New 10`x10` Manual - Royal Building Products
Transcription
New 10`x10` Manual - Royal Building Products
THE ESQUIRE STORAGE Model S101 Owners Manual 10’ x 10’ (3.05m x 3.05m) Version 3.7 BUILDING PLEASE READ OWNER’S MANUAL COMPLETELY BEFORE ASSEMBLING YOUR BUILDING. ALL STATED SIZES ARE NOMINAL DIMENSIONS. THE ESQUIRE Thank you for choosing the Royal Outdoor Products Storage Building. Please read this Owner's Manual completely before assembling your building. Retain manual and your dated sales slip for future reference and warranty claims. Assembly Safety Information As with any construction project, use common sense when assembling your building. Royal Outdoor Products cannot be responsible for any damages or injuries resulting from the incorrect use of any tools, equipment or the mishandling of any of the building components. • Use proper lifting procedures when handling the packages. • Take care when handling the individual components and wear gloves to avoid cuts or scrapes. • Follow proper operating procedures for any tools, ladders, etc. used when assembling the building. • Protect your eyes. Always wear safety glasses when assembling building and when using power tools and hammers. • Do not assemble building during high winds. • Do not assemble building if parts are missing. A partially assembled building may be seriously damaged by high winds. • This building must be anchored to the foundation to prevent wind damage. See pages 4 and 5 for how to anchor. Screws for anchoring are not included. THIS IS A MAINTENANCE FREE PRODUCT MADE OF WEATHERABLE VINYL AND AS SUCH DOES NOT NEED TO BE PAINTED. PAINTING OF THE PRODUCT OTHER THAN THE DOORS WILL VOID THE WARRANTY. ATTENTION: Before you assemble the building: The 26 gauge galvanized steel doors are primed and ready to be painted (paint not included). PLEASE TAKE A COMPLETE INVENTORY OF ALL PARTS USING THE PARTS LIST AND PART IDENTIFICATION GUIDE PROVIDED ON PAGES 1, 2 AND 3. DO NOT ATTEMPT TO ASSEMBLE BUILDING IF PARTS ARE MISSING OR DAMAGED. THE ENTIRE DOOR INCLUDING ALL WOOD MUST BE PAINTED WITHIN THE FIRST 30 DAYS OF INSTALLATION WITH A HIGH QUALITY EXTERIOR TRIM PAINT. (Paint and other recommended supplies not included). For assistance or replacement parts call: 1-877-GO-ROYAL © 2003 ROYAL OUTDOOR PRODUCTS CO. 100-B Royal Group Crescent Woodbridge, Ontario, Canada L4H 1X9 PARTS LIST: Length Right Door Jamb Groove Panel 74 15/16” (190.3cm) Left Door Jamb Groove Panel 74 15/16” (190.3cm) Side Wall Joiner Panels 69” (175.2cm) Side Wall Groove Panels 69” (175.2cm) Front/Back Wall Joiner Panels 72 7/16” (183.9cm) Back Wall Groove Panels 74 15/16” (190.3cm) Back Wall Joiner Panels 77 1/2” (196.9cm) Back Wall Groove Panels 80” (203.3cm) Back Wall Joiner Panels 82 5/8” (209.8cm) Back Wall Groove Panel 83 7/16” (211.9cm) Roof Joiner Panels 61” (155.0cm) Roof Groove Panels 61” (155.0cm) Corner Posts 69” (175.2cm) Upper Ridge Beam Cap 60” (152.4cm) Lower Ridge Beam Ends 56 3/8” (143.2cm) Header Assembly 72 1/16” (183.0cm) Roof Fascia Caps 60” (152.4cm) Doors Door Sweeps Astrigal 71 5/8” (182.0cm) Right Back/Left Rear/Right Front Base Channel 59 1/16” (150.1cm) Left Back/Left Front/Right Rear Base Channel 59 1/16” (150.1cm) Right Front Base Channel 23 5/8” (60.0cm) Left Front Base Channel 23 5/8” (60.0cm) Door Lintel 71 15/16” (182.8cm) Lintel Insert 73 7/8” (187.6cm) Ridge Beam Steel Support Beams 10 1/4” (26.0cm) Ridge Beam Steel Support Beams 79 5/16” (201.4cm) Fascia Gable Right Front and Left Rear 61” (155.0cm) Fascia Gable Left Front and Right Rear 61” (155.0cm) Side Slope Wall Cap 59 1/16” (150.1cm) Side Slope Wall Cap 59 1/16” (150.1cm) Wall Stiffener Insert 81 1/16” (205.9cm) Wall Stiffener Insert 6 1/16” (15.4cm) Part No. Qty. DJ1 DJ2 JT1 PT1 JT2 PT2 JT3 PT3 JT4 PT4 JW1 PW1 CN1 RB3 RB4A HD1 FC1 DR DS AST AL1 AL2 AL5 AL6 LN1 LT1 RS1 RS2 FG1 FG2 SC1 SC2 WS1 WS3 1 1 12 10 4 2 2 2 2 1 12 10 4 2 2 1 4 2 2 1 3 3 1 1 1 1 2 2 2 2 2 2 1 1 REC RJC1 FCC AS HL DHS DLS DHS HP LK DH VN 2 1 2 215 2 8 8 16 4 1 4 4 BS 16 Accessory Bag: Ridge Beam End Caps Ridge Beam Joint Cover 6” (15.2cm) Roof Fascia Cap Covers 4” (10.2cm) Screws #10 x 3/4” (1.90cm) Door Handles Door Handle Screws #9 x 1” (2.54cm) Flat Quad Door Lintel Screws #10 x 1/2” (1.27cm) Hinge Screws #9 x 1” (2.54cm) Flat Quad Door Pins Slide Lock Hinges Vents Ridge Beam Steel Insert Beam Bolt Set (Bolt, Washer, Nut) 3/8” x 5/8” one extra set included NOTE: PARTS ARE PACKAGED WITHIN OTHER PARTS. PLEASE CHECK PACKAGE CAREFULLY. 