Certification of Public Involvement, Official Public Hearing Transcript
Transcription
Certification of Public Involvement, Official Public Hearing Transcript
Certification of Public Involvement, Official Public Hearing Transcript, and the disposition of the comments received LEGAL NOTICE OF PUBLIC HEARING Monroe County will hold a Public Hearing on Thursday, December 11, 2014, beginning at 6:00 p.m., at the Monroe County Courthouse, Nat U Hill Meeting Room located at 100 W. Kirkwood Avenue, Bloomington, Indiana 47404 for the proposed Fullerton Pike Corridor Improvements Project (DES. # 0801059) in Bloomington, Monroe County. An open house session will take place from 6:00 p.m. until 6:45 p.m., with the formal presentation beginning at 6:45 p.m. The purpose of the public hearing is to offer all interested persons an opportunity to comment on the environmental document and preliminary design plans for the proposed transportation project. The purpose of the proposed project is to complete the objectives of prior transportation planning by providing a continuous east-west corridor on the south side of Bloomington, Indiana which improves connectivity, reduces traffic congestion, reduces travel time, and improves motorist and pedestrian safety. Moreover, the proposed project will provide enhanced access to essential facilities including hospitals and schools, as well as enhance connectivity for local residents by improving access to regional multi-use trails and other major transportation corridors. The proposed project includes the development of a continuous 2-lane roadway from Rockport Road to Sare Road, with approximately 0.7 miles of new roadway construction. The proposed project would consist of one 16-foot wide travel lane in each direction, separated by a 16-foot wide grass median bordered by curb and gutters from Rockport Road and continuing east to Walnut Street. In areas of need, the raised median may be omitted in favor of a two-way leftturn lane. The proposed project also includes a continuous 5-foot wide sidewalk on the south side of the roadway and a continuous 10-foot wide multi-use path on the north side of the roadway. This project would correct existing geometric deficiencies along the existing roadway, including sight distance and vertical alignment, and would improve intersections to provide additional turn lanes, adjust grades, and provide signalization where warranted. The intersection of Fullerton Pike and Sare Road would be re-designed as either a three-leg roundabout or a signalized intersection. A new bridge would be constructed over an unnamed tributary to Clear Creek and the Clear Creek Trail. The existing Monroe County Bridge No. 74 carrying Gordon Pike over Clear Creek and Monroe County Bridge No. 75 carrying Rhorer Road over Jackson Creek would be replaced to accommodate the expanded roadway width and to correct existing hydraulic deficiencies. In addition, Monroe County Bridge No. 610 carrying Rhorer Road over East Fork of Jackson Creek would be extended or replaced to accommodate the widened roadway. It is anticipated that the proposed project would require acquisition of 31.2 acres of new permanent right-of-way and 2 acres of temporary right-of-way. One residential relocation is anticipated. Based on 2013 costs, the estimated cost for this alternative is approximately $27,100,000. The Federal Highway Administration (FHWA) and the Indiana Department of Transportation have agreed this project falls within the guidelines of an Environmental Assessment (EA) document. The Public Hearing will consist of an informal Q&A session with the project management team followed by a formal presentation. Statements will be taken for the public record after the presentation. All comments collected before, during, and for a period of four (4) weeks after the hearing will be evaluated and addressed in the Finding of No Significant Impact (FONSI) request document submitted to the FHWA. Before and after the formal hearing, the environmental document and preliminary plans will be available for review. Anyone interested in talking to the engineers about the project may do so before or after the formal hearing. Conversations prior to or after the formal hearing will not be part of the official record. A copy of the Environmental Assessment is available for viewing at the following locations. 1. Monroe County Highway Department (501 North Morton Street #216, Bloomington, Indiana) 2. Monroe County Public Library (303 East Kirkwood Avenue, Bloomington, Indiana) In accordance with the “Americans with Disabilities Act”, if you have a disability for which Monroe County needs to provide accommodations, please call Ben Harvey at American Structurepoint, Inc., at (317) 547-5580, by Tuesday, December 8, 2014. A backup date has been set for the hearing in the event that hazardous winter weather conditions arise. Please call (317) 547-5580 to find out whether the meeting will be held or postponed to Wednesday, December 17, 2014. This notice is published in compliance with: 1) Code of Federal Regulations, Title 23, Section 771 (CFR 771.111(h)(1) stating, “Each State must have procedures approved by the FHWA to carry out a public involvement/public hearing program.”; 2) 23 CFR 450.210(a)(1)(ix) stating, “Provide for the periodic review of the effectiveness of the public involvement process to ensure that the process provides full and open access to all interested parties and revise the process, as appropriate.”; and 3) The INDOT Public Involvement Policies and Procedures approved by the Federal Highway Administration on August 16, 2012. Please direct any questions or comments concerning this project to Ben Harvey, American Structurepoint, Inc., 7260 Shadeland Station, Indianapolis, Indiana 46256, (317) 547-5580, fullertonpike@structurepoint.com. Comments on the proposed project will be accepted for four (4) weeks after the Public Hearing. Comments or concerns brought forth by the public during this process will be evaluated and addressed in the FONSI request. Projects 1 of 2 http://www.co.monroe.in.us/tsd/Government/Infrastructure/HighwayDep... LOGIN Home » GOVERNMENT Government Community Justice Calendar News REGISTER | | Documents > INFRASTRUCTURE > HIGHWAY DEPARTMENT > PROJECTS THURSDAY, DECEMBER 04, 2014 County Road Construction Projects Department - Quick Link Airport | Go I Want To... Ask Question or Provide Feedback FULLERTON PIKE CORRIDOR IMPROVEMENTS FULLERTON PIKE CORRIDOR - The Monroe County Highway Department has initiated a study to extend Fullerton Pike and improve adjacent local roadways on the south side of the City of Bloomington. The proposed Fullerton Pike improvements will extend from SR 37 to the east to South Sare Road, and will utilize portions of the existing West Fullerton Pike, West Gordon Pike, and East Rhorer Road. Notice of Public Hearing December 11, 2014 Go Draft Environmental Assessment Highway Links Highway Engineering Highway Maintenance Drainage Board Section 1 Section 2 Section 3 Section 4 Masterthoroughfare Plan News (Highway Archive) Section 5 Notice to Bidders Section 6 Permit Information Projects Section 7 Requests for Proposals Road Work Comments and questions can be sent to fullertonpike@structurepoint.com. Stormwater Quality Traffic Commission Weight Limit Ordinance Wheel Tax Ordinance MCG Links PUBLIC INFORMATION MEETING Fullerton Pike Public Information Meeting - October 3, 2012 FULLERTON PIKE COMMUNITY ADVISORY COMMITTEE MEETINGS Wellness Central (New Link!) June 20, 2012, 5:00 pm at Jackson Creek Middle School Monroe County Alert Notification Meeting Handouts Job Openings and Application Provide Feedback Frequently Asked Questions (FAQs) CAC 1st Meeting Summary CAC Meeting Agenda, July 23, 2012 Site Map GIS Website News PAVEMENT STRIPING PROGRAM Safety 2014 Holiday Closings 2015 Holiday Schedule The striping program will begin in May of 2010. The condition of the pavement markings on various roads throughout the County will be assessed for the need to improve the markings. ANNUAL BRIDGE PROJECTS 2007 Cumulative Bridge Program 2008 Cumulative Bridge Program 2009 Cumulative Bridge Program 2010 Cumulative Bridge Program 12/4/2014 3:00 PM Projects 2 of 2 http://www.co.monroe.in.us/tsd/Government/Infrastructure/HighwayDep... 2011 Cumulative Bridge Program 2011 Cumulative Bridge Program 2012 Cumulative Bridge Program 2013 Cumulative Bridge Program 2014 Cumulative Bridge Program You will need to download Adobe Acrobat Reader to read or print these Reports TRAIL PROJECTS Karst Farm Greenway Environmental Copyright 2012 by Monroe County Government | Privacy Statement | Terms Of Use 12/4/2014 3:00 PM Des. 0801059 Fullerton Pike Corridor Impovements - Rockport Road to Sare Road Legal Notice of Public Hearing General Mailing List Allan & Donna Dafoe Alva D. Reszka AMANDA DELIMAN AMEER BEITVASHAHI ANAHIT BEHJOU Ann Elsner ANWAR M & MARY KASIM NADERPOOR APRIL L BUSH ASSET MANAGEMENT CONTROL GROUP LLC BADRUDDIN PIRANI Barry & Brenda Galyan BARRY K & TERRI R ELKINS BATCHELOR HEIGHTS HOMEOWNERS ASSN INC BENNIE JR & DICQUES D SELTZER BILL C BROWN Bill Cuttill BLOOMINGTON COMMUNITY PARK & REC FOUNDATION INC BENJAMIN H BORUFF BRANDON D SHELBY BRIAN E & CARLA S MOORE 811 W Gordon Pike 3260 E. Rhorer Rd. 3927 S BUSHMILL DR 521 W GORDON PIKE 1515 W SHAMROCK CT 4017 S. Crane Ct. Bloomington, IN 47403 Bloomington, IN 47401 BLOOMINGTON, IN 47403 BLOOMINGTON, IN 47403 BLOOMINGTON, IN 47403 Bloomington, IN 47403 3313 FORRESTER 1202 W WREN CIRCLE BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47403 3930 S WALNUT ST 3931 S BUSHMILL DR 821 W. Gordon Pike 2010 W THAT ROAD BLOOMINGTON, IN 47402 BLOOMINGTON, IN 47403 Bloomington, IN 47403 BLOOMINGTON, IN 47403 3939 S CRAMER CIR BLOOMINGTON, IN 47403 4005 S DERBY DR 300 S ST RD 446 2812 S. Yonker BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47401 Bloomington, IN 47403 PO BOX 848 545 E RHORER RD 4001 S MAN-O-WAR CT 4001 S ROCKPORT RD BLOOMINGTON, IN BLOOMINGTON, IN BLOOMINGTON, IN BLOOMINGTON, IN BRIDLEWOOD DEV GROUP LLC BRUCE G FARRAND BRUCE L & KATRINA R WILLIAMS Bryan Paine C & W LLC CARL H & LORAINE C HOLMBERG CHAD A & TONYA MOORE CHARLES BYRON & CAROL A TOW CHARLES E JR & LEANNE R LAKE CHRISTOPHER GAAL & BETH E FLORINI 2800 S OLCOTT 320 E RHORER RD BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47401 1335 E RHORER RD 2645 E. Ciana Ct. PO BOX 209 BLOOMINGTON, IN 47401 Bloomington, IN 47401 BLOOMINGTON, IN 47402 1340 E RHORER RD 1401 W GORDON PIKE BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47403 4000 CLEARVIEW DR BLOOMINGTON, IN 47403 1503 W SHAMROCK BLOOMINGTON, IN 47403 2225 E RHORER RD BLOOMINGTON, IN 47401 47402 47401 47401 47403 Des. 0801059 Fullerton Pike Corridor Impovements - Rockport Road to Sare Road Legal Notice of Public Hearing General Mailing List Christy Gillenwater CITY OF BLOOMINGTON DEPT OF PARKS & RECREATION CLEAR CREEK CROSSING LLC DANIEL E KENNEDY & CAROL A ZWISSLER DANYEL EMERICK DAVID E SHERLOCK DAVID E & ERIN R YOUNG DAVID J & SHARON L KENWORTHY DAVID K & JENNIFER L CROFT DAVID W & TARA D HOLBROOK Denise Wyatt Dennis and Jackie Perez DIAMOND PROPERTIES LLC DOUGLAS M & ELLEN M MCDANIEL DOUGLAS W DYER E & W REALTY LLC EDWARD J & MARY ELLEN GEORGE EDWARDS FAMILY TRUST ELVA RICHARDSON FAWZIA NAWADI Faye Jameson GARY N & GINNIE R PHERO GEORGE A & BARBARA S QUALLS Glen J. Langley HARMON FARM II LLC 400 W. 7th St. Bloomington, IN 47404 349 S WALNUT PO BOX 209 BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47402 777 E RHORER RD 3937 S BUSHMILL DR 2240 E RHORER RD S77W16715 BRIDGEPORT WAY BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47403 BLOOMINGTON, IN 47401 1414 E RHORER RD BLOOMINGTON, IN 47401 650 E RHORER ROAD BLOOMINGTON, IN 47401 795 E RHORER RD 4430 Silverthorne 4250 S. Falcon Dr. PO BOX 1834 BLOOMINGTON, IN 47401 Bloomington, IN 47404 Bloomington, IN 47403 BLOOMINGTON, IN 47402 755 E RHORER RD 580 E RHORER RD 2120 S HARDING ST BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47401 INDIANAPOLIS , IN 46221 601 W GORDON PIKE PO BOX 534 2110 E RHORER RD 3313 FORRESTER 4011 S. Monroe Medical Park Blvd. 210 W GORDON PIKE BLOOMINGTON, IN 47403 ELLETTSVILLE , IN 47429 BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47401 721 W GORDON PIKE 5544 S. Rockport Rd. BLOOMINGTON, IN 47403 Bloomington, IN 47403 MUSKEGO , WI 53150 Bloomington, IN 47403 BLOOMINGTON, IN 47403 3727 E CAMERON AVENUE BLOOMINGTON, IN 47401 HIDEKI & TAMMY KAWANISHI 4011 S CRANE CT HILARY & CHRISTOPHER ELLIOTT 1640 E RHORER RD James & Harriet Kulis 1430 W. Estate Dr. BLOOMINGTON, IN 47403 BLOOMINGTON, IN 47401 Bloomington, IN 47403 Des. 0801059 Fullerton Pike Corridor Impovements - Rockport Road to Sare Road Legal Notice of Public Hearing General Mailing List JAMES D & MELODY S WEVER JAMES D JR & STACEY M MITCHELL James R. Tolen Jason Shaevitz 611 W GORDON PIKE BLOOMINGTON, IN 47403 3975 S BUSHMILL DR 717 S. Western Dr. 3623 S. Glsgow Circle 8435 STEMMONS FREEWAY 3947 S BUSHMILL DR 3815 Fox Chase Run BLOOMINGTON, IN 47403 Bloomington, IN 47403 Bloomington, IN 47403 4000 S DERBY DR 1302 W. Dove Circle 1423 W. Dove Dr. 1468 W. Eagleview Dr. 3913 S BUSHMILL DR 3927 S. Cramer Cir. 3993 S BUSHMILL DR 2470 E. Rhorer Rd. 801 W. Gordon Pike 2613 WINDEMERE WOODS DR BLOOMINGTON, IN 47401 Bloomington, IN 47403 Bloomington, IN 47403 Bloomington, IN 47403 BLOOMINGTON, IN 47403 Bloomington, IN 47403 BLOOMINGTON, IN 47403 Bloomington, IN 47401 Bloomington, IN 47403 JOHN S & MARTHA J NEWLIN John Wronowicz JOSEPH B JR & CICCI L KING JOSEPH WILLIAM WRIGHT Joy Jones JUDITH R DUNN Karen McGlynn KATHLEEN OWENS ETAL Keith Vogelsang KENNETH D & KATHLEEN M BRUHNKE Kevin & Debbie Luers KEVIN B MCWILLIAMS 420 W GORDON PIKE 1463 W. Eagleview Dr. 3927 NIMIT DR 5909 S FOXWOOD LN 3941 S. Bushmill Dr. 311 E RHORER RD 4223 S. Mallard Ct. 901 W GORDON PIKE 101 E. Glenwood BLOOMINGTON, IN 47403 Bloomington, IN 47403 BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47401 Bloomington, IN 47403 BLOOMINGTON, IN 47401 Bloomington, IN 47403 BLOOMINGTON, IN 47403 Bloomington, IN 47408 4013 S CRANE CT 4051 Jamie Lane 3959 S BUSHMILL DR BLOOMINGTON, IN 47403 Bloomington, IN 47403 BLOOMINGTON, IN 47403 KEVIN E & DEHORAH A LUERS KOUNS SANDRA R 4051 JAMIE LN 4001 S FALCON DR BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47403 L L CONURN ENTERPRISES INC LANCE A & JAMIE R FURR 4000 S OLD ST RD 37 4023 S TWO CREEKS LN BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47401 JASON T & STACEY A NELSON JASON W ROBBINS Jeff Wiser JEREMY E & ELIZABETH WINCHESTER Jerry Hays Jill Rensink Jimmie D. Johnson JO ANN MOUBRAY Joan Keeler JOANNA L JONES John Halluska John Letner JOHN P DYSON KENNARD , TX 75847 BLOOMINGTON, IN 47403 Bloomington, IN 47401 BLOOMINGTON, IN 47401 Des. 0801059 Fullerton Pike Corridor Impovements - Rockport Road to Sare Road Legal Notice of Public Hearing General Mailing List Larry & Judy Clark LAURA J MCCALLUM & MICHAEL JAMES WALLEY LAWRENCE D RINK & BETH A BAXTER Linda Ledbetter 4050 Jamie Lane Bloomington, IN 47403 4000 S FALCON DR BLOOMINGTON, IN 47403 501 S HAWTHORNE DR 3280 E. Rhorer Rd. BLOOMINGTON, IN 47401 Bloomington, IN 47401 MARK & AMANDA PETERSON MARK A GALL MARK R MINETT 3923 S BUSHMILL DR 511 W GORDON PIKE 911 W GORDON PIKE BLOOMINGTON, IN 47403 BLOOMINGTON, IN 47403 BLOOMINGTON, IN 47403 MARV L & LINDA D BLAUVELT MARY ELIZABETH CAMOZZI Matt Mullins MATTHEW S RUSSELL MAUREEN J ANDREAKIS Melissa Lund MICHAEL D & ANGELA R COLLIVER MONROE COUNTY COMMUNITY SCHOOL CORP 4001 CLEARVIEW DR 3919 S BUSHMILL DR 1413 Dove 4000 S ROGERS ST 3989 S BUSHMILL DR 4251 S. Mallard Ct. BLOOMINGTON, IN 47403 BLOOMINGTON, IN 47403 Bloomington, IN 47403 BLOOMINGTON, IN 47403 BLOOMINGTON, IN 47403 Bloomington, IN 47403 3901 S BUSHMILL DR BLOOMINGTON, IN 47403 315 E NORTH DRIVE BLOOMINGTON, IN 47401 MONTE & AMANDA SPEICHER N. E. Quinn Nelson Shaffer NEW RICHLAND 2 INC 425 E RHORER RD 3930 S. Nimit Drive 530 Cabot Ct. PO BOX 205 BLOOMINGTON, IN 47401 Bloomington, IN 47401 Bloomington, IN 47408 CLEAR CREEK, IN 47426 NOAH R & ANGELA E BROWN Norman & Arllys Papke 4000 S MAN-O-WAR 805 W. Hedgewood Dr. BLOOMINGTON, IN 47401 Bloomington, IN 47403 NORMAN E & JOYCE N QUINN Pam Sego PAMELA S GUESS PAUL E JR & HEATHER H JOHNSON PERRY-CLEAR CREEK FIRE PROTECTION DISTRICT PPF COMPANY LLC QUALITY REALTY & DEVELOPMENT LLC RICHARD L & DANIELLE C SHIELDS 3930 NIMIT DR 315 Gordon Pike 3963 S BUSHMILL DR BLOOMINGTON, IN 47401 Bloomington, IN 47403 BLOOMINGTON, IN 47403 1599 E RHORER RD BLOOMINGTON, IN 47401 3953 S KENNEDY DR 2248 E CAPECODE DRIVE BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47401 PO BOX 3131 BLOOMINGTON, IN 47202 750 E RHORER RD BLOOMINGTON, IN 47401 Des. 0801059 Fullerton Pike Corridor Impovements - Rockport Road to Sare Road Legal Notice of Public Hearing General Mailing List RICHARD W & COSETTE SEBASTIAN ROB & LEISA CRANDALL Robert Courter ROBERT M & PHYLLIS J WALKER Roberta Taylor RODNEY D VAN PELT ROGER D & COLLEEN M NEWHART Ron Brown Rosalie White S. Holly Barton Samantha Brummett Sandy Kouns SARAH BOCK SCOTT A SIEBOLDT Scott Hannon SHANNON R & RYAN BLACKWELL Sharon Walker Shawn and Mary Laszlo SOUTHCREST MOBILE HOME MANOR INC Stephen Burns STEPHEN R SCHUSTER Steve and Nan Brewer Sue Allmon 1509 W SHAMROCK 1208 W WREN CIRCLE 2125 W. Fullerton Pike BLOOMINGTON, IN 47403 BLOOMINGTON, IN 47403 Bloomington, IN 47403 1101 BENSON CT 3931 S. Cramer Cir. 4081 S ROCKPORT ROAD BLOOMINGTON, IN 47401 Bloomington, IN 47403 BLOOMINGTON, IN 47403 1100 BENSON CT 3907 S. Baytree Lane 3853 S. Cramer Circle 4016 S. Crane Ct. 1561 W. Dove Dr. 4001 S. Falcon Dr. 4020 S ROCKPORT ROAD 711 W GORDON PIKE 3627 S. Sims Lane BLOOMINGTON, IN 47401 Bloomington, IN 47401 Bloomington, IN 47403 Bloomington, IN 47403 Bloomington, IN 47403 Bloomington, IN 47403 BLOOMINGTON, IN 47403 BLOOMINGTON, IN 47403 Bloomington, IN 47403 3945 S BUSHMILL DR 4120 S. Purple Finch Dr. BLOOMINGTON, IN 47403 Bloomington, IN 47403 718 W. Hedgewood Drive 315 W GORDON PIKE LOT 4 4017 S. Crane Ct. 2415 E RHORER RD 3636 S. Rogers St. 4430 Silverthorne Bloomington, IN 47403 BLOOMINGTON, IN 47403 Bloomington, IN 47403 BLOOMINGTON, IN 47401 Bloomington, IN 47403 Bloomington, IN 47404 SUSAN M & CHERYL D TOWLE 621 W GORDON PIKE BLOOMINGTON, IN 47403 TEDDY BEAR REAL ESTATE LLC TERRI SUE HARDING & DANA GALE AXSOM THOMAS J & SHERRILL A BELCHER 1398 E RHORER RD BLOOMINGTON, IN 47401 3805 S ROGERS STREET 4910 E INVRNESS WOODS RD 5200 S LEONARD SPRINGS ROAD 4012 S. Crane Ct. BLOOMINGTON, IN 47403 THREE R DEV LLC Nick and Tiffany Smith TIM J SR & DEBBIE A HUMMEL 702 S RAVENCREST ST BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47403 Bloomington, IN 47403 BLOOMINGTON, IN 47401 Des. 0801059 Fullerton Pike Corridor Impovements - Rockport Road to Sare Road Legal Notice of Public Hearing General Mailing List TODD & BETH BOLING Travis Venzel TWO CREEKS DEV LLC 362 TYEE ST 3425 S. Rogers St. 4024 S TWO CREEKS LN SOLDOTNA, AK 99669 Bloomington, IN 47403 BLOOMINGTON, IN 47401 UNITY OF BLOOMINGTON INC 4001 S ROGERS ST BLOOMINGTON, IN 47403 PO BOX 100 901 W. Gordon Pike BLOOMINGTON, IN 47402 Bloomington, IN 47403 3907 S BUSHMILL DR 235 E RHORER RD 4011 S. Falcon Dr. 544 HORESHOE LN BLOOMINGTON, IN 47403 BLOOMINGTON, IN 47401 Bloomington, IN 47403 BEDFORD , IN 47421 UTILITIES SERVICE BOARD OF THE CITY OF BLOOMINGTON Valerie Owens VALLY BEHJOU & GUITY AHMADI VELMA C REIFINGER Vickie Turner WASHWORLD INC WAYNE L & JODY A VAUGHT WENDY BUCKLEY WILLIAM G & GLORIA J RAMSEY WM PARKS LLC Joe McWhorter Jr. 1402 S ROCKEAST ROAD 3967 S BUSHMILL DR SPRINGVILLE , IN 47462 BLOOMINGTON, IN 47403 575 E RHORER RD PO BOX 1289 3953 S. Kennedy Drive BLOOMINGTON, IN 47401 BLOOMINGTON, IN 47402 Bloomington, IN 47401 David Miller Keith Williamson 1224 South Barnes Drive 2603 Elm Leaf Bloomington, IN 47401 Bloomington, IN 47403 Kevin Burk Ameer Beitvashahi Larry Wilkerson Bloomington, IN 47403 Bloomington, IN 47403 Bloomington, IN 47401 Janet Ault 315 West Gordon Pike #4 521 West Gordon Pike 3260 Southern Oaks 41855 South Gran Haven Drive Steve and Kristen 3862 South Cramer Circle Bloomington, IN 47403 Debbie Anderson Paul and Gail Lavengood Bloomington, IN 47403 Bloomington, IN 47403 Barney and Carol Tow Richard Worsena Carry Drake 3923 South Cramer Circle 3440 S McDougal St 4000 South Clearview Drive 4313 West Moss Lane 2136 Fullerton Pike Vincent and Betty Sanson 3805 South Rogers Street Bloomington, IN 47403 Bloomington, IN 47401 Bloomington, IN 47403 Bloomington, IN 47403 Bloomington, IN 47403 Des. 0801059 Fullerton Pike Corridor Impovements - Rockport Road to Sare Road Legal Notice of Public Hearing General Mailing List Jennifer Miers 3212 South Rogers Street Roy Capio 3935 South Kennedy Drive Bloomington, IN 47401 Pam Harden 4035 South Rockport Road Bloomington, IN 47403 Dawn Hewitt 1900 South Walnut Street Bloomington, IN 47402 George and Maryann Cusack Bloomington, IN 47403 James Shelton Paul Ash 1506 West Leighton Lane 3312 South Rolling Oak Drive 512 Allen Street Philip Smith Dan Rarey 703 West Baywood Drive 517 North Walnut Bloomington, IN 47403 Bloomington, IN 47404 Clarence Dillon Frieda Snoddy 7781 West Kirksville Road Bloomington, IN 47403 725 East Tracee Court Bloomington, IN 47401 Judy McCammon James Comerford 510 East Moss Creek Drive Bloomington, IN 47401 2040 South Lodge Road Bloomington, IN 47403 Julie Thomas Cassey Connelly Mike Clark 3030 North Russell Road 4103 Hedgewood Ct. 505 East North Drive Bloomington, IN 47403 Bloomington, IN 47401 Bloomington, IN 47403 Bloomington, IN 47408 Bloomington, IN 47403 Bloomington, IN 47401 Mr. Rickie Clark Indiana State Senator Indiana State Representative Indiana State Representative Commissioner Commissioner Commissioner The Honorable Matthew Ubelhor The Honorable Peggy Mayfield Mr. Patrick Stoffers Ms. Iris F. Kiesling Ms. Julie Thomas Company Monroe County Council Monroe County Council Monroe County Council Monroe County Council Mr. Ryan J. Langley Mr. Marty Hawk Mr. Rick Dietz Mr. Geoff McKim Indiana House of Represenatives District 60 Monroe County Board of Commisioners Monroe County Board of Commisioners Monroe County Board of Commisioners Indiana House of Represenatives District 62 INDOT - Seymour District INDOT - Public Involvement Monroe County Council Attn Ms. Shelli Yoder United States Senator United States Congressman United States Senator Mr. David Dye The Honorable Joseph Donnelly The Honorable Dan Coats The Honorable Todd Young The Honorable Mark Stoops Environmental Scoping Manager Title Public Hearings Manager Name Suite 114 320 West 8th Street 200 West Washington Street, Room 4D-N 200 West Washington Street, Room 336/35 100 West Kirkwood Avenue 100 West Kirkwood Avenue 100 West Kirkwood Avenue 100 West Kirkwood Avenue 100 West Kirkwood Avenue 100 West Kirkwood Avenue 100 West Kirkwood Avenue 100 West Kirkwood Avenue 200 West Washington Street, Room 336/35 10 West Market Street Suite 100 Address 2 1650 Market Tower 185 Agrico Lane 115 N. Pennsylvania Street 100 North Senate Avenue, N642 Address 1 Des. 0801059 Fullerton Pike Corridor Impovements - Rockport Road to Sare Road Legal Notice of Public Hearing Public Officials Mailing List Zip Indiana 46204 Indiana 46204 Indiana 47274 Indiana 46204 State Indiana 46204 Indiana 46204 Indiana 46204 Bloomington Indiana 47404 Bloomington Indiana 47404 Bloomington Indiana 47404 Bloomington Indiana 47404 Bloomington Indiana 47404 Bloomington Indiana 47404 Bloomington Indiana 47404 Bloomington Indiana 47404 Indianapolis Indianapolis Indianapolis Bloomington Indiana 47404 Indianapolis Indianapolis Seymour Indianapolis City Dr. Mitch Zoll Ms. Michelle Allen Mr. Rick Marquis State Historic Preservation Officer Division Administrator 254 Federal Office Building 254 Federal Office Building 402 West Washington Street, W264 Federal Highway US Department of Administration Transportation Indiana Department of Natural Resources City Hall, Suite 130 2656 E. Second Street 100 West Kirkwood Avenue 100 West Kirkwood Avenue Federal Highway US Department of Administration Transportation Bloomington Planning & Transportation Department Monroe County Council Ms. Cheryl Munson Mr. Tom Micuda Director Ms. Joyce B. Poling Monroe County Historian Monroe County Council Ms. Elizabeth Lee Jones Indianapolis 575 North Pennsylvania Street Indianapolis Indiana 46204 Indiana 46204 Indiana 46204 Bloomington Indiana 47401 Bloomington Indiana 47402 Bloomington Indiana 47404 Bloomington Indiana 47404 575 North Pennsylvania Street Indianapolis 401 North Morton Street, PO Box 100 Des. 0801059 Fullerton Pike Corridor Impovements - Rockport Road to Sare Road Legal Notice of Public Hearing Public Officials Mailing List Project Team Monroe County Fullerton Pike Corridor Improvements Rockport Road to Sare Road INDOT Des# 0801059 Public Hearing December 11, 2014 Public Hearing Purpose » PresentationofProposedProject • • • • Projectdescription Rightofwayimpacts Anticipatedprojectcostsandschedule Landacquisitionprocess » PresentEnvironmentalDocument • ImpactstoNaturalandHumanEnvironment » MonroeCounty • BillWilliams,PublicWorksDirector/Highway Engineer » AmericanStructurepoint • RichZielinski,ProjectDevelopmentDirector • PatrickWooden,ProjectManager • KenOlson,ProjectDesignEngineer • BenHarvey,EnvironmentalSpecialist • PaulJohnson,EnvironmentalServicesManager • AmyMarlatt,EnvironmentalScientist Legal Notice of Public Hearing » Publicnoticeofhearingwasadvertised intheBloomingtonHeraldTimeson November26th andDecember 3rd,2014 » AcopyoftheLegalNoticewasmailedtoas manyaffectedpropertyownersandinterested partiesaspossible » Mailinglistsigninsheet » IndividualCommentPeriod Documents Available for Review » EnvironmentalDocument • Viewinglocations: MonroeCountyPublicLibrary 303EastKirkwoodAvenue Bloomington,Indiana47408 MonroeCountyHighwayDepartment 501NorthMortonStreet(Room216) Bloomington,Indiana47404 AvailableOnlineatMonroeCountyWebsite: http://www.co.monroe.in.us/tsd/Government/Infrastructure/Highw ayDepartment/Projects.aspx Public Comment Process » Formalpublicstatements tonight • Speaker Sign-In Sheet » Commentsheetininformationpacket • Mail comments to American Structurepoint • Give to project representatives after formal hearing is complete • Comment deadline – January 9, 2015 » Allcommentswillbeaddressedinwriting 1 Formal Public Statements » Willberecordedandtranscribedforpublic record Project Location – Fullerton Pike, Gordon Pike, and Rhorer Road » PublicStatements/Commentswillnotbe addressedtonightaspartofthishearingbut willbeaddressedinwritingaspartofthe environmentalprocess » PublicNoticewilladvertiseavailabilityof responsestopubliccomments » Questions Talkwithprojectteamafter formalhearing Project Purpose and Need » Provideacontinuouseastwestcorridoronthe southsideofBloomington • Improve connectivity - Access to S.R. 37 to the west Project Purpose and Need » Address current roadway deficiencies • Correct sight distance issues on corridor • Drainage improvements - Bridges, culverts, & storm sewers • Reduce traffic congestion & travel times » Improve motorist and pedestrian safety • Enhance access to hospitals and schools Alternative 1A – Preferred Alternative • Address lack of pedestrian facilities along corridor • Improve residential access to regional multiuse trails Typical Roadway Section » ContinuousTwoLaneroadwayfromRockportRoadtoSare Road • Continuoussidewalks/multiusepath,separatingpedestriansand vehicles • Correctionstogeometricandsightdistancedeficiencies • Encloseddrainagesystem • Threebridgereplacementsalongcorridor&onenewbridgeover UNTClearCreek » AlternateMeetsPurposeandNeedofProject • • • • Providescontinuouseastwestcorridor ConnectivitytoS.R.37/proposedI69 IntersectionImprovementstohandleanticipatedtrafficvolumes Continuouspedestrian&bicyclefacilities - ConnectiontoSchools&Trailsnearcorridor 2 Fullerton Pike Corridor Fullerton Pike Corridor Fullerton Pike Corridor Fullerton Pike Corridor Fullerton Pike Corridor Other Alternates Studied » Alternate 1B– Continuous4laneroadwayfromRockportRoad toSouthWalnutStreetandwouldcontinuewithroadway improvementstotheexisting2laneroadwayextendingeast fromSouthWalnutStreettoSareRoad » Alternate 1C– Improvesightdistanceatmajorintersectionsby adjustingroadwaygradesandincludeadditionalturninglanes wherewarranted » Alternate 2– UpgradeTappRoadtoserveastheneweastwest connectoronthesouthsideofBloomington » Alternate 3– UpgradeRockportRoadtoTappRoad,with improvementsonTappRoad(4lanes)toSouthWalnutSt. » Alternate4– ThatRoadUpgrade » Alternate5– DoNothing 3 Project Costs and Schedule » EstimatedProjectCosts • • • • Construction$24,100,000 RightofWay$1,900,000 PreliminaryEngineering$1,400,000 Bothfederalandlocalfunding New Right-of-Way Requirements » Approximately31.2acresrequiredfor90foot widecorridor » LandUse • Residential– Approximately11.9acres • Commercial– Approximately0.35acres » ProjectSchedule • • • • PhasedConstructioninSegments RightofwayacquisitionanticipatedSpring2015 PhaseIConstructionanticipated2016 AdditionalPhasesthereafter • Agriculture/forest– Approximately4.8acres • School– Approximately4acres • Other– Approximately10.2acres » Relocations • One(Residential) Land Acquisition Process » Howlandispurchasedbylocal agencies • Explains the process of buying property needed for highway improvements » LandAcquisitionProcessmustfollow theUniformActof1970 Land Acquisition Process » Amountofcompensationcannot belessthanfairmarketvalue » Partialacquisition • Agencywillstateamounttobepaidofthe partofthelandtobeacquired. • Separateamountwillbestatedfordamages totheportionretained. • Ifremainderhaslittleornovalue,agency willconsiderpurchasingremainder. Land Acquisition Process » “UniformAct”of1970 • Allfederal,state,andlocalgovernments mustcomply • Requiresjustcompensation » Acquisitionprocess • Appraisals • Reviewappraisals • Negotiations Land Acquisition Process » Agreement • Whenagreementisreached,ownerwillbe askedtosignanoptiontobuy,purchase agreement,easement,ordeed. » NoAgreement • Mediation • Condemnation 4 Environmental Impacts ScopeofEnvironmentalStudy » Evaluateimpactstonaturalandhuman environment • Waterways,wetlands,andendangeredspecies • CulturalResources(e.g.,Historicproperties) • Socialandeconomicfactors Environmental Assessment » An Environmental Assessment (EA) is prepared for actions in which the significance of the environmental impact is not clearly established » The EA examines potential social, economic, and environmental factors » The EA allows the FHWA and INDOT to determine whether or not an Environmental Impact Statement (EIS) is needed. Environmental Assessment » EA reviewed by INDOT and FHWA and approved the release for public involvement on November 19, 2014 » A Finding of No Significant Impact (FONSI) is anticipated for the project » A FONSI is issued for a project if the undertaking is a major action but is determined to not result in a significant impact, based on the EA findings. Environmental Impacts » CulturalResources • Archaeologicalreconnaissanceconducted - Portions of four archaeological sites are within project area - Archaeological resource (abandoned railroad line) part of North Clear Creek Historic Landscape District (NCCHLD) • Two properties eligible for listing in the National Register of Historic Places (NRHP) identified - NCCHLD - Winston Thomas Wastewater Treatment Plant (WTWTP) • Project will have an Adverse Effect on NCCHLD; No Adverse Effect on WTWTP • Memorandum of Agreement developed to mitigate adverse effects Environmental Impacts CoordinationandCommunityInvolvement » 40federal,state,andlocalagenciesaskedto provideinput » CommunityAdvisoryCommittee(CAC)Formed • Threemeetingsheld(June20,2012,July23,2012 andFebruary11,2013) • InputfromCACutilizedtodeveloppreferred alternative » PublicInformationMeeting(October3,2012) » PublicHearing(December11,2014) Memorandum of Agreement » MOA Stipulations: • Research, design, manufacture, and install three interpretive signs to be placed along the multi-use trail proposed as part of the Fullerton Pike Project • Consider the use of limestone treatment at appropriate locations in landscaping • Remove and re-install the circa 1935 stone gateposts at the WTWTP 5 Section 4(f) “Waters of the US” Impacts » Requirement to avoid use of parks, refuges, recreation areas and historic properties » Five Section 4(f) resources identified: » No wetlands identified in project limits » Six streams • 3 existing trails (Clear Creek, Bloomington Rail and Sare Road) – de minimis; • Winston Thomas Wastewater Treatment Plant – De minimis • North Clear Creek Historic District -- Individual » Trails – Connections to Multi-use path and design safe crossings » WTWTP and NCCHLD mitigation included in MOA Karst Resources » Areas of concern due to potential impacts on sensitive habitat » Two karst features (sinkholes) identified in project limits – no caves or springs affected » Mitigation • No drainage to the sinkholes • Appropriate erosion & sediment control Public Comments • Clear Creek (near Rogers) • 2 Tributaries to Clear Creek • Jackson Creek (near Sare) • 2 Tributaries to Jackson Creek Environmental Requirements Permits Expected to be Required » Section 404 Regional General Permit – US Army Corps of Engineers » Section 401 Water Quality Certification – Indiana Department of Environmental Management (IDEM) » Construction in a Floodway Permit – Indiana Department of Natural Resources (IDNR) » Rule 5 Erosion Control – IDEM Public Comments AmericanStructurepoint,Inc. CommentforPublicRecord » 7260ShadelandStation Indianapolis,Indiana46256 Attn:BenHarvey » Stateyourname Email » Stateyourcomment » fullertonpike@structurepoint.com » Speakclearlyintomicrophoneforeaseoftranscribing Respectfullyrequestcommentspostmarkedby » January9,2015 » Responseswillbeansweredinsubsequentproject documentation Allsubstantialcommentswillbereviewed,evaluated, andgivenfullconsiderationduringthedecisionmaking process. Pleaselimityourcommentsto23minutessoallpersons haveanopportunitytospeakandtoberespectfulofother people’stime » Comeuptopodium 6 PUBLIC HEARING Fullerton Pike Corridor Improvements Rockport Road to Sare Road Bloomington, Monroe County, Indiana Designation No. 0801059 INFORMATION PACKET Thursday, December 11, 2014 Formal Presentation: 6:45 p.m. Nat U Hall Meeting Room Monroe County Courthouse 100 West Kirkwood Avenue Bloomington, Indiana Prepared By: American Structurepoint, Inc. 7260 Shadeland Station Indianapolis, Indiana 46256 (317) 547-5580 IN2008.0807 December 11, 2014 Dear Concerned Citizens, Local Residents, and Elected Public Officials: Welcome to Monroe County’s public hearing regarding the proposed Fullerton Pike Corridor Improvements from Rockport Road to Sare Road. The purpose of the public hearing is to explain the proposed project and receive comments, concerns, and suggestions. We appreciate the opportunity to be here this evening and look forward to listening to the concerns and issues that are important to this community. Comments can be presented in several ways. 1. You may verbally express your comments here tonight during the public statement session held after the formal presentation. You may do this by signing the Speaker’s Sign-In Sheet located at the table with the handout materials. All statements will be recorded and transcribed in order to be included in the official public hearing transcript. 2. You may complete one of the comment sheets (attached) and return utilizing one of the following methods below. a. Hand deliver to one of the hearing representatives from American Structurepoint in attendance this evening b. Mail to Benjamin Harvey at American Structurepoint, Inc., 7260 Shadeland Station, Indianapolis, Indiana 46256 c. Fax to Benjamin Harvey at (317) 543-0270 d. Email to fullertonpike@structurepoint.com Should you choose to submit comments by mail, please have them postmarked by January 9, 2015. All comments submitted will become part of the transcript and be addressed in subsequent project documentation, along with the verbal comments presented here tonight. All substantial comments received will be evaluated and responded to in writing within subsequent project documentation. The documentation will address all concerns raised during the public hearing process and describe the final decisions reached following careful consideration of the views and concerns of the public. The approved environmental document is available for public review and inspection on the Monroe County website http://www.co.monroe.in.us/tsd/Government/Infrastructure/HighwayDepartment/Projects.aspx and at the following locations. Monroe County Highway Department 501 North Morton Street #216 Bloomington, Indiana Monroe County Public Library 303 East Kirkwood Avenue Bloomington, Indiana This notice is published in compliance with: 1) Code of Federal Regulations, Title 23, Section 771 (CFR 771.111(h)(1) stating, “Each State must have procedures approved by the FHWA to carry out a public involvement/ public hearing program.”; 2) 23 CFR 450.210(a)(1)(ix) stating, “Provide for the periodic review of the effectiveness of the public involvement process to ensure that the process provides full and open access to all interested parties and revise the process, as appropriate.”; and 3) The INDOT Public Involvement Policies and Procedures approved by the Federal Highway Administration on August 16, 2012. 2 IN2008.0807 Hearing Agenda American Structurepoint Staff will be available in the display area to explain proposed project details and environmental impacts before and after the official hearing. 1. Meeting Called to Order Bill Williams Monroe County Highway 2. Explanation of the Hearing Purpose and Process Paul Johnson American Structurepoint 3. Project Description Patrick Wooden, PE American Structurepoint 4. Environmental Document Benjamin Harvey American Structurepoint 5. Public Statement Session Paul Johnson American Structurepoint 6. Adjournment Paul Johnson American Structurepoint 7. Questions and Answers – Engineers and project representatives will be available in the display area to answer questions. IN2008.0807 3 Project Description The Monroe County Commissioners are developing a Federal-aid project to improve the Fullerton Pike corridor from Rockport Road to Sare Road. The purpose of the proposed project is to complete the objectives of prior transportation planning by providing a continuous east-west corridor on the south side of Bloomington, Indiana which improves connectivity, reduces traffic congestion, reduces travel time, and improves motorist and pedestrian safety. Moreover, the proposed project will provide enhanced access to essential facilities including hospitals and schools, as well as enhance connectivity for local residents by improving access to regional multi-use trails and other major transportation corridors. The proposed project includes the development of a continuous 2-lane roadway from Rockport Road to Sare Road, with approximately 0.7 miles of new roadway construction. The proposed project would consist of one 16-foot wide travel lane in each direction, separated by a 16-foot wide grass median bordered by curb and gutters from Rockport Road and continuing east to Sare Road. In areas of need, the raised median may be omitted in favor of a two-way left-turn lane. The proposed project also includes a continuous 5-foot wide sidewalk on the south side of the roadway and a continuous 10-foot wide multi-use path on the north side of the roadway. This project would correct existing geometric deficiencies along the existing roadway, including sight distance and vertical alignment, and would improve intersections to provide additional turn lanes, adjust grades, and provide signalization where warranted. The intersection of Fullerton Pike (Rhorer Road) and Sare Road would be re-designed as either a three-leg roundabout or a signalized intersection. A new bridge would be constructed over an unnamed tributary to Clear Creek and the Clear Creek Trail. The existing Monroe County Bridge No. 74 carrying Gordon Pike over Clear Creek and Monroe County Bridge No. 75 carrying Rhorer Road over Jackson Creek would be replaced to accommodate the expanded roadway width and to correct existing hydraulic deficiencies. In addition, Monroe County Bridge No. 610 carrying Rhorer Road over East Fork of Jackson Creek would be extended or replaced to accommodate the widened roadway. Construction would be completed in three phases and the proposed maintenance of traffic scheme would vary for each individual phase. Traffic would be maintained by means of approved traffic control devices in accordance with the current INDOT Design Manual and standard specifications. Coordination with emergency response agencies and schools will occur prior to closure and detour setup of all phases of construction. x Phase 1a – The segment surrounding the intersection of Gordon Pike/Rhorer Road and Walnut Street is an intersection improvement project. Through traffic would be maintained during most of project construction. Closure of this intersection is possible, but the length of time for any closure would be minimized. Access to all businesses located at this intersection would be maintained throughout construction. x Phase 1b - The segment from Rockport Road to Wickens Street is new road construction and would therefore not require a specific maintenance of traffic scheme. Access would need to be maintained at all times to the residential properties in the southeast quadrant of the intersection at Rockport Road. IN2008.0807 4 x Phase 1c - From Wickens Street to Sare Road, one lane of traffic in each direction would be maintained at all times where feasible to provide access to the many residences, schools, and businesses along the project corridor. Short term temporary closures may be required during certain phases of construction. Disruptions to major cross street traffic would be minimized during construction. Description of Right-of-Way The project will require the purchase of right-of-way. Refer to the pamphlets distributed at this meeting: ACQUISITION – “Acquiring Real Property for Federal and Federal-Aid Programs and Projects” and RELOCATION – “Your Rights and Benefits as a Displaced Person Under the Federal Relocation Assistance Program”. Acquisition and relocation information can also be viewed at http://www.fhwa.dot.gov/real_estate/. It is anticipated the project will require the acquisition of approximately 31.25 acres of new permanent right-of-way from primarily residential properties. Approximately 2.00 acres of temporary right-of-way acquisition will be required for driveway construction and tie-ins. One residential relocation is anticipated because the roadway would need to be raised in this area to meet current vertical curve design requirements, and the proposed raised roadway profile would not allow the reconstruction of the residence driveway. Project Schedule Milestone Expected Dates Right-of-Way Appraising Begins Phase I Construction Begins Spring 2015 2016 Estimated Project Cost Summary Based on 2013 costs, the estimated total cost associated with the project is $27,100,000. Both federal and local funds sources will be used. The proposed project was incorporated into the Indiana Department of Transportation Statewide Transportation Improvement Programs on December 4, 2013. IN2008.0807 5 Environmental Documentation The Indiana Department of Transportation (INDOT) and Federal Highway Administration (FHWA) have reviewed the Environmental Assessment (EA) prepared by American Structurepoint for this project and approved the document on November 19, 2014. The EA evaluates the impact of the project on the natural and human environment. No areas of potentially significant impacts have been identified. A Finding of No Significant Impact (FONSI) is anticipated for the project. A FONSI is issued for a project if the undertaking is a major action but is determined to not result in a significant impact based on the EA documentation. The project has been coordinated with several state and local historic preservation organizations, including the State Historic Preservation Officer (SHPO), in compliance with FHWA procedures for Indiana projects. The proposed action impacts items listed on or eligible for inclusion on the National Register of Historic Places (NRHP). The FHWA has issued an “Adverse Effect” finding for the project due to impacts to the North Clear Creek Historic Landscape District (NCCHLD) and the Winston Thomas Wastewater Treatment Plant (WTWTP). The State Historic Preservation Officer (SHPO) concurred with the finding on July 10, 2013. If an undertaking is determined to cause an “Adverse Effect” to a historic resource, then the undertaking must include measures to resolve and/or mitigate the “Adverse Effect.” The specific measures to resolve and/or mitigate the “Adverse Effects” are stipulated in a “Memorandum of Agreement” (MOA). The MOA is executed by FHWA, Indiana SHPO, INDOT, and Monroe County. A MOA was prepared to outline the proposed “Adverse Effect” the project would have on the NCCHLD and WTWTP, and the proposed mitigation for those adverse impacts. As mitigation for these impacts, three interpretive signs will be placed along the proposed multi-use trail, the circa 1935 stone gateposts at the WTWTP will be removed and re-installed, and the use of limestone will be considered for landscaping at appropriate locations. In addition to the historic resources related to this project, the EA also considered a broad range of potential social, economic, and environmental factors. Forty federal, state, and local agencies were contacted and asked to provide input regarding the project’s impacts on areas in which they have jurisdiction or special expertise. A wetland delineation and waters report was completed for the project corridor. No wetlands were identified. There are six streams located within the project limits – Clear Creek, Jackson Creek, 2 unnamed tributaries to Clear Creek, and 2 unnamed tributaries to Jackson Creek. Minor impacts to all six streams are anticipated as a result of stormwater outfalls, channel grading, bridge demolition, bridge construction, and culvert replacement. It is expected the project will require a Section 404 permit issued by the US Army Corps of Engineers and a Section 401 Water Quality Certification from the Indiana Department of Environmental Management (IDEM) for potential impacts to streams. A Rule 5 Erosion Control Notice of Intent from IDEM will be required. A Construction in a Floodway permit from the Indiana Department of Natural Resources (IDNR) will also be required. A Karst Report was completed for the proposed project in accordance with the 1993 Karst MOU. Two sinkholes were identified within the project area. Drainage from the roadway will not be directed to the IN2008.0807 6 sinkholes, and appropriate erosion and sediment control practices will be utilized during construction in order to avoid impacts to the identified karst features. Significant efforts were made to engage and involve the public in the project planning process. A Community Advisory Committee (CAC) was formed to gather input from the community and assist in developing the preferred alternative. Three CAC meetings were held - June 20, 2012, July 23, 2012, and February 11, 2013. In addition, a public information meeting was held on October 3, 2012 to further attempt to engage the public. Significant efforts were made to encourage public participation, including public notices and press releases published in the Herald-Times. IN2008.0807 7 IN2008.0807 8 Comment Sheet Please provide your comments, concerns, and/or suggestions regarding the proposed Fullerton Pike Corridor Improvements. Your comments are important to us, and we sincerely appreciate your time and participation during the public involvement process. Please submit comments by Friday, January 9, 2015. Comments may be mailed, faxed, or submitted via email to the address/fax number below. Benjamin Harvey American Structurepoint, Inc. 7260 Shadeland Station Indianapolis, Indiana 46256-3957 Fax: (317) 543-0270 Email: fullertonpike@structurepoint.com Meeting Date: Project: Thursday, December 11, 2014 Fullerton Pike Corridor Improvements (Rockport Road to Sare Road) Name: (Please print) Address: COMMENTS: SIGNATURE: IN2008.0807 9 1 Fullerton Pike Public Hearing Fullerton Pike Corridor Improvements Rockport Road to Sare Road INDOT DES#0801059 December 11, 2014 Monroe County Courthouse, Nat Hill Conference Room. Start: 6:45 **************************************************************************** BILL WILLIAMS: Good evening. My name is Bill Williams, Public Works Director for the Monroe County Highway Department. We're looking forward to hearing your comments tonight on this proposed project. This is the Official Public Hearing for the Fullerton Pike Corridor Improvement Project. The phase we will be concentrating on tonight begins at Rockport Road and will end at Sare Road, a 2.7 mile segment of the overall 7 mile project. Later phases of the road project are anticipated to be constructed in future years, eventually tying into SR 45 on the west end and Snoddy Road on the east end. This project has been in Monroe County's Thoroughfare Plan since the 1960s. It is identified in the Bloomington / Monroe County MPO's Long Range Transportation Plan and their Transportation Improvement Program or TIP. Having recently completed a major, multi-year project on the west side of Bloomington, Curry and Vernal Pikes in the industrial area of our community, we are now focusing our efforts on the Fullerton Pike Corridor. In September of 2011, Monroe County hired American Structurepoint, Inc., of Indianapolis, Indiana, to provide for us a project scoping study that included; x topographic survey of the corridor, x traffic data collection which tells us how the roads are being used today, x a traffic analysis that will break the use down further and make projections of what we may see in 20 years, x an Engineering Assessment Report which will take the traffic analysis and apply current design standards to the road design to meet our existing and future needs, inclusive of cost estimates and phasing scenarios that will allow us to logically construct certain road segments as the project develops, most importantly, within our budget constraints. x and Environmental Services that will include a wetlands delineation, historic properties review, archaeological investigations, karst investigations and other environmental reviews and studies, all with the goal of achieving an Environmental Assessment that is acceptable to the community, the INDOT and FHWA. The EA also includes the public involvement process which is why we are here today. 2 The estimated construction cost for this phase of the project is over $27 million. Monroe County will be applying for Federal funds to assist with its construction. The remaining funds to pay for the project are from a variety of local funding sources, inclusive of the Local Road & Street Fund, Cumulative Bridge Fund, the Fullerton Pike Economic Development Area, and Cumulative Capital Development Fund. Because the project is receiving federal funds, design standards as required by the FHWA and INDOT must be met and adequate public involvement, like this public meeting, are necessary. The design engineer will discuss costs further during the presentation. At this time I'd like to introduce a few of the local government officials that are here from County Government: County Commissioners - Julie Thomas. From the County Council - Geoff McKim, Rick Dietz and Cheryl Munson. Counsel Elect – Ryan Cobine is here with us tonight. Thank you all for coming. Also from our Redevelopment Commission -Jim Shelton is with us tonight. County Planning - Richard Martin and Jacqueline Scanlan is sitting back there. Other distinguished guests that are with us tonight are Michelle Allen, FHWA, Anna Dragonovich, MPO Staff, and Dave Williams, City Parks & Rec. Thanks for coming everyone. Also, I'd like to introduce our Design Team representatives from American Structurepoint: x Rich Zielinski, Project Development Director, Road Group x Patrick Wooden, Project Manager, Road Group x Ken Olson, Traffic Project Design Engineer Manager x Paul Johnson, Manager, Environmental Services Group x Ben Harvey, Environmental Specialist x Amy Marlatt, Environmental Services Group The purpose of this public hearing is to describe the proposed project, outline the anticipated environmental impacts and to receive your comments on the proposed. Project. Comments, recommendations and suggestions provided to date in previous meetings have been incorporated into the project being presented. Tonight we are presenting the results of the environmental assessment. At this time, I'd like to turn the meeting over to Paul Johnson, who will provide an overview of the public hearing and comment process. PAUL JOHNSON: I just want to make one quick announcement, if you have your cell phones if you would make sure they're off, at least on vibrate, if not turn 3 them off so we don't have distractions. I'm just going to take a brief couple minutes to go over what a public hearing is and how the process will work and what the overall process is to receive comments and how those will be addressed. As Bill mentioned, the presentation, we're going to make a presentation. We're going to talk about the project description. Patrick is going to go over that, talk about the right-of-way impacts that are anticipated, the anticipated project costs and the intended schedule. Then I'm also going to talk about the land acquisition process. How that has to work. We're going to present the environmental assessment document, the results of that study and look over the, look at the impacts to the natural and human environment. And then we'll have a comment period. We advertised the opportunity, or advertised this hearing twice in the Bloomington Herald-Times on November 26th and again on the December 3rd of this year. A copy of the legal notice was mailed to as many property owners as we have record of, and also interested parties as much as we could. We had mailing lists that were developed through various public meetings that we've had throughout the project and those who have expressed interest in the project. The Environmental document, the big binder that some of you have seen out there, that has been made available in a couple locations. First of all it was available at the public library, just down the road here on Kirkwood. And then also at the Monroe County Highway Department offices in the Showers Plaza. And then also Monroe County was also gracious enough to put that up on their website so you were able to review it on line. The comment process for tonight is we have, there are a bunch of different ways that you can make comments on this project, one of which and part of this public hearing is you can come up and make an oral statement on the project. We have a speaker sign in sheet. I brought those up here. We'll go through that, just kind of keep the order of that. And then if there's others that would like to come up and speak we'll open the floor to that. In the information packet that was out on the table there is a comment form that you can use if you want to make written, if you'd rather make a written comment. If you want to also make an oral comment and a written comment that is fine too. So there's ways, you can mail it to American Structurepoint because we'll be putting together those comments. You can give those to the folks that Bill introduced. We have a box back in the back, white box, that you put them in and give them to us. We're asking that any of those comments that are being sent in, written, emailed, etc., that they be provided to us by January 9th so we can close the hearing process, or the comment period. All of the comments will be addressed in writing. Tonight's presentation and tonight's meeting, it will just be a statement. There won't be questions and answers here at this hearing. After the meeting is over, 4 after the hearing is over, we can go back out in the foyer here and have questions and answers as late as, until they kick us out of the building. The comments that are made up here, they will all be recorded. We've got a couple of recorders. We have a court reporter here too that's preparing a transcript, verbatim transcript of the hearing. Like I said, all open statements and comments won't be addressed here right in this forum. They will be addressed in writing as part of the environmental process. We will public notice the availability of those comments, the responses to those comments. Like I said, if there's more questions, if you have additional questions during the presentation, something come to mind and you want to ask a specific question, then we'll be available after the meeting as well. With that I'm going to turn it over to Patrick Wooden who is going to provide the technical aspects of the project. PATRICK WOODEN: Just so we all are familiar with what the project is, we're going to start off with a brief project description. We are talking about the Fullerton Pike corridor project for this environmental document.. We are looking at Fullerton Pike beginning at the intersection on the western edge of the screen about there with Rockport Road and then continuing on to the east. This includes both Fullerton Pike and Rhorer Road. The project terminates at the intersection with Sare Road at the far east end. When we call it the Fullerton Pike corridor, please realize that we are talking about Gordon Pike, Rhorer Road as well. It's all part of the same east/west corridor. A little bit about the purpose and the need of the project. The purpose and the need was developed very early on in the process and this is really what the County had identified as the goals, when we're doing any evaluation of the alternates that are being compared for a corridor like this, really what we're looking at is trying to answer the question how does this solution fit the needs that have been identified. So the purpose and need has been identified for your project is to provide a continuous east-west corridor on or near the south side of the city of Bloomington. The intent is to improve connectivity to State Road 37 to the west, the future I69. Also to reduce traffic congestion and travel times, not just along this corridor, but within the region as well. And also to enhance access to schools and hospitals by providing that connectivity. That would be a need that we would look to identify a solution for. In addition, the goal for the project will be to address current deficiencies on the existing road network. After investigation, the scoping assessment that has been completed on the corridor, there were a number of deficiencies that were identified. Some of you who live along the corridor are probably aware of that. There are 5 number of hills along the corridor where you might not be able to see the next intersection ahead. So you might not be able to see a car in front of you that might stop. Those are issues that we would correct so that adequate sight distance can be provided. That will be a goal that any alternative route would have to address -we need to compare it against. We're also looking to address drainage improvements along the corridor, which could be through bridges, culverts and storm sewers. We want to address any deficiency that might be present along the corridor. And then also are looking to improve motorist and pedestrian safety. The primary need here that was identified was the lack of pedestrian facilities, continuous pedestrian facilities along the corridor where pedestrians might be forced to walk along the side roadway. A goal of the project would be to address that by providing separated facilities for pedestrians. And also to improve residential access to regional multi-use trails. The north/south trails that are located along the corridor. So with that identified as the goals of the project to be solved the environmental assessment has been done and we looked at a bunch of alternates and the preferred alternate that has been selected for the corridor is identified as Alternate 1A. Alternate 1A is a continuous two-lane roadway throughout the project runs from Rockport Road to Sare Road. Continuous sidewalks and a multi-use path, a multi-use path on one side of the corridor and a sidewalk on the opposite side of the corridor is proposed continuous through it and throughout to separate pedestrian and vehicles. We are looking to make corrections to geometric and sight-distance deficiencies along the corridor. That means we're going to be looking to fix vertical issues, profiles, we'll try to smooth that out so everybody can see a lot farther along the corridor than they might be able to under the present circumstance. Preferred Alternate recommends a enclosed drainage system. That's going to be a curb and gutter up alongside the travel lanes. A storm sewer runs along that curb line so any rainfall run off water will not run off the road, toward the roadside ditch, instead will be captured by an enclosed drainage system along the curb line. Three bridge replacements in addition are proposed along the corridor because their existing bridges are being replaced as part of the corridor. And then a new bridge spanning an unnamed tributary over Clear Creek - this is the creek that runs along the side the Clear Creek Trail - is proposed for the corridor. This alternate has been analyzed and has been determined that it does meet the purpose and need of the project. It does provide a continuous east/west corridor, it does provide connectivity to the west to State Road 37/I69. 