TekYapı 2016 Catalog
Transcription
TekYapı 2016 Catalog
PROJECT 32 201 6 PROJECT 32 OUR MISSION We have established Tek Yapı benefiting from the knowledge and experience that we have obtained in the construction sector for years and developed the company with the support provided by the young and dynamic staff. The goal of Tek Yapı is to create modern, high quality, economic and trustworthy solutions for investors. Tek Yapı aims at constructing buildings in line with the current construction technology, protecting both company employees and customers from potential occupational accidents and achieving the most appropriate and high quality solutions with our solution partners. Thus selecting the use of latest developments in the sector, quality, occupational safety and environmental standards as its goal, Tek Yapı offers turnkey services for investors. The “Quality Management System”, which turned into an Integrated Management System, has been certified by Bureau Veritas for the standards ISO-9001:2000, OHSAS-18001:2007, and ISO 14001:2004. The system and the Certificates cover all the operations performed in the headquarters and within the construction sites. Implementing ISO 9001 Quality Management System, OHSAS 18001 Occupational Health and Safety and 14001 Environmental Practices together, our system contributes to sustainable development and life quality, enables information to be used correctly, and minimizes every negative situation from planning to operation. We conduct our operations within this system and develop the system consistently. In order to support the solution of ecological problems faced with both globally and locally, it is aimed at constructing buildings with “Green Building” certificate, for which principles leading to a sustainable environment are utilized, and being one of the leading companies in this field. PROJECT 32 PROJECTS 36 TR-PHARM Pharmaceutical Plant 35 TÜRKİYE İŞ BANKASI Data Center 34 KORDSA GLOBAL Resarch and Development Center 33 TURKCELL Data Center 32 ANADOLU ISUZU Resarch and Development Center 31 RECORDATI Pharmaceutical Plant 30 3M Çorlu Manufacturing Plant 29 DOĞUŞ OTOMOTİV A Block Reinforcement, Roof Renovation 28 IFF GOSB Extension Project K.1 SAUDI SNACK FOODS (PEPSI CO.) Potato Chips Production Plant and Office Building 27 CHIPITA Industrial Food Production Complex 26 VOLVO Truck Service 25 DOĞUŞ OTOMOTİV Logistics Center 24 BOSCH (BU2) RBTR BU Block 310 Production Plant and Office Building 23 BOSCH (BU1) RBTR BU Block 113 Production Plant and Office Building 22 BSH Warehouse, Ring Roads, Container Yard, Railway Line, Creek Rehabilitation 21 CLARIANT Office Building and Masterbatch Building 20 FRITO LAY (PEPSI CO.) Potato Warehouse 19 VODAFONE Data Center 18 EREN ENERJİ 2x600 MW Turbine Cooling Water Pipes Installation 17 EREN ENERJİ 600 MW Coal Fired Power Plant 16 KENT CUDBURRY Chewing Gum and Confectionery Production Plant 15 MODKAR AMBALAJ Cardboard Manufacturing Plant (Kayseri) 14 KCC Paint Production Plant and Office Building 13 CANTAŞ Cooling Gas Charging Plant and Logistics Center 12 SIKA Production Plant and Office Building 11 JOTUN Çerkezköy Production Plant Extension 10 IŞIK UNIVERSITY (YY1) Işık University Şile Campus Dormitory (YY1) 9 ABB Transformer Production Plant and Office Building 8 MODERN KARTON PM4 Paper Mill 7 IŞIK UNIVERSITY (YY2) Işık University Şile Campus Dormitory (YY2) 6 GRUNDFOS Factory and Office Building 5 MODKAR AMBALAJ Cardboard Manufacturing Plant (Çorlu) 4 KÜEHNE + NAGEL Logistics Center and Office Building 3 DERİMSAN Leather Processing Plant and Office Building 2 GÖKYILDIZ Weaving Plant, Warehouse, Office Building and Showroom 1 FRANKE Manufacturing Plant, Warehouse and Office Building PROJECT 36 CLIENT TR Pharm İlaç Sanayi ve Ticaret A.