1 THE ESQUIRE Refer to parts list on opposite page for matching PLEASE TAKE A COMPLETE INVENTORY OF ALL PARTS USING THE PARTS LIST AND PART IDENTIFICATION GUIDE PROVIDED ON PAGES 1, 2 AND 3. DO NOT ATTEMPT TO ASSEMBLE BUILDING IF PARTS ARE MISSING OR DAMAGED. IF YOU NEED REPLACEMENT PARTS PLEASE CALL 1-877-GO-ROYAL. JT2 PT2 JT3 JT4 PT3 PT4 JT4 PT3 JT3 FG2 PT2 JT2 FG1 CN1 JW1 JW1 JW1 PT1 PW1 FC1 JT1 RB4A FJC1 RB3 JW1 RJC1 JT1 PT1 JT1 PW1 PT1 JW1 JT1 PW1 PT1 AL1 JW1 PW1 PW1 FC1 PW1 AL2 PT1 FC1 PW1 RS2 PW1 PT1 AL2 JT1 JW1 PT1 PW1 PW1 PT1 JT1 JW1 JW1 JT1 RS1 JW1 RB4A AL6 AL5 RB3 JT2 CN1 DJ1 CN1 DJ2 JT1 JT2 SC2 JT1 FJC1 PT1 JT1 RS2 JT1 JW1 LN1 LT1 WS3 HD FG2 FG1 2 SC2 PT1 AL1 RS1 JW1 FC1 JT1 AL1 SC1 AL2 SC1 WS1 CN1 THE ESQUIRE Part Identification Joiner Panel (JT1-JT4, JW1) Wall Stiffener Insert (WS1, WS3) Ridge Support Beam (RS1-RS2) Corner Post (CN1) Groove Panel (PT1-PT4, PW1) PVC Door Lintel (LN1) Fascia Gable (FG1-FG2) Slope Wall Cap (SC1-SC2) Lower Ridge Beam (RB4A) Lintel Insert (LT1) Vent (VN) Ridge Beam End Cap (REC) Base Channel (AL1, AL2, AL5, AL6) Door Handle (HL) Door Sweep (DS) 2 Prong Hinge Plates (DH) Slide Lock (LK) Upper Ridge Beam Cap (RB3) Ridge Beam Joint Cover (RJC1) Roof Fascia Cap (FC1) Full-Scale Hardware Screw #10 x 3/4" (1.90cm) (AS) Door Lintel Screw #10 x 1/2" (1.27cm) (DLS) Roof Fascia Cap Cover (FCC) Door Handle Screw #9 x 1" (2.54cm) (DHS) Hinge Screw #9 x 1" (2.54cm) (DHS) Tools Required • • • • • Power drill with Phillips® (#2) or a #2 square bit Ladder • Carpenter's square • Level Rubber mallet • Hammer • Safety glasses Gloves • Wrench - 9/16” size Measuring Tape - Minimum 16’ feet (5m) Nut Phillips is a registered trademark of PhillipsScrew Co. Washer (BS) Materials Needed • Foundation screws • Silicone Caulking Door Pin (HP) • Paint for Doors - Exterior grade enamel 3 Astrigal (AST) Bolt THE ESQUIRE Shed Base System Royal Outdoor Products is pleased to offer a new foundation option for your storage building. Made from 100% recycled composite material the Shed Base System features a rugged honeycomb design that supports heavy loads. For more information and ordering details call our Consumer Service Centre at 1-877-GO-ROYAL and ask about Shed Base System Model B007. How to Prepare the Building Site and Anchor the Building • Construct foundation (concrete slab or wooden platform) and anchor base channels before assembling your building. Foundation and anchoring materials are not included. • Make sure that your building complies with your local building codes. • Select a location that provides suitable drainage, ample room to erect the building, and an area that can be levelled properly. • Decide on the type of foundation. • Foundation must be complete before unpacking and assembly can begin. • In selecting the site, allow approximately 5' (1.52m) of clearance on all sides and 8’ (2.44m) more than the height of the building for assembly. Concrete slab 61'' (154.94cm) Exterior dimensions of 10' x 10' (3.05m x 3.05m) building: Roof Width: 122 1/2" (311.2cm) Roof Depth: 120 3/8" (305.8cm) Height: 86 3/8" (219.4cm) Wall Width: 118 3/16" (300.2cm) Wall Depth: 118 3/16" (300.2cm) Concrete Slab Option 122'' (309.88cm) Slab should be 4" (10.16 cm) thick. To provide the best support for your building and to ensure that the corners are square, the slab must be completely level and free of bumps and ridges. Follow Building Code requirements and provide a moisture barrier as specified by your concrete contractor. OPTIONAL: Use Concrete Sealer paint on cured concrete floor to prevent moisture buildup in building. Materials Needed: (not included) (3) 8' x 2" x 4" (2.44m x 5.08cm x 10.16cm) for forms (4) 10' x 2" x 4" (3.05m x 5.08cm x 10.16cm) for forms 1.21 yd.3 concrete for 4" (10.16cm) thick slab Cut Sizes: (2) (2) (4) (16) 118 3/4'' (301.63cm) 121 3/4'' (309.25cm) 10" x 2" x 4" (25.4cm x 5.08cm x 10.16cm) 118 3/4" x 2" x 4" (301.6cm x 5.08cm x 10.16cm) 61" x 2" x 4" (154.9cm x 5.08cm x 10.16cm) 16" x 2" x 4" (40.64cm x 5.08cm x 10.16cm) with pointed ends All stated sizes are nominal dimensions. 4 THE ESQUIRE Wood Platform Option To provide the best support for your building and to ensure that the corners are square, the platform must be completely level and free of bumps and ridges. Materials to construct platform may be obtained at a lumber yard. 1. Remove grass from area under platform dimensions, 120" x 120" (304.8cm x 304.8cm). Wood platform 2. Level ground to permit water drainage away from building site. 120'' (304.80cm) 24'' (60.96cm) 3. Have lumber cut to size and nail together following plan as shown. Recommended minimum nail length is 3”. 