SHERIDAN PLAY SYSTEM
Transcription
SHERIDAN PLAY SYSTEM
S H E R I D A N P L AY S Y S T E M A S S E M B L Y I N S T R U C T I O N S F23150 12-16-08 23' 10' Play System dimension with 35 ft l x 22 ft w safety allowance: 35’ x 22’ SET UP DIMENSIONS WITH SAFETY ALLOWANCE: 10 - 14 Hrs Prior to assembly, you MUST read the Owner’s Manual for important safety warnings and details on installing a shock absorbing surface. This unit’s maximum fall height is 7.5 feet and is intended for a maximum of 10 users, ages 3 to 10 (110 lbs. per child). Please call toll free: 1 - 8 7 7 - WO O D S E T ( 9 6 6 - 3 7 3 8 ) For questions, assembly help or assistance with missing or defective parts. Solowave Design 375 Sligo Rd. West • PO Box 10 • N0G 2L1 • Mount Forest, Ontario • Canada General Inquiries: 8:00am - 4:30pm EST Toll Free: 1-877-966-3738 • Email: support@solowavedesign.com 3403150 Important Information: Please ensure page is read. ABOUT OUR WOOD Solowave Design™ uses only Premium playground lumber, ensuring the safest product for your children’s use. Although great care has been taken in selecting the best quality lumber available, wood is a product of nature and susceptible to weathering (changes in the aesthetics of the wood). A light sanding may be required to remove minor splinters. For your information, we have described some changes that may occur as a result of weathering: 1. Checking Checks are surface cracks in the wood along the grain. 4” x 4” material will experience more checking than 2”, 1-1/4” or 1” material be cause the surface and interior moisture content will vary more widely than in thinner wood. 2. Warping Warping refers to any distortion (twisting, cupping) from the true plane that may take place during weathering. 3. Fading Wood exposed to sunlight, will over time, turn a grey color. Note: The above changes will not affect the strength of the product. What causes weathering? One of the main reasons for weathering is the effects of water (moisture); the moisture content of the wood at the surface is different than the interior of the wood. As the moisture moves in or out of the wood (result of climate changes), the different moisture content causes tension in the wood, which can result in checking and or warping. Due to changes in the climate moisture moves in and out of the wood Moisture content will vary throughout any piece of wood. How can I reduce the amount of weathering to my Play System? At the factory we have added water repellent to the stain. This water repellent decreases the amount of water absorption during rain or snow thus decreasing the tension in the wood. Sunlight will break down the water repellent, so we recommend applying a water repellent on a yearly basis (see your local stain and paint supplier for a recommended product). Also if storing the product before installation, make sure you store out of direct sunlight in a cool dry place. Will weathering affect the strength of my Play System? Most weathering is just the normal result of nature and will not affect safe play and enjoyment for your child. However if you are concerned that a part has experienced a severe weathering problem please call our consumer relations department for further assistance. 2 All rights reserved. © Solowave Design. Important Information: Please ensure page is read. HELPFUL HINTS Tools Required Shovel Measuring Tape Drill (1/8” 3/16” Bit) Safety Glasses Hammer Ratchet 1/2”, 7/16” & 9/16” Level #2 & #3 Phillips or Robertson Square Ruler Step Ladder Swing Hangers Tee - Nuts & Lock washers Swing hangers must be screwed into the wood the full length of the shaft, so that the triangular head is touching the wood (see swing hanger diagram). Failure to correctly install swing hangers may result in the hanger itself breaking, or the hanger becoming dislodged from the wood. Either circumstance can cause serious injury. Big Backyard cannot assume any responsibility for incorrect installation of swing hangers. (Liquid soap may be used as a lubricant for ease of installation). Place tee-nut in hole and tap into place with hammer. Insert the hex bolt through, first the lock washer and then the flat washer, and feed through hole. Hand tighten to ensure bolt and tee-nut connection (this may not be possible due to coating on hardware, if not use a ratchet), and then proceed with ratchet. DO NOT over tighten. Hardware should not crush wood. NOTE: A 1/4” lock washer and flat washer, are used with 1/4” hex bolt or 5/16” with 5/16”. NOTE: Follow proper assembly procedure. Swing Beam Hex Bolt Tee-Nut Swing Beam Swing Hanger orientation for swing attachment. Lock Washer Screw Hanger in until it is snug and flush with bottom of Swing Beam. Swing Hanger Swing Hanger Warning: For your child’s safety orientate the swing hangers as shown to ensure your swing will have the proper swinging motion when installed. Failure to do so could result in the premature breaking off of the swing hanger or swing chain. Hardware When making the selection of 1/4” and 5/16” hardware, carefully read the instructions in each step of this manual to ensure the proper hardware is used. NOTE: 5/16” Hardware is larger in diameter than 1/4”. The Swing Triangle Plate has a total of 5 holes, and they are all used depending on where you are installing it. When installing the plates, pay close attention to the holes required. When complete, the swing end should be angled out (away from fort) approx. 110˚ Flat Washer Wood Dowel Installation 1. Insert Dowel into provided holes until the shoulder of tenon is flush to the face of the Swing Rail or Access Rail or Ladder Post. 2. Pre-drill a 3 x 1/8” hole through Rail or Post prior to securing with wood screw. Securing with screw prior to pre-drilling may lead to cracking and must be avoided. 3. Secure dowel in place with approprate wood screws and instructed within manual. NOTE: In the event that the thread of a Hex Bolt is exposed beyond the tee-nut, please disassemble, add another flat washer to head of hex bolt and reassemble. © Solowave Design. All rights reserved. 