#88997 Standale Lumber Engelsma Homes Mirecki Residence

Transcription

#88997 Standale Lumber Engelsma Homes Mirecki Residence
B
A2
LU
S2
4
A1
A
16'
A3
'
6
1
2'
A4
"4
4'
O3
C19
C20
2'
2'
2'
G2
1'10"
G
GL
G5
G4
V4
LUS24
1'10"8
L
V3
K
V2
N
U
U
6
H
E11
E12
E13
V1
V
N1
U1
M
V
V
V6
12'
15'9"
V5
V
U7
10'
G6
G7
16'4"
C18
LUS24
2'
U
LUS24
G3
G1
2'
BW
E10
J
2'
H
15'10"
1'10"
2'
2'
2'
2'
2'
2'
2'
2'
E9
HUS26
O5
CL1
PB6
O3
PB7
HUS26
23'8"
C15
O4
2'
2'
O8
2'
#88997 Standale Lumber
Engelsma Homes
Mirecki Residence
Lot: MIRECKI
Layout: DCS
Designer: Robert Herron
Contractor: ENGELSMA
Customer: STANDALE LBR GRANDVILLE
Address: 1100 AUTUMN RIDGE DRIVE NE
1
AA
14
W
W
13
W
AA
2'
C2
2'
2'
U5
C11
V5
AA
1
AA
L
1
W
W
W
2
11
AA
W
10
W
'
24
AB
2'
HUS26
8
W
6
W
4
W
10
W 11
W
2
E8
2'
2'
BP
11'
trusses stubbed
1/2" here (shtng)
E7
2'
O9
W
W9
E6
2'
PB1
6'
5
W
1
W
1
W
W
AB
14
W
6'
W9
6'
W
U
U
6
1
C17
U1
U1
W
4
W
3
PB2
D
THASL/R29
W
AA
PB3
Q
W
2
ODD SPACE
2'
4'
2'
HUS26
2'
C3
C5
23'8"
C1
CL3
2'
2'
7"11
1'4"5
U1
W
1
2'
2'
U4
U
E3
E5
U2
T6
W9
2'
C14
1
W
W
T4
2'
beam (by others)
built in wall.
hang into girder
LU
S2
4
T3
L
W
2' EL2
12' 2'
girder cantilevered
here to allow hanger
2'
2'
2'
BP
E1
2'
U3
2'
C6
C9 P
C10
C8
W
2'
10
T2
LU
S2
4
2'
2'
2'
BP
NO HANGER
2'
C4
C7 ODD SPACE
C
ER
S
H
N
O
CL2
1'1"10
S
1'11"4
2'
T1
THASL29
1
1
W
2'
2'
TJC57
W
AN
G
2 PLY
S1
S2
TJC57
W9
57
W
2'
HUS26 hangers raised 2" here (scissors only)
TH
AS
L2
9
2'
C
TJ
W
2'
E
2'
2'
R
T5
E2
2'
2'
2'
2'
16-11-1/8" den
O2
E4
EL1
2'
4'
2'
C12
2'
2'
11-1-1/8" entry & partial garage
LUS24
O1
12
2'
10-1-1/8" porch
PB5
4"
2'
11"4
PB4
2'
9-1-1/8" typical
these 2 trusses dropped
for 2x4 outlookers
A5
2'
'1
1
10'4"
A6
A7
F
12'8"
C13
1
2'
4'
A3
JOB NO:
88997
PAGE NO:
1 OF 1
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / A 19'9" 7/6 Sci
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud::Rt Stub Wedge 2x4 SPF Stud:
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left and right cantilevers are exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
27
0.00
BC
75
2.21
BC
27
17.54
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
2.21
17.54
19.75
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
9'10"8
9'10"8
L 996 / / 425 / / 78
H 996 / / 425 / /Wind reactions based on MWFRS
L Min Brg Width Req = 1.6
H Min Brg Width Req = 1.6
Bearings L & H Fcperp = 565psi.
/W
/ 4.0
/ 4.0
D 4X4
12
7
1
11
"3
1'5
3X4 C
E
6'5"
J
A-B
B-C
C-D
3X4
6X8
3X5 B
3'10"
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
'5"
3
K
3X5
2X6(G1)
G
12
L
1'10"8
4X4
H
8'6
"14
33 - 65 J - I
54 - 136 I - H
1323
0 H-G
16'
8'6
"14
1'10"8
B-L
B-K
K-C
C-J
J-D
2'2"8
7'8"
7'8"
95 - 858 J - E
1233
0 E-I
57 - 455 I - F
310
0 H-F
1140
0
2'2"8
19'9"
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
0
- 135
- 65
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
DESC = A 19'9" 7/6 Sci
PLT TYP. WAVE
1323
54
33
9'1"2
4X4
2'2"8
2'2"8
A-L
L-K
K-J
3X5
I
6
7"14
0 - 1482
52 - 1383
141
- 33
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
F 3X5
2X6(G1)
A
141 - 33 D - E
52 - 1383 E - F
0 - 1482 F - G
PLY= 1 QTY= 4
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
A 19'9" 7/6 Sci
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =108.3
DUR. FAC 1.15
SEQ - 127065
SPACING 24.0 "
TYPE SCIS
310
57
1233
95
- 36
- 455
0
- 858
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / A1 19'9" 7/* Sp Hip
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud::Rt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left and right cantilevers are exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
9.02
BC
27
0.00
BC
52
2.21
BC
36
6.10
BC
23
8.91
BC
36
10.84
BC
52
13.65
BC
27
17.54
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
10.73
2.21
6.10
8.91
10.84
13.65
17.54
19.75
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
5'6"12
3'5"3
1'9"3
5'3"
7
5X10
E
6'5
"4
6'5
N 1019 / / 414 / / 59
I 1019 / / 414 / /Wind reactions based on MWFRS
N Min Brg Width Req = 1.6
I
Min Brg Width Req = 1.6
Bearings N & I Fcperp = 565psi.
3'8"
4
4
3'8"
4X6
D
12
5'6"12
1'9"3
12
4.72
3'5"3
4X6 C
F
A-B
B-C
C-D
D-E
4X4(R1)
3'10"13
1'11"11
2'10"12
4X6 K
G
4X6
M
5X5
2X6(G1)
A
3X5
2X6(G1)
H
12
7"14
A-N
N-M
M-L
L-K
9'1"2
6
4X6
N
12
1'10"8
1'10"11
"2
2'11
16'
I
2'11
"2
4X6
B-N
B-M
C-M
C-L
L-D
L-E
2'2"8
3'11"5
2'9"5
1'10"11
2'9"5
36 - 80 K - J
62 - 153 J - I
1078 - 140 I - H
1249 - 131
3'11"5
2'2"8
179
1198
97
322
330
138
- 862
- 186
- 226
- 11
- 16
- 131
E-K
K-F
J-F
J-G
I-G
19'9"
DESC = A1 19'9" 7/* Sp Hip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
1079
62
36
- 140
- 154
- 79
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
"15
2'2"8
2'2"8
281 - 1409
254 - 1329
164
- 35
1'10"8
4'4
5
"1
4'4
165 - 35 E - F
254 - 1328 F - G
281 - 1411 G - H
290 - 1252
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
J
3.99
/ 4.0
/ 4.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
"4
5X10
L
3X5 B
/W
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
A1 19'9" 7/* Sp Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =111.0
DUR. FAC 1.15
SEQ - 127067
SPACING 24.0 "
TYPE SPEC
330
284
97
1199
179
- 15
- 12
- 225
- 186
- 862
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / A2 19'9" */12 SP Girder
Top chord 2x4 SPF #1/#2 :T2, T4 2x4 SPF 1650f-1.5E:
Bot chord 2x6 SPF 1650f-1.5E :B1, B5 2x4 SPF #1/#2:
Webs 2x4 SPF Stud :W2, W6 2x4 SPF #1/#2:
:Lt Stub Wedge 2x4 SPF Stud::Rt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 76 plf at 0.00 to 76 plf at 1.42
TC- From 75 plf at 1.42 to 75 plf at 8.03
TC- From 38 plf at 8.03 to 38 plf at 11.72
TC- From 75 plf at 11.72 to 75 plf at 18.33
TC- From 76 plf at 18.33 to 76 plf at 19.75
BC- From 20 plf at 0.00 to 20 plf at 2.22
BC- From 21 plf at 2.22 to 21 plf at 7.92
BC- From 10 plf at 7.92 to 10 plf at 11.83
BC- From 21 plf at 11.83 to 21 plf at 17.53
BC- From 20 plf at 17.53 to 20 plf at 19.75
PLB- 320.82 lb Conc. Load at ( 8.09,11.03), (9.06,11.03), (10.69,11.03)
(11.66,11.03)
Left and right cantilevers are exposed to wind
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1'5"
6'7"5
3'8"6
6'7"5
1'5"
3'8"6
12
4.72
4
7'1"
5X6
C
5X5
D
7'1"
4
1'7
"
"1 1
1'7
1'5"13
1'10"12
4'1"
8X10 B
I
8X10
10X10
11
A-B
B-C
C-D
8X10
E
F 2X6(G1)
7"14
A-J
J-I
I-H
9'1"2
J
3.99
G
12
1'10"8
16'
3'10"14
6 '0 "
2'2"11
B-J
B-I
I-C
C-H
2'2"11
5'8"7
3'10"14
5'8"7
240 - 31 H - G
46 - 609 G - F
3111 - 209
46
242
116 - 1378 D - H
3755 - 248 H - E
987 - 43 G - E
20 - 33
972
- 43
3744 - 247
116 - 1376
2'2"11
19'9"
DESC = A2 19'9" */12 SP Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
- 607
- 31
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
2
2'2"11
242 - 3517
72 - 210
5X5
1'10"8
6 '0 "
2
72 - 209 D - E
242 - 3526 E - F
209 - 3104
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
H
2X6(G1)
A
5X5
/ 5.7
/ 5.7
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
7
/W
J 1507 / 58
///G 1507 / 58
///Wind reactions based on MWFRS
J Min Brg Width Req = 2.4
G Min Brg Width Req = 2.4
Bearings J & G Fcperp = 565psi.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
A2 19'9" */12 SP Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =117.9
DUR. FAC 1.15
SEQ - 127077
SPACING 24.0 "
TYPE SPEC
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / A2 19'9" */12 SP Girder
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
END(FT)
TC
24
8.05
11.70
BC
27
0.00
2.22
BC
72
2.22
7.89
BC
48
7.89
11.86
BC
72
11.86
17.53
BC
27
17.53
19.75
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
DESC = A2 19'9" */12 SP Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
A2 19'9" */12 SP Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =117.9
DUR. FAC 1.15
SEQ - 127077
SPACING 24.0 "
TYPE SPEC
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / A3 19'9" 7/12 Common
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud::Rt Stub Wedge 2x4 SPF Stud:
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left and right cantilevers are exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
19.75
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
9'10"8
9'10"8
11
'5"
3
3
'5"
11
12
/ 4.0
/ 4.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
C 4X4
7
/W
H 975 / / 406 / / 78
F 975 / / 406 / /Wind reactions based on MWFRS
H Min Brg Width Req = 1.5
F Min Brg Width Req = 1.5
Bearings H & F Fcperp = 565psi.
A-B
B-C
236 - 89 C - D
95 - 709 D - E
95
236
- 709
- 89
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6'5"
3X4 B
D
A-H
H-G
3X4
94 - 122 G - F
568 - 35 F - E
568
94
- 35
- 122
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
2X6(G1)
A
H-B
B-G
C-G
2X6(G1)
E
7"14
186 - 1034 G - D
119 - 106 D - F
266
0
119 - 106
186 - 1034
9'1"2
3X4
6X8
G
H
1'10"8
3X4
16'
F
1'10"8
19'9"
DESC = A3 19'9" 7/12 Common
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
A3 19'9" 7/12 Common
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =99.7
DUR. FAC 1.15
SEQ - 126477
SPACING 24.0 "
TYPE COMN
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / A4 19'9" 7/12 Pan
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud::Rt Stub Wedge 2x4 SPF Stud:
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
53
0.00
BC
75
4.54
BC
31
15.33
BC
53
17.56
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4 except as noted.
(**) 4 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left and right cantilevers are exposed to wind
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
4.54
15.33
17.56
19.75
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
9'10"8
9'10"8
P 978 / / 407 / / 78
H 980 / / 407 / /Wind reactions based on MWFRS
P Min Brg Width Req = 1.5
H Min Brg Width Req = 1.5
Bearings P & H Fcperp = 565psi.
/W
/ 4.0
/ 4.0
D 4X4
12
7
1
11
"3
1'5
A-B
B-C
C-D
E
6'5"
C
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
'5"
3
3X5 B
1'
3"8
7"14
P
1'10"8
5X6(**)
O M
1.5X4(**)
1.5X3
N
3X8
L
3.61
16'
5X6(**)
KI
1.5X4(**)
1.5X3
J
A-P
P-O
P-N
O-M
M-L
2X6(G1)
G
9'1"2
H
1'10"8
10'8"
2'5"8
4'5"
2'2"4
B-P
B-M
O-N
M-C
C-L
D-L
4'5"
2'2"12
1"8
1"8
10'8"
2'2"12
41 - 109 L - K
52 - 155 K - I
0
-4 J - H
54 - 154 I - H
799 - 15 H - G
2'2"4
85 - 831 L - E
947 - 35 E - K
32
0 K-F
77 - 222 J - I
74 - 285 H - F
295
0
19'9"
DESC = A4 19'9" 7/12 Pan
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 3
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
- 769
- 910
- 36
799
54
0
52
41
- 15
- 153
-4
- 155
- 109
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
12
2'5"8
89
75
169
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
F 3X5
2X6(G1)
A
169 - 36 D - E
75 - 909 E - F
89 - 769 F - G
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
A4 19'9" 7/12 Pan
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =120.2
DUR. FAC 1.15
SEQ - 126479
SPACING 24.0 "
TYPE SCIS
74
77
947
33
85
- 286
- 221
- 35
0
- 831
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / A5 19'9" 7/12 Common
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Rt Slider 2x10 SP 2400f-2.0E: BLOCK LENGTH = 2.563'
:Lt Stub Wedge 2x4 SPF Stud:
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Left and right cantilevers are exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
19.75
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
9'10"8
9'10"8
11
'5"
3
3
'5"
11
12
/ 4.0
/ 5.7
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
C 4X4
7
/W
I 1060 / / 444 / / 78
J 862 / / 348 / /Wind reactions based on MWFRS
I
Min Brg Width Req = 1.5
J Min Brg Width Req = 1.5
Bearings I & J Fcperp = 565psi.
A-B
B-C
C-D
255 - 75 D - E
106 - 851 E - F
105 - 888
148 - 1231
653 - 1536
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6'5"
3X5 B
D
1.5X3
A-I
I-H
E
632
1075
6X8(**)
F
I-B
B-G
7"14
182 - 1159 C - G
187 - 57 G - D
390
136
9'1"2
3X4
I
3X5
H
1'10"8
3X8
G
J
8"11
17'1"13
19'9"
DESC = A5 19'9" 7/12 Common
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
- 43
- 82
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
3X4
2X6(G1)
A
87 - 138 H - G
632 - 43 G - F
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
A5 19'9" 7/12 Common
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =103.6
DUR. FAC 1.15
SEQ - 126481
SPACING 24.0 "
TYPE COMN
0
- 508
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / A6 21'0"5 7/12 Common
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2 :B2 2x8 SP 2400f-2.0E:
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
9'10"8
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1'2"4
9'11"9
I 1119 / / 465 / / 78
F 878 / / 345 / /Wind reactions based on MWFRS
I
Min Brg Width Req = 1.5
F Min Brg Width Req = 1.5
Bearings I & F Fcperp = 565psi.
11
'6"
7
3
'5"
11
12
/W
/ 4.0
/ 5.7
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
C 4X4
7
END(FT)
21.03
A-B
B-C
289 - 67 C - D
102 - 990 D - E
104 - 1019
147 - 1413
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
D
6'5"
3X5 B
A-I
I-H
H-G
1.5X3
80 - 165 G - E
685 - 45 E - F
686 - 44
1136
0
- 82
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
2X6(G1)
A
I-B
B-G
E 2X8
7"14
7"4
3X4
I
H
6X8
G
3X8
1'10"8
174 - 1296 C - G
244 - 14 G - D
504
147
9'1"2
F
19'1"13
21'0"5
DESC = A6 21'0"5 7/12 Common
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
A6 21'0"5 7/12 Common
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =119.0
DUR. FAC 1.15
SEQ - 126483
SPACING 24.0 "
TYPE COMN
0
- 451
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / A7 20'9"13 7/12 Girder
Top chord 2x6 SPF 1650f-1.5E
Bot chord 2x8 SP 2400f-2.0E
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal spacing
between rows and stagger nails in each row to avoid splitting.
4" o.c. spacing of nails perpendicular and parallel to
grain required in area over bearings greater than 4"
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 76 plf at 0.00 to 76 plf at 8.00
TC- From 76 plf at 8.00 to 76 plf at 13.86
TC- From 76 plf at 13.86 to 76 plf at 20.82
BC- From 20 plf at 0.00 to 20 plf at 20.82
BC- 1413.46 lb Conc. Load at 1.06
BC- 1291.86 lb Conc. Load at 3.89
BC- 1251.69 lb Conc. Load at 6.72
BC- 1107.64 lb Conc. Load at 9.55
BC- 1737.00 lb Conc. Load at 12.38
BC- 1502.00 lb Conc. Load at 15.21
BC- 1400.00 lb Conc. Load at 18.03
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3 Complete Trusses Required
8'
5'10"5
Q 6011 / / 206 / /I 5695 / / 123 / /Wind reactions based on MWFRS
Q Min Brg Width Req = 2.2
J Min Brg Width Req = 2.1
Bearings Q & J Fcperp = 565psi.
6'11"8
"6
7
A-B
B-C
C-D
D-E
C 4X6
"2
9'3
/ 4.0
/ 5.7
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6'9
12
/W
0
0
0
0
- 2119 E - F
- 1925 F - G
- 1932 G - H
- 3846
0 - 2388
0
-5
0
0
6'11"8
3X4 B
6'5"
D
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X12
E
5X8(SRS)
F 4X8
Q-P
P-O
O-N
N-M
1.5X3
G H
5X5 A
3'
1'9"
P
H0310
O
6X8
N
5X7
M
4X4
L
4X6
K
5X5
J
3X10
0
0
0
0
M-L
L-K
K-J
J-I
2639
3467
2204
0
I
20'9"13
A-Q
A-P
P-B
B-N
C-N
N-D
M-D
0 - 1596 D - L
1845
0 L-E
180 - 58 E - K
0 - 195 K - F
1779
0 F-J
0 - 1459 G - J
602
0
1495
0
0 - 1019
0 - 1400
1570
0
0 - 2761
6
- 57
DESC = A7 20'9"13 7/12 Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 3 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
0
0
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
Q
2X6
17
1791
1791
2657
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
A7 20'9"13 7/12 Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =521.1
DUR. FAC 1.15
SEQ - 126406
SPACING 24.0 "
TYPE COMN
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / A7 20'9"13 7/12 Girder
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
END(FT)
TC
24
13.86
20.82
BC
120
0.00
20.82
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
DESC = A7 20'9"13 7/12 Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 3 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
A7 20'9"13 7/12 Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =521.1
DUR. FAC 1.15
SEQ - 126406
SPACING 24.0 "
TYPE COMN
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / AA 3'9"12 7/4 Jack
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
46
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
3.81
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'10"8
11"4
G 449 / / 190 / / 27
E -27
/ 28
/ 17 / /Wind reactions based on MWFRS
G Min Brg Width Req = 1.5
F Min Brg Width Req = Bearing G Fcperp = 565psi.
12
7
4
"
1'1
12
6
3'0"
A-B
B-C
D
1.5X3C
7"8
2X6(G1)
A
A-G
G-F
1'10"8
168 - 241 F - E
2 - 36
G-B
B-F
184 - 403 C - F
68
-4
3X4 F E
G
1'11"4
3'9"12
DESC = AA 3'9"12 7/4 Jack
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
0
-6
PLY= 1 QTY= 2
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
11'1"2
2X4
298 - 147 C - D
9 - 45
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
2'1"9
1'7"
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X6(SRS) B
PLT TYP. WAVE
/W
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
AA 3'9"12 7/4 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =23.8
DUR. FAC 1.15
SEQ - 126485
SPACING 24.0 "
TYPE SPEC
4
- 20
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / AA1 1'11"4 7/4 Jack
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Level Return 2x6 SPF 1650f-1.5E::Lt Level Return 2x4 SPF Stud:
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
23
0.04
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
1.94
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
11"4
1'
K 364 / / 93 / / 25
G 36
/ 36
/ 34 / /Wind reactions based on MWFRS
K Min Brg Width Req = H Min Brg Width Req = -
12
7
6
3'0"
1'7"
1.5X3
4X6(SRS) D
1.5X3
C
1.5X3 B
1.5X4 A
A-B
B-C
C-D
3'3"
4X4
4'1"9
3X4
I
45
50
320
-4 D - E
0 E-F
- 48
- 22
-6
11'1"2
I-H
5
- 66 H - G
0
0
HG
2'
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
A-J
B-J
C-I
I-K
9'1"2
K
5
-6 I - D
4
-1 D - H
367 - 312 E - H
111 - 364
1'11"4
1'10"8
LEFT RAKE = 1'11"11
DESC = AA1 1'11"4 7/4 Jack
PLT TYP. WAVE
19
0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
J 1.5X3
7"8
//-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
EF
2'1"9
4
"
1'1
12
/W
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
AA1 1'11"4 7/4 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =30.0
DUR. FAC 1.15
SEQ - 126487
SPACING 24.0 "
TYPE SPEC
53
119
16
- 358
-8
- 51
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / AA2 1'11"4 7/4 Jack
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
23
0.04
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
1.94
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
11"4
1'
H 117 / / 31 / / 16
E 105 / 28
/ 49 / /Wind reactions based on MWFRS
H Min Brg Width Req = F Min Brg Width Req = -
12
7
0
1'0"1
"
1'1
12
1.5X3
CD
1'7"
4X4
FE
A-B
B-C
- 15 C - D
- 23
0
-6
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
G-F
9'1"2
H
122
18
11'1"2
2'
3'3"
3X4
G
//-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
2'1"9
4X6(SRS) B
1.5X3 A
4'1"9
4
/W
A-G
G-H
G-B
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
DESC = AA2 1'11"4 7/4 Jack
PLY= 1 QTY= 4
- 63 F - E
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
1'11"4
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
31
56 - 38 B - F
0 - 117 C - F
10 - 127
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
AA2 1'11"4 7/4 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =21.6
DUR. FAC 1.15
SEQ - 126224
SPACING 24.0 "
TYPE SPEC
115
16
- 53
- 50
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / AB 5'3"3 */12 HJ Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
63
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
5.27
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
4'0"13
1'2"7
12
4.95
9
1'3"
12
A-B
B-C
D
1.5X3 C
A-G
G-F
2'0"15
7"8
2X6(G1)
A
2X6
2'7"1
0
4X4
303 - 442 F - E
5 - 76
0
G-B
B-F
326 - 617 C - F
119
-6
25
FE
2'8"2
5'3"3
DESC = AB 5'3"3 */12 HJ Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
-5
PLY= 1 QTY= 2
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
11'1"2
G
499 - 282 C - D
3 - 50
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X6(SRS) B
1'7"
/ 5.7
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4'2"2
2.83
/W
G 600 / 7
/ 240 / / 27
E -38
/ 38
/ 26 / /Wind reactions based on MWFRS
G Min Brg Width Req = 1.5
F Min Brg Width Req = Bearing G Fcperp = 565psi.
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
AB 5'3"3 */12 HJ Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =29.4
DUR. FAC 1.15
SEQ - 126489
SPACING 24.0 "
TYPE SPEC
- 12
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / B 5'10"8 7/6 Mono
Top chord 2x4 SP 2850f-2.3E
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
Wind loads and reactions based on MWFRS with additional C&C
member design.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 76 plf at 0.00 to 76 plf at 5.87
BC- From 20 plf at 0.00 to 20 plf at 2.21
BC- From 22 plf at 2.21 to 22 plf at 5.58
PLT- 375.00 lb Conc. Load at ( 2.46,11.14), (3.62,11.82)
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
27
0.00
BC
49
2.21
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
(J) Hanger Support Required, by others
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Shim all supports to solid bearing.
END(FT)
2.21
5.87
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1.5X3 C
"10
6'9
12
4'1"
A-B
3X5 B
7"14
4X6
158 - 101 B - C
149
- 96 E - D
B-E
B-D
97 - 994 C - D
117 - 93
4'
"4
3'9
2'2"8
2'2"8
3'8"
5'10"8
DESC = B 5'10"8 7/6 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 4
110
- 413
134
- 150
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
12
E
1'10"8
A-E
9'1"2
6
/ 4.0
/-
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'8"4
2X6(G1)
A
1'10"12
10'11"14
D
3X10(**)
/W
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
2'2"4
7
E 1036 / / 218 / / 63
D 321 / 37
/ 56 / /Wind reactions based on MWFRS
E Min Brg Width Req = 1.6
D Min Brg Width Req = Bearing E Fcperp = 565psi.
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
B 5'10"8 7/6 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =32.0
DUR. FAC 1.15
SEQ - 127073
SPACING 24.0 "
TYPE MONO
54
- 242
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / B 5'10"8 7/6 Mono
Mechanical Unit Loads Supported by this Truss
Load
At
Truss
Unit
Unit
Supporting
case#
X-Loc
Piece
Lbs.
Width
Trusses
1
3.04
TC
1500.0
1.17
4
4
3.04
TC
1500.0
1.17
4
5
3.04
TC
1500.0
1.17
4
6
3.04
TC
1500.0
1.17
4
This dwg. prepared by the ITW job designer program from truss mfr's layout.
DESC = B 5'10"8 7/6 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 4
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
B 5'10"8 7/6 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =32.0
DUR. FAC 1.15
SEQ - 127073
SPACING 24.0 "
TYPE MONO
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C 21'1"15 7/12 Mono Hip
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud :W1 2x6 SPF 1650f-1.5E:
:W4 2x4 SPF #3:
All plates are 3X4 except as noted.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
4.30
BC
75
0.00
BC
74
17.02
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
115 mph wind, 15.89 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
END(FT)
21.16
17.02
21.16
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
4'3"9
16'10"6
O 1108 / / 394 / / 48
G 1052 / 4
/ 375 / /Wind reactions based on MWFRS
O Min Brg Width Req = G Min Brg Width Req = -
16'10"6
12
7
1
1"1
4'1
5X6 B
5X5
C D
DT -1"12
E
3X5
4X4
3X4 A
5'10"14
O-N
N-M
M-L
L-K
N
3X5
M
3X8
L
15'2"1
1.5X3
K
1'10"6
17
541
541
2
- 70 J - I
- 98 K - H
- 98 I - G
- 10
16
0
0
9'1"2
1.5X3
H
4'1"8
87
861
105
390
124
882
- 1099
- 39
- 453
- 14
- 533
- 114
C-J
E-J
J-K
J-F
I-H
F-G
164
133
194
1206
0
160
21'1"15
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
0
- 13
0
A-O
A-N
N-B
B-L
L-C
L-J
DESC = C 21'1"15 7/12 Mono Hip
PLT TYP. WAVE
- 899
- 901
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
2'
O
115
115
11'1"2
2X6
G
I
71 - 661 D - E
107 - 789 E - F
115 - 899
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
5'6"8
8'0"10
6X8
1.5X3
//-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
F
A-B
B-C
C-D
J
/W
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C 21'1"15 7/12 Mono Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =173.5
DUR. FAC 1.15
SEQ - 126330
SPACING 24.0 "
TYPE HIPM
-9
- 447
0
- 154
- 22
- 997
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C1 23'7"7 7/12 Mono Hip
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud :W1 2x6 SPF 1650f-1.5E:
:W4, W5, W6, W9, W10 2x4 SPF #3:
:Rt Bearing Leg 2x6 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 1.5X3 except as noted.
115 mph wind, 15.89 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
(J) Hanger Support Required, by others
(b) Continuous lateral restraint equally spaced on member.