4. Position platform onto site and drive stakes into the ground to anchor platform. 48'' (121.92cm) 5. OPTIONAL: Paint floor to preserve platform. Materials Needed: (not included) (11) (2) (4) 120'' (304.80cm) 10' x 2" x 4" (304.8cm x 5.08cm x 10.16cm) pressure treated studs 8' x 2" x 4" (243.84cm x 5.08cm x 10.16cm) pressure treated studs 3/4" x 4' x 8' (1.90cm x 1.22m x 2.44m) exterior grade plywood 72'' (182.88cm) Cut Sizes: From (2) From (6) From (12) (4) From (8) 48'' (121.92cm) (2) 10' x 2" x 4" (304.8cm x 5.08cm x 10.16cm) cut: 120" x 2" x 4" (304.80cm x 5.08cm x 10.16cm) (6) 10' x 2" x 4" (304.8cm x 5.08cm x 10.16cm) cut: 117" x 2" x 4" (297.18cm x 5.08cm x 10.16cm) (3) 10' x 2" x 4" (304.8cm x 5.08cm x 10.16cm) cut: 22 1/2" x 2" x 4" (57.15cm x 5.08cm x 10.16cm) 18" x 2" x 4" (45.72cm x 5.08cm x 10.16cm) pointed for stakes (2) 8' x 2" x 4" (243.84cm x 5.08cm x 10.16cm) cut: 21 3/4" x 2" x 4" (55.25cm x 5.08cm x 10.16cm) 48'' (121.92cm) 96' (243.84cm) 120' (304.8cm) 96'' (243.84cm) 72'' (182.88cm) 48'' (121.92cm) 24'' (60.96cm) Plywood: 2.44m) cut: 24'' (60.96cm) 72'' (182.88cm) 2.44m) cut: 48'' (121.92cm) 2.44m) cut: 117' (297.18cm) 2.44m) cut: 120' (304.8cm) (1) 3/4" x 4' x 8' (1.90cm x 1.22m x at 96" x 48" (243.84cm x 121.92cm) (1) 3/4" x 4' x 8' (1.90cm x 1.22m x at 72" x 48" (182.88cm x 121.92cm) (1) 3/4" x 4' x 8' (1.90cm x 1.22m x at 72" x 24" (182.88cm x 60.96cm) (1) 3/4" x 4' x 8' (1.90cm x 1.22m x at 72" x 48" (182.88cm x 121.92cm) at 24" x 48" (60.96cm x 121.92cm) 96'' (243.84cm) From (1) From (1) From (1) From (1) (1) 2" x 4" x 18" STAKES 5 21 3/4'' (55.25cm) 22 1/2'' (57.15cm) 22 1/2'' (57.15cm) 22 1/2'' (57.15cm) 21 3/4'' (55.25cm) THE ESQUIRE Base Channel Assembly Parts Needed: 2 2 1 1 1 1 Side Base Channels Side Base Channels Right Rear Base Channel Left Rear Base Channel Right Front Base Channel Left Front Base Channel 1 Position 8 Base Channels on platform as shown. Allow 70 15/16” (180.2cm) between front Base Channels for door placement. Use a carpenter's square to line up corners. Please note: The diagonal measurement included in the diagram may vary slightly from the actual measurement. APPLY A CONTINUOUS BEAD OF SILICONE CAULK UNDERNEATH BASE CHANNELS, AROUND THE INSIDE PERIMETER OF THE BASE CHANNELS AND WHERE INDIVIDUAL CHANNEL PIECES MEET. CHECK 70 15/16” (180.2cm) door opening dimension between front Base AL1 Channels. AL2 AL1 AL2 (Right and left are determined when facing the front of building.) AL5 (405.3cm) 159 9/16''TO INSIDE CORNER RNER INSIDE CO 112 Concrete or wood foundation must be installed. See pages 4 and 5 for instructions on how to prepare site and anchor building. 7/8 " (2 86. 7cm ) 2c m ) AL1 18 0. AL2 /16 "( 30 0.2 cm ) NOTE: Holes in exterior of Base Channels are for drainage only. DO NOT INSTALL SCREWS IN THESE DRAINAGE HOLES. 2 DOUBLE CHECK 70 15/16" (180.2cm) door opening dimension between front Base Channels. 6 6' /1 15 83 70 11 Secure Base Channels (AL1, AL2, AL5, AL6) to foundation using flat-head wood screws if your foundation is wood or flathead concrete screws for a concrete slab. These screws are not included. The recommended size of flat-head screws to use is 3/16” x 3/4” Use pre-drilled holes in channels as a guide for screw placement. Install a minimum of 6 screws in each side and rear channel piece and 4 screws in each front channel. '( AL6 THE ESQUIRE 4 General Assembly The Joiner and Groove Panels are designed to make assembling your building easy. The Joiner Panel and Groove Panel slide together easily without additional lubricants. There is not an inside or outside surface to the panels. Some panels are shipped preassembled in groups of 3 or 4. Due to the weight of the pre-assembled panels, you may find it necessary to disassemble some groups of 3 or 4 in order to assemble your building. 3 Groove Panel Joiner Panel Back and Side Wall Assembly Parts Needed: 2 12 10 6 5 Corner Posts Side Wall Joiner Panels Side Wall Groove Panels Back Wall Joiner Panels Back Wall Groove Panels 5 First, insert a group of 3 preassembled side wall panels labeled JT1PT1-JT1 into side Base Channel at right rear corner. Make sure a Joiner Panel faces the corner. (Right and left are determined when facing the front of the building.) It’s helpful to lay out all the required panels on the ground around your foundation in their proper sequence. Note that the back wall panels are angled at the top edge and vary in length. Install the group of 3 pre-assembled back wall panels labeled JT3–PT2–JT2 into rear Base Channel. 