Adaro terus berkembang di 2013
Transcription
Adaro terus berkembang di 2013
Coal Age ® Edition 4 April 2013 A Mining Media publication www.mining-media.com Indonesia Coal here to stay Batubara tetap membara di Indonesia Adaro will continue to expand in 2013 Adaro terus berkembang di 2013 Maiden Katingan Ria reserve of 29 million tonnes Cadangan awal Katingan Ria 29 juta ton Indonesia FEATURES Spotlight on Indonesia A maiden JORC-compliant coal reserve of 29 million tonnes has been established at Realm Resources’ Katingan Ria Project in Central Kalimantan.. .........................................................4 Acquisition of a company which holds land near Sakari Resources’ Jembayan project will improve transport logistics and has potential to create savings in haulages. An agreement to purchase concessions to the north of the mine may also unlock wider reserves. ..............8 Coal Age ® Edition 4 April 2013 A Mining Media publication www.mining-media.com Indonesia Coal here to stay Batubara tetap membara di Indonesia Indus Coal aims to initiate drilling on its MukoMuko Coal Project in Western Sumatra by the end of June. The drilling was delayed while the company focused on completing legal and technical due diligence. .............................................................................................10 Challenger Deep Resources’ subsidiary PT Bestindo Energy has entered an exclusivity agreement relating to the right to mine and market coal from the KEM Coal Project ..........12 Killara Resources is continuing due diligence on the Bengkulu project and is negotiating an extension due to wet weather which prevented measurement of coal seam thicknesses.. ...14 South East Asia Resources has finalized acquisition of a Singapore-based company which holds interests in a number of Indonesian coal projects. The most recent project acquired by the new company is Penajam East in East Kalimantan. . ..................................................16 Palace Resources’ subsidiary Paser Pte Ltd has signed an MoU for exclusive rights to explore, mine and market coal from the Petangis project in East Kalimantan. ...................17 Acquisition of 33% of an operating East Kalimantan coal mine has transformed Altura Mining from explorer and developer into a producer. . .......................................................19 Indonesian Buyers Guide Mining plays a big role in Indonesia’s economy and supporting this are Indonesian-based equipment and service providers. This guide provides a directory of companies .... 23-32 Adaro will continue to expand in 2013 Adaro terus berkembang di 2013 Maiden Katingan Ria reserve of 29 million tonnes Cadangan awal Katingan Ria 29 juta ton PT ADARO Energy intends increasing 2013 production to 50-53 million tonnes from 47.2 million tonnes in 2012 and says this will come from ‘business improvement and cost savings’. Adaro is a fully integrated coal mining and energy company from exploration through to power. It is Indonesia’s second largest thermal coal producer, operates the largest single coal mine in Indonesia and is a significant supplier to the global seaborne thermal coal market. See article page 5 Photo courtesy PT Adaro Energy. AROUND THE REGION Philippines Coal Asia Holdings has brought forward production at its Davao Oriental project ................39 Australia Cuesta Coal will use placement funds to fast-track development of Moorlands .. ...............39 Russia Tigers Realm has been issued with a mining licence for the Amaam project . ...................39 Kyrgyz Republic Celsius Coal has received funding for exploration and development at its prospects .. .......39 Bukit Asam expands sales - 6 MICROMINE assistance - 20 DEPARTMENTS Advertisers’ index .............................................40 Events ...............................................................40 From the Editor ...................................................2 Indonesian briefs ..............................................21 Product news ................................................... 36 Supplier news ....................................................33 Cat develops MT5300D AC -37 April 2013 l Coal Age Indonesia l 1 From The Editor Coal is here to stay in Indonesia DESPITE fluctuating prices, increasing environmental concerns, promising new gas reserves, a strengthening push for renewable energy and signs of recovery in nuclear power generation, coal is here to stay as there is no effective alternative to the large amounts of power generated from coal, nor is there an effective alternative in steel-making. This is good news for Indonesia with its large, and growing, coal industry being a major contributor to the economy. There have been a few negatives lately with variable prices caused John Miller, editor by global economic fluctuations particularly affecting Indonesia’s major coal export sources in Asia, and changing government policies which have created uncertainty for coal miners operating in the country and for foreign investors associated with the industry. On the positive side has been wet weather in Australia which has hit coal producing regions, an uncertain political climate in Mongolia and continuing pressures on the industry in North America and Europe. It remains crucial for the future of the coal industry in Indonesia that the government plays its cards right in the future, while also balancing domestic demand, environmental, community and infrastructure issues. With so many conflicting interests this is not an easy task and there will be mistakes along the way but it appears the government is making some progress in regards to the industry’s future … and will continue to do so. This progress is not helped by the Fraser Institute’s recently published survey which rated Indonesia 96th and last on its index of attractive mining jurisdictions. Although Indonesia rates as one of the world’s top 10 most prospective places, the number of respondents who said they would not invest there because of regulatory difficulties and/or corruption is alarming. This ranking is hard to fathom and difficult to justify as the government is making some positive moves, it is the world’s biggest coal exporter, the industry is growing and there are quite a few foreign companies involved, all of which indicate that there are much worse jurisdictions for coal investment. Batubara tetap membara di Indonesia WALAUPUN sedang menghadapi tantangan harga yang bergejolak, keprihatinan akan lingkungan, ancer-ancer cadangan gas baru, dorongan meluap-luap untuk menggunakan sumber energi yang dapat diperbaharui dan tanda-tanda pemugaran tenaga nuklir, batubara akan terus hadir karena tidak ada pilihan lain untuk tenaga raksasa yang diprodusirnya, dan juga tidak ada pilihan lain dalam pembuatan besi. Ini adalah berita baik bagi Indonesia yang industri batubaranya adalah masokkan utama ekonomi negara. Memang ada beberapa hal negatif belakangan ini seperti perubahan harga disebabkan oleh perubahan ekonomi yang berdampak terhadap ekspor batubara di Asia, dan perubahan kebijaksanaan pemerintah yang mencetuskan ketidakstabilan bagi operatoroperator pertambangan batubara di Indonesia dan bagi para penanam modal asing yang bersangkutan dengan industri tersebut. Dipihak positifnya ialah cuaca hujan di Australia yang melanda daerah-daerah pertambangan batubara, situasi politik di Mongolia dan tekanan-tekanan pada industri ini di Amerika Utara dan Eropah. Tentunya penting sekali bagi masa depan industri batubara di Indonesia kalau pemerintah bertindak adil dengan mempertimbangkan keperluan domestik, lingkungan, komunitas dan hal-hal infrastruktur. Dengan adanya bermacam kepentingan yang berbeda, sudah pasti tugas ini bukannya mudah dan tentunya akan terjadi kesalahan-kesalahan dalam pelaksanaannya namun nampaknya pemerintah terus membuat kemajuan dalam hal masa depan industri ini…dan akan terus berbuat demikian. Sayangnya hal ini diwarnai oleh penerbitan sebuah hasil survei dari Fraser Institute yang meletakkan Indonesia pada nomor 96 dan terakhir pada indeks tempat-tempat pertambangan yang menarik. Walaupun Indonesia menduduki tempat sepuluh utama sebagai negara yang prospeknya tinggi, jumlah responden-responden survei tersebut yang menyatakan bahwa mereka tidak ingin menginvestasi disini adalah sangat mengejutkan. Ranking demikian sulit untuk dimengerti karena pemerintah terus bergerak secara positif, ia adalah pengekspor batubara terbesar di dunia, industri ini terus berkembang dan ada perusahaan-perusahaan asing yang terlibat didalamnya, yang semuanya ini menandakan bahwa ada tempat-tempat lain yang jauh lebih buruk untuk investasi batubara. 2 l Coal Age Indonesia l April 2013 Coal Age Indonesia ® www.coalage.com Coal Age Indonesia® Suite 9, 880 Canterbury Road, Box Hill, Melbourne, Victoria, 3128 Australia Phone: +61 3 9899 2981 Mobile: + 61 417 517 863 Editor - John Miller, jmiller@mining-media.com Editorial director - Steve Fiscor, sfiscor@mining-media.com Europe - Simon Walker, simon.iets@btinternet.com North America - Russ Carter, russ.carter.emj@gmail.com Latin America - Oscar Martinez, omartin1@ctcinternet.cl South Africa - Antonio Ruffini, antonior@absamail.co.za SALES Publisher - Lanita Idrus, lidrus@mining-media.com North America - Victor Matteucci, vmatteucci@mining-media.com Latin America - Mauricio Godoy, mgodoy@mining-media.com Germany, Austria, Switzerland - Gerd Strasmann, strasmannmedia@t-online.de Rest of Europe - Colm Barry, colm.barry@telia.com - Jeff Draycott, jeff.draycott@WOMPint.com Japan - Masao Ishiguro, Ishiguro@irm.jp Indonesia -Dimas Abdillah, dabdillah@mining-media.com Mining Media International 8751 East Hampden, Suite B-1 Denver, Colorado 80231, U.S.A. Phone: +1 303-283-0640 Fax: +1 303-283-0641 Publisher - Peter Johnson, pjohnson@mining-media.com Subscriptions - Tanna Holzer, tholzer@mining-media.com Accounting - Lorraine Mestas, lmestas@mining-media.com Coal Age Indonesia® is published two times per year by Mining Media International. Every endeavour is made to ensure that the contents are correct at time of publication. The Publisher and Editors do not endorse the opinions expressed in the magazine. Editorial advice is non-specific and readers are advised to seek professional advice for specific issues. Images and written material submitted for publication are sent at the owners risk and while every care is taken, Coal Age Indonesia® does not accept liability for loss or damage. Coal Age Indonesia® reserves the right to modify editorial and advertisement content. The contents may not be reproduced in whole or in part without the written permission of the publisher. Copyright 2013 Mining Media International Pty Ltd ISSN: 1832-7966 Indonesia Maiden 29 million tonne Katingan Ria reserve A MAIDEN JORC-compliant reserve of 29 million tonnes has been established at Realm Resources’ Katingan Ria Project in Central Kalimantan. Katingan Ria, which is 51%-owned by Realm, is shaping up as a simple, open-cut operation that will supply low ash and low sulphur coal suited for modern Indian and Chinese power generation. Reserve estimates are based on JORC coal resources of 89 million tonnes. This was established following phase 3 drilling with 6 million tonnes classified as measured, 44 million as indicated and 39 million as inferred. Realm’s chairman Richard Rossiter says, “We are pleased to achieve this important milestone, with sufficient reserves now defined for well over 10 years of operation. This estimate paves the way for possible financing and development following the expected receipt of the final Pinjam Pakai (forestry) operations permit in the second half of 2013.” The project is planned as a 2.5 million tonne/annum open cut mine. The planned operation consists of an open cut haul back mining method using hydraulic loaders and rear dump trucks to dump both in-pit and ex-pit. Coal is transported by 60 tonne road trucks about 45km to a stockpiling and barge loading facility on the Katingan River. Barges will then transport coal 435km to river mouth for transhipment to coal ships for delivery to market. Coal is planned to be sold unwashed, meaning there is no metallurgical treatment required to achieve a saleable product. The coal is expected to be predominately sold as a low ash and low sulphur coal ideally suited for modern Indian and Chinese power generation. Reserves have been estimated by applying realistic mining, metallurgical, economic, marketing, legal, environmental, social and government factors to the coal resources. Mining factors (such as recovery and dilution) have been defined from the proposed open cut mining method. The pit optimization study, which delineated the life of mine pit used in the reserves statement, was based on the area that was economical to mine at a reasonably low product coal sales price. No metallurgical factors are applicable as the ROM coal is sold as a raw coal without processing. In addition, due to the seasonality of the Katingan River, coal mining and barging has been limited to about 9 months in the year with campaign-style barging planned to take advantage of periods when river depths are fully navigable. All coal reserves are classified based on the level of detail com- Katingan Ria is in Central Kalimantan near the Katingan River. pleted in the mine planning and also the level of confidence in the resources. Resources are reported inclusive of reserves. Cadangan awal Katingan Ria 29 juta ton CADANGAN awal yang memenuhi kriteria JORC berjumlah 29 juta ton telah ditemui di Proyek Katingan Ria milik Realm Resources di Kalimantan Tengah. Katingan Ria 51% kepunyaan Realm akan menjadi operasi tambang terbuka yang memproduksi batubara berkadar abu dan sulfur yang rendah yang diingini pembangkit tenaga listrik modern India dan Cina. Cadangan batubara yang memenuhi kriteria JORC disini diperkirakan berjumlah 89 juta ton. Pemastian sumber ini dibuat setelah melaksanakan program pemboran Fase Ketiga yang menemukan 6 juta ton terukur, 44 juta ton terindikasi dan 39 juta ton taksiran. Komisaris Realm Richard Rossiter mengatakan, “Kami sangat gembira mencapai tahap penting ini, dengan sebuah sumber yang sudah nyata untuk operasi sepuluh tahun kedepan. Perkiraan ini membuka jalan untuk memungkinan pendanaan dan pengembangan setelah menerima izin operasi Pinjam Pakai (kehutanan) pada pertengahan kedua 2013.” Proyek ini direncanakan sebagai tambang ter4 l Coal Age Indonesia l April 2013 buka 2,5 juta ton per tahun. Operasi yang direncanakan terdiri dari metode tambang terbuka angkut belakang menggunakan pemuat hidrolik dan truk-truk bongkar belakang untuk pembongkaran di dalam dan di luar lubang tambang. Batubara diangkut oleh truk–truk berkapasitas 60 ton sejauh 45 km ke fasilitas penumpukan dan bongkar pasang tongkang di Sungai Ketingan. Kapal-kapal tongkang akan mengangkut batubara sejauh 435 km ke muara untuk dipindahkan ke kapal-kapal batubara yang akan mengangkutnya ke pasaran. Batubara direncanakan dijual tanpa pembersihan, dengan kata lain tidak memerlukan pengolahan matalurgi yang biasanya diperlukan bagi menghasilkan produk yang dapat dijual. Batubara itu diperkirakan akan dijual kebanyakannya sebagai batubara berkadar abu dan sulfur rendah sesuai untuk pembangkit tenaga listrik modern India dan Cina. Jumlah cadangan diperhitungkan dengan menggunakan faktor-faktor pertambangan, metalurgi, ekonomi, penjualan, hukum, lingkungan, sosial dan pemerintahan keatas sumber-sumber batubara. Faktor pertambangan (seperti pengerukan kembali dan pencairan) telah diperkirakan dari metode pertambangan terbuka yang diusulkan. Studi optimisasi untuk menentukan umur lubang tambang dan besarnya cadangan, didasarkan pada luas bidang yang dapat dieksploitasi secara ekonomis dengan harga jual batubara yang rendah. Tidak ada faktor metalurgi yang harus diperhitungkan karena batubara ROM dijual murni tanpa pengolahan. Ditambahkan disini, oleh karena perubahan musim di Sungai Katingan, penambangan dan pengangkutan batubara terbatas hanya pada sembilan bulan setahun dengan menggunakan pengangkutan berkampanye bagi mengambil kesempatan sewaktu dalamnya air sungai dapat dilayari sepenuhnya. Semua cadangan batubara diklasifikan menurut detil yang yang diperoleh sewaktu perencanaan tambang dan juga pada tahap keyakinan atas sumber-sumber yang dilaporkan termasuk cadangan-cadangan. Indonesia Adaro will continue to expand in 2013 PT ADARO Energy intends increasing 2013 production to 50-53 million tonnes from 47.2 million tonnes in 2012 and says the increase will come from ‘business improvement and cost savings’. Adaro is a fully integrated coal mining and energy company from exploration through to power. It is Indonesia’s second largest thermal coal producer, operates the largest single coal mine in Indonesia and is a significant supplier to the global seaborne thermal coal market. The company’s coal characteristics are subbituminous, medium heat value and ultra-low pollutant coal, with total JORC-compliant resources of 4.6 billion tonnes and reserves of 1.1 billion tonnes. Because of its environmental characteristics, Adaro’s coal is trademarked as ‘Envirocoal’ with acceptance among blue-chip power utilities. The 2013 forecasts followed a record final 2012 quarter which saw production reach 13.31 million tonnes, up 7% year-on-year, and sales volume of 13.96 million tonnes, up 12%. Demand is increasing, especially from emerging economies spearheaded by China and India. 2012 was Adaro’s second best production year with the coal market rebounding towards the end of the year after challenging conditions. It also introduced a new Envirocoal product, E4500, a blend between E5000 (Tutupan) and E4000 (Wara), in order to provide more options to its customers and to optimize its product portfolio revenue. Adaro sold 1.95 million tonnes of E4500 in 2012 to customers in Korea and Indonesia. This year Adaro plans to introduce another Envirocoal brand, E4700, which will be a standalone non-blended product from the northern area of Tutupan pit. Also, Adaro is developing an overburden crushing and conveying system and a 2 x 30MW mine-mouth power plant, both of which will be commissioned by June 30 2013. The company maintains geographical diversification to reduce risk and sells Envirocoal to 49 customers in 17 countries. It remains a leading domestic supplier with 10.74 million tonnes or 23% of its total sales volume. In 2012 exports to India amounted to 15% of the total, to Spain 12%, Japan 9%, Korea 8%, Hong Kong 8%, China 6%, Malaysia 5%, Taiwan 4% and USA 4%. Adaro is also increasing production through acquiring interests in other producers. It has entered an option to provide a convertible loan for three years which will result in acquisition of controlling interest in PT Bhakti Energi Persada (BEP), which owns 7 low-grade thermal licences in Muara Wahau district, East Kalimantan. Unloading side-tippers at Adaro’s coal operations in South Kalimantan, Indonesia’s largest single coal mine. Adaro terus berkembang di 2013 PT ADARO Energy bertekad meningkatkan jumlah produksi di tahun 2013 ke 50 sampai 53 juta ton dari 47.2 juta ton ditahun 2012 dan mengatakan bahwa peningkatan dihasilkan dari penyempurnaan bisnis serta penghematan biaya. Adaro adalah sebuah perusahaan pertambangan batubara sekalian pembangkit tenaga dari mulai eksplorasi sampai tenaga listrik. Ia adalah perusahaan kedua terbesar Indonesia yang memprodusir batubara panas, mengoperasikan tambang batubara tunggal terbesar di Indonesia dan supplier pasaran batubara panas dunia melalui laut yang signifikan. Ciri-ciri batubara perusahaan ini adalah subbituminous, dengan nilai panas menengah dan mengandung kadar polusi yang ultra-rendah, dengan batubara yang memenuhi kriteria JORC sebanyak 4.6 milyar ton dan cadangan 1,1 milyar ton. Oleh karena cirri-ciri lingkungannya yang baik, batubara Adaro ini dijuluki “Batubara Enviro” dan diterima baik oleh para pembangkit tenaga listrik ternama. Ramalan tahun 2013 menyusuli hasil kwartal akhir tahun 2012 yang meyakinkan dimana produksi mencapai 13,31 juta ton, naik 7% tahun demi tahun dan jumlah penjualan 13,96 juta ton naik dengan 12%. Permintaan terus meningkat terutama dari ekonomi-ekonomi baru Asia yang dipelopori oleh Cina dan India. 