Slides - Indico

Transcription

Slides - Indico
Luminosity Detector
Report
Prometeusz Jasinski
For the PANDA luminosity detector group
09.12.2013
collaboration meeting
09.12.2013
Prometeusz Jasinski
1
The Luminosity Detector
09.12.2013
Prometeusz Jasinski
2
HV-MAPS
(University and technical Institut of Heidelberg
in cooperation with Tobias Weber)
09.12.2013
Prometeusz Jasinski
3
HV-MAPS
09.12.2013
Prometeusz Jasinski
4
Beam Test Results with MuPix4 Prototype
~ 3 x 3 mm²
Event distribution
Efficiency for
column only
information
Next Testchip (MuPix6) submitted
09.12.2013
Prometeusz Jasinski
5
HV-MAPS
- interalignment -
(Roman Klasen, Diploma student)
09.12.2013
Prometeusz Jasinski
6
Current arrangement of HV-MAPS
09.12.2013
Prometeusz Jasinski
7
Some results by icp alignment
09.12.2013
Prometeusz Jasinski
8
Radiation studies
(Christian Stoll for the Bachelor thesis)
09.12.2013
Prometeusz Jasinski
9
Event Distributions
09.12.2013
Prometeusz Jasinski
10
Radiation doses
In additon ~250Hz neutrons/sensor @ 15GeV/c
→ should not be an issue.
09.12.2013
Prometeusz Jasinski
11
HV-MAPS cooling
(Heinrich Leithoff, PhD student)
09.12.2013
Prometeusz Jasinski
12
Simulated temperature distributions
for 1.5 kW power consumption
09.12.2013
Prometeusz Jasinski
13
Test clamp temperature drop
Result for a worst case load: < 10°C temperature drop with MX2 cooling paste
09.12.2013
Prometeusz Jasinski
14
Summary of production stages
Next: Operation in our Box
09.12.2013
Prometeusz Jasinski
15
Mechanical integration
(Flabian Heidelberg, Florian Feldbauer and a little bit by me)
09.12.2013
Prometeusz Jasinski
16
Mechanical assembly tests
09.12.2013
Prometeusz Jasinski
17
Mechanical assembly tests
09.12.2013
Prometeusz Jasinski
18
Mechanical assembly tests
09.12.2013
Prometeusz Jasinski
19
Box deformation
Finite Element Model (FEM)
bei Druckdiffererenz von 1 bar
09.12.2013
Prometeusz Jasinski
20
6m
m
Capacitive measurement of distances in vacuum
ADC with 15 of 18 effective bits
~244 nm res. at epics
40nm
resolution
09.12.2013
Prometeusz Jasinski
21
Pumping scheme
pipe
detector
Status: waiting for turbo pumps to test the system
By Feldbauer / Kauth
09.12.2013
Prometeusz Jasinski
22
Electrical routing
(Christof Motzko)
09.12.2013
Prometeusz Jasinski
23
Flex print on the module
5 x diff (100µ) 4 x SPI GND (bottom layer) LV LV sense HV HV-GND
09.12.2013
Prometeusz Jasinski
24
Flex Print for the feedthrough
479
Next: testing ordered copper printed samples
Electrically and glued into vacuum feedthroughs
09.12.2013
Prometeusz Jasinski
25
Software
(Anastasia Karavdina)
09.12.2013
Prometeusz Jasinski
26
Software
1.5 GeV/c
Performance after broken line fits
And back propagation
Strong influences by
- Magnetic field deviation
- Geant precision
Lumi software in very good shape!
09.12.2013
Prometeusz Jasinski
27
Conclusion:
We have a very good basis for a TDR
Thank you
09.12.2013
Prometeusz Jasinski
28
Geometrische Akzeptanz
Akzeptanz bei 1.5 GeV/c Strahlimpuls
09.12.2013
Prometeusz Jasinski
29
Mechanical assembly tests
Work of Florian Feldbauer (PostDoc)
09.12.2013
Prometeusz Jasinski
30
Stepper motor resolution
09.12.2013
Prometeusz Jasinski
31