6 – Strategic Improvements - Treasure Lake Talk – "TLT"
Transcription
6 – Strategic Improvements - Treasure Lake Talk – "TLT"
6 – Strategic Improvements Treasure Lake Master Plan The Treasure Lake Master Plan update was originally intended to address only the development potential of the undeveloped portions of the Treasure Lake property. However, as planning discussions evolved, it became clear that property owners were concerned with the condition of various existing facilities in the Treasure Lake community. Suggestions for strategic improvements to existing facilities were solicited through the property owners’ survey and open house and reviewed by the Infrastructure Committee and planning consultants, Gannett Fleming, Inc. Current assessments of Treasure Lake POA facilities and infrastructure were provided by the Infrastructure Committee: the Treasure Lake Road Summary (revised November 2007), the Treasure Lake Annual Road Cost (revised November 2007), the Treasure Lake Road Inventory (revised November 2007), and the Treasure Lake Physical Audit (conducted January 2006). The following table summarizes these current programs and outlines potential strategic improvements. Assessment of Current Facilities and Infrastructure Facility Roadways General Condition and Needed Improvement The road network in Treasure Lake includes paved, tar and chip and gravel roads. The Treasure Lake POA Infrastructure Committee has developed the following program for annual road maintenance. Road Maintenance/Repair Program Paved Roads There are 18.4 miles of paved roads. At a resurfacing cost of $145,000/mile, one complete cycle of resurfacing all paved roads totals $2,672,495. Budgeting the cycle over 9 years yields an annual resurfacing rate of 2.05miles/year at an annual cost of $296,944. Recent annual repaving has been lower than the annual need at 1.5 miles of actual improvements. 57 6 – Strategic Improvements Treasure Lake Master Plan Facility Roadways Condition and Needed Improvement Tar and Chip Roads There are 54.6 miles of tar and chip roads in Treasure Lake. At a cost of $20,000/mile for a double seal coat resurfacing, one complete cycle of resurfacing of all tar and chip roads costs $1,091,600. Budgeting the cycle over 5 years yields an annual average of 10.92 miles at a cost of $218,320. The tar and chip resurfacing programs for 2006 and 2007 have been near the number of miles to be improved annually; 7 miles of resurfacing were completed in 2006 and 12 miles in 2007. Campgrounds There are 7.0 miles of gravel road in the Cayman Campground. At a resurfacing cost of $12,000/mile, one complete cycle of resurfacing of all gravel roads totals $83,904. Budgeting the cycle over 7 years yields an annual resurfacing rate of 1.0 miles at an annual cost of $11,990. 58 6 – Strategic Improvements Treasure Lake Master Plan Facility Roadways Condition and Needed Improvement Roads are selected annually for the paving program based on two factors: road condition and level of service. Road conditions are rated from 1 to 5, where 1 is a condition that hinders traffic flow and may need to be reconstructed and 5 is a fully functional condition, requiring no immediate maintenance or repair. Level of Service (LOS) is rated from A to C based upon the number of homes served; LOS A serves more than 30 homes, LOS B, between 10 and 30 homes, and LOS C, less than 10 homes. The November 2007 assessment is summarized below: Tar & Chip Road Assessment (in miles) Condition 5 (good) 4 3 2 1 (poor) Total LOS A Roads +30 homes 1.70 1.15 2.49 0.00 0.00 5.34 LOS B Roads 10-30 homes 2.84 8.89 8.86 0.90 0.28 21.77 LOS C Roads <10 homes 5.41 11.09 8.39 1.97 0.70 27.57 Total 9.95 21.13 19.75 2.87 0.98 54.68 Rating by % 18% 39% 36% 5% 2% Paved Road Assessment (in miles) Condition 5 (good) 4 3 2 1 (poor) Total LOS A Roads +30 homes 4.52 5.41 1.26 0.00 16.14 LOS B Roads 10-30 homes 0.14 0.91 0.36 0.00 0.00 1.41 LOS C Roads <10 homes 0.17 0.72 0.00 0.00 0.00 0.88 Rating by % Total 0.31 6.15 5.77 1.26 0.00 18.43 29% 33% 31% 7% 0% Campground Roads (in miles) Condition 5 4 3 2 1 Total Rating by % Roads (No LOS Rating) 1.29 4.12 1.58 0.00 0.00 6.99 18% 59% 23% 0% 0% Summary 59 6 – Strategic Improvements Treasure Lake Master Plan Facility Roadways Condition and Needed Improvement The total cost of one full cycle of road maintenance for the 80.1 miles of various road types is $3,847,999. The total annual cost of road maintenance is $527,254. At a minimum resurfacing rate of 10.94 miles per year, the tar and chip program should be able to improve the roads that have a rating of 1 to 3 within three years. Repaving all roads with a rating of 1 to 3 will take more