Left end vertical not exposed to wind pressure.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
8.30
BC
75
0.00
BC
74
19.02
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
(a) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
END(FT)
23.62
19.02
23.16
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
8'3"9
15'3"14
P 1252 / / 453 / / 93
G 1295 / 18
/ 426 / /Wind reactions based on MWFRS
P Min Brg Width Req = G Min Brg Width Req = 4.7
Bearing G Fcperp = 565psi.
15'3"14
12
5X6 C
"5
9 '7
7
5X5
D
DT -1"12
3X4
E
4X8 G
11"13
17'2"3
P-O
O-N
N-M
M-L
8'1"1
(b)
4'4"8
(a)
K
A-P
A-O
B-O
O-C
C-M
M-D
M-K
D-K
2'
6X8
9'1"2
3X10
O
3X5
N
3X8
M
L
17'2"1
I
1'10"6
4'1"8
120
120
34 - 136 K - J
771 - 140 L - I
771 - 140 J - H
0 - 13
47
0
31
5"8
23'7"7
60
1046
132
34
224
91
978
59
- 1285
- 23
- 469
- 165
0
- 348
- 123
- 39
E-K
K-L
K-F
J-I
G-H
F-G
F-G
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
0
- 15
-6
137 - 478
157
0
1289 - 167
0
- 13
121
0
121
0
204 - 1319
DESC = C1 23'7"7 7/12 Mono Hip
PLT TYP. WAVE
- 906
- 907
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
2X6
H
J
52 - 859 D - E
141 - 890 E - F
117 - 870
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6'1"1
9'2"10
B
3X4
P
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-B
B-C
C-D
(a)
// 4.7
F
2X8
3X5 A
/W
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C1 23'7"7 7/12 Mono Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =198.1
DUR. FAC 1.15
SEQ - 126321
SPACING 24.0 "
TYPE SPEC
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C2 25'7"7 7/12 Mono Hip
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud :W1 2x6 SPF 1650f-1.5E:
:W4, W5, W6, W8, W9 2x4 SPF #3:
:Rt Bearing Leg 2x6 SPF Stud:
All plates are 2X6 except as noted.
(b) Continuous lateral restraint equally spaced on member.
Wind loads and reactions based on MWFRS with additional C&C
member design.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
115 mph wind, 15.89 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
12.30
BC
75
0.00
BC
74
21.02
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
(a) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
END(FT)
25.62
21.02
25.16
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
12'3"9
13'3"14
13'3"14
12
7
1
3X4
D
DT -1"12
4X10
E
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
2'1"13
5X6 C
"14
4'2
F 2X8
A-B
B-C
17'2"3
N-M
M-L
L-K
6'1"1
10'4"10
(a)
8'1"1
(b)
3'2"8
1.5X3
I
A-N
A-M
M-B
B-L
L-C
L-J
C-J
G
2'
J
9'1"2
3X5
M
6X12(**)
L
118
117
1.5X4
K
19'2"1
1'10"6
1.5X3
H
4'1"8
69 - 210 K - H
989 - 214 J - I
0 - 10 I - G
0
42
28
5"8
71
1064
79
102
177
897
38
- 1253
-2
- 285
- 310
0
- 143
- 176
D-J
J-K
J-E
I-H
F-G
E-F
E-F
25'7"7
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
- 13
-1
-6
160 - 563
270
0
1312 - 181
0
- 49
120
0
120
0
214 - 1356
DESC = C2 25'7"7 7/12 Mono Hip
PLT TYP. WAVE
- 841
- 839
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
(a)
6X8
N
71 - 1228 C - D
119 - 1106 D - E
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4 B
3X8 A
/W
N 1292 / / 506 / / 139 / F 1367 / 25
/ 478 / // 4.7
Wind reactions based on MWFRS
N Min Brg Width Req = F Min Brg Width Req = 4.7
Bearing F Fcperp = 565psi.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C2 25'7"7 7/12 Mono Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =202.1
DUR. FAC 1.15
SEQ - 126312
SPACING 24.0 "
TYPE SPEC
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C3 32'5"7 7/4 HHIP
Top chord 2x4 SPF #1/#2
Bot chord 2x8 SP 2400f-2.0E :B3 2x4 SPF #1/#2:
:B4 2x4 SPF 1650f-1.5E:
Webs 2x4 SPF Stud :W4, W6 2x4 SPF #3:
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
(a) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
0.00
BC
75
-0.56
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
END(FT)
18.05
32.46
Right end vertical exposed to wind pressure. Deflection meets L/180.
Max JT VERT DEFL: LL: 0.15" DL: 0.17". See detail
DEFLCAMB1014 for camber recommendations. Provide for
adequate drainage of roof.
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
7"4
18'
2'11"6
1'11"8
9'6"
12
7
3'4
/W
U 1732 / / 579 / / 119 / 3.5
K 2007 / / 694 / // 3.5
Wind reactions based on MWFRS
U Min Brg Width Req = 1.6
K Min Brg Width Req = 3.1
Bearings U & K Fcperp = 565psi.
"15
18'
F
3X5
3X4
C
D
5X6
8'5"8
12
7"4
U T
(a)
(a)
3X4
4
4'1"
H
4X6(SRS)
I 4X6
4X8(**)
5X5 S
7"11
5X5
R
5X5
Q
P
2X8
6X8
3X8
O
4X6
N
5'11"9
4X10
M
0
245
245
245
240
0
- 2278
- 2278
- 2278
- 1988
F-G
G-H
H-I
I-J
230 - 2070
200 - 1547
121 - 1346
60
0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
J
2'3"3
3X8
A-B
B-C
C-D
D-E
E-F
E
G
(a)
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
10
'11
"15
2'11"
4X10
B
A 3X4
5X5
9'8"6
9'1"2
6X8
L 3X5 K
U-S
T-S
T-S
S-T
S-R
R-Q
236 - 94 Q - P
1433 - 287 P - O
173 - 55 O - N
1433 - 71 N - M
1606 - 35 M - L
1606 - 26 L - K
1610
1608
2234
2234
1801
33
- 26
- 27
- 101
- 101
- 93
- 21
1'11"
26'4"15
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
33'0"2
A-T
T-B
B-Q
B-O
D-O
O-E
E-M
RIGHT RAKE = 2'0"4
DESC = C3 32'5"7 7/4 HHIP
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
54
247
273
986
135
175
203
- 182
- 2180
0
- 92
- 678
- 337
- 1522
F-M
M-G
G-L
H-L
L-I
I-K
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C3 32'5"7 7/4 HHIP
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =246.9
DUR. FAC 1.15
SEQ - 126433
SPACING 24.0 "
TYPE HHIP
1684 - 159
123 - 236
78 - 812
117 - 567
1819
- 42
218 - 2094
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C4 27'7"7 7/12 Mono Hip
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF #3 :W1 2x6 SPF 1650f-1.5E:
:W2, W3, W4, W8, W11 2x4 SPF Stud:
:Rt Bearing Leg 2x6 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4 except as noted.
115 mph wind, 15.89 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
(b) Continuous lateral restraint equally spaced on member.
(a) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
16.30
BC
75
0.00
BC
74
23.02
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
27.62
23.02
27.16
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
16'3"9
11'3"14
11'3"14
DT -1"12
5X6 E
/W
Q 1413 / / 556 / / 184 / H 1515 / 30
/ 532 / // 4.7
Wind reactions based on MWFRS
Q Min Brg Width Req = H Min Brg Width Req = 4.7
Bearing H Fcperp = 565psi.
F
4X10
G
'1
18
12
7
3'3"13
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
0"7
D
2X8
H
A-B
B-C
C-D
17'2"3
(b)
8'1"1
(a)
2'0"8
6X8
L
K
2X6
I
1.5X3
A-Q
Q-B
B-P
P-D
D-N
N-E
N-L
E-L
9'1"2
3X6
Q
1311 - 282 L - K
1221 - 215 M - J
1221 - 215 K - I
0 - 16
49
0
29
3X5
O
P
3X8
N
21'2"1
1.5X3
1.5X3
M
J
1'10"6
4'1"8
5"8
27'7"7
66
18
131
298
143
370
981
42
- 245
- 1647
- 13
-6
- 662
0
- 138
- 291
F-L
L-M
L-G
K-J
H-I
G-H
G-H
135 - 483
195
0
1399 - 188
0
- 31
129
0
129
0
243 - 1539
DESC = C4 27'7"7 7/12 Mono Hip
PLT TYP. WAVE
0
- 17
-6
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
(a)
2X6 A
2'
Q-P
P-O
O-N
N-M
6'1"1
11'6"10
3X5
113 - 1136
113 - 822
112 - 819
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
(a)
C
3X8B
59 - 202 D - E
84 - 1608 E - F
102 - 1555 F - G
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C4 27'7"7 7/12 Mono Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =230.0
DUR. FAC 1.15
SEQ - 126308
SPACING 24.0 "
TYPE SPEC
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C5 30'5"7 7/4 HHIP
Top chord 2x4 SPF #1/#2
Bot chord 2x8 SP 2400f-2.0E :B3, B4 2x4 SPF #1/#2:
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Max JT VERT DEFL: LL: 0.14" DL: 0.17". See detail
DEFLCAMB1014 for camber recommendations. Provide for
adequate drainage of roof.
(a) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
Right end vertical not exposed to wind pressure.
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
0.00
BC
80
-0.56
BC
75
6.34
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
14.05
6.34
30.46
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
6"11
14'0"10
4'11"6
12
7
9'6"
"12
E
5X5
B
10
4X6
"15
12
5X6
/W
/ 3.5
/ 3.5
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
'11
F 3X4
D
A-B
B-C
C-D
D-E
4
4'1"
8'5"8
5X5
C
T 1500 / / 542 / / 90
J 1884 / / 649 / /Wind reactions based on MWFRS
T Min Brg Width Req = 1.5
J Min Brg Width Req = 3.0
Bearings T & J Fcperp = 565psi.
5'8
14'0"10
A 3X4
1'11"8
0
0 E-F
172 - 1661 F - G
239 - 2225 G - H
208 - 1771 H - I
211 - 1760
164 - 1496
86 - 1282
60
0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
G
(a)
(a)
4X6(SRS)
H 4X6
7"4
T S
4X8(**)
5X5 R
7"11
2'3"3
3X8
2'11"
I
5X5
Q
5X5
P
O
3X5
6X8
3X4
N
5'11"9
3X5
M
3X10
L
9'8"6
9'1"2
4X12
K 3X5 J
1'11"
24'4"15
A-S
S-B
B-P
P-C
C-N
N-D
D-L
RIGHT RAKE = 2'0"4
DESC = C5 30'5"7 7/4 HHIP
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
143 - 72 P - O
1296 - 213 O - N
329
0 N-M
1296 - 73 M - L
1624 - 84 L - K
1624 - 34 K - J
56
215
753
100
605
73
164
- 186
- 2027
0
- 691
- 14
- 460
- 1286
E-L
L-F
F-K
G-K
K-H
H-J
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
2020
2019
2239
2239
1587
3
- 92
- 93
- 105
- 105
- 68
-5
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
31'0"2
PLT TYP. WAVE
T-R
S-R
S-R
R-S
R-Q
Q-P
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C5 30'5"7 7/4 HHIP
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =228.5
DUR. FAC 1.15
SEQ - 126430
SPACING 24.0 "
TYPE HHIP
1248 - 106
112 - 298
69 - 567
115 - 559
1739
- 43
200 - 1997
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C6 28'5"7 7/4 HHIP
Top chord 2x4 SPF #1/#2 :T2 2x4 SPF 1650f-1.5E:
Bot chord 2x8 SP 2400f-2.0E :B3 2x4 SPF #1/#2:
:B4 2x4 SPF 1650f-1.5E:
Webs 2x4 SPF Stud
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
0.00
BC
80
-0.56
BC
75
6.34
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
(a) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
Right end vertical not exposed to wind pressure.
END(FT)
10.05
6.34
28.46
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
6"11
10'0"10
6'11"6
12
7
"8
8'0
D
5X5(R1)
R 1399 / / 503 / / 90
I 1857 / / 607 / /Wind reactions based on MWFRS
R Min Brg Width Req = 1.5
I
Min Brg Width Req = 2.9
Bearings R & I Fcperp = 565psi.
10
'11
E
3X4
12
A-B
B-C
C-D
D-E
3X4
(a)
4X6(SRS)
G 4X6
2'3"3
H
3X8
7"4
4X8(**)
R
Q
5X5 P
7"11
5X5
O
5X5
N
M
3X5
6X8
3X5
L
5'11"9
3X8
K
9'8"6
9'1"2
4X10
J
3X5 I
22'4"15
166 - 1477
85 - 1259
59
0
A-Q
Q-B
B-N
N-C
C-K
D-K
RIGHT RAKE = 2'0"4
DESC = C6 28'5"7 7/4 HHIP
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
R-P
Q-P
Q-P
P-Q
P-O
O-N
109 - 79
1295 - 185
612
0
1295 - 79
1974 - 156
1908 - 64
N-M
M-L
L-K
K-J
J-I
60
188
858
128
195
1011
- 253
- 2165
0
- 953
- 1310
- 56
K-E
E-J
F-J
J-G
G-I
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
2454
2454
2451
1555
3
- 149
- 151
- 151
- 55
-4
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
1'11"
29'0"2
PLT TYP. WAVE
4 - 18 E - F
166 - 1956 F - G
181 - 1820 G - H
194 - 1734
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
F
(a)
4
4'1"
5X5(SRS)
C
2'11"
8'5"8
A
/ 3.5
/ 3.5
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
"15
10'0"10
5X6
B
/W
1'11"8
9'6"
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C6 28'5"7 7/4 HHIP
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =207.2
DUR. FAC 1.15
SEQ - 126427
SPACING 24.0 "
TYPE HHIP
108 - 301
50 - 549
120 - 566
1710
- 44
197 - 1961
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C7 28'1"8 7/12 MH Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x8 SP 2400f-2.0E
Webs 2x4 SPF #3 :W1 2x6 SPF 1650f-1.5E:
:W2, W6, W7, W9 2x4 SPF #1/#2: :W3, W4, W5 2x4 SPF Stud:
:W8 2x4 SP 2850f-2.3E: :W10 2x6 SP 2700f-2.0E:
:Rt Bearing Leg 2x6 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 4.50" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
4" o.c. spacing of nails perpendicular and parallel to
grain required in area over bearings greater than 4"
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
BC- From 20 plf at 13.74 to 20 plf at 15.74
BC- 2179.13 lb Conc. Load at 1.00
BC- 1175.52 lb Conc. Load at 3.00
BC- 1172.34 lb Conc. Load at 5.00, 7.00,17.00,19.00
BC- 1224.48 lb Conc. Load at 9.00,11.00,13.00,15.00
BC- 1123.90 lb Conc. Load at 19.64,21.00,23.00
BC- 1150.00 lb Conc. Load at 25.00,27.00
Brg blocks:0.131"x3", min. nails
brg x-loc #blocks
length/blk
#nails/blk
wall plate
1
0.000'
1
12"
17
2
20.333'
1
12"
4
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Negative reaction(s) of -645# MAX. (See below) from a non-wind
load case requires uplift connection.
115 mph wind, 15.90 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2 Complete Trusses Required
3"
17'4"2
10'5"10
5X5
G
F
12
20
3X5
7
4X10
I
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3'9"5
'0
5X10
"1 5
3X4
H
E
A-B
B-C
C-D
D-E
D
J
2X8
17'2"3
11'10"6
5X7 C
8'1"1
S-R
R-Q
Q-P
P-O
1'9"
6X8 A
BL1
4X6
BL2
R
6X8
Q
6X8
P
6X8
O
6X8
N
6X8
- 3180
- 2675
- 1603
- 1603
E-F
F-G
G-H
H-I
0
265
110
110
- 525
0
- 15
- 15
L
4X8
7'6"
K
H0310
A-S
A-R
R-B
B-Q
Q-C
C-O
O-E
E-N
5"8
27'7"4
28'0"12
DESC = C7 28'1"8 7/12 MH Girder
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 2 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
79
2706
2254
2254
-2
0
0
0
O-N
N-M
M-L
L-K
1321
385
0
3
0
0
- 247
-2
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
M
3X6
20'6"12
PLT TYP. WAVE
0
0
0
0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4 B
S
/W
S 8858 / / 82 / // 3.5
M 10920 / / 248 / // 5.5
J 1070 / 645 / 10 / // 4.7
Wind reactions based on MWFRS
S Min Brg Width Req = M Min Brg Width Req = J Min Brg Width Req = 4.7
Bearings S, M, & J Fcperp = 565psi.
10'5"10
H0710
SP Standard
SP Standard
0
2781
646
0
1749
0
2677
0
- 2408
0
- 80
- 545
0
- 1492
0
- 2293
F-M
M-G
G-L
L-H
L-I
J-K
I-J
I-J
0 - 2699
6 - 807
834
0
21 - 138
45 - 361
600
0
600
0
255 - 419
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C7 28'1"8 7/12 MH Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =659.4
DUR. FAC 1.15
SEQ - 127061
SPACING 24.0 "
TYPE SPEC
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C7 28'1"8 7/12 MH Girder
This dwg. prepared by the ITW job designer program from truss mfr's layout.
In lieu of structural panels or rigid ceiling use purlins
Truss designed for balanced snow load based on Pg=35.00 psf,
to laterally brace chords as follows:
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
CHORD
SPACING(IN OC)
START(FT)
END(FT)
TC
24
17.59
28.06
BC
120
0.00
27.60
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
N-F
2879
0
DESC = C7 28'1"8 7/12 MH Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 2 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C7 28'1"8 7/12 MH Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =659.4
DUR. FAC 1.15
SEQ - 127061
SPACING 24.0 "
TYPE SPEC
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C8 26'6"3 7/4 HHIP Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x8 SP 2400f-2.0E :B2 2x4 SPF 1650f-1.5E:
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 7.25" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 75 plf at 0.00 to 75 plf at 5.85
TC- From 76 plf at 5.85 to 76 plf at 15.06
TC- From 76 plf at 15.06 to 76 plf at 24.56
TC- From 75 plf at 24.56 to 75 plf at 28.43
BC- From 20 plf at 0.00 to 20 plf at 13.99
BC- From 20 plf at 13.99 to 20 plf at 18.66
BC- From 60 plf at 18.66 to 60 plf at 21.16
BC- From 20 plf at 21.16 to 20 plf at 26.52
BC- From 4 plf at 26.52 to 4 plf at 28.43
BC- 3316.00 lb Conc. Load at 11.46
All plates are 3X4 except as noted.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
0.00
BC
120
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
5.85
26.52
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs), or *=PLF
Loc R
/U
/ Rw / Rh / RL / W
2 Complete Trusses Required
5'10"2
9'2"9
12
7
1
9'6"
D
"
0'8
4X6 C
5'10"2
5X5
10
'1 1
O* 937 / / 140 / / 23
I 2461 / / 496 / /Wind reactions based on MWFRS
O Min Brg Width Req = I
Min Brg Width Req = 1.9
Bearings O & I Fcperp = 565psi.
1'11"8
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
"15
12
E
A-B
B-C
C-D
D-E
F
O-N
N-M
M-L
4X6(SRS)
G 3X5
2'3"3
3'1"
H
N
4X4
M
4X12
H0610
L
K
3X8
26'6"3
3X10
J
69
32
29
A-O
A-N
N-B
B-M
M-C
C-K
2X6 I
1'11"
90
1062
2017
- 86 L - K
-9 K - J
-7 J - I
1962
1221
1
43 - 494 D - K
930 - 34 K - E
92 - 1970 E - J
1112
0 F-J
1193 - 25 J - G
52 - 1162 G - I
RIGHT RAKE = 2'0"4
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 2 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
-7
- 15
-2
1253
- 33
61 - 182
23 - 600
55 - 309
1182
-7
85 - 1265
DESC = C8 26'6"3 7/4 HHIP Girder
PLT TYP. WAVE
- 987
- 861
-2
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
O
2X6
- 845 E - F
- 2386 F - G
- 1467 G - H
- 1472
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
2'11"
8'5"8
5X6(SRS)
B
32
74
80
80
4
4'1"
A
/ 46.7
/ 3.5
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C8 26'6"3 7/4 HHIP Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =375.5
DUR. FAC 1.15
SEQ - 126439
SPACING 24.0 "
TYPE HHIP
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C9 3'5"3 7/12 Stub
Top chord 2x6 SPF 1650f-1.5E
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
Wind loads and reactions based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
41
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
END(FT)
3.43
115 mph wind, 16.09 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
6"8
D 164 / 52
/ 64 / / 33
C 165 / / 70 / /Wind reactions based on MWFRS
D Min Brg Width Req = C Min Brg Width Req = -
12
3'4
A
7
"2
//-
2X6(**)
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B 3X4
D-C
- 64
3X4
C
D-A
D-B
3'5"3
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
DESC = C9 3'5"3 7/12 Stub
PLY= 1 QTY= 1
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
3X4
D
47
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
6'1"14
8'1"15
A-B
7'10"2
/W
2'10"11
47
106
- 99 B - C
-1
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C9 3'5"3 7/12 Stub
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =42.1
DUR. FAC 1.15
SEQ - 126496
SPACING 24.0 "
TYPE SPEC
0
- 128
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C10 10'3"2 7/12 Stub
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
120
-0.01
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
10.25
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
2"5
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1'6"5
1'7"
12
8'6"9
G 552 / 23
/ 222 / / 81
E 610 / / 198 / /Wind reactions based on MWFRS
G Min Brg Width Req = E Min Brg Width Req = -
13
4.95
B 5X5
12
9'1
0"1
//-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
7
3X4 A
/W
A-B
B-C
2
26 - 140 C - D
23 - 316
86
- 69
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4
G-F
116
- 39 F - E
A-G
A-F
F-B
1.5X3
85 - 678 F - C
688 - 68 C - E
95 - 212 D - E
3'4"2
D
9'1"2
G
3X4
3X4
F
3X8
E
10'3"2
DESC = C10 10'3"2 7/12 Stub
PLT TYP. WAVE
307
0
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
7'7"7
8'3"15
C
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C10 10'3"2 7/12 Stub
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =92.4
DUR. FAC 1.15
SEQ - 126498
SPACING 24.0 "
TYPE SPEC
139
3
34
- 226
- 504
- 108
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C11 9'11"4 7/12 Mono
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Right end vertical not exposed to wind pressure.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
118
0.11
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
9.94
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1.5X3
/W
A 483 / / 204 / / 108 / 6.0
E 473 / 18
/ 225 / //Wind reactions based on MWFRS
A Min Brg Width Req = 1.5
F Min Brg Width Req = Bearing A Fcperp = 565psi.
CD
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
7
1
'6"
11
A-B
B-C
0 - 567 C - D
56 - 104
0
-5
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4 B
6'3"9
A-G
G-F
407
404
- 89 F - E
- 90
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
G-B
B-F
240
0 C-F
117 - 527
3X4(B1) A
6"
11'1"2
3X4
G
1.5X3
FE
9'11"4
DESC = C11 9'11"4 7/12 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C11 9'11"4 7/12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =50.5
DUR. FAC 1.15
SEQ - 126500
SPACING 24.0 "
TYPE MONO
49
- 120
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C12 9'11"4 7/12 Mono
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
115 mph wind, 15.08 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Right end vertical not exposed to wind pressure.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
3.82
BC
119
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
5.57
9.94
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3'9"13
1'9"
4'4"7
/W
I 536 / / 194 / / 88
F 543 / 18
/ 220 / /Wind reactions based on MWFRS
I
Min Brg Width Req = 1.5
G Min Brg Width Req = Bearing I Fcperp = 565psi.
/ 6.0
/-
11
"
5'0
1.5X3
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
DE
A-B
B-C
1'9"
12
7
1
"
4'5
I-H
H-G
6'3"9
C
0
A-I
A-H
H-B
19 - 522 H - C
386
0 C-G
98
0 D-G
95
139
62
11'1"2
I
3X4
3X4
H
3X8
GF
9'11"4
DESC = C12 9'11"4 7/12 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
- 121
-6
PLY= 1 QTY= 1
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
3'9"
3X4 A
37 - 148 G - F
375 - 108
1'8"
3'10"12
94
0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X6(SRS)
4X4 B DT -1"12
8 - 519 C - D
40 - 378 D - E
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C12 9'11"4 7/12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =66.4
DUR. FAC 1.15
SEQ - 126291
SPACING 24.0 "
TYPE MONO
- 16
- 484
- 199
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C13 9'11"4 7/12 Mono
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
115 mph wind, 15.08 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Right end vertical not exposed to wind pressure.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
5.82
BC
119
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
7.57
9.94
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
5'9"13
1'9"
2'4"7
15
"
2'8
1'9"
1.5X3
7
6'8
5X6 B DT -1"12
"13
/ 6.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
DE
A-B
B-C
4X6(SRS)
12
/W
I 560 / / 197 / / 88
F 519 / 19
/ 216 / /Wind reactions based on MWFRS
I
Min Brg Width Req = 1.5
G Min Brg Width Req = Bearing I Fcperp = 565psi.
3 - 506 C - D
51 - 331 D - E
55
0
C
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
49 - 152 G - F
187 - 52
0
A-I
A-H
H-B
30 - 514 H - C
287
0 C-G
151 - 286 D - G
389
119
37
1'8"
3X4 A
11'1"2
I
H
3X8
3X4
3X4
GF
9'11"4
DESC = C13 9'11"4 7/12 Mono
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
4'11"
5'0"12
6'3"9
I-H
H-G
PLT TYP. WAVE
- 58
-6
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C13 9'11"4 7/12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =69.5
DUR. FAC 1.15
SEQ - 126293
SPACING 24.0 "
TYPE MONO
- 106
- 428
- 122
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C14 9'11"4 7/12 Mono
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
115 mph wind, 15.04 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Right end vertical not exposed to wind pressure.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
7.82
BC
119
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
9.94
9.94
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
7'9"13
2'1"7
/W
I 575 / / 201 / / 85
F 478 / 19
/ 210 / /Wind reactions based on MWFRS
I
Min Brg Width Req = 1.5
G Min Brg Width Req = Bearing I Fcperp = 565psi.
2'1"7
/ 6.0
/-
1.5X3
4X4 C DT -1"12
12
7
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
DE
"10
9'0
A-B
B-C
0 - 542 C - D
16 - 116 D - E
2
0
-2
0
3X4 B
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6'1"
6'2"12
I-H
H-G
46 - 146 G - F
362 - 84
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
A-I
A-H
H-B
25 - 530 B - G
332
0 C-G
212
0 D-G
115
25
48
1'8"
3X4 A
11'1"2
I
3X8
H
3X4
3X4
GF
9'11"4
DESC = C14 9'11"4 7/12 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
0
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C14 9'11"4 7/12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =73.7
DUR. FAC 1.15
SEQ - 126295
SPACING 24.0 "
TYPE MONO
- 560
- 42
- 87
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C15 40'10"8 7/12 HHip Girder
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Nail Schedule:0.131"x3", min. nails
Bot chord 2x8 SP 2400f-2.0E :B3 2x4 SPF #1/#2:
Top Chord: 1 Row @12.00" o.c.
Webs 2x4 SPF Stud :W1 2x6 SPF 1650f-1.5E:
Bot Chord: 1 Row @ 2.25" o.c.
:W2, W6, W16 2x4 SPF 1650f-1.5E: :W5, W9 2x4 SPF #3:
Webs : 1 Row @ 4" o.c.
:W7, W10, W18 2x4 SPF #1/#2: :W8 2x6 SP 2700f-2.0E: :W11 2x4 SP 2850f-2.3E:
Use equal spacing between rows and stagger nails
:Rt Stub Wedge 2x4 SPF Stud:
in each row to avoid splitting.
4" o.c. spacing of nails perpendicular and parallel to
grain required in area over bearings greater than 4"
115 mph wind, 15.30 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
All plates are 5X5 except as noted.