2012 adalah tahun produksi kedua terbaik dengan pasaran batubara membaik setelah keadaan pasar yang mencabar. Ia juga memperkenalkan sebuah produk Batubara Enviro baru, yang diberi nama E4500, sebuah campuran E5000 (Tutupan) dan E4000(Wara), untuk memberikan lebih banyak lagi pilihan kepada pelanggannya dan sekalian mengoptimasikan portfolio pendapatannya. Adaro menjual 1,95 juta ton E4500 pada tahun 2012 ke pelanggan-pelanggannya di Korea dan Indonesia. Tahun ini Adaro merencanakan untuk memperkenalkan satu lagi merek Batubara Enviro, yaitu E4700, sebuah produk murni (bukan campuran) dari bagian utara tambang Tutupan. Adaro juga sedang mengembangkan sebuah sistem pencernahan timbunan kotor dan pita pengantar serta 2 x 30MW pmbangkit tenaga listrik yang diperkirakan akan dikomisikan pada pertengahan pertama tahun 2013. Perusahaan tetap meneruskan diversifikasi lokasi bagi memperkecil risiko dan menjual Batubara Enviro ke 49 pelanggan di 17 negara. Ia juga terus berperan sebagai supplier domestik dengan 10,74 juta ton atau 23% dari jumlah penjualannya. Dalam tahun 2012 ekspor ke India berjumlah 15% dari keseluruhan, ke Sepanyol 12%, Jepang 9% Korea 8% Hong Kong 8% Cina 6%, Malaysia 5% Taiwan 4% dan AS 4%. Adora juga sedang meningkatkan produksinya melalui pembelian saham produsir-produsir lain. Ia telah juga menyatakan opsi menyediakan pinjaman convertible selama tiga tahun yang akan menguasai PT Bhakti Energi Persada (BEP) empunya tujuh lisensi batubara panas kadar rendah di kabupaten Muara Wahau di Kalimantan Timur. April 2013 l Coal Age Indonesia l 5 Indonesia Bukit Asam expands sales and facilities STATE-OWNED coal miner PT Bukit Asam, which operates mines in South Sumatra and East Kalimantan, intends to increase coal sales this year by 25% to 20 million tonnes and expects to benefit from higher average selling prices. To facilitate expanding sales, the company has set aside Rp2.5 trillion (US$258.13 million), including a Rp1.5 trillion port expansion at Tarahan in Lampung province and a US$18 million upgrading of loading facilities at Kertapati port in Pelambang, South Sumatra. Bukit Asam’s president director Milawarma says the production increase is intended to meet growing coal demand, especially from foreign markets. The company’s exports are directed China, Hong Kong, India, Japan, Malaysia, the Philippines, Taiwan and Vietnam. It hopes exports will grow to reach 50% of total revenues from the current 45%. He says the company will this year focus on exporting high-calorie coal, with a caloric value above 6000, as it provides better profit margins. “Japan needs high-calorie coal for its technology and because that coal produces low dust.” PT Bukit Asam has assembled an impressive team to advance its energy projects in Indonesia. However, the company will continue exporting low-calorie coal to India. Milawarma says the Tarahan terminal expansion is one of important programs needed to achieve the company’s targets. The expansion means construction of a new ship loader and a new dock, and the purchase of four new rotary car dumper (RCD) units. The expansion will mean the port can manage large vessels and increase its annual capacity to between 22 million and 25 million tonnes from 15 million. By accommodating large vessels, the company also hopes to reduce overseas freight costs as Tarahan functions as point of origin for exports to China, India, Japan, Taiwan and Vietnam. “The bigger the vessel, the cheaper the cost will be. We may be able to reduce the freight costs to China, for example, by $3 per tonne. The reduction will certainly benefit us,” Milawarma says. To support the Tarahan port, Bukit Asam is constructing a US$29.1 million coal-fired power plant, with capacity of 2x8MW. The plant is slated to begin operations in the second half of 2013. It is also increasing the capacity of the railroad used to transport coal from its Tanjung Enim concession in South Sumatra to Tarahan. Bukit Asam says it has saved about Rp75 billion by developing its own coal handling facility (CHF) at Kertapati. The project was managed by its own employees. “If we buy a CHF, it costs around Rp90 billion, but it only costs Rp15 billion to build ourselves,” says corporate secretary Joko Pramono. “The CHF is part of the Kertapati Port renovation. The refurbishment is expected to increase port capacity to annually accommodate 2.7 million tonnes of coal.” Bukit Asam tingkatkan pemasaran dan sarana-sarananya PERUSAHAAN tambang batubara milik negara PT Bukit Asam yang mengelola beberapa tambang di Sumatera Selatan dan Kalimantan Timur berencana meningkatkan 25% penjualan batubara tahun ini ke 20 juta ton dan mengharapkan keuntungan dari harga penjualan rata-rata yang lebih tinggi. Perusahaan telah menyediakan Rp2,5 triliun (AS$258.13 juta) termasuk Rp1,5 triliun untuk pengembangan pelabuhan di Tarahan, Propinsi Lampung dan AS$ 18 juta peningkatan sarana bongkar muat di pelabuhan Kertapati, Palembang, Sumatera Selatan. Dirut Bukit Asam Milawarma menyatakan bahwa peningkatan produksi dirmaksudkan untuk memenuhi peningkatan permintaan terutama dari pasaran-pasaran luar negeri. Perusahaannya mengekspor ke Cina, Hong Kong, India, Jepang, Malaysia, Filipina, Taiwan dan Vietnam. Diharapkan ekspor akan mencapai 50% dari hasil pendapatan yang pada waktu ini berjumlah 45%. Ia mengatakan bahwa perusahaannya akan memfokuskan diri pada ekspor batubara 6 l Coal Age Indonesia l April 2013 berkalorifik tinggi (diatas 6000) karena ini mendatangkan keuntungan yang lebih baik. “Jepang memerlukan batubara berkalorifik tinggi untuk teknologinya dan karena batubara tersebut mengeluarkan kadar abu yang rendah”. Namun perusahaan akan terus mengekspor batubara berkalorifik rendah ke India. Milawarma mengatakan bahwa pengembangan pelabuhan Tarahan adalah salah satu program penting bagi mencapai tujuan-tujuan perusahaan. Ini menyangkut konstruksi loader dan dock baru serta pembelian empat pembongkar gerbong putar (rotary car dumper (RCD)). Dengan demikian pelabuhan dapat mengelola kapal-kapal besar yang akan meningkatkan kapasitas dari 15 ton ke antara 22 sampai 25 juta ton setahun. Perusahaan juga mengharapkan ongkos pengangkutan keluar negeri akan berkurang dengan pengelolaan kapal-kapal besar sehingga Tarahan berfungsi sebagai titik mula ekspor ke Cina, India, Jepang, Taiwan dan Vietnam. “Lebih besar kapalnya lebih murah ongkosnya. Sebagai contoh, kita dapat mengurangkan ongkos-ongkos pengangkutan ke Cina dengan $3 per ton. Pengurangan ini pasti menguntungkan kami.” Kata Milawarma. Bagi menunjang operasi pelabuhan Tarahan, Bukit Asam sedang membangun pembangkit tenaga listrik berkapasitas 2 x 8 MW menggunakan bahan bakar batubara yang diharapkan bermula operasi pada pertengahan kedua 2013. Ia juga akan meningkatkan kapasitas pengangkutan keretapi untuk batubara dari konsesi Tanjung Enim nya in Sumatera Selatan ke Tarahan. Bukit Asam menyatakan bahwa dengan membangun sendiri sarana penanganan batubaranya di Kertapati ia telah menghemat kira-kira Rp75 milyar. Proyek tersebut dikelola oleh staff mereka sendiri. “Untuk membeli CHF akan memakan ongkos Rp90 milyar sedangkan membangunnya sendiri hanya memakan biaya Rp15 milyar,” kata Joko Pramono, Sekretaris eksekutif. “CHF adalah bagian dari renovasi Pelabuhan Kertapati. Pembaruan ini diharapkan meningkatkan kapasitas pelabuhan ke 2,7 juta ton batubara setahun” katanya. D DETAILS: INDONESIA: Dimas Abdillah - dabdillah@mining-media.com T +62 819 3263 9000; Sartika Anggraini - sartika@lagunagroup.net AUSTRALIA: Lanita Idrus - lidrus@mining-media.com T +61 3 9899 2981 or +61 417 517 863 Indonesia Acquisition to improve Jembayan logistics more detailed studies on the eastern corACQUISITION of a company which ridor. holds land near Sakari Resources’ The six concessions which Sakari Jembayan Coal Project will improve aims to purchase to the north of transport logistics and has potential to Jembayan could also benefit from the create substantial savings in haulage alternative transport route. Due dilicosts. Sakari’s agreement to purchase furgence on these concessions was schedther concessions to the north of the mine uled to begin in December. may also unlock wider coal reserves in Cash costs at the Jembayan operathe Separi basin of Kalimantan. tions have reduced from their peak of Sakari has acquired PT Tri Tunggal US$68 per tonne in the first quarter of Lestari Bersama, a company that owns 2012 to US$54.70 in the third quarter an exclusive right of way to convey coal while production continues its upward over Pertamina’s gas pipelines that lie to trend, reaching 2.35 million tonnes, the the east of the Separi basin and Jembayan mine. Sakari will, therefore, Acquisition of land near Jembayan Coal Project may result in highest quarterly rate for 2012. It was also 4% higher than the corresponding be able to open an overland route for significant haulage savings. quarter in 2011. transporting coal from Jembayan and the At Sebuku mine production in the Separi region to the coast. third quarter reached a record high of The distance from Jembayan to the 1.082 million tonnes, which was 146% coast in a direct overland route would be higher than in the same period of 2011. about 40km compared to the current Progress in the northern leases continroute that involves hauling coal 30km to ues as planned with the first coal mined Mahakam River and then barging it over in September from the second pit that distances of around 120km to ship loadhas been under development in 2012. ing anchorages. There has been a significant increase in Sakari’s pre-feasibility studies indimarketable reserves at Sebuku to 26.5 cate a direct transport route to the east million tonnes. coast would result in substantial savings Meantime, a takeover bid for Sakari in Jembayan haulage costs. by PTT Mining Group, a subsidiary of The Mahakam River is increasingly PTT International has succeeded with busy as a shipping route for various Sakari subsequently being delisted from commodities in inland Kalimantan and Coal stockpiled at Sakari Resources’ Jembayan project. the Main Board of the Singapore an alternative route for transporting coal Exchange Securities Trading Limited. would significantly facilitate transportaland assets and intellectual property assets in tion operations for Jembayan. the form of engineering studies for a bridge The delisting followed PTT gaining more than As well as the right of way, Tri Tunggal owns over the gas pipelines. Sakari will now finalize 93% of Sakari. Akuisisi tingkatkan logistika Jembayan PEROLEHAN sebuah perusahaan yang mempunyai tanah dekat Proyek Batubara Jembayan milik Sakari Resources akan membantu logistika pengangkutan dan berpotensi menghemat ongkos-ongkos pengangkutan secara signifikan. Persetujuan oleh Sakari untuk membeli lagi konsesi-konsesi disebelah utara tambang berkemungkinan membuka pula cadangan-cadangan batubara di daerah Separi di Kalimantan. Sakari telah memperoleh PT Tri Tunggal Lestari Bersama yang mempunyai hak eksklusif mengangkut batubara diatas pipa-pipa gas Pertamina di sebelah timur daerah Separi dan tambang Jembayan. Dengan demikian, Sakari dapat membuka rute jalan darat untuk mengangkut batubara dari jembayan dan Separi ke pesisir. Jarak jalan darat langsung dari Jembayan ke pesisir adalah kurang lebih 40 km ketimbang rute sekarang yang terdiri dari mengangkut batubara sejauh 30 km ke Sungai Mahakam diteruskan dengan tongkang ke lokasi kapal 8 l Coal Age Indonesia l April 2013 untuk dimuat yang jaraknya adalah 120 km. Studi pra-feasibility yang dilaksanakan Sakari menunjukkan bahwa pengangkutan rute langsung ke pesisir timur akan menghemat besar ongkos pengangkutan di Jembayan. Disamping itu, Sungai Mahakam juga terus bertambah sibuk sebagai jalur perkapalan membawa bermacam komoditas dari daratan Kalimantan. Jalur alternatif pengangkutan batubara akan membantu operasi transportasi Jembayan. Disamping hak jalan, Tri Tunggal juga memiliki aset tanah dan harta intelektuil dalam bentuk studi teknik pembangunan sebuah jembatan diatas pipa-pipa gas. Sekarang Sakari akan menyelesaikan studi-studi yang lebih mendetil di gerbang timur. Keenam konsesi di bagian utara Jembayan yang ingin dibeli Sakari juga akan mendapat keuntungan dari rute alternatif pengangkutan itu. Due diligence atas konsesi-konsesi ini direncanakan bermulai pada bulan Desember. Ongkos-ongkos tunai operasi Jembayan telah berkurang dari puncaknya yaitu AS$68 per ton di kwartal pertama tahun 2012 ke AS$54.70 pada kwartal ketiga, sedangkan produksi terus meningkat mencapai 2.35 juta ton, yaitu jumlah tertinggi untuk tahun 2012. Ini juga 4% melebihi hasil kwartal yang sama di tahun 2011. Produksi tambang Sebuku mencapai 1,082 juta ton di kwartal ketiga, yaitu 146% lebih tinggi dari periode yang sama di tahun 2011. Perkembangan di tambang-tambang bagian utara terus berjalan seperti direncanakan dengan penambangan batubara pertama pada bulan September dari lubang kedua yang dibuka di tahun 2012. Juga ada peningkatan dalam cadangan yang mudah jual di Sebuku ke 26.5 juta ton. Sementara itu rencana pengambil-alihan Sakari oleh group pertambangan PTT anak perusahaan PTT International tetnyata berhasil dengan Sakari dicabut dari pendaftaran Papan Utama bursa Singapura setelah PTT mendapat lebih dari 93% Sakari. Indonesia Indus Coal to initiate MukoMuko drilling ASX-LISTED Indus Coal intends to initiate a JORC-compliant drilling program on its MukoMuko Coal Project in Bengkulu province of Western Sumatra by the end of June. The drilling was delayed while the company focused on completing legal and technical due diligence, and financing and settling the first stage of the purchase of the Jambi Coal Projects, also in Sumatra. While completing this work Indus has ensured that the MukoMuko project has met its environmental and forestry commitments, continued to accumulate data for the preliminary feasibility study, maintained ongoing native title commitments in the local villages and progressed the exploration program via additional outcrop sampling. MukoMuko covers 2337 hectares of which about 63% encompasses the coal-bearing Lemau Formation and about 19% the secondary prospective Bitunan formation. Late last year Indus agreed to a series of transactions to purchase an indirect interest in three thermal coal-bearing concessions totalling 14,394 hectares in the thermal coal producing region of Jambi province. In early 2013 it purchased a 38% stake in BEP and BMC, representing stage 1 of the acquisition. The company has the right to purchase a further 38% interest while the vendor has the option to sell to Indus a further 24% shareholding, subject to the satisfaction of certain conditions. The concessions are Block 7 (5001 hectares), Block 8 (4380 hectares) and Block 9 (5013 hectares) in Jambi province, to the east of the MukoMuko project and with similar risk/reward profile. All three have granted exploration licence IUPs while Block 9 also has an AMDAL clearance (environmental licence). Indus expected that a production IUP and all necessary forestry permits would be granted for Block 9 during the first quarter of 2013. AMDAL clearances and forestry permits for the other blocks are expected before June 30. Numerous operating coal mines are in close proximity to all three concessions with stripping rates between 1:1 and 1:6. Regional costs of coal mine production are about US$32 per tonne while the coal being mined has an average calorific value of 5300-5700 kcal/kg and sulphur content of 0.059-1.04%, and sells for US$48 per tonne. A 150-hole JORC-compliant drilling program for 15,000 metres has been planned across the concessions and will start with a 70-hole campaign on Block 9 over a ‘sweet spot’ of 1000 hectares. Indus is focused on bringing the MukoMuko and Jambi projects to production over the next 12 months and is continuing to build scale with local coal partner PT Param Energy, a company founded by Indus executive director Vinay Hariani and which is a vertically integrated coal mining business with 15 years of experience in coal project identification, coal mining and international coal trading in Indonesia. Indus Coal’s MukoMuko project is in Western Sumatra with the new Jambi projects to the east. 10 l Coal Age Indonesia l March 2012 Indus Coal memulai pemboran MukoMuko INDUS Coal yang terdaftar di ASX berniat memulai program pemboran memenuhi JORC di Proyek Batubara MukoMuko di daerah Bengkulu di Sumatera Barat pada akhir bulan Juni. Pemboran ditunda karena perusahaan memusatkan perhatian dalam menyelesaikan due diligence hukum dan teknis, serta menyediakan dana dan menyelesaikan tahap pertama pembelian Proyek-proyek batubara Jambi, juga di Sumatera. Sambil menyelesaikan kegiatan-kegiatan tersebut Indus meyakinkan bahwa proyek MukoMuko telah memenuhi syarat-syarat lingkungan dan perhutanan, terus mengumpulkan data untuk feasibility study awal, mengawal syarat-syarat hak pribumi di kampong-kampung setempat dan telah meneruskan program eksplorasi melalui sampel outcrop tambahan. MukoMuko mencakup 2337 hektar 63% darinya adalah batubara Formasi Lemau dan lebih kurang 19% prospektif sekunder formasi Bitunan. Pada akhir tahun lalu Indus menyetujui beberapa transaksi untuk membeli saham tidak langsung di tiga konsesi batubara panas berjumlah 14,394 hektar di daerah produksi batubara panas Propinsi Jambi. Sebagai tahap pertama dari akuisisi ini pada awal 2013 ia telah membeli 38% saham di BEP dan BMC. Perusahaan ini berhak membeli 38% lagi sedangkan pihak penjual mempunyai opsi menjual kepada Indus 24% lagi saham setelah memenuhi beberapa syarat-syarat tertentu. Konsesi-konsesi tersebut adalah Blok 7 (5001 hektar), Blok 8 (4380 hektar) dan Blok 9 (5013 hektar) di Propinsi Jambi, disebelah timur proyek MukoMuko dan dengan profil risiko/hasil yang mirip sama. Ketiga-tiganya telah mendapatkan lisensi IUP eksplorasi sedangkan Blok 9 juga mempunyai pembebasan AMDAL (lisensi lingkungan). Indus mengharapkan IUP produksi dan semua izin-izin kehutanan yang diperlukan akan didapati untuk Blok 9 pada kwartal pertama 2013. Pembebasan AMDAL dan izin-izin kehutanan untuk blok-blok lainnya diharapkan sebelum 30 Juni. Banyak lagi tambang-tambang batubara lain beroperasi didekat ketiga konsesi-konsesi tersebut dengan nasbah stripping antara 1:1 sampai 1:6. Biaya-biaya setempat untuk produksi batubara berkisar sekitar AS$32 per tonne sedangkan batubaranya mempunyai nilai kalorifis antara 5300-5700 kcal/kg dan kadar sulfur 0.059-1.04% dan dijual seharga AS$48 per tonne. Sebuah program pemboran 150 lubang memenuhi syarat JORC sepanjang 15.000 meter menyangkut ketiga konsesi telah direncanakan dan akan dimulai dengan kampanye 70 lubang di Blok 9 diatas ‘titik manis’ seluas 1000 hektar. Indus bertekad menggiring proyek-proyek MukoMuko dan Jambi ke taraf produksi dalam waktu 12 bulan dan terus mendirikan skala dengan mitra lokal PT Param Energy, sebuah perusahaan pertambangan batubara terintegrasi vertikal yang dibentuk oleh Direktur Eksekutif Indus, Vinay Hariani dan berpengalaman 15 tahun dalam mengidentifikasi proyek batubara, pertambangan batubara dan penjual-belian internasional batubara di Indonesia. The MukoMuko project boasts impressive logistics. Indonesia Challenger signs mining and marketing agreement CHALLENGER Deep Resources’ subsidiary PT Bestindo Energy has entered an exclusivity agreement relating to the right to mine and market coal from the KEM Coal Project in Central Kalimantan. The agreement with CV Kara Elmas Madenleri (KEM) gives Challenger the exclusive right, for 60 days, to conduct due diligence on the KEM project and to enter into a mining operation-production agreement, which would give Challenger full control of all coal production and marketing within the project area. KEM owns the KEM project which is in Murah Teweh district and 12km east of the Barito River, the main river transportation route for the area. The project covers 335 hectares with an IUP operation production licence in place. It is a multi-seam high-quality thermal coal project with existing infrastructure in place to enable an early start to production, including a 12km haul road and loading jetty. Coal can be sold FOB barge at the jetty site or transhipped further downstream to a stockpile for later, direct loading on the mother vessel for shipment to final consumption markets. Challenger has staff onsite to complete due diligence, to begin mine plan drilling and to prepare infrastructure agreements. “This is a very important development for Challenger,” says