than four years at a program rate of 2.05 miles per year. Recommendation The paved roads that have condition rating of 1 or 2 also need work beyond only resurfacing. In many cases, shoulder improvements, road base repairs and storm water drainage improvements are needed to sustain the service life of these roads. These improvements should be factored into the Treasure Lake road improvements program and budget. Road Safety - Street lights are not necessary or in character with Treasure Lake’s rural atmosphere. However, lighting at major intersections, where two LOS A roadways meet, should be evaluated for safety. Entrance Drive to Town Center There is extremely poor visibility to the entrance drive due to roadway geometrics, the growth of natural vegetation and lack of lighting or other queues. This is a safety concern as well as poor promotion of the Town Center. Pruning or removal of vegetation should be considered. Lighting or reflective signage should also be considered to offer advance notice of the entrance to approaching drivers. 60 6 – Strategic Improvements Treasure Lake Master Plan Facility Buildings Front Gate/ Security Building Condition and Needed Improvement Physical Condition Exterior • Roof – good condition; replaced in 1999 • Walls, Doors and Windows – good to fair condition • Sidewalk and Driveway – good to fair condition • Landscaping – fair condition Interior • Walls – fair condition • Floor Covering – poor condition • Electrical – poor condition; needs upgrade • Windows- poor condition • HVAC – fair condition Function/Use Houses security services to Treasure Lake at the front gate. Maintenance As needed. Recommendation This building should be improved both in its overall functionality to provide front gate security for Treasure Lake and in its external appearance as it defines a visitor’s first impression of Treasure Lake. 61 6 – Strategic Improvements Treasure Lake Master Plan Facility Buildings Property Owners Association Administration Building Condition and Needed Improvement Physical Condition Exterior • Roof – good condition; replaced in 2007 Interior • HVAC – poor condition; heating is a mix of wall units, electric baseboard, heat pumps and electric furnace • Walls – fair condition • Doors – poor condition; need replacement • Windows – fair condition • Sidewalk – good condition • Paint & Stain – poor condition • ADA Access – fair condition Function/Use Large 10,680 sq. ft. building that houses the offices of TLPOA staff as well as other organizations and functions. Building has many small rooms previously used by sales staff to sell lots at Treasure Lake. Interior of building is not used efficiently. Recommendation Make exterior improvements to TLPOA building to make it a focal point for the Treasure Lake Town Center and interior renovations for more efficient use of space and energy. 62 6 – Strategic Improvements Treasure Lake Master Plan Facility Buildings Lakeview Lodge Condition and Needed Improvement Physical Condition Exterior • Roof – good condition; cedar shake roof pressure washed, sealed and damaged shakes replaced in 2005. • Wall, Doors, Windows and Sidewalks – fair to good condition • Driveways, ADA access and Handicapped Parking, and exterior paint and stain – poor condition Interior • Interior design/fixtures – good to fair condition; extensive interior improvements have been made. • Plumbing – Fair • HVAC – Fair Function/Use Currently, the POA is operating the restaurant space on weekends and for special events. The bar is operated separately. Alternatively, the restaurant space could be leased and operated and as a catered banquet facility, or with improvements, the building could be operated as a conference center with meeting rooms and on-site catering facilities and/services. Either alternative would likely require promotion and access by the public for profitability. Comprehensive redevelopment of the lodge site for other purpose could also be explored. Maintenance As needed for current function. 63 6 – Strategic Improvements Treasure Lake Master Plan Facility Buildings Condition and Needed Improvement Recommendation Improve driveway/parking and pedestrian access to the facility. Repair/upgrade facility infrastructure (plumbing and HVAC) to maintain safe, cost effective operation of the building. Ski Lodge Physical Condition Exterior • Roof, doors, windows and landscaping - fair to good condition • Walls – poor to fair; need staining Interior • Interior design/fixtures – fair to poor; restroom fixtures are cracked • Plumbing – fair to good; extensive repairs made, including installation of a grease trap. Function/Use Provides dining and meeting room space on the ground floor and leased restaurant space on the second floor. Under the terms of the lease the TLPOA is responsible for the exterior of the building and the lease holder is responsible for the interior. Maintenance As needed. Recommendation Refinish exterior of the facility. Monitor maintenance for compliance with the lease. Over time, make improvements to the building infrastructure (plumbing, HVAC, etc.) to ensure safe, cost effective and functional building operation. 