6 7 7 Install a Corner Post CN1. THE ESQUIRE Insert a group of 3 side wall panels labeled JT1-PT1-JT1 into side channel at the right front corner allowing room for a PT1 Groove Panel. Make sure a Joiner Panel faces the front corner. 9 8 Continue to build the right side wall adding a Groove Panel PT1 followed by a Joiner Panel JT1. Make sure you hold onto panel until you insert it into Base Channel; do not release panel and allow it to drop into channel. 10 Insert the group of 3 pre-assembled back wall panels labeled JT4–PT4–JT4 allowing room for PT3. Insert 81 1⁄16” (205.9cm) Wall Stiffener WS1 in center cavity of PT4 panel. 11 Add Groove Panel PT1 to complete right side wall. PT4 Panel 12 Snap 2 piece Vent Assembly VN provided into hole located at top of PT3 and insert. 8 Wall Stiffener Insert WS1 THE ESQUIRE 13 15 14 Insert the group of 3 pre-assembled back wall panels labeled JT2–PT2–JT3 at the left rear corner allowing room for PT3. Snap 2 piece Vent Assembly VN provided into hole located at top of PT3 and insert PT3 to complete back wall. HINT: A ladder may be required when assembling back wall. Insert a group of 3 pre-assembled side wall panels into side Base Channel at left rear corner. Make sure a Joiner Panel faces the corner. 16 17 9 Install a Corner Post CN1. Repeat above instructions to build left side wall. THE ESQUIRE Front Wall Assembly 18 Parts Needed: 2 1 1 2 1 1 1 4 4 2 2 2 1 8 2 Front Wall Joiner Panels Right Door Jamb Groove Panel Left Door Jamb Groove Panel Corner Posts Door Lintel Lintel Insert Header Assembly Slope Wall Caps Fascia Gables Ridge Beam Sections Ridge Beam Steel Support Beams Ridge Beam Steel Support Beams Ridge Beam Joint Cover Ridge Beam Steel Insert Beam Bolt Set Screws #10 x 3/4" (1.90cm) Door Lintel Screws #10 x 1/2" (1.27cm) Lay out all the required panels on the ground around your foundation in their proper sequence. Note that the front wall panels are angled at the top edge and vary in length. The door hinges must face the outside of building on the right and left Door Jamb Groove Panels DJ1 & DJ2. (Right and left are determined when facing the front of building.) 20 19 22 Install a Corner Post CN1. Repeat to install JT2 and DJ2 in left front corner. LT1 LN1 21 Insert JT2 and DJ1 in front Base Channel at the right front corner. Add Door Lintel LN1 across top of front walls. The Door Lintel’s grooved surface should face up and screw holes should face inside of building. Install Lintel Insert LT1 over top of Door Lintel LN1, making sure Lintel Insert LT1 is evenly spaced along door opening and the hollow opening faces the inside of the shed. Insert 6 1/16” (15.4cm) Wall Stiffener WS3 inside middle cavity of Header Assembly HD1. Push Header Assembly all the way into Door Lintel LN1. Make sure header is fully seated over top of Lintel Insert LT1. 10 THE ESQUIRE 23 Make sure Corner Posts CN1 and panels are fully seated into Base Channels. Install a screw (#10 x 1/2” (1.27cm)) at each end of Door Lintel LN1 only. 24 Match up front and rear Slope Wall Caps (SC1, SC2) for both sides of building. Attach caps, pre-drilled holes facing inside. Push down to fully seat. 25 Install right Fascia Gable FG1 on right side of front wall. Install the other right Fascia Gable FG1 to left side of rear wall (as you are facing front of building). Repeat to install left Fascia Gable FG2 on left side of front wall. Install the other left Fascia Gable FG2 to the right side of rear wall (as you are facing front of building). RS1 26 Ridge Beam Assembly Layout Ridge Beam Steel Support Beams (RS1 & RS2) to proper length as in diagram. Line up holes and bolt Steel Support Beams together using bolt set provided (Note: 8 bolts are to be used to fasten beams together at the centre and 8 bolts are to be used at either end to fasten 10 1/4” supports). Tighten bolts using 9/16” wrench. RS2 RS1 RS2 RS1 RS2 RS2 RS1 BOLT LOCATION NOT USED 117 23/32" (299cm) TOTAL BEAM LENGTH 11 THE ESQUIRE 28 Slide assembled Ridge Beam Steel Support Beams into Lower Ridge Beam RB4A. Steel Support Beams should extend approximately 2” from either end of lower ridge beam. RB4A RB4A TOP VIEW 27 Assemble Lower Ridge Beam RB4A pieces using diagram as a guide. Make sure RB4A ridge beam pieces are placed correctly with the screw locations nearest the piece edge facing outwards. RB4A RB4A 30 Slide a Ridge Beam Joint