estates strategy 2014-2017 - Stranmillis University College
Transcription
estates strategy 2014-2017 - Stranmillis University College
ESTATES STRATEGY 2014-2017 Revised Strategy Approved by Governing Body on 19 June 2014 Sections 1 Executive Summary 2 Introduction and Overview 3 Structure 4 Strategic Objectives 5 College Estate and Related Data 6 Space Utilisation 7 Valuation of Estate 8 Anticipated Costs of Strategy Appendices Revised Strategy Approved by Governing Body on 19 June 2014 2 EXECUTIVE SUMMARY 1 PURPOSE AND PERIOD FOR THE STRATEGY This strategy aims to provide a long-term plan for developing and managing the Estate in an optimum way in relation to the Institution’s Corporate Plan and business needs. It covers the period 2014-2017. In addition to the specific projects identified in this project the University College will continue to set aside, as appropriate, a substantial Maintenance Budget to address the routine and backlog of maintenance. 1.1 Strategic Objectives The University College has a Strategic Plan in place for the years 20132016. While growth in full-time student numbers is not envisaged due to the limits set by DEL, there is an anticipated increase in international students, professional development courses (some with significant associated teaching on campus), and curriculum development and research projects. This strategy is built with the purpose of increasing accommodation and investment into existing teaching and student accommodation so that it is fit for purpose. 1.2 The University College Estate The University College Estate has benefited from recently accelerated investment in the fabric of its buildings and in the refurbishment of teaching space and resources rooms within the Central Building. This investment has brought the accommodation up to a level which is fit for purpose. While the main teaching buildings are fit for purpose and well maintained, further resources will be required to attend to other issues around campus. Other works required will be in accordance with the attached Strategy. There has been considerable investment in the Halls of Residence in the past two years. Three blocks have been converted to en-suite facilities and there has been substantial investment in the refurbishment of the remaining blocks. By the start of the 2013-14 academic year there will be one triple block and two west blocks remaining that require improvement to provide a mix of facilities to meet the demands of the modern student and conference guests. 1.3 Proposals All buildings on campus have been subject to condition surveys carried out in 2008. This report portrays the most up-to-date position in relation to the backlog maintenance requirements to bring the campus up to present teaching standards as identified within the University College Corporate Plan. This Plan is now being updated to cover the period 2014-2017. Revised Strategy Approved by Governing Body on 19 June 2014 3 1.4 Funding and Implementation The funding required to complete the various works will be provided by DEL capital funding, surplus cash reserves and in-year surpluses. 2 INTRODUCTION AND OVERVIEW 2.1 Purpose of the Strategy HEFCE has defined an Estates Strategy as: “a long term plan for developing and managing the Estate in an optimum way in relation to the Institution’s Corporate Plan and business needs.” The structure of this document has been influenced by the HEFCE Guide for Good Practice on Estate Strategies. This document aims to complement the Corporate Plan for the period of 2014-2017. The Estates Strategy seeks to: 2.2 link the Corporate Plan and the Estates Strategy; assess the University Colleges’ existing Estate condition and performance; outline current and future requirements of the Estate and the changes required to implement those requirements; summarise the challenges presented by the existing Estate; identify opportunities for the development and rationalisation (where they exist) of the Estate; plan how to implement the Estate Strategy including the financial requirements of the Strategy; and to look ahead to how the Strategy can be converted into annual plans which enable delivery. Objectives of the Strategy The objectives of the Strategy are: to develop a strategy which underpins and facilitates the University College’s Corporate Plan and academic objectives in teaching and research; to encourage the efficient use of space; to design and control the implementation of major capital and minor works; to upgrade and maintain the University College’s buildings, services and grounds through an established policy and programmes of planned and reactive maintenance whilst ensuring compliance with current legislation, health and safety and best practice; to assess systematically and regularly the condition of the University College’s Estate and to prepare programmes for their maintenance; Revised Strategy Approved by Governing Body on 19 June 2014 4 2.3 to embrace the principles of sustainability and be environmentally conscious wherever possible in planning, design, operation and maintenance of the estate and buildings. Period for the Strategy and Consultation The strategy covers the period 2014-2017. Discussions are ongoing with the Corporate Planning and Academic Planning Teams, Students Union and a wide range of other relevant staff. 