64 6 – Strategic Improvements Treasure Lake Master Plan Facility Buildings Gold Course Pro Shop Condition and Needed Improvement Physical Condition Exterior • Walls, doors, windows – fair to good condition • Sidewalks and driveways – fair to good condition • Paint and stain – good condition; last painted and stained in 1999 • Roof – good condition • Landscaping – good condition Interior • Walls, plumbing and floor coverings – very good to fair condition Function/Use Seasonal supplies, opening in early May and closing in late September Maintenance Annual maintenance involves winterizing the building by turning off electricity and water in the building. Recommendation Continue with current maintenance schedule. Gold Course: Duffer’s Tavern Physical Condition Exterior • Walls, doors and windows – good to fair condition • Sidewalk and driveway – good condition. • Paint and Stain – good condition; stained in 1999 • Roof – good condition; 10-15 year life expectancy Interior • Walls, plumbing, floor covering, electrical windows and HVAC – good to fair condition; interior wall papered and painted in 2000. Continued 65 6 – Strategic Improvements Treasure Lake Master Plan Facility Buildings Condition and Needed Improvement Function/Use Serves the food service needs of golfers on the Gold Golf Course. Maintenance As needed. Recommendation Continue with current maintenance schedule. Silver Course Pro-Shop & 19th Hole Tavern Physical Condition Exterior • Walls, doors and windows – good to fair condition • Paint and Stain – good condition; painted/stained in 2001 • Sidewalks and Driveway – good condition Interior • Walls and Floor Covering – good condition • Plumbing – fair condition • Electrical – fair condition; needs upgrade • HVAC – good condition; last improved in 2002 Function/Use Serves the supply and food service needs of golfers on the Silver Golf Course. Extensive renovations were made by volunteers in 1999. Maintenance As needed. Recommendation Upgrade electrical system for safety and efficiency. 66 6 – Strategic Improvements Treasure Lake Master Plan Facility Buildings Treasure Lake Volunteer Fire Company Building Condition and Needed Improvement Physical Condition Exterior • Roof – good condition; rubber roof installed in 1998 • Doors – good condition • Windows – fair condition • Driveway – fair condition • Paint & Stain – good condition; painted/stained in 2004 • ADA Access – good condition Interior • Wall – fair condition • Plumbing – poor condition • Concrete Floor – good condition • Electrical – good condition Function/Use Houses two fire engines and other emergency equipment in a modified Butler Building. Includes meeting room and social area. A 40 ft. x 50 ft. addition was constructed in 2005; electrical upgrades were completed at this time. Maintenance As needed. Recommendation Continue maintenance. 67 6 – Strategic Improvements Treasure Lake Master Plan Facility Condition and Needed Improvement Recreational Facilities Gold and Silver Golf Courses Physical – Gold Course (the more scenic of the two courses) Fairways, Greens – good condition • Hazards – poor condition; sand traps need rehabilitation from stones • Cart paths, cart sheds – fair condition; shed needs new roof • Plumbing/Irrigation – good condition; replaced in 2006 • Landscaping – good condition • Parking – fair to good condition; need resurfacing Maintenance – Gold Course Gold Course maintenance building should be demolished and a new building built. 68 6 – Strategic Improvements Treasure Lake Master Plan Facility Condition and Needed Improvement Recreational Facilities Physical – Silver Course (the better course for quality fairways and greens) Fairways, Greens – good condition • Hazards – poor condition; sand traps need rehabilitation from stones • Cart paths, sheds – fair condition • Plumbing/Irrigation – good condition • Landscaping – good condition • Parking – fair to good condition; needs resurfacing Maintenance – Silver Course Silver Course maintenance building is visibly poor in appearance and condition. Recommendation Consider suggestions to improve yardage markers and to offer Sky Caddies and yardage books to golfers. 