Ş. PROJECT NAME Pharmaceutical Plant LOCATION Çerkezköy Industrial Zone, Tekirdag JOB DESCRIPTION Infrastructure and Civil Works STRUCTURE Reinforced Concrete AREA 20,700 sq.m CONTRACT DATE March 2th, 2016 STARTING DATE March 15th, 2016 FINISHING DATE December 31st, 2017 DESIGN Tekeli-Sisa Architecture PROJECT 35 CLIENT Türkiye İş Bankası A.Ş. PROJECT NAME Data Center LOCATION Tuzla, İstanbul JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Data Centers : Structural Steel Office Building : Reinforced Concrete AREA 14,000 sq.m CONTRACT DATE March 04th, 2016 STARTING DATE March 21st, 2016 FINISHING DATE December 25th, 2016 DESIGN Red Engineering WHITE SPACE AREA 4,000 sq.m TIER: IV (Design and Facility) LEED: Version 4 Gold Certificate DESIGN FACILITY UPTIME INSTITUTE CERTIFICATED UPTIME INSTITUTE CERTIFICATED PROJECT 34 CLIENT KordSA Global Endüstriyel İplik ve Kord Bezi Sanayi ve Ticaret A.Ş. PROJECT NAME Teknopark Composite Technologies Research and Development Center LOCATION Teknopark Pendik, Istanbul JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Reinforced Concrete AREA 14,000 sq.m CONTRACT DATE August 24th, 2015 STARTING DATE August 31st, 2015 FINISHING DATE May 31st, 2016 DESIGN Turgut Toydemir (Piramit Architecture) LEED: Version 3 Gold Certificate PROJECT 33 CLIENT TURKCELL Gayrimenkul Hizmetleri A.Ş. PROJECT NAME Data Center LOCATION Gebze Industrial Zone, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Reinforced Concrete AREA 37,000 sq.m CONTRACT DATE February 16th, 2015 STARTING DATE March 1st, 2015 FINISHING DATE May 31st, 2016 DESIGN Deerns International WHITE SPACE AREA 10,000 sq.m TIER: III (Design and Facility) LEED: Version 3 Gold Certificate DESIGN FACILITY UPTIME INSTITUTE CERTIFICATED UPTIME INSTITUTE CERTIFICATED PROJECT 32 CLIENT ANADOLU ISUZU Otomotiv Sanayi ve Ticaret A.Ş. PROJECT NAME Research and Development Center LOCATION Şekerpınar, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Structural Steel AREA 6,850 sq.m CONTRACT DATE November 14th, 2014 STARTING DATE February 1st, 2015 FINISHING DATE August 31st, 2015 DESIGN TEM Engineering PROJECT 31 CLIENT Recordati İlaç Sanayi ve Ticaret A.Ş. PROJECT NAME Pharmaceutical Plant LOCATION Çerkezköy Industrial Zone, Tekirdağ JOB DESCRIPTION Infrastructure and Civil Works STRUCTURE Reinforced Concrete AREA 18,150 sq.m CONTRACT DATE April 17th, 2014 STARTING DATE April 17th, 2014 FINISHING DATE May 17th, 2015 DESIGN Foster Wheeler Bimaş PROJECT 30 CLIENT 3M İnovasyon Ürünleri Sanayi ve Ticaret Ltd.