town of osoyoos - Province of British Columbia
Transcription
town of osoyoos - Province of British Columbia
TOWN OF OSOYOOS Summary of Water Supply Wells and Background Information Water Supply Well No. 1 (Old Public Works Site) -b7N 82 35 8 Water Supply Well No. 2 (Legion Beach) - k17‘rl/ 1870 2 Water Supply Well No. 3 (Maple Drive) kKF.lS30 13 (4) Water Supply Well No. 4 (Cottonwood Drive Park) - \F.mJ $3o I ( 5 ) Water Supply Well No. 5 (CottonwoodDrive Park)- W N 8 3 O J s (6) Water Supply Well No. 6 (Wye Area) bdJ11.J 830/& 3 (7) Water Supply Well No. 7 (Wye Area)- l a r r ~8 ~ 57 (8) Water Supply Well No. 8 (Kngfisher Drive) - b 7d r’3Z7 (1) (2) (3) - - prepared by ‘Olr)ll* TIM6 C R J U P TRUE Consulting Group February 2004 TOWN OF OSOYOOS SUMMARY OF WATER SUPPLY WELLS AND BACKGROUND INFORMATION (1) Water Supply Well No. 1 (Old Public Works Site) 9 9 9 9 P 9 P P LJtA F2 358 drilled January 1995 by Robbins Water Well Drilling and Pump Service casing diameter - 300mm (12 inch) screen - 6.8 m to 9.2 m Nominal Capacity - 450 USgpm Top of Casing (on completion of drilling) - Elevation 279.279m Design Drawing - TRUE 302-424-02 - April 1995 Pump - Gould 10 RJMC - 7 Stage (vertical turbine) - 50 Hp Pump Rating Point - 500 USgpm at 270 feet TDH B'2& 00 32-32 N+ Reference Information: 9 Completion Report by KALA Groundwater Consulting - March 8, 1995 (2) Water Supply Well No. 2 (Legion Beach) P dug well - 1965 approx. 9 use of well discontinued in mid 1990's (3) r r 7 Q2 g2ef'Jog 2.32 + 2 3 G.JTrJ Water Supply Well No. 3 (Maple Drive) P 9 9 9 9 P 9 drilled - May 1971 - Osoyoos Tile Works and Water Wells casing diameter - 3OOmm (12 inch) diameter screen - 9.75 m to 15.24 m Pumphouse Floor Slab Elevation - 280.56m Design Drawing - TRUE 302-851-01 - December 2001 Pump - Peerless - 12LB - 4 Stage (vertical turbine) - 75 Hp Pump Rating Point - approx. 600 USgpm Reference Information: 9 log and well construction information - source unknown (4) Water Supply Well No. 4 (Cottonwood Drive Park) 9 drilled August 1979 - Terra Drilling and Water Services 9 casing diameter - 200mm (8 inch) diameter PVC 9 screen - 16 m to 23.7 m 9 Pumphouse Floor Slab - elevation 280.00mL P Design Drawing - USL - B402-2 - September 1980 9 Pump - Aurora 8FHH - 15 Stage (vertical turbine) - 75 Hp 9 Pump Rating Point - 600 USgpm @ 330' TDH Q 2 (5) Water Supply Well No. 5 (Cottonwood Drive Park) 9 9 9 9 9 9 9 drilled July 1986 - AC Drillers casing diameter - 400mm (16 inch) diameter screen - 18.9 m to 26.5 m Pumphouse Floor Slab Elevation - 280.00+ Design Drawing Pump - Goulds 12RJHC - 5 Stage (vertical turbine) - 125 Hp Pump Rating Point - 1200 USgpm (@ 3 10 feet TDH Reference Information: 9 plot of pump test data - USL 1986 P Completion Report - USL letter dated October 14, 1986 9 Golder Associates letter dated September 30, 1986 (6) Water Supply Well No. 6 (Wye Area) 9 9 9 9 P 9 9 drilled September 1986 - Pacific Pump & Pressure Installations casing diameter - 250mm (10 inch) diameter screen - 10.3 m to 13.4 m Pumphouse Floor Slab Elevation Design Drawing Pump - Byron Jackson lOGM - 7 Stage (vertical turbine) - 50 Hp Pump Rating Point - Reference Information: 9 Solid system No. 8 Groundwater Development Program Groundwater Consulting - September 1986 (7) Water Supply Well No. 7 - KALA / 9 drilled January 1995 by Robbins Water Well Drilling and Pump Service M -T / 1 9 casing diameter - 250mm (10 inch) 2235-7 ” > screen- 12.0 m to 16.8 m c. rr: 9.j-r ‘? 7 l f 9 Nominal Capacity - 500 USgpm 9 Top of Casing (on completion of drilling) 9 Design Drawing - Not Used - capped only 2003 9 Pump 9 Pump Rating Point -2s.- Reference Information: 9 Completion Report by KALA Groundwater Consulting - March 8, 1995 UI (8) Water Supply Well No. 8 > > > > > > > > drilled April 1995 by Robbins Water Well Drilling and Pump Service casing diameter - 3OOmm (12 inch) screen - 8.75 m to 13.0 m Nominal Capacity - 800 USgpm Top of Casing (on completion of drilling) Elevation - 279.983 m Design Drawing - TRUE 302-425-02 - March 1997 Pump - Gould VIS-1ORJLC - 2 Stage (submersible) - 75 Hp Pump Rating Point - 850 USgpm at 273 feet TDH iSiTt\J F2-. 3-9 L'-zc0 3: =o Y 3 Reference Information: > Completion Report by KALA Groundwater Consulting - June 19, 1995 : ,-3c & i": 9 T.R Lkdenvood & Town of Osoyoos - Eng.nerry Underwood/March 8, 1995 Development program w Aquifer Test Evaluation - Town o f Osoyoos 1994/95 Groundwater Develovment fa) Descrivtion of Testing Drowam Following completion of the 1994195 drilling and well completion program for the Village of Osoyoos, pumping tests were conducted with the two new production wells completed at the Old Public Works Yard Site and the Well #7 Site. During each of the tests, the pumping interval was carried out for a 24 hour period and in each case, two existing wells were used for observation purposes. Water pumped firom the wells at each site was discharged to waste into Osoyoos Lake, using 6-inch flat lay pipe and the pumping rate was monitored using a standard circular orifice weir. During the early stages of each test, the pumping rate was set at a moderate level and this was progressively stepped upwards until the final pumping rate, which was maintained constant for the remainder of the test. At the Old Public Works Yard Site, Well No. 2 was shut down for the entire pumping interval, whereas at the Well #7 Site, Well No. 6 was pumped simultaneouslywith Well No. 7 for the final 8 hours of pumping. 8 A summary of the pumping test schedules is shown in Table 1. Kala Gro&ter Consulting M. Page 1 w T.R Underwood & Ass - TOW^ of OSOYOOS199 - Eng./Teny Undenvood/March 8, 1995 roundwater Development program w fi) Results of Testing Propram Drawdown and recovery measurements obtained during the present program have been tabulated and plotted on semi-log graphs of drawdown and residual drawdown versus time. An inspection of the plots show that at the time of the pumping tests, when lake levels were fairly low, steady-state conditions were not observed in either of the production wells. By steady-state, we refer to the condition where the pumping rate in the well is balanced by the rate of recharge to the aquifer and no firther drawdown occurs. The rate of drawdown however remained fairly constant in each of the wells. The second important observation resulting fiom the tests is that the zone of drawdown interference is fairly extensive for each of the new wells and with time, an effect on water levels in neighbouring production wells becomes evident. Again this may relate to water levels in Osoyoos Lake at the time of testing. Finally, the recovery data for each well shows that recovery in the aquifer is slow and will require the 24-hour period (length of pumping interval) to reach full recovery. IC)Evaluation of Safe Yield It is very dif€icult, if not impossible at this stage to assign a “safe yield” to the two new production wells because of the many outside influences. The critical fkctors include the seasonal fluctuation in lake levels and associated influence on aquifer recharge, the proposed pumping schedule and number of production wells which will be utilized at each site. There is a very small amount of available drawdown to work with in each well and therefore every change in water level becomes si@mt. Rather than recommending a safe pumping rate for each we4 we have provided a number of scenarios based on pumping rate and related drawdown. Our projections on the Kola Groundwater Consulting Lsd Page 2 T.R Underwood & As Town of Osoyoos - es Engfferry UnderwoodMarch 8,1995 Groundwater Development program W percent of total available drawdown utilized are based on (a) conditions encountered during the time of testing and @) allowing a 0.5 metre rise in the water level in Osoyoss Lake. The 0.5 m. figure is based on records of monthly mean water levels for Osoyoos Lake, obtained from Water Survey Canada for the period 1946-49, 1977-93 (see attached). As you are aware, a Hydrogeologist likes to work in the comfort zone of 70 percent of the available drawdown utilized, however in special circumstances such as in the case of a municipality experiencing a water shortage problem, exceptions have been made. - Town of Osoyoos 1994/95 Groundwater Development Program Pumping Test Summary A ) Old Works YardSite - Table #2 Pumping Rate and Drawdown Rojedions Pumping Period Percent of Available Drawdown ** 3 month season 10 month SeaSon 79 Yo 4.4 m 4.6 m 82 % I 72 % 75 % * Refers to continuous pumping for the period specified ** Percent of available drawdown indicates percent utilized at end of specified period Kala Groundnuter ConsultingLtd. Page 3 T.R U n d e r w d & As Town of Osoyoos - 1991 s' Eng./Teny UnderwoodMarch 8, 1995 "TyGroundwater Development program * - Town of Osovoos Pumpinn Test Summary (Cont'd) B) Well No. 7Site * Refers to continuous pumping for the specified period ** Percent of available drawdown indicates percent utilized at end of specified period Kala GrounmVater ConsultingLtd. Page 4 T.R Underwood & Town of Osoyoos - Engnerry Underwood/Uarch 8,1995 Development program 1 ‘ 11 Based on the results of the present program, we would recommend a maximum design pumping rate for each of the new wells as follows: fa) Old Public Works Ywd Site 400 USgpm pumping individually fb) WeZZ #7Site (i) 600 - 650 USgpm for Well #7 pumpng individually (2) 400 USgpm for Well #7 pumphg in combination with with Well #6 &la Gmundwuter ConsultingLtd Page 5 'I Ground level 1 \ Non-pumping water level 138 rn. below top of casing (Feb. 21/95) 223'feet 6.8 m. 30.2 feet 9.2 n. I Figure "K"packer / Driveshoe Johnson's stainlesssteel, telescopic well screen top 2 feet #150 slot bottom 5 feet #200 slot - FIGURE 1 Town of Osoyoos WELL COMPLETION DIAGRAM Old Public Works Yard (PW #1) Member, HCWWOA / w e s fln0 ; ;"--I,~---I-............. t.&' . ...... ._. rd-4 S . . . ---. J C - * / S& e... ..& #" I & - , ..... &AL .............. ..-..----- i I . . pI..-. 37. sp. --- ... -7 .. $+ 4....... : 7. C O N S U L WELL L O C A T............ I O N S K E TC;H . F i t t i n g s . top- . . Gravel Pack - _ . __ ~ -bottom 1. ... ... --- 277,586 ... -.-277,054 1982 1983 1984 1985 1986 1987 1988 1989 1930 1991 1992 1993 277,996 !77*92b 271.681 277,556 ?.. --- m . 1 3 2 Z ~ I , O I 2C7 7 . m 216.976 216.938 277.255 279.361 277,342 i71.94i ... --277.16~ 276.e1s 27c.jsi 216.849 ----- --. _-_ --- 273.072 210.036 277.95a 2 n . w i 277.118 271.662 217.563 277.47) 277.855 277.717 277.637 277.606 277.291 277,245 277.281 277.451 277.636 277.562 2?1.549 277.573 277.218 217.208 277,255 277,376 217.578 277.763 277,891 277.583 217.339 277.238 277,323 277.534 277.819 278.322 278.110 277,872 2 1 7 . ~ 3 2 7 t . w 277.14e 217.7~9 z7a.m 2 1 7 . ~ 2 271.993 27e.091 277.538 217.695 278.016 278.211 278.473 Z i L X 8 278.171 271.937 277.365 277.619 277,686 277,746 278,095 273.225 i 7 W 8 277.818 211.353 217.324 211,325 271.398 277.541 277.53 237.Sf3 Z77.553 217.265 217.458 271.635 277.581 277.953 277,!61 277.744 277.815 217.31e 211.341 211.331 lIf.61b 27J,7C5 277.946 27B.W 517,923 277.~70 211.212 277,iae 277.ci 271.814 21a.eco 271.443 277.770 277,631 217,655 277,652 277.667 277.671 277.789 277.717 217.618 277,618 277.661 211,602 217,616 271.71: 279.272 278.@@6 277.781 211.310 217.373 271.684 277.653 278.826 277.934 271.687 277.388 277.318 217.178 277.363 271.49 277.CCG 277.t73 276.:3 27&,?02 277.550 217.612 277.5SO 217.785 271.93,P 277.936 277.965 37.694 KeAR 277.363 277.083 277,478 277,SlB 277.831 271,fM 57?.tC% 111.751 217.671 1916 1!(7 1948 1949 1977 1378 1979 1s8e 1981 --- --- KATER LEVELS REPZMD TO GGODKTIC SUllYEl OF CJ!ADA DATUH --- --A ... -a- --- 217.ie9 27i.eii 2 ~ 276.982 7 278,611 277.485 277,493 277,352 --- 277.~62 217.60 277.598 277.659 277.531 277.933 277.731 277.645 277.569 277.533 -..- 2n.aoi 277.656 177,632 277.609 277.446 ..- 2 7 ~ 271.693 277.662 277.687 277,646 277.633 271.5?! 211.502 t’l?.Gl! 271.621 m.w 277.155 277,580 271.575 277.172 277.499 277,4?9 271,151 277.69 217.236 zit.416 273.271 277.478 27?.Q?9 277.373 217,636 217.~34 277.629 277.447 i77,513 277.559 277.22! --... 