1/8” Drill Bit Shoulder Dowel Tenon Rail Part Identification (Reduced Size) (2) LONG POST (2 x 4 x 92½") A1 3660895 Box 2 (2) SHORT POST (2 x 4 x 87¼") A2 3660896 Box 2 (1) GROUND SL SIDE (1 x 6 x 41½") A3 3660870 Box 3 (1) SL FLOOR (2 x 4 x 41½") A5 3660834 Box 3 (2) LOWER DIAGONAL (2 x 3 x 37") A6 3660369 Box 3 (4) LOWER POST (2 x 4 x 56") A7 3660754 Box 2 (1) SL TOP (2 x 4 x 41½") A8 3660925 Box 4 (2) GUSSET (5/4 x 4 x 18½") B6 3660403 Box 3 (1) LOWER SW SIDE (1 x 6 x 77¼") B1 3660497 Box 3 (1) SW FLOOR (5/4 x 6 x 41½") B2 3660437 Box 2 (1) SW TOP (5/4 x 6 x 41½") B3 3660436 Box 2 (1) WALL MOUNT (2 x 4 x 32¾") B4 3660459 Box 2 (2) GUSSET (2 x 4 x 23½") B5 3660912 Box 4 (2) CE GAP BOARD (1 x 6 x 38¾") E2 3610840 Box 2 (1) BACK WALL BOTTOM (5/4 x 4 x 46¾") E3 3660838 Box 2 (21) CE GAP BOARD (1 x 4 x 38¾") E4 3610839 Box 2 (1) TOP BACK (1 x 6 x 45¾") E5 3660847 Box 4 (2) FLOOR FRONT AND BACK (2 x 4 x 83 3/8") C1 3660833 Box 3 (1) FRONT GROUND (1 x 6 x 82½") C2 3660876 Box 2 (2) CENTRE SUPPORT (2 x 4 x 46") C3 3660867 Box 2 (1) TOP FRONT (5/4 x 4 x 40½") C4 (4) CE WALL BOARDS (1 x 6 x 23½") Stained W1 3660845 Box 2 (1) TABLE UPRIGHT (2 x 3 x 58") C5 3660858 Box 2 (1) GROUND FRONT AND BACK (1 x 6 x 82½") D1 3660804 Box 3 (1) MIDDLE BACK (5/4 x 6 x 83") D2 3660846 Box 3 (1) FLOOR JOIST ( 5/4 x 4 x 83½") E1 3660817 Box 3 4 3620702 Box 3 Part Identification (Reduced Part Size) (1) BACK ROOF SUPPORT (5/4 x 4 x 41¾") F1 (2) ROOF BLOCK (2 x 4 x 9½") F3 3660843 Box 4 (2) FRONT ROOF SUPPORT (1 x 6 x 41¾") F2 3660842 (2) SL SIDE (2 x 3 x 28¾") F4 Box 3 3620851 F5 Box 3 3620850 F6 Box 4 3620705 F7 Box 3 3620872 F8 Box 2 3620856 M4 Box 2 (1) WINDOW TOP (1 x 6 x 38¾") M2 3660923 3620839 M5 M6 Box 2 P3 3660498 Box 2 3660499 P4 3620866 Box 4 (4) CE ROOF SUPPORT (2 x 3 x 43½") 3620863 Box 3 R3 3620864 Box 3 U1 U2 3660911 R8 R9 Box 4 Box 4 Box 4 3620861 Box 4 U4 3620914 Box 4 (1) CAFE RIDGE (2 x 2 x 10¾") Box 4 3660924 3620922 (1) CAFE GABLE (1 x 4 x 11") Box 4 (2) CAFE SIDE (5/4 x 3 x 12½") 3620921 Box 4 (2) CE ROOF BOARD C (1 x 4 x 22") (2) CAFE SUPPORT (2 x 2 x 23¼") U3 3620920 Box 4 Box 1 (2) CE ROOF BOARD (1 x 4 x 27½") (1) CAFE CROSS BRACE (2 x 2 x 32¼") 3660917 R6 R7 (2) ROOF SIDE (2 x 6 x 54½") 3620857 3620522 (2) CE ROOF BOARD 33 (1 x 4 x 33") (2) ROOF JOIST (2 x 2 x 42¼") R4 R5 (1) CE ROOF BOARD 36 (1 x 4 x 36") 3625155 Box 3 R2 3681858 Box 1 (2) WINDOW DORMER CLEAT (5/4 x 2 x 8") (26) CEDAR ROOFING (3/8 x 3½" x 47½") R1 3660822 Box 2 (4) TENON DOWEL (1-1/8" x 18-5/8") Box 2 (2) CE ROOF TRIM (5/4 x 4 x 23") O1 3660865 Box 4 (1) LADDER BOTTOM (5/4 x 4 x 20") (1) RIGHT ACCESS (2 x 4 x 69") P2 3620916 Box 4 (2) ROOF GAP (1 x 4 x 45-5/8") (1) LEFT ACCESS (2 x 4 x 69") P1 3620496 Box 4 (2) WINDOW FRAME (1 x 2 x 21") Box 4 (1) CE GAP BOARD (1 x 4 x 38¾") Stained M3 3660836 Box 2 (6) CE SIDING (3/8 x 3½ x 38¾") (1) CE WINDOW BRACE (1 x 4 x 41¾") M1 3660837 Box 2 (1) WALL BRACE (2 x 3 x 6½") (2) CE ACCESS WALL (1 x 4 x 41¾") L1 3660875 Box 4 (1) WALL BRACE (5/4 x 4 x 8¾") (5) CEDAR WALL (1 x 4 x 23½") G3 3620918 Box 4 (3) BACK WALL BRACE (2 x 3 x 5¾") (5) CE WALL BOARD (1 x 4 x 17") G2 3660919 Box 4 (2) SL WALL (1 x 6 x 30") (2) CE WALL BOARD (1 x 5 x 41") G1 3660438 Box 2 U5 3660915 Box 4 (1) CAFE GUSSET (2 x 3 x 12") (2) CAFE ROOF (1 x 4 x 9½") U6 3660927 Box 4 5 U7 3620926 Box 4 Parts Identification (Reduced size) (2) CE WALL BOARDS (1 x 6 x 23½") (2) ROCK RAIL (5/4 x 4 x 71") Q1 Q4 3610702 Box 3 3660812 Box 3 SIDE (2 x 2 x 69") (5) ROCK BOARD A (1 x 6 x 23½") (2) ROCK 3660816 Box 3 Q2 Q5 3610737 Box 3 (7) GROUND STAKE (2 x 2 x 14") 3650318 Box 4 (1) SL BLOCK (2 x 4 x 12½") Y1 (6) ROCK BOARD B (1 x 6 x 23½") Q3 Y2 3610738 Box 3 (1) TABLE TOP (5/4 x 6 x 33¾") (1) TABLE SUPPORT (2 x 2 x 39") V1 3660913 Box 4 V2 3660871 Box 3 3660735 Box 2 X5 (2) SW BEAM (2 x 6 x 94½") X1 (1) SW RAIL BLOCK (2 x 4 x 5-3/8") 3664919 Box 2 3664926 Box 4 (2) SW POST (2 x 4 x 92½") X2 3664922 Box 2 (1) SW SUPPORT (5/4 x 4 x 48½") (1) SW UPRIGHT (2 x 4 x 50½") X3 X4 3664920 Box 2 3664921 Box 2 Hardware Identification (Actual Size) (9) Hex Bolt 1/4 x 2¾" (9277223) H9 1/4" Lock Washer - 1/4" Flat Washer - 1/4" T-Nut (2) Bushing Spacer (9300510) H0 (4) Hex Bolt 1/4 x 1" (9277210) 1/4" Lock Washer - 1/4" Flat Washer - 1/4" T-Nut P2 P3 (1) Pan Bolt 1/4-20 x 1-5/8" (9274216) 1/4" Ny-lok Nut (30) Pan Bolt 1/4-20 x 3/4" (9274203) 1/4" Ny-lok Nut (11) Hole Plugs (9329900) C2 (2) Carriage Bolt 1/4 x 2" (9279220) 1/4" Flat Washer - 1/4" Ny-lok -Nut C1 (1) TNR Slide Support Mount (9201101) (1) Corner Brace pkg of 2 with hardware (9201100) (8) Carriage Bolt 1/4 x 1½" (9279212) 1/4" Flat Washer - 1/4" Ny-lok -Nut 6 Hardware Identification (Actual Size) H1 (8) Hex Bolt 1/4 x 2-1/2" (9277222) 1/4" Lock Washer - 1/4" Flat Washer - 1/4" T-Nut H2 (2) Hex Bolt 1/4 x 2" (9277220) 1/4" Lock Washer - 1/4" Flat Washer - 1/4" T-Nut H3 (8) Hex Bolt 1/4 x3-1/2" (9277232) 1/4" Lock Washer - 1/4" Flat Washer - 1/4" T-Nut H4 (10) Hex Bolt 1/4 x 4" (9277240) 1/4" Lock Washer - 1/4" Flat Washer - 1/4" T-Nut H5 (6) Hex Bolt 1/4 x 4-1/2" (9277242) 1/4" Lock Washer - 1/4" Flat Washer - 1/4" T-Nut H6 (6) Hex Bolt 1/4 x 4¾" (9277243) 1/4" Lock Washer - 1/4" Flat Washer - 1/4" T-Nut H7 (4) Hex Bolt 1/4 x 5-1/2" (9277252) 1/4" Lock Washer - 1/4" Flat Washer - 1/4" T-Nut H8 (1) Hex Bolt 1/4 x 4-1/4" (9277241) 1/4" Lock Washer - 1/4" Flat Washer - 1/4" T-Nut (4) Hex Bolt 5/16 x 1-1/2" (9277312) G1 5/16" Lock Washer - 5/16" Flat Washer - 5/16" T-Nut G2 5/16" Lock Washer - 5/16" Flat Washer - 5/16" T-Nut (4) Hex Bolt 5/16 x 1" (9277310) G4 (2) Hex Bolt 5/16 x 4" (9277340) 5/16" Lock Washer - 5/16" Flat Washer - 5/16" T-Nut G5 (7) Hex Bolt 5/16 x 4-1/2" (9277342) 5/16" Lock Washer - 5/16" Flat Washer - 5/16" T-Nut 7 Hardware Identification (Actual Size) Z (2) Hex Bolt 5/16 x 6" Zinc (2) 5/16" Flat Washer 5/16" Nylok Nut (9277360) L1 (2) Hex Bolt 5/16 x 2" (8) 5/16" Lock Nut (9283300) (9277320) (2) 5/16" Flat Washer - 5/16" Ny-lok-Nut (41) Ny-Lok Nut (9283200) ⅜ (4) Lag Screw 3/8 x 3" (9262830) 3/8" Flat Washer LAG 3" (17) 5/16" T-Nut (9285300) (10) Lag Screw 1/4 x 