Topics
Ministry of Land, Infrastructure, Transport and Tourism
1. Main Features and Advantages of Shinkansen
2. Government Supports for Shinkansen
3. Benefits brought by Shinkansen
2
Current High Speed Rail (Shinkansen) Network
Ministry of Land, Infrastructure, Transport and Tourism
JR East
Total Length: 2,388 km
JR Central
JR West
Sapporo
Akita Line
JR Kyushu
(Upgraded conventional line)
Shin-Hakodate
Under
Construction
2016
Yamagata Line
(Upgraded conventional line)
Hachinohe
Planned
line
Joetsu Shinkansen (270km)
1997
Hokuriku Shinkansen (117km)
Sanyo Shinkansen (554km) Kanazawa
Tsuruga
Hakata
1975
Nagasaki
2004
12 Mar 2011
Shin-Yatsushiro
Kyushu Shinkansen (257km)
Kagoshima-Chuo
2015
1982
Nagoya
4 Dec 2010
2002
Morioka
Tohoku Shinkansen (675km)
1982
Nagano
1972Shin-Osaka
Okayama
Niigata
1999
1992
As of 2011
Shin-Aomori
Sendai
1982
1997
Takasaki
Omiya
1964
Tokyo
Tokaido Shinkansen (515km)
Omiya
1985
Ueno
1991
Tokyo
3
Safety, Frequency, Reliability, Ecology
Fatalities to date:
ZERO
Ministry of Land, Infrastructure, Transport and Tourism
for 48 years
since the start of operation in 1964
Up to
14 services per hour thanks to train control technology
Average delay time :
less than
1 min
for 48 years
Excellent environmental performance
7.5
CO₂
:
5
:
1
emission comparison
Automobile
Airplane
Shinkansen
4
Car Body (1) Lightweight
Ministry of Land, Infrastructure, Transport and Tourism
○ Comparison
Trainset (cars) - Seats (No.)
Train Weight (ton) *
Train Weight/Seat (ton/seat)
Shinkansen
Shinkansen
Series E5
Series N700
10 - 731
454
0.62
16 - 1323
635
0.48
A train
B train
20 – 750
16 - 858
766
818
1.02
0.95
*Unloaded train data
Train weight per seat
(ton/seat)
1
0.62
1.02
0.95
A train
B train
0.48
0.5
0
E5
N700
Lower CO2 emissions & Energy consumption
5
Car Body (2) Wide : Comfort and Large CapacityMinistry of Land, Infrastructure, Transport and Tourism
The car body of Shinkansen is wider than that of any other high speed rail
train.
Shinkansen
446-456
More
passengers
400-410
Shinkansen: 3350-3360 mm
Comfort
Width
(mm)
Seat
Pitch
(mm)
Seats/Car
(No./car)
Series E5
3350
1040
73.1
Series N700
3360
1040
82.7
Train A (TGV-R)
2904
900
37.5
Train B (ICE3)
2950
920
53.6
6
Small Infrastructure
Ministry of Land, Infrastructure, Transport and Tourism
The excellent air tightness of the car body of Shinkansen allows for
tunnel cross sections to be constructed small.
Shinkansen
TGV・ICE
64㎡
90㎡
軌道中心間隔4.3m
Distance
in-between: 4.3m
Small
R=
6,
25
0
R=
4,
75
0
○Tunnel Cross Section
軌道中心間隔4.5m
Distance in-between: 4.5m
Large
7
The Competitiveness among the Other Transport Modes
Ministry of Land, Infrastructure, Transport and Tourism
○ Passenger shares for the modes of passenger transport between Tokyo and Fukuoka
Tokyo–Nagoya
71%
Tokyo–Osaka
5% 23%
77%
19% 4%
Tokyo–Okayama
64%
Tokyo–Hiroshima
55%
Tokyo–Fukuoka
Population
of cities
(2008)
Tokyo
0km
34%
Bus
Airplane
Car
2%
42%
9%
Railway
2%
1%
90%
Source: Inter-Regional Passenger Mobility Survey FY 2007
8.3
2.2
3.6
Yokohama
30km
5.8 3.5 3.6
Nagoya
366km
5.0
Ahmedabad Anand/Nadiad Vadodara Surat
235km
0km
54km
103km
2.6
Osaka
553km
0.69
1.2
Okayama Hiroshima
733km
894km
1.4
Fukuoka
1,175km
12.0
Mumbai
500km
(million)
8
Topics
Ministry of Land, Infrastructure, Transport and Tourism
1. Main Features and the Advantages of Shinkansen
2. Government Supports for Shinkansen
3. Benefits brought by Shinkansen
9
Financial Supports for the Railway Construction
Ministry of Land, Infrastructure, Transport and Tourism
After 1997,
-Central and local governments pay for the construction cost.
-Operators (JRs) no longer shoulder the burden of the construction cost.
-This scheme ensures the sustainable operation of the JRs.
JR (operator)
Lease
Tracks
Pay Lease
Fee
JRTT*
(Builder and owner of tracks)
<Financial Supports>
Subsidize
2/3 of construction cost
Japanese (central)
government
Local governments
1/3 of construction cost
*JRTT: The Japan Railway Construction, Transport and Technology Agency
10
Other Supports for the Railway Construction
Ministry of Land, Infrastructure, Transport and Tourism
In case of Shinkansen construction extending across local authorities,
under entrustment from JRTT, local governments themselves purchase
