Fast, Affordable earned Value Management

Transcription

Fast, Affordable earned Value Management
Product overview
Deltek EV Essentials
Fast, Affordable Earned Value Management
The Deltek
EV Essentials
bundled
solution
includes:
•Deltek wInsight™
Professional with
Administrator, Briefing
Wizard, Connect and
Glue tools
•Deltek MPM™
•Performance
Measurement Baseline
•Project implementation
guides
•Desktop procedures
•Contract Performance
Reports
•Ability to expand
Earned Value
capabilities as
needs evolve
Are you new to Earned Value? Are you bidding
for the first time on a contract that has Earned
Value Requirements? Or maybe you are simply
interested in implementing Earned Value and
you don’t know where to start?
If your organization needs more than a quick
jump start and you need to create a system
that will stand up to a validation compliance
review, Deltek can help achieve your goal.
With the power to easily scale to meet your
needs, EV Essentials can be bundled to deliver a
system which is simple, fast and affordable.
You’ll get the tools and knowledge you need to
manage your project effectively and comply
with your customer’s earned value reporting
requirements. Or, bundle the tools, processes
and training to reach the highest levels of an
Earned Value competency with the capability to
pass an Earned Value Compliance Review.
“Deltek allowed us to streamline
the reporting process so that we
can spend the majority of our time
analyzing variances and estimates
to complete. The customer is very
happy with the new process.”
Sheila Lessard, BAE Systems.
www.deltek.com
info@deltek.com
800.456.2009
As the leading provider for Earned Value
Management Systems, Deltek is uniquely
qualified to help you achieve your Earned Value
Management objectives.
The EV Essentials bundled solution is your
foundation for an Earned Value based
project management control process. As your
organization grows, your solution can be
expanded using the EV Blueprint to become
compliant with the ANSI/EIA Standard
for Earned Value Management Systems
(ANSI/EIA-748).
With EV Essentials, you get a solution that will
quickly and afford ably:
•Familiarize you with the basics and the
benefits of using a cost and earned value
management system
•Guide you through the process of
establishing a performance measurement
baseline
•Give you the ability to produce useful
reports which support your contractual
reporting requirements (Contract
Performance Reports)
•Mentor you in Earned Value Management
best practices
software, tools and training bundle
When you choose the EV Essentials package, you’ll get a
combination of best-in-class software, tools and training
to help you get up and running with Earned Value in the
shortest possible time. In addition, these tools are designed
to integrate with the basic schedule tools, project-based
accounting and timekeeping solutions you already have
in place.
The EV Essentials Bundle includes:
• MPM
• wInsight
• wInsight Administrator
• Briefing Wizard
• wInsight Connect
Premier Earned Value Tools
Deltek wInsightTM
Deltek wInsight is the premier tool for analyzing, sharing,
consolidating and reporting Earned Value Management data.
wInsight is a scalable system that easily integrates with a
wide range of project management tools—including SAP,
Microsoft Project, Primavera P3/SureTrak, Deltek Open Plan
Deltek Cobra, Deltek MPM, and IMC Millennium—to provide a
common database for analysis and reporting on all projects
across your entire organization. It is also designed to help you
meet your mandated Earned Value reporting requirements,
such as DCMA/OSD trip wire metrics, UN/CEFACT XML Data
Import and Export Support, Published Periods and easier OMB
300 BY09 reporting.
The EV Essentials solution package includes applications that
enhance your ability to gather data from disparate sources
and applications, so reporting this information is much easier.
• wInsight Glue
Deltek MPMTM
Deltek MPM is a powerful yet flexible Earned Value
measurement solution that is easy to install and use. MPM is
used by hundreds of organizations, including 8 of the top 10
aerospace and defense contractors. It is compliant with ANSI/
EIA-748, and supports critical programs for Department of
Defense, Department of Energy, NASA and Department of
Transportation.
With MPM, you can:
• Identify trends early and adjust tactics to meet diverse
program challenges
Figure 1: wInsight’s Easy to Read KPIs Help Avoid Surprises
• Plan, track and analyze projects effectively throughout the
entire program lifecycle
• Enable cross-project analysis with MPM’s comprehensive
data warehouse
• Enhance pricing, planning and “what if” analysis with
powerful utilities
• Improve managers’ visibility with real-time project analysis
• Take advantage of more than 80 standard and government
reports
Figure 2: MPM’s Flexible Integrated Planning feature allows the user to
plan in hours or dollars and develop a plan which includes the most
popular EV Techniques and status your work all in one spot!
2
Deltek EV Essentials
• Support better decision making and increase customer
satisfaction
Services and Training to Ensure Success
Deltek can help integrate Earned Value Management with your existing project, schedule and cost management tools. But, software
alone will not get you to Earned Value success. A successful implementation and speedy user adoption of Earned Value will require
just the right mix of People, Training, Process and Technology.
Deltek’s EV Essentials Solution expands your EV Foundation by Introducting Earned Value Management
fundamentals through:
Our implementation consultants work with you to deploy only the processes needed without creating additional overhead. And,
our training focuses on maximizing user adoption and making Earned Value Management successful.
As part of EV Essentials, and depending on your needs, Deltek offers fixed cost implementation and training that will get you up and
running in just 3 to 6 weeks. We also recognize that all implementations are unique so our implementation consultants work with
you to tailor your implementation and training timeline based on the EV Essentials framework. At the conclusion of training, your
team will be able to produce contract performance reports using wInsight and MPM in support of your contractual requirements.
The Basic Service includes everything you need to get started including training your team and your first CPR. And the Full Service
helps organizations that need more help with process development, procedures, guides, multi reporting and training.
3
Deltek EV ESSENTIALS
Deltek EV Blueprint
Deltek EV Essentials provides you with a blueprint to quickly and easily maximize your Earned Value
skills and knowledge. Ultimately,leveraging Deltek’s uniquely bundled EV Essential’s Tools, Processes
and Training can help you achieve your Earned Value Goals by:
• Introducing Earned Value processes and concepts at the right time and at the right level to achieve
your goal minimizing impact on your organization
Contact
Deltek
•Integrating your Earned Value management system with the tools you already use, so you don’t
have to invest in an entirely new system as you grow
•Mentoring your staff to adopt and use Earned Value concepts as standard, best practice
www.deltek.com
info@deltek.com
800.456.2009
LEVELS
Deltek (NASDAQ: PROJ)
is the leading provider of
enterprise software
solutions designed
specifically for projectfocused businesses. For
more than two decades,
our software applications
have enabled
organizations to
automate mission-critical
business processes
around the engagement,
execution and delivery of
projects. More than
12,000 customers
worldwide rely on Deltek
to measure business
results, optimize
performance, streamline
operations and win
new business.
FACT: Industry experts have reported that programs over 15% complete and
more than 10% over budget or behind schedule never catch up. Don’t wait until
it’s too late, start with EV Essentials today.
4
Deltek • 13880 Dulles Corner Lane, Herndon, VA 20171
US & Canada: 800.456.2009 UK +44 (0) 20 7518-5010 UK +61 8 8112 1200
© 2009 Deltek, Inc. All rights reserved. All referenced trademarks are the property of their respective owners.