to project number of employees during regular and peak hours as leases are entered into. Lot 2 The number of employees for this location is anticipated to be 15 during the peak shift. v. Lot 1 As leases are entered into the applicant will be better able to provide expected customer counts. Lot 2 The expected total number of customers or visits during peak hours for this location is 100 per hour. vi. Lot 1 As leases are entered into the applicant will be better able to project the frequency and hours of commercial delivery. Lot 2 The expected frequency of deliveries is minimal and all deliveries will occur in early morning hours prior to opening. b. Residential Development: NOT APPLICABLE 2. The Applicant proposes to improve the property as follows: Overall Resubdivison The overall subdivision will be improved to include utility stubs to the property line of each of the proposed outlots to facilitate the development of Lot 1 and Lot 2 as well as for the future development of Lots 3 through 5. The proposed utility stubs will include sanitary sewer service, storm sewer service, water service, telephone, electric and gas. Lot 1 Lot 1 will be improved to include a 9,470 square foot free standing multi-tenant retail building. The building will have an attached masonry trash enclosure located along the northerly service drive for the building. The materials for the building are primarily composed of brick and cultured stone, with awnings, trellises, glazing and architectural roof shingles at features. Decorative building sconce light fixtures are also included. The development of the site will include 67 parking spaces and 3 bicycle parking spaces along with perimeter and interior landscaping per City standards. Landscaping will also be provided along the building frontage sidewalk in at- {00276323.DOCX /v. 1 } 2 grade planters. Pedestrian access will be accommodated via sidewalks around the perimeter of the building as well as an accessible route to the existing bike path along the Randall Road frontage. An outdoor patio space is also proposed for the southeast corner of the building. The site will include site lighting that matches the Richport Plaza Retail Site located at the north end of the shopping center. Lot 1 will include a freestanding multi-tenant monument style sign which will be located in the frontage area of the parcel. Lot 2 Lot 2 will be improved to include a 3,550 square foot free standing Carwash building. The building will have a detached trash enclosure located along the westerly service drive for the building. The materials for the building are primarily composed of brick and stone stamped precast panels which will be painted and a large architectural metal arched roof to help break up the height and façade of the building. There will be vacuum stalls on the East side of the building which will be covered with an arched metal roof, this will match the building architectural roof and a brick screen wall will be provided on the East side of the stalls to block head lights from shining across Randall road. Decorative building sconce light fixtures are also included. The development of the site will include 41 parking spaces along with perimeter and interior landscaping per City standards. Landscaping will also be provided along the building frontage sidewalk in at-grade planters. Pedestrian access will be accommodated via sidewalks around the perimeter of the building. The site will include site lighting that matches the Richport Plaza Retail Site located at the north end of the shopping center. Lot 2 will include freestanding monument style sign which will be located in the frontage area of the parcel. 3. In order to develop the property as noted above, a map amendment is being requested along with some departures from the City Zoning Code. These departures are as follows: Departures from PAB Planned Area Business District created under Ordinance No. G32-10: 1. Section 2-F.5.b.ii. Minimum required vehicle use area setback from an interior lot line is six feet. The plan proposes 0’ at north and west interior lot lines. Relief from Chapter 19, Section 19.12.300.E of the City of Elgin Municipal Code: The Applicant is respectfully requesting relief from the provision of Section 19.12.300.E. (E. Principal Buildings Per Zoning Lot) and requests that more than one (1) and not less {00276323.DOCX /v. 1 } 3 than five (5) principal buildings be permitted on the Property prior to recording of the final plat of resubdivision. This will serve the Applicant and its prospective tenants, in that if they desire to move quickly towards obtaining a building permit prior to the plat of resubdivision being recorded they will be able to obtain a building permit to do so. Additional Permitted Uses upon the Property Not Permitted in PAB Planned Area Business District created under Ordinance No. G32-10: The Property is located in PAB Planned Area Business District created under Ordinance No. G32-10. The proposed Map Amendment is requested, in part, to permit the following additional uses (“Additional Uses”) within the existing zoned PAB Planned Area Business District created under Ordinance No. G32-10, as amended: Computer programming, data processing and other related services Electrical and electronic repair shops Home healthcare services Legal Services Management and public relations services Offices and clinics of dentists Offices and clinics of doctors of medicine Offices and clinics of doctors of osteopathy Offices and clinics of other health practitioners Medical and dental laboratories as accessory to a medical or dental office Physical fitness facilities Car wash (as stand-alone primary use and not as an accessory use) The reasons for the Additional Uses as a proposed Map Amendment are as follows: 1. The proposed Additional Uses would be consistent and compatible with the character and development of the district in which they would be located. 2. The subject property has a deed restriction that the property shall only be used by tenants for the purposes of the kind typically found in shopping centers and the proposed Additional Uses meet those criteria. 