DRAFT FINAL PLAN: APPENDIX A
Transcription
DRAFT FINAL PLAN: APPENDIX A
T E L E G R A P H AV E N U E COMPLETE STREETS PLAN DR AFT FINAL PL AN: APPENDIX A RECOMMENDED PROJEC T PL AN SEPTEMBER 2014 This page intentionally left blank F I N A L P L A N 57th St. D R A F T 8’-6” 5’ 9’ 10’ 10’ 11’ 12’ Connecting to existing bike lanes and facilities Bike lane On-street parking, typical Transit stop Pedestrian crossing with PHB signal Figure A-1: Final Concept Plan Segment Drawings - 57th Street Feet 0 10 50 100 200 A-1 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s A V E N U E C O M P L E T E S T R E E T S P L A N Buffered bike lane, typical Raised median, typical 56th St. Aileen St. Permanent corner bulb-out, typical 55th St. T E L E G R A P H Bike lane, typical On-street parking, typical Advanced bike box, typical Median refuge nose, typical Figure A-2: Final Concept Plan Segment Drawings - Aileen Street to 55th Street Feet 0 10 50 100 200 A-2 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s D R A F T F I N A L P L A N Pedestrian open space within public right-of-way, typical Bike lane, typical Pedestrian crossing with PHB signal nt A ve. 51st St.. On-street parking, typical 52nd St. Transit island, typical Clar emo Figure A-3: Final Concept Plan Segment Drawings - Claremont Avenue to 51st Street Feet 0 10 50 100 200 A-3 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s T E L E G R A P H A V E N U E C O M P L E T E S T R E E T S P L A N Mid-block bulb-out, typical 48th St. 49th St. Shared lane marking “sharrow”, typical Median refuge nose, typical Bus bulb-out Pedestrian crossing with RRFB signal On-street parking, typical “Paint and Planters” interim bulb-out, typical 48th St. 49th St. 50th St. 8’ 11’ 11’ 10’ 11’ 11’ 8’ Permanent corner bulb-out, typical Extended bulb-out at T-intersection, typical Figure A-4: Final Concept Plan Segment Drawings - 50th Street to 48th Street Feet 0 10 50 100 200 A-4 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s D R A F T Shared lane marking “sharrow”, typical Separated pedestrian and bicycle crossings with RRFB Mid-block bulb-out, typical P L A N Median refuge nose, typical Transit island, typical End of “road diet” F I N A L Advanced bike box Temescal gateway element opportunity location “Paint and Planters” interim bulb-out, typical On-street parking, typical 44th St. 45th St. Permanent corner bulb-out, typical Buffered bike lane, typical “Kasper’s Korner” pedestrian open space within public right-of-way e. ck Av u Shatt 46th St. 47th St. Pedestrian crossing with RRFB signal THIS AREA SUBJECT TO FURTHER DESIGN ANALYSIS Figure A-5: Final Concept Plan Segment Drawings - 47th Street to 44th Street Feet 0 10 50 100 200 A-5 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s C O M P L E T E S T R E E T S P L A N Permanent corner bulb-out, typical 42nd St. A V E N U E 43rd St. T E L E G R A P H Buffered bike lane, typical On-street parking, typical “Paint and Planters” interim bulb-out, typical Figure A-6: Final Concept Plan Segment Drawings - 43rd Street to 42nd Street Feet 0 10 50 100 200 A-6 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s D R A F T Transit island , typical Right turn/bike through lane, typical F I N A L P L A N Mid-block bulb-out, typical Flex posts, typical 40th St. 41st St. Median refuge nose, typical 10’ 3’ 6’ 11’ 10’ 11’ 3’ 6’ 10’ 39th St. Permanent corner bulb-out, typical Shared lane marking “sharrow”, typical Buffered bike lane, typical 2-stage left turn box, typical On-street parking, typical “Paint and Planters” interim bulb-out, typical Figure A-7: Final Concept Plan Segment Drawings - 41st Street to 39th Street Feet 0 10 50 100 200 A-7 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s T E L E G R A P H A V E N U E C O M P L E T E S T R E E T S P L A N Mid-block bulb-out, typical Median refuge nose, typical ical cal Permanent corner bulb-out, typical MacA rthur Shared lane marking “sharrow”, typical 2-stage left turn box, typical 37th St. Apgar St. 38th St. Transit island, typical Blvd. Flex posts, typical Buffered bike lane, typical On-street parking, typical “Paint and Planters” interim bulb-out, typical Pedestrian open space within public right-of-way, typical Right turn/bike through lane, typical Figure A-8: Final Concept Plan Segment Drawings - Apgar Street to 37th Street Feet 0 10 50 100 200 A-8 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s D R A F T F I N A L P L A N Buffered bike lane, typical On-street parking, typical