the company’s president and CEO Ranjeet Sunder. “The KEM project gives us the potential to gen- Challenger Deep’s Tabang Coal Project is in East Kalimantan alongside the Belayan River erate near-term cash flow which will provide funding for our Tabang project development and will enable us to capitalize on other high-quality opportunities, while minimizing dilution to shareholders during these difficult capital markets. We view this project as having very low risk and relatively low capital requirements which are both key elements in our Indonesian coal strategy.” This agreement follows an MoU signed last year with Indonesian coal marketing firm, PT Surya Dinamika Lestari (SDL) to market domestic thermal coal from the Tabang project in East Kalimantan. Under the terms of the MOU the parties will work together to develop a marketing plan and negotiate a formal coal sales agreement for Tabang coal production. SDL will seek to secure domestic buyers for the coal and will advise Challenger on the best pricing parameters for different production scenarios. Tabang comprises four properties in close proximity. The ATRP and Pelangi properties are under formal purchase contracts while CBM and Inhuwa Purba (IP) are under exclusive MoUs. Challenger is developing Tabang using a threestep approach. Step one involves construction of a short-haul road and jetty facility on the Belayan River for production from the ATRP property. Steps two and three add infrastructure and development of the Pelangi, CBM and IP properties. After review, Challenger has determined that the Tabang project has favourable coal economics for export to India and China, while also supplying a burgeoning Indonesian domestic power market as its economy grows. Challenger tandatangani perjanjian pertambangan dan pemasaran PT BESTINDO Energy, anak perusahaan Challenger Deep Resources telah membuat perjanjian eksklusif untuk hak menambang dan memasarkan batubara dari Proyek Batubara KEM di Kalimantan Tengah. Persetujuan dengan CV Kara Elmas Madenleri (KEM) itu memberikan hak eksklusif kepada Challenger selama 60 hari untuk melaksanakan due diligence pada Proyek KEM dan untuk menjajaki perjanjian operasi pertambangan-pproduksi yang akan memberikan Challenger pengendalian penuh dalam produksi dan pemasaran batubara di kawasan proyek tersebut. Proyek KEM yang dimiliki KEM berada di Kabupaten Murah Teweh 12 km ditimur Sungai Barito, saranan pengangkutan utama di daerah tersebut. Proyek ini mencakup 335 hektar dengan lisensi IUP operasi dan produksi. Proyek ini terdiri dari seam ganda batubara panas bermutu tinggi dengan infrastruktur tersedia termasuk jalan sepanjang 12 km dan bongkar muat jetty, yang memungkinkan produksi seawal mungkin. Batubara dapat dijual FOB tongkang di jetty atau diangkut ke timbunan stok dihilir untuk dimuat 12 l Coal Age Indonesia l April 2013 langsung ke kapal yang mengangkutnya ke pasar konsumen. Challenger mempunyai staff ditempat untuk menyelesaikan due diligence, memulai pemboran sesuai dengan rencana pertambangan dan untuk menyiapkan persetujuan-persetujuan infrastruktur. “Ini adalah perkembangan yang penting bagi Challenger” kata Ranjeet Sunder Presiden dan CEO perusahaan. “Proyek KEM memberikan potensi untuk cash-flow jangka pendek yang akan menyediakan dana untuk pengembangan proyek Tabang dan memungkinkan kapitalisasi bagi kemungkinan-kemungkinan bermutu tinggi lain, sambil memperkecil pengurangan untuk pemegang saham dalam pasar modal waktu ini. Kami melihat proyek ini mempunyai risiko dan modal yang relative rendah. Kedua-duanya adalah unsur penting dalam strategi batubara Indonesia kami.” Persetujuan ini menyusul MoU dengan perusahaan pemasaran batubara Indonesia, PT Surya Dinamika Lestari (SDL) yang ditandatangani tahun lalu untuk memasarkan batubara panas dari proyek Tabang di Kalimantan Timur di dalam negeri. Menurut MoU tersebut, kedua belah pihak akan bekerjasama membuat rencana pemasaran dan mendapatkan persetujuan penjualan batubara resmi untuk produksi batubara Tabang. SDL akan mendapatkan pembeli-pembeli batubara dalam negeri dan akan mengusulkan parameter-parameter penentuan harga yang terbaik kepada Challenger bagi bermacam skenario produksi. Tabang terdiri dari empat kawasan yang berdekatan. Kawasan ATRP dan Pelangi masuk dalam kontrak beli sedangkan CBM dan Inhuwa Purba (IP) ada dibawah MoU Eksklusif. Challenger sedang mengembangkan Tabang menggunakan pendekatan tiga langkah. Langkah pertama ialah konstruksi sarana jalan ke dan jetty di Sungai Belayan untuk produksi dari ATRP. Langkah kedua dan ketiga adalah penambahan infrastruktur dan perkembangan Pelangi, CBM dan IP. Setelah penelitian kembali, Challenger memutuskan bahwa proyek Tabang mempunyai ekonomi batubara yang baik untuk ekspor ke India dan Cina, sambil mesuplai pasar tenaga dalam negeri Indonesia dengan ekonominya yang terus berkembang. Indonesia Killara continues Bengkulu due diligence KILLARA Resources is continuing its due diligence on the Bengkulu Coal Project in Sumatra and is negotiating an extension owing to wet weather which has prevented measurement of coal seam thicknesses in the recently identified outcrops. The rain increased river and tributary water levels and the proposed extension is expected to allow for re-assessment of the seams under more favourable field conditions. The Bengkulu project covers 2000 hectares of the larger Bengkulu Forearc Basin. Regional geological mapping from Indonesia’s Ministry or Mining and Energy Resources along with initial Killara field work shows this covering the prospective Lemau Formation and an area of Quarternary volcanics. Lemau is the foremost coal-bearing formation in Bengkulu province. Despite poor field conditions due to an extended wet season, Killara geologists identified and sampled two coal outcrops from the Lemau Formation with a potential strike length of 3.5km. Laboratory analysis of the samples was within expected ranges for the formation and indicates the presence of a moderate energy, direct export thermal coal with low levels of ash and sulphur. The due diligence follows the executive of a Memorandum of Understanding agreeing on commercial terms to acquire an 85% interest in the Bengkulu province tenement. The due diligence has comprised general reconnaissance mapping and representative sampling of coal occurrences along with socialization programs. Success will lead to a stratigraphic drilling campaign. The project is 100% APL forestry (Areal Pengunaan Lain or non-forestry) and no permits are required from the Indonesian Forestry Department to complete exploration or production activities. Following successful completion of the due diligence Killara has the option to proceed with the transaction by way of a series of payments which in total amounts to US$2.75 million. If due diligence is favourable Killara can elect to pay US$100,000 for the concession as an option exercise payment, a further US$100,000 upon receipt of necessary permits to enable exploration, US$250,000 upon completion of an initial resource drilling program, US$300,000 upon the upgrade of concessions to production status, US$500,000 upon completion of a bankable feasibility study and decision to mine, and US$1.5 million to commence commercial production. Killara has also conducted legal due diligence on the Nunukan Coal Project in East Kalimantan. The project comprises three IUPs that cover 15,103 hectares of the largely unexplored Tarakan Basin coal province. The due diligence showed that two of the IUPs were ‘Clean & Clear’ based on information provided by the Indonesian Ministry of Energy and Mining Resources, however the third one had expired. Given its integral nature to the Nunukan project, Killara has terminated any further work on the project pending re-issuance of the ‘Clean & Clear’ status. Examining coal outcrops on a Killara Resources’ Indonesian prospect. Killara teruskan ‘due diligence’ Bengkulu KILLARA Resources sedang meneruskan ‘duediligence’ pada Proyek Batubara Bengkulu di Sumatera dan tengah meminta perpanjangan waktu karena kesulitan pengukuran ketebalan batubara dan mengidentifikasi outcrops pada musim hujan yang telah menaikkan tinggi air di sungai dan anak-anak sungai. Perpanjangan waktu akan memungkinkan evaluasi ulang dalam kondisi yang lebih baik. Proyek Bengkulu ini mencakup 2000 hektar dari Lingkaran Muka Dataran Bengkulu. Peta geologis setempat dari Kementerian Pertambangan dan Energi serta kerja-kerja awal Killara menunjukkan bahwa kawasan ini meliputi daerah prospektif Formasi Lemau yang terdiri dari volcanis kwarternir. Lemau mempunyai formasi batubara utama di Propinsi Bengkulu. Walaupun kondisi tidak memuaskan oleh karena hujan yang berterusan, geolog-geolog Killara telah menemukan dan mencoba dua outcrops dari Formasi Lemau yang diperkirakan berpotensi panjang 3.5 km. 14 l Coal Age Indonesia l April 2013 Analisa laboratorium kedua sampel berada dalam batas-batas yang diharapkan dari formasi tersebut dan menunjukkan batubara panas dengan energy sederhana dan kadar abu dan sulfur yang rendah. Due diligence dilaksanakan setelah adanya MoU yang menyetujui syarat komersil bagi mendapatkan 85% andil dalam tenement Proponsi Bengkulu itu. Due diligence ini terdiri dari dan termasuk pemetaan umum dan percobaan batubara serta program-program sosialisasi. Keberhasilan akan membawa kampanye pemboran stratigrafis. Proyek ini adalah 100% APL perhutanan (Areal Penggunaan Lain atau non-perhutanan) dan tidak memerlukan izin-izin dari Departemen Perhutanan Indonesia bagi menyelesaikan eksplorasi atau kegiatan-kegiatan produksi. Seselesainya due diligence yang berhasil Killara mempunyai opsi untuk melaksanakan transaksi menerusi pembayaran sejumlah AS$2,75 juta. Seandainya due diligence sukses, Killara akan membayar AS$100,000 sebagai pembayaran opsi bagi konsensi tersebut, ditambah dengan AS$100,000 lagi setelah menerima izin-izin yang diperlukan untuk dapat memulai eksplorasi, AS$250,000 seselesainya program pemboran permulaan, AS$300,000 ketika peningkatakan status konsesi ke produksi, AS$500,000 seselesainya feasibility study dan keputusan untuk penambangan dan AS$1,5 juta untuk memulai produksi komersil. Killara telah pula melaksanakan due diligence hukum di Proyek Batubara Nunukan di Kalimantan Timur. Proyek ini terdiri dari tiga IUP mencakup 15,103 hektar daerah propinsi batubara dataran Tarakan yang belum pernah dieksplorasi. Berdasarkan informasi Kementerian Sumber Tenaga dan Pertambangan Indonesia,dua IUP dinyatakan ‘Bersih dan jelas’ sedangkan yang ketiga telah daluwarsa. Karena proyek Nunukan bersifat satuan, Killara telah menghentikan kegiatan dalam proyek ini sampai mendapatkan status ‘Bersih dan Jelas’. Indonesia South East Asia acquires Penajam East SOUTH East Asia Resources, formerly Victory West Metals, has finalized acquisition of a Singapore-based company, South East Asia Energy Resources (SEAE), which holds interests in a number of Indonesian thermal and coking coal projects, and has the ability to secure further projects. The most recent coking coal project acquired by the new company late last year is Penajam East in East Kalimantan. The acquisition agreement provides South East Asia with full title to all coal and production to existing jetty port facilities 34km from the mine. All infrastructure is in place for immediate mine production, including camp, mining equipment, haul road and processing crushing facilities. The Penajam East project comprises two coking coal mining concessions with total area of 164 hectares with IUP Production approval over the area. The project is within the Kutai Basin and has been subject to previous mining and exploration which should advance the development process. Five mining pits are already open with overburden removed and are available for recommissioning leading to reduced start-up costs and time. Coal thickness ranges between 0.45 metres and 1.1 metres, and there are additional opportunities for further exploration. The coal quality has been sampled over the 4 coal seams by SEAE geologists and has been sent for independent analysis. The company will commercially market the coal as coking coal and negotiations are under way with a Chinese steel mill in this regard. After mobilizing at the concession in December to undertake further drilling, mine planning and preparation for coal production, South East Asia South East Asia Resources expects to begin production this quarter at Penajam East. expected to begin production from existing exposed coal seams during the first quarter of 2013. There are no JORC-compliant reserves or resources reportable for this project at this stage. The development strategy was to begin operations in concession 1 in the most recently mined open pit where the coal seam is exposed. Coal produced here is expected to have medium to high sulphur and the company proposes to blend it with appropriate medium grade, low sulphur coal to reduce the project’s sulphur content to produce medium grade coal with less than 1% sulphur suitable for exporting. Following initial production, stage 2 will involve further exploration of the concession, in particular concession 2. Further drilling and exploration will continue throughout both concessions to look for additional mining opportunities. The Penajam East project will run concurrently with development of South East Asia’s other East and South Kalimantan thermal coal developments. On December 5, 2012, SEAE entered into an advanced funding/offtake arrangement term sheet with Guandong Era Elemen Resources. Guandong agreed to provide prepayment finance of US$3 million to SEAE, an advance which satisfies the condition of the acquisition of SEAE that South East Asia raises $3 million. South East Asia menguasai Penajam East SOUTH East Asia Resources yang sebelumnya dikenal sebagai Victory West Metals, telah menyelesaikan akuisisi sebuah perusahaan berpusat di Singapura, yaitu South East Asia Energy Resources (SEAE) yang mempunyai andil di beberapa proyek batubara panas dan coking di Indonesia, dan mempunyai kapasitas untuk mendapatkan lebih banyak lagi. Proyek batubara coking yang didapati terkini oleh perusahaan baru ini akhir tahun lalu ialah Penajam East di Kalimantan Timur. Persetujuan akuisisi ini memberikan South East Asia hak penuh atas semua batubara dan produksi termasuk sarana jetty pelabuhan 34 km dari lokasi tambang. Seluruh infrastruktur telah tersedia untuk dapat segera memulai produksi, termasuk kemah, alat-alat pertambangan, jalan pengangkutan dan sarana proses pemecahan. Proyek Penajam Timur terdiri dari dua konsesi tambang batubara coking sejumlah 164 hektar yang seluruhnya mempunyai izin produksi IUP. Proyek ini terletak di Dataran Kutai yang sudah pernah ada penambangan dan eksplorasi sehingga dapat mempercepat proses pengembangannya. 16 l Coal Age Indonesia l April 2013 Lima lubang tambang telah digali, bebas overburden dan tersedia untuk dikerjakan kembali. Ini akan mengurangkan biaya start-up dan waktu. Tebal batubara berkisar antara 0.45 meter dan 1.1 meter, dan juga ada kemungkinan-kemungkinan untuk eksplorasi lanjut. Mutu batubara telah diteliti oleh geolog-geolog SEAE dari 4 seam dan telah dikirim untuk analisa independen. Perusahaan akan memasarkan batubara ini secara komersil sebagai batubara coking dan perbincangan sedang berlangsung dengan sebuah pabrik besi Cina dalam hal ini. Setelah mengadakan kegiatan di konsesi tersebut pada bulan Desember untuk pemboran lanjut, perencaan tambang dan persiapan produksi batubara, South East Asia merencanakan memulai produksi dari seam batubara yang sudah terbuka itu pada kwartal pertama 2013. Pada waktu ini belum ada reserve atau sumber-sumber memenuhi syarat JORC yang dapat dilaporkan. Strategi pengembangan ialah memulai operasi di konsesi 1 di lubang terbuka yang baru saja ditambang dimana seam batubaranya sudah terbuka. Batubara yang diproduksi disini ditaksir mempunyai kadar sulfur antara rata-rata dan tinggi. Perusahaan bermaksud untuk mencampurnya dengan batubara bermutu medium tapi berkadar sulfur yang rendah untuk mengurangkan kadar sulfur proyek sehingga menghasilkan batubara bermutu medium dengan kadar sulfur kurang dari 1% dan dapat diekspor. Setelah produksi pertama, tahap kedua ialah mengeksplorasi lanjut konsesi, terutama konsesi 2. Pemboran dan eksplorasi akan diteruskan dikedua-dua konsesi untuk mencari kemungkinankemungkinan penambangan tambahan. Proyek Penajam Timur ini dilaksanakan bersamaan dengan pengembangan-pengembangan batubara panas South East Asia lainnya di timur dan selatan Kalimantan. Pada tanggal 5 Desember 2012, SEAE menyetujui pendanaan muka/offtake dengan Guandong Era Elemen Resources. Guandong setuju untuk menyediakan pembayaran muka sebesar AS$3 juta kepada SEAE. Jumlah ini adalah juga salah satu syarat akuisisi SEAE. Indonesia Palace considers Petangis acquisition PALACE Resources’ 70%-owned subsidiary Paser Pte Ltd has signed an MoU with PT Punggungan Tengah Samudera Indonesia for exclusive rights to explore, mine and market coal from the Petangis project in East Kalimantan. With exploration infrastructure in place and with Petangis being in close proximity to its existing Paser project, Palace is in a strong position to quickly mobilize its technical teams and assess the project’s potential efficiently and cost effectively. Palace believes the 100 hectare Petangis project is highly prospective with initial coal samples taken from outcrops within the prospect area returning assay results including calorific values from 6876-7149 Kcal/kg, 1.07%-1.54% sulphur and 11.26%-16.02% ash content. It lies within the Tanjung Formation and is about 127km southwest of Balikpapan and about 4km north of the Paser project. Good quality haul roads exist in and around the concessions area with jetty locations within 14km. These are also within a short distance to a deep water harbour with an existing operational port nearby. A comprehensive due diligence process, including a drill program, began during the first quarter with a coal quality report expected to be received during March. The 100 hectares of Petangis is within a greater 1000 hectare general survey licence but the MoU covers the lesser area. An application to convert the 1000 hectare concession from a general survey status to exploration status was submitted to the local authority in early December 2012. If granted the exploration status will provide Palace with the ability to mobilize a drill team and undertake its full due diligence process. Further analysis of drill results from the Paser project returned higher than expected average sulphur content at depth rendering the project less attractive at current commodity prices and causing a temporary suspension of the proposed project. Palace continues to pursue its mining objectives in the region and as a matter of priority has decided to further investigate the Petangis project and determine the economic viability. The Paser results followed an initial 10-hole drill program designed to investigate coal quality, depth, thickness and spread of coal seams below surface. A sampling program across the 43 hectares resulted in submission of about 150kg of coal samples to a laboratory in Samarinda for coal quality and processing analysis. The samples were collected along strike and down dip of the coal seams within the location to ensure a representative sampling program. On April 16, 2012, Palace announced that it had entered into a heads of agreement with the original Paser shareholders with regard to acquisition of the Paser project in East Kalimantan. ABOVE: Part of Palace Resources’ Paser coal project. LEFT: A coal outcrop on the Paser project in East Kalimantan. Palace mempertimbangkan akuisisi Petangis PASER Pte Ltd yang 70% dimiliki oleh Palace Resources telah menandatangani sebuah MoU dengan PT Punggungan Tengah Samudera Indonesia untuk hak eksklusif mengeksplorasi, menambang dan memasarkan batubara dari proyek Petangis di Kalimantan Timur. Dengan tersedianya infrastruktur eksplorasi dan dekatnya Petangis dengan proyek Paser, Palace berkedudukan kuat untuk memobilisir grup teknisnya dan mengevaluasi potensi proyek dan biaya secara efisien. Palace percaya bahwa 100 hektar dari proyek Petangis diperkirakan sangat berprospektif dengan sampel awal batubara dari outcrop di kawasan prospek menghasilkan assay menunjukkan nilai kalorifis antara 6876-7149 Kcal/kg, sulfur 1.07%1.54% dan isi abu 11.26% -16.02%. Ia berada di Formasi Tanjung lebih kurang 127km diselatan Balikpapan dan 4km diutara proyek Paser. Disekeliling kawasan konsensi-konsensi ini sudah ada jalan pengangkutan yang baik dan lokasi-lokasi jetty dalam jarak 14km. Juga terdapat pelabuhan air dalam didekatnya. Sebuah proses due diligence yang menyeluruh termasuk program pemboran, telah dimulai pada kwartal pertama dan laporan mutu batubara diharapkan diterima pada bulan Maret. 