Cover RJC1 onto the Upper Ridge Beam RB3. Apply a bead of silicone at all joints. Then slide Ridge Beam Joint Cover RJC1 across to cover the upper ridge beam seam. RB4A RB4A 29 Using a white rubber mallet or a mallet and a block of wood, tap down the Upper Ridge Beam sections RB3 onto the Lower Ridge Beam RB4A. RIDGE BEAM JOINT COVER RJC1 RB3 31 RB3 Add Ridge Beam. Make sure Steel Support Beam fits squarely into cut out portion of panels. In the event you do not have the recommended five feet of clearance on one side, you may follow these assembly instructions as an alternative: Ridge Beam Before Step 31: Wall Stiffener Working from the inside of the building, slide roof Joiner Panel JW1 into fascia FG at rear and front of building. Next, install Groove Panel PW1 and continue until entire side of roof is complete. Important: Make sure you slide roof panels down approximately eight inches from top of roof to allow the installation of the Ridge Beam. Install Ridge Beam as shown at Step 31 making sure bottom wing of Ridge Beam fits under Fascia Gable (FG1 & FG2) at each end of walls. Slide Joiner Panel JW1 nearest outside wall into Ridge Beam and continue at Step 34. BACK VIEW 12 THE ESQUIRE 32 Roof and Door Assembly Parts Needed: 12 Roof Joiner Panels 10 Roof Groove Panels 4 Roof Fascia Caps 2 Roof Fascia Cap Covers 2 Doors 2 Door Sweeps 4 Door Pins 2 Door Handles 8 Door Handle Screws #9 x 1"(2.54cm) 1 Slide Lock 2 Ridge Beam End Caps Screws, #10 x 3/4" (1.90cm) 6 Door Lintel Screws #10 x 1/2" (1.27cm) 33 Hint: Make sure panel is fully seated into the Ridge Beam. (Right and left are determined when facing the front of the building.) Lay out all the required panels on the ground around the building in their proper sequence. THE ENTIRE DOOR INCLUDING ALL WOOD MUST BE PAINTED WITHIN THE FIRST 30 DAYS OF INSTALLATION WITH A HIGH QUALITY EXTERIOR TRIM PAINT. (Paint not included.) To ensure good paint adhesion, the prepainted surface should be lightly roughened to break the surface using 360 grit sandpaper in the flat areas and steel wool along the embossment. The surface should then be cleaned to remove dirt, foreign debris, oils etc. and wiped dry with a clean towel. 34 Install 1 screw only into corner of Ridge Beam RB1 into hole nearest outside wall. 36 35 Working from the outside of the building, slide roof Joiner Panel JW1 into Fascia Gable FG at rear of building. Next, add roof Groove Panel PW1 and install screw into Ridge Beam hole only where Groove Panel PW1 meets Joiner Panel JW1. Continue to add Roof Panels and screws until both sides of roof are built. 13 To verify that your door is standing properly, ensure that the two larger panels are on top. The two smaller panels and the groove for the Door Sweep DS are on the bottom. When the Hinge Plates DH are installed the prongs on the Hinge Plate DH must face outward. THE ESQUIRE 37 Install the Door Sweep DS onto each door by gently tapping the sweep into the grooves on the door bottom. Important: Do not install Door Sweep DS until you have painted the doors. Before you attach the Hinge Plate DH please identify the correct position of the hinge using diagram a . The correct position of the hinge for the left door is (a) with the etched crown right-side up and facing you and (b) with the larger opening of the beveled screw holes facing you. The correct position of the hinge for the right door is (a) with the etched crown upsidedown and facing you and (b) with the larger opening of the beveled screw holes facing you. Line up Hinge Plates DH so that they are parallel with the back of the door frame as in diagram b . Make sure that the two prongs are facing outward. Insert the two outside screws first to ensure the hinge is properly aligned. 38 a b 39 Position left door as shown. Tap Door Pins HP in both top and bottom hinges with hammer. Repeat to install right door. Next, install Astrigal AST on left door of the building. Position Astrigal AST on inside of left door so that the screw locator holes on the Astrigal AST are positioned on the left door and the positioning fin on the Astrigal AST fits tightly against edge of left door. Mark hole locations on left door while holding Astrigal AST in place. Drill 1/16” diameter holes, making sure that the drill does not penetrate the exterior side of the door. Install Astrigal AST with #10 x 3/4” screws provided. 41 40 Install Door Handles HL in pre-drilled holes with curved end of handle facing outside of building. 