land for quick and smooth acquisition.
Construction Period
Design
Land
Acquisition
Test
Run
Construction
The local governments, which know
the area very well, accelerate land
acquisition.
Design
Land
Acquisition
Construction
*The cost of land acquisition belongs to JRTT.
Test
Run
Opening
Opening
Shorter Period
Less Interest
Low management
cost
Control Project
Cost
11
Local Governments’ Supports for the development around station
Ministry of Land, Infrastructure, Transport and Tourism
Before
Area around
Sakudaira
station
Planned Station
Hokuriku
Shinkansen
165km from Tokyo Station
1.5km from the center of Saku City
12
Local Governments’ Supports for the development around station
Ministry of Land, Infrastructure, Transport and Tourism
■Land rezoning project around the station
<Local Government’s Vision>
-Shopping, Business and Housing area
■Integrated city planning utilizing existing
city area and the area surrounding the station
Local government
Active participation
■Development of the station building
After
(10years after opening) = Year 2007
Sakudaira St.
Hokuriku
Shinkansen
13
Topics
Ministry of Land, Infrastructure, Transport and Tourism
1. Main Features and Advantages of Shinkansen
2. Government Supports for Shinkansen
3. Benefits brought by Shinkansen
14
The effect of opening Sakudaira Sta.
(1)Population increasing(Saku City)
Ministry of Land, Infrastructure, Transport and Tourism
(2)Passenger increasing(Sakudaira Sta.)
1997
(Opening yaer)
65,350
1997
(Opening year)
1,586/day
2012
(15 years after)
70,040
2011
(14 years after)
2,682/day
Increased
4,690
(7.2%UP)
increased
1,096/day
(70%UP)
*The average increasing rate in Japan = ▲0.2%(2011)
(3)Increasing of the asset tax revenue(around Sakudaira Sta.)
1996
(before opening)
¥4.35M
2012
(16 years after)
¥535.59M
increasing
¥531.24M
(×123)
15
Significant time saving
Ministry of Land, Infrastructure, Transport and Tourism
Kyushu Shinkansen: Hakata - Kagoshima-Chuo (250 km)
Phase 2: Hakata - Shin-Yatsushiro
opened in March 2011
Phase 1: Shin-Yatsushiro - Kagoshima-Chuo
opened in March 2004
■ Significant time saving
3’40”
Before Opening
2’12”
After phase 1 opening
(Shin-Yatsushiro - Kagoshima-Chuo)
About 1’20”
After opening of entire line (phases 1 & 2 )
(Hakata - Kagoshima-Chuo)
16
Benefits of High-Speed Rail
Ministry of Land, Infrastructure, Transport and Tourism
■ Huge impact on local economies
as a result of the increase in visitor numbers
the entire line opened in March
2011
Visitors to Kagoshima Prefecture
Ripple Effect on Economy
of Kagoshima Prefecture
Increased by 24.5%
(year-on-year basis)
460 million dollars
(since the opening of the entire line)
Source; Kagoshima Regional Economic Research Institute
17
Related Businesses Contributing to Railway Projects
Ministry of Land, Infrastructure, Transport and Tourism
Before
Hakata Station (Kyushu Shinkansen)
18
Related Businesses Contributing to Railway Projects
Ministry of Land, Infrastructure, Transport and Tourism
After
Hakata Station (Kyushu Shinkansen)
19
Wide-ranging Benefits of Shinkansen
Ministry of Land, Infrastructure, Transport and Tourism
Shinkansen brings job creation and regional economic development.
infrastructure construction
rolling-stock manufacturing
rail track maintenance
20
Conclusion
Ministry of Land, Infrastructure, Transport and Tourism
Japan will contribute to realization of HSR in India with united efforts by
public and private sectors, through experience of Shinkansen operation
for 48 years.
■The advanced Shinkansen Technology
- Safety, Reliability, Ecology etc.
■Regional Development which unify with
Shinkansen Construction
- Population and Visitors increasing, Ripple effect on Economy
■Financial Supports Scheme
- ODA Yen Loan, JBIC Loan
Public Sector
Private Sector
21
Ministry of Land, Infrastructure, Transport and Tourism
Thank you

Similar documents

128,000 € 120,000 € 390,000 € 131,000

128,000 € 120,000 € 390,000 € 131,000 VOLVO FM 9 YEAR 07.07.2006, 380CV, 6X2, 254.112KM, EURO 3, 12 CHANGE SPEED, pneumatic rear suspension, 3RD AXLE LIFTING EQUIPPED WITH HYDRAULIC CRANE HIAB 322-5 HIDUO ARTICULADA MARK 5 HIDRAULICAS,...

More information

pdf here

pdf here 2015 Superbike World Championship Race Schedule 22 Feb

More information