Şti. PROJECT NAME Çorlu Manufacturing Plant LOCATION European Free Trade Zone, Çorlu JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Structural Steel AREA 9,200 sq.m CONTRACT DATE August 1st, 2013 STARTING DATE August 1st, 2013 FINISHING DATE March 31st, 2014 DESIGN Seyaş Sey Architecture, Engineering, Consulting / Alaz Albay PROJECT 28 CLIENT IFF Internatıonal Flavors & Fragrances PROJECT NAME GOSB Extensıon Project LOCATION Gebze Industrial Zone, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works, Process Installation, Clean Rooms STRUCTURE Reinforced Concrete AREA 10,250 sq.m CONTRACT DATE April 29th, 2013 STARTING DATE May 1st, 2013 FINISHING DATE November 1st, 2014 DESIGN SEY Architecture, Engineering, Consulty / Alaz Albay PROJECT K.1 CLIENT Saudi Snack Food Limited (Pepsi Co.) PROJECT NAME Potato Chips Production Plant and Office Building LOCATION Dammam, Kingdom of Saudi Arabia JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Steel Structure AREA 16,000 sq.m CONTRACT DATE April 26th, 2013 STARTING DATE April 26th, 2013 FINISHING DATE September 30th, 2015 DESIGN TEM Engineering LEED: Version 3 Silver Certificate PROJECT 27 CLIENT Chipita Gıda Üretim A.Ş. PROJECT NAME Industrial Food Production Complex LOCATION Gebze Plastikçiler Industrial Zone, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Structural Steel AREA 6,500 sq.m CONTRACT DATE March 08th, 2013 STARTING DATE March 08th, 2013 FINISHING DATE October 08th, 2013 DESIGN Whitestone S.A. / TEM Engineering PROJECT 26 CLIENT Volvo Otomotiv Türk Ltd. Şti. PROJECT NAME Truck Service LOCATION Hadımköy, İstanbul JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Reinforced Concrete, Space Truss System Roof AREA 3,600 sq.m CONTRACT DATE June 07th, 2012 STARTING DATE July 16th, 2012 FINISHING DATE December 31st, 2012 DESIGN ORC Mimarlık Hizmetleri Ltd. Şti. PROJECT 25 CLIENT Doğuş Otomotiv Servis ve Ticaret A.Ş. PROJECT NAME Logistics Center LOCATION Şekerpınar, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Reinforced Concrete AREA 45,125 sq.m CONTRACT DATE March 01, 2012 STARTING DATE March 05, 2012 FINISHING DATE November 05, 2012 DESIGN Ateş Architecture and Engineering PROJECT 24 CLIENT Bosch ve Ticaret A.Ş. PROJECT NAME RB TR BU2 Block 310 Production Plant and Office Building LOCATION Nilüfer O.S.B., Bursa JOB DESCRIPTION Infrastructure, Civil Works and Architectural Works STRUCTURE Precast Concrete Columns, Structural Steel Roof AREA 7,994 sq.m CONTRACT DATE January 15th, 2012 STARTING DATE February 01st, 2012 FINISHING DATE January 18th, 2013 DESIGN Ateş Architecture and Engineering PROJECT 23 CLIENT Bosch ve Ticaret A.Ş. PROJECT NAME RBTR BU1 Block 113 Production Plant and Office Building LOCATION Nilüfer O.S.B., Bursa JOB DESCRIPTION Infrastructure, Civil Works and Architectural Works STRUCTURE Reinforced Concrete, Structural Steel Roof AREA 14,157 sq.m CONTRACT DATE January 15th, 2012 STARTING DATE February 01st, 2012 FINISHING DATE January 18th, 2013 DESIGN Ateş Architecture and Engineering PROJECT 22 CLIENT BSH Ev Aletleri San. ve Tic. A.Ş. PROJECT NAME Warehouse, Ring Roads, Container Yard, Railway Line, Creek Rehabilitation LOCATION Çerkezköy Industrial Zone, Tekirdağ JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Precast Columns, Space Truss System Roof AREA 44,120 sq.m CONTRACT DATE May 18th, 2011 STARTING DATE May 23rd, 2011 FINISHING DATE January 31st, 2012 DESIGN Ateş Architecture, Engineering PROJECT 21 CLIENT Clariant Türkiye Boya ve Kimyevi Maddeler San. ve Tic. A.