Left end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Brg blocks:0.131"x3", min. nails
brg x-loc #blocks
length/blk
#nails/blk
wall plate
1
0.000'
1
17"
27
2
23.667'
1
12"
6
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
SP Standard
SP Standard
Right cantilever is exposed to wind
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2 Complete Trusses Required
13'2"11
4'10"1
1'9"
7'3"
9'11"4
3'10"8
4'10"1
8'4
"
12
7
7X8
11
'3"
15
4X6
12
E
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'9"
C
F
7X8
G
11
'6
H DT 1"12
B
I
12
3X4
J
BL1
3X5(G1)
K 1.5X3
L
BL2
8X8
U
6X12
T
H0610
S R
6X8
23'10"12
8X10
Q
10X10
O
3X4
N
9'1"2
3X4
M
10"8
16'1"4
PLY= 2 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
V-U
U-T
T-S
S-R
R-Q
A-V
A-U
U-B
B-T
T-C
DESC = C15 40'10"8 7/12 HHip Girder
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
G-H
H-I
I-J
J-K
K-L
122
164
51
0
0
0
- 41
- 254
- 95
- 94
26
3340
3789
2971
2971
0
0
0
0
0
Q-P
P-O
O-N
N-M
M-L
46
0
178
340
88
- 119
- 136
- 37
-5
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
40'10"8
PLT TYP. WAVE
- 3857
- 4474
- 3572
- 2074
- 2437
-2
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'11"
7"8
5X5 P
0
0
0
0
0
191
4
4'1"
7'8"9
SS0712
A
V
H0312
A-B
B-C
C-D
D-E
E-F
F-G
"1
4'1"
11'9"9
5X7
D DT -1"12
/W
V 10928 / / 295 / // 4.0
P 11164 / / 196 / // 5.5
M 668 / / 10 / // 4.0
Wind reactions based on MWFRS
V Min Brg Width Req = P Min Brg Width Req = M Min Brg Width Req = 1.5
Bearings V, P, & M Fcperp = 565psi.
0 - 5008 F - P
4440
0 P-G
7 - 1214 G - O
894
0 H-O
1695
-5 O - I
0 - 4280
99 - 270
302 - 118
12 - 127
0 - 316
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C15 40'10"8 7/12 HHip Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =749.5
DUR. FAC 1.15
SEQ - 127052
SPACING 24.0 "
TYPE HIPS
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C15 40'10"8 7/12 HHip Girder
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Special loads
In lieu of structural panels or rigid ceiling use purlins
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
to laterally brace chords as follows:
TC- From 76 plf at 0.00 to 76 plf at 13.22
CHORD
SPACING(IN OC)
START(FT)
END(FT)
TC- From 75 plf at 13.22 to 75 plf at 15.64
TC
24
13.22
18.06
TC- From 37 plf at 15.64 to 37 plf at 18.06
TC
24
25.31
27.06
TC- From 38 plf at 18.06 to 38 plf at 23.00
BC
120
0.00
40.88
TC- From 76 plf at 23.00 to 76 plf at 25.31
Apply purlins to any chords above or below fillers
TC- From 75 plf at 25.31 to 75 plf at 27.06
at 24" OC unless shown otherwise above.
TC- From 76 plf at 27.06 to 76 plf at 37.00
TC- From 75 plf at 37.00 to 75 plf at 40.88
BC- From 10 plf at 0.00 to 10 plf at 8.50
BC- From 30 plf at 8.50 to 30 plf at 10.83
BC- From 10 plf at 10.83 to 10 plf at 13.17
BC- From 30 plf at 13.17 to 30 plf at 16.24
BC- From 10 plf at 16.24 to 10 plf at 21.07
BC- From 30 plf at 21.07 to 30 plf at 23.00
C-S
BC- From 40 plf at 23.00 to 40 plf at 23.74
S-D
BC- From 20 plf at 23.74 to 20 plf at 27.06
D-Q
BC- From 20 plf at 27.06 to 20 plf at 31.21
E-Q
BC- From 20 plf at 31.21 to 20 plf at 40.88
Q-F
BC- 1164.08 lb Conc. Load at 1.00, 3.00,13.00,15.00
23.00
BC- 2136.94 lb Conc. Load at 5.00, 7.00, 9.00,11.00
BC- 1115.64 lb Conc. Load at 15.64,17.00,19.00
BC- 1161.94 lb Conc. Load at 21.00
0 - 1532 I - N
3612
0 N-J
0 - 2256 J - M
1104 - 83 M - K
3609
0
123
10
47
24
0
- 179
- 328
- 90
DESC = C15 40'10"8 7/12 HHip Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 2 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C15 40'10"8 7/12 HHip Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =749.5
DUR. FAC 1.15
SEQ - 127052
SPACING 24.0 "
TYPE HIPS
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C17 46'9" 7/12 HHip
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2 :T6 2x4 SPF 1650f-1.5E:
Bot chord 2x4 SPF 1650f-1.5E :B1 2x4 SPF 2100f-1.8E:
Webs 2x4 SPF Stud :W1 2x6 SPF Stud:
:W4, W5, W6, W7, W8 2x4 SPF #3: :W14 2x4 SPF #1/#2:
:Lt Stub Wedge 2x4 SPF Stud::Rt Stub Wedge 2x4 SPF Stud:
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
(a) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
19.10
TC
24
35.19
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
115 mph wind, 15.30 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
WARNING: Furnish a copy of this DWG to the installation contractor.
Special care must be taken during handling, shipping and installation
of trusses. See "WARNING" note below.
Left and right cantilevers are exposed to wind
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
END(FT)
23.94
36.94
46.75
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
19'1"3
4'10"1
1'9"
11'3"
5'11"4
3'10"8
4'10"1
5X8
7
'0"
5
"5
2'1
2
1'9"
6X8
F
C
4X6
6'1
11'9"9
7X8(SRS)
H
G
6X8
A-B
B-C
C-D
D-E
E-F
B
0"8
12
DT 1"12
4
H0510
(a)
(a)
6X8
I
(a)
3X5(G1)
A
3X5(G1)
J 1.5X3
K
7"14
5'10"8
T
4X4
3X6(**)
R
3X4
Q
4X8
P
40'
4X4
O N
H0308
4X8
M
A-T
T-S
S-R
R-Q
Q-P
1'11"
7"8
5X6
S
PLY= 1 QTY= 2
T-B
B-S
S-C
C-Q
Q-D
D-P
E-P
P-F
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
F-G
G-H
H-I
I-J
J-K
302 - 3638
278 - 3315
274 - 4000
0 - 290
0 - 295
134 - 372 P - O
158 - 264 O - N
1750
0 N-M
1750
0 M-L
1912
0 L-K
3004
3824
3824
3699
276
- 45
- 149
- 149
- 240
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
DESC = C17 46'9" 7/12 HHip
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
- 116
- 1559
- 2424
- 2135
- 2670
9'1"2
4X10
L
10"8
46'9"
PLT TYP. WAVE
571
172
278
297
305
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4'1"
5'4"9
12
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
13
5X6
E
D DT -1"12
/W
T 3289 / / 1091 / / 165 / 4.0
L 2594 / / 832 / // 4.0
Wind reactions based on MWFRS
T Min Brg Width Req = 3.8
L Min Brg Width Req = 3.7
Bearings T & L Fcperp = 565psi.
259 - 3207 F - O
2211 - 52 O - G
168 - 1527 G - M
404
0 H-M
247 - 21 M - I
680 - 55 I - L
861 - 45 L - J
170 - 1488
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C17 46'9" 7/12 HHip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =307.2
DUR. FAC 1.15
SEQ - 127029
SPACING 24.0 "
TYPE HIPS
968
- 20
142 - 1096
99 - 1417
1564
- 29
137 - 401
390 - 4097
159 - 323
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C18 16'9"12 7/4 Mono Hip
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud :W5, W6 2x4 SPF #3:
:Rt Bearing Leg 2x4 SPF #3::Lt Stub Wedge 2x4 SPF Stud:
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
15.81
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
16.81
16.52
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Wind loads and reactions based on MWFRS with additional C&C
member design.
(a) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
Right end vertical not exposed to wind pressure.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
(J) Hanger Support Required, by others
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3'10"8
11'11"4
J 1037 / / 401 / / 153 / 4.0
F 803 / 33
/ 312 / //Wind reactions based on MWFRS
J Min Brg Width Req = 1.5
F Min Brg Width Req = Bearing J Fcperp = 565psi.
1'
4X6
12
7
D 4X4
DT -1"12
E
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
14
'9"
13
A-B
B-C
6'8"13
3X4 C
8'10"9
/W
1'
287 - 187 C - D
0 - 857 D - E
70
4
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
(a)
4
A-J
J-I
12
4'1"
F
2X6
1'11"
5X5(SRS) B
J-B
B-H
H-C
C-G
2'
2X6(G1)
A
9'1"2
3X4
J
3X5
I
3X4
H
1'10"8
203 - 216 I - H
770 - 262 H - G
770
630
4X10
G
200 - 1287
161 - 141
324
0
122 - 734
D-G
F-G
E-F
E-F
130
964
964
138
14'11"4
3"8
16'2"12
3"8
16'6"4
DESC = C18 16'9"12 7/4 Mono Hip
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
- 262
- 109
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
11'1"2
7"8
PLT TYP. WAVE
- 225
-7
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/23/16
BC DL
10.00 PSF
C18 16'9"12 7/4 Mono Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =118.7
DUR. FAC 1.15
SEQ - 126327
SPACING 24.0 "
TYPE SPEC
- 467
- 176
- 176
- 796
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C19 46'9" 7/12 HHip
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF 2100f-1.8E :B3 2x4 SPF 1650f-1.5E:
Webs 2x4 SPF Stud :W1 2x6 SPF 1650f-1.5E:
:W4, W5, W6, W7, W8, W9 2x4 SPF #3: :W15 2x4 SPF #1/#2:
:Lt Stub Wedge 2x4 SPF Stud::Rt Stub Wedge 2x4 SPF Stud:
All plates are 3X5(G1) except as noted.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
17.10
TC
24
37.19
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
END(FT)
25.94
38.94
46.75
Left and right cantilevers are exposed to wind
(a) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
WARNING: Furnish a copy of this DWG to the installation contractor.
Special care must be taken during handling, shipping and installation
of trusses. See "WARNING" note below.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
17'1"3
8'10"1
1'9"
11'3"
3'11"4
3'10"8
8'10"1
5X8
F
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
13
5X6
G
'0"
5
A-B
B-C
C-D
D-E
E-F
F-G
"9
9'9
12
1
7
1'9"
D
H
4'6
4X6
(a)
3X5 B C
6X8
(a)
"11
5X7(SRS) DT 1"12
J
I
5X7
(a)
12
4
4'1"
6X8(SRS)
K
L
A
1.5X3
M
7"14
1'11"
7"8
5'10"8
V
4X4
5X6
U
3X6(**)
T S
3X8
3X10
R
H0308
Q
4X4
P
5X8
O
9'1"2
4X10
N
10"8
40'
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
A-V
V-U
U-T
T-S
S-R
V-B
B-U
U-D
D-S
S-E
S-F
F-R
DESC = C19 46'9" 7/12 HHip
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
- 119
- 1076
- 1042
- 2218
- 1753
- 2263
G-H
H-I
I-J
J-K
K-L
L-M
309
350
286
300
7
0
- 2819
- 4252
- 3338
- 3995
- 238
- 253
138 - 374 R - Q
161 - 267 Q - P
1396
0 P-O
1396
0 O-N
2022
0 N-M
3194
3194
4159
3582
254
- 109
- 109
- 212
- 248
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
46'9"
PLT TYP. WAVE
569
140
161
270
271
303
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4'2"9
3X8
10'7"9
E DT -1"12
5X5
/W
V 3212 / / 1087 / / 148 / 4.0
N 2522 / / 829 / // 4.0
Wind reactions based on MWFRS
V Min Brg Width Req = 3.7
N Min Brg Width Req = 3.6
Bearings V & N Fcperp = 565psi.
253 - 3081 R - H
2082 - 67 H - P
177 - 1728 P - I
693
0 I-O
598 - 16 J - O
101 - 788 O - K
624
-2 K - N
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C19 46'9" 7/12 HHip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =299.2
DUR. FAC 1.15
SEQ - 126506
SPACING 24.0 "
TYPE HIPS
185
1108
149
129
1775
106
363
- 1389
- 47
- 1009
- 1832
- 91
- 233
- 3988
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C19 46'9" 7/12 HHip
This dwg. prepared by the ITW job designer program from truss mfr's layout.
G-R
866
- 39 N - L
DESC = C19 46'9" 7/12 HHip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C19 46'9" 7/12 HHip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =299.2
DUR. FAC 1.15
SEQ - 126506
SPACING 24.0 "
TYPE HIPS
151
- 327
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C20 40'10"8 7/12 HHip Girder
Top chord 2x4 SPF #1/#2 :T4, T5 2x4 SP 2850f-2.3E:
:T6 2x8 SP 2400f-2.0E:
Bot chord 2x6 SP 2700f-2.0E
Webs 2x4 SPF Stud :W1 2x6 SPF Stud:
:W2, W14 2x4 SPF #1/#2: :W5, W6, W7, W8, W9 2x4 SPF #3:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.50" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal spacing
between rows and stagger nails in each row to avoid splitting.
All plates are 4X6 except as noted.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
Right cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
10.12
TC
24
32.35
BC
120
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Left end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
END(FT)
21.17
34.17
40.88
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3 Complete Trusses Required
10'1"7
11'0"9
11'2"4
1'9"12
2'10"
T 10102 / 91
///J 9051 / 3
///Wind reactions based on MWFRS
T Min Brg Width Req = 3.7
J Min Brg Width Req = 3.3
Bearings T & J Fcperp = 565psi.
3'10"8
11'0"9
11
7
9'11"13
4X4
A
'8 "
9
5X6
3X4
D
C DT -1"5
E
6X8
B
12
'1 1
A-B
B-C
C-D
D-E
E-F
"7
1'9"12
F
3'3
"6
12
SS0712 DT 1"5
H
G
6X8
4'1"
7X8
I
5X10(D1)
J
1'11"
7"8
5X8
S
R
5X8
Q
5X8
P
6X8
O
N
H0510
M
5X7
L
T-S
S-R
R-Q
Q-P
P-O
9'1"2
3X4
K
10"8
40'
DESC = C20 40'10"8 7/12 HHip Girder
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 3 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
- 2516
- 3231
- 3520
- 3520
- 4282
F-G
G-H
H-I
I-J
31
0
2
11
- 5291
- 6376
- 6122
- 6529
17
2191
2766
2766
3613
0
- 27
- 38
- 38
- 35
O-N
N-M
M-L
L-K
K-J
4504
6537
6537
5231
5943
- 25
-1
-1
0
-9
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
A-T
A-S
S-B
B-R
R-C
C-P
D-P
P-E
40'10"8
PLT TYP. WAVE
33
49
46
46
45
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4
4 '1"
5X8
T
/ 4.0
/ 4.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3'6"13
12
/W
43
2812
40
901
243
1504
20
0
- 3138
- 33
- 1162
- 18
- 57
- 15
- 187
- 188
E-O
O-F
F-N
N-G
G-L
L-H
H-K
K-I
2168
0
0 - 1281
1348
0
0 - 2290
41 - 1718
2617
0
746
-1
10 - 740
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C20 40'10"8 7/12 HHip Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =964.0
DUR. FAC 1.15
SEQ - 126508
SPACING 24.0 "
TYPE HIPS
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / C20 40'10"8 7/12 HHip Girder
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 76 plf at 0.00 to 76 plf at 10.12
TC- From 75 plf at 10.12 to 75 plf at 21.17
TC- From 76 plf at 21.17 to 76 plf at 32.17
TC- From 75 plf at 32.17 to 75 plf at 34.17
TC- From 76 plf at 34.17 to 76 plf at 37.00
TC- From 75 plf at 37.00 to 75 plf at 40.88
BC- From 20 plf at 0.00 to 20 plf at 10.08
BC- From 60 plf at 10.08 to 60 plf at 13.33
BC- From 20 plf at 13.33 to 20 plf at 18.07
BC- From 60 plf at 18.07 to 60 plf at 21.16
BC- From 20 plf at 21.16 to 20 plf at 40.88
PLB- 776.22 lb Conc. Load at ( 1.06, 9.13)
PLB- 764.97 lb Conc. Load at ( 3.06, 9.13)
PLB- 725.69 lb Conc. Load at ( 5.06, 9.13)
PLB- 727.82 lb Conc. Load at ( 7.06, 9.13)
PLB- 800.58 lb Conc. Load at ( 9.06, 9.13)
PLB- 859.39 lb Conc. Load at (11.06, 9.13)
PLB- 919.02 lb Conc. Load at (13.06, 9.13), (15.06,9.13), (17.06,9.13)
(19.06,9.13), (21.06,9.13)
PLB- 2098.71 lb Conc. Load at (23.06, 9.13)
PLB- 2482.91 lb Conc. Load at (33.06, 9.13)
PLB- 1159.63 lb Conc. Load at (35.06, 9.13)
This dwg. prepared by the ITW job designer program from truss mfr's layout.
DESC = C20 40'10"8 7/12 HHip Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 3 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
C20 40'10"8 7/12 HHip Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =964.0
DUR. FAC 1.15
SEQ - 126508
SPACING 24.0 "
TYPE HIPS
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / CL1 10'11"1 Hip Frame
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF #3
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4 except as noted.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
This "Hip Frame" may be used in place of purlins on the hip plane to
brace the flat top chord of hip trusses. See detail drawing
HIPFRAME1014 or HIPFR1801014 for additional information.
Maximum Reactions (lbs), or *=PLF
Loc R
/U
/ Rw / Rh / RL / W
5'5"8
5'5"5
A* 2
///A Min Brg Width Req = Bearing A is a rigid surface.
/-
/ 131
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-B
B-C
C-D
D-E
D
12
10
1"
7'1
7'1
1"
10
E
C
-1 E - F
-1 F - G
-1 G - H
-1
A-M
M-L
L-K
-1
-1
-1
0
0
0
0 K-J
0 J-I
0 I-H
0
0
1
0
0
0
F
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp. Gables Tens. Comp.
B
B-M
C-L
K-E
0
0
0
-2 J - F
-2 I - G
-1
G
3X4(D1)
3X4(D1)
H
A
0'
M
L
K
10'11"1
J
I
DESC = CL1 10'11"1 Hip Frame
PLT TYP. WAVE
0
0
0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
13.89
6'3"14
0
0
0
0
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
CL1 10'11"1 Hip Frame
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =62.8
DUR. FAC 1.15
SEQ - 125929
SPACING 24.0 "
TYPE HIP_
0
0
-2
-1
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / CL2 9'2"2 Hip Frame
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF #3 :C1 2x4 SPF Stud:
All plates are 3X4 except as noted.
Shim all supports to solid bearing.
This "Hip Frame" may be used in place of purlins on the hip plane to
brace the flat top chord of hip trusses. See detail drawing
HIPFRAME1014 or HIPFR1801014 for additional information.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
Right end vertical not designed to be exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Maximum Reactions (lbs), or *=PLF
Loc R
/U
/ Rw / Rh / RL / W
A* 4
///A Min Brg Width Req = Bearing A is a rigid surface.
5
F
'8"
1
E
13.89
D
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
14'11"13
15'0"8
C
B
4'4"12
4'5"
3X4(**) A
A-B
B-C
C-D
-0"4
K
13.89
12
/ 45.6
13
12
/-
4X4
J
I
H
5'1
A-K
K-J
J-I
1
0"
5'3"11
5'3"11
-1 D - E
0 E-F
-4
0
0
-1
-1
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
G
9'1"5
3'9"13
0
6
0
1
0
0
0 I-H
-6 H - G
0
0
0
0
0
0"10
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp. Gables Tens. Comp.
9'1"8
RIGHT RAKE = 0"15
B-K
J-C
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
DESC = CL2 9'2"2 Hip Frame
PLY= 1 QTY= 1
6
0
0 D-I
- 14 E - H
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
CL2 9'2"2 Hip Frame
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =91.6
DUR. FAC 1.15
SEQ - 126342
SPACING 24.0 "
TYPE HIP_
2
0
0
-2
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / CL3 9'9"12 Hip Frame
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF #3
All plates are 3X4 except as noted.
Fasten rated sheathing to one face of this frame.
This "Hip Frame" may be used in place of purlins on the hip plane to
brace the flat top chord of hip trusses. See detail drawing
HIPFRAME1014 or HIPFR1801014 for additional information.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Right end vertical not designed to be exposed to wind pressure.
Shim all supports to solid bearing.
Maximum Reactions (lbs), or *=PLF
Loc R
/U
/ Rw / Rh / RL / W
0"2
9'9"10
C
D
E
O* 4
///O Min Brg Width Req = Bearing O is a rigid surface.
F G
/-
/ 59.4
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
9'0"9
A B
Snow loading based on an unobstructed roof. Complete drainage
required.
15'1"8
A-B
B-C
C-D
0
0
0
0 D-E
0 E-F
0 F-G
0
0
0
0
0
0
H
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6'0"15
I
13.89
J
12
O-N
N-M
M-L
L-K
0'
O N
M
K
L
3X6
9'9"12
8'0
"6
3"8
0
0
0
0
0 K-J
0 J-I
0 I-H
- 15
0
0
0
-2
-2
-2
4'6"12
4'6"12
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp. Gables Tens. Comp.
5'3"
B-N
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
DESC = CL3 9'9"12 Hip Frame
PLY= 1 QTY= 1
TC LL
0
-1 E - J
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
CL3 9'9"12 Hip Frame
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =141.4
DUR. FAC 1.15
SEQ - 126394
SPACING 24.0 "
TYPE HIP_
2
0
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / CL3 9'9"12 Hip Frame
This dwg. prepared by the ITW job designer program from truss mfr's layout.
C-M
D-K
4
0
0 F-I
- 15 G - H
DESC = CL3 9'9"12 Hip Frame
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
CL3 9'9"12 Hip Frame
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =141.4
DUR. FAC 1.15
SEQ - 126394
SPACING 24.0 "
TYPE HIP_
1
0
0
-1
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / D 30'5"8 7/12 Mono Hip Girder
Top chord 2x6 SP 2700f-2.0E :T2 2x6 SPF 1650f-1.5E:
Bot chord 2x10 SP 2400f-2.0E
Webs 2x4 SPF #1/#2
:W1, W6, W8, W10, W12, W14, W16 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Left cantilever is exposed to wind
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.00" o.c.
Bot Chord: 1 Row @ 3.50" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal spacing
between rows and stagger nails in each row to avoid splitting.
4" o.c. spacing of nails perpendicular and parallel to
grain required in area over bearings greater than 4"
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Truss must be installed as shown with top chord up.
The TC of this truss shall be braced with attached spans at 24" OC in
lieu of structural sheathing.
Wind loads and reactions based on MWFRS.
All plates are 5X5 except as noted.
115 mph wind, 17.18 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
End verticals not exposed to wind pressure.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
120
-0.01
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3 Complete Trusses Required
6"5
5X5
C
D
3X4
E
5X6
F
/W
/ 5.5
/ 4.8
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
G
H
I
5X6
5X8 J
A-B
B-C
C-D
D-E
E-F
6'1"1
1.5X3 A
S 13610 / 136 / 109 / /K 6867 / 89
/ 101 / /Wind reactions based on MWFRS
S Min Brg Width Req = 4.9
K Min Brg Width Req = 2.5
Bearings S & K Fcperp = 565psi.
29'11"3
6X8
B
END(FT)
30.45
0
30
42
41
41
-3
- 1856
- 2838
- 3474
- 3474
F-G
G-H
H-I
I-J
41
42
37
22
- 3474
- 3607
- 2766
- 1596
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
11'1"2
T
S
1.5X3
6"4
H0308
R
6X8
Q
4X6
P
O
3X8
H0714
N
5X8
M
5X6
L
5X8
3X5
K
T-A
S-B
B-R
R-C
C-Q
Q-D
D-P
E-P
DESC = D 30'5"8 7/12 Mono Hip Girder
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
3
73
1992
2903
3604
0
-1
- 33
- 43
- 43
O-N
N-M
M-L
L-K
3604
2829
1683
0
- 43
- 38
- 24
0
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
29'11"4
30'5"8
PLT TYP. WAVE
T-S
S-R
R-Q
Q-P
P-O
PLY= 3 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
2
50
3057
60
1450
29
957
43
- 119
- 2614
- 49
- 2571
- 14
- 1210
0
- 90
P-G
G-N
N-H
H-M
M-I
I-L
L-J
J-K
3 - 217
134
- 70
1333
-7
21 - 1184
1857
- 22
38 - 1635
2613
- 37
36 - 2120
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
D 30'5"8 7/12 Mono Hip Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =930.0
DUR. FAC 1.15
SEQ - 127063
SPACING 24.0 "
TYPE HIPM
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / D 30'5"8 7/12 Mono Hip Girder
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 76 plf at 0.53 to 76 plf at 30.46
BC- From 20 plf at 0.00 to 20 plf at 30.46
TC- 1294.70 lb Conc. Load at 2.52
TC- 1367.35 lb Conc. Load at 4.52
TC- 1514.83 lb Conc. Load at 6.52
TC- 1070.18 lb Conc. Load at 7.39
BC- 1051.81 lb Conc. Load at 0.52
BC- 4000.00 lb Conc. Load at 0.75,16.25
BC- 472.64 lb Conc. Load at 18.52,20.52
BC- 542.95 lb Conc. Load at 22.52
BC- 518.91 lb Conc. Load at 24.52
BC- 478.03 lb Conc. Load at 26.52
BC- 803.00 lb Conc. Load at 28.52
This dwg. prepared by the ITW job designer program from truss mfr's layout.
DESC = D 30'5"8 7/12 Mono Hip Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 3 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
D 30'5"8 7/12 Mono Hip Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =930.0
DUR. FAC 1.15
SEQ - 127063
SPACING 24.0 "
TYPE HIPM
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E 17'10"8 7/4 Pan
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
All plates are 1.5X3 except as noted.
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Filler 2x4 SPF #1/#2
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
:Rt Slider 2x4 SPF Stud: BLOCK LENGTH = 1.556':Lt Stub Wedge 2x4 SPF Stud:
wind BC DL=6.0 psf.
See DWGS A11515ENC101014, GBLLETIN1014, & GABRST101014
for gable wind bracing requirements.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Shim all supports to solid bearing.
(**) 4 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
Left cantilever is exposed to wind
Gable end supports 8" max rake overhang. Top
chord must not be cut or notched.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
55
0.00
BC
120
4.71
BC
35
15.24
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
4.71
15.24
17.88
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'2"4
7'8"4
3'10"8
6'
12
7
0
8'1
8'
F
"13
4X4(R1)
A-B
B-D
C-D
D-E
G
3X4
2X4 D
H 3X4
5X6(**)
N
1.5X4(**)
P
7"8
3X8
M
O
3.37
9'1"2
J
12
2'3"14
15'2"
A-C
C-P
C-O
P-N
N-M
5X6(E5)
I
5X5
L K
Q
3X4(**)
4.8
2'8"
5
B-C
N-E
E-M
F-M
4'7"
2'2"4
2'4"12
1"8
10'4"
1"8
2'8"8
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
91 - 958
92 - 982
129 - 1995
123 - 2066
77
1410
11
1396
1248
- 27
- 54
-2
- 52
- 60
M-L
L-K
K-J
J-I
1512
1702
1683
1688
106 - 124 M - G
460
0 G-L
82 - 538 Q - K
404
0 Q-J
110
567
41
11
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
17'10"8
DESC = E 17'10"8 7/4 Pan
PLT TYP. WAVE
E-F
F-G
G-H
H-I
PLY= 1 QTY= 1
- 86
- 79
- 82
- 89
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
10'4"
16'
2'7"7
30 - 78
31 - 58
88 - 1717
105 - 1703
4"10
12
1'10"8
/ 4.0
/ 4.0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
9"
1'
1'11"
5X10(**) B
2X6(G1)
A
C
/W
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
9'3
"2
4'1"
3X4 E
3"8
C 991 / / 407 / / 62
I 783 / / 291 / /Wind reactions based on MWFRS
C Min Brg Width Req = 1.5
I
Min Brg Width Req = 1.5
Bearings C & I Fcperp = 565psi.
12
5'5"
4
8'
P-O
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
23
- 71
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E 17'10"8 7/4 Pan
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =102.9
DUR. FAC 1.15
SEQ - 126510
SPACING 24.0 "
TYPE SCIS
- 788
0
0
-2
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E1 17'8"8 7/4 Stub Pan
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
All plates are 1.5X3 except as noted.
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Filler 2x4 SPF #1/#2
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
:Rt Slider 2x4 SPF Stud: BLOCK LENGTH = 1.500':Lt Stub Wedge 2x4 SPF Stud:
wind BC DL=6.0 psf.