277.531 277,676 277,351 277,572 277.319 217.421 277.325 217,171 271,493 217,576 271,681 1211.667 277.6’18 277.552 277,62@ 271,631 277.419 277.C96 217.681 ~77.5115 277.636 277.628 277.677 277,921 277.731 -*I ------e 27?.5!8 277.448 177.51t 277.598 iii.iei 277.544 217.itl 271.473 27ia625 2??M 277.ut 277.663 277.112 2?7.GS1 5?i.64@ 2ii.E fW W ' W CHE f - C ENVIRONMENTAL SERVICES DIVISION OF C A R 0 ENTERPRISES INC.) #l 368 Industrial Avenue, Kelowna, Br ish Columbia, Canada V1Y 7E8 ! 01 SampJ.c I d e n t i f.ical:j.on: Telephone (604) 763-5080 Fax 763-4810 A#rtxBrB i ' ;Old Works Yard I i Feb. 22/65, 12 :30am Date Received.' Feh. 22/95 I . 287 A l k a l i n i t y (Total): mg/L as CaC03 A1uminum <0.2 mg/L (0 * 01 mg/L Arsenic Barium 0.04 mg/L I Boron <o ..2 mg/L 1 <0.001 Cadmiiun mg/L 116 Calcium i mg/L 18.3 !I Chloride mg/L (0.02 mg/L Chromium I (10 Color Units Color (True) Date Sampled: i I Conductivity Copper 816 <O.O02 I I Cyanide Di..ssolved S o l i d s (T Fluoride Hardness (Total 1 ! Iron Lead I Magnesium ! Man CJ an ese Mercury Molybden urn <0.010 S 63 0.7 391 0.03 €0.001 24.8 < o * 01 0005 0.014 CO. urdms/cm mg/L mg/L mg/L mg/L mg/L a3 mg/L mg/L my/& mg/L mg/L mq/L . .2 Water amj Wastewater Analysis I TrpalrPcnt Plant Supervision. Operation 8 M C H C ~ ~ THE INFORMATION CONTAINED IEi i a THIS AEPOHTiS THE CONFIDENTIAL PROPERTY OF THE CLIENT. ANY t LlABlLlN ATTACHED THEflETO IS LIMITED TO THE F f E CHARGED. +' . i n k n u R3Y- W I II r:tye 2 Town of Osoyoos I March 7 , 1995 .Ii W0rb;nYard (~OIitr) i Icon?& Nitrake Nitrl.to PH Potassium Sodium Sill pha t.e Turbidity Uranium 3.69 mg/T, a5 N m g / L a3 N pH U n i t s 0.01 7.35 6.43 mg/L mg/L my/L 35.4 158 0.15 Zinc : Total. (;olifoim Fecal Coliform , f N.T.U. 0.0029 <0.002 0 0 mg/t mg/L colon i eo / 100m1; Colonies/lOOmL i Certified by: CHEMAC J a n i c e M. Fraabr, B.Sc., L a b Manager : CC: FAX 495-2400 FAX 497-5303, Robbins Water Well. I ) r i . l l i n g FAX 545-1720, Kale Groundwater C o n s u l t i n g i t i I PROPERTY OF I THE CLIENT. ANY UABllltY ATTACHED THERETO IS LIMITED TO THE FEE CWWQED. I . ... .-- 1916 :*. 1147 e-1948 216.976 1949 277.166 216J15 1977 1178 217.418 211.662 1979 271.291 277,245 1388 177.218 277,188 1981 277.339 271.238 1982 277,263 277.S41 1983 277.538 217.695 19811 277,365 277.649 1985 277.355 217.324 1981 277.265 211.158 198) 277.31@ 277.111 l9EB 277.~7e 217.202 1389 277.631 217.655 1990 217,618 277.161 1991 277.310 217.313 ,1991 277.318 277.110 1993 277,558 217,612 . I --- ' MM --a --- ..- 277,586 277.996 277,928 271.6ai 2?7,5s6 --277,654 * - - 277.132 271.016 277.124 277.169 271.411 236.998 277,255 278.361 211.942 i71.94i 218.811 277.185 27C.95i 276.849 ---.--- 278.032 27a.036 217.958 2 1 7 . ~ 271.~62 211.801 217,563 27l.479 271.651 277.717 277.637 277.606 277.666 277.656 277.287 277.151 217.636 277.562 2?7,549 277.571 277.598 177,632 277,255 277,376 277.578 277.763 277,897 277,583 271.659 271.609 277.323 277.534 277.819 278.322 278.110 277.071 277.531 177.146 277.748 277.799 278.615 217.752 277.993 27E.491 277.933 277.452 278.616 278.211 178.473 Zi8.288 218.171 277.937 277.131 217.455 277,686 271,749 278,095 278.i2S 27LG78 277.818 277.615 277,580 277.325 277.398 277.542 271.535 277.353 277.511 271.569 271.575 271.635 277.W 277.953 277.91 277.744 277.815 277.533 277.172 277.337 211.618 277.705 277.946 218.646 577.823 177.496 277.681 277.18e 211.1~ 271.814 27a.6~0 2 7 1 . ~ 271.770 271.~85 277.m 277,652 217,6$7 277.171 271.189 277.717 277.614 277.636 217.693 213.682 271.61C 27?.71? 274.212 278.@88 277.781 271.628 277.662 277,684 277.631 278.826 277.3~ 2 7 7 3 7 i77.7ea 2 7 7 . ~ 7 277,687 277.363 277.491 277.C4G 27i.613 276.N !7&462 277,921 277,646 271,510 117.185 211.93,9 277.556 277.965 211.634 273,731 277,633 --. -9- ___ -c- -. --- .I- --I --_ --- 276.J87 176.982 277.933 177.352 --a m.w --- -A .-. ... ... 277.678 211,351 277,572 277,319 271.421 277.325 217,571 271.493 277.576 271.181 211.667 271.678 277,552 !77.610 277,631 277,CIO 277.590 277,W 277.5!8 277,Zl 211.i13 277.469 277.515 277.296 277.598 277.416 271.lH 277.271 217.544 277,478 217.i46 277.429 271.173 277.37? 277.624 277.636 217.643 217~342 7 ~ 217.629 277.669 271.147 211,112 117.513 271.~~1 277.559 2?i.646 277,222 ili,i?1 277.363 277.483 277,178 277,518 211.831 277,56', 571.?Cf 277.751 217.671 271.574 211.582 271.619 :77.6!7 YAPER LEVELS RIIZRRZD TO GCODXIIC SORW OF EW3A DAIUH E!.: Town of Osoyoos KEIE Groundwater Consulting Ltd. W Old Works Yard Site New 12-inch Well Old Works Yard Site Town of Osoyoos New 12-inch well SEMI-LOG PLOT OF DRAWDOWN VERSUS TIME 0.00 0.50 1 .oo 1.50 v) E" .-C 2.00 2.50 0 '0 Es 3.00 n 3.50 4.00 4.50 5.00 1 10 100 . Time in minutes Kal8 Groundwater Consulting Lld. 1000 10000 Town of Osoyoos Old Works Yard Site 300 380 480 600 780 960 1200 1440 Kale Groundwater Consulting Ltd. 2.34 2.39 2.46 2.53 2.63 2.68 2.75 2.82 L_P 0.26 0.31 0.38 0.45 0.55 0.60 0.67 Pump rate 513 USgpm 0.74 Existing dug well ( O ~ S ) Town of Osoyoos Old Works Yard Site Existing Dug Well (Obs) SEMI-LOG PLOT OF DRAWDOWN VERSUS TIME 0.00 0.10 0.20 v) e 0.30 c f" ._ C 0.40 0.50 0.60 0.70 0.80 1 10 100 Time in minutes Kala Groundwater Consulting Ltd. 1000 \ 10000 Town of Osoyoos Kale Groundwater Consulting Ltd. U Old Works Yard Site W Well No. 2 (Obs) Town of Osoyoos Old Works Yard Site Well No. 2 (Obs) SEMI-LOG PLOT OF DRAWDOWN VERSUS TIME 0.00 I I I l l I I I 0.02 0.04 0.06 0.12 0.14 0.16 0.18 I I I 1 I 1 1 1 1 1 1 10 I I I I 1 1 1 1 1 100 Time in minutes Kala Groundwater Consulting Ud. I I I I I l l l l 1000 \ I I I I I I 10000 Town of Osoyoos Kale Groundwater Consulting Lfd. w Old Works Yard Site w New 12-inch Well (Rec.) Old Works Yard Site Town of Osoyoos New 12-inch Well (Rec.) SEMI-LOG PLOT OF RECOVERY 0.00 0.10 0.20 UI e + E ._ C 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1 .oo 1 .o Kala Groundwater Consulting Ltd. 10.0 100.0 1000.0 10000.0 Town of Osoyoos w -4 Groundwater Development SIEVE ANALYSIS PLOT 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kala Groundwater Consulting Ltd. 200 Town of Osoyoos W w 9 9 4 Groundwater Development I SIEVE ANALYSIS PLOT 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kale Groundwater Consulting Ltd. 200 Town of Osoyoos -994 W Groundwater Development SIEVE ANALYSIS PLOT 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 II 10.00 0.00 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kala Groundwater Consulting Ltd. 200 Town of Osoyoos 4 9 4 Groundwater Development w SIEVE ANALYSIS PLOT 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 i 0 I I 1 50 100 150 Sieve Opennings in Thousandths of an Inch Kala Groundwater Consulting Ltd. 200 Town of Osoyoos d 9 4 Groundwater Development Qv SIEVE ANALYSIS PLOT I 90.00 80.00 70.00 60.00 20.00 10.00 0.00 1 I 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kale Groundwater Consulting Ltd. 200 town of Osoyoos ~ 1 9 9 Groundwater 4 Development SIEVE ANALYSIS PLOT 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kala Groundwater Consulting Ltd. 200 Town of Osoyoos 994 Groundwater Development lrrrs SIEVE ANALYSIS PLOT 100.00 90.00 70.00 60.00 40.00 30.00 20.00 0.00 ! : 0 I I I I 50 100 I I 150 Sieve Opennings in Thousandths of an inch Kala Groundwater Consulting Ltd. 200 Town of Osoyoos 994 Groundwater Development w SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kale &OUndw8t~?r Consulting Ltd. 200 Town of Osoyoos d 9 4 Groundwater Development Lr SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch 1 Kale Groundwater Consulting Ltd. 200 Town of Osoyoos 994 Groundwater Development w SIEVE ANALYSIS PLOT 100.0 '0 .-ta 4) c s ae .-a> Q c i E of 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 200 Sieve Opennings in Thousandths of an Inch 1 Kale Groundwater Consulting Ltd. Town of Osoyoos 994 Groundwater Development SiEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kala Groundwater Consulting Ltd. 200 Town of Osoyoos 'Qll 994 Groundwater Development SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kala Groundwater Consulting Lid. 200 Town of Osoyoos * tw 1994 Groundwater Development 1 0 Kala Groundwater Consulting Ltd. 100 150 Sieve Opennings in Thousandths of an Inch 50 200 Town of Osoyoos ~ 9 9 Groundwater 4 Development I SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kale Groundwater Consulting Ltd. 200 Town of Osoyoos w 994 Groundwater Development SIEVE ANALYSIS PLOT 100.0 BC ._ * d (P 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 I Kah Groundwater Consulting Ltd. 100 150 Sieve Opennings in Thousandths of an Inch 50 200 I i - Cut 2 /a". e - CAsl UC o WELL LOG V i l l a g e of Osoyoos Osoyoos, BOG, 8" p r o d u c t i o n w e l l OSOYOOS, B.C. Well d i a , 8'l Well d e p t h 78' Screen d i a , 7-7/8", s c r e e n l e n g t h 29' Screen: .4Q .40 ,,55 .TO .60 i n 5' s e c t i o n s ( s t a i n l e s s s t e e l ) - - 0-6 - fill 6-51 s i l t (blue-black g r a n i t e ) 51-60 medium coarse sand and g r a v e l 60-63 c o a r s e g r a v e l s , medium sand, some cobble 63-74 c o a r s e g r a v e l s , lensed c o a r s e sand, some cobble 74-80 c o a r s e heavy g r a v e l & cobble, very l i t t l e sand 80-84 f i n e g r a v e l s and sands 84-100 blue s i l t ( g r a n i t i c ) S t a t i c l e v e l , Aug. 11/79 8 ' 4''. Start a i r - l i f t development 1 : O O pm, Aug, 11/79. - E s t . well y i e l d - 750 gpm, draw-down 24'6" (32'101 s u r f a c e ) - 50' Suggested pump i n t a k e l e v e l Suggested maximum output -2700 gpm 8'41r, Aug, 14/79 S t a t i c l e v e l a f t e r development S t a t i c recevwE3 -time 40 seconds from 32'10t1. - 1 4 October 1986 Town of Osoyoos P.O. Bax SO10 osoyoos, B.C. VOH 1\10 Att-entlon: _c_ Mr, L.A. 1 /os Administrator Deer S l r : Re: Camp leflan R e p o r t Water _suee.! Y We I 1 #9 In E s s- t - O T h i s l e t t e r 1s InSended as a form1 r s p o r t nrmrnar1zIng the construc'flan the new w e l l i n Esst O s O y W S (deslgnaied Water wail and cornpletlon o f #5). D r i 1 I ing of +he wet 1 wgs underiaken by A.C. b r i I l e r o ttd. o f KePorneoS b e h e e n 25 J u n e and 15 J u l y 1905. T b m l l Cons-kucilan Is summarlred a s follows: Surface to 20 f e e + 20 to 62 fee* 62 to 87 f e e t Sta*lc Weter Level - 20 - - Inch s t e e l carinq 16 Inch sSeel c u s h g 12 inch 30 slof stainless sfeel well screen 10 feet. The well i s located approxlrnafely 9 . 3 m%rs ( 3 0 f e e t ) from a x l s t l f l g W e l l lt4. Based on information from 1980 when k i l l H4 was construcSed, I t was a n f l c l p a t e d a+ the s f a r t of This pfoJsct t h a t Qn uqulfer c a n s i s f ' l n g p r l n c t p a f l y of coarse relat.lvely clean gravel would be e ncou n +er e a'. As yau are aware, drilllng of Well # 5 d l d not oncounfer granular materla!s a s a n t l c I p a h d . Water bearlng fine -to med[um sand #as drllled i n t o below 60 f e e f . The unenflcipafed f l n e r sail ma+arleIs necessitated r€!V?S!OnS ?o +he s c r a m lengih, d t a m e h r and S I & s l r e . On 4 and 5 September 1986, a pump h s t of Y e l l R5 w89 undertaken by Aqua-Flo C f d . o f Langley. The pump t e s t m a undertaken at. v a r y l n g dlschstge rates f o r a durafloo o f 15 h w r s . The resulis of tho pump t e s t are shoun g r a p h i c a l l y on .the enelos~ddraw Ing. The pump tdst Dec. 1 "92 10:l.S P, 3 WG I NEER ING 14 Octobar 1986 Our File: 8552-26 TOW o f O~oyoos Awn: Hr. L.A. M f l e s Page 2 tcdnt.ld) . graph 1llus.trates t h a t )he v e i l draws da#r ond sfablllzos very r a p l d l y , A t 1022 USgpm the drawdown 4n *he - 1 1 I s mly 13 l e o f , A t this pumplng f a t e only abau) 30 perced of ?'ha a m l ' l a b l e draudown or water b pumq t e s t plot I t lustrates d e p t h above ttw sctbens m s rr$lltted. l very minor I n b r f e r e n c e befueen exlrtIng Moil 1 4 and +he new Melt 15, In c o n c ~ U s l ~ nthe , safe y l e l d o f I000 recently cornpidad Mela 1 5 has a very conserva~ivo gpm, Hlgher punrplng m h s catlld be aahleved from rbe ret 1 , howova+, the screen capaclty kcarres .the I Irnlftng factor a t r a b s above 000 gpm. A l t h o u g h we dld m e M e wafer s a m p i e s for chemical an8 y s l s , we antic1pat.e tho mt.r qvallty ta be the same a s derlved frbm exlsting Well #4. The PI~Qtrr? conflrms +hat bath wells are derlvtng water from *,he same aquifer. As y4u a r e aware, the Mater quallty from Well # 4 Is excellent and r r r b a b l y low I n nlSrates whlch Is a concern w l h o t h e r uel Is I n