RECAPP Facility Evaluation Report
Transcription
RECAPP Facility Evaluation Report
RECAPP Facility Evaluation Report Northern Lights School Div #69 Bonnyville Centralized High School B2464A Bonnyville Report run on: March 15, 2010 9:41 PM Bonnyville - Bonnyville Centralized High School (B2464A) Facility Details Building Name: Bonnyville Centralized High S Address: 4908 - 49 Avenue Location: Bonnyville Building Id: Gross Area (sq. m): Replacement Cost: Construction Year: B2464A 5,774.50 $19,561,721 1958 Evaluation Details Evaluation Company: Wade Engineering Evaluation Date: June 10 2009 Evaluator Name: MIke Pangman Total Maintenance Events Next 5 years: 5 year Facility Condition Index (FCI): $4,477,357 22.89% General Summary: The original wood framed single storey gym was constructed in 1958 (628.5). Steel and concrete block two storey stand alone building was constructed in 1971 (5,146.0 sq.m.). School has a current enrollment of 350. The CTS shops area was modernized in 1990. School building envelope is in reasonable condition but the interior requires major modernization. The original gym building is still owned by the school board but leased out to a theatre group and was modernized in 1991. One room within the original building is used for one class per school year. Generally, the 1971 phase is in reasonable condition while 1958 phase is in poor condition. Structural Summary: Foundation system is typically concrete spread footings and grade beams with concrete slab on grade. Wood framed floor, roof and walls in 1958 building while 1971 building is steel structure with metal decking and bearing on steel columns and concrete blocks. Building structural system is in good condition. Envelope Summary: Exterior finishes of 1958 building is predominately stucco while the 1971 building includes brick, concrete block, stucco and metal siding. Curtain wall and aluminum windows throughout the 1971 building in good condition; single wood framed window in 1958 building requires replacement. Aluminum entrances and hollow metal doors are in good condition. 1958 exterior wood doors require replacement. SBS membrane and bulk of BUR membrane roofing is generally acceptable but the 1958 building roof requires reroofing. Permanent roof access has to be provided. Generally, building envelope is in good condition. Interior Summary: Partitions are a combination of concrete block and metal stud with gypsum board. Ceiling finishes are typically acoustic tile and gypsum board. Wall finishes are ceramic tile or paint and in good condition. Floor finishes include vinyl tile, sheet vinyl, ceramic tile, hardwood gym flooring and carpet. Some carpet requires replacement. Solid core wood doors and hollow metal doors require some work including; replace damaged doors and upgrade door hardware to barrier free levers and introduce electromagnetic hold open devices at fire doors. Lockers, millwork and signage requires replacement. Barrier free access is generally good but does require minor modifications to washrooms. Interior finishes are in need of replacement while acoustic treatment and fire stopping require upgrading. Building interior is in fair condition. Report run on: March 15, 2010 9:41 PM Page 2 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) Mechanical Summary: The school has had several modernizations and mechanical system upgrades. In 1990 new heating plant was installed and provided hydronic heating for radiant panels, glycol heat exchanger and other terminal heating units. In 2001 heating system was extended to provide heating media for administration and gymnasium air systems mechanical upgrades. Ventilation provided by four low velocity air systems. Ceiling space used as return air plenum where appropriate. Exhaust fans provided to exhaust rooms with activates requiring exhaust. Fire prevention consists of fire extinguishers installed on hook or in cabinets. BMCS system provides global control of the mechanical systems. Items found during school review which should be addressed but not limited to: - Upgrade plumbing fixtures. - Ventilate gasoline storage and paint storage. - Conduct study related to exhaust hoods in Industrial Arts. Mechanical system components are in acceptable condition. NOTE: 1958 building furnace supplying heat to kitchen needs new chimney. Instructed staff to de-commission until work complete. Serious fire hazard. Electrical Summary: 120/208V/3PH/4W - 800 ampere main power service to 1971 building. T8 type fluorescent light fixtures and high pressure sodium lighting to building exterior. Fire Alarm Building has a small generator for emergency lighting in stairwells and egress areas which is not in reliable condition. 120/208V 3PH/4W 400A distribution in 1958 building has past it's expected life and is in poor condition. Panelboards in this building are also not reliable along with the emergency battery backup and exit lights. The lighting and branch wiring are in need of upgrading. Electrical systems overall are in marginal condition. Condition Rating 1 - Critical 2 - Poor 3 - Marginal 4 - Acceptable 5 - Good 6 - Excellent Rating Guide Performance Unsafe, high risk of injury or critical system failure. Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs. Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs. Meets present requirements, minor deficiencies. Average operating/maintenance costs. Meets all present requirements. No deficiencies. As new/state of the art, meets present and foreseeable requirements. Report run on: March 15, 2010 9:41 PM Page 3 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) S1 STRUCTURAL A1010 Standard Foundations* Perimeter grade beams bearing on strip footings. Rating Installed Design Life Updated 4 - Acceptable 1971 100 MAR-10 A1030 Slab on Grade* Concrete slab on grade throughout. Rating Installed Design Life Updated 4 - Acceptable 1971 100 MAR-10 B1010.01 Floor Structural Frame (Building Frame)* Steel frame floor assembly at second floor. Wood framed floor added over conversation pit in student lunch area. Rating Installed Design Life Updated 4 - Acceptable 1971 100 MAR-10 B1010.02 Structural Interior Walls Supporting Floors (or Roof)* Load bearing concrete block and steel columns supporting suspended floor assemblies. Rating Installed Design Life Updated 4 - Acceptable 1971 100 MAR-10 B1010.03 Floor Decks, Slabs, and Toppings* Concrete topping slab on metal deck. Rating Installed Design Life Updated 4 - Acceptable 1971 100 MAR-10 B1010.05 Mezzanine Construction* Wood frame floor assembly at second floor conference room adjacent to library. Rating Installed Design Life Updated 4 - Acceptable 1971 100 MAR-10 B1010.09 Floor Construction Fireproofing* Non-combustible construction. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 50 MAR-10 Page 4 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) B1010.10 Floor Construction Firestopping* Rating Installed Design Life Updated 4 - Acceptable 1971 50 MAR-10 B1020.01 Roof Structural Frame* Steel framed structure bearing on concrete block and steel columns. Wood decking at pitched roof areas where exposed to view below; metal deck elsewhere. Rating Installed Design Life Updated 4 - Acceptable 1971 100 MAR-10 B1020.04 Canopies* Enclosure built around sawdust collector. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 50 MAR-10 Add Canopy Over Sawdust Collector - (6.2m2) Concern: Snow piles up within enclosure and makes it difficult to empty sawdust barrels and maintain sawdust collector. Recommendation: Add canopy over sawdust collector. Type Year Cost Priority Preventative Maintenance 2011 Low $4,660 Updated: MAR-10 B1020.06 Roof Construction Fireproofing* Non-combustible material. Rating 4 - Acceptable Installed Design Life Updated 1958 Report run on: March 15, 2010 9:41 PM 50 MAR-10 Page 5 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) S2 ENVELOPE B2010.01.02.01 Brick Masonry: Ext. Wall Skin* Brick added over insulation and concrete block exterior walls in 1971 building. Rating Installed Design Life Updated 4 - Acceptable 1986 75 MAR-10 B2010.01.06.03 Metal Siding** Metal siding added over insulation and concrete block exterior walls in 1971 building. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 40 MAR-10 Replace Metal Siding - (1195m2) Type Year Cost Priority Lifecycle Replacement 2026 Unassigned $488,800 Updated: MAR-10 B2010.01.08 Cement Plaster (Stucco): Ext. Wall* 1958 Building Stucco is 2-tone painted. Rating 4 - Acceptable Installed Design Life Updated 1958 75 MAR-10 B2010.01.08 Cement Plaster (Stucco): Ext. Wall* 1971 Building Stucco added over insulation and concrete block exterior walls in 1971 building. Rating 4 - Acceptable Installed Design Life Updated 1986 75 MAR-10 B2010.01.09 Expansion Control: Exterior Wall Skin* Caulked control joints at dissimilar materials and in long walls throughout. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 75 MAR-10 Page 6 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) B2010.01.11 Joint Sealers (caulking): Ext. Wall** Caulked control joints between dissimilar materials. Rating Installed Design Life Updated 4 - Acceptable Event: 1998 20 MAR-10 Replace Caulking - (590m) Type Year Cost Priority Lifecycle Replacement 2018 Unassigned $21,500 Updated: MAR-10 B2010.01.13 Paints (& Stains): Exterior Wall** 1958 Building Painted stucco on 1958 building. Rating Installed Design Life Updated 4 - Acceptable Event: 2000 15 MAR-10 Repaint Stucco - (841m2) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $22,100 Updated: MAR-10 B2010.02.03 Masonry Units: Ext. Wall Const.* Concrete block exterior walls throughout. Rating 4 - Acceptable Installed Design Life Updated 1971 100 MAR-10 B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation* Rigid insulation and exterior cladding added during modernization to 1971 building. Rating 4 - Acceptable Installed Design Life Updated 1986 100 MAR-10 B2010.05 Parapets* Pre-finished cap flashings where exposed to view and galvanized where not exposed to view in most areas. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 0 MAR-10 Page 7 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) B2010.06 Exterior Louvers, Grilles, and Screens* Painted and clear anodized aluminum grilles throughout. Rating Installed Design Life Updated 4 - Acceptable 1971 50 MAR-10 B2010.09 Exterior Soffits* Pre-finished metal soffit. Rating Installed Design Life Updated 4 - Acceptable 1971 50 MAR-10 B2020.01.01.02 Aluminum Windows (Glass & Frame)** Aluminum framed windows with vent along bottom throughout. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 40 MAR-10 Replace Windows - (37m2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $65,800 Updated: MAR-10 B2020.01.01.05 Wood Windows (Glass & Frame)** Wood picture window in shops area. Rating Installed Design Life Updated 2 - Poor 1971 35 Event: Replace wood window (1) MAR-10 Concern: Window frame is deteriorating and splitting from exposure. Recommendation: Replace with aluminum or PVC window. Type Year Cost Priority Failure Replacement 2011 Low $1,200 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 8 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) B2020.03 Glazed Curtain Wall** Aluminum curtain wall with fixed double glazed sealed units at second floor conference room, lunch room and gym storage. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 40 MAR-10 Replace Glazed Curtain Wall - (107m2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $243,300 Updated: MAR-10 B2030.01.02 Steel-Framed Storefronts: Doors** Insulated hollow metal with and without glazing set in pressed steel frames throughout. Rating Installed Design Life Updated 4 - Acceptable Event: 2001 30 MAR-10 Replace Doors - (18 Panels) Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $132,260 Updated: MAR-10 B2030.01.10 Wood Entrance Door** 1958 Building Wood entrance doors located on 1958 Building. Rating Installed Design Life Updated 3 - Marginal Event: 1958 30 MAR-10 Replace Doors - (6 Panels) Concern: Wood entry doors in poor condition, damaged wood and no longer serviceable. Recommendation: Install new steel frame and doors. Type Year Cost Priority Failure Replacement 2011 Low $13,700 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 9 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) B2030.02 Exterior Utility Doors** Steel hollow core doors throughout school. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 40 MAR-10 Replace Exterior Utility Doors - (15 Panels) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $17,100 Updated: MAR-10 B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** 1958 Building Asphalt and gravel BUR roof on 1958 building. Rating Installed Design Life Updated 2 - Poor Event: 1978 25 MAR-10 Replace BUR Asphalt and Gravel - (525m2) Concern: BUR asphalt and gravel roof is past its theoretical life and requires replacement. Recommendation: Replace roof with SBS. Type Year Cost Priority Failure Replacement 2011 Medium $105,100 Updated: MAR-10 B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** 1971 Building Built up roof with gravel ballast at gym roof. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 25 MAR-10 Replace BUR Asphalt and Gravel - (1880m2) Type Year Cost Priority Lifecycle Replacement 2016 Unassigned $361,000 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 10 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** Over second floor area. Rating Installed Design Life Updated 4 - Acceptable Event: 1994 25 MAR-10 Replace SBS - (1441m2) Type Year Cost Priority Lifecycle Replacement 2019 Unassigned $334,600 Updated: MAR-10 B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** CTS Shops Two ply SBS membrane in roofs over CTS shops. Rating Installed Design Life Updated 5 - Good Event: 2002 25 MAR-10 Replace SBS - (484m2) Type Year Cost Priority Lifecycle Replacement 2027 Unassigned $112,400 Updated: MAR-10 B3010.07 Sheet Metal Roofing** Corrugated metal roofing at sloped roofs over administration and gym stage. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 40 MAR-10 Replace Sheet Metal Roofing - (401m2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $126,100 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 11 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) B3010.08.02 Metal Gutters and Downspouts** Pre-finished eavestrough at base of sloped roofs with downspouts spilling onto lower roof. Scuppers and downspouts provided at some roof areas. Rating Installed Design Life Updated 3 - Marginal Event: 1971 30 MAR-10 Replace Downspouts - (21m) Concern: Downspouts are leaking and staining wall surfaces behind. Recommendation: Replace downspouts. Type Year Cost Priority Failure Replacement 2010 Low $3,728 Updated: MAR-10 B3010.09 Roof Specialties and Accessories* Steel ladder to roof hatch from second floor. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 0 MAR-10 Add Roof Access Ladders Concern: Roof access is not provided to roof area above IA lab and 1958 building. Recommendation: Introduce permanent steel ladders for access to all levels of roof. Type Year Cost Operating Efficiency Upgrade 2010 $5,500 Priority Low Updated: MAR-10 B3020.02 Other Roofing Openings (Hatch,Vent, etc)* Manufactured roof hatch sitting in built up wood roof curb with mechanical and HVAC fixtures at various locations on roof surface. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 25 MAR-10 Page 12 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) S3 INTERIOR C1010.01 Interior Fixed Partitions* Concrete block load bearing and partition walls. Rating Installed Design Life Updated 4 - Acceptable 1958 0 MAR-10 C1010.02 Interior Demountable Partitions* Demountable partitions throughout classrooms and administration area. Rating Installed Design Life Updated 4 - Acceptable 1971 50 MAR-10 C1010.03 Interior Operable Folding Panel Partitions** Aluminum framed folding partition between two classrooms. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 30 MAR-10 Replace Interior Operable Folding Panel Partitions - (85m2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $163,300 Updated: MAR-10 C1010.05 Interior Windows* Wired safety glass in pressed steel frames throughout. Rating 4 - Acceptable Installed Design Life Updated 1971 80 MAR-10 C1010.06 Interior Glazed Partitions and Storefronts* Aluminum framed storefront with tempered/laminated glass at office adjacent student lunch area. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 80 MAR-10 Page 13 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) C1010.07 Interior Partition Firestopping* Structure, mechanical ductwork and electrical conduit penetrate fire rated partitions throughout. Rating Installed Design Life Updated 1 - Critical Event: 1971 50 MAR-10 Add Fire Stopping Concern: Openings in fire separations have not been properly fire stopped. Recommendation: Provide fire stopping located in electrical room main floor of school. Type Year Cost Priority Code Repair 2010 High $9,320 Updated: MAR-10 C1020.01 Interior Swinging Doors (& Hardware)* Painted and clear finish solid core wood doors with and without glazed lites set in pressed steel frames throughout. Rating Installed Design Life Updated 4 - Acceptable 1971 40 MAR-10 C1020.02 Interior Entrance Doors* Glazed hollow metal doors set in pressed steel frames at bulk of vestibules. Rating Installed Design Life Updated 4 - Acceptable 2001 0 MAR-10 C1020.03 Interior Fire Doors* Hollow metal and solid core wood set in pressed steel frames. Rating Installed Design Life Updated 1 - Critical Event: 1971 50 MAR-10 Re-install Fire Doors Concern: Fire doors at south stair have been removed. Recommendation: Re-install salvaged fire doors in south stair. Type Year Cost Priority Code Repair 2010 High $1,864 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 14 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) C1020.04 Interior Sliding and Folding Doors* Metal bi-fold doors at closets in administration offices. Rating Installed Design Life Updated 4 - Acceptable 1971 25 MAR-10 C1030.01 Visual Display Boards** 1 Chalkboard, 58 whiteboards and 92 tack boards throughout. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 20 MAR-10 Replace Visual Display Boards - (151) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $135,900 Updated: MAR-10 C1030.01 Visual Display Boards** Smart Boards Smart boards throughout school in classrooms. Rating Installed Design Life Updated 5 - Good Event: 2008 20 MAR-10 Replace Smart Boards - (17) Type Year Cost Priority Lifecycle Replacement 2028 Unassigned $85,000 Updated: MAR-10 C1030.02 Fabricated Compartments(Toilets/Showers)** Floor supported metal toilet partitions in all washrooms. Rating Installed Design Life Updated 5 - Good Event: 2006 30 MAR-10 Replace Fabricated Compartments - (23) Type Year Cost Priority Lifecycle Replacement 2036 Unassigned $40,200 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 15 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) C1030.08 Interior Identifying Devices* A variety of signage including plastic signage, hand lettered on doors and hand lettered on paper. Rating Installed Design Life Updated 4 - Acceptable 1971 20 MAR-10 C1030.10 Lockers** Full height lockers in selected corridors. Half height lockers in shower rooms. Rating Installed Design Life Updated 5 - Good Event: 2006 30 MAR-10 Completed - Replace corridor lockers Concern: Lockers located in corridors are banged up and damaged throughout. Recommendation: Replace corridor lockers (380). Type Year Cost Priority Failure Replacement 2009 Low $93,204 Updated: MAR-10 Event: Replace Lockers - (433) Type Year Cost Priority Lifecycle Replacement 2039 Unassigned $590,200 Updated: MAR-10 C1030.12 Storage Shelving* Painted and clear finish plywood and steel storage shelving in various janitorial and storage rooms. Rating 4 - Acceptable Installed Design Life Updated 1971 30 MAR-10 C1030.14 Toilet, Bath, and Laundry Accessories* Commercial grade mirrors, soap dispensers, paper towel dispensers and toilet tissue holders in all washrooms. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 20 MAR-10 Page 16 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) C2010 Stair Construction* 1958 Building 1958 building contains two staircases. Staircase going from second floor to outside on the north east side. Rating Installed Design Life Updated 4 - Acceptable 1958 100 MAR-10 C2010 Stair Construction* 1971 Building Cast in place concrete stairs to second floor classroom wing. Wood framed open stair to second floor above administration offices. Rating Installed Design Life Updated 4 - Acceptable 1971 100 MAR-10 C2020.02 Terrazzo Stair Finishes* Terrazzo with carborundum strips on both stairs to second floor classrooms. Rating Installed Design Life Updated 4 - Acceptable 1971 60 MAR-10 C2020.05 Resilient Stair Finishes** Rubber treads on staircase in staff room. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 20 MAR-10 Replace Rubber Treads - (8.2m2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $4,100 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 17 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) C2020.06 Carpet Stair Finishes** 1958 Building Carpet stairs going to second floor in the 1958 building. Rating Installed Design Life Updated 3 - Marginal Event: 1986 10 MAR-10 Replace Carpet Stair Finishes - (10m2) Concern: Carpet on stairs are very old and are in need of a replacement. Recommendation: Replace carpet. Type Year Cost Priority Failure Replacement 2011 Low $1,200 Updated: MAR-10 C2020.08 Stair Railings and Balustrades* Wood handrail mounted over metal railings on one side; wood handrail mounted to wall on other side of both stairs to second floor. Wood handrail mounted over metal railings on one side of stair to second floor over administration offices. Rating Installed Design Life Updated 4 - Acceptable 1971 40 MAR-10 C3010.02 Wall Paneling** 1958 Building Wood paneling located by stage and in hallway. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 30 MAR-10 Replace Wood Paneling - (119m2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $14,000 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 18 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) C3010.02 Wall Paneling** 1971 Building Wood wall paneling in staff room. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 30 MAR-10 Replace Wall Paneling - (355m2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $42,000 Updated: MAR-10 C3010.11 Interior Wall Painting* All wall surfaces are painted under a routine maintenance plan. Rating 4 - Acceptable Installed Design Life Updated 2000 10 MAR-10 C3020.01.02 Paint Concrete Floor Finishes* Painted concrete floor finishes in selected mechanical and electrical rooms. Rating 4 - Acceptable Installed Design Life Updated 1971 0 MAR-10 C3020.03 Terrazzo Floor Finishes* Terrazzo floor finishes in bathrooms and stair areas throughout. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 75 MAR-10 Page 19 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) C3020.04 Wood Flooring** 1958 Building Wood flooring on stage in the 1958 building. Rating Installed Design Life Updated 3 - Marginal Event: 1971 30 MAR-10 Replace Wood Flooring - (118m2) Concern: Wood flooring on stage is really old and becoming loose at some areas. Recommendation: Replace wood flooring. Type Year Cost Priority Failure Replacement 2011 Low $33,000 Updated: MAR-10 C3020.04 Wood Flooring** 1971 Building Sprung hard wood gym flooring, refinished in 2003. Rating Installed Design Life Updated 5 - Good 1971 30 MAR-10 Event: Completed - Repair and Re-finish Gym Floor (474m2) Concern: Hard wood flooring is yellowing, joints are beginning to open up. Recommendation: Sand flooring down to bare wood, repair and re-finish. Type Year Cost Priority Repair 2009 Low $22,369 Updated: MAR-10 Event: Replace Wood Flooring - (474m2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $158,900 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 20 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) C3020.07 Resilient Flooring** 1958 Building VA tile in 1958 building in the mechanical and outside of mechanical room. Rating Installed Design Life Updated 3 - Marginal Event: 1971 20 MAR-10 Replace VA Tile - (8m2) Concern: VA tile is stained and cracking and poses a tripping hazard. Recommendation: Replace VA tile with VC tile. Type Year Cost Priority Failure Replacement 2011 Low $2,500 Updated: MAR-10 C3020.07 Resilient Flooring** 1971 Sheet vinyl in hallways and classrooms. Rating Installed Design Life Updated 4 - Acceptable Event: 1994 20 MAR-10 Replace Sheet Vinyl - (2316m2) Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $262,800 Updated: MAR-10 C3020.07 Resilient Flooring** 1971 Vinyl composite tile to selected rooms and classrooms throughout. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 20 MAR-10 Replace Vinyl Floor Tile - (345m2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $25,300 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 21 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) C3020.08 Carpet Flooring** 1958 Building Carpet throughout stage area and through hallway. Rating Installed Design Life Updated 3 - Marginal Event: 1986 15 MAR-10 Replace Carpet - (235m2) Concern: There are areas of torn carpet and buckling presenting tripping hazards. Recommendation: Replace carpet. Type Year Cost Priority Failure Replacement 2011 Low $18,400 Updated: MAR-10 C3020.08 Carpet Flooring** 1971 Building Carpet in library, administration and selected classrooms. Rating Installed Design Life Updated 4 - Acceptable Event: 2006 15 MAR-10 Replace Carpet Flooring - (985m2) Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $77,100 Updated: MAR-10 C3030.02 Ceiling Paneling (Wood)* Wood ceiling located in staff room and stage area, 282m2. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 60 MAR-10 Page 22 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar) ** 1991 Ceilings have been upgraded with acoustic ceiling tiles in suspended t-bar grid in a number of areas including student lunch area, selected corridors, administration area and library. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 25 MAR-10 Replace Acoustic Ceiling Treatment - (800m2) Type Year Cost Priority Lifecycle Replacement 2016 Unassigned $45,100 Updated: MAR-10 C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)** 1971 No acoustic ceiling treatment in gym. Rating Installed Design Life Updated 3 - Marginal Event: 1971 25 MAR-10 Add Ceiling Treatment In Gym Concern: Gym is noisy space and difficult to teach in. School plans to add acoustic ceiling panels. Recommendation: Add acoustic ceiling panels. Type Year Cost Program Functional Upgrade 2010 $27,961 Priority Low Updated: MAR-10 Event: Replace Acoustic Ceiling Tile - (42m2) Concern: Damaged ceiling tiles in outdoor phys-ed equipment storage room. Recommendation: Replace acoustic tile. Type Year Cost Priority Failure Replacement 2011 Low $2,300 Updated: MAR-10 Event: Replace Acoustic Ceiling Treatment - (2661m2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $144,100 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 23 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) C3030.07 Interior Ceiling Painting* Gypsum board ceilings are painted. Rating Installed Design Life Updated 4 - Acceptable 1971 20 MAR-10 C3030.09 Other Ceiling Finishes* Exposed metal decking used as ceiling finish in majority of corridors. Rating Installed Design Life Updated 4 - Acceptable 1971 0 MAR-10 D1010.01.02 Hydraulic Passenger Elevators** Inspection done in 2008. Elevator is fully functioning with a 550lb lift capacity located adjacent to mechanical room upper floor. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 30 MAR-10 Replace Hydraulic Passenger Elevators - (1) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $182,887 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 24 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) S4 MECHANICAL D2010.04 Sinks** 1958 (1) Double stainless steel sink in kitchen. Installed in 1971. Rating Installed Design Life Updated 5 - Good Event: 1971 30 MAR-10 Replace Sink (1) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $1,600 Updated: MAR-10 D2010.04 Sinks** 1971 Rating Installed Design Life Updated 4 - Acceptable Event: 1971 30 MAR-10 Replace sinks Type Year Cost Priority Lifecycle Replacement 2011 Unassigned $16,550 Updated: MAR-10 D2010.05 Showers** 1971 Central mix valve, on/off valve, institutional head. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 30 MAR-10 Replace Showers (12) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $10,752 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 25 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D2010.08 Drinking Fountains / Coolers** 1971 Rating Installed Design Life Updated 5 - Good Event: 1971 35 MAR-10 Replace Drinking Fountains / Coolers (5) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $18,578 Updated: MAR-10 D2010.09 Other Plumbing Fixtures* - Beauty Salon Sink Salon sink in beauty culture. Rating Installed Design Life Updated 5 - Good 1971 0 MAR-10 D2010.09 Other Plumbing Fixtures* - Handicap Lavatory Handicap lavatory provided in boy's washroom. Lever removed due to vandalism. Handicap water closet not provided. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 0 MAR-10 Install barrier free plumbing fixtures. Concern: Barrier free water closet not installed to compliment handicap lavatory. Recommendation: Install barrier free water closets. Consequences of Deferral: Lack of barrier free fixtures. Type Year Cost Priority Repair 2009 Medium $6,338 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 26 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D2010.09 Other Plumbing Fixtures* - Science Room Sink Science room sink brass vacuum breakers not installed, brass outlets missing. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 0 MAR-10 Repair sink brass in science room. Concern: Science room sink brass missing vacuum breakers and outlets. Recommendation: Replace vacuum breakers. Type Year Cost Priority Repair 2009 Medium $5,592 Updated: MAR-10 D2010.10 Washroom Fixtures (WC, Lav)** 1958 Floor mounted flush tank. Stall type urinals with flush tank. Porcelain on steel bowls with time delay faucets installed in 2000. Rating Installed Design Life Updated 5 - Good Event: 2000 35 MAR-10 Replace Washroom Fixtures WC, (2) Lav, (2) Type Year Cost Priority Lifecycle Replacement 2035 Unassigned $8,550 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 27 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D2010.10 Washroom Fixtures (WC, Lav, Urnl)** 1971 Stall type urinals with flush tank. Some tanks leak water continuous and frequency of tank flush results in water wastage. Rating Installed Design Life Updated 3 - Marginal Event: 1971 30 MAR-10 Replace flush tanks (8) Concern: Some flush tanks leak water continuous and frequency of tank flush results in water wastage. Recommendation: Install battery operated sensor flush valve. Type Year Cost Priority Failure Replacement 2010 Low $7,456 Updated: MAR-10 D2020.01.01 Pipes and Tubes: Domestic Water* Copper piping and fittings. Rating Installed Design Life Updated 4 - Acceptable 1971 40 NOV-08 D2020.01.02 Valves: Domestic Water** Gate isolation valves. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 40 MAR-10 Replace Valves (GFA: 5775) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $47,056 Updated: MAR-10 D2020.01.03 Piping Specialties (Backflow Preventors)** Boiler makeup complete with check valve. Rating Installed Design Life Updated 5 - Good Event: 1971 20 MAR-10 Replace back flow preventor (2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $10,955 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 28 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D2020.02.02 Plumbing Pumps: Domestic Water**1971 (3) Inline domestic hot water recirculation pumps installed for water heaters in mechanical room 19 and 58. Rating Installed Design Life Updated 5 - Good Event: 1971 20 MAR-10 Replace Plumbing Pumps (3) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $4,051 Updated: MAR-10 D2020.02.06 Domestic Water Heaters** 1958 Hot water tank supplying kitchen in 1958 building. Rating Installed Design Life Updated 4 - Acceptable Event: 2005 20 MAR-10 Replace Domestic Water Heater (1) Type Year Cost Priority Lifecycle Replacement 2025 Unassigned $3,900 Updated: MAR-10 D2020.02.06 Domestic Water Heaters** 1971 Mechanical room 40 gallon H.W. heater. Rating Installed Design Life Updated 5 - Good Event: 2000 20 MAR-10 Replace Domestic Water Heaters (2) Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $7,000 Updated: MAR-10 D2020.03 Water Supply Insulation: Domestic* Majority of domestic hot, cold and recirculation piping insulated. Some un-insulated piping in mechanical rooms at domestic hot water heater. Rating 5 - Good Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 40 MAR-10 Page 29 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D2030.01 Waste and Vent Piping* Cast iron and copper. Bottle traps installed in Bio Lab. Rating Installed Design Life Updated 5 - Good 1971 50 NOV-08 D2040.01 Rain Water Drainage Piping Systems* Cast iron piping discharges to grade. Rating Installed Design Life Updated 5 - Good 1971 50 NOV-08 D2040.02.04 Roof Drains* Cast iron dome, flow control. Rating Installed Design Life Updated 6 - Excellent 1971 40 NOV-08 D3010.02 Gas Supply Systems* Gas distribution piping installed to heating boilers, domestic hot water heater, science room. Gas line disconnected and isolated on roof top unit to gymnasium. Unit has been converted to glycol Make Up Air. Rating Installed Design Life Updated 6 - Excellent 1971 60 MAR-10 D3020.02.01 Heating Boilers and Accessories: H.W.