See DWGS A11515ENC101014, GBLLETIN1014, & GABRST101014
for gable wind bracing requirements.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
(**) 4 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
Left cantilever is exposed to wind
Gable end supports 8" max rake overhang. Top
chord must not be cut or notched.
(J) Hanger Support Required, by others
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'2"4
7'8"4
3'10"8
6'
12
7
0
8'1
7'10"
F
"13
4X4(R1)
1'
1'11"
5X10(**) B
2X6(G1)
A
C
3
A-B
B-D
C-D
D-E
G
3X4
2X4 D
P
7"8
3X8
M
O
3.37
5X5
L K
Q
3X4(**)
4.8
2X8(E3)
3X4(E3)
I
10"3
A-C
C-P
C-O
P-N
N-M
9'1"2
J
12
2'3"14
15'2"
2'8"
5
B-C
N-E
E-M
F-M
4'7"
2'2"4
2'4"12
1"8
10'4"
1"8
2'4"8
2"
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
77
1396
11
1383
1236
- 27
- 57
-2
- 55
- 63
M-L
L-K
K-J
J-I
1411
1581
1563
1568
106 - 125 M - G
455
0 G-L
83 - 536 Q - K
385
0 Q-J
104
515
41
11
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
17'8"8
DESC = E1 17'8"8 7/4 Stub Pan
PLT TYP. WAVE
91 - 943
91 - 964
124 - 1876
118 - 1955
PLY= 1 QTY= 1
- 84
- 76
- 78
- 85
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
10'4"
15'10"
2'7"7
E-F
F-G
G-H
H-I
2"10
12
1'10"8
31 - 76
32 - 57
89 - 1703
106 - 1688
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
H 3X4
5X6(**)
N
1.5X4(**)
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4'1"
3X4 E
3"8
9'0
"1
/W
C 986 / / 404 / / 62
I 776 / / 290 / /Wind reactions based on MWFRS
C Min Brg Width Req = 1.5
J Min Brg Width Req = Bearing C Fcperp = 565psi.
12
5'5"
4
7'10"
P-O
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
23
- 70
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E1 17'8"8 7/4 Stub Pan
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =101.5
DUR. FAC 1.15
SEQ - 126512
SPACING 24.0 "
TYPE SCIS
- 700
0
0
-2
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E1 17'8"8 7/4 Stub Pan
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
END(FT)
BC
55
0.00
4.71
BC
120
4.71
15.24
BC
32
15.24
17.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
DESC = E1 17'8"8 7/4 Stub Pan
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E1 17'8"8 7/4 Stub Pan
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =101.5
DUR. FAC 1.15
SEQ - 126512
SPACING 24.0 "
TYPE SCIS
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E2 17'10"8 7/12 Pan Hip
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
All plates are 1.5X3 except as noted.
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Filler 2x4 SPF #1/#2
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
:Rt Slider 2x4 SPF Stud: BLOCK LENGTH = 1.556':Lt Stub Wedge 2x4 SPF Stud:
wind BC DL=6.0 psf.
(**) 4 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
Left cantilever is exposed to wind
Gable end supports 8" max rake overhang. Top
chord must not be cut or notched.
See DWGS A11515ENC101014, GBLLETIN1014, & GABRST101014
for gable wind bracing requirements.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'2"4
3'10"14
3'10"8
11'9"6
2'2"10
2'8"11
4.58
4
12
2'11
2'8"11
2'1"6
"
4X6 F
"4
4'6
12
2'1"6
DT -1"12
2'11
G
4'2"10
4'1
A-B
B-D
C-D
D-E
E-F
0"9
H 4X4(R1)
12
2X4 D
I
5X6(**)
P
1.5X4(**)
R
7"8
3X4
O
3X8
N
Q
3.37
A-C
C-R
C-Q
R-P
P-O
9'1"2
K
12
2'3"14
16
35
248
282
253
- 131
- 101
- 1566
- 1565
- 1056
F-G
G-H
H-I
I-J
264
259
311
301
- 1001
- 1092
- 1862
- 1940
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
5X6(E5)
J
5X5
M L
S
1.5X4(**)
4.8
15'2"
3X4
9"
1'11"
1'
3'2"8
4'3"
3"8
/ 4.0
/ 4.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
7
5X10(**) B
2X6(G1)
A
C
/W
"
4X4
4X6 E
4'1"
C 1042 / / 401 / / 43
J 773 / / 286 / /Wind reactions based on MWFRS
C Min Brg Width Req = 1.5
J Min Brg Width Req = 1.5
Bearings C & J Fcperp = 565psi.
4"10
93 - 10
1294 - 194
12
-3
1275 - 189
962 - 173
O-N
N-M
M-L
L-K
K-J
978
1124
1585
1566
1571
- 139
- 199
- 223
- 225
- 232
12
10'4"
16'
2'7"7
1'10"8
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
2'8"
5
4'7"
2'2"4
2'4"12
1"8
10'4"
1"8
B-C
P-E
E-O
O-F
F-N
2'8"8
17'10"8
DESC = E2 17'10"8 7/12 Pan Hip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
99 - 129 G - N
439 - 19 N - H
100 - 44 H - M
125
0 S-L
150 - 89 S - K
183
76
630
41
11
-7
- 208
- 31
0
-3
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp. Gables Tens. Comp.
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E2 17'10"8 7/12 Pan Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =109.8
DUR. FAC 1.15
SEQ - 126514
SPACING 24.0 "
TYPE HIPS
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E2 17'10"8 7/12 Pan Hip
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
END(FT)
TC
24
8.82
10.93
BC
55
0.00
4.71
BC
120
4.71
15.24
BC
35
15.24
17.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
R-Q
33 - 102
DESC = E2 17'10"8 7/12 Pan Hip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E2 17'10"8 7/12 Pan Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =109.8
DUR. FAC 1.15
SEQ - 126514
SPACING 24.0 "
TYPE HIPS
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E3 17'8"8 7/4 Mono Hip
Top chord 2x4 SPF #1/#2 :T3 2x4 SPF 1650f-1.5E:
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 1.5X3 except as noted.
(**) 3 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Gable end supports 8" max rake overhang. Top
chord must not be cut or notched.
Left cantilever is exposed to wind
See DWGS A11515ENC101014, GBLLETIN1014, & GABRST101014
for gable wind bracing requirements.
Wind loads and reactions based on MWFRS with additional C&C
member design.
(J) Hanger Support Required, by others
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Right end vertical not exposed to wind pressure.
(a) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'2"4
8'4"13
3'10"8
7'1"7
6'8"9
7'1"7
7'1"7
12
7
"12
9'8
DT -1"12
A-B
B-D
C-D
4'1"
(a)
1'11"
1'
3"8
A-C
C-O
C-N
O-M
2X4 D
5X6(**)
M
1.5X4(**)
O
7"8
3X4
L
11"3
2X6
H
K
B-C
M-E
E-L
L-F
12'8"8
2'7"7
4'7"
2'6"8
2'4"12
70 - 25
1443 - 287
11
-3
1428 - 283
M-L
L-J
K-H
J-I
1274
710
0
717
1"8
10'5"8
2'3"
103 - 147
481 - 54
160 - 625
354
0
F-I
K-J
I-G
I-H
133
40
66
118
3"8
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
17'8"8
O-N
27
- 73
DESC = E3 17'8"8 7/4 Mono Hip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
- 262
- 110
- 19
- 101
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
15'10"
3.37
12
2'2"4
199 - 1736
76 - 907
0
-9
9'1"2
N
1'10"8
4X4
I
J
29 - 84 D - E
31 - 51 E - F
175 - 1749 F - G
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
5'8"4
3X4 E
5X10(**) B
2X6(G1)
A
C
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
2X4 G
12
5'10"
4
H0510 F
/W
C 1010 / / 421 / / 93
H 765 / 2
/ 286 / /Wind reactions based on MWFRS
C Min Brg Width Req = 1.5
H Min Brg Width Req = Bearing C Fcperp = 565psi.
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E3 17'8"8 7/4 Mono Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =107.2
DUR. FAC 1.15
SEQ - 126517
SPACING 24.0 "
TYPE HIPM
- 827
0
- 303
- 736
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E3 17'8"8 7/4 Mono Hip
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
END(FT)
TC
24
10.59
17.71
BC
55
0.00
4.71
BC
120
4.71
17.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
DESC = E3 17'8"8 7/4 Mono Hip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E3 17'8"8 7/4 Mono Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =107.2
DUR. FAC 1.15
SEQ - 126517
SPACING 24.0 "
TYPE HIPM
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E4 16' */12 Pan Hip Girder
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x6 SP 2700f-2.0E :T2 2x6 SPF 1650f-1.5E:
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF Stud
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
5.89
BC
29
0.15
BC
120
2.75
BC
29
13.31
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Girder supports 4-0-0 span to TC/BC split one face and 2-0-0 span to
TC/BC split opposite face.
Wind loads and reactions based on MWFRS.
Calculated horizontal deflection is 0.42" due to live load and 0.25"
due to dead load.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
10.11
2.69
13.25
15.85
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
5'10"10
4'2"12
A 1154 / / 36 / /F 1154 / / 36 / /Wind reactions based on MWFRS
A Min Brg Width Req = 1.8
F Min Brg Width Req = 1.8
Bearings A & F Fcperp = 565psi.
5'10"10
4'2"12
12
4.58
6'3"
9
6'3"
C 5X6
DT -1"5
3'1"
1'
3X4(B1)
A
I
1.5X3
10"1
2'8"8
9
A-B
B-C
C-D
E
J
2X6
1"8
A-J
B-I
I-H
3X4(B1)
F
9'1"2
G
2X6
1"8
0 - 407 D - E
0 - 2735 E - F
0 - 2791
0 - 2759
0 - 407
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
7X8
H
3X4
10'4"
/ 3.6
/ 4.2
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
5X6
D
7X8 B
/W
0 H-E
0 G-F
0
2814
6
77
0 D-H
63 - 210 E - G
5
0
63
77
16'
DESC = E4 16' */12 Pan Hip Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
0
0
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
J-B
I-C
C-H
2'8"8
6
2792
2788
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E4 16' */12 Pan Hip Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =92.3
DUR. FAC 1.15
SEQ - 126519
SPACING 24.0 "
TYPE HIPS
- 196
0
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E5 17'8"8 7/4 Mono Hip
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 1.5X3 except as noted.
(**) 3 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Gable end supports 8" max rake overhang. Top
chord must not be cut or notched.
Left cantilever is exposed to wind
See DWGS A11515ENC101014, GBLLETIN1014, & GABRST101014
for gable wind bracing requirements.
Wind loads and reactions based on MWFRS with additional C&C
member design.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
12.59
BC
55
0.00
BC
120
4.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Right end vertical not exposed to wind pressure.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
17.71
4.71
17.71
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'2"4
10'4"13
3'10"8
8'8"9
C 1048 / / 425 / / 115 / 4.0
I 726 / 9
/ 300 / //Wind reactions based on MWFRS
C Min Brg Width Req = 1.5
I
Min Brg Width Req = Bearing C Fcperp = 565psi.
5'1"7
5'1"7
G 4X6
12
7
8
'0"
12
DT -1"12
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
H
F
A-B
B-D
C-D
D-E
6'10"4
4'1"
1'
1'11"
5X10(**) B
2X6(G1)
A
C
A-C
C-P
C-O
P-N
2X4 D
5X6(**)
N
1.5X4(**)
P
7"8
4X8
M
1'10"8
4X4
J
K
11"3
9'1"2
O
2X6
I
L
- 956
- 928
-5
4'7"
2'2"4
B-C
N-E
E-M
F-M
M-G
12'8"8
2'7"7
2'6"8
2'4"12
1"8
10'5"8
2'3"
3"8
N-M
M-K
L-I
K-J
1313
461
0
466
101 - 143
504 - 57
189 - 602
131 - 548
871 - 80
G-J
L-K
J-H
J-I
122
43
51
125
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
17'8"8
DESC = E5 17'8"8 7/4 Mono Hip
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
69 - 24
1491 - 319
10
-4
1474 - 316
PLY= 1 QTY= 1
- 293
- 81
- 12
- 76
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
15'10"
3.37
12
PLT TYP. WAVE
45
118
2
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4 E
3"8
27 - 96 E - F
30 - 57 F - G
167 - 1782 G - H
194 - 1786
12
7'
4
/W
5'1"7
P-O
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
29
- 79
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E5 17'8"8 7/4 Mono Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =119.5
DUR. FAC 1.15
SEQ - 126521
SPACING 24.0 "
TYPE HIPM
- 673
0
- 221
- 698
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E6 17'8"8 7/4 Mono Hip
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 1.5X3 except as noted.
(**) 3 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Gable end supports 8" max rake overhang. Top
chord must not be cut or notched.
Left cantilever is exposed to wind
See DWGS A11515ENC101014, GBLLETIN1014, & GABRST101014
for gable wind bracing requirements.
Wind loads and reactions based on MWFRS with additional C&C
member design.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
14.59
BC
55
0.00
BC
120
4.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Right end vertical not exposed to wind pressure.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
17.71
4.71
17.71
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'2"4
12'4"13
3'10"8
10'8"9
C 1069 / / 426 / / 136 / 4.0
I 728 / 17
/ 316 / //Wind reactions based on MWFRS
C Min Brg Width Req = 1.5
I
Min Brg Width Req = Bearing C Fcperp = 565psi.
3'1"7
3'1"7
4X4 G
12
4
DT -1"12
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
H
A-B
B-D
C-D
D-E
5
'4"
14
F
8'0"4
8'2"
7
12
4'1"
1'11"
1'
3"8
2X6(G1)
A
A-C
C-P
C-O
P-N
2X4 D
5X6(**)
N
1.5X4(**)
P
C
7"8
3X10
M
L
B-C
N-E
E-M
F-M
M-G
12'8"8
2'7"7
4'7"
2'6"8
1"8
10'5"8
2'3"
3"8
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
1278
285
0
292
102
495
201
158
969
- 141
- 66
- 572
- 577
- 122
G-J
L-K
J-H
J-I
133
42
30
135
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
17'8"8
DESC = E6 17'8"8 7/4 Mono Hip
PLT TYP. WAVE
N-M
M-K
L-I
K-J
- 314
- 55
- 12
- 50
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
15'10"
3.37
2'4"12
70 - 23
1453 - 343
10
-4
1436 - 340
11"3
2X6
I
12
2'2"4
17 - 981
113 - 1001
1
-5
9'1"2
O
1'10"8
4X4
J
K
26 - 86 E - F
29 - 51 F - G
155 - 1771 G - H
181 - 1746
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4 E
5X10(**) B
/W
3'1"7
PLY= 1 QTY= 1
P-O
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
28
- 76
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E6 17'8"8 7/4 Mono Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =123.6
DUR. FAC 1.15
SEQ - 126523
SPACING 24.0 "
TYPE HIPM
- 668
0
- 140
- 699
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E7 17'8"8 7/4 Mono Hip
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud :W8 2x4 SPF #3:
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 1.5X3 except as noted.
(**) 3 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Gable end supports 8" max rake overhang. Top
chord must not be cut or notched.
Left cantilever is exposed to wind
See DWGS A11515ENC101014, GBLLETIN1014, & GABRST101014
for gable wind bracing requirements.
Wind loads and reactions based on MWFRS with additional C&C
member design.
(J) Hanger Support Required, by others
(a) Continuous lateral restraint equally spaced on member.
Right end vertical not exposed to wind pressure.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
2'2"4
14'4"13
3'10"8
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1'1"7
1'1"7
12'8"9
1'1"7
H
4X6
12
2X6
DT -1"12
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
I
A-B
B-D
C-D
D-E
1
'8"
16
7
3X5 F
9'2"4
9'4"
3X4 G
4
(a)
12
4'1"
A-C
C-Q
C-P
Q-O
3X4 E
1'11"
1'
3"8
2X4 D
5X6(**)
O
1.5X4(**)
Q
7"8
3X4
N
4X10 K
M
2'2"4
10'5"8
2'3"
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
1278
762
0
764
103 - 140
490 - 79
213 - 568
356
0
134 - 849
M-L
H-K
K-I
K-J
43
112
116
147
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
17'8"8
DESC = E7 17'8"8 7/4 Mono Hip
PLT TYP. WAVE
O-N
N-L
M-J
L-K
PLY= 1 QTY= 1
- 333
- 126
- 10
- 120
3"8
2'6"8
2'4"12
71 - 22
1452 - 366
10
-4
1434 - 363
B-C
O-E
E-N
N-G
G-K
12'8"8
2'7 "7
1"8
- 970
- 856
- 223
-4
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
12
4'7"
0
0
63
8
2X6
J
15'10"
3.37
E-F
F-G
G-H
H-I
11"3
9'1"2
P
1'10"8
L
25 - 70
27 - 52
142 - 1798
166 - 1753
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
(a)
5X10(**) B
2X6(G1)
A
C
/W
C 1080 / / 424 / / 158 / 4.0
J 801 / 26
/ 336 / //Wind reactions based on MWFRS
C Min Brg Width Req = 1.5
J Min Brg Width Req = Bearing C Fcperp = 565psi.
Q-P
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
27
- 77
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E7 17'8"8 7/4 Mono Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =125.0
DUR. FAC 1.15
SEQ - 126526
SPACING 24.0 "
TYPE HIPM
0
- 376
- 24
- 774
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E7 17'8"8 7/4 Mono Hip
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
END(FT)
TC
24
16.59
17.71
BC
55
0.00
4.71
BC
120
4.71
17.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
DESC = E7 17'8"8 7/4 Mono Hip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E7 17'8"8 7/4 Mono Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =125.0
DUR. FAC 1.15
SEQ - 126526
SPACING 24.0 "
TYPE HIPM
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E8 17'8"8 7/4 Mono
Top chord 2x4 SPF #1/#2 :T3 2x4 SPF 1650f-1.5E:
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud :W7 2x4 SPF #3:
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 1.5X3 except as noted.
(**) 3 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Gable end supports 8" max rake overhang. Top
chord must not be cut or notched.
Left cantilever is exposed to wind
See DWGS A11515ENC101014, GBLLETIN1014, & GABRST101014
for gable wind bracing requirements.
Wind loads and reactions based on MWFRS with additional C&C
member design.
(J) Hanger Support Required, by others
(a) Continuous lateral restraint equally spaced on member.
Right end vertical not exposed to wind pressure.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'2"4
3'10"8
C 966 / / 421 / / 171 / 4.0
I 859 / 33
/ 348 / //Wind reactions based on MWFRS
C Min Brg Width Req = 1.5
I
Min Brg Width Req = Bearing C Fcperp = 565psi.
13'10"
2X4
17
12
H
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-B
B-D
C-D
D-E
"10
'11
7
9'11"13
3X4 G
(a)
3X5 F
4
12
4'1"
1'
1'11"
5X10(**) B
2X6(G1)
A
C
A-C
C-P
C-O
P-N
2X4 D
5X6(**)
N
1.5X4(**)
P
7"8
3X4
M
1'10"8
11"3
2X6
I
L
15'10"
3.37
B-C
N-E
E-M
M-G
12
12'8"8
2'7"7
4'7"
2'2"4
2'6"8
2'4"12
1"8
10'5"8
2'3"
N-M
M-K
L-I
K-J
1149
771
0
773
105 - 121
465 - 83
204 - 439
354
0
G-J
L-K
J-H
J-I
165
43
78
155
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
DESC = E8 17'8"8 7/4 Mono
P-O
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
74 - 23
1311 - 368
9
-4
1298 - 365
3"8
17'8"8
PLT TYP. WAVE
PLY= 1 QTY= 1
- 960
- 846
- 210
- 333
- 136
- 10
- 131
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
O
0
0
138
4X4
J
K
27 - 67 E - F
27 - 55 F - G
127 - 1637 G - H
146 - 1596
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
(a)
3X4 E
3"8
/W
15'6"4
25
- 61
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E8 17'8"8 7/4 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =115.2
DUR. FAC 1.15
SEQ - 126528
SPACING 24.0 "
TYPE MONO
- 924
0
- 274
- 833
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E8 17'8"8 7/4 Mono
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
END(FT)
BC
55
0.00
4.71
BC
120
4.71
17.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
DESC = E8 17'8"8 7/4 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E8 17'8"8 7/4 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =115.2
DUR. FAC 1.15
SEQ - 126528
SPACING 24.0 "
TYPE MONO
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E9 17'8"8 7/4 Mono
Top chord 2x4 SPF #1/#2 :T2 2x4 SPF 1650f-1.5E:
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud :W4, W5 2x4 SPF #3:
:Lt Stub Wedge 2x4 SPF Stud:
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
17.71
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Wind loads and reactions based on MWFRS with additional C&C
member design.
(a) Continuous lateral restraint equally spaced on member.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3'10"8
13'10"
2X4
/W
H 1058 / / 420 / / 174 / 4.0
E 919 / 33
/ 353 / //Wind reactions based on MWFRS
H Min Brg Width Req = 1.5
E Min Brg Width Req = Bearing H Fcperp = 565psi.
D
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
3
'0"
16
A-B
B-C
7
9'11"13
A-H
H-G
(a)
12
4'1"
H-B
B-F
F-C
1'11"
5X5(SRS) B
214 - 205 G - F
778 - 285 F - E
206 - 1301 C - E
176 - 136 D - E
360
0
2X6(G1)
A
7"8
9'1"2
3X4
3X5
G F
3X4
15'10"
1'10"8
3X5
E
17'8"8
DESC = E9 17'8"8 7/4 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
- 208
PLY= 1 QTY= 5
778
697
- 285
- 116
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
(a)
H
139
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4 C
4
277 - 202 C - D
0 - 918
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E9 17'8"8 7/4 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =107.1
DUR. FAC 1.15
SEQ - 126530
SPACING 24.0 "
TYPE MONO
151
76
- 905
- 276
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E10 17'8"8 7/4 MH Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x6 SP 2700f-2.0E
Webs 2x4 SPF Stud :W7, W8, W9 2x4 SPF #3:
Wind loads and reactions based on MWFRS.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
15.75
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
17.71
17.71
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 75 plf at 0.00 to 75 plf at 3.87
TC- From 38 plf at 3.87 to 38 plf at 15.75
TC- From 75 plf at 15.75 to 75 plf at 17.71
BC- From 20 plf at 0.00 to 20 plf at 3.77
BC- From 10 plf at 3.77 to 10 plf at 17.71
BC- 488.84 lb Conc. Load at 3.77, 7.77, 9.77,11.77
BC- 477.60 lb Conc. Load at 5.77
BC- 468.94 lb Conc. Load at 13.77
BC- 470.27 lb Conc. Load at 15.77
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Left cantilever is exposed to wind
(a) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3'10"8
11'10"8
1'11"8
K 2385 / 6
//0 /G 2099 / /8
//Wind reactions based on MWFRS
K Min Brg Width Req = 2.3
G Min Brg Width Req = Bearing K Fcperp = 565psi.
1'11"8
E
2X4
6X8
/W
/ 4.0
/-
F
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
13
'9 "
A-B
B-C
C-D
7
5X7 D
160 - 589 D - E
29 - 2867 E - F
36 - 1929
7
0
- 592
0
(a)
4
12
(a)
3X6 C
4'1"
8'10"2
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-K
K-J
J-I
(a)
K-B
B-J
J-C
C-I
I-D
3X4(A1)
A
1'11"
1565
465
7"8
9'1"2
J
4X6
I
1'10"8
5X7
H
6X8
4X4
G
62 - 2385
381
0
940
0
0 - 960
1865 - 21
D-H
E-H
E-G
F-G
42 - 1765
2137
0
0 - 2062
5
- 73
15'10"
17'8"8
DESC = E10 17'8"8 7/4 MH Girder
PLT TYP. WAVE
- 26
0
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
5X8(SRS) B
K
2X6
1058 - 273 I - H
2176 - 29 H - G
2391 - 23
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/24/16
BC DL
10.00 PSF
E10 17'8"8 7/4 MH Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =143.5
DUR. FAC 1.15
SEQ - 126533
SPACING 24.0 "
TYPE HIPM
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E11 17'8"8 7/4 MH Girder
Top chord 2x4 SPF #1/#2 :T3 2x4 SPF 1650f-1.5E:
Bot chord 2x6 SP 2700f-2.0E
Webs 2x4 SPF Stud :W4, W6 2x4 SPF 1650f-1.5E:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 75 plf at 0.00 to 75 plf at 3.87
TC- From 76 plf at 3.87 to 76 plf at 5.75
TC- From 75 plf at 5.75 to 75 plf at 17.71
BC- From 20 plf at 0.00 to 20 plf at 17.71
BC- 467.74 lb Conc. Load at 3.77
BC- 453.08 lb Conc. Load at 5.77
BC- 463.64 lb Conc. Load at 7.77
BC- 465.33 lb Conc. Load at 9.77
BC- 532.99 lb Conc. Load at 11.77
BC- 579.11 lb Conc. Load at 13.77
BC- 481.14 lb Conc. Load at 15.77
Wind loads and reactions based on MWFRS.
(J) Hanger Support Required, by others
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
5.75
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
17.71
17.71
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3'10"8
1'10"8
11'11"8
11'11"8
12
7
4
I 2649 / / 77 / 0 / 0
F 2483 / / 122 / /Wind reactions based on MWFRS
I
Min Brg Width Req = 2.5
F Min Brg Width Req = Bearing I Fcperp = 565psi.
"1
2'2
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
4'1"
/W
C
3X4
D
4X8
A-B
B-C
4X12 E
173 - 472 C - D
0 - 3530 D - E
0 - 4129
0 - 4129
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6X8(SRS) B
3'0"2
3X4(A1)
A
1'11"
A-I
I-H
837 - 297 H - G
2620
0 G-F
3043
29
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
7"8
9'1"2
I
3X4
H
H0308
3X5
G
6X16
1'10"8
F
15'10"
I-B
B-H
C-H
C-G
0 - 3151 D - G
563
0 G-E
956
0 E-F
1208
0
74 - 488
4480
0
0 - 1999
17'8"8
DESC = E11 17'8"8 7/4 MH Girder
PLT TYP. WAVE
0
0
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E11 17'8"8 7/4 MH Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =102.5
DUR. FAC 1.15
SEQ - 126535
SPACING 24.0 "
TYPE HIPM
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E12 17'8"8 7/4 MH Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 1.5X3 except as noted.
Wind loads and reactions based on MWFRS.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Right end vertical not exposed to wind pressure.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
3.75
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 75 plf at 0.00 to 75 plf at 3.75
TC- From 75 plf at 3.75 to 75 plf at 17.42
TC- From 75 plf at 17.42 to 75 plf at 17.71
BC- From 20 plf at 0.00 to 20 plf at 17.71
BC- 97.31 lb Conc. Load at 3.76
BC- 41.58 lb Conc. Load at 5.81, 7.81, 9.81,11.81
BC- 369.84 lb Conc. Load at 16.76
END(FT)
17.71
17.71
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
14'9"10
11"8
1'11"6
3'9"
3"8
13'8"
"1
2'3
7
"7
3'11
1.5X4
I
4X4 F
4X10
B
1'10"8
A-B
B-C
C-D
D-E
13'8"
3X4
C
D
E
4X10
G
H
A-N
N-M
M-L
3X4(A1) A
7"8
9'1"2
N
2X8
M
L
3X6
1'10"8
2X6
K
SS0317
/ 4.0
/-
244 - 10 E - F
270 - 2311 E - G
179 - 2046 F - I
179 - 2046 G - H
76
-9
182 - 2062
47
-5
186 - 2101
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3'0"2
4
/W
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
11"8
12
12
N 1152 / 92
///J 1160 / 60
///Wind reactions based on MWFRS
N Min Brg Width Req = 1.5
J Min Brg Width Req = Bearing N Fcperp = 565psi.
15'10"
2368
55
159
203
1399
22
101
- 1466
- 15
- 161
- 307
- 340
D-K
K-H
F-G
H-I
H-J
41
2077
21
55
79
17'8"8
DESC = E12 17'8"8 7/4 MH Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
- 275
-5
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
N-B
B-M
B-L
L-C
C-K
J
5 - 203 L - K
989 - 116 K - J
1009 - 118
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E12 17'8"8 7/4 MH Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =106.3
DUR. FAC 1.15
SEQ - 126537
SPACING 24.0 "
TYPE HIPM
- 247
- 182
- 197
- 18
- 811
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / E13 1'9"7 4/12 Mono
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
4
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
21
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
1.79
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
12
F 85
// 34 / / 11
D 85
/6
/ 38 / /Wind reactions based on MWFRS
F Min Brg Width Req = 1.5
E Min Brg Width Req = Bearing F Fcperp = 565psi.