6 Intersection improvements are being designed throughout the corridor to handle anticipated traffic volumes. It might include a left turn lane or a right turn lane at a specific location to deal with the traffic that has been collected and counted as well as modeled for future traffic volumes. This alternate does provide continuous pedestrian and multi-use path along the corridor. So we still have connection to the schools and trails that are near and along the corridor. So that's a lot of words. I thought a picture might help that a little bit. This is the same picture you found out there on the board out there in the hallway. So if you are having difficulty looking at this please stop by at the display on your way out. We can go through it in a little bit more detail. A typical section, this is kind of like a roadway crosscut. This is a slice out and then you look at the roadway, kind of ending that view. The proposal for the recommended alternate has a single travel lane headed in each direction. So it will be one through travel lane in the east bound direction and another travel lane in the west bound direction. The proposal includes a separation of the eastbound and the west bound lanes, in the middle. That's kind of that green line that you see there in the middle. That is going to be a raised curb grassed median, a buffer to separate east bound and west bound traffic. What that buffer allows for is that when you get to a situation like say something needs an entrance or at a signalized intersection that grassed raised island could be eliminated and a left turn lane could be introduced to allow for access across the lane. That allows for the space for that to occur. As I mentioned, curb and gutters are going to be proposed on the outside edges of the corridor because that's where the storm sewer, any run off drainage would be collected in a storm drain system centered above that curb line. And then on the north side of the corridor you see a little bit of a green strip there, there's going to be a buffer, a grass buffer between the curb line and multi-use path on the north side. That's a ten foot wide, likely an asphalt multi-use path. On the south side of the corridor along the right of this screen again a buffer, a grass buffer separating the curb line from the sidewalk. And then a sidewalk would be proposed on the south side. So there would be a single multi-use path along the corridor on the north side and a continuous sidewalk on the south side of the corridor. The typical section on the top just shows the raised island if that's what's going to occur in the median section at a specific location. The section that's on the bottom is the same section only showing what it might look like if the raised island was not there, instead of either a left turn lane or potentially a two way left turn lane was needed at an individual location along the corridor. But regardless there would only be a through, a single through lane - one lane in each direction for the corridor. So this is considered a three lane section, could be considered a two lane section because of that buffer median. But it's really a single lane in each direction. That's just kind of like a cross cut slice of what the corridor would look like. 7 The next couple of slides on here are just kind of some snapshot views of what it might look like from a helicopter. This would be the proposed recommended alternate kind of superimposed on an existing aerial map. The first image I have on here is the western project limit. This is the intersection of Fullerton Pike and Rockport Road. The project is proposed to abut next to an INDOT project so it is not part of our proposed work and not part of our environmental analysis but it is work proposed by others. The work that's included in this Fullerton Pike Corridor includes the north leg of Rockport Road and then the east leg where we would take off and start the corridor moving to the east. So just the north leg and the west leg. The east leg, I apologize. The west leg and the south leg of this intersection are to be done by others as part of a separate project. The project that we're tying into does have more travel lanes than our proposed typical section. So at the intersection of Rockport Road there is a short adjustment to transition from multiple lanes that are occurring to the west of the intersection to transition down. So if you see on the far right side of the screen, the very edge where you have that green median buffer is where we're transitioning to a single lane in each direction with that raised buffer. And then our corridor will continue in the typical section after to be constructed from there on. But you can see in a gray area, north of the roadway corridor, a darker gray, that will be the multi-use path. That smaller kind yellowish strip on that south side will be the sidewalk on that south side. So it would be as currently proposed as appropriate to Rockport Road based on the traffic assessment. So continuing on the corridor further to the east this is the new bridge. This will be new road construction. There's not currently a road here. This is located at an unnamed tributary to Clear Creek. You can also see on that eastern bank of the unnamed tributary what is known as the Clear Creek Trail. So a new bridge is proposed at this location to span over both the creek and the trail. This is not being an at-grade crossing for the trail; however, we would make modifications to our multi-use path to the sidewalk on either side of our east/west corridor to tie down, to match in with the Clear Creek Trail so that we can access to the trail from the east/west corridor. But any pedestrian or non-motorized on the trail itself, they don't have to come to the roadway and stop. It's not an active crossing. You would go underneath the bridge so there would not be an active crossing of the trail as this location. Further on the corridor. I've got two images here. The one that's on top shows the intersection with Bachelor Middle School on the north side. Obviously the school is not there but the intersection for there. This just kind of shows you the possibilities that might exist with that median. You can see the green kind of round off in the green middle section there. That would be a location where we 8 could propose any left turn lanes to have access for vehicles, buses, etcetera, that might want to make a left turn through there into the subdivision on the south side or into the middle school entrance on the north side. Once you get through the intersection, even if it is kind of an off-set intersection as in this case, you could then reintroduce the raised median curb at that point. The other thing noted here is we have locations on the corridor where you might have a bunch of residents on the south side of the corridor and have an open field area on the north side of the corridor, the proposed roadway has taken into account making adjustments horizontally, shifting the roadway a little bit to the north to minimize impact to a bunch of property owners on the south side of the corridor in favor of kind of open field on the north side. There's a number of locations on the corridor where the roadway might shift up or down slightly to take advantage of what's available for the current situation. The image on the bottom the screen here is the intersection at Rogers. You can kind of see the sag of the proposed roadway that's superimposed on the map there, that we might be looking to shift the roadway down to again avoid impact the homes on the southwest corner of the intersection, but also the homes on the northeast corner. We are looking to make subtle shifts in that alignment to minimize the impact to as many folks as possible along that corridor. Again, when you get to an intersection, based on the traffic analysis, if it's warranted we might be looking at a lot of turn lanes as appropriate. Even in some locations a right turn lane might be warranted, again based on the traffic analysis. Once you get through that intersection you then revert back to the same single section as we discussed before, but just a single through east bound lane and a light opposite single west bound lane separated again by that buffer. A couple more images kind of showing the same thing. The first image in the upper left is the waste water treatment plant to the west of Walnut Street, Old 37 where the roadway would be shifted slightly to the north so that the frontage road along the residential south side could be maintained so access would not directly off the Fullerton Pike corridor like in this case. Access would still be maintained off that frontage road. There are obviously variations that would occur just based on the circumstances along the corridor. We are going to make those adjustments on the corridor. The intersection with Old 37 and Walnut Street shown kind of in the lower right here. And in this case based on the traffic counts and the traffic projections some turn lanes are going to be warranted there. The concept being it maintains then through the intersection of just a single through lane. Turn lanes may be added at the individual intersections as in this case here. Once you get through the intersection those turn lanes will be tapered out, the grass median will be returned 9 and it's just again a single through each direction. And the final image that I wanted to present is the eastern terminus of the corridor. This is the intersection of Rhorer Road at Sare Road. And the recommended alternate proposed is a roundabout at this intersection. The project limits which terminate just to the east of the Sare Road intersection. So once we can taper the road, tie back into the existing two lane roadway, that the terminus right after Jackson Creek of this project limit. So that was covered by the current study. As Bill mentioned an engineering scoping study was done for lighter project limit. But as part of this environmental document as part of this meeting today this is the terminus at Sare Road reaching the project limit. There are a number of other alternates that were studied as part of the corridor. I'm sure a lot of you who may have been involved in some of the earlier public meetings were aware of the previous alternate for a continuous four lane roadway. That is two lanes in each direction. Based on public feedback primarily this was one of the alternates was rejected in favor of the preferred alternate for a two lane corridor. Other alternates that were considered included spot improvements at specific major intersections, potential alternate corridors instead of the Fullerton Pike Corridor. The Tapp Road Corridor for instance or That Road Corridor upgrade to the south. An alternate to realign at Rockport Road to send up to Tapp Road. And a do nothing alternate was also pursued. For various reasons each other alternates were deemed not to meet the purpose and need as well as the preferred alternate with the continuous two lane roadway was. As Bill mentioned earlier, the estimated project costs for the corridor from Rockport to Sare, the construction costs have been estimated at just over $24,000,000. There are additional costs for right of way and preliminary engineering and design. That would make the total cost closer to $27,000,000 for the entire corridor. Both federal and local funding will be used to fund this overall project. And the project is not intended to be built all at one time. We don't intend to build the 2.7 mile corridor all at once. The project is expected to be built in phases based on funding availability. I can say right now Phase 1 portion of the project has been identified, kind of in the center of the corridor from Walnut Street through to East Walnut Street Pike, a short half mile segment. That's been identified as the Phase 1 portion of construction. We do anticipate right-of-way acquisition for this Phase 1 portion of the corridor to occur in 2015. And anticipate construction of the Phase 1 Corridor to begin in 2016. Beyond the Phase 1 portion of the corridor, the identification of and the sequencing of future phases has not been finalized. So I can't say today whether Phase 2 would continue on to the east or whether it would continue on to the west. Really, those are 10 decisions that will be made at a future date as funding becomes available for the project. But currently the project is funded for a portion of Phase 1 of the corridor. Not the full $27,000,000 corridor. Now I will turn the meeting over back to Paul who will talk a little bit about the right-of-way impacts on the corridor and kind of the steps, the process of land acquisition. PAUL JOHNSON: Thank you, Patrick. If you've had a chance to look at the environmental documents you've seen there's a fairly detailed list of land uses that, right-of-ways that's estimated to be acquired from approximately, just over 31 acres of whole new permanent right-of-way to accommodate the 90 foot wide, typical 90 foot wide corridor. Some of that is in residential, existing commercial, agricultural and forests, schools and then others which includes a variety of different things in mining, quarries, etcetera. There is one residential relocation that is proposed as part of the project. And I want to talk a little bit now about that process, the process of right-of-way acquisition and relocation assistance. The first part of that is out in the entryway when you came in there are two different pamphlets, one is a blue pamphlet that is all about the right-of-way acquisition process. So it explains how if a public agency is buying property utilizing federal funding. And then also the relocation which describes the rights and benefits that are required for any relocations. The land acquisition process must follow the Uniform Act of 1970, which is a federal act. It stipulates how land is to be purchased and how that process is to work. The Uniform Act is, all federal, state and local governments must comply with that law. It requires, generally it requires just compensation for any property purchased by the government entity. As part of that process there is appraisals of the property values. There are review of appraisals and then there are negotiations between the property owner and the local agency or the public agency that is acquiring the property. One of the biggest parts to that is that the amount of compensation cannot be less than the fair market value. There are instances of partial acquisition, so if it's part of the way up along the front of your property, or a property, the Agency will state the amount that will be paid as part of the land to be acquired. It will also offer a separate amount for damages to the remaining portion of the property. And then if remaining portion of the property basically has little or no value, then agency can consider purchasing the entire parcel. In the, after the negotiations are concluded, when there's an agreement reached and the owner will be asked to sign either an option to buy, purchase agreement, an 11 easement or an actual deed transferring the property. If there's no agreement between the agency and the property owner then we go to mediation and/or condemnation. I ran through that relatively quickly, but all of this is explained in further detail and I think useable, readable language in those pamphlets. It's not typical government speak, it's good government speak. With that, I'm going to turn it over to another speaker, Ben Harvey, who's been patiently waiting back here to talk all about the environmental impact. BEN HARVEY: Because the County is proposing to use federal money and is matching they are required to go into depth as a part of the environmental impact the projects may have. There are a formalized set of things that they typically will look at for this project. When we say the environmental impacts we do mean the impacts to the natural environment and the human environment. The natural environment typically wetlands and streams, and endangered species is what you typically think of. Human environment are the things typically that have to deal with cultural resources - historic property, how the project may impact neighborhoods, how they impact the overall community as a whole. So all of those are combined to complete the environmental study for the project. For this particular project we prepared what is called an Environmental Assessment. That is prepared into the higher level environmental document for projects which you necessarily know if it is a significant impact to the environmental resources or not. We prepared what's called an Environmental Assessment or EA. As I mentioned, all the factors going into that. The County prepared this document and that then goes to INDOT and Federal Highway so that they can review that and make sure it is in line with what all the federal and state regulations may be for that particular undertaking. At the end of that process they either make a determination that there is not a significant environmental impact. And significant is defined by as necessary and there are no impacts that not really a significant impact or it moves on to what's called Environmental Impact Statement. We submitted the EA for approval to INDOT and Federal Highway and it was approved in November of this year. The finding of no significant impact is anticipated for the project. Like I mentioned, it is considered a fairly high level environmental document and a major undertaking, but it is not necessarily a significant impact. One of the major components of the environmental study is public outreach and public involvement in the process. At the outset we sent letters to approximately 40 local and statewide stakeholders trying to get input on the project. We formed what is called a Community Advisory Committee which is local people, local stakeholders, members of the different neighborhood associations who may have a direct input on the project. We held three of these community advisory committee meetings. Two in June and July of last year and one in February, sorry 2012 and one in February 2013. We did get a whole lot of 12 input from the community advisory committee and that did shape a lot of what of we did, as Patrick mentioned, that was a direct result of that reduction from four lanes to two. We had a public information meeting on the project after two of the CAC meetings occurred, similar format to what we have here just to get the word out, trying to solicit as much information as we could on the project. And then the public hearing, I guess, is one of the final steps in that public involvement process. That's what we're here for tonight. With this project corridor one of the major identified impacts with these cultural resources we did a full archeological study on the corridor and identified that there were four potential sites that had been identified, one of which is located in what they're calling the North Clear Creek Historic Landscape District which is a limestone district towards the western end of the project. That was determined to be a significant cultural resource for the ruins that are there so it's technically an archeological resource. As it mentions, there are two properties identified that historically indicate the district as well as the Winston Thomas Wastewater Treatment Plant. When they say that they are a significant cultural resource it means they're eligible for listing or for potential listing on the National Register of Historic Places. Just the proposed adverse effects on the North Clear Creek Historic Landscape District and no adverse effects on the Wastewater Treatment Plant. As a result of the process and discussing this with the state agencies in regard to this, they in order to mitigate the impact of that historic resource they've come up with what's called a Memorandum of Agreement which details what is going to occur as part of this project because of those impacts with the historic resource. For this particular one they're going to put up three signs, design and manufacture three signs related to the North Clear Creek Historic Landscape District guiding those along the path on the north side to bring awareness to the native landscaping stone is required consideration to the design element. And at the wastewater treatment plant there are two stone gate posts at the entrance and those will be relocated away from the roadway. Section 4(f) is another I guess federal regulation. It relates to, we're required to avoid if at all possible impacts parks, natural wildlife refuges, recreation areas, as well as historical properties. For this project the three existing trail resources are all considered Section 4(f) resources. The wastewater treatment plant and the other eligible for listing is the North Clear Creek Landscape District. The finding on everything except for the historic landscape district is what's called a de minimis finding, which means it does not substantially diminish the existing value of that resource. But it's the existing trail and therefore wanted to make certain improvements so you can still use the trail. 13 At the historic district, that process is fairly intermeshed with what I mentioned before about the historic property procedures. So with the MOA, it was all 4(f) as well. And that eventually would bid on that. We looked at the natural environment along the project corridor. We did not identify any wetlands within the corridor. Six streams were identified. So Clear Creek which is near Rogers and two tributaries to Clear Creek and Jackson Creek which is at Sare Road and two tributaries at that. As Patrick mentioned there are bridges or certain work that may occur at those resources. This area of the state, karst resources are another thing we did a study for. Karst is a feature of the limestone bedrock that is here and there can be sensitive habitat associated with that. Within our project area we identified two areas of potential sinkholes. As a result of that there are certain design elements that need to ensure that you don't drain storm water to that sinkhole and protect it during the course of construction. As the project moves forward they will have to obtain environmental permits, Section 404 from the Army Corp and Section 401 from the Department of Environmental Management to bring back the water resources anywhere that's in the flood plain or floodway the Department of Natural Resources will have jurisdiction, another permit there. And then for any construction activity there will be what's called Rule 5 for storm water runoff associated with that. So I think I will turn it back over to Paul at this time. PAUL JOHNSON: That concludes the presentation that we put together about the project and the environmental assessment. What we'd like to do now is start the public comment process, open the floor for public comments. As I said earlier, we have a couple of different ways public comments can be provided. One of which is here tonight at this meeting and so up here and give an oral comment. As I said before, we also have the hearing packet, the information packet have a comment form in it so you can provide written comments. You can give that to one of us tonight, you can mail it in, you can email it in. We have a dedicated email address for this project - FULLERTONPIKE@STRUCTUREPOINT.COM. You can scan the form and send it in that way. If you just want to write an email and send it to that as a comment, say this is my comments to the Fullerton Pike Project that would be fine. Again, we're asking that all comments that are mailed, e-mailed, faxed, hand delivered, whichever, be done by January 9, 2015. All comments will be reviewed and evaluated and given full consideration during the decision making process as part of the finalizing of the environmental document. What we'll do now, I have a list of people who have asked to speak, asked to make comments. You're asking you come up to the podium, state their name for the record so we can get that on the transcript and then make your comment. And 14 we'd ask that you speak clearly into the microphone. It's really good acoustics here in the room. So speak clearly so we can make sure that comments get transcribed. We're going to ask that, because several people may want to speak on this project, we're going to ask you to keep your comments at two to three minutes and I'll be back here keeping time. I don't have a stop light but I will just kind of give you a heads up that you've got one minute left or 30 seconds left. Just ask you to be respectful of other's time so that they have the opportunity to speak as well. So with that the first individual who has asked speak tonight is Nan Brewer. NAN BREWER: Hello, I'm Nan Brewer. I just want to state that I'm tired of hearing that this revised plan has mullified neighbor's concern about the Monroe County Highway Department's plan for the Fullerton Pike/Gordon Pike/Rohr Road expansion project and that it has to be built to serve the need for I69. Simply deciding not to make these residential streets into a five lane mega road which would have been wider than most of the state's highways passing through the county does not address our real concern. Instead, a three lane road running past two middle schools, several churches, two rails-to-trails path would bring a high volume of traffic and trucks. By the county's own estimate an increase of at least 40% within five (5) years. As the first exit off I69 in to Bloomington this estimate may be conservative. The plan essentially changes our neighborhood streets into a commercial artery. I think there must have been an error in the report identifying our area as "urban" when it is clearly 99% suburban. As you all know there is only one commercially zoned intersection along the entire stretch from Fullerton Pike to Snoddy Road at Walnut, Business 37. And no empty land for further commercial development. INDOT’s directives recommended not placing exits or access roads dumping traffic through primarily residential neighborhood, i.e. having a low residential impact, and to follow established commercial traffic patterns. This plan does neither. This is the first public comment meeting on this proposal. Although it would drastically alter the quality of life, property values, safety of our children, noise and light levels and residential character in many built out established south side neighborhoods, including the Highlands, Eagle View, Clear Creek Estates, Bachelor Heights and Southcrest. Just to name a few. Let's not talk about an outdated irrelevant highway plan from the 1960s before these neighborhoods were built and Highway 37 even existed. How about thinking about what would best serve the people who live there now. This has become an entirely different project once it was decided to make it an access road off of an interstate highway. Rather than a connection to Highway 37 or to an I69 overpass. The only reasonable option for this established residential area of mostly single family homes is to go with an alternative that eliminates any connection to a highway interchange. This alternative being proposed tonight has the highest residential impact of any of the choices. I think that our neighborhoods deserve the same right to traffic reducing measures that any other Bloomington neighborhood as opposed to this which is the exact opposite. Thank you. 15 JIM SHELTON: Good evening, I'm Jim Shelton, I'm representing the Greater Bloomington Chamber of Commerce. The Chamber's been engaged in the process on this project for a long time representing the 900 businesses that are Chamber members, as members of the CAC. It has been stated this need been long recognized for improved east/west traffic throughout this entire community, not just on the south side. In 2006 the Chamber did a survey of its members from key points that needed improvement. And one of them that came back was infrastructure plans from trying to improve the infrastructure in the community. A team was put together and a report was produced in 2007 that identified the areas of storm water, water and sewer, etc. and transportation. One of the things the plan recognized was we need improved east/west traffic capability on the south side of the community and it recognized that the Fullerton Pike Corridor expansion when it's already in the Transportation Improvement Program. The taskforce also, at the same time the county leadership created a TIF, Fullerton Pike TIF to produce the funds to match the federal funding that would eventually be needed and it still exists and it's got funds in it right now. In a recent survey that we did just this year our certified membership again indicated that they think this road needs to be built, or this capability needs to be created in the southern part of our community and this is where our county's leadership has selected that it be. So we support the project. We are glad to hear that there's flexibility as they get down to nitty-gritty exactly where the roads are going to be, that they can move things a little bit further south to try to save people's yards or make people able to turn left when they get out of their driveway. We support the project and take the opportunity to say so. LIZ IRWIN: Thank you very much. I'm Liz Irwin. I'm here today representing the Bloomington Chamber of Commerce. I want to thank you for the opportunity to share our insight today about this project. The Chamber does recognize that the Fullerton Pike Expansion Project has been part of the TIF for many years. Jim mentioned our 2007 Infrastructure Task Force report and this report also recognized that a Fullerton Pike extension was an important project has been identified been the county. And now we understand that the county is in a position to move forward with this plan that it has long recognized a need for. One of the other things that is recognized in that project was the 45/46 bypass project, widening of that also which was somewhat of a controversy from some of the citizens in town but I will just say when you see you people using that now for needs other than just movement by vehicle. We also see the great multi paths available alongside. I think that's been a great benefit to the citizens of the community. It's nice to see at the Fullerton Pike expansion project also will have sidewalks and multiuse paths. I think that will be an improvement to the residents. Also important I think to recognize that Fullerton Pike is identified as one of the first Bloomington exits on the south side of Monroe County and the construction of interstate is now underway. But it is really a timely and be moving forward with 16 the project. We need to make sure that we plan accordingly and follow through with those plans in the necessary time. We understand that the current plan has scaled back some to address some of the concerns of the residents. At the Chamber we just hope that the project can continue to be serving the interests of both residents and the rest of the county in terms of increasing connectivity across east and west side of town. And that it will also consider the transportation needs of businesses and for the rest of the community. Thank you very much. ANN ELSNER: My name is Ann Elsner. I am an IU faculty member and also a business owner of 501 South Madison. So I have a business on the south side as well as living in Eagle View and I'm very much against this road. My main concern is the safety of the people who live within this neighborhood. That is specifically dead children and smashed pets. So the four acres you're talking about removing is where a lot of people I know walk their dogs and go jogging. And the middle school kids work out there. That's not going to be there any more. Many comments have been made that people support this road. No one in my neighborhood has ever said within my hearing that this is a good idea. So the people who live there are not complaining about long commute time and traffic back up. At the present time they're concerned about future back up when the traffic will be coming from Interstate 69 through the neighborhood that was never there before. So one of the things that Nan Brewer has been trying to do is find out the estimate of increased traffic coming from the connectivity or some miracle where would you put a lot to make thousands more cars. There's a lot next door to me but other than that there's almost no lots anywhere in our neighborhood. We're full. We've been full for ten years. There's nowhere left to build if you stick with single family homes. So you can't have more traffic. It's a dead end road and a lot of cul-de-sacs. To expect people to have a road that's either going to be a high speed road through the neighborhood because it's leveled off to have those line of sight corrections, so they won't be able to pull out of their driveways in a safe manner or pull out of their intersection in a safe manner or watch their children go to school or to the play, the middle school or walk their dog. It really does impact on neighborhood quality of life. I disagree with the environmental statement. The section in the pages forty etc,, the methodology for the di minimis finding was not given. The data in the back that have exception after exception from the CAC members, from the residents, those statements are not addressed in the front. But commute times we're talking about haven't been compared against a critical alternative which is turning left or having to do U-turns because of the increase of several thousand cars a day. So in terms of my commute, let me give you an example from my life. I put in yet another longer than 12 hour day at the university job and I knew I could get home safely because I didn't have to worry about a lot of traffic. And I could just drive from the university to my home. If you have a truck route there I will not be able to do that. I realize time is short so I carefully read the first 50 pages of the environmental statement. I do not feel the 17 costs reported are accurate. The 27 million dollars does not include the several million dollars required for the bridges. So the critically alternative of Tapp Road is more than 37 million. But the 27 million doesn't include the bridges or the connectivity to the bridges. That's going to be 10 millon at least, right? So those two are actually similar in costs at the present. The engineering plans aren't complete enough so we don't know how much it's going to cost to flatten the hill top. I have no idea if anyone will be able to get into their driveways but that's another point. The property values will be limited or impacted but they are saying there will be no environmental impact or property values or community cohesion in the statement I feel is incorrect. And I'll just leave it at that. Thanks. ISABELLA BEITVASHAHI: It’s Isabella Beitvashahi. I just want to say, Mr. Williams, it's so nice to meet you, I've heard your name so many times. There's my husband and my little daughter Iris, she's five months. I have a spirited two year old who is not here, which you're all probably all grateful for that because he's bonkers right now. He's with his grandpa in Eagleview. I live at 521 West Gordon Pike. You might have seen us with our two Irish setters. I landscaped the front, take so much pride in our home. I mowed the lawn every day when I was pregnant because I loved it. I remember our neighbor, Randy, and like no, I'll do it. You make my feel bad. And I'm like but I love it. When I first heard this, my husband bought the house when he was 25 and I was 26. Claire Perry who was our real estate agent never told us that this was in the plan. That would have affected our decision I'm sure. But we found out about this when I was nine months pregnant with my first son. It was like a bomb dropped. And our community is very quiet and that's what we love about it. The first time I seen everyone rally together, like everybody scared us. And the dreams I had, having my son, he is (inaudible). We are a traditional home, we follow a budget, have two babies, take care of them. The only place I feel safe is the YMCA for his preschool and (inaudible) when I can get some time. (crying) They take care of me as much as I take care of my baby. And it's scary. I'm afraid of the traffic flow. And mostly I'm heartbroken at the change of our quality of life, six years, our Irish setters were puppies. (crying) My puppies now are getting old and I understand things change but this happening to us was done to us, we didn't have a choice. I had Ameer, my husband called a real estate agent because even Bob Saltzburg assaulted us like we should have known. We were young, homeownership is important and it is something to be very proud of. Apparently dying is something important. I felt that this didn't take any of that into account. And she said, you know, should we leave, trade it out, what can we do, you know, we have a family, personally I'm afraid. I'm here at home alone with my babies. All I have is my dogs. She said, stick it out. You're not going to get your money back. Who knows, it may be better. You're locked in. You wait until it's there. You know, I felt so wronged, like fools, and we're stuck there. And now I'm just, I appreciate people listening to us. Me being a mom (crying). Thank you very much, Nannette Brewer I'm so 18 honored to have you as a beautiful advocate. Because every summer when I was out there mowing the law (crying) I was thinking about (crying) I was so angry, why are they doing this to me. My home is the only place I feel safe. And it feels like such a (crying – inaudible) And I'm not going to have it any more. I really appreciate your time. Thank you very much. RANDALL STEPHENSON: Hi, everybody. Ms. Beitvashahi, it's going to be okay. Yes, I did say I envied you because I remember (inaudible). Isabella, it's a juggernaut. Get used to the juggernaut. The juggernaut comes through, it does what it wants to do. Get used to it. And think of it as all good. Okay? Tapp Road is there, they're going to build an interchange. But a juggernaut says well, if you go through Gordon Pike it's not so much the residential areas that are worried or they're concerned, it's all that very valuable undeveloped land on the west side of Clear Creek Trail, think about that. So it's all good depending on who you are. If you own that undeveloped land it's great. If you live on Gordon Pike it's not so good. But, buck up, the juggernaut won't crush the people. And so I know better than pretend it's going to stop because we're here today. But I think it's good for people to see what's going on. Because the more we see what's going on maybe the next time the juggernaut comes in our direction we'll be aware of it and we'll be able to stop it ahead of time. And I'm guilty, I was not here when I should have been earlier. But I hope not to make that mistake again. Thanks for your time. CLARENCE DILLON: Clarence Dillon, I'm a geologist and a teacher. I've lived in the area, I lived on South Rogers for five years and my two daughters went to Bachelor. I worked at Bachelor and as part of my community involvement for my one hour of my education degree I had to choose a community involvement in the MCCSC and I chose to participate in the discussions about Bachelor Middle School. It was not designed as a prison, if you want to know likewise. I can tell you that clearly. And that was 1970-72 and it was told to us then that this was going to be a connection over to what was then being constructed as Highway 37, of which I worked summers there. And since that time the 1965 plan has been in place and from that time on every subdivision, every issue of annexation, every issue of locating the fire house, the discussion about this improvement has been made. The subdivisions out there even had to contribute through bonding some money to build a bridge over the unknown tributary. And every time these have to be recorded in your abstracts. And anybody who purchased property has in their abstract some place that this was going to occur. Getting back to some other issues, when it was discussed about the school, school buses were discussed. And the number of school buses that come from my area right now out on Kirksville Road, I see five school buses out my window every morning leaving. All five of those school buses have to take several miles, different routes, to get their students, extra time to get their students from the west side of 37 because there's no route from Rockport Road to Bachelor. In 1972 that was an objective of having a 19 connection there to 37 at that time. Not 69. 69 was planned at the very exact same route from the time it was planned in the late 1950s. I actually sat out there in 1975 with the state geologist, my boss, and he pointed off of Tramway Road and said this is the exactly where the road's going to go. And that's exactly where the road has been planned and exactly the impact that it was going to have on Monroe County was conjectured from that time on. It's not new. So school buses, Bachelor, fire house, impacts, there's some impacts that I see or suggestions - there needs to be some mitigation done in the spring to each bridge crossing. I do river watch, I wade the streams, I look at the under the bridges and things like that. I've got a little farm, you know, part of that should not be plantings at the intersections that gets in the line of sight. You know, I have to put up with. My one other suggestion I had made, oh talk about the drainage and I would hope that all the drainage coming off of the road way will be going to the sewage treatment plant and not directly in the local streams. So thank you very much. MARY ELLEN GEORGE: My name is Mary Ellen George and the reason I'm against this proposition is the safety for the students. I'm been an educator for over 30 years and there are 500 students at Bachelor, 500 students at Jackson Creek. That's over 1000 students , many, many buses. If you look at just the statistics we have a thousand kids, you have trucks, you have cars coming from an interstate. It's not if an accident is going to happen, it's a matter of when is when an accident is going to happen. As you have said, you knew this was in the project since the 1960s. I've lived in a house for 30 years, no one told me that I69 was coming. I understand perhaps a need for an east/west corridor - why Gordon Pike? Tapp Road exists, it will not cost as much, it has less impact on people and soon if you must have the east/west corridor you use Tapp Road. Highway Commissioner Lynn said in the paper that you have listened to the people. You have and I thank you for that. Listen to us now - we say no to the Fullerton Pike Corridor, yes to Tapp Road. Also please take into consideration, many of you have said this is going to be a good thing for the economy, a good thing for Bloomington, why let me add some sarcasm please – if any of you would like to buy my house, I'll sell it to you. Thank you. SARAH RYTERBAND: I'm Sarah Ryterband. I sit on the Citizens Advisory Committee for the MPO, I'm also, in the City of Bloomington I sit the Traffic Commission. So I bring two different perspectives to this. First of all, I encourage all of you to come join us on the Citizens Advisory Commission for the MPO where you can weigh in on these issues. (bell ringing) And what is in and not in on long range transportation plan. Unfortunately, this was planned 20 years ago and like too many projects it simply gets pushed along but we can make a difference. So I encourage you to. As I looked at this plan, first of all I opposed the original proposal but I'm equally appalled by 16 foot travel lane. I encourage all of you to think about a 16 foot travel lane. Now our average roadway has about 20 a ten foot travel lane. When you raise it to 16 foot you encourage much, much faster traffic. You can see that reflected in the turning radii at all of those entryways. It's meant for high speed traffic. So although this roadway may be designated as 35 miles per hour, we would hope because it's neighborhood traffic. I would guess, just off the top of my head in looking at something like West Third Street, that you're going to have people traveling at 55 to 60 per hour through your neighborhoods. And that's a reflection purely of a 16 foot travel lane – what are people thinking – verses these neighborhood. As already pointed out, the only commercial area is at Walnut. That is not, despite what the Chamber wants us to believe, is not a commercial area. So why do we need people traveling at 60 miles per hour and then we're talking about students at two middle schools. I'm appalled and I don't live there and I'm appalled. So that's some, one piece of it. When I read there's going to be minor impacts on all six streams I have to laugh because when I think of an extra four times the amount of roadway that you have now is going to have when you have a major water event. Some of the major rain events we've had, think of what it's going to do to those streams. Just consider that for a moment. Of course you'll have proper drainage. The other piece that kind of makes me laugh is when I read that there is going to be appropriate erosion and sediment control practices. We've been promised that before. All we have to do is look at what happened with I69 and what's happened to our friends. I would hope that this is true and that indeed we're going to see the appropriate practices but we have not seen IDEM and its Rule #5 actually do anything for us so far. I'm hoping that once again you will reconsider this project and scale it back even further because what we're looking at is a way of turning this in to a four or five lane highway. It's very clear from the dimensions that we're being given and that's just not concrete once again. Thank you. TRACEE LUTES: I wasn't sure if I was going to say anything or not until I got here tonight and heard some of Liz, and was taking some notes. I've been very involved with the Chamber and support. A lot of the activities that are good for business and I know in the past that we've always, we always look for good ways and I think everybody in here has to say that there's been times that you've wished for better ways to get from the west side to the east side. I don't think anybody can deny that. I don't think the Chamber really looked at this, and I may be wrong. But I don't think any of us look at this as an opportunity for development of commercial because there is no place to put the commercial. It's more of a way to get traffic from 37, which will be the future 69, over to the east side. There's definitely a need for that. Now I think it's unfortunate that at the time all this happened we didn't have a Tapp Road interchange so the Fullerton Pike interchange is there and it kind of was out this road would be a stub to nothing, or Rockport Road or whatever. And we can already see people coming off Rockport. There's a ton of traffic on that intersection now getting across Fullerton and cutting all over with the construction happening it's kind of a dangerous intersection there 21 today. That will change when this is done. But I think now that we have Tapp Road maybe it would be prudent to consider, not to longer traffic feeds, but also preventing large trucks and truck traffic from traveling on this route. Maybe we push them up to Tapp Road because I think that you're going to see them go that way anyway. I think it will be much more convenient for trucks because I've given this a lot of thought. I think that's the way they're going to go anyway because that that road is easy, it's better, it dumps it right out on Winslow, they can go north on Walnut. It's just an easier way for trucks to get there. And so I think that's been a good, a good development with the 69 project. Now I want to also ask that you consider the fact that where we drive past there every day and watch our kids try to get to school, unlike many neighborhoods that have a road next to them, this… Unlike other schools that have a road next to them, this school has two neighborhoods and then a sort of urban area off Rogers where kids have to walk to school and cross this road to get to the school. They have no choice. They have to walk. So I want to make sure that you're thinking about a good safe way to get those kids across the road. We're already seeing slip/slide and I've seen them slide all the way out in the street in the icy weather even from the Highlands and walking that way. So I'll hope you'll consider that. I hope you'll consider the fact that there's a lot of cross country track meets held not just for Bachelor but other schools have them there in that field. So there are many times that we as neighbors drive along there and see cars parked all the way down Gordon Pike watching kids run their cross country meets there. And I also would encourage you to consider sidewalks on Rogers Street when you're doing this project because you're gonna get a lot of people hit that intersection and head north on Rogers or south on Rogers. There are no sidewalks now and you'll see kids walking through the grass and trying to get across Rogers today. It's not always the safest so I think it's gonna be getting even more dangerous. At the very least please consider sidewalks along there for our kids that have to have to walk to school. Otherwise I do think you'll have some accidents and I don't think that, that it will be very safe walking. And so those of you who live along that corridor know, my family has been involved in development along there and we're very active in Eagle View and we were very active with seeing the platting through of the Highlands and Bachelor Heights. We didn't finish that project but we were active. In all of our time there we always knew that Gordon Pike would probably eventually go over that creek and connect to 37. Maybe I'm too young, nothing was ever brought up that it was going to be 69. As a matter of fact I recall, it may have been an option for 69 as Mr. Dillon mentioned. You all remember the debates on where 69 was going to go. So it was not for certain that it was going to be there. There were a lot of controversy about that. So it's there, we've got it but I don't think it was intended to be such a highly trafficked road. We actually all envisioned it would be very much like Gordon is today and would just continue out to 37. And didn't really expect it to be this huge wide road. Nobody ever pictured that when we were doing those projects. And I think for your realtors, if you know anybody looking out there and 22 they're looking in that area, make sure they ask their realtor to find out because a lot of them don't know. It's not out there where it's easy to find. So there's been a lot of them don't know. We're trying to get the word out and educate that community but a lot of them are younger and haven't doing it long and they're just not aware. Thank you. PAUL JOHNSON: At this time I don't have any others, any others that signed up to speak. If there are others that would like to come up to speak, I'd like them just to do it. We'll try to keep to that two or three minutes. If you'd like to come up, please again state your name. STEVE BURNS: Steve Burns. I wasn't going to say anything but the comment that "things change" view. Well, things do change. The world is different than in 1960 or '70 when they envisioned the road. One of the things that changed that hasn't come up that I want to mention is we have all these walking trails and if you look, it's not just the kids who have to cross the street. Some of these trails that are getting a lot of traffic are going to be crossing these new interchanges. Well, not interchanges, I'm sorry. New road. So at grade level. There will be a lot of people, a lot of bikes, people out jogging with kids that will be going across these 16 foot roads. One is actually just past the circle in front of Jackson Creek there's a crossing. One is down at Clear Creek and those are at-grade crossings. I think ultimately things are going to have to be done to build bridges. The costs are not realistic because they're gonna have to be cuts, there's gonna have to be a lot of other changes because things change. So I will wrap it up in a minute but I think the cost estimates are low ball considerably. I think the cost of maintaining 16 foot roads, salting them, maintaining median strips which somebody said we can always have gardens in them. Well, who's doing that? So I think this is a project that wants to exist because people want projects. But I think the need are not well expressed, especially now that there's a second interchange. SCOTT WELLS: Thank you, my name is Scott Wells. You know, people who are supporting this highway, I call it a big highway now because it's kind of like morphed like it's on anabolic steroids. When it first started I remember having my connect list I can definitely see this being a four lane all the way to at least Walnut Street because that median there is probably going to be eventually taken out as the traffic increases turning it into a four lane road there. For those people who say this is great, I'm glad we have this, just imagine this is your property, your front yard there and now how would you think if this happened to your property. That's all I'm asking. Just think about if the shoe's on the other foot. The other thing is, you know, I'm on the Monroe County Plan Commission by the way, and you know I like to make good decisions based on facts. We have some projects right now that relates to the neighborhood. We have a fairly big project that is just not that far north of where Sare Road T's in with Rhorer Road. And you've got a nice tree 23 lined proposed round about or maybe a stop there in the report. The question is what's the number of added daily trips. I see nothing in this report and if you want to calculate stuff, I know I69 I remember when Section 4 was going through and did have some erosion control problems with which we still have some of those. I can verify with people sitting in the audience that can tell you about that. And you're going across six different cuts of stream I hope finally we're going to do something right if the job's done right so water is protected. I got off track but what I'm trying to do, on the traffic, when you design the I69, if I recall, it's going to be an increase of 24,000 trips of more vehicles going north and south, of which one-third or 8,000 trips are trucks. If you've got those numbers figured out why don't you have numbers objective when it's going to go east all the way to Sare Road. I would like to see numbers so I can make good decision on we're going to plan for the ten years our roads. I mean, it's all about traffic, right? We want to move traffic. We wouldn't be in the problem right now if we had planned this road way back and the road was already connected then people wouldn't come in and develop the property and stuff. But the road is already there now. You've got further set backs from the property. So all I'm asking is, if you're going to do this presentation, next time I would like to know, I'm sure that number's somewhere, on average daily trips for the next five years down the road, ten years down the road because I69, I call it a highway until it's actually connects to the 69 highway. I don't want to, you know, we need to know what traffic trip counts so when the Plan Commission members start approving these developments we know pretty much how much more traffic is going to be there. Thank you. JENNIFER MIERS: I'm Jennifer Miers. I live at 3212 South Rogers Street, so my property isn't directly affected by this project but I think I will be affected. I'm against the project for many reasons people have already recited. But one thing I want to point out, it doesn't make any sense to talk about this without the larger context of I69. So we need to acknowledge what other people are doing with that other project. And as it stands right now this has been a big discussion about how the plans affect this neighborhood and it's unfortunate that the discussion hasn't been larger because as I69 stands right now not only are the people in this neighborhood or the people in Bloomington or the county affected by traffic patterns and that kind of thing but we're going to be buying two interstate interchanges in less than a mile. And to accomplish that second one at Fullerton and Gordon we're going to have to tear up more than seven miles of nature. We're paying for two interchanges in less than a mile and we're tearing up and creating a new road which is an additional cost. And frankly this infuriates me that you would use my tax money this way. Thank you. SANDY KOUNS: Hi, I'm Sandy Kouns, I live at that corner of Gordon and Falcon. And I'm a teacher at Bloomington South High School and I have two sons. My oldest goes to a university in West Lafayette and my youngest son is at 24 South. Anyway, I have major concerns on the traffic and the type of traffic it will have, the speeds. I would hope that we keep it very safe for the children. I really felt compelled to speak tonight because in 2009 my son the one that lives in West Lafeyette was walking to Bachelor and he was hit by a car. He's not like a darter. If it were my younger child I would question it. But this is my safe guy. And if there was a problem then in December of 2009 then once all this goes in I have immense concerns about the children getting to Bachelor. And I am sure that Jackson Creek area people would have the same kind of concerns. So I just felt compelled kind of for the sake of my son, to come down and take action. Kids already have problems. And I just wanted to put that on record and kind of put that out there. Thank you very much. HARRIETT KULLIS: Good evening, my name is Harriett Kullhis. I am a member of the Eagleview subdivision and have been a long time opponent of this particular roadway. I have no idea why it needs to be 90 feet in width. I have no idea why the Better Business Bureau or Chamber of Commerce cares because there are exactly eight or nine businesses at the corner of Walnut and Gordon Pike. So what businesses are they representing? Are they financial businesses or are they development businesses? Is it a business that is going to be used to take that area that is now pristine land and have multifamily dwellings on it. What are they proposing to … Why are "they" the only, some of the very few people who are in favor of this. And yet the residents, the people who use that area, who travel in that area, and who walk in that area because it was a suburban rural area are totally opposed to it. It does not mean that we want to go back to the Dark Ages. It's not mean that we're not involved in connectivity. But this is not the place for it. There is an adequate and above us, Tapp Road, that would be a far superior area and would allow for the traffic to go in. I can't imagine a truck coming in off of our area, getting onto all of the north/south arterial lanes are one way in each direction, making those corners and then winding their way down little roads at 30 miles an hour with no curve, no lights, no sidewalks to go to IU or any other business located in downtown Bloomington. So this is taxpayer money that is being wasted. We do not need two exits within a mile. I lived in Chicago, I can tell you far far better areas have greater distances than the amount of population than what's represented by our little community. This is a boondoggle. It is some way just to spend the money because it's available. They should take the money and use it to improve the roads that are already there. Thank you very much. AMEER BEITVASHAHI: Thank you. My name is Ameer Beitvashahi and I live on Gordon Pike. I have a very brief comment. I heard several mentions of Tapp Road. Two years ago we had a public hearing somewhere on this when the lane was four lanes and everyone conveniently glossed over why Gordon Pike was the better alternative than Tapp Road. I've never seen any numbers, just the, someone quickly bumbling the affects plus revenue. Well, I'd love to know how 25 many residents and I'd love to know how much, you know, how much more we're talking on Tapp Road because, you know, I'm not a super road designer but I can drive from 37 all the way across Tapp Road and count way less houses than I do when I cross Gordon Lane. Some facts to back it up would help maybe in the next presentation. Thanks. MIKE KRAMME: Hi, I'm Mike Kramme. I live on South Walnut Street Pike. Everybody I've heard here has spoken on the west side of Old 37. I certainly can understand that. In fact it's basically a dead end ever since I've moved here from Washington, D.C. in 1989. But I live on the other side and I live just a block off of Rhorer Road and South Walnut Street Pike on the north side. Many times in the evening or morning I just sit in my driveway trying to get out because of all the congestion there of people trying to cut through either going to the east side or trying to cut down Henderson and down to IU and that area. It's a real choke point from kind of a rural perspective. Like I said, I come from an area where this town has no traffic compared to what I'm used to. But because it is rural and the roads are smaller we do get these choke points. You know, we do need an east/west connector. The improvements to Tapp Road have been good. I work on Second Street on the west side by Liberty Drive and you know, what used to take me about eight to ten minutes to get home from that area will now take me about 35 minutes, especially if I leave at 5:00 o'clock in the afternoon. So we're getting a lot of improvements, we're getting the highway through here. We need to consider these type of improvements but I think there's been lots of good comments here about the construction of the road and things that can be done even though you may have the road through Gordon Pike there and you property there will be ways to, you know, secure the shoulders and the animals and things that are going on in there. I think there can be mitigations done for that. I think you guys are thinking about that too. So I appreciate that. Thank you. SANDRATAKARSKY: I'm SandraTakarsky. I've lived in Monroe County since 1975. I'm not directly affected by this project. My heart goes out to those of you who are dealing with this and my praise to all of you who are working so hard on it. One of the points in the presentation was about the karst. I live on land impacted by I69. The water pollution continues every time it rains. Rule 5 which is supposed to make sure that sediment from construction sites does not leave construction, water is not supposed to leave construction site. But in Indian Creek Township it's going off the construction site into the karst system and has contaminated springs and wells. Unfortunately, in the state of Indiana the highway construction lobby has a stranglehold. I urge you to speak up clearly, precisely and firmly to all your elected officials. PAUL JOHNSON: Is there anyone else that wishes to make a public statement or make a public comment? Okay. If there's no others that want to speak we will 26 stop this public hearing portion of this meeting. If you have questions, if you have questions we'll be available out in the foyer area for a little while longer. End 8:30 cf/12/27/14 pj/cf-1/16/2015 Email Comment 12/11/2014 Lloyd Hawkins Highlands subdivision Email Comment 11/26/2014 Email Comment 11/26/2014 Matthew Russell 4000 S. Rogers St. Email Comment 11/26/2014 Rodney Friend No address given Geoff McKim No address given Email Comment 11/26/2014 Name / Address / Method / Date John Carter 560 E. Miller Dr. Page 1 of 40 It seems to me that by completing the new project with a divided roadway, whether it be two lanes or four lanes, will make it safer for all residents in the area. The median will provide pedestrians an area to avoid trying to cross both east and west bound traffic at the same time. The road will keep through-traffic out of the sub divisions and the traffic will be on a road that is designed to Right now, The Highlands subdivision is used as a cut-through to connect Gordon Pike to Rockport Road. Cars cut through the subdivision in order to gain access to State Road 37. They speed through on roads that are not designed to handle heavy traffic. These cars drive down Wickens Street to McDougal Street or Hennessey Street and they often ignore stop signs and are well over the 20 mph speed limit. The Fire Department and Ambulance Service also use the neighborhood to get to calls and avoid the long drive by using either Tap Road or That Road to get to State Road 37 or Rockport Road. My name is Lloyd Hawkins and I live in The Highlands subdivision between Gordon Pike and Rockport Road. I am a supporter of the new project to connect Fullerton Pike and Gordon Pike with access to I69. I would like to see a four lane project that would be able to handle traffic for many years to come as Bloomington continues to grow, but I understand concerns and I am supportive of the scaled down version of the project as well. There was mention of raising the road by about 2 feet from the intersection west. My driveway is on Rogers just south of the intersection. I currently have drainage issues in my drive due to road resurfacing of Rogers that raised the road above my drive. How will drainage