2.4 Review It is envisaged that this Strategy will be reviewed and updated annually. 2.5 Status of this Strategy This strategy is at a stage where the funding required for some projects has been identified and allocated, whereas others are dependent on the success of University College in generating surpluses or special funding being made available by DEL. The profile is shown in Appendix 3. 2.6 The Existing Estate The existing Estate is focused on one campus which covers an area of approximately 46 acres and accommodates 22 buildings of some 32,780m² of floor area. This accommodation includes a mixture of buildings used including for academic, support services and residential purposes. 2.7 A Brief History of the Development of the Campus The College has its origins on the present campus in October 1922 when the site was acquired from Queen’s University. The main campus building from this period (Stranmillis House) still exists although it is much altered. A new building, known as the Main Building, was added and opened in 1930. Development of the campus included the addition of the Orchard Building, College Hall and Hostel Bungalows, along with the Henry Garrett Building. During the 1960s there was a need to increase teaching and accommodation space, and after the removal of all the Hostel Bungalows, the new four-storey Central Building was erected. At the same time new accommodation and dining blocks were erected in 1968 accommodating some 450 students. The only new development that has taken place since was the removal and replacement of the Orchard Building which was completed in July 2007. Revised Strategy Approved by Governing Body on 19 June 2014 5 3 STRUCTURE OF THIS STRATEGY This Strategy will be based on an analysis of the Estate, updated Corporate Plan, current resources and future opportunities. The key sections are as follows: Section 4 outlines: the strategic and academic objectives of the University College as defined in the Corporate Plan 2013-2016. Section 5 provides: An assessment of the existing estate. Identification of current and future requirements in order to satisfy the University College’s strategic aims. Evaluation of available options for the expected future use requirements of each building. The implementation plan showing how the proposals will be achieved. Appendices. 4 STRATEGIC OBJECTIVES The Strategic Objectives of the University College with respect to the Estates strategy in the 2014-17 planning cycle are set out below. 5 To achieve a return where at least 70% of the buildings on campus are assessed to be at least (B) against the following HEFCE definitions i.e. Sound, operationally safe, exhibiting only minor deterioration or better; (see Appendix 4). To increase the utilisation of the buildings and increase rental income, including that generated from strategic collaborative partnerships. UNIVERSITY COLLEGE ESTATE AND RELATED DATA The University College seeks to provide an Estate that is at least comparable with other HE Institutions. The implementation of the Estates Strategy will significantly enhance the campus environment. In accordance with HEFCE Good Practice Guide, buildings have been assessed against the following RICS definitions: A B C D As new Sound, operationally safe, exhibiting only minor deterioration Operational, but major repair or replacement needed soon Inoperative or serious risk of failure or breakdown. Revised Strategy Approved by Governing Body on 19 June 2014 6 Appendix 2 summarises the current RICS rating and the target ratings for each year over the 2014-2017 period. 5.1 New Orchard Building The original Orchard Building, which was a prefabricated building erected in the late 1940s as temporary teaching accommodation, has been demolished and a new purpose built building erected in its place. This new Orchard Building, completed in 2007, now houses the Health and Physical Education department, Technology and Design and Art and Craft subjects. A planned preventative maintenance programme operates to maintain the ‘as new’ A rating of this building. This is funded from the University College’s routine maintenance budget. Current Physical Condition: A Target Physical Condition Maintain: A 5.2 Central Building This building opened in 1970 and houses the main teaching facilities for the College. The structure of the building requires works on the concrete columns, due to some concrete spalling, and the replacement of single glazed windows would enhance the energy efficiency of the building. In order to enhance the student