3" (9262230) 1/4" Flat Washer (58) 1/4" T-Nut (9285200) LAG 2½" (4) Lag Screw 1/4 x 2-1/2" (9222222) 1/4" Flat Washer LAG 1½" (33) 5/16" Flat Washer (9251300) (14) Lag Screw 1/4 x 1-1/2" (9222212) 1/4" Flat Washer (92) 1/4" Flat Washer (9251200) S1 (29) Flat Head Screw #8 x 1-1/8" (9260514) S2 (17) 5/16" Lock Washer (9253300) (329) Flat Head Screw #8 x 1-1/2" (9260512) S3 (63) Flat Head Screw #8 x 2-1/2 (9260522) S4 (31) Flat Head Screw #8 x 3" (9260530) (2) Dormer Bracket with truss screws (58) 1/4" Lock Washer (9201510) (9253200) (52) #8 Flat Washer (9251500) S5 (52) Pan Screw #8 x 1/2" (9264502) (8) 1/4" Narrow Flat Washer (9291200) S6 (8) #12 X 1" Pan Screw (9264610) (4) 3/8" Flat Washer (9251800) S7 (32) Pan Screw #12 x 2" (9264620) T1 (1) Swing Hangers (9201940) Pkg of 4 (96) #8 x 7/8 Truss Head Screw (9229505) 8 Part Identification (Actual Size) (3) TNR Slide Clamp Ring Section (Set of 3) 3300100 with hardware included (2) TNR Slide Straight Half (1) TNR Slide Left Flange 3310301 3310303 (1) TNR Slide Right Flange 3310302 (3) TNR Slide Port Hole 3320193 (2) TNR Slide Elbow Half 3310304 (1) TNR Slide Exit 3310305 (1) Clamp Ring Filler 3300400 (1) Stool Seat Set (3320190) Package of 2 (1) Sheridan Tarp Set (1) Cafe Panel (9750811) (1) Porch Canopy (9750825) (1) Triangle Plate (3200184) Package of 4 (1) Small Window Dormer (3320597) Package of 2 (1) Window Mesh (9750817) (1) Patio Frame R (2) Patio Frame P (2) Patio Frame L (1) Cafe Roof Canopy (9750825) (1) Patio Frame U (1) Glider Hanger (3200202) Package of 2 (1) Plaque w/ screws (3320351) (1) Frame B (2) Patio Frame Z (2) Flower Box (3320401) (1) Hand Grip (3320240) Package of 2 (1) Rocks w/ hardware (3320211) Package of 11 (2) Window Dormer Roof Right (3620520) (2) Long Belt Swing (3724931) (2) Glider End (3320172) (1) Glider Seat (3320273) 9 (2) Window Dormer Roof Left (3620521) (1) Glider Rope & Chain (3533856) Pack of 4 HAVE YOU SORTED, IDENTIFIED, AND COUNTED ALL YOUR HARDWARE, WOOD PIECES AND ACCESSORIES? THIS WILL ASSIST YOU IN YOUR ASSEMBLY. WHEN THE PARTS IDENTIFICATION IS COMPLETED, YOU ARE READY TO START ASSEMBLY. IF YOU NEED ASSISTANCE CONTACT THE CONSUMER RELATIONS DEPARTMENT AT 1-877-966-3738 or support@solowavedesign.com 10 Symbol Reference Below is a sample of the part counts that can be found on each page. 2X A1 Post 2 x 4 x 83" Part Description, Part Size Key Number Quantity This symbol denotes that it is time to tighten bolts, but not too tight! Do not crush wood! This symbol denotes that 2 people are required to safely complete the step. When you see this symbol, make sure to get help! This symbol denotes that the assembly should be squared before tightening bolts. Hex Bolt Lock Washer Bolt Assembly Flat Washer T-Nut (Hammer into place) Do not crush wood! Lag Screw Flat Washer Lag Assembly Before mounting Lag Screws, use factory drilled holes as guides to drill 1/8" pilot holes. 11 Step 1 Swing Beam Assembly Wood Parts 2X 2X 1X 1X X1 X2 X3 X4 SW Beam 2 x 6 x 94½" SW Post 2 x 4 x 92½" SW Upright 2 x 4 x 50½" SW Support 5/4 x 4 x 48½" Hardware Attach Triangle Plates to (X1) SW Beams using (G1) Bolts as shown. Holes marked with X will not be used. Attach (X2) SW Posts to (X3) SW Upright using (G4) Bolts. Next, using (G5) Bolts attach (X4) SW Support to (X3) SW Upright and (X2) SW Posts. Note: Use (H7) Bolts on the ends of the beams to prevent checking and splitting of wood. 4X H7 1/4 x 5½" Bolt 4X G1 5/16 x 1½" Bolt 2X G4 5/16 x 4" Bolt T-Nuts MUST be on top of SW Beam with bolt heads at bottom 3X G5 5/16 x 4½" Bolt 4X Top Triangle Plates x H7 Tighten Bolts x x x Bottom G1 H7 X1 G1 Bottom Top Swing End Side With overhang G1 G1 Fort End No overhang Top Bottom H7 X1 H7 Bottom Notice: Perforated line depicts label on other side facing out. x x x x Top T-Nuts MUST be on top of SW Beam with bolt heads at bottom X2 X4 G5 X2 G4 12 X3 Step 2 Attach Swing End to Swing Beam Wood Parts 1X X5 SW Rail Block 2 x 4 x 5⅜" Hardware 1X G5 5/16 x 4½" Bolt Attach (X5) SW Rail Block between the SW Beam Assemblies using (H8) Bolt. Then, attach SW End Assembly to the SW Beam Assembly Connect to side with overhang using (G5) and (L1) Bolts. Make sure the Swing End flares out at an angle! 1X L1 5/16 x 2" Bolt Fort End NO OVERHANG 1X H8 1/4 x 4¼" Bolt H8 X5 Swing Beam Assemblies G5 L1 Swing End Side Side with OVERHANG Swing End Assembly Make sure Swing End Flares out 105° 105 13 Step 3 Attach Swing and Glider Hangers Hardware Parts List 4X Swing Hangers 2X Glider Hangers 1X Plaque with Screws 4X 3/8 3/8 x 3" Lag 4X 3/8" Flat Washer Attach Glider Hangers with 3/8" Lags. Attach Swing Hangers to (X1) SW Beam. Attach plaque with screws provided, in centre of swing assembly. ! Warning! For your safety, Glider Hangers must be tight and secured to the SW Beam. 3/8 Stagger Swing Hangers Swing Hanger orientation for swing attachment. Screw in until flush with SW Beam (Use liquid soap to ease installation) REFER TO HELPFUL HINTS PAGE AT FRONT OF THIS MANUAL. Step 4 Assemble Glider Hardware Glider Parts 2X Z 5/16 x 6" Bolt 12X 5/16" Flat Washer 6X 5/16" Ny-lok Nuts 4X Glider Rope and Chain Assembly 2X Glider Ends 1X Glider Seat Assemble Glider End to Seat, and repeat for other side. Attach Rope and Chain Assembly to Glider Ends. Glider Rope and Chain Assembly 5/16" (zinc) Flat Washer 5/16" Ny-Lok Nut Warning! Bolt must not exceed 1/2 thread past the Nut. ! Nut Nut Bolt Glider End x Bolt Protrudes Z Bolt Glider Seat Bolt is Flush 14 Step 5 Post Assembly Wood Parts Hardware 2X A1 Long Post (2 x 4 x 92½") 2X A2 Short Post (2 x 4 x 87¼") 4X A7 Lower Post (2 x 4 x 56") 28X S3 #8 x 2½" Screw Attach (A7) Lower Post to (A1) Long Post and (A2) Short Post using (S3) Screws. A2 S3 A7 A1 A7 S3 Step 6 Slide Wall Assembly Wood Parts 1X A3 Ground Sl Side (1 x 6 x 41½") 1X A5 Sl Floor (2 x 4 x 41½") 1X A8 SL Top (2 x 4 x 41½") Square Tighten Assembly Then Bolts Hardware 4X H4 1/4 x 4" Bolt 2X H6 1/4 x 4¾" Bolt 2X LAG 3" 1/4 x 3" Lag Attach (A3) Ground Sl Side to both Long Post assemblies using (H4) Bolts. Attach (A5) SL Floor to both (A1) Long Post assemblies