activities

Transcription

activities
vimac
PRESENTATION
PRESIDENT
ADVISOR TO
PRESIDENT
CHIEF
EXECUTIVES
QUALITY
DEPARTMENT
ENVIRONMENTAL
DEPARTMENT
ORGANISATION
DEPARTMENT
PREVENTION
DEPARTMENT
FINANCIAL
DEPARTMENT
PRODUCTION
RESOURCES
ESTUDIES AND
PROJECTS
NEW
PROJECTS
TECHNICAL
COORDINATOR
SALES
REPRESENTATIVE
INTERNATIONAL
PRODUCTION
CENTRAL REG.
MANAGER
BASQUE COUNTRY
REGIONAL OFFICE
DEVELOPMENT
NATIONAL
PRODUCTION
NORTHERN REG. SOUTHERN REG.
MANAGER
MANAGER
EASTERN ANDALUSIA
REGIONAL OFFICE
EASTERN REG.
MANAGER
VIMAC is a company with long experience in installations in
different sectors. Its origins go back to the beginning of the
twentieth century. Since then it has advanced with society,
keeping up with its needs and adapting to the new technologies.
It offers its considerable experience in installations and
maintenance in the electric, electromechanical, industrial,
telecommunications, railway and hydraulic sectors.
It has an infrastructure capable of undertaking large and highly
technical projects, and has its own technology in the railway
and telecommunication fields.
Its technical team is involved in research projects developing
new products and innovative solutions making use of new
materials and advanced technologie.
ACTIVITIES
POWER
In the field of Electric Power Installations, our experience
includes all the electricity transport, transformation and
distribution infrastructures, carried out to the strictest quality
and perfection requirements demanded by the electric
companies.
Our experience includes installation of:
• Power Plants
• Substations
• High and Medium Voltage Lines
• Win Energy Evacuation Networks
WORK UNDERTAKEN AND WORK UNDERWAY
• Ultra speed feeder cells and traction rectifiers substitution,
with few reliability on several substations of Zaragoza´s
JTMI.
Customer: ADIF
• 1500 Vcc electrical substations on Madrid´s underground
(Line 11). Customer: MINTRA
• Different works for Barcelona´s Territorial Headquarters.
Substitution of auxiliary service’s transformers on Motcada
and Mollet´s substations. Improvement of low tension
protection on substations. Substitution of cutter engines,
chain conditioning on Barcelona’s tunnels.
Customer: ADIF
• Electrical substations on Madrid´s prolongation
underground (Line 1), Vallecas's Widening.
Customer: MINTRA
• Rehabilitation and power increase on Las Infantas
traction´s substation, Line Madrid - Valencia.
Customer: ADIF
• Assembling works and auxiliary civil works on Puerto
Real´s Substations. Blue Project.
Customer: REE
• Power renforcement on Manlleu – Puigcerda section.
URTX-ALP and Planola´s substation.
Customer: ADIF
• Avila’s electrical traction substation rehabilitation, MadridHendaya line.
Customer: ADIF
• 45/15 KV transformer substation for electrical supplier to
irrigable zone of Adaja river.
Customer: Instituto Tecnológico Agrario, Junta de Castilla
y León.
• Electric power station harbour for Generalitat Catalana´s
railroads, Olesa. Montserrat.
Customer: GISA.
• Enlargement of the Utrera substation and new substation at
Dos Hermanas for the “Duplication of Lines, Sevilla to Cádiz,
from Dos Hermanas to Utrera" Project "
• Project, Installation and Maintenance of the new Villaverde
Bajo Substation for high speed line (LAV) Madrid - Barcelona
– French Border.
5
ACTIVITIES
RAILROADS
VIMAC has all the machinery necessary and specific for
installations such as:
- Electrification Installations for High Speed Lines
(AVE).
- Electrification Installations for Conventional Railroad
Lines.
- Traction Power Substations.
- Company Substations.
- Railroad signalling.
- Communications systems.
WORK UNDERTAKEN AND WORK UNDERWAY
• Interlocks modernization, 5 KVA SAI's installation of and
Termical recorders substitution for electronic systems on
T/Grañen – Tormillo substations, Zaragoza - Barcelona line.