14 Astrigal Door THE ESQUIRE 42 Before attempting to align doors, while inside the building, insert a screw in the first hole of the Base Channels (AL5 & AL6) at the Door Jambs (DJ1 & DJ2). If doors are uneven, refer to step 43. Note: The door hinges have a special mechanism that keeps the door locked into the hinge even if pins are removed. Do not remove the hinges. Door Jamb Door Install Screw Base Channel 43 Door Alignment Tips 1. Before you install screws in the Slope Wall Caps (roof/wall line), you must align the doors. DO NOT install screws unless the doors are lined up properly. 2. Ensure the doors are not upside down. The Door Sweep groove must be at the bottom. 3. If you have installed your doors and you are experiencing problems, as in Figure A, use the following instructions to correct: To obtain an even vertical gap between the doors, i.e. the doors are touching at the top or the bottom, gently push the building back and forth, not side to side. To obtain an even horizontal gap between the doors and the Door Lintel, i.e. the top of one door is higher than the other, gently push the shed side to side. You will notice that the doors shift as you push the building. Figure A Door Juts Outward 4. If you have installed your doors and you are experiencing problems as in Figure B, use the following instructions to correct: In Figure B, the right door does not line up properly with the left door because the bottom of the right door appears bent inward. To correct this, gently push on the building at the top of the front right corner (at the point shown in Figure B) until the right door is aligned properly. If the left door appears bent inward, correct the alignment by pushing on the top left corner of the building. 5. Complete your assembly by installing a few screws at a time. For example, install two or three screws and check your doors. Repeat this procedure until all the screws are installed. 6. If you are still experiencing problems, call the 1-800 consumer service line for assistance. 15 Door Juts Inward Figure B THE ESQUIRE 45 Install the remaining screws in the Door Lintel LN1 (#10 x 1/2" (1.27cm)) and front Fascia Gables (FG1 & FG2) (#10 x 3/4" (1.9cm)). Have one person push the Lintel upward at the centre so as the Lintel bends upward slightly while the remaining screws are installed in the Lintel. 44 Screw Installation Inside the building, beginning in each corner, secure rear Fascia Gable FG with screws to back wall panels. Pre-drilled holes should line up where the panels are joined. It is helpful to have one person on the outside of the building pushing down on the Fascia Gable FG while the second person inserts the screw from the inside. Install 3 screws into both front Fascia Gables FG beside door opening while one person holds the Fascia Gables FG down from the outside. IMPORTANT: Be sure to check door alignment several times during screw installation to ensure building has not moved out of alignment. If it has, realign and resume installation of screws. First, install lower screws on Slope Wall Caps (SC1 & SC2) into side wall panels. Next, inspect side wall to ensure it is visually straight from the front corner to the back corner along the length of the building. If your wall is not straight, correct it by pushing the wall inwards or outwards accordingly. Upon confirmation, install screws into the top of Slope Wall Caps (SC1 & SC2) into the roof panels. 46 Mark hole locations on inside of door while Slide Lock LK is held into the hole provided in the Door Lintel LN1. Drill 3 holes, 1/16" diameter into the door (make sure that the drill does not penetrate the exterior side of the door). Install Slide Lock LK with #10 x 3/4” (1.90cm) screws provided. NOTE: With Astrigal AST in place you may need to position Slide Lock LK over top of Astrigal AST in order to line up Slide Lock LK with predrilled hole in Lintel LN1. 48 47 Finish by installing a screw at the bottom of all panels - front, back and sides into Base Channels on inside only (Note: holes in exterior of Base Channels are for drainage only). DO NOT INSTALL SCREWS IN THESE DRAINAGE HOLES. 16 THE ESQUIRE 49 Cover roof ends with Roof Fascia Caps FC1. Make sure Roof Fascia Caps FC1 are flush with roof panels at each end. 50 51 Snap Roof Fascia Cap Covers FCC in place where the Roof Fascia Caps FC1 meet. Install screws, alternating top and bottom pre-drilled holes in Roof Fascia Caps FC1. 52 Insert Ridge Beam End Caps REC in front and back, and install screws. 