3. No evidence has been submitted or found that the proposed Additional Uses would exercise undue detrimental influence on the subject property or any of the surrounding property. The lots immediately to the south and west of the subject property are within the Walmart and Sam’s Club shopping center and are also zoned PAB Planned Area Business District. 4. The proposed Additional Uses would neither create a significant increase in the traffic volume nor require a reconfiguration of any rights of way to an area which currently accommodates the vehicular traffic generated by the Walmart, Sam’s Club and Portillo’s Hot Dogs. 5. There is no area zoned AB Area Business District located conveniently nearby to the subject property which permits these Additional Uses. 6. The proposed Additional Uses would have a positive economic effect by increasing the exposure and marketing value of the subject property and the surrounding properties to consumers and providers of the Additional Uses, by {00276323.DOCX /v. 1 } 4 creating employment opportunities, and by enhancing complementary Permitted Uses of the subject property. 7. The proposed Additional Uses would be in accordance with the standards of the zoned PAB Planned Area Business District and would not alter the essential character of the subject property or any of the surrounding properties. B. Site Characteristics 1. The subject Property is 5.22 acres, 227,456 square feet. 2. The property is generally rectangular in shape. 3. The subject Property contains approximately 4’-5’ of elevation change from east to west. The lowest elevation on the Property is 797’ and the highest elevation is 802’ 4. The subject Property is served by the overall shopping center detention pond which is located southwest of the subject Property. 5. Based upon our review of the Federal Emergency Management Agency flood insurance maps for Kane County, Illinois, and incorporated areas, map no. 17089c0164h with a revision date of august 3, 2009, indicates that the subject property lies within zone "x" (areas determined to be outside the 0.2% annual chance floodplain), 6. There are no wetlands within the limits of the subject Property. 7. The subject Property is presently maintained as turf grass and otherwise has no existing vegetation. 8. Lot 1 of the resubdivision will be 15.9% pervious and 84.1% impervious. Lot 2 of the resubdivision will be 78% impervious and 22% impervious. C. Sewer and Water 1. Both Lot 1 and Lot 2 of the resubdivision will be served with water and sewer from the existing 8” watermain and 8” sewer located along the west lot line of each lot. 2. The multi-tenant retail building on Lot 1 will require a 6” water service and a 6” sewer service. The Fuller’s Carwash on Lot 2 will require a 4” water service and a 6” sewer service. 3. Sanitary sewer and water stubs will be extended from the existing mains located within the Walmart private drive, along the west side of the subject property, to Lots 3, 4 and 5 as part of this project. 4. There are no private utility facilities on the subject Property. D. Traffic and Parking 1. Both Lots 1 and Lot 2 will be served by 2 full access entrances that connect to the existing Walmart private drive. There are no public streets to align the proposed driveways with on the opposite side of the private drive. 2. As noted above, all vehicular access will come from the existing private drive along the west side of the resubdivision. There will be no vehicular access directly to the lots from Randall Road. 3. There are no existing vehicular access points to the subject site in the existing condition. The proposed development for Lot 1 and Lot 2 will include two driveways as noted above. 4. The overall shopping center was designed to accommodate the future development of the {00276323.DOCX /v. 1 } 5 subject site with respect to vehicular circulation. As noted above, the existing north/south private drive located within the Walmart shopping center will serve as the main point of access to all outlots within this resubdivision. 5. The types of vehicles accessing the sites will be primarily of a passenger vehicle nature. Some delivery vehicles will access the sites periodically and are anticipated to be single axle type delivery trucks. 6. On site vehicle circulation for Lot 1 will be accommodated via two way drive aisles around the perimeter of the building. On site vehicle circulation for Lot 2 will be accommodated via a one way drive aisle to direct vehicle circulation thru the carwash. A curb opening has been left open before the building to allow traffic to bypass the tunnel if necessary. 7. Pedestrian and bicycle access for Lot 1 will be accommodated by sidewalks around the perimeter of the building with a direct connection to the existing bicycle path located along the east property line. Pedestrian and bicycle access for Lot 2 has not been provided due to the use of the facility being directly for vehicles. E. Surrounding Land Use and Zoning 1. The surrounding land uses are consumer retail (west), gas station use (north), restaurant use (north) and residential use (east). The land to the south is vacant. F. Trend of Development 1. The proposed use is compatible with the surrounding land uses. G. Zoning Districts 1. The subject Property has remained vacant since the original subdivision of the Elgin WalMart/Sam’s Club Subdivision in 2011. H. Comprehensive Plan 1. The proposed development is located within an existing vehicular oriented commercial area of Elgin consisting of a large scale planned development. The commercial area design guidelines outlined in the City Comprehensive Plan call for specific design treatments to meet the community’s preferences for the design of the City’s commercial land use areas. This includes implementation of distinctive architecture appropriate for its physical context, protection of pedestrian scale and character and landscaping at sidewalks and parking areas. Architecturally speaking, the proposed project adheres to the principals of the Comprehensive Plan through the use of high quality building materials such as brick and cultured stone veneer, and also integrates arched metal canopies, stamped brick and painted stone precast panels. In addition the project contain detailing through the use of, awnings, trellises, glazing, architectural roof shingles and decorative light fixtures which all serve to provide appropriate pedestrian scale. From a site perspective, the overall