VISI DAN MISI UPTD SAMPAH MANGGAR

Transcription

VISI DAN MISI UPTD SAMPAH MANGGAR
SOLID WASTE MANAGEMENT
BALIKPAPAN CITY 2014
Introduction Of Balikpapan
2
• THE ENTRANCE GATE OF EAST KALIMANTAN PROVINCE
• WIDTH : 83.189 hectare (land : 50.330 hectare, sea : 32.859 hectare)
• TOPOGRAPHY : 85% HILLY & 15% FLAT
• THE CITY OF MICE (MEETING, INCENTIVE, CONFERENCE, EXHIBITION)
• CENTRE OF OIL REFINERY FOR THE EASTERN PART OF INDONESIA
• POPULATION IN 2012 : 637.488 PEOPLE
• POPULATION IN 2013 : 660.437 PEOPLE
• POPULATION GROWTH :
4,89 %
Waste Stream Balikpapan City
140000
120000
100000
10%
80000
13%
Transported to TPA
7%
composted
71%
60000
Recycled
Untreated
2011
2012
2013
40000
20000
0
SOLID WASTE MANAGEMENT
203.03 tons/year
163,269 tons/year
INORGANIC
WASTE
NEIGHBOURHOOD
WASTE/DOMESTIC
WASTE
WASTE BANK
11,008 tons/year
SOURCE
OF WASTE
MARKET/SHOP
WASTE
WASTE
SORTING
ORGANIC
WASTE
WASTE
RESIDUE
ROAD/STREET
WASTE
5
COMPOST
HOUSE
115,266 tons/year
FINAL
DISPOSAL
AREA
Waste Collection System
Motto : No Waste Stays in Waste Container
 There Are 4 shift for collection the waste
1. Shift 1, (00-08.00 am),60 truck, all waste container in
the city
2. Shift 2, (03.00-11.00 am), 5 truck, residu from shift 1
3. Shift 3, (07.00 am- 03.00 pm), 5 truck, residu from shift
2 and new waste
4. Shift 4, (07.00 am- 03.00 pm), 8 pick up,sweep the
waste on the main street and new waste

KEBIJAKAN PEMERINTAH KOTA BALIKPAPAN
DALAM MANAJEMEN PENGELOLAAN SAMPAH 3 R
1. REVISION OF LOCAL REGULATION ABOUT SOLID WASTE
2. COMPOSE FEASIBILITY STUDY FOR SOLID WASTE MANAGEMENT IN CITY
BALIKPAPAN PADA TAHUN 2013
3. RECOMENDED INTERMEDIATE TREATMENT FACILITY FOR CITY OF
BALIKPAPAN (ITF)
- STAGE 1 : MATERIAL RECOVERY FACILITY ( MRF )
- STAGE 2 : AN-AEROBIC DIGESTION PLANT ( AD )
- STAGE 3 : ELECTRICITY PRODUCTION
4. DEVELOPMENT CWB ( CENTRAL WASTE BANK )
5. DEVELOPMENT WASTE WATER TREATMENT PLANT( IPAL) OFF-SITE.
6. 2013-2016 : PROJECT FOR CAPACITY DEVELOPMENT OF CENTRAL AND
LOCAL GOVERMENT FOR 3Rs AND DOMESTIC SOLID WASTE
MANAGEMENT SYSTEM BY JICA
7
There are 65 units of WASTE BANK
WASTE MANAGEMENT Innovation
Compost House (There are 38
units)
FINAL DISPOSAL AT MANGGAR LANDFILL
OVERVIEW OF FINAL DISPOSAL AT MANGGAR
LANDFILL
1.
Location
: Jl. Proklamasi RT 036 Manggar
2.
Width
: 27,1 Ha
3.
Land Status
: Property of Balikpapan City
Government
4.
System
: Sanitary Landfill
5.
Built in
: 1997/1998
6.
Fund Resource
: KUDP (Kalimantan Urban Development
Programme)
7.
Operated since
: 13 Januari 2002
DATA OF INORGANIC WASTE COLLECTED
BY COLLECTORS
IN 2013
111,400
109,700
JANUARI
FEBRUARI
MARET
APRIL
MEI
JUNI
104,200
98,300 97,500
93,500 96,300 96,800 91,300
95,900
181,800
89,700
JULI
AGUSTUS
SEPTEMBER
OKTOBER
NOVEMBER
DESEMBER
DATA OF COMPOST MANAGEMENT AND DISTRIBUTION
IN 2009 - 2013
915,040
910,300
800,200
SAMPAH ORGANIK
686,100
HASIL KOMPOS
607,800
PENGAMBILAN
KOMPOS
42,546
2009
22,752
48,027
2010
31,592
65,883
2011
28,540
57,885
2012
37,210
70,605
2013
34,095
ROUTE OF WASTE PROCESS INTO FINAL WASTE
DISPOSAL AREA
1
2
Truck entering TPA
3
Unloading
Scaling
Washing
6
5
4
TPA HUMAN RESOURCES & OPERATION