using (H6) Bolts. Square assembly. Drill 3/16" pilot holes using pre-drilled holes as a guide. Measure up 29-1/2" from (A5) top edge to locate (A8) bottom edge and attach using Lag 3". H6 H4 A3 A7 29½" A5 LAG 3" Square assembly before drilling 3/16" holes for Lags! 15 Notice: Hole orientation of pilot holes prior to attaching. A8 Step 7 Swing Wall Assembly Wood Parts Hardware 1X B1 Lower SW Side (1 x 6 x 77¼") 1X B2 SW Floor (5/4 x 6 x 41½") 1X B3 SW Top (5/4 x 6 x 41½") 4X H4 1/4 x 4" Bolt 6X H5 1/4 x 4½" Bolt 1X 5/16" T-Nut Attach (B1) Lower SW Side using (H4) Bolts and (B2) SW Floor, (B3) SW Top using (H5) Bolts to (A2) Short Post Assembly. Attach a 5/16" T-Nut to (B2) SW Floor. Do not tighten Bolts! H5 B3 H5 H4 A2 H5 B2 H4 H5 5/16" T-Nut B1 Notice: Pilot holes are above bolt hole A2 Step 8 Attach Gussets and Diagonals Wood Parts Hardware 2X A6 Lower Diagonal (2 x 3 x 37") 2X H2 1/4 x 2" Bolt 2X B6 Gusset (5/4 x 4 x 18½") 8X LAG 1/4 x 3" Lag 3" Square assembly. Drill with 3/16" pilot holes for Lags using pre-drilled holes as a guide, then fasten Lags. Attach both (A6) Lower Diagonals to (B1) Lower SW Side with (H2) Bolts and to (A2) Short Post using 3" Lag. Attach (B6) Gusset to (A2) Short Post Assembly and to (B2) SW Floor with 3" Lags. Fasten (B2) SW Floor to (A2) Short Post Assembly with 3" Lags. B6 H2 A6 LAG 3" LAG 3" A2 LAG 3" LAG 3" B1 A6 Square assembly before drilling 3/16" holes for Lags! H2 16 LAG 3" A2 B6 B2 Square Tighten Assembly Then Bolts Step 9 Front Wall Assembly Wood Parts 1X 1X 1X 1X 1X C1 Floor Front and Back (2 x 4 x 83-3/8") C2 Front Ground (1 x 6 x 82½") C3 Centre Support (2 x 4 x 46") C4 Top Front (5/4 x 4 x 40½") C5 Table Upright (2 x 3 x 58") Hardware 2X H1 1/4 x 2½" Bolt 4X H3 1/4 x 3½" Bolt Attach (C1) Floor Front and Back to fort posts using (H9) Bolts. Attach (C2) Front Ground to fort posts using (H3) Bolts. Attach (C5) Table Upright to (C2) using (S2) Screws and to (C1) Floor Front and Back using (H9) Bolts. Attach (C3) Centre Support to (C1) Floor Front and Back using (H9) Bolts. Attach (C4) Top Front to (C3) Centre Support and (A2) Short Post using (H1) Bolts. 5X H9 1/4 x 2¾" Bolt 2X S2 #8 x 1½" Screw H9 C4 H1 C3 H9 H9 C1 H1 H3 C5 S2 C2 H3 17 Use Help Square Tighten Assembly Then Bolts Step 10 Back Wall Assembly 1X 1X 1X 1X 2X Wood Parts D1 Ground Front and Back (1 x 6 x 82½") C1 Floor Front and Back (2 x 4 x 83-3/8") D2 Middle Back (5/4 x 6 x 83") C3 Centre Support (2 x 4 x 46") B5 Gusset (2 x 4 x 23½") Hardware 6X H1 1/4 x 2½" Bolt 4X H3 1/4 x 3½" Bolt Attach (C1) Floor Front and Back to fort posts using (H9) Bolts. Attach (D1) Ground Front and Back to fort posts using (H3) Bolts. Attach (D2) Middle Back to fort posts and (C3) Centre Support using (H1) Bolts. Attach (C3) Centre Support to (C1) Floor Front and Back using (H9) Bolts. Square assembly. Drill 3/16" pilot holes for Lags using the pre-drilled holes as a guide, then fasten Lags. Attach (B5) Gusset to (C1) Floor Front and Back and (A1) Post using 2½" Lags. 4X H9 1/4 x 2¾" Bolt 4X LAG 2½ 1/4 x 2½" Lag H1 C3 H1 D2 H9 Notice: Hole location H1 LAG 2½" H9 H9 C1 Notice: T-Nut is on this side. Bolt is on other side LAG 2½" B5 A1 H3 Use Help Square Tighten Assembly Then Bolts D1 H3 18 Step 11 Floor Assembly Wood Parts 1X E1 Floor Joist (5/4 x 4 x 83½") 2X E2 CE Gap Board (1 x 6 x 38¾") 1X E3 Back Wall Bottom (5/4 x 4 x 46¾") Hardware 10X S2 #8 x 1½" Screw 4X S4 #8 x 3" Screw Attach (E3) Back Wall Bottom to (A2) Short Post and (C3) Centre Support using (S7) Screws, and flush to top edge of (C1) Floor Front and Back. Attach (E1) Floor Joist to (B2) SW Floor and (A5) SL Floor using (S4) Screws. Attach (E2) CE Gap Board to both (C1) Floor Front and Backs and (E1) Floor Joist using (S2) Screws. 4X S7 #12 x 2" Screw NOTE: Keep (E2) CE Gap Board tight to (B2) SW Floor when attaching. E2 S2 x5 S4 x2 E1 S2 x5 A5 E2 S4 x2 B2 E3 S7 x2 C1 S7 x2 Notice: E3 flush to C1 top edge Use Help 19 Square Tighten Assembly Then Bolts Step 12 Attach Floor Boards Wood Parts Attach (E4) CE Gap Boards to both (C1) Floor Front and Backs and (E1) Floor Joist using (S2) Screws. Note: Prior to attaching, evenly space CE Gap Boards leaving 1/8"- 3/16" space between boards. Do not exceed 3/16" space. 21X E4 CE Gap Board (1 x 4 x 38¾") Hardware 105X S2 #8 x 1½" Screw S2 S2 C1 E4 x21 Step 13 Roof Support Assembly Wood Parts 1X E5 Top Back (1 x 6 x 45¾") 1X F1 Back Roof Support (5/4 x 4 x 41¾") 2X F2 Front Roof Support (1 x 6 x 41¾") 2X F3 Roof Block (2 x 4 x 9½") Hardware 22X S2 #8 x 1½" Screw Attach (F1) Back Roof Support to (A1) Long Post and (F3) Roof Block using (S7) Screws. Attach (E5) Top Back to (C3) Centre Support and (F3) Roof Block using (S2) Screws. Attach one (F2) Front Roof Support to (A1) Long Post and (F3) Roof Block and the other (F2) Front Roof Support to (C3) Centre Support using (S2) Screws. C3 9X S7 #12 x 2" Pan Screw E5 F3 F2 S2 F3 F1 C3 Notice: SL Top was removed for clarity. S2 S7 x9 S2 x18 F2 A1 A1 20 Step 14 Slide Wall Assembly Wood Parts 2X 2X 2X 1X 1X F4 SL Side (2 x 3 x 28¾") F5 SL Wall (1 x 6 x 30") F6 Back Wall Brace (2 x 3 x 5¾") F7 Wall Brace (5/4 x 4 x 8¾") R4 Roof Side (2 x 6 x 54½") Hardware 2X H6 1/4 x 4¾" Bolt Attach (R4) Roof Side to both (F3) Roof Blocks using (H6) Bolts. Attach two (F6) Back Wall Braces to (A1) Long Posts using (S4) Screws. Attach (F7) Wall Brace to (A1) Long Post using (S4) Screws. Attach (F5) SL Wall to (A8) SL Top and (F4) SL Side and (F6) Back Wall Brace using (S2) Screws. 