100 hektar Petangis itu berada di kawasan lebih besar yaitu 1000 hektar yang mempunyai lisensi survei umum walaupun MoU hanya menyangkut kawasan yang lebih kecil tersebut. Permohonan menukar status konsensi 1000 hektar itu dari lisensi survei umum ke eksplorasi telah diserahkan kepada yang berwenang setempat pada awal Desember 2012. Kalau disetujui Palace dapat memobilisir tim pemboran dan melaksanakan proses due diligence penuh. Namun analisa hasil pemboran lanjut dari proyek Paser menunjukkan isi sulfur yang lebih tinggi dari rata-rata sehingga membuat proyek tersebut kurang menarik ketimbang harga komoditas pada masa ini, karenanyaia telah menghen- tikan proyek yang diusulkan. Palace tetap meneruskan objektif-objektif pertambangannya di kawasan itu dan sebagai prioritas telah diputuskan untuk menyiasat lanjut proyek Petangis dan menentukan kemungkinan ekonominya. Hasil-hasil Paser tersebut menyusuli program pemboran 10 lubang awal bagi mengusut mutu batubara, kedalaman, tebal dan luasrnya seam batubara dibawah permukaan. Sebuah program percobaan/sampel diseluas 43 hektar menghasilkan penyerahan sekitar 150kg sampel batubara ke laboratorium di Samarinda untuk analisa mutu batubara dan prosesnya. Sampel-sampel tersebut dikumpulkan disepanjang dan kedalam seam batubara di lokasi bagi menentukan program percobaan/sampel yang representatif. Pada tanggal 16 April, 2012, Palace mengumumkan telah membuat perjanjian dengan pemegang-pemegang saham asal Paser mengenai akuisisi proyek Paser di Kalimantan Timur. April 2013 l Coal Age Indonesia l 17 Indonesia Altura acquires interest in operating project ACQUISITION of 33% of an operating East Kalimantan coal mine has transformed Altura Mining from explorer and developer into a producer. The transaction provides the ASX-listed company with a direct interest in PT Delta Ultima Coal, the owner and operator of the PT Binamitra Sumberarta tenement. The Delta operation produces and sells a medium energy thermal coal at an annual rate of 1.5 million tonnes but plans are in place to lift annual production and sales to 2.0 million tonnes by 2015. The mine has two defined resource areas with Gunung Lampu in the east of the tenement and Noni in the west, both serviced by a road network to the processing plant. Altura also has the Tabalong project in South Kalimantan with first production expected later in 2013, pending final mining approval. Tabalong has a JORC-compliant resource of 13.385 million tonnes of high-grade thermal coal. The Delta mine is on a 1260 hectare IUP in the Mahakam River delta in close proximity to the centres of Balikpapan and Samarinda. Coal is mined via open pit methods, crushed on site, loaded on barges at the company-owned loading facility on a river in the delta and barged to an offshore loading point. PT Delta Ultima Coal owns and operates all the coal processing plant and machinery necessary to lift, crush and fill barges from its load-out facility at the river barging site. The processing plant with hourly capacity of 1000 tonnes is centrally located to the mining areas with the port facility on a river 5km from the processing plant. The plant has a stockpile capacity of 75,000 tonnes which is sufficient for storage of product Altura Mining’s Delta coal project is in East Kalimantan, close to transport routes. until required at the barge loading facility. The ability to control the process from the runof-mine delivery point to loading of barges for cargoes allows for maximum flexibility for the supply chain. Product coal is transported by truck to the barge loading facility 5km east of the processing plant. This facility has the capacity to load barges at an hourly rate of up to 800 tonnes. Coal is transported by 8000 tonne barges to the offshore loading point for transfer to ships varying in size from Handysize to Panamax vessels. The coal resources in the IUP are on the limbs of an anticline and total some 57 million tonnes. Coal currently produced and sold is a highly desirable medium energy thermal coal with a calorific value on an air dried bases of 55005700 kcal/kg and a gross as received basis of 4800-5000 kcal/kg. Altura has engaged independent consultants to review the mine plan with a view to completion of JORC reserve estimates in the second quarter of 2013. There is also a significant opportunity to further increase resources through drilling of previously unexplored areas. Altura membeli proyek sudah berjalan ALTURA Mining telah menjelmakan diri sebagai produsen batubara yang tadinya pengeksplor dan pembangun dengan membeli 33% tambang batubara yang sedang berjalan di Kalimantan Timur. Dengan demikian perusahaan yang terdaftar di ASX ini mempunyai hak langsung di PT Delta Ultima Coal, pemilik dan operator kawasan pertambangan PT Binamitra Sumberarta. Operasi Delta ini mengeluarkan dan menjual batubara panas berenergi menengah sebesar 1,5 juta ton per tahun dan telah merencanakan peningkatan produk dan penjualan ke 2,0 juta ton pada tahun 2015. Tambang ini mempunyai dua sumber yaitu Gunung Lampu dibagian timur dan Noni di barat dan keduanya dihubungi dengan jaringan jalan ke tempat pemrosesan. Altura juga mempunyai proyek batubara Tabalong di Kalimantan Selatan yang diharapkan produksi pertamanya terjadi menuju akhir tahun 2013 tergantung izin pertambangan. Tabalong mempunyai 13,385 juta ton batubara panas bernilai tinggi yang memenuhi syarat-syarat JORC. Tambang Delta terletak diatas IUP sebesar 1.260 hektar di delta Sungai Mahakam berdekatan dengan Balikpapan dan Samarinda. Penambangan batubara disini menggunakan metode lubang terbuka, batubara di pecah-haluskan ditempat, dimuat ke tongkang-tongkang di sarana bongkar muat kepunyaan perusahaan diatas sungai di delta dan diangkut ke titik muat kapal-kapal besar lepas pantai. PT Delta Ultima Coal memiliki dan mengoperasikan semua sarana pemrosesan batubara dan mesin-mesin yang diperlukan bagi mengangkat, menghancur-haluskan serta memuat tongkangtongkant dari sarana bongkar muatnya diatas sungai. Pusat pemrosesan yang berkapasitas memprodusir 1000 ton/jam terletak ditengah-tengah kawasan pertambangan dengan sarana pelabuhan 5 km dari sini. Kapasitas tumpukan ialah 75.000 ton yang dianggap cukup bagi menyimpan produk hingga diperlukan di sarana bongkar muat. Kemampuan mengendali seluruh proses dari penambangan sampai ke pemuatan tongkang memberikan fleksibilitas yang maksimum dalam hal rantai suplai. Produk batubara diangkut dengan truk ke sarana bongkar muat 5km disebelah timur tempat pemrosesan. Sarana ini berkapasitas memuat 800 ton per jam. Batubara lalu diangkut menggunakan tongkang berkapasitas 8000 ton ke sarana bongkar muat kapal lepas pantai untuk kapal-kapal berkapasitas kelas Handysize sampai Panamax. Sumber-sumber di daerah IUP terletak di kaki bukit batu dan berjumlah 57 juta ton. Batubara yang diprodusir dan dijual waktu ini adalah batubara panas berenergi menengah yang sangat baik dengan nilai kalorifik 5500-5700 kcal/kg kering dan 4800-5000 kcal/kg kotor. Altura sedang menggunakan konsultan bebas untuk melihat kembali rencana pertambangannya dengan maksud menyelesaikan estimasi cadangan batubara yang memenuhi syarat-syarat JORC pada kwartal kedua tahun 2013. Tentunya juga banyak peluang untuk meningkatkan sumber-sumber melalui pemboran daerah-daerah yang belum dieksplorasi sebelum ini. April 2013 l Coal Age Indonesia l 19 Indonesia MICROMINE assists Indonesian coal operations WITH a history dating back more than 27 years, MICROMINE has a strong connection to the coal industry. Through provision of its software solutions and services, MICROMINE has assisted coal operations throughout Indonesia operate more efficiently and profitably. Released at MINExpo in Las Vegas last September, Coal Measure is a dynamic and integrated software solution for coal data management and coal data processing with 3D seam modelling, resource categorization, resource reporting, pit optimization, pit design and scheduling. Designed for clients demanding a software application that could be utilized for coal exploration and mining operations, Coal Measure’s strengths ultimately lie in driving cost reductions, improving planning and Seam BM and pit design using MICROMINE’s Coal Measure. increasing operational efficiencies. Coal Measure has been developed revenue into research and development, ensuring sally consistent system will be more transferable to cater to the geological and mining elements of its technology continues to lead the industry. within the industry and will allow operations to a project. The solution is coal industry specific, Future product development plans for Coal record and manage higher quality and more including its features, functions and terminology. Measure include the development of modules for accurate borehole data. MICROMINE is excited It contains elements of MICROMINE’s data Coal Bed Methane and Coal Seam Gas. to be part of this new data standardisation management solution Geobank, and the compaimprovement and being in a position to introduce ny’s flagship exploration and mine design soluthe new standard within clients’ operations,” he Coal Industry tion, Micromine. concludes. Development of the solution was done taking Standards Committee into account the needs of both MICROMINE’s Micromine Consulting existing coal clients and leading industry conAs part of MICROMINE’s commitment to sultants. Rigorous testing in real-life environ- positioning itself at the forefront of technological Services ments is part of the MICROMINE product deliv- and industry developments, the company ery process, which ensures the software meets involves itself with key industry groups and affilIn addition to offering software solutions to the requirements of the market. iations. The Australian Coal Industry recently the coal industry, Micromine’s Consulting MICROMINE’s CEO Kevin Fitzpatrick says, released ‘CoalLog’ Version 1, an Australian Services group (MCS) has provided consulting “With coal becoming an increasingly critical borehole data logging standard which was ini- services to a number of Indonesian coal clients, energy source, our clients have been demanding tially developed by senior GeoCheck staff including PT Timah, Altura and PT Asari. MCS a more sophisticated solution that takes into Andries Pretorius, Gary Ballantine and Brett is in the unique position of having recognized inaccount the complexities of coal and the ways in Larkin, followed by collaboration with major house experts in the area of coal mining and which it is mined. It has become very clear to us mining and software companies. geology. And, through the provision of premium that we needed to develop a world-class solution MICROMINE’s senior Geobank data man- services, has built a reputation as a leading conthat was both sophisticated enough to take into agement specialist Ibo Mango is a member of the sulting authority within the coal sector. account these complexities, whilst also ensuring collaborative panel responsible for the release of MCS delivers its services through a highly it remained both user-friendly and was easily CoalLog. Early involvement in this project, the professional and experienced team of geologists, transferable.” ACARP Project C21003, has enabled mine engineers, surveyors and GIS specialists In terms of functionality, Coal Measure’s MICROMINE to invest considerable time help- who have the proven expertise to help clients approach to coal deposits is vastly different to ing develop a solution that will benefit the coal achieve their objectives. that for metalliferous and irregular deposits. For sector and the company’s coal clients. Mongolian coal producer Sharyn Gol recently coal, interpretation and wireframing are replaced Ibo Mango says, “My involvement with the commissioned MCS to complete a technical by modelling seam morphology using griddling panel has been important to me as it is clear that report compliant with JORC guidelines for its based on stratigraphic sequence, followed by the standard will benefit the industry. For many coal mine north of Ulaanbaatar. The estimate direct conversion into a seam block model. years coal related data consultancy has been provided by MCS quadrupled Sharyn Gol Coal Coal Measure has been developed to ensure dependent on many variable factors. Depending project’s resource inventory. The report’s findthat modelling coal projects can be executed on the data format and dictionaries used, my ings enhanced the company’s competitiveness quickly due to seamless processes, from strati- findings have varied considerably from company within the domestic and international coal margraphic hierarchy compilation, through to grid- to company. kets, resulted in further developments of the ding and seam block model generation. “The best part about CoalLog is the benefits it mine, and increased the potential for greater MICROMINE invests 25% of its software will provide MICROMINE’s clients. A univer- profits and shareholder return. 20 l Coal Age Indonesia l April 2013 Indonesia Noble obtains Pan Asia stake Noble Resources International, a subsidiary of Singapore-listed Noble Group has acquired a stake in Pan Asia Corporation and has also been appointed a strategic advisor to PT Transcoal Minergy. PT TCM is developing a high CV thermal coal project in South Kalimantan and is 75% owned by Pan Asia. Noble will subscribe for 7 million shares amounting to 5.34% of Pan Asia and will appoint a non-executive director to Pan Asia’s board. Pan Asia CEO Alan Hopkins says, “We are very pleased to further strengthen the ties between the companies. We have a shared motivation to expedite the advancement of production at TCM, and to pursue additional growth opportunities. In particular, Noble has a strong understanding of and presence in the Indonesian coal industry and can provide Pan Asia with invaluable support in delivering the TCM project.” Harum completes KUP acquisition PT Harum Energy has completed the acquisition of 50.5% of PT Karya Usaha Pertiwi (KUP) for a total consideration of US$2 million. KUP holds a mining business licence (IUP) for a thermal coal concession in Kutai Kartanegara Regency, East Kalimantan. KUP’s concession area of about 2700 hectares is adjacent to Harum’s Mahakam Sumber Jaya (MSJ) and Santan Batubara (SB) mines. Due to this proximity, KUP coal is expected to have similar characteristics to coal from MSJ and SB, and allow its future coal production to utilize most of Harum’s existing infrastructure. Pre-operation and exploration activities at KUP are expected to begin shortly. Harum’s operating mines produce low ash, low sulphur thermal coal with bituminous characteristics which are marketed to a diversified customer base in Asia. Indomining signs contractor deal Indomining, a subsidiary of Toba Bara Sejahtera (TBS), has signed a US$115 million agreement with RPP Contractors Indonesia to develop a coal mine in East Kalimantan. Work to be undertaken includes land clear- ing, overburden removal, ripping, loading and transporting waste management, road maintenance, and treating water. RPP replaces previous contractor Saptaindra Sejati, whose commitment had expired. Indomining’s concession, which covers 683 hectares of land, is in Sanga-Sanga, Kutai Kartanegara, East Kalimantan. Total coal reserves at the mine, which the company has operated since 2007, are estimated to be 37 million tonnes. TBS owns a majority stake in three coal subsidiaries - Indomining (99.99%), Adimitra Baratama Nusantara (51%) and Trisensa Mineral Utama (99.92%). The company is targeting production of 12.1 million tonnes by 2014, up from the 7.6 million tonnes estimated for 2012. Investama opens mine in Aceh With the opening of its new mine in Aceh, Sumatra, publicly-listed PT ABM Investama aims to sell 6 million tonnes of coal this year. Last year’s coal sales were slightly more than 4 million tonnes. The company has coal reserves and resources of 221 million and 561 million tonnes respectively. ABM Investama is a member of Tiara Marga Trakindo Group, the distributor of Caterpillar heavy equipment, and runs its coal mining business through subsidiary PT Reswara Minergi Hartama, which has a concession in South Kalimantan held in turn by its subsidiary PT Tunas Inti Abadi, and in Aceh held by yet another subsidiary, PT Media Djaya Bersama. PHI Group acquires Tambang Sekarsa PHI Group has signed a definitive agreement to acquire 70% of equity ownership in PT Tambang Sekarsa Adadaya (TSA) for $10.5 million cash and stock. PT TSA owns a 9690-hectare coal concession with 71 million tonnes of measured coal resources and 205 million tonnes of indicated resources in West Sulawesi. The agreement will see PHI pay a total of $5.25 million in PHI Group common stock and $5.25 million in cash to TSA. The company intends to set the annual production level at 3 million tonnes by the second year of full operation. April 2013 l Coal Age Indonesia l 21 Indonesian Buyers Guide Guide to mining service providers in Indonesia INDONESIA’S mining industry is playing an increasingly important role in the archipelago’s growing economy and much of the industry is served by a growing number of Indonesian equipment companies, service providers, technical experts, educators and advisers. The industry is thriving owing to the abundance of coal and mineral resources throughout the island nation. Indonesia is one of the world’s leading coal and tin producers and also has prolific reserves of gold, copper, manganese, bauxite, silver, iron sands, etc. It is a leading coal exporter and its own growth is also creating demand for resources. This specially compiled buyers’ guide is a register of companies providing services to the mining industry. As such it provides a direct B2B opportunity for suppliers and end users and is, therefore, a strategic tool which can help create a more intelligent mining sector in Indonesia. It allows direct communication for interested parties and provides a quick reference point for newcomers wishing to identify resources. The directory is aimed at individuals or companies seeking specific resources within Indonesia, wherever they may be wanted. It is a perfect example of just how important the mining sector is to Indonesia and shows that it is much more than just exploration and mining at various sites. (AllMakes) Andalan Multi Kencana PT Jl. Raya Bekasi Km 22, Cakung Cilincing, East Jakarta, 13910 Indonesia +6221 4683 5566 Plant Electriication, Integrated Proccess Control And Optimization Solutions, Motor And Drives Systems, Instrumentation And Analyzer Systems Graha Baramulti, 3rd loor Komp. Harmoni Plaza Blok A‐8 Jl. Suryopranoto 2 Jakarta 10130 +6221 63868246 Bambang Agung Muljanto, Business Develop‐ ment Manager www.allmakes.co.id Heavy Equipment Parts Distributor Altrak 1978 PT Jl. RSC. Veteran No. 4 Bintaro Jakarta, Indonesia +6221 736 1978 Mr. Yosette Verdooren, Country Manager www.obt‐group.com Dry Bulk Cargo Transhipment Trison, Promotion Division www.altrak1978.co.id Heavy Equipment Distributor, Services And Sup‐ port Asia Development Engineering PT Komplek Pergudangan dan Industri Nusa Indah Blok C No. 3, Jl. Husein Sastranegara, Jurumudi Tangerang ‚Äì 15124, Indonesia +62 21 5438 2463 Alun PT Jalan Prof Dr Soepomo SH 233 Jakarta Selatan 12870, Indonesia +6221 829 0608 Aries, Sales Supervisor www.asia‐de.com Crushing Plant, Loading Conveyor, Maintenance And Operational Services, And Material Handling Equipment (Joy Global) P&H Minepro Indonesia PT Tempo Scan Tower 32th Floor Jl. HR. Rasuna Said Kav. 3‐4 Jakrta Selatan 12950 Indonesia +62 21 2934 9348 Noel Skilbeck, President Director www.minepro.com Supplier Of P&H Electric Shovel, Townhaul Trailer, Steamler Crusher, Le Torneau Loader (TRX Build) Airindo Sakti PT Jl. Raya Tanjung Barat No. 85 Poltangan, Pasar Minggu Jakarta, Indonesia +6221 789 0908 Bambang Rudiansah, Marketing & Communication Manager www.airindosakti.co.id