th% bquxs area. We a i f a c h herewith B letter from Galder hssocia+es nho were requested by the vrriler to review a11 The well bats fo confirm The safe y l e l d of the uel I You should note 'that Cafder Associafes have cwncluded t h a t the a q u l f e r Is capable of. supplying a fuv+hr 1000 gpm ( I n addl+lon fu We1 I 1 4 and # 5 ) through a future well whlch c o u l d be cons9rue)ed I n the same ganerel area. Galder recommend that. any addl tlanal ne1 Is be s l b d 300 -bo I000 f e e t from +ha axlsting W@lls !4 and # 5 . Should any further Informafton be reguirod rrslabd ?e t h e new w a l l , please contact t h e undersigned. Yours f r u l y , UFU3AN SYSTEHS CTD, T.R. Underwood, P.Png. TRU/cs Enc I asu r e S/E'd S9P'ON T W G I NEEE I NG w P, 4 Golder Associates CONSULTINGWOIECHNICIL AX0 UINW t/M/1090 Septeabcr 30, 1986 Dear Sir: AB requested i n your l e t t e r &fed 15th September, 1986, m have completed a review o f the pump telrt data eupplied far the recently cornp l a t e d Osayacrs Vel1 # 5 The Ed1aviug are our obasrvatipne and comments. I Drawdown In Well # S reached sroadp s t a t e q u i c k l y during aath etep This indicates a high level of recharge to the aquiof the p u p t e s t . f e r , prcemably by hydraulic connection LL, Oabyoos Lake, Analysis of the recovery data by the Theis Recovery uethod iadicrttee char the effect i v e aquifer transmissivity I s 00 the 6rder of 0.03 m2/, (200,000 U.5. gnl/day/faor) , The h i g h transmlosivity of the aquifer, combined wish excellent racharge w t e n t i a l , auggests that t h e aquifer i e capable o f sutttainiag high w e l l yfalds, Table 1 l l s t a the calculated a p e c i f h capacity of Well #5 aC three different discharge rates. The s w i f i c c a p a c i t y of the w l l in Mome 7 7 U-S. g a l l a n s / d n u c e / f o o t of draudova ( 1 6 ' 1 / 0 per metre draprdawn) and i9 i n s e n s i t i v e t o discharge rate in the discharge range of 600 to 1,200 U . S . gpm. This indicares the vel1 i s efficient tu this pumping range. From the Well 84 drillers l o g , it appeats Chat the cop Q f aquffcr i s at eone 50 foot depth. S t a t i c czater lev61 in Well 8 5 , with Well #4 pumpi n g , l e 11 f e e t . T ~ Q dZtawdaoTIl measured a t 1224 U.S. g p s me 15.8 f e a t , or mrne 402 of available drawdown PO top af aquifer. We t$efare judge that the safe y i e l d of Well CS 1s a t l a s t 1200 VIS. gm, and is likely a8 high as 1500 U.S. gpm. Dac. I 1 '92 113:17 TRU Sepcanbar, 1986 P. TEL 604-~a-0717 ENGINEERING 862-1096 2 3xBL.K L 6 74 LO22 1224 8.9 13.1 1s.a 76.1 18.3 n.4 Keasurmenta duridik the p m p tart t 4 l c a t e that interfareme from 14 added some 246 feet of draRLom ln ikll 15, Jl& *-tiyaned U S = charge QP Veil 84 i s 600 U.S. gp&b It csp therefore be.&ptckmd that intarferenca from Well b5 w i l l lover tbt IWI: level in Well #4 by aama 4 . 3 feet a t a pumping rate of 1006 a d by 6.4 feet a t (L pumpi n g rate o f 1500 U.S. gpmb Well The water level in Well Pb e h o d d be measured duriug pumpiag LO determine if this l e v e l o f vel1 interfez-e will maintain a safe submergence depch for the pump. We judge thac the aquifer hag t d f l t l s n & potenrial far developing anather 1000 U.S. 8pu1 well i n t h i s vfcluity- Bowwet, ouch 8 well locat e d , say, . 9 t o . 10 metres from the t w o alst.frrg mlLs would add another 4 t a 6 feet of interference t o the mUtLng u e l l a . If the radiue of influence of such a vel1 in this aquifer i s assumed to be 306 t o 1000 feet, the Thcim equation for s C e d p s t a t e dtawdowu predicts t h a t increasing the well epacfng t o 30 mettea (100 feet) w i l l decrease well incerfcrence t o some 1.5 t o 3 feet. 'ITSanalysis raquirer chat all assumptioas inherent in deriving the Their q u a t i a n are valid Par this aqui€er. We ttmt c h i s provides you with t h e information you require, Should you need aaythiag further, plea- do uot hesitate t o c a l l . Youra very truly, GDLDER ASSOCIATES B.D. Burnett Bpdtogealogit3t S/S'd,. 89P'ON . s 420 600 700 800 860 920 WEk-400rnm8 (16”) DEPTH TO TOP OF SCREEN - ‘osoYoos w 18.9m (62”) 3.0 4.0 5.0 7.0 8.0 ELAPSED PUMPING TIME (MINUTES) 6o 120 180 240 300 - --_ SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM 1986 , Prepared for Southern Okanagan Lands Irrigation District BY KALA GROUNDWATER CONSULTING LTD. September, 1986 ! W I C A U GROUNDWATER CONSULTING LTD. No. 208, 3407-39th AVenUe - Vernon, B.C. Telephone (604) 645-1720 - V1 T 3E3 September 19th, 1986 Southern Okanagan Lands Irrigation District Box 788, Oliver, B.C. VOH 1TO Attention: Mr. W.S. Ross Manager Dear Sirs: I Reference: ! ? SOLID System No. 8 - Groundwater Development Program We are pleased to submit our report outlining the results of the investigation recently undertaken to develop a groundwater supply for System No. 8 at Osoyoos. A summary of the pertinent information relating to the well and aquifer is included in Section 6 for your convenience. If you have any questions relating to the study, please feel free to contact our office. Yours very truly, CONSULTING LTD. Hydrogeologist LCT/ct Encl: TABLE OF CONTENTS Page ................ (i) . . . . . . . . . . . . . . . . . . . (ii) . . . . . . . . . . . . . . (iii) LETTER OF TRANSMITTAL TABLE OF CONTENTS LIST O F FIGURES AND TABLES . . . . . . . . . . . . . . 1 . . . . . . . . . . . . . . . 3 SECTION 1 INTRODUCTION SECTION 2 BACKGROUND SECTION 3 DESCRIPTION OF PRESENT PROGRAM Drilling And Well Completion Aquifer Testing . . . . . . . . 3.1 3.2 SECTION 4 4.1 4.2 SECTION 5 5.1 5.2 ..... . . . . . . . . . . . 4 4 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RESULTS O F PROGRAM Well Completion Aquifer Testing DISCUSSION OF RESULTS . . . . . . Projected Long Term Yield of Well and Aquifer . . Further Production From Aquifer . .... 7 7 8 10 . . . . . . . . 11 . . . . . 12 SECTION 6 CONCLUSIONS AND RECOMMENDATIONS APPENDIX A Aquifer Test Data APPENDIX B Sieve Analyses APPENDIX C Driller's Reports APPENDIX D Preliminary Report on Exploratory Drilling 10 - Osoyoos ' P (ii) F F F F. i F. SECTION 1 INTRODUCTION The present program was undertaken at the request of the Southern Okanagan Lands Irrigation District (SOLID), to develop a source of groundwater supply for System No. 8. Water from this system supplies the area immediately north of Osoyoos. .The present study was carried out following a preliminary exploratory test drilling program completed in early December, 1955. Results of the test drilling indicated favourable prospects for groundwater development. At present, System No. 8 is supplied by surface water obtained from Osoyoos Lake. During certain times of the year, concentrations of algae increase in the water supply, and consequently minor problems occur with respect to treatment and taste. A s a result SOLID management has decided to investigate the local groundwater resources. The present investigation has involved the construction of a 10inch test/production well, followed by an extensive program of aquifer testing. The extended tests were conducted to: 1) insure that dewatering of the aquifer will not occur with long- term production from the aquifer. 2) monitor changes in water quality, and in particular nitrate concentrations, during continuous pumping conditions. During the aquifer testing program, water levels in Osoyoos Lake were dropping, due to decreased inflows into the Lake. While this provided some complications regardinq pump test interpretation, it also provided evidence of a hydraulic connection between Osoyoos Lake and the aquifer. - 1 - The following report outlines the nature of the present investigation, provides a discussion of the results and includes recommendations for .further groundwater development. Detailed information includinq pumping test measurements, sieve analyses and the driller's report is attached to the Appendix. * . In addition to the 10-inch test/production well, a test/observation well was also drilled following completion of.the aquifer testing program. Although a detailed discussion of this well is not provided in the report, further reference is made in Section 5. - 2 - w SECTION 2 BACKGROUND The property selected for groundwater development during the present program, is located along an abandoned spur of the Canadian Pacific Railway, immediately north of the town of Osoyoos (see Figure 1). This propoerty is situated immediately west of a small bay on Osoyoos Lake, which at one time extended beyond the CPR right-of-way. With the construction of the Canadian Pacific Railway, a closed depression has been created, which presently contains a small slough. The surficial deposits comprising the general area, consist of sand and gravel of glacial outwash origin, overlying a thick sequence ’of lacustrine silt and clay. The outwash gravel is fairly extensive and consequently there is no problem in finding a permeable waterbearing zone at Osoyoos. The main difficulty is locating a site where the granular deposits have enough saturated thickness to complete a high capacity water well. In order to locate a site offering favourable prospects for groundwater development, a series of testholes were drilled in early December, 1985 ( a copy of the report is attached to the Appendix). A s a result of the exploratory drilling the present site was selected. With respect to groundwater development at this location, two potential problems were identified, namely: c 1) Following the installation of well screens in only 25 feet of saturated material, the amount of available drawdown in a production well will be limited. For the project to be successful the aquifer must be extremely permeable and have a reliable source of recharge. 2) Because the sand and gravel deposits extend to surface (i.e. have no protective clay layer), and considering the number of orchards in the area which use chemical sprays and fertilizer, water quality may be a probl’em. - 3 - With these factors in view, a program of well completion, aquifer testing and water quality monitoring was recommended to SOLID, and following their approval, initiated in August, 1986. - 4 - SECTION 3 3.1 DESCRIPTION OF PRESENT PROGRAM Drilling and Well Completion All of the drilling and pump testing services under the present program were carried out by Pacific Pump & Pressure Installations Ltd. of Castlegar, B.C. The owner, Walter Koftinoff arrived on site August 5, 1986, and drilling commenced that afternoon. The 10-inch test/production well was drilled by the cable tool method, using a 71 Speedstar drill. Once the water table was encountered at approximately 2 0 feet (6.1 metres), the material was loose enough, to allow advancement of the.10-inch casing by bailing and driving. Samples of the water-bearing material were obtained at 2-foot (0.6 metre) intervals and sieve analysis performed by Kala Groundwater Consulting Ltd. These analyses formed the basis for screen size selection. Results of the sieve analyses are included in the Appendix. The drilling phase was completed on the 6th of August. The screens were ordered and Walter Koftinoff returned on the 13th of August to set the screens and develop the well. Initially, development was carried out by surging with a solid surge block. Once the amount of sand entering the screen decreased, a one-way surge was attached, and the final development was carried out by surging and pumping with a contractors pump. 3.2 Aauifer Testinu Following completion of the ten-inch well, an extensive program of aquifer testing was conducted.. The program included a preliminary step-drawdown test, followed by three constant rate tests. A brief outline of the testing program is as follows: - 5 - Test Designation Date Test Started Step Drawdown Constant Rate 1 Constant Rate 2 Constant Rate 3 August August August August 15 15 21 23 Pumping Rate USgpm Recovery Interva1 30 min. 30 min. 3000 min. 4200 min. 403 1440 min. 40 min. 750 5520 min. 10080 min. 302,602, ti 703 650 . Pumping Interva1 During the testing program, a 31-foot ( 9 . 