plan has been laid out with generous landscape areas. This allows for adequate landscape to soften the building, while also allowing room for outdoor patio space to accommodate seating and bicycle parking. The parking lot islands are proposed to be landscaped per the requirements of the City code. {00276323.DOCX /v. 1 } 6 Overall, the proposed project has been carefully thought out and planned such that it conforms to the goals, objectives and policies of the City’s Comprehensive Plan. Respectfully submitted, Richport Property, LLC – S. Randall Outlot By: Phillip J. Salerno II, Attorney-Agent {00276323.DOCX /v. 1 } 7 1110-1190 South Randall Road MULTI TENANT RETAIL BUILDING PETITION 26-15 Know what's below. Call before you dig. Know what's below. Call before you dig. 25” 9’-3” 3” 22” RICHPORT COMMONS D/F INT. H.O. FLO. ILLUMINATED DISPLAY 3/8” = 1’-0” TENANT PANEL TENANT PANEL ALUMINUM CABINET, RETAINERS & H-BARS, BM HC34 WILMINGTON TAN PAINTED FINSH. 7'-1” 10'-0” TENANT PANEL TENANT PANEL WHITE LEXAN I.D. & TENANT PANEL FACES W/ VINYL APPLIED GRAPHICS. ALUMINUM COLUMN COVER W/ VENEER BRICK & MORTAR OVERLAY TO MATCH BLDG. ALUMINUM DRIP CAP, PMS #400 LT GREY PAINTED FINISH. 32" DISCONNECT SWITCH ALUMINUM CAP, PMS #400 LT GREY PAINTED FINISH. SIDE VIEW RICHPORT COMMONS R WHITEHEAD S RANDALL RD. ELGIN, IL JOHN W job#: 15-6251 11-23-15 12-23-15 page 10 of 10 Comments: Know what's below. Call before you dig. Know what's below. Call before you dig. Know what's below. Call before you dig. Know what's below. Call before you dig. Know what's below. Call before you dig. Know what's below. Call before you dig. Know what's below. Call before you dig. Know what's below. Call before you dig. Know what's below. Call before you dig. “ ” Know what's below. Call before you dig. ‟ Know what's below. Call before you dig. GREENBRIAR® - FLAT LENS (Various reflectors are protected by U.S. Patent No. 6,464,378.) HOUSING - The aluminum housing is available in two sizes. Both housings are the same dimensions square, however, the GFR is deeper. Both are finished to produce a clean, sharp appearance, and designed to ensure weather-tight construction. Top-access covers provide ease of installation and servicing. COMMUNITY FRIENDLY LENS/GASKET - The flat clear tempered glass lens is sealed to the housing with an EPDM gasket, preventing entry of moisture, dust and insects. Flat-lensed fixtures meet IESNA full cutoff classification TOP COVER FASTENERS - The four captive stainless steel fasteners secure the top-access cover to the housing. Shown with optional decal striping DIMENSIONS SOCKETS - Porcelain mogul-base sockets. All sockets are pulse-rated. A Bracket – B 12" (305mm) 2-bolt Pattern Arm Mount A LIGHT SOURCES - Pulse-Start Metal Halide, Natural White Pulse-Start Metal Halide, Metal Halide Reduced Envelope, or High Pressure Sodium. Clear lamp is supplied as standard. BALLASTS - Pulse-Start Metal Halide (200, 250, 320, 400, 750 and 1000 watt), 775 watt Natural White Pulse-Start Metal Halide, Metal Halide, and High Pressure Sodium fixtures feature a high-power factor type CWA ballast. The 575 watt Natural White Pulse-Start Metal Halide fixtures feature HX-HPF type ballasts. All ballasts are designed for -20° F operation. B GFM Arm Mount 21-5/8"(549mm) 12-3/4"(324mm) GFR Arm Mount 21-5/8"(549mm) 16-1/8"(410mm) LUMINAIRE EPA CHART - Greenbriar Flat Lens GFM GFR 12" Bracket 12" Bracket Single 3.2 3.8 D180° 6.3 D90° 5.7 7.6 T90° 8.8 11.4 TN120° 9.0 11.4 Q90° 11.3 15.2 7.6 Note: House Side Shield adds to fixture EPA. Consult factory. GFM: Type II (2), Type III (3), Perimeter Forward Throw (FP), and Type V (5). All reflectors are field-rotatable, enabling generous flexibility in distribution patterns without moving the fixture. Photometric data is tested in accordance with IESNA guidelines. BRACKETS - Arm Mount: Use with 5” traditional drilling pattern. 2-1/2” x 5-3/8” x 12” extruded aluminum bracket is shipped standard. An 8” bracket is available for single or D180° configurations, but must be ordered from the Options column of the ordering chart. A Round Pole Plate (RPP2) is required for mounting to 3”–5” round poles. (See Accessory Ordering Information chart.) FINISHES - Each fixture is finished with LSI’s DuraGrip® polyester powder coat finishing process. The DuraGrip finish withstands extreme weather changes without cracking or peeling, and is guaranteed for five full years. Standard colors include bronze, black, platinum plus, white, satin verde green, metallic silver, and graphite. DECAL STRIPING - LSI offers optional color-coordinated decals in 9 standard colors to accent the fixture. Decal is guaranteed for five years against peeling, cracking, or fading. PHOTOMETRICS - Please visit our web site at www.lsi-industries.com for detailed REFLECTORS/DISTRIBUTION PATTERNS photometric data. - The series is available in a variety of reflector systems and distribution patterns, all with vertical oriented This product, or selected versions of this product, lamps: GFR: Type II (2), Type III (3), meet the standards listed below. Please consult Perimeter Forward Throw (FP), Type V factory for your specific requirements. (5), Automotive Forward Throw (FA), ARRA as well as, ART (Advanced Reflector Funding Compliant wet location Technology) optical systems: Automotive Forward Throw (AFT), Automotive Interior (AI), and a high performance Type V (540) for 38’ - 42’ mounting heights. OUTDOOR SHIPPING WEIGHTS - Greenbriar Flat Lens Catalog Number Est. Weight (kg/lbs.) Length (mm/in.) Width (mm/in.) Height (mm/in.) 19/41 26/57 635/25 711/28 495/19.5 648/25.5 GFM GFR Project Name 172 Catalog # 635/25 724/28.5 Fixture Type 10/22/15 © 2015 LSI INDUSTRIES INC. GREENBRIAR® - FLAT LENS LUMINAIRE ORDERING INFORMATION TYPICAL ORDER EXAMPLE: Luminaire Prefix GFR Distribution 5 1000 PSMV F MT Lamp Wattage Medium Vertical Burn GFM - Arm Mount 2 – Type II 3 – Type III FP – Perimeter Forward Throw 5 – Type V 200 250 320 400 Reduced Vertical Burn GFR - Arm Mount 2 – Type II 3 – Type III FP – Perimeter Forward Throw FA - Automotive Forward Throw 5 – Type V Advanced Reflector Technology Optical Systems: 400 575 750 775 1000 AFT – Automotive Forward Throw AI – Automotive Interior 540 – Type V (38’-42’ Mtg. Ht.) 575 750 775 1000 Light Source PLP Lens 8BK 20 Line Voltage 480 MT – Multi Tap TT – Tri-Tap PSMV – Pulse-Start Metal Halide F – Flat Clear 200, 250, 320 Watt Tempered Glass PSMVR – Pulse-Start Metal Halide Reduced Envelope 400 Watt HPS – High Pressure Sodium 250, 400 Watt PSMV – Pulse-Start Metal Halide 400, 750, 1000 1 Watt MT – Multi Tap consists of 120V, 208V, NWPSMV – Pulse-Start Metal Halide 240V and 277V and is prepared for highest voltage. Alternate voltages will Natural White 575, 775 Watt require field adjustment. MHR - Metal Halide Reduced Envelope 1000 Watt TT – Tri-Tap consists of 120V, 277V and 347V and is shipped standard for Canadian applications and is prepared PSMV – Pulse-Start Metal Halide for highest voltage. Alternate voltages 1 750, 1000 Watt will require field adjustment. NWPSMV – Pulse-Start Metal Halide Natural White 575, 775 Watt MHR - Metal Halide Consult Factory Reduced Envelope 1000 Watt for International Voltages and Light Sources Luminaire Finish BRZ – Bronze BLK – Black PLP – Platinum Plus WHT – White SVG - Satin Verde Green GPT - Graphite MSV - Metallic Silver Options 8BK – 8" Bracket 2 PCI120 – Button-Type Photoelectric Control 3 PCI208 – Button-Type Photoelectric Control 3 PCI240 – Button-Type Photoelectric Control 3 PCI277 – Button-Type Photoelectric Control 3 PCI347 – Button-Type Photoelectric Control 3 LL – Less Lamp Color Decals 45 – Light Gold 20 – Charcoal Metallic 55 – Black 94 – Blue Metallic 59 – Dark Green 51 – Dark Red 21 – Tomato Red 50 – White 700 – Aztec Silver Metallic FOOTNOTES: 1- Tri-Tap not available in 1000 Watt PSMV. Voltage must be specified - 120V, 277V or 347V. 2- An 8" bracket can only be ordered with single and D180° configurations. 3- On GFR/GFPR photoelectric control can only be used with 400 Watt PSMV. ACCESSORY ORDERING INFORMATION Description FK120 - Single Fusing FK277 - Single Fusing DFK208, 240 - Double Fusing DFK480 - Double Fusing FK347 - Single Fusing RPP2 – Round Pole Plate BKS-BO-WM-*-CLR Wall Mount Plate (Accessories are field installed) Order Number Description GFR/GFM 2 HSS – House Side Shield FK120+ GFR/GFM 3 HSS – House Side Shield FK277+ GFR/GFM FP HSS – House Side Shield DFK208, 240+ GFR/GFPR FA/AFT HSS – House Side Shield DFK480+ FK347+ +Fusing must be located in the hand-hole of the pole on GFR Series - not in the fixture. 162914BLK++ 123111CLR Order Number 4342901++ 4342902++ 4342902++ 4342902++ ++ Black only. HOUSE SIDE SHIELD 4-5/16” (110mm) TYPE II (4342901) 2-5/16” (59mm) 5-3/8” (137mm) 8-7/8” (225mm) TYPE III AND FORWARD THROW (FA/FP/AFT) (4342902) OUTDOOR Project Name Catalog # Fixture Type 10/22/15 © 2015 LSI INDUSTRIES INC. 173 GREENBRIAR® WALL SCONCE (Various reflectors are protected by U.S. Patent No. 6,464,378) HOUSING - The aluminum housing is available in two sizes and is a rectangular shape. All mounting hardware is stainless steel or electro-zinc plated steel. Shown with optional decal striping COMMUNITY FRIENDLY Flat-lensed fixtures meet IESNA full cutoff classification DIMENSIONS DOOR FRAME - The aluminum door frame with two stainless steel captive fasteners allows easy access into the fixture. A one piece extruded silicone gasket seals the door frame against the housing. The door swings open and is held in place by a retainer. A D 30 o C (95mm) 3-3/4” (70mm)(25mm) 1" 2-3/4" Junction Box Centerline B Small Medium A (448mm) 17-5/8" (508mm) 20" B (244mm) 9-5/8" (341mm) 13-7/16" C (257mm) 10-1/8" (283mm) 11-5/32" D (137mm) 5-3/8" (218mm) 8-5/8" 5-11/16” (145mm) 7-3/4” (197mm) Universal Mounting Plate SHIPPING WEIGHTS - Greenbriar Wall Sconce Catalog Number OUTDOOR GBWS-HID GBWM-HID GBWS-CFL GBWM-CFL Est. Weight (kg/lbs.) Length (mm/in.) Width (mm/in.) Height (mm/in.) 10 / 22 15 / 32 8 / 17 11 / 24 616 / 24.25 616 / 24.25 616 / 24.25 616 / 24.25 394 / 15.5 394 / 15.5 394 / 15.5 394 / 15.5 343 / 13.5 419 / 16.5 343 / 13.5 419 / 16.5 ARRA Funding Compliant wet location (Downlight only) damp location (Uplight - covered locations only) Project Name 218 Catalog # WALL MOUNT - A galvanized-steel universal wall mounting plate easily mounts directly to a 4” octagonal or square junction box. An EPDM gasket is supplied to be installed between the mounting plate and junction box, sealing the junction box from entrance of water. The galvanized-steel universal plate allows the fixture to securely attach to the mounting plate using a unique clamping design which is locked into place with two hex-head screws. The universal plate permits the fixture to be mounted in the uplighting position (listed for damp locations) or downlighting position (listed for wet locations). LENS/GASKET - A flat clear tempered glass lens, which is sealed to the door frame with EPDM gasketing, is standard. An optional polycarbonate lens is available on most Compact Fluorescent fixtures. BALLASTS/ELECTRICAL COMPONENTS Electrical components are factorymounted in housing and prewired with voltage specific leads which extend out the back of the unit through a rubber grommet. This grommet prevents the entry of insects, dust, and moisture into the fixture. The need to open the fixture to make wiring connections is eliminated, thus making installation quick and easy. UL listed HID components with highpower factor ballasts rated for -20oF starting. Compact Fluorescent ballasts are Electronic Universal Voltage (120-277V 50/60 Hz) or 347V (60 HZ), 0oF starting. Compact Fluorescent fixtures with UE (Universal Electronic) voltage are available with an optional dimming ballast for multiple types of controls such as building lighting controls and occupancy sensors. Available battery back-up of BB (32° starting temperature) and CWBB (0° starting temperature) are 120 or 277 voltage specific for U.S. applications for 26 watt through 70 watt lamps. Consult factory for available wattages and voltages for use in Canada. Fixture Type SOCKETS - HID lampholders are glazed porcelain, medium base for the small fixture and mogul base for the medium fixture, 4KV pulse rated. The Compact Fluorescent fixtures feature a one-piece thermoplastic socket. LIGHT SOURCES - The fixture is designed to operate with horizontal Pulse-Start Metal Halide, Pulse-Start Metal Halide Reduced, Ceramic Metal Halide, Metal Halide, High Pressure Sodium, and single, double or triple Compact Fluorescent lamps. Lamps supplied as standard – HID (clear, shipped installed), and