experience the building has been substantially upgraded internally with the exception of the entrance foyer. A series of refurbishment projects have been carried out to the internal teaching areas on all levels of the building. The lecture theatres and all other teaching space, including the Science laboratories and the library, have been upgraded and a suite of toilets have been added to the Drama Theatre. Minor internal upgrades are still required to office areas, toilets and other common areas such as the entrance foyer. However with the recent investment the teaching areas are now fit for purpose. In addition to the above, a substantial services refurbishment has been undertaken in the past few years including new mechanical and electrical installations and new internal fit -out and re-roofing. Currently the entrance foyer is poorly designed and has no focal point for visitors to the building. The business case has just been approved which will allow for the refurbishment and enlargement of the entrance foyer to accommodate a catering outlet to replace the existing Betty’s Coffee Shop and include an enhanced reception area. This work will be part funded by DEL capital funding in 2014-2015 and should commence in June/July 2014. The Project is being progressed in consultation with CPD. The College Estates Team has worked with DFP Properties Division on the design. The repair of the external envelope, especially the deterioration of the concrete cladding and the replacement of all windows would bring the overall condition up to a ‘B+. However a further business case needs to be prepared for DEL approval before the work can commence. If additional Revised Strategy Approved by Governing Body on 19 June 2014 7 capital funding is made available in 2015-16 and 2016-17 it may be possible to commence the work during the 2016-17 year. Current Physical Condition: C + Target Physical Condition: B/B+ 5.3 Stranmillis House This is the oldest building on campus. It traditionally housed mainly the Students’ Union facilities. Large areas of this building were not in use due to the poor design and layout. The building is made of sandstone and many external areas are now showing deterioration due to many years of weathering. Many external features such as the ornate pinnacles have been removed and stored for safety. A specialised condition survey of the exterior of the building is required. A Business Case, for provision of disabled access facilities to include a new ramp to the main entrance, lift, stair lift and upgraded toilet facilities was prepared and planning and listed building consent was received. This work is now complete and was funded largely from the DEL capital funding allocation for 2013-2014. In addition the College funded a second phase of refurbishment to update the electrical and IT systems within the building and redecoration. The completion of these works in March 2014 provided the University College with a building where the staff and services from the ‘Main Building’ have been relocated, given the fact that the College secured an additional £2.81m to remove asbestos and refurbish the Main Building. On completion of the Main Building works in Spring/Summer 2015 it is expected that the staff and services previously accommodated within Main Building will move back. The College then plans to relocate its Student Support Services and a number of other functions to Stranmillis House when the Main Building works are complete. This project has commenced before the reclassification of the College as a NDPB and consequently CPD has not been involved. Physical Condition: B Target Physical Condition: B+ 5.4 Refectory This building, again circa 1970, contains the main kitchens and dining rooms and a conference centre. Some refurbishment has been carried out over the last 10 years, with a new roof being fitted, internal refurbishment being carried out, to convert under-utilised space to create a purpose built conferencing centre and reception area and in 2004 a major refurbishment to the kitchen and servery areas was completed. As the building features large glazed areas, the windows require upgrading to conform to the latest standard for health and safety. Major works were Revised Strategy Approved by Governing Body on 19 June 2014 8 carried out in 2004 to bring the building up to the latest fire and DDA standards. However funds available at that time did not permit the installation of a lift. The heating system within the building and the adjacent Halls of Residence blocks was totally replaced as part of the 5 year programme. This was achieved by installing controlled radiator systems and air handling systems for the dining rooms. Extensive electrical upgrade works and the installation of energy efficient lighting was included in the project. As part of the on-going review of usage of University College buildings to meet emerging needs it was proposed to relocate Scholar’s