69 6 – Strategic Improvements Treasure Lake Master Plan Facility Condition and Needed Improvement Recreational Facilities Lakeview Lodge Swimming Pool/ Tennis Court Complex Physical Condition Exterior • Structural – fair condition; deck and pool need repair/relining Interior • Interior design/fixtures – fair to poor condition; bathroom fixtures damaged Function/Use Provide recreational opportunities for residents and guests. Maintenance As needed. Recommendation Evaluate location of the complex. Address structural finishes and upgrade bathhouse, if complex remains in current location. Fix lights at tennis courts. Add/upgrade playground equipment. Refurbish/rebuild hard courts. 70 6 – Strategic Improvements Treasure Lake Master Plan Facility Condition and Needed Improvement Recreational Facilities Cayman Landing Lodge and Comfort Centers Lodge Exterior • Roof – fair condition • Doors, Windows – fair to poor condition • Driveway, walkways – fair condition • Paint & Stain – fair condition; needs stain • ADA Access – good condition Interior • Wall – good condition • Plumbing – fair condition • Floor – fair condition Comfort Centers • Comfort Centers 1-5 have been remodeled over the past 4 years. • Comfort Center 6 was demolished in 2007. Function/Use Serve campers with supplies and restrooms, showers and laundry Maintenance As needed, especially to repair vandalism. Recommendation Assess safety risk of lodge steps and ramp and repair as needed 71 6 – Strategic Improvements Treasure Lake Master Plan Facility Condition and Needed Improvement Recreational Facilities Cayman Landing Cabins Physical Condition Exterior • Walls – good condition; 10 cabins were pressure washed and stained and siding repaired in 2003 • Doors – poor condition • Windows – poor condition • Roofs – Asphalt shingles need to be replaced in the next 4-5 years. Interior • Walls – fair condition; need interior painting. • Plumbing – poor condition • Floor covering – fair condition • Electrical – fair condition • HVAC (Propane) – fair condition • Appliances/furnishings – in need of replacement Function/Use 23 cabins available for rent to Treasure Lake guests;2 are ADA accessible; each cabin has two units 1 additional 2-unit cabin; one unit used as office and the other for storage and maintenance supplies Maintenance Pressure wash, stain and repair siding on the remaining 13 cabins Complete additional maintenance as planned Recommendation Refurbish and use as golf package rentals. Define a sustainable level of service for the cabins and its facilities; program funds to regularly inspect and maintain (repair/replace) facilities 72 6 – Strategic Improvements Treasure Lake Master Plan Facility Condition and Needed Improvement Recreational Facilities Cayman Landing Campground Maintenance • Private lots – not well-maintained by owners Recommendation Continue to improve camp sites, e.g. raising and level sites, and utilities. Define a sustainable level of service and identify growth opportunities for the campground and its facilities; program funds to regularly inspect and maintain (repair/replace) facilities, and/or investigate the transfer of these assets either in whole or in part to a third party/developers for operation and maintenance 73 6 – Strategic Improvements Treasure Lake Master Plan Facility Condition and Needed Improvement Recreational Facilities Treasure Lake Marina & Snack Shop Physical Exterior • Wall –Fair • Doors and Windows –Poor • Paint and Stain – Fair • Driveway – Fair Interior • Walls – Fair (need repainting) • Plumbing – Good • Floor covering – Fair • Electrical –Fair (needs upgrade) Function/Use Serves users of the marina with snack food services from Memorial Day to Labor Day. Fuel drop is located at the water’s edge Maintenance Annual maintenance involves winterizing the building by turning off electricity and water in the building. Recommendations Repair and refinish exterior of building. Refinish/upgrade interior for safe, cost effective operation. 74 6 – Strategic Improvements Treasure Lake Master Plan Facility Condition and Needed Improvement Recreational Facilities Beaches and Bathhouses Physical Beach – fair condition; littered with goose droppings Bathhouse – good condition Parking – fair condition; limited size Function/Use Provide recreational opportunities for residents and guests Maintenance As needed. Recommendation Maintain adequate parking. Maintain surface of parking lots. Walking Trails Surface (grass) – good condition Landscaping/clearing – not applicable /none Trail head/signage - none Recommendations Consider design and construction of trail head signs to promote existing trails. Explore development of additional trails. Integrate development of additional trails and trail connections within future development. 