"10
1'10
/W
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1.5X3 BC
18
- 24 B - C
A
F-E
1'3"
4
- 40 E - D
-3
F
1.5X3
3X4
A-F
A-E
16
45
- 62 B - E
-4
ED
1'9"7
DESC = E13 1'9"7 4/12 Mono
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
0
0
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
9'1"2
PLT TYP. WAVE
0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'10"2
3X4
A-B
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
E13 1'9"7 4/12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =12.6
DUR. FAC 1.15
SEQ - 126539
SPACING 24.0 "
TYPE MONO
63
- 71
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / EL1 4'1"15 Hip Frame
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF #3
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4(D1) except as noted.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
This "Hip Frame" may be used in place of purlins on the hip plane to
brace the flat top chord of hip trusses. See detail drawing
HIPFRAME1014 or HIPFR1801014 for additional information.
Maximum Reactions (lbs), or *=PLF
Loc R
/U
/ Rw / Rh / RL / W
2'0"15
2'0"14
A* 2
///A Min Brg Width Req = Bearing A is a rigid surface.
/-
/ 50.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1
-1 B - C
A-D
0
0 D-C
26.23
B-D
0
-1
4'6"11
12
C
A
0'
D 3X4
4'1"15
DESC = EL1 4'1"15 Hip Frame
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
0
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
12
26.29
1
-1
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
"4
4 '8
4X4 B
4 '8
"4
A-B
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
EL1 4'1"15 Hip Frame
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =26.6
DUR. FAC 1.15
SEQ - 125993
SPACING 24.0 "
TYPE HIP_
0
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / EL2 7'0"11 Hip Frame
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF #3
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4 except as noted.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Right end vertical not designed to be exposed to wind pressure.
This "Hip Frame" may be used in place of purlins on the hip plane to
brace the flat top chord of hip trusses. See detail drawing
HIPFRAME1014 or HIPFR1801014 for additional information.
Maximum Reactions (lbs), or *=PLF
Loc R
/U
/ Rw / Rh / RL / W
A* 2
///A Min Brg Width Req = Bearing A is a rigid surface.
0
1
-1 C - D
-1 D - E
A-I
I-H
C
0
0
0 H-G
0 G-F
0
0
-2 D - G
-2 E - F
8'2"
B
3X4(D1) A
0'
0"4
G
F
7'0"7
DESC = EL2 7'0"11 Hip Frame
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
0
0
0
0
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp. Gables Tens. Comp.
B-I
C-H
PLT TYP. WAVE
-1
-1
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
13.89
H
1
0
D
10
'4"
15
A-B
B-C
I
/ 84.5
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
E
12
/-
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
EL2 7'0"11 Hip Frame
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =58.0
DUR. FAC 1.15
SEQ - 126009
SPACING 24.0 "
TYPE HIP_
0
0
-2
0
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / F 5'10"8 7/4 Jack
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
All plates are 1.5X3 except as noted.
(**) 3 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
45
-0.25
BC
24
3.62
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
3.62
5.62
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'2"4
3'8"4
3'10"8
C 515 / / 207 / / 41
H 147 / 12
/ 56 / /Wind reactions based on MWFRS
C Min Brg Width Req = 1.5
I
Min Brg Width Req = Bearing C Fcperp = 565psi.
2'
4 '3
4'1"
FG
200 - 105 D - E
203 - 90 E - F
32 - 330 F - G
- 118
- 36
-6
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
5X10(**) B
7"8
5X6(**)
3X4
I H
5.04
C
12
1'10"8
11"3
1.5X4(**) J
L
1'
1'11"
10'1"2
2X6(G1)
A
3"8
A-C
C-L
C-K
9'1"2
K
113 - 153 L - J
67 - 68 J - I
1
-1 I - H
2'
B-C
L-K
J-E
144 - 211 E - I
17 - 10 F - I
67 - 16
3'9"
2'2"4
1'6"12
1"8
2'
5'10"8
DESC = F 5'10"8 7/4 Jack
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
73
38
0
- 65
- 55
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
4'
15
1'9"
PLT TYP. WAVE
23
48
0
2'1"
3X4
E
2X4 D
3'1"
A-B
B-D
C-D
12
7
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
"4
12
4
/W
PLY= 1 QTY= 3
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
F 5'10"8 7/4 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =36.4
DUR. FAC 1.15
SEQ - 126541
SPACING 24.0 "
TYPE SPEC
60
32
- 42
- 113
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / G 9'10"8 7/4 Sci Hip
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
0.00
TC
24
7.50
BC
24
0.00
BC
44
2.00
BC
50
5.50
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
3.57
9.88
2.00
5.50
9.75
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3'6"14
1'11"2
2'
12
2'3
13
7
"
2'2
2'4"8
M 468 / / 173 / / 15
H 489 / / 168 / /Wind reactions based on MWFRS
M Min Brg Width Req = H Min Brg Width Req = -
"13
3'6"14
2'4"8
J
ML
3X4
4X6(SRS)
3X4
FG
5X6
4
M-L
L-K
K-J
I H
12
B-L
B-K
K-C
C-J
4
2'
2'
3'6"
0
0 J-H
17 - 14 I - H
1024 - 211
112 - 451
492 - 68
199 - 812
118 - 304
J-E
D-J
E-H
F-H
4'4"8
9'10"8
DESC = G 9'10"8 7/4 Sci Hip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
117
5
0
- 858
-3
0
737
155
- 156
- 33
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
3'8"
4
3'8"
0
0 D-E
55 - 385 E - F
122 - 859 F - G
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
9'1"2
3X4
K
4X4
A-B
B-C
C-D
1'9"13
E
1'10"5
1'2"
2'11"13
4X6(SRS)
C
3X4
//-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
D 4X4
AB
/W
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
G 9'10"8 7/4 Sci Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =59.5
DUR. FAC 1.15
SEQ - 126543
SPACING 24.0 "
TYPE SCIS
67
644
186
49
- 38
- 81
- 889
- 129
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / G1 9'10"8 */4 Sci
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
24
0.00
BC
44
2.00
BC
50
5.50
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
AB
3X4
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
2.00
5.50
9.75
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
3X4
C
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3X4
D
L 453 / / 168 / /G 478 / / 163 / /Wind reactions based on MWFRS
L Min Brg Width Req = G Min Brg Width Req = -
3X4 E F
//-
2'10"1
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'2"
I
A-B
B-C
C-D
5X6
LK
3X4
J
4X4
4
L-K
K-J
J-I
HG
12
3'8"
4
4
3'8"
B-K
B-J
J-C
C-I
3'6"
0
2
344
0 I-G
-1 H - G
- 89
128
457
142
511
- 440 D - I
- 106 I - E
- 403 E - G
- 117
4'4"8
9'10"8
DESC = G1 9'10"8 */4 Sci
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
175
0
- 788
0
25
151
- 26
- 40
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
2'
2'
0
0 D-E
63 - 273 E - F
175 - 788
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4 9'1"2
PLT TYP. WAVE
/W
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
G1 9'10"8 */4 Sci
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =58.5
DUR. FAC 1.15
SEQ - 126545
SPACING 24.0 "
TYPE SCIS
150
826
137
- 311
- 183
- 405
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / G2 7'8" 4/12 Sci Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 75 plf at 0.00 to 75 plf at 1.83
TC- From 75 plf at 1.83 to 75 plf at 5.83
TC- From 75 plf at 5.83 to 75 plf at 7.67
BC- From 21 plf at 0.00 to 21 plf at 1.96
BC- From 20 plf at 1.96 to 20 plf at 5.71
BC- From 21 plf at 5.71 to 21 plf at 7.67
BC- 28.72 lb Conc. Load at 1.84, 5.82
BC- 9.27 lb Conc. Load at 3.77
Wind loads and reactions based on MWFRS.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
1.83
BC
25
0.00
BC
45
1.96
BC
25
5.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
5.83
1.96
5.71
7.67
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1'10"
4
4'
12
1'10"
4'
1'11
1'11
"3
"3
D
1'3"
1'10"5
3X4 A
A-B
B-C
3X4
178 - 703 C - D
167 - 636
172
F
H0610(SRS)
2X6
2X6 9'1"2
H
H-G
G-F
15 - 15 F - E
651 - 173
15
- 15
E
4
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
12
1'8"
9
1'11"8
3'9"
1'8"
3'9"
A-H
A-G
B-G
B-F
9
87 - 365 F - C
660 - 169 F - D
67 - 42 D - E
6 - 15
65
645
85
1'11"8
7'8"
DESC = G2 7'8" 4/12 Sci Girder
PLT TYP. WAVE
- 688
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
G 4X8(SRS)
6"8
/ 4.0
/ 4.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X4
C
B 4X8
/W
H 399 / 83
///E 399 / 82
///Wind reactions based on MWFRS
H Min Brg Width Req = 1.5
E Min Brg Width Req = 1.5
Bearings H & E Fcperp = 565psi.
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
G2 7'8" 4/12 Sci Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =51.0
DUR. FAC 1.15
SEQ - 126547
SPACING 24.0 "
TYPE SCIS
- 44
- 163
- 359
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / G3 9'10"8 7/4 Sci
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
1.83
BC
24
0.00
BC
44
2.00
BC
50
5.50
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
9.88
2.00
5.50
9.75
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1'10"
8'0"8
L 464 / / 180 / / 19
G 489 / 6
/ 167 / /Wind reactions based on MWFRS
L Min Brg Width Req = G Min Brg Width Req = -
8'0"8
2'1
"8
/W
//-
12
7
3X4
D
DT -1"12
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4 E F
A-B
B-C
C-D
4'0"1
AB
3'1"
4'1"13
3X4
4X4 C
1'2"
I
6
0 D-E
60 - 242 E - F
124 - 455
122
0
- 452
0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
L-K
K-J
J-I
5X6
0
8
200
0 I-G
- 31 H - G
- 72
25
155
- 27
- 43
9'1"2
LK
3X4
4X8
J
3X4
HG
4
12
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
B-K
B-J
C-J
C-I
3'8"
4
4
3'8"
91 - 450 D - I
348 - 68 I - E
107 - 280 E - G
333 - 73
2'
2'
3'6"
4'4"8
9'10"8
DESC = G3 9'10"8 7/4 Sci
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
G3 9'10"8 7/4 Sci
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =69.2
DUR. FAC 1.15
SEQ - 126549
SPACING 24.0 "
TYPE SCIS
162
526
146
- 360
- 143
- 417
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / G4 9'10"8 7/4 Sci
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
3.83
BC
24
0.00
BC
44
2.00
BC
50
5.50
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
9.88
2.00
5.50
9.75
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3'10"
6'0"8
K 465 / / 188 / / 41
F 489 / 15
/ 175 / /Wind reactions based on MWFRS
K Min Brg Width Req = F Min Brg Width Req = -
6'0"8
12
7
"4
4'5
4X6 C
DT -1"12
3X4 DE
3'1"
K-J
J-I
I-H
1'2"
H 4X6
I
4X4
1.5X3
GF
4
12
3'8"
4
3'8"
0
0 H-F
17 - 68 G - F
298 - 118
B-J
B-I
I-C
53 - 450 C - H
305 - 18 H - D
85 - 296 D - F
4
2'
2'
3'6"
4'4"8
9'10"8
DESC = G4 9'10"8 7/4 Sci
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
67
0
- 242
0
24
155
- 27
- 47
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
3X4
6
0 C-D
48 - 240 D - E
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
5'2"1
5'3"13
AB
KJ
//-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-B
B-C
3X4
/W
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
G4 9'10"8 7/4 Sci
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =69.0
DUR. FAC 1.15
SEQ - 126551
SPACING 24.0 "
TYPE SCIS
102
318
155
- 83
- 87
- 416
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / G5 9'10"8 7/4 Sci
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
5.83
BC
24
0.00
BC
44
2.00
BC
50
5.50
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
9.88
2.00
5.50
9.75
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
5'10"
L 533 / / 192 / / 63
G 489 / 27
/ 189 / /Wind reactions based on MWFRS
L Min Brg Width Req = G Min Brg Width Req = -
4'0"8
12
7
D 4X4
"1
6'9
DT -1"12
3X4 E F
A-B
B-C
C-D
3'1"
L-K
K-J
J-I
1'2"
I
LK
4X6
J
5X5
4
B-K
B-J
J-C
C-I
HG
12
3'8"
4
4
3'8"
0
0 I-G
24 - 103 H - G
253 - 113
15 - 518 I - D
382
0 D-G
57 - 331 E - G
39 - 11
2'
2'
3'6"
4'4"8
9'10"8
DESC = G5 9'10"8 7/4 Sci
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
3
0
-2
0
230
155
- 81
- 51
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
3X4
3X4
6
0 D-E
18 - 277 E - F
57 - 347
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6'4"1
6'5"13
AB
//-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4 C
3X4
/W
4'0"8
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/24/16
BC DL
10.00 PSF
G5 9'10"8 7/4 Sci
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =77.5
DUR. FAC 1.15
SEQ - 126553
SPACING 24.0 "
TYPE SCIS
211
144
74
-9
- 410
- 138
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / G6 9'10"8 7/12 Mono Hip
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
7.83
BC
118
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
9.88
9.88
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
7'10"
2'0"8
K 579 / / 197 / / 85
G 469 / 32
/ 211 / /Wind reactions based on MWFRS
K Min Brg Width Req = H Min Brg Width Req = -
2'0"8
/W
//-
3X4
4X4 D DT -1"12
12
7
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
EF
"13
A-B
B-C
C-D
9'0
3X4 C
7'6"1
7'7"13
3
0
0
0 I-H
33 - 141 H - G
300
0
0 - 558 C - H
363
0 D-H
141 - 79 E - H
99
88
37
3'1"
B-J
B-I
I-C
9'1"2
3X4
I
3X4
H0308
HG
9'10"8
DESC = G6 9'10"8 7/12 Mono Hip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
- 95
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
AB
KJ
-2
0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
K-J
J-I
3X4
5
0 D-E
0 - 423 E - F
21 - 163
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
G6 9'10"8 7/12 Mono Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =80.1
DUR. FAC 1.15
SEQ - 126555
SPACING 24.0 "
TYPE HIPM
- 342
- 192
- 61
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / G7 9'10"8 7/12 Mono
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud :W5 2x4 SPF #3:
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
(a) Continuous lateral restraint equally spaced on member.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
118
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3"8
9'7"
J 481 / / 60 / /F 470 / / 58 / /Wind reactions based on MWFRS
J Min Brg Width Req = G Min Brg Width Req = DE
'1
11
12
/W
//-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4
7
END(FT)
9.88
A-B
B-C
"2
5
0 C-D
0 - 358 D - E
87
0
- 129
-5
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4 C
8'8"1
J-I
I-H
0 H-G
0 G-F
B-I
B-H
H-C
0 - 461 C - G
331
0 D-G
138 - 59
3'1"
AB
3"8
JI
3X4
3X4
H
3X4
9'1"2
GF
9'10"8
DESC = G7 9'10"8 7/12 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
270
0
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
(a)
3X4
0
2
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
G7 9'10"8 7/12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =71.7
DUR. FAC 1.15
SEQ - 126557
SPACING 24.0 "
TYPE MONO
0
0
- 367
- 182
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / GL 9'9"12 Hip Frame
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF #3
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4 except as noted.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Right end vertical not designed to be exposed to wind pressure.
This "Hip Frame" may be used in place of purlins on the hip plane to
brace the flat top chord of hip trusses. See detail drawing
HIPFRAME1014 or HIPFR1801014 for additional information.
Maximum Reactions (lbs), or *=PLF
Loc R
/U
/ Rw / Rh / RL / W
A* 2
///A Min Brg Width Req = Bearing A is a rigid surface.
/ 117
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
F
A-B
B-C
C-D
E
0
1
1
-1 D - E
-1 E - F
-1
1
1
-1
-1
14
'9"
5
/-
12
14.13
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
D
11'6"10
A-K
K-J
J-I
C
0
0
0
0 I-H
0 H-G
0
B
0
0
0
-2 E - H
-2 F - G
-2
3X4(D1) A
0'
K
J
I
H
G
9'9"9
DESC = GL 9'9"12 Hip Frame
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
0
0
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp. Gables Tens. Comp.
B-K
C-J
D-I
0"4
0
0
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
GL 9'9"12 Hip Frame
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =84.0
DUR. FAC 1.15
SEQ - 126025
SPACING 24.0 "
TYPE HIP_
0
0
-2
-1
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / H 5'1"7 */12 Mono
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud :W3 2x6 SPF 1650f-1.5E:
:Lt Stub Wedge 2x4 SPF Stud:
The following members need concentrated loads at the heel: 0-0-0
span/setback member on the 1-10-0 cant side requires 24 lbs and
the 0-0-0 span/setback member on the 1-10-0 cant side requires 24
lbs.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
36
-0.25
BC
26
2.75
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Left cantilever is exposed to wind
Sub-fascia beam assumptions: 0-0-0 sub-fascia beam on the 1-10-0
cantilever side. 0-0-0 sub-fascia beam on the 1-10-0 cantilever side.
Hipjack supports 3-7-7 setback jacks with 1-10-0 cantilever one
face; 1-10-0 cantilever opposite face.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
2.75
4.87
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
E 508 / 19
///D 19
/ 171 / 7
//Wind reactions based on MWFRS
E Min Brg Width Req = 1.5
D Min Brg Width Req = Bearing E Fcperp = 565psi.
5'3"2
2.83
12
1.5X3C
2X6(G1)
A
A-B
354
- 17 B - C
9
- 28
7"8
9'7"10
3X4 D
6"8
4"11
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
9'1"2
A-E
E
4X4
2'7"1
14 - 313 E - D
3'
1'7"15
20 - 332 D - C
323 - 15
5"8
5'1"7
DESC = H 5'1"7 */12 Mono
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
- 339
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
12
2'6"6
1'8"8
3'
16
2.83
B-E
B-D
PLT TYP. WAVE
/ 5.7
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'3"8
1'10"
3X4 B
/W
PLY= 1 QTY= 2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
H 5'1"7 */12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =24.5
DUR. FAC 1.15
SEQ - 126559
SPACING 24.0 "
TYPE MONO
16
- 66
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / J 3'8"8 4/12 Jack
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
27
0.00
BC
19
2.21
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
(J) Hanger Support Required, by others
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Shim all supports to solid bearing.
END(FT)
2.21
3.71
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
4
E 435 / / 215 / / 23
D 9
/ 132 / 6
//Wind reactions based on MWFRS
E Min Brg Width Req = 1.5
D Min Brg Width Req = Bearing E Fcperp = 565psi.
12
"15
3'10
1.5X3 C
2X6(G1)
A
A-B
7"8
9'7"10
3X4 D
4X6
E
6"8
4"13
212 - 120 B - C
9'1"2
A-E
4
128 - 170 E - D
195 - 306 C - D
189 - 72
5
1'3"
2'2"8
1'6"
3'8"8
DESC = J 3'8"8 4/12 Jack
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
- 26
76
- 197
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
B-E
B-D
2'2"8
14
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
1'10"
1'10"8
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'3"13
1'10"5
3X4 B
/W
PLY= 1 QTY= 3
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
J 3'8"8 4/12 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =22.4
DUR. FAC 1.15
SEQ - 126561
SPACING 24.0 "
TYPE MONO
35
- 47
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / K 5'2"2 */12 HJ Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
The following members need concentrated loads at the heel: 0-0-0
span/setback member on the 1-10-0 cant side requires 24 lbs and
the 0-0-0 span/setback member on the 1-10-0 cant side requires 24
lbs.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
62
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Left cantilever is exposed to wind
Sub-fascia beam assumptions: 0-0-0 sub-fascia beam on the 1-10-0
cantilever side. 0-0-0 sub-fascia beam on the 1-10-0 cantilever side.
Hipjack supports 3-7-15 setback jacks with 1-10-0 cantilever one
face; 1-10-0 cantilever opposite face.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
5.18
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
5'3"1
2.83
3
12
A-F
F-E
2X6
1.5X3
- 27 B - C
0
24 - 424 E - D
12
-1
0
F-B
30 - 520 B - E
113
ED
2'7"1
5'2"2
DESC = K 5'2"2 */12 HJ Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
-2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
F
451
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'10"2
7"8
2X6(G1)
A
/ 5.7
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
C
3X4 B
A-B
2'7"1
/W
F 474 / 18
///D 56
/ 126 / 9
//Wind reactions based on MWFRS
F Min Brg Width Req = 1.5
E Min Brg Width Req = Bearing F Fcperp = 565psi.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
K 5'2"2 */12 HJ Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =26.4
DUR. FAC 1.15
SEQ - 126563
SPACING 24.0 "
TYPE MONO
- 54
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / L 3'9" 4/12 Jack
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
45
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
(J) Hanger Support Required, by others
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
3.75
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
4
F 393 / / 194 / / 23
D 42
/ 93
/ 12 / /Wind reactions based on MWFRS
F Min Brg Width Req = 1.5
E Min Brg Width Req = Bearing F Fcperp = 565psi.
12
3'11
"7
3X4
A-B
306 - 174 B - C
0
-3
1'10"8
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-F
F-E
207 - 253 E - D
7
-6
0
0
7"8
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
1.5X3
1'10"8
F
F-B
183 - 355 B - E
ED
1.5X4
1'10"8
3'9"
DESC = L 3'9" 4/12 Jack
PLT TYP. WAVE
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
BC
2X6(G1)
A
/W
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 5
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
L 3'9" 4/12 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =19.6
DUR. FAC 1.15
SEQ - 126314
SPACING 24.0 "
TYPE MONO
87
- 39
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / M 8'0"1 */12 HJ Girder
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF Stud
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
The following members need concentrated loads at the heel: 0-0-0
span/setback member on the 1-10-0 cant side requires 31 lbs and
the 0-0-0 span/setback member on the 1-10-0 cant side requires 31
lbs.
Sub-fascia beam assumptions: 0-0-0 sub-fascia beam on the 1-10-0
cantilever side. 0-0-0 sub-fascia beam on the 1-10-0 cantilever side.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Left cantilever is exposed to wind
Hipjack supports 5-7-15 setback jacks with 1-10-0 cantilever one
face; 1-10-0 cantilever opposite face.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
8.01
Truss designed for unbalanced snow load, based on Pf=Pg=30.00
psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
5'5"12
2'6"5
G 649 / 13
///E 213 / /9
//Wind reactions based on MWFRS
G Min Brg Width Req = 1.5
F Min Brg Width Req = Bearing G Fcperp = 565psi.
12
4.95
13
2'8"
/W
/ 5.7
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1.5X3 C
5'7"9
A-B
B-C
12
A-G
G-F
1'11"
- 47 C - D
- 44
7"8
43 - 596 F - E
103
-5
G-B
B-F
9'1"2
56 - 797 C - F
6 - 122
3X4 F E
G
2X6
5'5"
8'0"1
DESC = M 8'0"1 */12 HJ Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
1
-5
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
3X4(A1)
A
2'7"1
655
42
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X6 B
2'11"8
2.83
D
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
M 8'0"1 */12 HJ Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =46.9
DUR. FAC 1.15
SEQ - 126565
SPACING 24.0 "
TYPE SPEC
14
- 125
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / N 5'9" 7/4 Jack
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
69
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
5.75
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3'10"8
1'10"8
E 490 / / 199 / / 44
D 157 / 16
/ 57 / /Wind reactions based on MWFRS
E Min Brg Width Req = 1.5
D Min Brg Width Req = Bearing E Fcperp = 565psi.
12
7
2 '2
"1
/W
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4
12
1.5X3 C
A-B
4'1"
3'0"2
A-E
E-B
B-D
7"8
218 - 283 E - D
217 - 497 C - D
123 - 125
9'1"2
3X4
E
2X6
D
3'10"8
5'9"
DESC = N 5'9" 7/4 Jack
PLT TYP. WAVE
- 68
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
95
- 93
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
2X6(G1)
A
1'10"8
26
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X6(SRS) B
1'11"
354 - 189 B - C
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
N 5'9" 7/4 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =32.9
DUR. FAC 1.15
SEQ - 126567
SPACING 24.0 "
TYPE SPEC
9
- 53
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / N1 3'7"15 4/12 Jack
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
44
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
3.66
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
4
F 396 / / 196 / / 23
D 35
/ 102 / 11 / /Wind reactions based on MWFRS
F Min Brg Width Req = 1.5
E Min Brg Width Req = Bearing F Fcperp = 565psi.
12
3'10
"5
3X4
A-B
301 - 172 B - C
0
-3
1'10"2
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-F
F-E
204 - 249 E - D
6
-6
0
0
7"8
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
1.5X3
1'10"8
F
F-B
184 - 357 B - E
ED
1.5X4
1'9"7
3'7"15
DESC = N1 3'7"15 4/12 Jack
PLT TYP. WAVE
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
BC
2X6(G1)
A
/W
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
N1 3'7"15 4/12 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =18.2
DUR. FAC 1.15
SEQ - 126569
SPACING 24.0 "
TYPE SPEC
92
- 33
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / O1 23' 10/8 Gable
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2 :B2 2x4 SPF 1650f-1.5E:
Webs 2x4 SPF Stud :W11 2x4 SPF #1/#2:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 1.5X3 except as noted.
Truss designed to support 2-0-0 top chord outlookers and cladding
load not to exceed 3.00 PSF one face and 24.0" span opposite face.
Top chord must not be cut or notched.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
115 mph wind, 15.56 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Calculated horizontal deflection is 0.26" due to live load and 0.15"
due to dead load.
Wind loads and reactions based on MWFRS with additional C&C
member design.
See DWGS A11530ENC101014, GBLLETIN1014, & GABRST101014
for gable wind bracing requirements.
Right end vertical not exposed to wind pressure.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
(J) Hanger Support Required, by others
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
11'0"7
3'3"2
AA 2168 / 26
/ 735 / / 285 / 4.0
O 2179 / 43
/ 710 / //Wind reactions based on MWFRS
AA Min Brg Width Req = 3.4
O Min Brg Width Req = Bearing AA Fcperp = 565psi.
3'3"2
F
G 5X6
J
AE
2X6
11
' 3"
15
K
AG
3X4 D
AH
2X6
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
AI
2X6
AF
AJ
2X6
L
AK
C
U
M
S
V
AC
1.5X3(**)
6X8 A
1'10"7
4X6
12
X
6X8
Y
AA Z
3X8
N
AM
AL
8
W
3X4
AB
R
6X8
Q
AA- Z
Z-Y
Y-X
X-W
W-V
V-U
P
1
12
"
2'5
'1"
7
3X6
2"
9'3"2
9'1"2
O
10'4"
10'4"
A -AA
A -AB
AB- Y
Y-B
B -AC
23'
DESC = O1 23' 10/8 Gable
PLT TYP. WAVE
- 1865
- 3419
- 3311
- 3588
- 3520
- 3167
- 3218
H-I
I-J
J-K
K-L
L-M
M-N
457
438
444
344
408
307
- 3218
- 3169
- 3512
- 3581
- 2450
- 2535
272
272
1714
1797
2975
3073
- 285
- 285
- 309
- 327
- 333
- 359
U-T
T-S
S-R
R-Q
Q-P
P-O
3030
2252
2292
2191
90
28
- 345
- 211
- 223
- 197
- 29
- 31
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
2'4"
2'4"
246
474
556
346
446
438
457
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3'7"12
6'10"11
3X8 B
AD
A-B
B-C
C-D
D-E
E-F
F-G
G-H
3X6
T
7X8
12
11'0"13
5X6I
E
6
'4"
14
10
H
/W
8'8"7
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
247
1573
1599
270
1104
- 2136
- 145
- 153
- 1750
- 36
AG- T
T -AI
T -AJ
AI- I
AJ-AK
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
O1 23' 10/8 Gable
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =202.6
DUR. FAC 1.15
SEQ - 126571
SPACING 24.0 "
TYPE GABL
1576
1594
733
1563
735
- 145
- 150
- 87
- 147
- 86
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / O1 23' 10/8 Gable
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
END(FT)
TC
24
11.04
14.30
BC
28
0.00
2.33
BC
120
2.33
12.67
BC
75
12.67
23.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
AD- W
W-D
D -AE
AE-AF
AF- T
G -AG
1089 - 32 AK- L
0 - 683 L - Q
287 - 65 Q -AL
290 - 68 AM- N
289 - 69 N - O
1545 - 142
744
- 83
78 - 1232
1860 - 172
1878 - 177
266 - 2119
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp. Gables Tens. Comp.