14X S2 #8 x 1½" Screw Use Help INSIDE VIEW 6X S4 #8 x 3" Screw A8 F3 24½" R4 H6 F5 A8 H6 F5 F4 F6 S4 F5 F4 A1 F7 S4 A1 S4 F6 24½" Opening for Slide 21 ½" MAX S2 x14 F5 Step 15 Middle Wall Assembly Wood Parts Use Help Hardware 1X F6 Back Wall Brace (2 x 3 x 5¾") 1X F8 Wall Brace (2 x 3 x 6½") 2X G1 CE Wall Board (1 x 5 x 41") 1X R4 Roof Side (2 x 6 x 54½") 2X H6 1/4 x 4¾" Bolt Tighten Bolts 8X S2 #8 x 1½" Screw 4X S4 #8 x 3" Screw Attach (R4) Roof Side to both (C3) Centre Supports using (H6) Bolts. Attach (F6) Back Wall Brace and (F8) Wall Brace to both (C3) Centre Supports using (S4) Screws. Attach (G1) CE Wall Board to (R4) Roof Side, (F6) and (F8) Wall Braces using (S2) Screws. INSIDE VIEW Notice: (E5) Top Back was removed for clarity. Do not remove. R4 S2 G1 S2 G1 H6 R4 C3 H6 C3 G1 S2 G1 F6 S4 F8 S4 22 S2 Step 16 Cedar Wall Assembly Wood Parts Hardware 5X G2 CE Wall Board (1 x 4 x 17") 5X G3 Cedar Wall (1 x 4 x 23½") 2X L1 CE Access Wall (1 x 4 x 41¾") 14X S1 #8 x 1-1/8" Screw 36X S2 #8 x 1½" Screw Attach both (L1) CE Access Walls to (E3) Back Wall Bottom, (D2) Middle Back and (F7) Wall Brace using (S2) Screws, and attach to (E5) Top Back using (S1) Screws. Attach (G2) CE Wall Board to (E5) Top Back using (S1) Screws and attach to (D2) Middle Back using (S2) Screws. Attach (G3) Cedar Wall to (E3) Back Wall Bottom and (D2) Middle Back using (S2) Screws. R4 Notice: (R4), (G1) and (B3) were removed for clarity. Do not remove! S1 ! 2" 2" G1 B3 Warning! Spacing of CE Wall Boards should not exceed 2". 2" 2" 2" 2" 2" L1 2" G2 S1 G2 G2 E5 Spacing of ! Warning! Cedar Wall boards should G2 G2 L1 not exceed 3". 3" Max. 3" Max. 3" Max. S2 3" Max. F7 3" Max. 3" Max. D2 G3 E3 G3 G3 G3 S2 G3 23 Step 17 Window Wall Assembly Wood Parts Hardware 1X M1 CE Window Brace (1 x 4 x 41¾") 1X M2 Window Top (1 x 6 x 38¾") 8X 1X M3 CE Gap Board (1 x 4 x 38¾")stained 2X 6X M4 CE Siding (3/8 x 3½ x 38¾") 6X 1X M6 Roof Gap (1 x 4 x 45-5/8") 6X 1X Window Mesh (20 x 39") 12X 1X Corner Brace with Screws S1 #8 x 1-1/8" Screw Use Help Square Assembly S2 #8 x 1½" Screw S5 #8 x 1/2" Pan Head Screw #8 Flat Washer T1 #8 x 7/8" Truss Head Screw Attach and keep tight Window Mesh to (F2) Front Roof Supports using (S5) Screws with #8 Flat washers. Attach (M2) Window Top to both (F2) Front Roof Support using (S1) Screws. Measure 14" below (M2) and attach (M3) CE Gap Board to (F2) Front Roof Support using (S1) Screws. Attach (M4) CE Siding to (F2) Front Roof Support and (M1) CE Window Brace using (T1) Screws while overlapping boards. Attach (M6) Roof Gap to (C3) Centre Support and (F3) Roof Block using (S2) Screws. Attach one Corner Brace with screws to (M2) Window Top and (M6) Roof Gap. Note: Mesh must be kept as tight as possible. Start Mesh 1" below (M6). Notice: (M1) is on inside and centred in window opening. S2 S2 Corner Brace M6 F3 S2 6" M2 S1 WINDOW MESH S5 6¼" 14" S5 6¼" F2 F2 M1 S1 M3 M4 M4 M4 M4 M4 M4 T1 24 X18 S1 C3 Step 18 Window Assembly Wood Parts Secure (M1) CE Window Brace to (M2) Window Top and (M3) CE Gap Board using (S1) Screws. Attach (M1) CE Window Brace to (E4) CE Gap Board using Corner Brace with hardware. Attach both (M5) Window Frames to (M2) Window Top and (M3) CE Gap Board using (S1) Screws. Attach (M6) Roof Gap to (C3) Centre Support and (F3) Roof Block using (S2) Screws. Attach Window Mesh to (M2) Window Top and (M3) CE Gap Board using (S5) Screws with #8 Flat Washers. 2X M5 Window Frame (1 x 2 x 21") 1X M6 Roof Gap (1 x 4 x 45-5/8") Hardware 7X S1 #8 x 1-1/8" Screw 2X S2 #8 x 1½" Screw 12X S5 #8 x 1/2" Pan Head Screw 12X #8 Flat Washer 1X Corner Brace with Screws Notice: Some wall boards have been S1 removed for clarity. Note: Mesh must be kept tight as possible. M1 M2 M6 M5 S2 M6 C3 M5 S2 F3 S5 X6 M1 A1 M3 M1 S1 S5 X6 F3 E4 M3 Step 19 Swing Wall Assembly Wood Parts Attach (B4) Wall Mount to (B2) SW Floor and (B3) SW Top using (G5) Bolts. Attach (W1) CE Wall Boards to (B2) SW Floor and (B3) SW Top using (S2) Screws. 1X B4 Wall Mount (2 x 4 x 32¾") 4X W1 CE Wall Boards (1 x 6 x 23½") stained Hardware 16X S2 #8 x 1½" Screw 2X G5 5/16 x 4½" Bolt (T-Nut was installed in Step 7) 2-5/8" Max. 2-5/8" Max. ! Warning! Spacing between CE Wall Boards must not exceed 2-5/8". 2-5/8" Max. 2-5/8" Max. B3 S2 X8 W1 W1 Tighten Bolts W1 B2 W1 S2 X8 G5 B4 Notice: Shading has been removed for clarity. 25 Step 20 Roof Frame Assembly Wood Parts Hardware 26X R1 Cedar Roofing (3/8 x 3½ x 47½") 3X S4 #8 x 3" Screw 4X R2 CE Roof Support (2 x 3 x 43½") 78X T1 #8 x 7/8" Truss Head Screw 2X R3 Roof Joist (2 x 2 x 42¼") Square Assembly Use Help Attach (R2) CE Roof Supports together using one (S4) Screws for each set. Attach (R3) Roof Joists together using one (S4) Screw. Attach (R1) Cedar Roofing to (R2) CE Roof Supports and (R3) Roof Joists using (T1) Truss Head Screws, making sure to over-lap boards 13 per side. S4 Notice: Factory drilled hole S4 S4 R2 R3 R2 Notice: Board was removed for clarity. T1 R2 R1 X13 R2 Notice: Over-lapped Cedar Roofing (Rough Side faces out) R2 R1 X13 26 Step 21 Dormer Window Assembly Window Dormer Components Hardware 2X R5 Window Dormer Cleat (5/4 x 2 x 8") 4X S2 #8 x 1½" Screw 2X Window Dormer Roof Left 2X Dormer Bracket with Truss Screws 2X Window Dormer Roof Right Small Window Dormer (pack of 2) with screws 2X Press the sides into the front of the Window Dormer. Attach the Window Dormer Roof Right to the Window Dormer Roof Left using a Dormer Bracket with truss screws. Attach the plastic Window Dormer to the wooden Window Dormer using screws and repeat process for second window. Attach both (R5) Window Dormer Cleats to roof board 4 using (S2) Screws from inside the fort. Attach the completed Window Dormer Assemblies to (R5) Window Dormer Cleats using truss screws. Dormer Bracket Side walls press fit into slots on window front Truss Screw x2 . . Window Dormer Roof Right Truss Screw x6 Truss Screw x2 Window Dormer Roof Left 9 8 R5 Notice: Loosen board 9 for ease of assembly. 