Heavy Equipment, Spare Part And After Sales Service (Uniquip) United Equipment Indonesia PT Jl. Raya Cakung Cilincing Kav. 203 Jakarta Timur 13910 Indonesia +62 21 4683 3232 Frisca Bsc, Managing Director www.uniquip‐indo.com Heavy Equipment Products Authorized Dealer (Vibromax, Jcb, Ammann, Terex, Genie) ABB SAKTI INDUSTRI PT World Trade Center, 15th Floor JL. Jend. Sudirman Kav 29‐31 South Jakarta, 12920, Indonesia +6221 2551 5555 Anil Bhatia, Business Development Manager www.abbindonesia.co.id Frankie Makaminang, National Sales Manager www.ptalun.com Mercedes‐Benz Trucks Authorized Dealer And Services Andhika Lines PT Menara Kadin Indonesia 20th Floor Jl. HR. Rasuna Said Blok X‐5 Kav. 2&3 Kuningan Jakarta 12950, Indonesia +6221 5227 220 Budiarto Idries, Senior General Manager www.andhika.com Dry Cargo, Tug Boat Ang Barges Angkasa Sakti PT Jl. Raya Bekasi Cakung km 23 no 18 Jakarta Timur, Indonesia +6221 4682 4422 Asiadrill Bara Utama PT World Trade Center, 13th Floor JL. Jend. Sudirman Kav 29‐31 South Jakarta, 12920, Indonesia +62 21 521 1241 Budi Utomo, Manager www.asiadrill.com Drilling Services: Mud Rotary, Mine Wall Dewa‐ tering (Angled And Horizontal), Water Boring AsiaRep PT MidPlaza II, 6th Floor Jl. Jend. Sudirman Kav. 10‐11, South Jakarta, Indonesia +62 21 570‐0550 www.angkasasakti.co.id Heavy Equipment Buying, Selling, And Rental Astrid, Corporate Secretary www.asiarepmining.com Electrical Technical Services And Parts Manufac‐ turer, Supplier And Training Provider Anugerah Aneka Industri PT Kawasan Industri ADR, Kampung Bitung RT/RW 04/03, Desa Kadujaya, Curug, Tangerang Banten 15810 Indonesia +62 21 598 1309 Astra Insurance Graha Asuransi Astra Jl. TB. Simatupang Kav.15, Lebak Bulus, Cilandak, Jakarta 12440 Indonesia +62 21 75 900 800 Ronald EB, Sales Manager Radiator And Heat Exchanger Products Laurentius Iwan Pranoto, Marketing Communi‐ cation and Head of Public Relation www.asuransi.astra.co.id Heavy Equipments Insurance And Mining Insur‐ Armada Indonesia Mandiri, PT April 2013 l Coal Age Indonesia l 23 Indonesian Buyers Guide ances Atlas Copco Nusantara PT Cilandak Commercial Estate, Building 201, Jl. Raya Cilandak KKO Jakarta Selatan 12560, Indonesia +62 21 789 0550 Reni Nugrahika Radhan, Communication Manager www.atlascopconusantara.co.id Main Distributor, Spare Part And After Sales Services For Mining Equipment Aurora Technic Mandiri PT Jl. Mulawarman No.23 RT.21 Kelurahan Sepinggan Balikpapan 76115 Kalimantan Timur Indonesia +62 542 700 6889 Berca Mandiri Perkasa PT Jl. Pangeran Jayakarta 149A Jakarta, 10730, Indonesia +62 21 600 6125 I Gede Raka, Marketing Spv. www.berca‐mp.co.id Heavy Equipment Rental And Service, Mechanical And Electrical Contracting, Generating Set, Services And Support Berkat Tiga Putri PT Berkat Niaga Dunia Jl. Cideng Barat No. 47D, Jakarta 10150 Indonesia +62 21 632 7060 B. Suryadi, Director www.berkatsafety.co.id Safety Equipment Rocky Sampouw, Director www.atecma.co.id Polypipe, Floater, Mining Rubber Hose, And Fabrication Bhumi Phala Perkasa PT Jl. Mulawarman No. 06 RT. 01 Batakan Manggar Balikpapan 76116 East Kalimantan ‐ Indonesia +62 542 764 632 Austin Engineering PT Jl. Mas Surya Negara Kav. B2, Kawasan Industrial Terpadu Kabil Batu Besar, Nongsa, Batam, 29467, Indonesia +62 778 711 999 www.bhumiphala.co.id Engineering, Fabrication, Supply & Services Endah Emilia Bayhaki, General Ofice Manager www.austineng.com.au Manufacturer Of Mining Attachment Equipment, Excavation, And Construction Machinery Banama Equipment Support Indonesia PT Cilandak Commercial Estate, The Garden Centre Building 5th Floor Suite 5‐14, Jl. Raya Cilandak KKO Jakarta Selatan, Indonesia +62 21 7890 541 Andre Wahyu, Marketing www.banama.co.id Supplier And Distributor Truck & Bus Tyres, Otr Earthmover Tyres, Undercarriage & Spare Parts, Otr Rims, Tire Equipment, Used Equipment, Re‐ pair/Servicing, Logistics Bando Indonesia PT Wisma Hayam Wuruk 6th loor, Suite 600 Jln. Hayam Wuruk No. 8 Jakarta 10120 ‐ Indonesia +62 21 351 7590 Freddy Rondonuwu www.bandoindonesia.com Power Transmission Belt, Conveyor Belt Manufacturer Bima Bisalloy PT MM2100 Industrial Town, Jl. Sumbawa C7‐ 1 Cikarang Barat ‐ Bekasi 17520, Indonesia +62 21 8998 1540 Krisbeth, Marketing Spv. www.bimabisalloy.com Wear Resistant Steel Plate, High Strenght Structural Steel Plate, Ferritic Stainles Steel Plate, Chromium Carbide Clad Steel Plate Biosystems Jl. Tambak Sari No. 1, Sanur Denpasar ‐ 80228, Bali, Indonesia +62 361 281 969 Rick Bolt www.biosystemsgroup.com Water Technologies Blackwoods Indonesia PT Jl. AMD Kariangau No. 42 RT 68, KM 5.5 Kel. Batu Ampar, Kec. Balikpapan Utara, Kalimantan Timur, 76124 +62 542 758 8272 Chris Bruderlin, Country Manager www.blackwoods.co.id Maintenance Repairs And Operations Equipment, Safety Products Suppliers And Services Boart Longyear PT Jl. Suci 12B, Susukan, Ciracas Jakarta Timur +62 21 8779 8007 BASF Indonesia PT Plaza GRI, 11th Floor Jl. Rasuna Said Blok X2‐1, Jakarta 12950, Indonesia +62 21 526 2481 Shirley Jean Mangowal, Personal Assistant www.boartlongyear.com Drilling Equipment And Support Systems Sumihar Sibuea, Manager, Marketing Performance Chemicals www.asiapaciic.basf.com Mining Chemicals, Meyco Global Underground Construction Borneo Statewide Bearings CV Jl. Marsma Iswahyudi No .334 RT.36 RW.01 Sepinggan, Balikpapan 76115 East Kalimantan, Indonesia +62 542 703 1166 Ian Berwick 24 l Coal Age Indonesia l April 2013 www.statewidebearings.com.au Bearings Supply Bosch Rexroth PT Cilandak Commercial Estate Bld.# 202‐ Jl. Cilandak KKO Jakarta 12560 Indonesia +62 21 789 1169 Hendra Hariyanto, Sales and Application Engi‐ neer www.boschrexroth.com Hydraulic Motors And Pumps Britmindo PT Jl. Kemang Timur Raya No. 60A Jakarta Selatan 12730, Indonesia +62 21 7197 116 David Nye, Business Development Manager www.britmindo.com Professional Mining Services Budhi Wiguna Prima PT Jl. A. Yani No. 43 RT 02 RW 01, Balikpapan 76113, Kalimantan Timur, Indonesia +62 542 423 886 Selly Njoman, Manager www.bwp.co.id Coal Hauling, Specialist Machining Bukit Makmur Mandiri Utama PT Komplek Harmoni Mas Blok A/7‐9 36 Jalan Jembatan Dua Jakarta Utara 14450, Indonesia +62 21 661 3636 Deny Hartono, General Manager Business Development www.bukitmakmur.com Geology And Planning, Overburden Removal, Coal Mining, Coal Hauling And Reclamation And Rehabilitation Cahaya Waja Lugas PT Jl. Pangeran Jayakarta Komplek 141 Blok F No. 11‐12, Jakarta, Indonesia +62 21 600 7550 Yohanes, Marketing Manager www.mikasa.cwl.co.id Construction Equipment CARSURIN PT ASKRINDO Building. 5th Floor Jl. Angkasa Blok B‐9 Kav. 8 Kota Baru Bandar Kemayoran Jakarta 10610, Indonesia +6221 654 0425 Arum, Corporate Secretary www.carsurin.com Geological Survey For Coal, Coal Preparation, Pre‐Shipment Inspection, Laboratory Analysis Catterpilar Global Mining The Garden Centre Building 5th Floor Jl. Raya Cilandak KKO Jakarta 12560 Indonesia +62 21 789 0388 David Duffy, Business Development Manager www.mining.cat.com Heavy Equipment, High Wall Mining Systems Indonesian Buyers Guide CBC Jakarta PT Kawasan Industri Pulo Gadung Jln. Rawa Sumur Barat Kav. K. 4.5.6 No 1, Pulo Gadung, Jakarta Timur 13930, Indonesia +6221 2922 1400 (Topographical & Geological), Mining Infrastructure (Road And Building Con‐ struction), Mine Design And Production Schedulling Fanindra Rezky Kinanthi www.conbear.com Bearings And Power Transmission Distributor, Associated Technical Services Coal Export Services International Marindo Indonesia PT Menara Anugrah Kantor Taman E3.3, 21st Floor, Jl. Mega Kuningan Lot 8.6 ‚Äì 8.7, Kawasan Mega Kuningan Jakarta 12950, Indonesia +6221 5794 2287 Chakra Jawara PT Gedung TMT 1, 3rd Floor Suite 301 Jl. Cilandak KKO No. 1, Jakarta Selatan 12560 Indonesia +6221 2997 6849 Wilda Bahtiar, Marketing Manager www.chakrajawara.co.id Iveco And Kenworth Trucks Distributor And Support China Harbour Indonesia PT Plaza Sentral 20th Floor Jl. Jend. Sudirman No. 47, Jakarta 12930, Indonesia +6221 5790 5127 Shen Chao, President Director www.chec.bj.cn Transportation, Infrastructure, And Construction Choice Plus Gemilang PT (Sharpmapping) Sentral Senayan II, 20/ F Suite 2002, Jl. Asia Afrika No 8 Jakarta Selatan, Indonesia, 10270 +62 21 3048 6780 Justin Lim, General Manager www.sharpmapping.com Geodetic Gps Services & Gis Services, After Sales Service Cigading International Bulk Terminal PT Perkantoran Permata Senayan Blok H. No.1, Jl. Patal Senayan Jakarta 12210 Indonesia +6221 579 49471 Norlent Pasaribu, Chief Operation oficer www.cibt.co.id Barge Unloading Of Coal, Wharf Conveyor, Out Loading Conveyor, Stockyard Cipta Krida Bahari PT Gedung TMT 1, 7th Floor Suite 701 Jl Cilandak KKO No 1 Jakarta 12560 Indonesia 6221 2997 6777 Bimo Cahyono, General Manager www.cesiservices.com Mine Survey, Stockpile Management, Barge Load‐ ing, Coal Preparation Survey Coates Hire Indonesia PT Jl. Proklamasi No. 38 RT 32, Balikpapan, Kalimantan Timur 76115, Indonesia +62 542 760 174 Rahmat Matondang, Marketing Manager www.ptcoates.com Equipment Rental, Power Generators, Pumps, Lighting Towers Columbia Chrome Indonesia PT Jl. Raya Cakung Cilincing Km 3,5 Semper Barat Cilincing Jakarta Utara 14130¬†¬†Indonesia +6221 440 0266 Agus Budiono, Marketing Manager www.terrafactor.com/cci.php Manufacturer Of Construction EquipmentAttach‐ ments And Oem Attachments Manufacturer CSA Global Indonesia, PT Ventura Building, Lobby Level Suite 102B, Jl. R.A. Kartini No.26 (TB Simatupang) Cilandak Barat, Jakarta selatan 12430 +6221 751 1655 John Bishop, President Director www.csaglobal.com Exploration& Evaluation, Data Management Mining, Resources & Mine Geology, Mining Consultant Services Dahana, PT Menara MTH, Lt.17, Jl. MT. Haryono Kav.23, Jakarta 12820 Indonesia +62 21 837 823 17 Juli Jajuli, Public Relation www.dahana.com Explosives Manufacturing Services, Drilling & Blasting Services Dando Drilling International /PT. Drill Tech Indonesia Old Customs House, Wharf Road, Little‐ hampton, West Sussex, UK, BN17 5DD /Kupang Indah 8 No. 22 Surabaya Jawa Timur 60225 Indonesia +44 1903 731312 / '+62 31 8300 0023 Quentin Dulake , Senior International Sales Engineer www.dando.co.uk www.dandodrillingindonesia.com Exporation Drilling, Drilling & Blasting, Drilling‐ Open Pit, Bits Darma Henwa PT Bakrie Tower 8th Floor, Rasuna Epicen‐ trum Complex, Jl. HR. Rasuna Said, Kuningan, Jakarta 12960 Indonesia +6221 5794 8830 Made Satya, Corporate Secretary www.ptdh.co.id Mining Services & Contractor Daya Kobelco Construction Machinery Indonesia PT Wisma Pondok Indah 2, 12th Floor Suite 1202, Jl. Sultan Iskandar Muda Kav. V‐TA Pondok Indah 12310, Jakarta Selatan, In‐ donesia +6221 7592 2828 Yushi Sandidarma, Marketing Manager www.dayakobelco.co.id Heavy Equipment Distributor: Hydraulic Excava‐ tors; Backhoe, Skid Steer, And Wheel Loader; Daya Manunggal Diesel PT Jl. Industri III Blok F No. 8 Kel. Pasir Jaya, Kec. Jati Uwung ‐ Tangerang, Banten 15135 Indonesia +62 21 5930 7361 Herman Nudjaja, Marketing Support www.dayamanunggaldiesel.com Authorized Man Diesel Supply, Sales And Service DNX Indonesia PT Park View Plaza 5th Floor Jl. Taman Kemang 2 No 27, Kemang Jakarta 12730 Indonesia +6221 7179 4791 Juju Juanda, Business Manager Nurhasymi Fauziah, Marketing Spv. www.ckb.co.id Coal Logistics Services Cipta Kridatama, PT TMT 2 Building, 3rd Floor Jl. Cilan‐ dak KKO No.1 Jakarta 12560 Indonesia +6221 2997 6866 Marwan Dalimunthe, Business Development Manager www.ciptakridatama.co.id Mining Survey & Exploration, Modeling April 2013 l Coal Age Indonesia l 25 Indonesian Buyers Guide www.dynonobel.com Explosives And Blasting Services Donaldson Filtration Indonesia PT Cilandak Commercial Estate #101, Jl. Raya Cilandak KKO, Jakarta 12560, Indonesia +62 21 782 7008 Riza Ramsey, Marketing Manager www.asia.donaldson.com Industrial Hydraulics Filtration, Engine+Vehicle Filtration, Industrial Air Filtration, Compressor Filtration Dongil Rubber Belt Co. Ltd Ariobimo Sentral 6th Floor Jl. HR. Rasuna Said Blok X‐2 Kav. 5 Jakarta 12950 Indonesia +62 21 522 5820 Rinto Almendes, Sales and Marketing Manager www.drbworld.com Conveyor Belt And System, Power Transmission Belt, Rubber Track And Undercarriage System, Services DSI Indonesia PT Menara Standar Chartered 30th Floor Jl. Prof. Dr. Satrio Kav. 164 Jakarta 12930, Indonesia +6221 2555 5730 Energy Provider Indonesia PT Jl. Agung Utara Raya Blok A36A No. 10‐11, Sunter Agung Podomoro Jakarta 14350, Indonesia +62 21 6530 3399 Flemmings Indonesia PT Palma One Building 11th Floor Suite 1107 Jl. H. Rasuna Said kav. X2 No. 4 Jakarta 12950 Indonesia +6221 522 8851 Ayu Singgih, Ofice Manager www.energyprovider‐indonesia.com Power Design, Supply, And Installation Provider Edy Suryanto, Manager Operational www.lemings‐safety.com Safety Equipments: Workwear, Personal Protec‐ tive Equipment & Industrial Supplies, Uniform Engineering Indonesia Karya PT City Lofts Sudirman Suite 21‐21 Jl. KH. Mas Mansyur No. 121 Jakarta Pusat 10220 Indonesia +62 21 2555 8704 Irwan Neo, Marketing Manager www.eika.co.id Excavator Attachment Designing And Manufac‐ turing Enrich Solutions PT Kawasan Pusat Niaga Terpadu Jl. Daan Mogot KM 19.6 Blok E No. 8 E‐F, Tangerang, Banten 15122 Indonesia +62 21 5436 1003 Sugih Sentosa, Sales Head (OTR Tire) www.i‐enrich.com Mrf Off The Road Tyres Distributor Hendra Purba, Country Manager www.dsiminingproducts.com Underground Mining Equipment Equator marindo PT Menara Anugrah, Kantor Taman E3.3, 22nd Floor, Kawasan Mega Kuningan +6221 5794 2328 Dunia Satindo PT Mega Kemayoran Ofice Tower A Lt.5 Jl. Angkasa Kav.B6 Kota Baru Bandar Kemay‐ oran +62 21 2937 1188 Dinar Putri, Secretary www.iss‐shipping.com Shipping Services Irsan, Business Development Manager www.safetyindonesia.com Safety And Sequrity Equipments Supplier Duta Putera Sumatera PT Jl. DI. Pandjaitan No. 138 Jakarta Timur 13410, Indonesia +62 21 8590 7989 Faisa Reza, Promotion Division www.man‐mn.co.id Man Trucks & Bus Dealer Eka Dharma Jaya Sakti PT Jl. Jend. Sudirman 22, Balikpapan Kalimantan Timur 76114, Indonesia +62 542 765 555 Rahmat Adi, Marketing Manager www.ekadharma.co.id Mack Trucks, Volvo Trucks, And Volvo Penta Au‐ thorized Dealer EMECO (Prima Traktor IndoNusa PT) Sudirman Square Ofice Towers, Tower B, 19th Floor, Jl.Jend.Sudirman kav. 45‐46, Jakarta 12930 Indonesia +62 215 75 0870 Putu, Marketing www.emecogroup.com Earthmoving Equipments: Rental, Maintained, Field Services, Equipment & Parts For Sale 26 l Coal Age Indonesia l April 2013 ESCO MINING PRODUCTS Cilandak Commercial Estate The Garden Centre 3rd Floor Suite 304 Jl. Raya Cilandak KKO Jakarta 12560 Indonesia +62 21 789 1181 Christopher Biehn, Marketing Manager www.escocorp.com Productive Wear Replacement Parts: Mining'S Ground Engaging Tools (Get), Blades, Buckets, Truck Bodies, And Service & Repair ETI Fire Systems PT Jl. Magelang ‐ Kopeng Km. 11, Tegalrejo, Magelang, Jawa Tengah 56192, Indonesia +6229 3314 8990 Tri Widodo, Quality Assurance www.etiiresystems.com Fire Suppression Systems Exsol Innovindo PT Gandaria 8, Floor 7, Suite B & C, Gandaria City, Jl. Sultan Iskandar Muda Jakarta 12240, Indonesia +62 21 2903 6643 Eddy Purnomo, Marketing Manager www.exsol‐innovindo.com Topcon Survey Products, Automated Positioning Systems Products, Automated Monitoring System, And Ele Interna‐ tional Products Distributor Fokus Kencana PT Jl. Pangeran Jayakarta No. 68 Blok C‐8, Jakarta 10730 Indonesia +62 21 625 0157 Ojong Sukili, Managing Director www.fokuskencana.com Mining Maintenance Equipment Supplier Forta Cheetah PT/ Forta Larese Jl. Musi No. 16 Jakarta 10150 Indonesia +6221 386 1018 Brus Win Husin, Sales & Marketing Manager www.cheetahsafety.com Manufaturer Of Cheetah Safety Wear Gaya Makmur Mobil PT Jl. Lingkar Luar Barat No. 9 Rawa Buaya, Cengkareng Jakarta Barat 11740 Indonesia +62 21 5830 0788 Maya, Corporate Secretary www.gmmobil.com Faw Heavy Duty Truck And Everdigm Hydraulic Breaker Distributor Gaya Makmur Tractors PT Jl. Lingkar Luar Barat No.3 Rawa Buaya, Cengkareng Jakarta Barat 11740 Indonesia +62 21 581 6899 Herry Hermansjah, Marketing Director www.gmtractors.net Heavy Equipments Wholesale Supplier And After Sales Services Geo Engineering Ultima Services PT Graha Elnusa Lt.3 & 4, TB Simatupang Jakarta Selatan, Indonesia +62 21 788 400 55 Antonius Widarto, Operational Director www.servogroup.co.id/exploration Exploration And Drilling Serices, Mining Engineering, Geodetical Survey, Gis GEOMIN INTERNATIONAL PT Komplek Rukan Grand Panglima Polim Kav. 61 Jl. Panglima Polim Raya Kebayoran Baru Jakarta, 12160 Indonesia +6221 7278 0963 Greg Parham Bsc www.geomininternational.com Mineral And Coal Resource Exploration, Geological Interpretation And Modeling Geoservices PT Jl. Setiabudi 79‐81 Bandung 40153, Indonesia Indonesian Buyers Guide +622 203 1316 Durban Ardjo www.geoservices.co.id Coal Laboratoty, Core Drilling, Equipment Supply GEOSURVEY INTERNATIONAL PT Jl. Ampera Raya No. 123, Jakarta Selatan 12550, Indonesia +6221 781 1750 Nandang Hermawan, Corporate Marketing www.anugrahgroup.com Drilling Services, Exploration Gigantika Pratama Prima PT Jl. Agung Utara Raya Blok A36D No. 30 Sunter Agung Jakarta Utara 14350 Indonesia +62 21 6530 5789 Patrick Luwi, Sales Engineer www.gigantika.co.id Industrial Networking Solution HATFIELD Consultant Indonesia PT LIPI Building, 3rd Floor Jl. Ir. H. Juanda No. 18 Bogor 16122, West Java, Indonesia +62 251 832 4487 Erlyn www.hatieldgroup.com Mining Environmental And Consulting Services Hazard Kontrol Indonesia PT Gading Bukit Indah F/16, Jl.Bukit Gading Raya, Kelapa Gading, Jakarta, Indonesia 14240 +62 21 4529 020 Arthur T., Sales Director www.f‐500.co.id F‐500 Single Dealer Hexindo Adiperkasa Tbk. PT Kawasan Industri Pulo Gadung Jl. Pulo Kambing II, Kav. I‐II No. 33 Jakarta 13930 Indonesia +62 21 461 1688 Global Fleet Sales Indonesia PT Pondok Indah Ofice Tower 3, 16th Floor Jl. Sultan Iskandar Muda Kav. V‐TA Jakarta 12310 Indonesia +6221 7592 2960 Stan Oshima, Marketing Coordinator www.hexindo‐tbk.co.id Heavy Equipment & Parts Sales, Rental, And Service Support Yuke Ernawati, Sales Coordinator www.rmaautomotive.net Heavy Duty Mine Site Vehicle Hidup Baru Perdana Abadi Jl. Mulawarman RT. 22 No. 155 Sepinggan Balikpapan 76115 East Kalimantan, Indonesia +62 542 761 425 GLOBAL MINING SERVICES PT THE BELLEZZA Permata Hijau: GP Tower 25th Floor. Jl. Letjen Soepeno No. 34 Jakarta Selatan, Indonesia 12220 +6221 2933 3189 www.gmservices.co.id Mining Consultant And Exploration Goltens Jakarta PT Jl. Danau Sunter Barat Blok A1/1 Sunter Agung, Jakarta Utara 14350 Indonesia +62 21 640 8091 Dodo Supriatna, Head of Sales and Marketing Department www.goltens.com Processing And Construction Equipment Hartono Raya Motor PT Jl. Daan Mogot KM. 1 No. 99 Jakarta Barat, Indonesia +62 21 560 5200 Aike Listya, Operational Director www.hartonomotor.com Mercedes Benz Trucks Authorized Dealer Hasta International Machinery (HAMAC) PT Komplek Rukan Mangga Dua Square Blok G/12 Jl. Gunung Sahari Raya No. 1, Kel. Ancol Kec. Pademangan Jakarta Utara 14430 Indonesia +6221 6231 3372 Rudi Chan, Marketing www.hamac.co.id Sole Agent Of Unic Crane: Truck Mounted Crane And Mini Crawler Crane Abdul Rachman, Marketing Manager www.hidup‐baru.com Dewatering Pumps & Gensets Service Mainte‐ nance, Sales, Rental & After Sales Service Hino Motors Sales Indonesia PT Wisma Indomobil II, Jl. Letjen MT. Haryono Kav. 9, Jakarta Timur 13330 Indonesia +62 21 856 4480 Ferdiansyah, Media Relation & Publication www.hino.co.id Hino Trucks Main Dealer And After Sales Serv‐ ices HMS bergbau indonesia PT The East Tower 11th Floor Unit 1 & 9 Jl. Lingkar Mega Kuningan Kav E3.2 No. 1 Jakarta 12950 Indonesia +6221 576 45 77 Leif Orthmann, President Director www.hms‐ag.com Steam Coal, Coking Coal & Coke, Anthracite, Pci Coal And Others Immersive Technologies Jl. Cirendeu Raya No. 35, Ciputat, Jakarta Selatan 15419, Indonesia +6221 2934 9600 Nicky Suwandy, South East Asia Regional Man‐ ager www.immersivetechnologies.com Mining Equipment Simulator Inamco Varia Jasa PT Jl. Poltangan Raya No. 48 Jakarta 12530 Indonesia +62 21 7883 7610 Christon Naibaho, Marketing Manager www.inamcomanpower.com Supply, Management And Development Of Workforces Indo Asia Resources PT Indonesia Stock Exchange Building 17th Floor, Jl. Jend. Sudirman Kav 52 ‐ 53, Jakarta 12190 Indonesia +6221 515 7706 Dewi Sartika , Manager www.ia‐resources.co.id Surface And Underground