Compact Fluorescent (coated, 4100K). EMERGENCY OPERATION - Integral Emergency Battery Back-up options are available on Compact Fluorescent units to comply with Life Safety Codes which require emergency lighting along the path of egress on the building’s exterior, so building occupants can exit safely. REFLECTORS/DISTRIBUTION PATTERNS Forward Throw (FTM, FT) and Type III (3) reflectors are available on small and medium. Wall Wash (WW) reflectors are also available on small. All are high performance, full cut-off distribution as defined by the IESNA (downlight position only). Photometric data is tested in accordance with IESNA guidelines. FINISHES - Each fixture is finished with LSI’s DuraGrip® polyester powder coat finishing process. The DuraGrip finish withstands extreme weather changes without cracking or peeling, and is guaranteed for five full years. Standard colors include bronze, black, platinum plus, white, satin verde green, metallic silver, and graphite. DECAL STRIPING - LSI offers optional colorcoordinated decals in 9 standard colors to accent the fixture. Decals are guaranteed for five years against peeling, cracking, or fading. PHOTOMETRICS - Please visit our web site at www.lsi-industries.com for detailed photometric data. 10/22/15 © 2015 LSI INDUSTRIES INC. GREENBRIAR® WALL SCONCE LUMINAIRE ORDERING INFORMATION GBWM 3 400 TYPICAL ORDER EXAMPLE: Luminaire Prefix GBWS (Small) Distribution Lamp Wattage 3 - Type III FT - Forward Throw WW - Wall Wash 50 70 100 150 FTM - Forward Throw Medium 26 32 42 WW - Wall Wash GBWM (Medium) 3 - Type III FT - Forward Throw F Light Source CMH - Ceramic Metal Halide 150 Watt1 MH - Metal Halide 50, 70, 1002, 1501 Watt HPS - High Pressure Sodium 50 3, 70, 100, 150 Watt CFL - Compact Fluorescent Single 26, 32, 42 Watt CFL2 - Compact Fluorescent Double 26, 32, 42 Watt Lens 250 320 400 ACCESSORY ORDERING INFORMATION Line Voltage 120 208 240 277 347 F- Flat Clear Tempered Glass FPC - Flat Clear Polycarbonate 4 UE - Universal Electronic (120-277V 50/60Hz) PSMH - Pulse Start Metal Halide F- Flat Clear Tempered Glass 250, 320 Watt PSMHR - Pulse Start Metal Halide Reduced 400 Watt HPS - High Pressure Sodium 250, 400 Watt CFL - Compact Fluorescent Single 57, 70 Watt CFL2 - Compact Fluorescent Double 57, 70 Watt CFL3 - Compact Fluorescent Triple 26, 32, 42 Watt 120 BRZ SQT F- Flat Clear Tempered Glass CFL - Compact Fluorescent Single 26, 32, 42 Watt 26 32 42 57 70 Description FK120 - Single Fusing FK277 - Single Fusing DFK208, 240 - Double Fusing DFK480 - Double Fusing FK347 - Single Fusing PSMHR 347 6 Luminaire Finish BRZ - Bronze BLK - Black PLP - Platinum Plus WHT - White SVG - Satin Verde Green GPT - Graphite MSV - Metallic Silver 120 208 240 277 347 480 F- Flat Clear UE - Universal Tempered Glass Electronic FPC - Flat Clear (120-277V 50/60Hz) 4,5 Polycarbonate 347 6 (Accessories are field installed) Order Number FK12012 FK27712 DFK208, 24012 DFK48013 FK34712 FOOTNOTES: 1- 150 MH must be used for downlight only. 2- Supplied with a HX-HPF transformer as standard. Also available with a 120/277 volt CWA transformer. Consult factory. 3- 50 Watt HPS is not available in TT or 347V. 4- FPC lens is not available with EMR options. 5- If a polycarbonate lens is required on an Uplight Medium fixture in 70 CFL2 or 42 CFL3, the glass lens with Polycarbonate Shield (GBWM PLS) accessory must be ordered. 6- 347V CFL is not available with dimming ballast (DIM) option. Consult factory for battery back-up (BB) options. 7- Tamper-proof Screwdriver must be ordered separately. (See Accessory Ordering Information) 8- Use with 5” traditional drilling pattern. Options PCI120 - Button-Type Photocell PCI208 - Button-Type Photocell PCI240 - Button-Type Photocell PCI277 - Button Type-Photocell PCI347 - Button Type-Photocell TP - Tamper Proof 7 PMA - Pole Mount Adaptor for use with square poles (for S or D180 mounting configurations only)8 Not compatible with EMR1, EMR2, EQ or EQ2 options PMAR - Pole Mount Adaptor for use with round poles (for S or D180 mounting configurations only)8 Not compatible with EMR1, EMR2, EQ or EQ2 options DIM - CFL Control Voltage Dimming Ballast 9 C - Coated MH or PSMH Lamp except 250 PSMH SQT - Standby Quartz (Time Delay) 10 SQN - Standby Quartz (Non-Time Delay) 10 BB - CFL Battery Back-up11 CWBB - CFL Cold Weather Battery Back-up11 LL - Less Lamp Color Decals 45 - Light Gold Metallic 55 - Black 20 - Charcoal Metallic 50 - White 94 - Blue Metallic 51 - Dark Red 59 - Dark Green 700 - Aztec Silver Metallic 21 - Tomato Red Consult Factory for International Voltages and Light Sources Description GBWS PLS - Polycarbonate Shield for Small GBWM PLS - Polycarbonate Shield for Medium SW BLK - Surface Wiring Box SCD - Tamper-proof Screwdriver Order Number 172786 172787 173156BLK14 477974 9- CFL Dimming Control by others. 10- HID lamp wattages 50 and 70 are supplied with a 50 watt, 120V quartz lamp. HID lamp wattages 100 through 250 are supplied with a 100 watt, 120V quartz lamp. HID lamp wattages of 320 & 400 are supplied with a 250 watt, 120V quartz lamp. 11- Battery Back-up available on single, double and triple 120 or 277 voltage specific units for U.S. applications. Please change Line Voltage of UE to 120 or 277 when ordering this option. On double and triple units, one lamp will be energized by Batter Back-up (BB) option. Consult factory for specific Means of Egress job application compliance. 12- Available on HID fixtures only. Fusing to be installed in a compatible junction box supplied by contractor. 13- Available on HID Medium fixture only. Fusing to be installed in a compatible junction box supplied by contractor. 14- SW BLK not compatible with PMA or PMAR option. OUTDOOR Project Name Catalog # Fixture Type 10/22/15 © 2015 LSI INDUSTRIES INC. 219 11 1 2675 Pratum Avenue Hoffman Estates, Illinois 60192 PH: (224) 293-6333 FAX: (224) 293-6444 www.wtengineering.com IL. License No.: 184.004512 Exp: 04/30/2016 C !" !" ##$%&'()*+#,+*-.%/#01213 Exterior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Exterior Lighting Zone 2012 IECC Richport Plaza Out-Lot New Construction 4 (High activity metropolitan commercial district) Construction Site: !"#$%&'%((#$'#%&'#)*+,-#$' .(/0&1#23 Owner/Agent: Designer/Contractor: 4%56#7,&85,((0 !9:#.&/0&,,50&/ ;<=>#?5%8@A#BC, D*EEA%&#.