Stations of Customer: ADIF
• 10 KVA and 1 H of autonomy SAI Equipments substitution
onT/Calatayud – Ricla substations, Madrid– Barcelona line.
Customer: ADIF
• Transformation elevators centers installation for supply of
II.SS. on Sabadell Sud and St. Vicenç de Castellet.
Customer: ADIF.
• Power point assembly of cutter conditioner of A.C. Alcázar
de San Juan - Manzanares Section 1 and Venta de
Cardenas and Correderas substations, Madrid - Seville line.
Customer: ADIF.
• Pump wells control substitution on San Bernardo's Tunnel,
Santa Justa – La Salud section, Seville - Cadiz line.
Customer: ADIF.
• Mechanical interlocks installation and exit feeders doors
improvement on Las Cabezas and El Cuervo´sSubstations.
Customer: ADIF.
• Critical materials substitution on L.A.C. Tudela de Veguin –
Peñarrubia section, El Soto del Rey – Elentrego line.
Customer: ADIF.
• Renovation sub plain of Insulating Meetings on JTMI´s area
of Barcelona.
Customer: ADIF.
• L.A.C.'s review correcting anomalies between P.K. 155/500
to P.K. 165/500, Section Torralba – Arcos de Jalón, Line
Madrid - Barcelona.
Customer: ADIF.
• Power supplyon Facilities of Security works, (C.T.C.
Enclavam, Blockades and Train Earth), to surroundings
Murcia - Alicante and Line Chinchilla - Cartagena,
SectionChinchilla - Cartagena.
Customer: ADIF.
• Modernization works of chain Montcada Bifurcación – Vic
sections, Barcelona – Puigcerda line.
Customer: ADIF.
• Tenerifes´s light rail electrification, line 1, between
Santacruz and The Lagoon.
Customer: EFACEC, S.A
• Electrificación de Zuera Northwest Corridor High Speed
Line: Zaragoza - Huesca, from Miraflores to Tardienta.
• Includes 66 kV High Voltage Park . 2x25 kV Substation and
transformation centres, in addition to catenary and supply for
350 Kms/H high speed in all-Spanish CAVE technology
system.
Customer: MINISTERIO DE FOMENTO
• Electrification Tardienta
Electrification Work on the Northwest Corridor High Speed.
Line Zaragoza - Huesca Canfranc Line Tardienta Huesca.
Width adaptation UIC Electrification (catenary and supply) for
high speed access between Tardienta and Huesca.
Customer: TECSA-DRAGADOS ( Ministerio de Fomento )
• Electrification of Atocha
Change of electrification system of Madrid Seville line from
3kV DC to 25 kV AC at 50 Hz. Conditioning of 3000 V
catenary to 25000 V (High speed) at Atocha Station (Puerta
de Atocha exit) and Negro Hill.
Customer: RENFE AVE
• Electrification of Irún
Rehabilitation of the catenary line at the Irún Station ,
affecting local tracks with both widths.
Customer: RENFE
7
ACTIVITIES
SYSTEMS & COMMUNICATIONS
• SYSTEMS
Our Systems and Development Department also has
material and human resources necessary to take on
projects of all kinds and sizes, from small modifications in
domotic systems, to large Control projects.
At Vimac, we believe that there is no such thing a generic
solution to the problems of automation at any firm. That is
why we give personalized, tailored treatment, so each
solution adjusts to the customer's needs .
• COMMUNICATIONS
At Vimac our Telecommunications Division can take on a
wide variety of projects, always sure that our customers will
be completely satisfied. Results guaranteed .
We offer integral service for our customers, from
engineering to system start-up, from supply to installation.
WORK UNDERTAKEN AND WORK UNDERWAY
Main line optic fibre networks for RENFE
• Optic Fibre Infrastructure for the Railway Network, Sevillato-Huelva, (Laying 115 km of underground optic fibre cable,
and 110 km. of overhead catenary optic fibre cable) and
from Guadalcanal to Rosales (laying 75 km. of underground
optic fibre cable).
• Optic Fibre Network for the Railway Network
Infrastructure, from Seville to Utrera. (Laying 32 km of
underground optic fibre cable).