on my property be addressed to prevent flooding of my property due to an increased road level? Will the sidewalk on the south of the road be at road level or at my property level? It concerns me to have sidewalk at the same level as my home considering the proposed proximity of it to my home. Will the south side of Gordon Pike west of Rogers be regraded to a more gradual slope or will be a retaining wall be erected? I own property at 4000 S Rogers St that will be significantly effected by the proposed road project. I went to the library to review the Environmental Assessment and was disappointed that it did not match what was stated in the letter i received. The letter stated that the entire corridor would consist of a single lane in each direction with a center median. All the maps in the EA showed 2 lanes in each direction at the Rogers St intersection. Can you please supply me with the updated routing maps indicated the proposed right of way? I also have a few questions. Please send a map of the purposed project. Your written description in this notice is poor and extremely hard to visualize. Your Legal notice of hearing describes in one paragraph an intersection of Fullerton Pike and Sare Road. There is no intersecting of these streets as they exist not unless some current streets get renamed. Greetings -- is a copy of the EA for the Fullerton Pike Project available in electronic form? Any light you could shed on these questions would be appreciated. Looking over the Final Engineering Assessment for the Fullerton Pike Project I was unable to determine exactly how the intersection of Fullerton/Gordon Pike and Batchelor Drive was to be treated. We do have students walking from Clear Creek Estates across Fullerton/Gordon Pike. Will there still be a 3 way stop there? Will it be signalized? We also have more than 20 buses entering/exiting twice per day. Comment Des 0801059 Fullerton Pike Corridor Improvements Public Hearing Comments Email Comment 12/11/2014 Roberta L. Taylor 3931 S. Cramer Cir. Email Comment 12/11/2014 Joel Fosha Clear Creek Estates subdivision Email Comment 12/11/2014 Terrill Cosgray 3700 S Mae Ct. Email Comment 12/11/2014 Tammy Kawanishi 4011 S. Crane Ct. Page 2 of 40 This exit should be at Tapp Road for very obvious reasons!!!! I vehemently disagree with putting an exit off 69 onto Fullerton Pike, a residential district!!! You've heard a lot of people against this - LISTEN TO THE PEOPLE!!! I urge the powers that be to reconsider this project This is simply not a good idea. Once the flood gates are opened, the unforeseen costs of infrastructure updates with no commercial benefits, and most importantly, a greatly diminished quality of life for the residents, will be the outcome! It’s not too late to drop this project and bury it! I strongly urge you to do so on behalf of my family and all the family that will be adversely affected. I am a home owner in Clear Creek Estates and will be affected by the Fullerton Pike road project. I am writing to you as an opponent of the project. This project was conceived many years ago when there was little or no development in the area. The plan is simply outdated given the neighborhood development that was allowed to be established in the area. The project, even in it’s scaled-down form, will adversely affect the quality of life for residents of the three surrounding neighborhoods in terms of traffic density, noise pollution, lowered property values, the health and safety of residents, and those who will attend school at Batchelor Middle School. Additionally, there is no infrastructure to handle the increased traffic as it pushes east. The early morning and five o’clock evening traffic bottlenecks as it is. That Road is, and will continue to be, a not-so-perfect solution to this problem if an east-west artery needs to be introduced in the area. The negative impact on people, neighborhoods, and costs would be much less if this were an option. I'm writing to support the current Fullerton Pike plan as described in today's Bloomington Herald Times newspaper article. I reside in a neighborhood off of Rhorer Road and am very familiar with the traffic patterns in Bloomington's Southeast side of town. There is very high need for a major East-West corridor. However road enhancements are also needed beyond Sare Road to Snoddy Road as well to move traffic further East and North to Rogers Road and then on to Smith Road. Also, Rhorer Road going East from Sare Road to Snoddy is very popular with bicyclists but the road is very narrow which can be dangerous for drivers and cyclists; a bike path and sidewalk are needed. Easy access to the trail is also important to help combat the rise in obesity and inactivity as highlighted on the front page of today’s paper (We’re Fat, We Smoke and We Refuse to Exercise – The Herald Times – Thursday December 11, 2014). It is important to point out that Bloomington has been given the honor of being awarded a gold level bicycle friendly community (one of only 55 in the country). What does it say about our community when we’re willing to damage/destroy a portion of the trail that makes this community unique. I ask that the committee seriously consider making the exit at Tapp Road to minimize the impact on healthy activity and living that makes Bloomington a unique place. A better alternative exsists with Tapp Road. Tapp road with its recent upgrades have allowed for bridges to already be built over the trail. Tapp Road has many businesses that would love the increased exposure that the increase in traffic would bring. Tapp Road also has ample room for the number of lanes needed to accommodate the corridor. The Fullerton Pike proposal will impact 2 large middle schools that have a good deal of walkers as well as a number of houses that have been built in the area where the corridor is proposed to run. When we moved to Bloomington over 10 years ago, we looked at a number of housing developments. We chose Eagleview because it was close to everything we needed, but away from the hussle and bussle of the eastside of town. We also loved the fact that our backyard was adjacent to a “feeder” to the trail. We love to ride our bikes, walk and run the trail. We use the trail several times a week (even during the winter) and have met some wonderful people on the trail. My husband has spent numerous hours (day and night) on the trail as he has trained for obstacle course races including World’s Toughest Mudder three times – which was highlighted in InStride in October of 2012. Please voice my opinion for me that I am a supporter of the project. handle it. Email Comment 12/11/2014 Jimmy Ratcliff No address given Email Comment 12/11/2014 Melinda Johnson The Highlands subdivision Email Comment 12/11/2014 Jolene Bettencourt No address given Page 3 of 40 I support the construction of the Fullerton Pike Corridor. I think the Eagle View neighborhood won an ill advised concession regarding the number of traffic lanes being proposed for the area. This corridor to Sare Road should be four lanes all the way. That is what planning for the future is all about. I live on the southwest side of S.R. 37 (soon to be I- 69). Like many others, who use Rockport Rd. to access S.R. 37 from the southwest, I-69 is going to cause an inconvenience since we no longer will be able to get onto it without taking That Rd. to Fullerton Pike. The bottom line is one person's inconvenience is another person's convenience. Being able to drive across I-69 on Rockport Rd. and then take Fullerton Pike all the way to Sare Rd. will be a convenience for us who have to travel Rockport Rd. to get to the eastside of Bloomington. At some point Sare Rd. all the way to I am unable to attend the public meeting but I did want to comment on the project. I live in the Highlands subdivision and I think a new road is very needed. The current way to get to Ind 37 from my neighbourhood is extremely hazardous. The roadway is way too narrow with no shoulders. The tree overhang on Rockport road keeps the roadway wet and slick most of the time. There are several deer in the area and no place to go when you see one because of no shoulders. The intersection of Rockport and Fullerton is also extremely dangerous. The sight line to the west is very limited and when cars are coming from the highway and you are turning onto Rockport from Fullerton you cannot see if a car is in the dip in the road or not. There have been accidents resulting in death on this stretch of Rockport because of pedestrians walking at night with no shoulder for them to get on. There is no lighting on this dark hilly road making it a hazard for both drivers and pedestrians. With the new interchange we are going to have more traffic on this county road and we need a safe road for the extra traffic. Not only is the road unsafe but what a way for people to view Bloomington for the first time if they choose to use this interchange and end up on unsafe roads. The ambulances to Monroe hospital must also use this interchange from the city side because of no Tapp road interchange. If you were to meet an ambulance on the road there would be no place to get out of the way. There are many safety issues far more important than the size of someone’s front yard. They could also put a stop light at the crossing for the few students who do need to walk to school. This would also alleviate cars who live in the neighbourhood from having to stop at a 4 way stop several times a day and night and all summer when school is not in session. The busses could file out more quickly with a light instead of the stop and wait we have now. The traffic flow could be greatly improved for all with a stop light. Please take a very close look at other possibilities other than adding yet another road through dense residential development, which could prove to be fatal mistake for our young people traversing this direction every day. I'm afraid I do not see the benefit to adding a connection from Fullerton to I69 when Tapp Road has recently been upgraded, enlarged, widened, etc. The upgrades already given to Tapp along with its current mix of business/industrial/residential makes a much better thoroughfare than a non-existent road through untouched growth, a trail system, very close frontage neighborhoods and a middle school. The Clear Creek trail is also an major issue for this road. Some type of overpass or underpass would need to be constructed in order to keep all the patrons of the trail safe from the flow of fast moving traffic. It makes much more sense to use Tapp Road, which already has a nice underpass for the trail. Tapp Road already has business/commercial offerings, much less residential frontage and the same access to major roads, and does not cross in front of a public school. I cannot attend the meeting this evening, but would like to offer my perspective. It is with great concern that I write about the proposed Fullerton Pike corridor. Since my family lives in close proximity to this road I think the safety concerns are great. I have a current student at Batchelor Middle School and two younger children who will also walk to this school daily within the coming years. With the current school schedule my student walks to school in complete darkness for a large portion of the school year. He must cross multiple intersections, including the main one to the school as it crosses Fullerton. There is already a decent amount of traffic as all the residential traffic takes it's course on the way to work at this time of day. To take this closed road and then connect it to not only a highway, but a soon to be Interstate, would substantially increase traffic, much to the large number of walking students detriment. And it would not simply be an increase in the volume of traffic, but also include larger vehicles, delivery trucks and such. The Batchelor Middle School cross country team also uses the surrounding neighborhoods and Clear Creek trail for training runs. They intentionally keep the kids from high traffic areas now, but this would become almost impossible if Fullerton is an Interstate exit and "beltway around the city." Verbal Comment 12/11/2014 Page 4 of 40 Good evening, I'm Jim Shelton, I'm representing the Greater Bloomington Chamber of Commerce. The Chamber's been engaged in the process on this project for a long time representing the 900 businesses that are Chamber members, as members of the CAC. It has been stated this need been long recognized for improved east/west traffic throughout this entire community, not just on the south side. In 2006 the Chamber did a survey of its members from key points that needed improvement. And one of them that came back was infrastructure plans from trying to improve the infrastructure in the community. A team was put together and a report was produced in 2007 that identified the areas of storm water, water and sewer, etc. and transportation. One of the things the plan recognized was we need improved east/west traffic capability on the south side of the community and it recognized that the Fullerton Pike Corridor expansion when it's already in the Transportation Improvement Program. The taskforce also, at the same time the county leadership created a TIF, Fullerton Pike TIF to produce the funds to match the federal funding that would eventually be needed and it still exists and it's got funds in it right now. In a recent survey that we did just this year our certified membership again indicated that they think this road needs to be built, or this capability needs to be created in Jim Shelton 1716 S. Springhouse Verbal Comment 12/11/2014 I just want to state that I'm tired of hearing that this revised plan has mullified neighbor's concern about the Monroe County Highway Department's plan for the Fullerton Pike/Gordon Pike/Rohr Road expansion project and that it has to be built to serve the need for I69. Simply deciding not to make these residential streets into a five lane mega road which would have been wider than most of the state's highways passing through the county does not address our real concern. Instead, a three lane road running past two middle schools, several churches, two rails-to-trails path would bring a high volume of traffic and trucks. By the county's own estimate an increase of at least 40% within five (5) years. As the first exit off I69 in to Bloomington this estimate may be conservative. The plan essentially changes our neighborhood streets into a commercial artery. I think there must have been an error in the report identifying our area as "urban" when it is clearly 99% suburban. As you all know there is only one commercially zoned intersection along the entire stretch from Fullerton Pike to Snoddy Road at Walnut, Business 37. And no empty land for further commercial development. INDOT’s directives recommended not placing exits or access roads dumping traffic through primarily residential neighborhood, i.e. having a low residential impact, and to follow established commercial traffic patterns. This plan does neither. This is the first public comment meeting on this proposal. Although it would drastically alter the quality of life, property values, safety of our children, noise and light levels and residential character in many built out established south side neighborhoods, including the Highlands, Eagle View, Clear Creek Estates, Bachelor Heights and Southcrest. Just to name a few. Let's not talk about an outdated irrelevant highway plan from the 1960s before these neighborhoods were built and Highway 37 even existed. How about thinking about what would best serve the people who live there now. This has become an entirely different project once it was decided to make it an access road off of an interstate highway. Rather than a connection to Highway 37 or to an I69 overpass. The only reasonable option for this established residential area of mostly single family homes is to go with an alternative that eliminates any connection to a highway interchange. This alternative being proposed tonight has the highest residential impact of any of the choices. I think that our neighborhoods deserve the same right to traffic reducing measures that any other Bloomington neighborhood as opposed to this which is the exact opposite. Thank you. Thank you for your consideration. I do not mean to dismiss the concerns of the residents of Fullerton Pike and hope you will work with them to minimize the impact. Nonetheless, I believe this corridor must be created, and as soon as possible. This connection is absolutely essential now that I69 construction is underway and impacts are being felt. I will lose (actually have already partially lost) my access to SR 37. I must now find alternative routes to work and everywhere else I go. People affected by the I69 project need multiple new options and this corridor makes absolute sense. It would be an important and significant improvement in my ability to travel safely for work, shopping, visiting and other trips. I am unable to attend the hearing this evening but wanted to write and express my strong support for the Fullerton Pike corridor project. Nan Brewer 3636 S. Rogers St. Email Comment 12/11/2014 Julio Alonso 1865 W. That Rd. College Mall Rd. may have to be widened. Verbal Comment 12/11/2014 Ann Elsner 4017 South Crane Verbal Comment 12/11/2014 Liz Irwin th 400 West 7 Street, Suite 102 Page 5 of 40 My name is Ann Elsner. I am an IU faculty member and also a business owner of 501 South Madison. So I have a business on the south side as well as living in Eagle View and I'm very much against this road. My main concern is the safety of the people who live within this neighborhood. That is specifically dead children and smashed pets. So the four acres you're talking about removing is where a lot of people I know walk their dogs and go jogging. And the middle school kids work out there. That's not going to be there any more. Many comments have been made that people support this road. No one in my neighborhood has ever said within my hearing that this is a good idea. So the people who live there are not complaining about long commute time and traffic back up. At the present time they're concerned about future back up when the traffic will be coming from Interstate 69 through the neighborhood that was never there before. So one of the things that Nan Brewer has been trying to do is find out the estimate of increased traffic coming from the connectivity or some miracle where would you put a lot to make thousands more cars. There's a lot next door to me but other than that there's almost no lots anywhere in our neighborhood. We're full. We've been full for ten years. There's nowhere left to build if you stick with single family homes. So you can't have more traffic. It's a dead end road and a lot of cul-de-sacs. To expect people to have a road that's either going to be a high speed road through the neighborhood because it's leveled off to have those line of sight corrections, so they won't be able to pull out of their driveways in a safe manner or pull out of their intersection in a safe manner or watch their children go to school or to the play, the middle school or walk their dog. It really does impact on neighborhood quality of life. I disagree with the environmental statement. The section in the pages forty etc,, the methodology for the di minimis finding was not given. The data in the back that have exception after exception from the CAC members, from the residents, those statements are not addressed in the front. But commute times we're talking about haven't been compared against a critical alternative which is turning left or having to do Uturns because of the increase of several thousand cars a day. So in terms of my commute, let me give you an example from my life. I put in yet another longer than 12 hour day at the university job and I knew I could get home safely because I didn't have to worry about a lot of traffic. And I could just drive from the university to my home. If you have a truck route there I will not be able to do that. I realize time is short so I carefully read the first 50 pages of the environmental statement. I do not feel the costs reported are accurate. The 27 million dollars does not include the several million dollars required for the bridges. So the critically alternative of Tapp Road is more than 37 million. But the 27 million doesn't include the bridges or the connectivity to the bridges. the southern part of our community and this is where our county's leadership has selected that it be. So we support the project. We are glad to hear that there's flexibility as they get down to nitty-gritty exactly where the roads are going to be, that they can move things a little bit further south to try to save people's yards or make people able to turn left when they get out of their driveway. We support the project and take the opportunity to say so. Thank you very much. I'm Liz Irwin. I'm here today representing the Bloomington Chamber of Commerce. I want to thank you for the opportunity to share our insight today about this project. The Chamber does recognize that the Fullerton Pike Expansion Project has been part of the TIF for many years. Jim mentioned our 2007 Infrastructure Task Force report and this report also recognized that a Fullerton Pike extension was an important project has been identified been the county. And now we understand that the county is in a position to move forward with this plan that it has long recognized a need for. One of the other things that is recognized in that project was the 45/46 bypass project, widening of that also which was somewhat of a controversy from some of the citizens in town but I will just say when you see you people using that now for needs other than just movement by vehicle. We also see the great multi paths available alongside. I think that's been a great benefit to the citizens of the community. It's nice to see at the Fullerton Pike expansion project also will have sidewalks and multiuse paths. I think that will be an improvement to the residents. Also important I think to recognize that Fullerton Pike is identified as one of the first Bloomington exits on the south side of Monroe County and the construction of interstate is now underway. But it is really a timely and be moving forward with the project. We need to make sure that we plan accordingly and follow through with those plans in the necessary time. We understand that the current plan has scaled back some to address some of the concerns of the residents. At the Chamber we just hope that the project can continue to be serving the interests of both residents and the rest of the county in terms of increasing connectivity across east and west side of town. And that it will also consider the transportation needs of businesses and for the rest of the community. Thank you very much. Page 6 of 40 Clarence Dillon, I'm a geologist and a teacher. I've lived in the area, I lived on South Rogers for five years and my two daughters went to Bachelor. I worked at Bachelor and as part of my community involvement for my one hour of my education degree I had to choose a community involvement in the MCCSC and I chose to participate in the discussions about Bachelor Middle School. It Clarence Dillon No address given Verbal Comment 12/11/2014 Hi, everybody. Ms. Beitvashahi, it's going to be okay. Yes, I did say I envied you because I remember (inaudible). Isabella, it's a juggernaut. Get used to the juggernaut. The juggernaut comes through, it does what it wants to do. Get used to it. And think of it as all good. Okay? Tapp Road is there, they're going to build an interchange. But a juggernaut says well, if you go through Gordon Pike it's not so much the residential areas that are worried or they're concerned, it's all that very valuable undeveloped land on the west side of Clear Creek Trail, think about that. So it's all good depending on who you are. If you own that undeveloped land it's great. If you live on Gordon Pike it's not so good. But, buck up, the juggernaut won't crush the people. And so I know better than pretend it's going to stop because we're here today. But I think it's good for people to see what's going on. Because the more we see what's going on maybe the next time the juggernaut comes in our direction we'll be aware of it and we'll be able to stop it ahead of time. And I'm guilty, I was not here when I should have been earlier. But I hope not to make that mistake again. Thanks for your time. Randall Stephenson No address given Verbal Comment 12/11/2014 Isabella Beitvashahi 521 West Gordon Pike That's going to be 10 millon at least, right? So those two are actually similar in costs at the present. The engineering plans aren't complete enough so we don't know how much it's going to cost to flatten the hill top. I have no idea if anyone will be able to get into their driveways but that's another point. The property values will be limited or impacted but they are saying there will be no environmental impact or property values or community cohesion in the statement I feel is incorrect. And I'll just leave it at that. Thanks. I just want to say, Mr. Williams, it's so nice to meet you, I've heard your name so many times. There's my husband and my little daughter Iris, she's five months. I have a spirited two year old who is not here, which you're all probably all grateful for that because he's bonkers right now. He's with his grandpa in Eagleview. I live at 521 West Gordon Pike. You might have seen us with our two Irish setters. I landscaped the front, take so much pride in our home. I mowed the lawn every day when I was pregnant because I loved it. I remember our neighbor, Randy, and like no, I'll do it. You make my feel bad. And I'm like but I love it. When I first heard this, my husband bought the house when he was 25 and I was 26. Claire Perry who was our real estate agent never told us that this was in the plan. That would have affected our decision I'm sure. But we found out about this when I was nine months pregnant with my first son. It was like a bomb dropped. And our community is very quiet and that's what we love about it. The first time I seen everyone rally together, like everybody scared us. And the dreams I had, having my son, he is (inaudible). We are a traditional home, we follow a budget, have two babies, take care of them. The only place I feel safe is the YMCA for his preschool and (inaudible) when I can get some time. (crying) They take care of me as much as I take care of my baby. And it's scary. I'm afraid of the traffic flow. And mostly I'm heartbroken at the change of our quality of life, six years, our Irish setters were puppies. (crying) My puppies now are getting old and I understand things change but this happening to us was done to us, we didn't have a choice. I had Ameer, my husband called a real estate agent because even Bob Saltzburg assaulted us like we should have known. We were young, homeownership is important and it is something to be very proud of. Apparently dying is something important. I felt that this didn't take any of that into account. And she said, you know, should we leave, trade it out, what can we do, you know, we have a family, personally I'm afraid. I'm here at home alone with my babies. All I have is my dogs. She said, stick it out. You're not going to get your money back. Who knows, it may be better. You're locked in. You wait until it's there. You know, I felt so wronged, like fools, and we're stuck there. And now I'm just, I appreciate people listening to us. Me being a mom (crying). Thank you very much, Nannette Brewer I'm so honored to have you as a beautiful advocate. Because every summer when I was out there mowing the law (crying) I was thinking about (crying) I was so angry, why are they doing this to me. My home is the only place I feel safe. And it feels like such a (crying – inaudible) And I'm not going to have it any more. I really appreciate your time. Thank you very much. I'm Sarah Ryterband. I sit on the Citizens Advisory Committee for the MPO, I'm also, in the City of Bloomington I sit the Traffic Commission. So I bring two different perspectives to this. First of all, I encourage all of you to come join us on the Citizens Advisory Commission for the MPO where you can weigh in on these issues. (bell ringing) And what is in and not in on long range transportation plan. Unfortunately, this was planned 20 years ago and like too many projects it simply gets pushed along but we can make a difference. So I encourage you to. As I looked at this plan, first of all I opposed the original proposal but I'm equally appalled by 16 foot travel lane. I encourage all of you to think about a 16 foot travel lane. Now our average roadway has about a ten foot travel lane. When you raise it to 16 foot you encourage much, much faster traffic. You can see that reflected in the turning radii at all of those entryways. It's meant for high speed traffic. So although this roadway may be designated as 35 miles per hour, we would hope because it's neighborhood traffic. I would guess, just off the top of my head in looking at something like West Third Street, that you're going to have people traveling at 55 to 60 per hour through your neighborhoods. And that's a Sarah Ryterband nd 820 West 2 Street Verbal Comment 12/11/2014 Page 7 of 40 My name is Mary Ellen George and the reason I'm against this proposition is the safety for the students. I'm been an educator for over 30 years and there are 500 students at Bachelor, 500 students at Jackson Creek. That's over 1000 students , many, many buses. If you look at just the statistics we have a thousand kids, you have trucks, you have cars coming from an interstate. It's not if an accident is going to happen, it's a matter of when is when an accident is going to happen. As you have said, you knew this was in the project since the 1960s. I've lived in a house for 30 years, no one told me that I69 was coming. I understand perhaps a need for an east/west corridor - why Gordon Pike? Tapp Road exists, it will not cost as much, it has less impact on people and soon if you must have the east/west corridor you use Tapp Road. Highway Commissioner Lynn said in the paper that you have listened to the people. You have and I thank you for that. Listen to us now - we say no to the Fullerton Pike Corridor, yes to Tapp Road. Also please take into consideration, many of you have said this is going to be a good thing for the economy, a good thing for Bloomington, why let me add some sarcasm please – if any of you would like to buy my house, I'll sell it to you. Thank you. Mary Ellen George 601 W. Gordon Pike Verbal Comment 12/11/2014 was not designed as a prison, if you want to know likewise. I can tell you that clearly. And that was 1970-72 and it was told to us then that this was going to be a connection over to what was then being constructed as Highway 37, of which I worked summers there. And since that time the 1965 plan has been in place and from that time on every subdivision, every issue of annexation, every issue of locating the fire house, the discussion about this improvement has been made. The subdivisions out there even had to contribute through bonding some money to build a bridge over the unknown tributary. And every time these have to be recorded in your abstracts. And anybody who purchased property has in their abstract some place that this was going to occur. Getting back to some other issues, when it was discussed about the school, school buses were discussed. And the number of school buses that come from my area right now out on Kirksville Road, I see five school buses out my window every morning leaving. All five of those school buses have to take several miles, different routes, to get their students, extra time to get their students from the west side of 37 because there's no route from Rockport Road to Bachelor. In 1972 that was an objective of having a connection there to 37 at that time. Not 69. 69 was planned at the very exact same route from the time it was planned in the late 1950s. I actually sat out there in 1975 with the state geologist, my boss, and he pointed off of Tramway Road and said this is the exactly where the road's going to go. And that's exactly where the road has been planned and exactly the impact that it was going to have on Monroe County was conjectured from that time on. It's not new. So school buses, Bachelor, fire house, impacts, there's some impacts that I see or suggestions - there needs to be some mitigation done in the spring to each bridge crossing. I do river watch, I wade the streams, I look at the under the bridges and things like that. I've got a little farm, you know, part of that should not be plantings at the intersections that gets in the line of sight. You know, I have to put up with. My one other suggestion I had made, oh talk about the drainage and I would hope that all the drainage coming off of the road way will be going to the sewage treatment plant and not directly in the local streams. So thank you very much. Verbal Comment 12/11/2014 Verbal Comment 12/11/2014 Tracee Lutes No address given Page 8 of 40 I wasn't sure if I was going to say anything or not until I got here tonight and heard some of Liz, and was taking some notes. I've been very involved with the Chamber and support. A lot of the activities that are good for business and I know in the past that we've always, we always look for good ways and I think everybody in here has to say that there's been times that you've wished for better ways to get from the west side to the east side. I don't think anybody can deny that. I don't think the Chamber really looked at this, and I may be wrong. But I don't think any of us look at this as an opportunity for development of commercial because there is no place to put the commercial. It's more of a way to get traffic from 37, which will be the future 69, over to the east side. There's definitely a need for that. Now I think it's unfortunate that at the time all this happened we didn't have a Tapp Road interchange so the Fullerton Pike interchange is there and it kind of was out this road would be a stub to nothing, or Rockport Road or whatever. And we can already see people coming off Rockport. There's a ton of traffic on that intersection now getting across Fullerton and cutting all over with the construction happening it's kind of a dangerous intersection there today. That will change when this is done. But I think now that we have Tapp Road maybe it would be prudent to consider, not to longer traffic feeds, but also preventing large trucks and truck traffic from traveling on this route. Maybe we push them up to Tapp Road because I think that you're going to see them go that way anyway. I think it will be much more convenient for trucks because I've given this a lot of thought. I think that's the way they're going to go anyway because that that road is easy, it's better, it dumps it right out on Winslow, they can go north on Walnut. It's just an easier way for trucks to get there. And so I think that's been a good, a good development with the 69 project. Now I want to also ask that you consider the fact that where we drive past there every day and watch our kids try to get to school, unlike many neighborhoods that have a road next to them, this… Unlike other schools that have a road next to them, this school has two neighborhoods and then a sort of urban area off Rogers where kids have to walk to school and cross this road to get to the school. They have no choice. They have to walk. So I want to make sure that you're thinking about a good safe way to get those kids across the road. We're already seeing slip/slide and I've seen them slide all the way out in the street in the icy weather even from the Highlands and walking that way. So I'll hope you'll consider that. I hope you'll consider the fact that there's a lot of cross country track meets held not just for Bachelor but other schools have them there in that field. So there are many times that we as neighbors drive along there and see cars parked all the way down Gordon Pike watching kids run their cross country meets there. And I also would encourage you to consider sidewalks on Rogers Street when you're doing this project because you're gonna get a lot of people hit that intersection and head north on Rogers or south on Rogers. There are no sidewalks now and you'll see kids walking through the grass and trying to get across Rogers today. It's not always the safest so I think it's gonna be getting even more dangerous. At the very least please consider sidewalks along there for our kids that have to have to walk to school. Otherwise I do think you'll have some accidents reflection purely of a 16 foot travel lane – what are people thinking – verses these neighborhood. As already pointed out, the only commercial area is at Walnut. That is not, despite what the Chamber wants us to believe, is not a commercial area. So why do we need people traveling at 60 miles per hour and then we're talking about students at two middle schools. I'm appalled and I don't live there and I'm appalled. So that's some, one piece of it. When I read there's going to be minor impacts on all six streams I have to laugh because when I think of an extra four times the amount of roadway that you have now is going to have when you have a major water event. Some of the major rain events we've had, think of what it's going to do to those streams. Just consider that for a moment. Of course you'll have proper drainage. The other piece that kind of makes me laugh is when I read that there is going to be appropriate erosion and sediment control practices. We've been promised that before. All we have to do is look at what happened with I69 and what's happened to our friends. I would hope that this is true and that indeed we're going to see the appropriate practices but we have not seen IDEM and its Rule #5 actually do anything for us so far. I'm hoping that once again you will reconsider this project and scale it back even further because what we're looking at is a way of turning this in to a four or five lane highway. It's very clear from the dimensions that we're being given and that's just not concrete once again. Thank you. Verbal Comment 12/11/2014 Page 9 of 40 Thank you, my name is Scott Wells. You know, people who are supporting this highway, I call it a big highway now because it's kind of like morphed like it's on anabolic steroids. When it first started I remember having my connect list I can definitely see this being a four lane all the way to at least Walnut Street because that median there is probably going to be eventually taken out as the traffic increases turning it into a four lane road there. For those people who say this is great, I'm glad we have this, just imagine this is your property, your front yard there and now how would you think if this happened to your property. That's all I'm asking. Just think about if the shoe's on the other foot. The other thing is, you know, I'm on the Monroe County Plan Commission by the way, and you know I like to make good decisions based on facts. We have some projects right now that relates to the neighborhood. We have a fairly big project that is just not that far north of where Sare Road T's in with Rhorer Road. And you've got a nice tree lined proposed round about or maybe a stop there in the report. The question is what's the number of added daily trips. I see nothing in this report and if you want to calculate stuff, I know I69 I remember when Section 4 was going through and did have some erosion control problems with which we still have some of those. I can verify with people sitting in the audience that can tell you about that. And you're going across six different cuts of stream I hope finally we're going to do something right if the job's done right so water is protected. I got off track but what I'm trying to do, on the traffic, when you design the I69, if I recall, it's going to be an increase of 24,000 trips of more vehicles going north and south, of which one-third or 8,000 trips are trucks. If you've got those numbers figured out why don't you have numbers objective when it's going to go east all the way to Sare Road. I would like to see numbers so I can make good decision on we're going to plan for the ten years our Scott Wells No address given Verbal Comment 12/11/2014 I wasn't going to say anything but the comment that "things change" view. Well, things do change. The world is different than in 1960 or '70 when they envisioned the road. One of the things that changed that hasn't come up that I want to mention is we have all these walking trails and if you look, it's not just the kids who have to cross the street. Some of these trails that are getting a lot of traffic are going to be crossing these new interchanges. Well, not interchanges, I'm sorry. New road. So at grade level. There will be a lot of people, a lot of bikes, people out jogging with kids that will be going across these 16 foot roads. One is actually just past the circle in front of Jackson Creek there's a crossing. One is down at Clear Creek and those are at-grade crossings. I think ultimately things are going to have to be done to build bridges. The costs are not realistic because they're gonna have to be cuts, there's gonna have to be a lot of other changes because things change. So I will wrap it up in a minute but I think the cost estimates are low ball considerably. I think the cost of maintaining 16 foot roads, salting them, maintaining median strips which somebody said we can always have gardens in them. Well, who's doing that? So I think this is a project that wants to exist because people want projects. But I think the need are not well expressed, especially now that there's a second interchange. Steve Burns 4017 S. Crane Ct. and I don't think that, that it will be very safe walking. And so those of you who live along that corridor know, my family has been involved in development along there and we're very active in Eagle View and we were very active with seeing the platting through of the Highlands and Bachelor Heights. We didn't finish that project but we were active. In all of our time there we always knew that Gordon Pike would probably eventually go over that creek and connect to 37. Maybe I'm too young, nothing was ever brought up that it was going to be 69. As a matter of fact I recall, it may have been an option for 69 as Mr. Dillon mentioned. You all remember the debates on where 69 was going to go. So it was not for certain that it was going to be there. There were a lot of controversy about that. So it's there, we've got it but I don't think it was intended to be such a highly trafficked road. We actually all envisioned it would be very much like Gordon is today and would just continue out to 37. And didn't really expect it to be this huge wide road. Nobody ever pictured that when we were doing those projects. And I think for your realtors, if you know anybody looking out there and they're looking in that area, make sure they ask their realtor to find out because a lot of them don't know. It's not out there where it's easy to find. So there's been a lot of them don't know. We're trying to get the word out and educate that community but a lot of them are younger and haven't doing it long and they're just not aware. Thank you. Verbal Comment 12/11/2014 Page 10 of 40 Hi, I'm Sandy Kouns, I live at that corner of Gordon and Falcon. And I'm a teacher at Bloomington South High School and I have two sons. My oldest goes to a university in West Lafayette and my youngest son is at South. Anyway, I have major concerns on the traffic and the type of traffic it will have, the speeds. I would hope that we keep it very safe for the children. I really felt compelled to speak tonight because in 2009 my son the one that lives in West Lafeyette was walking to Bachelor and he was hit by a car. He's not like a darter. If it were my younger child I would question it. But this is my safe guy. And if there was a problem then in December of 2009 then once all this goes in I have immense concerns about the children getting to Bachelor. And I am sure that Jackson Creek area people would have the same kind of concerns. So I just felt compelled kind of for the sake of my son, to come down and take action. Kids already have problems. And I just wanted to put that on record and kind of put that out there. Thank you very much. Sandy Kouns 4001 S. Falcon Dr. Verbal Comment 12/11/2014 I'm Jennifer Miers. I live at 3212 South Rogers Street, so my property isn't directly affected by this project but I think I will be affected. I'm against the project for many reasons people have already recited. But one thing I want to point out, it doesn't make any sense to talk about this without the larger context of I69. So we need to acknowledge what other people are doing with that other project. And as it stands right now this has been a big discussion about how the plans affect this neighborhood and it's unfortunate that the discussion hasn't been larger because as I69 stands right now not only are the people in this neighborhood or the people in Bloomington or the county affected by traffic patterns and that kind of thing but we're going to be buying two interstate interchanges in less than a mile. And to accomplish that second one at Fullerton and Gordon we're going to have to tear up more than seven miles of nature. We're paying for two interchanges in less than a mile and we're tearing up and creating a new road which is an additional cost. And frankly this infuriates me that you would use my tax money this way. Thank you. Jennifer Miers 3212 S. Rogers St. roads. I mean, it's all about traffic, right? We want to move traffic. We wouldn't be in the problem right now if we had planned this road way back and the road was already connected then people wouldn't come in and develop the property and stuff. But the road is already there now. You've got further set backs from the property. So all I'm asking is, if you're going to do this presentation, next time I would like to know, I'm sure that number's somewhere, on average daily trips for the next five years down the road, ten years down the road because I69, I call it a highway until it's actually connects to the 69 highway. I don't want to, you know, we need to know what traffic trip counts so when the Plan Commission members start approving these developments we know pretty much how much more traffic is going to be there. Thank you. Hi, I'm Mike Kramme. I live on South Walnut Street Pike. Everybody I've heard here has spoken on the west side of Old 37. I certainly can understand that. In fact it's basically a dead end ever since I've moved here from Washington, D.C. in 1989. But I live on the other side and I live just a block off of Rhorer Road and South Walnut Street Pike on the north side. Many times in the evening or morning I just sit in my driveway trying to get out because of all the congestion there of people trying to cut through either going to the east side or trying to cut down Henderson and down to IU and that area. It's a real choke point from kind of a rural perspective. Like I said, I come from an area where this town has no traffic compared to what I'm used to. But because it is rural and the roads are smaller we do get these choke points. You know, we do need an east/west connector. The improvements to Tapp Road have been good. I work on Second Street on the west side by Liberty Drive and you know, what used to take me about eight to ten minutes to get home from that area will now take me about 35 minutes, especially if I leave at 5:00 o'clock in the afternoon. So we're getting a lot of improvements, we're getting the highway through here. We need to consider these type of improvements but I think there's been lots of good comments here about the construction of the road and things that can be done even though you may have the road through Gordon Pike there and you property there will be ways to, Mike Kramme 3850 S. Walnut Street Pike Verbal Comment 12/11/2014 Verbal Comment 12/11/2014 Page 11 of 40 My name is Ameer Beitvashahi and I live on Gordon Pike. I have a very brief comment. I heard several mentions of Tapp Road. Two years ago we had a public hearing somewhere on this when the lane was four lanes and everyone conveniently glossed over why Gordon Pike was the better alternative than Tapp Road. I've never seen any numbers, just the, someone quickly bumbling the affects plus revenue. Well, I'd love to know how many residents and I'd love to know how much, you know, how much more we're talking on Tapp Road because, you know, I'm not a super road designer but I can drive from 37 all the way across Tapp Road and count way less houses than I do when I cross Gordon Lane. Some facts to back it up would help maybe in the next presentation. Thanks. Ameer Beitvashahi 521 W. Gordon Pike Verbal Comment 12/11/2014 I am a member of the Eagleview subdivision and have been a long time opponent of this particular roadway. I have no idea why it needs to be 90 feet in width. I have no idea why the Better Business Bureau or Chamber of Commerce cares because there are exactly eight or nine businesses at the corner of Walnut and Gordon Pike. So what businesses are they representing? Are they financial businesses or are they development businesses? Is it a business that is going to be used to take that area that is now pristine land and have multifamily dwellings on it. What are they proposing to … Why are "they" the only, some of the very few people who are in favor of this. And yet the residents, the people who use that area, who travel in that area, and who walk in that area because it was a suburban rural area are totally opposed to it. It does not mean that we want to go back to the Dark Ages. It's not mean that we're not involved in connectivity. But this is not the place for it. There is an adequate and above us, Tapp Road, that would be a far superior area and would allow for the traffic to go in. I can't imagine a truck coming in off of our area, getting onto all of the north/south arterial lanes are one way in each direction, making those corners and then winding their way down little roads at 30 miles an hour with no curve, no lights, no sidewalks to go to IU or any other business located in downtown Bloomington. So this is taxpayer money that is being wasted. We do not need two exits within a mile. I lived in Chicago, I can tell you far far better areas have greater distances than the amount of population than what's represented by our little community. This is a boondoggle. It is some way just to spend the money because it's available. They should take the money and use it to improve the roads that are already there. Thank you very much. Harriet Kulis 1430 W. Estate Dr. Monroe County residents need the Fullerton Pike extension. The usefulness of this project outweighs the desires of the homeowners who did not check the county planning maps prior to building or buying their homes. The road should be a four-lane, not a two-lane. The existing section is already two lanes and is inadequate for traffic right now. Project to when I69 is complete. It will be a mess. Make it a four-lane, and stop bending to the wishes of a few to the detriment of thousands and thousands of people who will use those four lanes every single day. Sarah Klaiber No address given As a resident of Woodhaven Estates, I say build the road. We have always had to drive through neighborhoods to get to Batchelor Middle School. We used to cut through the Eagle View neighborhood. Now we cut through the Highlands. People speed and nearly get hit due to traveling on unfamiliar roads. Is that really safer? Build the road. If someone bought a house and didn't research the area, it doesn't mean their rights are suddenly more important. This connector road should not be built. It is not needed. Tapp Rd. has been functioning as a major east-west corridor for years. There are less residences along Tapp Rd. and more businesses and they are all used to having a busy road passing by. There is much more land available on Tapp Rd. for widening the road if necessary. Tapp Rd./Country Club/Winslow/Rogers Rds. still connect to the north end of Sare Rd. and therefore to the bypass. Furthermore, Rogers Rd. connects to Smith Rd., making it possible for cars heading east to Lake Monroe or Brown County to avoid the busy College Mall area. Marci Creps Woodhaven Estates subdivision Email Comment 12/12/2014 Christine Linnemeier No address given Page 12 of 40 Another negative effect of the Fullerton Pike-Gordon Pike connector road would be disturbing one of the longer, more peaceful sections of the Clear Creek Trail. I have walked on the Rail Trail underneath SR 37. It is very noisy and frightens my dog. I do not walk that part of the trail anymore because of that. Please, don't ruin another walking trail with an overpass. I do not live on Gordon Pike, Rhorer Rd. or Sare Rd., though I do live on the south side of town and frequently drive on these roads and Tapp Rd, and walk on the Clear Creek Trail. It is clear to me that building the Fullerton Pike-Gordon Pike connector will ruin the neighborhood for those people owning houses along Gordon Pike. It will make walking to Batchelor Middle School more dangerous. Furthermore, it will send more traffic past Jackson Creek Middle School and bring added traffic and noise to another residential neighborhood—that on the south end of Sare Rd. When the curving south end of Sare Rd. was built, was it really intended to be part of a beltway? I don't think so. Also, this project needs to happen, so cars will stop going through the Highlands. It was never designed to be a road. Email Comment 12/12/2014 Email Comment 12/12/2014 A roundabout should be put in at Fullerton and Rockport. It would deal with some of the alignment issues with the two roads. A sky bridge could be put in for the kids, similar to what is on bypass north of town. There is a school there, as well. Lisa Williams No address given Email Comment 12/11/2014 Verbal Comment 12/11/2014 I'm SandraTakarsky. I've lived in Monroe County since 1975. I'm not directly affected by this project. My heart goes out to those of you who are dealing with this and my praise to all of you who are working so hard on it. One of the points in the presentation was about the karst. I live on land impacted by I69. The water pollution continues every time it rains. Rule 5 which is supposed to make sure that sediment from construction sites does not leave construction, water is not supposed to leave construction site. But in Indian Creek Township it's going off the construction site into the karst system and has contaminated springs and wells. Unfortunately, in the state of Indiana the highway construction lobby has a stranglehold. I urge you to speak up clearly, precisely and firmly to all your elected officials. Sandra Takarsky No address given you know, secure the shoulders and the animals and things that are going on in there. I think there can be mitigations done for that. I think you guys are thinking about that too. So I appreciate that. Thank you. Email Comment 12/12/2014 Stephen Schuster 2415 Rhorer Rd. Email Comment 12/12/2014 Kate Arthur th 400 E. 7 St. Email Comment 12/12/2014 Email Comment 12/12/2014 Nathan Schroder No address given Bruce Farrand 750 E. Kirkwood Ave. Page 13 of 40 Regarding curbs - I believe the drainage issues will add a lot of expense to the project. Furthermore they will be a maintenance problem. Just look at the gutters along Sare Road; they are full of sand, grass and debris. Who will clean them? The County However east of Walnut Pike to Sare Road I feel the project should take on a more rural and residential mindset. For example I can see no need for a median or curb on this portion of the project and the large roadway will reduce the front yards of many homes. The median is impractical both aesthetically and functionally as this is an existing area that has numerous driveway cuts. How would people get out of their driveways? You can't expect people to go in the wrong direction and then do a U turn can you? This boulevard approach works on the Sare Road extension because it was a new development and there are no driveways directly to Sare Road, only a few streets. Additionally because of the older and more rural feel of this area I believe a grass median or third turn lane (except where needed - like at Jaimie Lane) would look out of place. Also remember people have to walk across the road daily to retrieve their mail. A wider faster road would make this difficult. Thank you for your presentation last night. The proposed project from SR37/I69 to Walnut Pike seems fairly appropriate to me; as this is the connection from the interchange to commercial areas. Additionally this had been in the plan for at least 30 years so Batchelor Middle School etc were located in anticipation of this. Glad to hear this went from 4 to 2 lanes, but really this should either not happen at all, or not be an I-69 interchange. I live in one of these neighborhoods and have children who will be walking to Batchelor. There is nothing down there that anyone needs to get to, it would just clog up S Walnut/Old 37, be a nightmare for going grocery shopping at the Kroger… it’s already so busy there with people coming N and S on Walnut and folks going to and from Rhorer or S Walnut Pike, completely unsafe, noise for no reason in a residential neighborhood/school zone, etc… The thought itself of an E/W corridor is appealing, but as somebody living over here it seems quite dreadful, and with the trails… It makes way more sense to make this on Tapp Rd., where most everything is industrial anyway. I am not a fan. If you want to connect Fullerton/Gordon fine, but definitely no interchange, and definitely not a 4 lane, and definitely lower the speed limit through there. Do not downgrade this project any further. It should never have been downgraded from 4 lanes in the first place. Plan for the future growth, don’t deny that will happen. Do not kick the can down the road like was done with the bypass. As a resident who lives southwest of Bloomington, I feel the pain of the residents alongside the Fullerton Pike project. I now have a front row view of I69 out of my front door. I knew when I purchased my home that I69 was someday likely coming through. I also know, now that it is here, the need for a true West to East corridor for the southern side of the city is even more necessary. And I say West to East, not West to Walnut. The combination of a major interstate and a major university will only make our city more attractive to new businesses and residents, further expanding the need for this project. I was not able to go to the meeting last night and have a question. I live at 320 East Rhorer Rd. (the southeast corner of Rhorer and Walnut Street Pike). I understand you are widening Rhorer. How much of my yard will I be losing? Or how wide is Rhorer going to be widened on the south side of the road just east of Walnut Street Pike? Building this road is a bad idea. Don't do it. Just because something has been talked about for the past 50 years, does not mean it should be done. Times change. Fifty years ago there were no housing developments or schools in this area. It was rural. South Sare Rd. did not exist. I-69 was not planned. Clear Creek Trail did not exist. Email Comment 12/12/2014 Michael Kramme 1983 S. Liberty Dr. Page 14 of 40 The Fullerton Pike project would alleviate the stress on the Southside by adding another throughput for traffic, so traffic from the south would have Old 37 access, traffic from the west would have Fullerton Pike and traffic from the north would have Tapp Road As I try to commute to work there are three choices now, north to Winslow then onto Country Club and Tapp road, south to Rhorer Road then Gordon Pike to Rogers to That Road and 37 North, or go through town to Grimes Lane, Patterson and then second street. What used to take me 10-12 minutes to go <6 miles to work now takes me closer to 20 minutes. The reason is urban sprawl; the city has approved all the new construction over the last several years and the accompanying traffic has increase dramatically. The Sare Road connector has greatly increased the traffic on the Southside too. All of the buildup has led to safety, access, speed and lifestyle changes for every resident on the Southwest side of Bloomington. This project would give me a straight shot to the highway so I would be a contributing factor to traffic flow north of the Fullerton Pike corridor. First and foremost is the need for an east/west connector on the Southside of Bloomington. The Tapp road improvements had helped quite a bit for commuting and transiting west to east and vice versa before access to That Road was closed. Now it's congested worst than it ever has been during peak driving time. It also is only a two lane road through Country Club and Winslow to the Rogers Street circle. Major and costly improvements would need to be made to make it a viable alternative to the Fullerton Pike project as some vied for. This project would connect completely through to the east side of town making it a true Southside connector east/west. I'm writing comments in favor of the Fullerton Pike project as a resident along the Eastside of the corridor. The open house hearing held December 11 at the Monroe Courthouse had quite a few residents from the Westside of the project (west of Business 37) speaking against this project. Their overwhelming concern was safety, access, speed, and lifestyle changes as a result of their current dead-end residential street (including several side-street cul-de-sacs) being changed to a thoroughfare connector from a major new highway. High speed truck traffic was the top concern, as well as the increased traffic volume. I would like to speak to these issues as well as my perspective as a resident on S. Walnut Street Pike and the commute I must make to work to the Westside of Highway 37, off Second street and onto S. Liberty Drive. I have lived in the area since 1992 and have long awaited this access. I am writing this message to express my support for the project. I think it is very important to the south side of Bloomington to open up this access from the I-69 interchange and provide a good quality east/west connector through the area. The changes to That Road diminish it as a heavily used path to between SR-37 and Rogers Street. I realize that the project will have a greater impact (with some aspects negative) on those that live directly on Fullerton Pike/Gordon Pike and Rhorer Road, but I think it will ultimately benefit all the residents of the area to have efficient access to other parts of the community and access to I-69. I live in the Eagle View neighborhood adjacent to the planned Fullerton Pike project. I was unable to attend the Public Review on 12/11/14 but was able to download and review the Environmental Assessment Des. no. 0801059. Email Comment 12/12/2014 Reed Adams 1310 W. Feathercrest Ct. Email Comment 12/12/2014 Bill Williams and friends keep saying they want to listen to people and give the people want they want. I will repeat again what the people are saying: “We don’t want this road.” James Kulis No address given won't and it will be impossible for the residents to stand in a busy road and clean them. They will create huge drainage issues and you will need to build retention ponds as all of this water cannot flow directly into Jackson Creek. One last thought the bridges over Jackson Creek were just recently rebuilt so they should be to current standards. Page 15 of 40 I would like to thank Mr Williams and the rest of the decision-making committee for scaling back the project to plan 1A, the 2-lane Hello, I was at the most recent public meeting you held at the Courthouse, and wanted to thank you, as well as submit a few questions Email Comment 12/15/2014 Matt Mullins No address given Email Comment 12/18/2014 I was just notified that Monroe County is considering buying my property because of the Fullerton Pike project. Can you tell me when I can expect to hear if they are or if they are not. I’m at 320 East Rhorer Rd. Thank you for your time. These people just do not want change. Too bad. I am very disappointed that the Highway Department and the others involved have kowtowed to this small group that yelled the loudest. We had a real chance for the first effective eastwest passage across the southside of Bloomington, and now it will just be another half-baked traffic jam because the traffic will be there, whether the road is designed to handle it or not. Of course, roads with traffic, even lots of traffic, go through strictly residential areas. Drive around Bloomington. Drive around Columbus, Indiana or nearly every medium-sized community in the Midwest region. They all have arterial streets going through neighborhoods where there are schools. There is nothing special, unique, or even "important" about the "Batchelor" neighborhood. I have no patience for this "Not In My Backyard" mentality and some of the opinions quoted in the local newspaper on Friday, December 12 are just plain wrong. I am writing now to voice my strongest possible objection to the small number of people who are holding our county hostage. Bruce Farrand 320 E. Rhorer Rd. Email Comment 12/13/2014 Jeff Whitmer No address given Finally I'd like to touch on the construction process. There are mostly residential properties along this corridor and being able to ensure right-of-way property isn't damaged and is returned in good shape after the project is complete is very important. I would hope the crews are sensitive to the property owners concerns and do all they can to mitigate the heavy equipment and materials interference during construction. Thank you for this opportunity to voice my opinion on your project, good luck. It will cost more money to responsively satisfy the environmentalists and the Gordon Pike/Eagle View section of this project, but collaboratively solving the issues and the funding requirements is what this town is all about. Engage the people, have them help you solve the issues and the project will benefit from the interaction. Now, for the few that live along the Westside corridor and have concerns for safety, access, speed, lifestyle or that have environmental concerns, I believe the Fullerton Pike Project Office should engage with them and mitigate their issues as much as possible. This is an impactful change for them and I'm sure the design changes you've made so far go a long way towards addressing their issues. Ensuing the adult, children's and pets safety is number one, access onto and off of the new roadway is second and speed it probably third. Being environmentally responsibility is one of the areas that this city takes pride in, so not taking this lightly is very important; especially after the issues Section 4 of I-69 have experienced. primarily. The leveling of traffic flow would allow for safer conditions, the multiple access would lessen wear & tear on the roadways, less congestion would ease frustration and lower speeding, and a shorter compute with access from the Westside to Sare Road would improve lifestyle conditions for most of the people. Email Comment 12/19/2014 Greg Alexander 1015 N. Madison St. Page 16 of 40 The county has a complete streets policy in place. Don't ignore it. The only way the road could be good at all is if it had a 25mph design speed. That would mean 10 foot travel lanes, 10 foot curb radii at intersections, frequent stops/crossings/driveways, you know, like an urban road. By being an oversized road with a divider, it will encourage a limited access mentality. As a result, connecting residential development will be of the suburban form, vast networks of cul de sacs with only one connection to the rest of the world. That design discourages biking and violates the county MPO's complete streets requirement. It will be inaccessible by bike. You cannot put a bike lane on a highway! You have to design the road for bikes. When you put a bike path beside a road with large turning radiuses, every intersection becomes a body count. You will literally kill cyclists with this design. AND YOU KNOW IT -- LOOK AT BEST PRACTICES FOR BIKE DESIGN, THERE IS NO SHORTAGE OF ENGINEERING DESIGN GUIDES ABOUT BIKES. Earn your pay! Once it meets Sare Rd, it will effectively form a beltway around Bloomington. That would be a catastrophe, substantially changing the nature of Bloomington's development patterns. If it attracts development, it will be shitty development, AS YOU WELL KNOW. Look at the development along roadways of a similar design elsewhere in the nation! And that's the best case -- it's also likely to just be an overbuilt road with no development on it, a high speed corridor filled with people in cars who don't want to be where they are. It will actively destroy the sense of place. I cannot say "No", I must say: HELL NO. Regarding the plan to make a boulevard or suburban highway out of Fullerton Pike: Overall, I am very much in favor of this road, as it will improve access to the highway, and smooth out the rest of the road, making it more convenient for most living along that route. I also think that upon completion, most people near the road (not those directly on the road, unfortunately) will see a modest property value rise with the ideal location near a direct feeder to I-69. 