Currently, TPA Manggar has 65 personnel consisting
of:
Civil Servants : 10 Person
2.Administrative Staffs : 2 Person
3.Operational Personnel : 51 Person
4.The employees above get the average salary of
1,000,000 IDR to 1,500,000 IDR per month
1.
FACILITIES AND INFRASTRUCTURE IN FINAL WASTE DISPOSAL
AREA
NO
1
2
3
4
QUANTITY
NO
HEAVY EQUIPMENT
9 UNIT
1
LANDFILL
1 UNIT
TRANSPORTATION EQUIPMENT
9 UNIT
2
SCALING
1 UNIT
3
WASTE WATER TREATMENT
PLANT
1 UNIT
4
COMPOSTING BUILDING
1 UNIT
5.
3R BUILDING
1 UNIT
6.
EDUCATIONAL PARK AND
GAZEBO
1 UNIT
7
HEAVY EQUIPMENT GARAGE
1 UNIT
8
METHANE GASS AREA
1 UNIT
9
SECURITY POST
1 UNIT
FACILITY
3 R EQUIPMENT
METHANE GASS BIO
EQUIPMENTS
6 UNIT
6 UNIT
5
OTHER EQUIPMENTS
39 UNIT
INFRASTRUCTURE
QUANTITY
WASTE STACK LOCATION
The land arrangement uses Cut and Fill system.
The waterproof layer (Geomembrane) with an area of ​26,000 m2 in Zone I and 30,000 m2 in Zone
II is given a 40 cm-thick layer of red soil. The Leachate and gas pipeline installation has the distance
of 20 m (10) lines. The Waste Destroying System is Sanitary Landfill. Final Waste Disposal Area
Manggar is located on Jl. Proklamasi RT 036, Manggar subdistrict, East Balikpapan district or ± 23
Km from the city center
WASTE IS UNLOADED
USING THE EXCAVATOR
WASTE IS UNLOADED
USING THE EXCAVATOR
WASTE IS LEVELED
USING THE BULL DOZER
AS MAXIMUM AS POSSIBLE TRY TO
HAVE NO MORE WASTE AND ODOR
COVER THE WASTE USING THE
LAND
CITY OF BALIKPAPAN
CLEANSING, PARKS, AND CEMETERIES MANAGEMENT DEPARTMENT
FINAL DISPOSAL AT MANGGAR LANDFILL
WASTE STACK AREA OPERATION BASED ON DAILY CELL
B37
B29
B28
B27
B26
B34
B25
B24
B33
B23
B32
B22
B31
B21
B20
B2 B30
B4
B6
B9
B19
B18
B17
C2C1
C4
C5
C6
C7
C8
C9
C10
B10
B12
C3
B16
C18
C17
C16
C15
C14
C13
C12
C11
A1
B1
B3
B5
B7
B1B9
B13 1
B14
B15
A13
A1
A12
A11
A10
A2
A4
A5
A6
A33
A32
A31
A30
A29
A28
A27
A6
A23
A5
A22
A20
A3
A15
A2
A14
MASUK
A34
A35
A35
A4
A21
A3
WASTE STACK IMAGE DESCRIPTION
IN ZONE II
B35
B36
A26
BLOK A
BLOK B
BLOK C
A25
A24
A7
DAILY CELL POSITION
A19
A8
A18
A17
A9
A16
A10
CELL BOUNDARY OF WEEKLY
STACK
A11
A9
A8
A12
A7
A13
ACCESS TO THE STACK
Leachate Treatment System
Compost Production Facilities
1
2
3
4
DESCRIPTION KETERANGAN :
1. Compost Material
2. Material grinding
3. Fermentation
4. Reversal
5. Drying in the sun
6. Grinding
7. Packing
7
6
5
Plastic Cutting Facilities
The house to cut up the plastic is still
under construction
Cutting Machine
Waste Recycle Process
Methane Gass Production Facilities
1
Description Keterangan :
1. Stacking
2. Methane gass well
3. Separating tool of gass I and II
4. Gauge
5. Pipe transmitting methane gass to
the population
6. Methane gass is utilised by the
people
2
3
4
6
5
FINAL WASTE DISPOSAL AREA AS THE
EDUCATION FACILITY
1. Change the people’s point of view regarding the TPA that it is no longer dirty and smelly
Nursery House
2. Nursery house for education
3. Education on inorganic waste / use the waste for handicraft
Handicraft
resulted from
inorganic waste
4. Education on organic waste/use the waste for compost.
Compost resulted from
organic waste is ready to
be distributed to the
community free of
charge.
5. Education on the methane gass
Methane gass utilised
by the community
Reading park
6. Education on reading park
FINAL WASTE DISPOSAL AREA AS THE
RECREATION FACILITY
The recreation facilities are among others:
1. ATP Car Mobil ATP
2. Suspended bridge and other playing facilities
3. Flying fox
4. Cafe Methane
THANK YOU

Similar documents