bar from Stranmillis House to the basement of the Refectory Building in 2013. This move will consolidate the social and conferencing functions to the Refectory Building. In addition accessibility will be improved by the provision of a lift. This is in response to compliance with DDA requirements. The business case for this project has been approved by DEL. The College has funded the project, which nears completion at June 2014, from its cash reserves. To complete the Refectory Project a second phase to replace the windows and fire escape, improve top floor toilet facilities and re-clad the building to both improve insulation, and energy efficiency and to enhance the appearance of the building, creating an architectural linkage to buildings elsewhere on campus will be required. Initial design details have already been prepared and a business case will be submitted to DEL early in the 2014-15 academic year. It is anticipated that this phase will be partially funded from DEL capital funding for 2014-15 plus College reserves. This project has commenced before the reclassification of the College as a NDPB and consequently CPD has not been involved. A further business case for a project to undertake the re-cladding of the building façade and replacement of the external glazing to create a more uniform campus will be prepared for DEL approval. Some elements of the design work have already been completed as part of the first phase of the project. Advice will be sought from DEL and CPD about how the project should be progressed. Current Physical Condition: B Target Physical Condition: B+ 5.5 Halls of Residence Built circa 1968; the Halls of Residence comprise 6 blocks which are in reasonable condition, having had new roofing systems installed and the electrical systems replaced over the last ten years. Some major refurbishment was carried out in 1997 to all bedrooms and common areas, so that the buildings conformed with fire regulations. Further works were carried out to comply with enhanced fire regulations in 2004. DDA works have been carried out and disabled bedrooms have been provided within Navan West and Nendrum blocks. All of Nendrum, Arboe and Dunseverick blocks have been refurbished to incorporate high Revised Strategy Approved by Governing Body on 19 June 2014 9 standard en-suite facilities. Navan Hall (North & South corridors) blocks of standard rooms were refurbished in the summer of 2012 and the Devenish Hall (North & South corridors) will be refurbished in the summer of 2013. The previous steam heating system has systematically been removed and individual gas boilers have been installed in each building providing individual heating and hot water systems. All the mechanical heating systems and controls were also upgraded within all Halls of Residence. All works were substantially funded by DEL. During the 2013-16 planning cycle further refurbishment to increase the number of en suite rooms and improve the condition of the remaining standard rooms is planned. The targets are set out below. Hall Dunseverick Arboe Nedrum Navan (North & South) Navan (West) Devenish (North & South) Devenish West Culmore (North & South) Culmore (West) 5.6 Current Physical Condition June 2014 B+ B+ B+ B Target Physical Condition 2013-14 Maintain as B+ Maintain as B+ Maintain as B+ Maintain as B Target Physical Condition 2014-15 Maintain as B+ Maintain as B+ Maintain as B+ Maintain as B Target Physical Condition 2015-16 Maintain as B+ Maintain as B+ Maintain as B+ Maintain as B C B Maintain as C Maintain as B Maintain as C Maintain as B Maintain as C Maintain as B C Maintain as C Maintain as C Maintain as C C Refurbish as B Maintain as B B C Maintain as C Maintain as C Maintain as C Former Student Support Centre/Now Cybertub The Student Support Centre has provided accommodation for the services of Counselling, Medical Centre and general pastoral support to students. This building sustained significant damage as a tree fell on the building in March 2013. The building has now been repaired. The Centre is now being used as an information point for students in residence, provides a new location for student laundry facilities and provides the base from which the Residence Co-ordinator (night worker) operates. A number of resources and social space which residential students require access to are being relocated to this building in order to improve access for all students including those with disabilities. Current Physical Condition B+ Target Physical Condition: B+ The Revised Strategy Approved by Governing Body on 19 June 2014 10 5.7 Estates Offices/Farmyard Buildings These buildings are in reasonable condition. Some repointing has been carried out and new windows have been installed in all upper area buildings which are used for offices and workshops. Internal refurbishment and upgrading of the heating system has been carried out in upper buildings also. Physical Condition: B Target