4) Have any attempts been made to accelerate the construction? Beginning in 2016 seems very far in the future. I would like to minimize the time as much as possible so that everyone can begin using the road and getting used to the new normal. 3) Also, the property on the NE corner of Rhorer/Walnut St Pike is currently for sale. Has any thought been given to acquiring that property and using it for a roundabout, minimizing the effect on the other 3 corners? I think that would be a perfect plan. 2) Are there any possibilities of implementing more roundabouts along this route? I believe there would be room (and definitely the need) at the intersection with Rogers and Walnut St Pike. Roundabouts are just so much more efficient than the 4 way stops currently in place. There may not be much room at Walnut St Pike, but wouldn't that necessitate a smaller roundabout and slower speeds? Perhaps another roundabout at the entrance of Batchelor would also be suitable for traffic management as well as speed control to help the drivers stay focused and help the children cross safely. 1) I live in Eagleview, and have 1 child currently walking to Batchelor (crossing Gordon to get there) and 2 more who will be going in the next several years. Are there any considerations for an under- or overpass? What traffic-control measures might also work to control speed in that area? I don't have overwhelming concerns about safety, but believe this would be very useful. Questions: road with occasional turn lanes. I think this seems like the 'right size' road for the area and the neighborhoods along the way. I received a flier at my residence asking for my opinion regarding two interchanges being built within a mile on I69 at Fullerton Pike and Tapp Road. Email Comment 12/22/2014 Thomas Albright 711 W. Estate Dr. Page 17 of 40 Yes we should have an interchange at fullerton pike. The interchange and the improvements across to Sare rd. will be a long range benefit to the community. Ultimately, I would prefer an overpass at I69 and Fullerton, instead of the proposed off ramp. With Tapp Road only an additional mile north, it seems like a waste of money and will severely impact the area. 2. Noise. The increase in traffic and truck traffic will create extra noise in the area (especially as they are preparing to stop at Rogers and Fullerton). How will this be addressed? Examples: Signs to discourage and enforce no air braking, very reduced and enforced speed limit signs (20 mph school zone), no 48-Dtrucks over a certain weight, sound barriers, etc. 1. Concerned that S. Clear View Drive to W. Hedgewood Drive to Estate Drive will be used as a cut through for traffic when there is a back up at the new traffic light at Fullerton and Rogers. People will inevitably figure this out and it will create excessive traffic through our W. Hedgewood Drive neighborhood (risking children, pets, etc.). Will this be addressed with speed bumps on Clear Creek Estate roads (e.g. W. Hedgewood Drive), a traffic diversion from Clear View, etc.? I share many of the same concerns expressed by my extended neighbors along the corridor being considered for construction (Fullerton Pike Project). In addition to the obvious concerns of sending increased traffic (truck and car) off of an Interstate (69) through the middle of our neighborhood endangering children, pets and other pedestrians, there are two concerns I have specific to the Clear Creek Estates neighborhood: Finally, funding is still not totally in place for the proposed corridor, and I (along with many others) do NOT want my federal, state, and county tax dollars used for this project. All travelers would be better served having our current bridges and roads fixed. This proposed corridor is not even really an east-west artery. It will become, in fact, a southern bypass moving people away from downtown businesses and IU. During our recent town hall public meeting, someone spoke admiringly of the 3rd street artery and how everyone is aided by it. I drive on this once a week when I have to--fast traffic makes it unfriendly and causes unease in negotiating turn-offs. Also, it is ugly; it is almost an embarrassment for out-of-towners to have to take this--especially as their first introduction to our city. It is common knowledge that we have distracted drivers. More so in the past few years than ever! Our proposed corridor will be one of those streets designed to facilitate traffic through suburbs, and we will see deaths of, and injuries to, our children and elderly. In the United States, every 2 hours a pedestrian dies in a traffic accident. More than half of pedestrian traffic deaths over the past decade occurred on “arterial roads” built through suburban sprawl. These factoids come from the “2014 Dangerous by Design” report by Smart Growth America. These cities’ poorly thought-out corridors were built only in the interest of moving cars, rather than built to keep pedestrians safe. More than 90% of people hit by cars traveling at 20 mph survive the crash. At 45 mph, only 35% live. These factoids show what WE will have if this corridor is built as proposed. I am writing to express my total hate of the proposal to complete the Fullerton Corridor. This “corridor” will immediately become an arterial road going by two middle schools and through suburbs. Only one intersection is business zoned. P.J. Smith 703 W. Baywood Dr. Email Comment 12/21/2014 Shawn Laszlo Clear Creek Estates subdivision Email Comment 12/20/2014 Rosalie White 3853 S. Cramer Cir. Email Comment 12/27/2014 John Chambers No address given Email Comment 12/26/2014 Email Comment 12/26/2014 Sarah Klaiber No address given No name given No address given Email Comment 12/26/2014 Mo Beit No address given Email Comment 12/25/2014 PO Box 3261 The most important reason is that there is a hospital located at Fullerton Pike and I69. What could be better than a hospital with emergency facilities right on the Interstate! Another good reason is that the Fullerton Pike interchange would complete the “beltway” around Bloomington. There is really nothing of the same importance at Tapp Road. None of the medical offices near Tapp Road at I69 are emergency facilities. Page 18 of 40 Logistics! There is NO WAY that extending Fullerton Pike could ease or speed up travel to the east side of Bloomington. There are way too many obstacles: Count them. Most existing streets and roads are 2 lane and narrow. Predominately residential. Two schools. S Roger street stop. Intersecting Trails. S 37 stop light. S Walnut St Pike stop. Rhorer Rd/ Sare Rd intersection. Medical district on Sare. Rogers roundabout. etc etc I agree with Mary Ann Williams 12/26 Letter to the HT editor for her reasons and many more. The simplest reason is that it doesn't make sense. Who would it serve? People driving north? It provides no benefit in time or mileage over the present corridors. People driving south would use 46 bypass. People driving east have ½ dozen options now. People driving west have the same options . I would guess that few drivers exiting from I69 would select Fullerton pike to go to the east side of town! Again, please build the Fullerton Pike extension as the originally-planned court-lane road. We 100% support the Fullerton Pike extension in Bloomington, IN. However, please make it a four-lane road instead of a twolane road. A two-lane does nothing to facilitate traffic any better than the current road does. People along the route will adapt, and any increase of traffic during “school hours” will be minimal. It’s not like more students, parents, and staff will be traveling to and from the schools because of a new road. A new road will not increase the number of busses that currently travel to those facilities. This is a nonsense complaint that is used as a “scare attempt” to discourage road development in Monroe County. First, I don't appreciate a flyer in my mailbox, which is unlawful. Second, I support Fullerton Pike as an I 69 Interchange with improvements to the Corridor to Sare Road. 6. Please put stop to this non sense before one of our children die crossing the street going to school. 5. Monroe county is known to kick small businesses out using the environment for excuse but then they are bringing trucks and semi in and around our schools and residential. 4. Monroe county politicians are known for making these non sense decisions in our schools and our roads. They are in it for themselves and do not care about the working people. We will remember that when it is time to vote. 3. The people who are making these decision have a stake in this to make money. all are land owners and are making millions from tax payers. These people do not live in the area and have no children. 2. You are putting our children and our schools in harm's way. This is residential neighbor hood. Kids are crossing and walking to school in this area. There is too much traffic already going by the schools. 1. Waste of tax payers money to pay for 2 interchanges. We already have Tapp Rd. - - I live in Clear Creek Estates on Estate Drive which is the next intersection on Rogers Street south of Gordon Pike, so this discussion is directly relevant to me. I believe that the Fullerton Pike interchange at I69 is far more important to have than the Tapp Road interchange at I69. If the number of interchanges is limited to one, then it should be built at Fullerton Pike: Email Comment 12/28/2014 Roger Innes 2401 E. Rhorer Rd. Email Comment 12/28/2014 Janet and Jim Ault No address given Email Comment 12/27/2014 Steve Keucher 4621 N. Shelburne Dr. Page 19 of 40 I also have concerns about the lack of attention paid to the bikeway in the DEA document. There are very real safety concerns associated with creation of a separate bikeway when it encounters a busy road. The intersection of South Walnut/Old 37 and Gordon Pike/Rhorer road is especially concerning. At such broad intersections it is very difficult for drivers to see all potential hazards. When an additional separate lane for bikes is added, drivers will easily miss seeing a cyclist. I strongly recommend that an underpass for cyclists be created at this intersection, similar to what was done under the 46 bypass. This will greatly speed up travel time for cyclists, and greatly reduce hazards for drivers and cyclists alike. Given the proximity to Batchelor and Jackson Creek middle schools, many of these cyclists will likely be middle school students, who are not yet road savvy. For this reason in particular I would also recommend an underpass at Rogers Road. I understand that underpasses are costly, but this cost will be well worth it to avoid a tragic death. I encourage the engineers to visit Boulder Colorado to see a well-designed bikeway system. I served on the Citizen's Advisory Committee (CAC) for the Fullerton Pike Corridor Improvements project and attended two of the CAC meetings. In reading over the Draft Environmental Assessment (DEA) document dated October 13, 2014, I was pleased to see that the preferred alternative (1A) for this corridor is now a two lane road, rather than four lane road. As brought up by multiple members of the CAC, there were serious concerns about creating a large boulevard that would encourage high speed travel past numerous residences and two middle schools. Changing this route to two lanes with a median should discourage speeding. However, I am concerned that the lanes are still too wide at 16 feet, and I question the need for a 16 foot wide median, which creates a very broad right-of-way when combined with the bike path on the north side and a sidewalk on the south. This large width will continue to encourage speeding, which will be especially problematic in front of Batchelor Middle School. I would recommend reducing the lane width further, similar to what has been done on Sare Road north of Jackson Creek School, where the median creates a narrow lane for cars to pass by, encouraging cars to watch their speed. Please reconsider relocating the project from Fullerton Pike to Tapp Road and Country Club Road. The State of Indiana and Bloomington needs to carefully plan the building of such projects that have impacts on safety, pollution, and tax dollars. I do not see that happening with the current Fullerton Pike Project proposal. If you changed the boulevard location to Tapp Road and Country Club Road this would be less expensive, less soil and stream erosion, and less hazzardous to middle school students. The Fullerton Project is proposed to be built in a large flood plain, adding a huge construction expense, removing hills, and creating immense soil erosion in the streams that eventually run into Lake Monroe, Bloomington's water source. The projected building of a boulevard that goes past two middle schools would create a hazzard and potentilal death of one or more middle school students.. The citizens were told that the boulevard would make it safer for pedestrians, however, many days and nights I see students run, walk, skateboard, bicycle across the road instead of using crosswalks, something middle school students commonly do. Crossing a boulevard in this manner would be extremely hazzardous. The cost of the project is a huge responsibility for tax payers. The project would cost less if it was relocated to Tapp Road and Country Club Road that already has an existing path. I am a long time resident of Monroe County and wish to share my concerns about the proposed Fullerton Pike Corridor Project. As a long-time resident of the Bloomington community I fully support the development, finally, of the last leg of the East-West corridor we’ve been waiting for. Particularly with the coming of I-69 we need this route. Failure to move forward with this will result in suboptimal traffic patterns, resulting in pedestrian endangerment and traffic disruption in multiple other locations throughout the area. Ann Elsner Email Comment 12/30/2014 Jim Schroeder No address given Page 20 of 40 Cramming a Gordon Pike connector through our residential neighborhood creates a major truck route off I-69. It is neither safe, I hope that you consider all that I have contributed, and if you have any questions feel free to contact me for anymore consultation. It is also hoped that there will be a grassy buffer with trees separating the northside bike/ped path and the southside sidewalk with the roadway. This grassy buffer will be more attractive, enjoyable, and safe for the bicyclists and pedestrians. Do not create another ugly West Vernal Pike in Monroe County. Instead of this grassy median, I feel that frequent refuge islands could be added for pedestrians and bicyclists to cross this corridor. Also, to follow the "complete streets" concept, bicycle lanes should be included on both directions for the entire corridor to accommodate those bicyclists that desire to ride alongside motor vehicles and not have to worry about crossing driveways and side streets as if on the northside path. I disagree with the grassy median in the middle of the corridor It is a waste of space with no purpose, as it will not "slow" traffic but will frustrate speeders that want to pass law-abiding drivers or bicyclists that choose to legally ride on the road. "Road rage" apparently was not considered when this boulevard concept was designed. I agree with Alternate 1A in that it will only be one lane of traffic in each direction. I am worried about the speeds that this road will promote. I would hope that the posted speed limit be no more than 40mph, and 30- 35mph be preferred. Occasional bumps like that on Moores Pike at Hyde Park(?) would insure proper speeds. The overpass over Clear Creek Trail will insure a safe separation of automobile traffic and multiple types of users on this path. However, I am concerned that there is not an overpass/underpass to accommodate the Bloomington Rail Trail. The county's future plan is to extend this southward, and I envision this extension to Lake Monroe to be a considerable tourist option for Bloomington and Monroe County. I am assuming that the current design with the grassy median would include a refuge island for the Bloomington Rail Trail users so they would only have to navigate one direction of traffic at a time. I thank the designers that have included a separate bike/ped path on the entire north side and a sidewalk on the entire south side. This separate bike/ped path will serve the "80-90%" of bicyclists that do not feel safe sharing a roadway with motor vehicles. This east/west connector bike path will provide access for many suburban bicyclists and families to the Clear Creek Trail, Bloomington Rail Trail, and the B-Line Trail and then link to downtown Bloomington and Indiana University. I agree with the county that Fullerton Pike and Gordon Pike need to be connected for the many reasons that are listed by the county planners. As President of the Bloomington Bicycle Club I have heard many discussions regarding this controversial east/west corridor of the southern Bloomington suburban area. Also, I would like to stress that this is only my opinion and wishes and does not represent all of our 200 members that drive cars and ride bicycles for transportation and recreation. Lastly, I am particularly concerned about pedestrian access to Batchelor Middle School from the south. The wide width of the corridor will take significant time to cross, backing up traffic, and posing a risk to the pedestrians. This risk could be eliminated by incorporating an underpass or overpass at the top of the hill (at the intersection of Clear View Drive and Gordon Pike) that could be used by both pedestrians and cyclists. One can cycle around Boulder with almost never crossing a busy intersection due to the many underpasses that they have created for their bike paths. Email Comment 01/04/2015 Denny VanPelt 4081 S. Rockport Rd. Email Comment 01/03/2015 Karen Laucella Clear Creek Estates subdivision Email Comment 01/02/2015 Ginny Myerson 4060 Judee Dr. Email Comment 12/31/2014 4017 S. Crane Ct. Page 21 of 40 Thanks for your consideration in this matter. Through this road improvement process I have recently had my driveway access eliminated from Rockport Road and am now concerned with the entry/exit opportunities from a second driveway access onto Fullerton Pike. Since the project is in development phase I appreciate the opportunity to express my concerns regarding access from my property onto the new two lane roadway beginning at Rockport/Fullerton Pike. Since my property borders both Rockport and Fullerton I previously had quick access to the highway with no real concern. With the Rockport Road driveway being eliminated I now have concern about the ability to go westbound out of my Fullerton Pike driveway based upon discussions with the project team members during the public hearing on December 11, 2014. I would like to request that the traffic scheme allow me to exit west or eastbound from my Fullerton Pike driveway without any back tracking due to a median or some other traffic design that would interrupt my westbound exit. Surely, you can do better. I am writing about my concern over the Fullerton Pike corridor project. I live in the Clear Creek Estates neighborhood. My sons had to walk to Batchelor Middle school during their 7th & 8th grades of school. Unfortunately, for a major part of the school year, classes start before the sun is up. My children had a terrible time crossing Gordon Pike while it was dark; many times cars would not see them or simply choose not to stop. They had to back up quite a few times when cars started through the intersection while they were starting to cross the road. My point is that the intersection is already unsafe for children having to walk and cross Gordon Pike; making this road a corridor will only exacerbate the problem. For our children's safety, please use a better option. I am also confused as to why we need to spend an exorbitant amount of public money that will result in two interchanges within a mile. I am sending a copy of this comment & question to the H-T reporter, Rachel Bunn, whose article on Dec. 11 was on this topic and am hoping she will do some research & reporting that can explain why there have to be TWO exits that fill a need for an eastwest corridor within a 1/2 mile of each other when the existing route (Tapp-Country Club-Rogers corridor) already serves that purpose and does not upset residential or school routes? I don't understand why no mention is made of the Tapp road east-west route off of I-69 that can serve the same purpose as the proposed Fullerton Pike route. I was not at the public meeting about this but I read in the H-T that some people mentioned this. So if Tapp Rd. is already in place as an exit & does not have the objections about the effect on residential areas as does Fullerton Pike proposal, why does Bloomington need another east-west route so close-by? The proposed road needs new funding, so why would we waste money on an east-west artery instead of improved access to the new IU Health facility, which will be north? environmentally sound, nor cost-effective. Thousands of cars and trucks are predicted to roar through our yards. Will we still have children walking to Batchelor Middle School, sports teams working out on the grass, neighbors walking their dogs, families enjoying the Clear Creek Trail, or cyclists safely crossing on the B-line? The FHWA Environmental Assessment form in the Monroe County Library has mistakes. Cornfields and mainly single family homes were classified as “urban.” It was concluded that building this southernmost connector to I-69 would not increase noise. The report said that building a wide artery with thousands of extra cars and trucks racing on steep grades, where there is now a dead end road, would not affect community cohesion. The report concluded that property values would not decrease. The acres of woods and grassy fields being exchanged for pavement were not considered as important to the environment or drainage. As proposed, our concerns are that these plans/designs will significantly affect the safety, security, habitability and value of the residence located at 1909 Rhorer Road. As proposed and presented, the project will bring the right of way (roadway/trails etc) to Mailed Comment Page 22 of 40 We have concerns with the designs and plans involved with the acquisition of property for the proposed Rockport Road to Sare Road project, Designation #0801059. I urge you to examine the area yourselves and look carefully at what a disastrous effect the proposal now in place will bring. Other obvious, more immediate issues such as driveway access for those homes directly on Gordon Pike, wells and septics in front yards are also problematic, as is how the bus & parent pick-up back-ups at the schools will be addressed. How will this be an efficient traffic-moving artery when there are two schools, 2 nursery schools, and numerous driveways and development entrances that will feed into it. A smaller connecting road with slow residential & school zone speeds, etc. would not be opposed by most of the neighborhoods that will be impacted. On the other hand, a roadway that takes up a 70 ft wide footprint, and allow semis to barrel along at 40 mph will in no way enhance our lives, natural areas and/or ability to traverse through town more quickly. (The north/south feeders that will connect will be totally inadequate to absorb the anticipated increased traffic flow/ ie. garden hose reducing to a soda straw effect if you will.) Our neighborhoods will be less safe, noisy, polluted, disrupted. Our natural areas will be interrupted and noisy, with unknown other ecological effects and the quality of our lives will be sorely diminished. This plan is not going to enhance our well-being in any manner and I encourage you to look more deeply into the ramifications and consider the trade-offs that will be made if it is allowed. Putting this road through a suburban, developed area makes little logical sense & the vision of this connecting roadway from many years past is not in touch with today's reality of development. There was no highway 37, nor Tapp rd. exit, nosaturated residential development. It is therefore an outdated vision. I question the criteria used to dismiss other ideas for a new west-east connector ...we were told in brief that other options were considered & dismissed with no explanation of what the dismissals were based on. As a nearby resident in Batchelor Heights, I have many reservations regarding the proposed Fullerton Pike project. Primary is the safety of residents and children who must cross Fullerton Pike. (In the dark at certain times of year) Adequate speed controls and access must be be implemented as the road passes developments containing hundreds of homes and those people need admittance on and off the roadway. In questioning Structurepoint, (Dec. 11 meeting) these details seem to be unknown. The currently proposed roadway with 16 ft. wide lanes, will, in my opinion, encourage faster speeds and make our neighborhoods unsafe and inaccessible to those who are bordered by the roadway. I reside in the Highlands 2nd Addition very near the proposed exchange site, a very short 1/2 block away as a matter of fact. I do want to voice my opinion about the proposed route despite the fact that I do not have children in my home. The children belong to my friends and fellow neighbors and I am in agreement with their concerns for their children's safety. Personally, I do not believe we need to construct two interchanges within one mile of each other, nor do we need the added expense for the additional construction. I do not believe that such a costly endeavor is in any way a benefit to our area. It will only increase vehicle emissions pollution, road disrepair (already an issue), traffic and traffic noise. We can already hear traffic on SR 37 and the Bloomington Speedway, do we really need to add to that scenario? What happened to our property rights of "peaceful enjoyment"? I am encouraging you to reconsider and redirect this project. Count me against this construction! Fred Dunn 1909 Rhorer Rd. Email Comment 01/05/2015 Joan Keeler 3927 S. Cramer Cir. Email Comment 01/05/2015 Deborah Thompson 3895 S. Bushmill Dr. Email Comment 01/07/2015 Ann Elsner 4017 S. Crane Ct. Email Comment 01/06/2015 Sean and Rachael Streff No address given 01/05/2015 Page 23 of 40 2. On page 43, there is a prediction that there would be no increase in noise, but this cannot be correct. The current Gordon Pike 1. On page 16, the proposed arterial road is marked as “urban,” when in fact there are cornfields, park land, and mainly single family dwellings. The only commercial area is one intersection at Walnut St. and Gordon Pike/Fullerton Pike. This small shopping area is already well-served by Walnut St. providing the north-south continuity to other east-west connectors that have less challenging grades, with the rightof-way to permit roundabouts. There are several conclusions of “no impact” made in the front section of the report that are in conflict with data, as well as the discussion from the neighborhood residents. Here are some of the most obvious mistakes or incorrect conclusions, any of which should lead to a rejection of FONSI. I urge that the Environmental Impact study for the proposed Fullerton Pike project be shown to demonstrate significant impact. Please do not agree with and sign the documentation for a finding of no significant impact (FONSI), since there is significant and negative environment impact. The negative impact on the environment is far greater than that in the conclusions at the beginning of the report. Evidence of this negative impact is contained within this document, the comments from residents and the end of the document, records of public hearings, and other sources. The data show that the conclusion of FONSI is unwarranted. The projected costs will be discussed in another letter. For these reasons and many more, my wife and I staunchly oppose this new road. We are abhorred at the lack of disregard for the communities that will be affected by this project You are not just building a road, you are ruining a nice and quiet family community, homeowners property values, and a beautiful park. When I moved here, I fall in love with the Clear Creek Trail. You can take a peaceful run through the woods. This new road will go directly through this beautiful landscape. The wonderful ecosystem and tranquility trail, will be destroyed by one road. Not only will this road damage our community, it will also damage the price of my house. It will deeply impact this facet, and being a new homeowner, this is highly frustrating and saddening. My family and I recently bought a home in this area. We moved from Illinois. We were having a baby at the time, and wanted to get away from all the fast paced traffic that you find in Illinois. So, when looking for a neighborhood to live in, we wanted a quiet and safe community. We purchased this home based on these facts. We live on the north side of Gordon pike, which is directly next to the new road that is being proposed to build. This new road will be a huge detriment to our quiet neighborhood. Also, My wife and I have a 4.5 month old girl, her bedroom faces Gordon Pike. This new road will make her room loud and noisy, especially when she will be sleeping. Moreover, this will create a unsafe living condition for her, since the road will be much closer to our house now. Thank you for your time and attention. We look forward to successfully resolving our issues and concerns with you at your convenience. It is suggested and requested that the proposed 16'wide grass median from the bridge to the Sare Road intersection be omitted in favor of multi-lane travel on Rhorer Road between the new bridge and the Sare Road roundabout/signal. within a few yards of the existing residence (1909 Rhorer Road), raising concerns of safety, security, habitability, noise pollution and property valuation. In addition we are concerned that, as proposed, the only access to the property will be by right turn only entry/exit due to the proposed 16' grass median. The replacement of Monroe County bridge #610 over Jackson Creek will further complicate/affect these concerns. Page 24 of 40 One of the most hotly debated aspects is property values, which were concluded not to decrease. Numerous neighborhood residents have stated that they believe that their property would be worthless. Home with the largest decrease in value are those that would not be acquired but would be left with a large and busy road only feet from their windows. The costs of the This report does not adequately address maintaining diversity. There is a majority of single family homes, but there are also condo and a few areas with trailers. Neighborhood residents hope to preserve the balance of housing options to maintain diversity. At present, homes that have virtually no yards have open space and access to a quiet Clear Creek Trail system. If the proposed, oversized road is built, it would be exceeding difficult to provide an acceptable quality of life for families living in condos on a noisy road with increased truck emissions, or those in the trailers that do not have much yard space. The individuals who live in condos and trailers would be losing a significant proportion of their only open recreational land, 4 acres of grass within 2 blocks and a large number of acres of wooded areas scattered over the project. Community cohesion is far more than sharing a school. Residents living both north and south of Gordon Pike/Fullerton Pike use the park land that is the southern fields of Batchelor Middle School because we do not have another neighborhood park or undeveloped space elsewhere. These open lands are places where sports teams work out, cross country meets are held, people jog and walk their dogs, and other activities that help preserve community cohesion. Residents of our neighborhood walk from their homes to the Clear Creek Trail for walking, jogging, skating, and biking. At present, the path along Gordon Pike is used by residents along or in combination with the Clear Creek Trail. This trail provides a truck-free haven for daily recreation throughout the day. Groups of moms with strollers use the Clear Creek trail for community building through play dates. Small groups exercise after work and on week-ends. Parents from our neighborhood and all over Bloomington teach their children to ride bikes on the Clear Creek Trail. 3. On pages 44 – 47, there are a number of related items that are incorrect, such as community cohesion marked as “no” impact and “no” for decrease in property values. As for cohesion, the cartoon by Joe Lee in the local paper, the Herald-Times, pointed out that the proposed road would be impossible to cross for the Batchelor Middle School children, of which there are roughly 500. Our neighborhoods are already built out and existing neighborhoods, with some on the south side of the road and some on the south, some in Bloomington and others in Monroe County. All feed students into Batchelor Middle School and its after school sports and activities. One pedestrian bridge for the 2.7 mile long road has been proposed, but even that seems impossible given the steep grade and lack of space for needed right of way. Community cohesion would be negatively impacted because parents would not allow theirchildren to cross north or south to their friends’ homes of the activities at the school. Children are unlikely to walk a mile or more in the wrong direction just to use the bridge, then walk back. The proposed road would be unsafe for children. is a steep and dead end local road that provides access to larger connectors for neighborhoods abutting, and both north and south of the road. Homes are arranged in a series of housing additions and cul de sacs. The proposed road goes virtually through back, front, and side yards, sometimes directly under bedroom windows of residents. At present, Gordon Pike does not even connect to SR 37. The connectors are at the other ends of the housing additions where the grades are not as steep. If Gordon Pike/Fullerton Pike is turned into the southernmost exit for Bloomington from I- 69, there would be a significant increase in noise 24/7. The models have not been clearly presented or analyzed as to the traffic pattern or speeds that the vehicles would be travelling. The estimates of cars have been predicted to escalate to somewhere between 4000 and 7000 vehicles per day, with considerable truck traffic. At the present time, there is virtually no nighttime traffic, and trucks are only utility vehicles, safety, or delivery trucks because there are no businesses in these quiet residential neighborhoods, but this is projected to change to 24 hr truck traffic. Email Comment 01/07/2015 Nancy A. Newton 1598 E. Rhorer Rd. Email Comment 01/07/2015 Jim Shelton No address given Email Comment 01/07/2015 Harriet Kulis 1430 W. Estate Dr. Page 25 of 40 Having resided at 1598 E. Rhorer Rd since 1972, I have witnessed dramatic increase in the traffic on our once-rural road. In the past several years, the volume of traffic on Rhorer Rd, along with the speed of most of the vehicles that use it, has turned it into a truly dangerous artery. This reality is dismaying to me. I understand that the current plan for Fullerton was scaled back to address the concerns of residents. It is hoped that an agreement can be made that serves the interests of the residents along the corridor and the County, while continuing to address the connectivity and transportation needs of our growing community. Fullerton Pike is identified as the first Bloomington exit on the south side of Monroe County and construction of this interstate is currently underway. With this in mind, it is essential that we plan accordingly and move forward with the project. Without this project, traffic exiting at Fullerton (including traffic from Crane and Westgate) will work its way east through neighborhood streets. It would be much safer if there were a path prepared to handle this traffic. Fullerton/Gordon/Rhorer is that pathway selected by county officials. I support the County’s decision to move forward with this project at this time, with the understanding that it would greatly improve east-west connectivity and that expanding Fullerton has been the County’s intention for many years. The straight road with minimal curves will allow for high speeds. The County does not have the patrols to enforce lower speed limits, as we see at Tapp Road. Beyond aesthetics, noise, and safety, there is the cost. Tapp Road is a major intersection, just one mile north, that is available for I-69 users to enter Bloomington. Why are we taxpayers spending $27+ million (est.2013), including bridges, for a duplicate road? This is waste of our money for a redundant road that continues to lead to nowhere. The project would consist of one 16' wide travel lane in each direction, plus 4.7' of gutters and curbs, separated by a 16' wide grass median, a 5’ wide sidewalk, a 10’ wide multi-use path with berms on each side. I am frustrated by the proposed Fullerton Pike Extension. This 80’ wide swath will cut through residential areas, in front of schools, churches, and day cares. All of the north-south connecting streets are one-lane each direction, with no plans for improvement. There are life safety hazards, zoning concerns, loss from removing the bucolic setting, and considerable environmental hazards, e.g. pollution from semi-trailers, autos, noise and building on the fragile karsts. Property values would be negatively impacted by the increased noise and pollution of thousands more vehicles per day through a residential neighborhood. Property values would be negatively impacted by the loss of parkland and its replacement by an ugly and noisy road. Property values would be negatively impacted by the difficulty in crossing busy traffic to leave home or return home, or get to Batchelor Middle School. Property values would be negatively impacted by the loss of community cohesiveness. Property values would be negatively impacted by the significant decrease in safety and the increase in travel times because residents would now have to turn left across busy traffic either to leave home or return, whereas now the traffic is light and commuting from this neighborhood is quick and safe. construction to homeowners would decrease property values, particularly given that it would be clear to potential buyers that homeowners could be required to pay to move septic systems or other utilities such as the buried electric lines and internet and telephone cables. The grades and changes in heights of hundreds of driveways, which directly connect with Gordon Pike or Fullerton Pike, would also lead to sizeable costs to homeowners because some would be too high and some too low to connect with the wide road that is proposed. The grades of all these driveways could be considerably steeper. Homes with difficult access are not sought out by potential buyers. Stephen A. Wolter and Lynn M. Jamieson 3924 S. Nimit Dr. Email Comment 01/07/2015 Steve Brewer 3636 S. Rogers St. Page 26 of 40 In reviewing the overall purpose of the Project in various documents there appears to be a major misidentification of the projects purpose. Although intended as a “quality” east-west transportation facility allowing enhanced connectivity to the City of Bloomington business district and Indiana University from the south, the project actually constructs a southern IN 45/46 Bypass I am concerned about how an increase of over 50% more traffic(ADT) by 2030, including at least 5% trucks, will effect the northsouth residential cross streets off of this proposed high-volume access route off of I-69. These roads are not slated for any improvements. How will all of this traffic be encouraged to go down to the county's existing commercial artery (Walnut Street/Business 37), rather than turning up earlier residential streets, like Rogers Street, which is steep, narrow, and 100% single-family residential up to Tapp Road? This area already backs up at rush hour, making it impossible to get out of our driveways. Instead of a traffic light, which will just increase the problem on Rogers Street and Gordon Pike, could there be a round-about at this intersection by Bachelor Middle School like those at Jackson Creek and Tri-North Middle Schools? Will these cross streets be no truck routes and will there be traffic claiming devices and sound abatement (as there should be along Gordon Pike and Rhorer Road as well)? The environmental impact to the residents of this south-side neighborhood extends beyond the homes immediately adjacent to this proposed mega-road project. These issues are not addressed in the Environmental Assessment and would only increase the costs for Alternatives 1 or 2 (i.e. connecting a series of residential streets to an exit off of an inter-continental highway), making this alternative the wrong choice for a built-out residential community surrounding two public schools. When we brought our property in 1997 and later when we added on an addition in 2002, we did our due diligence and contacted the MCHD and were NOT told that Fullerton Pike would be the first exit into Bloomington from the south off of I-69 and that other existing east-west connections to Highway 37 would be eliminated. This is not the same road project that was discussed in the 1960s, when our 1870 farm house was one of the few homes in the area and neither of the schools or even Highway 37 existed. As such, this road project should be removed from the TIF and new alternatives that reflect the current reality and residential character of this area should be discussed with the appropriate amount of public involvement. I support Alternative 3 (without a connection between Fullerton Pike and Gordon Pike), which would improve the safety and livability of our neighborhood, rather than doing the exact opposition. On financial grounds, on engineering grounds, on issues of school and residential safety, I register my strongest opposition to the proposed Fullerton corridor. I trust you will share my views with those who are charged with decisions about traffic patterns in Bloomington and Monroe County. I question the project’s financing in the context of the very dubious engineering idea of taking a major thoroughfare through a well-known karst area – and why in the world such a route should be chosen when, just north of it, there is already a perfectly constructed connection of Winslow/Country Club with our Bypass Highway! Why undertake such an expensive and environmentally destructive project when a wider east-west corridor already exists with a well-engineered connection to the highway? Could it be the objections of the owners of the Bloomington Country Club? I do not know the answer to this last question, but I would certainly like to know if my suspicions are valid. It also appears to me that there are fewer residences to be disturbed by such construction on the Tapp/Country Club/Winslow route than on the Rhorer Rd one. I share the concerns about this proposed corridor expressed by Mary Ann Williams in her recent letter to the editor published in the Herald-Times. She highlights the very negative impacts that the corridor’s traffic would have on Batchelor and Jackson Creek middle schools – dangerous traffic, traffic congestion, terrible traffic noise, dramatically increased traffic pollution; painful loss of somewhat peaceable surroundings. She also questions the projects’s financial accountability. But the dismay I feel about the current traffic load and the speed that most cars and trucks use when on Rhorer Rd pales in comparison with the negative responses I feel toward the proposed Fullerton corridor. Email Comment 01/08/2015 Page 27 of 40 Collisions and near misses among users and/or their vehicles are promoted by poor trail design: These trails have significant The design of the trail features, while making connections between Bloomington's primary north-south trail connections do so by creating an experience that crosses major roads at grade and alongside very high noise, high speed and significant truck traffic. This investment should be reconsidered to reflect standards found in federal research related to conflicts on trails. In "CONFLICTS ON MULTIPLE-USE TRAILS: Synthesis of the Literature and State of the Practice Sponsored by The Federal Highway Administration and The National Recreational Trails Advisory Committee" it was found that many situations or conditions caused by other trail users can keep visitors from achieving their desired trail experiences. This interference is due to safety concerns is a common source of conflicts on trails and a number of threats to user safety that can occur on trails. Some of these include: It is documented in the development proposal and documents that "An additional project consideration is connectivity of the local trail network. The proposed project corridor crosses three public trails including the Clear Creek Trail, the Bloomington Rail Trail along Clear Creek which is an extension of Bloomington Rail Trail, and the Sare Road Trail. The majority of existing trails within the community are configured in a north-south direction, resulting in a lack of connectivity. This project proposes an east-west connection via multi-use path and sidewalk across the south side of Bloomington, which would tie the three aforementioned trails together." Specifically regarding the Fullerton Pike Project Trail Analysis Result: The Project Scope and EIS as published are flawed and must be restudied to reflect the assumed and implied increased traffic volume, traffic patterns, and associated impacts to existing properties in the Fullerton Pike project Corridor and continuing through Bloomington to include Sare Road to IN 45/46. 2) The primary need for this project is the lack of an east-west transportation facility that would allow enhanced connectivity from the south to the city of Bloomington business district and Indiana University, accommodating the input of traffic resulting from the proposed I-69 interchange at Fullerton Pike and existing State Road 37 (SR 37), as well as improving cross-town traffic along the south side of Bloomington. Businesses, residents, and emergency vehicles alike are challenged by the difficulty of accessing the city of Bloomington from the south and accessing primary arteries to reach other areas of the state I contend these project scope descriptions are incorrect. Instead, the project scope should state that the primary need for this project is the lack of a completed southern connection to the IN 45/46 Bypass from I-69, IN 37 and other points south of the municipality of Bloomington, IN. The project also includes a signficiant east-west transportation facility that would allow enhanced connectivity for Bloomington and Monroe County long identified inadequate transportation access in the east-west direction. 1) the Fullerton Pike Project has current classifications of Rural Major Collector west of SR 37, an Urban Minor Arterial from SR 37 to Sare Road, and an Urban Major Collector from Sare Road to Snoddy Road. Specifically regarding the Fullerton Pike Project Scope: extension to I-69. There is no current planned or identified alternative to using the Fullerton Pike project as the southern connection to IN 45/46 thereby making this project the defacto connection. The resulting estimates of traffic volume and noise as depicted in all planning documents are in fact erroneous. The increased number of vehicles who will be using this access method to travel from points south of Bloomington, IN to connect to major shopping and residential areas on the east side of Bloomington, as well as to major east travel on Indiana State Highways is significantly underestimated in the planning documents. The result is that the EIS for the project is in fact inadequate and flawed. Email Comment 01/08/2015 Whitney A. Gates 542 S. College Ave. Page 28 of 40 I fully support the expansion of Rhorer Road/Gordon Pike/Fullerton Pike to SR 37/I-69. What is the timetable for bridging the gap from the current proposed expansion and connecting it to I-69? However, the analysis is flawed as it was conducted for a limited time frame during one day and does NOT consider the impact of noise from the increased traffic of a bypass use during evening and night hours. These hours are significantly important to the health of individual residents along the project, and recent studies show a correlation and causation between overall public health and noise. The October 2014 analysis is subject to a much more thorough analysis. The project noise analysis is inadequate as the increased evening and night traffic noise will have substantial degradation to the health of residents along this corridor. 337 residential properties will be affected more or less and it is clear that the inadequate analysis has led to conclusions that do not support development of more noise barriers particularly taking into account elevated portions of the FullertonPike Project which transmit increased, longer and evening-night noise into residential areas that are lower than the roadway. The EIS suggests that a 1574 foot long noise barrier is considered reasonable and feasible at the existing (and proposed) rightof-way limit along the north side of Fullerton Pike from near Clear Creek to Wickens Street, subject to the views of property owners and residents. It is feasible because the barrier would reduce noise levels by at least 5 dBA for the majority of impacted receptors and benefit 23 dwelling units. A ten-foot barrier at $30 per square foot would cost $20,520 per benefitted receptor, which is below the $30,000 cost- effectiveness criterion for locations where homes are in place before the new road is built. This appears to be the only mitigation suggested. Specifically Regarding the Fullerton Pike Project Noise Analysis Using this set of standards in analysis of the Fullerton Pike Project shows that the proposed design and operating traffic speeds for trucks/vehicles are too high for safe pedestrian and bicycle travel along this corridor, especially given proposed sight distances, traffic volumes and driveway frequencies, and the future installation of a traffic lights. One method to mitigate this poor design would be a separated 6-8 foot median with trees, trail user overpasses-underpasses at the 3 major intersections, and carrying the design through the crosswalk at the intersection to include high visibility-user initiateded-prompt response crosswalk flashers at the 3 main intersections. These efforts included a community workshop and numerous publicaly-held meetings of the MPO Policy and Technical Committee. Further, the Bicycle Level of Service Model is based on the research documented by the Transportation Research Board of the National Academy of Sciences footnote. It was developed using data from over 150,000 miles of evaluated urban, suburban, and rural roads and streets across North America. Many urban planning agencies and state highway departments are using this established method of evaluating their roadway networks. These include Anchorage AK, Baltimore MD, Birmingham AL, Buffalo NY, Gainesville FL, Houston TX, Philadelphia PA, Lexington KY, Sacramento CA, Springfield MA, Tampa FL, as well as the Delaware Department of Transportation (DelDOT), Florida Department of Transportation (FDOT), New York State Department of Transportation (NYDOT), Virginia Department of Transportation (VDOT) Maryland Department of Transportation (MDOT) and many others. possible collision and near miss locations at 3 major north-south intersections including Walnut Street Pike, Walnut Street, and Rogers Road. No plans for high visibility-user initiated-prompt responding crosswalk flashers are planned or for trail overpasses or underpasses in an east/west direction Email Comment 01/08/2015 Nan Brewer 3636 S. Rogers St. Email Comment 01/08/2015 Liz Irwin th 400 W. 7 St., Suite 102 Page 29 of 40 3) How were the traffic counts (ADT and hourly volumes) determined? In one place in the report it gives a figure for increased ADT as 7,500, while in another as 13,976. Which is correct? What is the hourly volume now? Do these figures take into account the exit off I-69 and closures at That Road and Rockport Road? How was it determined that there would be only a 5% increase in truck traffic off an interstate? How will an increase of over 50% ADT improve the safety and traffic congestion on our neighborhood streets, especially with students walking to two schools and neighbors to school functions and to use the schools’ green space? It seems that Alternative 3 can address all of the safety concerns without increasing ADT. Alternatives 1 and 2 2) A major problem with the comparison of the various alternatives is that this report seems to have been written before the interchange off I-69 at Tapp Road was established, thus making all of these comments irrelevant and the whole report based on false assumptions. 1) I was one of few residents from the neighborhoods directly affected by this project on the CAC (as recommended by the MCHD) that was not a developer or realtor. Although the report claimed that there were “many” comments in favor of this project, I recall at the Public Information Meeting at Bachelor Middle School on Oct. 3, 2012, that over 90% of the verbal public comments given that night were negative about all of the proposed alternatives, except for Alternative 3 that did not connect our neighborhood residential streets to an inter-continental highway (I-69) interchange. We were told at that meeting that our comments were being transcribed, but I didn’t see them included in this report. Why? Since there was only one public meeting prior to this report and many of the negative comments were not included here, I think that it is incorrect to claim that there isn’t public opposition to this project, which there clearly is. We understand that the current plan for Fullerton was scaled back to address the concerns of residents. We are supportive of changes to better serve the interests of the residents along the corridor and the County, while continuing to address the connectivity and transportation needs of our growing community. Increasing east-west connectivity continues to be an important issue to our Chamber members. In our recent member survey, many Chamber members expressed the importance of completing the Fullerton Pike expansion project. With construction currently underway on I-69, this need becomes even more pressing. Fullerton Pike is identified as the first Bloomington exit for Interstate 69 on the south side of Monroe County. It is essential that the County plan accordingly and move forward with the project as quickly as possible. The Chamber has historically supported projects that improve east-west connectivity. In a 2007 Infrastructure Task Force Report, The Chamber recommended that community leaders give high priority to developing east-west thoroughfares and elevate these projects to the Transportation Improvement Program (TIP). The report also recognized the Fullerton Pike expansion as a project that would fulfill this need and had been identified as a priority for the County for many years. I am writing on behalf of the Greater Bloomington Chamber of Commerce and its 900+ members to express the organization’s support of the County’s decision to move forward with the Fullerton Pike Expansion project. When complete, Fullerton Pike will provide a much-needed east-west route along the south side of the community Page 30 of 40 9) This is NOT the same road project envisioned in the 1960s plan, when almost none of these homes or schools existed, nor was there a plan to make this road an access road off of I-69 in 2010 or 2011, which was also prior to any CAC meetings or public comment period. When did INDOT make their final announcement of the interchanges? When was the interchange at Tapp Road added only one mile north? Who was pushing for the interchange at Fullerton? MCHD or INDOT? The LOS (level of service) on these roads is fine without a connection to I-69, since there is little room for more residential expansion. Instead of 8) This construction will definitely have an impact on many school and community events held at both middle schools both during the school year and the summer. 7) I don’t understand how this proposed roadway complies with local and regional development patterns, when it is zoned 99% residential, but this plan suggests changing a series of residential streets into a commercial artery. If this was the case, all of the suburban developments (some relatively recent) should not have been zoned for this area. Please explain how this plan will increase property values, when there is little room for any further residential development (it is almost completely “built out”) and one local realtor (Tracee Lutes) has already seen reduced home values along the road’s proposed route. How is there no low income impact (no EJ population of concern) in this area, when there are over 170 mobile homes in the Southcrest Mobile Home community immediately adjacent to this roadway? 