-8%8,-1#23#<FGH; ;;I9;HJ9<JJJ Allowed Exterior Lighting Power A Area/Surface Category B Quantity Parking area C Allowed Watts / Unit 44871 ft2 0.13 D Tradable Wattage E Allowed Watts (B X C) Yes Total Tradable Watts (a) = Total Allowed Watts = Total Allowed Supplemental Watts (b) = 5833 5833 5833 1300 (a) Wattage tradeoffs are only allowed between tradable areas/surfaces. (b) A supplemental allowance equal to 1300 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Parking area (44871 ft2): Tradable Wattage HID 1: Metal Halide: Pulse start: HID 1 copy 1: Metal Halide: Pulse start: B Lamps/ Fixture C D # of Fixture Fixtures Watt. 1 11 575 1 1 250 Total Tradable Proposed Watts = E (C X D) 6325 250 6575 Exterior Lighting PASSES: Design 8% better than code Exterior Lighting Compliance Statement !"#$%&'()*+,&,)")',-##:K,#L5*L*-,'#,M8,50*5#(0/K80&/#',-0/,L5,-,&8,'#0K0-#'*N@A,&8#0-#N*&-0-8,&8#+08K#8K,#O@0('0&/#L(%&-1 -L,N0E0N%80*&-1#%&'#*8K,5#N%(N@(%80*&-#-@OA088,'#+08K#8K0-#L,5A08#%LL(0N%80*&P#:K,#L5*L*-,'#,M8,50*5#(0/K80&/#-Q-8,A-#K%C,#O,,& ',-0/&,'#8*#A,,8#8K,#;FG;#2.""#5,R@05,A,&8-#0&#"S4(.)(/#7,5-0*&#IPFPG#%&'#8*#N*AL(Q#+08K#8K,#A%&'%8*5Q#5,R@05,A,&8-#(0-8,' 0K,#2&-L,N80*&#"K,N6(0-8P 11/20/2015 Mark Ventrelli T%A,#9#:08(, 0/&%8@5, ?5*V,N8#:08(,W $0NKL*58#?(%X%#S@893*8 U%8%#E0(,&%A,W YY;6G;',((FGY4."DZY;FG>Y4G>J=<#9#$0NKL*58#?(%X%#S@8(*8Y"%(N@(%80*&.R@0LA,&8"@8-Y4G>J=<PNN6 U%8, $,L*58#'%8,W GG[;F[G> ?%/, G#*E > !" !" ##$%&'()*+#,+*-.%/#01213 4/-5+6'.%/# 7+689.-' .&,5/Q#"*',W#;FG;#2."" $,R@05,A,&8-W#GFFPF\#+,5,#%''5,--,'#'05,N8(Q#0K,#"S4(.)(/#-*E8+%5, :,M8#0K,#]"*AA,&8-[B--@AL80*&-]#N*(@A�-#L5*C0','#OQ#8K,#@-,5#0K,#"S4NK,N6#$,R@05,A,&8-#-N5,,&P#^*5#,%NK 5,R@05,A,&81#8K,#@-,5#N,580E0,-#8K%8#%#N*',#5,R@05,A,&8#+0((#O,#A,8#%&'#K*+#8K%8#0-#'*N@A,&8,'1#*5#8K%8#%&#,MN,L80*& 0-#O,0&/#N(%0A,'P#!K,5,#N*AL(0%&N,#0-#08,A0X,'#0&#%#-,L%5%8,#8%O(,1#%#5,E,5,&N,#8*#8K%8#8%O(,#0-#L5*C0','P :23:#4; <9)/#=+>.+( "GFJP; _?$`aG ?(%&-1#-L,N0E0N%80*&-1#%&'[*5 N%(N@(%80*&-#L5*C0',#%((#0&E*5A%80*& +08K#+K0NK#N*AL(0%&N,#N%&#O, ',8,5A0&,'#E*5#8K,#,M8,50*5#(0/K80&/ %&'#,(,N850N%(#-Q-8,A-#%&'#,R@0LA,&8 %&'#'*N@A,&8#+K,5,#,MN,L80*&-#8* 8K,#-8%&'%5'#%5,#N(%0A,'P#2&E*5A%80*& L5*C0','#-K*@('#0&N(@',#,M8,50*5 (0/K80&/#L*+,5#N%(N@(%80*&-1#+%88%/,#*E O@(O-#%&'#O%((%-8-1#85%&-E*5A,5-#%&' N*&85*(#',C0N,-P "*AL(0,U*,-#T*8 ?(%&-1#-L,N0E0N%80*&-1#%&'[*5 N%(N@(%80*&-#L5*C0',#%((#0&E*5A%80*& +08K#+K0NK#N*AL(0%&N,#N%&#O, ',8,5A0&,'#E*5#8K,#%''080*&%(#,&,5/Q ,EE0N0,&NQ#L%N6%/,#*L80*&-P "*AL(0,U*,-#T*8 "IF< _?$HaG %?59.+-@ %??+/'-AB--C?5'.%/$,R@05,A,&8#+0((#O,#A,8P T*8#SO-,5C%O(, T*8#BLL(0N%O(, $,R@05,A,&8#+0((#O,#A,8P T*8#SO-,5C%O(, T*8#BLL(0N%O(, BDD.'.%/)9# %??+/'-AB--C?5'.%/-E G D0/K#2AL%N8#b:0,5#Gc ; 4,'0@A#2AL%N8#b:0,5#;c J 3*+#2AL%N8#b:0,5#Jc ?5*V,N8#:08(,W $0NKL*58#?(%X%#S@893*8 U%8%#E0(,&%A,W YY;6G;',((FGY4."DZY;FG>Y4G>J=<#9#$0NKL*58#?(%X%#S@8(*8Y"%(N@(%80*&.R@0LA,&8"@8-Y4G>J=<PNN6 $,L*58#'%8,W GG[;F[G> ?%/, ;#*E > :23:#4; "IF>P;PI _.3;>a; =%CF7G4/#;9+6'*.6)9#4/-5+6'.%/ B@8*A%80N#(0/K80&/#N*&85*(-#E*5#,M8,50*5 (0/K80&/#0&-8%((,'P %?59.+-@ "*AL(0,U*,-#T*8 %??+/'-AB--C?5'.%/$,R@05,A,&8#+0((#O,#A,8P T*8#SO-,5C%O(, T*8#BLL(0N%O(, "IF>P< _.3;IaG .M8,50*5#/5*@&'-#(0/K80&/#*C,5#GFF#! L5*C0',-#d<F#(A[!#@&(,--#*&#A*80*& -,&-*5#*5#E0M8@5,#0-#,M,AL8#E5*A#-N*L, *E#N*',#*5#E5*A#,M8,5&%(#3?UP "*AL(0,U*,-#T*8 $,R@05,A,&8#+0((#O,#A,8P T*8#SO-,5C%O(, T*8#BLL(0N%O(, BDD.'.%/)9# %??+/'-AB--C?5'.%/-E G D0/K#2AL%N8#b:0,5#Gc ; 4,'0@A#2AL%N8#b:0,5#;c J 3*+#2AL%N8#b:0,5#Jc ?5*V,N8#:08(,W $0NKL*58#?(%X%#S@893*8 U%8%#E0(,&%A,W YY;6G;',((FGY4."DZY;FG>Y4G>J=<#9#$0NKL*58#?(%X%#S@8(*8Y"%(N@(%80*&.R@0LA,&8"@8-Y4G>J=<PNN6 $,L*58#'%8,W GG[;F[G> ?%/, J#*E > :23:#4; "IF>P<P; _^2GHaG "IF`PJ _^2I`aG "IF< _^2JIaG H./)9#4/-5+6'.%/ %?59.+-@ .M8,50*5#(0/K80&/#L*+,5#0-#N*&-0-8,&8 +08K#+K%8#0-#-K*+&#*K,#%LL5*C,' (0/K80&/#L(%&-1#',A*&-85%80&/ L5*L*-,'#+%88-#%5,#(,--#8K%&#*5#,R@%( 8*#%((*+,'#+%88-P "*AL(0,U*,-#T*8 30/K80&/#-Q-8,A-#K%C,#O,,,-8,'#8* ,&-@5,#L5*L,5#N%(0O5%80*&1#%'V@-8A,&81 L5*/5%AA0&/1#%&'#*L,5%80*&P "*AL(0,U*,-#T*8 .EE0N0,&8#D7B"#L,5E*5A%&N,1#,EE0N0,&8 (0/K80&/#-Q-8,A1#*5#*&9-08,#-@LL(Q#*E 5,&,+%O(,#,&,5/Q#N*&-0-8,&8#+08K +K%8#0-#-K*+K,#%LL5*C,'#L(%&-P "*AL(0,U*,-#T*8 %??+/'-AB--C?5'.%/+))*,.)*01,)2%!2*3%4.,%'4*5%1,62)*7(.)86$)*5!2*9&$6)7: T*8#SO-,5C%O(, T*8#BLL(0N%O(, $,R@05,A,&8#+0((#O,#A,8P T*8#SO-,5C%O(, T*8#BLL(0N%O(, $,R@05,A,&8#+0((#O,#A,8P T*8#SO-,5C%O(, T*8#BLL(0N%O(, BDD.'.%/)9# %??+/'-AB--C?5'.%/-E G D0/K#2AL%N8#b:0,5#Gc ; 4,'0@A#2AL%N8#b:0,5#;c J 3*+#2AL%N8#b:0,5#Jc ?5*V,N8#:08(,W $0NKL*58#?(%X%#S@893*8 U%8%#E0(,&%A,W YY;6G;',((FGY4."DZY;FG>Y4G>J=<#9#$0NKL*58#?(%X%#S@8(*8Y"%(N@(%80*&.R@0LA,&8"@8-Y4G>J=<PNN6 $,L*58#'%8,W GG[;F[G> ?%/, I#*E > ?5*V,N8#:08(,W $0NKL*58#?(%X%#S@893*8 U%8%#E0(,&%A,W YY;6G;',((FGY4."DZY;FG>Y4G>J=<#9#$0NKL*58#?(%X%#S@8(*8Y"%(N@(%80*&.R@0LA,&8"@8-Y4G>J=<PNN6 $,L*58#'%8,W GG[;F[G> ?%/, >#*E > STEEL ROUND POLES DIMENSIONS RPN – N= 2-3/8"(60mm) O.D. x 4-3/4"(121mm) Tall Tenon 4N= 4"(102mm) O.D. x 4-7/8"(124mm) Tall Tenon RPB3, RPB5 – Bolt-On Mount, 2-Bolt Pattern POLE SHAFT - Pole shaft is electro-welded ASTM-A500 Grade C steel tubing with a minimum yield strength of 46,000 psi. On Tenon Mount steel poles, tenon is highstrength pipe. Tenon N option is 2-3/8” O.D. x 4-3/4” tall. Tenon 4N option is 4” O.D. x 4-7/8” tall. Steel round poles are 4” and 5” in diameter. HAND-HOLE - Standard hand-hole location is 12” above pole base. Poles 18’ and above have a 3” x 6” reinforced hand-hole. Shorter poles have 2” x 4” non-reinforced handhole. BASE - Pole base is ASTM-A36 hot-rolled steel plate with a minimum yield strength of 36,000 psi. Two-piece square base cover is optional. BASE COVERS- Optional two-piece decorative die-cast aluminum (GBC) base covers or square two-piece aluminum base covers are available. 10'-30' (5.5m - 9.1m) ANCHOR BOLTS - Poles are furnished with anchor bolts featuring zinc-plated double nuts and washers. Galvanized anchor bolts are optional. Anchor bolts conform to ASTM F 155407a Grade 55 with a minimum yield strength of 55,000 psi. Hand-hole GROUND LUG - Ground lug is standard. 