Z -AB
C -AC
AD- X
E -AE
AE- V
F -AF
AF- U
AG-AH
14
90
74
120
84
186
112
2
- 46
- 201
- 140
- 280
- 160
- 19
0
- 21
H -AH
AH-AI
S -AJ
AJ- J
R -AK
AK- K
P -AL
AM- M
DESC = O1 23' 10/8 Gable
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
O1 23' 10/8 Gable
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =202.6
DUR. FAC 1.15
SEQ - 126571
SPACING 24.0 "
TYPE GABL
88
2
109
170
86
119
91
121
-5
- 21
0
- 15
- 168
- 278
- 177
- 272
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / O2 23' 10/8 Sci
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
10.58
BC
28
0.00
BC
120
2.33
BC
75
12.67
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
14.75
2.33
12.67
23.00
115 mph wind, 15.75 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
End verticals not exposed to wind pressure.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
(J) Hanger Support Required, by others
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
10'7"
4'2"1
M 1167 / / 499 / / 137 / 4.0
H 1176 / / 487 / //Wind reactions based on MWFRS
M Min Brg Width Req = 1.8
H Min Brg Width Req = Bearing M Fcperp = 565psi.
4'2"1
D 5X6
5X6E
10
' 8"
13
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
5
'9"
13
3X4 C
F
12
11'0"13
A-B
B-C
C-D
3X4
J
6X8
10
3X5 B
3X4
8
12
4'0"5
3X4
M-L
L-K
K-J
I
2'3"
K
M
2X6
5X5
L
1
12
"
2'5
'1"
7
2X6
2"
A-M
A-L
L-B
B-K
K-C
C-J
H
10'4"
130 - 136 J - I
878 - 103 I - H
1539 - 81
53 - 1147 D - J
840 - 19 J - E
100 - 938 J - F
563
0 F-I
52 - 403 I - G
122 - 32 G - H
10'4"
23'
DESC = O2 23' 10/8 Sci
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
108 - 1738
109 - 1819
84 - 1272
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
1158
68
- 44
- 31
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
9'3"2
9'1"2
2'4"
2'4"
56 - 898 D - E
135 - 1703 E - F
109 - 1819 F - G
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X5
6'10"11
G
3X5 A
/W
8'3"
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
O2 23' 10/8 Sci
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =158.0
DUR. FAC 1.15
SEQ - 126573
SPACING 24.0 "
TYPE SCIS
889
0
898
0
381
- 18
97 - 728
939
- 12
73 - 1145
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / O3 22'11"4 10/8 Sci
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.78 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
10.52
BC
27
0.00
BC
120
2.27
BC
75
12.60
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
14.69
2.27
12.60
22.94
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
10'6"4
4'2"1
M 1164 / / 498 / / 136 / H 1172 / / 486 / //Wind reactions based on MWFRS
M Min Brg Width Req = H Min Brg Width Req = -
4'2"1
D 5X6
5X6 E
10
' 8"
13
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
5
'8"
13
3X4 C
F
12
11'0"13
A-B
B-C
C-D
3X4
J
6X8
10
3X5
M-L
L-K
K-J
3X4
3X4
8
2'3"10
12
3X8
M
5X8
L
12
12
'5"
'1"
7
4'0"5
6'10"11
G
K
I
2X6
2"
9'3"2
9'1"2
A-M
A-L
L-B
B-K
K-C
C-J
H
10'4"
130 - 136 J - I
857 - 101 I - H
1525 - 80
52 - 1145 D - J
836 - 19 J - E
100 - 942 J - F
569
0 F-I
53 - 408 I - G
122 - 31 G - H
10'4"
22'11"4
DESC = O3 22'11"4 10/8 Sci
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
108 - 1730
108 - 1811
84 - 1268
PLY= 1 QTY= 8
1154
68
- 44
- 31
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
2'3"4
2'3"4
54 - 874 D - E
133 - 1687 E - F
109 - 1812 F - G
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X6 B
5X5 A
/W
8'3"
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
O3 22'11"4 10/8 Sci
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =156.6
DUR. FAC 1.15
SEQ - 126316
SPACING 24.0 "
TYPE SCIS
883
0
893
0
378
- 19
97 - 725
936
- 12
73 - 1142
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / O5 22'11"4 */8 Sci
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF #3 :W5, W6, W7, W8, W9 2x4 SPF Stud:
115 mph wind, 20.16 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
27
0.00
BC
120
2.27
BC
75
12.60
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
End verticals not exposed to wind pressure.
Max JT VERT DEFL: LL: 0.12" DL: 0.15". See detail
DEFLCAMB1014 for camber recommendations. Provide for
adequate drainage of roof.
(a) Continuous lateral restraint equally spaced on member.
END(FT)
2.27
12.60
22.94
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
/W
22'11"4
A
5X5
5X5
B
5X5
C
3X4
D
3X5
E
5X5
F
5X5
M 1116 / 7
/ 434 / /H 1124 / 5
/ 436 / /Wind reactions based on MWFRS
M Min Brg Width Req = H Min Brg Width Req = -
G
//-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-B
B-C
C-D
(a)
10'10"13
(a)
(a)
6'10"11
11'0"13
(a)
J
6X8
(a)
M-L
L-K
K-J
4X4 12
4X6
3X4
2"
3X4
M
5X8
L
A-M
A-L
L-B
B-K
K-C
C-J
9'3"2
9'1"2
H
2'3"4
2'3"4
10'4"
0 J-I
- 38 I - H
- 95
108
1033
139
994
174
1225
- 1091
- 87
- 1122
- 76
- 1055
- 102
D-J
J-F
F-I
I-G
G-H
10'4"
22'11"4
DESC = O5 22'11"4 */8 Sci
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 3
672
66
- 78
- 33
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
'1"
7
12
0
330
874
I
12
'5"
145 - 1727
145 - 1727
40 - 494
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
8
K
18 - 213 D - E
54 - 665 E - F
145 - 1727 F - G
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
O5 22'11"4 */8 Sci
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =215.4
DUR. FAC 1.15
SEQ - 126577
SPACING 24.0 "
TYPE SCIS
143 - 463
1424 - 119
192 - 1186
1096
- 88
113 - 1092
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / O8 22'11"4 7/8 HHip
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF #3
:W4, W5, W6, W7, W8, W9 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 20.42 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
End verticals not exposed to wind pressure.
Calculated horizontal deflection is 0.24" due to live load and 0.17"
due to dead load.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Max JT VERT DEFL: LL: 0.19" DL: 0.27". See detail
DEFLCAMB1014 for camber recommendations. Provide for
adequate drainage of roof.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
(a) Continuous lateral restraint equally spaced on member.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
(b) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
17'0"9
4'10"11
N 1162 / / 442 / / 53
I 1149 / 22
/ 482 / /Wind reactions based on MWFRS
N Min Brg Width Req = I
Min Brg Width Req = -
1 '1
"1 4
12
7
A
4X4
3X8
C
"15
G 4X6
H
17'0"9
4X4
B
5'7
3X5
D
1.5X3
E
//-
4X4
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6X8 F
A-B
B-C
C-D
D-E
12
58
213
213
- 250 E - F
- 841 F - G
- 2706 G - H
- 2706
213 - 2706
73 - 1097
30
- 29
(a)
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
(a)
N-M
M-L
L-K
(a)
6'10"11
9'10"13
(b)
K
6X8
12'0"1
12'9"1
(b)
(a)
6X8
L
2X4
N
5X8
M
4X6
J
2'3"4
26 - 65 K - J
383 - 109 J - I
1092 - 181
1149
152
- 119
- 31
8
12
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
12
'1"
7
'5"
12
4X4
I
2"
9'3"2
9'1"2
A-N
A-M
M-B
B-L
L-C
C-K
2'3"4
10'4"
76
1084
144
1154
192
1999
- 1136
- 54
- 1199
- 86
- 1251
- 162
K-F
E-K
F-J
J-G
G-I
H-I
2068 - 227
118 - 560
249 - 1868
1645 - 133
130 - 1118
11
- 58
10'4"
22'11"4
DESC = O8 22'11"4 7/8 HHip
PLT TYP. WAVE
/W
1'
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
O8 22'11"4 7/8 HHip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =218.3
DUR. FAC 1.15
SEQ - 127044
SPACING 24.0 "
TYPE HIPS
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / O8 22'11"4 7/8 HHip
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
END(FT)
TC
24
0.00
17.05
BC
27
0.00
2.27
BC
120
2.27
22.94
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
DESC = O8 22'11"4 7/8 HHip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
O8 22'11"4 7/8 HHip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =218.3
DUR. FAC 1.15
SEQ - 127044
SPACING 24.0 "
TYPE HIPS
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / O9 22'11"4 7/8 HHip
Top chord 2x4 SPF 1650f-1.5E :T3 2x4 SPF #1/#2:
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF #3 :W4, W5, W7, W9 2x4 SPF Stud:
:W6, W8 2x4 SPF #1/#2:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 19.84 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
End verticals not exposed to wind pressure.
Calculated horizontal deflection is 0.41" due to live load and 0.31"
due to dead load.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Max JT VERT DEFL: LL: 0.33" DL: 0.49". See detail
DEFLCAMB1014 for camber recommendations. Provide for
adequate drainage of roof.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
(a) Continuous lateral restraint equally spaced on member.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
(b) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
15'0"9
6'10"11
M 1163 / / 442 / / 78
H 1149 / 25
/ 498 / /Wind reactions based on MWFRS
M Min Brg Width Req = H Min Brg Width Req = -
1 '1
"1 4
12
7
2
7'1
1"1
F
4X6
G
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X10
C
1.5X3
D
8X8(SRS)
8'8"13
6'10"11
J
6X12
A-B
B-C
C-D
E
(b)
(b)
(a)
M-L
L-K
K-J
(a)
(a)
6X8
K
3X4
M
5X8
L
5X5
10 - 282 D - E
70 - 1027 E - F
381 - 4477 F - G
381 - 4477
49 - 1086
31
- 29
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12'0"1
5X5
B
12'9"1
5X5
34 - 98 J - I
432 - 148 I - H
1328 - 236
2380
153
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
12
12
'1"
7
'5"
12
4X4
H
2"
A-M
A-L
L-B
B-K
K-C
C-J
9'3"2
9'1"2
60
1085
149
1275
208
3504
- 1137
- 38
- 1224
- 100
- 1398
- 313
J-E
D-J
E-I
I-F
F-H
G-H
3055 - 312
86 - 401
348 - 2677
1505 - 109
140 - 1121
11
- 57
10'4"
10'4"
22'11"4
DESC = O9 22'11"4 7/8 HHip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
- 276
- 32
I
8
2'3"4
2'3"4
//-
4X4
15'0"9
A
/W
1'
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
O9 22'11"4 7/8 HHip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =209.4
DUR. FAC 1.15
SEQ - 127048
SPACING 24.0 "
TYPE HIPS
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / O9 22'11"4 7/8 HHip
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
END(FT)
TC
24
0.00
15.05
BC
27
0.00
2.27
BC
120
2.27
22.94
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
DESC = O9 22'11"4 7/8 HHip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
O9 22'11"4 7/8 HHip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =209.4
DUR. FAC 1.15
SEQ - 127048
SPACING 24.0 "
TYPE HIPS
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / P 12'8"4 7/12 MH Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x8 SP 2400f-2.0E
Webs 2x4 SP 2850f-2.3E :W2, W4 2x4 SPF #1/#2:
:W6 2x4 SPF Stud:
Left end vertical not exposed to wind pressure.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
0.00
BC
120
0.00
BC
42
12.60
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 38 plf at 0.00 to 38 plf at 9.74
TC- From 38 plf at 9.74 to 38 plf at 12.69
BC- From 10 plf at 0.00 to 10 plf at 12.69
BC- From 94 plf at 12.69 to 94 plf at 13.19
PLB- 1044.71 lb Conc. Load at ( 1.33, 9.13)
PLB- 699.19 lb Conc. Load at ( 3.33, 9.13)
PLB- 468.28 lb Conc. Load at ( 5.33, 9.13), (7.33,9.13), (9.33,9.13)
PLB- 910.64 lb Conc. Load at ( 5.44, 9.13)
PLB- 164.11 lb Conc. Load at ( 6.99, 9.13)
PLB- 1494.00 lb Conc. Load at ( 9.75, 9.13)
PLB- 401.88 lb Conc. Load at (11.44, 9.13)
END(FT)
9.74
12.60
13.19
115 mph wind, 16.03 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
(a) (2) #3 or better scab reinforcing members. Same size & 80%
length of web member. Attach one to each face w/10d Box or Gun
(0.128"x3",min.) nails @ 6" OC.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
9'8"15
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
6"
2'11"5
K 3454 / 188 / //E 3316 / 173 / //Wind reactions based on MWFRS
K Min Brg Width Req = 3.3
F Min Brg Width Req = 3.1
Bearings K & F Fcperp = 565psi.
12
9'8"15
4.95
3'2"
3
A
5X8
3X4
B
7X8
C
/W
/ 4.0
/ 3.5
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
D
5X7
A-B
B-C
85 - 1761 C - D
85 - 1761
49
- 29
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
(a)
7'6"9
K-J
J-I
I-H
H-G
0
0
1470 - 76
1418 - 74
2003 - 659
G-F
G-F
G-E
F-G
2312
49
0
2312
- 123
- 894
0
- 123
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
5X6
F
K
3X6
I H 5X5
H0312
J
8X10
9'9"
A-K
A-J
B-J
J-C
9'8"6
E
7"4
9'1"2
5X5 G 4X10
2'10"4
135 - 2641 I - C
3112 - 150 C - F
32 - 393 D - F
513 - 15
2554 - 128
178 - 3432
6
- 75
7"
13'2"4
DESC = P 12'8"4 7/12 MH Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
P 12'8"4 7/12 MH Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =138.6
DUR. FAC 1.15
SEQ - 126589
SPACING 24.0 "
TYPE HIPM
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / PB1 3'7"11 7/12 Piggy
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
115 mph wind, 21.08 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
34
20.03
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
22.84
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'7"11
12
7
1'
A 245 / 7
/ 66 / / 23
E 167 / 8
/ 61 / /Wind reactions based on MWFRS
A Min Brg Width Req = 1.5
E Min Brg Width Req = 3.5
Bearings A & E Fcperp = 565psi.
1'1
"14
"11
3'0
A-B
B-C
1'1"4
3X4(A1) B
A
1"12
3X4
E
F
0 - 104 C - D
14 - 102
B-F
20'1"15
47
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
F-E
25 - 165 F - D
3'0"8
LEFT RAKE = 3"12
DESC = PB1 3'7"11 7/12 Piggy
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
- 102
-9
3'7"11
PLT TYP. WAVE
32
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
1'8"4
1'6"10
D 1.5X3
7"3
/ 3.5
/ 3.5
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
C 3X4
1"10
/W
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
PB1 3'7"11 7/12 Piggy
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =14.0
DUR. FAC 1.15
SEQ - 126443
SPACING 24.0 "
TYPE SCIS
37
- 127
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / PB2 22'11"4 */12 Piggy
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
115 mph wind, 21.33 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
120
-19.89
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
3.04
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs), or *=PLF
Loc R
/U
/ Rw / Rh / RL / W
P* 94
/3
/ 35 / /Wind reactions based on MWFRS
P Min Brg Width Req = Bearing P is a rigid surface.
/ 275
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
22'9"15
1.5X3
A
1.5X3
B
1.5X3
C
1.5X3
D
A-B
B-C
C-D
D-E
1"5
3X5
E F
1.5X3
1.5X3
G
20'3"9
1.5X3
O 1.5X3
1.5X3 N M
3X5
L 1.5X3
22'11"4
K 1.5X3
J
1.5X3
1.5X3
- 10 E - F
- 10 F - G
- 10 G - H
- 10
1
1
1
P-O
O-N
N-M
M-L
10
10
10
10
-1 L - K
-1 K - J
-1 J - I
-1
10
10
10
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
31
93
90
90
- 112 F - K
- 320 G - J
- 311 H - I
- 312
90
93
28
DESC = PB2 22'11"4 */12 Piggy
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
-1
-1
-1
I
A-P
B-O
C-N
D-L
PLT TYP. WAVE
- 10
- 10
- 10
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1.5X3
H
1'0"6
P
1
1
1
1
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
PB2 22'11"4 */12 Piggy
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =74.2
DUR. FAC 1.15
SEQ - 126446
SPACING 24.0 "
TYPE SCIS
- 310
- 320
- 101
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / PB3 22'11"4 7/12 Piggy
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
0.00
BC
120
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
115 mph wind, 21.76 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
21.22
22.94
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs), or *=PLF
Loc R
/U
/ Rw / Rh / RL / W
Q* 96
/4
/ 35 / /1
Wind reactions based on MWFRS
Q Min Brg Width Req = Bearing Q is a rigid surface.
/ 275
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
21'2"10
1'8"10
21'2"10
1'1
A-B
B-C
C-D
D-E
1"1
4
12
1.5X3
C
1.5X3
D
3X5
E
1.5X3
F
1.5X3
G
H
DT 1"12
3X4(**)
1'9"14
I 1.5X3
11"10
Q-P
P-O
O-N
N-M
1'11"10
1.5X3
B
20'3"9
Q
1.5X3
P 1.5X3
1.5X3O N 3X5
1.5X3M
22'11"4
L
1.5X3
K 1.5X3
1.5X3
- 11
- 11
- 11
- 11
E-F
F-G
G-H
H-I
7
7
8
14
J
11
11
11
20
-7 M - L
-7 L - K
-7 K - J
-4
20
20
20
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
A-Q
B-P
C-O
D-M
32
91
90
91
- 105 F - L
- 312 G - K
- 304 I - J
- 306
88
98
18
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
-4
-4
-4
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
DESC = PB3 22'11"4 7/12 Piggy
PLT TYP. WAVE
- 11
- 11
- 16
- 70
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
7
1.5X3
A
7
7
7
7
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
PB3 22'11"4 7/12 Piggy
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =85.4
DUR. FAC 1.15
SEQ - 126449
SPACING 24.0 "
TYPE SCIS
- 302
- 314
- 129
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / PB4 4'2"1 10/12 Piggy
Top chord 2x4 SPF #1/#2
Bot chord
This dwg. prepared by the ITW job designer program from truss mfr's layout.
WARNING: WIND DL GREATER THAN NON-WIND DESIGN DL.
115 mph wind, 21.03 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of rigid ceiling use purlins to brace BC @ 1199998" OC.
Deflection meets L/180 live and L/120 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'1"
2'1"
A 145 / 24
/ 39 / / 26
C 145 / 24
/ 35 / /Wind reactions based on MWFRS
A Min Brg Width Req = 1.5
C Min Brg Width Req = 1.5
Bearings A & C are a rigid surface.
/W
/ 5.5
/ 5.5
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
2'8
"9
2'8
B
A-B
40
- 93 B - C
"9
3X4
1'8"14
12
10
A
C
20'1"15
4'2"1
DESC = PB4 4'2"1 10/12 Piggy
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 9
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
0.00 PSF
PB4 4'2"1 10/12 Piggy
BC LL
0.00 PSF
TOT. LD
37.00 PSF
WEIGHT =8.4
DUR. FAC 1.15
SEQ - 126451
SPACING 24.0 "
TYPE SCIS
40
- 93
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / PB5 3'3"2 10/12 Piggy
Top chord 2x4 SPF #1/#2
Bot chord
This dwg. prepared by the ITW job designer program from truss mfr's layout.
WARNING: WIND DL GREATER THAN NON-WIND DESIGN DL.
115 mph wind, 20.84 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of rigid ceiling use purlins to brace BC @ 1199998" OC.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Deflection meets L/180 live and L/120 total load. Creep increase
factor for dead load is 2.00.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1'7"9
1'7"9
2'1
7
"
2'1
12
B
A 110 / 18
/ 29 / / 20
C 110 / 18
/ 29 / /Wind reactions based on MWFRS
A Min Brg Width Req = 1.5
C Min Brg Width Req = 1.5
Bearings A & C are a rigid surface.
A-B
"7
30
- 70 B - C
3X4
1'4"5
C
20'1"15
3'3"2
DESC = PB5 3'3"2 10/12 Piggy
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
/ 5.5
/ 5.5
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
10
A
/W
PLY= 1 QTY= 2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
0.00 PSF
PB5 3'3"2 10/12 Piggy
BC LL
0.00 PSF
TOT. LD
37.00 PSF
WEIGHT =8.4
DUR. FAC 1.15
SEQ - 126454
SPACING 24.0 "
TYPE SCIS
30
- 70
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / PB6 4'10"1 7/12 Piggy
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4(B1) except as noted.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
33
0.50
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
115 mph wind, 21.60 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
3.43
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs), or *=PLF
Loc R
/U
/ Rw / Rh / RL / W
12
7
2'5"
2'5"
"10
2'9
2'9
"10
A 46
/8
/ 13 / / 21 / 6.9
B* 123 / 5
/ 45 / // 37.7
E 46
/6
/7
/// 6.9
Wind reactions based on MWFRS
A Min Brg Width Req = 1.5
B Min Brg Width Req = E Min Brg Width Req = 1.5
Bearings A, B, & E are a rigid surface.
B
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'6"11
1'5"1
C 3X4
D
A
1"10
E
1"12
A-B
B-C
20'10"9
20'8"15
10"3
3'1"12
81
0
10"3
3'1"12
4'10"1
LEFT RAKE = 7"3 RIGHT RAKE = 7"3
DESC = PB6 4'10"1 7/12 Piggy
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
33
31
- 136
- 23
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B-D
10"3
31 - 24 C - D
33 - 136 D - E
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
PB6 4'10"1 7/12 Piggy
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =14.0
DUR. FAC 1.15
SEQ - 126467
SPACING 24.0 "
TYPE COMN
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / PB7 4'10"1 7/12 Piggy
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4(B1) except as noted.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
0.90
BC
33
0.11
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
115 mph wind, 21.40 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
2.24
3.04
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs), or *=PLF
Loc R
/U
/ Rw / Rh / RL / W
1'9"
1'4"1
1'9"
A 47
/7
/ 11 / / 15 / 6.9
B* 123 / 5
/ 42 / // 37.7
F 47
/7
/9
/// 6.9
Wind reactions based on MWFRS
A Min Brg Width Req = 1.5
B Min Brg Width Req = F Min Brg Width Req = 1.5
Bearings A, B, & F are a rigid surface.
1'4"1
12
2'0
"
"5
2'0
1'0"6
C 3X4
B
5
3X4
D
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
E
A
1"10
A-B
B-C
C-D
1'2"
7
F
1"12
20'10"9
20'8"15
26 - 24 D - E
78 - 140 E - F
65 - 101
78
26
- 140
- 24
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
10"3
10"3
3'1"12
10"3
B-E
101
- 32
3'1"12
4'10"1
LEFT RAKE = 7"3 RIGHT RAKE = 7"3
DESC = PB7 4'10"1 7/12 Piggy
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
PB7 4'10"1 7/12 Piggy
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =16.8
DUR. FAC 1.15
SEQ - 126464
SPACING 24.0 "
TYPE COMN
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / Q 10'7"15 */12 Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x8 SP 2400f-2.0E
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 75 plf at -2.07 to 75 plf at 2.12
TC- From 76 plf at 2.12 to 76 plf at 10.66
BC- From 4 plf at -2.07 to 4 plf at 0.00
BC- From 20 plf at 0.00 to 20 plf at 10.66
BC- 552.01 lb Conc. Load at 0.21
BC- 609.51 lb Conc. Load at 2.83
BC- 230.91 lb Conc. Load at 5.44
BC- 165.12 lb Conc. Load at 8.06
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Wind loads and reactions based on MWFRS.
(J) Hanger Support Required, by others
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
End verticals not exposed to wind pressure.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
-0.85
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
9.81
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'1"7
8'6"8
I 1830 / / 116 / /F 911 / / 70 / /Wind reactions based on MWFRS
I
Min Brg Width Req = 1.7
F Min Brg Width Req = Bearing I Fcperp = 565psi.
1.5X3
12
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-B
B-C
I-H
H-G
7'6"4
1
4'4"1
12
4X6(SRS) C
B-I
B-H
H-C
C-G
2'3"3
A
1
815
-4 G - F
0
0 - 1343 G - D
1114
0 D-F
7 - 222 E - F
56 - 66
9'1"2
I
2X8
H
3X5
2'0"14
3X4 F
G
3X4
10'7"15
LEFT RAKE = 2'2"1
DESC = Q 10'7"15 */12 Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
0
72
- 906
- 106
729
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
3X5 B
2'11"
48
-6 C - D
0 - 870 D - E
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4 D
3.7
/ 3.5
/-
E
"7
9'8
6.47
/W
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
Q 10'7"15 */12 Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =95.0
DUR. FAC 1.15
SEQ - 126591
SPACING 24.0 "
TYPE COMN
648
0
21
0
- 975
- 152
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / R 12'8"13 */12 Mono Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x8 SP 2400f-2.0E
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 76 plf at 0.00 to 76 plf at 12.73
BC- From 20 plf at 0.00 to 20 plf at 12.73
BC- 97.52 lb Conc. Load at 5.07
BC- 256.79 lb Conc. Load at 8.31
BC- 348.41 lb Conc. Load at 10.30
Wind loads and reactions based on MWFRS.
(J) Hanger Support Required, by others
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
12.73
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1.5X3
G 996 / 35
///E 942 / 47
///Wind reactions based on MWFRS
G Min Brg Width Req = 1.5
E Min Brg Width Req = Bearing G Fcperp = 565psi.
D
/ 4.3
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
9
"
4'5
12
/W
1
A-B
B-C
6.47
149 - 35 C - D
59 - 920
94
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
7'6"4
3X4 C
A-G
G-F
26
69
- 98 F - E
- 78
751
- 47
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
3X5 B
G-B
B-F
F-C
4X4(A1) A
7"14
61 - 898 C - E
796 - 39 D - E
419 - 63
55
27
9'1"2
G
2X8
3X5 E
F
3X4
2'0"1
10'8"12
12'8"13
DESC = R 12'8"13 */12 Mono Girder
PLT TYP. WAVE
- 136
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/24/16
BC DL
10.00 PSF
R 12'8"13 */12 Mono Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =91.6
DUR. FAC 1.15
SEQ - 126593
SPACING 24.0 "
TYPE MONO
- 863
- 198
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / S 10'6"15 7/12 Mono
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
10.58
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1.5X3
C
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
'3"
12
12
/W
E 631 / / 286 / / 115 / 4.0
D 402 / 36
/ 189 / //Wind reactions based on MWFRS
E Min Brg Width Req = 1.5
D Min Brg Width Req = Bearing E Fcperp = 565psi.
A-B
7
220 - 153 B - C
82
- 125
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6'9"15
3X4 B
A-E
135
- 98 E - D
270
- 142
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
E-B
B-D
120 - 502 C - D
168 - 320
2X6(G1)
A
7"14
9'1"2
3X5
E
3X4
1'10"8
D
8'8"7
10'6"15
DESC = S 10'6"15 7/12 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
S 10'6"15 7/12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =61.7
DUR. FAC 1.15
SEQ - 126595
SPACING 24.0 "
TYPE MONO
65
- 164
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / S1 9'5"15 7/12 Mono
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
9.49
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1.5X3
12
7
/W
E 582 / / 266 / / 103 / 4.0
D 348 / 34
/ 163 / //Wind reactions based on MWFRS
E Min Brg Width Req = 1.5
D Min Brg Width Req = Bearing E Fcperp = 565psi.