Physical Condition: Maintain at B 5.8 Back Gate Lodge and Warden’s House These two properties are let out to non-College residents at commercial rents. The properties are in reasonable condition externally but were in need of internal refurbishment. Internal refurbishment has been carried out on both the Back Gate Lodge, and the Warden’s House. A new gas boiler has been installed in the Warden’s house. Oak Lodge Refurbishment on the Oak Lodge property was carried out in 2012 with the addition of en –suite facilities and a new gas boiler. It is used mainly for visiting Professors and academic staff. As a result of the works the building has been re-designated as a B rating. Physical Condition:Back Gate Lodge B Oak Lodge B+ Warden’s House B Target Physical Condition: Maintain at B and B+ 5.9 Front Gate Lodge The front gate Lodge is a listed cottage located by the front gates of the campus which is occupied by the University College Security Department. It requires some internal and external refurbishment including electrical services upgrades. Current Physical Condition: C Target Physical Condition: Maintain at C 5.10 Main Building This listed building was erected in 1930; the building is in reasonable condition and, over the last ten years, the internal fabric has been refurbished. Some external works have been carried out recently to the rainwater goods. The mechanical and electrical services are beyond their useful life and require replacing, with the upgrade of lighting for current computer use regulations a priority. Some asbestos removal is required within the roof space as a “dirty clean” was carried out some 20 years ago. Revised Strategy Approved by Governing Body on 19 June 2014 11 This building houses corporate administration, some teaching space and a number of project teams. Certain areas are also allocated for conference/meeting use. In 2004 the building was upgraded to bring it up to the required standards for Fire Safety and DDA. A business case for the removal of asbestos and refurbishment of the building was approved by DEL and an application for listed building consent for works to the Main Building has also been processed. The works include asbestos removal, replacement ceilings and replacement and upgrade of mechanical and electrical services and some replacement windows. The Main Building will be unoccupied for the duration of the works and staff and services from this building were relocated to Stranmillis House in March 2014 for the duration of the required works. The works on the Main Building commenced in March/April 2014 and it is estimated that the work will take 12-14 months to complete. This project has commenced before the reclassification of the College as a NDPB and consequently CPD has not been involved. Current Physical Condition: C Target Physical Condition: A 5.11 College Hall This is a prefabricated building, circa 1940. The building is used mainly as an examination hall and for accommodating some social events. The main hall has had new electrical circuits installed and some redecoration completed. New controls have been fitted to the heating circuits, which enable the conditions within the building to remain more stable using very old under floor heating. Replacement of this heating system would be advantageous as it is presently very inefficient to run. The toilets have been refurbished and a disabled toilet and ramps added to meet disabled access requirements. All low level windows have been replaced with safety glass. The old animal house and back stage areas need refurbishment and the scenery store is cladded with asbestos sheeting both inside and out. This will have to be removed in due course. College Hall will be maintained at grade C in the immediate future. However, the long term proposal is to demolish the building and provide a new purpose built facility on the site in response to anticipated future needs. Physical Condition: C Target Physical Condition: Maintain at C Revised Strategy Approved by Governing Body on 19 June 2014 12 5.12 Lagan Lodge Built in 1934; this five bedroom house was used by College Principals until around 1990 when it was rented out for a short period. It has not been used for accommodation since the early 1990s and has deteriorated internally to such an extent that it is unsafe and requires demolition. An application was lodged for approval to demolish which was granted in Spring 2013. The Demolition Business Case has been approved by DEL. The plan is now to demolish the building by July 2014 and retain the footprint of the building for possible future use such as additional car parking. In the interim the ground will be landscaped following the demolition of the building. This project had commenced before the reclassification of the College as a NDPB and consequently CPD has not been involved. Note: The building has been demolished 5.13 Henry Garrett Building This building was closed in 2008 as