• Optic Fibre Network for the Railway Network
Infrastructure, from Ariza-Calatayud (Laying 40 km of
underground optic fibre cable).
• Optic Fibre Network for the Railway Network
Infrastructure, from Fuencarral to Majadahonda. Laying 27
Km of underground optic fibre cable).
Communications Infrastructure Operators:
Optic Fibre Network in Industrial Parks, Operator Ono.
• Connection from Polirrosa Industrial Park to Pavipresa
Industrial Park, Huelva.
• Connection from El Palmar Industrial Park to Las Salinas
Industrial Park , Puerto de Santa María.
• Connection from Palmones I Industrial Park to Palmones II
Industrial Park, Algeciras.
• Connection in Avenida San Francisco Javier, Seville.
(Laying > 8 Km of underground optic fibre cable.)
Laying paired-cable trunk communications line, operator
ONO.
• Polirrosa, La Esperanza, La Paz, Pavipresa, San Diego,
El Rincón, Naviluz and La Luz, Industrial Parks (Huelva). El
Palmar and Las Salinas ( Puerto de Santa Maria ) Industrial
Parks, and Zona Franca Cadiz. (Laying >11 KM of up to 25
pp cable underground inter-building and overhead) .
9
ACTIVITIES
Others
• Protection manager installation in Majaravique Substation
Customer: ADIF.
• Protection manager installation in Las Cabezas Substation
Customer: ADIF.
• AVE tunnels illumination automation, Madrid-Sevilla line.
Customer: RENFE – AVE.
• Installation of Communications Line for Train. Madrid to
Sigüenza.
• Telephone System and 14 cuat. cable segregation in
Valdelatas, Getafe , Leganés, Sagunto and Tarrasa
substations.
• Installation of Railway links on the Madrid-to-Móstoles line.
Communications and Signalling.
• Communications Line at la Encina Station .
• Installation of optic fibre railway network infrastructure, from
Zafra to Guadalcanal (70 km).
• Communications and Signalling Cables for detour in GetafeSector 3.
• Installation of “Proceed” Order Signalling System.
• Installation of electronic and remote control equipment at
Silla-Gandia Substation.
• Telephone System and installation of electronic and
distribution control equipment at Torrebonica – Tarrasa
Substation.
RESEARCH & DEVELOPMENT
• Development of overhead contact system analyser plate
The Overhead Contact System is a component which, despite
the restricted access to the track areas, runs the risk of a
multitude of accidents, such as falling rays, breakages, short
circuits, the electrocution of persons or animals, etc. Therefore,
whatever the incident, it is important to react quickly to avoid
causing harm to persons or property.
• Development of Distributed Control
Created and development as a middle step between the
substation systems and the maintenance worker team to ensure a
good and safe working process of the substation.
• Development of protection manager for traction substations
The Protection Manager consists of a programmable
automaton (PLC) which functions completely independently of the
rest of the PLCs which make up the system. Its main function is
supervising the correct operation of the installation, focusing on
safety. The main parameter which makes the Protection Manager
so efficient is the response speed between the fault diagnosis and
the action, which is less than 4 milliseconds. As a result, a
multitude of potential disasters are avoided, in which nonsuppression of the fault would result in the total destruction of the
affected equipment, or even a fire in the whole installation
• Development of demo fitting platform for operation and formation
of distributed control substations.
The development of this system is very complex, and along
with the fact that the final installations are extremely important,
this becomes a critical factor. For this reason, it would be
desirable to have a location for testing where we could carry out
checks of the system which are as similar as possible to a real
installation, and which allow us to have guarantees on the
developed system before its real introduction.
11
ACTIVITIES
INDUSTRY
Our highly qualified electromechanical, electronic and
automation assemblies enable us to work in nearly all the
sectors of industry, petrochemical, food, manufacturing,
power, etc.