C
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
"15
'11
10
A-B
221 - 105 B - C
77
- 115
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6'2"5
3X4 B
A-E
114 - 107 E - D
225
- 133
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
E-B
B-D
104 - 477 C - D
155 - 263
2X6(G1)
A
7"14
9'1"2
3X5
E
3X4
1'10"8
D
7'7"7
9'5"15
DESC = S1 9'5"15 7/12 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/24/16
BC DL
10.00 PSF
S1 9'5"15 7/12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =53.6
DUR. FAC 1.15
SEQ - 126597
SPACING 24.0 "
TYPE MONO
62
- 153
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / S2 4'8" 7/12 Mono
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
56
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
4.67
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
12
7
5'4
"13
3X4
D 399 / / 196 / / 50
C 98
/ 35
/ 32 / /Wind reactions based on MWFRS
D Min Brg Width Req = 1.5
C Min Brg Width Req = Bearing D Fcperp = 565psi.
B
/W
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A-B
298
- 58
3'4"9
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-D
91 - 192 D - C
7
-3
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
3X5(G1)
A
D-B
6 - 296 B - C
7"14
9'1"2
1.5X4
D
1'10"8
1.5X3
C
2'9"8
4'8"
DESC = S2 4'8" 7/12 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
S2 4'8" 7/12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =26.2
DUR. FAC 1.15
SEQ - 126599
SPACING 24.0 "
TYPE MONO
87
- 84
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / T1 11'9"12 7/12 Mono
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
11.81
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3X4
12
/W
H 681 / / 307 / / 128 / 4.0
E 468 / 38
/ 222 / //Wind reactions based on MWFRS
H Min Brg Width Req = 1.5
F Min Brg Width Req = Bearing H Fcperp = 565psi.
CD
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
2
'8"
13
A-B
B-C
7
312 - 72 C - D
18 - 347
0
-5
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
7'6"9
3X4 B
A-H
H-G
98 - 164 G - F
331 - 135 F - E
0
0
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
H-B
B-G
24 - 658 G - C
185 - 306 C - F
413
136
3X6(G1)
A
7"14
9'1"2
3X4
G
H
3X4
1'10"8
3X4
FE
9'11"4
11'9"12
DESC = T1 11'9"12 7/12 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 5
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
T1 11'9"12 7/12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =72.9
DUR. FAC 1.15
SEQ - 126601
SPACING 24.0 "
TYPE MONO
- 103
- 440
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / T2 21'10" 7/4 Common
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Left cantilever is exposed to wind
(a) #3 or better scab reinforcement. Same size & 80% length of web
member. Attach with 10d Box or Gun (0.128"x3",min.)nails @ 6" OC.
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
21.83
Truss passed check for 20 psf additional bottom chord live load in
areas with 42"-high x 24"-wide clearance.
Right end vertical exposed to wind pressure. Deflection meets L/180.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
11'10"8
8'
C 5X5
12
7
1'11"8
9'3
"2
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
'9"
13
12
D
A-B
B-C
C-D
4
4'1"
3X4
A-M
M-L
L-K
4X6(SRS)
F 3X4
G
2'3"3
(a)
3X5(G1)
A
2'11"
E
9'1"2
3X4
1'10"8
3X4
L
3X5
K
3X4
J
3X8
I
2X6
M-B
B-L
L-C
C-J
J-D
H
19'11"8
21'10"
128
103
56
87 - 184 K - J
908 - 64 J - I
713
0 I-H
713
929
33
162 - 1485
135 - 140
384 - 23
415 - 34
123 - 147
D-I
E-I
I-F
F-H
1'11"
RIGHT RAKE = 2'0"4
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
0
- 46
- 21
59 - 671
37 - 136
862
- 15
205 - 1192
DESC = T2 21'10" 7/4 Common
PLT TYP. WAVE
- 679
- 673
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
7"14
M
330 - 60 D - E
159 - 1140 E - F
167 - 1157 F - G
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
7'7"
4X4 B
/W
M 1221 / / 487 / / 120 / 4.0
H 1230 / / 428 / // 3.5
Wind reactions based on MWFRS
M Min Brg Width Req = 1.5
H Min Brg Width Req = 1.9
Bearings M & H Fcperp = 565psi.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
T2 21'10" 7/4 Common
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =132.4
DUR. FAC 1.15
SEQ - 126604
SPACING 24.0 "
TYPE COMN
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / T3 19'11"8 7/4 DP Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x6 SP 2700f-2.0E
Webs 2x4 SPF Stud :W2, W5, W10 2x4 SPF #1/#2:
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 4.50" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
4" o.c. spacing of nails perpendicular and parallel to
grain required in area over bearings greater than 4"
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 76 plf at 0.00 to 76 plf at 10.00
TC- From 76 plf at 10.00 to 76 plf at 18.00
TC- From 75 plf at 18.00 to 75 plf at 21.88
BC- From 10 plf at 0.00 to 10 plf at 19.96
BC- From 4 plf at 19.96 to 4 plf at 21.88
BC- 1276.58 lb Conc. Load at 0.06,15.94
BC- 1214.27 lb Conc. Load at 2.06, 4.06, 6.06, 7.94
9.94,11.94,13.94
BC- 1176.74 lb Conc. Load at 17.94
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
120
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
19.96
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2 Complete Trusses Required
10'
8'
C 5X6
5
1'11"8
"2
A-B
B-C
C-D
1
12
D
3X4
7'7"
3X5 B
4'1"
M-L
L-K
K-J
F 5X8
1'9"
2'3"3
G
A-M
A-L
L-B
B-K
C-K
K-D
9'1"2
K
7X8
19'11"8
J
5X6
I
6X8
0 - 3741 D - E
0 - 2966 E - F
0 - 2963 F - G
0 - 3618
0 - 2246
24
-3
33
3155
3078
-0 J - I
0 I-H
0
2321
5
H
4X6
1'11"
0 - 2831
3280
0
751 - 64
0 - 840
2742
0
0 - 738
D-J
J-E
E-I
I-F
F-H
660
- 52
1056
0
0 - 1854
3172
0
0 - 3228
RIGHT RAKE = 2'0"4
DESC = T3 19'11"8 7/4 DP Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 2 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
0
-1
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
2'11"
6X8 A
L
6X8
/ 4.0
/ 3.5
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4
6X8(SRS)
E
M
4X6
/W
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
"1
1'6
12
7
9'3
M 7598 / / 153 / /H 6500 / / 92 / /Wind reactions based on MWFRS
M Min Brg Width Req = 4.0
H Min Brg Width Req = 3.4
Bearings M & H Fcperp = 565psi.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
T3 19'11"8 7/4 DP Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =288.5
DUR. FAC 1.15
SEQ - 126251
SPACING 24.0 "
TYPE COMN
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / T4 4'9"10 7/12 Mono
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
58
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.24 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
4.80
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
12
5'6
"11
A
D 231 / 57
/ 128 / / 52
C 231 / / 87 / /Wind reactions based on MWFRS
D Min Brg Width Req = C Min Brg Width Req = -
7
1.5X3
//-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B 3X4
7'6"9
A-B
92
- 92
4'8"15
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D-C
3X4
C
A-D
D-B
4'9"10
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
DESC = T4 4'9"10 7/12 Mono
PLY= 1 QTY= 1
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
3X5
D
/W
84 - 183 B - C
125 - 27
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
T4 4'9"10 7/12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =40.0
DUR. FAC 1.15
SEQ - 126606
SPACING 24.0 "
TYPE SPEC
0
- 183
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / T5 7'7"15 7/12 Mono
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
7.66
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1.5X3
12
7
8'1
E 502 / / 233 / / 83
D 257 / 33
/ 116 / /Wind reactions based on MWFRS
E Min Brg Width Req = 1.5
D Min Brg Width Req = Bearing E Fcperp = 565psi.
C
0"6
/W
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-B
122
- 85 B - C
88
- 126
5'1"8
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-E
114
- 62 E - D
E-B
B-D
89 - 400 C - D
162 - 131
2X6(G1)
A
7"14
9'1"2
3X4
E
3X4
D
5'9"7
7'7"15
DESC = T5 7'7"15 7/12 Mono
PLT TYP. WAVE
- 156
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
3X4 B
1'10"8
126
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/24/16
BC DL
10.00 PSF
T5 7'7"15 7/12 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =43.8
DUR. FAC 1.15
SEQ - 126608
SPACING 24.0 "
TYPE MONO
75
- 174
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / T6 9'7"9 7/4 Mono
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
End verticals not exposed to wind pressure.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
9.63
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
7'11"4
A
1'8"5
G 576 / 32
/ 225 / / 96
E 552 / / 186 / /Wind reactions based on MWFRS
G Min Brg Width Req = E Min Brg Width Req = -
12
1.5X3
9'2
A-B
B-C
"4
82 - 127 C - D
37 - 491
G-F
4
1'9"
6
A-G
G-B
B-F
4X6(SRS)
297
0 F-E
52 - 163 C - F
153 - 458 F - D
228 - 59 D - E
2'4"4
2'11"
D 3X4
9'1"2
F
3X8
3X4
E
9'7"9
DESC = T6 9'7"9 7/4 Mono
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
- 377
PLY= 1 QTY= 1
1
-1
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
7'6"9
C
3X5
0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4
12
G
//-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
7
B
/W
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
T6 9'7"9 7/4 Mono
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =68.2
DUR. FAC 1.15
SEQ - 126610
SPACING 24.0 "
TYPE SPEC
107
569
0
- 342
0
- 617
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / U 1'10"15 4/12 Jack
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 17.27 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
21
0.14
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
1.91
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Top chord overhangs have been checked only for loads as
indicated. Overhangs not checked for man load.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
4
B 528 / 73
/ 190 / / 31
C -89
/ 89
/ 33 / /D 22
/ 30
/ 20 / /Wind reactions based on MWFRS
B Min Brg Width Req = 1.5
C Min Brg Width Req = D Min Brg Width Req = Bearing B Fcperp = 565psi.
12
9
5'0"
C
6"1
D
A
2'10"8
DESC = U 1'10"15 4/12 Jack
PLT TYP. WAVE
1'10"13
1'1"11
17'9"2
3X4(B1)
B
A-B
16'11"2
72
0 B-C
B-D
0
0
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
44
- 68
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
1'10"15
PLY= 1 QTY= 4
/ 6.0
/ 1.5
/ 1.5
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
LEFT RAKE = 3'0"6
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
/W
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
U 1'10"15 4/12 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =11.2
DUR. FAC 1.15
SEQ - 126612
SPACING 24.0 "
TYPE JACK
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / U1 3'10"15 7/4 Jack
Top chord 2x4 SPF 2100f-1.8E :T2 2x4 SPF #1/#2:
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
45
0.14
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 1.5X3 except as noted.
115 mph wind, 17.97 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
3.91
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Top chord overhangs have been checked only for loads as
indicated. Overhangs not checked for man load.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1'
2'10"15
5"
3'5"15
12
7
"7
3'4
12
9
6'8"
2X4 C
HB 1"8
B-H
10"1
3X4(B1) B
6"1
A
94
0 C-E
9 - 84 E - F
96 - 169
69
- 34 H - G
16'11"2
D-E
16
- 74 D - H
HG
3'10"15
LEFT RAKE = 3'0"6
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 4
113
0
- 130
-6
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
DESC = U1 3'10"15 7/4 Jack
PLT TYP. WAVE
/ 6.0
/ 1.5
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3X4
3'3"9
D
1'8"
A-B
B-C
C-D
EF
2'10"8
/W
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
2'6"7
4
B 664 / 34
/ 189 / / 52
G 100 / / 60 / /Wind reactions based on MWFRS
B Min Brg Width Req = 1.5
G Min Brg Width Req = Bearing B Fcperp = 565psi.
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
U1 3'10"15 7/4 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =23.6
DUR. FAC 1.15
SEQ - 126614
SPACING 24.0 "
TYPE JACK
18
- 91
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / U2 16' 7/4 Hip Girder
Top chord 2x4 SPF #1/#2 :T1, T4 2x6 SP 2700f-2.0E:
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF Stud
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
0
6.00
TC
24
8.00
BC
120
0.15
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4 except as noted.
115 mph wind, 18.58 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
#1 hip supports 6-0-0 jacks to BC.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
8.00
10.00
15.85
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1'
5'
4'
5'
3"8
7'10"4
B 1421 / 23
///K 1434 / 25
///Wind reactions based on MWFRS
B Min Brg Width Req = 2.2
K Min Brg Width Req = 2.2
Bearings B & K Fcperp = 565psi.
1'
7'10"4
4'
12
"7
5'9
7
4
12
"1
11'3
1
F
I 4X6
1.5X3
G
4X10
11'3
"11
J
C
4X4(A1) B
K 4X4(A1)
B-M
16'11"2
6"1
L
M
3X8
2'10"8
72
0
55
0
32
0
- 12
- 2198
- 787
- 1453
- 613
- 1465
F-I
G-H
H-J
I-J
J-K
K-L
32 - 614
0 - 1463
0 - 1450
55 - 788
0 - 2196
72
- 12
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4'8"5
1.5X3
3'1"7
3'9"1
A-B
B-C
C-D
C-E
D-F
E-G
H
E
A
/ 6.0
/ 6.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
5'9
"7
4X6
D
1997
0 M-K
1997
D-E
F-G
86
96
0 G-M
0 H-I
1053
87
16'
LEFT RAKE = 3'0"6
RIGHT RAKE = 3'0"6
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
DESC = U2 16' 7/4 Hip Girder
PLT TYP. WAVE
/W
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
U2 16' 7/4 Hip Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =114.0
DUR. FAC 1.15
SEQ - 126616
SPACING 24.0 "
TYPE SPEC
0
0
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / U3 16' 7/4 DP
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF 2100f-1.8E :T2, T3 2x4 SPF #1/#2:
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
120
0.14
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
All plates are 3X4(B1) except as noted.
115 mph wind, 19.16 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
1'
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
15.86
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
1"12
7'
1"12
7'10"4
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
7'10"4
7'
B 1012 / 17
/ 388 / / 80
G 1049 / 17
/ 388 / /Wind reactions based on MWFRS
B Min Brg Width Req = 1.6
G Min Brg Width Req = 1.6
Bearings B & G Fcperp = 565psi.
1'
/W
/ 6.0
/ 6.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
7
12
4
1 1'3
"
8'1
5X5(R1)
D
4
"11
8'1
"
A-B
B-C
C-D
C-E
4
1 1'3
E
"11
3'1"7
5'8"3
4'11"1
B-I
G
6"1
16'11"2
A
846
0 I-G
D-E
94 - 172 E - I
H
2X4
I
2'10"8
16'
2'10"8
LEFT RAKE = 3'0"6
RIGHT RAKE = 3'0"6
DESC = U3 16' 7/4 DP
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 2
165 - 509
0 - 563
0 - 1001
84
0
839
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
F 3X4
B
D-F
E-F
F-G
G-H
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X10
3X4 C
72
0
0 - 1026
166 - 507
0 - 574
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
U3 16' 7/4 DP
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =90.2
DUR. FAC 1.15
SEQ - 126261
SPACING 24.0 "
TYPE SPEC
336
0
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / U4 16' 7/4 DP
Top chord 2x4 SPF 2100f-1.8E :T2, T3 2x4 SPF #1/#2:
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
120
0.14
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4(B1) except as noted.
115 mph wind, 19.16 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
15.86
1'
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1"12
7'
7'10"4
1"12
7'10"4
7'
A 782 / / 300 / / 70
F 1059 / 20
/ 389 / /Wind reactions based on MWFRS
A Min Brg Width Req = 1.5
F Min Brg Width Req = 1.7
Bearings A & F Fcperp = 565psi.
1'
/W
/ 6.0
/ 6.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
"4
8'1
7
8'3"
A-B
B-C
B-D
C-E
8'1
"
4
6
D
11'3
"11
3'1"7
3X4 B
E
A
35
76
54
93
- 1173 D - E
- 318 E - F
- 891 F - G
- 395
A-H
1006
0 H-F
F
C-D
16'11"2
131 - 345 D - H
G
2X4
H
2'10"8
RIGHT RAKE = 3'0"6
DESC = U4 16' 7/4 DP
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
995
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
3X4
6"1
16'
44 - 860
35 - 1160
84
0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X10
5'8"3
4'11"1
4
12
5X5(R1)
C
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
U4 16' 7/4 DP
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =87.4
DUR. FAC 1.15
SEQ - 126264
SPACING 24.0 "
TYPE SPEC
339
0
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / U5 16' 7/4 DP
Top chord 2x4 SPF #1/#2 :T3 2x4 SPF 2100f-1.8E:
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4 except as noted.
115 mph wind, 19.53 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
120
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
15.86
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
8'1"12
7'10"4
8'
7'
A 796 / 0
/ 309 / / 65
F 768 / / 300 / /Wind reactions based on MWFRS
A Min Brg Width Req = 1.5
F Min Brg Width Req = 1.5
Bearings A & F Fcperp = 565psi.
1'
/W
/ 6.0
/ 6.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-B
B-C
C-E
12
7
"4
9'2
5X5(R1) C
8'1
"4
D
A-G
4
F
A
B-G
G-D
3'1"7
E
988
- 53 G - F
77 - 408 C - D
456
0
3X4(B1)
6"1
3"1
2X6(D8R)
16'11"2
G
16'
DESC = U5 16' 7/4 DP
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
- 92
- 946
PLY= 1 QTY= 2
766
-2
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
4'11"1
1.5X3 B
14
43
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
8'3"
6
12
113 - 1206 D - E
103 - 895 E - F
74 - 887
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
U5 16' 7/4 DP
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =76.2
DUR. FAC 1.15
SEQ - 126266
SPACING 24.0 "
TYPE SPEC
472
0
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / U6 8'4"5 */12 HJ Girder
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x6 SP 2700f-2.0E :T2 2x4 SPF #1/#2:
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF Stud
All plates are 3X4 except as noted.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
Hipjack supports 5-10-15 setback jacks with no webs.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
115 mph wind, 18.54 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
Top chord overhangs have been checked only for loads as
indicated. Overhangs not checked for man load.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.08
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Truss designed for unbalanced snow load, based on Pf=Pg=30.00
psf.
END(FT)
8.30
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1'5"
6'11"6
5"
7'11"5
/W
I 937 / 65
///G 383 / / 11 / /Wind reactions based on MWFRS
I
Min Brg Width Req = 1.5
H Min Brg Width Req = Bearing I Fcperp = 565psi.
/ 7.7
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
3
7'6"
4.95
1.5X4
13
12'4"
I
3X4(A1)
B
HB 1"8
3'8"7
12
B-H
C
D-E
16'11"2
2X4
A
4'1"9
- 11 C - E
- 80 E - F
- 21
70
1
8
- 14 H - G
0
52 - 314 D - H
49
HG
8'4"5
LEFT RAKE = 4'2"14
DESC = U6 8'4"5 */12 HJ Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 2
- 167
-7
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
10"1
6"1
100
5
79
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
D
4'7"11
2'4"8
2.83
A-B
B-C
C-D
EF
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
U6 8'4"5 */12 HJ Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =65.8
DUR. FAC 1.15
SEQ - 126618
SPACING 24.0 "
TYPE HIP_
- 320
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / U7 6' 7/4 End Jack
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4(B1) except as noted.
115 mph wind, 18.58 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
70
0.14
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Right end vertical not exposed to wind pressure.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Top chord overhangs have been checked only for loads as
indicated. Overhangs not checked for man load.
END(FT)
6.00
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
1'
5'
B 680 / 12
/ 216 / / 79
G 292 / 9
/ 114 / /Wind reactions based on MWFRS
B Min Brg Width Req = 1.5
H Min Brg Width Req = Bearing B Fcperp = 565psi.
5"
5'7"
/W
/ 6.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
"7
5'9
7
EF
A-B
B-C
C-D
1.5X3
12
3X4
2'4"6
HB 1"8
B-H
C
B
2X4
48
-1 H - G
D-E
57 - 222 D - H
16'11"2
HG
1.5X4
2'10"8
6'
LEFT RAKE = 3'0"6
DESC = U7 6' 7/4 End Jack
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
- 107
-6
PLY= 1 QTY= 3
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
10"1
6"1
A
111
0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
D
4'6"3
"
8'11
3'9"1
4
81
0 C-E
6 - 122 E - F
8 - 112
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
U7 6' 7/4 End Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =35.6
DUR. FAC 1.15
SEQ - 126620
SPACING 24.0 "
TYPE EJAC
67
- 241
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / V 3'9"7 4/12 Jack
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
45
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
3.79
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
4
12
3'11
"1 4
C
11'8"4
1.5X3B
1'10"10
1'7"2
A-E
B-E
E
- 71 B - C
87
- 22 E - D
239 - 367
D
2'4"8
3'9"7
DESC = V 3'9"7 4/12 Jack
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 4
22
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
10'1"2
2X6
75
- 64
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
7"8
HB 1'1"3
/ 4.0
/ 1.5
/ 1.5
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-B
2X6(G1)
A
/W
E 618 / / 315 / / 23
D -139 / 139 / 6
//C -152 / 152 / //Wind reactions based on MWFRS
E Min Brg Width Req = 1.5
D Min Brg Width Req = C Min Brg Width Req = Bearing E Fcperp = 565psi.
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
V 3'9"7 4/12 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =15.4
DUR. FAC 1.15
SEQ - 126622
SPACING 24.0 "
TYPE JACK
0
0
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / V1 15'9" 7/4 Hip Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF Stud
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
5.88
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
9.88
15.75
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
#1 hip supports 5-10-8 jacks to BC.
Left side jacks have 5-10-8 setback with 2-4-8 cant and 0-0-0
overhang. End jacks have 5-10-8 setback with 2-4-8 cant and 0-0-0
overhang. Right side jacks have 5-10-8 setback with 2-4-8 cant and
0-0-0 overhang.
Left and right cantilevers are exposed to wind
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3'10"8
2'
4'
4
2'3
" 13
"13
2 '3
12
4'1"
C
1'11"
/ 4.0
/ 4.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
5X5
D
5X6
4X6(SRS) B
3'1"
3'10"8
4'
12
7
2'
/W
J 637 / / 14 / /G 637 / / 14 / /Wind reactions based on MWFRS
J Min Brg Width Req = 1.5
G Min Brg Width Req = 1.5
Bearings J & G Fcperp = 565psi.
A-B
B-C
C-D
4'1"
E
361 - 17 D - E
0 - 284 E - F
0 - 207
0
363
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X6(SRS)
A-J
J-I
I-H
3X4(A1)
A
11 - 298 H - G
151
-8 G - F
204
0
151
11
-9
- 300
F 3X4(A1)
7"8
10'1"2
J
2X8
I
3X4
2'4"8
H
3X8
J-B
B-I
C-I
C-H
G
2X8
11'
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
2'4"8
28 - 676 H - D
67
0 H-E
20 - 13 E - G
3
0
21
69
29
15'9"
DESC = V1 15'9" 7/4 Hip Girder
PLT TYP. WAVE
- 287
- 18
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
V1 15'9" 7/4 Hip Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =89.3
DUR. FAC 1.15
SEQ - 126624
SPACING 24.0 "
TYPE SPEC
-9
0
- 678
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / V2 15'9" 7/4 DP
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud::Rt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left and right cantilevers are exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
15.75
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3'10"8
12
7
4'
4'
"9
4'7
4'7
"9
3'10"8
H 866 / / 332 / / 46
F 866 / / 332 / /Wind reactions based on MWFRS
H Min Brg Width Req = 1.5
F Min Brg Width Req = 1.5
Bearings H & F Fcperp = 565psi.
A-B
B-C
12
4'1"
4'3"
4'1"
4X6(SRS) B
D
381 - 179 C - D
45 - 465 D - E
45
381
- 465
- 179
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-H
H-G
4X6(SRS)
198 - 301 G - F
294 - 26 F - E
294
198
- 14
- 301
1'11"
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
2X6(G1)
A
2X6(G1)
E
7"8
10'1"2
3X8
G
H
3X4
2'4"8
H-B
B-G
C-G
241 - 927 G - D
121
0 D-F
154
0
F
3X4
11'
2'4"8
15'9"
DESC = V2 15'9" 7/4 DP
PLT TYP. WAVE
/ 4.0
/ 4.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
C 4X4
4
/W
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
V2 15'9" 7/4 DP
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =78.9
DUR. FAC 1.15
SEQ - 126626
SPACING 24.0 "
TYPE SPEC
121
241
0
- 927
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / V3 12'8"8 7/4 Stub DP
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Bearing Leg 2x4 SPF Stud::Rt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Right cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.29
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
12.71
++ Anchorage req'd to prevent truss from slipping off
bearing.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
4'10"
12
7
5'7
4'
4'7
"2
B
3'10"8
"9
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4
C
4X8 A
A-B
B-C
4X6(SRS)
2X6(G1)
D
11"11
2X6
7"8
5"8
3X8
F
G-F
F-E
10'6"10
10'1"2
A-F
H-A
H-A
G-H
2'4"8
3"8
382
213
290
- 23 E - D
- 23
210
12'5"
225
0 B-F
71
0 F-C
178 - 1044 C - E
71
0
150
136
257
12'8"8
LEFT RAKE = 4"1
DESC = V3 12'8"8 7/4 Stub DP
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
- 190
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
- 302
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
E
3X4
10'4"
65 - 495 C - D
70 - 461
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'11"
4'3"
4 '1"
1.5X4
G
/ 1.5
/ 4.0
4X4
12
H
/W
H 546 / / 180 / / 48
E 862 / / 333 / /Wind reactions based on MWFRS
H Min Brg Width Req = 1.5
E Min Brg Width Req = 1.5
Bearing H is a rigid surface.
Bearing E Fcperp = 565psi.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
V3 12'8"8 7/4 Stub DP
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =69.3
DUR. FAC 1.15
SEQ - 126628
SPACING 24.0 "
TYPE SPEC
0
0
- 923
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / V4 10'4" 7/4 Stub DP
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Bearing Leg 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
++ Anchorage req'd to prevent truss from slipping off
bearing.
Wind loads and reactions based on MWFRS with additional C&C
member design.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
120
-0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
10.04
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
4'10"
7
"2
5'7
1'6"
4'7
"9
B
4X4
C
4X8 A
A-B
B-C
5"8
G-F
1.5X3
1'5"
2X6
215
- 28 F - E
A-F
H-A
H-A
G-H
E
3X4
282
0
66
0
181 - 1061
66
0
B-F
F-C
C-E
D-E
10'4"
LEFT RAKE = 4"1
DESC = V4 10'4" 7/4 Stub DP
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 3
31
- 16
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
478
- 75
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
10'6"10
10'1"2
F
3X8
10'0"8
72 - 531 C - D
74 - 524
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X6(SRS)
D
G
1.5X4
3"8
/ 1.5
/ 4.0
4
11"11
H
/W
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'7"
12
4'3"
H 568 / / 191 / / 38
E 560 / / 195 / /Wind reactions based on MWFRS
H Min Brg Width Req = 1.5
E Min Brg Width Req = 1.5
Bearing H is a rigid surface.
Bearing E Fcperp = 565psi.
1'11"
12
4'
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
V4 10'4" 7/4 Stub DP
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =61.2
DUR. FAC 1.15
SEQ - 126630
SPACING 24.0 "
TYPE SPEC
185
86
115
24
0
- 132
- 689
- 28
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / V5 8'2"3 */12 HJ Girder
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF Stud
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
The following members need concentrated loads at the heel: 0-0-0
span/setback member on the 2-4-0 cant side requires 77 lbs and the
0-0-0 span/setback member on the 2-4-0 cant side requires 77 lbs.
Sub-fascia beam assumptions: 0-0-0 sub-fascia beam on the 2-4-0
cantilever side. 0-0-0 sub-fascia beam on the 2-4-0 cantilever side.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
-0.29
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Left cantilever is exposed to wind
Hipjack supports 5-9-7 setback jacks with 2-4-0 cantilever one face;
2-4-0 cantilever opposite face.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
7.89
Truss designed for unbalanced snow load, based on Pf=Pg=30.00
psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
5'5"12
2'8"7
G 761 / 29
///E 125 / / 14 / /Wind reactions based on MWFRS
G Min Brg Width Req = 1.5
F Min Brg Width Req = Bearing G Fcperp = 565psi.