4 metre) domestic well, located 88 feet (26.8 metres) from the new production well, was used for observation purposes. This well was contructed with cement cribbing. Also, some occassional measurements were obtained during Test No. 3, from a utility well supplying a condominium complex, located north of the new production well. ' A l l of the wells used during the present program, are shown in Figure 2 . * previously noted, the water level in Osoyoos Lake was dropping during the testing program, due to decreased flows into the lake. The drop in lake level is illustrated in Figure 3 . As - 6 - PLAN I- . .. .- . . . . . . . . . ,. .... . 65 . i . -. . . ! . . . . .I - . . ! . -__ ..... i . . . . .. 1 ! ._ .. . .... i . . ... ! _.. . . . . . _. _. . - ! I . . . -.. ,- .. - . ~... ... I I ..-. .- . . . ....... I . . . ;L .. ' . . . I . . ., - ....... . I . . . . .... _.... . . ! . . . . . . ! I . i . 2 I I I , I . - AUGUST 8 ~ i I , -4 - - ;, i . . . 1 : ; . . ! FIGURE 3 LAKE LEVEL FLUCTUATION OSOYOOS LAKE ' I . 1 . i ........... i , . - / 1 . I ; ; . j . . ~. . . . . . . . . . .. . . t .... SEPT. -. , . W SECTION 4 4.1 RESULTS OF PROGRAM Well Completion At the site of the new ten-inch well, the lacustrine silt and clay interface was encountered at a depth of 44 feet (13.4 metres) below surface. The ten-inch casing was taken an additional 3 feet (0.9 metres) into the silt and clay material, and drilling was terminated at 47 feet (14.3 metres) below surface. The water-bearing glacial outwash material overlying the lacustrine deposits consisted for.the most part of coarse, well rounded gravel with some coarse sand, which was fairly angular. A sandier interval was encountered from 34 to 38 feet (10.6 to 1 1 . 6 metres). The water table, at the time of drilling, was encountered at 18.8 feet (5.73 metres) below surface. Based on the results of the sieve analyses, a screen assembly was selected and installed as follows: Depth Interval Description 33.5 33.7 - 33.7 ft. (10.2 38.9 ft. (10.3 - 10.3 m) 11.9 m) 38.9 - 44.0 ft. (11.9 - 13.4 m) 44.0 - 47.0 ft. (13.4 - 14.3 m) Figure "K" packer 10-inch telescopic, #150 slot (150 thousandths of an inch) size Johnson stainless steel screen. 10-inch telescopic, 11200 slot, Johnson's stainless steel screen. 8-inch casing size, steel, blank section. The blank section was installed at the bottom of the screen assembly to allow utilization of all the available drawdown. This can be accomplished by attaching a tail pipe to the base of the pump bowl assembly. A well diagram is shown in Figure 4 . - 7 - -- 1.0 ft 0.3 II Ground Leve1 / 10-inch steel, welded joint casing ! i 33.5 ft. (10.2 m) Water level (Aug. 7, 1986) (5.73 m) below s u r f a / 18.8 ft 33.8 ft. (10. 44.0 ft. (13.4 m) I 47.0 ft. (14.3 m) L Figure "K" packer /Johnson's 10-inch telescopic, 11150 slo stainless steel sc 10-inch telescopic, #200 slo / Johnson's stainless steel /blank 8-inch casing size, steel section L Solid plate FIGURE 4 WELL COMPLETION DIAGRAM sc 4.2 Aquifer Testing .. The aquifer testing program was initiated with a preliminary step drawdown test to determine the efficiency of the new well. Results of the step drawdown test are briefly summarized as follows: Step No. 1 2 3 I Pumping Rate (USqpm) 302 602 703 Drawdown after.10 min. 2.6 feet 5.2 feet 6.3 feet Specific Capacity USgpm/foot of drawdown 116 USgpm/ft 116 USgpm/ft 112 USgpm/ft Based on these results, the specific capacity of the well, which is the quantity of water obtained from the well per unit of drawdown, is 116 USgpm /foot, up to 600 USgpm. Beyond this pumping rate, the specific capacity begins to drop a small amount. The relative consistency in specific capacity, with increasingly higher pumping rates indicates that the well is fairly efficient. The second phase of the aquifer testing program, involved a series of constant rate tests, to establish the hydraulic parameters of the aquifer. Because of the limited available drawdown in the well, it was important to establish steady-state conditions, where the quantity of water withdrawn from the well is balanced by the rate of recharge to the aquifer. For this reason, a total of three tests were conducted. A summary of the test results is included in Table 1. shown in Table 1, the coefficient of transmissivity varied somewhat, depending on the pumping rate, the length of test, and the type of observation. In our opinion, this variation is due mainly, to the drop in lake levels during the testing program. Because the test data is analysed on log graphs, the effect would be most noticeable during the longer pumping tests. As - 8 - TABLE NO. 1 SUMMARY OF AQUIFER TEST RESULTS HYDRAULIC PARAMETER Aquifer Test Number No. 1 Well Designation and Status Pumping rate USgpm Pumping Drop in lake Interval level during Minutes pumping int. Transmissivity Storage Drawdown at Method end of test of Coefficient Coefficient metres feet Analyses USgal/day/ft 650 3000 2.485 8.15 Dug Well (Observ. 0.65 Dug Well (Observ.) 0.65 New Well (Pumping) 0.02 metres 1.37 x 10 2.13 2.13 Theis 1.16 x 10 Mod. Jacob 1.37 x 105 New Well (Recovery) No. 2 1.18 x 105 1.46 4.79 Mod. Jacob 1.7 0.34 1.11 Mod. Jacob 1.46 x 105 2.99 9.8 Mod. Jacob 1.40 x 105 Dug Well (Observ.) 0.91 2.98 Mod. Jacob 1.28 x 105 Dug Well (Observe) 0.91 2.98 Theis 1.56 x 10 1.51 x 105 New well (Pumping) 403 1440 0.01 metres Dug Well (Observ.) No. 3 5 Mod. Jacob Mod. Jacob New Well (Pumping) New Well (Recovery) 7 50 5520 Q . 10 metres Mod. Jacob 3.8 x 10-1 x 105 1.4 x #-’ During Test No.. 3, steady-state conditions (i.e. no further drawdown in the aquifer) began to occur after approximately 4000 minutes of pumping. However? the lake level was also dropping fairly rapidly at this stage (see Figure 3 1 , and consequenlty a further drop in the pumping level was observed. The recovery data obtained during Test No. 3 , provides a fairly good indication that there is a hydraulic connection between the lake and the aquifer under present discussion. Recovery in the well, reached a peak on August 31, 1986, and the most recent data s h o w s that the water level in the well has been dropping at approximately the same rate as the lake level. Taking all factors into consideration, we have used a transmissivity coefficient of 1.50 x l o 5 USgalIdaylfoot, ,and a storage coefficient of 1.4 x lo-' for purposes of projecting a safe yield of the well and aquifer. This is discussed in Section 5 of the report. During the aquifer testing program, the nitrate concentration in the water samples rose from 5 . 4 to 7.3 PPM and appeared to stabilize at the higher concentrations. It is recommended that the nitrate levels be monitored during extended pumping from the aquifer. i - 9 - SECTION 5 5.1 DISCUSSION OF RESULTS Projected Lonq Term Yield of Well and Aquifer Based on the results of the present program, a projected long-term, safe yield for the new ten-inch well is 575 USgpm. Further, by drilling a second well, at a distance of between 4 0 0 and 500 feet (122 and 152 metres) from Well No. 1, production from the aquifer can be increased to 1000 USgpm. These projections are based on the following assumptions: 1) Groundwater production from the new well (wells) will be carried out for up to seven months per year on a continuous basis. 2) The water level in Osoyoos Lake will be maintained at approximate1 911 feet (277.6 metres). These safe yield projections have also been made assuming that steadystate conditions will not occur in the aquifer, but that there is a hydraulic connection between the lake and the glacial aquifer under present discussion. In other words, it is our opinion that Osoyoos Lake is a main source of recharge to the aquifer. If in fact, steady state conditions do occur with extended pumping, it may be possible to increase our projected safe yields. Our safe yield projections have taken into account the following: 1) Initial drawdown after 10 minutes (specific capacity of well) 2) Drawdown in aquifer per log cycle (see Appendix) 3 ) Drawdown interference from additional wells (see Figure 5) - 10 - .. 1. c, i- . I -. . . . . . . . . . . . . . . - ............ .. - Le-_* 0.0 a, a, W c -d a, u c 'a, k a, W & /.0 .. . . : . ; . I I . . . . . . . . . a, c, c !-I . E a %k 0 . _- . _- - . __ - _I.-. -- 8 P r o j e c t e d drawdown i n t e r f e r e n c e i n a q u i f e r a f t e r seven months c o n t i n u o u s pumping from W e l l N o . a a a, 1 c, U a, e n 0 k PC / D i s t a n c e From Well N o . 1 in f e e t FIGURE 5 PROJECTED DRAWDWON INTERFERENCE FROM WELL NO. 1 5.2 Further Production From Aquifer As noted in Section 5.1, production from the aquifer can be increased by utilizing a second well. During the present program, a 10-inch testhole was drilled on the north branch of the abandoned CPR spur. This testhole was drilled to be used as an observation well during production from Well No. 1, and also with the option of completing as a future production well. Based on the results of the preserit program, we would recommend that in completing the second well, a shorter screen assembly be utilized, with a larger slot size. This will allow more available drawdown in the well. From a visual inspection of the samples obtained at the second location, a #250 slot ( 2 5 0 thousandths of an inch slot opennings) size screen could be used in the well design. Once the second well has been completed and tested, pumping rates for the two wells can be recommended. If the second well is as efficient as Well No. 1, then a possible pumping rate schedule may be 475 USgpm from Well No. 1, and 525 USgpm from Well No. 2 . - 11 - W SECTION 6 'I) CONCLUSIONS AND RECOMMENDATIONS During the present investigation, a ten-inch test/production well has been completed, and an extensive program of aquifer testing carried out. Results of the investigation have provided the following conclusions with respect to the new well and aquifer: 1 ) The new well is completed to a depth of 4 7 feet (14.3 metres) in a shallow glacial outwash aquifer, which occurs along the west side of Osoyoos Lake (see well completion diagram-Figure 4) 2) The new well has a specific capacity of 116 USgpm/foot of draw- down, and the aquifer has a coefficient of transmissivity of 1.5 x l o 5 US gallons/day/foot, and a 'storage coefficient of 1.4 x 10-1 (see Section 4.2). 3) There is good evidence that there is a hydraulic connection between Osoyoos Lake and the shallow aquifer, and reasonable evidence that steady-state conditions (balance between production from the well and recharge to the aquifer) will occur with exitended pumping (see Section 4.2) . 4) Based on the aquifer test results, and assuming that steadystate conditions will not occur, the new well has a long-term projected yield of 575 USgpm. By utilizing a second well, production from the aquifer can be increased to 1000 USgpm. 5 ) Nitrate levels in water samples obtained during the testing program, rose from 5.4 to 7.3 PPM, but appeared to stabilize at the 7 PPM range. During the aquifer testing program, water levels in Osoyoos Lake were dropping fairly rapidly, which created some complications with respect to the interpretation of aquifer test data. For this reason - 12 - we would recommend the following program of water level and water quality monitoring: 1) Measure the water level in the new well and obtain lake level data, on a weekly basis during the next few months. 2) i :J Once the new well is put into proauction, measure water levels in the pumping'well and new observation well, on a daily basis for one month, and a weekly basis for the remaining production period. 