Ş. PROJECT NAME Office Building and Masterbatch Building LOCATION Gebze Industrial Zone, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Precast Columns, Space Truss System Roof AREA 10,900 sq.m CONTRACT DATE March 03rd, 2011 STARTING DATE March 21st, 2011 FINISHING DATE October 02nd, 2011 DESIGN LİM Architecture, Engineering Alaz Albay PROJECT 32 PROJECT 32 PROJECT 20 CLIENT Frito Lay Gıda Sanayi A.Ş. PROJECT NAME Potato Warehouse LOCATION Suadiye, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Reinforced Concrete, Structural Steel Roof AREA 6,300 sq.m CONTRACT DATE December 23rd, 2010 STARTING DATE December 23rd, 2010 FINISHING DATE July 30th, 2011 DESIGN TEM Engineering PROJECT 19 CLIENT Vodafone Telekomünikasyon Altyapı Hizmetleir A.Ş. PROJECT NAME Data Center LOCATION Esenyurt, İstanbul JOB DESCRIPTION Turnkey: Earth Works, Piling Works, Construction and Architectural Works, Electromechonical Works STRUCTURE Structural Steel AREA 11,200 sq.m CONTRACT DATE January 04th, 2010 STARTING DATE January 07th, 2010 FINISHING DATE April 30th, 2012 DESIGN METSİS Architecture WHITE SPACE AREA 2,800 sq.m PROJECT 18 CLIENT Eren Enerji Elektrik Üretim A.Ş. PROJECT NAME 2X600 MW Turbine Cooling Water Pipes Installation LOCATION Zonguldak JOB DESCRIPTION Pipe Installation / Pipe Supports / Motorway and Railway Passages PIPELINE 4 X 3.500 m – ø 3.244 mm Pipeline CONTRACT DATE February 10th, 2009 STARTING DATE February 15th, 2009 FINISHING DATE October 31th, 2010 DESIGN Scala / Modern Engineering PROJECT 17 CLIENT Eren Enerji Elektrik Üretim A.Ş.. PROJECT NAME 600 MW Coal Fired Power Plant LOCATION Zonguldak JOB DESCRIPTION Infrastructure, Civil Works, Architectural Works STRUCTURE Reinforced Concrete, Structural Steel AREA 62,500 sq.m CONTRACT DATE April 28th, 2008 STARTING DATE May 1st, 2008 FINISHING DATE April 30th, 2010 DESIGN Modern Engineering PROJECT 16 CLIENT Kent Gıda Maddeleri Sanayi ve Ticaret A.Ş. PROJECT NAME Chewing Gum and Confectionery Production Plant LOCATION Gebze, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Reinforced Concrete AREA 15,600 sq.m CONTRACT DATE April 1st, 2008 STARTING DATE April 3rd, 2008 FINISHING DATE April 30th, 2009 DESIGN Ateş Architecture, Engineering PROJECT 15 CLIENT Modkar Ambalaj Sanayi ve Ticaret A.Ş. PROJECT NAME Cardboard Manufacturing Plant LOCATION Kayseri JOB DESCRIPTION Infrastructure, Civil Works and Architectural Works STRUCTURE Precast Concrete AREA 21,764 sq.m CONTRACT DATE October 1, 2007 STARTING DATE October 5, 2007 FINISHING DATE May 31, 2008 DESIGN Barka Engineering PROJECT 14 CLIENT KCC Boya Sanayi ve Ticaret A.Ş. PROJECT NAME Paint Production Plant and Office Building LOCATION Gebze Industrial Zone, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Reinforced Concrete AREA 15,500 sq.m CONTRACT DATE July 16th, 2007 STARTING DATE August 7th, 2007 FINISHING DATE April 28th, 2008 DESIGN Seyaş Architecture, Engineering Alaz Albay PROJECT 13 CLIENT Cantaş İç ve Dış Ticaret Soğutma Sistemleri A.Ş. PROJECT NAME Cooling Gas Charging Plant and Logistics Center LOCATION Gebze Güzeller Industrial Zone, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Sector A: Precast Concrete Sector B and C: Reinforced Concrete AREA 9,750 sq.m CONTRACT DATE March 23rd, 2007 STARTING DATE April 15th, 2007 FINISHING DATE October 10th, 2007 DESIGN Seyaş Arch., Engineering Alaz Albay PROJECT 12 CLIENT SIKA Yapı Kimyasalları A.