** Two (2) Super Hot steel tube boilers, 2,160 MBH each. Replaced new in 2006. Boilers complete with low water cut off, relief valve and flow switch. Rating Installed Design Life Updated 6 - Excellent Event: 2001 35 MAR-10 Capacity Size Capacity Unit 2160 MBH N/A Completed - Replace Heating Boilers and Accessories: H.W. Type Year Cost Priority Lifecycle Replacement 2009 Unassigned $272,185 Updated: MAR-10 Event: Replace Heating Boilers and Accessories (2) Type Year Cost Priority Lifecycle Replacement 2044 Unassigned $272,185 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 30 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D3020.02.02 Chimneys (&Comb. Air): H.W. Boiler** Class B chimney. Rating Installed Design Life Updated 5 - Good Event: 1971 30 MAR-10 Replace Chimneys (&Comb. Air): H.W. Boiler (1) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $32,930 Updated: MAR-10 D3020.03 Furnaces** 1958 Rating Installed Design Life Updated 4 - Acceptable Event: 1990 0 MAR-10 Replace Furnace (5) Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $14,500 Updated: MAR-10 D3020.03.01 Furnaces** 1971 In mechanical rooms 19, 21, 30 and 58 furnace heat exchangers were removed and glycol coils installed. Blower and filter section reused. NOTE: No chimney required. Rating Installed Design Life Updated 6 - Excellent Event: 2001 25 MAR-10 Replace Furnaces (12) Type Year Cost Priority Lifecycle Replacement 2026 Unassigned $76,837 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 31 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D3020.04.04 Chimney (&Comb.Air):Fuel-Fired Heater* 1958 All gas fired furnaces are newer and had adequate B vents installed. With exception of Hot water heater which has failed. Rating Installed Design Life Updated 2 - Poor 2001 Event: Code Repair Chimney (1) 30 MAR-10 Concern: Chimney pipe is touching wood frame of truss above where it enters the ceiling. Imminent fire hazard. Recommendation: Discontinue use of furnace immediately and replace chimney. Consequences of Deferral: Building may burn down. Type Year Cost Priority Code Repair 2010 High $2,000 Updated: MAR-10 D3030.06.02 Refrigerant Condensing Units** 1971 Roof mounted condensing unit for Dx coil installed in supply air duct to computer room. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 25 MAR-10 Replace Refrigerant Condensing Units (1) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $11,955 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 32 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.01.01 Air Handling Units: Air Distribution - Administration** 1971 Administration area air system during 2001 mechanical upgrade had furnace gas fired heat exchanger and burner removed and glycol heating coils installed. Rating Installed Design Life Updated 4 - Acceptable Event: 1990 30 MAR-10 Replace Air Handling Units (1) Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $143,811 Updated: MAR-10 Event: Review replacement of underground ductwork Concern: Unit supplies air to underground ductwork which fills up with water. Recommendation: Conduct study to determine if system should be abandoned and above ground and rooftop unit be installed. Consequences of Deferral: Air quality and possible H&S issues. Type Year Cost Priority Study 2009 High $6,338 Updated: APR-09 D3040.01.01 Air Handling Units: Air Distribution - Classroom** 1971 Classroom air system complete with supply fan (12,660 cfm), return fan (11,400 cfm), motorized fresh, return, exhaust air dampers, glycol heating coil, 50 mm pleated filters, evaporative humidifier. Rating Installed Design Life Updated 5 - Good Event: 1990 30 MAR-10 Replace Air Handling Unit (1) Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $143,811 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 33 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.01.01 Air Handling Units: Air Distribution - Gymnasium** 1971 Gymnasium air system is a Lennox rooftop unit which was reused during 2001 mechanical upgrade. Glycol heating coil was added in supply air ductwork in Mechanical Room 58. Existing in-line duct heaters remained in place. Damper motors were added to control fresh, return and exhaust air dampers. Unit complete with supply fan, motorized fresh, return, exhaust dampers, filters. Rating Installed Design Life Updated 4 - Acceptable Event: 1990 30 MAR-10 Conduct study to determine upgrade required to air system for high/low occupancy functions. Concern: Air system is single speed and may not be suitable for high/low occupancy functions. Recommendation: Conduct study to determine upgrade required for high/low occupancy functions. Type Year Cost Priority Study 2009 Low $3,728 Updated: APR-09 Event: Replace Air Handling Unit (1) Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $107,600 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 34 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.01.01 Air Handling Units: Air Distribution - Industrial Arts** 1971 Industrial Arts air system is a ICG indoor unit installed in 1988 complete with fresh, return air dampers, supply fan, indirect fired heat exchanger, two in line gas fired duct heaters. Access to duct heaters for maintenance and repair is limited. Rating Installed Design Life Updated 4 - Acceptable Event: 1988 30 MAR-10 Relocate in-line duct heater for maintenance and repair. Concern: Access to duct heater for maintenance and repair is limited. Recommendation: Relocate duct heater to allow maintenance and repair. Type Year Cost Operating Efficiency Upgrade 2009 $9,320 Priority Medium Updated: APR-09 Event: Replace Air Handling Unit (1) Type Year Cost Priority Lifecycle Replacement 2018 Unassigned $143,811 Updated: MAR-10 D3040.01.03 Air Cleaning Devices:Air Distribution* Air systems complete with throw away filters. Rating 5 - Good Installed Design Life Updated 2001 Report run on: March 15, 2010 9:41 PM 30 MAR-10 Page 35 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.01.04 Ducts: Air Distribution* Classroom area air supply from air system is distributed via low velocity ductwork to grilles and diffusers. Ceiling space used as return air plenum. Gymnasium area air supply from air system is distributed via low velocity underground ductwork to side wall grilles. return air ducted to air system. Industrial Arts air supply from air system is distributed via low velocity ductwork to grilles. Return air ducted to air system. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 50 MAR-10 Eliminate/replace underground supply air ductwork Concern: Ductwork fills up with water. Pumps have been added to pump water out. Potential for mould exists despite addition of pumps. Recommendation: Install above ground ductwork, related rooftop unit, reheat coils, radiation and connect to glycol piping in Mechanical Room 58. Consequences of Deferral: Poor air quality. Type Year Cost Priority Repair 2009 High $161,400 Updated: MAR-10 D3040.01.05 Duct Accessories: Air Distribution* Balancing dampers provided in branch line ducts to air outlets. Fire dampers provided in fire rated walls. Rating 5 - Good Installed Design Life Updated 1971 0 NOV-08 D3040.01.07 Air Outlets & Inlets:Air Distribution* Air outlets vary as to type, fixed square pattern diffusers, perforated diffusers, adjustable bar grilles, sidewall grille. Rating 5 - Good Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 30 NOV-08 Page 36 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.03.01 Hot Water Distribution Systems** 1971 Black iron piping to radiant panels, unit heaters, two (2) plate glycol heat exchangers, entrance heaters. Two inline circulation pumps. Rating Installed Design Life Updated 5 - Good Event: 1971 40 MAR-10 Replace Hot Water Distribution Systems Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $885,639 Updated: DEC-08 D3040.04.01 Fans: Exhaust** - Paint Exhaust Hood 1971 Paint exhaust hood, welding booth exhaust, forge exhaust do not appear to be effective in removal of fumes. Rating Installed Design Life Updated 3 - Marginal Event: 1971 0 MAR-10 Conduct study related to indoor air quality in Industrial Arts. Concern: Paint exhaust hood, welding booth exhaust, forge exhaust do not appear to be effective in removal of fumes. Indoor air quality may be at risk. Recommendation: Conduct study to determine effectiveness of hoods. Consequences of Deferral: Possible poor air quality. Type Year Cost Priority Study 2010 Medium $4,474 Updated: MAR-10 Event: Replace Paint Exhaust Hood (1) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $21,520 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 37 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.04.01 Fans: Exhaust** - Roof Mounted 1971 (5) Roof mounted and inline exhaust fans are provided to exhaust various functions. Exhaust fans are dome or louvred design. Separation of outflow from air intakes adequate. 