3 ) Monitor nitrate levels in the well water on a monthly basis. With respect to pump setting, we would recommend that the base of the bowl assembly be s e t as close to the t o p of the screen as possiblr or t h a t a tail pipe be added to the pump bowls. - 13 - 1 APPENDIX A Aquifer Test Data SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM NEW WELL STEP DRAWDOWN TEST Pre-test water level: 6.05 m (19.85 ft.) Reference point: top of c s c Date of test: Aug. 15th, 1986 Time test started: 3:OO PM Ht. of casing: 0.3 m (1.00 above grour PUMPING INTERVAL Time (t) since pumping started in minutes Depth to water (metres) Drawdown in metres Comments Step No. 1 1 6.615 0.565 2 6.84 3 4 6.79 0.79 0.74 6.83 6.84 0.78 0.79 6.85 6.85 0.80 0.80 1 7.55 Pumping rate: 6 0 2 USgpm 2 7.635 7 ..61 7,615 7.63 7.64 7.65 1.50 1.585 1.56 1.565 1.58 1.59 1.60 1 2 7.91 7.92 1.86 1.87 Pumping rate: 703 USgpm 3 4 7.92 7.93 1.87 1.88 6 7.94 7.96 1.89 6 8 10 . Pumping rate: 302 USgpm Step No. 2 3 4 6 8 10 Step No. 3 8 1.91 I 1 r a U n m I t N SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM NEW WELL (CONSTANT RATE TEST NO. 1) PUMPING WELL Pre-test water level: 6.06 m Date of test: Aug. 15th, 1986 Time test started: 4:OO Pm Reference Point: top of casing Ht. of casing: 0.3 m (1.00 ft) above ground PUMPING INTERVAL Time (t) since pumping started in minutes Depth to water (metres) Drawdown in metres 1 2 7.81 7.82 3 7.82 7.82 7.85 7.84 7.85 1.75 1.76 1.76 1.76 1.79 1.78 1.79 7.86 7.875 7.885 7.905 7.92 7.935 1.80 1.815 1.825 1.845 1.86 1.875 7.955 7.97 7.99 8.015 8.035 8.06 8.085 8.12 1.895 1.91 1.93 1.955 1.975 2.00 2.025 2.06 8.15 8.18 2.09 2.12 4 6 8 10 13 16 20 25 32 40 50 64 80 100 120 150 190 240 300 380 Comments Pumping rate: 650 USgpm . Cont'd Following Page c w S O L I D SYSTEM NO. 8, Constant Rate Test (New Well) Cont'd PUMPING INTERVAL CONT'D Time (t) since pumping started in minutes Depth to water (metres) Drawdown in metres 600 780 8.21 8.25 8.29 2.15 2 :19 2.23 960 8.33 2.27 1200 1440 8.36 2.30 2.33 1680 8.39 8.425 1920 8.45 2.365 2.39 2160 2400 2580 8.45 8.48 2.39 2.42 8.49 2.43 2880 8.545 2.485 480 Comments Pumping rate: 650 USgpm ' Increase pumping rate slightly 2 6 4 8 2 4 6 0 , ...I. j 2 6 4 2 8 0.0 /. 0 , . . . . . . . . . . . . . . . . ., . . . . . . . . . - ...1 - ........+...:. . . . . . . . . . . . . . . . . . O . . . O . . . . ( - 2.0 _.-.. . . I . . .. . . . . .:. . ; : I": .,..!.. , a ~ ! ........ ' . . . . . . . , . , . . . . . . . ._ - . .. . . . . . . -...-.. -. ,...... ......... ~ .;.. . . I . . . I . . . ...( 0. . m-. ' I 1 ' ' . . . . .... , i ! . . I . , ._ . . . . . . ,. . , . . . . . . . . ~ I . Time (t) in minutes Well NO. (Status) : New well .(pumping) Dote : Aug. 15th, 1986 Discharge ( Q 1 : 65 0 Usgpm Aquifer Test : Constant Rate No. 1 Reference Point : TOP of casing Pre-test Water Level : 6. 0 6 metres Remarks : 0.3 m above surface \ + \ \ u u . . o u ~ ~ * u m c o ~ u ~ ~ * o ~ m SOLID SYSTEM #8 rrn GROUNDWATER DEVELOPMENT PROGRAM CONSTANT RATE TEST NO. 1 -ILL. _.I. --I," C ~ C A .. . . -. . . . . . . - . . . . _. I . I . . . . . . I.. . . : ........., . ... . .: .... ....i . /io3 ,. . ._ ,.-. ..: - ._,.. , . ! , I I... . . . --a- . . . . . . .I . . ' n s = 0.38 . -0.-* .. . . . . t ..! ! ./ . . . . . . . . . . . . .,.., . . . . . . . . . . . . : , . . ., , I : .! . 1.. .... -- .... _, - -.- _ . - - /-. . . . . . , . .I . . . . . . . .-. . . . . . . . . . . . . . 4 .. ' ..,-.. , , .. , . ; ; ._.... -*-a- : . I ...!. ..:. . . . .i . ;....j ..,,.._... . , ..,. .. , . . . . . . . . . . . . . . . .. . .. ; . .I . . . 1 _; . , . . ,...I..... . < ...I ... - . ...__ .. ,.__i . ....i. ...:._.I. , -__. c-. -_ .I.. . I ....,... ! . . . 1 . . . . . . . . . .I. . . . . . . . . . : .: ..........., . . ...... . . . . . . . . . . ; ...] . . . f . . i . I................. . - .. ._..... .__..._ . . : . . .................... i ........ . I. . . , : , . . . . . :...,. ........... ..... ......... . . . . . . . . ,. . . . ,, . . . . . . I . , . . . . . . . . ~ i :.. .j... I ! ~ .................... - __ . ~ . . . . . . . . . . . . . . . .- .............. . . . . ! , . , I . . I 0 ..i /...I I . . . . . . , . ,. . . .1 ..i . . . . . . . ! .. . . --i ..... . - .................... I -1 .... . . . . . . . . . ;..!...i .... . . . . . . I . .....I : 3 1 . !...I 1. . . . . . I , . . . . . . . . . . . . . . .I .... :....I ,_....!I ...!, i . . . . ., . ! I, . . ., : ..! ! 1 . ' . . . . . i I .-. .- ..- ..__/ . . . . I . ; ._., ._.._., , a : . ,! .. . . I .:.I .j I . .. :,..(...:. . .- w W SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM NEW WELL (CONSTANT RATE TEST NO. 1) DUG WELL (Observation) Pre-test water level: 25.08 feet Date of test: Aug. 15th, 1986 Time test started: 4:OO PM Depth of well: 31 feet Reference point: top of cribbing Ht. of cribbing: ground level r = 88 feet PUMPING INTERVAL Time (t) since pumping started in minutes Depth to water in feet* Drawdown in in feet 25.08 25.125 25.125 0.045 25.17 0.09 8 10 13 16 20 25 32 40 50 64 80 100 120 150 25.17 25.17 25.21 25.21 25.21 25.23 25.25 25.27 25.30 25.33 25.40 25.43 25.50 25.55 25.625 0.09 0.09 0.13 0.13 0.13 0.15 0.17 0.19 0.22 0.25 0.32 0.35 0.42 0.47 0.545 190 240 25.71 25.79 0.63 0.71 300 25.89 380 26.00 0.81 0.92 0.00 0.045 Cont'd Comments Pumping rate in new well - 650 USgpm SOLID SYSTEM NO. 8, Constant Rate Test No. 1, Dug well (Observ.) PUMPING INTERVAL CONT'D Depth to water in feet* Drawdown in in feet 480 26.11 600 26.21 1 :03 1.13 780 960 26.375 26.46 1200 26.625 1.38 1.545 1440 26.71 1.63 1680 1920 2160 2400 2580 26.875 26.96 27.00 27.10 1.795 1.88 1.92 2.02 27.125 2.045 2880 3000 27.19 27.21 2.11 2.13 Time (t) since pumping started in minutes Comments 1.295 Pumping rate: 650 USgpm . L, a, cu . . . . . . . u-c c . .rl . . . . . . . . . , . , . . . c . . .#.. . . . . . . . . . . . . , . . . . . . . . . . . . . . . ,..... . . . . .-. . - .- .--. . . - - ..-. .. .I a . . . . - % . . i -1 !4 a . . . . ., . . . . . . . .!.. '00 Well No. ( S t a t u s ) Aquifer Test Pre-test : Water : T i m e (t) i n m i n u t e s D u g w e l l ( o b s e r v . ) Dote : A u g . Constant R a t e No. Level : 25. 08 f e e t 1 Discharge ( Q 1 Reference Point Remorkr : . M U - W ~ C Q V W L M ~ * I ~ L ~ In.--. L.- a < .*no ---*m S O L I D SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM CONSTANT RATE TEST NO. 1 1 5 t h , 1986 650 usgprn :top of cribbing ground l e v e l - . I 2 3 4 3 I 6 7 ~ 2 1 7 4 5 6 t u 9 I 2 3 4 5 6 7 4 9 ' 2 3 4 5 6 7 U 9 I 2 3 1 5 - .'r('#I ~ I I 9 9 8 n 7 7 6 6 S 5 4 4 3 3 2 . . . . . . I . . . . . . . , - .. . : , . . . .. . I 9 8 7 6 5 4 4 2 0.1 9 8 7 6 5 4 3 2 .o I c SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM NEW WELL (CONSTANT RATE TEST NO. 1) RECOVERY Date test started: Auq. 17th, 1986 Time test started: 6:OO PM RECOVERY INTERVAL Time (t') since pumping stopped in minutes 1 T Date Aug 17 Time 6:OOPM 2 3001 1501 1001 751 501 376 3 4 6 8 10 13 16 20 25 32 40 50 64 80 120 180 240 300 840 1080 1320 1560 2280 2520 $. T' T' 301 232 189 151 121 95 76 61 48 38.5 26 18 13.5 11 Aug 18 Aug 19 8:OOAM 12:OO N 4 :OOPM 8: OOPM 4.6 3.8 3.3 2.9 8:OOAM 12:OO N 2.3 2.2 Residual Drawdown Pumping Well Dug Well in metres feet* 0.79 0.78 0.77 2.13 2.12 2.10 0.765 0.745 2.09 2.07 2.045 2.02 0.73 0.715 0.705 0.68 0.66 0.64 0.62 0.60 0.58 0.555 0.53 0.49 0.44 1.98 1.94 1.92 1.88 1.84 1.795 ---- 0.20 0.17 0.14 1.67 1.61 1.50 1.38 1.23 1.14 0.68 0.61 0.48 0.40 0.21 0.10 0.13 0.40 0.375 0.245 0.22 Cont'd Following Page w W SOLID SYSTEM NO. 8, CONSTANT RATE TEST NO. 1, RECOVERY RECOVERY INTERVAL CONT'D 9ime (t') since pumping stopped in minutes 2760 1+ bate Aug 19 3000 3720 4200 Aug 20 T' Residual Drawdown Pumping Well Dug Well in metres Feet +ime T' 4:OOPM 2.1 0.08 0.09 8: OOPM 2.0 0.07 8:OOAM 1.8 1.7 0.05 0.04 0.08 0.08 4 :OOPM 0.05 2 4 6 0 2 6 4 2 8 I 6 4 . . . . . . ! . , . . - . . ...* . . . I t . . . . .. .. - .. -.. .. . I .,. , . . ..... . . . . a a . . . . . . . . . . . . . . . . . . . _. . . . . . . . . . . . . , .... . ,..,, . . . . . . . . . . , . . . . . ..; . . . . . . . , , . . I . , . . . . . ,. . . . . . . . . , . . . . 1 , . . . . a , . ; . . . . . . . . . . . ,. . . . . ........... . , . . . . . . . . . . - Q , ...... . . . . . . - .-. . . .. __ . . . :...a , ..,. , .... . . . . . .; ..... . ~ I . . . . . . . . . . . . . . . . . ......... ...... .... ._.. - - ....... .. ... : . . . . . . . . . . . . . . .... . : . .~. . . "6.. e . , I 0 , . . . . . . . . . . . . , . . /o0 0 Dote: Aquifer Test :No. 1 (Recovery) Pre-test Woter level : 17th, 1 9 8 6 AUg. Discharge ( Q ): Reference Point : Top of casinq 0.3 m above surface SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM CONSTANT RATE TEST NO. 1 (RECOVERY) . _ _ _ _ ___ . ._ . . . . 0 .' ._ . __ . . . . . . . . .. , Time (t') in minutes .. . . . . .._. .. ...I..._ . . . . . . .............................. )...I 2 8 U Qlw SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM NEW WELL (CONSTANT RATE TEST NO. 2) PUMPING WELL Pre-test water level: 6.10 metres Reference point: top of casing Date of test: Aug. 21st, 1986 Time test started: 11:OO AM Ht. of casing: 0.3 m (1.00 ft) above ground PUMPING INTERVAL Time (t) since pumping started in minutes Depth to water (metres) Drawdown in metres 1 2 3 4 6 8 7.51 7.19 7.185 7.20 7.20 1.41 1.09 1.09 1.085 1.10 1.10 7.21 7.225 7.24 7.26 7.285 1.11 1.125 1.14 1.16 1.185 7.285 7.22 1.185 1.12 1.195 1.21 1.215 1.23 1.255 10 13 16 20 25 32 40 50 64 80 100 120 150 190 240 300 380 480 7.19 7.295 7.31 7.315 7.33 7.355 7.37 7.39 7.40 7.425 7.44 7.445 Comments Pumping rate: 403 -USgpm ' Decrease pumping rate slightly 1.27 1.29 1.30 1.325 1.34 1.345 Increase pumping rate slightly Cont 'd Following Page w w SOLID SYSTEM NO. 8, CONSTANT RATE TEST NO. 2, PUMPING WELL PUMPING INTERVAL CONT'D Time (t) since pumping started in minutes ! i Depth to water (metres ) 600 7.50 780 960 7.505 7.52 7.54 1200 1440 Drawdown in metres 1.40 1,405 1.42 7.56 1.44 1.46 1 6.52 1.42 2 6.51 6.50 6.49 6.48 6.46 1.41 1.40 1.39 1.38 6.44 6.42 6.395 1.34 1.32 RECOVERY INTERVAL 3 4 6 10 16 25 40 1.36 1.295 Comments Pumping rate: 403 USgpr ~ 2 6 4 8 2 L-. 2 4 4 2 . . . _I . .. .I. ""!' ..... ....,. ...... . .s -:& Time (t) in metres Well No. (Status) Aquif8r Test : Pre-test Water A/. -==eF=\' ~ n n ~ 11u.I-- .. e. u -* m . I . . , - Remarks t m . : New well (pumping) Constant rate No. 2 level : 6 . 10 metres Dote : 21, 1 9 8 6 Aug. Discharge ( Q I Reference Point : SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM CONSTANT RATE TEST NO. 2 : : 4 03 USgpm Top of casing 0.3 m above surface V SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM NEW WELL (CONSTANT RATE TEST NO. 2) DUG WELL (Observation) Pre-test water level: 25.08 f e e t Reference p o i n t : t o p of c a s i n g o f c r i b b i n g : ground l e v e l D a t e o f t e s t : Aug. 21st, 1986 Ht. T i m e t e s t s t a r t e d : 11:OO AM r = 88 f e e t PUMPING INTERVAL Depth t o Drawdown water in i n feet* (feet) 1 25.08 0.00 2 25.08 25.08 0.00 25.08 0.00 6 25.08 8 10 13 16 25.08 0.00 0.00 20 25 32 40 50 64 80 100 120 153 25.15 25.21 25.21 25.23 25.25 25.30 25.35 25.375 25.42 25.48 190 240 25.54 25.58 0.50 300 25.65 0.57 380 25.71 0.63 Time (t) s i n c e pumping s t a r t e d i n minutes 3 4 25.08 25.11 25.125 Comments Pumping r a t e i n new w e 1 403 USgpm 0.00 0.00 0.03 0.045 0.07 0.13 0.13 0.15 0.17 0.22 0.27 0.295 0.34 0.40 0.46 C o n t ' d F o l l o w i n g Page SOLID SYSTEM NO. 8, CONSTANT RATE TEST NO. 2, DUG WELL (Observ.) PUMPING INTERVAL CONT'D Depth to water in feet* Drawdown in (feet) 480 25.79 0.71 600 25. a6 780 25.94 960 1200 26.02 26.10 26.19 0.78 0.86 0.94 1.02 1.11 Time (t) since pumping started in minutes 1440 i Comments - 2 6 4 2 8 6 4 2 8 2 4 . h . . . . ,. . . . . . . .. I I . , . . . . . . , , . ; . 8 , . . . . .A,. . . e..: ..... , ........... /o 0 .111" , . , , ---,a# . . . .I .i .; . . 4 .. LL-L-. -.c , Time (t) in minutes Well No. ( S t o t u r ) :Dug well (observ.) Dote : Aug. 21, 1986 ,Constant Rate NO. 2 Discharge ( a ) : 4 0 3 USgpm Pre-test Water l e v e l : 25-08 feet Reference Point : Top of cribbing ground level Remorks : SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM CONSTANT RATE TEST NO. 2 ._ . , . . , . . . . , . . . . . . . , I . . w w SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM NEW WELL (CONSTANT RATE TEST NO. 3) PUMPING WELL Pre-test water level: 6.15 metres Date test started: Aug. 23rd, 1986 Time test started: 2:OO PM Reference point: top of casing Ht. of casing: 0.3 m (1.00 ft) above ground PUMPING INTERVAL Depth to water (metres) Drawdown in metres 1 2 8.23 8.20 2.08 2.05 3 4 6 8 8.19 8.20 8.22 10 13 16 8.25 8.27 8.28 2.04 2.05 2.07 2.09 2.10 2.12 2.13 20 8.30 2.15 8.315 8.34 8.36 8.385 8.41 8.43 8.46 8.48 2.165 2.19 2.21 2.235 2.26 2.28 2.31 2.33 2.355 2.39 2.42 2.46 Time (t) since pumping started in minutes 8.24 25 32 40 50 64 80 100 120 150 190 240 300 380 8.505 8.54 8.57 8-61 8.645 8.68 8.72 2.57 750 8.57 2.60 960 8.86 2.71 480 600 Aug. 24 Comments Pumping rate: 750 USgpm . Increase pumping rate 2.495 2-53 Pumping rate high Decrease slightly w rrlrrp SOLID SYSTEM NO. 8, CONSTANT RATE TEST NO. 3, PUMPING WELL PUMPING INTERVAL CONT'D Depth to water (metres) Drawdown in metres 1200 1440 8.84 8.87 2.69 2 ..72 1680 8.895 2.745 1920 8.93 2.78 8-95 8.97 2.80 2-82 2.84 2.85 2.87 Time (t) since pumping started in minutes 2160 . Aug. 25 2400 2640 2880 3120 3360 3600 3840 4080 4320 4560 4800 5040 5280 5520 8.99 9.00 9.02 Aug. 26 9.08 2.89 2.905 2.92 2.93 2.93 9.09 9.11 9.12 2.94 2.96 2.97 9.135 9.14 2.985 2.99 9.04 9.055 9.07 9.08 Aug. 27 comments Pumping rate: 750 USgpm 2 2.0 s 4 o 2 2 2 3 5:o 2.6 Pia k 2.7 , 2.9 . . . . . . . . . . . . . . . . . . . . . . ,. ... , . . . . . . . . . ... . 