12" (305mm) Standard Optional Base Cover Projection DUPLEX RECEPTACLE - Weatherproof duplex receptacle is optional. SF – Single Flood Pole Preparation GROUND FAULT CIRCUIT INTERRUPTER - Self-testing ground fault circuit interrupter is optional. FINISHES - Each pole is finished with DuraGrip®, LSI’s baked-on polyester-powder finishing process which electrostatically applies and fuses a polyester powder to the pole. Provides an extremely smooth and uniform finish to withstand extreme weather changes without cracking or peeling, and features a five-year limited warranty. Optional DuraGrip® Plus features the added protection of a 3.0 to 5.0 mil thickness of polyesterpowder finish plus an inner coating, as well as a seven-year limited warranty. (4) Anchor Bolts Foundation By Other DETERMINING THE LUMINAIRE/POLE COMBINATION FOR YOUR APPLICATION: DRILLING LOCATIONS Side “C” Side “D” Side “B” Side “A” (Hand-hole Side) Sides A B C D Hand-hole X Single X X X D180° X X D90° X X X T90° X TN120°* X X X X Q90° Single FBO X Double FBO X X *Other two locations will be 120° to the left and right of Side A. Note: Consult factory for custom variations. Standard SF and DF pole preparations are located 3/4 of the height of the pole from the base, unless otherwise specified. OUTDOOR SHIPPING WEIGHTS - Steel Round Poles 4"(102mm) Dia. 10 Ga. is approximately 5"(127mm) Dia. 11 Ga. is approximately 5"(127mm) Dia. 07 Ga. is approximately Anchor Bolts (3/4” x 30”)(19mm x 762mm) Anchor Bolts (1” x 36”)(125mm x 914mm) ARRA Funding Compliant Project Name 180 Catalog # 6.0 lbs./ft. 7.0 lbs./ft. 10.0 lbs./ft. 15 lbs.(7kg)/set 30 lbs.(14kg)/set • Select luminaire from luminaire ordering information • Select bracket configuration if required • Determine EPA value from luminaire/bracket EPA chart • Select pole height • Select MPH to match wind speed in the application area (See windspeed map). • Confirm pole EPA equal to or exceeding value from note above • Consult factory for special wind load requirements and banner brackets POLE SELECTION CHART: 4" (102mm) and 5" (127mm) steel round poles Height 10' (3.0m) 12' (3.7m) 14' (4.3m) 16' (4.9m) 16' (4.9m) 16' (4.9m) 18' (5.5m) 18' (5.5m) 18' (5.5m) 20' (6.1m) 20' (6.1m) 20' (6.1m) 22' (6.7m) 22' (6.7m) 22' (6.7m) 24' (7.3m) 24' (7.3m) 24' (7.3m) 26' (7.9m) 26' (7.9m) 28' (8.5m) 30' (9.1m) 70 MPH 18.5 14.6 11.7 9.9 18.6 32.2 15.5 24.2 37.5 12.5 20.0 31.7 10.0 16.6 26.9 7.8 13.6 22.9 11.1 19.5 16.5 13.8 EPA 80 MPH 90 MPH 10.6 13.8 8.0 10.7 6.1 8.4 4.9 6.9 9.8 13.4 17.0 23.2 8.0 11.1 12.9 17.5 20.9 27.7 6.1 8.7 10.2 14.2 17.3 23.1 4.4 6.7 8.0 11.5 14.2 19.4 3.0 4.9 6.0 9.1 11.6 16.2 4.3 7.1 9.4 13.5 7.4 11.1 5.6 8.9 100 MPH 8.2 6.1 4.5 3.4 7.3 12.6 5.8 9.6 16.1 4.2 7.4 13.1 2.8 5.5 10.5 1.5 3.8 8.3 2.3 6.4 4.7 3.2 Outside Dimensions 4" (102mm) 4" (102mm) 4" (102mm) 4" (102mm) 5" (127mm) 5" (127mm) 4" (102mm) 5" (127mm) 5" (127mm) 4" (102mm) 5" (127mm) 5" (127mm) 4" (102mm) 5" (127mm) 5" (127mm) 4" (102mm) 5" (127mm) 5" (127mm) 5" (127mm) 5" (127mm) 5" (127mm) 5" (127mm) Material S10G S10G S10G S10G S11G S07G S10G S11G S07G S10G S11G S07G S10G S11G S07G S10G S11G S07G S11G S07G S07G S07G Bolt Circle L L L L L M L L M L L M L L M L L M L M M M EPA based on ANSI/ASCE 7-93. Refer to EPA information on next page. For applications in Canada and areas using code requirements other than ANSI/ASCE 7-93 and for banner brackets, consult factory. If luminaire weight exceeds 250 lbs. (113.4 kg), consult factory. Fixture Type 11/11/15 © 2015 LSI INDUSTRIES INC. STEEL ROUND POLES POLE ORDERING INFORMATION TYPICAL ORDER EXAMPLE: 5RPB5 S07G 24 S PLP Pole Series Material Height 4 Bolt-On Mount1 - See pole selection guide for patterns and fixture matches. 4RPB3 - 3" Reduced Drilling Pattern 5RPB3 - 3" Reduced Drilling Pattern 4RPB5 - 5" Traditional Drilling Pattern 5RPB5 - 5" Traditional Drilling Pattern S11G – 11 Ga. Steel S10G – 10 Ga. Steel 3 S07G – 07 Ga. Steel 10’ 12’ 14’ 16’ 18' 20' 22' 24' 26' 28' 30' Tenon Mount - See pole selection guide for tenon and fixture/bracket matches. 4RPN 5RPN SF DGP Pole Finish Mounting Configuration BRZ – Bronze BLK – Black PLP – Platinum Plus WHT – White SVG - Satin Verde Green GPT - Graphite MSV - Metallic Silver S – Single/Parallel D180° – Double D90°– Double DN90°– Double T90°– Triple TN120°– Triple Q90°– Quad N – Tenon Mount 4N – Tenon Mount (Available with 5RPN only. For 4” poles, use 4RPSF below)2 Consult Pole Selection Chart on opposite page Greenlee Slipfit - Use with: • Greenlee Lifestyle CH mounting styles • Constitution, Enterprise & Lexington PT Single mounting styles2 4RPSF Options GA – Galvanized Anchor Bolts SF – Single Flood 5 DF – Double Flood 5 DGP – DuraGrip® Plus LAB – Less Anchor Bolts OSXX - Pole preparation for PMOS Occupancy Sensor6 Standard SF and DF pole preparations are located 3/4 of the height of the pole from the base, unless otherwise specified. * Greenlee Universal Bracket1 (No Drilling) - Use with: • Lifestyle UCLS • Lifestyle UCLD180 4RPI 5RPI ACCESSORY ORDERING INFORMATION Description 4" SRBC Square Base Cover 5" SRBC Square Base Cover 4" /5” GBC Decorative Base Cover ER2 – Weatherproof Duplex Receptacle (Poles below 18’) ER2 – Weatherproof Duplex Receptacle for Reinforced Hand-hole (Poles 18' and above) GFI – Ground Fault Circuit Interrupter (Poles below 18’) (Accessories are field installed) Order Number 158450CLR 158451CLR 483859CLR 122557CLR 122566CLR 122558CLR Order Number Description GFI – Ground Fault Circuit Interrupter for Reinforced Hand-hole (Poles 18' and above) 122567CLR MHD – Mounting Hole Weatherproof Decal 340120 Consult Factory for EPA calculations BB - Banner Brackets PMOS120 - 120V Occupancy Sensor 518030CLR7 PMOS208/240 - 208, 240V Occupancy Sensor 534239CLR7 PMOS277 - 277V Occupancy Sensor 518029CLR7 PMOS480 - 480V Occupancy Sensor 534240CLR7 FOOTNOTES: 1 - Standard flat black pole cap provided. Domed Greenlee pole cap will ship with SA4 and SA5 Constitution, Enterprise, and Lexington fixtures, SA Lifestyle fixtures, BK SPT BO, BK MPT BO and UCL brackets. 2 - For Constitution, Enterprise, and Lexington D180 or other mounting configuration styles using BK SPT BO and BK MPT BO accessories, see chart on Bolt-on Mount 4RPB3 / 5RPB3 DRILLING PATTERN section on pole selection chart. 3 - 4" poles are available in S10G only. 5" poles available in S11G and S07G only. 4 - Pole heights will have +/- 1/2" tolerance. 5- See Flood Lighting Brackets section for choice of FBO brackets. 