1971 section only. Rating Installed Design Life Updated 5 - Good Event: 1971 30 MAR-10 Replace Fans (5) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $29,137 Updated: MAR-10 D3040.04.01 Fans: Exhaust** - Science Room 1971 Science room fume hood. Screen drying exhaust. No complaints. Rating Installed Design Life Updated 5 - Good Event: 1971 30 MAR-10 Replace Exhaust Fans (1) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $21,520 Updated: MAR-10 D3040.04.02 Air Cleaning Devices: Exhaust* Rating Installed Design Life Updated 3 - Marginal Event: 1971 0 MAR-10 Provide dedicated exhaust for chemical storage. Concern: Chemicals not stored within exhausted containment space. Recommendation: Provide dedicated exhaust for chemical storage compartment. Type Year Cost Priority Code Repair 2009 High $3,728 Updated: MAR-10 D3040.04.03 Ducts: Exhaust* Low velocity exhaust air ductwork to exhaust air outlets and fans. Rating 5 - Good Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 50 NOV-08 Page 38 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.04.04 Ducts Accessories: Exhaust* Room previously used for acetylene storage is being used for gasoline storage and other volatiles. Room not ventilated. Paint storage in Industrial Arts requires exhaust. Rating Installed Design Life Updated 2 - Poor Event: 2001 0 MAR-10 Ventilate rooms containing flammable materials and liquids Concern: Extraction of fumes within storage rooms not occurring. Recommendation: Install dedicated exhaust fans and related ductwork. Type Year Cost Priority Code Repair 2010 High $7,083 Updated: MAR-10 D3040.04.05 Air Outlets and Inlets: Exhaust* Exhaust air grilles. Rating Installed Design Life Updated 5 - Good 2001 30 DEC-08 D3040.05 Heat Exchangers** 1971 (1) Plate heat exchanger for air system glycol heating coils. Two (2) glycol system circulation pumps. Butterfly, globe valves installed. Rating Installed Design Life Updated 5 - Good Event: 1990 30 MAR-10 Replace Heat Exchangers (1) Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $3,661 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 39 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D3050.02 Air Coils** 1971 Dx cooling coil installed in branch line duct serving completer room. Rating Installed Design Life Updated 5 - Good Event: 2001 30 MAR-10 Replace Air Coils (1) Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $10,760 Updated: MAR-10 D3050.03 Humidifiers** 1971 Classroom air system complete with wetted evaporative pads complete with reservoir. Water carryover is resulting in fan casing, motor and unit internals rusting resulting in poor aseptic condition. Rating Installed Design Life Updated 3 - Marginal Event: 1971 25 MAR-10 Replace Humidifiers (1) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $12,349 Updated: MAR-10 Event: Study classroom air system humidification. Concern: Evaporative humidifier water carryover is resulting in fan casing, motor and unit internals rusting resulting in poor aseptic condition and air quality compromised. Recommendation: Conduct study to determine alternate method of humidification. Consequences of Deferral: Air quality compromised. Type Year Cost Priority Study 2009 Medium $3,355 Updated: APR-09 Report run on: March 15, 2010 9:41 PM Page 40 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D3050.05.02 Fan Coil Units** 1971 Hot water fan coil unit installed in entrances. Rating Installed Design Life Updated 5 - Good Event: 1971 30 MAR-10 Replace Fan Coil Units (6) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $36,913 Updated: MAR-10 D3050.05.03 Finned Tube Radiation** 1971 Finned tube radiation under windows over office and library area. 1971 section only. Rating Installed Design Life Updated 5 - Good Event: 1971 40 MAR-10 Replace Finned Tube Radiation (2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $74,094 Updated: MAR-10 D3050.05.06 Unit Heaters** 1971 (3) Hot water Unit heaters installed in mechanical rooms and meter room. Rating Installed Design Life Updated 5 - Good Event: 1971 30 MAR-10 Replace Unit Heaters (3) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $10,760 Updated: MAR-10 D3050.05.08 Radiant Heating (Ceiling & Floor)** 1971 Radiant panels installed in classrooms and administration area. Rating Installed Design Life Updated 6 - Excellent Event: 1990 35 MAR-10 Replace Radiant Heating (15) Type Year Cost Priority Lifecycle Replacement 2025 Unassigned $10,760 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 41 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D3060.02.01 Electric and Electronic Controls** 1971 Line voltage electric thermostats cycles unit heaters and fan coil fans to maintain set point. These are all controlled by central maintenance remotely. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 30 MAR-10 Replace Electric and Electronic Controls (GFA: 5775) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $12,651 Updated: MAR-10 D3060.02.02 Pneumatic Controls** 1971 Duplex air compressor, refrigerated air dryer. Pneumatic room thermostats, control valves, damper motors. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 40 MAR-10 Replace Pneumatic Controls (GFA: 5775) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $50,607 Updated: MAR-10 D3060.02.05 Building Systems Controls (BMCS, EMCS)** 1971 BMCS system controls equipment activation and assists in maintaining building environment. Connected via modem to control work station in Bonnyville. BMCS enables and controls air systems, heating system. Rating Installed Design Life Updated 5 - Good Event: 1990 25 MAR-10 Replace Building Systems Controls (GFA: 5775) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $189,780 Updated: MAR-10 D4030.01 Fire Extinguisher, Cabinets and Accessories* ABC extinguishers on wall hooks or in cabinets. Evidence of annual inspections. Rating 5 - Good Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 30 MAR-10 Page 42 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D4090.05 Halon Extinguishing Systems** 1971 Two sprinkler heads with Halon bottle installed for finishing room in CTS. Rating Installed Design Life Updated 5 - Good Event: 1971 40 MAR-10 Replace Halon Extinguishing Systems (2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $32,400 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 43 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) S5 ELECTRICAL D5010.03 Main Electrical Switchboards (Main Distribution)**1958 Building Lyle Victor Albert Centre - 400 Amp 3ph 4w 120/208V Service installed in 1971. Rating Installed Design Life Updated 2 - Poor Event: 1971 0 MAR-10 Capacity Size Capacity Unit 400 amps Replace Main Service Concern: 400 Amp distribution is in poor condition and several additions have made maintenance and general operation hazardous. Recommendation: Upgrade service to MDP with main breaker. Type Year Cost Priority Failure Replacement 2010 Medium $39,600 Updated: MAR-10 D5010.03 Main Electrical Switchboards (Main Distribution)**1971 Building Underground service from pad mounted transformer. Main power service terminates to a Westinghouse main distribution switchboard located in Electrical Room. Service is rated for 800 ampere, 120/208V/3PH/4W. Rating Installed Design Life Updated 5 - Good Event: 1971 40 MAR-10 Replace Main Electrical Switchboards Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $17,851 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 44 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**1958 building Branch Panelboards are from Original Building Rating Installed Design Life Updated 2 - Poor Event: 1958 30 MAR-10 Replace Original Panelboards (3 Panels) Concern: Panels have reached the end of their life cycle and can no longer be relied upon. Recommendation: Replace with new. Consequences of Deferral: Electrical fire. Type Year Cost Priority Failure Replacement 2010 Medium $18,500 Updated: MAR-10 D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**1971 Building Westinghouse branch circuit panelboards. Most panelboards are original but some were replaced in 2004 and future spaces added. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 30 MAR-10 Replace Electrical Branch Circuit Panelboards (11 Panels) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $67,700 Updated: MAR-10 D5010.07.02 Motor Starters and Accessories** Square D and Cutler Hammer combination motor starters to motor loads. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 30 MAR-10 Replace Motor Starters and Accessories (17 Starters) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $27,100 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 45 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D5020.01 Electrical Branch Wiring* Computer Lab Wiring & devices installed in pac poles. Rating Installed Design Life Updated 1 - Critical Event: 1971 50 MAR-10 Replace existing wiring devices. Concern: Service poles in computer lab 22 are PVC construction and have not stood up to the day to day activities. Recommendation: Replace wiring devices with new extruded aluminum service poles fastened at the top and bottom in order to maintain continued service. Consequences of Deferral: Existing poles have a tendency to open up and leave students exposed to live electrical parts at desk level. Type Year Cost Priority Code Repair 2009 High $11,000 Exposed Parts On Computer Room Service Pole. Updated: MAR-10 D5020.02.01 Lighting Accessories (Lighting Controls)* Separate switching generally provided to each room. Rating 4 - Acceptable Installed Design Life Updated 1971 30 MAR-10 D5020.02.02.01 Interior Incandescent Fixtures*1958 Building Lyle Victor Albert Centre - Interior Incandescent Fixtures are in very poor condition and in some conditions not safe. Fixtures to be replaced with florescent type. Costs for replacement are carried in D5020.02.02.02 Interior Florescent Fixtures**1958 Building, as part of the total GFA of that building section. Rating 2 - Poor Installed Design Life Updated 1958 30 MAR-10 D5020.02.02.01 Interior Incandescent Fixtures*1971 Building There are minimal incandescent fixtures in the school in non-essential lighting applications. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 30 MAR-10 Page 46 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D5020.02.02.02 Interior Florescent Fixtures**1958 Building Interior Fluorescent Fixtures. Rating Installed Design Life Updated 2 - Poor 1971 30 MAR-10 Event: Replace Existing Fluorescents (420 M sq.GFA) Concern: Existing T-12 4' & 8' fixtures are past the end of their expected life and do not provide adequate lighting. Recommendation: Replace all fluorescent fixtures with T-8 4'. Type Year Cost Priority Failure Replacement 2010 Medium $36,700 Updated: MAR-10 D5020.02.02.02 Interior Florescent Fixtures**1971 Building 2002. Combination of surface mounted and recess mounted fluorescent light fixtures retrofitted with T8 lamps with electronic ballasts. Rating Installed Design Life Updated 5 - Good Event: 2002 30 MAR-10 Replace building light fixtures. (5647 M sq.GFA) Type Year Cost Priority Lifecycle Replacement 2032 Unassigned $493,000 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 47 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D5020.02.03.02 Emergency Lighting Battery Packs**1958 Building Emergency Battery Packs. Rating Installed Design Life Updated 1 - Critical Event: 1971 20 MAR-10 Replace & Add Emergency Battery Packs (10 Packs) Concern: Battery packs no longer function in public areas. Recommendation: Replace existing & add new where required. Consequences of Deferral: Building not safe in power outage. Type Year Cost Priority Failure Replacement 2009 High $14,700 Updated: MAR-10 D5020.02.03.02 Emergency Lighting Battery Packs**1971 Building Em Battery Packs in limited areas in the school Rating Installed Design Life Updated 1 - Critical Event: 1971 20 MAR-10 Replace Emergency Lighting Battery Packs (3 Packs) Concern: Some areas are not covered by EM lighting fed from EM Generator and are no longer functioning. Recommendation: Replace battery units and all associated remote heads. Consequences of Deferral: Building is not protected for Em lighting in certain areas during a power outage. Students exposed to potential injury. Type Year Cost Priority Failure Replacement 2009 High $4,400 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 48 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D5020.02.03.03 Exit Signs*1958 Building Exit Signs Rating Installed Design Life Updated 1 - Critical Event: 1971 30 MAR-10 Replace & Add New Exits Where Required (12) Concern: Exit signs have reached the end of their lifecycle and do not function properly. Recommendation: Replace existing & add new where required. Type Year Cost Priority Code Repair 2009 High $8,500 Updated: MAR-10 D5020.02.03.03 Exit Signs*1971 Building Exit signs are incandescent and placed as required throughout the school. Rating 4 - Acceptable Installed Design Life Updated 1971 30 MAR-10 D5020.03.01.04 Exterior H.P. Sodium Fixtures* Wall mounted HPS lighting units provided along building perimeter. Rating 4 - Acceptable Installed Design Life Updated 1971 30 MAR-10 D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)* Exterior lighting photocell controlled from a central lighting control panel. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 30 MAR-10 Page 49 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D5030.01 Detection and Fire Alarm** 1997. Edwards manufacture (ESA 2000), hard wired, zoned, supervised system. Last tested August/1999. Panel is located at control room with remote annunciator at the entrance. Rating Installed Design Life Updated 4 - Acceptable Event: 1997 25 MAR-10 Replace Detection and Fire Alarm (5647 M sq.GFA) Type Year Cost Priority Lifecycle Replacement 2022 Unassigned $154,100 Updated: MAR-10 D5030.02.02 Intrusion Detection** Ademco security system comprised of key pad entry, main controller. Multi Zones, motion sensors & door contacts. Intrusion Alarm entry key pads are located for entry/exit. Rating Installed Design Life Updated 4 - Acceptable Event: 2003 25 MAR-10 Replace Intrusion Detection (5647 M sq.GFA) Type Year Cost Priority Lifecycle Replacement 2028 Unassigned $85,000 Updated: MAR-10 D5030.02.04 Video Surveillance** Approximately 10 security cameras at building interior to a video recording system. Rating Installed Design Life Updated 4 - Acceptable Event: 2006 25 MAR-10 Replace Video Surveillance Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $12,951 Updated: MAR-10 D5030.03 Clock and Program Systems* Battery operated clocks with class change through call system. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 20 MAR-10 Page 50 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D5030.04.01 Telephone Systems* Panasonic telephone system upgraded approximately in 2002. Rating Installed Design Life Updated 4 - Acceptable 2002 25 MAR-10 D5030.04.02 Paging Systems* Paging through call system with speakers in corridors and classrooms. Rating Installed Design Life Updated 4 - Acceptable 2003 0 MAR-10 D5030.04.03 Call Systems** Dukane intercom system with return call stations in classrooms. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 15 MAR-10 Replace call system Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $6,700 Updated: MAR-10 D5030.04.04 Data Systems* Cat. 5 data cabling to data outlets with HUB located in storage room on main floor. Rating 4 - Acceptable Installed Design Life Updated 2005 15 MAR-10 D5030.06 Television Systems* Cable TV provided by Norther Cable. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 20 MAR-10 Page 51 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) D5090.02 Packaged Engine Generator Systems (Emergency Power System)** Emergency generator provides emergency power to building. Generator is natural gas fired, 120/240V/1PH, 3 KW complete with transfer switch. Rating Installed Design Life Updated 1 - Critical Event: 1971 35 MAR-10 Replace emergency generator 30 KW Concern: Emergency generator is natural gas fired, is very old and in poor shape, and no longer complies with code. Recommendation: Generator should be replaced with new model and automatic transfer switch. Type Year Cost Priority Failure Replacement 2010 High $72,828 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 52 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION E1010.05.01 Barber and Beauty Shop Equipment* Barber and beauty shop equipment. Rating Installed Design Life Updated 4 - Acceptable 1971 0 MAR-10 E1010.07 Vending Equipment* Vending machines located in corridors in several locations. Rating Installed Design Life Updated 4 - Acceptable 1971 0 MAR-10 E1020.02 Library Equipment* Book theft protection equipment, electronic book scanner and study carrels located in the library. Rating 4 - Acceptable Installed Design Life Updated 1971 25 MAR-10 E1020.03 Theater and Stage Equipment* 1958 Building Stage curtains and lights. Rating 4 - Acceptable Installed Design Life Updated 1971 25 MAR-10 E1020.05 Audiovisual Equipment* Ceiling mounted projector equipment together with wall roll up screen. Rating 4 - Acceptable Installed Design Life Updated 1971 0 MAR-10 E1020.07 Laboratory Equipment* Fume hood, eye washer and chemical storage system. Rating 4 - Acceptable Installed Design Life Updated 1971 25 MAR-10 E1090 Other Equipment Variety of power and manual for wood and metal shops in CTS; dust collector system in CTS; metal boot racks at entrances. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 0 MAR-10 Page 53 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) E1090.03 Food Service Equipment* Commercial beverage cooler in canteen. Rating Installed Design Life Updated 4 - Acceptable 1971 25 MAR-10 E1090.04 Residential Equipment* Residential range, refrigerator, dishwasher and microwave ovens in staff room. Residential microwave ovens in student lunch area. Washer and dryer in home ec. lab. Rating Installed Design Life Updated 4 - Acceptable 1971 10 MAR-10 E1090.07 Athletic, Recreational, and Therapeutic Equipment* Two wall hung Plexiglas and four wall hung plywood basketball backboards. Electric scoreboard and shot clocks. Fabric gymnasium divider. Rating Installed Design Life Updated 4 - Acceptable 1971 15 MAR-10 E2010.02 Fixed Casework - Educational Facility Casework** Painted plywood casework with plastic laminate clad tops in most classrooms. Rating Installed Design Life Updated 3 - Marginal Event: 1971 0 MAR-10 Replace Selected Millwork - (65m) Concern: Plastic laminate coming off countertops in areas. Cabinets doors are damaged in areas. Computer rooms lack purpose built millwork. Some millwork no longer used due to program changes in room. Recommendation: Replace millwork in selected classrooms (65 m.), provide millwork in computer rooms (120 stations) and replace storage cabinets in 8 classrooms. Type Year Cost Priority Failure Replacement 2011 Low $65,300 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 54 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) E2010.02 Fixed Casework** Painted plywood cabinets with plastic laminate countertops in staff room. Clear finish plywood shelving in library. 1971 - Plastic laminate clad vanities in washrooms. 2000 - Plastic laminate clad cabinet with plastic laminate clad countertop at reception in office area. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 35 MAR-10 Replace Fixed Casework - (GFA: 5582) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $509,347 Updated: MAR-10 E2010.03.01 Blinds** Horizontal aluminum blinds and vertical Louvre blinds throughout. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 30 MAR-10 Replace Blinds - (39m2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $5,500 Updated: MAR-10 E2010.03.06 Curtains and Drapes** 1971 Building Vinyl privacy screens in former CTS Foods remain in place; heavy duty curtains in welding booths. Fabric curtains in administration areas. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 20 MAR-10 Replace Curtains and Drapes - (156m2) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $21,800 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 55 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) E2010.05 Fixed Multiple Seating** 1958 Building Theater seating with folding seats in the 1958 building. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 35 MAR-10 Replace Fixed Multiple Seating - (188 seats) Type Year Cost Priority Lifecycle Replacement 2013 Unassigned $106,700 Updated: MAR-10 E2020 Moveable Furnishings Wide variety of educational and office furnishings including desks, tables, bookshelves and chairs. Rating 4 - Acceptable Installed Design Life Updated 1971 0 MAR-10 F1020.02.13 Paint Booths* Paint booth provided in CTS shops. Rating 4 - Acceptable Installed Design Life Updated 1971 0 MAR-10 F2020.01 Asbestos* 1971 HAZMAT audit not available. Original 9 x 9 vinyl tile likely contains asbestos in a stable form. Rating 4 - Acceptable Installed Design Life Updated 1971 Report run on: March 15, 2010 9:41 PM 0 MAR-10 Page 56 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) F2020.04 Mould* Noticeable musty odor likely due to water in underslab ductwork. Rating Installed Design Life Updated 3 - Marginal Event: 1971 0 MAR-10 Undertake Mould Assessment Concern: Musty smell detected in 1971 phase; likely due to water in underslab ductwork. Recommendation: Undertake mould assessment study complete with recommendations. Type Year Cost Priority Hazardous Material Management Upgrade 2010 High $5,592 Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 57 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) S8 FUNCTIONAL ASSESSMENT K3010 Building Services Fire doors are removed on the upper floor at the west staircase. In the 1958 building there are no lights from the upstairs to door leading outside. Rating Installed Design Life Updated 3 - Marginal Event: 1971 0 MAR-10 Install electro magnetic hold open devices Concern: Fire doors at exit stairs are required to provide safe exiting from the building. Removing troublesome doors in heavy use locations is commonplace but defeats their purpose. Recommendation: Install electro magnetic hold open devices tied in to fire alarm to release on activation (8 doors). Type Year Cost Priority Code Upgrade 2010 Low $22,369 Updated: MAR-10 K4010.01 Barrier Free Route: Parking to Entrance* Access provided from drop off at east end of school to east entrance. Also ramp located on west side of building leading from parking to entrance. Rating Installed Design Life Updated 4 - Acceptable 1971 0 MAR-10 K4010.02 Barrier Free Entrances* Barrier free access required to main entrance doors. Rating Installed Design Life Updated 4 - Acceptable Event: 1971 0 MAR-10 Provide Power Assisted Door Operators - (2) Concern: No power assisted door operators provided at east or west entrances. Recommendation: Provide power assisted door operators at east and west entrances. Type Year Cost Barrier Free Access Upgrade 2010 $7,456 Priority Medium Updated: MAR-10 Report run on: March 15, 2010 9:41 PM Page 58 of 59 Bonnyville - Bonnyville Centralized High School (B2464A) K4010.03 Barrier Free Interior Circulation* Access good to all areas. Public counter at main entrance reception area. Plastic laminate clad plywood public telephone enclosure provided adjacent main entrance. Rating 4 - Acceptable Installed Design Life Updated 1971 0 MAR-10 K4010.04 Barrier Free Washrooms* 2 barrier free washrooms provided, c/w watercloset, grab bars, wall hung lavatory with lever faucets and floor length mirror. Rating 5 - Good Installed Design Life Updated 2006 Report run on: March 15, 2010 9:41 PM 0 MAR-10 Page 59 of 59
Similar documents
Ottewell Junior High School
Avenue on the North, Ottewell Road on the East, 94 Avenue on the South and 73 Street on the West. It is under the jurisdiction of Edmonton School District No. 7. The current student enrollment is 7...
More informationJoussard School
conditions. Some condensation and frosting during winter. Recommendation: Replace aluminum windows with aluminum curtain wall type throughout (24.0 sq m). Type
More information