1 . . I . . , ........... .1 ...... "'! . . . . New well (Pumping) Aauifor Toat :Constant Rate NO. 3 h - w Water i o v d : 6. 15 metres No. ( S t o t u a ) Remorka -.. . .yLu-.IcIIy.IIm . . -_-*... . . . . .' ' " ... . . . . . . . W.II ....... : I Doto : Diachorpo Rdoronc* Time (t) in minutes 23, 1986 [ Q ) I 750 USgPm Point : Top Of Casing 0.3 m above surface Aug. SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM CONSTANT RATE TEST NO. 3 2 4 SOLID SYSTEM NO. 8, CONSTANT RATE TEST NO. 3, DUG WELL (Observ.) PUMPING INTERVAL CONT'D Time (t) since pumping started in minutes 1680 1920 2160 Aug.25th 2400 2640 2880 3120 3600 Aug. 26th 3840 4020 4080 4320 4560 4800 5040 Aug. 27th 5280 5520 Depth to water (feet) Drawdown in feet* 2,37 2.48 2.58 2.67 2.73 2.81 2.89 2.90 2.94 2.97 2.99 3,Ol 3.05 3.125 3.125 3.17 3.19 2.16 2.27 2.37 2.46 2.52 2.60 2.68 2.69 2.73 2.76 2.78 2.80 2.84 2.915 2.915 2.96 2.98 Comments Pumping rate: 750 USgpm . . I I 2 3 .I 5 h 2 3 4 > . I -a:+' 2 3 4 5 h I ( 1 9 I 2 3 4 5 6 -.- * 8 9 l f d r Y X P 0 2 I I 9 2 J 4 5 6 1 8 9 I 2 I I 5 h I d , I 2 3 4 J - - * # I z 3 1 5 r , ? n 9 ' 3 1 5 6 ' 8 . I l W W SOLID SYSTEM NO. 8 GROUNDWATER DEVELOPMENT PROGRAM NEW WELL (CONSTANT RATE TEST NO. 3) RECOVERY Time test started: 1O:OO AM Date test started: Aug. 27th, 1986 RECOVERY INTERVAL ! Date Aug 27 Time Time (t') since pumping stopped in minutes 1O:OO AM T' Depth to water (metres) Residual Drawdown (metres) 7.20 1.05 2 3 4 2761 1841 7.20 1.05 1.035 6 1381 921 7.185 7.17 7.14 1.02 0.99 8 691 7.12 0.97 10 553 7.10 0.95 13 16 426 0.93 0.91 20 346 277 7.08 7.06 7.04 0.89 25 222 7.01 0.86 32 174 40 139 111 6.99, 6.96 0.84 0.81 6.935 6.90 6.875 6.845 0.785 0.75 0.725 0.695 6.77 6.72 0.62 6.69 0.54 380 4:OO PM T' 5521 300 8:OO AM 12:OO Noon + 1 50 64 80 100 170 240 Aug 28 T 87 70 56 33 24 0.57 19 15.5 12.5 6.65 0.50 6.615 0.465 480 1320 1560 5.2 6.445 0.295 4.5 6.415 0.265 1800 4.0 6.405 0.255 , Cont'd Following Page W APPENDIX B SIEVE ANALYSES , DEPTH: .3 0 ' 100 90 80 a w 73 z - a e W C 5 L W 50 0 K w 0 40 W L > so l- a J 20 IO 0 ... ,d S I E V E I9HRLYSIS PROJECT: dt? -r ' DEPTH: SIEVE OPENING IN THOUSANDTHS Of AN INCH 90 90 eo n W 70 70 -a L' t- W a co 60 so 50 iIJ V a w a. 49 43 W I -- I I I I - ., -> t 4 1 J I I) I 20 $20 3 V IO IO 16 8 NUMBER - 0 DEPTH: SIEVE ?9‘ OPENING IN THOUSANDTHS Of AN INCH IO0 90 90 90 2 83 80 -5 L - 70 c 60 J 70 9 3 0 r so &J L 50 J -D- a 40 J 3 30 2 30 3 J -2G 20 10 IO 0 0 -po1odcfo49 Y) 20 I6 SIE% . 8 N U M B ER 0 DEPTH: SIEVE 5% / OPENING IN THOUSANOTHS e OF AN INCH 4 N U M 8 ER SIEVE .J 50 OPENING IN THOUSANOTHS OF AN INCH : 3 ' 1 30 20 IO 0 IO 0 -- DEPTH; SIEVE . 3 F ' -- OPENItJG IN THOUSANDTHS Of AN NUMBER I ( ~ L ~ I 6 c DEPTH: +/ --' - DEPTH; -7-? / I SIEVE . ,. . HO OPENING . . . 16 IN . S I &E THOUSANDTHS OF AN INCH . io 8 N U M 8 ER 4 4 APPENDIX C Driller's R e p o r t s '.C 3 4Ad "WATER WHERE YOU WANT IT-WHEN YOLJ WANT IT" - ~ - Date Unit Driller -- WELL> - rubivb - GUMPLtTE PRESSUFE SYSTEMS -- IRRIGATION SYSTEMS A N D SUPPLIES - Unit D2?0 From Total Feet I REMARKS: To be signed by makor Drilla: LAJELLS - PgMPS - CGL’PLETE PRESSURE S Y S T E M S - IRR!GATiOM SYSTEMS AND SUPPLiES ”WATER WHERE YOU V J A N T IT-WIHEN P.O. Box 3297 Castlegar, B.C. Vltd 3i-16 YOU VJAbIT IT” Phone 355-5200 APPENDIX D ‘3 Prelimary Report on Exploratory Test Drilling - Osoyoos / / 1 / f 1 AXLA GROUNDWA TER CONSUL TING L TD. 8204 Tebo Drive Vernon, B.C. VlB lV3 Phone (6041 545- 1720 January 22nd, 1986 Southern Okanagan Lands Irrigation District Box 7 8 8 , Oliver, B.C. VOH 1TO Attention: Mr. W.S. Ross Manager Dear Sirs: Reference: .'> Exploratory Test Drilling Program - Oliver and osoyoos The following is to outline the results of the test drilling program which was carried out at O s o y o o s and Oliver in early December, 1985. The purpose of the investigation, was to determine the potential for groundwater development, at locations where a source of groundwater supply would prove beneficial to S.O.L.I.D., at this stage in their overall water distrubution plans. All of the drilling was carried out by Northspan Explorations Ltd. of Kelowna, B.C., using a Mobile Drill, equipped to drill by the reverse circulation method. With this technique, doublewalled drill stem is utilized, injecting air to return the drill cuttings to surface. The drill stem serves as casing as the drilling proceeds, providing representative soil samples, and allowing a fairly good indication of groundwater occurrence. Results of the program are briefly described as follows: Cont'd . ./2 r of ing re lete :he IO. 1 IO. 4, II to 0 et - 3 - in a production well will be limited. 2) Because the sand and gravel deposits extend to surface, ( i . e . no protective clay layer), and considering the number of orchards in the area which use chemical sprays and fertilizer, water quality may become a problem at this site. In order to answer these questions relating to well yield and water quality, we would recommend that a test well be drilled at the " Y " Site. T o partially overcome the problem of available drawdown, a blank section could be attached to the bottom of the I . ps screen assembly, which will allow for the installation of a pump intake below the screens. Upon completion of the test well, a 24-hour pumping test should be conducted and water samples obtained for chemical analyses. Results of the test will provide the necessary parameters to design a well system, and the chemical analyses will answer the question reqarding water quality. If an adequate supply of water cannot be obtained from the test/production well, because of the limited available drawdown, it may be necessary to utilize amulti-welldesign, involving two or more wells. It may also be worth considering the construction of a horizontal collector system, similar to the well at Prince George, or artificial recharge to the aquifer by pumping from the Lake. With respect to the initial phase, it is recommended that a 10-inch diameter test well be considered. This will provide sufficient allowance for the pump intake to be set below the screen assembly, if this becomes necessary. A n estimate of costs to drill and complete a 10-inch test/production well is outlined as follows: Cont'd . ./4 Bd - 4 Mobilization and demobilization . . . . . . $ 500.00 Drill and drive 10-inch casing 65 feet x $50.00Jft 3250.00 Supply well screen 15 feet x $222.00/ft 3330.00 Supply blank section 1 0 feet x $45.00/ft 450.00 Install screen assembly and develop well 4 0 hours x $70.00/hr . . . . . . . . . . 2800.00 Total $10330.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Adding in the costs for pump testing and consulting, the initial phase will range between $15,000.00 and $16,000.00. 2) Oliver -3 At Oliver, an 83-foot testhole was drilled towards the south end of town, west of Highway 9 7 and the Oliver Airport. The hole was drilled in the northeast corner of L o t ~ L Yui1 - , _ _ Posnikoff property (see Figure 2). The subsurface materials encountered at this location, consisted of sand and gravel to 8 0 feet, unerlain by s i l t . with respect t o texture, the sand and gravel was medium to coarse in size, and the gravel was fairly well rounded. Upon completion, the water level in the testhole was 20 feet below surface. Based on the preliminary test results, it is our opinion that the prospects for qroundwater development at this location are excellent. The granular deposits are permeable and there is at least 60 feet of saturated thickness. We feel that a properly designed well at this site, should produce between 500 and 1000 USgpm. Cont'd . ./5 c W - 5 - The next stage, will be to establish the yield requirements at this location. Providing these requirements are not excessivly high , the completion of a test/production well should follow, which will be used to evaluate the groundwater source, and hopefully meet the water demands. We trust this meets your present needs, and please feel free to contact our office if there are any questions concerning the test drilling program. We are available on request, to discuss further groundwater development at either of the locations addressed in this letter. Yours truly KALA GROUHDWATER CONSULTING LTD. L.C. Topp Hydrogeologist LCT/ts Encl: S.O.L.I.D. EXPLORATORY T E S T DRILLING PROGRAM ( A ) OSOYOOS TI-I. MO. 1 ("Y" Depth Interval ( i n feet) 0 - 7 7 - 16 16 - 3 0 . 30 - 38 38 - 45 45 - 57 57 - 82 Tfi. Lithologic Description Coarse sand and gravel, brown, dry Medium coarse sand with some gravel Medium to coarse sand with gravel lenses (medium'gravel) dry Medium to coarse sand with gravel lenses (medium gravel) wet Medium to coarse sand and gravel saturated producing small amount of water Coarse sand with medium g r a v e l , fairly well rounded Silty clay, grey NO. 2 (Railway grade immediately above lake) Depth Interval (in feet) 0 - 9 9 Site) - 19 Lithologic Description Railway grade fill, clay, sand and mixed gravel Medium to coarse sand with medium gravel, brown, dry 19 - 23 Medium to coarse sand with medium gravel (wet) 23 - 47 Gravel (pea size) with coarse sand saturated 47 - 60 Silt - silty clay -. , TH. NO. 3 (Osoyoos Depth I n t e r v a l (in feet) 0 12 13 - 24 - 24 Medium sand w i t h medium t o c o a r s e g r a v e l , brown, d r y 51 Medium t o c o a r s e sand w i t h medium g r a v e l , s a t u r a t e d a p p e a r s t o be siltier t h a n a t s i t e N o . 2 Silt M a t e r i a l o v e r a l l does n o t a p p e a r t o be a s c l e a n and permeable a s a t S i t e N o . 2 . 4 0 - 7 62 Lithologic Description N a t i v e soil, loamy g r a v e l , g r e y brown (Osoyoos 9 1 s t and 92nd Avenue) Depth I n t e r v a l (in feet) 45 3 0 0 f t n o r t h of T H # 2 ) 13 NO. - - Railway g r a d e f i l l , sand and g r a v e l Note: 7 Railway Grade 12 51 - 60 TH. - L i t h o l o g i c Description Medium sand and g r a v e l , brown, d r y 45 S i l t y c l a y , brown m o t t l e d 62 S i l t y c l a y , g r e y brown m o t t l e d 120 S i l t y c l a y , grey w S.O.L.I.D. EXPLORATORY TEST D R I L L I N G PROGRAM (B) OLIVER 1 (Oliver TH. NO. Depth I n t e r v a l (in feet) - Posnikoff S i t e ) Lithologic Description G r a v e l , medium t o c o b b l e s i z e (dry) Gravel a s a b o v e w i t h some s a n d (dry) Gravel medium t o c o a r s e , f a i r l y d i r t y ( s i l t y ) saturated 0 - 10 10 - 19 19 - 30 30 - 37 Gravel medium t o c o a r s e , c l e a n e r 37 - 47 Coarse s a n d a n d g r a v e l (medium t o coarse) f a i r l y c l e a n 47 - 53 Medium g r a v e l w i t h s t r i n g e r s of f i n e t o medium s a n d 53 - 80 Medium s a n d a n d g r a v e l , some t h i n s t r i n g e r s of o r g a n i c m a t e r i a l 80 - 80.5 Boulder 83 Silt 3 "_ 80.5 Note: Water l e v e l m e a s u r e d a t 2 0 f e e t b e l o w g r o u n d l e v e l . T.R U n d e m d & a t e s Eng./Terry Undemoodhlarch 8, 1995 Town of Osoyoos 1994/95 Groundwater Development program - w - Aquifer Test Evaluation Town of Osovoos 199445 Groundwater Development fa) Description of Testina wogram Following completion of the 1994/95 drilling and well completion program for the Village of Osoyoos, pumping tests were conducted with the two new production wells completed at the Old Public Works Yard Site and the Well #7 Site. During each of the tests, the pumping interval was carried out for a 24 hour period and in each case, two existing wells were used for observation purposes. Water pumped Erom the wells at each site was discharged to waste into Osoyoos Lake, using 6-inch flat lay pipe and the pumping rate was monitored using a standard circular orifice weir. During the early stages of each test, the pumping rate was set at a moderate level and this was