Drilling Services, Coal Seam Gas Drilling Services, Contracting, Coal Bed Methane Drilling Indodrill Indonesia PT Plaza Niaga I Blok A #2 Sentul City Bogor, 16810 West Java, Indonesia +6221 8796 1774 Wieke Widuri www.indodrill.com Drilling And Support Services Indomobil Prima Niaga PT Jl. Raya Kletek No. 9 Taman ‐ Sidoarjo, Jawa Timur, Indonesia +62 31 787 8000 Sunaryanto, Marketing Spv. www.ipn.co.id Hino Trucks Sales And Parts Indonesia Bulk Terminal PT Menara Karya 20th & 22nd Floor Jl. H.R. Rasuna Said Blok X‐5 Kav. 1‐2 Jakarta 12950 Indonesia +6221 522 9250 Bram Surjadi, Marketing Manager www.ptibt.com Coal Discharging And Loading, Coal Stockpiling, Coal Blending, Fuel Terminal Indotruck Utama PT Jl. Raya Cakung Cilincing Kav. 3A Semper Timur, Jakarta 14130, Indonesia +62 21 441 2168 Enrico Herinanto, Marketing www.indotruck‐utama.co.id Heavy Equipment, Heavy Duty Transportation, Port Equipment, And Material Handling Distributor INTAN BARA UTAMA PT Jl. Niaga II Rt.007 Kel. Simpang Pasir Kec. Palaran Kota Samarinda Kalimantan Timur, Indonesia +62 541 6213 021 Slamet Ezra, Director www.ibugroup.com Coal Mining Contractor Intan Baruprana Finance PT Jl. Pangeran Jayakarta 115, Blok C 1‐3 Jakarta 10730, Indonesia +62 21 440 1408 Kurniawan Saktiaji, Marketing www.terrafactor.com/ibf.php April 2013 l Coal Age Indonesia l 27 Indonesian Buyers Guide Heavy Equipment Financing Intecs Teknitama Industri,PT Jl. Ciputat Raya No. 18D, Kebayoran Lama Selatan, Jakarta Selatan 12240 Indonesia +6221 729 3351 Mila Sari, Marketing Department www.intecs.co.id Fire Suppression Systems, Filtration, Fluid Management, Mining Watercart And Washdown Facilities Integrasi Spareparts Indonesia PT Mutiara Taman Palem C 3 no. 15 & C2 No. 52 Jl. Kamal Raya Outer Ring Road Cengkareng Timur Jakarta Barat 11730 Indonesia +62 21 9888 8899 Irwan , President Director www.spareparts.co.id Spare Parts For Coal Mining Commercial Off‐ Road Trucks, Light Vehicle And Heavy Machinery Supplier International Auksion Multimesin PT Jl. Benyamin Sueb C‐3 Kemayoran Jakarta 14410, Indonesia +62 21 645 0123 Benedict, Sales Manager www.jakartaauctions.com Heavy Equipment Trading, Rental, And Auctions Intertek Utama Services, PT Jl. Raya Bogor Km. 28 Jakarta 13710 Indonesia +6221 2937 822 Yuni Seubert, Administrtion Manager www.intertek.com Mine‐Site Minerals Laboratories, Coal Inspection And Testing Intraco Penta PT Jl. Raya Cakung Cilincing Km 3.5 Jakarta 14130 Indonesia +62 21 440 1408 Fadli, Corporate Communication www.intracopenta.com Heavy Equipment Dealer: Excavator, Backhoe Loader, Wheel Loader IOL Indonesia PT Menara Bidakara 2, 11th Floor Jl. Jend. Gatot Subroto Kav. 71‐73 Jakarta 12870 Indonesia +62 21 2906 9411 Zefnat Anakotta, Country Manager www.inspectorate.com Analytical And Inspection Services Isuzu Astra Motor Indonesia PT Jl. Danau Sunter Utara Blok O3 Kav. 30 Sunter II, Jakarta 14330 Indonesia +6221 650 1000 Maman Fathurrohman, Advertising and Promo‐ tion Department www.isuzu‐astra.com Isuzu Product Sole Agent & Distributor Jalamas Berkatama PT Jl. Cideng Timur No. 70 Jakarta 10160, Indonesia +62 21 350 6470 www.jimac‐co.com Heavy Equipment And Machinery Trading, Rental And Recondition Business Herman Wirjawan www.jalamas.com Electrical Equipment Supplier Kalimantan Prima Persada PT Jl. Rawa Gelam I No. 9 Kawasan Industri Pulogadung Jakarta Timur 13930 Indonesia +62 21 4683 4633 Jamieson Consulting PT Wisma 46,‐Kota BNI, 47th Floor Jl. Jend. Sudirman Kav. 1, Jakarta Selatan Indonesia +6221 574 8576 Nur Apiatu, Executive Assistant www.jamieson‐group.com Consulting: Performance Improvement, Training And Project Management Jasa boga Indonesia PT Puri Mutiara Blok D no. 8, Jl. Griya Utama Sunter Agung Jakarta Utara 14350 Indonesia +6221 6530 0560 Heri Sulistiono, Business Development Manager www.jbi.co.id Catering, Housekeeping, Store And Logistic Serv‐ ice JASA MUTU MINERAL INDONESIA PT Jl. Rapak Indah No. 189 Samarinda, Indonesia +62 541 627 6886 Netty Dini R., Marketing Manager www.mutumineral.com Coal Quality Management, Coal Laboratory JAVA RINO (LanggengKarya MakmurLestari PT) Semeru 124, Bambe ‐ Driyorejo Gresik 61177 ‐ Indonesia +62 31 7664 205 Jeff Collins, Export Marketing Oficer www.javarino.com Rubber Conveyor Belt Manufacturer JDA Indonesia PT Plaza Aminta 7th Floor Jl. TB Simatupang Kav. 10, Cilandak , Jakarta 12310 Indonesia +6221 7590 4835 Dana Basalama, Business Development Manager www.jda‐indonesia.co.id Human Resources Consultancy Service Jebsen & Jessen Technology Indonesia PT Graha Inti Fauzi, 7th Floor No. 22, Jalan Buncit Raya, Jakarta 12510 Indonesia +62 21 2753 7030 Dewi Sakuntala www.jjsea.com Material Handling (Cranes & Components), Off‐ shore (Lifting And Pulling Equipment) JIMAC Perkasa (Sany Indonesia Machinery) PT Jl. Benyamin Sueb Blok C‐2, New City Kemayoran Jakarta 14410, Indonesia +6221 640 7311 Amelia Agustina Tanamas, Personal Assistant 28 l Coal Age Indonesia l April 2013 Tri Yuli Adriana , Director www.kppmining.com Mining Contractors Kencana Cakra Buana, PT MT. Haryono Square 2nd Floor Unit 28‐29Jl. Otto Iskandardinata No.390 Jakarta ‐ Timur 13330 +62 21 2906 7280 Dikdik Rodiajaya, Marketing www.pt‐kcb.com Corrugated Steel Pipe, Steel Bridge, Galvanizing Kimberly Clark Professional Indonesia,PT Wisma Sudirman, GKBI suite 2301 Jl. Jendral sudirman No.28 Jakarta 10210 Indonesia +62 21 3040 0800 Anna Fandia, Assistant Product Manager www.kcprofessional.co.id Machinery, Occupational Health & Safety Kinhamas Abadi PT Graha Codein (Ex. Tira Building) 4th Floor Suite #4J Jl. HR. Rasuna Said Kav. B3 Kuningan ‐ Jakarta 12920, Indonesia +62 21 2637 5001 Ratna Mulia, Sales and Marketing Manager www.kinhamas.com Conveyor, Crusher, Mine Process Operation Parts, Fabrication And Manufacture Kobexindo Traktors, PT Kobexindo Tower Jl. Pasir Putih Raya Blok E‐5‐D Ancol, Pademangan Jakarta Utara 14430 Indonesia +6221 6470 0800 Sunardi, Marketing www.kobexindo.com Heavy Equipments And Industrial Machinery Kreasi Auto Kencana, PT JL.KH. Hasyim Ashari no. 45 Jakarta Pusat 10150 Indonesia +62 21 630 6508 Nugroho Suharlim, General Manager Fleet & GSO www.autokencana.com Ford Vehicle Supplier Lancar Jaya Mitra Abadi, PT Jl. Pangeran No 93 A Jakarta, Indonesia +62 21 731 9498 www.lancarjaya.web44.net General Contractrors And Heavy Equipments Rental Lavinta Buana Sakti (C-Track Asia), PT Jl. Kencana Utama II, M4‐1A, Jakarta Indonesian Buyers Guide 15157, Indonesia +6221 5835 6114 Deutz Ag German (Diesel & Gas Engine) Author‐ ized Sole Agent And Distributor ing; Grinding; Screening, Material And Equip‐ ment Supply Bart van Dongen, Managing Director Indonesia www.ctrackindonesia.com Vehicle Location, Fleet Management, Satellite Navigation, Driver Safety Systems & Fuel Man‐ agement Systems. Maxidrill Indonesia Tekno park industrial kav A6, BSD City, Tangerang Selatan 15314 Indonesia +6221 7560 797 Mitra Hardware Indonesia PT/ Halysafe Indonesia PT Komplek Rukan Mangga Dua Square Blok G No.12; Jl. Gunung Sahari Raya No. 1 ‐ Jakarta Utara 14430 Indonesia +62 21 6231 3372 Leighton Contractors Indonesia PT Talavera Ofice Park 19th Floor JI. T.B. Simatupang Kav. 22‐26 Cilandak Barat Jakarta, 12430 Indonesia +62 21 3000 2323 Lydia Astriningworo, Corporate Communication www.leightonasia.com Engineering Contractor Liebherr Indonesia Perkasa,PT Jl. Mulawarman RT 19 No. 17 Kelurahan Manggar 761,16 Balikpapan Indonesia +62 21542 764 215 Sahid Hasyim, Sales Manager www.liebherr.com Mining Excavator And Trucks Supplier Linda Jaya Mandiri PT Kompleks Ruko Balkpapan Baru Fantasi Junction Blok FJ 3 No. 12A‐15 Balikpapan 76114 Indonesia +62 542 720 4467 Jeffrey Alexander, Director www.lindajayamandiri.net Mining Supply And Services (Bridgestone, Trelleborg, Flexco, Etc) Linindo Paciic International PT Gold Coast Blok A No. 01‐02 Jl. Pantai Indah Kapuk Boulevard Jakarta Utara 144470 Indonesia +62 21 2903 2900 Marketing Department www.linindopaciic.com Supplier Auto Electrical Machines Madhani Talatah Nusantara, PT Talavera Ofice Park 12th Floor Jl Letjen TB Simatupang Kav 22‐26 Cilandak Barat, Jakarta Selatan 12430 Indonesia +62 21 7592 4414 Sukemi Widodo, Business Development Manager Mining Contractors Martin Supra Engineering PT Pergudangan Bandara Mas Blok A8 No.7 Tangerang 15127 Banten, Indonesia +6221 5591 2842 Diky Trisna, General Manager www.martin‐eng.com Belt Cleaning Solutions, Transfer Point Solutions, Flow Aid Solutions, Dust Management Solutions Maxi Utama Energy PT Royal Gading Square RG 10 No. 18‐B Jl. Pegangsaan Dua, Kelapa Gading Jakarta 14260 Indonesia +62 21 4587 2239 Sandy Wuinanto, Director www.maxideutz.com Peter Forrest, GM & Director www.maxidrill.net Drilling Services (Pumping Units, Compressor/ Booster Packs) Cindy, Marketing Executive www.halysafe.com Scaffolding & Accessories MBE CMT Indonesia PT Plaza Mutiara 17th. Floor Suite 1702 Jl. Lingkar Mega Kuningan Kav East 1.2‚Äâ/‚Äâ1 and 2 Jakarta Selatan 12950‚ÄâIndonesia +62 21 5785 2301 Mitrabahtera Sejati Tbk PT Menara Karya Building 12th Floor Jl. H.R. Rasuna Said Blok X‐5 Kav. 1 ‚Äì 2 Kuningan Jakarta 12950 Indonesia +6221 57944755 Abihuda Hidajat, Sales Manager www.mbe‐cmt.com Coal And Mineral Processing Equipment Ong Saibun, Marketing Manager www.mbss.co.id Shipping Services, Logistics Services McElhanney Indonesia PT Jl. Pejaten Barat II No. 20 Unit A Jakarta Selatan, 12510, Indonesia +62 21 7179 3137 MMD Asia Paciic Ltd Menara Prima 27th Floor Suite D Jl. Lingkar Mega Kuningan Blok 6.2 Jakarta 12950 Indonesia +62 21 5794 8088 M. Nurjatmiko, Marketing Manager www.mcelhanney.com Surveing, Engineering, And Mapping/Remote Sensing Services Sandyanto Karambe , Regional Sales Manager www.mmdsizers.com Mmd Sizers, Heavy Duty Apron Plate Feeder, And Sizer Station Miang Besar Coal Terminal PT Ventura Building 5th Floor Suite 503 Jl. R. A. Kartini No. 26 Cilandak Barat Jakarta Selatan 12430 Indonesia +62 21 765 2544 MMU Bukit Rejeki PT Jln.Kalasan II No 9 Komplek New Pharmindo Bandung +62 22 606 1147 Jim Dracopoulos, Advisor www.mbct.co.id Coal Barge Unloading, Stockpiling, Blending And Ship‐Loading Services Moedjiarto, Managing Diredtor www.mmubukitrejeki.com Drilling And Blasting, Driling Rental, Labour Sup‐ ply, Geoelectric Research Micromine, PT Wisma Pondok Indah 2, 12th Floor Suite 1202 Jl. Sultan Iskandar Muda Kav. V‐TA Pondok Indah Jakarta, Indonesia 12310 +6221 7590 5333 Mobilis Hausen Jl. Bulevar Gajah Mada No. 2087 Lippo Karawaci, Tangerang, Indonesia +62 21 558 2427 Evelina Saitri, Marketing Executive www.micromine.com Provider Software For Mining, Consulting Septiana Indrawati, Marketing www.mobilishausen.malljb.com Building Contractor (Temporary Housing For Worker, Camp) MINELOG SERVICES INDONESIA Nuansa Asri Cipadu blok A. No .3, Jl. KH. Wahid Hasyim no. 54 Pondok Aren Tangerang , 15222 Indonesia +6221 7345 6908 Modular Mining Indonesia PT Jl.Jendral Sudirman Rt 49 No. 96 Balikpa‐ pan, Kalimatan Timur Indonesia 76114 Indonesia +62 542 7213 975 Aditya, Drilling Supervisor www.minelog‐services.com Exploration Services, Mine Technical Services, Mining Exploration Management Services, Min‐ ing Contractor Services Wesly Grace, Marketing Manager www.mmsi.com Mining Equipment Management Systems Devel‐ opment, Manufactures, Markets, And Services Minspec Indonesia PT Complex ITC Malibu B/12, Bumi Serpong Damai Serpong Tangerang Indonesia +62 21 5384 978 Motorola Solutions Indonesia PT BRI II Building, Suite 1001 Jalan. Jend. Sudirman Kav. 44 ‐ 46 Jakarta 10210, Indonesia (62‐21) 3043 5200 Asrul Azis, Business Development Manager www.minspec‐id.com Raw Material Handling Systems, Conveying; Crs‐ Chiat Peng, Marketing www.motorola.com Comunication, Two Ways Radio April 2013 l Coal Age Indonesia l 29 Indonesian Buyers Guide MTU Detroit Diesel Indonesia PT Cilandak Commercial Estate Building 109 Jl. Cilandak KKO Jakarta 12560 Indonesia +6221 789 1410 Kusuma Wardani www.mtu‐online.com Mtu & Diesel Products & Parts Authorized Dis‐ tributor, After Sales Services Multi Nitrotama Kimia PT Equity Tower 40th loor suite E, Jl. Jend Sudirman kav.52‐53 Jakarta Selatan 12190 Indonesia +6221 2903 5022 Ronny Saefullah, Corporate Affairs & Legal Manager www.mnk.co.id Amonium Nitrate, Technical Services, Blasting Services ODG Wormald Indonesia PT Jl. Letjen TB Simatupang No. 150B Tanjung Barat, Jagakarsa Jakarta 12530, Indonesia +6221 780 1353 William E. Bradshaw, President Director www.ptodg.com Electrical, Mechanical And Fire Services Orica Mining Services PT Sentral Senayan I, 4th Floor , Jl. Asia Afrika No. 8, Jakarta 10270 Indonesia +62 21 572 3070 Anita Carolina, Marketing www.orica.com Mining Services,Mining Chemicals, General Chemicals, Ground Support Pam Automobilindo PT Jl. Batu Jajar No. 37 Jakarta 10120,Indonesia +6221 345 3888 Multi Prima Universal PT Jl Raya Bekasi Km 22 Jakarta 13910, Indonesia +62 21 4600 606 David Setiadi, Marketing Department www.ptpam.com Shacman Heavy Duty Truks Single Dealer Bambang Tjahyono, Director of Rental & Used Department www.mpu.co.id Rental, Used Heavy Equipment, And Mining Con‐ tracting Pamapersada Nusantara PT Jl. Rawagelam 1 No.9 Jakarta Industrial Estate Pulo Gadung, Jakarta 13930 Indonesia +6221 460 2015 New Resource Mine Consulting PT (NRM) Pondok Indah Ofice Tower 3 Suite 2502 25th Floor Jl. Sultan Iskandar Muda Kav. V‐TA Jakarta Selatan 12310 Indonesia +62 21 2932 7967 Bill Park www.nrm‐consulting.com Geology, Mine Planning, Independent Technical Review And Jorc Resource And Reserve Report‐ ing, Mine Infrastructure, Mine Operations, Mining Economics, Mining Computer Software. NUSA KONSTRUKSI ENJINIRING PT Jalan Sunan Kalijaga No. 64 Jakarta 12160, Indonesia +6221 722 1003 Marketing Department www.nusakonstruksi.com Constructing Mining Infrastructure And Mining Contracting Astraditya Bastar, Business Development Division www.pamapersada.com Mining Contractors Pandu Selamat Utama PT Jl. Lebak Bulus Raya I No. 28 Jakarta Selatan 12440 Indonesia +6221 766 6063 www.pandusafety.com Rental Equipment, Training Safety, Calibration, Gas Detector Pertamina Transkontinental, PT Jl. Kramat Raya No. 29 Jakarta Pusat 10450 +6221 3192 3005 www.ptk‐shipping.com Ships Charter And Broker Petrosea, PT Wisma Anugraha Jl. Taman Kemang No. 32B Kemang Jakarta Selatan 12730, Indonesia +6221 718 3255 David Timbong, Corporate Communication www.petrosea.com Infrastructure Construction: Roads, Tailing Dams,Technical Services: Mine Planning, Mine Optimization, Hard Rock Mining Primacom Interbuana, PT International Financial Centre,16th loor Jl. Jendral Sudirman Kav. 22‐23 Jakarta Selatan 12920 +6221 5224720 Dian Mustika DP, Marketing Communication www.primacom.com Satellite Communication System Provider Probesco Disatama, PT KEM Tower 15th Floor Jl. Landasan Pacu Barat Blok B10 Kav.2 Kemayoran Central Jakarta, 10610 +6221 6570 4111 Aryo Prahmanto, Product Manager www.probesco.com Heavy Equipment Repair & Maintenance, Zf Service Center, Hydraulic Hose Assembling, Parts Support Rahman Abdijaya, PT Menara FIF, 2nd Floor, Suite 202‐203 Jl. Letjen TB. Simatupang Kav.15 Lebak Bulus ‚Äì Cilandak Jakarta Selatan 12440, Indonesia +6221 2904 0699 www.rajaya.co.id Mining & Earth Moving Services Rekayasa Industri PT Jl. Kalibata Timur I No. 36 Kalibata Jakarta 12740, Indonesia +6221 7988 700 www.rekayasa.com Coal Fired Power Plant Reksa Mahadaya Engineering, PT Gedung Pesona, Suite 305 Jl. Ciputat Raya No. 20, Tanah Kusir, Kebayoran Lama Utara, Jakarta Selatan, Indonesia 12240 +6221 729 0310 Muhammad Satrio, Business Development Manager www.reksame.co.id Reline Tools, Hydraulic Water Tower Tank, Water Treatment System Resindo PT Menara 165 Ofice Tower, 11 Floor Jl. TB Simatupang Kav. 1 Cilandak Timur Jakarta Selatan 12560 Indonesia +6221 2940 6555 Simon Birch, Director www.resindori.com Consulting And Implementation For Resources Development, Mining & Power Generation 30 l Coal Age Indonesia l April 2013 Indonesian Buyers Guide Ritma Group PT Jl. Karang Anyar Raya No 15C Jakarta, 10740 ‐ Indonesia +6221 625 3887 www.ritma.co.id Filter, Battery, And Diesel Engine Spare Parts Supplier +6221 29976830 +62 21 7818 111 Anggita Pradipta www.ptssb.co.id Fabrication Division, Site Services Division, Remanufacturing Division,Transport Equipment Division www.sgs.co.id Analytical Services, Exploration Services, Metallurgy And Process Design. Rulmeca Indonesia PT Rukan Mutiara Taman Palem B5 No.15 Cengkareng Jakarta Barat 11730 Indonesia +62 21 5435 5608 Saptaindra Sejati, PT Gedung Graha Saptaindra JL. T.B. Simatupang KAV.18 Cilandak Barat, Jakarta 12430 +6221 769 3378 Eddy Martono, Area Sales Manager www.rulmeca.com Rollers And Stations, Motorized Pulleys, Compo‐ nents: Cover And Cleaner, Pulleys Nenden Maryam, Customer and Contract Development Manager www.saptaindra.co.id Mining Contractors Rutraindo Perkasa, PT Komplek Cendrawasih, Jl. P. Jayakarta No.141 Blok III/F16 Jakarta 10730, Indonesia +6221 600 8889 Sarana Teknik PT / Petro Teknik Persada PT Kompleks Perkantoran Sunter Permai Blok B.11, Jl. Danau Sunter Utara Kav. K‐2, Sunter Agung Jakarta 14350 Indonesia +62 21 651 9582 Familia, Marketing www.rutraindo.com Road Construction Equipment Importer Salva Resources PT Cilandak Commercial Estate The Garden Centre 3rd Floor Unit 18 Jl. Cilandak KKO Raya Jakarta 12560 Indonesia +62 21 789 0269 Agung Wibowo, Business Development Manager www.salvaresources.com Mining Consultant, Coal Markerting Services, Espm Services, And Exploration Management Sampulu Sada Mandiri, PT Rukan Kirana Cawang, Jakarta Timur +6281 25496354 Bambang http://ssm‐group.com/demo/ Mining Engineering, Geological Engineering, Geodetic Engineering Samson Tiara, PT Cilandak Commercial Estate The Garden Center #6‐03 Jl. Raya Cilandak KKO Jakarta 12560 Indonesia +6221 780 1388 Indra www.sarana‐teknik.com Mechanical Power Transmission & Electrical Motor Products Distributor www.siemens.com Mine Winder, Enviromental Care, Power Solu‐ tions, Service And Maintenance. Simpson Spence & Young Indonesia PT Menara Anugrah, Kantor Taman E3.3 21st Floor Jl. DR Ide Anak Agung Gde Agung Lot 8.6‐8.7 Jakarta 12950 Indonesia +62 21 5794 2330 Michael Drachmann, Managing Director www.ssyonline.com Dry Cargo Chartering Sitech Indonesia PT Gedung TMT 2, Suite GF‐01 JL.Cilandak KKO No.1 Jakarta 12560, Indonesia +6221 2997‐6896 Satnetcom, PT Jl, Ruhui Rahayu I RT 75 #3, Balikpapan, Kalmantan Timur 76114 Indonesia +62 542 875 570 Yolanda Sondak, Sales Engineer www.sitech‐id.com Trimble Heavy Civil Construction Distributor Juli Turangga, National Sales www.satnetcom.com It & Communications Product And Services SMG Consultant PT Sudirman Plaza, Indofood Tower, Suite 703. Jl. Jend. Sudirman Kav. 76‐78. Jakarta Selatan 12910 Indonesia +62 21 5793 5968 Schenker petrolog utama, PT Wisma Raharja 5th Floor, Jl. TB simatupang kav 1 12560 Jakarta Indonesia +6221 7884 3788 Moritz Zimmermann, Head of Sales / KAM www.dbschenker.co.id Freight Forwading, Logistics Schneider Electric PT Ventura Building 7th Floor Jl. R.A. Kartini Kav.26 Cilandak, Jakarta 12430 +6221 8970 203 Herdian Mohammad, Business Development Manager www.samson‐tiara.co.id Safety Training And Products Mahanani Octaviapasma www.schneider‐electric.co.id Mining Extraction And Beneiciation, Proccess Control Solution For Mineral Processing, Au‐ tomation Solutions For Material Handling, Sandvik Mining & Construction, PT Mugi Griya Building 3rd Fl. Jl. Mt. Haryono Kav 10 Jakarta 12810 Indonesia +6221 8370 8474 Selamat Sempurna Tbk. PT Wisma ADR Jl. Pluit Raya I No. 1 Jakarta 14440 Indonesia +62 21 661 0033 Teguh Kurniawan, Salas & Marketing www.sandvik.com Mining Equipment And Tools : Breakers And Demolition Tool, Drill Rigs And Rock Drill, Load And Haul Equipment, Mine Automation System David Setiadi, Marketing Assistant Section Head www.adr‐group.com Manufacturer Of Filter And Radiator For Auto‐ motive & Heavy Duty Appilacations Sanggar Sarana Baja, PT TMT Building, 5th Floor, Suite 501, Jl. Cilandak KKO No.1, Jakarta 12560 Siemens Indonesia PT Arkadia Ofice Park Tower F, Level 18 Jl. T.B. Simatupang Kav. 88 Jakarta 12520 Indonesia +62 21 2754 3000 SGS Indonesia PT Cilandak Commercial Estate #108 C Jl Raya Cilandak KKO Jakarta Selatan, 12560 Indonesia Alistair Mcdonald, Business Development Manager www.smgc.co.id Geogolical And Mine Consulting STX Corporation PT Plaza Bapindo, Menara Mandiri 23 loor Jl. Jend. Sudirman Kav. 54‐55 Jakarta,Indonesia +62 21 527 8088 Alzairi