Ş. PROJECT NAME Production Plant and Office Building LOCATION Tuzla Industrial Zone, İstanbul JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Structural Steel AREA 15,980 sq.m CONTRACT DATE June 1st, 2006 STARTING DATE June 12nd, 2006 FINISHING DATE April 11st, 2006 DESIGN Ateş Architecture PROJECT 11 CLIENT Jotun Boya Sanayi ve Ticaret A.Ş. PROJECT NAME Çerkezköy Production Plant Extension LOCATION Çerkezköy Industrial Zone, Tekirdağ JOB DESCRIPTION Infrastructure, Civil Works, Architectural Works STRUCTURE Warehouse: Precast Concrete Production Plant: Reinforced Concrete AREA 2,912 sq.m CONTRACT DATE June 12nd, 2006 STARTING DATE June 15th, 2006 FINISHING DATE December 31st, 2006 DESIGN UMO Architecture PROJECT 9 CLIENT ABB Elektrik Sanayi A.Ş. PROJECT NAME Transformer Production Plant and Office Building LOCATION Dudullu Industrial Zone, İstanbul JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Precast Concrete AREA 10,817 sq.m CONTRACT DATE September 28th, 2005 STARTING DATE October 3rd, 2005 FINISHING DATE July 26th, 2006 DESIGN Ateş Architecture, Engineering PROJECT 8 CLIENT Modern Karton Sanayi ve Ticaret A.Ş. PROJECT NAME PM4 Paper Mill LOCATION Çorlu, Tekirdağ JOB DESCRIPTION Infrastructure, Civil Works, Architectural Works STRUCTURE Precast Concrete AREA 67,605 sq.m CONTRACT DATE January 26th, 2006 STARTING DATE February 1st, 2006 FINISHING DATE May 30th, 2008 DESIGN Modern Architecture PROJECT 6 CLIENT Grundfos Pompa Sanayi ve Ticaret A.Ş. PROJECT NAME Factory and Office Building LOCATION Gebze Industrial Zone, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Factory.: Precast Concrete Columns, Steel Girders, Office Building.: Reinforced Concrete AREA 6,600 sq.m CONTRACT DATE February 15th, 2005 STARTING DATE February 25th, 2005 FINISHING DATE September 5th, 2005 DESIGN Ramboll Ateş Architecture, Engineering PROJECT 5 CLIENT Modkar Ambalaj Sanayi ve Ticaret A.Ş. PROJECT NAME Cardboard Manufacturing Plant LOCATION Çorlu, Tekirdağ JOB DESCRIPTION Infrastructure, Civil Works, Architectural Works STRUCTURE Precast Concrete AREA 21,764 sq.m CONTRACT DATE January 15, 2005 STARTING DATE February 1, 2005 FINISHING DATE August 30, 2005 DESIGN Foster Wheeler – Bimaş PROJECT 4 CLIENT Küehne+Nagel Nakliyat Ltd. Şti. PROJECT NAME Logistics Center and Office Building LOCATION Gebze Industrial Zone, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Precast Concrete AREA 10,895 sq.m CONTRACT DATE July 28th, 2004 STARTING DATE August 17th, 2004 FINISHING DATE December 31st, 2004 DESIGN Ateş Architecture, Engineering PROJECT 1 CLIENT Franke Mutfak Sistemleri Ltd. Şti. PROJECT NAME Manufacturing Plant, Warehouse and Office Building LOCATION Gebze Industrial Zone, Kocaeli JOB DESCRIPTION Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works STRUCTURE Factory and Warehouse: Structural Steel, Office Build.: Reinforced Concrete AREA 7,400 sq.m CONTRACT DATE July 1st, 2003 STARTING DATE July 1st, 2003 FINISHING DATE December 31st, 2003 DESIGN Onur Özsoy, Özsoy Architecture PROJECT 32 PROJECT 32 PROJECT 32 HEAD OFFICE Esentepe Mah. Koreşehitleri Cad. Mithat Ulu Ünlü Sokak No:16 34394 Sisli, Istanbul, Turkey T : +90 212 275 7510 www.tekyapi.com info@tekyapi.com SAUDI ARABIA OFFICE Al Jarbuo Building No:3580 Floor 8 Office No:802, Al Aqrabiyah Al Khobar 34446 6283 Saudi Arabia T : +966 (03) 811 6812 / 6814/6815 www.tekyapi.com info@tekyapi.com