It`s a lean life!
Transcription
It`s a lean life!
It’s a lean life! The Journey What is LEAN? • Lean Tools-5S, Takt time, Kaizen, SMED, A3, JIT, KANBAN • Using the scientific method to continuously improve the business and other related parts of the entire value stream • A complete change in the way that we work as human beings – From individual heros to strong teams – From computer driven systems to simple, physical ones – From complex systems understood by experts to simple systems that give power to the workers – From job=work to job=work + improving the work(kaizen) Nappanee Window Extrusion Mill Turning point for me Turning Point • Lost 40m/yr business in the downturn • Sold off assets and saw all of our mistakes • only dabbled with lean • Saw many of the same issues at Alum Trailer but now saw thru lean eyes Company Overview • Founded 1999 • Purchasing in Cargo Trailer Co. • Elkhart County- Trailer Capital – RVs – Cargo Trailers Products Reason For Action-Phase 1 • 60% Drop in Sales from ’07-’09 • Relied heavily on tribal knowledge • Average Vendor paid 25 days late • Negative equity • 5 inventory turns Separated into 3 lines based on work content and complexity Line 1(Raven) Line 3(Custom/Large) Line 2(Midline) Value Streams 10 Trailer Design Order Order Trailer Design Inside sales Order Order Production Drawings Production team members Order Order Order Order Order Order Order Order Order Order Order Value Stream Leader Order Purchasing and Scheduling VALUE STREAM 2 TEAM Metrics Numbers • 1000 weekly output • 500 material cost/non material margin • 500 left over • 400 people cost Phases of lean at ATC Trailers 7 Years of lots of hard work!!! Improve Flow-8 months Before After Clean up the mess-3 years Before After Sort, Set, Shine, Standardize and Sustain-4 years Before After Supermarket/Material Supply System-3 years Before After Materials/Kanban to the line Value Stream Management-2012 to present Phase 3: Lean Management System Lean= Process Improvement Tools Something was missing Lean Management System “everybody, every where, every day comes together in small teams and reflects on how we did yesterday, where was the waste, and how we can do better today” –Joe Murli True North • • • • • Zero Defects 15% Productivity Improvement year over year 100% value-added activity 100% on time delivery Respect for People True North is the unifying, overarching purpose for the entire organization and keeps the individuals and organization all pulling in the same direction. Visual Controls Visual Management makes clear to the entire team both at the working task level and leadership what should be happening versus what is actually happening Standard Work: Everyone talks about it but no one does it Operational Standard Work is what the people on the front line are doing—creating value for the customer. It is also the platform upon which the next improvement is built. Standard work-Current Open Utility Frame Table January 8, 2015 November 3, 2015 February 24, 2016 Cycle time 181 minutes Cycle time 134 minutes Cycle time 84 minutes 1 Week Production Example • 5 People • 6 OCH • 8 OUT • $44,735/week 1 Week Production Example • 6 People • 11 OCH • 25 OUT • $93,242/week 1 Week Production Example • 7 People • 13 OCH • 25 OUT • $108,600/ week Results-Labor Minutes on Open Utility line 1/30/15 360 7/30/15 315 4/13/16 31% Increase 248 People Systems • Training Leaders to lead in a new way • Training ourselves to ask the right questions People Systems ensure that HR/People Development systems, policies, and practices align with the behaviors necessary for continual improvement. Leader Standard Work-Bus Schedule Accountability Systems Accountability Systems are the methods employed to avoid the trap of assigning a failure to individual blame as a management control mechanism. It encourages the surfacing of problems throughout the organization in an objective and actionable way. Daily Reflection/Tier Meetings Tier 2-Market Tier 2-Final • Video of Tier 2 meeting Changing the way we work as human beings- CAN’T BE DELEGATED! Lean accounting: is simple and just makes sense to lean organizations Lean at home 37 Lean at home Lean at home
Similar documents
Lean Principles in Facility Management
• Lean manufacturing is the production of goods using less of everything compared to traditional mass production: less waste, human effort, manufacturing space, investment in tools, inventory, and ...
More information