Novtika, Trading & Marketing Manager www.stx.co.kr Shipbuilding And Machinery, Shipping And Trading, Plant And Engineering, And Energy Sucoindo PT Graha SUCOFINDO Jalan Raya Pasar Minggu Kav.34 Jakarta Selatan 12780 Indonesia +6221 7983 666 www.sucoindo.co.id Consulltation For Coal And Mineral Mining Re‐ serve Calculation, Inspectioan For Coal Products, Consultation For Mineral Processing And Metal‐ lurgy Testing Sumberdaya Sewatama PT TMT 2 Building, Floor 1 & 2, Jl. Cilandak KKO No. 1 Jakarta 12560 Indonesia +6221 2997 6712 Mila Kamala Putri, Marketing Customer Relation April 2013 l Coal Age Indonesia l 31 Indonesian Buyers Guide www.sewatama.com Standby Power, Prime Power, Peak Shaving, Temporary Power, Quarries Timken Singapore Pty Ltd Ariobimo Sentral 4th Floor Jl. HR. Rasuna Said Blok X‐2 Kav. 5 +6221 2525 751 Suprabakti Mandiri PT Jl. Danau Sunter Utara Blok A No. 9 Sunter Jakarta Utara 14350 Indonesia +6221 6583 3666 Mario Herlambang www.timken.com Bearings, Lubricants And Lubricating Systems, Alloy And Steel Components, And Services www.beltcare.com Conveyor, Surface Protection, Power Transmis‐ sion, Flow Aids And Services Surveyor Carbon Consulting Indonesia PT Menara Bidakara 2, Lantai 3 Unit 03 A Jl. Jend. Gatot Subroto Kav. 71‐73 Jakarta 12870 +6221 2906 9423 www.scci.co.id Quality Analysis,Quality Management, Quality & Quantity Witnessing, Quality & Quantity Superintending, Stockpile Management, Consulting Services Surveyor Indonesia PT Graha Surveyor Indonesia, Jl. Gatot Subroto Kav. 56 Jakarta 12950 ‐ Indonesia +6221 526 5526 Givrey Panggabean, Senior Manager www.ptsi.co.id Inspection, Surveyor, Consulting Swadaya Traktor Adiperkasa PT Gading Bukit Indah Blok A No. 12‐15 Kelapa Gading, Jakarta Utara, Indonesia +6221 4513 625 Lia Apriliani, Marketing www.swadayagroup.com Heavy Equipmenta; Excavator, Wheel Loader Distributor And Services Support TATA BARA UTAMA, PT Graha Inti Fauzi Building Lantai 4. Jl. Buncit Raya No. 22 Jakarta Selatan, 12510 Indonesia +6221‐7918830 www.tatabarautama.co.id Mining Services, Drilling Exploration, Geology And Topographjy Mapping Totalindo Mandiri PT Jl. MT. Haryono RT. 60, No. 09 Balikpapan 76114 East Kalimantan, Indonesia +62 542 887 9087 Andy, Part Sales www.totalindo‐mandiri.com Heavyequipment Parts & Hydraulic Hose Assembly Trada Maritime PT Trada Building Jln Kyai Maja No 4 Kebayoran Baru, Jakarta 12120 Indonesia +62 21 7278 6844 www.trada.co.id Dry Bulk Transportation Services And Coal Trading Trakindo Utama PT Gedung TMT 1 Jl. Cilandak KKO No. 1 Jl. Raya Cilandak KKO Jakarta 12560 Indonesia +6221 782 2373 www.trakindo.co.id Supplier Machine & Equipment, Authorized Caterpilar Transkon Jaya PT Jl. Mulawarman No. 21 RT. 023 Manggar, Balikpapan 76116, Indonesia +62 542 770 401 Rizal Amdani www.transkon.com 4X4 Vehicle Rentals, Servicing, "On Site" Workshops And Parts Supply Trelleborg Engineered Systems Australia Pte Ltd Ruko Fantasy Junction FJ3 No. 8 Balikpapan Baru, Balikpapan Kalimantan Timur 76114 +62 542 7212 470 Terra Facor Indonesia PT Jl. Pangeran Jayakarta 115, Blok C 1‐3 Jakarta 10730, Indonesia +62 21 639 3538 Okky M. Yasin , Regional Manager‐Indonesia www.trelleborg.com.au Material Handling Parts And Protection Martha Purba, Marketing www.terrafactor.com Heavy Equipment Rental Solution Tri Difta Utama PT Fortune Building 3rd Fl Jl.Raya Mampang Prapatan No.96 Jakarta Selatan 12790, Indonesia +62 21 7901 144 Thiess Contractors Indonesia PT Ratu Prabu 2 Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia +62 21 2754 9999 www.thiess.co.id Mining Services, Mine Planning, Mine Management 32 l Coal Age Indonesia l April 2013 M. Hatta, Business Development www.tridiftautama.co.id Lubricating Equipment, Replacement Part For Commercial Equipment Ultratrex Indonesia PT Perkantoran Plaza Pasiik Blok A4/96 Jl. Boulevard Raya Barat, Kelapa Gading, Jakarta 14240 Indonesia +62 21 4587 8800 Irham Maghfuri, Business Development www.ultratrex.co.id Amphibious Undercarriage, Long Reach Arm For Hydraulic Excavator; Bulk Handling Equipment; Excavator Attachments Designing And Manufacturing United Tractors Pandu Engineering PT Jl. Jababeka XI Blok H 30 ‚Äì 40 Kawasan Industri Jababeka Cikarang 17530 Indonesia +62 21 893 5016 www.patria.in Komatsu Support Product, Steel Fabrication: Dump Vessel, Medium And Big Bucket Attachments United Tractors PT Jl. Raya Bekasi Km 22,Cakung Jakarta Timur 13910 Indonesia +6221 2457 9999 Rendy, Promotion www.unitedtractors.com Mining Contracting, Services, And Construction Machinery Verdanco Indonesia PT Komplek Cempaka Mas Blok C No.23‐24 Jl. Letjen Suprapto Jakarta Pusat 10640 Indonesia +62 21 4287 0310 Prisca Sulaiman, Marketing Communication www.verdanco.com Tire, Lighting Tower, Diesel Generator, Brake Pad, Pump WEIR Minerals Multilo PT JL. Mulawarman No 29A RT 003 Batakan Kecil, Balikpapan 76116 ‐ East Kalimantan, Indonesia +62 542 746 098 Darren Nelson, Marketing Manager www.weirminerals.com Coal And Mineral Processing Equipment: Slurry Pumps, Valves, Cyclone, Mill Liners, And Belt Transmission Supplier News Jamieson Group memperluas Jakarta office extends Jamieson Group outreach jangkauan dengan peresmian GLOBAL business consultancy Jamieson Group has opened a new office in Jakarta headed up by the group’s vice president - operational support and analysis, Marty McKowen. Jamieson Group is a leading global provider of performance improvement and transformation solutions within the resource industry. Founded by David Jamieson 17 years ago, the company’s head office is in Australia. Jamieson Group has a team of experienced consultants across all corners of the globe to provide innovative, hands-on, practical consulting. The group boasts a successful track record in assisting clients with productivity improvement, business process engineering, project management, and attitudinal and behavioural change through coaching and training. Notable highlights for the Jamieson Group include a 23% increase in mine output for an open cut mine, a greater than 30% increase in coal production for a contract mining client and a reduction in gold production costs of 10% for another client. Marty McKowen brings to the role 16 years in consulting and around 13 years in Indonesia. Previous management roles have been with Leighton Contractors Indonesia and with Barrick Gold Corporation. He has shown an emphasis on achieving successful outcomes by ensuring that the people have the right systems and skills to be able to do their job. Marty McKowen says, “Jamieson provides a range of support to the industry. At the moment we are providing supervisor training and coaching to a major mining company and we are also in conversations with two concession owners in Indonesia and Malaysia to provide the project management support to develop and run their mines. “I’m looking forward to reinforcing our commitment to Indonesia by establishing a local base camp. We aim to partner with the growing mining industry and share our expertise, with the ability to offer Indonesian specific approaches in terms of training and coaching with an end result of improving viability and maximizing value for all clients and their stakeholders,” he says. The group opened a preliminary office in Jakarta in 2000 with all activity streamlined via the head office during the global financial crisis under the shelter of Australia’s strong economy. “Due to our organization’s continued growth, in particular strong industry partnerships and demand within Indonesia, the time is right to re-establish our local presence,” says Marty McKowen. kantor baru di Jakarta KONSULTAN Bisnis Internasional, Jamieson Group. Telah Meresmikan kantor baru di jakarta yang akan dipimpin oleh Marty McKowen - wakil Presiden Jamieson Group - Bagian Operasional dan Analisis. Jamieson Group adalah penyedia konsultasi peningkatan operasional kerja dan solusi transformasi di industri pertambangan yang terkemuka di dunia. Didirikan oleh David Jamieson 17 tahun yang lalu, dan berbasis Pusat di Australia, Jamieson group memiliki tim konsultan yang berpengalaman di seluruh penjuru dunia yang menyediakan Konsultasi praktis dan inovatif. Jamieson Group telah mencetak pengalaman yang sukses dalam membantu kliennya meningkatan produktivitas tambang, Pengolahan teknis, Manajemen proyek dan juga perubahan sikap dan perilaku melalui pembinaan dan pelatihan. Salah satu Kesuksesan Jamieson Group adalah menghasilkan 23 persen kenaikan output di proyek open cut mining, 30 persen lebih peningkatan produksi batubara dan juga penurunan biaya produksi emas sebesar 10 persen untuk beberapa klien di industri pertambangan. Marty McKowen mempunyai 16 tahun pengalaman di bidang konsultasi, dan menggunakan pengalamannya sekitar 13 tahun di indonesia. Sebelum menjabat di Jamieson Group, Marty McKowen sebelumnya pernah bergabung bersama PT Leighton Contractors Indonesia dan Barrick Gold Corporation. Marty menunjukan untuk mencapai suatu hasil yang sukses, sumber daya manusia harus dipastikan memiliki sistem yang tepat dan keterampilan untuk dapat melakukan pekerjaan mereka. Marty mengatakan, "Jamieson Group menyediakan berbagai macam pelatihan bagi industri pertambangan, saat ini kami menyediakan pelatihan dan pembinaan Supervisor untuk beberapa perusahaan tambang dan juga dalam proses pembicaraan dengan dua pemilik konsesi di indonesia dan malaysia untuk memberikan pelatihan Manajemen dalam mengembangkan dan melakukan produksi tambang tersebut. Ditambahkan Marty “pembukaan kantor di jakarta ini adalah wujud dari komitmen Jamieson Group untuk Indonesia, Dengan Tujuan untuk memberikan keahlian di industri pertambangan di indonesia khususnya dalam hal pelatihan dan pembinaan yang diharapkan hasil akhirnya akan menciptakan kepuasan bagi klien dan nilai terbaik bagi para stakeholder. Jamieson Group sudah hadir di Jakarta sejak awal tahun 2000, selama krisis keuangan global di bawah naungan kuat ekonomi Australia, semua aktivitas dilakukan melalui kantor pusat di australia. "seiring kokohnya kerjasama di industry pertambangan dan kuatnya permintaan di Indonesia, Saat ini adalah waktu yang tepat untuk membangun kembali kehadiran kami di indonesia," ujar Marty. Weir Minerals are there, every step of the way WEIR Minerals are specialists in delivering and supporting mill circuit solutions including pumps, hydrocyclones, valves, hose, screens and screen media, cone crushers, rubber, wear resistant linings, mill systems and mine dewatering solutions for global mining and mineral processing and general industry. Weir’s product strength lies in the excellence of its hydraulic designs and wear, corrosion and abrasion resistant materials. In slurry pumping, processing and control applications where the cost of ownership often outweighs capital cost as a priority, Weir helps its customers address such issues as longevity, capacity, efficiency of operation, and maintenance. With more than 500 expert staff in more than 20 locations in the Asia Pacific region, including Balikpapan, Indonesia, Weir is there for you and your operation, every step of the way. An example from mine dewatering specialist Weir Minerals Multiflo (WMM) is the Hydrau-Flo valve system. Manufactured in Australia and in use since 1997, Hydrau-Flo fuel filling valves are used globally by many of the biggest names in construction and mining. The patented Hydrau-Flo system is based on a sound mechanical principle – springopposed hydraulic pressure that delivers a clean, fast and safe solution to organizations that transfer liquid as part of their operation. WMM says Hydrau-Flo valves achieve extremely fast refuelling times by delivering up to 1000 litres per minute into alloy, plastic or steel fuel tanks and where the operation is already utilizing fast fill, the Hydrau-Flo system maintains tank integrity by ensuring the tank is not pressurized during or following the refuelling process. With Hydrau-Flo safety valves, the risk of overfilling, spillage and diesel tank rupture is a thing of the past; so too risks associated with environmental hazards and operator safety. These improvements have been achieved without the need for electronics or complex arrangements prone to blockage and failure. The Hydrau-Flo system incorporates robust fuel filler safety and float control valves that provide a reliable, hydraulicallyoperated arrangement that depends on fluid levels as opposed to pressure. April 2013 l Coal Age Indonesia l 33 Supplier News PT Atlas Copco Nusantara in partnership for KPC THE Kaltim Prima Coal (KPC) mine at metres below sea level. Marradian Dwi is Sangatta is an 11-pit operation - so large that drill and blast manager for Thiess’ mining it takes an hour just to travel from one side operations and says two pits can be totally of the property to the other. To meet the different with up to 8 layers of coal in 5 to monthly production goal of 3.3 million 30 metre seams at varying depths with 40 to tonnes, KPC contracted the drilling services 70 metres of overburden between layers. of Pama and Thiess. PT Atlas Copco One pit has a flat layer of coal 10 metres Nusantara’s satellite branch at Sangatta is a thick with the bottom lying 120 metres complete partner with all three operating below sea level. companies, offering drill rig support and a Due to the formation variations there is no variety of service-related items. perfect bit but they’ve found the Atlas The Sangatta service branch is like an ant Copco Secoroc EH42CAH 7 ⅞-inch bit and hill of activity. Although 90% of its work is Teamalloy 6.25 drill pipe to be the best for done outside the shop, service vehicles and the formation overall. They average 8000 to people move in and out of the property in a 11,000 metres per bit. Because Thiess is continuous flow. Service operations are paid by tonnage of overburden, it’s necesactive 24 hours a day, 7 days a week and 365 sary to have their operational equipment all days a year, with 75 people manning the the time. office, customer shops, pits or the many fuel “We expect 98% utilization from our drill depots and transfer locations. rigs,” says Marradian Dwi. Their need for The branch provides fire suppression sysdependable equipment brought them to PT tem installation, hose and fittings, lubrication Atlas Copco Nusantara. In total they operate systems and consumable parts. It also services seven drills. They use Atlas Copco’s DM45 and supports what could be seen as the largest SP and DML SP drill rigs for most drilling, fuel management system in the world. but they also have a multi-pass DM45. Each At KPC’s Sangatta mine 280 million drill averages 80 metres per hour, and each tonnes of overburden and 40 million tonnes is expected to drill 50,000 metres per month. of coal are shifted annually, and that requires Marradian Dwi says, “For me, our decia very large fleet. Atlas Copco’s technical sion to use Atlas Copco comes down to less advisor Raymond Daniels says, “Every big maintenance required and greater availabilitruck brand and large digger you can think Thiess Indonesia Sangatta’s Drill and Blast Manager ty. That means greater operational availabilof is operating at KPC.” Marradian Dwi shows the sticky overburden mine ity and greater parts availability.” As they KPC operates 30 of the largest diggers that can cause complications with hole flushing. move forward he said he would also like to made. For digger efficiency and to support utilize more training services. “My drillers PT Atlas Copco Nusantara’s responsibility know how to drill but I want to make them betthe optimal 12-metre bench height, 300-ton trucks are the most efficient, and there are more doesn’t end with fuel systems. It’s also charged ter and standardize best practices.” than 500 in operation. Add the truck fleets and with the installation and maintenance of auto Collaboration is proving the key to success at there are 800 trucks operating at KPC Sangatta lubrication, fire suppression systems and over- Sangatta. By customizing its service offerings Mine. Combined, the vehicles consume more all fluid maintenance onsite. to fit the needs of all operating companies, PT Each pit presents variations in formation with Atlas Copco Nusantara is demonstrating how it than a million litres of fuel a week. Atlas Copco, an authorized Banlaw dealer, manages the depths ranging from 40 to 70 metres of overbur- can be part of the large-scale operation’s winden over the coal seam not lower than 120 ning strategy. sophisticated electronic fuel tracking system. Jess Kindler new director for PT Atlas Copco Nusantara JESS Kindler has accepted the position of director for PT Atlas Copco Nusantara. Since June 2010, he worked as business line manager for the company’s Mining and Rock Excavation Service division in the United States. He originally joined Atlas Copco in 2005 as product line manager for Atlas Copco Drilling Solutions and in 2007 became Intermountain regional manager. Jess Kindler graduated with highest honours and earned a Bachelor of Science degree in mining engineering from the Colorado School of Mines in the US in 1998. He served as a Captain in the US Army Corps of Engineers until 2002, completing both Ranger and Airborne training. He then joined Ingersoll-Rand as worldwide service manager for Drilling Solutions and later ran the DM30/DM45/DML manufacturing workshop. He worked at two underground mines as an engineer and supervisor for UNOCAL and Vulcan Materials, and in 2012 earned an MBA degree from The Wharton School, where he achieved the class leadership award. “Jess’s track record of successful business development and as a leader gives him a very good platform for this new assignment,” says Mining and Rock Excavation Service division president Andreas Malmberg. PT Atlas Copco Nusantara’s Jess Kindler. April 2013 l Coal Age Indonesia l 35 Product News Fluid couplings avoid AFC downtime THE Jin Cheng Coal Group, one of the biggest coal groups in China, found a way to avoid unexpected downtimes of the AFCs (armored face conveyor) and to raise the productivity of the Chang Ping Coal Mine. In the past, the underground mine was facing a lot of problems because of their AFC drives equipped with two two-speed motors but then the head of Jin Cheng decided to replace the two-speed motors with Voith Fluid Couplings (type 562 DTPKWL2), in order to prevent chain breaks as well as gearbox and motor break downs in the future. The couplings provide a lot of benefits for AFC drives. “Based on the hydrodynamic principle, the fluid couplings protect the whole drive train from overload situations, which often happen at Chang Ping Coal Mine”, head of the Mechanical and Electrical Department of Chang Ping Coal Mine, Mao Weihong says. “The 562 DTPKWL2-1000 couplings are so powerful that they can easily handle blockages of the AFC without downtime or damage of the equipment.” Mao Weihong says he is very satisfied with the exchange of the equipment. Furthermore, he compliments the reliability of the couplings and especially their soft start function. “For upcoming mining projects, we will also rely on Voith Fluid Couplings to raise our productivity.” Since installation of the couplings in 2009, the AFC experienced no chain breaks, which also means significantly reduced maintenance efforts. Nowadays, the 225 metre wide and 1000 metre long coal panels produce an annual output of 3 million tonnes in the Chang Ping mine and the situation of the coal mine has, Fluid couplings enable less downtimes and increased productivity at the AFC. therefore, greatly improved. Located near Jin Cheng City, Chang Ping Coal Mine employs more than 6000 people and produces 6 million tonnes of coal each year. Voith Turbo, the specialist for hydrodynamic drive, coupling and braking systems for road, rail and industrial applications, as well as for ship propulsion systems, is a group division of Voith GmbH. Voith sets standards in the markets of energy, oil & gas, paper, raw materials and transportation & automotive. Founded in 1867, Voith employs more than 42,000 people, generates 5.7 billion Euro in sales, operates in more than 50 countries around the world and is today one of the biggest family-owned companies in Europe. Whittle implements new Prober C software WHITTLE Consulting, which provides strategic planning services for mining companies, has announced a significant upgrade to its inhouse Prober software. The company says that the