12
4.95
2 '1 1
"1
/W
/ 5.7
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1.5X3 C
5'7"9
D
A-B
B-C
12
2.83
- 61 C - D
- 71
A-G
G-F
3'0"6
HB 1"8
-5
56 - 638 F - E
67 - 85
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
3X4(A1)
A
7"8
G-B
B-F
10'1"2
3'3"9
2X8
68 - 891 C - F
99 - 79
3X4 F E
G
4'10"10
8'2"3
DESC = V5 8'2"3 */12 HJ Girder
PLT TYP. WAVE
1
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X6(SRS) B
1'11"
711
22
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
V5 8'2"3 */12 HJ Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =46.9
DUR. FAC 1.15
SEQ - 126632
SPACING 24.0 "
TYPE HIP_
8
- 68
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / V6 5'10"8 7/4 EJack
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
71
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
5.87
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
3'10"8
2'
12
7
4
G 570 / / 236 / / 45
E 93
/ 22
/ 44 / /Wind reactions based on MWFRS
G Min Brg Width Req = 1.5
E Min Brg Width Req = Bearing G Fcperp = 565psi.
"13
2'3
A-B
B-C
4'1"
A-G
G-F
3'1"
HB 1"8
1'11"
408 - 211 C - D
25 - 69
0
-6
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4X6(SRS) B
238 - 331 F - E
18 - 78
0
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
2X6(G1)
A
G-B
B-F
7"8
233 - 543 C - F
104 - 24
10'1"2
G
2'4"8
3X4
FE
3X4
5'10"8
DESC = V6 5'10"8 7/4 EJack
PLT TYP. WAVE
/ 4.0
/ 1.5
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
D
1.5X3 C
12
/W
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 3
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
V6 5'10"8 7/4 EJack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =32.9
DUR. FAC 1.15
SEQ - 126634
SPACING 24.0 "
TYPE EJAC
11
- 64
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W 3'9"7 7/4 Jack
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
45
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
10"15
2'10"8
F 455 / / 193 / / 27
D -40
/ 40
/ 12 / /C 7
/5
/4
//Wind reactions based on MWFRS
F Min Brg Width Req = 1.5
D Min Brg Width Req = C Min Brg Width Req = Bearing F Fcperp = 565psi.
12
7
4
"11
1'0
12
6
3'0"
A-B
10'11"
4X6(SRS) B
/ 4.0
/ 1.5
/ 1.5
295 - 143 B - C
6
- 42
2'1"6
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
2X6(G1)
A
A-F
F-E
164 - 236 E - D
2 - 36
0
0
7"8
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
1.5X3
F
F-B
185 - 417 B - E
E D
1.5X3
1'10"8
3'9"7
DESC = W 3'9"7 7/4 Jack
PLT TYP. WAVE
/W
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
C
1'7"
END(FT)
3.79
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 8
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W 3'9"7 7/4 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =21.0
DUR. FAC 1.15
SEQ - 126636
SPACING 24.0 "
TYPE JACK
62
-3
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W1 5'9"7 7/4 Jack
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
69
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
5.79
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'10"8
2'10"15
12
7
F 502 / / 201 / / 49
D 53
/1
/ 37 / /C 122 / 19
/ 31 / /Wind reactions based on MWFRS
F Min Brg Width Req = 1.5
D Min Brg Width Req = C Min Brg Width Req = Bearing F Fcperp = 565psi.
"7
3'4
C
4
/ 4.0
/ 1.5
/ 1.5
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12'1"
12
/W
A-B
6
3'0"
278 - 156 B - C
61
- 86
3'3"6
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'7"
4X6(SRS) B
A-F
F-E
173 - 218 E - D
27 - 70
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
2X6(G1)
A
F-B
7"8
177 - 450 B - E
9'1"2
F
1'10"8
E D
1.5X3
2X4
5'9"7
DESC = W1 5'9"7 7/4 Jack
PLT TYP. WAVE
0
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 8
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W1 5'9"7 7/4 Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =28.0
DUR. FAC 1.15
SEQ - 126638
SPACING 24.0 "
TYPE JACK
79
- 30
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W2 27'9" 7/4 Hip Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF Stud
Wind loads and reactions based on MWFRS.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
7.88
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 75 plf at 0.00 to 75 plf at 2.87
TC- From 76 plf at 2.87 to 76 plf at 7.88
TC- From 37 plf at 7.88 to 37 plf at 19.87
TC- From 76 plf at 19.87 to 76 plf at 24.87
TC- From 75 plf at 24.87 to 75 plf at 27.75
BC- From 20 plf at 0.00 to 20 plf at 7.88
BC- From 10 plf at 7.88 to 10 plf at 19.87
BC- From 20 plf at 19.87 to 20 plf at 27.75
BC- 809.97 lb Conc. Load at 7.88,19.87
BC- 309.98 lb Conc. Load at 9.94,11.94,13.88,15.81
17.81
END(FT)
19.87
27.75
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left and right cantilevers are exposed to wind
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'10"8
5'
12'
5'
2'10"8
12'
12
7
4
12
5'9
3X4
D
"7
A-B
B-C
C-D
4X6
E
3 '0"
4'6"
6
6X8(SRS)
6
A-L
L-K
K-J
3X4(A1) A
G
9'1"2
1'10"8
3X8
L
4X8
I
3X8
24'
128 - 4160
97 - 3724
233
- 30
22 - 202 J - I
1707 - 48 I - H
3094 - 75 H - G
3094
1708
22
H
1'10"8
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
L-B
B-K
K-C
C-J
D-J
27'9"
123 - 3123
1546 - 25
830
-8
1307 - 63
32 - 454
J-E
E-I
I-F
F-H
1307
- 63
830
-8
1546
- 25
123 - 3123
DESC = W2 27'9" 7/4 Hip Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
- 75
- 48
- 202
3X4(A1)
7"8
8X8
J
233 - 30 D - E
97 - 3724 E - F
128 - 4160 F - G
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6X8(SRS)
F
B
4X8
K
/ 4.0
/ 4.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
"7
DT -1"5
4X6 C
3 '0"
1'7"
5'9
/W
L 2628 / 43
///H 2628 / 43
///Wind reactions based on MWFRS
L Min Brg Width Req = 3.7
H Min Brg Width Req = 3.7
Bearings L & H Fcperp = 565psi.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W2 27'9" 7/4 Hip Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =158.5
DUR. FAC 1.15
SEQ - 126640
SPACING 24.0 "
TYPE SPEC
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W3 27'9" 7/4 Hip
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud::Rt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left and right cantilevers are exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
9.88
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
17.87
27.75
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'10"8
7'
8'
7'
L 1437 / / 551 / / 66
H 1332 / / 551 / /Wind reactions based on MWFRS
L Min Brg Width Req = 1.9
H Min Brg Width Req = 1.7
Bearings L & H Fcperp = 565psi.
2'10"8
/W
/ 4.0
/ 4.0
8'
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
7
8'1
"4
5X6 C
DT -1"9
5X5
D
8'1
E
5X6
"4
A-B
B-C
C-D
3 '0"
6
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6
5'8"
3 '0"
5X6(SRS)
2X6(G1)
A
A-L
L-K
K-J
5X6(SRS)
F
B
2X6(G1)
G
7"8
9'1"2
1'10"8
3X4 L
3X8
K
3X5
J
3X8
I
3X4 H
24'
- 47 J - I
- 64 I - H
- 27 H - G
307 - 1555
508
0
300
0
46 - 293
D-I
E-I
I-F
F-H
DESC = W3 27'9" 7/4 Hip
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
1242
730
141
- 27
- 64
- 47
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
L-B
B-K
K-C
K-D
1'10"8
141
805
1242
27'9"
PLT TYP. WAVE
172 - 1136
147 - 1447
129 - 141
12
4
1'7"
129 - 141 D - E
147 - 1476 E - F
172 - 1136 F - G
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W3 27'9" 7/4 Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =151.4
DUR. FAC 1.15
SEQ - 126642
SPACING 24.0 "
TYPE SPEC
111 - 293
300
0
508
0
307 - 1426
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W4 25'10"8 7/4 Hip
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Bot chord 2x4 SPF 2100f-1.8E :B2 2x4 SPF #1/#2:
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
Webs 2x4 SPF Stud
wind BC DL=6.0 psf.
:Lt Slider 2x8 SPF #1/#2: BLOCK LENGTH = 1.500':Rt Stub Wedge 2x4 SPF Stud:
Wind loads and reactions based on MWFRS with additional C&C
Bottom chord checked for 10.00 psf non-concurrent bottom chord
member design.
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
Truss designed for unbalanced snow load based on Pg=35.00 psf,
factor for dead load is 2.00.
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Right cantilever is exposed to wind
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
10.00
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
14.00
25.87
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
10'
4'
9'
A 1277 / / 456 / / 84
I 1492 / / 561 / /Wind reactions based on MWFRS
A Min Brg Width Req = I
Min Brg Width Req = 2.0
Bearing I Fcperp = 565psi.
2'10"8
4'
4X6 D
7
4X6
E
15
'6"
11
10
'5
A-B
B-C
C-D
D-E
"1
12
1.5X3 C
6'10"
F 3X4
3X4 B
3X10(E3)
3X4(E3)
A
A-M
M-L
L-K
1'
2X6(G1)
H
7"8
3X5
L
3X8
K
3X4
J
2X6
- 1924 E - F
- 1782 F - G
- 1418 G - H
- 1051
1429
1094
1094
- 72 K - J
0 J-I
0 I-H
9'1"2
1'10"8
C-M
M-D
D-K
E-K
127 - 394 K - F
376
0 F-J
142 - 228 J - G
321
0 G-I
25'10"8
DESC = W4 25'10"8 7/4 Hip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
171 - 1349
136 - 1592
284 - 125
1317
645
139
- 34
- 26
- 224
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
I
24'
211
182
159
179
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
4
3'0"
6
5X6(SRS)
G
3X4
M
// 4.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'7"
12
DT -1"9
/W
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W4 25'10"8 7/4 Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =146.7
DUR. FAC 1.15
SEQ - 126644
SPACING 24.0 "
TYPE SPEC
65 - 339
80 - 137
708
- 30
242 - 1612
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W5 25'10"8 7/4 DP
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Bot chord 2x4 SPF #1/#2
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
Webs 2x4 SPF Stud :W2, W3 2x4 SPF #3:
wind BC DL=6.0 psf.
:Lt Slider 2x8 SPF #1/#2: BLOCK LENGTH = 1.500':Rt Stub Wedge 2x4 SPF Stud:
Wind loads and reactions based on MWFRS with additional C&C
Truss passed check for 20 psf additional bottom chord live load in
member design.
areas with 42"-high x 24"-wide clearance.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
Deflection meets L/360 live and L/240 total load. Creep increase
live load applied per IBC-15 section 1607.
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Right cantilever is exposed to wind
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
25.87
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
12'
11'
D
12
7
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
5X5
12
'8
"11
'10
13
"13
E
A-B
B-C
C-D
1.5X3
12
8'
1.5X3 C
4
A-K
K-J
J-I
1'
F
7"8
3X5
J
3X8
I
3X4
1387
988
988
- 40 I - H
0 H-G
0
9'1"2
C-K
K-D
D-I
152 - 385 I - E
640 - 40 I - F
608 - 33 F - H
H
24'
1'10"8
25'10"8
DESC = W5 25'10"8 7/4 DP
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 7
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
187 - 1545
146 - 1703
265 - 159
682
167
- 19
- 207
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
5X6(SRS)
2X6(G1)
G
1'7"
3X4 B
3X10(E3)
3X4(E3)
A
163 - 1867 D - E
151 - 1724 E - F
192 - 1556 F - G
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
3'0"
6
3X4
K
/W
A 1214 / / 456 / / 100 / H 1433 / / 561 / // 4.0
Wind reactions based on MWFRS
A Min Brg Width Req = H Min Brg Width Req = 1.9
Bearing H Fcperp = 565psi.
2'10"8
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W5 25'10"8 7/4 DP
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =139.8
DUR. FAC 1.15
SEQ - 126646
SPACING 24.0 "
TYPE DUBL
143 - 469
775
- 39
283 - 1540
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W6 25'10"8 7/4 Stub Hip
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Bot chord 2x4 SPF #1/#2
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
Webs 2x4 SPF Stud
wind BC DL=6.0 psf.
:Lt Slider 2x8 SPF #1/#2: BLOCK LENGTH = 1.500':Rt Stub Wedge 2x4 SPF Stud:
Wind loads and reactions based on MWFRS with additional C&C
Bottom chord checked for 10.00 psf non-concurrent bottom chord
member design.
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
Truss designed for unbalanced snow load based on Pg=35.00 psf,
factor for dead load is 2.00.
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Right cantilever is exposed to wind
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
8.00
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
16.00
25.87
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
8'
8'
7'
A 1177 / / 452 / / 68
I 1445 / / 557 / /Wind reactions based on MWFRS
A Min Brg Width Req = I
Min Brg Width Req = 1.9
Bearing I Fcperp = 565psi.
2'10"8
8'
/W
// 4.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
7
"2
9'3
5X5 D
DT -1"9
5X5
E
5X6
F
8'1
"
A-B
B-C
C-D
D-E
4
12
5'8"
A-L
L-K
K-J
1'7"
1'
2X6(G1)
H
7"8
3X8
L
3X5
K
3X8
J
3X4
9'1"2
I
24'
178 - 1160
154 - 1495
126 - 131
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
5X6(SRS)
G
3X4 B
3X10(E3)
3X4(E3)
A
- 1689 E - F
- 1572 F - G
- 1411 G - H
- 1164
4
3'0"
6
1.5X3 C
189
179
166
169
- 78 J - I
- 38 I - H
- 38
813
134
92 - 242 F - J
337
0 J-G
62 - 287 G - I
44 - 305
310
0
512
0
311 - 1565
25'10"8
DESC = W6 25'10"8 7/4 Stub Hip
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
- 67
- 46
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
C-L
L-D
L-E
E-J
1'10"8
1254
1268
1268
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W6 25'10"8 7/4 Stub Hip
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =141.1
DUR. FAC 1.15
SEQ - 126249
SPACING 24.0 "
TYPE SPEC
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W8 25'10"8 7/4 DPHip Girder
Top chord 2x4 SPF 1650f-1.5E :T3, T4 2x4 SPF #1/#2:
Bot chord 2x6 SP 2700f-2.0E
Webs 2x4 SPF Stud
:Lt Slider 2x6 SPF Stud: BLOCK LENGTH = 1.500'
Right cantilever is exposed to wind
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 76 plf at 0.00 to 76 plf at 6.00
TC- From 37 plf at 6.00 to 37 plf at 18.00
TC- From 76 plf at 18.00 to 76 plf at 23.00
TC- From 75 plf at 23.00 to 75 plf at 25.87
BC- From 20 plf at 0.00 to 20 plf at 6.01
BC- From 10 plf at 6.01 to 10 plf at 17.94
BC- From 20 plf at 17.94 to 20 plf at 25.87
BC- 809.97 lb Conc. Load at 6.01
BC- 342.45 lb Conc. Load at 7.94,16.06
BC- 587.87 lb Conc. Load at 10.00,14.00
BC- 467.13 lb Conc. Load at 12.00
BC- 309.98 lb Conc. Load at 17.94
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
6.00
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
END(FT)
18.00
25.87
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
6'
12'
5'
A 2691 / /1
//H 2662 / 3
///Wind reactions based on MWFRS
A Min Brg Width Req = 2.5
H Min Brg Width Req = 2.5
Bearings A & H Fcperp = 565psi.
2'10"8
12'
1
6'1
5'9
"6
DT -1"5
5X5 C
3X4
D
5X7
E
"7
12
4'6"
3 '0"
A-B
B-C
C-D
4
6
A-K
K-J
J-I
1'
3X4(A1)
G
7"8
J
H0714
24'
I
5X5
54 - 4429 D - E
13 - 4341 E - F
22 - 4887 F - G
22 - 4887
26 - 3801
208
- 32
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6X8(SRS)
F
3X6
4X10(E3) B
3X4(E3)
A
K
3X8
/ 4.0
/ 4.0
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
1'7"
12
7
/W
9'1"2
H
3X4
-4 I - H
-5 H - G
- 14
1757
29
- 21
- 178
Maximum Web Forces Per Ply (lbs)
Tens. Comp.
Webs Tens.Comp. Webs
K-C
C-J
D-J
J-E
1'10"8
3621
3577
3189
1090
0 E-I
1580 - 21 I - F
29 - 453 F - H
2061 - 10
427
-8
1558
0
68 - 3156
25'10"8
DESC = W8 25'10"8 7/4 DPHip Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W8 25'10"8 7/4 DPHip Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =145.9
DUR. FAC 1.15
SEQ - 126254
SPACING 24.0 "
TYPE SPEC
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W9 11'0"2 */12 HJ Girder
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2 :T2 2x4 SPF 1650f-1.5E:
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF Stud
:Lt Slider 2x8 SPF #1/#2: BLOCK LENGTH = 3.100'
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning requirements.
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
The following members need concentrated loads at the heel: 0-0-0
span/setback member on the 1-10-0 cant side requires 31 lbs and
the 0-0-0 span/setback member on the 1-10-0 cant side requires 31
lbs.
Sub-fascia beam assumptions: 0-0-0 sub-fascia beam on the 1-10-0
cantilever side. 0-0-0 sub-fascia beam on the 1-10-0 cantilever side.
Hipjack supports 7-9-7 setback jacks with 1-10-0 cantilever one
face; 1-10-0 cantilever opposite face.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
11.01
Truss designed for unbalanced snow load, based on Pf=Pg=30.00
psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
4'0"13
6'11"6
12
4.95
7'6
G 797 / 7
///E 500 / / 14 / /Wind reactions based on MWFRS
G Min Brg Width Req = 1.5
F Min Brg Width Req = Bearing G Fcperp = 565psi.
"3
1.5X3
A-B
B-C
1'7"
2X4(C6)
319 - 17 C - D
124 - 142
1
HB 1"8
A-G
G-F
4'5"6
12
12 - 250 F - E
389
0
0
3X6(C6)
G-B
G-B
0 - 815 B - F
84 - 97 C - F
0
45
9'1"2
G
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
6"13
1.5X3
4X4 F E
2'7"1
8'5"1
11'0"2
DESC = W9 11'0"2 */12 HJ Girder
PLT TYP. WAVE
-7
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
6X12(**) B
A
/ 5.7
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
CD
4'2"5
3
/W
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 4
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W9 11'0"2 */12 HJ Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =87.7
DUR. FAC 1.15
SEQ - 126648
SPACING 24.0 "
TYPE HIP_
- 395
- 345
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W10 7'10"8 7/4 EJ Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
This dwg. prepared by the ITW job designer program from truss mfr's layout.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Left cantilever is exposed to wind
(J) Hanger Support Required, by others
(J) Hanger Support Required, by others
Wind loads and reactions based on MWFRS with additional C&C
member design.
END(FT)
7.88
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Right end vertical not exposed to wind pressure.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'10"8
5'
12
"7
5'9
7
G 605 / / 233 / / 72
E 310 / 22
/ 117 / /Wind reactions based on MWFRS
G Min Brg Width Req = 1.5
F Min Brg Width Req = Bearing G Fcperp = 565psi.
1.5X3
175 - 162 C - D
105 - 141
0
6
3'0"
4'6"
A-G
G-F
5X5(SRS) B
170 - 108 F - E
186 - 117
0
G-B
B-F
2X6(G1)
A
198 - 540 C - F
121 - 192
71
9'1"2
3X4
G
1'10"8
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
7"8
3X4
FE
6'
7'10"8
DESC = W10 7'10"8 7/4 EJ Girder
PLT TYP. WAVE
-6
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
HB 1"8
1'7"
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
CD
A-B
B-C
4
/W
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 9
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W10 7'10"8 7/4 EJ Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =41.6
DUR. FAC 1.15
SEQ - 126247
SPACING 24.0 "
TYPE EJAC
- 222
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W11 7'10"8 7/4 EJ Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 75 plf at 0.00 to 75 plf at 2.88
TC- From 38 plf at 2.88 to 38 plf at 7.88
BC- From 20 plf at 0.00 to 20 plf at 4.88
BC- From 10 plf at 4.88 to 10 plf at 7.88
BC- 364.21 lb Conc. Load at 2.88
BC- 116.76 lb Conc. Load at 4.88, 6.88
END(FT)
7.88
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'10"8
5'
12
"7
5'9
7
G 810 / / 19 / /E 342 / / 21 / /Wind reactions based on MWFRS
G Min Brg Width Req = 1.5
F Min Brg Width Req = Bearing G Fcperp = 565psi.
1.5X3
159 - 337 C - D
75 - 99
0
6
3'0"
4'6"
A-G
G-F
4X6(SRS) B
299 - 132 F - E
292 - 19
0
G-B
B-F
2X6(G1)
A
72 - 394 C - F
20 - 302
12
9'1"2
3X4
G
1'10"8
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
7"8
3X4
FE
6'
7'10"8
DESC = W11 7'10"8 7/4 EJ Girder
PLT TYP. WAVE
-4
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
HB 1"8
1'7"
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
CD
A-B
B-C
4
/W
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W11 7'10"8 7/4 EJ Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =41.6
DUR. FAC 1.15
SEQ - 126245
SPACING 24.0 "
TYPE EJAC
- 157
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W13 10'10"8 7/4 End Jack
This dwg. prepared by the ITW job designer program from truss mfr's layout.
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF Stud
:Lt Stub Wedge 2x4 SPF Stud:
All plates are 3X4 except as noted.
(J) Hanger Support Required, by others
Right end vertical not exposed to wind pressure.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Wind loads and reactions based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
5.81
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Truss designed for unbalanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
END(FT)
10.88
10.88
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
2'10"8
2'11"4
5'0"12
L 666 / / 283 / / 49
F 467 / 2
/ 153 / /Wind reactions based on MWFRS
L Min Brg Width Req = 1.5
G Min Brg Width Req = Bearing L Fcperp = 565psi.
5'0"12
12
7
4
"13
3'4
DT -1"12
C 4X6
12
/W
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
DE
6
3'0"
A-B
B-C
287 - 137 C - D
63 - 395 D - E
84
0
- 330
0
5'3"9
2X6(G1)
A
HB 1"8
3'7"
7"8
L
K
3X8
I
1.5X3
5'1"13
4X6(SRS) B
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-L
L-K
K-I
11'1"2
H
155 - 228 J - G
141 - 91 I - H
14
-4 G - F
2
14
0
2'
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
L-B
B-K
K-C
K-D
9'1"2
1.5X4
J
1'10"8
GF
1.5X4
9'
6'2"8
4'3"
206 - 657 J - I
216 - 14 H - D
113 - 180 H - G
359 - 92
91
135
135
5"
10'10"8
DESC = W13 10'10"8 7/4 End Jack
PLT TYP. WAVE
0
-4
0
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 1
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W13 10'10"8 7/4 End Jack
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =72.8
DUR. FAC 1.15
SEQ - 126650
SPACING 24.0 "
TYPE EJAC
0
- 416
- 419
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / W14 10'10"8 7/4 End Jack Girder
Top chord 2x4 SPF #1/#2
Bot chord 2x6 SPF 1650f-1.5E :B2 2x4 SPF #1/#2:
Webs 2x4 SPF Stud
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4 except as noted.
Wind loads and reactions based on MWFRS.
115 mph wind, 15.00 ft mean hgt, ASCE 7-10, CLOSED bldg,
Located anywhere in roof, RISK CAT II, EXP B, wind TC DL=4.2 psf,
wind BC DL=6.0 psf.
Left cantilever is exposed to wind
Right end vertical not exposed to wind pressure.
(J) Hanger Support Required, by others
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
CHORD
SPACING(IN OC)
START(FT)
TC
24
3.81
BC
75
0.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Bottom chord checked for 10.00 psf non-concurrent bottom chord
live load applied per IBC-15 section 1607.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
END(FT)
10.88
10.88
Truss designed for balanced snow load based on Pg=35.00 psf,
Ct=1.10, Ce=1.00, CAT II & Pf=26.95 psf.
Maximum Reactions (lbs)
Loc R
/U
/ Rw / Rh / RL
11"4
2'10"8
Special loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC- From 75 plf at 0.00 to 75 plf at 2.88
TC- From 76 plf at 2.88 to 76 plf at 3.81
TC- From 75 plf at 3.81 to 75 plf at 9.87
TC- From 37 plf at 9.87 to 37 plf at 10.88
BC- From 20 plf at 0.00 to 20 plf at 9.87
BC- From 10 plf at 9.87 to 10 plf at 10.58
BC- From 10 plf at 10.58 to 10 plf at 10.88
PLB- 35.64 lb Conc. Load at ( 5.87,11.13)
PLB- 104.96 lb Conc. Load at ( 9.87, 9.13)
PLB- 116.76 lb Conc. Load at (10.00, 9.13)
7'0"12
N 668 / 11
///F 588 / 22
///Wind reactions based on MWFRS
N Min Brg Width Req = 1.5
G Min Brg Width Req = Bearing N Fcperp = 565psi.
12
7
4
3'0"
7'0"12
"
1'1
12
6
5X6 C
DT -1"5
A-B
B-C
HB 1"8
1.5X3
1.5X3
I
3X6
H
11'1"2
A-N
N-M
M-K
L-J
1.5X4
1'10"8
J
1.5X3
GF
N-B
B-M
M-C
M-D
9'
6'2"8
4'3"
32
0
- 573
0
4 - 199
304 - 12
44
-4
2
-2
K-I
I-H
J-G
G-F
44
44
2
0
-4
-4
-2
0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp. Webs
Tens. Comp.
9'1"2
L
237
-8 C - D
16 - 511 D - E
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
2'
K
4'0"4
7"8
3'7"
4'1"9
3X4(A1) A
M
3X8
/ 4.0
/-
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
DE
4X6(SRS) B
N
/W
27 - 743
454 - 25
66 - 325
542 - 29
L-K
I-J
H-D
H-G
52
105
35
26
0
0
- 330
- 408
5"
10'10"8
DESC = W14 10'10"8 7/4 End Jack Girder
PLT TYP. WAVE
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
W14 10'10"8 7/4 End Jack Girder
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =81.0
DUR. FAC 1.15
SEQ - 126240
SPACING 24.0 "
TYPE EJAC
Job:(88997) / -STANDALE LBR GRANDVILLE /MIRECKI / WL 11'10"8 Hip Frame
Top chord 2x4 SPF #1/#2
Bot chord 2x4 SPF #1/#2
Webs 2x4 SPF #3
This dwg. prepared by the ITW job designer program from truss mfr's layout.
All plates are 3X4 except as noted.
Deflection meets L/360 live and L/240 total load. Creep increase
factor for dead load is 2.00.
This "Hip Frame" may be used in place of purlins on the hip plane to
brace the flat top chord of hip trusses. See detail drawing
HIPFRAME1014 or HIPFR1801014 for additional information.
Maximum Reactions (lbs), or *=PLF
Loc R
/U
/ Rw / Rh / RL / W
5'11"4
5'11"
A* 2
///A Min Brg Width Req = Bearing A is a rigid surface.
/-
/ 142
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
A-B
B-C
C-D
D 4X4
"6
8 '8
C
A-L
L-K
K-J
6'10"8
E
-1
-1
-1
0
0
0
0 J-I
0 I-H
0 H-G
0
0
0
0
0
0
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp. Gables Tens. Comp.
B
B-L
C-K
J-D
F
3X4(D1)
0
0
0
-2 I - E
-2 H - F
-1
3X4(D1)
G
A
0'
L
K
J
11'10"8
I
H
DESC = WL 11'10"8 Hip Frame
PLT TYP. WAVE
0
1
0
"6
8 '8
-1 D - E
-1 E - F
-1 F - G
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp. Chords Tens. Comp.
12
13.89
0
1
0
DESIGN CRIT=IBC 2015 /TPI-2014 FT/RT=3%(0%)/0(0)
PLY= 1 QTY= 2
REV. 15.02.00C.1217.15
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions.
ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance
with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.
A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering
responsibility solely for the design shown.
The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
TC LL
30.00 PSF
JOB #: 88997
TC DL
7.00 PSF
DATE - 02/26/16
BC DL
10.00 PSF
WL 11'10"8 Hip Frame
BC LL
0.00 PSF
TOT. LD
47.00 PSF
WEIGHT =73.4
DUR. FAC 1.15
SEQ - 125828
SPACING 24.0 "
TYPE HIP_
0
0
-2
-2