7 6 5 8½" 4 3 8½" S2 2 1 R5 27 Step 22 Attach Roof Frame to Fort Hardware 4X S3 #8 x 2½" Screw 4X S4 #8 x 3" Screw Attach each (R2) Roof Support from the Roof Assembly, to both (R4) Roof Sides using (S3) and (S4) Screws. Use Help R2 R4 S3 S4 REPEAT PROCEDURE FOR ALL 4 CORNERS Step 23 Attach CE Roof Boards Wood Parts 1X O1 CE Roof Trim (5/4 X 4 X 23") 1X R6 CE Roof Board 36 (1 X 4 X 36") 2X R7 CE Roof Board 33 (1 X 4 X 33") 2X R8 CE Roof Board (1 X 4 X 27½") 2X R9 CE Roof Board C (1 X 4 X 22") Hardware Use Help 38X S2 #8 x 1½" Screw Attach (R6) CE Roof Board 36 at the centre to (A8) SL Top and (R2) CE Roof Support using (S2) Screws. Attach (R7) CE Roof Board 33, (R8) CE Roof Board, (R9) CE Roof Board C to (R4) Roof Side and (R2) CE Roof Support using (S2) Screws. Attach (O1) CE Roof Trim to (R6) CE Roof Board 36 and (R7) CE Roof Board 33, from the outside of fort, using (S2) Screws. ! S2 X14 Warning! Spacing between CE Roof boards must not exceed 2¼". Note: Both (R9) CE Roof Boards are tight to Posts. OUTSIDE FORT VIEW R2 R9 R8 R7 R6 R7 R8 R9 S2 X21 O1 S2 X3 A8 28 2¼" MAX BETWEEN ALL BOARDS INSIDE FORT VIEW Step 24 Dormer Window Assembly Wood Parts 1X O1 CE Roof Trim (5/4 x 4 x 23") 1X U1 Cafe Cross Brace (2 x 2 x 32¼") 2X U2 Cafe Support (2 x 2 x 23¼") 2X U3 Cafe Side (5/4 x 3 x 12½") 1X U4 Cafe Gable (1 x 4 x 11") 1X U5 Cafe Ridge (2 x 2 x 10¾") 1X U6 Cafe Gusset (2 x 3 x 12") 2X U7 Cafe Roof (1 x 4 x 9½") Hardware 18X S2 #8 x 1½" Screw 5X S3 #8 x 2½" Screw 6X S4 #8 x 3" Screw Attach (U1) Cafe Cross Brace to (U2) Cafe Support using (S2) and (S4) Screws. Attach (U6) Cafe Gusset to (U5) Cafe Ridge using one (S2) and (S3) Screw. Attach (U7) Cafe Roof and (U4) Cafe Gable to (U1) Cafe Cross Brace and (U2) Cafe Support using (S2) Screws. Attach (U3) Cafe Side to (U2) Cafe Support using (S3) Screw. Attach (O1) CE Roof Trim to (U4) Cafe Gable and (U7) Cafe Roof using (S2) Screws. Attach one (U3) Cafe Side to (A1) Long Post and one to (C3) Centre Support using (S4) Screws. Attach (U2) Cafe Supports together using (S4) Screw. Attach (U2) Cafe Support to (U5) Cafe Ridge using (S4) Screw. Use Help U6 ! 3/4" Warning! Spacing between (U7) and (U4) must not exceed 3". S3 Notice: (U4) is centred and keeps (U2) tight together U5 S2 3" 3" U3 U3 U2 U7 U4 U2 U7 O1 S3 S2 5/8" S2 S2 S3 S3 U1 S2 S3 A1 U6 U3 S4 U5 C3 S4 U2 O1 U2 S4 U3 29 S2 Step 25 Attach Dormer Roof to CE Siding Hardware 2X S7 #12x 2" Pan Screw Attach the Dormer Roof Assembly to the fort using (S7) Screws, at CE Siding board 2 and 4. Use Help 6 5 9¾" 4 S7 3 4" 2 1 Step 26 Attach Dormer Canopy Wood Parts 1X Dormer Canopy Hardware 10X S5 #8 x 1/2" Pan Head Screw 10X #8 Flat Washer Attach the Dormer Canopy using (S5) #8 x 1/2" Pan Head Screws with #8 Flat Washers, to (U3) Cafe Side and (U5) Cafe Ridge. S5 U5 Dormer Canopy S5 U3 U3 S5 30 Step 27 Cafe Table/Panel Assembly Wood Parts Hardware 1X V1 Table Support (2 x 2 x 39") 1X V2 Table Top (5/4 x 6 x 33-3/4") Parts 4X S3 #8 x 2½" Screw 1 Cafe Panel 12X S5 #8 x ½" Pan Head Screw 12X #8 Flat Washer 5X S7 #12 x 2" Pan Head Screw Pre-drill with 1/8" drill bit into the (V2) Table Top using the holes in the (V1) Table Support as a guide. Attach (V1) Table Support to (V2) Table Top using (S7) Pan Head Screws. Attach the Cafe Panel/Tarp to (C3) Centre Support, (C2) Front Ground, (A1) Long Post, and (V1) Table Support using (S5) Pan Head Screws with #8 Flat Washers. FRONT VIEW V1 SIDE VIEW V2 S7 1½" Space FRONT VIEW INSIDE FORT VIEW A1 V2 S5 V1 X2 S5 X2 EVENLY SPACE (S5) SCREWS. C2 Loosen screws and hex bolts for ease of assembling the Cafe Panel/Tarp C3 S5 X8 Measure up approximately 19 ½" from the (C2) Front Ground top edge to the (V1) Table Support bottom edge. Using four (S3) Screws, fasten the Table Top Assembly to the fort. S3 X2 V1 S3 X2 19½" C2 31 Step 28 Stool Assembly Using the hardware provided with the Stool Seat, attach (1) Seat to (1) Seat Support, then create another Seat Assembly. Fasten the Cross Brace to the Seat Assemblies, making sure to keep the Cross Brace tight against the Seat Supports. ¼ - 20 x 1" Machine Screw ¼" Flat Washer Parts 2X Stool Seat Set 2X Seats 2X Seat Supports 1X Cross Brace 2X ¼ -20 x 1" Machine Screw 2X ¼" Flat Washer 2X 0.32 Spacer 2X ¼ -20 x 1¼" Machine Screw 2X ¼ -20 Ny-lok Nut ¼- 20" Nylok Nut 0.32 Spacer Seat Support Cross Brace ¼ - 20 x 1¼" Machine Screw Step 29 Attach Stool Assembly to Fort Parts Hardware 1X Stool Assembly Tighten Bolts 4X G2 5/16 x 1" Bolt Attach Stool Assembly to (C2) Front Ground using (G2) Bolts. Do not over-tighten or wood will be crushed! C2 G2 G2 32 Step 30 Attach Swing to Fort Use Help Hardware 1X L1 5/16 x 2" Bolt Square Tighten Assembly then Bolts 1X G5 5/16 x 4½" Bolt MOVE FORT TO FINAL LOCATION LEVEL AND SQUARE. ATTACH SWING ASSEMBLY TO FORT USING HARDWARE BELOW. Do not over-tighten hex bolts ! Warning! or wood will be crushed. NOTICE: A 6FT SAFETY CLEARANCE MUST BE KEPT AROUND THE FORT. SEE FRONT COVER. G5 L1 Step 31 Attach Hand Grips Parts 2X Hand Grips Hardware 4X H0 1/4 x 1" Hex Bolt Attach two hand grips to (L1) CE Access Wall with (H0) Bolts. Hand Grip H0 X4 33 Step 32 Rock Wall Assembly Wood Parts Hardware 2X Q4 Rock Rail (5/4 x 4 x 71") 8X S7 #12 x 2" Pan Head Screw 2X Q5 Rock Side (2 x 2 x 69") Q5 Pre-drill with 1/8" drill bit into (Q4) Rock Rail prior to attaching to the (Q5) Rock Side. Align drill 3/4" from the Rock Side edge. Attach (Q5) Rock Side to (Q4) Rock Rail using (S7) Pan Head Screws. Q5 Q4 Q4 Side View Top View S7 Mount Screws ¾" Step 33 Attach Rock Wall Rock Boards Wood Parts Hardware 1X Q1 CE Wall Boards (1 x 6 x 23½") 5X Q2 Rock Board A (1 x 6 x 23½") 6X Q3 Rock Board B (1 x 6 x 23½") 48X S2 #8 x 1½" Screw Start at bottom with (Q1) CE Wall Board flush to bottom edge of (Q4) Rock Rail. Attach (Q1) CE Wall Board to (Q4) Rock Rail using four (S2) Screws, making sure they are tight to (Q5) Rock Side. Attach (Q3) Rock Board B followed by (Q2) Rock Board A, following sequence to the top using (S2) Screws. Note: Rock Boards must be tight to each other. Q3 Q2 Notice: Start here, making sure the CE Wall Board is flush with the Rock Rail bottom edge Q3 Q2 Q3 Q3 Q2 Q1 34 Q2 Q3 Q2 Q3 S2 X48 Step 34 Attach Rocks Parts 11X Rocks with Hardware Using the hardware in the climbing rock bags, attach (11) Rocks to the (11) Rock Boards. Using (1) #8 x 1" Pan Screw per Rock, screw into the remaining hole in Rock this screw prevents the Rock from spinning. ¼" Barrel Nut (No Prongs) ¼ x 1¼" Pan Bolt ¼" Lock Washer #8 x 1" Pan Screw Step 35 Attach Rock Wall to Fort Wood Parts Hardware 1X Q1 CE Wall Board (1 x 6 x 23½") 4X S2 #8 x 1½" Screw 4X S7 #12 x 2" Pan Head Screw 4X 1/4" Flat Washer Attach Rock Wall to fort using four (S7) Pan Head Screws with 1/4" flat washers, making sure to centre in opening. Attach (Q1) CE