Ikegami Y_ OTEC Okinawa Plant
Transcription
Ikegami Y_ OTEC Okinawa Plant
-Seminar and Technology Match Make Eventby Government of the Netherlands 100 kW CC-OTEC Plant and Deep Ocean water Applications in Kumejima, Okinawa, Japan Hawai’i Convention Center Honolulu, HAWAI’I,USA September 10, 2013 Yasuyuki Ikegami Institute of Ocean Energy, Saga University(IOES), JAPAN Katsuya Furugen Department of Commerce, Industry and Labor Okinawa Prefectural Government OTEC Demonstration Facility in Kumejima (Okinawa) Okinawa Prefectural Deep Sea Water Research Center, since 2000 OTEC Demonstration Facility (Picture on 10 March. 2013) Go to NEW STAGE (ReSTART) of Real OTEC Technology to connect the electric grid for the first time in 15 years in the world. IOES (Institute of Ocean Energy, Saga Univ.) 30 kW Electricity Lithium Recovery Desalination H2 Storage Experiments and Demonstration by IOES (Institute of Ocean Energy, Saga University) NEDO Renewable Energy Technology White Paper (outline) ~ Toward a new, energy-diversified society ~ July 2010 New Energy and Industrial Technology Development Organization (NEDO) JAPAN 7. OTEC ~Technology Roadmap~ Power Demands in Okinawa Okinawa Mainland Population: approx.1.25mil. Total Capacity of Existing Power Plant: 1733MW Kumejima Population: approx.9thou. Total Capacity of Existing Power Plant: 19.2MW Miyakojima Population: approx.50thou. Total Capacity of Existing Power Plant: 76.5MW Ishigakijima Population: approx.45thou. Total Capacity of Existing Kuroshio Current Area Power Plant: 69MW Chichijima Population: approx.2 thou. Total Capacity of Existing Power Plant:4.3MW Minamitorishima (Out of this map: 24o17’N 153o59E) Okinotorishima REFERENCE: NEDO「 海洋エネル ギーポテンシャルの把握に係る業務」 (平成23年3月)における温度差分 布図(5年間平均値) に追記 8 Implementation System of Okinawa’s OTEC Demonstration Project Institute of Ocean Energy, Saga University Okinawa pref. Gov Commission Cooperation Cooperation IHI Plant Construction, Xenesys, Yokogawa Electric (JV) Main role ○ IHI Plant Construction ○ Xenesys ○ Yokogawa Electric Produce & set up sea water system Design, work ・・・etc Basic concept Produce & set up generation unit & heat exchanger Examine multiple usage of DSW ・・・etc Produce & set up electricity & control system ・・・etc 100kW OTEC Demonstration Facility in Kumejima (Okinawa) Power Generation Unit Unit A for Continuous Power Generation (max.50kW) Evaporator A Evaporator B Unit B for Experiments on Elemental Technology (50kW size without Turbine Generator) >Working Fluid: R134a >Thermo Cycle: Rankine (2-Stage Rankine when Unit-A and B are combined) >Evaporator and Condenser: Titanium Plate HEX (Cross Flow) >Turbine Generator (Unit-A): 50kW, 400V, 33000rpm with frequency conditioner Monitoring and Control Space Condenser A Condenser B OTEC Demonstration Facility in Kumejima (Okinawa) Recent Mile Stones Jan. 2013 Feb. 2013 Mar. 2013 Apr. 2013 May. 2013 June,2013 16 June. Official Operation Starts 28 Jan. Construction Started at Site 30 Mar. / 1st Power Generation Test Succeeded Surface Water: Deep Water: Power Output: 23.5 oC, 330t/h 9.3 oC, 250t/h 3.1kW (for Test) Aquaculture Using DOW ‘TAKUMI’ Project 拓海 Recycling Mineral Rich Deep Ocean Water (by Prof. Ouchi) Marine Forum 21 Project TAKUMI in Final Docking Before Delivery in IHI Yokohama Shipyard, May 2003 海洋肥沃化装置「拓海」の開発と実海域実験 海洋肥沃化装置「拓海」の設計・製作・設置・運用について ㈱大内海洋コンサルタント大内一之 ㈱大内海洋コンサルタント 大内 一之 TAKUMI on Operation at Sagami Bay (by Prof. Ouchi, The University of Tokyo ) Nippon Kaiji Kyokai (known as ClassNK) has issued its first Approval-in-Principle (AIP) for Totally Submerged OTEC floating power plant model of JMU(Japan Marine United Corp.) On September 2nd ,2013 16 Fukushima Wind Farm Project 17 18 Nippon Kaiji Kyokai (known as ClassNK) has issued its first Approval-in-Principle (AIP) for Totally Submerged OTEC floating power plant model of JMU(Japan Marine United Corp.) On September 2nd ,2013 19