6) I would like to know more about how you plan for noise abatement (category A and B) given that there is no way to do sound barriers in this densely populated residential area with many of the homes’ driveways dumping directly onto the roadway? What is the noise increase that is projected with a more than 50% increase of cars and trucks? Is there any concern about the interior noise impact? I live in a historic 1870 farm house (Thomas Randall House) (on the BRI list and being considered for the National Historic Registry) and will need to have new windows and doors to make the old home inhabitable, due to the increased sound, which may cause preservation issues. 5) At the last CAC meeting, I asked for an example of a comparable roadway with 14 ft. lanes and a 16 ft. medium through a residential area and was only told the north end of Clarizz Blvd. next to K-Mart, Bloomingfoods East, a medical office building, and the back of an apartment complex. This is clearly NOT the type of road through a built-out suburban neighborhood of primarily single family homes. A member of CONA (Council of Neighborhood Associations) also said that this is not the size or type of street that is recommended in a neighborhood setting per AASHTO guidelines. 4) The biggest error in the whole report is to categorize this 2.7 mile series of road as “urban,” when there is only one commercially-zoned intersection along the whole route from Highway 37 to Sare Road at Walnut Street/Business 37 (with the exception of an old stone company near Highway 37). By any account this is a 99% residential area. It comprises mostly single family homes surrounding two public schools. This report does not seem to take into any account the environmental impact on the hundreds of residents in this area and the 500 students at each school. Could you please explain howthis project has a “de minimus” impact on schools? In INDOT’s own guidelines for choosing appropriate interchanges and access roads recommended “minimal” residential impact and following “established” commercial arteries. How does this proposed project meet these criteria? have the highest number of rightof-way acquisition from primarily residential properties; highest total forest loss (with exception of That Road upgrade); highest amount of perennial/intermittent stream crossings (with the exception of That Road upgrade); highest amount of new construction; and highest use of farmland (with exception of That Road upgrade). Many of the other environmental impacts were not even considered from the other alternatives, making the comparisons unless. The cost comparison for Alternative 1 didn’t include many elements of the project (such as the expensive bridges, roundabouts, etc.), making any true comparison impossible. Email Comment 01/08/2015 Mary Ann Williams 3550 South McDougal Street uncertain cost and financing economic hardship on homeowners, due to declining real estate values and the cost of remediation of septic systems along corridor. the destruction of wildlife habitat that has already occurred, on Fullerton from Rockport to Rt. 37 toxic emissions and run-off that will require curbs, gutters, trees public health considerations related to stress and illness Page 31 of 40 Fatal pedestrian injury remains a leading cause of death for people 15 years of age and younger. The street must be design to reduce speed at schools and through neighborhoods. A slower speed would be safer for residents in neighborhoods, pedestrians, school personnel, students, and traffic and customers driving into various commercial locations. Question 5: The speed limits above conflict. Can the proposed “designed” and legal speeds be decreased to more readily fit with the established neighborhood homes, the four schools, and various shops and offices? Question 4: How would Alternative 1A be designed and built to assure that slower neighborhood and school area driving speeds are observed? Indiana’s maximum residential road speed is 30 mph. For school zones, the maximum speed is 20-25 mph. The Designed (40 mph) and Legal Speeds (35 mph) exceed these maximums. Speed Suggestion: An urban street must accommodate more pedestrians, bicyclists, curb cuts, speeds and frequency of potential points-of-contact. The street should be 10’ to 11’ wide, no median, and 4’ shoulders. The street must match the neighborhood character—not too flat, wide or open. The speed must be 20-25 mph in school zones, with appropriate signage, crosswalks, sidewalks, multi-use paths, crossing guards, and street trees. Question 3: The current character of the environment and neighborhoods along the proposed route varies greatly. Can the road be built to accommodate and enhance this diversity, e.g. eight + neighborhoods, wildlife habitat, trails, bike and walking, four schools, commercial? Specifically, what could be done to accomplish these things? Question 2: Why is the character considered to be “urban” rather than “sub-urban?” What is the difference between these two? Roadway Character Question 1: Please describe the decision-making process that led to the answer of “No” for the question, “Will the project involve substantial controversy concerning community and/or natural resource impacts?” What process was used to create this “no” answer? - - Both at the hearing and in other public events, discussion varies widely on topics such as: I observed substantial controversy at the Public Hearing on December 11, 2014. Controversy building an expensive, high-traffic access route off an interstate through a residential area (Alternative 1 and 2), the County needs to upgrade the existing southside neighborhood roads along Fullerton Pike, Gordon Pike, Rhorer Road, and Sare Road (Alternative 3).The number of errors, problems and mis-characterizations of the history of this project warrant a delay and reassessment of it, with more opportunities for public comments. Email Comment 01/08/2015 Stephen Burns No address given Email Comment 01/08/2015 Unity of Bloomington 4001 South Rogers Street Email Comment 01/08/2015 Kevin Luers 4051 Jamie Lane 6-8 neighborhoods, with many homes 2 middle schools 2 nursery schools commercial Page 32 of 40 The Justification has been put forth is based on the assumption that this connector will decrease traffic load in other parts of the My concerns center on several issues. Some are related to the issues of safety and environment, which I do not find to be fully addressed. Others relate to the underlying justification and cost estimates, which arise both from the scope of the current project as well as from the fact that the project seems to have been arbitrarily separated from related portions, which unrealistically obscures the true cost of the project. Finally, I am concerned about the basis for the projections and the fact that modern trends in commuting and urbanization are not following the implicit assumptions of suburbanization that dominated discussions during the 1960’s when the current proponents apparently formed their plans. This suggests that the documents are based on outmoded models of traffic and community growth. As the project moves forward, I am happy to be the contact person for Unity of Bloomington for both American Structurepoint and the Monroe County Planning Department. Also in consideration of the proposed project, Unity of Bloomington requests that impacts to our parking areas be as minimal as possible. The semi-circular drive and parking area off Rogers Street is used by office personnel, for special events attendees and for better ADA access into the main level of the building. Impacts to this parking area can limit usability by the church. Likewise, reduction of the parking area nearer the Rogers Street and Gordon Pike intersection and along Gordon Pike should also be minimal so as to not impact our ability to provide adequate parking. In consideration of the proposed project, Unity of Bloomington requests that the only entrance into the church parking lot, entered off Gordon Pike, not be blocked nor made inaccessible by any means. It is critical that no median strip be installed that would prevent west-bound access into the parking lot off Gordon Pike. Likewise, it is also critical that access to and from the semicircular drive off Rogers Street not be blocked nor made inaccessible by any means. On behalf of the board of trustees and members of Unity of Bloomington, I am submitting comments to you regarding the Fullerton Pike Corridor project. As you are no doubt aware, Unity of Bloomington is located at the SE corner of the Fullerton/Gordon Pike and Rogers Street intersection. I will be very receptive to this extension if Rhorer is modified substantially, but I will not cooperate if this is built as proposed. My biggest objection to this project is the width of the lanes and median for the Rhorer Rd. portion. My home sits on the corner of Jamie and Rhorer and is in the direct path of the proposed widening. The width of the road as proposed will jeopardize my families quality of life. I want a safe road and I do want a bicycle/walking path on the North side of the Rhorer, as I do want to safely bike or walk to the trail or Kroger etc. However, the width of the median is unprecedented in size and would require millions to build and maintain. I would also think one bike/walking lane would be sufficient for the amount of foot traffic this path would generate which would save on the width of this project. - Question 6: What consideration can be given to varying the type of roadway, along the corridor, so that the road fits with the various existing natural and built-out qualities and conditions and enhances their character? Speed and Character Page 33 of 40 7. Grading and weather control. Presumably Federal requirements would alleviate the direct safety concerns by requiring considerable grading of this route. However if it is not properly graded and maintained it is a very hillly region of Bloomington that has seen the roads close by flooding twice within the last few years. That is, both creeks along Gordon Pike and the gap between Gordon Pike and Fullerton have gone significantly outside their banks. This relates to the related environmental concern of now providing miles of drainage, installed along the roadway and properly diverting it into streams that already flood. The concrete footprint of this project is larger than almost any other two lane road and this will cause unwarranted environmental loads on the water carrying capacity of the streams and Karst features. The findings of the study seem to ignore the hydrology with little to document the findings. 6. This route goes past two schools and a church. Already there were enough problems with Bachelor school access that stop signs needed to be installed for safety. This is on a road fed only by the local housing developments. Because Bachelor has only one real entrance path, either major traffic flow improvements at the school will be needed, or there will need to be some other modifications will be required. There a lot of kids living in the areas around Bachelor and Jackson Creek, and so extreme care (and corresponding costs) would be required that go beyond the direct costs of the connector. The cost estimates and provision of a road designed for high speeds do not seem to discuss the costs of traffic control devices. 5. As mentioned, it will dump traffic onto roads that lack even a shoulder. Safety: This route will cause a number of safety consideration. 4. For Westbound traffic there are no obvious routes to connect to this project. If traffic from College Mall (and Nashville) aims for this connector it will be forced to either go via Sare, or Third street. Both already have high volumes and I see no way that the addition of another route that draws traffic to these will be beneficial or help throughput in any way at all. In fact, with access to 69 at Country Club and further North, most traffic progressing in a Westbound direction will naturally use these exits, since all start further North and the routes take a diagonal course. 3. For Eastbound traffic the assumption for routing to downtown seems to be that people take the first exit. However, the distance when mapped is considerably shorter to take Country Club and Rockport, by a distance of more than 1 mile. Thus, it will not alleviate traffic on those routes. 2. For Eastbound traffic (from the Evansville directrion) this means that the “connector” will dump high volumes of cars and trucks onto a series of two lane roads. Already traffic on Walnut and Rogers can be quite bad during commuting time. If the connector becomes a major traffic attractor, then it means that the volume on these other two lane roads will increase, and may decrease traffic on 2nd street, but increase it on Walnut and Rogers. Safety is a major concern here since if the traffic estimates are met, then it will push traffic onto roads that are not designed for that traffic and represent a significant safety issue. 1. For Northbound traffic (proceeding Northbound from Bedford), this road will only lengthen the distance to downtown compared to Walnut street, and will require traversing a longer route, through residential neighborhoods, back to Walnut, a considerably longer route. City of Bloomington and meet regional transportation needs. Specifically mentioned are access from the south to downtown and to Indiana University. I do not believe that the project will actually alleviate problems of traffic throughput. The proposal calls for two lanes that will extend from I 69/Rte 37 to Sare Road. The road beds are unusually large, apparently to accommodate higher speeds and larger vehicles, however of the existing endpoints only Walnut supports truck traffic realistically, and it is only two lanes and often fills with traffic from the south. . Page 34 of 40 13. Overall, it is not clear what part of the community benefits from this large project. This is at the southern border of the population density of Bloomington. The existence of an entrance to I69 a mile north, and the general trending of the roads to the southwest will not serve most of the residents. There is little commercial zoning along the roadway, with the exception of the e. As mentioned the incorporation of duplicate pedestrian access, which in turn requires extra shoulder work and drainage is not well justified and seems more designed to increase the footprint for construction than to meet actual needs. One mult-use pathway seems to meet realistic needs, and at a minimum a fact based assessment of need should be presented. d. There is mention of numerous other “abutting” projects. Some appear related to the fact that the scope of this project was changed during the review, and some of the other projects mentioned during the hearing seem to represent these changes in scope. This suggests that the entire cost should be calculated based on a combination of all related projects. c. There will be an ongoing burden on budget for maintaining more than 2 miles of 16 foot wide median. b. Traffic control costs will be high in order to ensure safety at major crossings (and there will be foot and bicycle traffic at every crossing). a. There will need to be large amounts of sculpting for topography, it is not clear how land acquisition was computed in the absence of this, since at the meetings engineers would not address how terrain would be changed near some of the houses near crests of hills. 12. The costing estimates seem to not include numerous items. 11. It is a very large project footprint. The roadway footprint proposed is over 70 feet (including lanes, medians, shoulders/runoff control, multi-use path and sidewalk). Already there is a second exit to I69 proposed within a mile that has a complete road, already upgraded, and lesser residential impact. As mentioned above the aspects that will ultimately be required by the City and County for safety ameliorations, will expand the cost way beyond what is put forth. The documentation for the choice of such a large footprint is not provided. Lower speeds are mentioned for safety reasons, but low speed residential roads should not require 16 foot travel lanes plus dual shoulders. Good use of our funds. The cost benefit of this plan seem to be poor for the community. 10. Driveways will open directly onto this road, and given the footprint it can be expected that speeds will be such that this is a risk. This again calls into the lack of justification for 16 foot travel lanes plus shoulders. 9. Related to this is the fact that each intersection will also cross the multi-use pathways. While turn lanes are provided, most of these will require traffic control to be safe, since the traffic will be dealing with crossing proposed high volumes and high speeds of oncoming traffic, and will not be attending to individuals crossing on the multi-use or sidewalks. Note that the assumptions of a low speed limit will not be met without traffic control and the costing seems to not include a comprehensive traffic control plan and implementation. 8. The proposal actually involves two complete walkways/multi-use pathways, with a sidewalk on one side and a large multi-use pathway on the other. It is not clear that both are needed and no justification is provided, since in general multi-use includes walking. This is a safety concern because the connection of the three existing multi-use trails by this project is likely to increase bicycle and waling usage, yet two of the main crossings are at street level. Already there are problems at crossings and there has been the need to construct more warnings and traffic control. The traffic control costs do not seem to be part of the costing so their absence represents a major safety concern. Page 35 of 40 The table also states 16 home re-locations for the Alternate 2: Tapp Road Upgrade, even though the text of the analysis clearly This shows a “No” value for “Property Owner Impacts Minimized” for the Alternate 2: Tapp Road Upgrade and a “Yes” value for the Preferred Alternative 1A. However, the preferred option uses significantly more right-of-way (31.2 acres v. 23.2 acres) and primarily affects homeowners. Fifty per cent of the right-of-way for Tapp Road comes from commercial property, according to the document. Question 3: Please address all comparable issues in order to make for a balanced analysis of alternatives. In contrast, the analysis of the Preferred Alternative 1A does not address the loss of parking spaces currently being used for Unity Church and the Clear Creek Trail, the loss of acreage at Batchelor Middle School, or the loss of acreage at Jackson Creek Middle School. These seem like comparable impacts to the above mentioned for the “Upgrades to Tapp Rd” alternative The analysis of the Alternate 2: Tapp Road Upgrade addresses potential lost parking spaces for businesses along the roadway, the potential relocation of a church, and the potential for loss of tees and greens at the Bloomington Country Club. Question 2: Why are economic impacts not considered in the environmental assessment? Since INDOT’s guidance is being ignored, as mentioned in Question 1, it is even more import to assess economic impacts on the affected areas. On the other hand, Alternate 2: Tapp Road Upgrade would improve access to an area that is already commercially-zoned and developed. This has the potential for economic growth. In analyzing the alternatives, the environmental impact document assesses the short-term cost or each alternative, but not the medium- or long-term economic impacts. For example, since the “preferred option” would place an arterial through a neighborhood, hundreds of homes will lose value. Additionally, many residents along the Rhorer Road section of the corridor will likely have to pay out-of-pocket to upgrade septic systems affected by the construction. This is a severe negative impact to the economy of the area. Question 1: Please justify the decision to ignore INDOT’s very specific guidance regarding placing this type of arterial through a neighborhood. Since the roadway may connect to a full interstate interchange, it is accurate to describe it as, at least, a minor arterial. The South Batchelor neighborhoods consist of 500+ homes. The corridor itself will be along the back yards of at least 35 residences and the driveways of at least 25 others. On minor arterials, Section 40-1.01(01) of INDOT’s Indiana Design Manual states, “In an urban area, a minor arterial may carry local bus route and provide intra-community connections, but it will not, for example, penetrate a neighborhood.” Email Comment 01/08/2015 Ameer Beitvashahi 521 West Gordon Pike Email Comment 01/08/2015 I am writing to voice my approval for the Fullerton Pike expansion.I believe it is the logical choice to connect east/west Bloomington. Tina Boggs 850 W. Rosewood Dr. Walnut Intersection, thus the commercial value seems to be for longer distance traffic. Given the strong evidence that bypasses weaken the downtown areas of small cities, it is not clear that it is a good investment of citizen’s taxes to build routes that will weaken our city. Council of Neighborhood Email Comment 01/09/2015 Melinda Hamilton No address given uses significantly more right-of-way uses more forest has more Perennial/Intermittent Stream crossings has more Ephemeral Stream Encroachments impacts more acres of farmland impacts more identified karst features has more identified impacts to potential archaelogical sites has more impacted noise receivers creates more miles of new construction Page 36 of 40 The Council of Neighborhood Associations (CONA) represents the approximately 65 neighborhood associations in Bloomington Thank you for allowing us submissions. Please consider any possible alternatives that will be better for the area. One I have read about is an overpass and frontage road from Fullerton Pike to Tapp Road. I do not know if this would be the best one, but it is one to consider. I am sure there are a few more. 6) cost, OY! seems like a big price tag 5) age of the real plan, when was it created and does it work well within the area at this time as things are NOW, not then 4) destruction or damage to karst features and several creeks 3) safety of crossing of the Clear Creek Trail 2) 2 interchanges so close to each other (why here, why 2?) 1) safety regarding the location of 2 middle schools. I am emailing to request reconsideration of the proposed "Fullerton Pike Corridor." I am looking at the map and I am concerned about several items. Question 8: Will the county pay to install new sewer systems for residents whose septic systems will be impacted by the construction? Or are residents expected to pay for this expense out-of-pocket? Question 7: Will the county reimburse property owners whose property values are severely impacted by the increase in traffic and noise? Question 6: The project proposes a stoplight at the intersection of Gordon Pike and South Rogers. Several residences are just a few feet from this light. What provisions will be taken to make sure there are no traffic backups in front of driveways? What traffic control alternatives, e.g. round-a-bouts, have been considered? Question 5: Based on this comparison, please explain how can a “finding of no significant environmental impact” can be justified? - In Table 1, the comparison of Alternate 2: Tapp Road Upgrade to the Preferred Alternative 1A shows that the Preferred Alternative 1A: Question 4: Considering the large amount of right-of-way being used and the quantity of homes whose property value will be affected, can “Propert Owner Impacts Minimized” be corrected to a “No” for Preferred Alternative 1A in Table 1, Page 14? states that 12 of those relocations can be avoided by using land from the county club. Email Comment 01/09/2015 Associations The 2012 Final Engineering Assessment for the Fullerton Pike Corridor Improvements prepared for the Monroe County Board of Commissioners by American Structurepoint, Inc., which determined the Fullerton Pike interchange to be the most cost effective enhancement in this area, focused primarily on reducing travel times and enhancing vehicle operation with little regard to other important considerations such as neighborhood continuity, pedestrian and bike safety, community character, or the environmental impact to the area. I-69 is already connected via the proposed interchange at Tapp Road, 1 mile from this proposed interchange. CONA questions the expense of this expansion given the many drawbacks to this road widening project, and the other transportation needs the County has due to I 69. According to the US Department of Transportation Federal Highway Administration’s Highway Functional Classification Concepts, Criteria and Procedures: Arterial Considerations, “Arterials should avoid neighborhoods. They often serve as buffers between incompatible land uses and should avoid penetration of residential neighborhoods.” Gordon Pike and Rhorer Road, which, in fact, is the same road, in different townships, are the sites of two middle schools with a student population of 1,095 for the 2013-14 school year (this represents two thirds of Bloomington’s Middle School population) as well as many neighborhoods falling to the north and south of the roadway. Virtually all of this construction has taken place within the past 30 years, after the original plan for this roadway to become an arterial corridor. The long-term plan does not consider changes to traffic patterns and capacity based on alternative modes of transportation, changing fuel costs, public transportation and other considerations. Our first recommendation is to eliminate this interchange and adjoining road expansion entirely. This is the “No-Build Option” in the Fullerton Pike Transportation Improvement Project. Page 37 of 40 - Secondly, if this project does go forward, we recommend the following for the Fullerton Pike corridor: - Recommendations: - numerous existing residential neighborhoods. - 2 existing schools, Batchelor Middle School and Jackson Creek Middle School. - existing residential septic systems which will be destroyed at significant cost. - many driveway cuts, creating potential points of collision - 3 primary public pedestrian and bike trails, Clear Creek Trail, Bloomington Rail Trail and Olcott Trail. The proposed corridor will cross or otherwise affect: - - - - After much discussion, the CONA membership recognized the following problems with the Fullerton Pike interchange and new corridor: Residents from the area near the proposed Fullerton Pike interchange discussed their opposition to the new interchange and the connected corridor. CONA met on Wednesday, December 17 to discuss, among other things, the impact of I-69 on various neighborhoods in Bloomington and Monroe County. In particular, we discussed the impact of increased traffic on 17th Street between Crescent Bend and the roundabout and the impact of the interchange at Fullerton Pike. Concerned neighbors from each area expressed their concerns about each project and the impact on their particular neighborhoods. and Monroe County working with them to create healthy, secure neighborhoods, provide organizational support, and serve as a unified, advocating voice for neighborhood concerns. Email Comment 01/09/2015 Skip Daley Highlands subdivision Email Comment 01/09/2015 Nicholas Roberts No address given Create every possible safety measure possible for this school zone including: Reduce speed to 20mph in school zone (current plan is for 40mph). Design road to discourage speeding in school zone, rather than depend on enforcement. Add signage and signaled cross walks. - Page 38 of 40 The project will allow residents like myself amazing access to both I69 and SR37 Ease of Transportation: I fully support this project for a number of reasons, some of those include the following: I am a resident of a neighborhood known as the Highlands in Monroe County, Indiana, and I live adjacent to Gordon Pike and Fullerton Road. While I have declined to be part of the formal process of the advisory committee, I am a direct stakeholder in the outcome. I would not like to see this project continue. But if it somehow does, homeowners directly affected by the proposed construction should be amply compensated or given fair and equitable relocation. 3. Incompatibility with Bloomington: this sort of development is emblematic of the kind of characterless suburban sprawl one can find a few miles up the road in Indianapolis. It is not “Bloomington” and the lack of such development is part of what has made this town unique and liveable. 2. Dangerous: it does not make any sense to attempt to build a highway exit that touches driveways, endangers small children, and endangers school children 1. Property values will plummet: family friends live along this corridor and were not informed of this plan when they purchased their house almost 10 years ago. The development that would eat part of their front yard would have disastrous consequences for their property value and that of their neighbors. Although I do not reside along the corridor that would be affected by this proposed construction, I am a longtime Bloomington resident interested in responsible development of this town. I am not convinced that the proposed corridor project makes sense for the area it would affect. My main concerns: This message is to contribute to the record of public comments regarding the proposed Fullerton Pike Corridor project in Bloomington, Indiana. I am in opposition to this proposal. We urge you to abandon the Fullerton Pike interchange for the reasons stated above. If this is not possible, then we strongly urge you to consider the recommendations above to make the new corridor as unobtrusive and safe as possible for the adjacent neighborhoods. - - No bike lanes since there is a proposed multi-use path adjoining the project. Bike lanes are redundant, a waste of money and encourage excessive speeds. - Outside shoulders no larger than 4’ wide. - No more than 2 undivided lanes. - Maximum of 11’ wide lanes. - The road must be made compatible with existing neighborhood context including: Email Comment 01/10/2015 Bob Poortinga 5930 N. Maple Grove Rd. Email Comment 01/09/2015 Lynn Coyne Bloomington Economic Development Corporation The section of Gordon Pike immediately east of Rogers Street has been in grave need of repair for many years This project will end the number of vehicles which use the residential neighborhoods such as Eagleview and the Highlands as a short access route. The project will eliminate the excessive traffic which intersects the pedestrian trail on Rockport Road The project will include much needed improvements to the walking and biking trail which flows through the area Page 39 of 40 2) Better access to Batchelor Middle School is necessary. The intersection of Gordon Pike and Rogers St is often overwhelmed with traffic leaving/entering the school. 1) The Tapp/Country Club Rd corridor is wholly inadequate to handle the projected increase in traffic that will result in the completion of I-69 and resulting development that will ensue. A second access road to I-69 on the south side of Bloomington will be required. The Fullerton Pike Corridor is needed and necessary for a number of reasons. Bloomington and Monroe County has suffered under the artificial boundaries created by a lack of east-west access for too long, and the Fullerton Pike project offers a unique opportunity to bring our community closer together for the benefit of all. The original design of the project has been modified and narrowed over concerns about truck traffic and further delay would continue to deprive our fellow citizens of the advantage of the connectivity this project provides. In addition, we should keep in mind not only the traffic movement improvements that will be provided, but why those improvements are needed. They will allow increased communication between the facilities on both sides of our community. This includes easier access to employment opportunities and all the support services that are involved, such as day care. Expansion of community facilities such as parks, trails and entertainment venues on the west side will be facilitated and continue to increase the quality of life opportunities for everyone, and relieve some of the development pressures on the east side. Access to fire, ambulance and law enforcement services will be enhanced. It will also open up reciprocal opportunities for our regional neighbors to have access to education, entertainment and employment opportunities. The Fullerton Pike connector proposal is important to the future growth of employment and community opportunities for Monroe County. The Greater Bloomington Chamber of Commerce has clearly stated many good reasons to support this needed improvement. I am excited for the groundbreaking ceremony! There is no mistaking the benefits, and equally, no mistaking the reality that this project has been intended for decades. Regardless of whether or not one pays attention to long term infrastructure planning before moving into a neighborhood, no one can ignore the writing on the wall, which was the intentionally deep setbacks of sidewalks and utilities on Gordon Pike west of Rogers Street. My neighbors are all excited for these much anticipated improvements. Driving through the labyrinths of residential developments has been a dangerous chore, at best. Rockport Road is ridden with curves and blind spots . . . Fullerton (east of SR37) has been a disgrace for as long as I have lived in town. The project will inevitably assist with better disbursement of bus routes to Bachelor Middle School - - Increased Local Safety: - Page 40 of 40 I would also add that that several traffic roundabouts should be developed on this corridor: the intersection of Gordon Pike and Rogers St; the intersection of Gordon Pike, Clear View Dr, and Batchelor School Dr should be realigned with a roundabout; and the intersection of Rockport Rd / Fullerton Pike. 4) Much of the area in the vicinity of I-69 / Fullerton is undeveloped. Construction of the corridor will provide better opportunities for development of this area and increased economic activity. 3) Better access to the Rhorer Rd / Sare Rd corridor is necessary. This includes access to Jackson Creek Middle School and Sherwood Oaks Christian Church. The project should also include improvements to the Walnut Pike / Rhorer Rd intersection. From: To: Subject: Date: Attachments: Fullerton Pike Project chmelliott@gmail.com Fullerton Pike Project Wednesday, December 17, 2014 5:04:00 PM FHWA_Relocation_2014-10.pdf Hello, We spoke at the Fullerton Pike Public Hearing last week, and I mentioned that I would send over the updated Federal Highway Administration Relocation Pamphlet. Please find this pamphlet attached. I will also mail a copy to you, is this address correct: 1640 E Rhorer Road Bloomington, IN 47401 Please let me know that you received this message, a quick email reply is sufficient. Thank you very much for attending the hearing, and please let us know if you have any other questions at this time. Thanks, Ben Harvey _________________________________________ Fullerton Pike Project 7260 Shadeland Station, Indianapolis, Indiana 46256 T 317.547.5580 E fullertonpike@structurepoint.com F 317.543.0270 W www.structurepoint.com Follow us on From: To: Subject: Date: Hilary Elliott Fullerton Pike Project Re: Fullerton Pike Project Wednesday, December 17, 2014 5:36:49 PM Mr. Harvey Thank you and yes the address is correct. Hilary Elliott Sent from my iPhone On Dec 17, 2014, at 5:04 PM, Fullerton Pike Project <Fullertonpike@structurepoint.com> wrote: Hello, We spoke at the Fullerton Pike Public Hearing last week, and I mentioned that I would send over the updated Federal Highway Administration Relocation Pamphlet. Please find this pamphlet attached. I will also mail a copy to you, is this address correct: 1640 E Rhorer Road Bloomington, IN 47401 Please let me know that you received this message, a quick email reply is sufficient. Thank you very much for attending the hearing, and please let us know if you have any other questions at this time. Thanks, Ben Harvey _________________________________________ Fullerton Pike Project 7260 Shadeland Station, Indianapolis, Indiana 46256 T 317.547.5580 E fullertonpike@structurepoint.com F 317.543.0270 W www.structurepoint.com <image001.jpg> Follow us on <image002.jpg> <image003.jpg> DISCLAIMER: This message contains confidential information and is intended only for the individual named. If you are not the UPS: Tracking Information 1 of 2 http://wwwapps.ups.com/WebTracking/detail United Kingdom My UPS Shipping New User | Log-In Search Tracking Freight Locations Support UPS Solutions Cookie Disclosure This website uses cookies. By continuing to use the website, you consent to the use of cookies. Learn More Do not show this message again Log-In for additional tracking details. Track Tracking Detail Print Help A A A Updated: 09/01/2015 16:15 Eastern Time 1Z4390800367960757 Shipping Information Delivered Delivered On: Monday, 29/12/2014 at 10:51 Request Status Updates » Left At: Front door To: BLOOMINGTON, IN, US Shipped By UPS Ground Proof of Delivery Won't be home? Reschedule your parcel, even before the first delivery attempt. Click Continue now. ® I am already a UPS My Choice Member What's this? Shipment Progress Location Date Local Activity Time Bloomington, IN, United States 29/12/2014 10:51 Delivered 29/12/2014 3:53 Out for Delivery Bloomington, IN, United States 27/12/2014 5:54 Arrival Scan Indianapolis, IN, United States 27/12/2014 4:15 Departure Scan Indianapolis, IN, United States 26/12/2014 23:43 Arrival Scan 26/12/2014 23:18 Departure Scan 26/12/2014 17:13 Origin Scan 26/12/2014 14:37 Collection Scan United States 24/12/2014 11:59 Order Processed: Ready for UPS Additional Information Shipped/Billed On: Type: Weight: 24/12/2014 Package 1.00 lb 1/9/2015 4:16 PM UPS: Tracking Information 2 of 2 http://wwwapps.ups.com/WebTracking/detail Subscribe to UPS E-mail: Enter e-mail address Contact UPS Browse Online Support E-mail UPS Call Customer Service Sign Up » View Examples Support Get Started Register Open a Shipping Account Change Your Delivery Home About UPS Service Terms and Conditions Solutions for: Small Business Healthcare International Trade More... Site Guide Careers Website Terms of Use Pressroom Privacy Notice UPS Global Other UPS Sites: UPS Mobile Cookie Disclosure Protect Against Fraud Copyright © 1994-2015 United Parcel Service of America, Inc. All rights reserved. 1/9/2015 4:16 PM UPS: Tracking Information 1 of 1 http://wwwapps.ups.com/WebTracking/processPOD?Requester=&track... Proof of Delivery Close Window Dear Customer, This notice serves as proof of delivery for the shipment listed below. Tracking Number: Service: Weight: Shipped/Billed On: Delivered On: Delivered To: Left At: 1Z4390800367960757 UPS Ground 1.00 lb 24/12/2014 29/12/2014 10:51 BLOOMINGTON, IN, US Front door Thank you for giving us this opportunity to serve you. Sincerely, UPS Tracking results provided by UPS: 09/01/2015 16:16 ET Print This Page Close Window 1/9/2015 4:16 PM 4. 3. 2. 1. Comment No. Email Comment 11/26/2014 Email Comment 11/26/2014 Matthew Russell 4000 S. Rogers St. Rodney Friend No address given Email Comment 11/26/2014 Geoff McKim No address given Email Comment 11/26/2014 Name / Address / Method / Date John Carter 560 E. Miller Dr. Page 1 of 60 There was mention of raising the road by about 2 feet from the intersection west. My Will the sidewalk on the south of the road be at road level or at my property level? It concerns me to have sidewalk at the same level as my home considering the proposed proximity of it to my home. (4-C) Will the south side of Gordon Pike west of Rogers be regraded to a more gradual slope or will be a retaining wall be erected? (4-B) I own property at 4000 S Rogers St that will be significantly effected by the proposed road project. I went to the library to review the Environmental Assessment and was disappointed that it did not match what was stated in the letter i received. The letter stated that the entire corridor would consist of a single lane in each direction with a center median. All the maps in the EA showed 2 lanes in each direction at the Rogers St intersection. Can you please supply me with the updated routing maps indicated the proposed right of way? (4-A) I also have a few questions. Please send a map of the purposed project. Your written description in this notice is poor and extremely hard to visualize. (3-A) Your Legal notice of hearing describes in one paragraph an intersection of Fullerton Pike and Sare Road. There is no intersecting of these streets as they exist not unless some current streets get renamed. Greetings -- is a copy of the EA for the Fullerton Pike Project available in electronic form? (2-A) Any light you could shed on these questions would be appreciated. Looking over the Final Engineering Assessment for the Fullerton Pike Project I was unable to determine exactly how the intersection of Fullerton/Gordon Pike and Batchelor Drive was to be treated. We do have students walking from Clear Creek Estates across Fullerton/Gordon Pike. Will there still be a 3 way stop there? Will it be signalized? We also have more than 20 buses entering/exiting twice per day. (1-A) Comment 4-A 3-A 2-A 1-A Response No. Email response 12/01/2014: Please keep in mind that the current level of design is very preliminary, and formal design has not occurred at this section of the roadway. You are correct about the approximate number of lanes at this location. Traffic modeling showed that the number of lanes would need to be increased at the intersections to keep traffic moving through the intersections within the design standards. At this intersection there is a left, right, and center lane in the eastbound direction. Email response 12/01/2014: At this point in the development of the project, the specific items you mentioned below have not been determined. As design moves forward on that specific section of the roadway, there will be additional coordination between the engineers and the County to decide what type of traffic control or design modifications are necessary. Email response 12/09/2014: The EA has been uploaded to the Highway Department’s website. You can get to the page via this link: http://www.co.monroe.in.us/tsd/ Government/Infrastructure/Highway Department/Projects.aspx. Email response 11/26/2014: Thank you very much for your input Mr. Friend. A map is attached. Response Disposition of Comments on Des 0801059 Fullerton Pike Corridor Improvements 6. 5. Tammy Kawanishi Email Comment 12/11/2014 Lloyd Hawkins Highlands subdivision Page 2 of 60 When we moved to Bloomington over 10 years ago, we looked at a number of housing developments. We chose Eagleview because it was close to everything we Please voice my opinion for me that I am a supporter of the project. It seems to me that by completing the new project with a divided roadway, whether it be two lanes or four lanes, will make it safer for all residents in the area. The median will provide pedestrians an area to avoid trying to cross both east and west bound traffic at the same time. The road will keep through-traffic out of the sub divisions and the traffic will be on a road that is designed to handle it. Right now, The Highlands subdivision is used as a cut-through to connect Gordon Pike to Rockport Road. Cars cut through the subdivision in order to gain access to State Road 37. They speed through on roads that are not designed to handle heavy traffic. These cars drive down Wickens Street to McDougal Street or Hennessey Street and they often ignore stop signs and are well over the 20 mph speed limit. The Fire Department and Ambulance Service also use the neighborhood to get to calls and avoid the long drive by using either Tap Road or That Road to get to State Road 37 or Rockport Road. My name is Lloyd Hawkins and I live in The Highlands subdivision between Gordon Pike and Rockport Road. I am a supporter of the new project to connect Fullerton Pike and Gordon Pike with access to I69. I would like to see a four lane project that would be able to handle traffic for many years to come as Bloomington continues to grow, but I understand concerns and I am supportive of the scaled down version of the project as well. driveway is on Rogers just south of the intersection. I currently have drainage issues in my drive due to road resurfacing of Rogers that raised the road above my drive. How will drainage on my property be addressed to prevent flooding of my property due to an increased road level? (4-D) The current proposed plans for the project have curb and gutter within the roadway sections to catch rainfall within the roadway. Drainage design is not done until later in the project, but the designers typically look at all of the on-site drainage to make sure that there is positive drainage toward a receiving stream or storm sewer. 4-D Upgrading Tapp Road was considered as an alternative to the Sidewalks are typically placed at the grade of the roadway, and then the slope outside of the sidewalk will be tied into the existing grade outside the roadway. The sidewalks are typically sloped so that drainage from them flows back towards the roadway 4-C 6-A The likely design slope would be a 4:1, although this has not been finalized at this time. 4-B 8. 7. Email Comment 12/11/2014 Joel Fosha Clear Creek Estates subdivision Email Comment 12/11/2014 Terrill Cosgray 3700 S Mae Ct. Email Comment 12/11/2014 4011 S. Crane Ct. Page 3 of 60 I am a home owner in Clear Creek Estates and will be affected by the Fullerton Pike road project. I am writing to you as an opponent of the project. This project was conceived many years ago when there was little or no development in the area. The plan is simply outdated given the neighborhood development that was allowed to be established in the area. The project, even in it’s scaled-down form, will adversely affect the quality of life for residents of the three surrounding neighborhoods (8-A) in terms of traffic density, (8-B) noise pollution, (8-C) lowered property values, (8-D) the health and safety of residents, and those who will attend school at Batchelor Middle School. (8-E and 8-F) Additionally, there is no infrastructure to handle the increased I'm writing to support the current Fullerton Pike plan as described in today's Bloomington Herald Times newspaper article. I reside in a neighborhood off of Rhorer Road and am very familiar with the traffic patterns in Bloomington's Southeast side of town. There is very high need for a major East-West corridor. However road enhancements are also needed beyond Sare Road to Snoddy Road as well to move traffic further East and North to Rogers Road and then on to Smith Road. Also, Rhorer Road going East from Sare Road to Snoddy is very popular with bicyclists but the road is very narrow which can be dangerous for drivers and cyclists; a bike path and sidewalk are needed. Easy access to the trail is also important to help combat the rise in obesity and inactivity as highlighted on the front page of today’s paper (We’re Fat, We Smoke and We Refuse to Exercise – The Herald Times – Thursday December 11, 2014). It is important to point out that Bloomington has been given the honor of being awarded a gold level bicycle friendly community (one of only 55 in the country). What does it say about our community when we’re willing to damage/destroy a portion of the trail that makes this community unique. (6-B) I ask that the committee seriously consider making the exit at Tapp Road to minimize the impact on healthy activity and living that makes Bloomington a unique place. A better alternative exsists with Tapp Road. Tapp road with its recent upgrades have allowed for bridges to already be built over the trail. Tapp Road has many businesses that would love the increased exposure that the increase in traffic would bring. Tapp Road also has ample room for the number of lanes needed to accommodate the corridor. (6-A) The Fullerton Pike proposal will impact 2 large middle schools that have a good deal of walkers as well as a number of houses that have been built in the area where the corridor is proposed to run. needed, but away from the hussle and bussle of the eastside of town. We also loved the fact that our backyard was adjacent to a “feeder” to the trail. We love to ride our bikes, walk and run the trail. We use the trail several times a week (even during the winter) and have met some wonderful people on the trail. My husband has spent numerous hours (day and night) on the trail as he has trained for obstacle course races including World’s Toughest Mudder three times – which was highlighted in InStride in October of 2012. 8-A 7-A 6-B Coordination with the local parks department has been ongoing and will continue throughout the project development and design process. Impacts to existing trails will be minimized to the maximum extent practicable. For example, a bridge will be constructed to carry the roadway over the Clear Creek Trail, eliminating the need for an at-grade trail crossing at this location. In addition, the project would improve access to trails by providing a 10foot multi-use path that would connect the trails already in existence along the project corridor – Clear Creek Trail, Bloomington Rail Trail, and Sare Road Trail. Sare Road was chosen as the eastern terminus for this project because traffic counts do not indicate the same level of congestion that is present west of Sare Road. Improvements to the Fullerton Pike corridor east and west of the proposed project limits may be considered in the future as part of a separate project. The intent of the project is to develop the best project for the community while still accomplishing the purpose and need of the project. The project team will continue to solicit and review input from the public. This input will be used to develop and incorporate context sensitive solutions into the project to the proposed project. This alternative does not satisfy the purpose and need for the project. Please see the “Other Alternatives Considered” in the Environmental Assessment (Page 9 – Page 15) which explains why upgrading Tapp Road was not selected as the preferred alternative for the project. Page 4 of 60 I urge the powers that be to reconsider this project This is simply not a good idea. Once the flood gates are opened, the unforeseen costs of infrastructure updates with no commercial benefits, and most importantly, a greatly diminished quality of life for the residents, will be the outcome! It’s not too late to drop this project and bury it! I strongly urge you to do so on behalf of my family and all the family that will be adversely affected. traffic as it pushes east. The early morning and five o’clock evening traffic bottlenecks as it is. (8-G) That Road is, and will continue to be, a not-so-perfect solution to this problem if an east-west artery needs to be introduced in the area. The negative impact on people, neighborhoods, and costs would be much less if this were an option.(8-H) One of the goals of the project is to reduce congestion. Traffic forecasts indicate that without improvements, several areas along the project corridor will experience severe congestion by 2034. For more information, see the “Purpose and Need” section of the Environmental Assessment (Page 5-Page 6). A noise study was completed in accordance with INDOT policy. This study and its recommendations are included in the Environmental Assessment (Page 41 – Page 43). The INDOT Noise Policy, which provides appropriate measures for noise mitigation, will be followed throughout project development and design. The project is not anticipated to have any impact on the property values of residences not located directly along the project corridor. Any foreseeable reduction in property values would be incorporated into the right-of-way This is a acquisition process. standardized INDOT/FHWA process over which the County has no influence. For more information on this process, see http://www.fhwa.dot.gov/real_estate/. The project integrates roadway and pedestrian characteristics that would be anticipated to increase the pedestrian and bicycle safety along the corridor. The exact nature and locations of some pedestrian and bicycle amenities will be determined later in the project development process, with crosswalks and median cuts as an example. 8-B 8-C 8-D 8-E maximum extent practicable. 10. 9. Email Comment 12/11/2014 Jolene Bettencourt No address given Email Comment 12/11/2014 Roberta L. Taylor 3931 S. Cramer Cir. Page 5 of 60 I cannot attend the meeting this evening, but would like to offer my perspective. It is with great concern that I write about the proposed Fullerton Pike corridor. Since my family lives in close proximity to this road I think the safety concerns are great. I have a current student at Batchelor Middle School and two younger children who will also walk to this school daily within the coming years. With the current school schedule my student walks to school in complete darkness for a large portion of the school year. He must cross multiple intersections, including the main one to the This exit should be at Tapp Road for very obvious reasons!!!! (9-B) I vehemently disagree with putting an exit off 69 onto Fullerton Pike, a residential district!!! You've heard a lot of people against this - LISTEN TO THE PEOPLE!!! (9-A) Upgrading That Road was considered as an alternative to the proposed project. Please see the “Other Alternatives Considered” in the Environmental Assessment (Page 9 – Page 15) which explains why upgrading That Road was not selected as the preferred alternative for the project. The scope of this project does not include any I-69 interchanges. 8-H 10-B 10-A 9-B A significant volume of truck traffic is not anticipated along the corridor due to the limited commercial and industrial development to which the roadway leads. Regardless of a Tapp Road interchange, there is a need for for a direct connection between SR 37 and the residences Gordon Pike and Rhorer Road, reduction of traffic congestion, safety improvements, and trail connectivity improvements. There is independent utility for the project. Please see the “Purpose and Need” section of the Environmental Assessment (Page 5 – Page 6) for a more detailed discussion. See response 8-F. See Response 7-A 8-G 9-A The project would be anticipated to improve safety for motorists and pedestrians along the corridor. Additional design characteristics will be considered and incorporated into the plans if they are warranted for ensuring safe pedestrian crossings near schools. This includes but is not limited to evaluating pedestrian crossing assistance between Batchelor Middle School and Eagle View Subdivision. 8-F 11. Email Comment 12/11/2014 Melinda Johnson The Highlands subdivision Page 6 of 60 I am unable to attend the public meeting but I did want to comment on the project. I live in the Highlands subdivision and I think a new road is very needed. The current way to get to Ind 37 from my neighbourhood is extremely hazardous. The roadway is way too narrow with no shoulders. The tree overhang on Rockport road keeps the roadway wet and slick most of the time. There are several deer in the area and no place to go when you see one because of no shoulders. The intersection of Rockport and Fullerton is also extremely dangerous. The sight line to the west is very limited and when cars are coming from the highway and you are turning onto Rockport from Fullerton you cannot see if a car is in the dip in the road or not. There have been accidents resulting in death on this stretch of Rockport because of pedestrians walking at night with no shoulder for them to get on. There is no lighting on this dark hilly road making it a hazard for both drivers and pedestrians. With the new interchange we are going to have more traffic on this county road and we need a safe road for the extra traffic. Not only is the road unsafe but what a way for people to view Bloomington for the first time if they choose to use this interchange and end up on unsafe roads. The ambulances to Monroe hospital must also use this interchange from the city side because of no Tapp road interchange. If you were to meet an ambulance on the road there would be no place to get out of the way. There are many safety issues far more important than the size of someone’s front yard. They could also put a stop light at the crossing for the few students who do need to walk to school. This would also alleviate cars who live in the neighbourhood Please take a very close look at other possibilities other than adding yet another road through dense residential development, which could prove to be fatal mistake for our young people traversing this direction every day. I'm afraid I do not see the benefit to adding a connection from Fullerton to I69 when Tapp Road has recently been upgraded, enlarged, widened, etc. The upgrades already given to Tapp along with its current mix of business/industrial/residential makes a much better thoroughfare than a non-existent road through untouched growth, a trail system, very close frontage neighborhoods and a middle school. (10-F) The Clear Creek trail is also an major issue for this road. Some type of overpass or underpass would need to be constructed in order to keep all the patrons of the trail safe from the flow of fast moving traffic. (10-D) It makes much more sense to use Tapp Road, which already has a nice underpass for the trail. Tapp Road already has business/commercial offerings, much less residential frontage and the same access to major roads, and does not cross in front of a public school. (10-E) school as it crosses Fullerton. (10-A and 10-C) There is already a decent amount of traffic as all the residential traffic takes it's course on the way to work at this time of day. To take this closed road and then connect it to not only a highway, but a soon to be Interstate, would substantially increase traffic, much to the large number of walking students detriment. And it would not simply be an increase in the volume of traffic, but also include larger vehicles, delivery trucks and such. (10-B) The Batchelor Middle School cross country team also uses the surrounding neighborhoods and Clear Creek trail for training runs. They intentionally keep the kids from high traffic areas now, but this would become almost impossible if Fullerton is an Interstate exit and "beltway around the city." See response 6-A. See response 9-A and 9-B. 10-E 10-F Only preliminary roadway design has been completed for the proposed project at this time. As design progresses, all intersections will be analyzed to determine the most appropriate method of traffic control. See response 6-B. 10-D 11-A See response 8-E. 10-C 14. 13. 12. Verbal Comment 12/11/2014 Nan Brewer 3636 S. Rogers St. Email Comment 12/11/2014 Julio Alonso 1865 W. That Rd. Email Comment 12/11/2014 Jimmy Ratcliff No address given Page 7 of 60 I just want to state that I'm tired of hearing that this revised plan has mullified neighbor's concern about the Monroe County Highway Department's plan for the Fullerton Pike/Gordon Pike/Rohr Road expansion project and that it has to be built to serve the need for I69. (14-A) Simply deciding not to make these residential streets into a five lane mega road which would have been wider than most of the state's highways passing through the county does not address our real concern. Instead, a three lane road running past two middle schools, several churches, two rails-to-trails path would bring a high volume of traffic and trucks. (14-B) By the county's own estimate an increase of at least 40% within five (5) years. As the first exit off I69 in to Bloomington this estimate may be conservative. (14-C) The plan essentially changes our neighborhood streets into a commercial artery. I think there must have been an error in the report identifying our area as "urban" when it is clearly 99% suburban. As you all know there is only one commercially zoned intersection along the entire stretch from Fullerton Pike to Snoddy Road at Walnut, Business 37. And no empty land for further commercial development. (14-D) INDOT’s directives recommended not placing exits or access roads dumping traffic through primarily Thank you for your consideration. I do not mean to dismiss the concerns of the residents of Fullerton Pike and hope you will work with them to minimize the impact. (13-A) Nonetheless, I believe this corridor must be created, and as soon as possible. This connection is absolutely essential now that I69 construction is underway and impacts are being felt. I will lose (actually have already partially lost) my access to SR 37. I must now find alternative routes to work and everywhere else I go. People affected by the I69 project need multiple new options and this corridor makes absolute sense. It would be an important and significant improvement in my ability to travel safely for work, shopping, visiting and other trips. I am unable to attend the hearing this evening but wanted to write and express my strong support for the Fullerton Pike corridor project. I support the construction of the Fullerton Pike Corridor. I think the Eagle View neighborhood won an ill advised concession regarding the number of traffic lanes being proposed for the area. This corridor to Sare Road should be four lanes all the way. That is what planning for the future is all about. I live on the southwest side of S.R. 37 (soon to be I- 69). Like many others, who use Rockport Rd. to access S.R. 37 from the southwest, I-69 is going to cause an inconvenience since we no longer will be able to get onto it without taking That Rd. to Fullerton Pike. The bottom line is one person's inconvenience is another person's convenience. Being able to drive across I-69 on Rockport Rd. and then take Fullerton Pike all the way to Sare Rd. will be a convenience for us who have to travel Rockport Rd. to get to the eastside of Bloomington. At some point Sare Rd. all the way to College Mall Rd. may have to be widened. from having to stop at a 4 way stop several times a day and night and all summer when school is not in session. The busses could file out more quickly with a light instead of the stop and wait we have now. The traffic flow could be greatly improved for all with a stop light. (11-A) The need for the Fullerton Pike project has been demonstrated to be independent of the I-69 project. Without the construction of an I-69 interchange, safety and connectivity would continue to define the need for improvements to the existing corridor. See response 10-B. The process to determine future traffic counts included coordination with the Bloomington/Monroe County Metropolitan Planning Organization and the INDOT I-69 project team. 14-B 14-C The project team will continue to engage the public throughout the design process. 