new software can increase mining NPV by 5% to 35%, or substantially more. After more than 3 years of development, prototyping and testing, Whittle says Prober C enables intricate modelling of multiple steps in the mining value chain, bringing technologies such as mine-to-mill, selective blasting, ore sorting, and complex comminution strategies into the strategic planning process. “New technologies in ore characterization and extraction processes enable substantial economic and energy saving opportunities,” explains Whittle Consulting CEO Gerald Whittle. “Developments in these areas, led by our alliance partner JKTech, have clear operational benefits, and now we can harness their strategic significance by re-optimizing the pits/phases or underground mines, mining methods, life-of36 l Coal Age Indonesia l April 2013 mine schedules, cut-off grade and stockpiling strategies, processing policies, product strategies, logistics and capital scaling decisions to apply these technologies in an integrated fashion. This will compound economic performance and capital efficiency to new levels,” Gerald Whittle says. For the last decade, Whittle Consulting has helped mining companies substantially improve the cash flow profiles of their mining projects and operations through an integrated approach ‘Enterprise Optimization’. In many cases net cash flow is doubled in the first 3 to 5 years, usually with little or no capital expenditure involved. As the trends continue towards lower grade and problematic ore bodies, escalating costs, scarce capital and diminishing margins, it says the Enterprise Optimization capability will help progressive mining companies lead the way in terms of competitiveness and sustainability. Enterprise Optimization, often nicknamed the ‘Money Mining’ approach, is underpinned by Prober software developed by Jeff Whittle, founder of the Whittle business and the developer of the original Whittle Pit Optimization software that has become the industry standard for mine planning over the last three decades. Jeff Whittle, now 83-years-old, explains, “We have been using the previous version Prober B for more than a decade. It allows for three steps in the value chain: mining, processing and production, although with some clever but convoluted modelling more could be accommodated. “The new Prober C supports unlimited sequential or parallel procedures, making more detailed yet more intuitive modelling of complex mining and processing technologies possible. This is then simultaneously optimized to maximize the value of the business,” he adds. Whittle Consulting works with alliance partners Ausenco, Gemcom/Geovia, JKTech, Xstract, VBKom, MineQuest and Edison Research to deliver the Enterprise Optimization services worldwide. Product News Cat develops MT5300D AC for 320-ton-capacity CATERPILLAR has developed the MT5300D AC 320-ton-capacity (290-tonne) mining truck as part of its ongoing investment in the Unit Rig products acquired through the acquisition of Bucyrus International. The new truck integrates a Cat C175-16 engine and Cat 360T AC electric drive system with the proven Unit Rig MT Series trucks. The MT5300D AC takes its place in Caterpillar’s large mining truck product line between the 250-ton-capacity (227-tonne) 793F and the 360-toncapacity (327-tonne) 795F AC. The new truck builds on Unit Rig’s 50 years of electric-drive mining truck experience and the thousands of units currently working in mines around the world. The strength of the Cat engine and drive system combine with Cat dealer support and Unit Rig designs to deliver high performance and efficiency to mining customers. The MT5300D will be commercially available in the near future. The MT5300D AC leverages Unit Rig’s millions of hours of field experience with the MT Series truck chassis, hydraulics, electrical system and suspension and integrates those systems with a proven Cat engine, AC drive and vehicle information management system. The Cat AC electric drive train is state-of-the-art, efficient and reliable, and has logged hundreds of thousands of hours in the lab and field, most notably in the 795F AC. The Cat electric drive truck program also leverages ElectroMotive Diesel’s (EMD) locomotive experience in design and manufacturing. EMD is a Caterpillar company, and the highly efficient system is Caterpillar designed, integrated and supported. The MT5300D AC is designed to offer strong performance, safety, ease of operation and maintenance, and superior reliability. The Cat C175-16 is proven in Cat large mining trucks, and the Cat AC drive system features industry-leading dynamic retarding capacity combined with fourcorner wet disc brakes. The system creates operator confidence that leads A Cat 7495 shovel loads a Unit Rig MT5300D at the Caterpillar proving grounds in Arizona, USA. to productive and safe operation. The gross machine weight is 505,755kg and the engine delivers 2750 or optional 3500 net horsepower (2050 or optional 2610 net kW). The ROPS cab, wide access stairways, traction control, and quiet radial retarder grid with wide right-side visibility enhance safety and further benefit the operator. Simple hydraulic systems, modular components, hydraulic gauge cabinet, grouped service locations, engine bay service walkways and more ground accessible maintenance points translate into less downtime and enhance safety for maintenance technicians. 3April 2013 l Coal Age Indonesia l 37 Product News Australian technology in coal energy milestone TECHNOLOGY developed by an Australian company is behind a major coal upgrading milestone announced for New Zealand’s coal energy sector. South Australian-based GTL Energy and New Zealand Government-owned Solid Energy New Zealand jointly announced they had achieved sustained production runs at New Zealand’s first commercial coal upgrading plant utilizing GTL Energy’s coal upgrading technology. The companies have signed an agreement for the formation of a joint venture company, GTLE Development Ltd, to focus on the operation of the plant, further project development and deployment of the technology globally. Solid Energy is commissioning its Mataura briquette plant in Southland, which will produce lignite briquettes for New Zealand’s South Island energy market using GTL Energy’s technology. The technology involves converting lowgrade coal into higher-rank fuel by the removal of moisture from the coal and converting it into briquettes which feature higher energy content, reduced emissions, improved handling and transportation characteristics and increased market value. Once fully commissioned, the Mataura plant will be operated by GTLE Development 38 l Coal Age Indonesia l April 2013 through a wholly-owned New Zealand subsidiary to annually produce up to 90,000 tonnes of low-moisture and higher-energy briquettes from about 150,000 tonnes of lignite. The joint-venture company will manage briquette production at the Mataura plant, trial the product in international thermal export coal markets and focus on developing and deploying the upgrading technology globally. Solid Energy will have a 20% stake in GTLE and will continue to own the Mataura plant. Feedstock for the plant will come from Solid Energy’s nearby New Vale Mine and will be transformed into a high energy product for the joint venture under a tolling arrangement which underpins continuous production. This product will support the domestic market development along with proof of technology for global deployment. Solid Energy will market the product to its South Island customers with trials due to begin shortly. Solid Energy and GTLE are in consultation with staff at the plant about transferring their employment to the GTLE New Zealand subsidiary. In addition to the Mataura plant and its United States commercial demonstration plant in North Dakota, GTLE has plant projects under various stages of development in Indonesia and Australia, and opportunities under review in the USA and Europe. Solid Energy’s group manager coal developments Brett Gamble says, “We have worked closely with GTL Energy over many years, and the opportunity to combine our collective expertise and assets to accelerate commercialization and deployment of the technology makes a lot of sense for both of us. We are excited about the future of this proposed venture and believe the transformation of low rank high moisture coal into higher energy briquettes has potential to create significant value.” GTL Energy’s CEO Fred Schulte, who will also be CEO of GTLE, says, “This deal will create a company with the ability to accelerate technology deployment. The achievement of continuous, safe and reliable production at the New Zealand plant will provide the demonstration that is expected to support more widespread adoption. We will now have a production facility, engineering and operating capabilities in a single organization. The new entity will be looking beyond a technology licensing business model and moving into project development, ownership and operations. Despite challenging coal and capital markets, we have exciting projects which make sense regardless of market timing, and we look forward to bringing these into fruition through 2013.” Regional News Altura awarded Philippines contract Altura Mining has won the first of three coal operating contracts that it bid for as part of the Philippine Energy Contracting Round 4 (PECR4) in March 2012 and is awaiting confirmation of the results of the remaining two bids. The operating contract known as Area 3-Cantanduanes covers 7000 hectares and is on Catanduanes Island on the eastern seaboard of the Philippines. Altura has been focused on identifying coal resources in the Philippines with the establishment of a new company, Altura Mining Philippines Inc (AMPI). Applications for three coal resource areas were lodged with the Philippine Department of Energy (PDE). AMPI is following the same model used in Indonesia for the acquisition, exploration and development of coal operations. Acquisition of Area 3 brings Altura’s total South East Asia coal holdings to more than 24,000 hectares. Cuesta Coal raises Aus$12 million A placement has resulted in Cuesta Coal raising Aus$12 million, much of which will be used to fast-track the development project at Moorlands, 14km west of the Blair Athol Coal Mine in the Western Bowen Basin in Queensland, Australia. The placement was taken up by Longluck Investment (Australia), a subsidiary of Beijing Guoli Energy Investment Co. Cuesta will also use $5 million to redeem 50% of the $10 million convertible notes that will be issued to the vendors upon settlement of the acquisition of the Orion Coal Project from Hannigan & Associates. Orion is to the immediate north and a continuation of Cuesta's existing resource at Moorlands, which contains a combined resource of 136.3 million tonnes and an exploration target of 85-150 million tonnes. Davao starting date brought forward Coal Asia Holdings has brought forward the expected commercial production starting date for its mining project in Davao Oriental, the Philippines, by three months to October 2013. The mine is expected to annually produce 600,000 tonnes of high-grade coal. The company, which holds the country’s second largest coal reserves and resources, says the date has been made possible by early completion of drilling and exploration activities. Coal Asia, through subsidiary Titan Mining and Energy Corp, is also evaluating and testing two new previously undiscovered large coal deposit areas within its coal operating contract in Davao Oriental. Its other mine, in Zamboanga Sibugay, is expected to begin production in 2015. Coal Asia has secured offtake agreements with domestic and international buyers and plans to export coal to India, Japan, Taiwan, Hong Kong and Vietnam. Tigers Realm receives Amaam mining licence Following recent approval of Tigers Realm Coal's mining licence application by Russian federal subsoil agency Rosnedra, the agency's Chukotka Branch has issued Tigers Realm Russian subsidiary NPCC with a mining licence over the area covered by its mining licence application for the Amaam Coking Coal Project in Russia's Far East. Issuance of the licence enables Tigers Realm to exercise its right to increase ownership of NPCC and the Amaam project to 60%. Amaam North remains 80% owned by the company. Achieving this major milestone on schedule clearly demonstrates the high level of support NPCC has received for the Amaam project. The Amaam pre-feasibility study is in its final stages with the key findings expected to be announced in early April. Celsius receives Blumont funding Celsius Coal has received the first Aus$5 million tranche of a $10 million strategic funding arrangement with the Singapore-based Blumont Group which will pay for the 2013 exploration and development program at its Kyrgyz Republic coal prospects. The company has announced a maiden total inferred, JORC-compliant resource of 255 million tonnes at the Uzgen Basin project, comprising 230 million tonnes at Kargasha deposit and 25 million at Kokkia deposit. April 2013 l Coal Age Indonesia l 39 Events Coal calendar of events Money Mining Seminar, April 8-9, Fremantle, WA, Australia. www.whittleconsulting.com.au/events.html Hunter Valley Coal Chain Conference, April 8-9, Hunter Valley, NSW, Australia. www.ausimm.com.au/ coalchain2013/exhibition.asp OZMINE 2013, April 16-18, Jakarta, Indonesia, www.austrade.gov.au/ozmine Mongolia Investment Summit, April 16-18, London, UK. www.mongoliainvestmentsummit.com International Conference & Expo on Coal Beneficiation, April 18-19, New Delhi, India. www.cpsi.org.in Drill and Blast 2013, April 30-May 1, Brisbane, Australia. www.drillandblastevent.com.au International Coal Prep 2013, 30th Anniversary, April 30-May 2, Lexington, Kentucky, USA, www.coalprepshow.com; and International Coal Prep Exhibition, www.biztradeshows. com/trade-events/coal-prep.html 3rd Coaltrans Mongolia, May 25-26, Ulaanbaatar. www.coaltrans.com/ EventDetails/0/5180/ 3rd-Coaltrans-Mongolia.html 19th Coaltrans Asia, June 2-5, Bali. www.coaltrans.com/EventDetails/ 0/5187/19th-Coaltrans-Asia.html Coal Processing & Mining Technology, June 4-5, Ulaanbaatar, Mongolia. www.uexpos.com/coal ProcessingMining Tech_Mongolia.html 10th Clean Coal Forum, June 13-14, Beijing, China. www.cdmc.org.cn/2013/ccf/ Coal Gen 13, August 14-16, Charlotte, North Carolina, USA. www.coal-gen.com Sumatra Miner: Inaugural Coal Mining & Technology of South Sumatra, Sept 17-20, Palembang, Sumatra. www.Sumatra-miner.com XVII International Coal Preparation Congress, October 1-6, Istanbul, Turkey. www.icpc2013.com/en/ 2013 Coal Handling & Storage, October 22-24, St Louis, Missouri, USA. www.coalhandlingshow.com 40 l Coal Age Indonesia l April 2013 New Indonesian mining clubs MINING Media International, The ASIA Miner and Coal Age Indonesia are proud to announce the formation of two new Indonesian mining clubs - the Djakarta Mining Club and Coal Club Indonesia. Designed to support the growing mining industry in Indonesia, these new clubs will play an important role in the responsible development of natural resources and business opportunities. Mining Media is inviting those involved in the mining industry, directly or indirectly, or those wanting to be involved or interested in its development, to take part in the launch of these new clubs as a founding member or sponsor. The Djakarta Mining Club will serve to foster bilateral business relationships while promoting sustainable mineral production through educational outreach, promotion of exploration, and planned dialogue between stakeholders in the mining industry. Coal Club Indonesia is an innovative natural development for the coal industry in Indonesia. It will enable B2B (Business to Business) and B2G (Business to Government) connections to be made that will create opportunities for local/domestic and international businesses in a rapidly growing, international industry. Mining Media says this is a golden opportunity to be an active participant in these important clubs. It is your chance to become a founding member, a sponsor, or simply to register to attend upcoming events that will be held in the hubs of the mining industry in Indonesia. In Indonesia contact Dimas Abdillah (dabdillah@mining-media.com) for information and in Australia contact Lanita Idrus (lidrus@miningmedia.com). All other inquiries should be directed to Peter Johnson (pjohnson@miningmedia.com). Mining Media International is the only global publishing company focused solely on the mining and construction-materials industries. Mining Media publishes Engineering & Mining Journal, Coal Age, The ASIA Miner, Coal Age Indonesia and Equipo Minero, as well as custom foreign editions and related directories. The company also produces trade shows and conferences, such as Haulage & Loading and Longwall USA. Australian mining expertise on show at ozmine AUSTRALIA’S world-leading mining expertise will be on show at ozmine2013 in Jakarta on April 16 and 17 at the Shangri-La Hotel. Ozmine is Australia’s premier mining event in South East Asia and consists of a conference, exhibition and ample networking opportunities. The ozmine2013 conference with the theme ‘Australia and ASEAN: Partnering for Performance’ brings together key Indonesian, Australian and ASEAN industry and government players to identify and analyse trends, opportunities and challenges in mining. The two-day exhibition is where you can meet Australian companies offering innovative, competitive and high quality products and services for the mining and METS sectors. Australia’s Trade Commissioner in Jakarta Julianne Merriman says the theme signifies how business people in the region are linking with Australian expertise to improve efficiency and boost productivity. “ozmine2013 provides the perfect opportunity to build these relationships and meet your new Australian business partner from a variety of roles in the mining sector.” She says Australian mining and METS companies have much to offer mining operations in Indonesia and other South East Asian countries. “Australia has a robust mining industry which contributes 9% to Australia’s GDP. Australia’s miners operate in some of the most remote and harsh conditions found anywhere in the world. This environment has seen Australia develop the technologies and services needed to work efficiently within these tough conditions. Advertising index Balikpapan Expo ..................................................................................................13 Baramulti Group ...................................................................................................38 Caterpillar ...............................................................................................................9 Coaltrans Asia ......................................................................................................18 Coaltrans Mongolia ...............................................................................................34 Jamieson Consulting Group ..................................................................................33 KS Yanase Industries ...........................................................................................BC Micromine Consulting Services Workshop .............................................................3 Mines & Money Beijing..........................................................................................22 Mining Indonesia ..................................................................................................15 Mining Media International Indonesian mining clubs .............................................7 PT Britmindo .........................................................................................................39 PT Mobilis Hausen ...............................................................................................37 SatNetCom ..........................................................................................................IBC Sumatra Miner .......................................................................................................11 Weir Minerals.......................................................................................................IFC Whittle Consulting ................................................................................................21