progressively stepped upwards until the final pumping rate, which was maintained constant for the remainder of the test. At the Old Public Works Yard Site, Well No. 2 was shut down for the entire pumping interval, whereas at the Well #7 Site, Well No. 6 was pumped simultaneously with Well No. 7 for the final 8 hours of pumping, A summary of the pumping test schedules is shown in Table 1. Kala Groundwater Consulting Ltd. Page 1 T.R Undenvood & a t e s Eng./Terry UnderwoodMarch 8, 1995 Town of Osoyoos 1994/95 Groundwater Development program - fb) Results of * -- -------- Testing Propram Drawdown and recovery measurements obtained during the present program have been tabulated and plotted on semi-log graphs of drawdown and residual drawdown versus time. An inspection of the plots show that at the time of the pumping tests, when lake levels were fairly low, steady-state conditions were not observed in either of the production wells. By steady-state, we refer to the condition where the pumping rate in the well is balanced by the rate of recharge to the aquifer and no hrther drawdown occurs. The rate of drawdown however remained f k l y constant in each of the wells. The second important observation resulting fiom the tests is that the zone of drawdown interference is fairly extensive for each of the new wells and with time, an effect on water levels in neighbouring production wells becomes evident. Again this may relate to water levels in Osoyoos Lake at the time of testing. Finally, the recovery data for each well shows that recovery in the aquifer is slow and will require the 24-hour period (length of pumping interval) to reach full recovery. fcl Evaluation o f Safe Yield It is very difficult, if not impossible at this stage to assign a “safe yield” to the two new production wells because of the many outside influences. The critical factors include the seasonal fluctuation in lake levels and associated influence on aquifer recharge, the proposed pumping schedule and number of production wells which will be utilized at each site. There is a very small amount of availabIe drawdown to work with in each well and therefore every change in water level becomes sigmficat. Rather than recommending a safe pumping rate for each well, we have provided a number of scenarios based on pumping rate and related drawdown. Our projections on the Kola Growtmvater Consulting Ltd. Page 2 T.R Undenvood & w t e s Eng./Teny Undenvood/March 8, 1995 Town of Osoyoos - 1994/95 Groundwater Development program --- ---- __I percent of total available drawdown utilized are based on (a) conditions encountered during the time of testing and (b) allowing a 0.5 metre rise in the water level in Osoyoss Lake. The 0.5 m. figure is based on records of monthly mean water levels for Osoyoos Lake, obtained fiom Water Survey Canada for the period 1946-49, 1977-93 (see attached). As you are aware, a Hydrogeologist likes to work in the comfort zone of 70 percent of the available drawdown utilized, however in special circumstances such as in the case of a municipality experiencing a water shortage problem, exceptions have been made. Town of Osoyoos - 1994/95 GroundwaierDevelopment Program Pumping Test Sum- J A ) Old Works YardSite Pumping Period I 3 month season * Total Drawdown I 1 Percent of Available Drawdown ** I I 3.7 m 5yearsu Total available drawdmn 6.1 m * Refers to continuous pumping for the period specified ** Percent of available drawdown indicates percent utilized at end of specified period Kola GrowrdunterConsultingLtd. Page 3 I T.R Underwood & Assockljls Eng./Teny UnderwoodMarch 8. 1995 Town of Osoyoos - 1991/95 Groundwater Development program ----- -- - - Town of Osovoos Pum~innTest Summarv (Cont’d) B) Well No. 7Site - Table #2 Pumping Rate and Drawdown Projections Pumping Period Total Drawdown I Percent of Available Drawdown ** I * Refers to continuous pumping for the specified period ** Percent of available drawdown indicates percent utilized at end of specified period Kala Gtwundwuter ConsulthgLtd. Page 4 T.R Underwood & a t e s Eng-flerry Underwoodhiarch 8,1995 - Town of Osoyoos 1994195 Groundwater Development program Based on the results of the present program, we would recommend a maximum design pumping rate for each of the new wells as follows: fa) Old Public Works Yard Site 400 USgpm pumping individually fb) Well #7Site (i) 600 - 650 USgpm for Well #7 pumpng individually (ii) 400 USgpm for Well #7 pumping in combination with with WeU ##6 Kaka GrounmculterConsulting Ltd. Page 5 Ground level / 10-inch steel, welded joint, casing 393'feet 12.0 m. Non-pumping water level 7.91 m. below top of casing (Feb. 22/95) n. Figure "K"packer / Driveshoe l0-inch telescopic well screen #200 slot (200/1OOOths inch) FIGURE 2 Town of Osoyoos WELL COMPLETIONDIAGRAM PW #7 - 4. O R I L L J N G 45&c----. ADDITIVES 5. M E A S U R E M E N T S from I Clgroundlevcl 2 m f cosing n. mshly h9iglil above grwtrd level IsKL i.W E L L LOG O E S C R I P T I O N . o 196. ..... I .atz- ______._.. _ ___. .......... ..- 1' . I---......... ............ - - -- ..- . _ :.I . . .._-._.. -.--- . - _...- --- ];-:.I ............ - .... . . . 7 CONSULTANT ..... Ikllil .- . . . . : ... I . . . ....... .-_--..-._-I_ J l:;A:* .---LOCATION .... -. . . _----____._. 5- ... ..... ......... -.-...... CHEMAC ENVIRONMENTAL SERVICES (A DIVISION OF C A R 0 ENTERPRISES ING.) - #I 368 Industrial Avenue, Kelowna, British Calumbla, Canada V I Y 7E8 Telephone (604) 763-5090 Fax 763-4810 March 9, 1995 i J Town of Osoyoos P.O. Box 3010 osoYoos, BC VOH 1wo Sample 1dentifi.catiun: W e 1 1 #7 Date samp.l.ed: E'eb. 23/95, :I:lSpm Alkalinity (Total) Aluminum Arsenic Barium Boron Cadmium Calcium Chloride C h r omiurn Color (1:rue) Conductivity Copper Date Recej.ved: 248 (0.2 co.01 0.06 (0.2 <o. 001 105 40.0 <O. 02 (10 mg/JJ 340 Mo 1ybdeniim mg/L mg/'X, <0.010 Hardneoo ( T o t a l ) Mercmry mg/L c o . 0.02 742 4 68 Magnevi urn Man galle a D mg/L a3 CaC03 mg / JJ mg/L mg/L mg/L mg/L color Units umho s /cm mg/L Cyanide D i s s o l v e d S o l i d s (Total) Fluoride Iron Lead Feb.24/95 0.7 mg/L mg/L mg/L aa CnC03 <a. 02 mg/L 0.003 19.0 (0.01 <(I. 0005 ,O. 006 mg/L . . ,2 mg/L mg / TJ mg/L mg/L THIS REPORT ISTHE CONFIDENTIAL PROPERTY OF M E CLIENT- ANY UABlUPl ATTACHED THERETO 1s LIMITED TO 'ME FEE CHARGED. W Page 2 Tawn o f 030yoos March 9, 1995 ( a o n t ) ! . ..1 Nitrate .Nitrite 9.1 c0.01 --- PH Potassium Sodium Sulphate Ttirb j.d i t y Uranium 7.45 S.46 42.6 . 68 0.10 O.OU8O Zinc Total Coliiorm 0.002 0 Fecal Colirorm 0 C e r t i e i e d by: CHEKR(: NVIRONMEN AL SERVICES J a n i c e M. EYaow, R . Sc., Lab Manager Enclosure CC: FAX 495-2400 PAX 497-5303, Robbins Water Well Drilling FAX 545-1720, Kala Groundwater C o n s u l t i n g 8.3 N . mg/L mg/L mg/L N.T.U. mg/L mg/L Colonies/lOOmL Colonies/lOOm~ *- j i mg/L mg/L as N pH Units 1. ~ ... lP16 1 9-m ..- ..- -.- llil 1348 216.9?6 1941 277.164 i 277,586 271.996 217,Ub 271.681 277,651 277,132 277.024 --: 276.998 277.255 278.361 277.942 27i.115 27t.954 216.849 --- ..--- --- 278.072 278.036 277.95a 271.602 217.563 271.479 27l.tSS 271.711 277.637 277,245 217.287 277.451 177.636 277.562 2??,149 217,268 171,155 277,376 277.578 277.763 277.897 271,218 271,323 277.534 277.819 178.322 278.110 217.541 277.768 271.799 278.815 277.742 277.993 211.195 278.816 278.211 27a.471 271.288 278.171 277.619 277,686 271,740 278,095 273,225 2 7 W 8 217.324 217,325 277.398 277.512 117.535 277.553 217.418 271.635 277.581 277.953 277.91 277.744 277.314 217.537 217.618 277.785 277.946 278.645 277.282 277,188 211.469 271.814 278.6CO 271.4l3 277.6SS 271,612 277.617 271.611 277.169 217.711 277.661 271.612 27f.616 217.712 278.212 278.N6 117.373 211,604 277.653 2711.826 277.936 277.187 277.118 277.363 277.497 277.ICG 277.613 i7b,!3 211,612 277Sf0 213.185 271.939 277.56 277.565 ..* 1977 --- 1178 IS73 1S88 1981 111.118 277.291 277.218 21?.339 1982 277.263 1393 277.538 1984 277,315 1985 211.353 1981 217.265 1981 217.31E 1988 277.478 1989 277.631 1990 277,618 1991 217.310 1992 277.318 us3 277.558 --- a*- C I I --. 277,156 *-e *. -.- --e 277.124 277.189 271.611 276.987 276.982 i71.94f 278.811 277.485 277.493 277.352 --. -.- .-- .-. ... m ~ a 6271.~62 277.686 277.CC0 271.571 277,598 277,!83 277.659 277.671 277.531 27C.W 277.933 277.937 277.734 277.816 271.615 ??l.S53 273.569 271.815 277,533 577,823 277.t46 271.770 277.585 271.l1B 277.636 277.781 237.623 21i,a07 277.651 577.632 171.609 277.M 277.4J2 217,455 217.580 217.575 277.372 277.681 277.~91 271,678 271,351 277.572 277,319 277.421 277.325 211.571 271.493 271.576 277.681 277.(28 271.66f 2t1.693 277.678 277.662 277.512 i77.m 277.6’17 277.681 Z7f.flC :?&,$E2 277,921 211,646 277,631 ?II.SJi 277,731 277,633 271.W 277.~90 277,494 277.251 277.469 277.196 277.416 277.271 277.118 277.429 277.37? 277.636 277.E34 277.629 277.041 177.513 271.559 217.212 .-*-- *-- ... .-. 277,5!6 277.48 271.51! 271.591 211.7C2 217.844 277.74 277.573 277,624 277.643 277.flC 171.663 271,712 217.151 S?i.646 ili.i?I HEM 231.363 217.163 211,479 271.518 277.831 211,SOf 57I.tCi. 271.738 277.t71 271.574 211.582 27?.C19 277.62? tZ!2 MCAlIO6 I - Lc.T 49:91:43R N8G 11!:51rUii R6GUbAfiD w Town of Osoyoos 480 600 780 960 1200 1440 8.52 9.37 9.43 9.48 9.50 10.07 10.13 10.19 10.23' 10.28 10.34 10.39 10.44 10.49 10.56 10.66 10.72 10.79 10.89 10.97 I I 20 25 32 40 50 64 i . 80 100 120 150 190 240 300 380 I I ~~ Well No. 7 Kala Groundwater Consulting Ltd. 0.61 1.46 1.52 1.57 1.59 2.16 2.22 2.28 2.32 2.37 2.43 2.48 2.53 2.58 2.65 2.75 2.81 2.88 2.98 3.06 Pumping Interval Pumping rate: 300 USgpm Increase rate to 603 USgprn Pumping rate: 603 USgpm Increase rate to 816 USgprn Pumping rate: 816 USgpm Well No. 6 starts Obtain water samples I I __ Well No. 7 Town of Osoyoos Pumping Interval SEMI-LOG PLOT OF DRAWDOWN VERSUS TIME I - A I I I A-. T I I 1-00 -- I Time in minutes Kala Groundwater Consulling Ltd. , w Town of Osoyoos 80 100 120 150 190 240 300 380 480 600 780 960 1200 1440 Kale Groun.&ater Consulting Ltd. Well No, 6 6.01 6.03 6.03 6.04 6.05 6.07 6.09 6.1 1 6.14 6.1 8 6.24 6.28 7.93 8.10 0.03 0.05 0.05 0.06 0.07 0.09 0.1 1 0.13 0.16 0.20 0.26 Pumping rate: 816 USgpm 0.30 Well No. 6 starts 1.95 2.12 Obtain water samples Observation Well c-. Town of Osoyoos Well No. 6 Observation Well SEMI-LOG PLOT OF DRAWDOWN VERSUS TIME 0.00 C 0.50 1 .oo 1.50 2.00 2.50 1 10 100 Time in minutes Kala Groundwater Consulting Lid.. 1000 10000 w Town of Osoyoos I t Kala Groundwater Consulting Ltd. Condominium Utility Well Observation Well Condominium Utility Well Town of Osoyoos Observation Well SEMI-LOG PLOT OF DRAWDOWN VERSUS TIME 0.00 0.10 0.20 0.30 v) al L Y 0 E 0.40 .E 0.60 J- 0.70 0.80 0.30 1 10 100 Time in minutes Kala Groundweler Consulting Ltd. 1000\ 10000 Town of Osoyoos Kale Groundwater Consulting Ltd. Well No. 7 Recovery - Town of Osoyoos Recovery Well No. 7 SEMI-LOG PLOT OF RECOVERY 0.00 0.20 0.40 .E 0.60 0.80 1 .oo 1.20 1 .o 1 10.0 100.0 Time (t Kala Groundwater Consulling Ltd. + t')/t' 1000.0 10000.0 Town of Osoyoos w -1 994 Groundwater Development SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kale Groundwater Consulting Ltd. 200 ? 