Wall Board to top of Rock Wall using (S2) screws. Q1 S7 x4 S2 x4 35 Step 36 Access Ladder Assembly Wood Parts 1X 1X 1X 4X P1 P2 P3 P4 Hardware Left Access (2 x 4 x 69") Right Access (2 x 4 x 69") Ladder Bottom (5/4 x 4 x 20") Tenon Dowel (1-1/8 x 18-5/8") 8X S3 #8 x 2½" Screw 4X S4 #8 x 3" Screw Pre-drill with 1/8" drill bit through (P1) Left and (P2) Right Access and into each dowel. Attach (P1) Left Access and (P2) Right Access to (P4) Tenon Dowel, using (S3) Screws. Attach (P3) Ladder Bottom to Right and Left Access using (S4) Screws. NOTE: Refer to "Dowel installation" on Helpful Hints page near front of this manual. S3 x8 P2 P3 P4 x4 C1 P1 S4 x4 Step 37 Attach Ladder Assembly to Fort Wood Parts 1X Access Ladder Assembly Hardware 2X H4 1/4 x 4" Bolt Tighten Bolts Attach Access Ladder Assembly to (C1) Floor Front Back using (H4) Bolts. Do not over-tighten or wood will be crushed! H4 C1 36 Step 38 Patio Canopy/Tarp Assembly Sheridan Canopy Set 2X 2X 1X 2X 1X 1X 1X Use Help Patio Frame Z (45" long) Patio Frame L (33" long) Patio Frame U (44" long) Patio Frame P (17½" long) Patio Frame B Patio Frame R Patio Canopy with hardware Square Tighten Assembly Then Bolts Hardware 1X S6 #12 x 1" Pan Head Screw R Lay out the Tarp and Patio Frames B, L, R, U, Z into the pockets, & loosely fasten together using (3) #12 x ½" Machine Screws with #12 Nylok Nuts. L L Z L #12 x ½" Machine Screw #12 Nylok Nut U P P U R P #12 Nylok Nut #12 x ½" Machine Screw Z Attach the Patio Frame B of the Tarp Assembly above, to the inside face of (R2) CE Roof Support using 1 (S6) Pan Screw. S6 B NOTE: VIEW FROM INSIDE THE FORT SOME ROOF BOARDS WERE REMOVED FOR CLARITY 37 Step 39 Patio Frame Assembly Use Help Hardware 2X S6 #12 x 1" Pan Head Screw Tighten Square Assembly Then Bolts Tighen together connection 1 in Detail A. Tighten together connection 2 in Detail B for both sides of the Patio Frame Assembly. Detail -A CONNECTION 1: Detail A (Patio Frame Z to Patio Frame B) Z Detail B B #12 Ny-lok Nut R L #12 x ½" Machine Screw U Detail -B P P Using 2 (S6) Pan Screws, fasten the remaining ends of Patio Frame L to (R4) Roof Side, making sure to keep the Patio Frame L level and horizontal while tightening. CONNECTION 2 - Detail B (Patio Frame P to Patio Frames L,U,Z) Z L U #12 x ½" Machine Screw P L R4 S6 38 Step 40 Attach Patio Canopy to Fort Hardware 2X S6 #12 x 1" Pan Head Screw Use help Using the Patio Frame P as a guide, mark out a hole location & pre-drill with a 1/8" drill bit into (C4) Top Front, then pre-drill 1/8" into (D2) Middle Back located at the back of the fort. Using 1 (S6) Pan Screw per side, fasten Patio Frame P to (C4) Top Front then to (D2) Middle Back, making sure that the flat side of the Patio Frame P is against the board. Notice: (D2) Middle Back is shown. (C4) Top Front is for other side. D2 S6 Hardware 8X S5 #8 x 1/2" Pan Screw 8X #8 Flat Washer Using (4) (S5) #8 x ½" Pan Screws (#8 Flat Washers) per side, attach the Patio Canopy to the underside of the (R2) Roof Supports as shown below. Inside Fort View Notice: Some boards were removed for clarity. Do not remove. R2 S5 with #8 Flat Washer 4 per side 39 Step 41 Ground Stake Assembly Wood Parts Hardware 6X Y1 Ground Stake (2 x 2 x 14") 12X S3 #8 x 2½" Screw DIGGING CAN BE DANGEROUS. CHECK FIRST FOR ! WARNING! UNDERGROUND WIRING, CABLES, OR GAS LINES ETC. •DO NOT USE CONCRETE OR OTHER MATERIALS FOR ANCHORING STAKES! •Use a scrap wood piece in between the top of the Ground Stake and the Sledge Hammer to protect the stake from damage. •Stakes are to be secure to the posts and the ground. •Firmly anchor unit to ground before use. •Check for looseness, re-secure and replace if necessary. Drive six (Y1) Ground Stakes into the ground, making sure that the ground is firm underneath the stakes. Attach each (Y1) Ground Stake to the corresponding post as shown below using two (S3) Screws per (Y1) Ground Stake. Some boards were removed for clarity. Do not remove. This stake attaches to the Rock Wall This stake attaches to (X2) SW Post This stake attaches to the Long Post. This stake attaches to the Access Ladder SAMPLE STAKE CONNECTION Note: Play System must have a safety allowance of 6ft all around. Refer to front cover for specification. 23' S3 10' Y1 Ground Stake must be driven a minimum of 10½" into ground before attaching to post. 40 Step 42 Attach Flower Box, Swings, Hole Plugs 2X 2X 1X 11X Parts Flower Box Belt Swings Glider Assembly Hole Plugs Hardware 4X S5 #8 x 1/2" Pan Head Screws Attach both Flower Boxes to (M3) CE Gap Board using (S5) Pan Head Screws. Hang the Belt Swings from the swing hangers using chains at the top to adjust heights accordingly. Attach Glider to the Glider Hangers. Place a Hole Plug where there is a visible hole. See sample hole plug locations below. S5 M3 Sample Hole Plug Location Note: Place Hole Plugs into holes 1 inch or deeper. Place Hole Plugs on both sides where visible. 41 Step 43 Assemble all Slide Sections Parts 1X TNR Slide Left Flange 1X TNR Slide Right Flange 2X TNR Slide Straight Half 3X TNR Port Hole 2X TNR Slide Elbow Half Hardware Use Help 30X P3 1/4-20 x 3/4" Pan Bolt 30X 1/4" Ny-lok Nut NOTE: THOROUGHLY READ ALL TNR ASSEMBLY STEPS Attach all sections together as depicted below. TNR Left Flange TNR Straight Section P3 P3 P3 P3 TNR Right Flange CORRECT Assemble Port Hole with contour facing inward. This will provide a smooth sliding surface on the inside. TNR Port Hole P3 TNR Elbow Section INCORRECT P3 P3 Port Hole contour facing outward. Inside, slide is not smooth! 42 Step 44 Attach Flange to Fort Parts 1X TNR Flange Assembly Hardware 14X 14X LAG 1½" Use Help 1/4-20 x 3/4" Pan Bolt 1/4" Flat Washer Pre-drill using 1/8" drill bit prior to fastening the Flange Assembly to the Fort. Attach Flange Assembly to (A5) SL Floor, (A8) SL Top, and (F4) SL Side using 1½" Lags with 1/4" Flat Washers. LAG 1½" Notice: There are 3 Lags that are hidden from view. A8 LAG 1½" F4 LAG 1½" Notice: Deck Floor is flush to inside of flanges. A5 LAG 1½" Step 45 Helpful Hints for TNR Clamp Ring Installation To make assembly of slide sections easier, pre-assemble all Clamp Rings loosely with 2 bolts. Add third bolt once Clamps are in place over the serrated lips of each section. Follow all alignments to assure proper slide slope and mounting. 