6 - Order PMOS separately. Change “XX” to indicate height and side of pole location for pole preparation. EX: 0S18A indicates preparation is to be 18ft. up from pole base on side A. Optimal distance from ground to sensor is 20ft. 7 - OSXX option required. Not for use with Metal Halide fixtures. BOLT CIRCLE EPA INFORMATION 5" (127mm) Round 10-1/8" (257mm) sq. 10-1/8" (257mm) sq. 10-1/8" (257mm) sq. 11" (279mm) Dia. Bolt Circle 11" (279mm) Dia. Bolt Circle 11" (279mm) Dia. Bolt Circle L L M Bolt Circle Slotted 11" (279mm) Slotted 11" (279mm) Slotted 11" (279mm) Anchor Bolt Size 3/4" x 30" (19mm x 762mm) 3/4" x 30" (19mm x 762mm) 1" x 36" (25mm x 914mm) Anchor Bolt Projection 3-1/4" (83mm) 3-1/4" (83mm) 4" (102mm) Base Plate Opening for Wireway Entry 3-5/8" (92mm) 4-3/4" (121mm) 4-5/8" (117mm) 10-1/8" sq. x 3/4" thk. (257mm x 19mm) 10-1/8" sq. x 3/4" thk. (257mm x 19mm) 10-1/8" sq. x 1" thk. (257mm x 25mm) Base Plate Dimensions 5" (127mm) Round All LSI Industries’ poles are guaranteed to meet the EPA requirements listed. LSI Industries is not responsible if a pole order has a lower EPA rating than the indicated wind-loading zone where the pole will be located. CAUTION: This guarantee does not apply if the pole/bracket/fixture combination is used to support any other items such as flags, pennants, or signs, which would add stress to the pole. LSI Industries cannot accept responsibility for harm or damage caused in these situations. NOTE: Pole calculations include a 1.3 gust factor over steady wind velocity. Example: poles designed to withstand 80 MPH steady wind will withstand gusts to 104 MPH. EPAs are for locations 100 miles away from hurricane ocean lines. Consult LSI for other areas. Note: Hurricane ocean lines are the Atlantic and Gulf of Mexico coastal areas. For applications in Florida or Canada, consult factory. Note: Base plate illustrations may change without notice. Do not use for setting anchor bolts. Consult factory for the base plate templates. Project Name Catalog # Fixture Type OUTDOOR 4" (102mm) Round 10/22/15 © 2015 LSI INDUSTRIES INC. 181 1110-1190 South Randall Road FULLERS CAR WASH PETITION 26-15 LEGEND PROPERTY LINE WAL MART SERVICE DRIVE EXISTING RIGHT-OF-WAY PROPOSED SETBACK LINE HEAVY DUTY HMA PAVEMENT PROPOSED EASEMENT STANDARD DUTY ASPHALT PAVEMENT (TYP) 4" SOLID YELLOW LINE (TYP) R18' CONCRETE BOLLARDS ADA RAMP EXISTING LIGHT POLE 3' PROPOSED SIGN EXISTING SIGN ADA SIGN ON BOLLARD 10' 1 5' EXISTING SIGNAL CONTROLLER 4" DOUBLE YELLOW LINES @ 11" C-C 3' 110' 6' CONCRETE PARKING BLOCK (2 total) 1 LIGHT POLE & FIXTURE (SEE ELECTRICAL PLANS) 4' 8' THICKENED EDGE SIDEWALK (TYP) 12 10 25' 25' MONUMENT SIGN 1. THE CONTRACTOR SHALL FIELD VERIFY THE ELEVATIONS OF THE BENCHMARKS PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL ALSO FIELD VERIFY LOCATION AND ELEVATION OF EXISTING PIPE INVERTS, FLOOR ELEVATIONS, CURB OR PAVEMENT WHERE MATCHING INTO EXISTING WORK. THE CONTRACTOR SHALL FIELD VERIFY HORIZONTAL CONTROL BY REFERENCING SHOWN COORDINATES TO KNOWN PROPERTY LINES. NOTIFY ENGINEER OF DISCREPANCIES IN EITHER VERTICAL OR HORIZONTAL CONTROL PRIOR TO PROCEEDING WITH WORK. 2. REFER TO ARCHITECTURAL PLANS FOR EXACT BUILDING DIMENSIONS. 3. DIMENSIONS THAT LOCATE THE BUILDING ARE MEASURED TO THE OUTSIDE FACE OF THE BUILDING. 4. SIGN CONSTRUCTION AND PAVEMENT MARKINGS SHALL CONFORM TO THE REQUIREMENTS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION. 5. ALL RADII ARE DIMENSIONED TO THE BACK OF CURB. 6. ALL COORDINATES AND LINEAR PAVEMENT DIMENSIONS ARE REFERENCED TO THE EDGE OF PAVEMENT, UNLESS NOTED OTHERWISE. 7. SOME FIELD ADJUSTMENTS MAY BE NECESSARY AT POINTS WHERE PROPOSED PAVEMENT, CURB AND SIDEWALKS MEET EXISTING PAVEMENT, CURB AND SIDEWALKS. REVIEW ANY REQUIRED CHANGES WITH ENGINEER PRIOR TO CONSTRUCTION OF WORK. 8. ALL PAVEMENT MARKINGS SHALL BE PAINT. R3' R3' 9' (TYP) 4.2' EXISTING 10' PATH 10' 25' STANDARD DUTY ASPHALT PAVEMENT (TYP) 18.5' (TYP) 9' (TYP) B6.18 CONCRETE CURB & GUTTER (TYP) RANDALL LAYOUT NOTES VACUUM HOUSING RE: ARCH PLANS R3' R3' 18.5' (TYP) 4.5' R7' R5' B6.18 CONCRETE CURB & GUTTER (TYP) HEAVY DUTY HMA PAVEMENT R3' R3' 22' 2.5' (B-B) 3' H X 150' L SEGMENTAL BLOCK KNEE WALL 4" SOLID YELLOW LINE (TYP) 9 FREE VACUUM PARKING AREA CANOPY 25' STANDARD DUTY ASPHALT PAVEMENT (TYP) 22.5' 22' 5" PCC SIDEWALK (TYP) MANAGERS PARKING SPACE TO BLOCK EMERGENCY EXIT LANE. 4" SOLID YELLOW LINES 4' C-C @ 45 DEGREES (TYP) 16' 4" SOLID YELLOW LINES 3' C-C @ 45 DEGREES (TYP) VACUUM HOUSING RE: ARCH PLANS PROPOSED STRIPING 6 (T 0° YP ) 19' (TYP) ' 10 ) P Y (T 13.3' 20' 4" SOLID YELLOW LINE (TYP) 22.5' STANDARD DUTY ASPHALT PAVEMENT (TYP) 8' R3' HEAVY DUTY HMA PAVEMENT 21' R8' WHITE DIRECTIONAL ARROW (TYP) 3' BENCHMARK 5' 16.5' ROAD BENCHMARKS DESCRIPTION 0 XX XX ELEVATION BENCHMARK 1 WEST FLANGE BOLT ON FIRE HYDRANT ON WEST SIDE OF RESERVE DRIVE APPROXIMATELY 500 FEET SOUTH OF SOUTH LINE OF BOWES ROAD 799.17 BENCHMARK 2 RAILROAD SPIKE ON WEST FACE OF UTILITY POLE ON EAST SIDE OF RANDALL ROAD, 5TH POLE SOUTH OF SOUTH LINE OF BOWES ROAD 804.66 15071 5291 ZENITH PARKWAY LOVES PARK, IL 61111 VOICE: (815) 484-4300 FAX: (815) 484-4303 www.arcdesign.com Design Firm License No. 184-001334 C03 ADDRESS 1 ADDRESS 2 2' 6' EXISTING MAILBOX FULLER'S CAR WASH R8' 3' 12' R7' 5' NUMBER OF PROPOSED PARKING SPACES PAINTED YELLOW STRIPES EXISTING UTILITY POLE 5" PCC SIDEWALK (TYP.) 4" SOLID YELLOW LINES 2' C-C @ 45 DEGREES (TYP) 3,550 SQ. FT. F.F.E. = 801.00 5" PCC SIDEWALK 5 3' PAY STATION CANOPY R15' CONCRETE BOLLARDS FULLERS CAR WASH 32' 12' TRANSFORMER PAD W/ PROTECTIVE BOLLARDS SEE UTILITY PLAN FOR DETAILS EXISTING CONCRETE CURB AND GUTTER PROPOSED: 18.5' 8 4' P) TY '( 6.1' R2' 4' 17.8' R3' .4 21 4.6' B6.18 CONCRETE CURB & GUTTER (TYP) PROPOSED CONCRETE CURB AND GUTTER 6" STANDARD DUTY CONCRETE PAVEMENT 14' TRASH ENCLOSURE RE: ARCH PLANS 6" SOLID WHITE LINE (TYP) HEAVY DUTY CONCRETE PAVEMENT (TYP) 6 (T 0° YP ) 13.3' STANDARD DUTY ASPHALT PAVEMENT R25' HEAVY DUTY HMA PAVEMENT 18.9' 8" HEAVY DUTY CONCRETE PAVEMENT EXISTING FENCE CONCRETE SIDEWALK/PAVEMENT 10.1' R3' X HEAVY DUTY ASPHALT PAVEMENT 28' R15' CAR WASH PAY STATION WITH CONCRETE BOLLARD (SEE ARCH. PLANS) 10.8' R7' MATCH INTO EXISTING CURB & GUTTER ALIGNMENT AND PAVEMENT GRADE X 2.4' 23' X 6" SOLID YELLOW LINES 3' C-C @ 45 DEGREES (TYP) 11.2' 2' 2' MATCH INTO EXISTING CURB & GUTTER ALIGNMENT AND PAVEMENT GRADE DEPRESSED CONCRETE CURB AND GUTTER (TYP) 45.9' 10' SAWCUT LIMITS (TYP)