interfacing etcs with legacy cc-systems track - side
Transcription
interfacing etcs with legacy cc-systems track - side
INTERFACING ETCS WITH LEGACY CC-SYSTEMS TRACK - SIDE NEED FOR MIGRATION • • Elimination of National Systems and their replacement with ETCS – In most cases coming to the end of their life cycle. Two different strategies: – All train first, then trackside straight to ETCS in a big – bang. – Trackside dual (or triple fitted) as an overlay, then gradual fitting of trains. • • Need to interface to National Systems. Need to replace or enhance the existing Signalling Systems 2 MIGRATION STRATEGIES • GRADUAL MIGRATION – Maintain the existing ATP National System – Trains equipped with ETCS • STM national system – Automatic switch over can be performed (national function) • Full ATP national system – No Automatic switch over. Only under special design of dedicated interface GSM-R Radio LEVEL 1 LEVEL 2 NAT. EVC ETCS EV N1 + N2 C BTM ETCS -MMI NATIONAL 3 MIGRATION STRATEGIES • GRADUAL MIGRATION – It allows progressive ETCS implementation • • On board Trackside – ATP national system as a fall back during a period as desired – It allows a mixed traffic of equipped and non equipped trains – No need of special interface between ETCS/ATP track side • Eurobalises for beginning and end of ETCS territory ETCS L1 or L2 Existing National System 4 MIGRATION STRATEGIES • Spanish experience – Trains equipped with ETCS L1 and L2 and complete independent ASFA national system (no STM) ETCS L2 ETCS L1 ASFA National System 5 INTERFACES • • Interfaces ETCS L1, L2 / existing signalling systems – Relay type interlockings – Line side signals – Electronic interlockings – CTC ETCS level 2/Level 1 RBC Interlocking LEU EUROBALISE LEU EUROBALISE 6 INTERFACES ERTMS Central Control Balises LEU 1 System Aid Maintenance Local Operation ERTMS LEU 1 Balises LEU N local operation Interlocking LEU N LEU 15 Balises LEU 15 LTVs Compiler 7 ETCS/SIGNALLING INTERFACES • ETCS level 1 – Relay type interlocking/Track side elements No LEUs interconnection Max. speed determined by line side signals No centralized TSR´s • 2 SIGNAL LAMPS I/F LEU LEU LEU LEU LEU LEU LEU LEU Interlocking LEU 1 LEU • • • LEU, discrete Interface with parallel inputs • Direct wiring to any interlocking or signal aspects • LEUs centralized at relay room (1) • LEUs line side installed (2) Relatively simple interface LEU • 8 INTERFACES • ETCS level 1 – Relay type Interlocking – LEU Networked version • TCP/IP suitable for fibre optic comms. links to interlocking – – and Control Centre • Temporary Speed Restrictions direct from Control Centre Remote Maintenance and Diagnosis Max. speed can be higher LEU LEU LEU LEU INTERLOCKING PARALLEL I/O LEU LEU LEU LEU LEU LEU LEU LEUs CONCENTRATOR TDM 4 Balises / LEU 9 INTERFACES • ETCS level 1 – Electronic Interlocking LEU Networked version Non standard interface • Manufacturer's owned. LEU LEU LEU LEU LEU LEU LEU LEU LEU LEU LEUs CONCENTRATOR INTERLOCKING TCP/IP LEU – – 10 INTERFACES • ETCS level 2 – Relay type Interlocking • Safety Interface • Vital parallel I/O • Transmission Digital module • Serial vital comms protocol • Non standard • Manufacturer's owned RBC TDM VITAL PARALLEL INPUTS Interlocking • • Technically feasible Operationally not advisable • Maintenance • Investment • Lifecycle 11 INTERFACES ETCS level 2 – Electronic Interlocking – Serial Interface – Vital communications protocol – Non standard interface • Manufacturer's owned RBC INTERLOCKING • Signalling LAN 12 INTERFACES • ETCS level 2 – Electronic IL. Spanish experience – Westrace comms protocol has been implemented into Alcatel´s RBC in Spanish HS lines: • La Sagra – Toledo; Segovia – Valladolid; Lérida – Barcelona – Invensys RBC comms protocol has been implemented into – Alcatel´s Intersig interlocking in Córdoba – Málaga HS line Westrace comms protocol has been implemented into Siemens CBTC in L9 driverless Barcelona Metro Interlocking protocol Interlocking RBC RBC protocol RBC Interlocking 13 INTERFACES • ETCS Level 2 – Level 2. Different manufacturers – RBC - RBC Safe Communication Interface is being specified within UNISIG. UNISIG SUBSET – 039. FIS for RBC - RBC handover. UNISIG SUBSET – 098. RBC – RBC Safe Comm. Interface. UNISIG SUBSET – 099. RBC – RBC Test specification for Safe Comm. I/F RBC RBC Signalling LAN 14 INTERFACES • ETCS level 2 – Level 1 – Crossing from Level 2 to Level 1 is performed automatically on – board (national function) Eurobalises marking the border of Levels 1 an 2 ETCS L2 ETCS L1 15 INTERFACES • ETCS level 2 – Level 1 – L2 overlapping L1 – L1 used as fallback system – Automatic switch over as national function ETCS L2 ETCS L1 16 INTERFACES • ETCS level 1 / level 2 - CTC CTC SIL 2 comms ETCS Central Control ERTMS – CENTRAL EQUIPMENT ETCS comms Interface ETCS comms protocol Manufacturer's owned LOCAL OPERATION LEVEL 2 JRU LEU CLC hot stand by RBC INTERLOCKING Eurobalises LEVEL 1 ETCS LEVEL 1 EQUIPMENT 17 CONCLUSIONS • GRADUAL MIGRATION – Maintain the existing ATP National System during migration perio d • ETCS Level 1 – Advantages • • • • Overlays existing signalling with minimal change GSM-R not required Interoperability now well proven On-board is compatible with higher levels (add radio) • • • No capacity improvement (can be negative unless in -fill is fitted) High Cost (Line side Electronic Unit + in-fill+ cabling) Trackside does not migrate easily to higher levels – Disadvantages • ETCS Level 2 with SIGNALS – Advantages • • Overlays on existing train protection Balises become fixed (no trackside electronics) – Disadvantages • • GSM-R is required Radio coverage may need to be improved over voice 18 CONCLUSIONS • ETCS Level 2 WITHOUT SIGNALS – Advantages • • Cab-signalling system with cost savings Significant capacity increases through variable train detection sections – Disadvantages • • All trains need to be fitted Radio based cab-signalling of this complexity is new to the mainline railway industry • Fall back system requested? – – High density traffic lines Low traffic lines • Signalling Systems – Cost effective solutions/technical feasibility • • Gradual enhancement Replacement 19