it was no longer fit for purpose and was replaced by the new Orchard Building. The main part of the building is listed. However, the former Technology Centre, which was an add-on, is not listed and the University College has recently obtained the necessary consent to demolish the non-listed addition to the building. The University College is currently exploring a number of potential partnering arrangements whereby the building could be refurbished and rented out to an appropriate strategic partner. This would also enable the University College to meet its statutory obligations to maintain and protect a listed building. The Demolition Business Case has been approved by DEL. The plan is now to demolish the Technology Centre by July 2014 and retain the footprint of the building for possible future use such as additional car parking. In the interim the ground will be landscaped following the demolition of the building. The works have commenced. This project has commenced before the reclassification of the College as a NDPB and consequently CPD has not been involved. Physical Condition: D Target Physical Condition: Maintain at D 5.14 All-Weather Pitch The University College presently has a 25+ year old hockey pitch / training area made from quarry dust which is no longer fit for purpose as required by today’s sports bodies. For the University College to overcome this shortfall of facilities it wishes to install a purpose made all weather hockey / training area with suitable Revised Strategy Approved by Governing Body on 19 June 2014 13 floodlighting, changing rooms and adjacent car parking facilities which would enhance both the student and external user experience. A Business Case for this project is currently being prepared for DEL approval. This project will be progressed in consultation with CPD. If further capital funding is available from DEL, it is anticipated that the works will commence in 2015-16. Physical Condition: C Target Physical Condition: A 6 SPACE UTILISATION The University College is planning to introduce a computerised timetabling and room booking system to ensure that accommodation is used to maximum efficiency both for teaching and conference uses. However, it is evident that flexibility in the use of space is inhibited in many cases by the specialised nature of many of the rooms. It is important that the University College demonstrates that the accommodation is used to best advantage therefore more general purpose teaching rooms offering greater flexibility of use have been created within the main teaching block. 7 VALUATION OF ESTATE The Valuation & Lands Agency carried out an assessment of the value of the buildings and land on campus as at July 2009. The land was valued at £25m and the buildings at £24.31m. The valuation was prepared on the basis of depreciated replacement value. The value for each building is shown in Appendix 1. 8 ANTICIPATED COSTS OF THE ESTATES STRATEGY A revised summary of project costs, along with the associated funding sources when known, relating to the 2014-17 strategy is shown in Appendix 3. For the final 2 years of the current CSR period, to 31 March 2015, major projects totalling £6.9m have been identified and works are either underway or business cases and plans are currently being prepared. This includes approximately £2.7m expenditure relating to the Main Building. DEL capital funding received for these 2 years (2013-14 and 2014-15) amounts to £3.95M including £2.8m of special DEL funding which was secured in October 2013 re 2014-15 towards the Main Building project. This has enabled the timing of this major project to be accelerated. A further £1.14M of funding from DEL contributes to the costs of these projects with the College contributing an anticipated £2.95m from its cash reserves. Revised Strategy Approved by Governing Body on 19 June 2014 14 The projections included in Appendix 3 also outline 3 major anticipated projects costing an estimated £2.57m for the period 2015 -19. There are also 2 further priority projects for which no estimated costs are yet available. The 2015-19 period is linked to the next Comprehensive Spending Review period, when the University College should receive a further allocation of capital monies from its sponsoring department. At the time of writing the level of capital finding beyond 31 March 2015 is not known. Given the lengthy lead in times required for capital projects this does present challenges in being exact about the timing and affordability of priority projects identified in the Estates Strategy. It should be noted that some of the information provided is in the form of cost estimates and the timing of these projects is unclear. Furthermore, the amount of money available to spend on the University College’s maintenance programme will be determined by availability of funds and the success of the University College’s income generation strategy. Revised Strategy Approved by