Slides - Indico
Transcription
Slides - Indico
Luminosity Detector Report Prometeusz Jasinski For the PANDA luminosity detector group 09.12.2013 collaboration meeting 09.12.2013 Prometeusz Jasinski 1 The Luminosity Detector 09.12.2013 Prometeusz Jasinski 2 HV-MAPS (University and technical Institut of Heidelberg in cooperation with Tobias Weber) 09.12.2013 Prometeusz Jasinski 3 HV-MAPS 09.12.2013 Prometeusz Jasinski 4 Beam Test Results with MuPix4 Prototype ~ 3 x 3 mm² Event distribution Efficiency for column only information Next Testchip (MuPix6) submitted 09.12.2013 Prometeusz Jasinski 5 HV-MAPS - interalignment - (Roman Klasen, Diploma student) 09.12.2013 Prometeusz Jasinski 6 Current arrangement of HV-MAPS 09.12.2013 Prometeusz Jasinski 7 Some results by icp alignment 09.12.2013 Prometeusz Jasinski 8 Radiation studies (Christian Stoll for the Bachelor thesis) 09.12.2013 Prometeusz Jasinski 9 Event Distributions 09.12.2013 Prometeusz Jasinski 10 Radiation doses In additon ~250Hz neutrons/sensor @ 15GeV/c → should not be an issue. 09.12.2013 Prometeusz Jasinski 11 HV-MAPS cooling (Heinrich Leithoff, PhD student) 09.12.2013 Prometeusz Jasinski 12 Simulated temperature distributions for 1.5 kW power consumption 09.12.2013 Prometeusz Jasinski 13 Test clamp temperature drop Result for a worst case load: < 10°C temperature drop with MX2 cooling paste 09.12.2013 Prometeusz Jasinski 14 Summary of production stages Next: Operation in our Box 09.12.2013 Prometeusz Jasinski 15 Mechanical integration (Flabian Heidelberg, Florian Feldbauer and a little bit by me) 09.12.2013 Prometeusz Jasinski 16 Mechanical assembly tests 09.12.2013 Prometeusz Jasinski 17 Mechanical assembly tests 09.12.2013 Prometeusz Jasinski 18 Mechanical assembly tests 09.12.2013 Prometeusz Jasinski 19 Box deformation Finite Element Model (FEM) bei Druckdiffererenz von 1 bar 09.12.2013 Prometeusz Jasinski 20 6m m Capacitive measurement of distances in vacuum ADC with 15 of 18 effective bits ~244 nm res. at epics 40nm resolution 09.12.2013 Prometeusz Jasinski 21 Pumping scheme pipe detector Status: waiting for turbo pumps to test the system By Feldbauer / Kauth 09.12.2013 Prometeusz Jasinski 22 Electrical routing (Christof Motzko) 09.12.2013 Prometeusz Jasinski 23 Flex print on the module 5 x diff (100µ) 4 x SPI GND (bottom layer) LV LV sense HV HV-GND 09.12.2013 Prometeusz Jasinski 24 Flex Print for the feedthrough 479 Next: testing ordered copper printed samples Electrically and glued into vacuum feedthroughs 09.12.2013 Prometeusz Jasinski 25 Software (Anastasia Karavdina) 09.12.2013 Prometeusz Jasinski 26 Software 1.5 GeV/c Performance after broken line fits And back propagation Strong influences by - Magnetic field deviation - Geant precision Lumi software in very good shape! 09.12.2013 Prometeusz Jasinski 27 Conclusion: We have a very good basis for a TDR Thank you 09.12.2013 Prometeusz Jasinski 28 Geometrische Akzeptanz Akzeptanz bei 1.5 GeV/c Strahlimpuls 09.12.2013 Prometeusz Jasinski 29 Mechanical assembly tests Work of Florian Feldbauer (PostDoc) 09.12.2013 Prometeusz Jasinski 30 Stepper motor resolution 09.12.2013 Prometeusz Jasinski 31