Our offer includes:
• Chemical Plants
• Industrial Installations
• Loading Terminals
• Process Control
• Gas Ducts
• Maintenance
WORK UNDERTAKEN AND WORK UNDERWAY
• Solid Urban Waste Recycling Plant in Villarrasa (Huelva)
• Olive Packing Plant OLISE in Hinojos (Huelva)
CONSTRUCTION
In the building sector, we collaborate with the main
national builders in unique construction such as:
• Shopping Malls
• Department Stores
• Offices
• Hotels
• Congress and Exhibition Halls
• Amusement Parks
• Sports Facilities
With installations such as:
• Lighting and Electrical Services and Distribution
• Structured Wiring
• Integral Facility Control
• Access Control
• Closed Circuit Television
• Public Address System
• Interior and architectural lighting
• Alarms
• Domotics
WORK UNDERTAKEN AND WORK UNDERWAY
• Construction works for the stable puppet theatre “La Tía
Norica”
Customer: Cádiz Council
• Los Boliches parking
Customer: Fuengirola Council
• Underground parking in Luis Martín square, Roquetas de
Mar.
Customer: Roquetas de Mar
• Underground parking in El Caballo square, Jerez de la
Frontera.
Customer: AZVI.S.A.
• Electrical installations (BT and MT), voice - data, security
system, PA system, R-TV network and UPS for the "Los
Olivares" office building.
Others:
• Public address system installation, voice-data and video
conferencing at the Santa Justa Railway Station (Seville).
• Low voltage electrical and communications installation
DRASA.
13
ACTIVITIES
URBANIZATION & INDUSTRIAL PARKS
In traditional installations such as the urbanization of
industrial parks and residential areas, Vimac, is
characterized by its turnkey construction of the entire
installation project, including electrical installation, sanitation
and water supply.
Our industrial park electrification offer includes:
• Electrical service supply
• Transformation Centres
• Medium and low voltage grids
• Street lighting
• Excavation and channelling
WORK UNDERTAKEN AND WORK UNDERWAY
• Industrial estate urbanization MIRABUENO II,
TorreDonJimeno, Jaén.
Customer: E.P.S.A.
• Aguadulce Boulevard urbanization, Project 2, P.K.
428,679-429,437 Roquetas de Mar municipal district.
Customer: Roquetas de Mar Council
• Urbanization works in Cortijo San Rafael, Fase 4.
Customer: Frigiliana Council
• Urbanization electrical installation at industrial estate El
Fontanal
Customer: GESTARQ 21
• Street lighting in Arganda
Traffic safety. Installation of Public illumination of the N-III
highway from Madrid to Valencia , Sta. Eugenia stretch from
PK 10.00 to 22.00, Arganda de Rey Bypass. Province of
Madrid.
Includes 556 12-metre streetlights. 5 30-m, 14-Kw-power
towers including their high and low-voltage power supply.
• Tunnel nº 1 & 2 lighting of Ruta del Toro Highway, Cádiz.
Customer: AZVI, S.A.
• Urbanization for Utebo Council, Zaragoza
Customer: Utebo Council
• Channels for Parque de Actividades Medioambientales of
Aznalcollar
Customer: Instituto de Fomento de Andalucía.
• Reform works at Prim and Isaac Peral streets, Rota,
Cádiz.
Customer: Rota Council.
• Aguas Vivas Project urbanization.
Customer: Ministerio de Fomento.
Others:
• Traffic safety and Lighting of the Intersection at Lepe
(Huelva).
• Distribution of Power and Lighting at the Zuera Industrial
Park (SEPES)
ACTIVITIES
HYDRAULIC WORKS & ENVIRONMENT
We have created a water treatment department with the
technical and human media necessary to respond to all the
needs that come up in the Integral Water Cycle, from
project development to final execution of construction.
Our experience in a wide variety of construction in very
diverse sectors, means we have the personnel, the training
and the technical media necessary to deliver turnkey
construction in which the premise of Quality Assurance in all
processes related to the execution of work leaves the
customer completely satisfied.
WORK UNDERTAKEN AND WORK UNDERWAY
• Equipments and systems supply and installation for
remote control and chlorinating of water´s supply in San
Roque downtown, Jimena y Castellar de la Frontera
Customer: ACGISA
• Margins conditioning for Trejo and Del Burgo creeks
confluence at Setenil de las Bodegas Municipal Term, Cádiz
Customer: Confederación Hidrográfica del Guadalquivir.