Governing Body on 19 June 2014 15 Appendix 1 Appendix 1: Valuation of the Estate Depreciated Replacement Cost - 1 July 2009 £ Main Central Stran House College Hall Orchard Building Estate Buildings Refectory Halls of Residence Student Support Centre Front Gate Lodge Residences External works Land 2513300 4903993 925978 188235 5030012 101573 1689756 5796068 88631 24570 1375000 1670986 25000000 TOTAL 49,308102 Revised Strategy Approved by Governing Body on 19 June 2014 16 Appendix 2: Summary of building assessments and targets using the following RICS definitions: A As new; B/B+ Sound, operationally safe, exhibiting only minor deterioration; C/C+ Operational, but major repair or replacement needed soon; D Inoperative or serious risk of failure or breakdown. No Building/Facilities 1 New Orchard Building 2 3. 4. Physical Condition – Target 2014-15 Target 2015-16 Target 2016-17 A Maintain as A Maintain as A Maintain as A Central Building Stranmillis House Refectory Building Halls of Residence: Dunseverick Arboe Nendrum Navan (North/South) Navan (West) Devenish(North/South) Devenish (West) Culmore (North/South) Culmore (West) B B B B+ Maintain as B+ Maintain as B+ Maintain as B+ Maintain as B+ Maintain as B+ Maintain as B+ Maintain as B+ Maintain as B+ B+ B+ B+ B C B C C C Maintain B+ Maintain B+ Maintain B+ Maintain B Maintain C Maintain B Maintain C Maintain B Maintain C Maintain B+ Maintain B+ Maintain B+ Maintain B Maintain C Maintain B Maintain C Maintain B Maintain C Maintain B+ Maintain B+ Maintain B+ Maintain B Maintain C Maintain B Maintain C Maintain B Maintain C Student Support/Information Centre/Cybertub Estates Offices/Farmyard Back Gate Lodge B Maintain as B+ Maintain as B+ Maintain as B+ B Maintain B Maintain B Maintain B B Maintain B Maintain B Maintain B June 2014 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17 No Building/Facilities Physical Condition – Target 2014-15 Target 2015-16 Target 2016-17 Target 2014-15 Target 2015-16 Target 2016-17 Maintain B+ Maintain B+ Maintain B+ June 2014 Building 17. Oak Lodge Physical Condition – June 2014 B+ 18. Warden’s House B Maintain B Maintain B Maintain B 19. 20. 21. Front Gate Lodge Main Building College Hall C C C Maintain as C Maintain as A Maintain as C Maintain as C Maintain as A Maintain as C Maintain as C Maintain as A Maintain as C 22. Lagan Lodge Demolished 23. 24. Henry Garrett All Weather Pitch D C Maintain as D Maintain as C Maintain as D A Maintain as D Maintain as A 18 Appendix 3 Current and Target Rating of Stranmillis Estate 2014-2017 @ June 2014 Total no of buildings in each category June 2014 2014-15 2015-16 2016-17 A 1 2 3 3 B+ 5 8 8 8 B 7 6 6 6 C+ 1 0 0 0 C 8 6 5 5 D 1 1 1 1 Total 23 23 23 23 19 % of buildings in each category June 2014 2014-15 2015-16 2016-17 A B+ B C+ C D 4% 22% 31% 4% 35% 4% 9% 35% 26% 0% 26% 4% 13 % 35% 26% 0% 22% 4% 13 % 35% 26% 0% 22% 4% Total 100.00% % B and above 57% 100.00% 100.00% 100.00% 70% 74% 20 74% 2012 ‐ 2 0 1 7 E S T A T E S S T R A T E G Y 21 ONE CAMPUS 46 ACRES 21 BUILDINGS of 32,780m2 Floor Area ACADEMIC SUPPORT RECREATION RESIDENTIAL THE CAMPUS PLAN 22 STRATEGY PURPOSES • To establish the work required • To determine the work priority • To provide a methodology for work sequencing STRATEGY OBJECTIVES • Invest in upgrading and maintaining the site • To enhance the student experience • To future proof the campus for beyond 2015 STRATEGY PURPOSES & OBJECTIVES 23 • ONE CAMPUS • 46 ACRES • LARGE AREAS OF GRASS • MATURE WOODLAND AREAS • MATURE TREES THROUGHOUT SITE • POND • STEEP TOPOGRAPHY THROUGHOUT SITE TOPOGRAPHY 24 LISTED BUILDINGS • MAIN BUILDING RATING A • HENRY GARRETT RATING B+ • STRANMILLIS HOUSE RATING B1 • FRONT GATE LODGE RATING B2 • BACK GATE LODGE RATING B1 • GATEWAY RATING B1 • SITE BOUNDARY WALL TO STRANMILLIS ROAD RATING B1 CONSERVATION AREA 25 CONDITION SURVEY JUNE 2012 26 CONDITION SURVEY 2015 + 27 WORK TO HENRY GARRETT • PARTIAL DEMOLITION OF EXISTING BUILDINGS TO: - DIVERT MONEY INTO MAINTAINING BUILDING FOR FUTURE – IN REGONITION OF REPONSIBILITIES AND BUILT HERITAGE - ALLOW SPACE FOR FUTURE CAR PARKING • OPPORTUNITY FOR PARTNERSHIP TO PROMOTE FUTURE DEVELOPMENT AND USE WORK TO PRINCIPAL’S HOUSE • APPLICATION FOR DEMOLITION LODGED • MAY BE CONSIDERED IMPORTANT AND PROTECTED BY HENRY GARRETT LISTING AND CONSERVATION AREA – ALTERNATIVE USE AND UPGRADE TO BE PROPOSED TIME LINE 2015 + HENRY GARRETT & PRINCIPALS HOUSE 28 New Pedestrian Node link from Orchard to Central Building New link from Henry Garrett to Central Building • • • • • New covered link from Henry Garrett New high level link to Central Building New soft landscaping New resource/library building New pedestrian node behind Stran House • • • • • • New hard and soft landscape proposal New front entrance proposal to Central Building Traffic Calming and road narrowing New safe pedestrian route to College North New covered information points Pedestrian Priority 2015 +NEW LINKS 29