Permanent corner bulb-out, typical 36th St. 37th St. “Paint and Planters” interim bulb-out, typical Median refuge nose, typical Mid-block bulb-out, typical Figure A-9: Final Concept Plan Segment Drawings - 37th Street to 580 Freeway Feet 0 10 50 100 200 A-9 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s A V E N U E C O M P L E T E S T R E E T S P L A N Transit island, typical Right turn/bike through lane, typical Hawthorne St. T E L E G R A P H Buffered bike lane, typical 33rd St. Flex posts, typical Shared Lane Marking “Sharrow”, typical 34th St. Permanent corner bulb-out, typical On-street parking, typical “Paint and Planters” interim bulb-out, typical Extended bulb-out at T-intersection, typical Figure A-10: Final Concept Plan Segment Drawings - 580 Freeway to Hawthorne Street Feet 0 10 50 100 200 A-10 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s D R A F T Transit island, typical P L A N Median refuge nose, typical Flex posts, typical 30th St. Right turn/bike through lane, typical Buffered bike lane, typical On-street parking, typical Shared lane marking “Sharrow”, typ. 30th St. 31st St. 32nd St. Permanent corner bulb-out, typical F I N A L “Paint and Planters” interim bulb-out, typical Figure A-11: Final Concept Plan Segment Drawings - 32nd Street to 30th Street Feet 0 10 50 100 200 A-11 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s A V E N U E C O M P L E T E 29th St. Permanent corner bulb-out, typical S T R E E T S P L A N Flex posts, typical 29th St. T E L E G R A P H Right turn/bike through lane, typical Buffered bike lane, typical On-street parking, typical Figure A-12: Final Concept Plan Segment Drawings - 29th Street Feet 0 10 50 100 200 A-12 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s D R A F T 28th St. Buffered bike lane, typical On-street parking, typical “Paint and Planters” interim bulb-out, typical 27th St. Permanent corner bulb-out, typical Merrimac St. Median refuge nose, typical P L A N Transit island , typical 28th St. Mid-block bulb-out, typical F I N A L 2-stage left turn box, typical Flex posts, typical Right turn/bike through lane, typical Figure A-13: Final Concept Plan Segment Drawings - 28th Street to 27th Street Feet 0 10 50 100 200 A-13 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s T E L E G R A P H A V E N U E C O M P L E T E S T R E E T S P L A N Mid-block bulb-out, typical 24th St. Permanent corner bulb-out, typical 25th St. 26th St. Median refuge nose, typical Extended bulb-out at T-intersection, typical Transit island, typical Buffered bike lane, typical On-street parking, typical 25th St. Extended bulb-out at T-intersection, typical Sycamore St. 10’ 3’ 6’ 11’ 10’ 11’ 3’ 6’ 10’ “Paint and Planters” interim bulb-out, typical Figure A-14: Final Concept Plan Segment Drawings - 26th Street to 24th Street Feet 0 10 50 100 200 A-14 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s D R A F T F I N A L P L A N ose, typical ut at pical pical “Paint and Planters” interim bulb-out, typical On-street parking, typical Extended bulb-out at T-intersection, typical 23rd St. Buffered bike lane, typical W. Grand Ave. ut, typical Transit island, typical 23rd St. 24th St. Flex posts, typical Right turn/bike through lane, typical 2-stage left turn box, typical Figure A-15: Final Concept Plan Segment Drawings - 24th Street to W. Grand Avenue Feet 0 10 50 100 200 A-15 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s T E L E G R A P H A V E N U E C O M P L E T E S T R E E T S P L A N 20th St. Median refuge nose, typical ONE WAY Permanent corner bulb-out, typical 21st St. ONE WAY 22nd St. ONE WAY 22nd St. Pedestrian open space within public right of way Buffered bike lane, typical Existing permanent corner bulb-out, typical On-street parking, typical “Paint and Planters” interim bulb-out, typical Figure A-16: Final Concept Plan Segment Drawings - 22nd Street to 20th Street Feet 0 10 50 100 200 A-16 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s D R A F T F I N A L P L A N ONE WAY Existing permanent corner bulb-out, typical 19th St. William St. On-street parking, typical 19th St. Buffered bike lane, typical Figure A-17: Final Concept Plan Segment Drawings - William Street to 19th Street Feet 0 10 50 100 200 A-17 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s T E L E G R A P H A V E N U E C O M P L E T E S T R E E T S P L A N This page intentionally left blank A-18 A p p e n d i x A : R e c o m m e n d e d Pr o j e c t P l a n S h e e t s