53 Shelving Instructions Please make sure that all shelving and support screws (not provided with building) are installed into the seam between panels. The illustration below shows the Royal Ultraline Track System which can be purchased separately. 17 THE ESQUIRE Royal Outdoor Products Vinyl Storage Buildings 10- Year Non-Transferable Limited Warranty Royal Outdoor Products Co. 100B Royal Group Crescent Woodbridge, Ontario Canada, L4H 1X9 Royal Outdoor Products Co. ("Royal") in respect of vinyl storage buildings manufactured by it (hereinafter referred to as "Products") warrants to you the original purchaser of Products, that subject to the terms and conditions herein contained, the Products are and will be free from defects in materials and workmanship that result in warping, rotting, corroding, flaking, peeling, blistering, or abnormal discoloration of surfaces. This warranty is applicable for 10 years and applies only to the original purchaser of the Product if the Product is used in non-commercial applications. All failures to Products covered by this warranty will be repaired, replaced or restored by Royal in accordance with the terms and conditions of this warranty. By acceptance and use of the Products, you agree with Royal’s liability, and replacement of the Products at Royal’s option, as provided herein. Products which experience color change due to normal weathering are excluded from this warranty (including non-uniform fading and color changes resulting from unequal exposure of panels to the sun and elements.) For the purpose hereof, the term "normal weathering" means exposure to ultraviolet (sun) light, and extremes of temperature and atmosphere which will cause any colored or painted surface to fade, darken, chalk or acquire a surface accumulation of dirt or stains. The severity of these conditions depends on air quality, the geographic location of the property at which the Products are installed, and other local conditions over which Royal has no control. Royal shall not be liable for and this warranty does not apply or extend to any failure, defects or damages arising from or connected with, without limitation, misuse, neglect, faulty or improper installation. This warranty is void if structural parts and components not supplied by Royal are used. Failure, damage, defects or malfunctions resulting from misuse, abuse, negligence, alteration, accident, lack of proper maintenance, impact of foreign objects, hail, tornado, hurricane, other violent storm, flood, fire, pollutants, chemicals, acts of God and other causes beyond Royal’s control shall not be considered defects under this warranty and are not covered in any way by this warranty. Royal shall not be liable for inconvenience, labor, loss of time, maintenance, removal or reinstallation of the Products or other incidental, special or consequential damages arising in relation to the purchase or use of the Product. This warranty is void if the surface of the Product is covered with paint or any other foreign material, other than as specifically directed in the owners manual included with the Product. The 10-Year Limited Warranty-Non-Commercial Applications coverage provided by this warranty is extended to cover individuals who are using the Products as homeowners and does not extend to Products purchased by or installed upon property owned by and other entities, including, without limitation, corporations, partnerships, trusts, estates, governmental agencies or bodies, religious organizations, schools, condominiums, or co-operative housing arrangements, or installed on apartment buildings or any other multi-housing arrangements. Warranty Claims: The owner must give prompt notice of any defects to obtain warranty service. Should the Products contain a manufacturing defect, promptly contact the Royal Outdoor Products Co., Customer Care Center at 1-877 GO ROYAL (877 467 6925) or by mail at 100B Royal Group Crescent, Woodbridge, Ontario, Canada, L4H 1X9 to register the claim with a customer care representative. Royal will require proof of purchase, Product serial number and a clear photograph of the defective part(s) (or actual part(s) if requested). Royal will, at its option, repair or replace such defective part(s) free of charge, including freight charges within North America. Royal’s shipping service will deliver parts under this warranty within 8 to 10 business days. This warranty is not applicable outside North America. In order to ensure warranty coverage you must register your Product within 60 days of