'v:994 Groundwater Development Town of Osoyoos SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kala Groundwater Consulting ltd. 200 w 994 Groundwater Development Town of Osoyoos ’ SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kala Groundwater Consulting Ltd 200 Town of Osoyoos w 1994 Groundwater Development SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 Kala Groundwater Consulting Lid. 150 Sieve Opennings in Thousandths of an Inch 50 100 200 Town of Osoyoos 994 Groundwater Development U ! SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 I 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch i d Kala Groundwater Consulting Ltd. 200 - x4LA GROUNDWATER CONSULTING LTD. #3 - 3107A - 31st Ave. 0 Vernon, B.C. - VlT 2G9 Tel (604) 545-1720 Fax(604) 545 1720 208 - 220 4th Avenue 0 Kamloops, B.C. - V2C 3N6 Tel (604) 372-9194 Fax (604) 372-9398 June 19, 1995 T.R.Underwood Engineerkg Suite 201 - 655 Victoria Street Kamloops, B.C. V2C 2B3 Attention: Mr. T.R. Underwood, P. Eng. Dear Sirs: Re: - Town of Osoyoos 1994195 Well Drilling Program Construction and Testing of Well #8 The following is to provide a summary of results for the construction and testing of Well #8, which was recently completed for the Town of Osoyoos. Well #8 was constructed as part of the 1994/95 Groundwater Exploration and Development Program, designed to provide additional sources of water supply for Osoyoos. Kala Groundwater Consulting Ltd. was retained to monitor and report on the well construction and evaluation program. This report provides a description of the drilling and testing of Well #8, includes a discussion of the results and provides recommendations for a sustainable yield and pump setting. Detailed information including the putnping test data, water quality analysis, sieve analyses and driller’s record is attached to the Appendix. A summary of pertinent information relating to Well .f: 8 is shown in Table 1. Kala GroundwaterConsulting Ltd. Page I Wi? Duriri inch 1 Stree Towa drillec to pu comp betwc At eat over11 the ul origin Kala GI I , 3.0 Well Construction Well #81 All of the drilling services under the 1994/95 groundwater program, including the construction of Well #8, were provided by Robbins Waterwell Drilling & Pump Service. Well #8 is completed to a total depth of 42.7 feet (13.0 metres) with 12-inch (305 mm) diameter casing and 14 feet (4.3 metres) of 1%-inchtelescopic, Johnson’s stainless steel well screen. The screen size selection was based on sieve analyses of samples obtained during the drilling of the original 8-inch testhole, and ranges from #50 slot (50 thousandths of an inch) at the top to #180 slot at the bottom. The wide range in screen size is indicative of the formation lithology, which graded from a coarse sand to a medium gravel at the base. A copy of the driller’s lithology is attached to the Appendix and a well completion diagram is shown in Figure 2. 4.0 Aquifer Testing In order to evaluate well performance and the long-term, safe yield of the aquifer, a stepdrawdown test, followed by a 24-hour constant rate pumping test was conducted on June 1, 1995. All pump testing services were provided by Lingo Pump Service of Kamloops, B.C. During the testing program, water from Well #8 was discharged into Osoyoos Lake. The pumping rate was monitored using a standard circular orifice weir and drawdown measurements were obtained using an electric well sounder. Because of problems caused by a faulty control valve, the constant rate test was interrupted for 7 minutes following the 100 minute reading, and the valve repaired. This increased the discharge rate from 850 USgpm to 980 USgpm. Because of the elevated concentrations of nitrate in certain parts of Osoyoos, water samples were obtained every 3 hours during the test and sent to Chemac Environmental for a nitrate analysis. Near the end of the pumping test, samples were obtained for a complete chemical and bacteriological analysis. Kala Groundwater Consulting Lid. Page 3 I Ground level hon-pumping water level June 1,1995 - 2.12 rn. below top of casing I 28.7 feet 8.75 m. / 12-inch steel, welded joint, casing 42.7 feet 13.0 m. Figure "K" packer / Driveshoe 1Zinch telescopic Johnson's stainless steel well screen #50 slot 8.75 to 9.75 m. #lo0 slot - 9.75 to 10.75 m. #180 slot - 10.75 to 42.7 m. , - Stainless steel plate welded on FIGURE 2 Town of Osoyoos WELL COMPLETION DIAGRAM PW #8 5.0 Discussion of Results 5.1 Aquifer Testing Proprani Results of the step-drawdown, constant rate and recovery tests have been plotted on semi-log graphs of drawdown versus time (see Appendix). A summary of the results from the stepdrawdown test is shown in Table 2. I Table:2 Summarv of Results From Sten-Drawdown Test 1 2 3 352USgpm 600USgpm 862USmm 1.47 2.49 4.8 8.2 3.75 12.3 I 73.3 USgpdfI of dd 73.2 USgpdft of dd 70.1 USrrr>m/ftof dd Allowing some room for error in the orifice meter reading for Step No. 3, the specific capacity of the well remains fairly constant at 73 USgpdft of drawdown as the discharge rate is increased from 300 to 1000 USgpm. This would indicate that the well is efficient and developed properly. Contrary to our original expectations, the pumping level did not stabilize (level) during the constant rate test, but rather it exhibited a steady rate of drawdown in the amount of 2.0 feet (0.6 metres) per log cycle. Applying the parameters established during the present test program, including the specific capacity and drawdown with time, we have made a series of calculations to determine the projected drawdown versus pumping rate assuming 4 months of continuous pumping (see Table 3). Kcda GroundwaterCorisultingLtd. Page 4 Based on the results we would recommend a safe sustained (4 months continuous pumping) of somewhere between 700 and 750 USgpm (575 and 600 Igpm). On an intermittent pumping basis, the well could be pumped at 850 USgpm (700 Igpm) for up to 14 hours per day. 5.2 Wnter Ounlitv A copy of the certificate of analysis for the water sample obtained near the end of the constant rate pumping test is attached, along with results for a series of tests conducted for nitrate alone. With respect to potability, all parameters for which an analysis was performed, are within the acceptable limits for drinking water as recommended by the “Guidelines for Canadian Drinking Water Quality, 1993”. The water is very hard and over the aesthetic objective for total dissolved solids. Both iron and manganese are well below the aesthetic objectives, and nitrate appears to be comparable to concentrations observed in the general vicinity. With respect to nitrate, it is interesting to note that a steady decline in nitrate concentration was detected with extended pumping. This would indicate in our opinion that OSG~OOS Lake provides a very significant component of recharge to the aquifer. 6.0 Conclusions and Recommendations Well No. 8, located along the west shoreline of Osoyoos Lake, is completed to a total depth of 42.7 feet (13.0 metres) with 14 feet (4.27 metres) of Johnson’s stainless sted well screen. Because of the shallow depth of the new weil, the total available drawdown (distance between top Kafa Groundwuter.Corisulting Ltd. Page 5 ! 911 T.R. Underwood EnginwringMr. T.R Undeiuwd, P. Eng./June 19, 1995 Town of Osoyoos - Construction and Testing of Well #8 w of screen and non-pumping level is very limited. At the time of the present aquifer testing program conducted June 1, 1995, the available drawdown was 22.64 feet (6.9 metres). In order to maximize the available drawdown, it is imperative that the pump intake be set as close to the top of the screen assembly as possible without actually making contact with it. It is recommended that the top of the screens be sounded one final time before designing and installing the pump assembly. The new well has a specific capacity of 73 USgpdfoot of drawdown and during the constant rate pumping test, while pumping at 980 USgpm, a steady rate of drawdown in the amount of 2.0 feet (0.6 metres) per log cycle was observed. Based on these parameters we are recommending a pumping rate of 700 to 750 USgpm (575 to 600 Igpm) for a sustained pumping interval of four months. On an intermittent pumping basis, the well can be pumped at 850 USgpm (700 Igpm) for up to 14 hours per day. It is recommended that production fiom the new water source be accompanied by routine monitoring of production rates, water levels and possibly, nitrate levels. Water from the new well is very hard and over the aesthetic objective fot- total dissolved solids. With respect to potability, all parameters for which an analysis was performed are within the acceptable liinits as recommended by the “Guidelines for Canadian Drinking Water Quality, 1993”. We trust this meets your present requirements and if there are any questions, please do not hesitate to contact the undersigned. Yours truly, Kala Groundwatgr Consulting - Ltd. Hydrogeologist LCT/it Kala Groundwater Consulting Ltd. Page 6 ! APPENDE Town of Osoyoos Well No. 8 ~_________ I Step No. 2 - 600 USgpm 1 2 3 4 6 8 10 i 13 16 20 Step-Drawdown Test 4.60 4.64 4.64 4.65 4.65 4.66 4.67 4.68 4.68 4.70 ~ 2.48 Adjusting pumping rate 2.52 Pumping rate: 600 USgpm 2.52 2.53 2.53 2.54 2.55 2.56 2.56 2.58 Pumping rate: 600 USgpm ~~~~~ I ~~ ~ Step No. 3 - 862 USgpm $ * 11 2 3 4 6 8 10 13 16 20 1 Kala Groundwater Consulting Ltd. 5.88 5.89 5.90 5.91 5.97 5.98 5.99 6.00 6.00 6.01 3.76 Adjusting pumping rate: 3.77 Pumping rate: 862 USgpm 3.78 3.79 3.85 3.86 3.87 3.88 3.88 3.89 Pumping rate: 862 USgpm ~ i I Town of Osoyoos Well No. 8 ._ - Step-Drawdown Test SEMI-LOG PLOT OF DRAWDOWN VERSUS TIME 0.00 0.50 1 .oo 2 + 1.50 E .-C c 3 0 2.00 U 3 2.50 3.00 3.50 4.00 1 ' 10 Time in minutes Kala Groundwater Consulting Ltd. 100 , e-,-. .-4. , Town of Osoyoos Pumping Test SEMI-LOG PLOT OF DRAWDOWN VERSUS TIME c Kala Groundwater Consutting Ltd. V Town of Osoyoos Well No. 8 32 40 50 64 2.91 2.86 2.81 2.77 46.0 37.0 29.8 23.5 I Kala Groundwater Consulting Ltd. Recovery 0.79 0.74 0.69 0.65 I .. .. ~ Town of Osoyoos __ Recovery SEMI-LOG PLOT OF RECOVERY c c Kala Groundwater Consulting Ltd. w W CHEMAC ENVIRONMENTAL SERVICES (A DIVISION OF CAR0 ENTERPRISE6 INC.) - #i 368 Inductrial Avenue, Kelowna, Brlthh Columbla, Canada V1Y 7E8 Telephone (604) 783. b A n @ 1 4 , 1995 Town of Osoyooa Ldwy P . 0 , BOX 3010 OSOYOOS, BC VOH 1WO Sample I d e n t i f ' i c a t i o n : Well # 6 Date Samp1ed:June 2/95, 9:20am Alkalinity (Total) Alumhum Arsenic Barium Boron Cadmium Chloride Chromium Color (True) Copper Cyanide Dissolved Bolids(Tota1) Fluoride Hardneaa(Tota1) lron Lead Mnnyansae Mercury Mol ybdenurn Nitrate Nitrite PH Sodium Sulphate Turbidity Ura niu m Zinc Total Coliform F e c a l coliform Date Recaived:June 2/95 332 (0.2 <0*01 mg/L a s C ~ C O ~ mg/L mg/L 12 (0.2 co.001 23.5 mg/L mg/L mg/L L mg/L mg/L <0.02 (5 Color Units (0:002 (0.010 mg/L mg/L 573 0.5 423. (0.02 0.004 < .002 <O.OOO$ ,010 4.38 (0.01 7.. 2 0 41.0 125 e 15 0,0236 0.004 mg/L mg/L mg/L 48 CaCOj mg/L mg/L mg/L mg/L mg/L mg/L as N m$J/L 8 8 N p H Units mg/L mg/L N.T.U. mg/L W mg/L Colonies/lOOmL 0 Colonies/lOO& Certified b Encl Water and Wastewater Analysis Treatment Plant Superviaion, Operation 6 Maintenance 0 Research 8 Development CHEMAC ENVIRONMENTAL IIERVICES (A DIVISION OF C A R 0 ENTERPRISE6 INC.) w1 = 388 lndurtrlal Avenue, Kelowna, Britlsh Columbia, Oanade V I Y 7E8 Telephone (604) 763-6090 Fax 763-4810 J u n e 5 , 1995 Town o f Oeoyoos P . 0 . Box 3010 OSOYOOS, BC VOH 1WO Mr. Ron DoDear Sir; F o l l o w j - n g a r e the result8 o f the analyaes of well w a t e r samples t a k e n on d a t e s shown and received on June 2, 1995: & -N mg/L as N June 1, June 2 12::30pm 3 :30pm 9 :30pm 5.6 5.3 4.7 3 :30am 6: 30am 9 :20am 4.6 4.5 4.4 Yours t r u l y , CHEMAC ENIRONMENTAL SERVICES .. Ja-nice M. Fraser, B.Sc. Lab Manager E'AX 495-2400 Water and Waatawater Analysis - Treotmont Plant 8up.rvlrlon, Operetion & MalntenancO Research & Development m W U Town of Osoyoos 1994 Groundwater Development SIEVE ANALYSIS PLOT 100.0 90.0 -0 .-Ctoa +- rr" .-+-a> to E'E 3 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 I 0.0 0 I I I I I I 50 100 150 Sieve Opennings in Thousandths of an Inch Kala Groundwater Consulting L td. I L I I 200 W. Town of Osoyoos 1994 Groundwater Development SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kefa Groundwater Consulting Ltd. t 200 w Town of Osoyoos 1994 Groundwater Development SIEVE ANALYSIS PLOT 100.0 90.0 8n n w-.- 70.0 fin .... n 50.0 40.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kale Groundwater Consulting Ltd. 200 w Town of Osoyoos 1994 Groundwater Development SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kale Groundwater Consulting Ltd. 200 uv 1994 Groundwater Development Town of Osoyoos SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kala Groundwater Consulting Ltd. 200 W Town of Osoyoos 1994 Groundwater Development I I 1 1 I 1 I ! i SIEVE ANALYSIS PLOT 100.0 I i i 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kala Groundwater Consulting L td. 200 Town of Osoyoos W V 1994 Groundwater Development SIEVE ANALYSIS PLOT 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0 50 100 150 Sieve Opennings in Thousandths of an Inch Kale Groundwater Consulting Ltd. 200 V V Town of Osoyoos 1994 Groundwater Development SIEVE ANALYSIS PLOT ! Sieve Opennings in Thousandths of an Inch Kale Groundwater Consulting Ltd. I