5/16" Ny-lok Nut 5/16" Narrow Flat Washer 5/16" x 1¼" Bolt 43 Step 46 Attach Straight to Flange Clamp Ring Parts 1X TNR Clamp Ring (set of 3) 3X 5/16 x 1¼" Bolt 3X 5/16" Ny-lok Nut 6X 5/16" Narrow Flat Washers Hardware Use Help 3X C1 1/4 x 1-1/2" Carriage Bolt (1/4" Narrow Flat Washer, 1/4" Ny-lok Nut) FOLLOW CLAMP RING ASSEMBLY INSET BELOW. Attach Straight Section to Flange using Clamp Ring. Align molded #5 with seam of Flange and seam of Clamp Ring and tighten with Clamp Ring Bolts. Pre-drill 1/4" thru-hole at the bolt hole locations and fasten with (C1) Carriage Bolts. Flange Clamp Ring Straight 5/16" Bolt Seam 5/16" Lock Nut 5/16" Narrow Flat Washer Molded #5 Drill 1/4" thru-hole Location #1 Notice: Straight Assembly was removed for clarity. C1 Drill 1/4" thru-hole Location #2 Drill 1/4" thru-hole Location #3 44 Step 47 Attach Straight to Elbow Clamp Ring Parts 1X 3X 3X 6X Hardware TNR Clamp Ring (set of 3) 5/16 x 1¼" Bolt 5/16" Ny-lok Nut 5/16" Narrow Flat Washer Use Help 3X C1 1/4 x 1-1/2" Carriage Bolt (1/4" Narrow Flat Washer, 1/4" Ny-lok Nut) Attach Straight Section to Elbow using Clamp Ring. Align molded #5 on Straight, with seam of Clamp Ring and approximately 1" from #7 of Elbow; tighten with Clamp Ring Bolts. Pre-drill 1/4" thru-hole at the bolt hole locations and fasten with (C1) Carriage Bolts. Flange 5/16" Narrow Flat Washer 5/16 x 1¼" Bolt 5/16" Ny-lok Nut Molded #5 TNR Clamp Ring 1" Molded #7 Straight Elbow C1 C1 Drill 1/4" thru-hole Location #1 Drill 1/4" thru-hole Location #2 C1 Drill 1/4" thru-hole Location #3 1/4" Ny-lok Nut 1/4" Narrow Flat Washer 1/4 x 1½" Carriage Bolt Notice: Elbow has been removed for clarity. Do not remove. 45 Seam Step 48 Clamp Ring and Exit Assembly Parts Hardware 2X TNR Slide Elbow Half Assembly 1X TNR Clamp Ring (Set of 3) 1X TNR Slide Exit 1X Clamp Ring Filler Use Help 3X 5/16 x 1¼" Bolt 3X 5/16" Ny-lok Nut 6X 5/16" Narrow Flat Washer Insert the Clamp Ring Filler before mounting TNR Clamp Rings. TNR Clamp Ring Filler 1) Assemble TNR Slide Exit and TNR Slide Elbow using TNR Clamp Ring. Align Clamp seam at 1" to molded #7 on the top of TNR Slide Elbow Section. Molded #7 Molded #8 1" TNR Clamp Ring 5/16" T-Nut 5/16" x 1¼" Bolt 5/16" Narrow Flat Washer 2) Before tightening Clamp Ring Bolts, make sure top of Exit Rail is in line with molded #2. Tighten the clamp ring bolts. Pre-drill 1/4" hole through the Elbow and into the Exit. ALIGN TOP OF EXIT RAIL TO MOLDED #2 Molded #2 Pre-drill 1/4" drill- thru hole at location 1 Molded #1 TNR Elbow 2 1 46 Pre-drill hole location 2 is installed in the next step. Step 49 Clamp Ring and Exit Assembly TNR Clamp Ring Parts 2X TNR Slide Elbow Half Assembly 1X TNR Clamp Ring (Set of 3) 1X TNR Slide Exit 1X Clamp Ring Filler Hardware 1x C2 1/4 x 2" Carriage Bolt Use Help 1x 1/4" Narrow Flat Washer 1x 1/4" Lock Nut 1x Bushing Spacer 1) Loosen TNR Clamp Ring and remove Exit from Clamp Ring by lifting it out. Re-tighten Clamp Ring. Attach and tighten (C2) Carriage Bolt to previously drilled hole in Step 48. With Clamp Ring still in place on TNR Elbow, drill 1/4" hole at location 2. Drill second 1/4" thru-hole 1/4" Drill hole Location 2 2) Loosen TNR Clamp Ring and remove from TNR Elbow then assemble to TNR Exit. Tighten TNR Clamp Ring bolts and (C2) Carriage Bolt using previously drilled hole in Step 48. Drill last 1/4" hole in Exit using the holes in the Clamp Ring as a guide. Align previously drilled holes. Drill 1/4" hole through previously drilled hole in Clamp Ring 47 Step 50 Clamp Ring and Exit Assembly Parts 2X C2 1/4 x 2" Carriage Bolt (1/4" Narrow Flat Washer, 1/4" Lock Nut, Bushing Spacer) 1) Loosen clamp ring; re-assemble and re-align Elbow to Exit, tighten Clamp Ring. 2) To safely secure Exit, insert (C2) bolt assembly through previously drilled holes on both side rails and tighten. 3) Drill hole on bottom of Exit for mounting wood support in next step. Bushing Spacer 1/4" Flat Washer C2 1/4" Lock Nut (C2) Bolt Location 2 Drill 1/4" thru- hole. 48 Step 51 Secure Elbow to Exit Hardware 2X C1 1/4 x 1-1/2" Carriage Bolt (1/4" Narrow Flat Washer, 1/4" Ny-lok Nut) Pre-drill 1/4" holes through the TNR Clamp Rings in the locations as shown, and fasten the Elbow to the Exit using 2 (C1) Bolts. C1 Notice: Pre-drilling is required prior to fasten with (C1) Bolts. C1 Step 52 Attach Wood Support Hardware Parts 3X S6 #12 x 1" Pan Head Screw 1X Y2 SL Block (2 x 4 x 12½") 1X TNR Slide Support Mount 1X P2 1/4 x 1-5/8" Pan Bolt 1X 1/4" Lock Nut 2X C1 1/4 x 1-1/2" Carriage Bolt (1/4" Narrow Flat Washer, 1/4" Ny-lok Nut) Using (P2) Pan Bolt, attach slide to Support Mount through previously drilled hole in Clamp Ring. Using (S6) Pan Head Screws, attach (Y2) SL Block to the Support Mount. P2 1/4" Lock Nut S6 S6 Y2 49 TNR Slide Support Mount Use Help Step 53 Attach Stake 1X Y1 Ground Stake (2 x 2 x 14") Use Help 2X S3 #8 x 2½" Screw WARNING! Please refer to Owner's Manual for instruction for Ground Stake installation. CHECK FOR UNDER GROUND WIRING, LINES ETC ! BEFORE PROCEEDING TO DRIVE STAKE. Drive (Y1) Ground Stake into ground. Y2 Attach (Y1) Ground Stake to (Y2) SL Block using (S3) Screws. S3 Ground Stake must be driven a minimumof 10½" into the ground. Y1 ATTENTION *DURING PEAK PLAY SEASON, PERIODICALLY CHECK AND RE-TIGHTEN ALL HEX BOLTS, LAG BOLTS, AND WOOD SCREWS TO ENSURE SAFETY. DO NOT OVER TIGHTEN TO AVOID CRUSHING WOOD. *THOROUGHLY READ INSTRUCTIONS AND THE OWNERS MANUAL BEFORE USING PLAY CENTER. *KEEP INSTRUCTION MANUAL FOR FUTURE REFERENCE. PLEASE FILL THIS OUT BEFORE YOU DISCARD YOUR CARTONS. YOU WILL NEED THIS INFORMATION IF YOU CALL THE CONSUMER RELATIONS DEPARTMENT. PRODUCT NUMBER: DATE STAMP: (BOX No. 1) (BOX No. 2) (BOX No. 3) (BOX No. 4) 50
Similar documents
Brighton S-Box - Step 7-8
For questions, assembly help or assistance with missing or defective parts.
More information