purchase. Warranty registration can be accomplished by calling 1-877 GO ROYAL (877 467 6925), mailing in the completed Product warranty card or registering online at www.royaloutdoor.com. Shipping Instructions: If requested for inspection, defective parts must be shipped to Royal Outdoor Products Co., Customer Care Center, 100B Royal Group Crescent, Woodbridge, Ontario, Canada, L4H 1X9. Please include the following information in the package: full name, home address, telephone number, Product model number and part number. When returning product please use an insured method of delivery such as Fed Ex insured accordingly, with the signature option on, or your preferred courier service. You must pay for return shipment, as we will not accept C.O.D. returns or any additional shipping charges, which may occur when packages are entering into Canada. Royal reserves the right to discontinue or change any of its Products, including colors, without giving notice to the purchaser. Should a Product covered by this warranty be unavailable, Royal reserves the right to substitute a Product that is of equal quality according to Royal’s sole discretion or to refund the portion of the original price for defective part of the Product reflective of its original contribution to the cost of the Product. THIS WARRANTY IS GIVEN IN LIEU OF ALL OTHER WARRANTIES, LIABILITES OR OBLIGATIONS OF ROYAL EITHER EXPRESSED OR IMPLIED, EXCEPT THAT THE DURATION OF ANY IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE LIMITED IN TIME TO THE DURATION OF THIS WARRANTY. ROYAL SHALL IN NO EVENT BE LIABLE FOR CONSEQUENTIAL OR INCIDENTAL OR SPECIAL DAMAGES OF ANY KIND FOR BREACH OF ANY EXPRESS WRITTEN OR ORAL OR IMPLIED WARRANTY ON PRODUCTS. YOUR EXCLUSIVE REMEDY SHALL BE ENFORCEMENT OF THIS WARRANTY UPON THE TERMS AND CONDITIONS HEREIN CONTAINED. NO REPRESENTATIVE OF ROYAL OR ITS DISTRIBUTORS OR DEALERS IS AUTHORIZED TO MAKE ANY CHANGE OR MODIFICATION TO THIS WARRANTY. Some jurisdictions do not allow limitation on how long an implied warranty lasts, so the limitations contained herein above may not apply to you. Some jurisdictions do not allow the exclusion or limitation on consequential or special damage, so the above limitations or exclusions may not apply to you. This warranty gives you specific legal rights, and you may also have other rights, all of which vary from jurisdiction to jurisdiction. 18 Instructions For Cleaning Congratulations on your purchase of a fine quality Storage Building from Royal Outdoor Products. With proper maintenance your vinyl storage building will exceed your expectations for years to come. Cleaning: It is recommended that you clean your storage building at least twice a year to prevent a build up of dirt. Most often a heavy rain is sufficient in cleaning it or you may want to wash your building with a standard garden hose. If neither rain nor hosing does a satisfactory job, follow these instructions. Cleaning your new building is quite easy and the following cleaners can be utilized Simply Green™, Fantastic™, Soft Scrub™, Lestoil™, Murphy’s Oil Soap™, Windex™, and Tilex™, you may also consider a mixture of 30% vinegar and water solution to use as a cleaner. Use a soft cloth or an ordinary long handled soft bristle brush to wash. Avoid using any chlorine-based cleaner, nail polish remover laundry, detergent, furniture polish cleaner, and other cleaners containing organic solvents which could effect the surface appearance of the building. For stains such as pencil, paint, oil stains and tar, use a mildly abrasive cleaner with the understanding that any abrasive material could have a deleterious effect on the surface appearance. Caution: Any material, which covers up the vinyl, may cause serious damage and is not covered by the warranty. Remove leaves, dirt, sap or excessive snow which may accumulate on the roof, do not place any lattice, vines, tar, shingles, tarps or other materials such as paint onto the surface of the vinyl. Important: Any structural modifications to the building will void the product warranty. Always refer to your product manual for guidance. If you require additional assistance contact 1-877-GO-ROYAL. Attach serial number sticker from plastic crate cover here for future reference. Model S101 Owners Manual 10’ x 10’ (3.05m x 3.05m) Structure made in Canada Printed in Canada U.S. Pat. appl’d for A Division of Royal Group Technologies Inc. 100-B Royal Group Crescent Woodbridge, Ontario, Canada L4H 1X9 http://www.royaloutdoor.com