14-A 13-A Page 8 of 60 residential neighborhood, i.e. having a low residential impact, and to follow established commercial traffic patterns. (14-E) This plan does neither. This is the first public comment meeting on this proposal. (14-F) Although it would drastically alter the quality of life, (14-G) property values, (14-H) safety of our children, (14-I) noise and light levels (14-J) and residential character in many built out established south side neighborhoods, including the Highlands, Eagle View, Clear Creek Estates, Bachelor Heights and Southcrest. Just to name a few. Let's not talk about an outdated irrelevant highway plan from the 1960s before these neighborhoods were built and Highway 37 even existed. How about thinking about what would best serve the people who live there now. This has become an entirely different project once it was decided to make it an access road off of an interstate highway. Rather than a connection to Highway 37 or to an I69 overpass. The only reasonable option for this established residential area of mostly single family homes is to go with an alternative that eliminates any connection to a highway interchange. This alternative being proposed tonight has the highest residential impact of any of the choices. (14-K) I think that our neighborhoods deserve the same right to traffic reducing measures that any other Bloomington neighborhood as opposed to this which is the exact opposite. Thank you. The roadway is classified as an Urban Arterial per the INDOT Functional Classification Maps found on INDOT’s website. The location of proposed exits is outside the scope of this project. The proposed corridor travels between two neighborhoods. Eagleview and The Highlands neighborhoods are already separated by a roadway and each neighborhood was developed to allow space for the proposed completion of this project. There has been extensive public outreach in regards to the proposed project, and the current preferred alternative was presented during the second CAC meeting on 7/23/2012. During much of this coordination, the preferred alternative was a four-lane roadway. Impacts are reduced for the current preferred alternative twolane roadway and are all included in the analysis of the four-lane roadway that was presented for public comment previously. Please see the “Public Involvement” section of the Environmental Assessment (Page 2 – Page 4) for a discussion of all public involvement activities that have occurred to date. See response 8-A. See response 8-D. See response 8-F. See response 8-C. 14-D 14-E 14-F 14-G 14-H 14-I 14-J Traffic data can be found in the “Roadway Character” section of the Environmental Assessment (Page 16). 16. 15. Verbal Comment 12/11/2014 Liz Irwin th 400 West 7 Street, Suite 102 Verbal Comment 12/11/2014 Jim Shelton 1716 S. Springhouse Page 9 of 60 Good evening, I'm Jim Shelton, I'm representing the Greater Bloomington Chamber of Commerce. The Chamber's been engaged in the process on this project for a long time representing the 900 businesses that are Chamber members, as members of the CAC. It has been stated this need been long recognized for improved east/west traffic throughout this entire community, not just on the south side. In 2006 the Chamber did a survey of its members from key points that needed improvement. And one of them that came back was infrastructure plans from trying to improve the infrastructure in the community. A team was put together and a report was produced in 2007 that identified the areas of storm water, water and sewer, etc. and transportation. One of the things the plan recognized was we need improved east/west traffic capability on the south side of the community and it recognized that the Fullerton Pike Corridor expansion when it's already in the Transportation Improvement Program. The taskforce also, at the same time the county leadership created a TIF, Fullerton Pike TIF to produce the funds to match the federal funding that would eventually be needed and it still exists and it's got funds in it right now. In a recent survey that we did just this year our certified membership again indicated that they think this road needs to be built, or this capability needs to be created in the southern part of our community and this is where our county's leadership has selected that it be. So we support the project. We are glad to hear that there's flexibility as they get down to nitty-gritty exactly where the roads are going to be, that they can move things a little bit further south to try to save people's yards or make people able to turn left when they get out of their driveway. We support the project and take the opportunity to say so. Thank you very much. I'm Liz Irwin. I'm here today representing the Bloomington Chamber of Commerce. I want to thank you for the opportunity to share our insight today about this project. The Chamber does recognize that the Fullerton Pike Expansion Project has been part of the TIF for many years. Jim mentioned our 2007 Infrastructure Task Force report and this report also recognized that a Fullerton Pike extension was an important project has been identified been the county. And now we understand that the county is in a position to move forward with this plan that it has long recognized a need for. One of the other things that is recognized in that project was the 45/46 bypass project, widening of that also which was somewhat of a controversy from some of the citizens in town but I will just say when you see you people using that now for needs other than just movement by 14-K Please see the “Other Alternatives Considered” section of the Environmental Assessment (Page 9 – Page 15) for a comparison of anticipated impacts of all alternatives considered. Only one alternative – the Intersection Improvements alternative – would result in fewer residential relocations, and this alternative would not address the purpose and need of the project. 17. Verbal Comment 12/11/2014 Ann Elsner 4017 South Crane Page 10 of 60 My name is Ann Elsner. I am an IU faculty member and also a business owner of 501 South Madison. So I have a business on the south side as well as living in Eagle View and I'm very much against this road. My main concern is the safety of the people who live within this neighborhood. That is specifically dead children and smashed pets. (17-A and 17-B) So the four acres you're talking about removing is where a lot of people I know walk their dogs and go jogging. And the middle school kids work out there. That's not going to be there any more. Many comments have been made that people support this road. No one in my neighborhood has ever said within my hearing that this is a good idea. So the people who live there are not complaining about long commute time and traffic back up. At the present time they're concerned about future back up when the traffic will be coming from Interstate 69 through the neighborhood that was never there before. So one of the things that Nan Brewer has been trying to do is find out the estimate of increased traffic coming from the connectivity or some miracle where would you put a lot to make thousands more cars. There's a lot next door to me but other than that there's almost no lots anywhere in our neighborhood. We're full. We've been full for ten years. There's nowhere left to build if you stick with single family homes. So you can't have more traffic. It's a dead end road and a lot of cul-de-sacs. To expect people to have a road that's either going to be a high speed road through the neighborhood because it's leveled off to have those line of sight corrections, so they won't be able to pull out of their driveways in a safe manner or pull out of their intersection in a safe manner or watch their children go to school or to the play, the middle school or walk their dog. It really does impact on neighborhood quality of life. (17-C) I disagree with the environmental statement. The section in the pages forty etc,, the methodology for the di minimis finding was not given. (17-D) The data in the back that have exception after exception from the CAC members, from the residents, those statements are not addressed in the front. But commute times we're talking about haven't been compared against a critical alternative which is turning left or having to do U-turns because of the increase of several thousand cars a day. So in terms of my commute, let me give you an example from my life. I put in yet another longer than 12 hour day at the university job and I knew I could get vehicle. We also see the great multi paths available alongside. I think that's been a great benefit to the citizens of the community. It's nice to see at the Fullerton Pike expansion project also will have sidewalks and multiuse paths. I think that will be an improvement to the residents. Also important I think to recognize that Fullerton Pike is identified as one of the first Bloomington exits on the south side of Monroe County and the construction of interstate is now underway. But it is really a timely and be moving forward with the project. We need to make sure that we plan accordingly and follow through with those plans in the necessary time. We understand that the current plan has scaled back some to address some of the concerns of the residents. At the Chamber we just hope that the project can continue to be serving the interests of both residents and the rest of the county in terms of increasing connectivity across east and west side of town. And that it will also consider the transportation needs of businesses and for the rest of the community. Thank you very much. See response 8-A. The Fullerton Pike Section 4(f) evaluation follows Federal Highway Administration procedures. For more information, see http://www.environment.fhwa.dot.gov /4f/index.asp. The project corridor is not proposed to be converted to a designated truck route. The cost estimate includes all design, right-of-way, and construction costs for the entire project, including bridges. See response 8-D. 17-D 17-E 17-F 17-G See response 8-F. 17-B 17-C See response 8-E. 17-A 18. Verbal Comment 12/11/2014 Isabella Beitvashahi 521 West Gordon Pike Page 11 of 60 home safely because I didn't have to worry about a lot of traffic. And I could just drive from the university to my home. If you have a truck route there I will not be able to do that. (17-E) I realize time is short so I carefully read the first 50 pages of the environmental statement. I do not feel the costs reported are accurate. The 27 million dollars does not include the several million dollars required for the bridges. So the critically alternative of Tapp Road is more than 37 million. But the 27 million doesn't include the bridges or the connectivity to the bridges. That's going to be 10 millon at least, right? So those two are actually similar in costs at the present. The engineering plans aren't complete enough so we don't know how much it's going to cost to flatten the hill top. (17-F) I have no idea if anyone will be able to get into their driveways but that's another point. The property values will be limited or impacted but they are saying there will be no environmental impact or property values or community cohesion in the statement I feel is incorrect. (17-G) And I'll just leave it at that. Thanks. I just want to say, Mr. Williams, it's so nice to meet you, I've heard your name so many times. There's my husband and my little daughter Iris, she's five months. I have a spirited two year old who is not here, which you're all probably all grateful for that because he's bonkers right now. He's with his grandpa in Eagleview. I live at 521 West Gordon Pike. You might have seen us with our two Irish setters. I landscaped the front, take so much pride in our home. I mowed the lawn every day when I was pregnant because I loved it. I remember our neighbor, Randy, and like no, I'll do it. You make my feel bad. And I'm like but I love it. When I first heard this, my husband bought the house when he was 25 and I was 26. Claire Perry who was our real estate agent never told us that this was in the plan. That would have affected our decision I'm sure. But we found out about this when I was nine months pregnant with my first son. It was like a bomb dropped. And our community is very quiet and that's what we love about it. The first time I seen everyone rally together, like everybody scared us. And the dreams I had, having my son, he is (inaudible). We are a traditional home, we follow a budget, have two babies, take care of them. The only place I feel safe is the YMCA for his preschool and (inaudible) when I can get some time. (crying) They take care of me as much as I take care of my baby. And it's scary. I'm afraid of the traffic flow. And mostly I'm heartbroken at the change of our quality of life, six years, our Irish setters were puppies. (crying) My puppies now are getting old and I understand things change but this happening to us was done to us, we didn't have a choice. I had Ameer, my husband called a real estate agent because even Bob Saltzburg assaulted us like we should have known. We were young, homeownership is important and it is something to be very proud of. Apparently dying is something important. I felt that this didn't take any of that into account. And she said, you know, should we leave, trade it out, what can we do, you know, we have a family, personally I'm afraid. I'm here at home alone with my babies. All I have is my dogs. She said, stick it out. You're not going to get your money back. Who knows, it may be better. You're locked in. You wait until it's there. You know, I felt so wronged, like fools, and we're stuck there. And now I'm 18-A See response 8-A. 20. 19. Verbal Comment 12/11/2014 Clarence Dillon No address given Verbal Comment 12/11/2014 Randall Stephenson No address given Page 12 of 60 Clarence Dillon, I'm a geologist and a teacher. I've lived in the area, I lived on South Rogers for five years and my two daughters went to Bachelor. I worked at Bachelor and as part of my community involvement for my one hour of my education degree I had to choose a community involvement in the MCCSC and I chose to participate in the discussions about Bachelor Middle School. It was not designed as a prison, if you want to know likewise. I can tell you that clearly. And that was 1970-72 and it was told to us then that this was going to be a connection over to what was then being constructed as Highway 37, of which I worked summers there. And since that time the 1965 plan has been in place and from that time on every subdivision, every issue of annexation, every issue of locating the fire house, the discussion about this improvement has been made. The subdivisions out there even had to contribute through bonding some money to build a bridge over the unknown tributary. And every time these have to be recorded in your abstracts. And anybody who purchased property has in their abstract some place that this was going to occur. Getting back to some other issues, when it was discussed about the school, school buses were discussed. And the number of school buses that come from my area right now out on Kirksville Road, I see five school buses out my window every morning leaving. All five of those school buses have to take several miles, different Hi, everybody. Ms. Beitvashahi, it's going to be okay. Yes, I did say I envied you because I remember (inaudible). Isabella, it's a juggernaut. Get used to the juggernaut. The juggernaut comes through, it does what it wants to do. Get used to it. And think of it as all good. Okay? Tapp Road is there, they're going to build an interchange. But a juggernaut says well, if you go through Gordon Pike it's not so much the residential areas that are worried or they're concerned, it's all that very valuable undeveloped land on the west side of Clear Creek Trail, think about that. So it's all good depending on who you are. If you own that undeveloped land it's great. If you live on Gordon Pike it's not so good. But, buck up, the juggernaut won't crush the people. And so I know better than pretend it's going to stop because we're here today. But I think it's good for people to see what's going on. Because the more we see what's going on maybe the next time the juggernaut comes in our direction we'll be aware of it and we'll be able to stop it ahead of time. And I'm guilty, I was not here when I should have been earlier. But I hope not to make that mistake again. Thanks for your time. just, I appreciate people listening to us. Me being a mom (crying). Thank you very much, Nannette Brewer I'm so honored to have you as a beautiful advocate. Because every summer when I was out there mowing the law (crying) I was thinking about (crying) I was so angry, why are they doing this to me. My home is the only place I feel safe. And it feels like such a (crying – inaudible) And I'm not going to have it any more. I really appreciate your time. Thank you very much. Due to anticipated impacts to jurisdictional streams considered “waters of the US,” a US Army Corps of Engineers 404 Regional General Permit and IDEM 401 Water Quality Certification would be required for the proposed projects. Impact amounts would be determined at the time of preliminary design, and mitigation may be required for these anticipated impacts. Roadway drainage will be collected in the curb and gutter system and will outfall into existing or proposed stormwater facilities. Drainage will be designed in compliance with local and state ordinances and the current INDOT design manual. Stormwater 20-A 20-B 22. 21. Verbal Comment 12/11/2014 Sarah Ryterband nd 820 West 2 Street Verbal Comment 12/11/2014 Mary Ellen George 601 W. Gordon Pike Page 13 of 60 I'm Sarah Ryterband. I sit on the Citizens Advisory Committee for the MPO, I'm also, in the City of Bloomington I sit the Traffic Commission. So I bring two different perspectives to this. First of all, I encourage all of you to come join us on the Citizens Advisory Commission for the MPO where you can weigh in on these issues. (bell ringing) And what is in and not in on long range transportation plan. Unfortunately, this was planned 20 years ago and like too many projects it simply gets pushed along but we can make a difference. So I encourage you to. As I My name is Mary Ellen George and the reason I'm against this proposition is the safety for the students. (21-A) I'm been an educator for over 30 years and there are 500 students at Bachelor, 500 students at Jackson Creek. That's over 1000 students , many, many buses. If you look at just the statistics we have a thousand kids, you have trucks, you have cars coming from an interstate. It's not if an accident is going to happen, it's a matter of when is when an accident is going to happen. (21-B) As you have said, you knew this was in the project since the 1960s. I've lived in a house for 30 years, no one told me that I69 was coming. I understand perhaps a need for an east/west corridor - why Gordon Pike? Tapp Road exists, it will not cost as much, it has less impact on people and soon if you must have the east/west corridor you use Tapp Road. Highway Commissioner Lynn said in the paper that you have listened to the people. You have and I thank you for that. Listen to us now - we say no to the Fullerton Pike Corridor, yes to Tapp Road. (21-C) Also please take into consideration, many of you have said this is going to be a good thing for the economy, a good thing for Bloomington, why let me add some sarcasm please – if any of you would like to buy my house, I'll sell it to you. Thank you. routes, to get their students, extra time to get their students from the west side of 37 because there's no route from Rockport Road to Bachelor. In 1972 that was an objective of having a connection there to 37 at that time. Not 69. 69 was planned at the very exact same route from the time it was planned in the late 1950s. I actually sat out there in 1975 with the state geologist, my boss, and he pointed off of Tramway Road and said this is the exactly where the road's going to go. And that's exactly where the road has been planned and exactly the impact that it was going to have on Monroe County was conjectured from that time on. It's not new. So school buses, Bachelor, fire house, impacts, there's some impacts that I see or suggestions - there needs to be some mitigation done in the spring to each bridge crossing. (20-A) I do river watch, I wade the streams, I look at the under the bridges and things like that. I've got a little farm, you know, part of that should not be plantings at the intersections that gets in the line of sight. You know, I have to put up with. My one other suggestion I had made, oh talk about the drainage and I would hope that all the drainage coming off of the road way will be going to the sewage treatment plant and not directly in the local streams. (20-B) So thank you very much. See response 8-F. See response 10-B. See response 6-A. The lanes are sixteen feet wide in order to allow emergency vehicles room to pass yielding vehicles. The lane width is in accordance with the INDOT Design Manual. The posted speed limit on the 21-A 21-B 21-C 22-A 22-B quality improvement BMPs were rd CAC discussed during the 3 meeting, and will be evaluated when final design is conducted. 23. Verbal Comment 12/11/2014 Tracee Lutes No address given Page 14 of 60 I wasn't sure if I was going to say anything or not until I got here tonight and heard some of Liz, and was taking some notes. I've been very involved with the Chamber and support. A lot of the activities that are good for business and I know in the past that we've always, we always look for good ways and I think everybody in here has to say that there's been times that you've wished for better ways to get from the west side to the east side. I don't think anybody can deny that. I don't think the Chamber really looked at this, and I may be wrong. But I don't think any of us look at this as an opportunity for development of commercial because there is no place to put the commercial. It's more of a way to get traffic from 37, which will be the future 69, over to the east side. There's definitely a need for that. Now I think it's unfortunate that at the time all this happened we didn't have a Tapp Road interchange so the Fullerton Pike interchange is there and it kind of was out this road would be a stub to nothing, or Rockport Road or whatever. And we can looked at this plan, first of all I opposed the original proposal but I'm equally appalled by 16 foot travel lane. I encourage all of you to think about a 16 foot travel lane. (22-A) Now our average roadway has about a ten foot travel lane. When you raise it to 16 foot you encourage much, much faster traffic. You can see that reflected in the turning radii at all of those entryways. It's meant for high speed traffic. So although this roadway may be designated as 35 miles per hour, we would hope because it's neighborhood traffic. (22-B) I would guess, just off the top of my head in looking at something like West Third Street, that you're going to have people traveling at 55 to 60 per hour through your neighborhoods. And that's a reflection purely of a 16 foot travel lane – what are people thinking – verses these neighborhood. As already pointed out, the only commercial area is at Walnut. That is not, despite what the Chamber wants us to believe, is not a commercial area. So why do we need people traveling at 60 miles per hour and then we're talking about students at two middle schools. I'm appalled and I don't live there and I'm appalled. So that's some, one piece of it. When I read there's going to be minor impacts on all six streams I have to laugh because when I think of an extra four times the amount of roadway that you have now is going to have when you have a major water event. Some of the major rain events we've had, think of what it's going to do to those streams. Just consider that for a moment. Of course you'll have proper drainage. The other piece that kind of makes me laugh is when I read that there is going to be appropriate erosion and sediment control practices. We've been promised that before. All we have to do is look at what happened with I69 and what's happened to our friends. I would hope that this is true and that indeed we're going to see the appropriate practices but we have not seen IDEM and its Rule #5 actually do anything for us so far. (22-C) I'm hoping that once again you will reconsider this project and scale it back even further because what we're looking at is a way of turning this in to a four or five lane highway. It's very clear from the dimensions that we're being given and that's just not concrete once again. Thank you. Erosion and sediment control will be included in design plans, and an IDEM Rule 5 Notice of Intent will be required in accordance with state regulations. See response 10-B. See response 8-F. 22-C 23-A 23-B roadway will be 35 mph and the design speed is 40 mph. Page 15 of 60 already see people coming off Rockport. There's a ton of traffic on that intersection now getting across Fullerton and cutting all over with the construction happening it's kind of a dangerous intersection there today. That will change when this is done. But I think now that we have Tapp Road maybe it would be prudent to consider, not to longer traffic feeds, but also preventing large trucks and truck traffic from traveling on this route. (23-A) Maybe we push them up to Tapp Road because I think that you're going to see them go that way anyway. I think it will be much more convenient for trucks because I've given this a lot of thought. I think that's the way they're going to go anyway because that that road is easy, it's better, it dumps it right out on Winslow, they can go north on Walnut. It's just an easier way for trucks to get there. And so I think that's been a good, a good development with the 69 project. Now I want to also ask that you consider the fact that where we drive past there every day and watch our kids try to get to school, unlike many neighborhoods that have a road next to them, this… Unlike other schools that have a road next to them, this school has two neighborhoods and then a sort of urban area off Rogers where kids have to walk to school and cross this road to get to the school. They have no choice. They have to walk. So I want to make sure that you're thinking about a good safe way to get those kids across the road. (23-B) We're already seeing slip/slide and I've seen them slide all the way out in the street in the icy weather even from the Highlands and walking that way. So I'll hope you'll consider that. I hope you'll consider the fact that there's a lot of cross country track meets held not just for Bachelor but other schools have them there in that field. So there are many times that we as neighbors drive along there and see cars parked all the way down Gordon Pike watching kids run their cross country meets there. And I also would encourage you to consider sidewalks on Rogers Street when you're doing this project because you're gonna get a lot of people hit that intersection and head north on Rogers or south on Rogers. There are no sidewalks now and you'll see kids walking through the grass and trying to get across Rogers today. It's not always the safest so I think it's gonna be getting even more dangerous. At the very least please consider sidewalks along there for our kids that have to have to walk to school. Otherwise I do think you'll have some accidents and I don't think that, that it will be very safe walking. And so those of you who live along that corridor know, my family has been involved in development along there and we're very active in Eagle View and we were very active with seeing the platting through of the Highlands and Bachelor Heights. We didn't finish that project but we were active. In all of our time there we always knew that Gordon Pike would probably eventually go over that creek and connect to 37. Maybe I'm too young, nothing was ever brought up that it was going to be 69. As a matter of fact I recall, it may have been an option for 69 as Mr. Dillon mentioned. You all remember the debates on where 69 was going to go. So it was not for certain that it was going to be there. There were a lot of controversy about that. So it's there, we've got it but I don't think it was intended to 25. 24. Verbal Comment 12/11/2014 Scott Wells No address given Verbal Comment 12/11/2014 Steve Burns 4017 S. Crane Ct. Page 16 of 60 Thank you, my name is Scott Wells. You know, people who are supporting this highway, I call it a big highway now because it's kind of like morphed like it's on anabolic steroids. When it first started I remember having my connect list I can definitely see this being a four lane all the way to at least Walnut Street because that median there is probably going to be eventually taken out as the traffic increases turning it into a four lane road there. For those people who say this is great, I'm glad we have this, just imagine this is your property, your front yard there and now how would you think if this happened to your property. That's all I'm asking. Just think about if the shoe's on the other foot. The other thing is, you know, I'm on the Monroe County Plan Commission by the way, and you know I like to make good decisions based on facts. We have some projects right now that relates to the neighborhood. We have a fairly big project that is just not that far north of where Sare Road T's in with Rhorer Road. And you've got a nice tree lined I wasn't going to say anything but the comment that "things change" view. Well, things do change. The world is different than in 1960 or '70 when they envisioned the road. One of the things that changed that hasn't come up that I want to mention is we have all these walking trails and if you look, it's not just the kids who have to cross the street. Some of these trails that are getting a lot of traffic are going to be crossing these new interchanges. Well, not interchanges, I'm sorry. New road. So at grade level. There will be a lot of people, a lot of bikes, people out jogging with kids that will be going across these 16 foot roads. One is actually just past the circle in front of Jackson Creek there's a crossing. One is down at Clear Creek and those are at-grade crossings. I think ultimately things are going to have to be done to build bridges. (24-A) The costs are not realistic because they're gonna have to be cuts, there's gonna have to be a lot of other changes because things change. So I will wrap it up in a minute but I think the cost estimates are low ball considerably. (24-B) I think the cost of maintaining 16 foot roads, salting them, maintaining median strips which somebody said we can always have gardens in them. Well, who's doing that? So I think this is a project that wants to exist because people want projects. But I think the need are not well expressed, especially now that there's a second interchange. be such a highly trafficked road. We actually all envisioned it would be very much like Gordon is today and would just continue out to 37. And didn't really expect it to be this huge wide road. Nobody ever pictured that when we were doing those projects. And I think for your realtors, if you know anybody looking out there and they're looking in that area, make sure they ask their realtor to find out because a lot of them don't know. It's not out there where it's easy to find. So there's been a lot of them don't know. We're trying to get the word out and educate that community but a lot of them are younger and haven't doing it long and they're just not aware. Thank you. See response 6-B. The costs discussed in the Environmental Assessment (Page 20) do not include maintenance. The costs reflect design, right-of-way acquisition, and construction. See the “Roadway Character” section of the Environmental Assessment (Page 15) for the average daily traffic for 2010 and 2030. 24-A 24-B 25-A 27. 26. Sandy Kouns 4001 S. Falcon Verbal Comment 12/11/2014 Jennifer Miers 3212 S. Rogers St. Page 17 of 60 Hi, I'm Sandy Kouns, I live at that corner of Gordon and Falcon. And I'm a teacher at Bloomington South High School and I have two sons. My oldest goes to a I'm Jennifer Miers. I live at 3212 South Rogers Street, so my property isn't directly affected by this project but I think I will be affected. I'm against the project for many reasons people have already recited. But one thing I want to point out, it doesn't make any sense to talk about this without the larger context of I69. So we need to acknowledge what other people are doing with that other project. And as it stands right now this has been a big discussion about how the plans affect this neighborhood and it's unfortunate that the discussion hasn't been larger because as I69 stands right now not only are the people in this neighborhood or the people in Bloomington or the county affected by traffic patterns and that kind of thing but we're going to be buying two interstate interchanges in less than a mile. And to accomplish that second one at Fullerton and Gordon we're going to have to tear up more than seven miles of nature. We're paying for two interchanges in less than a mile and we're tearing up and creating a new road which is an additional cost. (26-A) And frankly this infuriates me that you would use my tax money this way. Thank you. proposed round about or maybe a stop there in the report. The question is what's the number of added daily trips. I see nothing in this report and if you want to calculate stuff, I know I69 I remember when Section 4 was going through and did have some erosion control problems with which we still have some of those. I can verify with people sitting in the audience that can tell you about that. And you're going across six different cuts of stream I hope finally we're going to do something right if the job's done right so water is protected. I got off track but what I'm trying to do, on the traffic, when you design the I69, if I recall, it's going to be an increase of 24,000 trips of more vehicles going north and south, of which one-third or 8,000 trips are trucks. If you've got those numbers figured out why don't you have numbers objective when it's going to go east all the way to Sare Road. I would like to see numbers so I can make good decision on we're going to plan for the ten years our roads. (25-A) I mean, it's all about traffic, right? We want to move traffic. We wouldn't be in the problem right now if we had planned this road way back and the road was already connected then people wouldn't come in and develop the property and stuff. But the road is already there now. You've got further set backs from the property. So all I'm asking is, if you're going to do this presentation, next time I would like to know, I'm sure that number's somewhere, on average daily trips for the next five years down the road, ten years down the road because I69, I call it a highway until it's actually connects to the 69 highway. I don't want to, you know, we need to know what traffic trip counts so when the Plan Commission members start approving these developments we know pretty much how much more traffic is going to be there. Thank you. 27-A 26-A See response 10-B. See response 9-A. 29. 28. Ameer Beitvashahi 521 W. Gordon Pike Verbal Comment 12/11/2014 Harriet Kulis 1430 W. Estate Dr. Verbal Comment 12/11/2014 Dr. Page 18 of 60 My name is Ameer Beitvashahi and I live on Gordon Pike. I have a very brief comment. I heard several mentions of Tapp Road. Two years ago we had a public hearing somewhere on this when the lane was four lanes and everyone conveniently glossed over why Gordon Pike was the better alternative than Tapp Road. I've never seen any numbers, just the, someone quickly bumbling the affects I am a member of the Eagleview subdivision and have been a long time opponent of this particular roadway. I have no idea why it needs to be 90 feet in width. (28-A) I have no idea why the Better Business Bureau or Chamber of Commerce cares because there are exactly eight or nine businesses at the corner of Walnut and Gordon Pike. So what businesses are they representing? Are they financial businesses or are they development businesses? Is it a business that is going to be used to take that area that is now pristine land and have multifamily dwellings on it. What are they proposing to … Why are "they" the only, some of the very few people who are in favor of this. And yet the residents, the people who use that area, who travel in that area, and who walk in that area because it was a suburban rural area are totally opposed to it. It does not mean that we want to go back to the Dark Ages. It's not mean that we're not involved in connectivity. But this is not the place for it. There is an adequate and above us, Tapp Road, that would be a far superior area and would allow for the traffic to go in. (28-B) I can't imagine a truck coming in off of our area, getting onto all of the north/south arterial lanes are one way in each direction, making those corners and then winding their way down little roads at 30 miles an hour with no curve, no lights, no sidewalks to go to IU or any other business located in downtown Bloomington. (28-C) So this is taxpayer money that is being wasted. We do not need two exits within a mile. I lived in Chicago, I can tell you far far better areas have greater distances than the amount of population than what's represented by our little community. This is a boondoggle. It is some way just to spend the money because it's available. They should take the money and use it to improve the roads that are already there. Thank you very much. university in West Lafayette and my youngest son is at South. Anyway, I have major concerns on the traffic and the type of traffic it will have, (27-A) the speeds. (27-B) I would hope that we keep it very safe for the children. I really felt compelled to speak tonight because in 2009 my son the one that lives in West Lafeyette was walking to Bachelor and he was hit by a car. He's not like a darter. If it were my younger child I would question it. But this is my safe guy. And if there was a problem then in December of 2009 then once all this goes in I have immense concerns about the children getting to Bachelor. And I am sure that Jackson Creek area people would have the same kind of concerns. (27-C) So I just felt compelled kind of for the sake of my son, to come down and take action. Kids already have problems. And I just wanted to put that on record and kind of put that out there. Thank you very much. 29-A See response 6-A. See response 10-B. See response 6-A. 28-B 28-C See response 22-A See response 8-F. 27-C 28-A The posted speed limit will be 35 mph. This is the same as the posted speed limit on the existing roadways. 27-B 32. 31. 30. Sarah Klaiber No address Verbal Comment 12/11/2014 Sandra Takarsky No address given Verbal Comment 12/11/2014 Mike Kramme 3850 S. Walnut Street Pike Verbal Comment 12/11/2014 Page 19 of 60 Monroe County residents need the Fullerton Pike extension. The usefulness of this project outweighs the desires of the homeowners who did not check the county I'm SandraTakarsky. I've lived in Monroe County since 1975. I'm not directly affected by this project. My heart goes out to those of you who are dealing with this and my praise to all of you who are working so hard on it. One of the points in the presentation was about the karst. I live on land impacted by I69. The water pollution continues every time it rains. Rule 5 which is supposed to make sure that sediment from construction sites does not leave construction, water is not supposed to leave construction site. But in Indian Creek Township it's going off the construction site into the karst system and has contaminated springs and wells. (22-C) Unfortunately, in the state of Indiana the highway construction lobby has a stranglehold. I urge you to speak up clearly, precisely and firmly to all your elected officials. Hi, I'm Mike Kramme. I live on South Walnut Street Pike. Everybody I've heard here has spoken on the west side of Old 37. I certainly can understand that. In fact it's basically a dead end ever since I've moved here from Washington, D.C. in 1989. But I live on the other side and I live just a block off of Rhorer Road and South Walnut Street Pike on the north side. Many times in the evening or morning I just sit in my driveway trying to get out because of all the congestion there of people trying to cut through either going to the east side or trying to cut down Henderson and down to IU and that area. It's a real choke point from kind of a rural perspective. Like I said, I come from an area where this town has no traffic compared to what I'm used to. But because it is rural and the roads are smaller we do get these choke points. You know, we do need an east/west connector. The improvements to Tapp Road have been good. I work on Second Street on the west side by Liberty Drive and you know, what used to take me about eight to ten minutes to get home from that area will now take me about 35 minutes, especially if I leave at 5:00 o'clock in the afternoon. So we're getting a lot of improvements, we're getting the highway through here. We need to consider these type of improvements but I think there's been lots of good comments here about the construction of the road and things that can be done even though you may have the road through Gordon Pike there and you property there will be ways to, you know, secure the shoulders and the animals and things that are going on in there. I think there can be mitigations done for that. I think you guys are thinking about that too. So I appreciate that. Thank you. plus revenue. Well, I'd love to know how many residents and I'd love to know how much, you know, how much more we're talking on Tapp Road because, you know, I'm not a super road designer but I can drive from 37 all the way across Tapp Road and count way less houses than I do when I cross Gordon Lane. (29-A) Some facts to back it up would help maybe in the next presentation. Thanks. 32-A 31-A Level of Service (LOS) is a measurement of a roadway’s See response 22-C. 35. 34. 33. Page 20 of 60 I do not live on Gordon Pike, Rhorer Rd. or Sare Rd., though I do live on the south side of town and frequently drive on these roads and Tapp Rd, and walk on the Clear Creek Trail. It is clear to me that building the Fullerton Pike-Gordon Pike connector will ruin the neighborhood for those people owning houses along Gordon Pike. (35-B) It will make walking to Batchelor Middle School more dangerous. Furthermore, it will send more traffic past Jackson Creek Middle School (35-C) and bring added traffic and noise (35-D) to another residential neighborhood—that on the south end of Sare Rd. When the curving south end of Sare Rd. was built, was it Build the road. If someone bought a house and didn't research the area, it doesn't mean their rights are suddenly more important. This connector road should not be built. It is not needed. Tapp Rd. has been functioning as a major east-west corridor for years. There are less residences along Tapp Rd. and more businesses and they are all used to having a busy road passing by. There is much more land available on Tapp Rd. for widening the road if necessary. Tapp Rd./Country Club/Winslow/Rogers Rds. still connect to the north end of Sare Rd. and therefore to the bypass. Furthermore, Rogers Rd. connects to Smith Rd., making it possible for cars heading east to Lake Monroe or Brown County to avoid the busy College Mall area. (35-A) Email Comment 12/12/2014 Christine Linnemeier No address given Email Comment 12/12/2014 As a resident of Woodhaven Estates, I say build the road. We have always had to drive through neighborhoods to get to Batchelor Middle School. We used to cut through the Eagle View neighborhood. Now we cut through the Highlands. People speed and nearly get hit due to traveling on unfamiliar roads. Is that really safer? Also, this project needs to happen, so cars will stop going through the Highlands. It was never designed to be a road. B) A roundabout should be put in at Fullerton and Rockport. It would deal with some of the alignment issues with the two roads. (33-A) A sky bridge could be put in for the kids, similar to what is on bypass north of town. There is a school there, as well. (33- planning maps prior to building or buying their homes. The road should be a fourlane, not a two-lane. The existing section is already two lanes and is inadequate for traffic right now. Project to when I69 is complete. It will be a mess. Make it a fourlane, and stop bending to the wishes of a few to the detriment of thousands and thousands of people who will use those four lanes every single day. (32-A) Marci Creps Woodhaven Estates subdivision Email Comment 12/12/2014 Lisa Williams No address given Email Comment 12/11/2014 given See response 8-C. Compared to an at-grade crossing, the bridge over Clear Creek Trail is intended to make the trail safer for users by reducing contact between trail users and motorists, and allowing continuous pedestrian movement under the bridge. Coordination with the local parks department regarding trail resources 35-E See response 8-F. 35-C 35-D See response 8-A. 35-B 33-B See response 6-A. See response 8-F. 33-A 35-A capacity to accommodate traffic. According to the INDOT Design Manual, the minimum LOS requirement for an urban arterial such as Fullerton Pike is LOS D. The traffic analysis conducted for the project determined that the entire corridor would achieve a LOS D or better and is therefore adequate to meet INDOT requirements. See response 11-A. 38. 37. 36. Kate Arthur th 400 E. 7 St. Email Comment 12/12/2014 Nathan Schroder No address given Email Comment 12/12/2014 Bruce Farrand 750 E. Kirkwood Ave. Page 21 of 60 Glad to hear this went from 4 to 2 lanes, but really this should either not happen at all, or not be an I-69 interchange. I live in one of these neighborhoods and have children who will be walking to Batchelor. (38-A) There is nothing down there that Do not downgrade this project any further. It should never have been downgraded from 4 lanes in the first place. (37-A) Plan for the future growth, don’t deny that will happen. Do not kick the can down the road like was done with the bypass. As a resident who lives southwest of Bloomington, I feel the pain of the residents alongside the Fullerton Pike project. I now have a front row view of I69 out of my front door. I knew when I purchased my home that I69 was someday likely coming through. I also know, now that it is here, the need for a true West to East corridor for the southern side of the city is even more necessary. And I say West to East, not West to Walnut. The combination of a major interstate and a major university will only make our city more attractive to new businesses and residents, further expanding the need for this project. I was not able to go to the meeting last night and have a question. I live at 320 East Rhorer Rd. (the southeast corner of Rhorer and Walnut Street Pike). I understand you are widening Rhorer. How much of my yard will I be losing? Or how wide is Rhorer going to be widened on the south side of the road just east of Walnut Street Pike? (36-A) Building this road is a bad idea. Don't do it. Just because something has been talked about for the past 50 years, does not mean it should be done. Times change. Fifty years ago there were no housing developments or schools in this area. It was rural. South Sare Rd. did not exist. I-69 was not planned. Clear Creek Trail did not exist. Another negative effect of the Fullerton Pike-Gordon Pike connector road would be disturbing one of the longer, more peaceful sections of the Clear Creek Trail. I have walked on the Rail Trail underneath SR 37. It is very noisy and frightens my dog. I do not walk that part of the trail anymore because of that. Please, don't ruin another walking trail with an overpass. (35-E) really intended to be part of a beltway? I don't think so. See response 8-F. See response 8-C. 38-B See response 32-A. Only preliminary roadway design has been completed for the proposed project at this time, so right-of-way numbers are not finalized. For more information on the right-of-way purchase process, see http://www.fhwa.dot.gov/real_estate/. This is a standardized INDOT/FHWA process over which the County has no influence. 38-A 37-A 36-A has been ongoing and will continue throughout the project development and design process. 40. 39. James Kulis No address given Email Comment 12/12/2014 Stephen Schuster 2415 Rhorer Rd. Email Comment 12/12/2014 Page 22 of 60 Bill Williams and friends keep saying they want to listen to people and give the people want they want. I will repeat again what the people are saying: “We don’t want this road.” Regarding curbs - I believe the drainage issues will add a lot of expense to the project. Furthermore they will be a maintenance problem. Just look at the gutters along Sare Road; they are full of sand, grass and debris. Who will clean them? The County won't and it will be impossible for the residents to stand in a busy road and clean them. They will create huge drainage issues and you will need to build retention ponds as all of this water cannot flow directly into Jackson Creek. (39-E) One last thought the bridges over Jackson Creek were just recently rebuilt so they should be to current standards. (39-F) However east of Walnut Pike to Sare Road I feel the project should take on a more rural and residential mindset. For example I can see no need for a median or curb on this portion of the project and the large roadway will reduce the front yards of many homes. The median is impractical both aesthetically and functionally as this is an existing area that has numerous driveway cuts. (39-A) How would people get out of their driveways? You can't expect people to go in the wrong direction and then do a U turn can you? (39-B) This boulevard approach works on the Sare Road extension because it was a new development and there are no driveways directly to Sare Road, only a few streets. Additionally because of the older and more rural feel of this area I believe a grass median or third turn lane (except where needed - like at Jaimie Lane) would look out of place. Also remember people have to walk across the road daily to retrieve their mail. (39-C) A wider faster road (39-D) would make this difficult. Thank you for your presentation last night. The proposed project from SR37/I69 to Walnut Pike seems fairly appropriate to me; as this is the connection from the interchange to commercial areas. Additionally this had been in the plan for at least 30 years so Batchelor Middle School etc were located in anticipation of this. anyone needs to get to, it would just clog up S Walnut/Old 37, be a nightmare for going grocery shopping at the Kroger… it’s already so busy there with people coming N and S on Walnut and folks going to and from Rhorer or S Walnut Pike, completely unsafe, noise (38-B) for no reason in a residential neighborhood/school zone, etc… The thought itself of an E/W corridor is appealing, but as somebody living over here it seems quite dreadful, and with the trails… It makes way more sense to make this on Tapp Rd., (38-C) where most everything is industrial anyway. I am not a fan. If you want to connect Fullerton/Gordon fine, but definitely no interchange, (38-D) and definitely not a 4 lane, and definitely lower the speed limit through there. (38-E) See response 27-B. The storm sewer will be designed to meet serviceability criteria out-letting water at allowable velocities. 39-D 39-E Existing bridge conditions will be evaluated as design continues. See response 8-E. 39-C 39-F It has not yet been determined where the breaks in the median are to occur. This will be determined on a case by case basis at a later date. The median will allow a refuge for pedestrians crossing the road. 39-B See response 27-B. 38-E The median will be designed in accordance with the INDOT Design Manual. See response 9-A. 38-D 39-A See response 6-A. 38-C 42. 41. Email Comment 12/12/2014 Michael Kramme 1983 S. Liberty Dr. Email Comment 12/12/2014 Email Comment 12/12/2014 Reed Adams 1310 W. Feathercrest Ct. Page 23 of 60 As I try to commute to work there are three choices now, north to Winslow then onto Country Club and Tapp road, south to Rhorer Road then Gordon Pike to Rogers to That Road and 37 North, or go through town to Grimes Lane, Patterson and then second street. What used to take me 10-12 minutes to go <6 miles to work now First and foremost is the need for an east/west connector on the Southside of Bloomington. The Tapp road improvements had helped quite a bit for commuting and transiting west to east and vice versa before access to That Road was closed. Now it's congested worst than it ever has been during peak driving time. It also is only a two lane road through Country Club and Winslow to the Rogers Street circle. Major and costly improvements would need to be made to make it a viable alternative to the Fullerton Pike project as some vied for. This project would connect completely through to the east side of town making it a true Southside connector east/west. I'm writing comments in favor of the Fullerton Pike project as a resident along the Eastside of the corridor. The open house hearing held December 11 at the Monroe Courthouse had quite a few residents from the Westside of the project (west of Business 37) speaking against this project. Their overwhelming concern was safety, access, speed, and lifestyle changes as a result of their current dead-end residential street (including several side-street cul-de-sacs) being changed to a thoroughfare connector from a major new highway. High speed truck traffic was the top concern, as well as the increased traffic volume. I would like to speak to these issues as well as my perspective as a resident on S. Walnut Street Pike and the commute I must make to work to the Westside of Highway 37, off Second street and onto S. Liberty Drive. I have lived in the area since 1992 and have long awaited this access. I am writing this message to express my support for the project. I think it is very important to the south side of Bloomington to open up this access from the I-69 interchange and provide a good quality east/west connector through the area. The changes to That Road diminish it as a heavily used path to between SR-37 and Rogers Street. I realize that the project will have a greater impact (with some aspects negative) on those that live directly on Fullerton Pike/Gordon Pike and Rhorer Road, but I think it will ultimately benefit all the residents of the area to have efficient access to other parts of the community and access to I-69. I live in the Eagle View neighborhood adjacent to the planned Fullerton Pike project. I was unable to attend the Public Review on 12/11/14 but was able to download and review the Environmental Assessment Des. no. 0801059. The project team will continue to engage the public throughout the design process. The County will comply with the Uniform Act, which ensures that property owners are fairly compensated for impacts to their property. For more information on the Uniform Act, see http://www.fhwa.dot.gov/real_estate/. 42-A 42-B 43. Email Comment Jeff Whitmer No address given Page 24 of 60 I have no patience for this "Not In My Backyard" mentality and some of the opinions quoted in the local newspaper on Friday, December 12 are just plain wrong. I am writing now to voice my strongest possible objection to the small number of people who are holding our county hostage. Finally I'd like to touch on the construction process. There are mostly residential properties along this corridor and being able to ensure right-of-way property isn't damaged and is returned in good shape after the project is complete is very important. I would hope the crews are sensitive to the property owners concerns and do all they can to mitigate the heavy equipment and materials interference during construction. (42-B) Thank you for this opportunity to voice my opinion on your project, good luck. It will cost more money to responsively satisfy the environmentalists and the Gordon Pike/Eagle View section of this project, but collaboratively solving the issues and the funding requirements is what this town is all about. Engage the people, have them help you solve the issues and the project will benefit from the interaction. (42-A) Now, for the few that live along the Westside corridor and have concerns for safety, access, speed, lifestyle or that have environmental concerns, I believe the Fullerton Pike Project Office should engage with them and mitigate their issues as much as possible. This is an impactful change for them and I'm sure the design changes you've made so far go a long way towards addressing their issues. Ensuing the adult, children's and pets safety is number one, access onto and off of the new roadway is second and speed it probably third. Being environmentally responsibility is one of the areas that this city takes pride in, so not taking this lightly is very important; especially after the issues Section 4 of I-69 have experienced. The Fullerton Pike project would alleviate the stress on the Southside by adding another throughput for traffic, so traffic from the south would have Old 37 access, traffic from the west would have Fullerton Pike and traffic from the north would have Tapp Road primarily. The leveling of traffic flow would allow for safer conditions, the multiple access would lessen wear & tear on the roadways, less congestion would ease frustration and lower speeding, and a shorter compute with access from the Westside to Sare Road would improve lifestyle conditions for most of the people. takes me closer to 20 minutes. The reason is urban sprawl; the city has approved all the new construction over the last several years and the accompanying traffic has increase dramatically. The Sare Road connector has greatly increased the traffic on the Southside too. All of the buildup has led to safety, access, speed and lifestyle changes for every resident on the Southwest side of Bloomington. This project would give me a straight shot to the highway so I would be a contributing factor to traffic flow north of the Fullerton Pike corridor. 43-A See response 32-A. 45. 44. Email Comment 12/18/2014 Email Comment 12/15/2014 Matt Mullins No address given Bruce Farrand 320 E. Rhorer Rd. 12/13/2014 Page 25 of 60 2) Are there any possibilities of implementing more roundabouts along this route? I believe there would be room (and definitely the need) at the intersection with Rogers and Walnut St Pike. Roundabouts are just so much more efficient than the 4 way stops currently in place. There may not be much room at Walnut St Pike, but wouldn't that necessitate a smaller roundabout and slower speeds? Perhaps another roundabout at the entrance of Batchelor would also be suitable for traffic management as well as speed control to help the drivers stay focused and help the 1) I live in Eagleview, and have 1 child currently walking to Batchelor (crossing Gordon to get there) and 2 more who will be going in the next several years. Are there any considerations for an under- or overpass? What traffic-control measures might also work to control speed in that area? I don't have overwhelming concerns about safety, but believe this would be very useful. (45-A and 45-B) Questions: I would like to thank Mr Williams and the rest of the decision-making committee for scaling back the project to plan 1A, the 2-lane road with occasional turn lanes. I think this seems like the 'right size' road for the area and the neighborhoods along the way. Hello, I was at the most recent public meeting you held at the Courthouse, and wanted to thank you, as well as submit a few questions I was just notified that Monroe County is considering buying my property because of the Fullerton Pike project. Can you tell me when I can expect to hear if they are or if they are not. I’m at 320 East Rhorer Rd. (44-A) Thank you for your time. These people just do not want change. Too bad. I am very disappointed that the Highway Department and the others involved have kowtowed to this small group that yelled the loudest. We had a real chance for the first effective eastwest passage across the southside of Bloomington, and now it will just be another halfbaked traffic jam because the traffic will be there, whether the road is designed to handle it or not. (43-A) Of course, roads with traffic, even lots of traffic, go through strictly residential areas. Drive around Bloomington. Drive around Columbus, Indiana or nearly every medium-sized community in the Midwest region. They all have arterial streets going through neighborhoods where there are schools. There is nothing special, unique, or even "important" about the "Batchelor" neighborhood. See response 8-F. See response 27-B. See response 11-A. Phased construction will be utilized in order to begin construction as soon as funding is available. 45-B 45-C 45-D After the environmental process is complete, the right-of-way acquisition will begin. 45-A 44-A 46. Email Comment 12/19/2014 Greg Alexander 1015 N. Madison St. Page 26 of 60 The only way the road could be good at all is if it had a 25mph design speed. That would mean 10 foot travel lanes, 10 foot curb radii at intersections, frequent stops/crossings/driveways, you know, like an urban road. By being an oversized road with a divider, it will encourage a limited access mentality. As a result, connecting residential development will be of the suburban form, vast networks of cul de sacs with only one connection to the rest of the world. That design discourages biking and violates the county MPO's complete streets requirement. It will be inaccessible by bike. You cannot put a bike lane on a highway! You have to design the road for bikes. When you put a bike path beside a road with large turning radiuses, every intersection becomes a body count. You will literally kill cyclists with this design. AND YOU KNOW IT -- LOOK AT BEST PRACTICES FOR BIKE DESIGN, THERE IS NO SHORTAGE OF ENGINEERING DESIGN GUIDES ABOUT BIKES. (46-B) Earn your pay! (46-A) Once it meets Sare Rd, it will effectively form a beltway around Bloomington. That would be a catastrophe, substantially changing the nature of Bloomington's development patterns. If it attracts development, it will be shitty development, AS YOU WELL KNOW. Look at the development along roadways of a similar design elsewhere in the nation! And that's the best case -- it's also likely to just be an overbuilt road with no development on it, a high speed corridor filled with people in cars who don't want to be where they are. It will actively destroy the sense of place. I cannot say "No", I must say: HELL NO. Regarding the plan to make a boulevard or suburban highway out of Fullerton Pike: Overall, I am very much in favor of this road, as it will improve access to the highway, and smooth out the rest of the road, making it more convenient for most living along that route. I also think that upon completion, most people near the road (not those directly on the road, unfortunately) will see a modest property value rise with the ideal location near a direct feeder to I-69. 4) Have any attempts been made to accelerate the construction? Beginning in 2016 seems very far in the future. I would like to minimize the time as much as possible so that everyone can begin using the road and getting used to the new normal. (45-D) 3) Also, the property on the NE corner of Rhorer/Walnut St Pike is currently for sale. Has any thought been given to acquiring that property and using it for a roundabout, minimizing the effect on the other 3 corners? I think that would be a perfect plan. children cross safely. (45-C) 46-B 46-A Safety of bicyclists as well as motorists is factored into design of bike paths and roadways. Proper facility use by both parties determines how safe the facility is. The development patterns of the area are not anticipated to change significantly because the current built-out nature of the area. 48. 