75 6 – Strategic Improvements Treasure Lake Master Plan Facility Condition and Needed Improvement Recreational Facilities Other Recreation Suggestions • • • • • • Add bocce ball courts and basketball court at Captain Kidd Park. Construct an additional marina or boat docks on Bimini Lake. Location and number of slips to be studied. Install new grills and picnic tables at the various pavilions. Landscape the mini-golf course. Expand the rifle range with an indoor pistol range. Build a sportsmen’s lodge near the shooting range, with meeting room, game/sports room, and lounge/snack area. 76 6 – Strategic Improvements Treasure Lake Master Plan 10 Prioritized Improvements The following prioritized list of projects describes the top ten projects that should be undertaken by the Treasure Lake POA. Financial and manpower resources will determine how quickly these improvements can be accomplished. This list should be reviewed and updated annually to reflect 1) projects that have been completed, 2) priorities that have changed, 3) additional facility needs that have been identified as priorities, and 4) redevelopment opportunities. Prioritized Projects 1. Ongoing roadway improvements Improvement Resurfacing and repaving of roads based on current program. Recommendation/Comment This should continue to be a top priority to insure safe mobility throughout Treasure Lake. 2. Lakeview Lodge Continue exterior and interior improvements. This distinctive building needs to be improved to make it a center of cultural events, entertainment and dining for Treasure Lake and the Dubois area. Alternatively, this site could be redeveloped for new functions. 3. Security Building – Front Gate Improve exterior appearance and interior functionality. This building should adequately serve security staff for Treasure Lake and provide an inviting appearance to visitors. 4. Gold & Silver Golf Courses Continue ongoing maintenance and improvements. The golf courses must continue to be well-maintained to satisfy current residents and attract new residents and visitors to Treasure Lake. 5. Property Owners Association Building Continue to make external and internal improvements. This building is also the center of many Treasure Lake events and needs to be updated to continue this function, especially if it is to become the anchor for an enhanced Village Center. 6. Lakeview Lodge Pool Provide necessary maintenance to this pool. Make the pool and lodge a focal point of summer fun and activities. 7. Cayman Cabins Improve and make available for year-round visitor packages. Continue ongoing maintenance and improvements. Provide sufficient marina space here and at Bimini Lake. Either renovate or replace cabins to initiate package programs. Provide a resource for hunting related events Locate sportsman’s lodge near future hunting and outdoor related activities. 8. Cayman Campground 9. Treasure Lake Marina 10. Sportsman’s Lodge The campground offers another experience for visitors. Maintain attractive marinas to attract boaters to these lakes. 77 6 – Strategic Improvements Treasure Lake Master Plan Suggested Service Improvements In addition to physical improvements, the planning process revealed several other serviceoriented concerns and suggestions among property owners. Other/Services Fire Protection Electric Utilities Wastewater Utilities Water Utilities Security Marketing/Facility Development • Volunteerism at the fire company is declining. Residents are concerned that insurance rates will increase, if the company leaves or closes. • Develop a campaign to recruit additional volunteers, especially targeting retirees who may wish to become involved in fire service activities. • Property owners indicate there have been frequent interruptions in electric service. • Work with Penelec to identify and resolve cause(s) of recent outages. • Repair/replace wastewater pumping station at Cayman Landing • Property owners indicate that water quality is very poor. Water filters reportedly last only 6 weeks, not 3 months. Quality is so poor that a clogged filter reduces water pressure. • Work with TESI, the Treasure Lake water provider to improve water quality. • Property owners are uncertain of the value of security as provided by current security staff. • Assess security staff performance under current scope of responsibility. • A suggestion was offered: create a pool of homes that could be made available by seasonal home owners to Treasure Lake as rentals for golf, skiing etc packages. • Improve the Cayman Cabins and develop new rental homes for golf and leisure weekend packages. 78