• Reparation and recovering, Alamin´s basin creek.
Customer: Guadalajara Council.
• Urban reform and conservation, Paseo de Nuestra Señora
de la O, Seville Municipal Term.
Customer: Hydrographic Federation of the Guadalquivir.
QUALITY AND ENVIRONMENT
A pioneer in Andalusia in creating a Quality Department,
Vimac received the UNE-EN-ISO 9002 certificate for quality
in 1995.
Later it also was also certified by AENOR with Certificate nº
ES-412/1/95, verifying correct application and operation as
per the UNE-ENN-ISO 9000 DE 2000 standard.
In its internal planning, Vimac has decided on and continues
to insist on continued training at all levels, so that all the
members of the company are not only linked to quality
parameters, but have the knowledge to efficiently put them
into practice.
From here we therefore wish to transmit a message of trust
and a firm promise to search for Excellence in each and
every one of the projects that our company undertakes, so
that Vimac will continue to be a references for quality in the
sector.
17
PREVENTION
In the belief that Human Capital is the basic pillar of our
organization, Vimac insists on the latest and most modern
systems of occupational accident prevention.
At Vimac an exhaustive control both a priori in the purchase
of individual protection equipment, collective protective
measures, related documentation, etc., and during the work
itself, with periodic visits, to check that not only legal
requirements are complied with, but all those measures
considered advisable to maximize the safety of the worker.
The continued training of workers in prevention of accidents
is another of the company's constant measures, to increase
knowledge and awareness of the people involved.
It should be pointed out that the atmosphere transmitted by
the company's management and its constant concern for the
safety of its workers have made it possible for us to reach
safety levels far above the sector average, which satisfies us
and encourages us not to become careless and to continue
working hard to maintain and even to increase our level of
safety.
SALES
VIMAC markets glass insulators:
E-40, E70 and E-100.
Tempered glass dielectric, transparent or very light green,
malleable forged hood with hot dip galvanized coating,
forged steel bolt with hot dip galvanized coating, stainless
steel cap and pin.
A-11 VV and RT-51 VV.
Tempered glass dielectric, malleable forged hood and bolt
with hot dip galvanised coating in accordance with UE
21.114.
• PROTECTION RELAYS
The VIMAC Development Department has just completed the
Protection Management project. It is the first product
completely developed in this department and we hope that it
is just the beginning of VIMAC as a TECHNOLOGY
SOLUTIONS company.
This relay was conceived and developed to protect traction
power substations, but is easily applicable to similar facilities
such as Transformation Centres, and extendable to a
multitude of applications such as domotics.
It monitors the critical elements in a substation, initiating an
entire sequence of safety actions to detect anything that
might not be working properly, with a response time of less
than 4 milliseconds, which reduces the time in which human
and material losses could occur due to malfunctioning of the
substation.
19
vimac
CENTRAL: DIR. REG. SUR
DIR. REG. CENTRO
DIR. REG. NORTE
Núcleo GRUPO VIMAC
Ctra. Nac.IV Madrid-Sevilla P.K. 531
41309 La Rinconada (SEVILLA)
Tlf.: 95 499 93 33
Fax: 95 499 92 14
Fax: 95 499 93 30
e-mail: vimac@vimac.es
http://www.vimac.es
C/ Rosario Pino 18, Planta 3ª. Oficina 3
28020 MADRID
Tlf.: 91 745 13 67
Fax: 91 564 96 88
C/ Sardenya, 397-399 2º 4 A
08025-BARCELONA
Tlf.: 93 208 15 82
Fax: 93 459 46 89
DEL. ANDALUCIA ORIENTAL
DEL. PAIS VASCO
DIR. REG. LEVANTE
C/ Nécora. nº 5, 4a
18003 GRANADA
Tfn: 958 270 916
Fax: 958 270 958
C/ Pablo Gorosabel 1, 1º Dcha
20400 TOLOSA
Tlf.: 943 670 185 / 619 077 849
Fax: 943 670 185
Centro de Negocio Trade Center
C/ Profesor Beltrán Báguena nº 4, local 415.
46009. VALENCIA
Tlf.: 96 347 44 16
Fax: 96 347 44 21