47. Email Comment 12/21/2014 Shawn Laszlo Clear Creek Estates subdivision Email Comment 12/20/2014 Rosalie White 3853 S. Cramer Cir. Page 27 of 60 1. Concerned that S. Clear View Drive to W. Hedgewood Drive to Estate Drive will be used as a cut through for traffic when there is a back up at the new traffic light at Fullerton and Rogers. People will inevitably figure this out and it will create excessive traffic through our W. Hedgewood Drive neighborhood (risking children, I share many of the same concerns expressed by my extended neighbors along the corridor being considered for construction (Fullerton Pike Project). In addition to the obvious concerns of sending increased traffic (truck and car) (48-A) off of an Interstate (69) through the middle of our neighborhood endangering children, (48-B) pets and other pedestrians, (48-C) there are two concerns I have specific to the Clear Creek Estates neighborhood: Finally, funding is still not totally in place for the proposed corridor, and I (along with many others) do NOT want my federal, state, and county tax dollars used for this project. (47-C) All travelers would be better served having our current bridges and roads fixed. This proposed corridor is not even really an east-west artery. It will become, in fact, a southern bypass moving people away from downtown businesses and IU. During our recent town hall public meeting, someone spoke admiringly of the 3rd street artery and how everyone is aided by it. I drive on this once a week when I have to-fast traffic makes it unfriendly and causes unease in negotiating turn-offs. Also, it is ugly; it is almost an embarrassment for out-of-towners to have to take this-especially as their first introduction to our city. It is common knowledge that we have distracted drivers. More so in the past few years than ever! Our proposed corridor will be one of those streets designed to facilitate traffic through suburbs, and we will see deaths of, and injuries to, our children and elderly. In the United States, every 2 hours a pedestrian dies in a traffic accident. More than half of pedestrian traffic deaths over the past decade occurred on “arterial roads” built through suburban sprawl. These factoids come from the “2014 Dangerous by Design” report by Smart Growth America. These cities’ poorly thought-out corridors were built only in the interest of moving cars, rather than built to keep pedestrians safe. More than 90% of people hit by cars traveling at 20 mph survive the crash. At 45 mph, only 35% live. These factoids show what WE will have if this corridor is built as proposed. (47-A and 47-B) I am writing to express my total hate of the proposal to complete the Fullerton Corridor. This “corridor” will immediately become an arterial road going by two middle schools and through suburbs. Only one intersection is business zoned. The county has a complete streets policy in place. Don't ignore it. See response 8-E. 48-C The traffic analysis has shown that all intersections will operate at an acceptable level of service, meaning significant backups are not anticipated. Traffic control for See response 8-F. 48-B 48-D See response 10-B. 48-A Funding for the first phase is programmed in the MPO’s Transportation Improvement Program (TIP), with the remaining funds described in the TIP but not yet programmed. Local matching funds will come from the Local Road & Street Account, Cumulative Bridge Fund, and the existing Fullerton Pike Economic Development Area Tax Increment Financing District (TIF). See Appendix G, Page G-3 to G-4 for relevant pages from the TIP. See response 27-B. 47-B 47-C See response 8-E. 47-A 51. 50. 49. Email Comment 12/26/2014 Mo Beit No address given Email Comment 12/25/2014 Email Comment 12/22/2014 Thomas Albright 711 W. Estate Dr. PO Box 3261 P.J. Smith 703 W. Baywood Dr. The most important reason is that there is a hospital located at Fullerton Pike and I69. What could be better than a hospital with emergency facilities right on the Interstate! Another good reason is that the Fullerton Pike interchange would complete the “beltway” around Bloomington. There is really nothing of the same importance at Tapp Road. None of the medical offices near Tapp Road at I69 are emergency facilities. Page 28 of 60 3. The people who are making these decision have a stake in this to make money. all are land owners and are making millions from tax payers. These people do not 2. You are putting our children and our schools in harm's way. This is residential neighbor hood. Kids are crossing and walking to school in this area. There is too much traffic already going by the schools. (51-B) (51-A) 1. Waste of tax payers money to pay for 2 interchanges. We already have Tapp Rd. - - - I live in Clear Creek Estates on Estate Drive which is the next intersection on Rogers Street south of Gordon Pike, so this discussion is directly relevant to me. I believe that the Fullerton Pike interchange at I69 is far more important to have than the Tapp Road interchange at I69. If the number of interchanges is limited to one, then it should be built at Fullerton Pike: (50-B) I received a flier at my residence asking for my opinion regarding two interchanges being built within a mile on I69 at Fullerton Pike and Tapp Road. (50-A) Yes we should have an interchange at fullerton pike. (49-A) The interchange and the improvements across to Sare rd. will be a long range benefit to the community. Ultimately, I would prefer an overpass at I69 and Fullerton, instead of the proposed off ramp. With Tapp Road only an additional mile north, it seems like a waste of money and will severely impact the area. (48-G) 2. Noise. The increase in traffic and truck traffic will create extra noise in the area (especially as they are preparing to stop at Rogers and Fullerton). How will this be addressed? (48-E) Examples: Signs to discourage and enforce no air braking, very reduced and enforced speed limit signs (20 mph school zone), (48-F) no trucks over a certain weight, sound barriers, etc. pets, etc.). Will this be addressed with speed bumps on Clear Creek Estate roads (e.g. W. Hedgewood Drive), a traffic diversion from Clear View, etc.? (48-D) See response 9-A. 48-G See response 8-F. See response 10-B. 51-B 51-C See response 9-A. See response 9-A. 50-B 51-A Please note that fliers were developed by an unknown private party and are in no way associated with the Fullerton Pike design team, Monroe County, INDOT, or the Federal Highway Administration. 50-A See response 9-A. See response 27-B. 48-F 49-A See response 8-C. 48-E neighborhood streets is beyond the scope of this project. 54. 53. 52. Email Comment 12/27/2014 John Chambers No address given Email Comment 12/26/2014 Email Comment 12/26/2014 Sarah Klaiber No address given No name given No address given Page 29 of 60 Logistics! There is NO WAY that extending Fullerton Pike could ease or speed up travel to the east side of Bloomington. There are way too many obstacles: Count them. Most existing streets and roads are 2 lane and narrow. Predominately residential. Two schools. S Roger street stop. Intersecting Trails. S 37 stop light. S Walnut St Pike stop. Rhorer Rd/ Sare Rd intersection. Medical district on Sare. I agree with Mary Ann Williams 12/26 Letter to the HT editor for her reasons and many more. The simplest reason is that it doesn't make sense. Who would it serve? People driving north? It provides no benefit in time or mileage over the present corridors. People driving south would use 46 bypass. People driving east have ½ dozen options now. People driving west have the same options . I would guess that few drivers exiting from I69 would select Fullerton pike to go to the east side of town! (54-A) Again, please build the Fullerton Pike extension as the originally-planned court-lane road. We 100% support the Fullerton Pike extension in Bloomington, IN. However, please make it a four-lane road instead of a two-lane road. A two-lane does nothing to facilitate traffic any better than the current road does. (53-A) People along the route will adapt, and any increase of traffic during “school hours” will be minimal. It’s not like more students, parents, and staff will be traveling to and from the schools because of a new road. A new road will not increase the number of busses that currently travel to those facilities. This is a nonsense complaint that is used as a “scare attempt” to discourage road development in Monroe County. First, I don't appreciate a flyer in my mailbox, which is unlawful. (52-A) Second, I support Fullerton Pike as an I 69 Interchange with improvements to the Corridor to Sare Road. (52-B) 6. Please put stop to this non sense before one of our children die crossing the street going to school. 5. Monroe county is known to kick small businesses out using the environment for excuse but then they are bringing trucks and semi in and around our schools and residential. (51-C) 4. Monroe county politicians are known for making these non sense decisions in our schools and our roads. They are in it for themselves and do not care about the working people. We will remember that when it is time to vote. live in the area and have no children. 54-A Please see the “Purpose and Need” section of the Environmental Assessment (Page 5 – Page 6). See response 32-A. See response 9-A. 52-B 53-A See response 50-A. 52-A 57. 56. 55. Email Comment 12/28/2014 Roger Innes 2401 E. Rhorer Rd. Email Comment 12/28/2014 Email Comment 12/27/2014 Janet and Jim Ault No address given Steve Keucher 4621 N. Shelburne Dr. Page 30 of 60 I served on the Citizen's Advisory Committee (CAC) for the Fullerton Pike Corridor Improvements project and attended two of the CAC meetings. In reading over the Draft Environmental Assessment (DEA) document dated October 13, 2014, I was pleased to see that the preferred alternative (1A) for this corridor is now a two lane road, rather than four lane road. As brought up by multiple members of the CAC, there were serious concerns about creating a large boulevard that would encourage high speed travel past numerous residences and two middle schools. Changing this route to two lanes with a median should discourage speeding. However, I am Please reconsider relocating the project from Fullerton Pike to Tapp Road and Country Club Road. The State of Indiana and Bloomington needs to carefully plan the building of such projects that have impacts on safety, pollution, and tax dollars. I do not see that happening with the current Fullerton Pike Project proposal. If you changed the boulevard location to Tapp Road and Country Club Road this would be less expensive, less soil and stream erosion, and less hazzardous to middle school students. The Fullerton Project is proposed to be built in a large flood plain, adding a huge construction expense, removing hills, and creating immense soil erosion in the streams that eventually run into Lake Monroe, Bloomington's water source. (56-C) The projected building of a boulevard that goes past two middle schools would create a hazzard and potentilal death of one or more middle school students.. The citizens were told that the boulevard would make it safer for pedestrians, however, many days and nights I see students run, walk, skateboard, bicycle across the road instead of using crosswalks, something middle school students commonly do. Crossing a boulevard in this manner would be extremely hazzardous. (56-B) The cost of the project is a huge responsibility for tax payers. The project would cost less if it was relocated to Tapp Road and Country Club Road that already has an existing path. (56-A) I am a long time resident of Monroe County and wish to share my concerns about the proposed Fullerton Pike Corridor Project. As a long-time resident of the Bloomington community I fully support the development, finally, of the last leg of the East-West corridor we’ve been waiting for. Particularly with the coming of I-69 we need this route. Failure to move forward with this will result in suboptimal traffic patterns, resulting in pedestrian endangerment and traffic disruption in multiple other locations throughout the area. Rogers roundabout. etc etc See response 27-B. See response 8-F. 57-C 57-D See response 39-A. 57-B See response 22-C. 56-C See response 22-A. See response 8-F. 56-B 57-A See response 6-A. 56-A 58. Email Comment 12/30/2014 Jim Schroeder No address given Page 31 of 60 I thank the designers that have included a separate bike/ped path on the entire I agree with the county that Fullerton Pike and Gordon Pike need to be connected for the many reasons that are listed by the county planners. As President of the Bloomington Bicycle Club I have heard many discussions regarding this controversial east/west corridor of the southern Bloomington suburban area. Also, I would like to stress that this is only my opinion and wishes and does not represent all of our 200 members that drive cars and ride bicycles for transportation and recreation. Lastly, I am particularly concerned about pedestrian access to Batchelor Middle School from the south. The wide width of the corridor will take significant time to cross, backing up traffic, and posing a risk to the pedestrians. This risk could be eliminated by incorporating an underpass or overpass at the top of the hill (at the intersection of Clear View Drive and Gordon Pike) that could be used by both pedestrians and cyclists. (57-D) I also have concerns about the lack of attention paid to the bikeway in the DEA document. There are very real safety concerns associated with creation of a separate bikeway when it encounters a busy road. The intersection of South Walnut/Old 37 and Gordon Pike/Rhorer road is especially concerning. At such broad intersections it is very difficult for drivers to see all potential hazards. When an additional separate lane for bikes is added, drivers will easily miss seeing a cyclist. I strongly recommend that an underpass for cyclists be created at this intersection, similar to what was done under the 46 bypass. This will greatly speed up travel time for cyclists, and greatly reduce hazards for drivers and cyclists alike. Given the proximity to Batchelor and Jackson Creek middle schools, many of these cyclists will likely be middle school students, who are not yet road savvy. For this reason in particular I would also recommend an underpass at Rogers Road. I understand that underpasses are costly, but this cost will be well worth it to avoid a tragic death. I encourage the engineers to visit Boulder Colorado to see a well-designed bikeway system. One can cycle around Boulder with almost never crossing a busy intersection due to the many underpasses that they have created for their bike paths. (57-E) concerned that the lanes are still too wide at 16 feet, (57-A) and I question the need for a 16 foot wide median, (57-B) which creates a very broad right-of-way when combined with the bike path on the north side and a sidewalk on the south. This large width will continue to encourage speeding, (57-C) which will be especially problematic in front of Batchelor Middle School. (57-D) I would recommend reducing the lane width further, similar to what has been done on Sare Road north of Jackson Creek School, where the median creates a narrow lane for cars to pass by, encouraging cars to watch their speed. See response 27-B. The need for and placement of refuge islands in the median will be 58-C The current design for the roadway at the Bloomington Rail Trail crossing will include a median refuge for bicyclist safety. See response 46-B. 58-B 58-A 57-E 59. Ann Elsner 4017 S. Crane Ct. Page 32 of 60 Cramming a Gordon Pike connector through our residential neighborhood creates a major truck route off I-69. (59-A) It is neither safe, (59-B) environmentally sound, nor cost-effective. Thousands of cars and trucks are predicted to roar through our yards. Will we still have children walking to Batchelor Middle School, (8-C) sports teams I hope that you consider all that I have contributed, and if you have any questions feel free to contact me for anymore consultation. It is also hoped that there will be a grassy buffer with trees separating the northside bike/ped path and the southside sidewalk with the roadway. This grassy buffer will be more attractive, enjoyable, and safe for the bicyclists and pedestrians. (58-E) Do not create another ugly West Vernal Pike in Monroe County. Instead of this grassy median, I feel that frequent refuge islands could be added for pedestrians and bicyclists to cross this corridor. (58-C) Also, to follow the "complete streets" concept, bicycle lanes should be included on both directions for the entire corridor to accommodate those bicyclists that desire to ride alongside motor vehicles and not have to worry about crossing driveways and side streets as if on the northside path. (58-D) I disagree with the grassy median in the middle of the corridor It is a waste of space with no purpose, as it will not "slow" traffic but will frustrate speeders that want to pass law-abiding drivers or bicyclists that choose to legally ride on the road. "Road rage" apparently was not considered when this boulevard concept was designed. I agree with Alternate 1A in that it will only be one lane of traffic in each direction. I am worried about the speeds that this road will promote. I would hope that the posted speed limit be no more than 40mph, and 30- 35mph be preferred. (58-B) Occasional bumps like that on Moores Pike at Hyde Park(?) would insure proper speeds. The overpass over Clear Creek Trail will insure a safe separation of automobile traffic and multiple types of users on this path. However, I am concerned that there is not an overpass/underpass to accommodate the Bloomington Rail Trail. The county's future plan is to extend this southward, and I envision this extension to Lake Monroe to be a considerable tourist option for Bloomington and Monroe County. I am assuming that the current design with the grassy median would include a refuge island for the Bloomington Rail Trail users so they would only have to navigate one direction of traffic at a time. (58-A) north side and a sidewalk on the entire south side. This separate bike/ped path will serve the "80-90%" of bicyclists that do not feel safe sharing a roadway with motor vehicles. This east/west connector bike path will provide access for many suburban bicyclists and families to the Clear Creek Trail, Bloomington Rail Trail, and the BLine Trail and then link to downtown Bloomington and Indiana University. See response 10-B. See response 8-E. 59-B A grass buffer will separate both the bike lane and the sidewalk from the roadway. Tree planting in this area is not planned at this time due to visibility concerns. 58-E 59-A The roadway lanes are wide enough to safely accommodate bicyclists who choose to ride on the road. 58-D determined further along in the design process on a case by case basis. 61. 60. Email Comment 01/03/2015 Karen Laucella Clear Creek Estates subdivision Email Comment 01/02/2015 Ginny Myerson 4060 Judee Dr. Email Comment 12/31/2014 Page 33 of 60 I am writing about my concern over the Fullerton Pike corridor project. I live in the Clear Creek Estates neighborhood. My sons had to walk to Batchelor Middle school during their 7th & 8th grades of school. Unfortunately, for a major part of the school year, classes start before the sun is up. My children had a terrible time crossing Gordon Pike while it was dark; many times cars would not see them or simply choose not to stop. They had to back up quite a few times when cars started through the intersection while they were starting to cross the road. My point is that the intersection is already unsafe for children having to walk and cross Gordon Pike; making this road a corridor will only exacerbate the problem. For our children's safety, please use a better option. (61-A) I am also confused as to why we need to spend an exorbitant amount of public money that will result in two interchanges within a mile. (61-B) I am sending a copy of this comment & question to the H-T reporter, Rachel Bunn, whose article on Dec. 11 was on this topic and am hoping she will do some research & reporting that can explain why there have to be TWO exits that fill a need for an east-west corridor within a 1/2 mile of each other when the existing route (Tapp-Country Club-Rogers corridor) already serves that purpose and does not upset residential or school routes? I don't understand why no mention is made of the Tapp road east-west route off of I69 that can serve the same purpose as the proposed Fullerton Pike route. I was not at the public meeting about this but I read in the H-T that some people mentioned this. So if Tapp Rd. is already in place as an exit & does not have the objections about the effect on residential areas as does Fullerton Pike proposal, why does Bloomington need another east-west route so close-by? (60-A and 60-B) The proposed road needs new funding, (59-H) so why would we waste money on an east-west artery instead of improved access to the new IU Health facility, which will be north? working out on the grass, neighbors walking their dogs, families enjoying the Clear Creek Trail, or cyclists safely crossing on the B-line? (59-D) The FHWA Environmental Assessment form in the Monroe County Library has mistakes. Cornfields and mainly single family homes were classified as “urban.” (59-I) It was concluded that building this southernmost connector to I-69 would not increase noise. (59-E) The report said that building a wide artery with thousands of extra cars and trucks racing on steep grades, where there is now a dead end road, would not affect community cohesion. (59-F) The report concluded that property values would not decrease. (59-G) The acres of woods and grassy fields being exchanged for pavement were not considered as important to the environment or drainage. See response 8-D. See response 47-C. See response 14-D. See response 6-A. See response 9-A. 59-G 59-H 59-I 60-A 60-B See response 9-A. See response 8-A. 59-F 61-B See response 8-C. 59-E See response 8-F. See response 6-B. 59-D 61-A See response 8-F. 59-C 64. 63. 62. Email Comment 01/05/2015 Joan Keeler 3927 S. Cramer Cir. Email Comment 01/05/2015 Deborah Thompson 3895 S. Bushmill Dr. Email Comment 01/04/2015 Denny VanPelt 4081 S. Rockport Rd. Page 34 of 60 As a nearby resident in Batchelor Heights, I have many reservations regarding the proposed Fullerton Pike project. Primary is the safety of residents and children who must cross Fullerton Pike. (64-A and 64-B) (In the dark at certain times of year) Adequate speed controls and access must be be implemented as the road passes developments containing hundreds of homes and those people need admittance on and off the roadway. (64-C) In questioning Structurepoint, (Dec. 11 meeting) these details seem to be unknown. The currently proposed roadway with 16 ft. wide lanes, I reside in the Highlands 2nd Addition very near the proposed exchange site, a very short 1/2 block away as a matter of fact. I do want to voice my opinion about the proposed route despite the fact that I do not have children in my home. The children belong to my friends and fellow neighbors and I am in agreement with their concerns for their children's safety. (63-A) Personally, I do not believe we need to construct two interchanges within one mile of each other, nor do we need the added expense for the additional construction. (630B) I do not believe that such a costly endeavor is in any way a benefit to our area. It will only increase vehicle emissions pollution, (63-C) road disrepair (already an issue), (63-D) traffic and traffic noise. (63-E) We can already hear traffic on SR 37 and the Bloomington Speedway, do we really need to add to that scenario? What happened to our property rights of "peaceful enjoyment"? I am encouraging you to reconsider and redirect this project. Count me against this construction! Thanks for your consideration in this matter. Through this road improvement process I have recently had my driveway access eliminated from Rockport Road and am now concerned with the entry/exit opportunities from a second driveway access onto Fullerton Pike. Since the project is in development phase I appreciate the opportunity to express my concerns regarding access from my property onto the new two lane roadway beginning at Rockport/Fullerton Pike. Since my property borders both Rockport and Fullerton I previously had quick access to the highway with no real concern. With the Rockport Road driveway being eliminated I now have concern about the ability to go westbound out of my Fullerton Pike driveway based upon discussions with the project team members during the public hearing on December 11, 2014. I would like to request that the traffic scheme allow me to exit west or eastbound from my Fullerton Pike driveway without any back tracking due to a median or some other traffic design that would interrupt my westbound exit. (62-A) Surely, you can do better. See response 8-F. See response 9-A. This project has been determined to generate minimal air quality impacts. Please see the “Air Quality” section of the Environmental Assessment (Page 40) for additional information. Maintenance is the responsibility of the County and the City and financed through a separate fund not associated with specific roadway projects. See response 8-C. See response 8-F. See response 8-E. See response 27-B. See response 22-A. 63-B 63-C 63-D 63-E 64-A 64-B 64-C 64-D It has not yet been determined where the breaks in the median are to occur. This will be determined on a case by case basis at a later date. Your request will be forwarded to the design team for consideration. 63-A 62-A 65. Mailed Comment 01/05/2015 Fred Dunn 1909 Rhorer Rd. Page 35 of 60 As proposed, our concerns are that these plans/designs will significantly affect the safety, security, habitability and value of the residence located at 1909 Rhorer Road. As proposed and presented, the project will bring the right of way (roadway/trails etc) to within a few yards of the existing residence (1909 Rhorer Road), raising concerns of safety, security, habitability, (65-A) noise pollution (65-B) and property valuation. (65-C) In addition we are concerned that, as proposed, the only We have concerns with the designs and plans involved with the acquisition of property for the proposed Rockport Road to Sare Road project, Designation #0801059. I urge you to examine the area yourselves and look carefully at what a disastrous effect the proposal now in place will bring. Other obvious, more immediate issues such as driveway access for those homes directly on Gordon Pike, wells and septics in front yards are also problematic, (42-B) as is how the bus & parent pick-up back-ups at the schools will be addressed. How will this be an efficient traffic-moving artery when there are two schools, 2 nursery schools, and numerous driveways and development entrances that will feed into it. A smaller connecting road with slow residential & school zone speeds, etc. would not be opposed by most of the neighborhoods that will be impacted. On the other hand, a roadway that takes up a 70 ft wide footprint, and allow semis (64-J) to barrel along at 40 mph will in no way enhance our lives, natural areas and/or ability to traverse through town more quickly. (The north/south feeders that will connect will be totally inadequate to absorb the anticipated increased traffic flow/ ie. garden hose reducing to a soda straw effect if you will.) Our neighborhoods will be less safe, noisy, 64-F) polluted, (64-G) disrupted. Our natural areas will be interrupted and noisy, with unknown other ecological effects (64-H) and the quality of our lives will be sorely diminished. (64-I) This plan is not going to enhance our well-being in any manner and I encourage you to look more deeply into the ramifications and consider the trade-offs that will be made if it is allowed. Putting this road through a suburban, developed area makes little logical sense & the vision of this connecting roadway from many years past is not in touch with today's reality of development. There was no highway 37, nor Tapp rd. exit, nosaturated residential development. It is therefore an outdated vision. I question the criteria used to dismiss other ideas for a new west-east connector ...we were told in brief that other options were considered & dismissed with no explanation of what the dismissals were based on. (64-E) will, in my opinion, encourage faster speeds and make our neighborhoods unsafe and inaccessible to those who are bordered by the roadway. (64-D) See response 8-D. See response 39-A. See response 39-F. 65-C 65-D 65-E See response 8-C. See response 42-B. 64-K 65-B See response 10-B. 64-J See response 8-A. See response 8-A. 64-I 65-A Please see the “Ecological Resources” section of the Environmental Assessment (Page 21 – Page 28). See response 63-C. 64-G 64-H See response 8-C. Please see the “Other Alternatives Considered” in the Environmental Assessment (Page 9 – Page 15) for a detailed discussion of the reasons other alternatives were dismissed. 64-F 64-E 67. 66. Email Comment 01/07/2015 Ann Elsner 4017 S. Crane Ct. Email Comment 01/06/2015 Sean and Rachael Streff No address given Page 36 of 60 I urge that the Environmental Impact study for the proposed Fullerton Pike project be shown to demonstrate significant impact. Please do not agree with and sign the documentation for a finding of no significant impact (FONSI), since there is significant and negative environment impact. The negative impact on the environment is far greater than that in the conclusions at the beginning of the report. Evidence of this negative impact is contained within this document, the comments from residents and the end of the document, records of public hearings, and other sources. The data show that the conclusion of FONSI is unwarranted. The projected For these reasons and many more, my wife and I staunchly oppose this new road. We are abhorred at the lack of disregard for the communities that will be affected by this project You are not just building a road, you are ruining a nice and quiet family community, homeowners property values, and a beautiful park. When I moved here, I fall in love with the Clear Creek Trail. You can take a peaceful run through the woods. This new road will go directly through this beautiful landscape. The wonderful ecosystem and tranquility trail, will be destroyed by one road. (66-D) Not only will this road damage our community, (66-B) it will also damage the price of my house. (66-C) It will deeply impact this facet, and being a new homeowner, this is highly frustrating and saddening. My family and I recently bought a home in this area. We moved from Illinois. We were having a baby at the time, and wanted to get away from all the fast paced traffic that you find in Illinois. So, when looking for a neighborhood to live in, we wanted a quiet and safe community. We purchased this home based on these facts. We live on the north side of Gordon pike, which is directly next to the new road that is being proposed to build. This new road will be a huge detriment to our quiet neighborhood. Also, My wife and I have a 4.5 month old girl, her bedroom faces Gordon Pike. This new road will make her room loud and noisy, especially when she will be sleeping. (66-A) Moreover, this will create a unsafe living condition for her, since the road will be much closer to our house now. Thank you for your time and attention. We look forward to successfully resolving our issues and concerns with you at your convenience. It is suggested and requested that the proposed 16'wide grass median from the bridge to the Sare Road intersection be omitted in favor of multi-lane travel on Rhorer Road between the new bridge and the Sare Road roundabout/signal. access to the property will be by right turn only entry/exit due to the proposed 16' grass median. (65-D) The replacement of Monroe County bridge #610 over Jackson Creek will further complicate/affect these concerns. (65-E) See response 8-D. 66-C See response 14-D. The Noise Analysis determined that there would be an increase in noise levels but that noise mitigation is not reasonable or feasible for much of the corridor. The Noise Analysis will be re-evaluated during final design. 67-A 67-B See response 6-B. See response 8-A. 66-B 66-D See response 8-C. 66-A Page 37 of 60 3. On pages 44 – 47, there are a number of related items that are incorrect, such as community cohesion marked as “no” impact (67-C) and “no” for decrease in property values. (67-E and 67-I) As for cohesion, the cartoon by Joe Lee in the local paper, the Herald-Times, pointed out that the proposed road would be impossible to cross for the Batchelor Middle School children, of which there are roughly 500. (67-F) Our neighborhoods are already built out and existing neighborhoods, with some on the south side of the road and some on the south, some in Bloomington and others in Monroe County. All feed students into Batchelor Middle School and its after school sports and activities. One pedestrian bridge for the 2.7 mile long road has been proposed, but even that seems impossible given the steep grade and lack of space for needed right of way. (67-G) Community cohesion would be negatively impacted because parents would not allow theirchildren to cross north or south to their 2. On page 43, there is a prediction that there would be no increase in noise, but this cannot be correct. The current Gordon Pike is a steep and dead end local road that provides access to larger connectors for neighborhoods abutting, and both north and south of the road. Homes are arranged in a series of housing additions and cul de sacs. The proposed road goes virtually through back, front, and side yards, sometimes directly under bedroom windows of residents. At present, Gordon Pike does not even connect to SR 37. The connectors are at the other ends of the housing additions where the grades are not as steep. If Gordon Pike/Fullerton Pike is turned into the southernmost exit for Bloomington from I- 69, there would be a significant increase in noise 24/7. The models have not been clearly presented or analyzed as to the traffic pattern or speeds that the vehicles would be travelling. The estimates of cars have been predicted to escalate to somewhere between 4000 and 7000 vehicles per day, with considerable truck traffic. At the present time, there is virtually no nighttime traffic, and trucks are only utility vehicles, safety, or delivery trucks because there are no businesses in these quiet residential neighborhoods, but this is projected to change to 24 hr truck traffic. (67-B and 67-D) 1. On page 16, the proposed arterial road is marked as “urban,” when in fact there are cornfields, park land, and mainly single family dwellings. The only commercial area is one intersection at Walnut St. and Gordon Pike/Fullerton Pike. This small shopping area is already well-served by Walnut St. providing the north-south continuity to other east-west connectors that have less challenging grades, with the rightof-way to permit roundabouts. (67-A) There are several conclusions of “no impact” made in the front section of the report that are in conflict with data, as well as the discussion from the neighborhood residents. Here are some of the most obvious mistakes or incorrect conclusions, any of which should lead to a rejection of FONSI. costs will be discussed in another letter. According to the INDOT Procedural Manual for Preparing Environmental Documents, negative neighborhood or community cohesion impacts may include relocations, splitting or isolating neighborhoods or ethnic groups, generating new development, and changing property values. Relocations for the project have been minimized to one. Several separate neighborhoods are located along the corridor. None of these individual neighborhoods would be divided by the project, and the separate neighborhoods are already separated by an existing roadway. New development is not anticipated due to the built-out nature of the area. The project is not anticipated to have any impact on the property values of residences not located directly along the project corridor, and any foreseeable reduction in property values would be incorporated into the right-of-way purchase process. For these reasons, no negative impact to community cohesion is anticipated. However positive impacts to community cohesion are anticipated as a result of the project such as improved pedestrian facilities, enhanced connection to trails, and a reduction in the number of vehicles utilizing residential streets within subdivisions for through travel. See response 10-B. See response 8-D. 67-C 67-D 67-E Page 38 of 60 One of the most hotly debated aspects is property values, which were concluded not to decrease. Numerous neighborhood residents have stated that they believe that their property would be worthless. Home with the largest decrease in value are those that would not be acquired but would be left with a large and busy road only feet from their windows. The costs of the construction to homeowners would decrease property values, particularly given that it would be clear to potential buyers that homeowners could be required to pay to move septic systems or other utilities such as the buried electric lines and internet and telephone cables. The grades and changes in heights of hundreds of driveways, which directly connect with Gordon Pike or Fullerton Pike, would also lead to sizeable costs to homeowners because some would be too high and some too low to connect with the wide road that is proposed. The grades of all these driveways could be considerably steeper. Homes This report does not adequately address maintaining diversity. There is a majority of single family homes, but there are also condo and a few areas with trailers. Neighborhood residents hope to preserve the balance of housing options to maintain diversity. At present, homes that have virtually no yards have open space and access to a quiet Clear Creek Trail system. If the proposed, oversized road is built, it would be exceeding difficult to provide an acceptable quality of life for families living in condos on a noisy road with increased truck emissions, or those in the trailers that do not have much yard space. The individuals who live in condos and trailers would be losing a significant proportion of their only open recreational land, 4 acres of grass within 2 blocks and a large number of acres of wooded areas scattered over the project. (67-H) Community cohesion is far more than sharing a school. Residents living both north and south of Gordon Pike/Fullerton Pike use the park land that is the southern fields of Batchelor Middle School because we do not have another neighborhood park or undeveloped space elsewhere. These open lands are places where sports teams work out, cross country meets are held, people jog and walk their dogs, and other activities that help preserve community cohesion. Residents of our neighborhood walk from their homes to the Clear Creek Trail for walking, jogging, skating, and biking. At present, the path along Gordon Pike is used by residents along or in combination with the Clear Creek Trail. This trail provides a truck-free haven for daily recreation throughout the day. Groups of moms with strollers use the Clear Creek trail for community building through play dates. Small groups exercise after work and on week-ends. Parents from our neighborhood and all over Bloomington teach their children to ride bikes on the Clear Creek Trail. friends’ homes of the activities at the school. Children are unlikely to walk a mile or more in the wrong direction just to use the bridge, then walk back. The proposed road would be unsafe for children. See response 63-C. See response 42-B. 67-I 67-K See response 8-A. 67-H INDOT has set design standards for driveway connections to ensure grades are appropriate for safe entrance and exit. INDOT standards will be followed for the project. No pedestrian bridges are proposed for the project at this time. Additional design characteristics will be considered and incorporated into the plans if they are warranted for ensuring safe pedestrian crossings near schools. 67-G 67-J See response 8-F. A school crossing from Eagle View to Batchelor Middle school will be reviewed during detailed design preparation. 67-F 68. Email Comment 01/07/2015 Harriet Kulis 1430 W. Estate Dr. Page 39 of 60 The straight road with minimal curves will allow for high speeds. The County does not have the patrols to enforce lower speed limits, as we see at Tapp Road. (68-G) Beyond aesthetics, noise, (68-E) and safety, there is the cost. Tapp Road is a major intersection, just one mile north, that is available for I-69 users to enter Bloomington. (68-H) Why are we taxpayers spending $27+ million (est.2013), including bridges, for a duplicate road? This is waste of our money for a redundant road that continues to lead to nowhere. The project would consist of one 16' wide travel lane in each direction, plus 4.7' of gutters and curbs, separated by a 16' wide grass median, a 5’ wide sidewalk, a 10’ wide multi-use path with berms on each side. I am frustrated by the proposed Fullerton Pike Extension. This 80’ wide swath will cut through residential areas, in front of schools, churches, and day cares. All of the north-south connecting streets are one-lane each direction, with no plans for improvement. There are life safety hazards, (8-E and 8-F) zoning concerns, loss from removing the bucolic setting, (68-C) and considerable environmental hazards, e.g. pollution from semi-trailers, (68-D) autos, noise and building on the fragile karsts. (68-F) Property values would be negatively impacted by the increased noise and pollution (67-K) of thousands more vehicles per day through a residential neighborhood. Property values would be negatively impacted by the loss of parkland and its replacement by an ugly and noisy road. Property values would be negatively impacted by the difficulty in crossing busy traffic to leave home or return home, or get to Batchelor Middle School. Property values would be negatively impacted by the loss of community cohesiveness. Property values would be negatively impacted by the significant decrease in safety and the increase in travel times because residents would now have to turn left across busy traffic either to leave home or return, whereas now the traffic is light and commuting from this neighborhood is quick and safe. with difficult access are not sought out by potential buyers. (67-J) See response 8-E. See response 8-F. See response 46-A. See response 10-B. See response 8-C. Studies have been undertaken to identify karst features. Additional studies may be warranted as the project continues. Best Management Practices will be utilized to ensure that no roadway drainage is routed into the karst system. Please see the “Karst” section of the Environmental Assessment (Page 27) for more information. The segment of Tapp Road mentioned is a city-maintained street, patrolled by the City of Bloomington Police Department. See response 9-A. 68-A 68-B 68-C 68-D 68-E 68-F 68-G 68-H 70. 69. But the dismay I feel about the current traffic load and the speed that most cars and trucks use when on Rhorer Rd pales in comparison with the negative responses I feel toward the proposed Fullerton corridor. Email Comment 01/07/2015 Page 40 of 60 I question the project’s financing in the context of the very dubious engineering idea of taking a major thoroughfare through a well-known karst area (70-F) – and why in the world such a route should be chosen when, just north of it, there is already a perfectly constructed connection of Winslow/Country Club with our Bypass Highway! Why undertake such an expensive and environmentally destructive project when a wider east-west corridor already exists with a well-engineered connection to the highway? Could it be the objections of the owners of the Bloomington Country Club? I do not know the answer to this last question, but I would certainly like to know if my suspicions are valid. It also appears to me that there are fewer residences to be disturbed by such construction on the Tapp/Country Club/Winslow I share the concerns about this proposed corridor expressed by Mary Ann Williams in her recent letter to the editor published in the Herald-Times. She highlights the very negative impacts that the corridor’s traffic would have on Batchelor and Jackson Creek middle schools (70-A) – dangerous traffic, traffic congestion, terrible traffic noise, (70-C) dramatically increased traffic pollution; (70-B) painful loss of somewhat peaceable surroundings. (70-D) She also questions the projects’s financial accountability. (70-E) Having resided at 1598 E. Rhorer Rd since 1972, I have witnessed dramatic increase in the traffic on our once-rural road. In the past several years, the volume of traffic on Rhorer Rd, along with the speed of most of the vehicles that use it, has turned it into a truly dangerous artery. This reality is dismaying to me. I understand that the current plan for Fullerton was scaled back to address the concerns of residents. It is hoped that an agreement can be made that serves the interests of the residents along the corridor and the County, while continuing to address the connectivity and transportation needs of our growing community. Fullerton Pike is identified as the first Bloomington exit on the south side of Monroe County and construction of this interstate is currently underway. With this in mind, it is essential that we plan accordingly and move forward with the project. Without this project, traffic exiting at Fullerton (including traffic from Crane and Westgate) will work its way east through neighborhood streets. It would be much safer if there were a path prepared to handle this traffic. Fullerton/Gordon/Rhorer is that pathway selected by county officials. I support the County’s decision to move forward with this project at this time, with the understanding that it would greatly improve east-west connectivity and that expanding Fullerton has been the County’s intention for many years. Nancy A. Newton 1598 E. Rhorer Rd. Email Comment 01/07/2015 Jim Shelton No address given See response 47-C. See response 68-F. See response 6-A. 70-E 70-F 70-G See response 8-C. 70-C See response 8-A. See response 63-C. 70-B 70-D See response 8-F. 70-A 72. 71. Stephen A. Wolter and Lynn M. Jamieson Email Comment 01/07/2015 Steve Brewer 3636 S. Rogers St. Page 41 of 60 In reviewing the overall purpose of the Project in various documents there appears to be a major misidentification of the projects purpose. Although intended as a “quality” east-west transportation facility allowing enhanced connectivity to the City of Bloomington business district and Indiana University from the south, the project I am concerned about how an increase of over 50% more traffic(ADT) by 2030, including at least 5% trucks, will effect the north-south residential cross streets off of this proposed high-volume access route off of I-69. These roads are not slated for any improvements. How will all of this traffic be encouraged to go down to the county's existing commercial artery (Walnut Street/Business 37), rather than turning up earlier residential streets, like Rogers Street, which is steep, narrow, and 100% single-family residential up to Tapp Road? (71-A) This area already backs up at rush hour, making it impossible to get out of our driveways. Instead of a traffic light, which will just increase the problem on Rogers Street and Gordon Pike, could there be a round-about at this intersection by Bachelor Middle School like those at Jackson Creek and Tri-North Middle Schools? (71-B) Will these cross streets be no truck routes (71-C) and will there be traffic claiming devices and sound abatement (as there should be along Gordon Pike and Rhorer Road as well)? The environmental impact to the residents of this south-side neighborhood extends beyond the homes immediately adjacent to this proposed mega-road project. These issues are not addressed in the Environmental Assessment and would only increase the costs for Alternatives 1 or 2 (i.e. connecting a series of residential streets to an exit off of an inter-continental highway), making this alternative the wrong choice for a built-out residential community surrounding two public schools. When we brought our property in 1997 and later when we added on an addition in 2002, we did our due diligence and contacted the MCHD and were NOT told that Fullerton Pike would be the first exit into Bloomington from the south off of I-69 and that other existing eastwest connections to Highway 37 would be eliminated. This is not the same road project that was discussed in the 1960s, when our 1870 farm house was one of the few homes in the area and neither of the schools or even Highway 37 existed. As such, this road project should be removed from the TIF and new alternatives that reflect the current reality and residential character of this area should be discussed with the appropriate amount of public involvement. I support Alternative 3 (without a connection between Fullerton Pike and Gordon Pike), (71-D) which would improve the safety (71-E) and livability of our neighborhood, (71-F) rather than doing the exact opposition. On financial grounds, on engineering grounds, on issues of school and residential safety, I register my strongest opposition to the proposed Fullerton corridor. I trust you will share my views with those who are charged with decisions about traffic patterns in Bloomington and Monroe County. route than on the Rhorer Rd one. (70-G) See response 10-B. Please see the “Other Alternatives Considered” section of the Environmental Assessment (Page 9 – Page 15) which explains in detail why each of these alternative we dismissed. See response 8-E. See response 8-A. 71-C 71-D 71-E 71-F Please note that an Environmental Assessment (EA) was prepared for this project, not an Environmental Impact Statement (EIS) which is a See response 11-A. 71-B 72-A Traffic travelling on arterials tends to stay on arterials until approaching the destination. This is the safest and quickest route for traffic because of the frequent stop signs and visibility issues on nearby residential roads. Therefore, a significant increase in traffic on these residential roads is not anticipated. 71-A Email Comment 01/08/2015 3924 S. Nimit Dr. Page 42 of 60 It is documented in the development proposal and documents that "An additional project consideration is connectivity of the local trail network. The proposed project corridor crosses three public trails including the Clear Creek Trail, the Bloomington Rail Trail along Clear Creek which is an extension of Bloomington Rail Trail, and the Sare Road Trail. The majority of existing trails within the community are configured Specifically regarding the Fullerton Pike Project Trail Analysis Result: The Project Scope and EIS as published are flawed and must be restudied to reflect the assumed and implied increased traffic volume, traffic patterns, and associated impacts to existing properties in the Fullerton Pike project Corridor and continuing through Bloomington to include Sare Road to IN 45/46. 2) The primary need for this project is the lack of an east-west transportation facility that would allow enhanced connectivity from the south to the city of Bloomington business district and Indiana University, accommodating the input of traffic resulting from the proposed I-69 interchange at Fullerton Pike and existing State Road 37 (SR 37), as well as improving cross-town traffic along the south side of Bloomington. Businesses, residents, and emergency vehicles alike are challenged by the difficulty of accessing the city of Bloomington from the south and accessing primary arteries to reach other areas of the state I contend these project scope descriptions are incorrect. Instead, the project scope should state that the primary need for this project is the lack of a completed southern connection to the IN 45/46 Bypass from I-69, IN 37 and other points south of the municipality of Bloomington, IN. The project also includes a signficiant east-west transportation facility that would allow enhanced connectivity for Bloomington and Monroe County long identified inadequate transportation access in the east-west direction. 1) the Fullerton Pike Project has current classifications of Rural Major Collector west of SR 37, an Urban Minor Arterial from SR 37 to Sare Road, and an Urban Major Collector from Sare Road to Snoddy Road. Specifically regarding the Fullerton Pike Project Scope: actually constructs a southern IN 45/46 Bypass extension to I-69. There is no current planned or identified alternative to using the Fullerton Pike project as the southern connection to IN 45/46 thereby making this project the defacto connection. The resulting estimates of traffic volume and noise as depicted in all planning documents are in fact erroneous. The increased number of vehicles who will be using this access method to travel from points south of Bloomington, IN to connect to major shopping and residential areas on the east side of Bloomington, as well as to major east travel on Indiana State Highways is significantly underestimated in the planning documents. (72-B and 72-C) The result is that the EIS (72-A) for the project is in fact inadequate and flawed. There are no projects currently programmed for Fullerton Pike west of SR 37. See response 6-B. See response 46-B. The noise analysis for the project was completed in accordance with the requirements set forth in INDOTs Traffic Noise Analysis Procedure (2011). The FHWA requires the traffic projections included in the noise analysis model to be based on the worst hour, which is normally during either the AM or PM rush hour. These traffic projections are included in three models that were prepared for the project, one for existing conditions using current year traffic, one for the Build Alternative in the design year (20 years out) using design year traffic projections, and one for the No Build Alternative in the design year. The model developed for the project utilized FHWAs approved software, Traffic Noise Model, Version 2.5 (TNM 2.5). This software is three dimensional and does take into account changes in elevations between the noise source, in this case the road, and the receptor. The ambient measurements collected by the noise analysts are not intended to identify impacted 72-D 72-E 72-F See response 14-C. 72-C 72-B higher level document. Page 43 of 60 Using this set of standards in analysis of the Fullerton Pike Project shows that the proposed design and operating traffic speeds for trucks/vehicles are too high for safe pedestrian and bicycle travel along this corridor, especially given proposed sight distances, traffic volumes and driveway frequencies, and the future installation of a traffic lights. One method to mitigate this poor design would be a separated 6-8 foot median with trees, trail user overpasses-underpasses at the 3 major intersections, and carrying the design through the crosswalk at the intersection to Further, the Bicycle Level of Service Model is based on the research documented by the Transportation Research Board of the National Academy of Sciences footnote. It was developed using data from over 150,000 miles of evaluated urban, suburban, and rural roads and streets across North America. Many urban planning agencies and state highway departments are using this established method of evaluating their roadway networks. These include Anchorage AK, Baltimore MD, Birmingham AL, Buffalo NY, Gainesville FL, Houston TX, Philadelphia PA, Lexington KY, Sacramento CA, Springfield MA, Tampa FL, as well as the Delaware Department of Transportation (DelDOT), Florida Department of Transportation (FDOT), New York State Department of Transportation (NYDOT), Virginia Department of Transportation (VDOT) Maryland Department of Transportation (MDOT) and many others. (72-D and 72-E) Collisions and near misses among users and/or their vehicles are promoted by poor trail design: These trails have significant possible collision and near miss locations at 3 major north-south intersections including Walnut Street Pike, Walnut Street, and Rogers Road. No plans for high visibility-user initiated-prompt responding crosswalk flashers are planned or for trail overpasses or underpasses in an east/west direction The design of the trail features, while making connections between Bloomington's primary north-south trail connections do so by creating an experience that crosses major roads at grade and alongside very high noise, high speed and significant truck traffic. This investment should be reconsidered to reflect standards found in federal research related to conflicts on trails. In "CONFLICTS ON MULTIPLE-USE TRAILS: Synthesis of the Literature and State of the Practice Sponsored by The Federal Highway Administration and The National Recreational Trails Advisory Committee" it was found that many situations or conditions caused by other trail users can keep visitors from achieving their desired trail experiences. This interference is due to safety concerns is a common source of conflicts on trails and a number of threats to user safety that can occur on trails. Some of these include: in a north-south direction, resulting in a lack of connectivity. This project proposes an east-west connection via multi-use path and sidewalk across the south side of Bloomington, which would tie the three aforementioned trails together." receptors along the project. Rather, these measurements are collected to validate the noise model. As such, there are no restrictions as to when the measurements are taken, or for how long. Generally, these are short-term measurements ranging from 5-30 minutes. During the sampling time, the analysts record atmospheric conditions, traffic and speed, which are adjusted in the model to an hourly equivalent. If the noise output is within 3 decibels of what was measured in the field the model is considered to be valid. Validation of the model confirms the intended accuracy of the noise outputs generated at all modeled receptors, not just those subjected to ambient measurements. The TNM 2.5 model prepared for this project was determined to be technically sufficient by INDOT. 73. Email Comment 01/08/2015 Whitney A. Gates 542 S. College Ave. Page 44 of 60 I fully support the expansion of Rhorer Road/Gordon Pike/Fullerton Pike to SR 37/I69. What is the timetable for bridging the gap from the current proposed expansion and connecting it to I-69? (73-A) However, the analysis is flawed as it was conducted for a limited time frame during one day and does NOT consider the impact of noise from the increased traffic of a bypass use during evening and night hours. (72-F) These hours are significantly important to the health of individual residents along the project, and recent studies show a correlation and causation between overall public health and noise. The October 2014 analysis is subject to a much more thorough analysis. The project noise analysis is inadequate as the increased evening and night traffic noise will have substantial degradation to the health of residents along this corridor. 337 residential properties will be affected more or less and it is clear that the inadequate analysis has led to conclusions that do not support development of more noise barriers particularly taking into account elevated portions of the FullertonPike Project which transmit increased, longer and evening-night noise into residential areas that are lower than the roadway. The EIS suggests that a 1574 foot long noise barrier is considered reasonable and feasible at the existing (and proposed) right- of-way limit along the north side of Fullerton Pike from near Clear Creek to Wickens Street, subject to the views of property owners and residents. It is feasible because the barrier would reduce noise levels by at least 5 dBA for the majority of impacted receptors and benefit 23 dwelling units. A ten-foot barrier at $30 per square foot would cost $20,520 per benefitted receptor, which is below the $30,000 cost- effectiveness criterion for locations where homes are in place before the new road is built. This appears to be the only mitigation suggested. Specifically Regarding the Fullerton Pike Project Noise Analysis include high visibility-user initiateded-prompt response crosswalk flashers at the 3 main intersections. These efforts included a community workshop and numerous publicaly-held meetings of the MPO Policy and Technical Committee. 73-A Construction is anticipated to begin on Phase I - the portion of the corridor between Walnut Street and Walnut Street Pike - in 2016. Beyond the Phase I portion of the corridor, the sequencing and scheduling of future phases has not been finalized. 75. 74. Email Comment 01/08/2015 Nan Brewer 3636 S. Rogers St. Email Comment 01/08/2015 Liz Irwin th 400 W. 7 St., Suite 102 Page 45 of 60 2) A major problem with the comparison of the various alternatives is that this report seems to have been written before the interchange off I-69 at Tapp Road was established, thus making all of these comments irrelevant and the whole report 1) I was one of few residents from the neighborhoods directly affected by this project on the CAC (as recommended by the MCHD) that was not a developer or realtor. (75-A) Although the report claimed that there were “many” comments in favor of this project, I recall at the Public Information Meeting at Bachelor Middle School on Oct. 3, 2012, that over 90% of the verbal public comments given that night were negative about all of the proposed alternatives, except for Alternative 3 that did not connect our neighborhood residential streets to an inter-continental highway (I-69) interchange. We were told at that meeting that our comments were being transcribed, but I didn’t see them included in this report. Why? (75-B) Since there was only one public meeting prior to this report and many of the negative comments were not included here, I think that it is incorrect to claim that there isn’t public opposition to this project, which there clearly is. (72-C) We understand that the current plan for Fullerton was scaled back to address the concerns of residents. We are supportive of changes to better serve the interests of the residents along the corridor and the County, while continuing to address the connectivity and transportation needs of our growing community. Increasing east-west connectivity continues to be an important issue to our Chamber members. In our recent member survey, many Chamber members expressed the importance of completing the Fullerton Pike expansion project. With construction currently underway on I-69, this need becomes even more pressing. Fullerton Pike is identified as the first Bloomington exit for Interstate 69 on the south side of Monroe County. It is essential that the County plan accordingly and move forward with the project as quickly as possible. The Chamber has historically supported projects that improve east-west connectivity. In a 2007 Infrastructure Task Force Report, The Chamber recommended that community leaders give high priority to developing east-west thoroughfares and elevate these projects to the Transportation Improvement Program (TIP). The report also recognized the Fullerton Pike expansion as a project that would fulfill this need and had been identified as a priority for the County for many years. I am writing on behalf of the Greater Bloomington Chamber of Commerce and its 900+ members to express the organization’s support of the County’s decision to move forward with the Fullerton Pike Expansion project. When complete, Fullerton Pike will provide a much-needed east-west route along the south side of the community CAC members were identified from publically available information on neighborhood homeowners associations and local officials, as well as recommendations from the County Highway Department, who recommended your inclusion on the CAC. During initial CAC meetings and in the CAC invitation letter, the project team asked for recommendations for additional representatives from any neighborhood that was not represented. The only formal requirement for 75-A 75-B Page 46 of 60 5) At the last CAC meeting, I asked for an example of a comparable roadway with 14 ft. lanes and a 16 ft. medium through a residential area and was only told the north end of Clarizz Blvd. next to K-Mart, Bloomingfoods East, a medical office building, and the back of an apartment complex. This is clearly NOT the type of road through a built-out suburban neighborhood of primarily single family homes. A member of CONA (Council of Neighborhood Associations) also said that this is not the size or type of street that is recommended in a neighborhood setting per AASHTO guidelines. (75-K) 4) The biggest error in the whole report is to categorize this 2.7 mile series of road as “urban,” when there is only one commercially-zoned intersection along the whole route from Highway 37 to Sare Road at Walnut Street/Business 37 (with the exception of an old stone company near Highway 37). By any account this is a 99% residential area. (75-H) It comprises mostly single family homes surrounding two public schools. This report does not seem to take into any account the environmental impact on the hundreds of residents in this area and the 500 students at each school. Could you please explain howthis project has a “de minimus” impact on schools? (75-I) In INDOT’s own guidelines for choosing appropriate interchanges and access roads recommended “minimal” residential impact and following “established” commercial arteries. How does this proposed project meet these criteria? (75-H) 3) How were the traffic counts (ADT and hourly volumes) determined?(75-E) In one place in the report it gives a figure for increased ADT as 7,500, while in another as 13,976. Which is correct? What is the hourly volume now? Do these figures take into account the exit off I-69 and closures at That Road and Rockport Road? How was it determined that there would be only a 5% increase in truck traffic off an interstate? How will an increase of over 50% ADT improve the safety and traffic congestion on our neighborhood streets, especially with students walking to two schools and neighbors to school functions and to use the schools’ green space? It seems that Alternative 3 can address all of the safety concerns without increasing ADT. Alternatives 1 and 2 have the highest number of rightof-way acquisition from primarily residential properties; highest total forest loss (with exception of That Road upgrade); highest amount of perennial/intermittent stream crossings (with the exception of That Road upgrade); highest amount of new construction; and highest use of farmland (with exception of That Road upgrade). Many of the other environmental impacts were not even considered from the other alternatives, making the comparisons unless. (75-F) The cost comparison for Alternative 1 didn’t include many elements of the project (such as the expensive bridges, roundabouts, etc.), making any true comparison impossible. (75-G) based on false assumptions. (75-D) Please see the “Other Alternatives Considered” section of the Environmental Assessment (Page 9 – Page 15) which explains in detail why each of these alternative we dismissed. See response 17-F. See response 14-D. The term “de minimus” refers to Section 4(f) of the US Department of Transportation Act of 1966. The law applies to publicly owned parks, recreation areas, and wildlife/waterfowl refuges, and National Register eligible or listed historic properties. The schools do not qualify as Section 4(f) resources. See response 14-E. CONA’s 75-F 75-G 75-H 75-I 75-J 75-K been See response 14-C. 75-E have See response 6-A and 9-B. 75-D comments All comments received in writing, via email, and during the public hearing have been included in the Environmental Assessment. 75-C transcription is at the public hearing. The project team attempted to record and transcribe the Public Information meeting discussion, but the facility conditions and recording quality was not good enough for transcription. 76. Mary Ann Williams Controversy Page 47 of 60 9) This is NOT the same road project envisioned in the 1960s plan, when almost none of these homes or schools existed, nor was there a plan to make this road an access road off of I-69 in 2010 or 2011, which was also prior to any CAC meetings or public comment period. When did INDOT make their final announcement of the interchanges? When was the interchange at Tapp Road added only one mile north? Who was pushing for the interchange at Fullerton? MCHD or INDOT? The LOS (level of service) on these roads is fine without a connection to I-69, since there is little room for more residential expansion. Instead of building an expensive, hightraffic access route off an interstate through a residential area (Alternative 1 and 2), the County needs to upgrade the existing southside neighborhood roads along Fullerton Pike, Gordon Pike, Rhorer Road, and Sare Road (Alternative 3).The number of errors, problems and mis-characterizations of the history of this project warrant a delay and re-assessment of it, with more opportunities for public comments. Q) 8) This construction will definitely have an impact on many school and community events held at both middle schools both during the school year and the summer. (75- 7) I don’t understand how this proposed roadway complies with local and regional development patterns, when it is zoned 99% residential, but this plan suggests changing a series of residential streets into a commercial artery. If this was the case, all of the suburban developments (some relatively recent) should not have been zoned for this area. (75-N) Please explain how this plan will increase property values, when there is little room for any further residential development (it is almost completely “built out”) and one local realtor (Tracee Lutes) has already seen reduced home values along the road’s proposed route. (75-O) How is there no low income impact (no EJ population of concern) in this area, when there are over 170 mobile homes in the Southcrest Mobile Home community immediately adjacent to this roadway? (75-P) 6) I would like to know more about how you plan for noise abatement (category A and B) given that there is no way to do sound barriers in this densely populated residential area with many of the homes’ driveways dumping directly onto the roadway? What is the noise increase that is projected with a more than 50% increase of cars and trucks? (75-L) Is there any concern about the interior noise impact? I live in a historic 1870 farm house (Thomas Randall House) (on the BRI list and being considered for the National Historic Registry) and will need to have new windows and doors to make the old home inhabitable, due to the increased sound, which may cause preservation issues. (75-M) During construction access will be maintained to the schools. The schools have been, and will continue to be included, in the project development process. See response 47-C. 75-Q 76-A Please see the “Environmental Justice” section of the Environmental Assessment (Page 44 – Page 46). This section explains both the methodology and the results of the environmental justice analysis. 75-P See response 46-A. 75-N See response 8-D. The property located at 3636 South Rogers Street does not lie within the Area of Potential Effects (APE) for the project as show in Appendix C, Page 25. Please see the “Cultural Resources” section of the Environmental Assessment (Page 31 – Page 36) for more information on the studies conducted for the project in accordance with Section 106 of the National Historic Preservation Act. Additionally, the property located at 3636 South Rogers Street is not identified as a noise sensitive receptor – defined as being located within 500 feet of the project, in accordance with INDOT’s Traffic Noise Policy. 75-M 75-O See response 8-C. 75-L addressed directly. Email Comment 01/08/2015 3550 South McDougal Street Page 48 of 60 Fatal pedestrian injury remains a leading cause of death for people 15 years of age Question 5: The speed limits above conflict. Can the proposed “designed” and legal speeds be decreased to more readily fit with the established neighborhood homes, the four schools, and various shops and offices? Question 4: How would Alternative 1A be designed and built to assure that slower neighborhood and school area driving speeds are observed? Indiana’s maximum residential road speed is 30 mph. For school zones, the maximum speed is 20-25 mph. The Designed (40 mph) and Legal Speeds (35 mph) exceed these maximums. Speed Suggestion: An urban street must accommodate more pedestrians, bicyclists, curb cuts, speeds and frequency of potential points-of-contact. The street should be 10’ to 11’ wide, no median, and 4’ shoulders. The street must match the neighborhood character—not too flat, wide or open. The speed must be 20-25 mph in school zones, with appropriate signage, crosswalks, sidewalks, multi-use paths, crossing guards, and street trees. (76-I and 76-J) Question 3: The current character of the environment and neighborhoods along the proposed route varies greatly. Can the road be built to accommodate and enhance this diversity, e.g. eight + neighborhoods, wildlife habitat, trails, bike and walking, four schools, commercial? Specifically, what could be done to accomplish these things? Question 2: Why is the character considered to be “urban” rather than “sub-urban?” What is the difference between these two? (76-H) Roadway Character Question 1: Please describe the decision-making process that led to the answer of “No” for the question, “Will the project involve substantial controversy concerning community and/or natural resource impacts?” What process was used to create this “no” answer? (76-G) - - uncertain cost and financing (76-B) economic hardship on homeowners, due to declining real estate values and the cost of remediation of septic systems along corridor. (76-B and 76-C) the destruction of wildlife habitat that has already occurred, on Fullerton from Rockport to Rt. 37 (76-D) toxic emissions and run-off that will require curbs, gutters, trees (76-E and 76-F) public health considerations related to stress and illness Please note that the construction between SR 37 and Rockport Road is a part of the I-69 project and is not included in the scope of the Fullerton Pike project. See response 63-C. See response 4-D. The Environmental Assessment (EA) study provides a detailed analysis of the environmental impacts proposed by this undertaking. INDOT and FHWA, by approving the EA, have concurred that the project does not involve substantial controversy concerning community and/or natural resource impacts. See response 14-D. See response 8-F. See response 8-E. See response 8-A. 76-E 76-F 76-G 76-H 76-I 76-J 76-K See response 42-B. See response 8-D. 76-D 76-C Both at the hearing and in other public events, discussion varies widely on topics such as: - 76-B I observed substantial controversy at the Public Hearing on December 11, 2014. 78. 77. Email Comment 01/08/2015 Unity of Bloomington 4001 South Rogers Street Email Comment 01/08/2015 Kevin Luers 4051 Jamie Lane 6-8 neighborhoods, with many homes 2 middle schools 2 nursery schools commercial Page 49 of 60 Also in consideration of the proposed project, Unity of Bloomington requests that impacts to our parking areas be as minimal as possible. The semi-circular drive and parking area off Rogers Street is used by office personnel, for special events attendees and for better ADA access into the main level of the building. Impacts to this parking area can limit usability by the church. Likewise, reduction of the parking In consideration of the proposed project, Unity of Bloomington requests that the only entrance into the church parking lot, entered off Gordon Pike, not be blocked nor made inaccessible by any means. It is critical that no median strip be installed that would prevent west-bound access into the parking lot off Gordon Pike. Likewise, it is also critical that access to and from the semi-circular drive off Rogers Street not be blocked nor made inaccessible by any means. (78-A) On behalf of the board of trustees and members of Unity of Bloomington, I am submitting comments to you regarding the Fullerton Pike Corridor project. As you are no doubt aware, Unity of Bloomington is located at the SE corner of the Fullerton/Gordon Pike and Rogers Street intersection. I will be very receptive to this extension if Rhorer is modified substantially, but I will not cooperate if this is built as proposed. My biggest objection to this project is the width of the lanes (77-A) and median (77-B) for the Rhorer Rd. portion. My home sits on the corner of Jamie and Rhorer and is in the direct path of the proposed widening. The width of the road as proposed will jeopardize my families quality of life. (77-C) I want a safe road and I do want a bicycle/walking path on the North side of the Rhorer, as I do want to safely bike or walk to the trail or Kroger etc. However, the width of the median is unprecedented in size and would require millions to build and maintain. I would also think one bike/walking lane would be sufficient for the amount of foot traffic this path would generate which would save on the width of this project. - Question 6: What consideration can be given to varying the type of roadway, along the corridor, so that the road fits with the various existing natural and built-out qualities and conditions and enhances their character?(76-K) Speed and Character and younger. The street must be design to reduce speed at schools and through neighborhoods. A slower speed would be safer for residents in neighborhoods, pedestrians, school personnel, students, and traffic and customers driving into various commercial locations. See response 62-A. Impacts to parking areas will be minimized to the greatest extent possible. 78-A 78-B See response 8-A. See response 39-A. 77-B 77-C See response 22-A. 77-A 79. Email Comment 01/08/2015 Stephen Burns No address given Page 50 of 60 2. For Eastbound traffic (from the Evansville directrion) this means that the “connector” will dump high volumes of cars and trucks onto a series of two lane roads. Already traffic on Walnut and Rogers can be quite bad during commuting time. If the connector becomes a major traffic attractor, then it means that the volume on these other two lane roads will increase, and may decrease traffic on 2nd street, but increase it on Walnut and Rogers. Safety is a major concern here since if the traffic estimates are met, then it will push traffic onto roads that are not designed for that traffic and represent a significant safety issue. 1. For Northbound traffic (proceeding Northbound from Bedford), this road will only lengthen the distance to downtown compared to Walnut street, and will require traversing a longer route, through residential neighborhoods, back to Walnut, a considerably longer route. The Justification has been put forth is based on the assumption that this connector will decrease traffic load in other parts of the City of Bloomington and meet regional transportation needs. Specifically mentioned are access from the south to downtown and to Indiana University. I do not believe that the project will actually alleviate problems of traffic throughput. (79-A) The proposal calls for two lanes that will extend from I 69/Rte 37 to Sare Road. The road beds are unusually large, (79-B) apparently to accommodate higher speeds (79-C) and larger vehicles, (79-D) however of the existing endpoints only Walnut supports truck traffic realistically, and it is only two lanes and often fills with traffic from the south. My concerns center on several issues. Some are related to the issues of safety and environment, which I do not find to be fully addressed. Others relate to the underlying justification and cost estimates, which arise both from the scope of the current project as well as from the fact that the project seems to have been arbitrarily separated from related portions, which unrealistically obscures the true cost of the project. Finally, I am concerned about the basis for the projections and the fact that modern trends in commuting and urbanization are not following the implicit assumptions of suburbanization that dominated discussions during the 1960’s when the current proponents apparently formed their plans. This suggests that the documents are based on outmoded models of traffic and community growth. As the project moves forward, I am happy to be the contact person for Unity of Bloomington for both American Structurepoint and the Monroe County Planning Department. (78-B) area nearer the Rogers Street and Gordon Pike intersection and along Gordon Pike should also be minimal so as to not impact our ability to provide adequate parking. 79-L While the long-term goal is to improve the Fullerton Pike/Gordon Pike/Rhorer Road corridor from SR 45 to Snoddy Road, there are no immediate plans for improvements west of Rockport Road or east of Sare Road by Monroe County. See response 63-D. See response 6-A. 79-I 79-K See response 46-B. 79-H See response 44-A. See response 39-E. 79-G 79-J See response 8-F. See response 10-B. 79-D 79-F See response 27-B. 79-C See response 67-J See response 22-A. 79-B 79-E The traffic analysis has shown that all intersections will operate at an acceptable level of service, meaning significant backups are not anticipated. 79-A Page 51 of 60 8. The proposal actually involves two complete walkways/multi-use pathways, with a sidewalk on one side and a large multi-use pathway on the other. It is not clear that both are needed and no justification is provided, since in general multi-use includes walking. This is a safety concern because the connection of the three existing multi- 7. Grading and weather control. Presumably Federal requirements would alleviate the direct safety concerns by requiring considerable grading of this route. However if it is not properly graded and maintained it is a very hillly region of Bloomington that has seen the roads close by flooding twice within the last few years. That is, both creeks along Gordon Pike and the gap between Gordon Pike and Fullerton have gone significantly outside their banks. This relates to the related environmental concern of now providing miles of drainage, installed along the roadway and properly diverting it into streams that already flood. The concrete footprint of this project is larger than almost any other two lane road and this will cause unwarranted environmental loads on the water carrying capacity of the streams and Karst features. The findings of the study seem to ignore the hydrology with little to document the findings. 6. This route goes past two schools and a church. Already there were enough problems with Bachelor school access that stop signs needed to be installed for safety. This is on a road fed only by the local housing developments. Because Bachelor has only one real entrance path, either major traffic flow improvements at the school will be needed, or there will need to be some other modifications will be required. There a lot of kids living in the areas around Bachelor and Jackson Creek, and so extreme care (and corresponding costs) would be required that go beyond the direct costs of the connector. (79-F) The cost estimates and provision of a road designed for high speeds do not seem to discuss the costs of traffic control devices. 5. As mentioned, it will dump traffic onto roads that lack even a shoulder. Safety: This route will cause a number of safety consideration. 4. For Westbound traffic there are no obvious routes to connect to this project. If traffic from College Mall (and Nashville) aims for this connector it will be forced to either go via Sare, or Third street. Both already have high volumes and I see no way that the addition of another route that draws traffic to these will be beneficial or help throughput in any way at all. In fact, with access to 69 at Country Club and further North, most traffic progressing in a Westbound direction will naturally use these exits, since all start further North and the routes take a diagonal course. 3. For Eastbound traffic the assumption for routing to downtown seems to be that people take the first exit. However, the distance when mapped is considerably shorter to take Country Club and Rockport, by a distance of more than 1 mile. Thus, it will not alleviate traffic on those routes. The cost benefit of this plan seem to be poor for the Page 52 of 60 d. There is mention of numerous other “abutting” projects. Some appear related to the fact that the scope of this project was changed during the review, and some c. There will be an ongoing burden on budget for maintaining more than 2 miles of 16 foot wide median. (79-K) b. Traffic control costs will be high in order to ensure safety at major crossings (and there will be foot and bicycle traffic at every crossing). a. There will need to be large amounts of sculpting for topography, it is not clear how land acquisition was computed in the absence of this, since at the meetings engineers would not address how terrain would be changed near some of the houses near crests of hills. 12. The costing estimates seem to not include numerous items. 11. It is a very large project footprint. The roadway footprint proposed is over 70 feet (including lanes, medians, (79-G) shoulders/runoff control, multi-use path and sidewalk). Already there is a second exit to I69 proposed within a mile that has a complete road, already upgraded, and lesser residential impact. (79-I) As mentioned above the aspects that will ultimately be required by the City and County for safety ameliorations, will expand the cost way beyond what is put forth. The documentation for the choice of such a large footprint is not provided. Lower speeds are mentioned for safety reasons, but low speed residential roads should not require 16 foot travel lanes plus dual shoulders. Good use of our funds. community. 10. Driveways will open directly onto this road, and given the footprint it can be expected that speeds will be such that this is a risk. (79-E) This again calls into the lack of justification for 16 foot travel lanes plus shoulders. 9. Related to this is the fact that each intersection will also cross the multi-use pathways. While turn lanes are provided, most of these will require traffic control to be safe, since the traffic will be dealing with crossing proposed high volumes and high speeds of oncoming traffic, and will not be attending to individuals crossing on the multi-use or sidewalks. Note that the assumptions of a low speed limit will not be met without traffic control and the costing seems to not include a comprehensive traffic control plan and implementation. use trails by this project is likely to increase bicycle and waling usage, yet two of the main crossings are at street level. Already there are problems at crossings and there has been the need to construct more warnings and traffic control. The traffic control costs do not seem to be part of the costing so their absence represents a major safety concern. (79-H) 81. 80. Email Comment 01/08/2015 Email Comment 01/08/2015 Ameer Beitvashahi 521 West Gordon Pike Tina Boggs 850 W. Rosewood Dr. Page 53 of 60 In analyzing the alternatives, the environmental impact document assesses the short-term cost or each alternative, but not the medium- or long-term economic impacts. For example, since the “preferred option” would place an arterial through a neighborhood, hundreds of homes will lose value. (81-B) Additionally, many residents along the Rhorer Road section of the corridor will likely have to pay out-of-pocket to upgrade septic systems affected by the construction. (81-C) This is a severe negative impact to the economy of the area. Question 1: Please justify the decision to ignore INDOT’s very specific guidance regarding placing this type of arterial through a neighborhood. (81-A) Since the roadway may connect to a full interstate interchange, it is accurate to describe it as, at least, a minor arterial. The South Batchelor neighborhoods consist of 500+ homes. The corridor itself will be along the back yards of at least 35 residences and the driveways of at least 25 others. On minor arterials, Section 40-1.01(01) of INDOT’s Indiana Design Manual states, “In an urban area, a minor arterial may carry local bus route and provide intracommunity connections, but it will not, for example, penetrate a neighborhood.” I am writing to voice my approval for the Fullerton Pike expansion.I believe it is the logical choice to connect east/west Bloomington. 13. Overall, it is not clear what part of the community benefits from this large project. This is at the southern border of the population density of Bloomington. The existence of an entrance to I69 a mile north, and the general trending of the roads to the southwest will not serve most of the residents. There is little commercial zoning along the roadway, with the exception of the Walnut Intersection, thus the commercial value seems to be for longer distance traffic. Given the strong evidence that bypasses weaken the downtown areas of small cities, it is not clear that it is a good investment of citizen’s taxes to build routes that will weaken our city. e. As mentioned the incorporation of duplicate pedestrian access, which in turn requires extra shoulder work and drainage is not well justified and seems more designed to increase the footprint for construction than to meet actual needs. One mult-use pathway seems to meet realistic needs, and at a minimum a fact based assessment of need should be presented. of the other projects mentioned during the hearing seem to represent these changes in scope. This suggests that the entire cost should be calculated based on a combination of all related projects. (79-L) The proposed roadway does not penetrate a neighborhood. Eagleview neighborhood exists on the south side of Gordon Pike and the Highlands exists on the north side of Gordon Pike. These neighborhoods are currently separated by a roadway, and each neighborhood was developed to allow space for the proposed completion of this project. See response 8-D. See response 42-B See response 6-A. 81-A 81-B 81-C 81-D - Page 54 of 60 uses significantly more right-of-way uses more forest has more Perennial/Intermittent Stream crossings has more Ephemeral Stream Encroachments impacts more acres of farmland In Table 1, the comparison of Alternate 2: Tapp Road Upgrade to the Preferred Alternative 1A shows that the Preferred Alternative 1A: (81-J) Question 4: Considering the large amount of right-of-way being used and the quantity of homes whose property value will be affected, can “Propert Owner Impacts Minimized” be corrected to a “No” for Preferred Alternative 1A in Table 1, Page 14? The table also states 16 home re-locations for the Alternate 2: Tapp Road Upgrade, even though the text of the analysis clearly states that 12 of those relocations can be avoided by using land from the county club. (81-H) This shows a “No” value for “Property Owner Impacts Minimized” for the Alternate 2: Tapp Road Upgrade and a “Yes” value for the Preferred Alternative 1A. However, the preferred option uses significantly more right-of-way (31.2 acres v. 23.2 acres) and primarily affects homeowners. Fifty per cent of the right-of-way for Tapp Road comes from commercial property, according to the document. (81-G) Question 3: Please address all comparable issues in order to make for a balanced analysis of alternatives. In contrast, the analysis of the Preferred Alternative 1A does not address the loss of parking spaces currently being used for Unity Church and the Clear Creek Trail, the loss of acreage at Batchelor Middle School, or the loss of acreage at Jackson Creek Middle School. These seem like comparable impacts to the above mentioned for the “Upgrades to Tapp Rd” alternative (81-F) The analysis of the Alternate 2: Tapp Road Upgrade addresses potential lost parking spaces for businesses along the roadway, the potential relocation of a church, and the potential for loss of tees and greens at the Bloomington Country Club. (81-E) Question 2: Why are economic impacts not considered in the environmental assessment? Since INDOT’s guidance is being ignored, as mentioned in Question 1, it is even more import to assess economic impacts on the affected areas. On the other hand, Alternate 2: Tapp Road Upgrade would improve access to an area that is already commercially-zoned and developed. This has the potential for economic growth. (81-D) “Property owners” refers to owners of all types of property, not just residential property owners. The Tapp Road Upgrade would require at least 16 residential relocations and 2 business relocations, whereas the preferred alternative would require only one residential relocation. Relocation is considered a much greater impact to property owners than acquisition of strip rightof-way. Potential impacts to the golf course may be of sufficient magnitude to require acquisition of the entire course, and at-best would require substantial compensation to reconstruct and/or re-design the course. The golf course property impacts or the potential relocation of 12 residences are each greater in 81-H It was determined that the primary use of Batchelor and Jackson Creek Middle Schools as education facilities would not be diminished by the project. 81-F 81-G Tapp Road Upgrade does not satisfy the purpose and need for the project. During analysis of the Tapp Road Upgrade parking space acquisition was determined to be of sufficient magnitude to potentially require the relocation of businesses. The same determination was not made with regard to Unity Church. Parking spaces were not identified on Alternative 1A in the vicinity of Clear Creek Trail. 81-E 82. Email Comment 01/09/2015 Melinda Hamilton No address given impacts more identified karst features has more identified impacts to potential archaelogical sites has more impacted noise receivers creates more miles of new construction 6) cost, OY! seems like a big price tag (82-G) Page 55 of 60 5) age of the real plan, when was it created and does it work well within the area at this time as things are NOW, not then (82-F) 4) destruction or damage to karst features and several creeks (82-D and 82-E) 3) safety of crossing of the Clear Creek Trail (82-C) 2) 2 interchanges so close to each other (why here, why 2?) (82-B) 1) safety regarding the location of 2 middle schools. (82-A) I am emailing to request reconsideration of the proposed "Fullerton Pike Corridor." I am looking at the map and I am concerned about several items. Question 8: Will the county pay to install new sewer systems for residents whose septic systems will be impacted by the construction? Or are residents expected to pay for this expense out-of-pocket? Question 7: Will the county reimburse property owners whose property values are severely impacted (81-I) by the increase in traffic and noise? Question 6: The project proposes a stoplight at the intersection of Gordon Pike and South Rogers. Several residences are just a few feet from this light. What provisions will be taken to make sure there are no traffic backups in front of driveways? What traffic control alternatives, e.g. round-a-bouts, have been considered? (81-L) Question 5: Based on this comparison, please explain how can a “finding of no significant environmental impact” can be justified? (81-K) - The determination of a finding of no significant impact is not based on the project’s alternatives analysis or a comparison between alternatives. The proposed project does not have significant environmental impacts, as described in the approved EA. See response 11-A. See response 8-F. See response 9-A. 81-K 81-L 82-A 82-B 82-E 82-D Efforts will be made during design and construction to avoid and minimize impacts to water resources. Please see the See response 68-F. See response 6-B. Tapp Road Upgrade does not satisfy the purpose and need for the project. A formal investigation into Karst features, noise receivers, and historic resources along Tapp Road is beyond the scope of this project; however, predicted property owner impacts and stream impacts were considerably higher along the Tapp Road Upgrade. 81-J 82-C All property will be acquired in accordance with federal and state regulations, including compensation for any real reduction in property value. 81-I magnitude than property owner impacts related to Alternative 1A. 83. Email Comment 01/09/2015 Council of Neighborhood Associations - - - Page 56 of 60 The 2012 Final Engineering Assessment for the Fullerton Pike Corridor Improvements prepared for the Monroe County Board of Commissioners by American Structurepoint, Inc., which determined the Fullerton Pike interchange to be the most cost effective enhancement in this area, focused primarily on reducing travel times and enhancing vehicle operation with little regard to other important considerations such as neighborhood continuity, pedestrian and bike safety, community character, or the environmental impact to the area. (83-B and 83-C) I-69 is already connected via the proposed interchange at Tapp Road, 1 mile from this proposed interchange. CONA questions the expense of this expansion given the many drawbacks to this road widening project, and the other transportation needs the County has due to I 69. According to the US Department of Transportation Federal Highway Administration’s Highway Functional Classification Concepts, Criteria and Procedures: Arterial Considerations, “Arterials should avoid neighborhoods. They often serve as buffers between incompatible land After much discussion, the CONA membership recognized the following problems with the Fullerton Pike interchange and new corridor: Residents from the area near the proposed Fullerton Pike interchange discussed their opposition to the new interchange and the connected corridor. CONA met on Wednesday, December 17 to discuss, among other things, the impact of I-69 on various neighborhoods in Bloomington and Monroe County. In particular, we discussed the impact of increased traffic on 17th Street between Crescent Bend and the roundabout and the impact of the interchange at Fullerton Pike. (83-A) Concerned neighbors from each area expressed their concerns about each project and the impact on their particular neighborhoods. The Council of Neighborhood Associations (CONA) represents the approximately 65 neighborhood associations in Bloomington and Monroe County working with them to create healthy, secure neighborhoods, provide organizational support, and serve as a unified, advocating voice for neighborhood concerns. Thank you for allowing us submissions. Please consider any possible alternatives that will be better for the area. One I have read about is an overpass and frontage road from Fullerton Pike to Tapp Road. (82-H) I do not know if this would be the best one, but it is one to consider. I am sure there are a few more. See response 8-A. See response 47-C. See response 6-A. See response 9-A and 9-B. Please see the “Purpose and Need” section of the Environmental Assessment (Page 5 – Page 6). The purpose of the project includes the motorized traffic improvements mentioned as well as improvements to pedestrian safety and trail access. Please see the “Community Impacts” section of the Environmental Assessment (Page 43 – Page 44) and the “Ecological Resources” section of the Environmental Assessment (Page 21 – Page 28) for reference to the analysis conducted for this project on the referenced topics. The proposed roadway does not penetrate a neighborhood. Eagleview neighborhood exists on the south side of Rhorer Road and the Highlands exists on the north side of Rhorer Road. These neighborhoods are currently separated by a roadway, and each neighborhood was developed to allow space for the proposed 82-F 82-G 82-H 83-A 83-B 83-C 83-D “Streams, Rivers, Watercourses, and Jurisdictional Ditches” section of the Environment Assessment (Page 21 – Page 23) for a discussion of potential stream impacts. Our first recommendation is to eliminate this interchange and adjoining road expansion entirely. This is the “No-Build Option” in the Fullerton Pike Transportation Improvement Project. (83-K) - Outside shoulders no larger than 4’ wide. - No more than 2 undivided lanes. - Maximum of 11’ wide lanes. - - Page 57 of 60 Create every possible safety measure possible for this school zone including: Reduce speed to 20mph in school zone (current plan is for 40mph). (83-N) Design road to discourage speeding in school zone, rather than depend on - No bike lanes since there is a proposed multi-use path adjoining the project. Bike lanes are redundant, a waste of money and encourage excessive speeds. (83-M) (83-L) - The road must be made compatible with existing neighborhood context including: - Secondly, if this project does go forward, we recommend the following for the Fullerton Pike corridor: - Recommendations: - numerous existing residential neighborhoods. (83-J) - 2 existing schools, Batchelor Middle School and Jackson Creek Middle School. All INDOT of Federal Highway Administration standards will be conformed to in the design of the roadway. Bike lanes are not proposed. A multi-use path will be constructed on the north side of the roadway for bicycle traffic. 83-M The “No-Build” Alternative was not selected because it does not address the purpose and need of the project. Please see the “Other Alternatives Considered” section of the Environmental Assessment (Page 9 – Page 15) for more explanation. 83-K 83-L See response 8-A. See response 42-B. 83-J 83-I The project would in fact eliminate points of conflict by introducing a grassed median to limit left turns out of driveways. 83-H - many driveway cuts, creating potential points of collision (83-H) - existing residential septic systems which will be destroyed at significant cost. (83-I) See response 6-B. The Bloomington/Monroe County Metropolitan Planning Organization is responsible for assessing future transportation needs, including the effect of alternative transportation and fuel costs on local traffic patterns. 83-F 83-G See response 8-F. 83-E completion of this project. - 3 primary public pedestrian and bike trails, Clear Creek Trail, Bloomington Rail Trail and Olcott Trail. (83-G) The proposed corridor will cross or otherwise affect: - uses and should avoid penetration of residential neighborhoods.” (83-D) Gordon Pike and Rhorer Road, which, in fact, is the same road, in different townships, are the sites of two middle schools with a student population of 1,095 for the 2013-14 school year (this represents two thirds of Bloomington’s Middle School population) (83-F) as well as many neighborhoods falling to the north and south of the roadway. Virtually all of this construction has taken place within the past 30 years, after the original plan for this roadway to become an arterial corridor. The long-term plan does not consider changes to traffic patterns and capacity based on alternative modes of transportation, changing fuel costs, public transportation and other considerations. (83-F) 85. 84. Email Comment 01/09/2015 Skip Daley Highlands subdivision Email Comment 01/09/2015 Nicholas Roberts No address given enforcement. Add signage and signaled cross walks. - Page 58 of 60 The project will allow residents like myself amazing access to both I69 and SR37 Ease of Transportation: I fully support this project for a number of reasons, some of those include the following: I am a resident of a neighborhood known as the Highlands in Monroe County, Indiana, and I live adjacent to Gordon Pike and Fullerton Road. While I have declined to be part of the formal process of the advisory committee, I am a direct stakeholder in the outcome. I would not like to see this project continue. But if it somehow does, homeowners directly affected by the proposed construction should be amply compensated or given fair and equitable relocation. 3. Incompatibility with Bloomington: this sort of development is emblematic of the kind of characterless suburban sprawl one can find a few miles up the road in Indianapolis. It is not “Bloomington” and the lack of such development is part of what has made this town unique and liveable. (84-D) and 84-C) 2. Dangerous: it does not make any sense to attempt to build a highway exit that touches driveways, endangers small children, and endangers school children. (84-B 1. Property values will plummet: family friends live along this corridor and were not informed of this plan when they purchased their house almost 10 years ago. The development that would eat part of their front yard would have disastrous consequences for their property value and that of their neighbors. (84-A) Although I do not reside along the corridor that would be affected by this proposed construction, I am a longtime Bloomington resident interested in responsible development of this town. I am not convinced that the proposed corridor project makes sense for the area it would affect. My main concerns: This message is to contribute to the record of public comments regarding the proposed Fullerton Pike Corridor project in Bloomington, Indiana. I am in opposition to this proposal. We urge you to abandon the Fullerton Pike interchange for the reasons stated above. If this is not possible, then we strongly urge you to consider the recommendations above to make the new corridor as unobtrusive and safe as possible for the adjacent neighborhoods. - 84-D See response 46-A. See response 9-A. See response 8-F. 84-B 84-C See response 8-D. See response 27-B. 84-A 83-N 86. Email Comment 01/09/2015 Lynn Coyne Bloomington Economic Development Corporation The section of Gordon Pike immediately east of Rogers Street has been in grave need of repair for many years This project will end the number of vehicles which use the residential neighborhoods such as Eagleview and the Highlands as a short access route. The project will eliminate the excessive traffic which intersects the pedestrian trail on Rockport Road The project will include much needed improvements to the walking and biking trail which flows through the area Page 59 of 60 The original design of the project has been modified and narrowed over concerns In addition, we should keep in mind not only the traffic movement improvements that will be provided, but why those improvements are needed. They will allow increased communication between the facilities on both sides of our community. This includes easier access to employment opportunities and all the support services that are involved, such as day care. Expansion of community facilities such as parks, trails and entertainment venues on the west side will be facilitated and continue to increase the quality of life opportunities for everyone, and relieve some of the development pressures on the east side. Access to fire, ambulance and law enforcement services will be enhanced. It will also open up reciprocal opportunities for our regional neighbors to have access to education, entertainment and employment opportunities. The Fullerton Pike connector proposal is important to the future growth of employment and community opportunities for Monroe County. The Greater Bloomington Chamber of Commerce has clearly stated many good reasons to support this needed improvement. I am excited for the groundbreaking ceremony! There is no mistaking the benefits, and equally, no mistaking the reality that this project has been intended for decades. Regardless of whether or not one pays attention to long term infrastructure planning before moving into a neighborhood, no one can ignore the writing on the wall, which was the intentionally deep setbacks of sidewalks and utilities on Gordon Pike west of Rogers Street. My neighbors are all excited for these much anticipated improvements. Driving through the labyrinths of residential developments has been a dangerous chore, at best. Rockport Road is ridden with curves and blind spots . . . Fullerton (east of SR37) has been a disgrace for as long as I have lived in town. The project will inevitably assist with better disbursement of bus routes to Bachelor Middle School - - - Increased Local Safety: - 87. Email Comment 01/10/2015 Bob Poortinga 5930 N. Maple Grove Rd. Page 60 of 60 I would also add that that several traffic roundabouts should be developed on this corridor: the intersection of Gordon Pike and Rogers St; the intersection of Gordon Pike, Clear View Dr, and Batchelor School Dr should be realigned with a roundabout; and the intersection of Rockport Rd / Fullerton Pike. (87-A) 4) Much of the area in the vicinity of I-69 / Fullerton is undeveloped. Construction of the corridor will provide better opportunities for development of this area and increased economic activity. 3) Better access to the Rhorer Rd / Sare Rd corridor is necessary. This includes access to Jackson Creek Middle School and Sherwood Oaks Christian Church. The project should also include improvements to the Walnut Pike / Rhorer Rd intersection. 2) Better access to Batchelor Middle School is necessary. The intersection of Gordon Pike and Rogers St is often overwhelmed with traffic leaving/entering the school. 1) The Tapp/Country Club Rd corridor is wholly inadequate to handle the projected increase in traffic that will result in the completion of I-69 and resulting development that will ensue. A second access road to I-69 on the south side of Bloomington will be required. The Fullerton Pike Corridor is needed and necessary for a number of reasons. Bloomington and Monroe County has suffered under the artificial boundaries created by a lack of east-west access for too long, and the Fullerton Pike project offers a unique opportunity to bring our community closer together for the benefit of all. about truck traffic and further delay would continue to deprive our fellow citizens of the advantage of the connectivity this project provides. 87-A See response 11-A. From: To: Subject: Date: michelle.allen@dot.gov Fullerton Pike Project; bwilliams@co.monroe.in.us; Harvey, Benjamin FW: Decision Fullerton Wednesday, February 11, 2015 6:42:18 AM Please include in the project record. Michelle Allen FHWA-IN (317) 226-7344 From: Ann Elsner [mailto:aeelsnerhome@gmail.com] Sent: Tuesday, February 10, 2015 8:12 PM To: Allen, Michelle (FHWA) Subject: Fwd: Decision Fullerton So many of us want the Fullerton Pike road project stopped. Here is my video. I plan to send it to a few H-T reporters, since it is cross-cutting between Monroe County, nature, and arts. I plan to send it to Bloomington, Monroe County, and Indiana highway officials. Your video has been published at http://youtu.be/qYtaP6fpZO4 Decision Fullerton So many of us have fought long and hard to stop the truck route through our neighborhoods near Batchelor Middle School. This music video shows some of what will be lost. The Clear Creek trail is a wetlands habitat, and the section to be developed is at present without traffic noise or pollution. Dog walkers, joggers, cyclists, kids in strollers, and walkers share the peace and serenity with heron, fish, river mammals, and crawfish. The road into this pristine area dead ends just past the entrance to Batchelor Heights. The westernmost housing additions along Gordon Pike and Fullerton Pike, Batchelor Heights, Eagleview, and Clear Creek Estates house hundreds of families. Most of these home were built more than 10 years ago, some more than 20 years ago, with approval from Monroe County. There is not space for a large road because the right of way was not planned for anything more than a small neighborhood street. Batchelor Middle School would not be visible from an exit off I-69. This puts at least 500 children at risk. Other children use the parkland on Gordon Pike as a sports practice field. Cross country is popular here. This puts more children at risk if a major arterial were built here. It also degrades the air quality and introduces high noise levels. Cars and trucks might be assuming that 50 mph was OK, given that this route is proposed as the first exit to Bloomington when driving north on I-69, when in fact this is a residential neighborhood. Thousands of extra cars are predicted to drive through what is now people’s yards. The park land near Batchelor and the sidewalks along Gordon Pike are all part of a pedestrian and bicycle loop that hooks into both the Clear Creek Trail and the Rails to Trails, which are at the southern end of the B-line trail system. This system is now used extensively for recreation. Those who live in the condos, apartments, trailers have this as their green space. It is not unused land, and there is no Bryan Park near-by. Those who live along Gordon Pike engage in a variety of activities, such as basketball, directly next to the proposed high speed and large roadway. The Rails to Trails crossing currently cuts through a wooded area at grade. This trail has boomed in popularity in the last year. This means that the hundreds of people who use this trial will have to hope that the thousands of cars can see them and can stop in time. The same difficulty will be faced by people travelling in or out of the Unity Church. A large number of homes have driveways directly on Gordon Pike. It will be nearly impossible to pull out of their driveways into the large volume of traffic. The opposite side of this problem occurs for many of these residents returning home and needing to turn left against a high volume of traffic. If this is possible, it will slow the traffic to a crawl at rush hour. How some of these driveways can be made to work, due to the steep grade of Gordon Pike, is problematic. The proposed road may be above or below where the driveways now are. There is a good reason why again and again Monroe County decided not build a major road at Gordon Pike and Fullerton Pike: the grade is exceptionally steep and unsuitable for a high speed road. The large volume of traffic on such a steep grade creates an unsafe situation. We need to decide again not to build this road. Mitigation and Project Commitments Des# 0801059 – Fullerton Pike Corridor Improvement Project Project Commitments Firm Commitments 1. Minimize and contain within the project limits in channel disturbance and the clearing of trees and brush within the floodway. (IDNR) 2. Revegetate "low-maintenance" areas within the floodway with a mixture of grasses (excluding all varieties of tall fescue), legumes, and native shrub and hardwood tree species as soon as possible upon completion. (IDNR) 3. Do not cut any trees suitable for Indiana bat roosting (greater than three inches diameter at breast height (DBH), living or dead, with loose hanging bark) from April 1 through September 30. (USFWS and IDNR) 4. Appropriately designed measures for controlling erosion and sediment must be implemented to prevent sediment from entering the stream or leaving the construction site; maintain these measures until construction is complete and all disturbed areas are stabilized. (IDNR and IDEM) 5. If any archaeological artifacts or human remains are uncovered during construction, demolition, or earthmoving activities, state law (Indiana Code 14-21-1-27 and 29) requires that the discovery must be reported to the Department of Natural Resources within two (2) business days. (IDNR) 6. Reasonable precautions must be taken to minimize fugitive dust emissions from construction and demolition activities. Dirt tracked onto paved roads from unpaved areas should be minimized. (IDEM) 7. The use of cutback asphalt or asphalt emulsion containing more than seven percent (7 percent) oil distillate is prohibited during the months of April through October. (IDEM) 8. Install silt fence or other erosion control measures around the perimeter of any wetlands and/or other water bodies to remain undisturbed at the project site. (IDEM) 9. Stabilize all disturbed areas upon completion of land-disturbing activities. (IDEM) 10. Wastes and unused building materials shall be managed and disposed of in accordance with all applicable statutes and regulations. (IDEM) 11. A stable construction site access shall be provided at all points of construction traffic ingress and egress to the project site. (IDEM) 12. Public or private roadways shall be kept cleared of accumulated sediment that is a result of run-off or tracking. (IDEM) 13. If any permanent structures or equipment utilized for the proposed project penetrates the 100:1 slope from the Bloomington Monroe County Airport, FAA form 7460 (Notice of Proposed construction or alteration) must be filed. (INDOT Office of Aviation) 14. The stone gateposts at the Winston Thomas Wastewater Treatment Plant would be relocated away from the proposed roadway per the project’s Section 106 Memorandum of Understanding. (DNR-SHPO) 15. The principles of context-sensitive solutions shall be implemented during project development. In addition, the County should consider the use of limestone treatment in landscaping. (DNR-SHPO) 16. Three interpretive signs shall be placed at accessible locations along the multi-use trail. These signs shall discuss historic themes relating to the Maple Hill Mill and Quarry as part of the NCCHLD, transportation and the dimension limestone industry in Monroe County. The design of the signs shall be coordinated with the DNR-SHPO prior to installation. (DNRSHPO) 17. If the scope of work or right of way amounts change, INDOT Environmental Services would be contacted immediately. (INDOT) 18. Any work in a wetland area within County’s right-of-way or in borrow/waste areas directly related to this project is prohibited unless specifically allowed in the US Army Corps of Engineers or IDEM permit. (INDOT) 19. If any potential hazardous materials are discovered during construction the IDEM Spill Line should be notified with details of the discovery within 24 hours. (IDEM) 20. Install appropriate erosion and sediment control practices to minimize runoff and sediment deposition in the sinkhole areas identified in the Karst Report (Monroe County) 21. Install vegetative filter strips and minimize the placement of fill in the vicinity of the sinkhole areas identified in the Karst Report (Monroe County). 22. A hydraulic design study that addresses various structure size alternatives will be completed for the new bridge, two bridge replacements and the extension of Monroe County Bridge 610 during the preliminary design phase. A summary of this study will be included with the Field Check Plans (Monroe County). 23. Sediment and soil excavated for construction of piers/foundations in Clear Creek (replacement of Monroe County Bridge 74) sampled an analyzed for PCBs to determine appropriate disposal of excavated material. (Monroe County) 24. Prior to the initiation of any construction activities on bridges, including the removal of any bridge structures, the underside of each bridge should be carefully examined for the presence of bats, especially between April 1 and September 30. If any bats are found roosting on the underside of the bridge, immediately contact USFWS. (USFWS) 25. Prior to the demolition of older structures, such as barns and sheds, a visual search should be performed to see if bats are using the structure for roosting. Should bats be found using the structure, please contact USFWS to discuss options for excluding the bats prior to demolition. (USFWS) 26. Avoid Channel Work during the fish spawning season (April 1 through June 30). (USFWS and IDNR) 27. Post DO NOT DISTURB signs at the construction zone boundaries and do not clear trees or understory vegetation outside the boundaries. (USFWS) 28. Implement temporary erosion and siltation control devices, such as placement of straw bales in drainage ways and ditches; covering exposed areas with burlap, jute matting, or straw; and grading slopes to retain runoff in basins. (USFWS) 29. Revegetate all disturbed soil areas immediately upon project completion, using native species in riparian areas and natural areas. (USFWS) 30. Restrict below low-water work to placement of piers, pilings and/or footings, shaping of the spill slopes around the bridge abutments, and placement of riprap. (USFWS and IDNR) 31. Restrict channel work and vegetation clearing to the minimum necessary for installation of the bridge. (USFWS) 32. Culverts should span the active stream channel, should be either embedded or a 3-sided or open-arch culvert, and be installed where practicable on an essentially flat slope. When an open-bottomed culvert is used in a stream with good bottom substrate for aquatic habitat (gravel, cobbles and boulders), the existing substrate should be left undisturbed beneath the culvert. (USFWS) 33. All available design measures, including reduced construction zone width, should be used in sensitive areas to minimize impacts on streams, forest, karst features, and steep slopes. (USFWS) 34. Mitigation should include enhancement of riparian buffers along the major streams in this roadway corridor. (USFWS) 35. If riprap is utilized for bank stabilization, extend it below low-water elevation to provide aquatic habitat. (USFWS/IDNR) 36. Minimize the extent of artificial bank stabilization and use bioengineering methods wherever feasible. (USFWS/IDNR) 37. Implement appropriate safeguards to ensure that groundwater is not endangered, including precautions for fueling/servicing large equipment and developing contingency plans to handle the release of any hazardous materials. (USEPA – Ground Water and Drinking Water Branch) 38. Comply with the Monroe County Stormwater Management Ordinance, including provisions for runoff in sinkhole watersheds, the capture and infiltration of stormwater runoff, and reducing the post-construction stormwater discharge to pre-construction levels. (Monroe County Highway Department Drainage Engineer) 39. The new structure must not create conditions that are less favorable for wildlife passage under the new structure compared to the current conditions. (IDNR) 40. If tree clearing is determined to be necessary for this project, avoidance of cutting any trees suitable for Indiana bat roosting, which are trees greater than three inches diameter at breast height (dbh), living or dead, with loose hanging bark, is required from April 1 through September 30. (USFWS) 41. Impacts to the parking areas of the Unity of Bloomington Church will be minimized to the maximum extent practicable. (Unity of Bloomington) 42. Appropriate efforts shall be made to minimize disturbance to trail resources and pedestrians utilizing these resources during construction activities. Design shall ensure that no long-term diminishment of the features or attributes of the trail resources occurs, and that the project will maintain or enhance public access to trails relative to existing conditions. (Bloomington Parks Department) 43. The Bloomington Parks Department will continue to be involved in discussions on the project and will be able to provide input regarding roadway/trail intersections as the design progresses. (Bloomington Parks Department) 44. A noise analysis re-evaluation shall occur prior to final plan development in the area west of existing Gordon Pike. The re-evaluation will determine if noise mitigation (including noise walls) is reasonable and feasible, and the appropriate coordination with INDOT and the public will occur at that time. (Project Sponsor) Items for Further Consideration 1. Appropriate structures and techniques should be utilized both during the construction phase, and after completion of the project, to minimize the impacts associated with stormwater runoff. (IDEM) 2. The City requests design input and review of the Walnut Street and Rhorer Road/Gordon Pike intersection, and recommends that a modern roundabout alternative be evaluated at this intersection. If this occurs, INDOT ES will be notified as soon as possible to determine if an Additional Information document is needed. (City of Bloomington Engineering Department) 3. Quantify traffic impacts to South Walnut Street and South Sare Road during the design process to coordinate future City infrastructure improvements. (City of Bloomington Engineering Department) 4. Smooth-surfaced material should be placed on the side-slopes instead of riprap, such as articulated concrete mats or turf reinforcement mats, so as to not impair wildlife movement along the banks under the bridge. (IDNR) 5. Impacts to non-wetland forest under one (1) acre should be mitigated at a 1:1 ratio, while impacts to non-wetland forest over one (1) acre should be mitigated at a 2:1 ratio. Impacts to wetlands should be mitigated at the appropriate ratio as well. (IDNR) 6. IDNR recommends bridges rather than culverts and bottomless culverts rather than box or pipe culverts for purposes of maintaining fish passage through a crossing structure. Wide culverts are better than narrow culverts, and culverts with shorter through lengths are better than culverts with longer through lengths. If box or pipe culverts are used, the bottoms should be buried a minimum of 6” (or 20% of the culvert height/pipe diameter, whichever is greater up to a maximum of 2’) below the stream bed elevation to allow a natural streambed to form within or under the crossing structure). (IDNR) 7. Soft armoring and bioengineering techniques should be considered prior to hard armoring (riprap) for stabilization and erosion control. (IDNR) 8. Riprap should be used only at the toe of the side slopes up to the ordinary high water mark (OHWM). (IDNR) 9. Do not construct any temporary runarounds or causeways. (IDNR) 10. Post “Do Not Mow or Spray” signs along the right-of-way. (IDNR) 11. The physical disturbance of the stream and riparian vegetation, especially large trees overhanging any affected water bodies should be limited to only that which is absolutely necessary to complete the project. (IDEM) 12. The principles of Low Impact Development shall be considered during design of the project. These principles shall be considered to improve stormwater quality related to the proposed roadway improvement. (CAC Process) 13. Additional signage, mid-block crosswalks, and the use of traffic slowing design modifications shall be considered in the areas surrounding existing schools. (CAC Process, public outreach) 14. The use of under or overpasses shall be considered where trail resources cross the project or pedestrian crossings are planned. (CAC Process) 15. Due to the potential for residual PCB contamination within the sediment in Clear Creek, sampling for PCBs is recommended for soils and sediment excavated during construction of piers and foundations for the replacement of Monroe County Bridge 74 to determine appropriate disposal of excavated material. (Project sponsor) 16. Incorporate street trees between the curb and pedestrian facilities. For all City roadway projects, a minimum five foot wide grass plot containing large canopy street trees planted 40 feet apart is required. (City of Bloomington Planning Director) 17. A median break will be considered at the north entrance of the Unity of Bloomington Church to allow westbound traffic to enter the church from the north. (Unity of Bloomington)